HomeMy WebLinkAboutMemo - Recommendation of AwardCITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO: Johnny Martinez, P.E., City Manager DATE: November 15, 2013 FILE: SUBJECT: Recommendation of Award for NW 1811' Place Road Improvements —D3 B-40314 Mark Spanioli, P.F., Director REFERENCES: 'TB 12-13-064 pital Improvements Program ENCLOSURES: Recommendation Based on the findings below, Capital improvements Program hereby recommends that the Project be awarded to MAGGOLC, .Inc. ("MAGGOLC") who has been determined to be the lowest responsive and responsible Bidder for 11B 12-13-064 — NW 18th Place Road Improvements — D3 - B-40314. Background On Monday, October 7, 2013, Capital Improvements Program. ("CIP") received six (6) bids in response to the solicitation for ITB 12.13-064 — NW 18`h Place Road Improvements — D3 - B-40314 (the "Project") (see attached Bid Security List). Bidders were required to hold a current certified General Contractor license issued by the State of Florida ,O, 1 a Miami -Dade County Certificate of Competency as a General Engineering Contractor. In addition to one of the above -specified licenses, Bidders had to have a minimum of five (5) years experience cinder its current business name in the construction of roadway/horizontal ,projects involving public right-of-way, construction/installation/repair/replacement of drainage system pipes and maintenance of vehicular traffic, where the Bidder self. -performed at least thirty percent (30%) of the physical construction work, supported by references for five (5) projects completed within the past five (5) years. Findings As reflected on the attached Bid Security List, MAGGOLC was the lowest bidder for 1TB 12-13-064 and the local preference ordinance is not applicable since none of the other Bids are within 15% of MAGGOLC's bid. After determining that MAGGOLC is a responsible bidder and meets the minimum requirements to bid on the Project, CIP reviewed and compared the line items in MAGGOLC's bid with the design consultant's construction estimates for said items and, based thereon, determined that 1 MAGGOLC's bid is responsive to !TB 12-13-064. Having determined that MAGGOLC is the lowest responsive and responsible bidder for ITB 12-13-064, CIP recommends that the Project be awarded to MAGGOLC. Contract Execution Accordingly, CIP hereby requests authorization to prepare for execution a contract in the amount of MAGGOLC's total bid of $352,348.79 plus a ten percent (10%0) contingency for a total contract amount not to exceed $387,583.67. Approved: Jo f ny Marti z,�P.T. C1t'Manager cc: Alice Bravo, P.E., Assistant City Manager Mark Spnnioli, P.E., Director, CIF Jeovanny Rodriguez, P.E., Assistant Director, CIP 2 Date: \t-21-l)