Fiscal Year
2013-2014
City of Miami Capital Plan
13-01066-Exhibit-SUB
City of Miami Capital
Improvements and
Transportation Program
OCTOBER 24, 2013
1M.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
INTENTIONALLY BLANK
efie Yalu/re
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
CAPITAL BUDGET MESSAGE
CITY of MIAMI, FLORIDA
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Tomas P. Regalado Johnny Martinez, PE
Mayor Chief Administrator / City Manager
On behalf of our colleagues on the City Commission together with the City Administration, we are pleased
to present the 2013-2014 Capital Improvements Program and Multi -Year Capital Plan — the CIP.
As Miami plans for the future, we continue to utilize a capital planning process that gives City government
an effective, service and result -oriented program to focus on meeting the needs of our citizens, as well as
positioning the City for future growth. This CIP outlines the City's current and proposed capital
improvement program for the upcoming year thru the year 2019. The preservation, management and
utilization of these significant capital resources thru our CIP, both physical and fiscal, are the foundation on
which we build the Miami of today and of the future.
Under the guidance of Miami's elected officials, capital improvements are based on core planning
principles, preservation of assets and customer service needs. The plan demonstrates the City's renewed
commitment to positively impact the lives and well-being of its residents and visitors by improving,
enhancing or expanding the streets on which we travel, the paths on which we walk, the parks where we
play, the arts and social facilities to support our culture, the fire and police facilities that keep us safe, and
the infrastructure that maintains our environment.
The City Administration has set up a team of well -qualified engineers, architects, construction managers,
and financial managers in the Department of Capital Improvements. They administer, manage and
implement our capital and transportation programs, with all City Departments playing integral roles. It is
the Departments mission to implement the capital program in the most efficient, expedient and cost
effective manner possible.
Miami's CIP has been developed to best address all of the currently identified needs in the City within the
limitations of the available funding revenues. Capital projects are organized by fund and programmed for
the current fiscal year and into the next five years. Revenue has been analyzed and projected for future
years, then assigned to those projects and needs that take precedence. The CIP by nature is a dynamic,
evolving document that will continually be refined as each of the projects within the program
advances. This most likely will include projects moving in and out of the years in which they are
programmed, as well as the introduction of new projects and possibly the modification or elimination of
others. As City priorities, project scopes of work, cost estimates and production schedules are advanced,
the CIP will be modified to reflect any necessary changes. It is in this context that we respectfully request
your approval of the CIP presented before you.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
INTENTIONALLY BLANK
1tze &IL 1tze Yalu/re
CITY OF MIAMI
City Commission
Chairman: M. Sarnoff
Vice -Chairman: W. Gort
Commissioner: F. Carollo
Commissioner: M. Spence -Jones
Commissioner: F. Suarez
City Attorney
Julie O. Bru
Auditor General
Theodore Guba
City Clerk
Todd Hannon
Other Agencies
Bayfront Park
Management Trust
Civil Service Board
Civilian
Investigative Panel
Community
Redevelopment
Agency
TABLE OF ORGANIZATION
Residents of Miami
Tomas P. Regalado
Executive Mayor
Office of International
Business Development
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Johnny Martinez
Chief Administrator / City Manager
1
Assistant City Manager/
Chief Financial Officer
Finance
Procurement
Risk Management
1
Management
and Budget'
1
Assistant City Manager/
Chief of Infrastructure
Building
CIP &Transportation
i
,
Information
Technology
i 1
Planning & Zoning
Public Facilities
Public Works
Downtown
Development
Authority
Miami Parking
Authority
Fire Fighter's & Police
Officer's Retirement
Trust
General Employees &
Sanitation Employees'
Retirement Trust
,
Miami Sports &
Exhibition Authority
Virginia Key Beach Park
Trust
Liberty City Trust
1
Assistant City Manager/
Chief of Operations
Code Enforcement,
1
Community
Development
Grants
Administration
GSA
NET
i 1
Parks & Recreation
Solid Waste
Fire -Rescue
Police
}
}
Communications
EODP
}
e
Human Resources
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
INTENTIONALLY BLANK
efie Yalu/re
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
TABLEOF CONTENTS THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
PREFACE
Capital Budget Message
Table of Organization
How to Read this Document
1. INTRODUCTION
Purpose 1
CIP Development Process 1
Prioritization Criteria 2
Capital Plan Framework 3
2013-2014 Multi -Year Capital Plan Program Overview 4
2. HIGHLIGHTS
Highlights by Fund 7
3. FUNDING OVERVIEW
Funding Sources 21
Funded, Partially Funded and Unfunded 23
Section Reports:
1-Funding Type by Job 25
2-Fund by Cost Component and Funding Source 49
3-Cost Estimates vs. Available Funding 67
4-Funded Proportion by Department/Job Number 99
4. OPERATING IMPACT
Operating Impact Summary 129
Section Reports:
1-Public Works Department Summary and Detail 132
2- Public Facilities Department Summary and Detail 145
5. CAPITAL PLAN FY2013-2014 APPROPRIATIONS
Purpose 149
Section Reports:
1-FY2013-2014 Capital Plan - New Appropriations to Projects 151
2-FY2013-2014 Capital Plan - Projects Appropriations Transfers 155
APPENDIX
1-Alphabetical Project Index 159
2-Capital Improvements Program Current Projects Cost to Date by Fund 187
3-List of Completed Projects in FY2012-2013 219
4-List of Initiated Projects in FY2012-2013 235
5-Capital Projects New Appropriations FY2012-2013 257
6-Capital Projects Appropriations Transfers FY2012-2013 273
Cite iutivie
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
INTENTIONALLY BLANK
1tze &IL 1tze Yalu/re
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1 . INTRODUCTION
tne, Cite sutteie
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Cite iutivie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
INTRODUCTION
Purpose of the Capital Improvement Plan
The Multi -Year Capital Plan (the Capital Improvement Plan or CIP) is an official statement of public policy
regarding long-range physical development in the City of Miami. A capital improvement is defined as a
capital or "in -kind "expenditure of $5,000 or more, resulting in the acquisition, improvement or addition to
fixed assets in the form of land, buildings or improvements, more or less permanent in character, and durable
equipment with a life expectancy of at least three years. The Capital Plan is a proposed funding schedule for
six years, updated annually to add new projects, reevaluate project priorities and revise recommendations,
with the first year of the plan being the Capital Budget.
The Capital Budget
Miami's Capital Budget is distinct from the Operating Budget. The Capital Budget represents a legal
authorization to spend, during the first year of the plan, funds from Federal, State and various other sources
and is adopted separately from the six year plan by means of an appropriations resolution. The Capital
Budget authorizes capital expenditures while the Operating Budget authorizes the expenditure of funds for
employee salaries and the purchase of supplies and small equipment. Capital projects can have an impact on
the operating budget through additional costs, revenues or cost savings.
Legal Authority
Legal requirements for preparing Miami's Capital Plan are set forth in the Florida Statutes and the City of
Miami Code. A capital improvement programming process to support the Comprehensive Plan is required
by the Local Government Comprehensive Planning and Land Development Regulation Act, more
particularly, Section 163.3177, Florida Statutes (2012). Further, the Financial Integrity Ordinance, Chapter
18/Article IX/Divisions 1 and 2 of the Code of the City of Miami, Florida, as amended ("City Code"),
requires the development and approval of a multi -year capital plan.
CIP Development Process
The 2013-2014 Multi -Year Capital Plan is an update to the 2012-2013 Multi -Year Capital Plan which was
approved by the City Commission on December 13, 2012 via Resolution R-12-0498. The new FY13-14 Plan
contains the same fund and program framework and project priorities as the prior Plan, but incorporates
allocations for funding sources becoming available in FY2014. The primary focus of the Capital
Improvements Program Office since the approval of the previous Plan has been the continued management
of ongoing projects, initiation of previously approved projects, and coordination with the Finance Team to
identify and secure financing opportunities.
The goals and objectives of the plan are as follows:
1
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Provide Excellent Recreational, Educational & Cultural
Programs — through frequent communication with the Parks and
Recreation Department, continued implementation of high -
priority parks capital projects based on the needs of the residents.
Restore, Maintain & Beautify Residential & Urban Infrastructure —
continued management of ongoing construction and design for street, traffic
calming, bicycle facilities, pedestrian walkways/greenways and drainage
projects identified as top priorities through resident, elected official input and
studies developed by the Departments of Public Works and Capital
Improvements.
2013, the final
Systems for Future Growth — The Transportation section of the Capital
Improvements and Transportation Program, through capital funding, have
developed the Miami Trolley Program which began with the launch of the
Health District, Health District/Stadium Route in March 2012. Immediately
after, the City launched the Brickell/Biscayne Trolley route which provides
downtown Miami with an alternate transportation mode through the central
business and the financial districts. During summer 2012, the Overtown-
Health District Route was launched connecting residential neighborhoods to
major employment centers. Furthermore, the City launched an additional
route that further expands the transit network to the west, connecting
downtown Miami to the retail district along NW 20th Street. On October 4,
planned route was implanted connecting Coral Gables with the City of Miami
via a trolley route that will runs along Coral Way and connects to Downtown Miami and the Port of Miami.
The Miami Trolley System is already the largest and most comprehensive municipal transportation system in
Miami -Dade County, providing businesses, residents and visitors with a quality transportation network for
moving around the City's core employment centers.
Provide Excellent Public Safety — through frequent communication
with the Miami Police and Fire -Rescue Departments, continue to
implement significant public safety projects including the acquisition
of Police Swat Vehicles and the construction of Fire Station No. 13.
Improve Business and Service Delivery Processes — utilize
resources made available through the Capital Program Support
Services contract to develop project scopes and estimates,
and facilitate progress of the Multi -Year Capital Plan.
Further, the Capital Improvements Program Office seeks
opportunities to develop alternate contracting
methodologies, through pre -approved contracts with
industry professionals, to help expedite the large volume of
projects in the Capital Plan.
2
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Prioritization Criteria
In addition to the surveying of all of CIP's client departments to determine their capital project needs, CIP
uses a hierarchy of criteria to determine how projects are considered for funding on a yearly basis. Projects
with the highest rankings, or in the case of projects meeting more than one criterion, are given priority for
funding and implementation. The criterion used is listed as follows in the order of priority:
Life/Safety- These projects are normally related to structural issues at City facilities and demand immediate
attention. They are considered "emergency" projects as they are not always planned for or funded.
Legal Requirements- These projects are funded based on the need to comply with legally mandated
requirements set forth by Federal, State and local governments. These types of projects may be required as a
result of binding settlements with other governmental agencies to meet current codes, ordinances or health
and safety issues. An example of these projects is a federal mandate to comply with ADA requirements
either citywide or at a particular park or facility.
Essential Improvements- These types of projects demand funding for improvements necessary to the
functioning and/ or preservation of facilities or infrastructure. This criterion measures the extent to which a
facility or infrastructure has deteriorated and needs improvements relative to the overall condition of similar
structures. Bridge repairs, storm water infrastructure improvements and repairs, and roadway resurfacing
highlight a variety of public works related projects that would fall under this criterion. The majority of Street
Bonds -funded projects would fall under this category as the preservation and improvement of the existing
infrastructure is the overwhelming goal. Facility roof replacements, repairing of structural damage, and fire
station renovations and replacement are also examples of essential facility improvements.
Quality of Life Improvements- Projects of this type improve the overall quality of life for the residents of
Miami. Projects such as these would include traffic calming, streetscapes, fountains, parks, neighborhood
and entry signs, and landscaping.
Efficiency Improvements- This criterion measures those projects that when completed will increase
efficiency or result in overall cost savings to the city. Such projects may benefit a greater number of people
or more efficiently and effectively provide and support the defined functional requirements of the intended
use. Projects such as these include renovation to offices, layout or workspace within a building, planning or
zoning department where a smoother and more fluid processing of plans equates to time savings and
increased customer service.
Revenue Producing- These projects when completed would generate additional revenues to the city.
Projects of this nature show an overall return on investments, and should be measured on the risk involved.
The criterion measures the number of people who will benefit from the project, both directly and indirectly,
and the associated costs versus revenues generated. Elements considered in the rating include the project type
and overall community needs. Such a project might include a new park with a community center and water
park.
Service Improvements- These types of projects demonstrate an increased delivery capability when
completed. This criterion measures the number of people served and the benefit derived from a project.
Replacements and renewals, which bring facilities up to acceptable standards and expand capacity, such as a
marina expansion and renovation are illustrations of these types of projects.
Service/Space Expansion- These are projects which result in expansion of space to serve the needs of the
community. Such projects, typically parks or public facilities, would include renovations, additions,
expansions or new construction of recreation centers, fire stations, police facilities, theatres and convention
centers.
3
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Capital Plan Framework
The 2013-2014 Multi -Year Capital Plan is structured into eleven (11) distinct funds or programs, some with
subcategories. With the exception of the Funding Type by Job report, all reports in the Plan follow this
program framework. The programs are listed and described below.
O Community Redevelopment Area (CRA): This program accounts for the acquisition or
construction of major capital facilities and infrastructure for community redevelopment in the
defined Community Redevelopment Area.
1 General Government Projects: This program consists of capital improvements, including
computers and communications, to the City of Miami's municipal office buildings and operations
facilities.
O Public Safety: The Public Safety fund or program accounts for the acquisition of equipment or
construction of major facilities that support the operations of the Police and Fire -Rescue
Departments.
1 Disaster Recovery: This fund is utilized to account for revenue received from the Federal
Emergency Management Agency (FEMA), insurance and other agencies resulting from declared
disasters which required measures of relief in the areas of debris removal, roads and bridges,
buildings and equipment, parks, marinas, and stadiums.
1 Public Facilities: The Public Facilities program includes improvements to public use facilities such
as stadiums, auditoriums and marinas. This fund also accounts for capital funding for redevelopment
projects and historic preservation efforts.
O Parks and Recreation: This program accounts for the acquisition, rehabilitation or construction of
capital facilities for recreational activities. The City of Miami's park system comprises over 100
parks.
O Streets and Sidewalks: The capital projects in the Streets and Sidewalks program provide
reconstruction, major maintenance and beautification to Miami's street system.
O Mass Transit: This program accounts for the acquisition of equipment or construction of capital
facilities that support the maintenance and operation of public transportation systems.
O Sanitary Sewers: This program includes projects that will improve the City's existing sanitary
sewer system.
O Storm Sewers: The Storm Sewer program accounts for projects that result in improved drainage and
stormwater management throughout the City of Miami.
O Solid Waste: This program includes projects for the acquisition of equipment or construction of
facilities for the collection and removal of solid waste.
4
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Projiram Overview
The total value of the six -year plan is $448 million, representing 628 projects (288 active and 340 future)
throughout the various programs. The following graph shows that the Streets and Sidewalks program
accounts for the largest portion of the total Capital Plan funding at $160 million or 35.70%. The General
Government, the second largest, accounts for $80 million or 17.76% of the overall Plan value. The Parks and
Recreation, the third largest, accounts for $76 million or 16.93% of the overall Plan value.
PROGRAM OVERVIEW BY FUND - $448 MILLION
Sanitary Sewers
$4,246,000
0.96%
Streets& Sidewalks
$160,106,947
35.70%
Solid Waste
$5,004,427
1.12%
5torrn Sevier!
$62,841,766
14.01%
Mass Transit
$4,187,602
0.93%
General Government
$79,646,467
17.76%
Public Facilities
$15,371,414
3A3%
CRA projects
$9,593,000
214%
Public Safety -Fire
Rescue
$26,754,119
5.97%
Public Safety- Po
$2,791,763
0.62%
Parks and Recreation
$75,941,989
16.93%
Disaster Recovery
$1,895,593
OA2%
■ General Government
■ CRA projects
■ Public Safety - F ire Rescue
■ Public Safety -Police
■ Parks and Recreation
■ Disaster Recovery
■ Public Facilities
■ MassTransit
■ Streets &Sidewalks
■ Sanitary Sewers
■ Storm Sewers
■ Solid Waste
5
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
efie Yalu/re
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
2. HIGHLIGHTS
tne, Cite sutteie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
HIGHLIGHTS
Highlights by Fund
The most significant project accomplishments of the hundreds of projects under development in CIP and
other City departments are highlighted in this section and grouped according to fund category. The
projects that are noted in this section are deemed to be significant based on:
❑ Scale or magnitude and/or anticipated impact to the community;
❑ High priority alignment with the City's Strategic Map;
❑ Accomplishment of a long standing need or objective; or,
❑ Representation of an innovative solution to a problem.
FUND 301 COMMUNITY REDEVELOPMENT AREA (CRA)
Gibson Park New Construction Phase II — The project entails the construction of a new 22,700 SF
gymnasium building that shall consist of a Gymnasium area, men restrooms, women restrooms, kitchen
concession area, equipment storage area, classrooms, computers lab, recreational space, electrical,
mechanical and janitor rooms. Project is currently under design with an estimated construction start date
of second quarter of 2014. Project Location: 350 NW 13 St.
Museum Park Baywalk and Promenade, Phases II and III — This project is being developed in
conjunction with the construction of the Art and Science Museum to provide a World Class Park on the
Bay. Museum Park Baywalk phase includes the construction of a pedestrian walkway along the bulkhead
which can be used for emergency access for fire trucks and other emergency vehicles. The Decorative
Walkway shall include associated site/civil, landscaping, irrigation, pedestrian amenities and lighting
work. The Promenade phase includes the construction of a grand
pedestrian walkway along the northern boundary of the park,
adjacent to the proposed Science and Art Museums, which can be
used for special events, emergency access to fire trucks and other
emergency vehicles. The work includes associated site/civil,
landscaping, irrigation and lighting. In addition, an asphalt
parking lot for approximately 40 cars will be constructed along
with a restroom facility. Project is currently under construction
with an expected completion time of winter 2013.
7
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Miami Women's Club Baywalk Project — Project involves a new seawall in front of the Miami
Woman's Club to include new Baywalk sidewalk, pedestrian lighting and other amenities. Project is
designed and permited ready for BID, with an expected construction start date of first quarter 2014. :
Project is located on 1737 North Bayshore Drive - Baywalk at the east end of the Women's Club property
roof. Ph. 3:
Old Fire Station No. 2 Restoration — Design and
construction to rehabilitate and restore the old Fire
Station No. 2, a historic 1926 two story CBS
structure approximately 10,500 SF (5,250 SF per
floor). The work includes selective demolition,
environmental cleanup, construction of new
structural and roof systems, second floor, all new
MEP including HVAC, new restrooms on both
floors, restoration and installation of historical
elements, exterior site work, ADA and code
upgrades and related work. Design will be done in
three phases. Ph. 1: Condition Assessment Report &
Recommendations. Ph. 2: Design & Construction
for strengthening of the structural systems and new
Design and Construction of adaptive re -use. Project is completed. Project location: 1401
North Miami Avenue.
FUND 311 GENERAL GOVERNMENT IMPROVEMENTS
City Hall Window Replacement — Replacement of all window and store fronts at City Hall with new
impact resistant window. Project is currently under construction and is expected to be completed by
winter 2013
City Hall Roof Terrace — Removal of second floor roof terrace floor tiles and installation of new Sika
Sarnafil roof system and new tiles. Project is currently under construction and expected to be completed
by the end of 2013.
Public Works Maintenance Yard — The project consists of assessing an existing building including
recommendations for site remodeling or demolition and, the design and construction of a new Public
Works Maintenance Yard to include field offices, locker rooms, a kitchenette, storage and related spaces.
The site work will include parking, and outdoor storage under the I-95 right-of-way. Project is currently
under design. Project Location: 551 NW 71 Street; 7142 NW 5th Court; 7148 NW 5th Court.
Damaged Vehicle Replacement and Repair (GSA) — Replacement or repairs to vehicles damaged by
collision or other events. Project Location: Citywide
Citywide General Fleet Replacement — Replacement of general fleet vehicles. Project Location:
Citywide
MRC Security System Hardening — Design of a state of the art Security system at the Miami Riverside
Center which includes incorporating the existing security system equipment in the main building parking
garage into the new system and any and all necessary components for the system to operate at maximum
efficiency. The design of the project is currently funded, future funds to be identified for the construction
of the project. Project Location: 444 SW 2nd Avenue.
8
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
GSA Fleet Maintenance Garage Expansion — Acquisition and installation of an additional vehicle lift,
wheel balancing machine and other items that will help expanding the capabilities to service the City's
fleet vehicles. Project Location: 1390 N.W. 20 Street.
Communications/Technology:
IT Modernization — The City continues the most far reaching technology modernization effort in its
history. Legacy business systems are being replaced with new software applications offering modern
technical designs to enable best business practices. The internet, high bandwidth and wireless
telecommunication, geographic information systems, business intelligence databases, and modern desktop
and server hardware form the foundation for a reliable, agile, technology infrastructure.
Two major modernization efforts were the focal point of the Information Technology Department:
iMiami ERP system including Oracle R12 upgrade and the Land Management System, each contribute
directly to the accomplishment of City's strategic objectives.
Oracle R12 brings the latest version of the financials and human resources systems to the city along with
improvements in business processes and computer processing speed. In addition, the team launched the
implementation of Hyperion Budget and Planning system as well as Oracle Business Intelligence
applications.
FUND 312 PUBLIC SAFETY
Police:
Police Vehicles Replacement — Project Location: Citywide
Police Swat Vehicles — Project Location: Citywide
Police Headquarters Helipad and Roof Replacement — The City of Miami Helipad is the only FAA
approved rooftop helipad available to first respondent in the downtown area and, as such, it would be
critical should a large scale catastrophic event occur. The project consists of upgrading the current roof to
withstand hurricane winds and upgrading the current helipad by elevating it 2 feet above the roof
supported by columns that would tie into the existing support columns of the building. Project is fully
design and expected to start construction by winter 2013. Project Location: 400 NW 2 Avenue.
Fire:
Firefighting Equipment — SAFER — Capital purchase of large equipment
that needs to be replaced as it wears out or gets damaged. This includes
generators, hydraulic tools, fans, etc. Project Location: Citywide
Fire Rescue Personal Protective Equipment — The department of
Federal Emergency Management Agency (FEMA), US Department of
Homeland Security, Grants Management Branch, has awarded the
"Assistance to Firefighters Grant Award for Fiscal Year 2010" to the
City of Miami Department of Fire -Rescue. The grant is going to assist
the Department of Fire -Rescue in purchasing Personal Protective
Equipment. Project Location: Citywide
9
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fire Stations Generator Replacements — Replacement of existing standby generator at fire stations 1, 6,
8, and 9. Project has been designed and advertised for construction with an anticipated construction start
date of January 2014.
Fire Station 13 — Design and construction of a New Fire Station facility of
approximately 11,105 square feet Gross Area. The building shall be a one
story, two bay apparatus fire rescue facility. The facility shall include all
typical fire station amenities for fire rescue personnel. The project also
includes site development such as parking spaces as per zoning
requirements, landscaping, water main improvement, street signalization and
seek LEED Silver Certification. The Project is currently under construction
with an estimated construction completion date of winter 2013. Project
Location: 958-960-990 NE 79 Street.
Fire Station 14 — Design of a 10,000 SF two-story fire rescue facility on a portion of a public park. The
facility will include bays for four trucks, dormitories, offices, a recreation room, kitchen and
miscellaneous support spaces. Demolition includes the removal of the existing fire station trailer, related
utilities, and select street trees, possible relocation of electrical mains and sanitary force main. The site
work will include the addition of a parking lot, service apron, new curb cuts and signalization. As part of
the enhancement of the surrounding park, a mini -soccer field will be added. Project is currently under
design and construction will commence in late 2014: Project location 1800 SW 21st Ave.
Replace Existing Fire Apparatus — Replace Fire Apparatus on a rotational Basis
FUND 325 PUBLIC FACILITIES
New Dinner Key Marina Dockmaster Building — Demolition of existing dockmaster building and
Design and Construction of a LEED certified New Dockmaster Facility of approx. 11,296 Sq.Ft. (Gross
Area) with a new outdoor plaza of approximately 10,000 SF at Dinner Key Marina. The new facility is a
three story building to serve as the Dinner Key Marina and Harbomaster's (Mooring) administration
building. Project is currently under construction with an anticipated construction completion date of
winter 2014, Project Location: 3400 Pan American Drive.
James L. Knight Center Chiller & Cooling Tower — This project consists of
removing and replacing four Chillers and all related pumps, piping and
electrical work at the James L. Knight Center. The
project also includes the Demolition of the existing
cooling tower and replacing it with new cooling tower
assembly. Project has been completed and it is currently
in use. . Project Location: 400 SE 2nd Avenue.
FUND 331 PARKS AND RECREATION
Bay of Pigs Park Lighting — design and construction of new lighting system within the park. Project has
been design and it is currently release for construction with an estimated completion dates of first quarter
of 2014.
Coral Way NET Office Remodeling/Community
Center — Design and remodeling of an existing
10
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
building into a new Community Center. Project includes Multipurpose spaces, a computer lab, offices, a
break room, restrooms and support spaces. Site modifications include demolition of an existing residential
building, three new play structures on a new playground, and a new parking lot. Project is currently under
construction with an estimated completion date of June 2014. Project Location: 1300 SW 12th Avenue.
Bryan Park Community Building — Demolition of the 600 SF Comfort Station and construction of a
1,500 SF community building. Project scope will also include upgrading the Miami -Dade Water and
Sewer utility lines in the vicinity of the park. Project is designed and currently under permit review.
Project Location: 2240 SW 12 Street.
Melreese Golf Training Center — The Melreese Golf
Training Center (First Tee Academy) will be located
adjacent to the existing practice range and new clubhouse. It
will be used primarily as an instructional golf facility. The
facility will have approximately 5000 square feet and will
include a large assembly/classroom area, three enclosed
bays facing the practice range, two offices, storage area,
restrooms, a kitchenette, a vending area and support spaces. It will also have a pre -fabricated canopy over
the existing practice range and connecting walkways to the new clubhouse and parking lot. The facility
will be certified LEED Silver. Project is complete. Project Location: 1802 NW 37th Avenue.
Caribbean Marketplace Renovation — Project consists of the interior
demolition and renovation of the marketplace to create an open air market
with kiosks to sell goods to the public. The repairs will include new
plumbing, ventilation and electrical systems. The Project is currently under
Construction with an anticipated completion date of December 2013.
Project Location: 5925-27 NE 2nd Avenue.
Lummus Landing Square — The project entails the design and
construction of a new restroom/storage building and three pavilions as improvements to Lummus Landing
Square property. The one story facility will be approximately 2,400 SF Gross Area. Also, the
improvements will include landscape and hardscape. The project is currently under design phase. Project
Location: 250 NW North River Drive and 176 NW North River Drive.
Hadley Park New Youth Center — This project consists of furnishing of all labor, materials and
equipment for the design and construction of a new youth center structure of approximately 23,000 square
feet. The building will include an indoor basketball court, an exercise room with adjacent lockers and
restrooms, classrooms, meeting rooms, computer room, office spaces and storage. The building
lobby/reception area will interconnect with a new covered drop-off area that will abut a cultural plaza.
Other park improvements include a covered entry/drop-off for the existing Senior Center building and
improvements at the Carrie Meek Center. ADA reconstruction of parking areas of recreation building and
field Parking lot, pavement marking, signage and ADA concrete ramps. Design is complete and
permitted. Project has been advertised and construction bids are currently under evaluation. Project has a
potential funding shortfall for construction. Project Location: 1300 NW 50th Street.
Moore Park New Construction — Project consists of a design criteria package and design/build services
for a new 15,000 S.F. community building center that will incorporate office, classroom and recreational
spaces and site improvements that will synergize with the existing tennis center and playfields. The
project will also include a new daycare center of approximately 3,000 S.F, a new driveway with parking
spaces and drainage system and a new open park area/community gathering space. Project is designed,
11
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
permitted and under construction with an estimated construction completion date of December 2013. .
Project Location: 3600 NW 7th Avenue.
African Square Park - Splash Park — The project consists of the design and construction of a new
Splash Park. Project includes: partial regrading to maintain existing amphitheater; creating a new
interactive water playground in an approximately 2400 SF paved area; enclosing splash park area with a
48" high steel fence; extending electric and water utilities to splash park area; demolishing existing
restrooms and creating new accessible restrooms; providing accessible route to splash park; preserving
existing large trees and introducing new landscaping; renovating and painting exteriors of neighboring
electrical room and entry feature. Project is currently in pre -design phase. Project Location: 1400 NW
62nd Street.
West End Park Community Building — The scope of work is the design and construction of a new
community building of approximately 6,600 G.S.F. consisting of multipurpose rooms, fitness room, art
and craft room, computer room, break room and restrooms. In addition, the project shall construct a
permanent canopy over the existing picnic area, and ADA improvements in the park. The City recently
entered into an inter -local agreement with Miami -Dade County receiving GOB to supplement funding.
Project Location: 6030 SW 2nd Street also known as 250 SW 60th Avenue.
FUND 341 STREETS AND SIDEWALKS
Grove BID Sidewalk Improvements — Mary, Virginia, FLORIDA, Commodore, & Fuller -
Replacement of existing sidewalk pavers. Project is 100% design and permitted for all streets.
Construction is currently underway in Florida Street and Mary Street with an expected completion date of
fall 2013.
Tamiami Blvd. & 72nd St. Circle _The scope of work is the design and construction of a traffic circle
at the intersection of Tamiami Blvd and NW 72nd Ave. Project is design and permitted. A construction
contractor has been selected and construction is expected to start by fall 2013.
Tamiami Canal Rd. & 6th St. Circle _The scope of work is the design and construction of a traffic
circle at the intersection of Tamiami Canal and NW 6t'' street. Project is design and permitted. A
construction contractor has been selected and construction is expected to start by fall 2013.
Citywide Bicycle Rack & Signage Program — Installation of bicycle facilities including bicycle lane
markings, shared use lane markings, bicycle signage, and bicycle racks throughout the City. Project is
currently Phase 1 ARRA grant is in punch list close-out and Phase 2 non-ARRA is in design. Project
Location: Citywide.
Health District Bicycle and Pedestrian Mobility Study — Bicycle Pedestrian Mobility Study will
examine the issues related to improving bicycle and pedestrian opportunities in the Health District. The
project will include coordination with the stakeholders in the area, and create a plan for improvements.
Project is completed. Project Location: I-95 on the East, NW 17th Ave on the West, NW 20th St on the
North, SR 836 on the South.
Citywide Sidewalk Repair Project (PW) — Sidewalk and curb and gutter replacement citywide.
Additional funds were recently identified in order to procure and award contract in 2013. Project
Location: Citywide.
12
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Beacom Project Area Improvements — Roadway restoration including milling and resurfacing of
existing pavement, new curb and gutter along EOP with miscellaneous drainage improvements as needed.
Project is currently under construct with estimated completion date of fall 2013. Project Location:
Between SW 22nd Avenue and Beacom Blvd.: SW 2nd Street, SW 2nd Terrace, SW 3rd Street and SW
4th Street.
Beacom Phase II — Roadway restoration including milling and resurfacing of existing pavement, new
curb and gutter along EOP with miscellaneous drainage improvements as needed. Where there is parking
in swale areas, propose swale block and provide ADA ramps at curb returns. Project is designed and
permitted. Construction start date is anticipated for summer 2014. Project Location: Area generally
bounded by SW lst Street to the North, SW 27th Avenue to the west and Beacom Boulevard to the East
and South.
Miami River Greenway 5th Street Bridge Extension — The design will follow the Miami River
Greenways Design Guidelines already established and adopted for the previous segments. Construction
will include but not limited to: improvements to the existing drainage system where needed, new roadway
pavement, new curb and gutter, new sidewalks, new decorative street and pedestrian lighting, new
benches and trash receptacles, new landscaping and tree planting as well as the required directional and
informational signage and hardscape. Project is currently under construction with an anticipated
construction completion date of fall 2013.. Project Location: NW 12 Avenue to NW 10 Avenue along
NW South River Drive, NW 11 Avenue between NW South River Drive and NW 7 Street, and along NW
7 Street between NW 11 Avenue and NW 10 Avenue.
Miami River Greenway from NW loth Avenue to NW 12th Avenue — The design will follow the
Miami River Greenways Design Guidelines already established and adopted for the previous segments.
Construction will include but not limited to: improvements to the existing drainage system where needed,
new roadway pavement, new curb and gutter, new sidewalks, new decorative street and pedestrian
lighting, new benches and trash receptacles, new landscaping and tree planting as well as the required
directional and informational signage and hardscape. Project is currently under construction with an
anticipated construction completion date of fall 2103. Project Location: NW South River Drive from NW
10 Avenue to the NW 12 Avenue Bridge, In addition, this project will complete the missing segment of
greenway along NW North River Drive directly in front of the Lummus Park.
Bird Avenue Road Improvement — Project consists of Street beautification including milling and
resurfacing, designated bike lanes in each direction, ADA compliant sidewalks, landscaping within the
project limits, and drainage improvements as necessary. Project Location: Bird Avenue from US1 to SW
27 Avenue, Bird Avenue from US 1 to Aviation Avenue, Allamanda St. & Oak Avenue, Bird Avenue
from US1 to Aviation Avenue and along McDonald Street from US1 to Jackson Avenue Project is
currently under design with an anticipated construction start date of first quarter 2014.
Brickell Area Shared Use Path and Roadway Improvements — Brickell Ave lighting improvements,
median landscape improvements, sidewalk/path improvements and art in public places. Project is
designed and it is currently under construction. Project Location: Brickell Ave from SE 15th Rd to SE
26th Rd.
Center Grove Street and Lighting Improvements — The design and
installation of decorative street lighting; the repair of broken and
displaced sidewalks and the addition of ADA compliant accessible
ramps as required. In addition, Mary Street will receive new
sidewalks in sections where none currently exists contingent upon
13
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
adjacent property owner frontage dedications. Project is currently under design. Project location: Phase I -
North Day Avenue - Oak Avenue and Virginia Street to SW 27th Avenue. Phase II - Virginia to
McDonald from Day Avenue to Bird Avenue.
Miami River Greenway SW 1st Court to South Miami Avenue — Work involves road improvements
including, but not limited to reconstruction of streets, including new sidewalks, new drainage, striping,
signage, landscaping, hardscape, decorative street and pedestrian lighting, and ADA ramps based on the
Miami River Greenways Master Plan. Project is currently under construction. Project Location: South
Miami Avenue Rd from SW 1st Court to South Miami Avenue.
Miami River Greenway from Miami Circle Greenway to South Miami Avenue — The Scope of Work
involves road improvements including, but not limited to reconstruction of roads, including new
sidewalks, drainage, striping, signage, landscaping, hardscape, decorative street lighting, and ADA ramps
based on the Miami River Greenways Master Plan. Project is currently in design. Project Location: Area
bounded by SE 5th St from S Miami to Brickell Ave and SE lth Ave from SE 6th St to Miami River.
NW llth Street Roadway Improvement Project — The Scope of Work involves the milling and
resurfacing of the existing asphalt pavement, the replacement of associated pavement markings and
damaged sidewalk replacement if needed. Project construction is complete. Project Location: NW 1 lth
Street from NW 27th Avenue to NW 42nd Avenue.
NW 14 Avenue and 28 Street Area Roadway Improvements — Milling and resurfacing, swale
restoration, drainage improvements, minor curb and sidewalk repairs, and restriping as needed. The
project is currently under construction with an estimated construction completion date of first quarter
2014. Project Location: NW 14th Ave from NW 28th St to 30th St; NW 28th St from NW 12th Ave to
17th Ave; NW 14th Ave from NW 20th St to 21 st St; NW l lth Ave from NW 21 st St to 22nd St.
NW 18th Avenue Roadway Improvement Project — Milling and resurfacing, swale restoration,
drainage improvements, minor curb and sidewalk repairs, ADA modification and striping as needed. The
design phase is complete; project is currently under construction. Project Location: Area bounded by NW
19th Terrace, NW 15th Street, NW 17th Avenue, and NW 19th Avenue.
NW 33rd Street Roadway Improvement Project — Milling and resurfacing, swale restoration, drainage
improvements, minor curb and sidewalk repairs, ADA modification and striping as needed. Project is
100% designed. We are currently waiting for MD WASD to complete a water main system betterment in
the area before we start construction. Project Location: Area bounded by NW 12th Avenue, NW 17th
Avenue, NW 36th Street and NW 30th Street.
NW 9th Street Roadway Improvement Project — The Scope of Work involves the milling and
resurfacing of the existing asphalt pavement, the replacement of associated pavement markings and
damaged sidewalk replacement if needed. Project construction is complete. Project Location: NW 9th
Street from NW 22nd Ct to NW 28th Avenue; NW 22nd Ct to NW 28th Avenue between NW 7th St and
NW 1 lth Street; NW 23rd Ct between NW 1 lth Street and NW 7th Street; NW 25th Avenue between
NW 1 lth Street and NW 7th Street.
SW 19th Terrace Improvements (SW 23 Avenue to SW 24th Avenue) Partially funded by CDBG —
The scope of work consists of improvements of the street (re -construct and milling and resurfacing) The
work also includes improvements of existing curbs, sidewalks, driveways, ADA ramps, some drainage as
required and landscaping. Project is construction is complete. Project Location: SW 19th Terrace between
SW 22nd Avenue and SW 27th Avenue.
14
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Traffic Calming SW 6th Street Project — The Scope of Work involves the design of two (2) traffic
calming devices. The improvements consist of milling and resurfacing within the improvement area,
ADA ramps, curbs, signing, pavements markings, landscaping and drainage, if necessary. Project
construction is complete. Project Location: SW 6th Street & SW 39th Avenue -SW 6th Street & SW 39th
Court.
NW 12 Avenue / NW 12 Place Roadway Improvements — Development of a Linear Park with new
sidewalk landscaping, hardscape and benches. Project is currently under construction with an anticipated
construction completion date of second quarter 2014. Project Location: West side of NW 12th Ave
between NW 62nd street and NW 71 st Street.
Overtown Greenway @ NW 11 Terrace - Partially Funded by CRA — The scope includes the design
and construction of urban pathways, decorative lighting, landscaping and ancillary site improvements to
the NW 1 lth Terrace and former FEC Railway corridor. This project is a phase of the Overtown
Greenprint Plan. The project is currently under design. Project Location: NW 1 lth Terrace between NW
2rd Avenue and NW 7th Avenue.
NE 2 Avenue Improvements — Provide all project management and engineering analysis and design
services necessary for preparing construction documents for the reconstruction of NE 2nd Avenue from
NE 20th Street to NE 84th Street. The project length is approximately
4.1 miles. The scope of work includes roadway reconstruction, storm
water system, curb and gutter, concrete sidewalk, signing and
pavement markings, decorative lighting, signalization and landscape.
Segment B 1 (NE 36 Street to NE 42 Street) is completed, Segments
B2 (NE 51 Street to NE 57 Street) is complete Segment C (NE 57
Street to NE 69 Street) is complete Segments A (NE 20 Street to NE
36 Street), B3 (NE 42 Street to NE 51 Street) and D (NE 69 Street to
NE 84 Street) are currently under design.
FUND 352 STORM SEWERS
Rockerman Canal Improvements _Phase I of this project includes the dredging of the western half of
the canal. This phase is complete. Phase II of the project includes the restoration of the south shoreline of
the canal at the park's sides. Work includes the stabilization of shoreline via the installation of new riprap
and the planting of new mangroves. Project is fully designed all environmental permits (MD-DERM,
ACOE, FDEP) are secured. Project has been advertise for construction and a contractor has been selected.
Construction is anticipated to start in the fall of 2013.
Durham Terrace Drainage Project — The design and construction of a stormwater drainage system to
mitigate severe flooding in the area. Milling and resurfacing of the roadway pavement will be performed.
Swales will be reworked and regraded to comply with Public Works Bulletin #28 and new landscaping
and trees will be added. Broken sidewalks will be replaced, as well as new ADA compliant pedestrian
ramps will be constructed. Project is construction is complete. Project Location: Area approximately
bounded by NW 7 Street, NW 3 Street, NW 38 Court and NW 42 Avenue.
Mary Brickell Village Drainage Improvements — To provide street improvements (Milling and
resurfacing) including drainage improvements, and limited roadside reconstruction at the following
locations: SW 9th Street from SW 1st Avenue to SE 1st Avenue (Brickell Plaza Drive), SW loth Street
from SW 1st Avenue to SE 1st Avenue(Brickell Plaza Drive), SW 1 lth Street from SW 1st Avenue to SE
15
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
1st Avenue(Brickell Plaza Drive), SW 12th Street from SW 1st Avenue to SE 1st Avenue(Brickell Plaza
Drive), and Select Portions of SE 1st Avenue(Brickell Plaza Drive) between SW 9th Street and SW
12th Street. Project also consists of constructing a pump station at the intersection of SW loth Street and
SW 1st Avenue; and connecting isolated drainage system located at the intersection of SW 10th Street
and S Miami Avenue to the existing drainage system located at mid -block on SW loth Street between
SW 1st Avenue and S Miami Avenue. Project is currently designed and permitted. Project has been
advertised and construction bids are under review.
Citywide Storm Sewer Repair Project (PW) — Repair and installation of the storm sewer infrastructure
to alleviate flooding at critical areas with the City boundaries. Project Location: Citywide
Garden Storm Sewer - Phase I — Storm water and roadway improvements to the project area bounded
by NW 28th St, NW 38th St, NW 22nd Ave. and NW 27th Ave. Project is designed and permitted.
Construction is expected to start in early 2014.
San Marco Island and Biscayne Island Drainage Improvements Project consists of drainage
improvements, roadway reconstruction and/or milling & resurfacing, striping, landscaping, and signage
for the islands. For San Marco Island, storm sewer system, a
storm water pump station, injection wells, and outfall discharges
into Biscayne Bay are included in the design as well as increasing
the initial number of drainage wells from 2 to 3, and adding a
temporary well for dewatering. The 5 sedimentation tanks initially
proposed were changed to 5 Pollution Control Structures. For
Biscayne Island- Decorative street lighting was added along N.
Venetian Drive on Biscayne Island, and pipe bursting technique
were included for the repairs of three (3) existing outfall pipes.
Project is currently under construction with an estimated
construction completion date of fall 2013. Project Location: San
Marco and Biscayne Islands.
Silver Bluff Drainage Improvements — Drainage improvements. Project is designed. Project Location:
Area 1: SW 23rd Terrace to SW 25th Street from SW 27th Avenue to SW 23rd Avenue; is currently
under construction, Area 2: SW 24th Terrace to SW 25th Terrace from SW 22nd Avenue to SW 21st
Avenue; Area 3: SW 14th Street to SW 16th Terrace from SW 21st Avenue to SW 18th Avenue.is
expected to be completed by summer 2014
Northwest Road and Storm Sewers Improvements — Design and construction of a storm sewer system
including: road improvements such as damaged sidewalk replacement, damaged curb and / or gutter
replacement, ADA compliant ramp construction, re -sod of swales, milling & resurfacing. The project
construction is complete. Project Location: Area generally bounded by NW 71st St, NW 7th Ave, NW
62nd St, and NW 12th Ave.
Kinloch Storm Sewer Improvements Project — This project consists of three parts:
(1) The General Development Report (GDR) to address flooding problems within the limits of the project.
This comprehensive report serves as a plan to design drainage systems to reduce flooding in these
communities. It also identified contributing factors to the flooding conditions, evaluated feasible measures
to reduce flood stages, established drainage requirements, and provided specific recommendations to
improve drainage conditions within the project limits. This phase of the project is completed.
(2) Phase I Design and Construction: consists of exfiltration trenches, manholes, inlets, cross drains,
swale trenches, and surface restoration. This phase of the project is constructed.
16
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
(3) Phase II Design and Construction: consists of a connection to an existing outfall, old exfiltration
trenches will be replaced with new ones, manholes, inlets, swale trenches and surface restoration. This
phase of the project is complete
Road improvements for both phases include roadway
milling & resurfacing, ADA Ramps, damaged sidewalk
and curb and/or gutter replacement and swale restoration
on street blocks impacted by the drainage construction.
Project Location: Area bounded by SW/NW 42 Avenue,
SW/NW 47 Avenue, NW 7 Street, and SW 8 Street; and
NW 43rd Avenue from Flagler to 4th Terrace.
FUND 353 SOLID WASTES
Solid Waste Collection Equipment Upgrade — This project included the acquisition of new Hybrid
Autocar Automated Side Loader, Rubbish Truck, Freightliner M2, and Commercial Grinder for Virginia
Key Composting Facility. Project Location: Citywide.
Solid Waste Equipment Acquisition — The Solid Waste Department continues to purchase a large
variety of equipment, including Street Sweepers, Roll -Off Transfer Trucks, Litter Containers, Side Loader
Compactor Waste Collection Vehicles, and Rear Load Waste Collection Vehicles. This new equipment
will improve the efficiency of garbage and trash pickup within the City as well as help insure a clean city
for our residents and visitors.
GRANT FUNDED TROLLEY PROGRAM
Miami Trolley Program — Operation and Maintenance — The City of Miami was awarded transit
service development program funds by the Florida Department of Transportation (FDOT) for the
implementation of a municipal rubber -tire circulator. The state funds are intended to offset fifty percent
of the operating and maintenance costs associated with the first three years of service. The City's match
originates from the transit portion of the half -cent transit surtax proceeds. The City of Miami launched its
inaugural routes of the Miami Trolley early 2012 with only two routes, Health District and Health
District/Stadium and continues to develop the program to a total of seven routes. The following are the
implemented and/or proposed routes:
❑ Health District and Stadium Routes - Launched in March 2012
❑ Brickell and Biscayne Routes — Launched in April 2012
❑ Overtown Route — Launched in July 2012
❑ Allapattah Route — Launched in November 2012
❑ Coral Way Route — Scheduled for an October 2013 launch
The latest ridership estimates indicate a system wide average of 7,000 passengers on a typical weekday,
up from 3,500 passengers last year. All Trolleys are accessible to riders using wheelchairs and are ADA
compliant. Furthermore, each vehicle can carry up to two bicycles to promote the use of a multimodal
system. The Trolley provides the same high level of service to passengers with or without disabilities and
is Free for all users.
17
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
:-IFALTH DISTRICT/ STADIUM P-IAF
The Health District and Stadium routes began on March 1,
2012. The service runs approximately every 15 minutes from
6:30 am to 11 pm, Monday through Saturday, and on Sundays
when there is a special event at the Stadium. The Health
District Trolley route travels around the district between NW
7th Avenue and NW 14th Avenue and NW 14th Street and
NW 20th Street. Routes include stops at the following
locations: UM Life Science Park, Lindsey Hopkins Technical
Education Center, Miami -Dade College Medical Campus,
Ryder Trauma Center, Jackson Memorial Hospital, Veterans
Affairs Miami Medical Center, UM Hospital and Clinics, UM Biomedical Research Building, Bascom
Palmer Eye Institute, Marlins Stadium. Combined, these routes average 1,400 daily riders.
The Brickell and Biscayne routes were launched on
April 27, 2012. The service runs approximately every
15 minutes from 6:30 am to 11 pm, Monday through
Saturday and on Sundays from 8:00 am to 8:00
pm. The alignment was reconfigured in May 2013 as
follows: The Biscayne route runs along the eastern
side of Downtown Miami via Biscayne Boulevard
between NE 39th Street in the Design District and the
Brickell Metrorail Station. The Brickell route runs
from Mercy Hospital on South Bayshore Drive to
Brickell Key in the north. Combined, the Brickell and
Biscayne routes link several dense areas and point of
interests including the following locations: Financial District, Mary Brickell Village, Brickell Key, Miami
Convention Center, Bayfront Park, Freedom Tower, Miami -Dade College Wolfson Campus, American
Airlines Arena, Museum Park, Adrienne Arsht Center for the Performing Arts, Miami International
University of Art and Design, Margaret Pace Park, and the Omni Bus Terminal. The original alignment
was extended south to Mercy Hospital in December 2012 while the Biscayne route was extended north to
Midtown and the Design District area in spring 2013. Initial ridership projection for this corridor was
approximately 2,500 boardings per day. As of June 2013, these routes are transporting a combined 4,300
passengers on a typical weekday.
BISCAYNE/ BRIC KELL MAP
The Overtown route was launched in July 2012. The
service runs approximately every 15 minutes from
6:30 am to 7:00 pm, Monday through Friday. Route
includes stops at the following locations: UM Life
Science Park, Lindsey Hopkins Technical Education
Center, Miami -Dade College Medical Campus, Ryder
Trauma Center, Bascom Palmer Eye Institute,
Biomedical Research Institute UM, UM Hospitals and
Clinics, Seybold Pointe, Henry Reeves Park, Rosa
Parks Community School-Overtown, Overtown
Transit Village, Black Police Precinct & Courthouse
Museum, Booker T. Washington School. The
Overtown route is transporting an average of over 400
passengers per day.
The Allapattah route was launched in November 2012. The service runs approximately every 15 minutes
from 6:30 am to 7:00 pm, Monday through Saturday. The route runs east -west along NW 20 Street
18
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
between NW 27 Avenue and NW 3 Avenue, north -south on 3 Avenue between NW 20 Street and NW 14
Street and East-West on NW 14 Street between NW 3 Avenue and North Bayshore Drive to the OMNI.
The Allapattah — Overtown route provides a vital link to the City's growing Miami Trolley system, as it
connects to each of the City's existing trolley routes. On NW 20 Street between NW 7 and 10 Avenues,
passengers can transfer to the Overtown, Health District and Health District — Stadium routes. At the
OMNI, passengers can transfer to the Biscayne-Brickell route. The route complements the Miami -Dade
Transit system with stops adjacent to the Santa Clara Metrorail Station and the Metromover system at the
Adrienne Arsht Center Station. Trolley stops are located on most blocks, and coordinated with existing
Miami -Dade Transit stops. Ridership has grown since the route's inception to approximately 2,200
passengers per day
The Coral Way route was launched on October 3, 2013. The Coral Way-Brickell Trolley operates along
Coral Way serving the commercial, retail, and residential locations along the corridor. The trolley
connects to the Brickell Metrorail/Metromover Station at SW 1st Court where a connection to the Brickell
and Biscayne routes is provided. The route extends from PortMiami on the east to Ponce de Leon
Boulevard, in the City of Coral Gables, on the west where a connection to the City of Coral Gables
Trolley is provided. In addition, the trolley operates along Flagler Street to serve the downtown's Central
Business District as well as an alternate connection to Port Miami. Based on a system wide modeling
analysis completed in November 2010, this route is anticipated to attract over 700 riders daily.
PUBLIC/PRIVATE PARTNERSHIP FUNDED BICYCLE SHARE PROGRAM
The City of Miami Deco Bike Program is planned to launch in the first quarter of 2014. The Deco Bike
program is planned to have sixty (60) stations and five hundred (500) bicycles in an area serving the
Upper East Side Design District, Midtown, Edgewater, Wynwood, Downtown, Brickell, Calle Ocho, and
Coconut Grove. The program will be managed and maintained by Deco Bike, LLC. The Deco Bike
program will provide an additional mobility option for residents and visitors to explore Miami and serve
as the last mile for transit users. By providing
transportation options, the program will allow for people
to choose not to drive, and help reduce congestion. Deco
Bike also provides an effective way for residents to get an
opportunity for exercise in their daily lives. Deco Bike
already serves Miami Beach and will provide connectivity
between the two cities. The current agreement is for a ten
(10) year cycle with opportunities to expand beyond the
phase 1 limit. The current agreement provides a share of
advertising revenue to the City for each year of the ten
year cycle.
19
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
efie Yalu/re
20
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
3. FUNDING OVERVIEW
Cite sutteie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
FUNDING OVERVIEW
Fundin' Sources
The Capital Improvement Plan contains funding from seven types of revenue sources:
❑ Federal Grants - Federal grants, such as Community Development Block Grants (CDBG), may be
used only for the purposes specified in Federal laws. The amount of funding available from Federal
sources is dedicated by National priorities. These grants derive from agencies at the federal level
such as the Federal Emergency Management Agency (FEMA) and Housing and Urban Development
(HUD).
❑ State Grants - State grants are awarded by State of Florida agencies such as the Florida Department
of Transportation (FDOT) and Florida Inland Navigation District (FIND) Waterways Assistance
Program. These grants may be used only for the purposes specified in State laws.
❑ Miami -Dade County Grants - Miami -Dade County may contribute funding in the form of a grant
for specific projects to be undertaken by the City.
❑ Grant — Other - These are grants which do not derive from Federal, State or Miami -Dade County
resources. An example of this funding type is a grant or contribution from another municipality.
❑ City Bonds - Two types of bonds can be issued by the City for capital improvements: (1) General
Obligation Bonds and (2) Special Obligation Bonds:
• General obligation bonds are backed by the full faith and credit of the City of Miami and are
secured by the City's ad valorem taxing power. These bonds finance specific capital
improvement programs such as public safety, highway or storm sewers. The City's most recent
general obligation bond issuance was approved by voters in November 2001. These bonds,
named the Homeland Defense/Neighborhood Improvement (HD) Bonds, provide for a total
infusion of $255 million worth of capital investment in the areas of public safety, parks and
recreation, streets, drainage, quality of life infrastructure improvements, and historic
preservation. The first issuance in the amount of $155 million took place in 2002 while the
second issuance took place in July 2007 and derived almost $51 million. The third issuance in
the amount of $50.6 million took place in May 2009.
• Special obligation bonds are secured by a limited revenue source.
• In order to accelerate the construction of much needed road and drainage
infrastructure projects, the City leveraged recurring revenue streams from Local
Option Gas Tax, the Transit Half -Cent Surtax, and the Parking Surcharge into a
special obligation bond program. The first issuance of this bond program, known as
21
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
the "Streets Bonds", in the amount of $80 million took place at the end of calendar
year 2007. The second issuance in the amount of $57,634,240 took place in
December 2009.
❑ CIP Fees/Revenues - These funds are collected from current revenues produced by miscellaneous
county or city taxes and various fees. Notable funding sources included in this category are the
annual General Fund contribution to capital projects, storm water utility trust funds, local option
gas tax, the transit t/2 cent surtax, parking surcharge, and impact fees.
❑ Private Donation/Other - This funding source includes any private funds contributed to the City
as well as the dedication or sale of land for capital facilities.
The chart below shows that CIP Fees/Revenues represent the largest share of funding in the Capital Plan,
accounting for 43.80% of overall Plan funds. City Bonds represent the second largest funding source,
accounting for 27.73% of the Plan's funding. Sources deriving from Miami -Dade County represent 6.43% of
the Plan. The remaining 22.04% of funding is from Federal, State, Grant -Other, and Private Donations/Other
sources.
SUMMARY BY FUND TYPE - $448 MILLION
Private Donations / Other
$3,710,424
0.83%
Grant - Miami -Dade
County
$28,832,106
6.43%
City Bonds
$124,355,706.
27.73%
Grant - Federal
$6,730,678
1.50%
Grant -Other
$21,271,854
4.74%
Combined with Others
$4,335,000
0.47%
CIP Fees/Revenues
$195,343,788
43.80%
• Com Nine d with Others
■ G rant -State
■ CIP Fees/Revenues
• Grant -Federal
• City Bonds
■ G rant - Miami -Dade County
Private Donations / Other
Grant - Other
The "Funding Type by Job Number" Report in the Reports Section provides a listing of projects associated
with the various sources under each of the funding types described above.
Funded, Partially Funded and Unfunded Projects
The projects in the CIP can be placed in one of three funding proportion categories: Funded, Partially Funded
or Unfunded. The "Cost Estimates versus Available Funding" listing in the Reports Section provides a
breakdown of funded, partially funded and unfunded projects by fund. It is important to note that the total
funded amounts in the CIP do not account for unfunded project estimates. The funding proportion is
determined by comparing a project's estimated costs against anticipated revenues and available dollars. It is
22
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
anticipated that revenues to address the unfunded gap will derive from future year allocations of general fund
revenues or other existing recurring revenues, successful pursuit of grants, or identification of new revenue
sources or financing options.
The portion of project estimates that is currently unfunded accounts for 50.40% of total estimated costs for
the projects identified in the "Cost Estimates versus Available Funding" listing. This percentage is derived
from projects that are completely unfunded 30.30% as well as the unfunded portion of partially funded
projects 20.10%. These needs will be evaluated annually based on priorities and availability of funding.
COST ESTIMATE BY FUNDED PROPORTION - $904 MILLION
UNFUNDED
$273,908,043
30.30%
„.•
FUNDED
$336,940,49
37.27%
PARTIALLY FUNDED
$303,658,4E5
33.68%
PARTIALLY FUNDED -
ALLOCATED
$111,496,093
12.33%
PARTIALLY FUNDED
SHORTFALL
$181,70.0,293
20.10%
23
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
efie Yalu/re
24
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
SECTION REPORTS
1 . FUNDING TYPE BY JOB
Cite sutavie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
Grant - Federal
888899 FEMA Hazard Mitigation Grant
B-30183 Garden Storm Sewer - Phase I $750,000 $750,000 $0 $0 $0 $0 $0 $0
888899 $750,000 $750,000 $0 $0 $0 $0 $0 $0
888902 Community Development Block Grant
B-30365E Coral Way NET Office Remodeling / $1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0
B-30695 SW 19th Terr. Imp. -Partial CDBG $300,000 $300,000 $0 $0 $0 $0 $0 $0
B-30774 West Flagler Area Improvements - D4 - $350,000 $350,000 $0 $0 $0 $0 $0 $0
B-30832 Douglas Park ADA Improvement $133,474 $133,474 $0 $0 $0 $0 $0 $0
B-70213 Fire Station No.5 - Interior Renovation $348,240 $0 $348,240 $0 $0 $0 $0 $0
888902 $2,131,714 $1,783,474 $348,240 $0 $0 $0 $0 $0
888925 FEMA Recovery Assistance
B-50654 Overtown Stormwater Pump Station $173,200 $173,200 $0 $0 $0 $0 $0 $0
888925 $173,200 $173,200 $0 $0 $0 $0 $0 $0
888927 Federal Aviation Admin. Grant
ccii B-75001 Watson Island Infrastructure $150,000 $150,000 $0 $0 $0 $0 $0 $0
888927 $150,000 $150,000 $0 $0 $0 $0 $0 $0
888937 Urban Areas Security Initiative Grant
B-70415 MRC Security System Hardening - UASI $69,842 $69,842 $0 $0 $0 $0 $0 $0
888937
888939 FEMA Federal Assistance to Firefighters Grant
B-70411 Fire Rescue Personal Protective
B-70418 FEMA Assistance to Firefighters Program
$69,842 $69,842 $0 $0 $0 $0 $0 $0
$656,466 $656,466 $0 $0 $0 $0 $0 $0
$274,888 $274,888 $0 $0 $0 $0 $0 $0
888939 $931,354
888959 FEMA 2007 & Future Pre -Disaster Mitigation (PDM) Grant
B-30588 San Marco Island and Biscayne Island $600,000
$931,354 $0 $0 $0 $0 $0 $0
$600,000 $0 $0 $0 $0 $0 $0
888959 $600,000 $600,000 $0 $0 $0 $0 $0 $0
888982 FEMA Tree Funding
B-30500T Civic Center NW 14th Street - Tree $100,000 $0 $100,000 $0 $0 $0 $0 $0
B-30538T Museum Park -FEMA Tree Funding $215,943 $0 $215,943 $0 $0 $0 $0 $0
B-30611T DI FEMA Tree Funded Projects $169,930 $0 $169,930 $0 $0 $0 $0 $0
B-30613T D3 FEMA Tree Funded Projects $255,930 $0 $255,930 $0 $0 $0 $0 $0
B-30614T D4 - FEMA Tree Funded Projects $315,930 $0 $315,930 $0 $0 $0 $0 $0
B-30615T D5 FEMA Tree Funded Component $119,930 $0 $119,930 $0 $0 $0 $0 $0
B-30624T Overtown Greenway @ NW 11 Terrace $100,000 $0 $100,000 $0 $0 $0 $0 $0
B-30630T Palm Grove Road Improvements - Tree $70,000 $0 $70,000 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
Grant - Federal (Cont.)
888982 FEMA Tree Funding
B-30687T Coconut Grove Business Improvement $100,000 $0 $100,000 $0 $0 $0 $0 $0
B-30699T Beacom Project Area Improvements - $60,000 $0 $60,000 $0 $0 $0 $0 $0
B-30724T NW 33rd Street Roadway Improvement $60,000 $0 $60,000 $0 $0 $0 $0 $0
B-30727T NW 18th Avenue Roadway $60,000 $0 $60,000 $0 $0 $0 $0 $0
B-30780T NW 14 Ave & 28 St. Are Roadway $26,000 $0 $26,000 $0 $0 $0 $0 $0
B-30822T Brickell Area Shared Use Path and $85,930 $0 $85,930 $0 $0 $0 $0 $0
B-30882T African Square Park - Splash Park D5 $50,000 $0 $50,000 $0 $0 $0 $0 $0
B-30883T NW 12 Avenue/NW 12 Place Roadway $46,000 $0 $46,000 $0 $0 $0 $0 $0
B-40704AT SW 32 Avenue Improvements D2 Tree $60,000 $0 $60,000 $0 $0 $0 $0 $0
888982 $1,895,593 $0 $1,895,593 $0 $0 $0 $0 $0
888983 FDEP Invasive Species at Marine Stadium Marina
B-30706 Miscellaneous Repairs 10% Set Aside $28,975 $0 $28,975 $0 $0 $0 $0 $0
888983 $28,975 $0 $28,975 $0 $0 $0 $0 $0
Grant - Federal
Grant - State
000008 CRA - FIND Grant
B-30538 Museum Park - Partially Funded by CRA
$6,730,678 $4,457,870 $2,272,808
$1,143,000 $1,143,000
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
000008 $1,143,000 $1,143,000 $0 $0 $0 $0 $0 $0
888909 FL Dept of Environmental Protection (FDEP)
B-30588 San Marco Island and Biscayne Island $500,000 $500,000 $0 $0 $0 $0 $0 $0
B-50672 Belle Meade Storm Sewer Project, Ph 2 $500,000 $500,000 $0 $0 $0 $0 $0 $0
B-70011 Clean Vessel Act 2013 - PF $20,584 $0 $0 $20,584 $0 $0 $0 $0
888909 $1,020,584 $1,000,000 $0 $20,584 $0 $0 $0 $0
888913 FDOT Transportation Enhancement Program
B-30130 Miami River Greenway SW 1st Courtto $1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0
B-30336 Miami River Greenway (5th Street $1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0
B-30624 Overtown Greenway @ NW 11 Terrace $1,079,879 $1,079,879 $0 $0 $0 $0 $0 $0
B-30631 Miami River Greenway from Miami $1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0
B-30651 Miami River Greenway from NW loth to $2,339,739 $2,339,739 $0 $0 $0 $0 $0 $0
B-30940 Downtown Miami Bicycle and Pedestrian $250,000 $0 $250,000 $0 $0 $0 $0 $0
B-30941 Downtown Miami Signage and $1,000,000 $0 $0 $0 $1,000,000 $0 $0 $0
B-39911 Venetian Causeway Improvements $1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0
B-40643A North Spring Garden Greenway $1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0
B-40686 Miami River Greenways/ Streetscape $1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
888913 $10,669,618 $9,419,618 $250,000
888917 FDOT Other
$o $1,000,000
$0 $0 $0
B-30500 Civic Center NW 14th Street $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-70715 City of Miami Trolley Program - Capital $1,899,151 $1,899,151 $0 $0 $0 $0 $0 $0
888917 $1,999,151 $1,999,151 $0 $0 $0 $0 $0 $0
888920 FIND Waterways Assistance Program FY07 and Future
B-30541C Kennedy Park Shoreline Stabilization $115,000 $115,000 $0 $0 $0 $0 $0 $0
B-30688 Marine Stadium Restoration $175,000 $175,000 $0 $0 $0 $0 $0 $0
B-30689 Marine Stadium Bulkhead Replacement $802,500 $17,500 $785,000 $0 $0 $0 $0 $0
B-30706 Miscellaneous Repairs 10% Set Aside $38,750 $38,750 $0 $0 $0 $0 $0 $0
B-30721 Spoil Island E Restoration and Floating $72,500 $15,000 $57,500 $0 $0 $0 $0 $0
B-30731 MiamiWomen'sClubBaywalkProject- $46,500 $46,500 $0 $0 $0 $0 $0 $0
B-30801 Manatee Bend Park Shoreline $38,500 $0 $38,500 $0 $0 $0 $0 $0
B-30802 Pallot Park Shoreline Improvements - D2 $30,000 $0 $30,000 $0 $0 $0 $0 $0
B-30825 Biscayne Bay Spoil Island B Public $7,500 $0 $7,500 $0 $0 $0 $0 $0
B-30825A Biscayne Bay Spoil Island E Picnic $7,500 $0 $7,500 $0 $0 $0 $0 $0
v B-30825B Biscayne Bay Spoil Island E Public $7,500 $0 $7,500 $0 $0 $0 $0 $0
B-40171 Coconut Grove Viewing Platform Spoil $7,500 $7,500 $0 $0 $0 $0 $0 $0
B-40172 Coconut Grove Viewing Platform Spoil $7,500 $7,500 $0 $0 $0 $0 $0 $0
B-40180 Marine Stadium Marina at Virginia Key $800,000 $800,000 $0 $0 $0 $0 $0 $0
B-50643 Wagner Creek / Seybold Canal Dredging $1,700,000 $1,000,000 $700,000 $0 $0 $0 $0 $0
B-50722 Little River Waterfront Park $117,500 $117,500 $0 $0 $0 $0 $0 $0
B-50722A Little River Waterfront Park Acquisition $183,750 $0 $183,750 $0 $0 $0 $0 $0
888920 $4,157,500 $2,340,250 $1,817,250 $0 $0 $0 $0 $0
888960 Sunshine State Financing Commission Number 1
B-30538 Museum Park - Partially Funded by CRA $75,534 $75,534 $0 $0 $0 $0 $0 $0
B-30541 Citywide Park Equipment & Site $2,449,706 $2,449,706 $0 $0 $0 $0 $0 $0
B-35887 Moore Park New Construction $145,829 $145,829 $0 $0 $0 $0 $0 $0
888960 $2,671,069 $2,671,069 $0 $0 $0 $0 $0 $0
888961 Sunshine State Financing Commission Number 2
B-30305B Gibson Park New Construction $8,000,467 $8,000,467 $0 $0 $0 $0 $0 $0
B-30538 Museum Park - Partially Funded by CRA $6,015,466 $6,015,466 $0 $0 $0 $0 $0 $0
B-30541 Citywide Park Equipment & Site $1,012,439 $1,012,439 $0 $0 $0 $0 $0 $0
B-30588 San Marco Island and Biscayne Island $475,000 $475,000 $0 $0 $0 $0 $0 $0
B-30671 Caribbean Marketplace Renovation $147,939 $147,939 $0 $0 $0 $0 $0 $0
B-35002 Virginia Key Landfill Assessment $750,000 $750,000 $0 $0 $0 $0 $0 $0
B-35806 Curtis Park New Pool Facility and Boat $505,070 $505,070 $0 $0 $0 $0 $0 $0
B-35812A Duarte Park Building Renovation, $560,000 $560,000 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
Total
Funding
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Prior Approp.
Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
Grant - State (Cont.)
888961 Sunshine State Financing Commission Number 2
B-35838
B-35883A
B-35887
B-60454
B-70100
B-70414
B-72915A
Kennedy Park Restroom Building
Hadley Park New Youth Center D5
Moore Park New Construction
Fire Station #14 (New)
Gusman Hall Improvements / Repairs
James L. Knight Center / Hyatt- Fire
Police Headquarters Helipad and Roof
$21,000
$3,785,528
$1,454,171
$3,845,377
$29,236
$351,876
$400,000
$21,000
$3,785,528
$1,454,171
$3,845,377
$29,236
$351,876
$400,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
888961 $27,353,569
888966 Sunshine State Financing Commission Number 3
B-74609 ERP Integration System $8,356,706
B-74614 Land Management System $5,139,942
$27,353,569
$8,356,706
$5,139,942
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
888966
888981 Florida Boating Improvement Program
B-30706 Miscellaneous Repairs 10% Set Aside
$13,496,648
$13,496,648 $0
$0
$56,893 $0 $46,000 $10,893
$0
$0
$0
$0
$0
$0
$0
$0
888981
888984 State of Florida Department of Health
B-70242 Fire Department - FY2012 "Emergency
$56,893 $0 $46,000 $10,893
$238,000
$0 $0 $238,000
$0
$0
$0
$0
$0
$0
$0
$0
888984
$238,000
$0 $0 $238,000
$0
$0
$0
$0
Grant - State
Grant - Miami -Dade County
373001 Safe Neighborhood Parks Bond
B-30541 Citywide Park Equipment & Site
$62,806,032 $59,423,305 $2,113,250 $269,477
$119,622
$119,622 $0
$0
$1,000,000
$0
$0
$0
$0
$0
$0
$0
373001
373002 Safe Neighborhood Parks Bond 2008 & Future
B-30174 Virginia Key Beach Park Historic
B-30541 Citywide Park Equipment & Site
$119,622
$49,472
$83,320
$119,622 $0
$49,472 $0
$83,320 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
373002
888896 Miami -Dade County DERM Virginia Key Grant
B-35002 Virginia Key Landfill Assessment
$132,792
$650,000
$132,792 $0
$650,000 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
888896
888938 Miami -Dade County Grant/Contribution
B-30501B Manuel Artime Dimmer Rack System
B-30637A South Miami Avenue Drainage
$650,000
$13,239
$204,444
$650,000 $0
$13,239
$204,444
$0
$0 $0
$0 $0
$0
$0
$0
$0
$0 $0 $0 $0
$0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
Grant - Miami -Dade County (Cont.)
888938 Miami -Dade County Grant/Contribution
B-30646 South Bayshore Drive Roadway and $8,304,395 $450,000 $0 $2,000,000 $1,000,000 $2,000,000 $1,000,000 $1,854,395
888938 $8,522,078 $667,683 $0 $2,000,000 $1,000,000 $2,000,000 $1,000,000 $1,854,395
888947 MDC Building Better Communities GOB
B-30008 Grove Park Road and Storm Sewers $6,250,000 $681,000 $0 $0 $1,800,000 $1,300,000 $2,469,000 $0
B-30011 Englewood Road and Storm Sewer $6,250,000 $681,000 $0 $1,800,000 $1,300,000 $2,469,000 $0 $0
B-30504 Linear Parks, Greenways and Baywalk $961,000 $0 $0 $0 $961,000 $0 $0 $0
B-30531 Dorsey Memorial Library Restoration $250,000 $250,000 $0 $0 $0 $0 $0 $0
B-30690 West End Park New Community $1,500,000 $0 $1,500,000 $0 $0 $0 $0 $0
B-30784 Health District Riverwalk $961,000 $0 $0 $0 $200,000 $761,000 $0 $0
B-40456 Antonio Maceo Community Building - $1,500,000 $0 $0 $0 $1,500,000 $0 $0 $0
B-40457 Kinloch Park Building Addition - D1 $1,300,000 $0 $0 $300,000 $1,000,000 $0 $0 $0
888947 $18,972,000 $1,612,000 $1,500,000 $2,100,000 $6,761,000 $4,530,000 $2,469,000 $0
888953 Miami -Dade Metropolitan Planning Org (MPO)
N B-30645E Overtown / Wynwood Bicycle $48,000 $48,000 $0 $0 $0 $0 $0 $0
co
B-30645F Miami Regional Intermodal Plan $33,000 $0 $33,000 $0 $0 $0 $0 $0
888953 $81,000 $48,000 $33,000 $0 $0 $0 $0 $0
888976 Miami -Dade County Dept Cultural Affairs
B-30671 Caribbean Marketplace Renovation $354,614 $354,614 $0 $0 $0 $0 $0 $0
888976 $354,614 $354,614 $0 $0 $0 $0 $0 $0
Grant - Miami -Dade County
Grant - Other
$28,832,106 $3,584,711 $1,533,000 $4,100,000 $7,761,000 $6,530,000 $3,469,000 $1,854,395
000004 CRA Operating Budget
B-30305B Gibson Park New Construction $3,800,000 $3,800,000 $0 $0 $0 $0 $0 $0
B-30394 North 14 St. Multi Media Entertainment $6,000,000 $6,000,000 $0 $0 $0 $0 $0 $0
B-30538 Museum Park - Partially Funded by CRA $6,143,000 $6,143,000 $0 $0 $0 $0 $0 $0
B-30538B Museum Park Environmental $1,800,000 $1,800,000 $0 $0 $0 $0 $0 $0
B-30731 MiamiWomen'sClubBaywalkProject- $46,500 $46,500 $0 $0 $0 $0 $0 $0
B-40169 300 NW 11 Street Community Center - $1,500,000 $1,500,000 $0 $0 $0 $0 $0 $0
000004 $19,289,500 $19,289,500 $0 $0 $0 $0 $0 $0
888948 School Board of Miami -Dade County - Grant
B-72915A Police Headquarters Helipad and Roof $850,854 $0 $850,854 $0 $0 $0 $0 $0
888948 $850,854 $0 $850,854 $0 $0 $0 $0 $0
888955 MSEA Contribution to Capital
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
Grant - Other (Cont.)
888955 MSEA Contribution to Capital
B-30671 Caribbean Marketplace Renovation $350,000 $350,000 $0 $0 $0 $0 $0 $0
888955 $350,000 $350,000 $0 $0 $0 $0 $0 $0
888957 Downtown Development Agency
B-30645A
B-30940
B-30941
Transportation Program Support
Downtown Miami Bicycle and Pedestrian
Downtown Miami Signage and
$25,000 $25,000 $0 $0 $0 $0 $0 $0
$37,500 $0 $37,500 $0 $0 $0 $0 $0
$150,000 $0 $0 $0 $150,000 $0 $0 $0
888957 $212,500 $25,000 $37,500 $0 $150,000 $0 $0 $0
888962 The Children's Trust
B-30174 Virginia Key Beach Park Historic $260,000 $260,000 $0 $0 $0 $0 $0 $0
888962 $260,000 $260,000 $0 $0 $0 $0 $0 $0
888965 Bayfront Park Management Trust
B-40173 Bayfront Park Electrical Repairs $309,000 $309,000 $0 $0 $0 $0 $0 $0
888965 $309,000 $309,000 $0 $0 $0 $0 $0 $0
Grant - Other
City Bonds
$21,271,854 $20,233,500 $888,354 $0 $150,000 $0 $0 $0
356005-1 Streets Bond Program - Series 1
B-30008A Grove Park Road Improvements - D3 $244,499 $244,499 $0 $0 $0 $0 $0 $0
B-30011 Englewood Road and Storm Sewer $1,643,748 $1,643,748 $0 $0 $0 $0 $0 $0
B-30130 Miami River Greenway SW 1st Courtto $407,530 $407,530 $0 $0 $0 $0 $0 $0
B-30167D Shenandoah Roadway Improvements $353,127 $353,127 $0 $0 $0 $0 $0 $0
B-30168A Silver Bluff Traffic Calming Priority 3 - $188,804 $188,804 $0 $0 $0 $0 $0 $0
B-30377C District 3 - Sidewalk Repairs and ADA $250,691 $250,691 $0 $0 $0 $0 $0 $0
B-30540 Little River Industrial Park $1,988,000 $1,988,000 $0 $0 $0 $0 $0 $0
B-30606 DWNTWNBeautificationProjectPhase $236,151 $236,151 $0 $0 $0 $0 $0 $0
B-30606D DWNTWN Beautification - Design $341,271 $341,271 $0 $0 $0 $0 $0 $0
B-30606L DWNTWN Beautification (Lighting) $1,371,543 $1,371,543 $0 $0 $0 $0 $0 $0
B-30606N DWNTWN Beautification - North $4,651,682 $4,651,682 $0 $0 $0 $0 $0 $0
B-30606S DWNTWN Beautification - South $3,399,353 $3,399,353 $0 $0 $0 $0 $0 $0
B-30610 NW 7th Court $170,283 $170,283 $0 $0 $0 $0 $0 $0
B-30613 District 3 - Miscellaneous Roadway $0 $0 $0 $0 $0 $0 $0 $0
B-30614 District 4 - Miscellaneous Roadway $36,001 $36,001 $0 $0 $0 $0 $0 $0
B-30643 Lummus Park Landing Project - Street $1,368,535 $1,368,535 $0 $0 $0 $0 $0 $0
B-30662D US-1 Median Closures at Bridgeport $280,576 $280,576 $0 $0 $0 $0 $0 $0
B-30677 D3 - Sidewalk ADA Retrofits $700,000 $700,000 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
City Bonds (Cont.)
356005-1 Streets Bond Program - Series 1
B-30687 Coconut Grove Business Improvement $203,036 $203,036 $0 $0 $0 $0 $0 $0
B-30699 Beacom Project Area Improvements $1,053,114 $1,053,114 $0 $0 $0 $0 $0 $0
B-30718 I-95 South Miami Terminal Street $350,000 $350,000 $0 $0 $0 $0 $0 $0
B-30722 NW 31st Street Roadway Improvement $311,000 $311,000 $0 $0 $0 $0 $0 $0
B-30732 NW 9th Street Roadway Improvement $259,540 $259,540 $0 $0 $0 $0 $0 $0
B-30749 Citrus Grove Roadway Improvements $556,791 $556,791 $0 $0 $0 $0 $0 $0
B-30770 SW 22nd Avenue Medians - US 1 to $4,622 $4,622 $0 $0 $0 $0 $0 $0
B-30771 Traffic Calming SW 6th Street Project - $324,670 $324,670 $0 $0 $0 $0 $0 $0
B-30776 Silver Bluff Drainage Improvements - D4 $1,384,644 $1,384,644 $0 $0 $0 $0 $0 $0
B-30778 Traffic Circle - SW 18th Ave. & SW 13th $102,557 $102,557 $0 $0 $0 $0 $0 $0
B-30780 NW 14 Avenue and 28 Street Area $447,337 $447,337 $0 $0 $0 $0 $0 $0
B-30781 NW 11 Street from 27 to 37 Avenue Area $751,218 $751,218 $0 $0 $0 $0 $0 $0
B-30884 NW 62 Street West of I-95 Roadway $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-30891 Buena Vista One -Way Street Conversion $250,000 $250,000 $0 $0 $0 $0 $0 $0
w B-30894 Little Haiti Right of Way Improvements - $500,000 $500,000 $0 $0 $0 $0 $0 $0
B-30960 La Pastorita Traffic Calming and misc. $121,810 $121,810 $0 $0 $0 $0 $0 $0
B-30982 Little River Area Road and Drainage $180,900 $180,900 $0 $0 $0 $0 $0 $0
B-30983 NW 44th Street between NW 7th and $63,045 $63,045 $0 $0 $0 $0 $0 $0
B-40300 SW 18th Terr. Road Improvements - D3 $17,929 $17,929 $0 $0 $0 $0 $0 $0
B-40643A North Spring Garden Greenway $1,257,175 $1,257,175 $0 $0 $0 $0 $0 $0
B-40672D Flagami Traffic Calming Phase IV - D4 $459,881 $459,881 $0 $0 $0 $0 $0 $0
B-40686 Miami River Greenways/ Streetscape $455,506 $455,506 $0 $0 $0 $0 $0 $0
B-40704A SW 32 Avenue Improvements $657,244 $657,244 $0 $0 $0 $0 $0 $0
B-50672 Belle Meade Storm Sewer Project, Ph 2 $1,957,219 $1,957,219 $0 $0 $0 $0 $0 $0
B-78500B Buena Vista East Roadway, Drainage, $2,117,620 $2,117,620 $0 $0 $0 $0 $0 $0
356005-1 $31,518,652 $31,518,652 $0 $0 $0 $0 $0 $0
356005-2 Streets Bond Program - Series 2
B-30008A Grove Park Road Improvements - D3 $383,822 $383,822 $0 $0 $0 $0 $0 $0
B-30130 Miami River Greenway SW 1st Courtto $150,000 $150,000 $0 $0 $0 $0 $0 $0
B-30167D Shenandoah Roadway Improvements $1,196,873 $1,196,873 $0 $0 $0 $0 $0 $0
B-30168A Silver Bluff Traffic Calming Priority 3 - $514,740 $514,740 $0 $0 $0 $0 $0 $0
B-30500 Civic Center NW 14th Street $2,500,000 $2,500,000 $0 $0 $0 $0 $0 $0
B-30588 San Marco Island and Biscayne Island $600,000 $600,000 $0 $0 $0 $0 $0 $0
B-30606 DWNTWN Beautification Project Phase $2,864,414 $2,864,414 $0 $0 $0 $0 $0 $0
B-30606D DWNTWN Beautification - Design $157,509 $157,509 $0 $0 $0 $0 $0 $0
B-30606L DWNTWN Beautification (Lighting) $3,104,372 $3,104,372 $0 $0 $0 $0 $0 $0
B-30606N DWNTWN Beautification - North $1,754,250 $1,754,250 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
City Bonds (Cont.)
356005-2 Streets Bond Program - Series 2
B-30606S DWNTWN Beautification - South $680,000 $680,000 $0 $0 $0 $0 $0 $0
B-30610 NW 7th Court $189,717 $189,717 $0 $0 $0 $0 $0 $0
B-30611 District 1 - Miscellaneous Roadway $14,234 $14,234 $0 $0 $0 $0 $0 $0
B-30613 District 3 - Miscellaneous Roadway $21,044 $21,044 $0 $0 $0 $0 $0 $0
B-30614 District 4 - Miscellaneous Roadway $97,565 $97,565 $0 $0 $0 $0 $0 $0
B-30615 District 5 - Miscellaneous Roadway $1,004,511 $1,004,511 $0 $0 $0 $0 $0 $0
B-30630 Palm Grove Road Improvements $2,379,918 $2,379,918 $0 $0 $0 $0 $0 $0
B-30637 Mary Brickell Village Drainage $2,000,000 $2,000,000 $0 $0 $0 $0 $0 $0
B-30687 Coconut Grove Business Improvement $2,896,602 $2,896,602 $0 $0 $0 $0 $0 $0
B-30695 SW 19th Terr. Imp. -Partial CDBG $67,191 $67,191 $0 $0 $0 $0 $0 $0
B-30716 Tigertail Resurfacing - D2 $400,400 $400,400 $0 $0 $0 $0 $0 $0
B-30718 I-95 South Miami Terminal Street $509,000 $509,000 $0 $0 $0 $0 $0 $0
B-30724 NW 33rd Street Roadway Improvement $3,700,000 $3,700,000 $0 $0 $0 $0 $0 $0
B-30727 NW 18th Avenue Roadway Improvement $1,810,000 $1,810,000 $0 $0 $0 $0 $0 $0
iw B-30729 NW 17th Terrace Roadway Improvement $250,000 $250,000 $0 $0 $0 $0 $0 $0
B-30730 NW 4th Terrace Roadway Improvement $75,000 $75,000 $0 $0 $0 $0 $0 $0
B-30732 NW 9th Street Roadway Improvement $496,708 $496,708 $0 $0 $0 $0 $0 $0
B-30760 SW 17th Avenue Roadway & Drainage $600,000 $600,000 $0 $0 $0 $0 $0 $0
B-30775 Shenandoah Area Improvements - D4 $0 $0 $0 $0 $0 $0 $0 $0
B-30776 Silver Bluff Drainage Improvements - D4 $152,442 $152,442 $0 $0 $0 $0 $0 $0
B-30781 NW 11 Street from 27 to 37 Avenue Area $40,581 $40,581 $0 $0 $0 $0 $0 $0
B-30830 US1 Landscaping between 17 Ave and $55,000 $55,000 $0 $0 $0 $0 $0 $0
B-30880 NE 2nd Court Roadway and Drainage $400,000 $400,000 $0 $0 $0 $0 $0 $0
B-30892 Little Haiti Gateway Signs - D5 $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-30960 La Pastorita Traffic Calming and misc. $503,190 $503,190 $0 $0 $0 $0 $0 $0
B-30980 Liberty Square T-Turnarounds - D5 $250,000 $250,000 $0 $0 $0 $0 $0 $0
B-30983 NW 44th Street between NW 7th and $121,955 $121,955 $0 $0 $0 $0 $0 $0
B-39911 Venetian Causeway Improvements $2,196,465 $2,196,465 $0 $0 $0 $0 $0 $0
B-40300 SW 18th Terr. Road Improvements - D3 $98,192 $98,192 $0 $0 $0 $0 $0 $0
B-40301 SW 15th Street Road Improvements $84,969 $84,969 $0 $0 $0 $0 $0 $0
B-40302 SW 1st Avenue Road Improvements - $230,928 $230,928 $0 $0 $0 $0 $0 $0
B-40303 SW 23rd Road Improvements - D3 $244,748 $244,748 $0 $0 $0 $0 $0 $0
B-40306 SW loth Street Road Improvements - D3 $307,385 $307,385 $0 $0 $0 $0 $0 $0
B-40307 SW 16th Street Road Improvements - D3 $257,693 $257,693 $0 $0 $0 $0 $0 $0
B-40308 SW 17th Terrace Road Improvements - $225,567 $225,567 $0 $0 $0 $0 $0 $0
B-40310 SW 20th Road Improvements - D3 $116,682 $116,682 $0 $0 $0 $0 $0 $0
B-40312 SW 22nd Terr. & SW 13th Ave Road $376,211 $376,211 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
City Bonds (Cont.)
356005-2 Streets Bond Program - Series 2
B-40313 SW 3rd Ave Road Improvements - D3 $293,740 $293,740 $0 $0 $0 $0 $0 $0
B-40314 NW 18th Place Road Improvements - D3 $224,611 $224,611 $0 $0 $0 $0 $0 $0
B-40315 SW 15th Street Road Improvements $245,349 $245,349 $0 $0 $0 $0 $0 $0
B-40317 SW 28th Road Improvements - D3 $40,149 $40,149 $0 $0 $0 $0 $0 $0
B-40318 SW 1st Ave Road Improvements - $167,562 $167,562 $0 $0 $0 $0 $0 $0
B-40319 SW 25th Road Improvements - D3 $118,561 $118,561 $0 $0 $0 $0 $0 $0
B-40320 SW 26th Road Improvements Segment 2 $498,804 $498,804 $0 $0 $0 $0 $0 $0
B-40321 SW 2nd Ave Road Improvements - D3 $721,333 $721,333 $0 $0 $0 $0 $0 $0
B-40322 SW 27th Road Improvements - D3 $498,804 $498,804 $0 $0 $0 $0 $0 $0
B-40323 SW 1st Ave Road Improvements Segment $126,638 $126,638 $0 $0 $0 $0 $0 $0
B-40324 NW l lth Ave Road Improvements - D3 $160,203 $160,203 $0 $0 $0 $0 $0 $0
B-40325 Beacom Phase II - D3 $1,500,000 $1,500,000 $0 $0 $0 $0 $0 $0
B-40326 The Roads Roadway Improvements - D3 $500,000 $500,000 $0 $0 $0 $0 $0 $0
B-40327 Shenandoah Roadway Improvements - $1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0
w B-40672D Flagami Traffic Calming Phase IV - D4 $738,131 $738,131 $0 $0 $0 $0 $0 $0
B-40672G Flagami Traffic Calming - D4 $590,000 $590,000 $0 $0 $0 $0 $0 $0
B-40686 Miami River Greenways/ Streetscape $1,179,778 $1,179,778 $0 $0 $0 $0 $0 $0
B-40704A SW 32 Avenue Improvements $310,083 $310,083 $0 $0 $0 $0 $0 $0
356005-2 $45,093,624 $45,093,624 $0 $0 $0 $0 $0 $0
369100 1991 Fire Bonds
B-72802 Fire Stations & Other Fire Facilities $46,477 $46,477 $0 $0 $0 $0 $0 $0
369100 $46,477 $46,477 $0 $0 $0 $0 $0 $0
371100 Series 1995 Sanitary Sewer Bonds
B-70600 Police Department Sanitary Sewer $60,000 $60,000 $0 $0 $0 $0 $0 $0
371100 $60,000 $60,000 $0 $0 $0 $0 $0 $0
385200-1 2002 Homeland Defense Bonds (Series 1)
B-30538 Museum Park -Partially Funded by CRA $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-30541 Citywide Park Equipment & Site $19,940 $19,940 $0 $0 $0 $0 $0 $0
B-30671 Caribbean Marketplace Renovation $45,111 $45,111 $0 $0 $0 $0 $0 $0
B-33514 Marine Stadium Marina Improvements $58,775 $58,775 $0 $0 $0 $0 $0 $0
B-35806 Curtis Park New Pool Facility and Boat $14,072 $14,072 $0 $0 $0 $0 $0 $0
B-35838 Kennedy Park Restroom Building $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-35887 Moore Park New Construction $393,641 $393,641 $0 $0 $0 $0 $0 $0
B-35904 Neighborhood Parks Improv. $260,307 $260,307 $0 $0 $0 $0 $0 $0
B-40643A North Spring Garden Greenway $79,800 $79,800 $0 $0 $0 $0 $0 $0
B-40695E Miami River Greenway Segment G and $5,085 $5,085 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
Total
Funding
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Prior Approp.
Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
City Bonds (Cont.)
385200-1 2002 Homeland Defense Bonds (Series 1)
B-60453A
B-60454
B-72803
B-72813
B-78508
Fire Station #13
Fire Station #14 (New)
Fire Station Equipment and Furniture
Defense and Security Equipment
NE 2 Avenue Improvements
$52,992
$181,362
$3,798
$802,249
$1,050,600
$52,992
$181,362
$3,798
$802,249
$1,050,600
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
385200-1
385200-2 2002 Homeland Defense Bonds (Series 2)
$3,167,732
B-30134A Bryan Park Community Building - D4 $6,992
B-30174 Virginia Key Beach Park Historic $1,046,765
B-30305B Gibson Park New Construction $97,774
B-30538 Museum Park - Partially Funded by CRA $278,153
B-30541 Citywide Park Equipment & Site $408,167
B-30671 Caribbean Marketplace Renovation $204,889
B-30689 Marine Stadium Bulkhead Replacement $839,408
B-30690 West End Park New Community $8,311
B-30772 Bay of Pigs Park Lighting - D4 $53,000
B-30800 Fern Isle / PBA Park Improvements $116,782
B-35806 Curtis Park New Pool Facility and Boat $108,439
B-35812D Duarte Park Building Renovation, $15,000
B-39910E District 2 Quality of Life Park $578,237
B-40457 Kinloch Park Building Addition - D1 $47,843
B-60453A Fire Station #13 $5,006,636
B-60464 New Dinner Key Marina Dockmaster $250,006
B-72813 Defense and Security Equipment $983,364
B-78502A Museum of Science - Development in $738,000
$3,167,732
$6,992
$1,046,765
$97,774
$278,153
$408,167
$204,889
$839,408
$8,311
$53,000
$116,782
$108,439
$15,000
$578,237
$47,843
$5,006,636
$250,006
$983,364
$738,000
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
385200-2
385200-3 2002 Homeland Defense Bonds (Series 3)
B-30134A Bryan Park Community Building - D4
B-30178 Design District/FEC
B-30179
B-30373A
B-30538B
B-30541
B-30541C
B-30541D
B-30547E
Downtown Baywalk Master Plan &
Police Department Property Unit
Museum Park Environmental
Citywide Park Equipment & Site
Kennedy Park Shoreline Stabilization
Citywide Park Equipments & Site
Parks ADA Modifications - District 2
$10,787,766
$845,136
$100,000
$450,000
$116,235
$200,000
$457,515
$71,000
$31,000
$215,348
$10,787,766 $0
$845,136
$100,000
$450,000
$116,235
$200,000
$457,515
$71,000
$31,000
$215,348
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Active & Future
CIP Projects Only
FUNDING
Total
Funding
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Prior Approp.
Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
City Bonds (Cont.)
385200-3 2002
B-30547G
B-30680
B-30688
B-30689
B-30690
B-30696
B-30721
B-30773
B-30777
B-30778
B-30779
B-30801
B-30802
B-30882
B-30884
B-30886
B-30960
B-30961
B-30962
B-30963
B-30964
B-30965
B-30981
B-33514
B-35806
B-35812A
B-35838
B-35861B
B-35883A
B-35887
B-35904
B-39910
B-39910C
B-39910E
B-39910K
B-40180
B-40456
Homeland Defense Bonds (Series 3)
Parks ADA Modifications - District 4
Rockerman Canal Improvements
Marine Stadium Restoration
Marine Stadium Bulkhead Replacement
West End Park New Community
Miamarina Pier A, B & C Fire Line
Spoil Island E Restoration and Floating
Martin Luther King (MLK) Blvd / I-95
Coral Gate Mini Park - D4
Traffic Circle - SW 18th Ave. & SW 13th
SW 2nd Street and SW 40th Avenue
Manatee Bend Park Shoreline
Pallot Park Shoreline Improvements - D2
African Square Park - Splash Park - D5
NW 62 Street West of I-95 Roadway
Lummus Landing Square - D5
La Pastorita Traffic Calming and misc.
East Flagami Roadway Improvements -
Robert King High Fencing and
Bay of Pigs Memorial Park Lighting - D4
Modification of Speed Humps on SW 11
Coral Gate Speed Humps - D4
Oakland Grove Park - upgrades - D5
Marine Stadium Marina Improvements
Curtis Park New Pool Facility and Boat
Duarte Park Building Renovation,
Kennedy Park Restroom Building
Maximo Gomez / Domino Park
Hadley Park New Youth Center D5
Moore Park New Construction
Neighborhood Parks Improv.
Quality of Life District 2 - Various
North Venetian Drive Lighting (District
District 2 Quality of Life Park
Bayside Historic Sign - D2
Marine Stadium Marina at Virginia Key
Antonio Maceo Community Building -
$491,147 $491,147 $0 $0 $0 $0 $0 $0
$65,000 $65,000 $0 $0 $0 $0 $0 $0
$175,000 $175,000 $0 $0 $0 $0 $0 $0
$178,000 $178,000 $0 $0 $0 $0 $0 $0
$1,090,210 $1,090,210 $0 $0 $0 $0 $0 $0
$380,000 $380,000 $0 $0 $0 $0 $0 $0
$105,000 $105,000 $0 $0 $0 $0 $0 $0
$100,000 $100,000 $0 $0 $0 $0 $0 $0
$100,000 $100,000 $0 $0 $0 $0 $0 $0
$10,000 $10,000 $0 $0 $0 $0 $0 $0
$50,000 $50,000 $0 $0 $0 $0 $0 $0
$50,027 $50,027 $0 $0 $0 $0 $0 $0
$50,000 $50,000 $0 $0 $0 $0 $0 $0
$600,000 $600,000 $0 $0 $0 $0 $0 $0
$75,000 $75,000 $0 $0 $0 $0 $0 $0
$925,061 $925,061 $0 $0 $0 $0 $0 $0
$50,000 $50,000 $0 $0 $0 $0 $0 $0
$422,264 $422,264 $0 $0 $0 $0 $0 $0
$102,468 $102,468 $0 $0 $0 $0 $0 $0
$20,000 $20,000 $0 $0 $0 $0 $0 $0
$25,000 $25,000 $0 $0 $0 $0 $0 $0
$53,000 $53,000 $0 $0 $0 $0 $0 $0
$42,190 $42,190 $0 $0 $0 $0 $0 $0
$120,000 $120,000 $0 $0 $0 $0 $0 $0
$1,297,161 $1,297,161 $0 $0 $0 $0 $0 $0
$752,797 $752,797 $0 $0 $0 $0 $0 $0
$96,133 $96,133 $0 $0 $0 $0 $0 $0
$19,127 $19,127 $0 $0 $0 $0 $0 $0
$1,591,277 $1,591,277 $0 $0 $0 $0 $0 $0
$5,168,221 $5,168,221 $0 $0 $0 $0 $0 $0
$510,916 $510,916 $0 $0 $0 $0 $0 $0
$60,132 $60,132 $0 $0 $0 $0 $0 $0
$100,000 $100,000 $0 $0 $0 $0 $0 $0
$409,751 $409,751 $0 $0 $0 $0 $0 $0
$33,000 $33,000 $0 $0 $0 $0 $0 $0
$940,007 $940,007 $0 $0 $0 $0 $0 $0
$65,722 $65,722 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
Total
Funding
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Prior Approp.
Approp. 2012 - 2013
THIS DOCUMENT IS ASUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
City Bonds (Cont.)
385200-3 2002
B-40643A
B-40686
B-50706A
B-60453A
B-60454
B-60464
B-70100
B-72813
B-75883
B-75973
B-78502A
B-78508
Homeland Defense Bonds (Series 3)
North Spring Garden Greenway
Miami River Greenways/ Streetscape
Roadway, Drainage and Traffic
Fire Station #13
Fire Station #14 (New)
New Dinner Key Marina Dockmaster
Gusman Hall Improvements / Repairs
Defense and Security Equipment
Peacock Park Site Improvements
Oakland Grove Park Playground
Museum of Science - Development in
NE 2 Avenue Improvements
$100,200
$478,217
$776,000
$18,364
$1,050,105
$3,213,164
$394,169
$1,981,636
$595,000
$15,000
$1,262,000
$2,649,420
$100,200
$478,217
$776,000
$18,364
$1,050,105
$3,213,164
$394,169
$1,981,636
$595,000
$15,000
$1,262,000
$2,649,420
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
385200-3 $31,343,120
385200-8 2002 Homeland Defense Series 1 Interest Post 09-30-06
B-30305B
B-30538
B-30981
B-35861B
Gibson Park New Construction
Museum Park - Partially Funded by CRA
Oakland Grove Park - upgrades - D5
Maximo Gomez / Domino Park
$841,280
$236,436
$2,697
$29,241
$31,343,120 $0
$841,280
$236,436
$2,697
$29,241
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
385200-8 $1,109,654
397001 1970 Pollution Control G.O.B. (303000) (399003)
B-60351 Fire Station #10 (New) $361,200
$1,109,654 $0
$361,200 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
397001
399001 1976 & 78 Storm Sewer G O Bond
B-30183 Garden Storm Sewer - Phase I
B-50643 Wagner Creek / Seybold Canal Dredging
$361,200
$250,000
$617,481
$361,200 $0
$250,000 $0
$617,481 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
399001
$867,481
$867,481 $0
$0
$0
$0
$0
$0
City Bonds
CIP Fees/Revenues
356001 Local Option Gas Tax
B-30551 Public Works Maintenance Yard
B-30588 San Marco Island and Biscayne Island
B-30615 District 5 - Miscellaneous Roadway
B-30700 Citywide - FDEP Drainage Wells
B-30992 Riverview and Lawrence Pump Stations -
124,355,706 124,355,706 $0
$2,000,000 $2,000,000
$747,170 $747,170
$193,767 $193,767
$500,000 $500,000
$500,000 $500,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
CIP Fees/Revenues (Cont.)
356001 Local Option Gas Tax
B-40168 South Bayshore Drive from Aviation $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-40643A North Spring Garden Greenway $325,000 $325,000 $0 $0 $0 $0 $0 $0
B-50654 Overtown Stormwater Pump Station $200,000 $200,000 $0 $0 $0 $0 $0 $0
B-78500B Buena Vista East Roadway, Drainage, $250,862 $250,862 $0 $0 $0 $0 $0 $0
356001 $4,816,799 $4,816,799 $0 $0 $0 $0 $0 $0
356002 Local Option Gas Tax 2009 and Future
B-43114B Public Works Miscellaneous Sidewalk $484,400 $158,400 $326,000 $0 $0 $0 $0 $0
B-73102C Citywide Street Milling and Resurfacing $401,400 $0 $0 $401,400 $0 $0 $0 $0
356002 $885,800 $158,400 $326,000 $401,400 $0 $0 $0 $0
356003 Parking Surcharge
B-71210 Downtown Street Conversions $50,000 $50,000 $0 $0 $0 $0 $0 $0
356003 $50,000 $50,000 $0 $0 $0 $0 $0 $0
356007 Parking Surcharge 2007
v B-30606N DWNTWN Beautification - North $549,715 $549,715 $0 $0 $0 $0 $0 $0
B-306065 DWNTWN Beautification - South $549,716 $549,716 $0 $0 $0 $0 $0 $0
B-30621 Center Grove Street and Lighting $888,185 $888,185 $0 $0 $0 $0 $0 $0
B-30628 Bird Avenue Road Improvement $1,280,505 $1,280,505 $0 $0 $0 $0 $0 $0
B-30631 Miami River Greenway from Miami $221,625 $221,625 $0 $0 $0 $0 $0 $0
B-30637 Mary Brickell Village Drainage $1,623,442 $1,000,000 $0 $623,442 $0 $0 $0 $0
B-30646 South Bayshore Drive Roadway and $300,000 $0 $0 $300,000 $0 $0 $0 $0
B-30833 SW 1st Ave between SW 15th and SW $368,212 $0 $0 $368,212 $0 $0 $0 $0
B-31206 SE 3rd Street Widening $280,205 $280,205 $0 $0 $0 $0 $0 $0
B-73102A Citywide Streets Milling & Resurfacing $2,452,375 $1,023,775 $1,428,600 $0 $0 $0 $0 $0
B-73102B Citywide Streets Milling and $6,207,946 $0 $0 $607,946 $1,400,000 $1,400,000 $1,400,000 $1,400,000
356007 $14,721,926 $5,793,726 $1,428,600 $1,899,600 $1,400,000 $1,400,000 $1,400,000 $1,400,000
359101 Special Assessment District (SAD) Revenue
B-30680 Rockerman Canal Improvements $272,490 $248,490 $24,000 $0 $0 $0 $0 $0
359101 $272,490 $248,490 $24,000 $0 $0 $0 $0 $0
360001 Stormwater Utility Fund
B-30262 Citywide Storm Sewer Repair Project $1,372,476 $1,372,476 $0 $0 $0 $0 $0 $0
B-30680 Rockerman Canal Improvements $286,599 $286,599 $0 $0 $0 $0 $0 $0
B-50643 Wagner Creek/ Seybold Canal Dredging $2,534,159 $2,534,159 $0 $0 $0 $0 $0 $0
B-50654 Overtown Stormwater Pump Station $360,152 $360,152 $0 $0 $0 $0 $0 $0
B-50672 Belle Meade Storm Sewer Project, Ph 2 $3,357,982 $3,357,982 $0 $0 $0 $0 $0 $0
360001 $7,911,368 $7,911,368 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
CIP Fees/Revenues (Cont.)
360003 Stormwater Utility Fund (FY07 and Future)
B-30008 Grove Park Road and Storm Sewers $119,000 $119,000 $0 $0 $0 $0 $0 $0
B-30011 Englewood Road and Storm Sewer $273,961 $273,961 $0 $0 $0 $0 $0 $0
B-30262 Citywide Storm Sewer Repair Project $4,038,685 $2,738,685 $700,000 $600,000 $0 $0 $0 $0
B-30421 D1 - Stromwater Projects $1,078,000 $0 $0 $0 $238,000 $280,000 $280,000 $280,000
B-30422 D2 - Stormwater Projects $1,078,000 $0 $0 $0 $238,000 $280,000 $280,000 $280,000
B-30423 D3 - Stormwater Projects $1,078,000 $0 $0 $0 $238,000 $280,000 $280,000 $280,000
B-30424 D4 - Stormwater Projects $1,078,000 $0 $0 $0 $238,000 $280,000 $280,000 $280,000
B-30425 D5 - Stormwater Projects $1,078,000 $0 $0 $0 $238,000 $280,000 $280,000 $280,000
B-30588 San Marco Island and Biscayne Island $489,938 $489,938 $0 $0 $0 $0 $0 $0
B-30637 Mary Brickell Village Drainage $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-30680 Rockerman Canal Improvements $272,726 $272,726 $0 $0 $0 $0 $0 $0
B-30700 Citywide - FDEP Drainage Wells $1,740,934 $504,934 $0 $400,000 $209,000 $209,000 $209,000 $209,000
B-30992 Riverview and Lawrence Pump Stations - $1,324,095 $624,095 $700,000 $0 $0 $0 $0 $0
B-40271 Solid Waste Sweeper $170,000 $170,000 $0 $0 $0 $0 $0 $0
w B-50643 Wagner Creek / Seybold Canal Dredging $430,297 $430,297 $0 $0 $0 $0 $0 $0
B-50672 Belle Meade Storm Sewer Project, Ph 2 $2,415,562 $2,415,562 $0 $0 $0 $0 $0 $0
B-50706A Roadway, Drainage and Traffic $154,916 $154,916 $0 $0 $0 $0 $0 $0
360003 $16,920,114 $8,294,114 $1,400,000 $1,000,000 $1,399,000 $1,609,000 $1,609,000 $1,609,000
367001 Impact Fees
B-30373A Police Department Property Unit $386,102 $386,102 $0 $0 $0 $0 $0 $0
B-31206 SE 3rd Street Widening $177,892 $177,892 $0 $0 $0 $0 $0 $0
B-35806 Curtis Park New Pool Facility and Boat $9,295 $9,295 $0 $0 $0 $0 $0 $0
B-35838 Kennedy Park Restroom Building $4,900 $4,900 $0 $0 $0 $0 $0 $0
B-50654 Overtown Stormwater Pump Station $12,088 $12,088 $0 $0 $0 $0 $0 $0
B-50672 Belle Meade Storm Sewer Project, Ph 2 $700,000 $700,000 $0 $0 $0 $0 $0 $0
B-60351 Fire Station #10 (New) $195,737 $195,737 $0 $0 $0 $0 $0 $0
B-70108 Purchase of a video transmission server $0 $0 $0 $0 $0 $0 $0 $0
B-72803 Fire Station Equipment and Furniture $82,022 $82,022 $0 $0 $0 $0 $0 $0
B-74205B GSA Fleet Maintenance Garage $250,063 $250,063 $0 $0 $0 $0 $0 $0
367001 $1,818,099 $1,818,099 $0 $0 $0 $0 $0 $0
367011 Impact Fees - Ord 12750
B-30174 Virginia Key Beach Park Historic $124,500 $0 $124,500 $0 $0 $0 $0 $0
B-30373A Police Department Property Unit $447,200 $367,200 $80,000 $0 $0 $0 $0 $0
B-30541 Citywide Park Equipment & Site $345,785 $345,785 $0 $0 $0 $0 $0 $0
B-30541D Citywide Park Equipments & Site $1,741,439 $483,112 $1,258,327 $0 $0 $0 $0 $0
B-30984 Athalie Range Park HVAC Replacement $193,043 $0 $193,043 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
Total
Funding
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Prior Approp.
Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
CIP Fees/Revenues (Cont.)
367011 Impact Fees - Ord 12750
B-30995 Virginia Key Bike and Kayak Facility - $477,000
B-35806 Curtis Park New Pool Facility and Boat $243,123
B-35883A Hadley Park New Youth Center D5 $500,000
B-35887 Moore Park New Construction $443,600
B-40273 Police Station Headquarters Generator $10,000
B-40454 Park Expansions and Land Acquisition - $1,000,000
B-40455 Citywide Capital Improvements Projects $263,946
B-40456 Antonio Maceo Community Building - $121,028
B-40457 Kinloch Park Building Addition - D1 $114,007
B-60453A Fire Station #13 $6,504
B-60464 New Dinner Key Marina Dockmaster $87,986
B-70718 Fire Facilities Generators (North & $280,500
B-72810A New Fire Rescue Apparatus (North & $573,740
B-72915A Police Headquarters Helipad and Roof $244,428
B-74205B GSA Fleet Maintenance Garage $154,152
B-74205C GSA Truck Wash Pit $88,000
B-74219B Property Maintenance Security $25,000
B-74219C Property Maintenance Bobcats & Trailer $40,000
B-75883 Peacock Park Site Improvements $124
$477,000
$193,123
$500,000
$443,600
$0
$0
$0
$0
$0
$6,504
$87,986
$280,500
$113,044
$24,506
$49,055
$0
$9,776
$0
$124
$0
$50,000
$0
$0
$10,000
$1,000,000
$263,946
$121,028
$114,007
$0
$0
$0
$460,696
$219,922
$105,097
$88,000
$15,224
$40,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
367011
375001 Fire Assessment Fee
B-70102A Fire Station No. 6 Office Building -
B-70104 Fire Station No. 10 Restroom
B-70105 Refurbishing of Existing Apparatus
B-70106 Firefighting Equipment and Gear
B-70211 Fire Station No. 3 Dormitories Build -out
B-70212 Fire Station No. 12 - Re -roofing Project
B-70718 Fire Facilities Generators (North &
B-72801 Computer Aided Dispatch (CAD)
B-72802 Fire Stations & Other Fire Facilities
B-72803 Fire Station Equipment and Furniture
B-72804 Phone and Radio Equipment Upgrades
B-72808 Light Fleet Replacement
B-72809 Large Firefighting Equipment
B-74609 ERP Integration System
$7,525,105
$74,619
$60,301
$230,000
$158,124
$100,000
$77,000
$19,500
$120,866
$2,404,979
$175,000
$291,200
$374,867
$110,316
$305,015
$3,381,315 $4,143,790
$74,619
$60,301
$230,000
$158,124
$100,000
$77,000
$19,500
$120,866
$2,404,979
$175,000
$291,200
$374,867
$110,316
$305,015
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
375001 $4,501,787
$4,501,787
$0 $0
$0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
CIP Fees/Revenues (Cont.)
375002 Fire Assessment Fee (FY07)
B-70104 Fire Station No. 10 Restroom $55,524 $55,524 $0 $0 $0 $0 $0 $0
B-72802 Fire Stations & Other Fire Facilities $501,290 $501,290 $0 $0 $0 $0 $0 $0
B-72803 Fire Station Equipment and Furniture $130,018 $130,018 $0 $0 $0 $0 $0 $0
B-72804 Phone and Radio Equipment Upgrades $60,000 $60,000 $0 $0 $0 $0 $0 $0
B-72808 Light Fleet Replacement $292,791 $292,791 $0 $0 $0 $0 $0 $0
B-72809 Large Firefighting Equipment $216,500 $216,500 $0 $0 $0 $0 $0 $0
375002 $1,256,123 $1,256,123 $0 $0 $0 $0 $0 $0
382001 Contribution From General Fund
B-30365H Generator for City Hall $27,293 $27,293 $0 $0 $0 $0 $0 $0
B-30501C Manuel Artime Window Replacement $37,716 $37,716 $0 $0 $0 $0 $0 $0
B-30538 Museum Park - Partially Funded by CRA $50,778 $50,778 $0 $0 $0 $0 $0 $0
B-30994 City of Miami Impact Fee Study - $65,491 $65,491 $0 $0 $0 $0 $0 $0
B-33506 James L. Knight Center Miscellaneous $48,722 $48,722 $0 $0 $0 $0 $0 $0
B-60351 Fire Station#10 (New) $341,186 $341,186 $0 $0 $0 $0 $0 $0
o B-74200 Citywide General Fleet Replacement $1,070,989 $1,070,989 $0 $0 $0 $0 $0 $0
B-74220 Police Vehicle Replacement $9,141,422 $9,141,422 $0 $0 $0 $0 $0 $0
B-74606 Upgrade PC Software & Hardware $2,003,786 $2,003,786 $0 $0 $0 $0 $0 $0
B-74609 ERP Integration System $5,486,772 $5,486,772 $0 $0 $0 $0 $0 $0
B-74614 Land Management System $1,176,209 $1,176,209 $0 $0 $0 $0 $0 $0
382001 $19,450,364 $19,450,364 $0 $0 $0 $0 $0 $0
382007 Contribution From General Fund 2003
B-74609 ERP Integration System $7,000,000 $7,000,000 $0 $0 $0 $0 $0 $0
382007 $7,000,000 $7,000,000 $0 $0 $0 $0 $0 $0
382008 Contribution From General Fund 2007 and Future
B-30365E Coral Way NET Office Remodeling/ $15,000 $15,000 $0 $0 $0 $0 $0 $0
B-30365H Generator for City Hall $28,562 $28,562 $0 $0 $0 $0 $0 $0
B-30365J Beckham Hall Fire Damage Repair $6,770 $6,770 $0 $0 $0 $0 $0 $0
B-30373A Police Department Property Unit $120,107 $120,107 $0 $0 $0 $0 $0 $0
B-30501A Manuel Artime Miscellaneous Project $3,300 $3,300 $0 $0 $0 $0 $0 $0
B-30501C Manuel Artime Window Replacement $25,000 $25,000 $0 $0 $0 $0 $0 $0
B-30541D Citywide Park Equipments & Site $144,939 $9,200 $135,739 $0 $0 $0 $0 $0
B-30551 Public Works Maintenance Yard $1,268,254 $1,268,254 $0 $0 $0 $0 $0 $0
B-30865A Environmental Remediation Study $466,900 $0 $45,900 $421,000 $0 $0 $0 $0
B-30865B City Hall Roof Terrace $314,176 $0 $314,176 $0 $0 $0 $0 $0
B-30865C City Hall Windows and Doors $296,001 $0 $296,001 $0 $0 $0 $0 $0
B-30865E MRC A/C Replacements $289,823 $0 $289,823 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
CIP Fees/Revenues (Cont.)
382008 Contribution From General Fund 2007 and Future
B-30865F Environmental Remediation Study - $140,000 $0 $140,000 $0 $0 $0 $0 $0
B-40410 Fire Alarm Replacement, Air $1,426,200 $0 $1,426,200 $0 $0 $0 $0 $0
B-40527 Melreese Golf Course Renovations $200,000 $0 $0 $200,000 $0 $0 $0 $0
B-60455B Fire Station #1 - Renovation and $500,000 $0 $500,000 $0 $0 $0 $0 $0
B-70104 Fire Station No. 10 Restroom $72,394 $72,394 $0 $0 $0 $0 $0 $0
B-70210 Fire Station #5 Exterior Walls Repair - $150,000 $150,000 $0 $0 $0 $0 $0 $0
B-70241 Fire Rescue Capital Needs - FY2014 $1,858,500 $0 $0 $1,858,500 $0 $0 $0 $0
B-70411 Fire Rescue Personal Protective $164,114 $164,114 $0 $0 $0 $0 $0 $0
B-70418 FEMA Assistance to Firefighters Program $68,722 $68,722 $0 $0 $0 $0 $0 $0
B-70969 IT - Financial Management Upgrade $500,000 $0 $500,000 $0 $0 $0 $0 $0
B-72802 Fire Stations & Other Fire Facilities $695,152 $595,152 $100,000 $0 $0 $0 $0 $0
B-72803 Fire Station Equipment and Furniture $400,000 $150,000 $250,000 $0 $0 $0 $0 $0
B-72809 Large Firefighting Equipment $61,500 $0 $61,500 $0 $0 $0 $0 $0
B-73202C Solid Waste Collection Equipment $5,009,427 $3,548,727 $854,100 $606,600 $0 $0 $0 $0
-P B-74200 Citywide General Fleet Replacement $2,539,280 $2,189,280 $350,000 $0 $0 $0 $0 $0
B-74220 Police Vehicle Replacement $18,350,315 $16,498,315 $1,852,000 $0 $0 $0 $0 $0
B-74606 Upgrade PC Software & Hardware $916,896 $916,896 $0 $0 $0 $0 $0 $0
B-74609 ERP Integration System $2,825,965 $2,825,965 $0 $0 $0 $0 $0 $0
B-74617 IT Modernization $2,800,000 $2,800,000 $0 $0 $0 $0 $0 $0
382008 $41,657,297 $31,455,758 $7,115,439 $3,086,100 $0 $0 $0 $0
383001 CIP Misc. Revenue
B-50654 Overtown Stormwater Pump Station $46,358 $46,358 $0 $0 $0 $0 $0 $0
383001 $46,358 $46,358 $0 $0 $0 $0 $0 $0
383005 CIP Miscellaneous Revenue
B-30365E Coral Way NET Office Remodeling / $276,833 $0 $0 $276,833 $0 $0 $0 $0
B-72915A Police Headquarters Helipad and Roof $161,837 $0 $161,837 $0 $0 $0 $0 $0
383005 $438,670 $0 $161,837 $276,833 $0 $0 $0 $0
888923 Contribution From Special Revenue
B-30501A Manuel Artime Miscellaneous Project $19,744 $19,744 $0 $0 $0 $0 $0 $0
B-30501B Manuel Artime Dimmer Rack System $35,115 $35,115 $0 $0 $0 $0 $0 $0
B-60464 New Dinner Key Marina Dockmaster $4,163 $4,163 $0 $0 $0 $0 $0 $0
B-74609 ERP Integration System $1,500,000 $1,500,000 $0 $0 $0 $0 $0 $0
888923 $1,559,022 $1,559,022 $0 $0 $0 $0 $0 $0
888924 DRI Fees Transportation
B-30538F Museum Park - DRI Transportation $2,296,404 $2,296,404 $0 $0 $0 $0 $0 $0
B-31206A SE 3rd St Widening (fka Dupont Plaza) $1,500,000 $1,500,000 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
888924 $3,796,404 $3,796,404
888926 Prior Year Fund Balance
B-50643 Wagner Creek / Seybold Canal Dredging $91,565 $91,565
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
888926 $91,565 $91,565 $0 $0 $0 $0 $0 $0
888930 Transit Half -Cent Surtax
B-30183 Garden Storm Sewer - Phase I $149,920 $149,920 $0 $0 $0 $0 $0 $0
B-30336 Miami River Greenway (5th Street $277,280 $277,280 $0 $0 $0 $0 $0 $0
B-30606 DWNTWN Beautification Project Phase $50,000 $50,000 $0 $0 $0 $0 $0 $0
B-30615 District 5 - Miscellaneous Roadway $150,916 $150,916 $0 $0 $0 $0 $0 $0
B-30630 Palm Grove Road Improvements $256,693 $256,693 $0 $0 $0 $0 $0 $0
B-30645A Transportation Program Support $588 $588 $0 $0 $0 $0 $0 $0
B-30662D US-1 Median Closures at Bridgeport $60,000 $60,000 $0 $0 $0 $0 $0 $0
B-30695 SW 19th Terr. Imp. -Partial CDBG $170,000 $170,000 $0 $0 $0 $0 $0 $0
B-30716 Tigertail Resurfacing - D2 $2,702 $2,702 $0 $0 $0 $0 $0 $0
B-30774 West Flagler Area Improvements - D4 - $98,933 $98,933 $0 $0 $0 $0 $0 $0
B-30775 Shenandoah Area Improvements - D4 $366,281 $366,281 $0 $0 $0 $0 $0 $0
N B-30776 Silver Bluff Drainage Improvements - D4 $115,073 $115,073 $0 $0 $0 $0 $0 $0
B-30780 NW 14 Avenue and 28 Street Area $335,798 $335,798 $0 $0 $0 $0 $0 $0
B-30781 NW 11 Street from 27 to 37 Avenue Area $147,694 $147,694 $0 $0 $0 $0 $0 $0
B-30785 NW 36 Avenue 15 to 16 Street Drainage $50,000 $50,000 $0 $0 $0 $0 $0 $0
B-30786 NW 43 Avenue between 9 to 11 Street $78,224 $78,224 $0 $0 $0 $0 $0 $0
B-40695L Miami River Greenway Segment G and $140,700 $140,700 $0 $0 $0 $0 $0 $0
B-50672 Belle Meade Storm Sewer Project, Ph 2 $1,300,000 $1,300,000 $0 $0 $0 $0 $0 $0
B-50706A Roadway, Drainage and Traffic $284,903 $284,903 $0 $0 $0 $0 $0 $0
B-70246 Transportation Program Support Services $51,200 $51,200 $0 $0 $0 $0 $0 $0
B-70246A Beach Corridor Transit Connection $30,000 $30,000 $0 $0 $0 $0 $0 $0
B-73102A Citywide Streets Milling & Resurfacing $15,353 $0 $15,353 $0 $0 $0 $0 $0
B-78508 NE 2 Avenue Improvements $55,001 $55,001 $0 $0 $0 $0 $0 $0
888930 $4,187,259 $4,171,906 $15,353 $0 $0 $0 $0 $0
888931 Transit Half -Cent Surtax (FY07 and Future)
B-30011 Englewood Road and Storm Sewer $618,102 $618,102 $0 $0 $0 $0 $0 $0
B-30336 Miami River Greenway (5th Street $979,360 $979,360 $0 $0 $0 $0 $0 $0
B-30411 FY2014 - D1 Roadway, drainage and $90,000 $0 $0 $90,000 $0 $0 $0 $0
B-30412 FY2014 - D2 Roadway, drainage and $90,000 $0 $0 $90,000 $0 $0 $0 $0
B-30413 FY2014 - D3 Roadway, drainage and $90,000 $0 $0 $90,000 $0 $0 $0 $0
B-30414 FY2014 - D4 Roadway, drainage and $82,143 $0 $0 $82,143 $0 $0 $0 $0
B-30416 NW 34 Ave over Comfort Canal - Bridge $178,700 $0 $0 $178,700 $0 $0 $0 $0
B-30431 D1 - Reconstruction of Roadway $2,400,000 $0 $0 $0 $600,000 $600,000 $600,000 $600,000
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
CIP Fees/Revenues (Cont.)
888931 Transit Half -Cent Surtax (FY07 and Future)
B-30432 D2 - Reconstruction of Roadway $1,200,000 $0 $0 $0 $0 $0 $600,000 $600,000
B-30433 D3 - Reconstruction of Roadway $2,400,000 $0 $0 $0 $600,000 $600,000 $600,000 $600,000
B-30434 D4 - Reconstruction of Roadway $2,400,000 $0 $0 $0 $600,000 $600,000 $600,000 $600,000
B-30435 D5 - Reconstruction of Roadway $2,400,000 $0 $0 $0 $600,000 $600,000 $600,000 $600,000
B-30518 Northwest 14th Street Streetscape Project $439,000 $439,000 $0 $0 $0 $0 $0 $0
B-30540 Little River Industrial Park $12,000 $12,000 $0 $0 $0 $0 $0 $0
B-30588 San Marco Island and Biscayne Island $1,076,873 $1,076,873 $0 $0 $0 $0 $0 $0
B-30606N DWNTWN Beautification - North $861,784 $861,784 $0 $0 $0 $0 $0 $0
B-306065 DWNTWN Beautification - South $461,784 $461,784 $0 $0 $0 $0 $0 $0
B-30611 District 1 - Miscellaneous Roadway $714,000 $200,000 $514,000 $0 $0 $0 $0 $0
B-30613 District 3 - Miscellaneous Roadway $3,252,644 $2,038,644 $514,000 $700,000 $0 $0 $0 $0
B-30614 District 4 - Miscellaneous Roadway $360,821 $0 $314,000 $46,821 $0 $0 $0 $0
B-30615 District 5 - Miscellaneous Roadway $514,000 $0 $514,000 $0 $0 $0 $0 $0
B-30621 Center Grove Street and Lighting $1,103,383 $700,000 $403,383 $0 $0 $0 $0 $0
w B-30624 Overtown Greenway @ NW 11 Terrace $461,905 $461,905 $0 $0 $0 $0 $0 $0
B-30628 Bird Avenue Road Improvement $680,000 $680,000 $0 $0 $0 $0 $0 $0
B-30630 Palm Grove Road Improvements $1,201,546 $1,201,546 $0 $0 $0 $0 $0 $0
B-30645A Transportation Program Support $392,489 $392,489 $0 $0 $0 $0 $0 $0
B-30645B Transportation Program Support $881,042 $881,042 $0 $0 $0 $0 $0 $0
B-30645E Overtown / Wynwood Bicycle $12,000 $12,000 $0 $0 $0 $0 $0 $0
B-30645F Miami Regional Intermodal Plan $15,000 $15,000 $0 $0 $0 $0 $0 $0
B-30646 South Bayshore Drive Roadway and $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-30651 Miami River Greenway from NW loth to $820,640 $820,640 $0 $0 $0 $0 $0 $0
B-30662D US-1 Median Closures at Bridgeport $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-30694A Citywide Bicycle Rack & Signage $115,000 $115,000 $0 $0 $0 $0 $0 $0
B-30716 Tigertail Resurfacing - D2 $308,156 $308,156 $0 $0 $0 $0 $0 $0
B-30723 NW 24th Avenue Roadway Improvement $700,000 $0 $0 $700,000 $0 $0 $0 $0
B-30770 SW 22nd Avenue Medians - US 1 to $54,000 $54,000 $0 $0 $0 $0 $0 $0
B-30774 West Flagler Area Improvements - D4 - $909,239 $909,239 $0 $0 $0 $0 $0 $0
B-30779 SW 2nd Street and SW 40th Avenue $200,000 $0 $200,000 $0 $0 $0 $0 $0
B-30780 NW 14 Avenue and 28 Street Area $83,467 $83,467 $0 $0 $0 $0 $0 $0
B-30782 Allapattah Area Roadway Improvement - $500,000 $500,000 $0 $0 $0 $0 $0 $0
B-30803 SW 18th Avenue from SW 23rd Street to $97,000 $0 $0 $97,000 $0 $0 $0 $0
B-30822 Brickell Area Shared Use Path and $844,267 $844,267 $0 $0 $0 $0 $0 $0
B-30823 Fair Isle Area Roadway and Drainage $180,000 $180,000 $0 $0 $0 $0 $0 $0
B-30827 South Grove Phase 1 Roadway and $286,830 $0 $110,617 $176,213 $0 $0 $0 $0
B-30835 South Grove Phase 2 Roadway and $492,000 $0 $0 $492,000 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS ASUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
CIP Fees/Revenues (Cont.)
888931 Transit Half -Cent Surtax (FY07 and Future)
B-30836 South Grove Phase 3 Roadway and $1,231,787 $0 $0 $31,787 $600,000 $600,000 $0 $0
B-30883 NW 12 Avenue/NW 12 Place Roadway $1,199,976 $1,199,976 $0 $0 $0 $0 $0 $0
B-30888 Wynwood Area Roadway Improvement - $500,000 $500,000 $0 $0 $0 $0 $0 $0
B-30900 NW 40 St from NW 10 Ave to NW 12 $98,981 $0 $0 $98,981 $0 $0 $0 $0
B-30902 Phase I: Little River (N); NE 82 St (S); N $90,509 $0 $0 $90,509 $0 $0 $0 $0
B-30904 NW 70 Street Area Roadway & Minor $100,510 $0 $0 $100,510 $0 $0 $0 $0
B-30967 SW 16th Terrace from SW 21 Ave to SW $150,467 $0 $0 $150,467 $0 $0 $0 $0
B-30968 SW 12th St (SW 30th Ave and SW 30th $36,102 $0 $0 $36,102 $0 $0 $0 $0
B-30969 SW 30th Court (SW 12th Street and SW $43,214 $0 $0 $43,214 $0 $0 $0 $0
B-30971 SW 5th Street between 42 Ave and 43 $7,857 $0 $0 $7,857 $0 $0 $0 $0
B-30972 SW 64 Court Roadway & Drainage $132,522 $0 $0 $132,522 $0 $0 $0 $0
B-30975 Swale Restoration @ NW 2 Street $28,809 $0 $0 $28,809 $0 $0 $0 $0
B-30976 SW 2 St from 53 Ave to 54 Ave - D4 $54,000 $0 $0 $54,000 $0 $0 $0 $0
B-30978 Drainage improvements @ SW 4 St $51,065 $0 $0 $51,065 $0 $0 $0 $0
-P B-30979 SW 21st St. & 24th Ave Roadway $60,000 $0 $0 $60,000 $0 $0 $0 $0
B-30985 Design District Roadway and Stormwater $500,000 $0 $0 $500,000 $0 $0 $0 $0
B-30990 Roadway Improvements $361,000 $361,000 $0 $0 $0 $0 $0 $0
B-30993 SW/NW 17th Avenue Traffic Corridor $200,000 $200,000 $0 $0 $0 $0 $0 $0
B-30998 Citywide Sidewalk Repair Project - PW $169,615 $169,615 $0 $0 $0 $0 $0 $0
B-31206 SE 3rd Street Widening $183,398 $183,398 $0 $0 $0 $0 $0 $0
B-40704A SW 32 Avenue Improvements $785,000 $785,000 $0 $0 $0 $0 $0 $0
B-50672 Belle Meade Storm Sewer Project, Ph 2 $2,070,295 $2,070,295 $0 $0 $0 $0 $0 $0
B-50706A Roadway, Drainage and Traffic $2,426 $2,426 $0 $0 $0 $0 $0 $0
B-70245 Transportation Program Support Services $294,958 $144,958 $100,000 $50,000 $0 $0 $0 $0
B-70246 Transportation Program Support Services $448,800 $267,202 $0 $181,598 $0 $0 $0 $0
B-70247 Citywide Mass Transit Studies $318,402 $0 $0 $318,402 $0 $0 $0 $0
B-70715 City of Miami Trolley Program - Capital $1,021,972 $1,021,972 $0 $0 $0 $0 $0 $0
B-73102A Citywide Streets Milling & Resurfacing $6,734,037 $0 $504,600 $0 $1,324,955 $1,476,328 $1,633,000 $1,795,154
B-78508 NE 2 Avenue Improvements $1,230,811 $1,230,811 $0 $0 $0 $0 $0 $0
888931 $49,265,688 $23,182,951 $3,174,600 $4,678,700 $4,324,955 $4,476,328 $4,633,000 $4,795,154
888956 Contribution from Special Revenue - SRF 2007
B-30501A Manuel Artime Miscellaneous Project $69,839 $69,839 $0 $0 $0 $0 $0 $0
B-30501B Manuel Artime Dimmer Rack System $58,299 $58,299 $0 $0 $0 $0 $0 $0
B-30501C Manuel Artime Window Replacement $87,663 $87,663 $0 $0 $0 $0 $0 $0
B-30602 Seminole Dinghy Dock Expansion $30,000 $30,000 $0 $0 $0 $0 $0 $0
B-30689 Marine Stadium Bulkhead Replacement $71,695 $71,695 $0 $0 $0 $0 $0 $0
B-30706 Miscellaneous Repairs 10% Set Aside $1,896,375 $808,759 $571,400 $516,216 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
CIP Fees/Revenues (Cont.)
888956 Contribution from Special Revenue - SRF 2007
B-30735 Dinner Key Marina Dinghy Dock - D2 $253,070 $178,070 $75,000 $0 $0 $0 $0 $0
B-33514 Marine Stadium Marina Improvements $76,870 $76,870 $0 $0 $0 $0 $0 $0
B-43114B Public Works Miscellaneous Sidewalk $549,746 $0 $549,746 $0 $0 $0 $0 $0
B-50722 Little River Waterfront Park $600,000 $600,000 $0 $0 $0 $0 $0 $0
B-50722A Little River Waterfront Park Acquisition $551,250 $0 $551,250 $0 $0 $0 $0 $0
B-60464 New Dinner Key Marina Dockmaster $655,921 $655,921 $0 $0 $0 $0 $0 $0
B-70010 Miamarina Pier 5 Canopies - PF $435,000 $200,000 $0 $235,000 $0 $0 $0 $0
B-70011 Clean Vessel Act 2013 - PF $20,584 $0 $0 $20,584 $0 $0 $0 $0
B-75883 Peacock Park Site Improvements $100,000 $0 $100,000 $0 $0 $0 $0 $0
888956 $5,456,312 $2,837,116 $1,847,396 $771,800 $0 $0 $0 $0
888969 Subrogation Auto Claim Revenues
B-30666 Damaged Vehicle Replacement / Repairs $726,051 $603,864 $122,187 $0 $0 $0 $0 $0
888969 $726,051 $603,864 $122,187 $0 $0 $0 $0 $0
-P 888972 Rickenbacker Marina Rental Revenue
cn
B-30706 Miscellaneous Repairs 10% Set Aside $137,601 $137,601 $0 $0 $0 $0 $0 $0
888972 $137,601 $137,601 $0 $0 $0 $0 $0 $0
888973 TVM Production Basic Use Fee
B-30182A Coconut Grove Waterfront Master Plan $549,631 $219,631 $330,000 $0 $0 $0 $0 $0
B-30541C Kennedy Park Shoreline Stabilization $75,000 $75,000 $0 $0 $0 $0 $0 $0
B-30721 Spoil Island E Restoration and Floating $75,000 $75,000 $0 $0 $0 $0 $0 $0
B-30824 Spoil Island B & C Swim Area $67,000 $67,000 $0 $0 $0 $0 $0 $0
B-30825 Biscayne Bay Spoil Island B Public $10,000 $10,000 $0 $0 $0 $0 $0 $0
B-30825A Biscayne Bay Spoil Island E Picnic $750 $750 $0 $0 $0 $0 $0 $0
B-30825B Biscayne Bay Spoil Island E Public $750 $750 $0 $0 $0 $0 $0 $0
B-40171 Coconut Grove Viewing Platform Spoil $5,938 $5,938 $0 $0 $0 $0 $0 $0
B-40172 Coconut Grove Viewing Platform Spoil $5,931 $5,931 $0 $0 $0 $0 $0 $0
B-75883 Peacock Park Site Improvements $30,000 $30,000 $0 $0 $0 $0 $0 $0
888973 $820,000 $490,000 $330,000 $0 $0 $0 $0 $0
888977 DRI Fees Air Quality
B-30538E Museum Park - DRI Air Quality $313,129 $313,129 $0 $0 $0 $0 $0 $0
888977 $313,129 $313,129 $0 $0 $0 $0 $0 $0
888978 DRI Fees Administration
B-30538D Museum Park - DRI Fees
B-31206B SE 3rd Street Widening - DRI
$600,000 $600,000 $0 $0 $0 $0 $0 $0
$100,000 $100,000 $0 $0 $0 $0 $0 $0
888978 $700,000 $700,000 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
CIP Fees/Revenues (Cont.)
888980 Surplus Goods & Fixed Assets Sales
B-30666 Damaged Vehicle Replacement / Repairs
$68,457 $0 $68,457 $0 $0 $0 $0 $0
888980 $68,457 $0 $68,457 $0 $0 $0 $0 $0
CIP Fees/Revenues
Private Donations / Other
000000 Non-CIP Funding
B-70112 Police Headquarters Interview rooms
196,393,788 134,066,259 $20,157,659 $12,114,433 $7,123,955 $7,485,328 $7,642,000 $7,804,154
$55,000 $55,000 $0 $0 $0 $0 $0 $0
000000 $55,000 $55,000 $0 $0 $0 $0 $0 $0
000001 General Fund Operating Budget
B-50654 Overtown Stormwater Pump Station $60,000 $60,000 $0 $0 $0 $0 $0 $0
000001 $60,000 $60,000 $0 $0 $0 $0 $0 $0
000002 Special Revenue Operating Budget
B-30262 Citywide Storm Sewer Repair Project $290,400 $290,400 $0 $0 $0 $0 $0 $0
rn
B-30346 Traffic Study Reviews - Oracle Project
$411,622 $411,622 $0 $0 $0 $0 $0 $0
000002 $702,022 $702,022 $0 $0 $0 $0 $0 $0
888951 Other Public & Private Contributions
B-30374 Virginia Key Rowing Center $616,513 $616,513 $0 $0 $0 $0 $0 $0
B-30837 South Miami Avenue - SE 6th and 5th $771,545 $0 $0 $0 $771,545 $0 $0 $0
B-40171 Coconut Grove Viewing Platform Spoil $1,650 $1,650 $0 $0 $0 $0 $0 $0
B-40172 Coconut Grove Viewing Platform Spoil $1,650 $1,650 $0 $0 $0 $0 $0 $0
888951 $1,391,358 $619,813 $0 $0 $771,545 $0 $0 $0
888963 Proceeds from Conveyance of Easement
B-30182A Coconut Grove Waterfront Master Plan $1,502,044 $1,502,044 $0 $0 $0 $0 $0 $0
888963 $1,502,044 $1,502,044 $0 $0 $0 $0 $0 $0
Private Donations / Other
Combined with Others
$3,710,424 $2,938,879 $0 $0 $771,545 $0 $0 $0
355001 1988 Sanitary Sewer Bonds
B-30134AS Bryan Park New Tennis/Community $50,000 $50,000 $0 $0 $0 $0 $0 $0
B-30305BS Gibson Park New Construction - $117,000 $0 $117,000 $0 $0 $0 $0 $0
B-30365ES Coral Way NET Office Remodeling D3 $50,000 $50,000 $0 $0 $0 $0 $0 $0
B-30374S Virginia Key Rowing Center $100,000 $0 $100,000 $0 $0 $0 $0 $0
B-30538S Museum Park - Sanitary Sewer $1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0
B-30671A Caribbean Marketplace Renovation - $114,000 $114,000 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
2013 - 2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
Combined with Others (Cont.)
355001 1988 Sanitary Sewer Bonds
B-30690S West End Park New Community $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-30882S African Square Park - Splash Park D5 - $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-30886S Lummus Landing Square - D5 Sanitary $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-30887S Little Haiti Soccer Field Bathroom D5 $365,000 $100,000 $265,000 $0 $0 $0 $0 $0
B-30995S Virginia Key Bike Trail Building - D2 - $50,000 $50,000 $0 $0 $0 $0 $0 $0
B-35806S Curtis Park New Pool Facility and Boat $500,000 $500,000 $0 $0 $0 $0 $0 $0
B-35812AS Duarte Park Building Renovation, $50,000 $50,000 $0 $0 $0 $0 $0 $0
B-35838S Kennedy Park Restroom Building $50,000 $50,000 $0 $0 $0 $0 $0 $0
B-35861BS Maximo Gomez / Domino Park $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-35883AS Hadley Park New Youth Center D5 - $200,000 $200,000 $0 $0 $0 $0 $0 $0
B-35887S Moore Park New Construction D5 - $500,000 $500,000 $0 $0 $0 $0 $0 $0
B-60454S Fire Station #14 (New) - D4 - Sanitary $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-60464S New Dinner Key Marina Dockmaster $690,000 $600,000 $90,000 $0 $0 $0 $0 $0
355001 $4,336,000 $3,764,000 $572,000 $0 $0 $0 $0 $0
Combined with Others $4,336,000 $3,764,000 $572,000 $0 $0 $0 $0 $0
Total
448,436,588 352,824,230 $27,537,071 $16,483,910 $16,806,500 $14,015,328 $11,111,000 $9,658,549
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
efie Yalu/re
48
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
SECTION REPORTS
2. FUND BY COST COMPONENT AND
FUNDING SOURCE
Cite sutavie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
Active & Future
CIP Projects Only
FUND: 301-CRA projects
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$0.00
$0.00
$0.00
$960,607.00
$5,269,375.00
$0.00
$161,575.00
$2,889,868.00
$311,575.00
$0.00
$0.00
$0.00
$960,607.00
$5,269,375.00
$0.00
$161,575.00
$2,889,868.00
$311,575.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total $9,593,000.00 $9,593,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fund Fund
No. Name
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
000004 CRA Operating Budget
385200-3 2002 Homeland Defense Bonds (Series 3)
co
888920 FIND Waterways Assistance Program FY07
$9,346,500.00
$200,000.00
$46,500.00
$9,346,500.00
$200,000.00
$46,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total $9,593,000.00 $9,593,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 311-General Government
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$7,575,471.28
$1,268,254.37
$0.00
$20,467,626.40
$5,913,108.35
$44,023,553.47
$159,583.00
$149,999.99
$88,870.35
$7,564,636.28
$1,268,254.37
$0.00
$19,768,052.40
$3,264,286.81
$41,096,627.08
$132,495.00
$149,999.99
$51,217.35
$10,835.00
$0.00
$0.00
$278,574.00
$2,371,988.54
$2,926,926.39
$27,088.00
$0.00
$37,653.00
$0.00
$0.00
$0.00
$421,000.00
$276,833.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
$79,646,467.21 $73,295,569.28 $5,653,064.93 $697,833.00 $0.00 $0.00 $0.00 $0.00
Fund Fund
No. Name
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
356001 Local Option Gas Tax
cn 367001 Impact Fees
367011 Impact Fees - Ord 12750
375001 Fire Assessment Fee
382001 Contribution From General Fund
382007 Contribution From General Fund 2003
382008 Contribution From General Fund 2007 and
383005 CIP Miscellaneous Revenue
385200-3 2002 Homeland Defense Bonds (Series 3)
888896 Miami -Dade County DERM Virginia Key
888902 Community Development Block Grant
888920 FIND Waterways Assistance Program FY07
888923 Contribution From Special Revenue
888937 Urban Areas Security Initiative Grant
888951 Other Public & Private Contributions
888961 Sunshine State Financing Commission
888966 Sunshine State Financing Commission
888969 Subrogation Auto Claim Revenues
888973 TVM Production Basic Use Fee
888980 Surplus Goods & Fixed Assets Sales
$2,000,000.00 $2,000,000.00 $0.00
$250,062.90 $250,062.90 $0.00
$307,152.07 $58,831.55 $248,320.52
$305,015.00 $305,015.00 $0.00
$18,971,961.99 $18,971,961.99 $0.00
$7,000,000.00 $7,000,000.00 $0.00
$32,184,143.05 $26,549,043.05 $5,214,100.00
$276,833.00 $0.00 $0.00
$60,131.60 $60,131.60 $0.00
$650,000.00 $650,000.00 $0.00
$1,000,000.00 $1,000,000.00 $0.00
$15,000.00 $15,000.00 $0.00
$1,500,000.00 $1,500,000.00 $0.00
$69,842.00 $69,842.00 $0.00
$3,300.00 $3,300.00 $0.00
$750,000.00 $750,000.00 $0.00
$13,496,648.12 $13,496,648.12 $0.00
$726,051.38 $603,864.00 $122,187.38
$11,869.07 $11,869.07 $0.00
$68,457.03 $0.00 $68,457.03
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$421,000.00
$276,833.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
$79,646,467.21 $73,295,569.28 $5,653,064.93 $697,833.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 312-Public Safety
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$9,202.19
$1,767,043.06
$20,000.00
$2,035,034.84
$13,637,090.67
$10,986,158.66
$480,709.96
$0.00
$610,642.86
$9,202.19
$1,767,043.06
$20,000.00
$1,941,850.84
$11,650,917.70
$8,017,462.50
$447,531.96
$0.00
$552,324.86
$0.00
$0.00
$0.00
$93,184.00
$1,986,172.97
$872,196.16
$33,178.00
$0.00
$58,318.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,096,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
$29,545,882.24 $24,406,333.11 $3,043,049.13 $2,096,500.00 $0.00 $0.00 $0.00 $0.00
Fund Fund
No. Name
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
000000 Non-CIP Funding
cn 367001 Impact Fees
367011 Impact Fees - Ord 12750
369100 1991 Fire Bonds
375001 Fire Assessment Fee
375002 Fire Assessment Fee (FY07)
382001 Contribution From General Fund
382008 Contribution From General Fund 2007 and
383005 CIP Miscellaneous Revenue
385200-1 2002 Homeland Defense Bonds (Series 1)
385200-2 2002 Homeland Defense Bonds (Series 2)
385200-3 2002 Homeland Defense Bonds (Series 3)
397001 1970 Pollution Control G.O.B. (303000)
888902 Community Development Block Grant
888939 FEMA Federal Assistance to Firefighters
888948 School Board of Miami -Dade County - Grant
888961 Sunshine State Financing Commission
888984 State of Florida Department of Health
$55,000.00
$663,861.05
$1,562,371.83
$46,477.39
$4,196,771.13
$1,256,123.03
$341,185.98
$4,090,489.10
$161,836.89
$1,040,400.59
$5,990,000.00
$3,166,339.93
$361,200.00
$348,240.00
$931,354.00
$850,854.32
$4,245,377.00
$238,000.00
$55,000.00
$663,861.05
$791,753.91
$46,477.39
$4,196,771.13
$1,256,123.03
$341,185.98
$1,320,489.10
$0.00
$1,040,400.59
$5,990,000.00
$3,166,339.93
$361,200.00
$0.00
$931,354.00
$0.00
$4,245,377.00
$0.00
$0.00
$0.00
$770,617.92
$0.00
$0.00
$0.00
$0.00
$911,500.00
$161,836.89
$0.00
$0.00
$0.00
$0.00
$348,240.00
$0.00
$850,854.32
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,858,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$238,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
$29,545,882.24 $24,406,333.11 $3,043,049.13 $2,096,500.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 313-Disaster Recovery
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$0.00
$0.00
$0.00
$0.00
$1,895,593.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,895,593.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total $1,895,593.00 $0.00 $1,895,593.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fund Fund
No. Name
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
888982 FEMA Tree Funding
$1,895,593.00
$0.00
$1,895,593.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total $1,895,593.00 $0.00 $1,895,593.00 $0.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 325-Public Facilities
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$73,351.45
$0.00
$752,044.46
$4,604,000.86
$8,956,210.12
$147,067.17
$228,476.57
$150,000.00
$460,768.33
$73,351.45
$0.00
$752,044.46
$4,274,000.86
$6,646,558.37
$147,067.17
$228,476.57
$150,000.00
$460,768.33
$0.00
$0.00
$0.00
$330,000.00
$1,506,375.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$803,276.75
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
$15,371,918.96 $12,732,267.21 $1,836,375.00 $803,276.75 $0.00 $0.00 $0.00 $0.00
Fund Fund
No. Name
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
367011 Impact Fees - Ord 12750
cn 382001 Contribution From General Fund
382008 Contribution From General Fund 2007 and
385200-1 2002 Homeland Defense Bonds (Series 1)
385200-2 2002 Homeland Defense Bonds (Series 2)
385200-3 2002 Homeland Defense Bonds (Series 3)
888909 FL Dept of Environmental Protection (FDEP)
888920 FIND Waterways Assistance Program FY07
888923 Contribution From Special Revenue
888927 Federal Aviation Admin. Grant
888938 Miami -Dade County Grant/Contribution
888947 MDC Building Better Communities GOB
888956 Contribution from Special Revenue - SRF
888961 Sunshine State Financing Commission
888963 Proceeds from Conveyance of Easement
888972 Rickenbacker Marina Rental Revenue
888973 TVM Production Basic Use Fee
888981 Florida Boating Improvement Program
888983 FDEP Invasive Species at Marine Stadium
$87,986.00
$86,438.00
$28,300.02
$58,775.00
$1,089,413.88
$5,400,339.97
$20,583.75
$1,816,250.00
$59,021.86
$150,000.00
$13,239.00
$250,000.00
$3,655,315.34
$381,111.75
$1,502,044.46
$137,601.00
$549,630.93
$56,893.00
$28,975.00
$87,986.00
$86,438.00
$28,300.02
$58,775.00
$1,089,413.88
$5,400,339.97
$0.00
$1,031,250.00
$59,021.86
$150,000.00
$13,239.00
$250,000.00
$2,237,115.34
$381,111.75
$1,502,044.46
$137,601.00
$219,630.93
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$785,000.00
$0.00
$0.00
$0.00
$0.00
$646,400.00
$0.00
$0.00
$0.00
$330,000.00
$46,000.00
$28,975.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$20,583.75
$0.00
$0.00
$0.00
$0.00
$0.00
$771,800.00
$0.00
$0.00
$0.00
$0.00
$10,893.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
$15,371,918.96 $12,732,267.21 $1,836,375.00 $803,276.75 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 331-Parks and Recreation
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$1,363,266.66
$2,235,000.00
$0.00
$12,739,475.33
$52,690,205.70
$3,243,391.20
$1,583,652.82
$260,307.00
$1,826,689.89
$1,363,266.66
$500,000.00
$0.00
$12,670,975.33
$45,749,615.95
$3,243,391.20
$1,583,652.82
$260,307.00
$1,826,689.89
$0.00
$1,735,000.00
$0.00
$68,500.00
$3,940,589.75
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$500,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,500,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
$75,941,988.60 $67,197,898.85 $5,744,089.75 $500,000.00 $2,500,000.00 $0.00 $0.00 $0.00
Fund Fund
No. Name
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
000004 CRA Operating Budget
000008 CRA - FIND Grant
355001 1988 Sanitary Sewer Bonds
367001 Impact Fees
367011 Impact Fees - Ord 12750
373001 Safe Neighborhood Parks Bond
373002 Safe Neighborhood Parks Bond 2008 &
382001 Contribution From General Fund
382008 Contribution From General Fund 2007 and
385200-1 2002 Homeland Defense Bonds (Series 1)
385200-2 2002 Homeland Defense Bonds (Series 2)
385200-3 2002 Homeland Defense Bonds (Series 3)
385200-8 2002 Homeland Defense Series 1 Interest
888902 Community Development Block Grant
888920 FIND Waterways Assistance Program FY07
888924 DRI Fees Transportation
888947 MDC Building Better Communities GOB
888951 Other Public & Private Contributions
888955 MSEA Contribution to Capital
888956 Contribution from Special Revenue - SRF
888960 Sunshine State Financing Commission
888961 Sunshine State Financing Commission
888962 The Children's Trust
$9,943,000.00 $9,943,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$1,143,000.00 $1,143,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$100,000.00 $100,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$14,195.00 $14,195.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$5,567,594.99 $2,442,744.24 $3,124,850.75 $0.00 $0.00 $0.00 $0.00 $0.00
$119,622.00 $119,622.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$132,792.00 $132,792.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$50,777.90 $50,777.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$344,939.00 $9,200.00 $135,739.00 $200,000.00 $0.00 $0.00 $0.00 $0.00
$933,070.95 $933,070.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$3,708,351.87 $3,708,351.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$16,979,207.54 $16,979,207.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$1,109,653.66 $1,109,653.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$133,474.00 $133,474.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$579,750.00 $247,500.00 $332,250.00 $0.00 $0.00 $0.00 $0.00 $0.00
$2,296,403.60 $2,296,403.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$4,300,000.00 $0.00 $1,500,000.00 $300,000.00 $2,500,000.00 $0.00 $0.00 $0.00
$616,513.00 $616,513.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$350,000.00 $350,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$1,251,250.00 $600,000.00 $651,250.00 $0.00 $0.00 $0.00 $0.00 $0.00
$2,671,069.00 $2,671,069.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$21,502,080.97 $21,502,080.97 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$260,000.00 $260,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 331-Parks and Recreation
Fund Fund
No. Name
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
888965 Bayfront Park Management Trust
888973 TVM Production Basic Use Fee
888976 Miami -Dade County Dept Cultural Affairs
888977 DRI Fees Air Quality
888978 DRI Fees Administration
$309,000.00
$258,500.00
$354,614.00
$313,129.12
$600,000.00
$309,000.00
$258,500.00
$354,614.00
$313,129.12
$600,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
$75,941,988.60 $67,197,898.85 $5,744,089.75 $500,000.00 $2,500,000.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 341-Streets & Sidewalks
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$818,717.74
$0.00
$0.00
$19,295,508.30
127,629,795.19
$0.00
$4,858,516.44
$338,702.47
$7,165,706.68
$701,985.74
$0.00
$0.00
$17,199,291.30
$84,231,019.49
$0.00
$4,328,554.44
$338,702.47
$6,608,959.68
$103,775.00
$0.00
$0.00
$98,800.00
$5,594,299.00
$0.00
$7,500.00
$0.00
$10,425.00
$12,957.00
$0.00
$0.00
$401,747.00
$6,723,162.05
$0.00
$97,266.00
$0.00
$121,126.00
$0.00
$0.00
$0.00
$471,260.00
$9,147,263.65
$0.00
$94,488.00
$0.00
$94,488.00
$0.00
$0.00
$0.00
$321,260.00
$8,127,092.00
$0.00
$94,488.00
$0.00
$94,488.00
$0.00
$0.00
$0.00
$401,575.00
$6,395,205.00
$0.00
$118,110.00
$0.00
$118,110.00
$0.00
$0.00
$0.00
$401,575.00
$7,411,754.00
$0.00
$118,110.00
$0.00
$118,110.00
Total
160,106,946.82 113,408,513.12 $5,814,799.00 $7,356,258.05 $9,807,499.65 $8,637,328.00 $7,033,000.00 $8,049,549.00
Fund Fund
No. Name
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
000002 Special Revenue Operating Budget $411,622.47 $411,622.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
356001 Local Option Gas Tax $869,629.36 $869,629.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
356002 Local Option Gas Tax 2009 and Future $885,800.00 $158,400.00 $326,000.00 $401,400.00 $0.00 $0.00 $0.00 $0.00
356003 Parking Surcharge $50,000.00 $50,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
356005-1 Streets Bond Program - Series 1 $26,533,040.67 $26,533,040.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
356005-2 Streets Bond Program - Series 2 $42,341,183.29 $42,341,183.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
356007 Parking Surcharge 2007 $13,098,484.02 $4,793,725.97 $1,428,600.00 $1,276,158.05 $1,400,000.00 $1,400,000.00 $1,400,000.00 $1,400,000.00
367001 Impact Fees $177,891.86 $177,891.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
385200-1 2002 Homeland Defense Bonds (Series 1) $1,135,485.30 $1,135,485.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
385200-3 2002 Homeland Defense Bonds (Series 3) $4,696,100.95 $4,696,100.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888902 Community Development Block Grant $650,000.00 $650,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888913 FDOT Transportation Enhancement Program $10,669,618.00 $9,419,618.00 $250,000.00 $0.00 $1,000,000.00 $0.00 $0.00 $0.00
888917 FDOT Other $100,000.00 $100,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888924 DRI Fees Transportation $1,500,000.00 $1,500,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888930 Transit Half -Cent Surtax $2,255,575.79 $2,240,222.79 $15,353.00 $0.00 $0.00 $0.00 $0.00 $0.00
888931 Transit Half -Cent Surtax (FY07 and Future) $42,816,329.46 $17,733,592.46 $3,174,600.00 $3,678,700.00 $4,324,955.00 $4,476,328.00 $4,633,000.00 $4,795,154.00
888938 Miami -Dade County Grant/Contribution $8,304,395.00 $450,000.00 $0.00 $2,000,000.00 $1,000,000.00 $2,000,000.00 $1,000,000.00 $1,854,395.00
888947 MDC Building Better Communities GOB $1,922,000.00 $0.00 $0.00 $0.00 $1,161,000.00 $761,000.00 $0.00 $0.00
888951 Other Public & Private Contributions $771,544.65 $0.00 $0.00 $0.00 $771,544.65 $0.00 $0.00 $0.00
888953 Miami -Dade Metropolitan Planning Org $81,000.00 $48,000.00 $33,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
888956 Contribution from Special Revenue - SRF $549,746.00 $0.00 $549,746.00 $0.00 $0.00 $0.00 $0.00 $0.00
888957 Downtown Development Agency $187,500.00 $0.00 $37,500.00 $0.00 $150,000.00 $0.00 $0.00 $0.00
888978 DRI Fees Administration $100,000.00 $100,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 341-Streets & Sidewalks
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Total 160,106,946.82 113,408,513.12 $5,814,799.00 $7,356,258.05 $9,807,499.65 $8,637,328.00 $7,033,000.00 $8,049,549.00
Active & Future
CIP Projects Only
FUND: 343-Mass Transit
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$0.00
$0.00
$0.00
$962,508.81
$318,402.19
$2,871,999.63
$34,691.00
$0.00
$0.00
$0.00
$0.00
$0.00
$780,911.00
$0.00
$2,871,999.63
$34,691.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$181,597.81
$318,402.19
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total $4,187,601.63 $3,687,601.63 $0.00 $500,000.00 $0.00 $0.00 $0.00 $0.00
Fund Fund
No. Name
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
888917 FDOT Other $1,899,150.63
cn 888930 Transit Half -Cent Surtax $81,788.00
co
888931 Transit Half -Cent Surtax (FY07 and Future) $2,181,663.00
888957 Downtown Development Agency $25,000.00
$1,899,150.63
$81,788.00
$1,681,663.00
$25,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$500,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total $4,187,601.63 $3,687,601.63 $0.00 $500,000.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 351-Sanitary Sewers
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$2,129.00
$0.00
$0.00
$65,203.00
$4,192,420.00
$0.00
$13,871.00
$0.00
$22,377.00
$2,129.00
$0.00
$0.00
$65,203.00
$3,620,420.00
$0.00
$13,871.00
$0.00
$22,377.00
$0.00
$0.00
$0.00
$0.00
$572,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
$4,296,000.00 $3,724,000.00 $572,000.00
$0.00 $0.00 $0.00 $0.00 $0.00
Fund Fund
No. Name
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
355001 1988 Sanitary Sewer Bonds
371100 Series 1995 Sanitary Sewer Bonds
$4,236,000.00
$60,000.00
$3,664,000.00
$60,000.00
$572,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
$4,296,000.00 $3,724,000.00 $572,000.00
$0.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 352-Storm Sewers
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$288,702.90
$64,884.94
$0.00
$6,952,662.82
$51,441,819.41
$170,000.00
$1,337,266.83
$0.00
$2,586,429.54
$288,702.90
$64,884.94
$0.00
$6,770,977.82
$30,052,062.46
$170,000.00
$1,297,266.83
$0.00
$2,586,429.54
$0.00
$0.00
$0.00
$0.00
$2,124,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$181,685.00
$3,701,756.95
$0.00
$40,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$4,499,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$5,378,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$4,078,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,609,000.00
$0.00
$0.00
$0.00
$0.00
Total
$62,841,766.44 $41,230,324.49 $2,124,000.00 $3,923,441.95 $4,499,000.00 $5,378,000.00 $4,078,000.00 $1,609,000.00
Fund Fund
No. Name
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
000001 General Fund Operating Budget $60,000.00 $60,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
rn 000002 Special Revenue Operating Budget $290,400.00 $290,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
o
356001 Local Option Gas Tax $1,947,170.00 $1,947,170.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
356005-1 Streets Bond Program - Series 1 $4,985,611.33 $4,985,611.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
356005-2 Streets Bond Program - Series 2 $2,752,442.35 $2,752,442.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
356007 Parking Surcharge 2007 $1,623,441.95 $1,000,000.00 $0.00 $623,441.95 $0.00 $0.00 $0.00 $0.00
359101 Special Assessment District (SAD) Revenue $272,490.00 $248,490.00 $24,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
360001 Stormwater Utility Fund $7,911,368.37 $7,911,368.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
360003 Stormwater Utility Fund (FY07 and Future) $16,920,114.17 $8,294,114.17 $1,400,000.00 $1,000,000.00 $1,399,000.00 $1,609,000.00 $1,609,000.00 $1,609,000.00
367001 Impact Fees $712,087.88 $712,087.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
383001 CIP Misc. Revenue $46,357.55 $46,357.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
385200-3 2002 Homeland Defense Bonds (Series 3) $841,000.00 $841,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
399001 1976 & 78 Storm Sewer G O Bond $867,481.00 $867,481.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888899 FEMA Hazard Mitigation Grant $750,000.00 $750,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888909 FL Dept of Environmental Protection (FDEP) $1,000,000.00 $1,000,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888920 FIND Waterways Assistance Program FY07 $1,700,000.00 $1,000,000.00 $700,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
888925 FEMARecoveryAssistance $173,200.00 $173,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888926 Prior Year Fund Balance $91,565.00 $91,565.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888930 Transit Half -Cent Surtax $1,849,896.53 $1,849,896.53 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888931 Transit Half -Cent Surtax (FY07 and Future) $4,267,696.24 $3,767,696.24 $0.00 $500,000.00 $0.00 $0.00 $0.00 $0.00
888938 Miami -Dade County Grant/Contribution $204,444.08 $204,444.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888947 MDC Building Better Communities GOB $12,500,000.00 $1,362,000.00 $0.00 $1,800,000.00 $3,100,000.00 $3,769,000.00 $2,469,000.00 $0.00
888959 FEMA 2007 & Future Pre -Disaster $599,999.99 $599,999.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 352-Storm Sewers
Fund Fund
No. Name
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
888961 Sunshine State Financing Commission $475,000.00
$475,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total $62,841,766.44 $41,230,324.49 $2,124,000.00 $3,923,441.95 $4,499,000.00 $5,378,000.00 $4,078,000.00 $1,609,000.00
Active & Future
CIP Projects Only
FUND: 353-Solid Waste
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$0.00
$0.00
$0.00
$0.00
$0.00
$5,009,427.21
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$3,548,727.21
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$854,100.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$606,600.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
$5,009,427.21 $3,548,727.21 $854,100.00 $606,600.00 $0.00 $0.00 $0.00 $0.00
Fund Fund
No. Name
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
382008 Contribution From General Fund 2007 and
$5,009,427.21
$3,548,727.21
$854,100.00
$606,600.00
$0.00
$0.00
$0.00
$0.00
Total
$5,009,427.21 $3,548,727.21 $854,100.00 $606,600.00 $0.00 $0.00 $0.00 $0.00
2012-2013 Capital Improvement Plan THIS DOCUMENT IS A SUBSTITUTION
Active & Future TO ORIGINAL. BACKUP ORIGINAL
CIP Projects Only Funding by Cost Component & Sources CAN BE SEEN AT THE END OF THIS DOCUMENT.
FUND: Totals
Total Prior Current
Phase Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$10,130,841.22
$5,335,182.37
$772,044.46
$68,082,627.36
271,944,019.63
$66,451,597.34
$8,858,342.62
$3,788,877.46
$13,073,059.65
$10,003,274.22
$3,600,182.37
$772,044.46
$64,431,869.55
190,484,255.78
$59,095,274.79
$8,228,114.62
$3,788,877.46
$12,420,341.65
$114,610.00
$1,735,000.00
$0.00
$869,058.00
$19,991,018.26
$4,653,222.55
$67,766.00
$0.00
$106,396.00
$12,957.00
$0.00
$0.00
$1,186,029.81
$12,323,430.94
$2,703,100.00
$137,266.00
$0.00
$121,126.00
$0.00
$0.00
$0.00
$471,260.00
$16,146,263.65
$0.00
$94,488.00
$0.00
$94,488.00
$0.00
$0.00
$0.00
$321,260.00
$13,505,092.00
$0.00
$94,488.00
$0.00
$94,488.00
$0.00
$0.00
$0.00
$401,575.00
$10,473,205.00
$0.00
$118,110.00
$0.00
$118,110.00
$0.00
$0.00
$0.00
$401,575.00
$9,020,754.00
$0.00
$118,110.00
$0.00
$118,110.00
Total
448,436,592.11 352,824,234.90 $27,537,070.81 $16,483,909.75 $16,806,499.65 $14,015,328.00 $11,111,000.00 $9,658,549.00
Fund Fund
No. Name
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
000000 Non-CIP Funding $55,000.00 $55,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
rn 000001 General Fund Operating Budget $60,000.00 $60,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
w 000002 Special Revenue Operating Budget $702,022.47 $702,022.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
000004 CRAOperatingBudget $19,289,500.00 $19,289,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
000008 CRA-FINDGrant $1,143,000.00 $1,143,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
355001 1988 Sanitary Sewer Bonds $4,336,000.00 $3,764,000.00 $572,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
356001 Local Option Gas Tax $4,816,799.36 $4,816,799.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
356002 Local Option Gas Tax 2009 and Future $885,800.00 $158,400.00 $326,000.00 $401,400.00 $0.00 $0.00 $0.00 $0.00
356003 Parking Surcharge $50,000.00 $50,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
356005-1 Streets Bond Program - Series 1 $31,518,652.00 $31,518,652.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
356005-2 Streets Bond Program - Series 2 $45,093,625.64 $45,093,625.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
356007 Parking Surcharge 2007 $14,721,925.97 $5,793,725.97 $1,428,600.00 $1,899,600.00 $1,400,000.00 $1,400,000.00 $1,400,000.00 $1,400,000.00
359101 Special Assessment District (SAD) Revenue $272,490.00 $248,490.00 $24,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
360001 Stormwater Utility Fund $7,911,368.37 $7,911,368.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
360003 Stormwater Utility Fund (FY07 and Future) $16,920,114.17 $8,294,114.17 $1,400,000.00 $1,000,000.00 $1,399,000.00 $1,609,000.00 $1,609,000.00 $1,609,000.00
367001 Impact Fees $1,818,098.69 $1,818,098.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
367011 Impact Fees - Ord 12750 $7,525,104.89 $3,381,315.70 $4,143,789.19 $0.00 $0.00 $0.00 $0.00 $0.00
369100 1991 Fire Bonds $46,477.39 $46,477.39 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
371100 Series 1995 Sanitary Sewer Bonds $60,000.00 $60,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
373001 Safe Neighborhood Parks Bond $119,622.00 $119,622.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
373002 Safe Neighborhood Parks Bond 2008 & $132,792.00 $132,792.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
375001 Fire Assessment Fee $4,501,786.13 $4,501,786.13 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
375002 Fire Assessment Fee (FY07) $1,256,123.03 $1,256,123.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
FUND: Totals
Fund Fund Total Prior Current
No. Name Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
382001 Contribution From General Fund $19,450,363.87 $19,450,363.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
382007 Contribution From General Fund 2003 $7,000,000.00 $7,000,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
382008 Contribution From General Fund 2007 and $41,657,298.38 $31,455,759.38 $7,115,439.00 $3,086,100.00 $0.00 $0.00 $0.00 $0.00
383001 CIP Misc. Revenue $46,357.55 $46,357.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
383005 CIP Miscellaneous Revenue $438,669.89 $0.00 $161,836.89 $276,833.00 $0.00 $0.00 $0.00 $0.00
385200-1 2002 Homeland Defense Bonds (Series 1) $3,167,731.84 $3,167,731.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
385200-2 2002 Homeland Defense Bonds (Series 2) $10,787,765.75 $10,787,765.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
385200-3 2002 Homeland Defense Bonds (Series 3) $31,343,119.99 $31,343,119.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
385200-8 2002 Homeland Defense Series 1 Interest $1,109,653.66 $1,109,653.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
397001 1970 Pollution Control G.O.B. (303000) $361,200.00 $361,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
399001 1976 & 78 Storm Sewer G O Bond $867,481.00 $867,481.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888896 Miami -Dade County DERM Virginia Key $650,000.00 $650,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888899 FEMA Hazard Mitigation Grant $750,000.00 $750,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888902 Community Development Block Grant $2,131,714.00 $1,783,474.00 $348,240.00 $0.00 $0.00 $0.00 $0.00 $0.00
888909 FL Dept of Environmental Protection (FDEP) $1,020,583.75 $1,000,000.00 $0.00 $20,583.75 $0.00 $0.00 $0.00 $0.00
888913 FDOT Transportation Enhancement Program $10,669,618.00 $9,419,618.00 $250,000.00 $0.00 $1,000,000.00 $0.00 $0.00 $0.00
rn
-P 888917 FDOT Other $1,999,150.63 $1,999,150.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888920 FIND Waterways Assistance Program FY07 $4,157,500.00 $2,340,250.00 $1,817,250.00 $0.00 $0.00 $0.00 $0.00 $0.00
888923 Contribution From Special Revenue $1,559,021.86 $1,559,021.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888924 DRI Fees Transportation $3,796,403.60 $3,796,403.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888925 FEMARecoveryAssistance $173,200.00 $173,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888926 Prior Year Fund Balance $91,565.00 $91,565.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888927 Federal Aviation Admin. Grant $150,000.00 $150,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888930 Transit Half -Cent Surtax $4,187,260.32 $4,171,907.32 $15,353.00 $0.00 $0.00 $0.00 $0.00 $0.00
888931 Transit Half -Cent Surtax (FY07 and Future) $49,265,688.70 $23,182,951.70 $3,174,600.00 $4,678,700.00 $4,324,955.00 $4,476,328.00 $4,633,000.00 $4,795,154.00
888937 Urban Areas Security Initiative Grant $69,842.00 $69,842.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888938 Miami -Dade County Grant/Contribution $8,522,078.08 $667,683.08 $0.00 $2,000,000.00 $1,000,000.00 $2,000,000.00 $1,000,000.00 $1,854,395.00
888939 FEMA Federal Assistance to Firefighters $931,354.00 $931,354.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888947 MDC Building Better Communities GOB $18,972,000.00 $1,612,000.00 $1,500,000.00 $2,100,000.00 $6,761,000.00 $4,530,000.00 $2,469,000.00 $0.00
888948 School Board of Miami -Dade County - Grant $850,854.32 $0.00 $850,854.32 $0.00 $0.00 $0.00 $0.00 $0.00
888951 Other Public & Private Contributions $1,391,357.65 $619,813.00 $0.00 $0.00 $771,544.65 $0.00 $0.00 $0.00
888953 Miami -Dade Metropolitan Planning Org $81,000.00 $48,000.00 $33,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
888955 MSEA Contribution to Capital $350,000.00 $350,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888956 Contribution from Special Revenue - SRF $5,456,311.34 $2,837,115.34 $1,847,396.00 $771,800.00 $0.00 $0.00 $0.00 $0.00
888957 Downtown Development Agency $212,500.00 $25,000.00 $37,500.00 $0.00 $150,000.00 $0.00 $0.00 $0.00
888959 FEMA 2007 & Future Pre -Disaster $599,999.99 $599,999.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888960 Sunshine State Financing Commission $2,671,069.00 $2,671,069.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
888961 Sunshine State Financing Commission $27,353,569.72 $27,353,569.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
FUND: Totals
Fund Fund Total Prior Current
No. Name Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
888962 The Children's Trust
888963 Proceeds from Conveyance of Easement
888965 Bayfront Park Management Trust
888966 Sunshine State Financing Commission
888969 Subrogation Auto Claim Revenues
888972 Rickenbacker Marina Rental Revenue
888973 TVM Production Basic Use Fee
888976 Miami -Dade County Dept Cultural Affairs
888977 DRI Fees Air Quality
888978 DRI Fees Administration
888980 Surplus Goods & Fixed Assets Sales
888981 Florida Boating Improvement Program
888982 FEMA Tree Funding
888983 FDEP Invasive Species at Marine Stadium
888984 State of Florida Department of Health
$260,000.00 $260,000.00
$1,502,044.46 $1,502,044.46
$309,000.00 $309,000.00
$13,496,648.12 $13,496,648.12
$726,051.38 $603,864.00
$137,601.00 $137,601.00
$820,000.00 $490,000.00
$354,614.00 $354,614.00
$313,129.12 $313,129.12
$700,000.00 $700,000.00
$68,457.03 $0.00
$56,893.00 $0.00
$1,895,593.00 $0.00
$28,975.00 $0.00
$238,000.00 $0.00
$0.00
$0.00
$0.00
$0.00
$122,187.38
$0.00
$330,000.00
$0.00
$0.00
$0.00
$68,457.03
$46,000.00
$1,895,593.00
$28,975.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$10,893.00
$0.00
$0.00
$238,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
448,436,592.11 352,824,234.90 $27,537,070.81 $16,483,909.75 $16,806,499.65 $14,015,328.00 $11,111,000.00 $9,658,549.00
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
1tze &IL 1tze Yalu/re
66
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
SECTION REPORTS
3. COST ESTIMATE VS. AVAILABLE
FUNDING
Cite sutavie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
Active & Future
CIP Projects Only
B-No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
301-CRA projects
B-30394
B-30538B
B-30731
B-40169
Community Redevelopment
Agency
Community Redevelopment
Agency
Community Redevelopment
Agency
Community Redevelopment
Agency
North 14 St. Multi Media Entertainment
District Streetscape CRA 92-686001
Museum Park Environmental
Remediation/Seawall - CRA 92-686001
Miami Women's Club Baywalk Project - CRA
92-686001
2
1,2,3,4,5
2
300 NW 11 Street Community Center - CRA 5
92-689001
6,000,000
2,000,000
93,000
2,293,250
6,000,000 Active
2,000,000 Active
93,000 Active
1,500,000 Active
5-Construction Funded 0
5-Construction Funded 0
3-Design Funded 0
3-Design Partially Funded -793,250
311-General Government
B-30365E Community Development
B-30365J Building Department
B-30666 General Services
Administration
B-30865A Grants Administration
B-30865B General Services
Administration
B-30865C General Services
Administration
B-30865E General Services
Administration
B-30865F Fire Rescue
B-30994
B-35002
B-39910
B-40171
Public Facilities
Capital Improvement Program
Admin
Capital Improvement Program
Admin
City Manager
B-40172 City Manager
301-CRA projects
Coral Way NET Office Remodeling /
Community Center D3 - CD 91-02994
Beckham Hall Fire Damage Repair
Damaged Vehicle Replacement / Repairs
Environmental Remediation Study
City Hall Roof Terrace
City Hall Windows and Doors
MRC A/C Replacements
Environmental Remediation Study -
Fire -Rescue
10,386,250 9,593,000
3 1,291,833 1,291,833 Active 5-Construction Funded
1 6,770 6,770 Future 8-Future Funded
1,2,3,4,5 794,508 794,508 Active 5-Construction Funded
1,2,3,4,5 466,900 466,900 Active 1-Study Funded
1,2,3,4,5 314,176 314,176 Active 5-Const. (JOC) Funded
1,2,3,4,5 296,000 296,000 Active 5-Const. (JOC) Funded
1,2,3,4,5 289,823 289,823 Active 7-On-Hold Funded
1,2,3,4,5 140,000 140,000 Active 1-Study Funded
City of Miami Impact Fee Study - Citywide 1,2,3,4,5 65,490 65,490 Active 1-Study Funded
Virginia Key Landfill Assessment 2 1,400,000 1,400,000 Active 5-Construction Funded
Quality of Life District 2 - Various Projects 2 60,131 60,131 Active 3-Design Funded
Coconut Grove Viewing Platform Spoil Island 2 15,088 15,088 Active 5-Construction Funded
C - D2
Coconut Grove Viewing Platform Spoil Island 2 15,080 15,080 Active 5-Construction Funded
E - D2
-793,250
0
0
0
0
0
0
0
0
0
0
0
0
0
Active & Future
CIP Projects Only
B-No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
311-General Government
B-40410
B-70415
B-70969
B-74205B
B-74205C
B-74219B
B-74219C
B-74220
B-74609
B-30365H
B-30551
B-74200
B-74606
B-74614
B-74617
B-30365C
B-30365Q
B-40001
B-40002
B-40007
General Services
Administration
General Services
Administration
Information Technology
General Services
Administration
General Services
Administration
General Services
Administration
General Services
Administration
General Services
Administration
Information Technology
General Services
Administration
Public Works
General Services
Administration
Information Technology
Information Technology
Information Technology
Community Development
Community Development
Public Works
Public Works
Public Works
Fire Alarm Replacement, Air Conditioning 1,2,3,4,5 1,426,200 1,426,200 Future 8-Future
Repairs and maintenance
MRC Security System Hardening - UASI 2 69,842 69,842 Active 7-On-Hold
Funded 18-180011 / 10th Floor 18-180022
IT - Financial Management Upgrade Module
GSA Fleet Maintenance Garage Expansion
GSA Truck Wash Pit
Property Maintenance Security Improvements
Property Maintenance Bobcats & Trailer
Police Vehicle Replacement
ERP Integration System
Generator for City Hall
Public Works Maintenance Yard
Citywide General Fleet Replacement
Upgrade PC Software & Hardware
Land Management System
IT Modernization
City Property Building Maintenance
Coral Way Community Center Playground
Oracle Project 91-03275
New Public Works Operations Facilities
Public Works Fleet and Heavy Machinery
Replacement FY2014
PW - Heavy Machinery Replacement -
FY2015
1,2,3,4,5 500,000 500,000 Active 5-Construction
1 404,214 404,214 Active 5-Construction
1,2,3,4,5 88,000 88,000 Future 8-Future
1,2,3,4,5 25,000 25,000 Future 8-Future
1,2,3,4,5 40,000 40,000 Future 8-Future
1,2,3,4,5 27,491,737 27,491,737 Active 5-Construction
1,2,3,4,5 25,474,457 25,474,457 Active 5-Construction
1,2,3,4,5 186,819 55,855 Active 5-Const. (JOC)
1,2,3,4,5 4,719,387 3,268,254 Active 1-Study
1,2,3,4,5 3,969,887 3,610,268 Active 5-Construction
1,2,3,4,5 7,174,921 2,920,682 Active 5-Construction
1,2,3,4,5 7,913,018 6,316,151 Active 3-Design
1,2,3,4,5 4,100,000 2,800,000 Active 5-Construction
1,2,3,4,5 700,000 0 Future 8-Future
3 500,000 0 Future 8-Future
1,2,3,4,5 1,875,500 0 Future 8-Future
1,2,3,4,5 499,000 0 Future 8-Future
1,2,3,4,5 95,000 0 Future 8-Future
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
0
0
0
0
0
0
0
0
Funded 0
Partially Funded -130,963
Partially Funded -1,451,132
Partially Funded -359,618
Partially Funded -4,254,238
Partially Funded -1,596,866
Partially Funded -1,300,000
UnFunded -700,000
UnFunded -500,000
UnFunded -1,875,500
UnFunded -499,000
UnFunded -95,000
B-40008 Public Works
PW Heavy Equipment and Machinery
Replacement - FY2016
1,2,3,4,5 650,000 0 Future 8-Future
UnFunded -650,000
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
Dist. Estimate ($) Funds ($) Status Phase Status Estimate ($)
311-General Government
B-40009 Public Works PW Updrage Operations Division Equipment - 1,2,3,4,5 300,000 0 Future 8-Future UnFunded -300,000
FY2017
B-40960 Communications City Hall Studio Area - A/C Unit Replacement 1,2,3,4,5 51,632 0 Future 8-Future UnFunded -51,632
B-40961 Communications Office of Communications - Fleet Upgrade 1,2,3,4,5 144,000 0 Future 8-Future UnFunded -144,000
B-40962 Communications Office of Communications - Upgrade Systems 1,2,3,4,5 40,000 0 Future 8-Future UnFunded -40,000
to Media Equipment
B-40963 Communications Office of Communications - Robotics Cameras 1,2,3,4,5 30,000 0 Future 8-Future UnFunded -30,000
B-40964 Communications Office of Communications - Large Format 1,2,3,4,5 90,000 0 Future 8-Future UnFunded -90,000
Video Cameras Replacement
B-40965 Communications Office of Communications - Studio Cameras 1,2,3,4,5 18,000 0 Future 8-Future UnFunded -18,000
B-70108 General Services Purchase of a video transmission server 1,2,3,4,5 100,000 0 Future 8-Future UnFunded -100,000
Administration
B-70320 General Services City of Miami Fleet Vehicle Replacement 1,2,3,4,5 1,700,000 0 Future 8-Future UnFunded -1,700,000
co Administration
B-70321 General Services City of Miami Fleet Vehicle Replacement 1,2,3,4,5 1,750,000 0 Future 8-Future UnFunded -1,750,000
Administration (Trucks)
B-70322 General Services Carpet Replacement at the MRC Facility 1,2,3,4,5 300,000 0 Future 8-Future UnFunded -300,000
Administration
B-70323 General Services GSA Communications Division - Back up 1,2,3,4,5 42,000 0 Future 8-Future UnFunded -42,000
Administration Batteries for Communications Systems
B-70324 General Services MRC Building - UPS System 1,2,3,4,5 7,000 0 Future 8-Future UnFunded -7,000
Administration
B-70325 General Services GSA Fleet Facility - Fuel Station Roof 1,2,3,4,5 25,000 0 Future 8-Future UnFunded -25,000
Administration Replacement
B-70326 General Services GSA Communications Division - Impact 1,2,3,4,5 30,000 0 Future 8-Future UnFunded -30,000
Administration Windows and Hurricane Grade Electric Garage
Doors
B-70327 General Services GSA Mechanics Shop - Light Fleet Aligment & 1,2,3,4,5 65,000 0 Future 8-Future UnFunded -65,000
Administration Lift Mechanism for vehicles up to 3,500
pounds
B-70328 General Services Fuel Pump Replacements 1,2,3,4,5 200,000 0 Future 8-Future UnFunded -200,000
Administration
B-70329 General Services Roof Repairs at the GSA Communications 1,2,3,4,5 60,000 0 Future 8-Future UnFunded -60,000
Administration Warehouse and USAR Warehouse
Active & Future
CIP Projects Only
B-No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
311-General Government
B-70330
B-70331
B-70332
B-70333
B-70334
B-70335
B-70336
B-70956
B-70957
B-70958
B-70959
B-70960
B-70961
B-70962
B-70963
B-70964
B-70965
B-70966
B-70967
B-70968
B-74220B
General Services
Administration
General Services
Administration
General Services
Administration
General Services
Administration
General Services
Administration
General Services
Administration
General Services
Administration
Information Technology
Information Technology
Information Technology
Informat
Informat
Informat
Informat
on Technology
on Technology
on Technology
on Technology
Information Technology
Information Technology
Information Technology
Information Technology
Information Technology
Information Technology
General Services
Administration
Re -grouping and polishing of all MRC Granite 1,2,3,4,5 70,000 0 Future 8-Future
and Bathrooms
Heavy Fleet Tow Truck 1,2,3,4,5 250,000 0 Future 8-Future
MRC Facility - Repair of HVAC VAV Boxes 1,2,3,4,5 120,000 0 Future 8-Future
Bucket Truck for the Electrical Division at 1,2,3,4,5 162,000 0 Future 8-Future
GSA
City Hall Repairs
Replacement of Fire Panel at MRC Facility
Roof Repair at the MRC Facility
MRC Telecommunications Infrastructure
Replacement
eGovernment/Web Services City View
Replacement
eGoverment/Web Services iBuild Miami
Phases II and III
eGovernment Services Platform
CIP Document Mgmt & Data Consolidation
Audit Compliance
Server Virtualization
Business Continuity Systems Consolidation
City Wide Personal Computer Replacement
(20%)
Hyperion Financial Management Application
Kronos System Upgrade
Cloud Data Service - Data Storage
Replacement: City Clerk Systems
Police Vehicle Acquisition - FY2014
1,2,3,4,5 200,000 0 Future 8-Future
1,2,3,4,5 340,000 0 Future 8-Future
1,2,3,4,5 350,000 0 Future 8-Future
1,2,3,4,5 455,000 0 Future 8-Future
1,2,3,4,5 2,464,000 0 Future 8-Future
1,2,3,4,5 480,000 0 Future 8-Future
1,2,3,4,5 1,480,000 0 Future 8-Future
1,2,3,4,5 380,000 0 Future 8-Future
1,2,3,4,5 22,000 0 Future 8-Future
1,2,3,4,5 98,000 0 Future 8-Future
1,2,3,4,5 56,000 0 Future 8-Future
1,2,3,4,5 1,560,000 0 Future 8-Future
1,2,3,4,5 430,000 0 Future 8-Future
1,2,3,4,5 105,000 0 Future 8-Future
1,2,3,4,5 220,000 0 Future 8-Future
1,2,3,4,5 660,000 0 Future 8-Future
1,2,3,4,5 2,040,000 0 Future 8-Future
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
-70,000
-250,000
-120,000
-162,000
-200,000
-340,000
-350,000
-455,000
-2,464,000
-480,000
-1,480,000
-380,000
-22,000
-98,000
-56,000
-1,560,000
-430,000
-105,000
-220,000
-660,000
-2,040,000
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
Dist. Estimate ($) Funds ($) Status Phase Status Estimate ($)
311-General Government 109,953,419 79,646,467 -30,306,952
312-Public Safety
B-30373A Police Police Department Property Unit Outdoor 1,2,3,4,5 1,069,644 1,069,644 Active 4-Bid (JOC) Funded 0
Storage
B-40273 Police Police Station Headquarters Generator Slab 2 10,000 10,000 Active 2-Pre-Design Funded 0
B-60453A Fire Rescue Fire Station #13 2 5,084,496 5,084,496 Active 5-Construction Funded 0
B-60455B Fire Rescue Fire Station #1 - Renovation and 2 500,000 500,000 Active 2-Pre-Design Funded 0
Miscellaneous Repairs
B-70102A Fire Rescue Fire Station No. 6 Office Building - Structural 5 74,619 74,619 Active 7-On-Hold Funded 0
Analysis
B-70104 Fire Rescue Fire Station No. 10 Restroom Remodeling 1 188,218 188,218 Active 4-Bid (JOC) Funded 0
B-70105 Fire Rescue Refurbishing of Existing Apparatus 1,2,3,4,5 230,000 230,000 Future 8-Future Funded 0
B-70106 Fire Rescue Firefighting Equipment and Gear 1,2,3,4,5 158,123 158,123 Active 5-Construction Funded 0
B-70112 Police Police Headquarters Interview rooms sound 1,2,3,4,5 55,000 55,000 Active 4-Bid (JOC) Funded 0
proofing - Oracle 19-690002
B-70210 Fire Rescue Fire Station #5 Exterior Walls Repair - D1 1 150,000 150,000 Active 5-Const. (JOC) Funded 0
B-70211 Fire Rescue Fire Station No. 3 Dormitories Build -out 3 100,000 100,000 Active 5-Const. (JOC) Funded 0
Project
B-70212 Fire Rescue Fire Station No. 12 - Re -roofing Project 5 77,000 77,000 Active 5-Const. (JOC) Funded 0
B-70213 Fire Rescue Fire Station No.5 - Interior Renovation Work 1 348,240 348,240 Active 3-Design Funded 0
Oracle Project 91-03237
B-70241 Fire Rescue Fire Rescue Capital Needs - FY2014 1,2,3,4,5 1,858,500 1,858,500 Future 8-Future Funded 0
B-70411 Fire Rescue Fire Rescue Personal Protective Equipment 1,2,3,4,5 820,580 820,580 Active 3-Design Funded 0
B-70418 Fire Rescue FEMA Assistance to Firefighters Program 1,2,3,4,5 343,610 343,610 Active 3-Design Funded 0
FY2011
B-70718 Fire Rescue Fire Facilities Generators (North & South) 1,2,3,4,5 300,000 300,000 Future 8-Future Funded 0
B-72801 Fire Rescue Computer Aided Dispatch (CAD) 1,2,3,4,5 120,865 120,865 Active 3-Design Funded 0
B-72802 Fire Rescue Fire Stations & Other Fire Facilities 1,2,3,4,5 3,647,898 3,647,898 Active 5-Construction Funded 0
B-72803 Fire Rescue Fire Station Equipment and Furniture 1,2,3,4,5 790,837 790,837 Active 5-Construction Funded 0
Replacement
B-72810A Fire Rescue New Fire Rescue Apparatus (North & South) 1,2,3,4,5 573,739 573,739 Future 8-Future Funded 0
B-72813 Fire Rescue Defense and Security Equipment Acquisition 1,2,3,4,5 3,767,249 3,767,249 Active 5-Construction Funded 0
B-72915A Police Police Headquarters Helipad and Roof 1,2,3,4,5 1,657,118 1,657,118 Active 3-Design Funded 0
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
Dist. Estimate ($) Funds ($) Status Phase Status Estimate ($)
312-Public Safety
Replacement
B-60351 Fire Rescue Fire Station #10 (New) 1 6,275,200 898,123 Active 3-Design Partially Funded -5,377,076
B-60454 Fire Rescue Fire Station #14 (New) 4 6,916,509 5,076,843 Active 2-Pre-Design Partially Funded -1,839,665
B-70242 Fire Rescue Fire Department - FY2012 "Emergency 1,2,3,4,5 317,333 238,000 Future 8-Future Partially Funded -79,333
Medical Services (EMS)"
B-72804 Fire Rescue Phone and Radio Equipment Upgrades 1,2,3,4,5 1,209,200 351,200 Active 5-Construction Partially Funded -858,000
B-72808 Fire Rescue Light Fleet Replacement 1,2,3,4,5 1,649,658 667,658 Active 5-Construction Partially Funded -982,000
B-72809 Fire Rescue Large Firefighting Equipment 1,2,3,4,5 660,316 388,316 Active 5-Construction Partially Funded -272,000
B-70113 Police Police Headquarters 5th floor Interior 1,2,3,4,5 496,956 0 Future 8-Future UnFunded -496,956
renovations
B-70114 Police Fire Pump Electrical Rewiring - Police Dept. 1,2,3,4,5 35,000 0 Future 8-Future UnFunded -35,000
B-70115 Police Domestic Water Pump - Police Dept. 1,2,3,4,5 65,000 0 Future 8-Future UnFunded -65,000
j B-70116 Police Police Headquarter Elevators Renovation & 1,2,3,4,5 75,000 0 Future 8-Future UnFunded -75,000
Repairs
B-70117 Police I-95 Lighting Project - Police Dept. 1,2,3,4,5 85,000 0 Future 8-Future UnFunded -85,000
B-70118 Police Police Central Station Parking Garage 1,2,3,4,5 210,000 0 Future 8-Future UnFunded -210,000
B-70119 Police Police Headquarters Presure Clean/Seal/Paint 1,2,3,4,5 275,000 0 Future 8-Future UnFunded -275,000
Exterior
B-70120 Police Carpeting and Flooring - Police Dept. 1,2,3,4,5 65,000 0 Future 8-Future UnFunded -65,000
B-70121 Police Police Headquarter & South District Storm 1,2,3,4,5 425,000 0 Future 8-Future UnFunded -425,000
Drains and Parking Lot Asphalt
B-70122 Police South District Police Sub Station Furniture 1,2,3,4,5 175,000 0 Future 8-Future UnFunded -175,000
B-70123 Police Security System for Central/Headquarter - 1,2,3,4,5 85,000 0 Future 8-Future UnFunded -85,000
Police Dept.
B-70124 Police Police South District Air Conditioning Diffuser 1,2,3,4,5 275,000 0 Future 8-Future UnFunded -275,000
B-70125 Police North and South Police Stations Landscaping 1,2,3,4,5 50,000 0 Future 8-Future UnFunded -50,000
B-70126 Police Grapeland Heights Electrical Panel - Police 1,2,3,4,5 125,000 0 Future 8-Future UnFunded -125,000
Dept.
B-70127 Police Police Headquarter Building Emergency 1,2,3,4,5 25,000 0 Future 8-Future UnFunded -25,000
Generator Shed Replacement
B-70128 Police Forensic Lab Expansion - Police Dept. 1,2,3,4,5 1,200,000 0 Future 8-Future UnFunded -1,200,000
B-70129 Police College of Police Auditorium Lighting 1,2,3,4,5 15,000 0 Future 8-Future UnFunded -15,000
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
THIS DOCUMENT IS ASUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
Dist. Estimate ($) Funds ($) Status Phase Status Estimate ($)
312-Public Safety
B-70130 Police College of Police Lobby Lighting 1,2,3,4,5 20,000 0 Future 8-Future UnFunded -20,000
B-70131 Police Mounted Stables Stall Repairs - Police Dept. 1,2,3,4,5 100,000 0 Future 8-Future UnFunded -100,000
B-70132 Police Police South District Exterior Lighting 1,2,3,4,5 35,000 0 Future 8-Future UnFunded -35,000
B-70133 Police Security System for Police South District 1,2,3,4,5 70,000 0 Future 8-Future UnFunded -70,000
Substation
B-70134 Police Replacement of 400 Desktop Computers - 1,2,3,4,5 324,172 0 Future 8-Future UnFunded -324,172
Police Dept.
B-70135 Police Replacement of Sauna Water Heating System - 1,2,3,4,5 15,000 0 Future 8-Future UnFunded -15,000
Police Dept.
B-70136 Police Police Headquarters Record Unit Exterior 1,2,3,4,5 496,458 0 Future 8-Future UnFunded -496,458
Walls Replacement
B-70214 Fire Rescue Fire Stations Computer Aided Dispatch System 1,2,3,4,5 2,400,000 0 Future 8-Future UnFunded -2,400,000
B-70215 Fire Rescue Uniform Fire Station Data Closets x12 1,2,3,4,5 48,000 0 Future 8-Future UnFunded -48,000
B-70216 Fire Rescue Fire Station and AO PC Replacement 1,2,3,4,5 70,000 0 Future 8-Future UnFunded -70,000
B-70217 Fire Rescue New Citywide Fire Stations Digital Radio 1,2,3,4,5 5,000,000 0 Future 8-Future UnFunded -5,000,000
System
B-70218 Fire Rescue Citywide Fire Station Replace out of Warranty 1,2,3,4,5 150,000 0 Future 8-Future UnFunded -150,000
Mobile Data
B-70219 Fire Rescue Citywide Warranty and Outdated Fire Station 1,2,3,4,5 105,000 0 Future 8-Future UnFunded -105,000
Computers and Monitors
B-70220 Fire Rescue Citywide Bunker Gear (Fire Station) 1,2,3,4,5 274,800 0 Future 8-Future UnFunded -274,800
B-70221 Fire Rescue Fire Stations Warranty Lifepak/EKG Units 1,2,3,4,5 946,000 0 Future 8-Future UnFunded -946,000
B-70222 Fire Rescue Rebuilding Fire Station #1 2 9,000,000 0 Future 8-Future UnFunded -9,000,000
B-70223 Fire Rescue Rebuilding Fire Station #10 1 6,000,000 0 Future 8-Future UnFunded -6,000,000
B-70224 Fire Rescue Fire and Rescue Training Center 2 17,000,000 0 Future 8-Future UnFunded -17,000,000
(Renovate/Rebuild)
B-70225 Fire Rescue Fire Station #15 (Fire Boat) 2 10,000,000 0 Future 8-Future UnFunded -10,000,000
B-70226 Fire Rescue Citywide Fire Station Pumpers 1,2,3,4,5 1,960,000 0 Future 8-Future UnFunded -1,960,000
B-70227 Fire Rescue Fire Rescue 1,2,3,4,5 4,320,000 0 Future 8-Future UnFunded -4,320,000
B-70228 Fire Rescue Apparatus Replacement 1,2,3,4,5 950,000 0 Future 8-Future UnFunded -950,000
B-70229 Fire Rescue Replace Fireboat 1 1,250,000 0 Future 8-Future UnFunded -1,250,000
B-70230 Fire Rescue Fire Station Training Facility 1,2,3,4,5 750,000 0 Future 8-Future UnFunded -750,000
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
Dist. Estimate ($) Funds ($) Status Phase Status Estimate ($)
312-Public Safety
B-70231 Fire Rescue Expand Comunication/Alarm Office Facility 1,2,3,4,5 500,000 0 Future 8-Future UnFunded -500,000
w/PD (Fire Station)
B-70232 Fire Rescue Facility Budget Requests (Fire) 1,2,3,4,5 1,750,000 0 Future 8-Future UnFunded -1,750,000
B-70233 Fire Rescue Fire Station Equipment/Furniture 1,2,3,4,5 200,000 0 Future 8-Future UnFunded -200,000
B-70234 Fire Rescue Fire Station Hurricane Hardening 1,2,3,4,5 384,000 0 Future 8-Future UnFunded -384,000
B-70235 Fire Rescue Fire Station Light Fleet Vehicle Replacement 1,2,3,4,5 630,000 0 Future 8-Future UnFunded -630,000
B-70236 Fire Rescue Fire Station Hardening/Security 1,2,3,4,5 935,000 0 Future 8-Future UnFunded -935,000
B-70237 Fire Rescue Fire Station #5 Renovation 1 800,000 0 Future 8-Future UnFunded -800,000
B-70238 Fire Rescue Fire Training Props 2 350,000 0 Future 8-Future UnFunded -350,000
B-70239 Fire Rescue Fire Station Flat Panels 24" 1,2,3,4,5 3,500 0 Future 8-Future UnFunded -3,500
B-70240 Fire Rescue Fire Station Paperless Inspection System (i.e. 1,2,3,4,5 80,000 0 Future 8-Future UnFunded -80,000
MobileEyes software)
v B-70417 Police Satellite Communications Antenna Installation 2 20,000 0 Future 8-Future UnFunded -20,000
B-72811 Fire Rescue Replace Existing Fire Engines 1,2,3,4,5 3,035,000 0 Future 8-Future UnFunded -3,035,000
312-Public Safety 112,607,844 29,545,882 -83,061,961
313-Disaster Recovery
B-30500T Capital Improvement Program Civic Center NW 14th Street - Tree Funded 1,2,3,4,5 100,000 100,000 Active 4-Bid Funded 0
Admin Component
B-30538T Capital Improvement Program Museum Park - FEMA Tree Funding 215,943 215,943 Active 5-Construction Funded 0
Admin Component
B-30611T Capital Improvement Program D1 FEMA Tree Funded Projects 1 169,930 169,930 Future 8-Future Funded 0
Admin
B-30613T Capital Improvement Program D3 FEMA Tree Funded Projects 3 255,930 255,930 Future 8-Future Funded 0
Admin
B-30614T Capital Improvement Program D4 - FEMA Tree Funded Projects 4 315,930 315,930 Future 8-Future Funded 0
Admin
B-30615T Capital Improvement Program D5 FEMA Tree Funded Component 5 119,930 119,930 Future 8-Future Funded 0
Admin
B-30624T Capital Improvement Program Overtown Greenway @ NW 11 Terrace - D5 5 100,000 100,000 Active 3-Design Funded 0
Admin Tree Funded Component
B-30630T Capital Improvement Program Palm Grove Road Improvements - Tree 2 70,000 70,000 Active 3-Design Funded 0
Admin Component D2
B-30687T Capital Improvement Program Coconut Grove Business Improvement District 2 100,000 100,000 Active 5-Const. (JOC) Funded 0
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
313-Disaster Recovery
Admin
B-30699T
B-30724T
B-30727T
B-30780T
B-30822T
B-30882T
B-30883T
B-40704AT
Capital
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Improvement Program
Improvement Program
Improvement Program
Improvement Program
Improvement Program
Improvement Program
Improvement Program
Improvement Program
D2 Tree Component
Beacom Project Area Improvements - Tree
Component D3
NW 33rd Street Roadway Improvement
Project - D1 Tree Component
NW 18th Avenue Roadway Improvement
Project - D1 Tree Component
NW 14 Ave & 28 St. Are Roadway
Improvements- D1 - Tree Component
Brickell Area Shared Use Path and Roadway
Improvements - Tree Component D2
African Square Park - Splash Park D5 Tree
Component
NW 12 Avenue/NW 12 Place Roadway
Improv. Tree Component D5
SW 32 Avenue Improvements D2 Tree
Component
3
1
1
1
2
5
5
2
60,000
60,000
60,000
26,000
85,930
50,000
46,000
60,000
60,000 Active
60,000 Active
60,000 Active
26,000 Active
85,930 Active
50,000 Active
46,000 Active
60,000 Active
5-Construction Funded
7-On-Hold Funded
5-Construction Funded
5-Construction Funded
5-Const. (JOC) Funded
3-Design Funded
5-Construction Funded
5-Const. (JOC) Funded
0
0
0
0
0
0
0
0
325-Public Facilities
B-30501A Public Facilities
B-30501B Public Facilities
B-30531
B-30696
B-30706
B-30735
B-33506
B-60464
B-70010
B-70011
B-70414
Capital Improvement Program
Admin
Public Facilities
Public Facilities
Public Facilities
Public Facilities
Public Facilities
Public Facilities
Public Facilities
Public Facilities
313-Disaster Recovery
Manuel Artime Miscellaneous Project
Manuel Artime Dimmer Rack System
Dorsey Memorial Library Restoration
Miamarina Pier A, B & C Fire Line Repairs
Miscellaneous Repairs 10% Set Aside
Dinner Key Marina Dinghy Dock - D2
James L. Knight Center Miscellaneous
Improvements
New Dinner Key Marina Dockmaster Building
Miamarina Pier 5 Canopies - PF
Clean Vessel Act 2013 - PF
James L. Knight Center / Hyatt- Fire Alarm
System Replacement
3
1,2,3,4,5
2
2
2
1,2,3,4,5
2
2
2
2
1,895,593
92,882
106,653
250,000
380,000
2,158,593
253,070
48,721
4,211,239
435,000
41,167
351,876
1,895,593
92,882
106,653
250,000
380,000
2,158,593
253,070
48,721
4,211,239
435,000
41,167
351,876
Active
Active
Active
Active
Active
Active
Active
Active
Active
Future
Active
5-Const. (JOC)
3-Design
3-Design
5-Const. (JOC)
5-Construction
3-Design
5-Construction
5-Construction
4-Bid (JOC)
8-Future
1-Study
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
0
0
0
0
0
0
0
0
0
0
0
0
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
325-Public Facilities
B-30182A Public Facilities
B-30501C Public Facilities
B-30602 Public Facilities
B-30688 Public Facilities
B-30689 Public Facilities
B-33514 Public Facilities
B-40180 Public Facilities
B-70100 Public Facilities
B-75001 Public Facilities
B-30834 Public Facilities
B-35000 Public Facilities
B-35003 Public Facilities
Coconut Grove Waterfront Master Plan
Implementation - Phase I
Manuel Artime Window Replacement 970
Building - PF
Seminole Dinghy Dock Expansion
Marine Stadium Restoration
Marine Stadium Bulkhead Replacement
Marine Stadium Marina Improvements
Marine Stadium Marina at Virginia Key
Gusman Hall Improvements / Repairs
Watson Island Infrastructure
Dinner Key Dredging - Spoil Island C Floating
Dock Repair
Watson Island Public Park Improvements
Allapattah Community Elderly Center
2
2
2
2
2
2
2
2
2
2
2
1
47,179,389
173,607
60,000
511,716
2,094,393
1,315,550
33,180,900
10,000,000
647,190
308,375
2,600,000
287,000
2,051,675 Active
150,379 Active
30,000 Future
350,000 Active
1,891,603 Active
255,645 Active
1,740,007 Active
423,405 Active
150,000 Future
0 Future
0 Future
0 Future
4-Bid
3-Design
8-Future
7-On-Hold
4-Bid
3-Design
7-On-Hold
5-Construction
8-Future
8-Future
8-Future
8-Future
Partially Funded -45,127,714
Partially Funded -23,227
Partially Funded -30,000
Partially Funded -161,716
Partially Funded -202,789
Partially Funded -1,059,905
Partially Funded -31,440,893
Partially Funded -9,576,594
Partially Funded -497,190
UnFunded -308,375
UnFunded -2,600,000
UnFunded -287,000
331-Parks and Recreation
B-30134A Parks and Recreation
B-30174 Virginia Key Park Trust
B-30305B Parks and Recreat
B-30538 Parks and Recreat
B-30538D Capital Improvement Program
Admin
B-30538E Capital Improvement Program
Admin
B-30538F Capital Improvement Program
Admin
B-30541C Parks and Recreation
B-30541D Parks and Recreation
325-Public Facilities
Bryan Park Community Building - D4
4
Virginia Key Beach Park Historic Restoration 2
Phase 2
on Gibson Park New Construction (Partially
Funded by CRA 92-689001)
on Museum Park - Partially Funded by CRA
92-686001
Museum Park - DRI Fees Administration
Museum Park - DRI Air Quality
Museum Park - DRI Transportation
106,687,324
852,128
1,480,737
5 12,739,521
1,2,3,4,5 14,042,367
1,2,3,4,5 600,000
1,2,3,4,5 313,129
1,2,3,4,5 2,296,403
Kennedy Park Shoreline Stabilization Phase I 2
Citywide Park Equipments & Site
Improvements FY12
1,2,3,4,5
261,000
15,371,918
852,128 Active
1,480,737 Active
12,739,521 Active
14,042,367 Active
600,000 Active
313,129 Active
2,296,403 Active
261,000 Active
1,917,378 1,917,378 Active
3-Design Funded
5-Construction Funded
5-Construction Funded
5-Construction Funded
5-Construction Funded
5-Construction Funded
5-Construction Funded
5-Construction Funded
3-Design Funded
-91,315,405
0
0
0
0
0
0
0
0
0
Active & Future
CIP Projects Only
B-No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
331-Parks and Recreation
B-30547E
B-30547G
B-30671
B-30690
B-30721
B-30772
B-30800
B-30824
B-30825
B-30825A
B-30825B
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Capital Improvement Program
Admin
Parks and Recreat
Parks ADA Modifications - District 2
Parks ADA Modifications - District 4
Caribbean Marketplace Renovation
West End Park New Community Building
Spoil Island E Restoration and Floating Dock
Bay of Pigs Park Lighting - D4
Fern Isle / PBA Park Improvements Project -
D1
Spoil Island B & C Swim Area Improvement -
D2
on Biscayne Bay Spoil Island B Public Shelter -
D2
Parks and Recreation
Parks and Recreation
B-30886S Parks and Recreation
B-30962 Parks and Recreation
B-30963
B-30981
B-30984
B-30995
B-35806
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
B-35812A Parks and Recreat
B-35812D
B-35838
B-35861B
Parks and Recreation
Parks and Recreation
Parks and Recreat
Biscayne Bay Spoil Island E Picnic Tables,
Benches & Umbrellas - D2
Biscayne Bay Spoil Island E Public Trail - D2
Lummus Landing Square - D5 Sanitary Sewer
Component
Robert King High Fencing and Miscelaneous
Improvements
Bay of Pigs Memorial Park Lighting - D4
Oakland Grove Park - upgrades - D5
Athalie Range Park HVAC Replacement - D5
Virginia Key Bike and Kayak Facility - D2
Curtis Park New Pool Facility and Boat Ramp
Improvement
on Duarte Park Building Renovation, Splash Park
and Sign
Duarte Park Building Renovation, Splash Park
(Lighting)
Kennedy Park Restroom Building
Improvements
on Maximo Gomez / Domino Park Restroom
2 215,348 215,348
4 491,147 491,147
5 1,102,553 1,102,553
4 2,598,521 2,598,521
2 252,500 252,500
4 53,000 53,000
1 116,781 116,781
2 67,000 67,000 Active
2 17,500 17,500 Active
2 8,250 8,250 Active
2 8,250 8,250 Active
5 100,000 100,000 Active
4 102,468 102,468 Active
4 20,000 20,000
5 44,886 44,886
5 193,043 193,043
2 477,000 477,000
1 2,177,159 2,177,159
1 1,312,797 1,312,797 Active
1 15,000 15,000 Future
2 222,033 222,033 Active
3 48,368 48,368 Active
Active 3-Design
Active 4-Bid (JOC)
Active 5-Construction
Active 3-Design
Active 4-Bid
Active 5-Const. (JOC)
Active 5-Construction
3-Design
7-On-Hold
3-Design
3-Design
3-Design
4-Bid (JOC)
Future 8-Future
Active 2-Pre-Design
Future 8-Future
Active 2-Pre-Design
Active 3-Design
5-Const. (JOC)
8-Future
4-Bid (JOC)
3-Design
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Improvements - D3
Active & Future
CIP Projects Only
B-No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
331-Parks and Recreation
B-35887
B-39910E
B-40173
B-40454
B-40456
B-40457
B-40527
B-50722
B-50722A
B-75883
B-75973
B-78502A
B-30374
B-30541
B-30777
B-30801
B-30802
B-30832
B-30882
B-30886
B-35883A
B-35904
B-40455
B-30905
Parks and Recreation
Parks and Recreation
Bayfront Park Management
Trust
Public Facilities
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Public Facilities
Parks and Recreation
Parks and Recreation
Capital Improvement Program
Admin
Parks and Recreat
Parks and Recreat
Parks and Recreation
Parks and Recreation
Parks and Recreation
Community Development
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Moore Park New Construction
District 2 Quality of Life Park Improvements
Bayfront Park Electrical Repairs
Park Expansions and Land Acquisition -
Citywide
Antonio Maceo Community Building - D 1
Kinloch Park Building Addition - D 1
Melreese Golf Course Renovations
Little River Waterfront Park
Little River Waterfront Park Acquisition PHII
Peacock Park Site Improvements
Oakland Grove Park Playground Equipment
Museum of Science - Development in
Bicentennial Park - Phase 2
on Virginia Key Rowing Center Improvements -
P&R Project
on Citywide Park Equipment & Site
Improvements
Coral Gate Mini Park - D4 4 200,633
5 7,605,462 7,605,462
2 987,988 987,988
2 309,000 309,000
1,2,3,4,5 1,000,000
Active
Active
Active
1,000,000 Future
1 1,686,750 1,686,750
1 1,461,850 1,461,850
1 200,000 200,000
2 717,500 717,500
2 735,000 735,000
2 725,124 725,124
5 15,000 15,000
1,2,3,4,5 2,000,000 2,000,000
2 1,327,022
1,2,3,4,5 5,293,595
Manatee Bend Park Shoreline Improvements - 2 675,826
D2
Pallot Park Shoreline Improvements - D2
Douglas Park ADA Improvement (restrooms) -
CD Project 91-03279
African Square Park - Splash Park - D5
Lummus Landing Square - D5
Hadley Park New Youth Center D5
Neighborhood Parks Improv. Contingencies -
ADA Modifications
Citywide Capital Improvements Projects
Seybold House Demolition and Reconstruction
2 1,438,000
2 133,474
Active
Active
Future
Active
Active
Active
Future
Active
616,513 Active
4,896,494 Active
100,000 Active
88,526 Active
80,000 Active
133,474 Active
5 670,000 600,000
5 1,007,000 925,061
5 8,049,933 5,876,805
1,2,3,4,5 1,272,223 771,223
1,2,3,4,5 413,946
5 200,000
Active
Active
Active
Future
263,946 Active
0 Future
5-Construction Funded 0
5-Construction Funded 0
5-Const. (JOC) Funded 0
8-Future Funded 0
3-Design Funded 0
2-Pre-Design Funded 0
8-Future Funded 0
7-On-Hold Funded 0
3-Design Funded 0
3-Design Funded 0
8-Future Funded 0
5-Construction Funded 0
3-Design Partially Funded -710,509
5-Construction Partially Funded -397,100
3-Design Partially Funded -100,633
3-Design Partially Funded -587,300
3-Design Partially Funded -1,358,000
4-Bid (JOC) Partially Funded -0
3-Design Partially Funded -70,000
3-Design Partially Funded -81,939
7-On-Hold Partially Funded -2,173,128
8-Future Partially Funded -501,000
3-Design Partially Funded -150,000
8-Future UnFunded -200,000
- D5
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
THIS DOCUMENT IS ASUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
Dist. Estimate ($) Funds ($) Status Phase Status Estimate ($)
331-Parks and Recreation
B-40458 Parks and Recreation Citywide Park Building AC Replacement 1,2,3,4,5 600,000 0 Future 8-Future UnFunded -600,000
B-40459 Parks and Recreation African Square Park Playground 5 125,000 0 Future 8-Future UnFunded -125,000
B-40460 Parks and Recreation African Square Park Restroom & Building 5 750,000 0 Future 8-Future UnFunded -750,000
Renovation
B-40461 Parks and Recreation Allapattah Mini Park Access Control 1 30,000 0 Future 8-Future UnFunded -30,000
B-40462 Parks and Recreation Allapattah Mini Park Court 1 25,000 0 Future 8-Future UnFunded -25,000
B-40463 Parks and Recreation Armbrister Park Field 2 1,350,000 0 Future 8-Future UnFunded -1,350,000
B-40464 Parks and Recreation Bay of Pigs Park Playground 5 100,000 0 Future 8-Future UnFunded -100,000
B-40465 Parks and Recreation Baywood Park Seawall Repair 5 150,000 0 Future 8-Future UnFunded -150,000
B-40466 Parks and Recreation Baywood Park Site Development 5 125,000 0 Future 8-Future UnFunded -125,000
B-40467 Parks and Recreation Belafonte Tacolcy Park 5 35,000 0 Future 8-Future UnFunded -35,000
B-40468 Parks and Recreation Belafonte Tacolcy Park 5 40,000 0 Future 8-Future UnFunded -40,000
v
co B-40469 Parks and Recreation Belafonte Tacolcy Park entire facility 5 5,000,000 0 Future 8-Future UnFunded -5,000,000
reconstruction
B-40470 Parks and Recreation Bell Meade Park Improvements 2 50,000 0 Future 8-Future UnFunded -50,000
B-40471 Parks and Recreation Biscayne Heights Park (Shorecrest Park) 5 100,000 0 Future 8-Future UnFunded -100,000
Improvements
B-40472 Parks and Recreation Biscayne Park Soccer Facility 2 2,250,000 0 Future 8-Future UnFunded -2,250,000
B-40473 Parks and Recreation Bryan Park Tennis Court 4 45,000 0 Future 8-Future UnFunded -45,000
B-40474 Parks and Recreation Kirk Munroe Tennis Park 2 30,000 0 Future 8-Future UnFunded -30,000
B-40475 Parks and Recreation Coral Gate Park Access Control 4 20,000 0 Future 8-Future UnFunded -20,000
B-40476 Parks and Recreation Coral Gate Park Baseball Field 4 30,000 0 Future 8-Future UnFunded -30,000
B-40477 Parks and Recreation Crestwood Park Basketball Courts Resurfacing 5 25,000 0 Future 8-Future UnFunded -25,000
B-40478 Parks and Recreation Curtis Park Access Control (Fencing) 1 225,000 0 Future 8-Future UnFunded -225,000
B-40479 Parks and Recreation Curtis Park Access Control (Roll up doors) 1 25,000 0 Future 8-Future UnFunded -25,000
B-40480 Parks and Recreation Curtis Park Basketball and Tennis Courts 1 125,000 0 Future 8-Future UnFunded -125,000
Resurfacing
B-40481 Parks and Recreation Curtis Park Parking Lot 1 125,000 0 Future 8-Future UnFunded -125,000
B-40482 Parks and Recreation Curtis Park Playground 1 200,000 0 Future 8-Future UnFunded -200,000
B-40483 Parks and Recreation Curtis Park Restrooms Renovation 1 200,000 0 Future 8-Future UnFunded -200,000
B-40484 Parks and Recreation Curtis Park Stadium Restrooms Improvements 1 1,250,000 0 Future 8-Future UnFunded -1,250,000
B-40485 Parks and Recreation Domino Park Building 3 50,000 0 Future 8-Future UnFunded -50,000
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
Dist. Estimate ($) Funds ($) Status Phase Status Estimate ($)
331-Parks and Recreation
B-40486 Parks and Recreation Domino Park Restroom Renovation 3 250,000 0 Future 8-Future UnFunded -250,000
B-40487 Parks and Recreation Domino Park Shade Structure 3 30,000 0 Future 8-Future UnFunded -30,000
B-40488 Parks and Recreation Dorsey Park Ballfield 2 45,000 0 Future 8-Future UnFunded -45,000
B-40489 Parks and Recreation Douglas Park Irrigation System 2 40,000 0 Future 8-Future UnFunded -40,000
B-40490 Parks and Recreation Douglas Park Lighting 2 50,000 0 Future 8-Future UnFunded -50,000
B-40491 Parks and Recreation Douglas Park Playground 2 130,000 0 Future 8-Future UnFunded -130,000
B-40492 Parks and Recreation Duarte Park Basketball and Tennis Courts 1 75,000 0 Future 8-Future UnFunded -75,000
Resurfacing
B-40493 Parks and Recreation Duarte Park Lighting 1 175,000 0 Future 8-Future UnFunded -175,000
B-40494 Parks and Recreation Duarte Park Playground 1 120,000 0 Future 8-Future UnFunded -120,000
B-40495 Parks and Recreation Eaton Park Daycare Improvements 5 100,000 0 Future 8-Future UnFunded -100,000
B-40496 Parks and Recreation Eaton Park Improvements 5 1,500,000 0 Future 8-Future UnFunded -1,500,000
co
o B-40497 Parks and Recreation Fort Dallas Park (Lummus Park Historic 5 750,000 0 Future 8-Future UnFunded -750,000
District) Demolition
B-40498 Parks and Recreation Gibson Park Stadium 5 850,000 0 Future 8-Future UnFunded -850,000
B-40499 Parks and Recreation Grapeland Park Picnic Shelter 1 850,000 0 Future 8-Future UnFunded -850,000
B-40500 Parks and Recreation Grove Mini Park Playground 2 65,000 0 Future 8-Future UnFunded -65,000
B-40501 Parks and Recreation Hadley Park Ballfield 5 80,000 0 Future 8-Future UnFunded -80,000
B-40502 Parks and Recreation Hadley Park Bleachers 5 600,000 0 Future 8-Future UnFunded -600,000
B-40503 Parks and Recreation Hadley Park Football Field 5 1,750,000 0 Future 8-Future UnFunded -1,750,000
B-40504 Parks and Recreation Hadley Park Parking Lot 5 100,000 0 Future 8-Future UnFunded -100,000
B-40505 Parks and Recreation Hadley Park Pool Locker rooms improvment 5 80,000 0 Future 8-Future UnFunded -80,000
B-40506 Parks and Recreation Hadley Park Pool Improvement 5 280,000 0 Future 8-Future UnFunded -280,000
B-40507 Parks and Recreation Citywide - Land Acquisition Park 1,2,3,4,5 15,000,000 0 Future 8-Future UnFunded -15,000,000
B-40508 Parks and Recreation Legion Park Boat Ramp 2 450,000 0 Future 8-Future UnFunded -450,000
B-40509 Parks and Recreation Legion Park HVAC (heating, ventilation, and 2 100,000 0 Future 8-Future UnFunded -100,000
air conditioning) Replace
B-40510 Parks and Recreation Legion Park Improvements 2 250,000 0 Future 8-Future UnFunded -250,000
B-40511 Parks and Recreation Legion Park Restrooms 2 100,000 0 Future 8-Future UnFunded -100,000
B-40512 Parks and Recreation Lemon City Park Daycare Parking Lot 5 100,000 0 Future 8-Future UnFunded -100,000
B-40513 Parks and Recreation Lemon City Park Daycare Playground 5 75,000 0 Future 8-Future UnFunded -75,000
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
Dist. Estimate ($) Funds ($) Status Phase Status Estimate ($)
331-Parks and Recreation
B-40514 Parks and Recreation Lemon City Park Improvements 5 40,000 0 Future 8-Future UnFunded -40,000
B-40515 Parks and Recreation Lemon City park Walkways 5 30,000 0 Future 8-Future UnFunded -30,000
B-40516 Parks and Recreation Little Haiti Soccer Park 5 170,000 0 Future 8-Future UnFunded -170,000
B-40517 Parks and Recreation Little Haiti Soccer Park Stadium Bleacher 5 100,000 0 Future 8-Future UnFunded -100,000
Modification
B-40518 Parks and Recreation Little Haiti Soccer Park Stadium Repairs 5 160,000 0 Future 8-Future UnFunded -160,000
B-40519 Parks and Recreation Little Haiti Freedom Garden Park 5 50,000 0 Future 8-Future UnFunded -50,000
B-40520 Parks and Recreation Little River Commerce Park Building 5 500,000 0 Future 8-Future UnFunded -500,000
B-40521 Parks and Recreation Little River Pocket Park Playground 5 50,000 0 Future 8-Future UnFunded -50,000
B-40522 Parks and Recreation Lummus Park Playground 5 125,000 0 Future 8-Future UnFunded -125,000
B-40523 Parks and Recreation Manatee Bend Park 2 100,000 0 Future 8-Future UnFunded -100,000
B-40524 Parks and Recreation Marti Pool Park Locker -rooms Renovation 3 100,000 0 Future 8-Future UnFunded -100,000
co
B-40525 Parks and Recreation Marti Pool Park Pool Improvements 3 110,000 0 Future 8-Future UnFunded -110,000
B-40526 Parks and Recreation Marti Pool Park Pump Improvement 3 100,000 0 Future 8-Future UnFunded -100,000
B-40528 Parks and Recreation Melrose Park Playground 5 125,000 0 Future 8-Future UnFunded -125,000
B-40529 Parks and Recreation Merrie Christmas Park Improvements 2 600,000 0 Future 8-Future UnFunded -600,000
B-40530 Parks and Recreation Virginia Key Rowing Center Park Building 2 350,000 0 Future 8-Future UnFunded -350,000
B-40531 Parks and Recreation Moore Park Tennis Court Improvement 5 380,000 0 Future 8-Future UnFunded -380,000
B-40532 Parks and Recreation Morningside Park Floating Dock 2 50,000 0 Future 8-Future UnFunded -50,000
B-40533 Parks and Recreation Morningside Park Boat Ramp Improvements 2 380,000 0 Future 8-Future UnFunded -380,000
B-40534 Parks and Recreation Morningside Park Tennis Center Building 2 650,000 0 Future 8-Future UnFunded -650,000
B-40535 Parks and Recreation Morningside Park Court Renovations 2 500,000 0 Future 8-Future UnFunded -500,000
B-40536 Parks and Recreation Morningside Park Walkways and ADA 2 250,000 0 Future 8-Future UnFunded -250,000
Compliance
B-40537 Parks and Recreation Morningside Pool Park Pool Facility 2 1,000,000 0 Future 8-Future UnFunded -1,000,000
Improvements
B-40538 Parks and Recreation North Bay Vista Park Playground 5 75,000 0 Future 8-Future UnFunded -75,000
B-40539 Parks and Recreation Oakland Grove Mini Park 5 50,000 0 Future 8-Future UnFunded -50,000
B-40540 Parks and Recreation Virginia Key Beach Park Access Control 1,2,3,4,5 35,000 0 Future 8-Future UnFunded -35,000
B-40541 Parks and Recreation Operation Yard Park Trailers 1,2,3,4,5 225,000 0 Future 8-Future UnFunded -225,000
B-40542 Parks and Recreation Pallot Park Seawall 2 300,000 0 Future 8-Future UnFunded -300,000
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
Dist. Estimate ($) Funds ($) Status Phase Status Estimate ($)
331-Parks and Recreation
B-40543 Parks and Recreation PBA / Fern Isle Redevelopment 1 4,500,000 0 Future 8-Future UnFunded -4,500,000
B-40544 Parks and Recreation Peacock Park Building Renovation 2 150,000 0 Future 8-Future UnFunded -150,000
B-40545 Parks and Recreation Peacock Park Playground 2 150,000 0 Future 8-Future UnFunded -150,000
B-40546 Parks and Recreation Pine Heights Park Playground 1 75,000 0 Future 8-Future UnFunded -75,000
B-40547 Parks and Recreation Citywide Parks Playground Replacements 1,2,3,4,5 1,500,000 0 Future 8-Future UnFunded -1,500,000
B-40548 Parks and Recreation Pullman Mini Park Playground Replacement 5 75,000 0 Future 8-Future UnFunded -75,000
B-40549 Parks and Recreation Rainbow Village Park Playground 5 75,000 0 Future 8-Future UnFunded -75,000
B-40550 Parks and Recreation Athalie Range Park Playground 5 120,000 0 Future 8-Future UnFunded -120,000
B-40551 Parks and Recreation Athalie Range Park Restroom Renovation 5 80,000 0 Future 8-Future UnFunded -80,000
B-40552 Parks and Recreation Athalie Range Park Pool Heater 5 75,000 0 Future 8-Future UnFunded -75,000
B-40553 Parks and Recreation Reeves Park Basketball Court 5 35,000 0 Future 8-Future UnFunded -35,000
B-40554 Parks and Recreation Reeves Park Playground 5 100,000 0 Future 8-Future UnFunded -100,000
co
N B-40555 Parks and Recreation Reeves Park Sidewalks & Walkways 5 75,000 0 Future 8-Future UnFunded -75,000
B-40556 Parks and Recreation Reeves Park Volleyball Court 5 25,000 0 Future 8-Future UnFunded -25,000
B-40557 Parks and Recreation Riverside Park Restroom Renovation 3 75,000 0 Future 8-Future UnFunded -75,000
B-40558 Parks and Recreation Citywide Park Buildings Roof Repairs 1,2,3,4,5 350,000 0 Future 8-Future UnFunded -350,000
B-40559 Parks and Recreation Sewell Park kayak Launch 1 225,000 0 Future 8-Future UnFunded -225,000
B-40560 Parks and Recreation Sewell Park Parking Lot 1 60,000 0 Future 8-Future UnFunded -60,000
B-40561 Parks and Recreation Sewell Park Playground 1 75,000 0 Future 8-Future UnFunded -75,000
B-40562 Parks and Recreation Shedavia Jenkins Parks Lighting 1,5 125,000 0 Future 8-Future UnFunded -125,000
B-40563 Parks and Recreation Shenandoah Park Pool Renovation 4 2,200,000 0 Future 8-Future UnFunded -2,200,000
B-40564 Parks and Recreation Simpson Park Building Roof Replacement 2 65,000 0 Future 8-Future UnFunded -65,000
B-40565 Parks and Recreation Southside Park Field 3 450,000 0 Future 8-Future UnFunded -450,000
B-40566 Parks and Recreation Spring Garden Point Park Historic Building 5 1,250,000 0 Future 8-Future UnFunded -1,250,000
B-40567 Parks and Recreation Spring Garden Point Park 5 150,000 0 Future 8-Future UnFunded -150,000
B-40568 Parks and Recreation Citywide Park Buildings Termite Control 1,2,3,4,5 200,000 0 Future 8-Future UnFunded -200,000
B-40569 Parks and Recreation Town Park Playground 5 100,000 0 Future 8-Future UnFunded -100,000
B-40570 Parks and Recreation Virginia Key Beach Park Restrooms 2 750,000 0 Future 8-Future UnFunded -750,000
Replacement
B-40571 Parks and Recreation Virrick Park New Pool 2 3,000,000 0 Future 8-Future UnFunded -3,000,000
B-40572 Parks and Recreation Alice Wainwright Park Restrooms 2 350,000 0 Future 8-Future UnFunded -350,000
Active & Future
CIP Projects Only
B-No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
331-Parks and Recreation
B-40573
B-40574
Parks and Recreation
Parks and Recreation
B-40575 Parks and Recreation
B-40576 Parks and Recreation
B-40577 Parks and Recreation
B-40578 Parks and Recreation
B-40579 Parks and Recreation
B-40580 General Services
Administration
Grapeland Water Park Renovations 1
West Buena Vista Park Building Restrooms 5
improvements
West Buena Vista Park Courts 5
West Buena Vista Park Playground 5
Williams Park Playground 5
Williams Park Pool Improvement 5
Williams Park Sport Field Lights 5
Jose Marti Roof Repair - GSA 3
750,000
50,000
50,000
120,000
175,000
175,000
350,000
26,100
0 Future 8-Future
0 Future 8-Future
0 Future 8-Future
0 Future 8-Future
0 Future 8-Future
0 Future 8-Future
0 Future 8-Future
0 Future 8-Future
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
-750,000
-50,000
-50,000
-120,000
-175,000
-175,000
-350,000
-26,100
341-Streets & Sidewalks
B-30008A
B-30130
B-30167D
B-30168A
B-30178
B-30336
B-30346
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Transportation & Transit
B-30377C Public Works
B-30416 Public Works
B-30500
Capital Improvement Program
Admin
331-Parks and Recreation
Grove Park Road Improvements - D3
Miami River Greenway SW 1st Court to South
Miami Avenue - D2
Shenandoah Roadway Improvements
Silver Bluff Traffic Calming Priority 3 - D4
Design District/FEC
Miami River Greenway (5th Street bridge
eaten.)
Traffic Study Reviews - Oracle Project
35-110007
District 3 - Sidewalk Repairs and ADA
NW 34 Ave over Comfort Canal - Bridge
876417 - PW - D1/Citywide
Civic Center NW 14th Street
B-30504 Capital Improvement Program Linear Parks, Greenways and Baywalk
Admin Improvements
144,107,700
3 628,320
2 1,557,530
4 1,550,000
4 703,544
5 100,000
3 2,256,640
1,2,3,4,5 411,622
3 250,691
1 178,700
1,2,3,4,5 2,600,000
1,2,3,4,5 961,000
75,941,988
628,320 Future
1,557,530 Active
1,550,000 Active
703,544 Active
100,000 Future
2,256,640 Active
411,622 Active
250,691 Active
178,700 Active
2,600,000 Active
961,000 Future
8-Future
5-Construct
3-Design
4-Bid (JOC)
8-Future
5-Construct
1-Study
7-On-Hold
2-Pre-Design
4-Bid
8-Future
Funded
on Funded
Funded
Funded
Funded
on Funded
Funded
Funded
Funded
Funded
Funded
-68,165,711
0
0
0
0
0
0
0
0
0
0
0
Active & Future
CIP Projects Only
B-No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
341-Streets & Sidewalks
B-30540
B-30606
B-30606D
B-30606L
B-30606N
B-30606S
B-30610
B-30613
B-30614
B-30615
B-30621
B-30628
B-30631
B-30645B
B-30645E
B-30645F
B-30651
Capital Improvement Program Little River Industrial Park
Admin
Capital Improvement Program DWNTWN Beautification Project Phase I
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
DWNTWN Beaut
DWNTWN Beaut
DWNTWN Beaut
DWNTWN Beaut
Capital Improvement Program NW 7th Court
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Transportation & Transit
Transportation & Transit
Transportation & Transit
Capital Improvement Program
Admin
B-30662D Capital Improvement Program
fication - Design Phase
fication (Lighting)
fication - North
fication - South
District 3 - Miscellaneous Roadway
Improvements
District 4 - Miscellaneous Roadway
Improvements
District 5 - Miscellaneous Roadway
Improvements
Center Grove Street and Lighting
Improvements
Bird Avenue Road Improvement
Miami River Greenway from Miami Circle
Greenway to South Miami Avenue
Transportation Program Support Services -
Transportation Professional Services
Overtown / Wynwood Bicycle Pedestrian
Mobility Plan
Miami Regional Intermodal Plan
Miami River Greenway from NW loth to NW
12th Ave.
US-1 Median Closures at Bridgeport and SW
5 2,000,000 2,000,000 Active
1,2,3,4,5 3,150,565 3,150,565 Active
1,2,3,4,5 498,780 498,780 Active
1,2,3,4,5 4,475,915 4,475,915 Active
1,2,3,4,5 7,817,431 7,817,431
1,2,3,4,5 5,090,853 5,090,853 Active
5 360,000 360,000 Active
3 3,273,688 3,273,688 Future
4 494,386 494,386 Future
5 1,863,194 1,863,194 Future
2 1,991,568 1,991,568 Active
2 1,960,505 1,960,505 Active
2 1,221,625 1,221,625 Active
1,2,3,4,5 881,042 881,042 Active
2,5 60,000 60,000 Active
1,2,3,4,5 48,000 48,000 Active
3 3,160,379 3,160,379 Active
2 440,576 440,576 Active
3-Design
5-Const. (JOC)
3-Design
3-Design
Active 5-Const. (JOC)
5-Const. (JOC)
7-On-Hold
8-Future
8-Future
8-Future
4-Bid
3-Design
7-On-Hold
3-Design
1-Study
1-Study
5-Construction
3-Design
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
0
0
0
0
Active & Future
CIP Projects Only
B-No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
341-Streets & Sidewalks
B-30677
B-30694A
B-30695
Admin
Capital Improvement Program
Admin
Transportation & Transit
Capital Improvement Program
Admin
B-30716 Capital Improvement Program Tigertail Resurfacing - D2
B-30718
B-30722
B-30724
B-30727
B-30729
B-30730
B-30732
B-30749
B-30760
B-30770
B-30771
B-30773
B-30774
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
30 Ct - D2
D3 - Sidewalk ADA Retrofits 3 700,000
Citywide Bicycle Rack & Signage Program 1,2,3,4,5 115,000
SW 19th Terr. Imp. -Partial CDBG 91-02889 - 4 537,191
D4
2 711,257
I-95 South Miami Terminal Street 2 859,000
Improvements - D2
NW 31st Street Roadway Improvement Project 1 311,000
- D1
NW 33rd Street Roadway Improvement 1 3,700,000
Project Phase I - D1
NW 18th Avenue Roadway Improvement 1 1,810,000
Project - D 1
NW 17th Terrace Roadway Improvement 1 250,000
Project - D 1
NW 4th Terrace Roadway Improvement 1 75,000
Project - D 1
NW 9th Street Roadway Improvement Project 1 756,247
D1
Citrus Grove Roadway Improvements 3 556,791
SW 17th Avenue Roadway & Drainage 3,4 600,000
Improvements - D3 & D4
SW 22nd Avenue Medians - US 1 to Coral 4 58,622
Way - D4
Traffic Calming SW 6th Street Project - D4 4 324,670
Martin Luther King (MLK) Blvd / I-95 Area 5 100,000
Improvements - Murrals
West Flagler Area Improvements - D4 - Oracle 4 1,358,172
CDBG Project 91-03102
711,257 Active
859,000 Active
311,000 Active
3,700,000 Active
1,810,000 Active
250,000 Active
75,000 Active
756,247 Active
700,000 Active 7-On-Hold Funded
115,000 Active 4-Bid (JOC) Funded
537,191 Active 5-Construction Funded
5-Const. (JOC) Funded
3-Design Funded
3-Design Funded
7-On-Hold Funded
5-Construction Funded
3-Design Funded
5-Const. (JOC) Funded
3-Design Funded
556,791 Active 5-Const. (JOC) Funded
600,000 Active
58,622 Active
324,670 Active
100,000 Active
1,358,172 Active
5-Construction Funded
4-Bid (JOC) Funded
7-On-Hold Funded
3-Design Funded
5-Const. (JOC) Funded
0
0
0
0
Active & Future
CIP Projects Only
B-No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
341-Streets & Sidewalks
B-30779
B-30780
B-30781
B-30782
B-30784
B-30785
B-30786
B-30822
B-30823
B-30827
B-30830
B-30835
B-30837
B-30880
B-30883
B-30884
B-30888
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
SW 2nd Street and SW 40th Avenue Traffic
Circle - D4
NW 14 Avenue and 28 Street Area Roadway
Improvements - D1
NW 11 Street from 27 to 37 Avenue Area
Roadway Improvements - D1
Allapattah Area Roadway Improvement - D1
Health District Riverwalk
NW 36 Avenue 15 to 16 Street Drainage
Improvements - D1
NW 43 Avenue between 9 to 11 Street
Roadway Improvements - D1
Brickell Area Shared Use Path and Roadway
Improvements
Fair Isle Area Roadway and Drainage
Improvements - D2
South Grove Phase 1 Roadway and Drainage
Improvements - D2
US 1 Landscaping between 17 Ave and Viscaya
- D2
South Grove Phase 2 Roadway and Drainage
Improvements - D2
South Miami Avenue - SE 6th and 5th Street
Traffic Modifications - D2
NE 2nd Court Roadway and Drainage
Improvements Project - D5
NW 12 Avenue / NW 12 Place Roadway
Improvements
NW 62 Street West of I-95 Roadway
Improvements - D5
Wynwood Area Roadway Improvement - D5
4 250,000
1 866,602
1 939,493
1 500,000
1 961,000
1 50,000
1 78,224
2 844,267
2 180,000
2 286,830
2 55,000
2 492,000
2 771,544
5 400,000
5 1,199,975
5 175,000
5 500,000
250,000 Active
866,602 Active
939,493 Active
500,000 Active
961,000 Future
50,000 Active
78,224 Active
844,267 Active
180,000 Active
286,830 Active
55,000 Active
492,000 Active
771,544 Future
400,000 Active
1,199,975 Active
175,000 Active
500,000 Active
3-Design
5-Construction
4-Bid
3-Design
8-Future
3-Design
3-Design
5-Const. (JOC)
5-Const. (JOC)
2-Pre-Des
gn
4-Bid (JOC)
2-Pre-Design
8-Future
5-Const. (JOC)
5-Construction
3-Design
2-Pre-Des
gn
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Active & Future
CIP Projects Only
B-No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
341-Streets & Sidewalks
B-30891
B-30892
B-30894
B-30940
B-30941
B-30960
B-30961
B-30964
B-30968
B-30969
B-30971
B-30972
B-30975
B-30976
B-30978
B-30980
B-30982
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Buena Vista One -Way Street Conversion and 5
Signage - D5
Little Haiti Gateway Signs - D5 5
Little Haiti Right of Way Improvements - D5 5
Downtown Miami Bicycle and Pedestrian 2
Mobility Improvement Project
Downtown Miami Signage and Wayfinding 2
System
La Pastorita Traffic Calming and misc. 4
improvements - D4
East Flagami Roadway Improvements - SW 4
2nd Street and SW 4th Street - D4
Modification of Speed Humps on SW 11 St. 4
between 30 Ave and 31 Ct. - D4
SW 12th St (SW 30th Ave and SW 30th Place) 4
- D4
SW 30th Court (SW 12th Street and SW 13th 4
Street) - D4
SW 5th Street between 42 Ave and 43 Ave 4
Improvement - D4
SW 64 Court Roadway & Drainage 4
Improvements (from SW 6 St to SW 8 St) - D4
Swale Restoration @ NW 2 Street between 34 4
Ave & 35 Ave - D4
SW 2 St from 53 Ave to 54 Ave - D4 4
Drainage improvements @ SW 4 St between 4
53 Ave & 54 Ave - D4
Liberty Square T-Turnarounds - D5 5
Little River Area Road and Drainage
Improvements - D5
5
250,000
100,000
500,000
287,500
1,150,000
675,000
422,264
25,000
36,102
43,214
7,857
132,522
28,809
54,000
51,065
250,000
180,900
250,000 Active
100,000 Active
500,000 Active
287,500 Active
1,150,000 Active
675,000 Active
422,264 Active
25,000 Future
36,102 Future
43,214 Future
7,857 Future
132,522 Future
28,809 Future
54,000 Future
51,065 Future
250,000 Active
180,900 Active
3-Design
3-Design
3-Design
3-Design
3-Design
3-Design
3-Design
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
3-Design
3-Design
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Active & Future
CIP Projects Only
B-No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
341-Streets & Sidewalks
B-30983
B-30990
Capital Improvement Program
Admin
Capital Improvement Program
Admin
B-30993 Capital Improvement Program
Admin
B-30998 Public Works
B-31206A Capital Improvement Program
Admin
B-31206B Capital Improvement Program
Admin
B-39910C
B-39910K
B-39911
B-40168
B-40300
B-40301
B-40302
B-40303
B-40307
B-40308
B-40310
B-40312
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Public Works
NW 44th Street between NW 7th and NW 8th 5
Ave - D5
Roadway Improvements 1,2,3,4,5
SW/NW 17th Avenue Traffic Corridor Study - 1,2,3,4,5
Citywide
Citywide Sidewalk Repair Project - PW 1,2,3,4,5
SE 3rd St Widening (fka Dupont Plaza) - DRI 2
Transportation
SE 3rd Street Widening - DRI Administration 2
North Venetian Drive Lighting (District 2
QOL)
Bayside Historic Sign - D2
Venetian Causeway Improvements
South Bayshore Drive from Aviation Avenue
to Kirk Avenue - D2 PW
Capital Improvement Program SW 18th Terr. Road Improvements - D3
Admin
Capital Improvement Program SW 15th Street Road Improvements Segment 1
Admin - D3
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
SW 1st Avenue Road Improvements - Segment
1 - D3
SW 23rd Road Improvements - D3
SW 16th Street Road Improvements - D3
SW 17th Terrace Road Improvements - D3
SW 20th Road Improvements - D3
SW 22nd Terr. & SW 13th Ave Road
185,000
361,000
200,000
169,615
1,500,000
100,000
100,000
33,000
3,196,465
100,000
116,121
84,969
230,928
244,748
257,693
225,567
116,682
376,211
185,000 Active
361,000 Future
200,000 Active
169,615 Future
1,500,000 Active
100,000 Active
100,000 Active
33,000 Active
3,196,465 Active
100,000 Active
116,121 Active
84,969 Active
230,928 Active
244,748 Active
257,693 Active
225,567 Active
116,682 Active
376,211 Active
3-Design Funded
8-Future Funded
1-Study Funded
8-Future Funded
3-Design Funded
3-Design Funded
3-Design Funded
3-Design Funded
5-Construction Funded
2-Pre-Design Funded
5-Construction Funded
7-On-Hold Funded
7-On-Hold Funded
5-Construction Funded
5-Construction Funded
5-Construction Funded
5-Construction Funded
5-Construction Funded
0
0
0
0
0
0
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
Dist. Estimate ($) Funds ($) Status Phase Status Estimate ($)
341-Streets & Sidewalks
Admin Improvements - D3
B-40313 Capital Improvement Program SW 3rd Ave Road Improvements - D3 3 293,740 293,740 Active 5-Construction Funded 0
Admin
B-40315 Capital Improvement Program SW 15th Street Road Improvements Segment 2 3 245,349 245,349 Active 5-Construction Funded 0
Admin - D3
B-40317 Capital Improvement Program SW 28th Road Improvements - D3 3 40,149 40,149 Active 5-Construction Funded 0
Admin
B-40318 Capital Improvement Program SW 1st Ave Road Improvements - Segment 2 - 3 167,562 167,562 Active 5-Construction Funded 0
Admin D3
B-40319 Capital Improvement Program SW 25th Road Improvements - D3 3 118,561 118,561 Active 5-Construction Funded 0
Admin
B-40320 Capital Improvement Program SW 26th Road Improvements Segment 2 - D3 3 498,804 498,804 Active 5-Construction Funded 0
Admin
coB-40321 Capital Improvement Program SW 2nd Ave Road Improvements - D3 3 721,333 721,333 Active 5-Construction Funded 0
Admin
B-40322 Capital Improvement Program SW 27th Road Improvements - D3 3 498,804 498,804 Active 5-Construction Funded 0
Admin
B-40323 Capital Improvement Program SW 1st Ave Road Improvements Segment 3 - 3 126,638 126,638 Active 5-Construction Funded 0
Admin D3
B-40324 Capital Improvement Program NW l lth Ave Road Improvements - D3 3 160,203 160,203 Active 4-Bid (JOC) Funded 0
Admin
B-40325 Capital Improvement Program Beacom Phase II - D3 3 1,500,000 1,500,000 Active 7-On-Hold Funded 0
Admin
B-40326 Capital Improvement Program The Roads Roadway Improvements - D3 3 500,000 500,000 Active 5-Construction Funded 0
Admin
B-40327 Capital Improvement Program Shenandoah Roadway Improvements - D3 3 1,000,000 1,000,000 Active 5-Construction Funded 0
Admin
B-40643A Capital Improvement Program North Spring Garden Greenway 5 2,762,175 2,762,175 Active 5-Construction Funded 0
Admin
B-40672D Capital Improvement Program Flagami Traffic Calming Phase IV - D4 4 1,198,012 1,198,012 Active 5-Const. (JOC) Funded 0
Admin
B-40672G Capital Improvement Program Flagami Traffic Calming - D4 4 590,000 590,000 Active 5-Const. (JOC) Funded 0
Admin
B-40686 Capital Improvement Program Miami River Greenways/ Streetscape Segment 3 3,113,501 3,113,501 Active 5-Construction Funded 0
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
Dist. Estimate ($) Funds ($) Status Phase Status Estimate ($)
341-Streets & Sidewalks
Admin D (ELH)
B-40695L Capital Improvement Program Miami River Greenway Segment G and 3 145,785 145,785 Active 7-On-Hold Funded 0
Admin Segment E2 Decorative Lighting
B-40704A Capital Improvement Program SW 32 Avenue Improvements Additional 2,4 1,752,327 1,752,327 Active 5-Const. (JOC) Funded 0
Admin Services
B-43114B Public Works Public Works Miscellaneous Sidewalk 1,2,3,4,5 1,034,146 1,034,146 Future 8-Future Funded 0
Replacement
B-71210 Capital Improvement Program Downtown Street Conversions 2,5 50,000 50,000 Active 1-Study Funded 0
Admin
B-73102A Capital Improvement Program Citywide Streets Milling & Resurfacing - CIP 1,2,3,4,5 9,201,765 9,201,765 Future 8-Future Funded 0
Admin
B-73102B Capital Improvement Program Citywide Streets Milling and Resurfacing - 1,2,3,4,5 6,207,946 6,207,946 Future 8-Future Funded 0
Admin Parking Surcharge
oB-78500B Capital Improvement Program Buena Vista East Roadway, Drainage, Signage 5 2,368,482 2,368,482 Active 3-Design Funded 0
Admin and Lighting Improvements
B-30179 Capital Improvement Program Downtown Baywalk Master Plan & Design 2 11,248,770 450,000 Active 1-Study Partially Funded -10,798,770
Admin
B-30411 Capital Improvement Program FY2014 - D1 Roadway, drainage and 1 100,000 90,000 Future 8-Future Partially Funded -10,000
Admin sidewalks repairs
B-30412 Capital Improvement Program FY2014 - D2 Roadway, drainage and 2 100,000 90,000 Future 8-Future Partially Funded -10,000
Admin sidewalks repairs
B-30413 Capital Improvement Program FY2014 - D3 Roadway, drainage and 3 100,000 90,000 Future 8-Future Partially Funded -10,000
Admin sidewalks repairs
B-30414 Capital Improvement Program FY2014 - D4 Roadway, drainage and 4 100,000 82,143 Future 8-Future Partially Funded -17,857
Admin sidewalks repairs
B-30431 Capital Improvement Program D1 - Reconstruction of Roadway identified as 1 4,114,165 2,400,000 Future 8-Future Partially Funded -1,714,165
Admin "Very Poor" by PW
B-30432 Capital Improvement Program D2 - Reconstruction of Roadway identified as 2 2,500,000 1,200,000 Future 8-Future Partially Funded -1,300,000
Admin "Very Poor" by PW
B-30433 Capital Improvement Program D3 - Reconstruction of Roadway identified as 3 2,500,000 2,400,000 Future 8-Future Partially Funded -100,000
Admin "Very Poor" by PW
B-30434 Capital Improvement Program D4 - Reconstruction of Roadway identified as 4 2,500,000 2,400,000 Future 8-Future Partially Funded -100,000
Admin "Very Poor" by PW
B-30435 Capital Improvement Program D5 - Reconstruction of Roadway identified as 5 2,500,000 2,400,000 Future 8-Future Partially Funded -100,000
Active & Future
CIP Projects Only
B-No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
THIS DOCUMENT IS ASUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
341-Streets & Sidewalks
Admin "Very Poor" by PW
B-30518 Capital Improvement Program Northwest 14th Street Streetscape Project - CIP
B-30611
B-30624
B-30630
B-30643
B-30646
B-30687
B-30699
B-30723
B-30775
B-30778
B-30803
B-30833
B-30836
B-30900
B-30902
B-30904
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Parks and Recreation
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Funded
District 1 - Miscellaneous Roadway
Improvements
Overtown Greenway @ NW 11 Terrace
Palm Grove Road Improvements
Lummus Park Landing Project - Street Project
South Bayshore Drive Roadway and Drainage
Improvements
Coconut Grove Business Improvement District
- Street Improvements
Beacom Project Area Improvements
NW 24th Avenue Roadway Improvement
Project - D 1
Shenandoah Area Improvements - D4
Traffic Circle - SW 18th Ave. & SW 13th St. -
D4
SW 18th Avenue from SW 23rd Street to SW
23rd Terrace - D4
SW 1st Ave between SW 15th and SW 7th
Street
South Grove Phase 3 Roadway and Drainage
Improvements - D2
NW 40 St from NW 10 Ave to NW 12 Ave -
D5
Phase I: Little River (N); NE 82 St (S); N
Miami Ave (W); NE 2 Ave (E) - D5
NW 70 Street Area Roadway & Minor
Drainage Improvements - D5
5 2,617,649 439,000 Active
1 825,418 728,234 Future
5 2,661,864 1,541,784 Active
2 4,174,623 3,838,157 Active
5 2,605,245 1,368,535 Active
2 8,748,530 8,704,395 Active
2 3,503,015 3,099,637 Active
3 1,053,114 1,053,113 Active
1 1,140,000 700,000 Future
4 468,649 366,281 Active
4 122,557 112,557 Active
4 137,000 97,000 Future
1,2,3,4,5 775,600 368,212 Active
2 1,231,787 1,231,786 Active
5 129,641 98,981 Future
5 625,287 90,508 Future
5 2,052,550 100,510 Future
7-On-Hold
8-Future
3-Design
5-Construct
Partially Funded
Partially Funded
Partially Funded
on Partially Funded
3-Design
3-Design
5-Const. (JOC)
5-Construction
8-Future
5-Construction
5-Const. (JOC)
8-Future
3-Design
2-Pre-Design
8-Future
8-Future
8-Future
-2,178,649
-97,184
-1,120,080
-336,465
Partially Funded -1,236,710
Partially Funded -44,135
Partially Funded -403,377
Partially Funded -0
Partially Funded -440,000
Partially Funded -102,368
Partially Funded -10,000
Partially Funded -40,000
Partially Funded -407,388
Partially Funded -0
Partially Funded -30,659
Partially Funded -534,778
Partially Funded -1,952,040
Active & Future
CIP Projects Only
B-No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
341-Streets & Sidewalks
B-30965
B-30967
B-30979
B-31206
B-40306
B-40314
B-70245
B-73102C
B-78508
B-30415
B-30520
B-30612
B-30736
B-30751
B-30787
B-30788
B-30789
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Transportation & Transit
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Coral Gate Speed Humps - D4
SW 16th Terrace from SW 21 Ave to SW 22
Ave - D4
SW 21st St. & 24th Ave Roadway
Improvement - D4
SE 3rd Street Widening
SW loth Street Road Improvements - D3
NW 18th Place Road Improvements - D3
Transportation Program Support Se
Transportation
Citywide Street Milling and Resurfacing -
Local Option Gas Tax
NE 2 Avenue Improvements
FY2014 - D5 Roadway, drainage and
sidewalks repairs
ces -
Hainsworth Village Street Improvement
District 2 - Miscellaneous Roadway
Improvements
Phase II: NW 33rd Street Roadway
Improvement - D 1
SW 23 Street btw 16 and 17 Ave for M&R -
D3
NW 32 Ct & NW 32 Place Milling and
Resurfacing - D 1
NW 16 Ave and 14 Ter and NW 16 Ave and
15St-D1
NW 20th Street from 7th Avenue to 20th
Avenue
4 163,845
4 206,386
4 140,000
2 2,044,987
3 347,385
53,000 Future
150,467 Future
60,000 Future
641,494 Active
307,385 Active
3 474,611 224,611
1,2,3,4,5 500,000
1,2,3,4,5 1,625,000
2,5 20,166,607
1 196,625
2 1,062,500
2 0
1 2,375,000
3 43,101
1 303,375
1 57,618
1 500,000
294,957 Active
401,400 Future
4,985,832 Active
0 Future
0 Future
0 Future
0 Future
0 Future
0 Future
0 Future
0 Future
8-Future
8-Future
8-Future
3-Design
5-Construction
Active 4-Bid (JOC)
3-Design
8-Future
3-Design
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
Partially Funded
Partially Funded
Partially Funded
Partially Funded
Partially Funded
Partially Funded
Partially Funded
Partially Funded
Partially Funded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
-110,845
-55,918
-80,000
-1,403,492
-40,000
-250,000
-205,042
-1,223,600
-15,180,775
-196,625
-1,062,500
0
-2,375,000
-43,101
-303,375
-57,618
-500,000
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
341-Streets & Sidewalks
B-30896
B-30896A
B-30897
B-30898
B-30899
B-30901
B-30901A
B-30901B
B-30902A
B-30902B
B-30903
B-30903A
B-30966
B-30970
B-30973
B-30974
B-30977
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Improvement Program
Improvement Program
Improvement Program
Improvement Program
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Phase I: NW 29th Street (NW 7 Ave to NW 2 5 597,219 0 Future 8-Future
Ave) - D5
Phase II: NW 29 St (NW 7 Ave to NW 2 Ave) 5 597,219 0 Future 8-Future
- D5
NW 41 St from NW 7 Ave to NW 12 Ave - 5 475,349 0 Future 8-Future
D5
NW 43 St from NW 10 Ave to NW 11 Ave - 5 115,236 0 Future 8-Future
NW 10 Ave from NW 40 St & NW 8 Ave 5 280,888 0 Future 8-Future
from NW 46 St to NW 43 St - D5
Pahse I: NE 78 St (N); NE 75 St (S); N Miami 5 526,967 0 Future 8-Future
Ave (W); NE 2 Ave (E) - D5
Phase II: NE 78 St (N); NE 75 St (S); N 5 532,967 0 Future 8-Future
Miami Ave (W); NE 2 Ave (E) - D5
Phase III: NE 78 St (N); NE 75 St (S); N 5 532,967 0 Future 8-Future
Miami Ave (W); NE 2 Ave (E) - D5
Phase II: Little River (N); NE 82 St (S); N 5 625,287 0 Future 8-Future
Miami Ave (W); NE 2 Ave (E) - D5
Phase III: Little River (N); NE 82 St (S); N 5 625,287 0 Future 8-Future
Miami Ave (W); NE 2 Ave (E) - D5
Phase I: NE 82 St (N); NE 79 St (S); N Miami 5 504,158 0 Future 8-Future
Ave (W); NE 1 Ave (E) - D5
Phase II: NE 82 St (N); NE 79 St (S); N 5 0 0 Future 8-Future
Miami Ave (W); NE 1 Ave (E) - D5
SW 5 St between 27 ave and 28 ave street 4 288,090 0 Future 8-Future
improvement - D4
SW 20 Street (SW 31 Ave to SW 32 Ave) - D4 4 56,178 0 Future 8-Future
D5
Traffic Circle - SW 12 St and 31 Ave (SR 4 201,663 0 Future 8-Future
2013005677) - D4
Coral Gate Speed Humps - Phase II - D4 4 108,034 0 Future 8-Future
Traffic Circle on SW 23 Ave and SW 26 Street 4 221,672 0 Future 8-Future
- D4
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
-597,219
-597,219
-475,349
-115,236
-280,888
-526,967
-532,967
-532,967
-625,287
-625,287
-504,158
0
-288,090
-56,178
-201,663
-108,034
-221,672
Active & Future
CIP Projects Only
B-No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
341-Streets & Sidewalks
B-31212
B-31213
B-31214
B-31215
B-31217
B-40003
B-40005
B-70245D
Capital Improvement Program NE 1st Avenue Reconstruction - NE 41 St. to 5
Admin NE 43 St. - D5
Capital Improvement Program N. Miami Court Reconstruction - D5
Admin
Capital Improvement Program NE 1 Court Reconstruction - D5
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Public Works
Public Works
Transportation & Transit
5
5
660,816
441,636
666,995
NE Miami Place Reconstruction - D5 5 500,000
NE 43 Street Reconstruction - D5 5 868,100
PW Citywide Sidewalk Replacement Contract 1,2,3,4,5 7,435,000
M-0096 (Fy14-FY18)
PW Citywide Pavement Resurfacing Contract 1,2,3,4,5 6,912,761
M0098 (FY14-18)
Transportation PSS - Transportation DRI Fees 1,2,3,4,5 155,042
Administration
0 Future
0 Future
0 Future
0 Future
0 Future
0 Future
0 Future
0 Active
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
3-Design
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
-660,816
-441,636
-666,995
-500,000
-868,100
-7,435,000
-6,912,761
-155,042
343-Mass Transit
B-70246 Transportation & Transit
B-70246A Transportation & Transit
B-70247
B-70715
Transportation & Transit
Transportation & Transit
B-30645A Transportation & Transit
341-Streets & Sidewalks
Transportation Program Support Services -
Transit Professional
Beach Corridor Transit Connection Study -
Citywide
Citywide Mass Transit Studies
City of Miami Trolley Program - Capital
Acquisition
Transportation Program Support Se
Transit Professional Services
ces -
230,219,000
1,2,3,4,5 500,000
1,2,3,4,5 30,000
1,2,3,4,5
318,402
1,2,3,4,5 2,921,122
1,2,3,4,5
160,106,946
500,000 Active
30,000 Active
318,402 Active
2,921,122 Active
418,077 418,076 Active
2-Pre-Des
8-Future
2-Pre-Des
gn
gn
3-Design
3-Design
Funded
Funded
Funded
Funded
Partially Funded
-70,112,053
0
0
0
0
-0
343-Mass Transit
4,187,601 4,187,601 -0
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
Dist. Estimate ($) Funds ($) Status Phase Status Estimate ($)
351-Sanitary Sewers
B-30134AS Parks and Recreation Bryan Park New Tennis/Community Center 4 50,000 50,000 Active 3-Design Funded 0
D4 - Sanitary Sewer Component
B-30305BS Capital Improvement Program Gibson Park New Construction - Sanitary 5 117,000 117,000 Active 5-Construction Funded 0
Admin Sewer Component
B-30365ES Community Development Coral Way NET Office Remodeling D3 - 3 50,000 50,000 Active 5-Construction Funded 0
Sanitary Sewer Component
B-30374S Parks and Recreation Virginia Key Rowing Center Improvements - 2 100,000 100,000 Active 3-Design Funded 0
Sanitary Sewer Component
B-30538S Capital Improvement Program Museum Park - Sanitary Sewer Allocation 1,2,3,4,5 1,000,000 1,000,000 Active 5-Construction Funded 0
Admin
B-30671A Parks and Recreation Caribbean Marketplace Renovation - Sanitary 5 114,000 114,000 Active 5-Construction Funded 0
Sewer Component
B-30690S Parks and Recreation West End Park New Community Building - 4 100,000 100,000 Active 3-Design Funded 0
co Sanitary Sewer
cn
B-30882S Parks and Recreation African Square Park - Splash Park D5 - 5 100,000 100,000 Active 3-Design Funded 0
Sanitary Sewer Component
B-30887S Parks and Recreation Little Haiti Soccer Field Bathroom D5 5 365,000 365,000 Active 3-Design Funded 0
B-30995S Parks and Recreation Virginia Key Bike Trail Building - D2 - 2 50,000 50,000 Active 2-Pre-Design Funded 0
Sanitary Sewer Component
B-35806S Parks and Recreation Curtis Park New Pool Facility and Boat Ramp 1 500,000 500,000 Active 3-Design Funded 0
D1 - Sanitary Sewer Component
B-35812AS Parks and Recreation Duarte Park Building Renovation, Splash 1 50,000 50,000 Active 5-Const. (JOC) Funded 0
PArk & Sign - D1 Sanitary Sewer Component
B-35838S Parks and Recreation Kennedy Park Restroom Building 2 50,000 50,000 Active 4-Bid (JOC) Funded 0
Improvements D2 - Sanitary Sewer Component
B-35861BS Parks and Recreation Maximo Gomez / Domino Park Restroom 3 100,000 100,000 Active 3-Design Funded 0
Improvements - D3
B-35883AS Capital Improvement Program Hadley Park New Youth Center D5 - Sanitary 5 200,000 200,000 Active 7-On-Hold Funded 0
Admin Sewer Component
B-35887S Parks and Recreation Moore Park New Construction D5 - Sanitary 5 500,000 500,000 Active 5-Construction Funded 0
Sewer Component
B-60454S Fire Rescue Fire Station #14 (New) - D4 - Sanitary Sewer 4 100,000 100,000 Active 2-Pre-Design Funded 0
Component
B-60464S Public Facilities New Dinner Key Marina Dockmaster Building 2 690,000 690,000 Active 5-Construction Funded 0
Active & Future
CIP Projects Only
B-No. Client
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Project Dist.
Total Cost
Estimate ($)
Total
Funds ($) Status Phase
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Fund
Status
Total Fund
minus
Total Cost
Estimate ($)
351-Sanitary Sewers
D2 - Sanitary Sewer Component
B-70600 Police Police Department Sanitary Sewer System
Repairs
1,2,3,4,5
60,000
60,000 Active
3-Design
Funded 0
352-Storm Sewers
B-30011
B-30183
B-30262
B-30425
B-30588
B-30637
B-30680
B-30700
B-30776
B-30992
B-40271
B-50654
B-50672
B-50706A
B-30008
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Public Works
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Public Works
Solid Waste
Public Works
Capital Improvement
Admin
Capital Improvement
Admin
Program Belle Meade Storm Sewer Project, Ph 2
Program Roadway, Drainage and Traffic Improvements
- D1 & D4 - Partially Funded CDBG D4
91-03102
Capital Improvement Program
Admin
Grove Park Road and Storm Sewers
Improvements - D3 (Formelly Glenn Royal
Stormsewer P3)
351-Sanitary Sewers
Englewood Road and Storm Sewer 4
Improvements - Phase III - D4
Garden Storm Sewer - Phase I 1
Citywide Storm Sewer Repair Project
D5 - Stormwater Projects
San Marco Island and Biscayne Island
Drainage Improvements - D2
Mary Brickell Village Drainage Improvements
Rockerman Canal Improvements
Citywide - FDEP Drainage Wells Compliance
Silver Bluff Drainage Improvements - D4
Riverview and Lawrence Pump Stations - D3 3
Solid Waste Sweeper 1,2,3,4,5
Overtown Stormwater Pump Station Upgrades 5
2
1,2,3,4,5
5
4,296,000
8,785,811
1,149,920
5,701,561
1,078,000
2 4,488,980
1,2,3,4,5 3,723,441
2 896,815
1,2,3,4,5 2,240,934
4 1,652,160
1,824,095
170,000
851,797
12,301,058
4,296,000
0
8,785,811 Active 5-Construction Funded 0
1,149,920 Active 4-Bid Funded 0
5,701,561 Active 5-Construction Funded 0
1,078,000 Future 8-Future Funded 0
4,488,980 Active 5-Construction Funded 0
3,723,441 Active 4-Bid Funded 0
896,815 Active 4-Bid Funded 0
2,240,934 Active 3-Design Funded 0
1,652,160 Active 5-Construction Funded 0
1,824,095 Active 3-Design Funded 0
170,000 Active 5-Construction Funded 0
851,797 Active 3-Design Funded 0
12,301,058 Active 5-Const. (JOC) Funded 0
1,4 1,218,245 1,218,245 Active 4-Bid (JOC) Funded 0
3
12,819,059 6,369,000 Active 7-On-Hold Partially Funded -6,450,059
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
Dist. Estimate ($) Funds ($) Status Phase Status Estimate ($)
352-Storm Sewers
B-30421 Capital Improvement Program D1 - Stromwater Projects 1 1,198,000 1,078,000 Future 8-Future Partially Funded -120,000
Admin
B-30422 Capital Improvement Program D2 - Stormwater Projects 2 1,198,000 1,078,000 Future 8-Future Partially Funded -120,000
Admin
B-30423 Capital Improvement Program D3 - Stormwater Projects 3 1,198,000 1,078,000 Future 8-Future Partially Funded -120,000
Admin
B-30424 Capital Improvement Program D4 - Stormwater Projects 4 1,198,000 1,078,000 Future 8-Future Partially Funded -120,000
Admin
B-30637A Capital Improvement Program South Miami Avenue Drainage Improvements 2 806,500 204,444 Active 4-Bid Partially Funded -602,055
Admin - MDC
B-30985 Capital Improvement Program Design District Roadway and Stormwater 5 1,500,000 500,000 Future 8-Future Partially Funded -1,000,000
Admin Improvement - D5
B-50643 Capital Improvement Program Wagner Creek / Seybold Canal Dredging 1,5 23,353,488 5,373,502 Active 3-Design Partially Funded -17,979,985
co Admin
v
B-30007 Capital Improvement Program Auburn Storm Sewer Phase III 4 7,049,000 0 Future 8-Future UnFunded -7,049,000
Admin
B-30009 Capital Improvement Program Lawnview Storm Sewer 3 5,719,000 0 Future 8-Future UnFunded -5,719,000
Admin
B-30012 Capital Improvement Program Auburn Storm Sewer Ph. I & II 4 5,320,000 0 Future 8-Future UnFunded -5,320,000
Admin
B-30013 Capital Improvement Program Reid Acres Storm Sewers 5 5,719,000 0 Future 8-Future UnFunded -5,719,000
Admin
B-30015 Capital Improvement Program Little River Storm Sewers Ph. II 5 3,990,000 0 Future 8-Future UnFunded -3,990,000
Admin
B-30016 Capital Improvement Program Liberty Storm Sewers 5 5,586,000 0 Future 8-Future UnFunded -5,586,000
Admin
B-30017 Capital Improvement Program Fairway Storm Sewers 5 5,586,000 0 Future 8-Future UnFunded -5,586,000
Admin
B-30018 Capital Improvement Program NW 71 St. Main Trunk Storm Sewer 5 9,975,000 0 Future 8-Future UnFunded -9,975,000
Admin
B-30216 Capital Improvement Program Avalon Storm Sewer - Phase III 2,4 4,500,000 0 Future 8-Future UnFunded -4,500,000
Admin
B-40004 Public Works Morningside Drainage Improvement Project 2 6,260,000 0 Future 8-Future UnFunded -6,260,000
D2 - PW
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
Dist. Estimate ($) Funds ($) Status Phase Status Estimate ($)
352-Storm Sewers
B-40006 Public Works
Mechanical Upgrades to Riverview and
Lawrence Pump Stations - D3 - PW
3 125,000 0 Future 8-Future UnFunded -125,000
352-Storm Sewers 149,182,867 62,841,766 -86,341,100
353-Solid Waste
B-73202C Solid Waste Solid Waste Collection Equipment 1,2,3,4,5 5,009,526 5,009,427 Active 5-Construction Partially Funded -99
B-70476 Solid Waste Solid Waste Building Reinforcement for 1,2,3,4,5 1,000,000 0 Future 8-Future UnFunded -1,000,000
Hurricane
B-70477 Solid Waste Solid Waste Mini -Dump Renovation 1,2,3,4,5 200,000 0 Future 8-Future UnFunded -200,000
B-70478 Solid Waste Solid Waste Fleet Replacement 1,2,3,4,5 24,311,800 0 Future 8-Future UnFunded -24,311,800
353-Solid Waste
30,521,326 5,009,427 -25,511,899
Grand Total
904,044,927 448,436,592 -455,608,335
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
SECTION REPORTS
4. FUNDED PROPORTION BY
DEPARTMENT/JOB NUMBER
Cite sutavie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
Active & Future
CIP Projects Only
Program: All
031-PWK-Public Works
Total
Cost
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
Funded Years 2012-2013 2013-2014 2014-2015
2015-2016 2016-2017 2017-2018
Over/
(Under)
FUNDED
B-30262 Citywide Storm Sewer Repair
B-30377C District 3 - Sidewalk Repairs and
B-30416 NW 34 Ave over Comfort Canal -
B-30992 Riverview and Lawrence Pump
B-30998 Citywide Sidewalk Repair Project -
B-40168 South Bayshore Drive from
B-43114B Public Works Miscellaneous
B-50654 Overtown Stormwater Pump Station
$5,701,561
$250,691
$178,700
$1,824,095
$169,615
$100,000
$1,034,146
$851,797
$5,701,561
$250,691
$178,700
$1,824,095
$169,615
$100,000
$1,034,146
$851,797
$4,401,561
$250,691
$0
$1,124,095
$169,615
$100,000
$158,400
$851,797
$700,000
$0
$0
$700,000
$0
$0
$875,746
$0
$600,000
$0
$178,700
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
TOTAL FUNDED
PARTIALLY FUNDED
B-30551 Public Works Maintenance Yard
$10,110,605 $10,110,605 $7,056,159 $2,275,746 $778,700 $0
$4,719,387 $3,268,254 $3,268,254
$0
$0
$0
$0
$0 $0 $0 $0 $0 $0 ( $1,451,133)
TOTAL PARTIALLY FUNDED
UNFUNDED
B-40001
B-40002
B-40003
B-40004
B-40005
B-40006
B-40007
B-40008
B-40009
New Public Works Operations
Public Works Fleet and Heavy
PW Citywide Sidewalk
Morningside Drainage
PW Citywide Pavement
Mechanical Upgrades to Riverview
PW - Heavy Machinery
PW Heavy Equipment and
PW Updrage Operations Division
$4,719,387 $3,268,254 $3,268,254
$1,875,500
$499,000
$7,435,000
$6,260,000
$6,912,761
$125,000
$95,000
$650,000
$300,000
$0 $0 $0 $0 $0 $0 ( $1,451,133)
$0 $0 $0 $0 $0 $0 $0 $0 ( $1,875,500)
$0 $0 $0 $0 $0 $0 $0 $0 ( $499,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $7,435,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $6,260,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $6,912,761)
$0 $0 $0 $0 $0 $0 $0 $0 ( $125,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $95,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $650,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $300,000)
TOTAL UNFUNDED $24,152,261
$0 $0 $0 $0 $0 $0 $0 $0 ( $24,152,261)
Total 031-PWK-Public Works $38,982,253 $13,378,859 $10,324,413 $2,275,746 $778,700 $0 $0 $0 $0 ( $25,603,394)
Active & Future
CIP Projects Only
Program: All
122-T&T-Transportation & Transit
Total
Cost
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
Funded Years 2012-2013 2013-2014 2014-2015
2015-2016 2016-2017 2017-2018
Over/
(Under)
FUNDED
B-30346 Traffic Study Reviews - Oracle
B-30645A Transportation Program Support
B-30645B Transportation Program Support
B-30645E Overtown / Wynwood Bicycle
B-30645F Miami Regional Intermodal Plan
B-30694A Citywide Bicycle Rack & Signage
B-70246 Transportation Program Support
B-70246A Beach Corridor Transit Connection
B-70247 Citywide Mass Transit Studies
B-70715 City of Miami Trolley Program -
$411,622
$418,077
$881,042
$60,000
$48,000
$115,000
$500,000
$30,000
$318,402
$2,921,123
$411,622
$418,077
$881,042
$60,000
$48,000
$115,000
$500,000
$30,000
$318,402
$2,921,123
$411,622
$418,077
$881,042
$60,000
$15,000
$115,000
$318,402
$30,000
$0
$2,921,123
$0
$0
$0
$0
$33,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$181,598
$0
$318,402
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
TOTAL FUNDED
PARTIALLY FUNDED
B-70245 Transportation Program Support
$5,703,266 $5,703,266 $5,170,266 $33,000 $500,000 $0 $0 $0 $0 $0
$500,000 $294,958 $144,958 $100,000 $50,000 $0 $0 $0 $0 ( $205,042)
TOTAL PARTIALLY FUNDED
UNFUNDED
B-70245D Transportation PSS - Transportation
$500,000 $294,958 $144,958 $100,000 $50,000 $0 $0 $0 $0 ( $205,042)
$155,042 $0 $0 $0 $0 $0 $0 $0 $0 ( $155,042)
TOTAL UNFUNDED
$155,042 $0 $0 $0 $0 $0 $0 $0 $0 ( $155,042)
Total 122-T&T-Transportation & Transit
$6,358,308 $5,998,224 $5,315,224 $133,000 $550,000 $0 $0 $0 $0 ( $360,084)
Active & Future
CIP Projects Only
Program: All Total Total Prior Current Future Funding Estimates Over/
25-CMA-City Manager Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 (Under)
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
THIS DOCUMENT IS ASUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
FUNDED
B-40171 Coconut Grove Viewing Platform $15,088 $15,088 $15,088 $0 $0 $0 $0 $0 $0 $0
B-40172 Coconut Grove Viewing Platform $15,081 $15,081 $15,081 $0 $0 $0 $0 $0 $0 $0
TOTAL FUNDED $30,169 $30,169 $30,169 $0 $0 $0 $0 $0 $0 $0
Tota125-CMA-City Manager $30,169 $30,169 $30,169 $0 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
Program: All
28-FIR-Fire Rescue
Total
Cost
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
Funded Years 2012-2013 2013-2014 2014-2015
2015-2016 2016-2017 2017-2018
Over/
(Under)
FUNDED
B-30865F Environmental Remediation Study -
B-60453A Fire Station #13
B-60454S Fire Station #14 (New) - D4 -
B-60455B Fire Station #1 - Renovation and
B-70102A Fire Station No. 6 Office Building -
B-70104 Fire Station No. 10 Restroom
B-70105 Refurbishing of Existing Apparatus
B-70106 Firefighting Equipment and Gear
B-70210 Fire Station #5 Exterior Walls
B-70211 Fire Station No. 3 Dormitories
B-70212 Fire Station No. 12 - Re -roofing
B-70213 Fire Station No.5 - Interior
B-70241 Fire Rescue Capital Needs -
B-70411 Fire Rescue Personal Protective
B-70418 FEMA Assistance to Firefighters
B-70718 Fire Facilities Generators (North &
B-72801 Computer Aided Dispatch (CAD)
B-72802 Fire Stations & Other Fire Facilities
B-72803 Fire Station Equipment and
B-72810A New Fire Rescue Apparatus (North
B-72813 Defense and Security Equipment
$140,000
$5,084,496
$100,000
$500,000
$74,619
$188,218
$230,000
$158,124
$150,000
$100,000
$77,000
$348,240
$1,858,500
$820,580
$343,610
$300,000
$120,866
$3,647,899
$790,838
$573,740
$3,767,249
$140,000
$5,084,496
$100,000
$500,000
$74,619
$188,218
$230,000
$158,124
$150,000
$100,000
$77,000
$348,240
$1,858,500
$820,580
$343,610
$300,000
$120,866
$3,647,899
$790,838
$573,740
$3,767,249
$0
$5,084,496
$100,000
$0
$74,619
$188,218
$230,000
$158,124
$150,000
$100,000
$77,000
$0
$0
$820,580
$343,610
$300,000
$120,866
$3,547,899
$540,838
$113,044
$3,767,249
$140,000 $0 $0
$0 $0 $0
$0 $0 $0
$500,000 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$348,240 $0 $0
$0 $1,858,500 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$100,000 $0 $0
$250,000 $0 $0
$460,696 $0 $0
$0 $0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
TOTAL FUNDED
PARTIALLY FUNDED
B-60351
B-60454
B-70242
B-72804
B-72808
B-72809
Fire Station #10 (New)
Fire Station #14 (New)
Fire Department - FY2012
Phone and Radio Equipment
Light Fleet Replacement
Large Firefighting Equipment
$19,373,979 $19,373,979 $15,716,543 $1,798,936 $1,858,500
$6,275,200
$6,916,510
$317,333
$1,209,200
$1,649,658
$660,316
$898,123
$5,076,844
$238,000
$351,200
$667,658
$388,316
$898,123
$5,076,844
$0
$351,200
$667,658
$326,816
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 ( $5,377,077)
$0 $0 $0 $0 $0 $0 ( $1,839,666)
$0 $238,000 $0 $0 $0 $0 ( $79,333)
$0 $0 $0 $0 $0 $0 ( $858,000)
$0 $0 $0 $0 $0 $0 ( $982,000)
$61,500 $0 $0 $0 $0 $0 ( $272,000)
TOTAL PARTIALLY FUNDED
UNFUNDED
B-70214
B-70215
B-70216
B-70217
B-70218
B-70219
B-70220
Fire Stations Computer Aided
Uniform Fire Station Data Closets
Fire Station and AO PC
New Citywide Fire Stations Digital
Citywide Fire Station Replace out
Citywide Warranty and Outdated
Citywide Bunker Gear (Fire
$17,028,217 $7,620,141 $7,320,641 $61,500 $238,000 $0 $0 $0 $0 ( $9,408,076)
$2,400,000
$48,000
$70,000
$5,000,000
$150,000
$105,000
$274,800
$0 $0 $0 $0 $0 $0 $0 $0 ( $2,400,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $48,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $70,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $5,000,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $150,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $105,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $274,800)
Active & Future
CIP Projects Only
Program: All Total Total Prior Current Future Funding Estimates Over/
28-FIR-Fire Rescue Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 (Under)
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
UNFUNDED
B-70221
B-70222
B-70223
B-70224
B-70225
B-70226
B-70227
B-70228
B-70229
B-70230
B-70231
B-70232
B-70233
B-70234
B-70235
B-70236
B-70237
B-70238
B-70239
B-70240
B-72811
Fire Stations Warranty
Rebuilding Fire Station #1
Rebuilding Fire Station #10
Fire and Rescue Training Center
Fire Station #15 (Fire Boat)
Citywide Fire Station Pumpers
Fire Rescue
Apparatus Replacement
Replace Fireboat 1
Fire Station Training Facility
Expand Comunication/Alarm Office
Facility Budget Requests (Fire)
Fire Station Equipment/Furniture
Fire Station Hurricane Hardening
Fire Station Light Fleet Vehicle
Fire Station Hardening/Security
Fire Station #5 Renovation
Fire Training Props
Fire Station Flat Panels 24"
Fire Station Paperless Inspection
Replace Existing Fire Engines
$946,000
$9,000,000
$6,000,000
$17,000,000
$10,000,000
$1,960,000
$4,320,000
$950,000
$1,250,000
$750,000
$500,000
$1,750,000
$200,000
$384,000
$630,000
$935,000
$800,000
$350,000
$3,500
$80,000
$3,035,000
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 ( $946,000)
$0 $0 $0 ( $9,000,000)
$0 $0 $0 ( $6,000,000)
$0 $0 $0 ( $17,000,000)
$0 $0 $0 ( $10,000,000)
$0 $0 $0 ( $1,960,000)
$0 $0 $0 ( $4,320,000)
$0 $0 $0 ( $950,000)
$0 $0 $0 ( $1,250,000)
$0 $0 $0 ( $750,000)
$0 $0 $0 ( $500,000)
$0 $0 $0 ( $1,750,000)
$0 $0 $0 ( $200,000)
$0 $0 $0 ( $384,000)
$0 $0 $0 ( $630,000)
$0 $0 $0 ( $935,000)
$0 $0 $0 ( $800,000)
$0 $0 $0 ( $350,000)
$0 $0 $0 ( $3,500)
$0 $0 $0 ( $80,000)
$0 $0 $0 ( $3,035,000)
TOTAL UNFUNDED $68,891,300
$o $o $0 $0 $0 $0 $0 $0 ( $68,891,300)
Tota128-FIR-Fire Rescue $105,293,496 $26,994,120 $23,037,184 $1,860,436 $2,096,500 $0 $0 $0 $0 ( $78,299,376)
Active & Future
CIP Projects Only
Program: All Total Total Prior Current Future Funding Estimates Over/
29-POL-Police Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 (Under)
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
FUNDED
B-30373A Police Department Property Unit $1,069,644 $1,069,644 $989,644 $80,000
B-40273 Police Station Headquarters $10,000 $10,000 $0 $10,000
B-70112 Police Headquarters Interview $55,000 $55,000 $55,000 $0
B-70600 Police Department Sanitary Sewer $60,000 $60,000 $60,000 $0
B-72915A Police Headquarters Helipad and $1,657,119 $1,657,119 $424,506 $1,232,613
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
TOTAL FUNDED $2,851,763 $2,851,763 $1,529,150 $1,322,613 $0 $0 $0 $0 $0 $0
UNFUNDED
B-70113 Police Headquarters 5th floor $496,956 $0 $0 $0 $0 $0 $0 $0 $0 ( $496,956)
B-70114 Fire Pump Electrical Rewiring - $35,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $35,000)
B-70115 Domestic Water Pump - Police $65,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $65,000)
B-70116 Police Headquarter Elevators $75,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $75,000)
B-70117 I-95 Lighting Project - Police Dept. $85,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $85,000)
B-70118 Police Central Station Parking $210,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $210,000)
B-70119 Police Headquarters Presure $275,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $275,000)
o B-70120 Carpeting and Flooring - Police $65,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $65,000)
-P B-70121 Police Headquarter & South District $425,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $425,000)
B-70122 South District Police Sub Station $175,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $175,000)
B-70123 Security System for $85,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $85,000)
B-70124 Police South District Air $275,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $275,000)
B-70125 North and South Police Stations $50,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $50,000)
B-70126 Grapeland Heights Electrical Panel $125,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $125,000)
B-70127 Police Headquarter Building $25,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $25,000)
B-70128 Forensic Lab Expansion - Police $1,200,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $1,200,000)
B-70129 College of Police Auditorium $15,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $15,000)
B-70130 College of Police Lobby Lighting $20,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $20,000)
B-70131 Mounted Stables Stall Repairs - $100,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $100,000)
B-70132 Police South District Exterior $35,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $35,000)
B-70133 Security System for Police South $70,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $70,000)
B-70134 Replacement of 400 Desktop $324,172 $0 $0 $0 $0 $0 $0 $0 $0 ( $324,172)
B-70135 Replacement of Sauna Water $15,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $15,000)
B-70136 Police Headquarters Record Unit $496,458 $0 $0 $0 $0 $0 $0 $0 $0 ( $496,458)
B-70417 Satellite Communications Antenna $20,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $20,000)
TOTAL UNFUNDED $4,762,586 $0 $0 $0 $0 $0 $0 $0 $0 ( $4,762,586)
Tota129-POL-Police $7,614,349 $2,851,763 $1,529,150 $1,322,613 $0 $0 $0 $0 $0 ( $4,762,586)
Active & Future
CIP Projects Only
Program: All Total Total Prior Current Future Funding Estimates Over/
32-SWA-Solid Waste Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 (Under)
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
FUNDED
B-40271 Solid Waste Sweeper
$170,000 $170,000 $170,000 $0
$0 $0 $0 $0 $0 $0
TOTAL FUNDED $170,000 $170,000 $170,000 $0 $0 $0 $0 $0 $0 $0
PARTIALLY FUNDED
B-73202C Solid Waste Collection Equipment $5,009,526 $5,009,427 $3,548,727
$854,100 $606,600 $0 $0 $0 $0
$99)
TOTAL PARTIALLY FUNDED $5,009,526 $5,009,427 $3,548,727 $854,100 $606,600 $0 $0 $0 $0
$99)
UNFUNDED
B-70476 Solid Waste Building $1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $1,000,000)
B-70477 Solid Waste Mini -Dump $200,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $200,000)
B-70478 Solid Waste Fleet Replacement $24,311,800 $0 $0 $0 $0 $0 $0 $0 $0 ( $24,311,800)
TOTAL UNFUNDED $25,511,800
$o $o $0 $0 $0 $0 $0 $0 ( $25,511,800)
Tota132-SWA-Solid Waste $30,691,326 $5,179,427 $3,718,727 $854,100 $606,600 $0 $0 $0 $0 ( $25,511,899)
Active & Future
CIP Projects Only
Program: All
35-CCF-Public Facilities
Total
Cost
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
Funded Years 2012-2013 2013-2014 2014-2015
2015-2016 2016-2017 2017-2018
Over/
(Under)
FUNDED
B-30501A Manuel Artime Miscellaneous
B-30501B Manuel Artime Dimmer Rack
B-30696 Miamarina Pier A, B & C Fire Line
B-30706 Miscellaneous Repairs 10% Set
B-30735 Dinner Key Marina Dinghy Dock -
B-30994 City of Miami Impact Fee Study -
B-33506 James L. Knight Center
B-40454 Park Expansions and Land
B-50722A Little River Waterfront Park
B-60464 New Dinner Key Marina
B-60464S New Dinner Key Marina
B-70010 Miamarina Pier 5 Canopies - PF
B-70011 Clean Vessel Act 2013 - PF
B-70414 James L. Knight Center / Hyatt-
$92,883
$106,653
$380,000
$2,158,594
$253,070
$65,491
$48,722
$1,000,000
$735,000
$4,211,239
$690,000
$435,000
$41,168
$351,876
$92,883
$106,653
$380,000
$2,158,594
$253,070
$65,491
$48,722
$1,000,000
$735,000
$4,211,239
$690,000
$435,000
$41,168
$351,876
$92,883
$106,653
$380,000
$985,110
$178,070
$65,491
$48,722
$0
$0
$4,211,239
$600,000
$200,000
$0
$351,876
$0 $0
$0 $0
$0 $0
$646,375 $527,109
$75,000 $0
$0 $0
$0 $0
$1,000,000 $0
$735,000 $0
$0 $0
$90,000 $0
$0 $235,000
$0 $41,168
$0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
TOTAL FUNDED
PARTIALLY FUNDED
B-30182A Coconut Grove Waterfront Master
B-30501C Manuel Artime Window
B-30602
B-30688
B-30689
B-33514
B-40180
B-70100
B-75001
Seminole Dinghy Dock Expansion
Marine Stadium Restoration
Marine Stadium Bulkhead
Marine Stadium Marina
Marine Stadium Marina at Virginia
Gusman Hall Improvements /
Watson Island Infrastructure
$10,569,696 $10,569,696 $7,220,044 $2,546,375 $803,277 $0 $0 $0 $0 $0
$47,179,389 $2,051,675 $1,721,675 $330,000 $0 $0 $0 $0 $0 ( $45,127,714)
$173,607 $150,379 $150,379 $0 $0 $0 $0 $0 $0 ( $23,228)
$60,000 $30,000 $30,000 $0 $0 $0 $0 $0 $0 ( $30,000)
$511,716 $350,000 $350,000 $0 $0 $0 $0 $0 $0 ( $161,716)
$2,094,393 $1,891,603 $1,106,603 $785,000 $0 $0 $0 $0 $0 ( $202,790)
$1,315,550 $255,645 $255,645 $0 $0 $0 $0 $0 $0 ( $1,059,905)
$33,180,900 $1,740,007 $1,740,007 $0 $0 $0 $0 $0 $0 ( $31,440,893)
$10,000,000 $423,405 $423,405 $0 $0 $0 $0 $0 $0 ( $9,576,595)
$647,190 $150,000 $150,000 $0 $0 $0 $0 $0 $0 ( $497,190)
TOTAL PARTIALLY FUNDED
UNFUNDED
B-30834 Dinner Key Dredging - Spoil Island
B-35000 Watson Island Public Park
B-35003 Allapattah Community Elderly
$95,162,745 $7,042,714
$308,375
$2,600,000
$287,000
$5,927,714 $1,115,000
$o $o $0 $0 $0 ( $88,120,031)
$0 $0 $0 $0 $0 $0 $0 $0 ( $308,375)
$0 $0 $0 $0 $0 $0 $0 $0 ( $2,600,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $287,000)
TOTAL UNFUNDED $3,195,375
$0 $0 $0 $0 $0 $0 $0 $0 ( $3,195,375)
Total 35-CCF-Public Facilities $108,927,816 $17,612,410 $13,147,758 $3,661,375 $803,277 $0 $0 $0 $0 ( $91,315,406)
Active & Future
CIP Projects Only
Program: All Total Total Prior Current Future Funding Estimates Over/
37-GA-Grants Administration Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 (Under)
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
FUNDED
B-30865A Environmental Remediation Study $466,900 $466,900
$0 $45,900 $421,000
$0 $0 $0 $0 $0
TOTAL FUNDED $466,900 $466,900 $0 $45,900 $421,000 $0 $0 $0 $0 $0
Tota137-GA-Grants Administration $466,900 $466,900 $0 $45,900 $421,000 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
Program: All
42-GSA-General Services
Total
Cost
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
Funded Years 2012-2013 2013-2014 2014-2015
2015-2016 2016-2017 2017-2018
Over/
(Under)
FUNDED
B-30666 Damaged Vehicle Replacement /
B-30865B City Hall Roof Terrace
B-30865C City Hall Windows and Doors
B-30865E MRC A/C Replacements
B-40410 Fire Alarm Replacement, Air
B-70415 MRC Security System Hardening -
B-74205B GSA Fleet Maintenance Garage
B-74205C GSA Truck Wash Pit
B-74219B Property Maintenance Security
B-74219C Property Maintenance Bobcats &
B-74220 Police Vehicle Replacement
$794,508
$314,176
$296,001
$289,823
$1,426,200
$69,842
$404,215
$88,000
$25,000
$40,000
$27,491,738
$794,508
$314,176
$296,001
$289,823
$1,426,200
$69,842
$404,215
$88,000
$25,000
$40,000
$27,491,738
$603,864
$0
$0
$0
$0
$69,842
$299,118
$0
$9,776
$0
$25,639,738
$190,644
$314,176
$296,001
$289,823
$1,426,200
$0
$105,097
$88,000
$15,224
$40,000
$1,852,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
TOTAL FUNDED
PARTIALLY FUNDED
B-30365H Generator for City Hall
B-74200 Citywide General Fleet
$31,239,503 $31,239,503 $26,622,338 $4,617,165
$186,819
$3,969,887
$55,855
$3,610,269
$55,855
$3,260,269
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 ( $130,964)
$350,000 $0 $0 $0 $0 $0 ( $359,618)
TOTAL PARTIALLY FUNDED
UNFUNDED
B-40580
B-70108
B-70320
B-70321
B-70322
B-70323
B-70324
B-70325
B-70326
B-70327
B-70328
B-70329
B-70330
B-70331
B-70332
B-70333
B-70334
B-70335
B-70336
Jose Marti Roof Repair - GSA
Purchase of a video transmission
City of Miami Fleet Vehicle
City of Miami Fleet Vehicle
Carpet Replacement at the MRC
GSA Communications Division -
MRC Building - UPS System
GSA Fleet Facility - Fuel Station
GSA Communications Division -
GSA Mechanics Shop - Light Fleet
Fuel Pump Replacements
Roof Repairs at the GSA
Re -grouping and polishing of all
Heavy Fleet Tow Truck
MRC Facility - Repair of HVAC
Bucket Truck for the Electrical
City Hall Repairs
Replacement of Fire Panel at MRC
Roof Repair at the MRC Facility
B-74220B Police Vehicle Acquisition -
$4,156,706
$26,100
$100,000
$1,700,000
$1,750,000
$300,000
$42,000
$7,000
$25,000
$30,000
$65,000
$200,000
$60,000
$70,000
$250,000
$120,000
$162,000
$200,000
$340,000
$350,000
$2,040,000
$3,666,124 $3,316,124 $350,000 $0 $0 $0 $0 $0 ( $490,582)
$0 $0 $0 $0 $0 $0 $0 $0 ( $26,100)
$0 $0 $0 $0 $0 $0 $0 $0 ( $100,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $1,700,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $1,750,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $300,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $42,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $7,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $25,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $30,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $65,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $200,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $60,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $70,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $250,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $120,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $162,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $200,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $340,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $350,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $2,040,000)
Active & Future
CIP Projects Only
Program: All Total Total Prior Current Future Funding Estimates Over/
42-GSA-General Services Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 (Under)
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
TOTAL UNFUNDED $7,837,100 $0 $0 $0 $0 $0 $0 $0 $0 ( $7,837,100)
Total 42-GSA-General Services $43,233,309 $34,905,627 $29,938,462 $4,967,165 $0 $0 $0 $0 $0 ( $8,327,682)
Active & Future
CIP Projects Only
Program: All Total Total Prior Current Future Funding Estimates Over/
45-CMD-Community Development Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 (Under)
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
FUNDED
B-30365E Coral Way NET Office Remodeling $1,291,833 $1,291,833 $1,015,000 $0 $276,833 $0 $0 $0 $0 $0
B-30365E Coral Way NET Office Remodeling $50,000 $50,000 $50,000 $0 $0 $0 $0 $0 $0 $0
B-30832 Douglas Park ADA Improvement $133,474 $133,474 $133,474 $0 $0 $0 $0 $0 $0 $0
TOTAL FUNDED $1,475,307 $1,475,307 $1,198,474 $0 $276,833 $0 $0 $0 $0 $0
UNFUNDED
B-30365C City Property Building Maintenance $700,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $700,000)
B-30365Q Coral Way Community Center $500,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $500,000)
TOTAL UNFUNDED $1,200,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $1,200,000)
Total45-CMD-Community Development $2,675,307 $1,475,307 $1,198,474 $0 $276,833 $0 $0 $0 $0 ( $1,200,000)
Active & Future
CIP Projects Only
Program: All
46-IT-Information Technology
Total
Cost
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
Funded Years 2012-2013 2013-2014 2014-2015
2015-2016 2016-2017 2017-2018
Over/
(Under)
FUNDED
B-70969 IT - Financial Management
B-74609 ERP Integration System
$500,000 $500,000 $0 $500,000
$25,474,458 $25,474,458 $25,474,458 $0
$0
$0
$0 $0
$0
$0
$0
$0
$0
$0
$0
$0
TOTAL FUNDED
PARTIALLY FUNDED
B-74606 Upgrade PC Software & Hardware
B-74614 Land Management System
B-74617 IT Modernization
$25,974,458 $25,974,458 $25,474,458 $500,000
$7,174,921
$7,913,018
$4,100,000
$2,920,683
$6,316,151
$2,800,000
$2,920,683
$6,316,151
$2,800,000
$0 $0
$0
$0
$0
$0
$0 $0 $0 $0 $0 $0 ( $4,254,238)
$0 $0 $0 $0 $0 $0 ( $1,596,867)
$0 $0 $0 $0 $0 $0 ( $1,300,000)
TOTAL PARTIALLY FUNDED
UNFUNDED
B-70956
B-70957
B-70958
B-70959
B-70960
B-70961
B-70962
B-70963
B-70964
B-70965
B-70966
B-70967
B-70968
MRC Telecommunications
eGovernment/Web Services City
eGoverment/Web Services iBuild
eGovernment Services Platform
CIP Document Mgmt & Data
Audit Compliance
Server Virtualization
Business Continuity Systems
City Wide Personal Computer
Hyperion Financial Management
Kronos System Upgrade
Cloud Data Service - Data Storage
Replacement: City Clerk Systems
$19,187,939 $12,036,834 $12,036,834
$455,000
$2,464,000
$480,000
$1,480,000
$380,000
$22,000
$98,000
$56,000
$1,560,000
$430,000
$105,000
$220,000
$660,000
$o $o $o $o $o $o ( $7,151,105)
$0 $0 $0 $0 $0 $0 $0 $0 ( $455,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $2,464,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $480,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $1,480,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $380,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $22,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $98,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $56,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $1,560,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $430,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $105,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $220,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $660,000)
TOTAL UNFUNDED $8,410,000
$o $o $o $o $o $o $o $o ( $8,410,000)
Total 46-IT-Information Technology $53,572,397
$38,011,292 $37,511,292 $500,000 $0 $0 $0 $0 $0 ( $15,561,105)
Active & Future
CIP Projects Only
Program: All Total Total Prior Current Future Funding Estimates Over/
56-BLD-Building Department Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 (Under)
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
FUNDED
B-30365J Beckham Hall Fire Damage Repair
$6,770 $6,770
$6,770 $0
$0 $0 $0 $0 $0 $0
TOTAL FUNDED $6,770 $6,770 $6,770 $0 $0 $0 $0 $0 $0 $0
Total 56-BLD-Building Department $6,770 $6,770 $6,770 $0 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
Program: All
58-P&R-Parks and Recreation
Total
Cost
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
Funded Years 2012-2013 2013-2014 2014-2015
2015-2016 2016-2017 2017-2018
Over/
(Under)
FUNDED
B-30134A Bryan Park Community Building -
B-30134A Bryan Park New
B-30305B Gibson Park New Construction
B-30374S Virginia Key Rowing Center
B-30538 Museum Park - Partially Funded by
B-30541C Kennedy Park Shoreline
B-30541D Citywide Park Equipments & Site
B-30547E Parks ADA Modifications - District
B-30547G Parks ADA Modifications - District
B-30671 Caribbean Marketplace Renovation
B-30671A Caribbean Marketplace Renovation
B-30690 West End Park New Community
B-30690S West End Park New Community
B-30721 Spoil Island E Restoration and
B-30772 Bay of Pigs Park Lighting - D4
B-30800 Fern Isle / PBA Park Improvements
B-30825 Biscayne Bay Spoil Island B Public
B-30825A Biscayne Bay Spoil Island E Picnic
B-30825B Biscayne Bay Spoil Island E Public
B-30882S African Square Park - Splash Park
B-30886S Lummus Landing Square - D5
B-30887S Little Haiti Soccer Field Bathroom
B-30962 Robert King High Fencing and
B-30963 Bay of Pigs Memorial Park
B-30981 Oakland Grove Park - upgrades -
B-30984 Athalie Range Park HVAC
B-30995 Virginia Key Bike and Kayak
B-30995S Virginia Key Bike Trail Building -
B-35806 Curtis Park New Pool Facility and
B-35806S Curtis Park New Pool Facility and
B-35812A Duarte Park Building Renovation,
B-35812A Duarte Park Building Renovation,
B-35812D Duarte Park Building Renovation,
B-35838 Kennedy Park Restroom Building
B-35838S Kennedy Park Restroom Building
B-35861B Maximo Gomez / Domino Park
B-35861B Maximo Gomez / Domino Park
B-35887 Moore Park New Construction
B-35887S Moore Park New Construction D5 -
$852,128 $852,128 $852,128 $0 $0 $0 $0 $0 $0 $0
$50,000 $50,000 $50,000 $0 $0 $0 $0 $0 $0 $0
$12,739,521 $12,739,521 $12,739,521 $0 $0 $0 $0 $0 $0 $0
$100,000 $100,000 $0 $100,000 $0 $0 $0 $0 $0 $0
$14,042,367 $14,042,367 $14,042,367 $0 $0 $0 $0 $0 $0 $0
$261,000 $261,000 $261,000 $0 $0 $0 $0 $0 $0 $0
$1,917,378 $1,917,378 $523,312 $1,394,066 $0 $0 $0 $0 $0 $0
$215,348 $215,348 $215,348 $0 $0 $0 $0 $0 $0 $0
$491,147 $491,147 $491,147 $0 $0 $0 $0 $0 $0 $0
$1,102,553 $1,102,553 $1,102,553 $0 $0 $0 $0 $0 $0 $0
$114,000 $114,000 $114,000 $0 $0 $0 $0 $0 $0 $0
$2,598,521 $2,598,521 $1,098,521 $1,500,000 $0 $0 $0 $0 $0 $0
$100,000 $100,000 $100,000 $0 $0 $0 $0 $0 $0 $0
$252,500 $252,500 $195,000 $57,500 $0 $0 $0 $0 $0 $0
$53,000 $53,000 $53,000 $0 $0 $0 $0 $0 $0 $0
$116,782 $116,782 $116,782 $0 $0 $0 $0 $0 $0 $0
$17,500 $17,500 $10,000 $7,500 $0 $0 $0 $0 $0 $0
$8,250 $8,250 $750 $7,500 $0 $0 $0 $0 $0 $0
$8,250 $8,250 $750 $7,500 $0 $0 $0 $0 $0 $0
$100,000 $100,000 $100,000 $0 $0 $0 $0 $0 $0 $0
$100,000 $100,000 $100,000 $0 $0 $0 $0 $0 $0 $0
$365,000 $365,000 $100,000 $265,000 $0 $0 $0 $0 $0 $0
$102,468 $102,468 $102,468 $0 $0 $0 $0 $0 $0 $0
$20,000 $20,000 $20,000 $0 $0 $0 $0 $0 $0 $0
$44,887 $44,887 $44,887 $0 $0 $0 $0 $0 $0 $0
$193,043 $193,043 $0 $193,043 $0 $0 $0 $0 $0 $0
$477,000 $477,000 $477,000 $0 $0 $0 $0 $0 $0 $0
$50,000 $50,000 $50,000 $0 $0 $0 $0 $0 $0 $0
$2,177,160 $2,177,160 $2,127,160 $50,000 $0 $0 $0 $0 $0 $0
$500,000 $500,000 $500,000 $0 $0 $0 $0 $0 $0 $0
$1,312,797 $1,312,797 $1,312,797 $0 $0 $0 $0 $0 $0 $0
$50,000 $50,000 $50,000 $0 $0 $0 $0 $0 $0 $0
$15,000 $15,000 $15,000 $0 $0 $0 $0 $0 $0 $0
$222,033 $222,033 $222,033 $0 $0 $0 $0 $0 $0 $0
$50,000 $50,000 $50,000 $0 $0 $0 $0 $0 $0 $0
$48,368 $48,368 $48,368 $0 $0 $0 $0 $0 $0 $0
$100,000 $100,000 $100,000 $0 $0 $0 $0 $0 $0 $0
$7,605,462 $7,605,462 $7,605,462 $0 $0 $0 $0 $0 $0 $0
$500,000 $500,000 $500,000 $0 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
Program: All
58-P&R-Parks and Recreation
Total
Cost
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
Funded Years 2012-2013 2013-2014 2014-2015
2015-2016 2016-2017 2017-2018
Over/
(Under)
FUNDED
B-39910E District 2 Quality of Life Park
B-40456
B-40457
B-40527
B-50722
B-75883
B-75973
Antonio Maceo Community
Kinloch Park Building Addition -
Melreese Golf Course Renovations
Little River Waterfront Park
Peacock Park Site Improvements
Oakland Grove Park Playground
$987,988
$1,686,750
$1,461,850
$200,000
$717,500
$725,124
$15,000
$987,988
$1,686,750
$1,461,850
$200,000
$717,500
$725,124
$15,000
$987,988
$65,722
$47,843
$0
$717,500
$625,124
$15,000
$0
$121,028
$114,007
$0
$0
$100,000
$0
$0
$0
$300,000
$200,000
$0
$0
$0
$0
$1,500,000
$1,000,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
TOTAL FUNDED
PARTIALLY FUNDED
B-30374 Virginia Key Rowing Center
B-30541 Citywide Park Equipment & Site
B-30643 Lummus Park Landing Project -
B-30777 Coral Gate Mini Park - D4
B-30801 Manatee Bend Park Shoreline
B-30802 Pallot Park Shoreline Improvements
B-30882 African Square Park - Splash Park -
B-30886 Lummus Landing Square - D5
B-35883A Hadley Park New Youth Center D5
B-35904 Neighborhood Parks Improv.
B-40455 Citywide Capital Improvements
$54,867,675 $54,867,675 $47,950,531 $3,917,144 $500,000 $2,500,000
$1,327,023
$5,293,595
$2,605,245
$200,634
$675,827
$1,438,000
$670,000
$1,007,000
$8,049,934
$1,272,223
$413,946
$616,513
$4,896,494
$1,368,535
$100,000
$88,527
$80,000
$600,000
$925,061
$5,876,805
$771,223
$263,946
$616,513 $0
$4,896,494 $0
$1,368,535 $0
$100,000 $0
$50,027 $38,500
$50,000 $30,000
$600,000 $0
$925,061 $0
$5,876,805 $0
$771,223 $0
$0 $263,946
$0 $0 $0 $0
$0 $0 $0 $0 $0 ( $710,510)
$0 $0 $0 $0 $0 ( $397,101)
$0 $0 $0 $0 $0 ( $1,236,710)
$0 $0 $0 $0 $0 ( $100,634)
$0 $0 $0 $0 $0 ( $587,300)
$0 $0 $0 $0 $0 ( $1,358,000)
$0 $0 $0 $0 $0 ( $70,000)
$0 $0 $0 $0 $0 ( $81,939)
$0 $0 $0 $0 $0 ( $2,173,129)
$0 $0 $0 $0 $0 ( $501,000)
$0 $0 $0 $0 $0 ( $150,000)
TOTAL PARTIALLY FUNDED
UNFUNDED
B-30905
B-40458
B-40459
B-40460
B-40461
B-40462
B-40463
B-40464
B-40465
B-40466
B-40467
B-40468
B-40469
B-40470
B-40471
B-40472
Seybold House Demolition and
Citywide Park Building AC
African Square Park Playground
African Square Park Restroom &
Allapattah Mini Park Access
Allapattah Mini Park Court
Armbrister Park Field
Bay of Pigs Park Playground
Baywood Park Seawall Repair
Baywood Park Site Development
Belafonte Tacolcy Park
Belafonte Tacolcy Park
Belafonte Tacolcy Park entire
Bell Meade Park Improvements
Biscayne Heights Park (Shorecrest
Biscayne Park Soccer Facility
$22,953,427 $15,587,104 $15,254,658 $332,446
$200,000
$600,000
$125,000
$750,000
$30,000
$25,000
$1,350,000
$100,000
$150,000
$125,000
$35,000
$40,000
$5,000,000
$50,000
$100,000
$2,250,000
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0 $0 ( $7,366,323)
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$200,000)
$600,000)
$125,000)
$750,000)
$30,000)
$25,000)
( $1,350,000)
( $100,000)
( $150,000)
( $125,000)
( $35,000)
( $40,000)
( $5,000,000)
( $50,000)
( $100,000)
( $2,250,000)
Active & Future
CIP Projects Only
Program: All
58-P&R-Parks and Recreation
Total
Cost
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
Funded Years 2012-2013 2013-2014 2014-2015
2015-2016 2016-2017 2017-2018
Over/
(Under)
UNFUNDED
B-40473 Bryan Park Tennis Court $45,000
B-40474 Kirk Munroe Tennis Park $30,000
B-40475 Coral Gate Park Access Control $20,000
B-40476 Coral Gate Park Baseball Field $30,000
B-40477 Crestwood Park Basketball Courts $25,000
B-40478 Curtis Park Access Control $225,000
B-40479 Curtis Park Access Control (Roll up $25,000
B-40480 Curtis Park Basketball and Tennis $125,000
B-40481 Curtis Park Parking Lot $125,000
B-40482 Curtis Park Playground $200,000
B-40483 Curtis Park Restrooms Renovation $200,000
B-40484 Curtis Park Stadium Restrooms $1,250,000
B-40485 Domino Park Building $50,000
B-40486 Domino Park Restroom Renovation $250,000
B-40487 Domino Park Shade Structure $30,000
B-40488 Dorsey Park Ballfield $45,000
cri
B-40489 Douglas Park Irrigation System $40,000
B-40490 Douglas Park Lighting $50,000
B-40491 Douglas Park Playground $130,000
B-40492 Duarte Park Basketball and Tennis $75,000
B-40493 Duarte Park Lighting $175,000
B-40494 Duarte Park Playground $120,000
B-40495 Eaton Park Daycare Improvements $100,000
B-40496 Eaton Park Improvements $1,500,000
B-40497 Fort Dallas Park (Lummus Park $750,000
B-40498 Gibson Park Stadium $850,000
B-40499 Grapeland Park Picnic Shelter $850,000
B-40500 Grove Mini Park Playground $65,000
B-40501 Hadley Park Ballfield $80,000
B-40502 Hadley Park Bleachers $600,000
B-40503 Hadley Park Football Field $1,750,000
B-40504 Hadley Park Parking Lot $100,000
B-40505 Hadley Park Pool Locker rooms $80,000
B-40506 Hadley Park Pool Improvement $280,000
B-40507 Citywide - Land Acquisition Park $15,000,000
B-40508 Legion Park Boat Ramp $450,000
B-40509 Legion Park HVAC (heating, $100,000
B-40510 Legion Park Improvements $250,000
B-40511 Legion Park Restrooms $100,000
$0 $0 $0 $0 $0 $0 $0 $0 ( $45,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $30,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $20,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $30,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $25,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $225,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $25,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $125,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $125,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $200,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $200,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $1,250,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $50,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $250,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $30,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $45,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $40,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $50,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $130,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $75,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $175,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $120,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $100,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $1,500,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $750,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $850,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $850,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $65,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $80,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $600,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $1,750,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $100,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $80,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $280,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $15,000,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $450,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $100,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $250,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $100,000)
Active & Future
CIP Projects Only
Program: All
58-P&R-Parks and Recreation
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Total Total Prior Current Future Funding Estimates Over/
Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 (Under)
UNFUNDED
B-40512 Lemon City Park Daycare Parking $100,000
B-40513 Lemon City Park Daycare $75,000
B-40514 Lemon City Park Improvements $40,000
B-40515 Lemon City park Walkways $30,000
B-40516 Little Haiti Soccer Park $170,000
B-40517 Little Haiti Soccer Park Stadium $100,000
B-40518 Little Haiti Soccer Park Stadium $160,000
B-40519 Little Haiti Freedom Garden Park $50,000
B-40520 Little River Commerce Park $500,000
B-40521 Little River Pocket Park $50,000
B-40522 Lummus Park Playground $125,000
B-40523 Manatee Bend Park $100,000
B-40524 Marti Pool Park Locker -rooms $100,000
B-40525 Marti Pool Park Pool Improvements $110,000
B-40526 Marti Pool Park Pump $100,000
B-40528 Melrose Park Playground $125,000
B-40529 Merrie Christmas Park $600,000
B-40530 Virginia Key Rowing Center Park $350,000
B-40531 Moore Park Tennis Court $380,000
B-40532 Morningside Park Floating Dock $50,000
B-40533 Morningside Park Boat Ramp $380,000
B-40534 Morningside Park Tennis Center $650,000
B-40535 Morningside Park Court $500,000
B-40536 Morningside Park Walkways and $250,000
B-40537 Morningside Pool Park Pool $1,000,000
B-40538 North Bay Vista Park Playground $75,000
B-40539 Oakland Grove Mini Park $50,000
B-40540 Virginia Key Beach Park Access $35,000
B-40541 Operation Yard Park Trailers $225,000
B-40542 Pallot Park Seawall $300,000
B-40543 PBA / Fern Isle Redevelopment $4,500,000
B-40544 Peacock Park Building Renovation $150,000
B-40545 Peacock Park Playground $150,000
B-40546 Pine Heights Park Playground $75,000
B-40547 Citywide Parks Playground $1,500,000
B-40548 Pullman Mini Park Playground $75,000
B-40549 Rainbow Village Park Playground $75,000
B-40550 Athalie Range Park Playground $120,000
B-40551 Athalie Range Park Restroom $80,000
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0 $0 $0 ( $100,000)
$0 $0 $0 $0 $0 ( $75,000)
$0 $0 $0 $0 $0 ( $40,000)
$0 $0 $0 $0 $0 ( $30,000)
$0 $0 $0 $0 $0 ( $170,000)
$0 $0 $0 $0 $0 ( $100,000)
$0 $0 $0 $0 $0 ( $160,000)
$0 $0 $0 $0 $0 ( $50,000)
$0 $0 $0 $0 $0 ( $500,000)
$0 $0 $0 $0 $0 ( $50,000)
$0 $0 $0 $0 $0 ( $125,000)
$0 $0 $0 $0 $0 ( $100,000)
$0 $0 $0 $0 $0 ( $100,000)
$0 $0 $0 $0 $0 ( $110,000)
$0 $0 $0 $0 $0 ( $100,000)
$0 $0 $0 $0 $0 ( $125,000)
$0 $0 $0 $0 $0 ( $600,000)
$0 $0 $0 $0 $0 ( $350,000)
$0 $0 $0 $0 $0 ( $380,000)
$0 $0 $0 $0 $0 ( $50,000)
$0 $0 $0 $0 $0 ( $380,000)
$0 $0 $0 $0 $0 ( $650,000)
$0 $0 $0 $0 $0 ( $500,000)
$0 $0 $0 $0 $0 ( $250,000)
$0 $0 $0 $0 $0 ( $1,000,000)
$0 $0 $0 $0 $0 ( $75,000)
$0 $0 $0 $0 $0 ( $50,000)
$0 $0 $0 $0 $0 ( $35,000)
$0 $0 $0 $0 $0 ( $225,000)
$0 $0 $0 $0 $0 ( $300,000)
$0 $0 $0 $0 $0 ( $4,500,000)
$0 $0 $0 $0 $0 ( $150,000)
$0 $0 $0 $0 $0 ( $150,000)
$0 $0 $0 $0 $0 ( $75,000)
$0 $0 $0 $0 $0 ( $1,500,000)
$0 $0 $0 $0 $0 ( $75,000)
$0 $0 $0 $0 $0 ( $75,000)
$0 $0 $0 $0 $0 ( $120,000)
$0 $0 $0 $0 $0 ( $80,000)
Active & Future
CIP Projects Only
Program: All Total Total Prior Current Future Funding Estimates Over/
58-P&R-Parks and Recreation Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 (Under)
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
UNFUNDED
B-40552 Athalie Range Park Pool Heater $75,000
B-40553 Reeves Park Basketball Court $35,000
B-40554 Reeves Park Playground $100,000
B-40555 Reeves Park Sidewalks & $75,000
B-40556 Reeves Park Volleyball Court $25,000
B-40557 Riverside Park Restroom $75,000
B-40558 Citywide Park Buildings Roof $350,000
B-40559 Sewell Park kayak Launch $225,000
B-40560 Sewell Park Parking Lot $60,000
B-40561 Sewell Park Playground $75,000
B-40562 Shedavia Jenkins Parks Lighting $125,000
B-40563 Shenandoah Park Pool Renovation $2,200,000
B-40564 Simpson Park Building Roof $65,000
B-40565 Southside Park Field $450,000
B-40566 Spring Garden Point Park Historic $1,250,000
B-40567 Spring Garden Point Park $150,000
B-40568 Citywide Park Buildings Termite $200,000
B-40569 Town Park Playground $100,000
B-40570 Virginia Key Beach Park Restrooms $750,000
B-40571 Virrick Park New Pool $3,000,000
B-40572 Alice Wainwright Park Restrooms $350,000
B-40573 Grapeland Water Park Renovations $750,000
B-40574 West Buena Vista Park Building $50,000
B-40575 West Buena Vista Park Courts $50,000
B-40576 West Buena Vista Park Playground $120,000
B-40577 Williams Park Playground $175,000
B-40578 Williams Park Pool Improvement $175,000
B-40579 Williams Park Sport Field Lights $350,000
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0 $0 $0 ( $75,000)
$0 $0 $0 $0 $0 ( $35,000)
$0 $0 $0 $0 $0 ( $100,000)
$0 $0 $0 $0 $0 ( $75,000)
$0 $0 $0 $0 $0 ( $25,000)
$0 $0 $0 $0 $0 ( $75,000)
$0 $0 $0 $0 $0 ( $350,000)
$0 $0 $0 $0 $0 ( $225,000)
$0 $0 $0 $0 $0 ( $60,000)
$0 $0 $0 $0 $0 ( $75,000)
$0 $0 $0 $0 $0 ( $125,000)
$0 $0 $0 $0 $0 ( $2,200,000)
$0 $0 $0 $0 $0 ( $65,000)
$0 $0 $0 $0 $0 ( $450,000)
$0 $0 $0 $0 $0 ( $1,250,000)
$0 $0 $0 $0 $0 ( $150,000)
$0 $0 $0 $0 $0 ( $200,000)
$0 $0 $0 $0 $0 ( $100,000)
$0 $0 $0 $0 $0 ( $750,000)
$0 $0 $0 $0 $0 ( $3,000,000)
$0 $0 $0 $0 $0 ( $350,000)
$0 $0 $0 $0 $0 ( $750,000)
$0 $0 $0 $0 $0 ( $50,000)
$0 $0 $0 $0 $0 ( $50,000)
$0 $0 $0 $0 $0 ( $120,000)
$0 $0 $0 $0 $0 ( $175,000)
$0 $0 $0 $0 $0 ( $175,000)
$0 $0 $0 $0 $0 ( $350,000)
TOTAL UNFUNDED $62,010,000
$o $o $0 $0 $0 $0 $0 $0 ( $62,010,000)
Total 58-P&R-Parks and Recreation $139,831,102 $70,454,779 $63,205,189 $4,249,590 $500,000 $2,500,000 $0 $0 $0 ( $69,376,323)
Active & Future
CIP Projects Only
Program: All
87-COM-Communications
Total
Cost
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current
THIS DOCUMENT IS ASUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
Funded Years 2012-2013 2013-2014 2014-2015
2015-2016 2016-2017 2017-2018
Over/
(Under)
UNFUNDED
B-40960 City Hall Studio Area - A/C Unit
B-40961 Office of Communications - Fleet
B-40962 Office of Communications -
B-40963 Office of Communications -
B-40964 Office of Communications - Large
B-40965 Office of Communications - Studio
$51,632
$144,000
$40,000
$30,000
$90,000
$18,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$51,632)
$144,000)
$40,000)
$30,000)
$90,000)
$18,000)
TOTAL UNFUNDED
$373,632 $0 $0 $0 $0 $0 $0 $0 $0 ( $373,632)
Total 87-COM-Communications
$373,632 $0 $0 $0 $0 $0 $0 $0 $0 ( $373,632)
Active & Future
CIP Projects Only
Program: All
99-CIP-Capital Improvement
Total
Cost
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
Funded Years 2012-2013 2013-2014 2014-2015
2015-2016 2016-2017 2017-2018
Over/
(Under)
FUNDED
B-30008A Grove Park Road Improvements -
B-30011 Englewood Road and Storm Sewer
B-30130 Miami River Greenway SW 1st
B-30167D Shenandoah Roadway
B-30168A Silver Bluff Traffic Calming
B-30178 Design District/FEC
B-30183 Garden Storm Sewer - Phase I
B-30305B Gibson Park New Construction -
B-30336 Miami River Greenway (5th Street
B-30425 D5 - Stormwater Projects
B-30500 Civic Center NW 14th Street
B-30500T Civic Center NW 14th Street - Tree
B-30504 Linear Parks, Greenways and
B-30531 Dorsey Memorial Library
B-30538D Museum Park - DRI Fees
B-30538E Museum Park - DRI Air Quality
B-30538F Museum Park - DRI Transportation
B-305385 Museum Park - Sanitary Sewer
B-30538T Museum Park - FEMA Tree
B-30540 Little River Industrial Park
B-30588 San Marco Island and Biscayne
B-30606 DWNTWN Beautification Project
B-30606D DWNTWN Beautification - Design
B-30606L DWNTWN Beautification
B-30606N DWNTWN Beautification - North
B-306065 DWNTWN Beautification - South
B-30610 NW 7th Court
B-30611T D1 FEMA Tree Funded Projects
B-30613 District 3 - Miscellaneous Roadway
B-30613T D3 FEMA Tree Funded Projects
B-30614 District 4 - Miscellaneous Roadway
B-30614T D4 - FEMA Tree Funded Projects
B-30615 District 5 - Miscellaneous Roadway
B-30615T D5 FEMA Tree Funded Component
B-30621 Center Grove Street and Lighting
B-30624T Overtown Greenway @ NW 11
B-30628 Bird Avenue Road Improvement
B-30630T Palm Grove Road Improvements -
B-30631 Miami River Greenway from
$628,321 $628,321 $628,321 $0 $0 $0 $0 $0 $0 $0
$8,785,811 $8,785,811 $3,216,811 $0 $1,800,000 $1,300,000 $2,469,000 $0 $0 $0
$1,557,530 $1,557,530 $1,557,530 $0 $0 $0 $0 $0 $0 $0
$1,550,000 $1,550,000 $1,550,000 $0 $0 $0 $0 $0 $0 $0
$703,544 $703,544 $703,544 $0 $0 $0 $0 $0 $0 $0
$100,000 $100,000 $100,000 $0 $0 $0 $0 $0 $0 $0
$1,149,920 $1,149,920 $1,149,920 $0 $0 $0 $0 $0 $0 $0
$117,000 $117,000 $0 $117,000 $0 $0 $0 $0 $0 $0
$2,256,640 $2,256,640 $2,256,640 $0 $0 $0 $0 $0 $0 $0
$1,078,000 $1,078,000 $0 $0 $0 $238,000 $280,000 $280,000 $280,000 $0
$2,600,000 $2,600,000 $2,600,000 $0 $0 $0 $0 $0 $0 $0
$100,000 $100,000 $0 $100,000 $0 $0 $0 $0 $0 $0
$961,000 $961,000 $0 $0 $0 $961,000 $0 $0 $0 $0
$250,000 $250,000 $250,000 $0 $0 $0 $0 $0 $0 $0
$600,000 $600,000 $600,000 $0 $0 $0 $0 $0 $0 $0
$313,129 $313,129 $313,129 $0 $0 $0 $0 $0 $0 $0
$2,296,404 $2,296,404 $2,296,404 $0 $0 $0 $0 $0 $0 $0
$1,000,000 $1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0 $0
$215,943 $215,943 $0 $215,943 $0 $0 $0 $0 $0 $0
$2,000,000 $2,000,000 $2,000,000 $0 $0 $0 $0 $0 $0 $0
$4,488,981 $4,488,981 $4,488,981 $0 $0 $0 $0 $0 $0 $0
$3,150,565 $3,150,565 $3,150,565 $0 $0 $0 $0 $0 $0 $0
$498,780 $498,780 $498,780 $0 $0 $0 $0 $0 $0 $0
$4,475,915 $4,475,915 $4,475,915 $0 $0 $0 $0 $0 $0 $0
$7,817,431 $7,817,431 $7,817,431 $0 $0 $0 $0 $0 $0 $0
$5,090,853 $5,090,853 $5,090,853 $0 $0 $0 $0 $0 $0 $0
$360,000 $360,000 $360,000 $0 $0 $0 $0 $0 $0 $0
$169,930 $169,930 $0 $169,930 $0 $0 $0 $0 $0 $0
$3,273,688 $3,273,688 $2,059,688 $514,000 $700,000 $0 $0 $0 $0 $0
$255,930 $255,930 $0 $255,930 $0 $0 $0 $0 $0 $0
$494,387 $494,387 $133,566 $314,000 $46,821 $0 $0 $0 $0 $0
$315,930 $315,930 $0 $315,930 $0 $0 $0 $0 $0 $0
$1,863,195 $1,863,195 $1,349,195 $514,000 $0 $0 $0 $0 $0 $0
$119,930 $119,930 $0 $119,930 $0 $0 $0 $0 $0 $0
$1,991,568 $1,991,568 $1,588,185 $403,383 $0 $0 $0 $0 $0 $0
$100,000 $100,000 $0 $100,000 $0 $0 $0 $0 $0 $0
$1,960,505 $1,960,505 $1,960,505 $0 $0 $0 $0 $0 $0 $0
$70,000 $70,000 $0 $70,000 $0 $0 $0 $0 $0 $0
$1,221,625 $1,221,625 $1,221,625 $0 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
Program: All
99-CIP-Capital Improvement
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Total Total Prior Current Future Funding Estimates Over/
Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 (Under)
FUNDED
B-30637 Mary Brickell Village Drainage
B-30651 Miami River Greenway from NW
B-30662D US-1 Median Closures at
B-30677 D3 - Sidewalk ADA Retrofits
B-30680 Rockerman Canal Improvements
B-30687T Coconut Grove Business
B-30695 SW 19th Terr. Imp. -Partial CDBG
B-30699 Beacom Project Area Improvements
B-30699T Beacom Project Area Improvements
B-30700
B-30716
B-30718
B-30722
B-30724
Citywide - FDEP Drainage Wells
Tigertail Resurfacing - D2
I-95 South Miami Terminal Street
NW 31st Street Roadway
NW 33rd Street Roadway
B-30724T NW 33rd Street Roadway
B-30727 NW 18th Avenue Roadway
B-30727T NW 18th Avenue Roadway
B-30729 NW 17th Terrace Roadway
B-30730 NW 4th Terrace Roadway
B-30732 NW 9th Street Roadway
B-30749 Citrus Grove Roadway
B-30760 SW 17th Avenue Roadway &
B-30770 SW 22nd Avenue Medians - US 1
B-30771 Traffic Calming SW 6th Street
B-30773 Martin Luther King (MLK) Blvd /
B-30774 West Flagler Area Improvements -
B-30776 Silver Bluff Drainage
B-30779 SW 2nd Street and SW 40th
B-30780 NW 14 Avenue and 28 Street Area
B-30780T NW 14 Ave & 28 St. Are Roadway
B-30781 NW 11 Street from 27 to 37
B-30782 Allapattah Area Roadway
B-30784 Health District Riverwalk
B-30785 NW 36 Avenue 15 to 16 Street
B-30786 NW 43 Avenue between 9 to 11
B-30822 Brickell Area Shared Use Path and
B-30822T Brickell Area Shared Use Path and
B-30823 Fair Isle Area Roadway and
B-30824 Spoil Island B & C Swim Area
$3,723,442
$3,160,379
$440,576
$700,000
$896,815
$100,000
$537,191
$1,053,114
$60,000
$2,240,934
$711,258
$859,000
$311,000
$3,700,000
$60,000
$1,810,000
$60,000
$250,000
$75,000
$756,248
$556,791
$600,000
$58,622
$324,670
$100,000
$1,358,173
$1,652,160
$250,000
$866,602
$26,000
$939,493
$500,000
$961,000
$50,000
$78,224
$844,267
$85,930
$180,000
$67,000
$3,723,442
$3,160,379
$440,576
$700,000
$896,815
$100,000
$537,191
$1,053,114
$60,000
$2,240,934
$711,258
$859,000
$311,000
$3,700,000
$60,000
$1,810,000
$60,000
$250,000
$75,000
$756,248
$556,791
$600,000
$58,622
$324,670
$100,000
$1,358,173
$1,652,160
$250,000
$866,602
$26,000
$939,493
$500,000
$961,000
$50,000
$78,224
$844,267
$85,930
$180,000
$67,000
$3,100,000
$3,160,379
$440,576
$700,000
$872,815
$0
$537,191
$1,053,114
$0
$1,004,934
$711,258
$859,000
$311,000
$3,700,000
$0
$1,810,000
$0
$250,000
$75,000
$756,248
$556,791
$600,000
$58,622
$324,670
$100,000
$1,358,173
$1,652,160
$50,000
$866,602
$0
$939,493
$500,000
$0
$50,000
$78,224
$844,267
$0
$180,000
$67,000
$0
$0
$0
$0
$24,000
$100,000
$0
$0
$60,000
$0
$0
$0
$0
$0
$60,000
$0
$60,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$200,000
$0
$26,000
$0
$0
$0
$0
$0
$0
$85,930
$0
$0
$623,442
$0
$0
$0
$0
$0
$0
$0
$0
$400,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$209,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$200,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$209,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$761,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$209,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$209,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Active & Future
CIP Projects Only
Program: All
99-CIP-Capital Improvement
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Total Total Prior Current Future Funding Estimates Over/
Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 (Under)
FUNDED
B-30827
B-30830
B-30835
B-30836
B-30837
B-30880
South Grove Phase 1 Roadway and
US 1 Landscaping between 17 Ave
South Grove Phase 2 Roadway and
South Grove Phase 3 Roadway and
South Miami Avenue - SE 6th and
NE 2nd Court Roadway and
B-30882T African Square Park - Splash Park
B-30883 NW 12 Avenue / NW 12 Place
B-30883T NW 12 Avenue/NW 12 Place
B-30884 NW 62 Street West of I-95
B-30888 Wynwood Area Roadway
B-30891 Buena Vista One -Way Street
B-30892 Little Haiti Gateway Signs - D5
B-30894 Little Haiti Right of Way
B-30940 Downtown Miami Bicycle and
B-30941 Downtown Miami Signage and
B-30960 La Pastorita Traffic Calming and
B-30961 East Flagami Roadway
B-30964 Modification of Speed Humps on
B-30968 SW 12th St (SW 30th Ave and SW
B-30969 SW 30th Court (SW 12th Street and
B-30971 SW 5th Street between 42 Ave and
B-30972 SW 64 Court Roadway & Drainage
B-30975 Swale Restoration @ NW 2 Street
B-30976 SW 2 St from 53 Ave to 54 Ave -
B-30978 Drainage improvements @ SW 4 St
B-30980 Liberty Square T-Turnarounds - D5
B-30982 Little River Area Road and
B-30983 NW 44th Street between NW 7th
B-30990 Roadway Improvements
B-30993 SW/NW 17th Avenue Traffic
B-31206A SE 3rd St Widening (flka Dupont
B-31206B SE 3rd Street Widening - DRI
B-35002 Virginia Key Landfill Assessment
B-35883A Hadley Park New Youth Center D5
B-39910 Quality of Life District 2 - Various
B-39910C North Venetian Drive Lighting
B-39910K Bayside Historic Sign - D2
B-39911 Venetian Causeway Improvements
$286,830
$55,000
$492,000
$1,231,787
$771,545
$400,000
$50,000
$1,199,976
$46,000
$175,000
$500,000
$250,000
$100,000
$500,000
$287,500
$1,150,000
$675,000
$422,264
$25,000
$36,102
$43,214
$7,857
$132,522
$28,809
$54,000
$51,065
$250,000
$180,900
$185,000
$361,000
$200,000
$1,500,000
$100,000
$1,400,000
$200,000
$60,132
$100,000
$33,000
$3,196,465
$286,830
$55,000
$492,000
$1,231,787
$771,545
$400,000
$50,000
$1,199,976
$46,000
$175,000
$500,000
$250,000
$100,000
$500,000
$287,500
$1,150,000
$675,000
$422,264
$25,000
$36,102
$43,214
$7,857
$132,522
$28,809
$54,000
$51,065
$250,000
$180,900
$185,000
$361,000
$200,000
$1,500,000
$100,000
$1,400,000
$200,000
$60,132
$100,000
$33,000
$3,196,465
$0
$55,000
$0
$0
$0
$400,000
$0
$1,199,976
$0
$175,000
$500,000
$250,000
$100,000
$500,000
$0
$0
$675,000
$422,264
$25,000
$0
$0
$0
$0
$0
$0
$0
$250,000
$180,900
$185,000
$361,000
$200,000
$1,500,000
$100,000
$1,400,000
$200,000
$60,132
$100,000
$33,000
$3,196,465
$110,617
$0
$0
$0
$0
$0
$50,000
$0
$46,000
$0
$0
$0
$0
$0
$287,500
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$176,213
$0
$492,000
$31,787
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$36,102
$43,214
$7,857
$132,522
$28,809
$54,000
$51,065
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$600,000
$771,545
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,150,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$600,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Active & Future
CIP Projects Only
Program: All
99-CIP-Capital Improvement
Total
Cost
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
Funded Years 2012-2013 2013-2014 2014-2015
Over/
2015-2016 2016-2017 2017-2018 (Under)
FUNDED
B-40300
B-40301
B-40302
B-40303
B-40307
B-40308
B-40310
B-40312
B-40313
B-40315
B-40317
B-40318
B-40319
B-40320
B-40321
B-40322
B-40323
B-40324
B-40325
B-40326
B-40327
SW 18th Terr. Road Improvements
SW 15th Street Road Improvements
SW 1st Avenue Road
SW 23rd Road Improvements - D3
SW 16th Street Road Improvements
SW 17th Terrace Road
SW 20th Road Improvements - D3
SW 22nd Terr. & SW 13th Ave
SW 3rd Ave Road Improvements -
S W 15th Street Road Improvements
SW 28th Road Improvements - D3
SW 1st Ave Road Improvements -
SW 25th Road Improvements - D3
SW 26th Road Improvements
SW 2nd Ave Road Improvements -
SW 27th Road Improvements - D3
SW 1st Ave Road Improvements
NW 1 lth Ave Road Improvements -
Beacom Phase II - D3
The Roads Roadway Improvements
Shenandoah Roadway
$116,121
$84,969
$230,928
$244,748
$257,693
$225,567
$116,682
$376,211
$293,740
$245,349
$40,149
$167,562
$118,561
$498,804
$721,333
$498,804
$126,638
$160,203
$1,500,000
$500,000
$1,000,000
B-40643A North Spring Garden Greenway $2,762,175
B-40672D Flagami Traffic Calming Phase IV - $1,198,012
B-40672G Flagami Traffic Calming - D4 $590,000
B-40686 Miami River Greenways/ $3,113,501
B-40695L Miami River Greenway Segment G $145,785
B-40704A SW 32 Avenue Improvements $1,752,327
B-40704A SW 32 Avenue Improvements D2 $60,000
B-50672 Belle Meade Storm Sewer Project, $12,301,058
B-50706A Roadway, Drainage and Traffic $1,218,245
B-71210 Downtown Street Conversions $50,000
B-73102A Citywide Streets Milling & $9,201,765
B-73102B Citywide Streets Milling and $6,207,946
B-78500B Buena Vista East Roadway, $2,368,482
B-78502A Museum of Science - Development $2,000,000
$116,121
$84,969
$230,928
$244,748
$257,693
$225,567
$116,682
$376,211
$293,740
$245,349
$40,149
$167,562
$118,561
$498,804
$721,333
$498,804
$126,638
$160,203
$1,500,000
$500,000
$1,000,000
$2,762,175
$1,198,012
$590,000
$3,113,501
$145,785
$1,752,327
$60,000
$12,301,058
$1,218,245
$50,000
$9,201,765
$6,207,946
$2,368,482
$2,000,000
$116,121
$84,969
$230,928
$244,748
$257,693
$225,567
$116,682
$376,211
$293,740
$245,349
$40,149
$167,562
$118,561
$498,804
$721,333
$498,804
$126,638
$160,203
$1,500,000
$500,000
$1,000,000
$2,762,175
$1,198,012
$590,000
$3,113,501
$145,785
$1,752,327
$0
$12,301,058
$1,218,245
$50,000
$1,023,775
$0
$2,368,482
$2,000,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$60,000
$0
$0
$0
$1,948,553
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$607,946
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,324,955
$1,400,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,476,328
$1,400,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,633,000
$1,400,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,795,154
$1,400,000
$0
$0
TOTAL FUNDED $164,217,670
PARTIALLY FUNDED
$164,217,670 $130,101,264 $6,328,646 $5,231,778 $8,154,500 $7,195,328 $3,522,000 $3,684,154
$0
B-30008 Grove Park Road and Storm Sewers $12,819,059
$6,369,000 $800,000 $0 $0 $1,800,000 $1,300,000 $2,469,000
$0 ( $6,450,059)
Active & Future
CIP Projects Only
Program: All
99-CIP-Capital Improvement
Total
Cost
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
Funded Years 2012-2013 2013-2014 2014-2015
2015-2016 2016-2017 2017-2018
Over/
(Under)
PARTIALLY FUNDED
B-30179
B-30411
B-30412
B-30413
B-30414
B-30421
B-30422
B-30423
B-30424
B-30431
B-30432
B-30433
B-30434
B-30435
B-30518
B-30611
B-30624
B-30630
Downtown Baywalk Master Plan &
FY2014 - D1 Roadway, drainage
FY2014 - D2 Roadway, drainage
FY2014 - D3 Roadway, drainage
FY2014 - D4 Roadway, drainage
D1 - Stromwater Projects
D2 - Stormwater Projects
D3 - Stormwater Projects
D4 - Stormwater Projects
D1 - Reconstruction of Roadway
D2 - Reconstruction of Roadway
D3 - Reconstruction of Roadway
D4 - Reconstruction of Roadway
D5 - Reconstruction of Roadway
Northwest 14th Street Streetscape
District 1 - Miscellaneous Roadway
Overtown Greenway @ NW 11
Palm Grove Road Improvements
B-30637A South Miami Avenue Drainage
B-30646 South Bayshore Drive Roadway
B-30687 Coconut Grove Business
B-30723 NW 24th Avenue Roadway
B-30775 Shenandoah Area Improvements -
B-30778 Traffic Circle - SW 18th Ave. &
B-30803 SW 18th Avenue from SW 23rd
B-30833 SW 1st Ave between SW 15th and
B-30900 NW 40 St from NW 10 Ave to NW
B-30902 Phase I: Little River (N); NE 82 St
B-30904 NW 70 Street Area Roadway &
B-30965 Coral Gate Speed Humps - D4
B-30967 SW 16th Terrace from SW 21 Ave
B-30979 SW 21st St. & 24th Ave Roadway
B-30985 Design District Roadway and
B-31206 SE 3rd Street Widening
B-40306 SW loth Street Road Improvements
B-40314 NW 18th Place Road Improvements
B-50643 Wagner Creek / Seybold Canal
B-73102C Citywide Street Milling and
B-78508 NE 2 Avenue Improvements
$11,248,770 $450,000 $450,000 $0 $0 $0 $0 $0 $0 ( $10,798,770)
$100,000 $90,000 $0 $0 $90,000 $0 $0 $0 $0 ( $10,000)
$100,000 $90,000 $0 $0 $90,000 $0 $0 $0 $0 ( $10,000)
$100,000 $90,000 $0 $0 $90,000 $0 $0 $0 $0 ( $10,000)
$100,000 $82,143 $0 $0 $82,143 $0 $0 $0 $0 ( $17,857)
$1,198,000 $1,078,000 $0 $0 $0 $238,000 $280,000 $280,000 $280,000 ( $120,000)
$1,198,000 $1,078,000 $0 $0 $0 $238,000 $280,000 $280,000 $280,000 ( $120,000)
$1,198,000 $1,078,000 $0 $0 $0 $238,000 $280,000 $280,000 $280,000 ( $120,000)
$1,198,000 $1,078,000 $0 $0 $0 $238,000 $280,000 $280,000 $280,000 ( $120,000)
$4,114,165 $2,400,000 $0 $0 $0 $600,000 $600,000 $600,000 $600,000 ( $1,714,165)
$2,500,000 $1,200,000 $0 $0 $0 $0 $0 $600,000 $600,000 ( $1,300,000)
$2,500,000 $2,400,000 $0 $0 $0 $600,000 $600,000 $600,000 $600,000 ( $100,000)
$2,500,000 $2,400,000 $0 $0 $0 $600,000 $600,000 $600,000 $600,000 ( $100,000)
$2,500,000 $2,400,000 $0 $0 $0 $600,000 $600,000 $600,000 $600,000 ( $100,000)
$2,617,649 $439,000 $439,000 $0 $0 $0 $0 $0 $0 ( $2,178,649)
$825,419 $728,234 $214,234 $514,000 $0 $0 $0 $0 $0 ( $97,185)
$2,661,864 $1,541,784 $1,541,784 $0 $0 $0 $0 $0 $0 ( $1,120,080)
$4,174,623 $3,838,157 $3,838,157 $0 $0 $0 $0 $0 $0 ( $336,466)
$806,500 $204,444 $204,444 $0 $0 $0 $0 $0 $0 ( $602,056)
$8,748,530 $8,704,395 $550,000 $0 $2,300,000 $1,000,000 $2,000,000 $1,000,000 $1,854,395 ( $44,135)
$3,503,015 $3,099,638 $3,099,638 $0 $0 $0 $0 $0 $0 ( $403,377)
$1,140,000 $700,000 $0 $0 $700,000 $0 $0 $0 $0 ( $440,000)
$468,650 $366,281 $366,281 $0 $0 $0 $0 $0 $0 ( $102,369)
$122,557 $112,557 $112,557 $0 $0 $0 $0 $0 $0 ( $10,000)
$137,000 $97,000 $0 $0 $97,000 $0 $0 $0 $0 ( $40,000)
$775,600 $368,212 $0 $0 $368,212 $0 $0 $0 $0 ( $407,388)
$129,641 $98,981 $0 $0 $98,981 $0 $0 $0 $0 ( $30,660)
$625,287 $90,509 $0 $0 $90,509 $0 $0 $0 $0 ( $534,778)
$2,052,550 $100,510 $0 $0 $100,510 $0 $0 $0 $0 ( $1,952,040)
$163,845 $53,000 $53,000 $0 $0 $0 $0 $0 $0 ( $110,845)
$206,386 $150,467 $0 $0 $150,467 $0 $0 $0 $0 ( $55,919)
$140,000 $60,000 $0 $0 $60,000 $0 $0 $0 $0 ( $80,000)
$1,500,000 $500,000 $0 $0 $500,000 $0 $0 $0 $0 ( $1,000,000)
$2,044,987 $641,495 $641,495 $0 $0 $0 $0 $0 $0 ( $1,403,492)
$347,385 $307,385 $307,385 $0 $0 $0 $0 $0 $0 ( $40,000)
$474,611 $224,611 $224,611 $0 $0 $0 $0 $0 $0 ( $250,000)
$23,353,488 $5,373,502 $4,673,502 $700,000 $0 $0 $0 $0 $0 ( $17,979,986)
$1,625,000 $401,400 $0 $0 $401,400 $0 $0 $0 $0 ( $1,223,600)
$20,166,608 $4,985,832 $4,985,832 $0 $0 $0 $0 $0 $0 ( $15,180,776)
Active & Future
CIP Projects Only
Program: All
99-CIP-Capital Improvement
Total
Cost
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Future Funding Estimates
Funded Years 2012-2013 2013-2014 2014-2015
2015-2016 2016-2017 2017-2018
Over/
(Under)
TOTAL PARTIALLY FUNDED $122,185,189
UNFUNDED
B-30007 Auburn Storm Sewer Phase III
B-30009 Lawnview Storm Sewer
B-30012 Auburn Storm Sewer Ph. I & II
B-30013 Reid Acres Storm Sewers
B-30015 Little River Storm Sewers Ph. II
B-30016 Liberty Storm Sewers
B-30017 Fairway Storm Sewers
B-30018 NW 71 St. Main Trunk Storm
B-30216 Avalon Storm Sewer - Phase III
B-30415 FY2014 - D5 Roadway, drainage
B-30520 Hainsworth Village Street
B-30736 Phase II: NW 33rd Street Roadway
B-30751 SW 23 Street btw 16 and 17 Ave
B-30787 NW 32 Ct & NW 32 Place Milling
B-30788 NW 16 Ave and 14 Ter and NW 16
B-30789 NW 20th Street from 7th Avenue to
B-30896 Phase I: NW 29th Street (NW 7
B-30896A Phase II: NW 29 St (NW 7 Ave to
B-30897 NW 41 St from NW 7 Ave to NW
B-30898 NW 43 St from NW 10 Ave to NW
B-30899 NW 10 Ave from NW 40 St & NW
B-30901 Pahse I: NE 78 St (N); NE 75 St
B-30901A Phase II: NE 78 St (N); NE 75 St
B-30901B Phase III: NE 78 St (N); NE 75 St
B-30902A Phase II: Little River (N); NE 82 St
B-30902B Phase III: Little River (N); NE 82
B-30903
B-30966
B-30970
B-30973
B-30974
B-30977
B-31212
B-31213
B-31214
B-31215
B-31217
Phase I: NE 82 St (N); NE 79 St
SW 5 St between 27 ave and 28 ave
SW 20 Street (SW 31 Ave to SW
Traffic Circle - SW 12 St and 31
Coral Gate Speed Humps - Phase II
Traffic Circle on SW 23 Ave and
NE 1st Avenue Reconstruction - NE
N. Miami Court Reconstruction -
NE 1 Court Reconstruction - D5
NE Miami Place Reconstruction -
NE 43 Street Reconstruction - D5
$55,470,537 $22,501,920 $1,214,000 $5,219,222 $6,152,000 $6,820,000 $7,589,000 $5,974,395 ( $66,714,652)
$7,049,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $7,049,000)
$5,719,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $5,719,000)
$5,320,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $5,320,000)
$5,719,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $5,719,000)
$3,990,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $3,990,000)
$5,586,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $5,586,000)
$5,586,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $5,586,000)
$9,975,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $9,975,000)
$4,500,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $4,500,000)
$196,625 $0 $0 $0 $0 $0 $0 $0 $0 ( $196,625)
$1,062,500 $0 $0 $0 $0 $0 $0 $0 $0 ( $1,062,500)
$2,375,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $2,375,000)
$43,101 $0 $0 $0 $0 $0 $0 $0 $0 ( $43,101)
$303,375 $0 $0 $0 $0 $0 $0 $0 $0 ( $303,375)
$57,618 $0 $0 $0 $0 $0 $0 $0 $0 ( $57,618)
$500,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $500,000)
$597,219 $0 $0 $0 $0 $0 $0 $0 $0 ( $597,219)
$597,219 $0 $0 $0 $0 $0 $0 $0 $0 ( $597,219)
$475,349 $0 $0 $0 $0 $0 $0 $0 $0 ( $475,349)
$115,236 $0 $0 $0 $0 $0 $0 $0 $0 ( $115,236)
$280,888 $0 $0 $0 $0 $0 $0 $0 $0 ( $280,888)
$526,967 $0 $0 $0 $0 $0 $0 $0 $0 ( $526,967)
$532,967 $0 $0 $0 $0 $0 $0 $0 $0 ( $532,967)
$532,967 $0 $0 $0 $0 $0 $0 $0 $0 ( $532,967)
$625,287 $0 $0 $0 $0 $0 $0 $0 $0 ( $625,287)
$625,287 $0 $0 $0 $0 $0 $0 $0 $0 ( $625,287)
$504,158 $0 $0 $0 $0 $0 $0 $0 $0 ( $504,158)
$288,090 $0 $0 $0 $0 $0 $0 $0 $0 ( $288,090)
$56,178 $0 $0 $0 $0 $0 $0 $0 $0 ( $56,178)
$201,663 $0 $0 $0 $0 $0 $0 $0 $0 ( $201,663)
$108,034 $0 $0 $0 $0 $0 $0 $0 $0 ( $108,034)
$221,672 $0 $0 $0 $0 $0 $0 $0 $0 ( $221,672)
$660,816 $0 $0 $0 $0 $0 $0 $0 $0 ( $660,816)
$441,636 $0 $0 $0 $0 $0 $0 $0 $0 ( $441,636)
$666,995 $0 $0 $0 $0 $0 $0 $0 $0 ( $666,995)
$500,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $500,000)
$868,100 $0 $0 $0 $0 $0 $0 $0 $0 ( $868,100)
Active & Future
CIP Projects Only
Program: All Total Total Prior Current Future Funding Estimates Over/
99-CIP-Capital Improvement Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 (Under)
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
TOTAL UNFUNDED $67,408,947
$0 $0 $0 $0 $0 $0 $0 $0 ( $67,408,947)
Total 99-CIP-Capital Improvement $353,811,806 $219,688,207 $152,603,184 $7,542,646 $10,451,000 $14,306,500 $14,015,328 $11,111,000 $9,658,549 ( $134,123,599)
Active & Future
CIP Projects Only
Program: All Total Total Prior Current Future Funding Estimates Over/
A1-BPM-Bayfront Park Management Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 (Under)
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
FUNDED
B-40173 Bayfront Park Electrical Repairs
$309,000 $309,000 $309,000 $0
$0 $0 $0 $0 $0 $0
TOTAL FUNDED $309,000 $309,000 $309,000 $0 $0 $0 $0 $0 $0 $0
Total A1-BPM-Bayfront Park $309,000 $309,000 $309,000 $0 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
Program: All Total Total Prior Current Future Funding Estimates Over/
A2-VKP-Virginia Key Park Trust Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 (Under)
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
FUNDED
B-30174 Virginia Key Beach Park Historic
$1,480,737 $1,480,737
$1,356,237 $124,500
$0 $0 $0 $0 $0 $0
TOTAL FUNDED $1,480,737 $1,480,737 $1,356,237 $124,500 $0 $0 $0 $0 $0 $0
Total A2-VKP-Virginia Key Park Trust $1,480,737 $1,480,737 $1,356,237 $124,500 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
Program: All Total Total Prior Current Future Funding Estimates Over/
A3-CRA-Community Redevelopment Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018 (Under)
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
FUNDED
B-30394 North 14 St. Multi Media $6,000,000 $6,000,000 $6,000,000 $0 $0 $0 $0 $0 $0 $0
B-30538B Museum Park Environmental $2,000,000 $2,000,000 $2,000,000 $0 $0 $0 $0 $0 $0 $0
B-30731 Miami Women's Club Baywalk $93,000 $93,000 $93,000 $0 $0 $0 $0 $0 $0 $0
TOTAL FUNDED $8,093,000 $8,093,000 $8,093,000 $0 $0 $0 $0 $0 $0 $0
PARTIALLY FUNDED
B-40169 300 NW 11 Street Community $2,293,250 $1,500,000 $1,500,000 $0 $0 $0 $0 $0 $0 ( $793,250)
TOTAL PARTIALLY FUNDED $2,293,250 $1,500,000 $1,500,000 $0 $0 $0 $0 $0 $0 ( $793,250)
Total A3-CRA-Community $10,386,250 $9,593,000 $9,593,000 $0 $0 $0 $0 $0 $0 ( $793,250)
Grand Total
$904,044,927 $448,436,591 $352,824,233 $27,537,071 $16,483,910 $16,806,500 $14,015,328 $11,111,000 $9,658,549 ( $455,608,336)
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
4. OPERATING IMPACT
Cite sutteie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
OPERATING IMPACT BY DEPARTMENT
SUMMARY
While the city's Capital Budget is distinct from the Operating Budget, there is an interrelationship that
exists since projects funded and implemented through the Capital Budget may impact the Operating
Budget to address increased fund needs for employee salaries and the purchase of supplies and minor
equipment to support and operate new or enhanced city facilities.
The potential operating impact of any proposed capital project is carefully considered as a part of the
capital program review process. In many cases, the most important component of a capital spending
decision is not the initial acquisition and development cost but the operating cost impact on the annual
budget over the lifetime of the facility or equipment. The completion of capital projects that represent
new or significantly enhanced facilities will impact the respective department's operating budget as
projects are completed and transferred back to the client department for operation and maintenance.
Many capital projects involve purchase or reconstruction of existing infrastructure to update equipment
and facilities to modern standards and, as such, do not carry significant operating impacts. There are,
however, some capital projects that may require additional operating expenditures for utilities, such as
electricity and water, or landscape and lighting maintenance that exceed current consumption levels.
Other completely new projects, such as park recreation centers, fire stations or police facilities require the
hiring of new personnel, purchase of new furniture and equipment, as well as routine maintenance and
payment of increased utility bills. Consequently, the impacts of capital projects on the annual operating
budget are estimated to the best accuracy possible and noted in the Capital Improvement Plan under this
separate section.
The methodology used to project these impacts on departmental budgets requires input from each client
department. Factors such as: hiring of new and/or part-time personnel to meet the needs of a new facility
and what level of desired service, increased utility or contract maintenance fees, potential increased
revenues resulting from new or enhanced facilities are considered in determining the impact to operation.
Each project is then assigned a projected dollar amount for personnel, operating, capital outlay, non -
operating, and revenues and those figures are entered in the fiscal year in which that project is estimated
to be completed. An escalation factor is then added to the present day operating cost projection and
calculated for the remainder of the five year capital plan. The individual projects are totaled to represent
the client departmental summary. Each department's summary is then incorporated into the total City
operating impact report.
In accordance with this approach, capital project impacts attempt to identify all associated operating costs.
The figures contained in this section are shared with the appropriate city budget staff for further
129
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
discussions with departments and consideration during preparation of the City's future annual operating
budget(s) .
These costs are included in the following tables.
130
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
City of flIliami
Capital Improvement Program
Operating Impact Report
Fiscal Years 2013-14 through 2018-19
Department
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
Parks & Recreation
Public Works
21,500 69,145 70,347 76,587 77,866 79,494
Public Facilities
0 67,000 66,950 67,956 68,062 66,790
GSA
Fire
Police
Report Totals
Total Operating Budget Impact 21,500 136,145 137,297 144,543 145,928 146,284
The cost impacts from the following projects will be funded from each department's operating budget. For some projects or departments,
the operating impacts show a negative amount denoting savings. For example, the installation of high efficiency air conditioning units
may result in energy savings costs or a project may produce more revenues than expenses. The GSA Department provides maintenance
to buildings operated and staffed by other departments such as Parks, Public Facilities and Public Works. The cost impacts to GSA
shown below represent costs which are not included in the operating impact figures shown for those departments. Additional information
can be found on the respective project detail sheets.
131
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
eitp of iftliatni
Operating Budget
Impact Summary
Public Works Department
Project #
Title
B-301 67D Shenandoah Roadway Improvements
B-30712 NW 21 Avenue from NW 1 ST to NW 3 ST
B-30728 NW 17 Court Roadway Improvements
B-30745 NW 8 Street Drainage and Roadway Improvements
B-30746 NW 14 Street Drainage and Roadway Improvements
B-30747 SW 13 Street from SW 13 AVE to SW 14 AVE
B-30771 Traffic Calming SW 39 Ave & SW 6 ST
B-40672D.01 Traffic Calming Flagami Blvd. & SW 4 ST
B-40672G.03 Traffic Calming SW 53 AVE & SW 4 ST
B-40672G.04 Flagami Calming Improvements D-4
B-78500B.02 Buena Vista Historic District -Drainage Improvements
B-78500B.03 Buena Vista Decorative Lighting
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
O 10,250 10,557 10,874 11,200 11,536
O 10,250 10,557 10,874 11,200 11,536
O 1,175 1,210 1,246 1,284 1,322
O 13,850 14,265 14,693 15,134 15,900
O 2,310 2,379 2,450 2,524 2,600
O 2,310 2,379 2,450 2,524 2,600
O 1,500 1,500 2,500 2,500 2,500
O 1,500 1,500 2,500 2,500 2,500
O 1,500 1,500 2,500 2,500 2,500
O 1,500 1,500 2,500 2,500 2,500
O 1,500 1,500 2,500 2,500 2,500
21.500 21,500 21,500 21,500 21,500 21,500
Totals 21,500 69,145 70,347 76,587 77,866 79,494
132
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
eftp of Ohtani
Projected
Operating Costs
Shenandoah Roadway Improvements
B-30167D
Operating Costs
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
0 0 0 0 0 0
0 10,250 10,557 10,874 11,200 11,536
0 0 0 0 0 0
0 10,250 10,557 10,874 11,200 11,536
Summary of Impact:
Estimated costs for additional maintenance of drainage structures and drainage system.
133
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
eftp of Ohtani
Projected
Operating Costs
NW 21 Avenue from NW 1 ST to NW 3 ST
B-30712
Operating Costs
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
0 0 0 0 0 0
0 10,250 10,557 10,874 11,200 11,536
0 0 0 3 0 0
0 10,250 10,557 10,877 11,200 11,536
Summary of Impact:
Estimated costs for additional maintenance of drainage structures and drainage system.
134
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
eftp of Ohtani
Projected
Operating Costs
NW 17 Court Roadway Improvements
B-30728
Operating Costs
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
0 0 0 0 0 0
0 1,175 1,210 1,246 1,284 1,322
0 0 0 0 0 0
0 1,175 1,210 1,246 1,284 1,322
Summary of Impact:
Estimated costs for additional maintenance of drainage structures and drainage system.
135
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
eftp of Ohtani
Projected
Operating Costs
NW 8 Street Drainage and Roadway Improvements
B-30745
Operating Costs
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
0 0 0 0 0 0
0 13,850 14,265 14,693 15,134 15,900
0 0 0 0 0 0
0 13,850 14,265 14,693 15,134 15,900
Summary of Impact:
Estimated costs for additional maintenance of drainage structures and drainage system.
136
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
eftp of Ohtani
Projected
Operating Costs
NW 14 Street Drainage and Roadway Improvements
B-30746
Operating Costs
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
0 0 0 0 0 0
0 2,310 2,379 2,450 2,524 2,600
0 0 0 0 0 0
0 2,310 2,379 2,450 2,524 2,600
Summary of Impact:
Estimated costs for additional maintenance of drainage structures and drainage system.
137
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
eftp of Ohtani
Projected
Operating Costs
SW 13 Street from SW 13 AVE to SW 14 AVE
B-30747
Operating Costs
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
0 0 0 0 0 0
0 2,310 2,379 2,450 2,524 2,600
0 0 0 0 0 0
0 2,310 2,379 2,450 2,524 2,600
Summary of Impact:
Estimated costs for additional maintenance of drainage structures and drainage system.
138
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
eftp of Ohtani
Projected
Operating Costs
Traffic Calming SW 39 Ave & SW 6 St
B-30771
Operating Costs
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
0 0 0 0 0 0
1,500 1,500 2,500 2,500 2,500
0 0 0 0 0 0
0 1,500 1,500 2,500 2,500 2,500
Summary of Impact:
Additional cost for traffic circle maintenance
139
eftp of �liatrri
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Projected
Operating Costs
Traffic Calming Flagami Blvd. & SW 4 ST
B-40672D.01
Operating Costs
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
0 0 0 0 0 0
1,500 1,500 2,500 2,500 2,500
0 0 0 0 0 0
0 1,500 1,500 2,500 2,500 2,500
Summary of Impact:
Additional cost for traffic circle maintenance
140
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
eftp of Ohtani
Projected
Operating Costs
Traffic Calming SW 53 AVE & SW 4 ST
B-40672G.03
Operating Costs
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
0 0 0 0 0 0
1,500 1,500 2,500 2,500 2,500
0 0 0 0 0 0
0 1,500 1,500 2,500 2,500 2,500
Summary of Impact:
Additional cost for traffic circle maintenance
141
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
eftp of Ohtani
Projected
Operating Costs
Flagami Calming Improvements D-4
B-40672G.04
Operating Costs
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
0 0 0 0 0 0
0 1,500 1,500 2,500 2,500 2,500
0 0 0 0 0 0
0 1,500 1,500 2,500 2,500 2,500
Summary of Impact:
Additional cost for traffic circle maintenance
142
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
eftp of Ohtani
Projected
Operating Costs
Buena Vista Historic District -Drainage Improvements
B-78500B.02
Operating Costs
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
0 0 0 0 0 0
0 1,500 1,500 2,500 2,500 2,500
0 0 0 0 0 0
0 1,500 1,500 2,500 2,500 2,500
Summary of Impact:
Estimated costs for additional maintenance of 4 drainage structures and 100 linear feet of drainage pipe.
143
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
eftp of Ohtani
Projected
Operating Costs
Buena Vista Decorative Lighting
B-78500B.03
Operating Costs
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
0 0 0 0 0 0
0 21,500 21,500 21,500 21,500 21,500
0 0 0 0 0 0
21,500 21,500
21,500 21,500
21,500 21,500
Summary of Impact:
Estimated costs for energy and maintenance costs to Florida Power & Light for 85 Decorative Light Posts
144
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
(itp of ififUnit
Operating Budget
Impact Summary
Public Facilities
Project #
Title
B-30182A Coconut Grove Waterfront Master Plan Implementation - Phase I
B-30365N James L. Knight Center Restroom Improvements
B-30501 B Manuel Artime Dimmer Rack System
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
O 140,000 142,800 145,656 148,562 151,540
O -62,000-64,500 -66,000 -68,000 -71,500
O -11,000-11,350 -11,700 -12,500 -13,250
Totals 0 67,000 66,9511 67,956 68,062 66,790
145
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
eftp of Ohtani
Projected
Operating Costs
Coconut Grove Waterfront Master Plan Implementation - Phase I
B-30182A
Operating Costs
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
o o 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 140,000 142,800 145,656 148,562 151,540
0 140,000 142,800 145,656 148,562 151,540
Summary of Impact:
Rate increase will be justified because of the new Dockmaster office.
146
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
eftp of Ohtani
Projected
Operating Costs
James L. Knight Center Restroom Improvements
B-30365N
Operating Costs
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
o o 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
62,000 64,500 66,000 68,000 71,500
0-62,000-64,500 -66,000 -68,000 -71,500
Summary of Impact:
upgraded convention hall restrooms will help substantiate rate increase.
147
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
eftp of Ohtani
Projected
Operating Costs
Manuel Artime Dimmer Rack System
B-30501B
Operating Costs
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
o o 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
11,000 11,350 11,700 12,500 13,250
0-11,000-11,350 -11,700 -12,500 -13,250
Summary of Impact:
Upgraded dimmer system should help substantiate additional rate increase.
148
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
5. CAPITAL PLAN FY2013-2014
APPROPRIATIONS
Cite Yuttere
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Cite iutivie
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
CAPITAL PLAN FY2013-2014 APPROPRIATIONS
The purpose of this section is to amend Capital Projects Appropriations Resolution No 13-0335,
adopted September 12, 2013 by appropriating new funding sources and reprogramming existing
funding.
These new appropriations, as well as reprogramming of existing funding to continue projects,
require that the Capital Improvements Appropriations Resolution No. 13-0335 be amended to
reflect said changes to the capital appropriations. New appropriations of revenues from
Contribution from General Fund, Marinas Capital Repairs and Capital Related Improvements,
Transit Half -Cent Surtax, Parking Surcharge, Local Option Gas Tax, Contribution from Swire
Properties, Inc., Settlement for Fire Damage, Stormwater Utility are being established to fund
various Capital Improvements projects. New appropriations of grants from Florida Department
of Environmental Protection, Florida Boating Improvement, State of Florida Department of
Health, Miami -Dade County GOB are being established to fund various Capital Improvements
projects.
The FY2013-2014 Capital Plan — Projects Appropriation Transfers contains the reprogramming
if existing funding among Capital Projects.
The FY2013-2014 Capital Plan - New Appropriations to Projects contains the new funding
sources installments for Fiscal Year 2013-2014 that have already been identified by the Budget
Department.
These new funding sources and reprogramming of existing funding are reflected in the CIP Plan
but are not reflected in Oracle, the City's Financial Software, since they require commission
approval.
149
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
INTENTIONALLY BLANK
efie Yalu/re
150
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
CIP PLAN NEW APPROPRIATION FOR FY13-14
Project
Amount
Fund
Award / Source
B-30865A - FY2014 Citywide
Environmental Remediation Study
421,000.00
31000 -
General
Government
Award 1426 - Contribution
from General Fund FY 2014
B-74220B - Police Vehicle
Acquisition
2,040,000.00
31000 -
General
Government
Award 1426 - Contribution
from General Fund FY 2014
B-70241 Fire Rescue Capital needs
FY2014
1,858,500.00
32000 - Public
Safety
Award 1426 - Contribution
from General Fund FY 2014
B-70969 - IT - Financial
Management Upgrade Module
500,000.00
31000 -
General
Government
Award 1426 - Contribution
from General Fund FY 2013
B-30706 Miscellaneous Repair -
10% Set Aside
516,216.00
34000 - Public
Facilities-CIP
Award 1437 - FY07 Marinas
Capital Repairs and Capital
Related Improvements
B-70010 - Miamarina Pier 5
Canopies - PF
235,000.00
34000 - Public
Facilities-CIP
Award 1437 - FY07 Marinas
Capital Repairs and Capital
Related Improvements
B-70011 - Clean Vessel Act - 2013
20,584.00
34000 - Public
Facilities-CIP
Award 1437 - FY07 Marinas
Capital Repairs and Capital
Related Improvements
B-70011 - Clean Vessel Act - 2013
20,583.75
34000 - Public
Facilities-CIP
Award TBD - Florida
Department of Environmental
Protection
B-40457 - Kinloch Park Building
Addition - D1
300,000.00
35000 - Parks &
Recreation
Award TBD - Miami -Dade
County GOB FY2014
B-40527 - Melreese Golf Course
Renovations
200,000.00
35000 - Parks &
Recreation
Award 1426 - Contribution
from General Fund FY 2014
B-30416 -NW 34 Ave over Comfort
Canal - Bridge 876417 - PW -
D1/Citywide
178,700.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30411 - FY2014 - D1 Roadway,
drainage and sidewalks repairs
90,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30723 - NW 24th Avenue
Roadway Improvement Project - D1
700,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
151
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
CIP PLAN NEW APPROPRIATION FOR FY13-14
Project
Amount
Fund
Award / Source
B-30412 - FY2014 - D2 Roadway,
drainage and sidewalks repairs
90,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30827 - South Grove Phase 1
Roadway and Drainage
Improvements - D2
176,213.03
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30835 - South Grove Phase 2
Roadway and Drainage
Improvements - D2
492,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30836 - South Grove Phase 3
Roadway and Drainage
Improvements - D2
31,786.97
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30413 - FY2014 - D3 Roadway,
drainage and sidewalks repairs
90,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30613 - D3 Miscellaneous Street
Maintenance
700,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30414 - FY2014 - D4 Roadway,
drainage and sidewalks repairs
82,143.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30967 - SW 16th Terrace from
SW 21 Ave to SW 22 Ave - D4
150,467.01
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30968 - SW 12th St (SW 30th
Ave and SW 30th Place) - D4
36,102.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30969 -SW 30th Court (SW 12th
Street and SW 13th Street) - D4
43,214.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30971 - SW 5th Street between
42 Ave and 43 Ave Improvement -
D4
7,857.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half-
Cent FY2014
B-30972 - SW 64 Court Roadway &
Drainage Improvements (from SW
6 St to SW 8 St) - D4
132,522.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30975 - Swale Restoration @ NW
2 Street between 34 Ave & 35 Ave -
D4
28,809.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half-
Cent FY2014
152
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
CIP PLAN NEW APPROPRIATION FOR FY13-14
Project
Amount
Fund
Award / Source
B-30976 - SW 2 St from 53 Ave to
54 Ave - D4
54,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half-
Cent FY2014
B-30978 - Drainage improvements
@ SW 4 St between 53 Ave & 54
Ave - D4
51,065.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half-
Cent FY2014
B-30979 - SW 21st St. & 24th Ave
Roadway Improvement - D4
60,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30803 - SW 18th Avenue from
SW 23rd Street to SW 23rd Terrace -
D4
97,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30614 - D4 Miscellaneous Street
Maintenance
46,820.99
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30902 - Phase I: Little River (N);
NE 82 St (S); N Miami Ave (W); NE
2 Ave (E) - D5
90,508.83
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30904 - NW 70 Street Area
Roadway & Minor Drainage
Improvements - D5
100,510.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30900 - NW 40 St from NW 10
Ave to NW 12 Ave - D5
98,981.17
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30985 - Design District Roadway
and Stormwater Improvement - D5
500,000.00
38000 - Storm
Sewers
Award 1297 - Transit Half -
Cent FY2014
B-70245 -Transportation Program
Support Services - Transportation
Professional
50,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-70246 - Transportation Program
Support Services - Transit
Professional
181,597.81
38000 - Mass
Transit
Award 1297 - Transit Half -
Cent FY2014
B-70247 -Citywide Mass Transit
Studies
318,402.19
38000 - Mass
Transit
Award 1297 - Transit Half -
Cent FY2014
B-73102B - Citywide Streets Milling
and Resurfacing - Parking
Surcharge
607,946.05
36000 - Streets
& Sidewalks
Award 1419 - Parking
Surcharge - FY2014
153
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
CIP PLAN NEW APPROPRIATION FOR FY13-14
Project
Amount
Fund
Award / Source
B-30646 - South Bayshore Drive
Roadway and Drainage
Improvements
300,000.00
36000 - Streets
& Sidewalks
Award 1419 - Parking
Surcharge - FY2014
B-30833 - SW 1st Ave between SW
15th and SW 7th Street - D2
368,212.00
36000 - Streets
& Sidewalks
Award 1419 - Parking
Surcharge - FY2014
B-30637 - Mary Brickell Village
Drainage Improvements
623,441.95
38000 - Storm
Sewers
Award 1419 - Parking
Surcharge - FY2014
B-73102C - Citywide Streets Milling
and Resurfacing - Local Option Gas
Tax
401,400.00
36000 - Streets
& Sidewalks
Award 1552 - Local Option
Gas Tax 2009-Contribution
from GF FY14
B-30837 - South Miami Avenue - SE
6th and 5th Street Traffic
Modifications - D2
771,544.65
36000 - Streets
& Sidewalks
Award TBD - Contribution
from Swire Properties, Inc. -
Brickell City Center
B-30706 Miscellaneous Repair -
10% Set Aside
10,893.00
34000 - Public
Facilities-CIP
Award 1950 - Florida Boating
Improvement Grant
B-70242 - Fire Department -
FY2012 "Emergency Medical
Services (EMS)
238,000.00
32000 - Public
Safety
Award TBD - State of Florida
Department of Health Grant
B-30365E - Coral Way NET Office
Remodeling / Community Center D3
- CD 91-02994
276,833.00
31000 -
General
Government
Award TBD - Settlement for
Fire Damage - Coral Way Net
Office (Misc. CIP Revenue)
B-30262 - Citywide Storm Sewer
Repair Project
600,000.00
38000 - Storm
Sewers
Award 1431 - Stormwater
Utility FY2014
B-30700 - Citywide FDEP Drainage
Wells Compliance
400,000.00
38000 - Storm
Sewers
Award 1431 - Stormwater
Utility FY2014
B-73202C - Solid Waste Collection
Equipment
606,600.00
39000 - Solid
Waste-CIP
Award 1426 - Contribution
from General Fund FY 2014
NEW APPROPRIATION TOTAL
15,995,454.40
154
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPROPRIATION TRANSFERS - CIP PLAN FY2013-2014
From Project
Amount
From Fund
To Project
Amount
To Fund
Award / Source
B-30247 - Dinner Key
Dredging
(14,926.91) 34000 Public II IlDFloatingreg - Spoil Island
Facilities Dredging - Island C
14,926.91 34000 -
Public
Facilities
Award 1584 - Homeland
Defense / Neighborhood
Improvement Bond Series
3
8-305418 - Kennedy
Park Floating Dock PH
I
(14,621.00) 34000 - Public II II8 0541D - Citywide
Facilities Park Equipment & Site
Improvemen
14,621.00 34000 -
Public
Facilities
Award 1426 - Contribution
from General Fund.
Reverse 02/28/2013
Appropriation
B-30541D - Citywide
Park Equipment & Site
Improvement
(9,200.00) 34000 - Public II II B-30 6nte Jt amesr
L.
Facilities
9,200.00 34000 -
Public
Facilities
Award 1426 - Contribution
from General Fund.
Reverse 02/28/2013
Appropriation
B-60464 - New Dinner
Key Marina
Dockmaster Building
(116,723.52) 34000 - Public II II8-30247 - Dinner Key
Facilities Dredging
116,723.52 34000 -
Public
Facilities
Award 1584 - Homeland
Defense/Neighborhood
Improvement Bond Series
3 - Reverse 10/15/2012
Appropriation
B-40455 - Citywide
Capital Improvements
Projects
(6,590.00) 35000 - Parks II B-35812D - Duarte Park
& Recreation Building (Lighting) - D1
6,590.00 35000 -
Parks &
Recreation
Award 1422 - Impact Fees
B-40455 - Citywide
Capital Improvements
Projects
(35,000.00) 35000 - Parks
& Recreation
B-30905 - Seybold
House demolition and
Reconstruction - D5
35,000.00 35000 -
Parks &
Recreation
Award 1422 - Impact Fees
B-40455 - Citywide
Capital Improvements
Projects
(70,000.00) 35000 - Parks
& Recreation
B-30882 - African
Square Park - Splash -
D5
70,000.00 35000 -
Parks &
Recreation
Award 1422 - Impact Fees
8-30984 - Athalie
Range Park HVAC
Replacement - D5
(193, 043.00) 35000 - Parks &
Recreation
8-40455 - Citywide
Capital Improvements
Projects
193,043.00 35000 - Award 1422 - Impact
Parks & Fees. Reverse
Recreation 06/27/2013 Appropriation
B-40454 - Park
Expansions and Land
Acquisition - Citywide
(1,000,000.00) 35000 - Parks II B-40463 - Armbrister
& Recreation Park Field
1,000,000.00 35000 -
Parks &
Recreation
Award 1422 - Impact Fees
B-30611 - D1
Miscellaneous Street
Ma intenance
(14,234.00) 36000 -
Streets &
Sidewa Iks
B-30723 - NW 24th
Avenue Roadway
Improvement Project -
D1
14,234.00 36000 -
Streets &
Sidewa Iks
Award 1638 - Street
Bonds Series 2
B-30611 - D1
Miscellaneous Street
Ma intenance
(430,000.00) 36000 -
Streets &
Sidewa Iks
B-30723 - NW 24th
Avenue Roadway
Improvement Project -
D1
430,000.00 36000 -
Streets &
Sidewa Iks
Award 1297 - Transit Half -
Cent Surtax
B-30611 - D1
Miscellaneous Street
Maintenance
(149,222.00) 36000 -
Streets &
Sidewa Iks
B-30787 - NW 32 Ct &
NW 32 Place Milling and
Resurfacing - D1
149,222.00 36000 -
Streets &
Sidewa Iks
Award 1297 - Transit Half -
Cent Surtax
155
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPROPRIATION TRANSFERS - CIP PLAN FY2013-2014
From Project
Amount
From Fund
To Project
Amount
To Fund
Award / Source
B-30611 - D1
Miscellaneous Street
Maintenance
(57,618.00)
36000 -
Streets &
Sidewalks
B-30788 - NW 16 Ave
and 14 Ter and NW 16
Ave and 15 St - D1
57,618.00
36000 -
Streets &
Sidewalks
Award 1297 - Transit Half -
Cent Surtax
B-35812D - Duarte
Park Building
Renovation, Splash
Park - D1
(15,000.00)
35000 - Park
and
Recreation
B-35812B - Duarte Park
ADA Modifications - D1
15,000.00
35000 -
Parks and
Recreation
Award 1584 - Homleand
Defense - Reverse
09/12/2013 Appropriation
B-30724 - NW 33rd
Street Roadway
Improvement Project
Phase I - D1
(775,000.00)
36000 -
Streets &
Sidewalks
B-30736 Phase II: NW
33rd Street Roadway
Improvement - D1
775,000.00
36000 -
Streets &
Sidewalks
Award 1638 - Street
Bonds Series 2
B-73102A - Citywide
Streets Milling &
Resurfacing - CIP
(1,403,492.00)
36000 -
Streets &
Sidewalks
B-31206 - SE 3rd Street
Widening - D2
1,403,492.00
36000 -
Streets &
Sidewalks
Award 1419 - Parking
Surcharge - FY12 & FY13
B-73102A - Citywide
Streets Milling &
Resurfacing - CIP
(775,600.00)
36000 -
Streets &
Sidewalks
B-30833 - SW 1st Ave
between SW 15th and
SW 7th Street - D2
775,600.00
36000 -
Streets &
Sidewalks
Award 1419 - Parking
Surcharge - FY2013
B-73102A - Citywide
Streets Milling &
Resurfacing - CIP
(273,283.00)
36000 -
Streets &
Sidewalks
B-73102C - Citywide
Streets Milling &
Resurfacing - CIP
Parking Surcharge
273,283.00
36000 -
Streets &
Sidewalks
Award 1419 - Parking
Surcharge - FY2013
B-30613 - D3
Miscellaneous Street
Maintenance
(43,101.00)
36000 -
Streets &
Sidewalks
B-30751 - SW 23 Street
btw 16 and 17 Ave for
M&R - D3
43,101.00
36000 -
Streets &
Sidewalks
Award 1297 - Transit Half -
Cent Surtax
B-30613 - D3
Miscellaneous Street
Maintenance
(250,000.00)
36000 -
Streets &
Sidewalks
B-40314 - NW 18th Place
Road Improvements D3
250,000.00
36000 -
Streets &
Sidewalks
Award 1297 - Transit Half -
Cent Surtax
B-30614 - D4
Miscellaneous Street
Maintenance
(20,000.00)
36000 -
Streets &
Sidewalks
B-30963 - Bay of Pigs
Memorial Park Lighting -
D4
20,000.00
36000 -
Streets &
Sidewalks
Award 1297 - Transit Half -
Cent Surtax
B-30614 - D4
Miscellaneous Street
Maintenance
(36,000.99)
36000 -
Streets &
Sidewalks
B-30965 - Coral Gate
Speed Humps - D4
36,000.99
36000 -
Streets &
Sidewalks
Award 1379 - Streets
Bond Series 1
B-30614 - D4
Miscellaneous Street
Maintenance
(74,844.01)
36000 -
Streets &
Sidewalks
B-30965 - Coral Gate
Speed Humps - D4
74,844.01
36000 -
Streets &
Sidewalks
Award 1297 - Transit Half -
Cent Surtax
B-30614 - D4
Miscellaneous Street
Maintenance
(32,712.00)
36000 -
Streets &
Sidewalks
B-30964 - Modification of
Speed Humps on SW 11
St. between 30 Ave and
31 Ct. - D4
32,712.00
36000 -
Streets &
Sidewalks
Award 1297 - Transit Half -
Cent Surtax
156
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPROPRIATION TRANSFERS - CIP PLAN FY2013-2014
From Project
Amount
From Fund 1 1 To Project
Amount
To Fund
Award / Source
B-30614 - D4 (186,443.99) 36000 - B-30966 - SW 5 St 186,443.99 36000 -
Miscellaneous Street Streets & between 27 ave and 28 Streets &
Maintenance Sidewalks ave street improvement - Sidewalks
D4
Award 1297 - Transit Half -
Cent Surtax
B-30614 - D4 (41,646.01) 36000 - B-30966 - SW 5 St 41,646.01 36000 -
Miscellaneous Street Streets & between 27 ave and 28 Streets &
Maintenance Sidewalks ave street improvement - Sidewalks
D4
Award 1638 - Street
Bonds Series 2
B-30614 - D4 Miscellaneous Street (55,918.99) Steens & II Terrace from SW 1 Ave 55,918.99 Steens &
Maintenance Sidewalks to SW 22 Ave - D4 Sidewalks
Award 1638 - Street
Bonds Series 2
B-30776 - Silver Bluff (26,327.56) 36000 -
Drainage Streets &
Improvements - D4 Sidewalks
B-30629 - Durham
Terrace Drainage Project
26,327.56 36000 - Award 1379 - Street
Streets & Bonds Series 1 - Reverse
Sidewalks 09/12/2013 Appropriation
D4B-30775 - Area Improvements Shenandoah (80,000.00) Sidewalks & II 24th Ave Roadent wayD4 St. & 80,000.00 Sidewalks
&
36000 -
Award 1101 - Transit Half -
Cent Surtax
B-30168A - Silver Bluff (40,000.00) 36000 -
Traffic Calming Priority Streets &
3 Sidewalks
B-30803 - SW 18th 40,000.00 36000 -
Avenue, between SW Streets &
23rd street and 23rd Sidewalks
terrace - D4
Award 1379 - Streets
Bond Series 1
B-30615
Street (1,004,511.28) Streets & II IlGreenway @vertown NW 11 1,004,511.28 Streets &
Maintenance Sidewalks Terrace Sidewalks
Award 1638 - Street
Bonds Series 2
B-30615
Street (115,568.72) Sleets & II IlGreenway @vertown NW 11 115,568.72 Sleets &
Maintenance Sidewalks Terrace Sidewalks
Award 1297 - Transit Half -
Cent Surtax
s (398,431.28) 36000 - IIII98,431.2836000 -
Miscellaneous Street Sets &
h Street
NW 7 Ave StreMainteets
Sidewalksto Ave)A )D5 Sidewalks
Award 1297 - Transit Half -
Cent Surtax
Miscellaneous
is ellane us Street (193,767.33) Sidewalks & II IIo 29th Street Ave) N D5 Ave 193,767.33 Sidewalks
&
36000 - 36000 -
Mainten
Award 1113 - Local Option
Gas Tax
(5,020•39) 36000 - IIII,020.3936000 -
Miscellaneous Street Streets
h Street
NW 7 Ave StreMainteets
Sidewalks to Ave)A )D5 Sidewalks
Award 1101 - Transit Half -
Cent Surtax
MiscellaneousStreet S B-30615
(115,236.00) leets & II IIfrom NW 10 Ave to NW
115,236.00 36000 Streets &
Maintenance Sidewalks 11 Ave - D5 Sidewalks
Award 1101 - Transit Half -
Cent Surtax
157
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPROPRIATION TRANSFERS - CIP PLAN FY2013-2014
From Project
Amount
From Fund
To Project
Amount
To Fund
Award / Source
B-30615 - D5 (30,659.83) 36000 -
Miscellaneous Street Streets &
Maintenance Sidewalks
B-30900 - NW 40 St 30,659.83 36000 - Award 1101 - Transit Half -
from NW 10 Ave to NW Streets & Cent Surtax
12 Ave - D5 Sidewalks
B-30538D - Museum (155,042.25) 35000 - Parks
Park - DRI Fees & Recreation
Administration
B-70245D - 155,042.25 36000 - Award 1231 - Downtown
Transportation PSS - Streets & Development
Transportation - DRI Sidewalks Supplemental Fee
Fees Administration
B-30693 - (48,107.82) 36000-
Neighborhood Traffic Streets &
Calming Sidewalks
Improvements - D4
B-30775 - Shenandoah 48,107.82 36000 - Award 1638 - Street
Area Improvements - D4 Streets & Bonds Series 2. Reverse
Sidewalks 05/23/2013 Appropriation
B-30373A - Police (20,000.00) 32000 - Public
Department Property Safety
Unit Outdoor Storage
B-40273 - Police Station 20,000.00 32000 - Award 1422 - Impact Fees
Generator Slab Public Safety
APPROPRIATION
TRANSFERS TOTAL
(8,326,892.88)
8,326,892.88
158
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPENDIX
Cite sutteie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPENDIX 1
ALPHABIT'ICAL PROJECT INDEX
Cite sutavie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
>n` s ALPHABETICAL PROJECT
` :77em.�:w'waw�r7�F _ , i�''�_.'$ •
INDEX
. 'L� ♦,wis.+IV ._ I.. ` L s ` �:r-. t.. — _ _•
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
300 NW 11 Street Community Center - CRA 92-689001
B-40169
5
2,293,250
1,500,000
FY2015
Active
African Square Park - Splash Park - D5
B-30882
5
670,000
600,000
FY2015
Active
African Square Park - Splash Park D5 - Sanitary Sewer
Component
B-308825
5
100,000
100,000
FY2015
Active
African Square Park - Splash Park D5 Tree Component
B-30882T
5
50,000
50,000
FY2015
Active
African Square Park Playground
B-40459
5
125,000
0
FY2016
Future
African Square Park Restroom & Building Renovation
B-40460
5
750,000
0
FY2016
Future
Alice Wainwright Park Restrooms
B-40572
2
350,000
0
FY2016
Future
Allapattah Area Roadway Improvement - D1
B-30782
1
500,000
500,000
FY2014
Active
Allapattah Community Elderly Center
B-35003
1
287,000
0
FY2018
Future
Allapattah Mini Park Access Control
B-40461
1
30,000
0
FY2016
Future
Allapattah Mini Park Court
B-40462
1
25,000
0
FY2016
Future
Antonio Maceo Community Building - D1
B-40456
1
1,686,750
1,686,750
FY2016
Active
Apparatus Replacement
B-70228
1,2,3,
4,5
950,000
0
FY2017
Future
Armbrister Park Field
B-40463
2
1,350,000
0
FY2016
Future
Athalie Range Park HVAC Replacement - D5
B-30984
5
193,043
193,043
FY2015
Future
Athalie Range Park Playground
B-40550
5
120,000
0
FY2016
Future
Athalie Range Park Pool Heater
B-40552
5
75,000
0
FY2016
Future
Athalie Range Park Restroom Renovation
B-40551
5
80,000
0
FY2016
Future
Auburn Storm Sewer Ph. I & II
B-30012
4
5,320,000
0
FY2019
Future
Auburn Storm Sewer Phase III
B-30007
4
7,049,000
0
FY2021
Future
159
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Audit Compliance
B-70961
1,2,3,
4,5
22,000
0
FY2016
Future
Avalon Storm Sewer - Phase III
B-30216
2,4
4,500,000
0
FY2020
Future
Bay of Pigs Memorial Park Lighting - D4
B-30963
4
20,000
20,000
FY2015
Future
Bay of Pigs Park Lighting - D4
B-30772
4
53,000
53,000
FY2014
Active
Bay of Pigs Park Playground
B-40464
5
100,000
0
FY2016
Future
Bayfront Park Electrical Repairs
B-40173
2
309,000
309,000
FY2014
Active
Bayside Historic Sign - D2
B-39910K
2
33,000
33,000
FY2014
Active
Baywood Park Seawall Repair
B-40465
5
150,000
0
FY2016
Future
Baywood Park Site Development
B-40466
5
125,000
0
FY2016
Future
Beach Corridor Transit Connection Study - Citywide
B-70246A
1,2,3,
4,5
30,000
30,000
FY2015
Active
Beacom Phase II - D3
B-40325
3
1,500,000
1,500,000
FY2016
Active
Beacom Project Area Improvements
B-30699
3
1,053,114
1,053,114
FY2014
Active
Beacom Project Area Improvements - Tree Component D3
B-30699T
3
60,000
60,000
FY2014
Active
Beckham Hall Fire Damage Repair
B-30365J
1
6,770
6,770
FY2014
Future
Belafonte Tacolcy Park
B-40467
5
35,000
0
FY2016
Future
Belafonte Tacolcy Park
B-40468
5
40,000
0
FY2016
Future
Belafonte Tacolcy Park entire facility reconstruction
B-40469
5
5,000,000
0
FY2016
Future
Bell Meade Park Improvements
B-40470
2
50,000
0
FY2016
Future
Belle Meade Storm Sewer Project, Ph 2
B-50672
2
12,301,058
12,301,058
FY2014
Active
Bird Avenue Road Improvement
B-30628
2
1,960,505
1,960,505
FY2015
Active
Biscayne Bay Spoil Island B Public Shelter - D2
B-30825
2
17,500
17,500
FY2015
Active
Biscayne Bay Spoil Island E Picnic Tables, Benches &
Umbrellas - D2
B-30825A
2
8,250
8,250
FY2015
Active
Biscayne Bay Spoil Island E Public Trail - D2
B-30825E
2
8,250
8,250
FY2016
Active
Biscayne Heights Park (Shorecrest Park) Improvements
B-40471
5
100,000
0
FY2016
Future
160
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Biscayne Park Soccer Facility
B-40472
2
2,250,000
0
FY2016
Future
Brickell Area Shared Use Path and Roadway Improvements
B-30822
2
844,267
844,267
FY2014
Active
Brickell Area Shared Use Path and Roadway Improvements -
Tree Component D2
B-30822T
2
85,930
85,930
FY2014
Active
Bryan Park Community Building - D4
B-30134A
4
852,128
852,128
FY2015
Active
Bryan Park New Tennis/Community Center D4 - Sanitary
Sewer Component
B-30134AS
4
50,000
50,000
FY2015
Active
Bryan Park Tennis Court
B-40473
4
45,000
0
FY2016
Future
Bucket Truck for the Electrical Division at GSA
B-70333
1,2,3,
4,5
162,000
0
FY2018
Future
Buena Vista East Roadway, Drainage, Signage and Lighting
Improvements
B-78500E
5
2,368,482
2,368,482
FY2014
Active
Buena Vista One -Way Street Conversion and Signage - D5
B-30891
5
250,000
250,000
FY2014
Active
Business Continuity Systems Consolidation
B-70963
1,2,3,
4,5
56,000
0
FY2018
Future
Caribbean Marketplace Renovation
B-30671
5
1,102,553
1,102,553
FY2014
Active
Caribbean Marketplace Renovation - Sanitary Sewer
Component
B-30671A
5
114,000
114,000
FY2014
Active
Carpet Replacement at the MRC Facility
B-70322
1,2,3,
4,5
300,000
0
FY2016
Future
Carpeting and Flooring - Police Dept.
B-70120
1,2,3,
4,5
65,000
0
FY2017
Future
Center Grove Street and Lighting Improvements
B-30621
2
1,991,568
1,991,568
FY2014
Active
CIP Document Mgmt & Data Consolidation
B-70960
1,2,3,
4,5
380,000
0
FY2019
Future
Citrus Grove Roadway Improvements
B-30749
3
556,791
556,791
FY2014
Active
City Hall Repairs
B-70334
1,2,3,
4,5
200,000
0
FY2018
Future
City Hall Roof Terrace
B-30865E
1,2,3,
4,5
314,176
314,176
FY2014
Active
City Hall Studio Area - NC Unit Replacement
B-40960
1,2,3,
4,5
51,632
0
FY2015
Future
City Hall Windows and Doors
B-30865C
1,2,3,
4,5
296,001
296,001
FY2014
Active
City of Miami Fleet Vehicle Replacement
B-70320
1,2,3,
4,5
1,700,000
0
FY2016
Future
City of Miami Fleet Vehicle Replacement (Trucks)
B-70321
1,2,3,
4,5
1,750,000
0
FY2016
Future
City of Miami Impact Fee Study - Citywide
B-30994
1,2,3,
4,5
65,491
65,491
FY2014
Active
161
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
City of Miami Trolley Program - Capital Acquisition
B-70715
1,2,3,
4,5
2,921,123
2,921,123
FY2015
Active
City Property Building Maintenance
B-30365C
1,2,3,
4,5
700,000
0
FY2020
Future
City Wide Personal Computer Replacement (20%)
B-70964
1,2,3,
4,5
1,560,000
0
FY2016
Future
Citywide - FDEP Drainage Wells Compliance
B-30700
1,2,3,
4,5
2,240,934
2,240,934
FY2021
Active
Citywide - Land Acquisition Park
B-40507
1,2,3,
4,5
15,000,000
0
FY2016
Future
Citywide Bicycle Rack & Signage Program
B-30694A
1,2,3,
4,5
115,000
115,000
FY2014
Active
Citywide Bunker Gear (Fire Station)
B-70220
1,2,3,
4,5
274,800
0
FY2016
Future
Citywide Capital Improvements Projects
B-40455
1,2,3,
4,5
413,946
263,946
FY2015
Active
Citywide Fire Station Pumpers
B-70226
1,2,3,
4,5
1,960,000
0
FY2016
Future
Citywide Fire Station Replace out of Warranty Mobile Data
B-70218
1,2,3,
4,5
150,000
0
FY2018
Future
Citywide General Fleet Replacement
B-74200
1,2,3,
4,5
3,969,887
3,610,269
FY2014
Active
Citywide Mass Transit Studies
B-70247
1,2,3,
4,5
318,402
318,402
FY2016
Active
Citywide Park Building AC Replacement
B-40458
1,2,3,
4,5
600,000
0
FY2016
Future
Citywide Park Buildings Roof Repairs
B-40558
1,2,3,
4,5
350,000
0
FY2016
Future
Citywide Park Buildings Termite Control
B-40568
1,2,3,
4,5
200,000
0
FY2016
Future
Citywide Park Equipment & Site Improvements
B-30541
1,2,3,
4,5
5,293,595
4,896,494
FY2014
Active
Citywide Park Equipments & Site Improvements FY12
B-30541 D
1,2,3,
4,5
1,917,378
1,917,378
FY2017
Active
Citywide Parks Playground Replacements
B-40547
1,2,3,
4,5
1,500,000
0
FY2016
Future
Citywide Sidewalk Repair Project- PW
B-30998
1,2,3,
4,5
169,615
169,615
FY2015
Future
Citywide Storm Sewer Repair Project
B-30262
1,2,3,
4,5
5,701,561
5,701,561
FY2018
Active
Citywide Street Milling and Resurfacing - Local Option Gas
Tax
B-73102C
1,2,3,
4,5
1,625,000
401,400
FY2018
Future
Citywide Streets Milling & Resurfacing - CIP
B-73102A
1,2,3,
4,5
9,201,765
9,201,765
FY2017
Future
Citywide Streets Milling and Resurfacing - Parking Surcharge
B-73102E
1,2,3,
4,5
6,207,946
6,207,946
FY2018
Future
Citywide Warranty and Outdated Fire Station Computers and
Monitors
B-70219
1,2,3,
4,5
105,000
0
FY2018
Future
162
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Civic Center NW 14th Street
B-30500
1,2,3,
4,5
2,600,000
2,600,000
FY2014
Active
Civic Center NW 14th Street - Tree Funded Component
B-30500T
1,2,3,
4,5
100,000
100,000
FY2014
Active
Clean Vessel Act 2013 - PF
B-70011
2
41,168
41,168
FY2016
Future
Cloud Data Service - Data Storage
B-70967
1,2,3,
4,5
220,000
0
FY2016
Future
Coconut Grove Business Improvement District - Street
Improvements
B-30687
2
3,503,015
3,099,638
FY2016
Active
Coconut Grove Business Improvement District D2 Tree
Component
B-30687T
2
100,000
100,000
FY2014
Active
Coconut Grove Viewing Platform Spoil Island C - D2
B-40171
2
15,088
15,088
FY2014
Active
Coconut Grove Viewing Platform Spoil Island E - D2
B-40172
2
15,081
15,081
FY2014
Active
Coconut Grove Waterfront Master Plan Implementation -
Phase I
B-30182A
2
47,179,389
2,051,675
FY2014
Active
College of Police Auditorium Lighting
B-70129
1,2,3,
4,5
15,000
0
FY2019
Future
College of Police Lobby Lighting
B-70130
1,2,3,
4,5
20,000
0
FY2019
Future
Computer Aided Dispatch (CAD)
B-72801
1,2,3,
4,5
120,866
120,866
FY2014
Active
Coral Gate Mini Park - D4
B-30777
4
200,634
100,000
FY2014
Active
Coral Gate Park Access Control
B-40475
4
20,000
0
FY2016
Future
Coral Gate Park Baseball Field
B-40476
4
30,000
0
FY2016
Future
Coral Gate Speed Humps - D4
B-30965
4
163,845
53,000
FY2014
Future
Coral Gate Speed Humps - Phase 11 - D4
B-30974
4
108,034
0
FY2017
Future
Coral Way Community Center Playground Oracle Project 91-
03275
B-30365Q
3
500,000
0
FY2014
Future
Coral Way NET Office Remodeling / Community Center D3 -
CD 91-02994
B-30365E
3
1,291,833
1,291,833
FY2014
Active
Coral Way NET Office Remodeling D3 - Sanitary Sewer
Component
B-30365ES
3
50,000
50,000
FY2014
Active
Crestwood Park Basketball Courts Resurfacing
B-40477
5
25,000
0
FY2016
Future
Curtis Park Access Control (Fencing)
B-40478
1
225,000
0
FY2016
Future
Curtis Park Access Control (Roll up doors)
B-40479
1
25,000
0
FY2016
Future
Curtis Park Basketball and Tennis Courts Resurfacing
B-40480
1
125,000
0
FY2016
Future
163
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Curtis Park New Pool Facility and Boat Ramp D1 - Sanitary
Sewer Component
B-35806S
1
500,000
500,000
FY2015
Active
Curtis Park New Pool Facility and Boat Ramp Improvement
B-35806
1
2,177,160
2,177,160
FY2015
Active
Curtis Park Parking Lot
B-40481
1
125,000
0
FY2016
Future
Curtis Park Playground
B-40482
1
200,000
0
FY2016
Future
Curtis Park Restrooms Renovation
B-40483
1
200,000
0
FY2016
Future
Curtis Park Stadium Restrooms Improvements
B-40484
1
1,250,000
0
FY2016
Future
D1 - Reconstruction of Roadway identified as "Very Poor" by
PW
B-30431
1
4,114,165
2,400,000
FY2018
Future
D1- Stromwater Projects
B-30421
1
1,198,000
1,078,000
FY2016
Future
D1 FEMA Tree Funded Projects
B-30611T
1
169,930
169,930
FY2018
Future
D2 - Reconstruction of Roadway identified as "Very Poor" by
PW
B-30432
2
2,500,000
1,200,000
FY2018
Future
D2 - Stormwater Projects
B-30422
2
1,198,000
1,078,000
FY2016
Future
D3 - Reconstruction of Roadway identified as "Very Poor" by
PW
B-30433
3
2,500,000
2,400,000
FY2018
Future
D3 - Sidewalk ADA Retrofits
B-30677
3
700,000
700,000
FY2012
Active
D3 - Stormwater Projects
B-30423
3
1,198,000
1,078,000
FY2016
Future
D3 FEMA Tree Funded Projects
B-30613T
3
255,930
255,930
FY2018
Future
D4 - FEMA Tree Funded Projects
B-30614T
4
315,930
315,930
FY2018
Future
D4 - Reconstruction of Roadway identified as "Very Poor" by
PW
B-30434
4
2,500,000
2,400,000
FY2018
Future
D4 - Stormwater Projects
B-30424
4
1,198,000
1,078,000
FY2016
Future
D5 - Reconstruction of Roadway identified as "Very Poor" by
PW
B-30435
5
2,500,000
2,400,000
FY2018
Future
D5 - Stormwater Projects
B-30425
5
1,078,000
1,078,000
FY2017
Future
D5 FEMA Tree Funded Component
B-30615T
5
119,930
119,930
FY2018
Future
Damaged Vehicle Replacement/ Repairs
B-30666
1,2,3,
4,5
794,508
794,508
FY2015
Active
Defense and Security Equipment Acquisition
B-72813
1,2,3,
4,5
3,767,249
3,767,249
FY2014
Active
Design District Roadway and Stormwater Improvement - D5
B-30985
5
1,500,000
500,000
FY2016
Future
164
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Design District/FEC
B-30178
5
100,000
100,000
FY2015
Future
Dinner Key Dredging - Spoil Island C Floating Dock Repair
B-30834
2
308,375
0
FY2015
Future
Dinner Key Marina Dinghy Dock - D2
B-30735
2
253,070
253,070
FY2015
Active
District 1 - Miscellaneous Roadway Improvements
B-30611
1
825,419
728,234
FY2017
Future
District 2 - Miscellaneous Roadway Improvements
B-30612
2
0
0
FY2019
Future
District 2 Quality of Life Park Improvements
B-39910E
2
987,988
987,988
FY2014
Active
District 3 - Miscellaneous Roadway Improvements
B-30613
3
3,273,688
3,273,688
FY2018
Future
District 3 - Sidewalk Repairs and ADA
B-30377C
3
250,691
250,691
FY2015
Active
District 4 - Miscellaneous Roadway Improvements
B-30614
4
494,387
494,387
FY2017
Future
District 5 - Miscellaneous Roadway Improvements
B-30615
5
1,863,195
1,863,195
FY2017
Future
Domestic Water Pump - Police Dept.
B-70115
1,2,3,
4,5
65,000
0
FY2017
Future
Domino Park Building
B-40485
3
50,000
0
FY2016
Future
Domino Park Restroom Renovation
B-40486
3
250,000
0
FY2016
Future
Domino Park Shade Structure
B-40487
3
30,000
0
FY2016
Future
Dorsey Memorial Library Restoration
B-30531
2
250,000
250,000
FY2014
Active
Dorsey Park Ballfield
B-40488
2
45,000
0
FY2016
Future
Douglas Park ADA Improvement (restrooms) - CD Project 91-
03279
B-30832
2
133,474
133,474
FY2015
Active
Douglas Park Irrigation System
B-40489
2
40,000
0
FY2016
Future
Douglas Park Lighting
B-40490
2
50,000
0
FY2016
Future
Douglas Park Playground
B-40491
2
130,000
0
FY2016
Future
Downtown Baywalk Master Plan & Design
B-30179
2
11,248,770
450,000
FY2017
Active
Downtown Miami Bicycle and Pedestrian Mobility
Improvement Project
B-30940
2
287,500
287,500
FY2015
Active
Downtown Miami Signage and Wayfinding System
B-30941
2
1,150,000
1,150,000
FY2016
Active
Downtown Street Conversions
B-71210
2,5
50,000
50,000
FY2014
Active
165
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Drainage improvements @ SW 4 St between 53 Ave & 54
Ave - D4
B-30978
4
51,065
51,065
FY2016
Future
Duarte Park Basketball and Tennis Courts Resurfacing
B-40492
1
75,000
0
FY2016
Future
Duarte Park Building Renovation, Splash PArk & Sign - D1
Sanitary Sewer Component
B-35812AS
1
50,000
50,000
FY2014
Active
Duarte Park Building Renovation, Splash Park (Lighting)
B-35812D
1
15,000
15,000
FY2014
Future
Duarte Park Building Renovation, Splash Park and Sign
B-35812A
1
1,312,797
1,312,797
FY2014
Active
Duarte Park Lighting
B-40493
1
175,000
0
FY2016
Future
Duarte Park Playground
B-40494
1
120,000
0
FY2016
Future
DWNTWN Beautification - Design Phase
B-30606D
1,2,3,
4,5
498,780
498,780
FY2014
Active
DWNTWN Beautification - North
B-30606N
1,2,3,
4,5
7,817,431
7,817,431
FY2015
Active
DWNTWN Beautification - South
B-306065
1,2,3,
4,5
5,090,853
5,090,853
FY2014
Active
DWNTWN Beautification (Lighting)
B-30606L
1,2,3,
4,5
4,475,915
4,475,915
FY2014
Active
DWNTWN Beautification Project Phase I
B-30606
1,2,3,
4,5
3,150,565
3,150,565
FY2016
Active
East Flagami Roadway Improvements - SW 2nd Street and
SW 4th Street - D4
B-30961
4
422,264
422,264
FY2014
Active
Eaton Park Daycare Improvements
B-40495
5
100,000
0
FY2016
Future
Eaton Park Improvements
B-40496
5
1,500,000
0
FY2016
Future
eGoverment/Web Services iBuild Miami Phases II and III
B-70958
1,2,3,
4,5
480,000
0
FY2017
Future
eGovernment Services Platform
B-70959
1,2,3,
4,5
1,480,000
0
FY2017
Future
eGovernment/Web Services City View Replacement
B-70957
1,2,3,
4,5
2,464,000
0
FY2016
Future
Englewood Road and Storm Sewer Improvements - Phase III
- D4
B-30011
4
8,785,811
8,785,811
FY2014
Active
Environmental Remediation Study
B-30865A
1,2,3,
4,5
466,900
466,900
FY2015
Active
Environmental Remediation Study - Fire -Rescue
B-30865F
1,2,3,
4,5
140,000
140,000
FY2016
Active
ERP Integration System
B-74609
1,2,3,
4,5
25,474,458
25,474,458
FY2015
Active
Expand Comunication/Alarm Office Facilityw/PD (Fire
Station)
B-70231
1,2,3,
4,5
500,000
0
FY2016
Future
Facility Budget Requests (Fire)
B-70232
1,2,3,
4,5
1,750,000
0
FY2018
Future
166
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Fair Isle Area Roadway and Drainage Improvements - D2
B-30823
2
180,000
180,000
FY2014
Active
Fairway Storm Sewers
B-30017
5
5,586,000
0
FY2020
Future
FEMA Assistance to Firefighters Program FY2011
B-70418
1,2,3,
4,5
343,610
343,610
FY2014
Active
Fern Isle / PBA Park Improvements Project - D1
B-30800
1
116,782
116,782
FY2014
Active
Fire Alarm Replacement, Air Conditioning Repairs and
maintenance
B-40410
1,2,3,
4,5
1,426,200
1,426,200
FY2016
Future
Fire and Rescue Training Center (Renovate/Rebuild)
B-70224
2
17,000,000
0
FY2017
Future
Fire Department - FY2012 "Emergency Medical Services
(EMS)"
B-70242
1,2,3,
4,5
317,333
238,000
FY2016
Future
Fire Facilities Generators (North & South)
B-70718
1,2,3,
4,5
300,000
300,000
FY2014
Future
Fire Pump Electrical Rewiring - Police Dept.
B-70114
1,2,3,
4,5
35,000
0
FY2017
Future
Fire Rescue
B-70227
1,2,3,
4,5
4,320,000
0
FY2016
Future
Fire Rescue Capital Needs- FY2014
B-70241
1,2,3,
4,5
1,858,500
1,858,500
FY2016
Future
Fire Rescue Personal Protective Equipment
B-70411
1,2,3,
4,5
820,580
820,580
FY2014
Active
Fire Station #1 - Renovation and Miscellaneous Repairs
B-60455E
2
500,000
500,000
FY2015
Active
Fire Station #10 (New)
B-60351
1
6,275,200
898,123
FY2018
Active
Fire Station #13
B-60453A
2
5,084,496
5,084,496
FY2014
Active
Fire Station #14 (New)
B-60454
4
6,916,510
5,076,844
FY2016
Active
Fire Station #14 (New) - D4 - Sanitary Sewer Component
B-604545
4
100,000
100,000
FY2016
Active
Fire Station #15 (Fire Boat)
B-70225
2
10,000,000
0
FY2018
Future
Fire Station #5 Exterior Walls Repair - D1
B-70210
1
150,000
150,000
FY2014
Active
Fire Station #5 Renovation
B-70237
1
800,000
0
FY2018
Future
Fire Station and AO PC Replacement
B-70216
1,2,3,
4,5
70,000
0
FY2017
Future
Fire Station Equipment and Furniture Replacement
B-72803
1,2,3,
4,5
790,838
790,838
FY2014
Active
Fire Station Equipment/Furniture
B-70233
1,2,3,
4,5
200,000
0
FY2017
Future
Fire Station Flat Panels 24"
B-70239
1,2,3,
4,5
3,500
0
FY2017
Future
167
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Fire Station Hardening/Security
B-70236
1,2,3,
4,5
935,000
0
FY2016
Future
Fire Station Hurricane Hardening
B-70234
1,2,3,
4,5
384,000
0
FY2017
Future
Fire Station Light Fleet Vehicle Replacement
B-70235
1,2,3,
4,5
630,000
0
FY2018
Future
Fire Station No. 10 Restroom Remodeling
B-70104
1
188,218
188,218
FY2014
Active
Fire Station No. 12 - Re -roofing Project
B-70212
5
77,000
77,000
FY2014
Active
Fire Station No. 3 Dormitories Build -out Project
B-70211
3
100,000
100,000
FY2014
Active
Fire Station No. 6 Office Building - Structural Analysis
B-70102A
5
74,619
74,619
FY2016
Active
Fire Station No.5 - Interior Renovation Work Oracle Project
91-03237
B-70213
1
348,240
348,240
FY2014
Active
Fire Station Paperless Inspection System (i.e. MobileEyes
software)
B-70240
1,2,3,
4,5
80,000
0
FY2018
Future
Fire Station Training Facility
B-70230
1,2,3,
4,5
750,000
0
FY2018
Future
Fire Stations & Other Fire Facilities
B-72802
1,2,3,
4,5
3,647,899
3,647,899
FY2014
Active
Fire Stations Computer Aided Dispatch System
B-70214
1,2,3,
4,5
2,400,000
0
FY2016
Future
Fire Stations Warranty Lifepak/EKG Units
B-70221
1,2,3,
4,5
946,000
0
FY2016
Future
Fire Training Props
B-70238
2
350,000
0
FY2016
Future
Firefighting Equipment and Gear
B-70106
1,2,3,
4,5
158,124
158,124
FY2015
Active
Flagami Traffic Calming - D4
B-40672G
4
590,000
590,000
FY2014
Active
Flagami Traffic Calming Phase IV - D4
B-40672D
4
1,198,012
1,198,012
FY2014
Active
Forensic Lab Expansion - Police Dept.
B-70128
1,2,3,
4,5
1,200,000
0
FY2019
Future
Fort Dallas Park (Lummus Park Historic District) Demolition
B-40497
5
750,000
0
FY2016
Future
Fuel Pump Replacements
B-70328
1,2,3,
4,5
200,000
0
FY2017
Future
FY2014 - D1 Roadway, drainage and sidewalks repairs
B-30411
1
100,000
90,000
FY2014
Future
FY2014 - D2 Roadway, drainage and sidewalks repairs
B-30412
2
100,000
90,000
FY2014
Future
FY2014 - D3 Roadway, drainage and sidewalks repairs
B-30413
3
100,000
90,000
FY2014
Future
FY2014 - D4 Roadway, drainage and sidewalks repairs
B-30414
4
100,000
82,143
FY2014
Future
168
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
FY2014 - D5 Roadway, drainage and sidewalks repairs
B-30415
1
196,625
0
FY2015
Future
Garden Storm Sewer- Phase I
B-30183
1
1,149,920
1,149,920
FY2014
Active
Generator for City Hall
B-30365H
1,2,3,
4,5
186,819
55,855
FY2014
Active
Gibson Park New Construction - Sanitary Sewer Component
B-30305BS
5
117,000
117,000
FY2015
Active
Gibson Park New Construction (Partially Funded by CRA 92-
689001)
B-30305E
5
12,739,521
12,739,521
FY2015
Active
Gibson Park Stadium
B-40498
5
850,000
0
FY2016
Future
Grapeland Heights Electrical Panel - Police Dept.
B-70126
1,2,3,
4,5
125,000
0
FY2018
Future
Grapeland Park Picnic Shelter
B-40499
1
850,000
0
FY2016
Future
Grapeland Water Park Renovations
B-40573
1
750,000
0
FY2016
Future
Grove Mini Park Playground
B-40500
2
65,000
0
FY2016
Future
Grove Park Road and Storm Sewers Improvements - D3
(Formelly Glenn Royal Stormsewer P3)
B-30008
3
12,819,059
6,369,000
FY2011
Active
Grove Park Road Improvements - D3
B-30008A
3
628,321
628,321
FY2019
Future
GSA Communications Division - Back up Batteries for
Communications Systems
B-70323
1,2,3,
4,5
42,000
0
FY2016
Future
GSA Communications Division - Impact Windows and
Hurricane Grade Electric Garage Doors
B-70326
1,2,3,
4,5
30,000
0
FY2016
Future
GSA Fleet Facility - Fuel Station Roof Replacement
B-70325
1,2,3,
4,5
25,000
0
FY2016
Future
GSA Fleet Maintenance Garage Expansion
B-74205E
1
404,215
404,215
FY2015
Active
GSA Mechanics Shop - Light Fleet Aligment & Lift
Mechanism for vehicles up to 3,500 pounds
B-70327
1,2,3,
4,5
65,000
0
FY2016
Future
GSA Truck Wash Pit
B-74205C
1,2,3,
4,5
88,000
88,000
FY2016
Future
Gusman Hall Improvements / Repairs
B-70100
2
10,000,000
423,405
FY2018
Active
Hadley Park Ballfield
B-40501
5
80,000
0
FY2016
Future
Hadley Park Bleachers
B-40502
5
600,000
0
FY2016
Future
Hadley Park Football Field
B-40503
5
1,750,000
0
FY2016
Future
Hadley Park New Youth Center D5
B-35883A
5
8,049,934
5,876,805
FY2015
Active
Hadley Park New Youth Center D5 - Sanitary Sewer
Component
B-35883AS
5
200,000
200,000
FY2015
Active
169
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Hadley Park Parking Lot
B-40504
5
100,000
0
FY2016
Future
Hadley Park Pool Improvement
B-40506
5
280,000
0
FY2016
Future
Hadley Park Pool Locker rooms improvment
B-40505
5
80,000
0
FY2016
Future
Hainsworth Village Street Improvement
B-30520
2
1,062,500
0
FY2019
Future
Health District Riverwalk
B-30784
1
961,000
961,000
FY2016
Future
Heavy Fleet Tow Truck
B-70331
1,2,3,
4,5
250,000
0
FY2018
Future
Hyperion Financial Management Application
B-70965
1,2,3,
4,5
430,000
0
FY2017
Future
1-95 Lighting Project- Police Dept.
B-70117
1,2,3,
4,5
85,000
0
FY2017
Future
1-95 South Miami Terminal Street Improvements - D2
B-30718
2
859,000
859,000
FY2014
Active
IT - Financial Management Upgrade Module
B-70969
1,2,3,
4,5
500,000
500,000
FY2015
Active
IT Modernization
B-74617
1,2,3,
4,5
4,100,000
2,800,000
FY2015
Active
James L. Knight Center / Hyatt- Fire Alarm System
Replacement
B-70414
2
351,876
351,876
FY2015
Active
James L. Knight Center Miscellaneous Improvements
B-33506
1,2,3,
4,5
48,722
48,722
FY2014
Active
Jose Marti Roof Repair - GSA
B-40580
3
26,100
0
FY2015
Future
Kennedy Park Restroom Building Improvements
B-35838
2
222,033
222,033
FY2014
Active
Kennedy Park Restroom Building Improvements D2 -
Sanitary Sewer Component
B-358385
2
50,000
50,000
FY2014
Active
Kennedy Park Shoreline Stabilization Phase 1
B-30541 C
2
261,000
261,000
FY2014
Active
Kinloch Park Building Addition - D1
B-40457
1
1,461,850
1,461,850
FY2015
Active
Kirk Munroe Tennis Park
B-40474
2
30,000
0
FY2016
Future
Kronos System Upgrade
B-70966
1,2,3,
4,5
105,000
0
FY2018
Future
La Pastorita Traffic Calming and misc. improvements - D4
B-30960
4
675,000
675,000
FY2014
Active
Land Management System
B-74614
1,2,3,
4,5
7,913,018
6,316,151
FY2015
Active
Large Firefighting Equipment
B-72809
1,2,3,
4,5
660,316
388,316
FY2014
Active
Lawnview Storm Sewer
B-30009
3
5,719,000
0
FY2019
Future
170
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Legion Park Boat Ramp
B-40508
2
450,000
0
FY2016
Future
Legion Park HVAC (heating, ventilation, and air conditioning)
Replace
B-40509
2
100,000
0
FY2016
Future
Legion Park Improvements
B-40510
2
250,000
0
FY2016
Future
Legion Park Restrooms
B-40511
2
100,000
0
FY2016
Future
Lemon City Park Daycare Parking Lot
B-40512
5
100,000
0
FY2016
Future
Lemon City Park Daycare Playground
B-40513
5
75,000
0
FY2016
Future
Lemon City Park Improvements
B-40514
5
40,000
0
FY2016
Future
Lemon City park Walkways
B-40515
5
30,000
0
FY2016
Future
Liberty Square T-Turnarounds - D5
B-30980
5
250,000
250,000
FY2014
Active
Liberty Storm Sewers
B-30016
5
5,586,000
0
FY2020
Future
Light Fleet Replacement
B-72808
1,2,3,
4,5
1,649,658
667,658
FY2014
Active
Linear Parks, Greenways and Baywalk Improvements
B-30504
1,2,3,
4,5
961,000
961,000
FY2018
Future
Little Haiti Freedom Garden Park
B-40519
5
50,000
0
FY2016
Future
Little Haiti Gateway Signs - D5
B-30892
5
100,000
100,000
FY2014
Active
Little Haiti Right of Way Improvements - D5
B-30894
5
500,000
500,000
FY2015
Active
Little Haiti Soccer Field Bathroom D5
B-308875
5
365,000
365,000
FY2014
Active
Little Haiti Soccer Park
B-40516
5
170,000
0
FY2016
Future
Little Haiti Soccer Park Stadium Bleacher Modification
B-40517
5
100,000
0
FY2016
Future
Little Haiti Soccer Park Stadium Repairs
B-40518
5
160,000
0
FY2016
Future
Little River Area Road and Drainage Improvements - D5
B-30982
5
180,900
180,900
FY2015
Active
Little River Commerce Park Building
B-40520
5
500,000
0
FY2016
Future
Little River Industrial Park
B-30540
5
2,000,000
2,000,000
FY2014
Active
Little River Pocket Park Playground
B-40521
5
50,000
0
FY2016
Future
Little River Storm Sewers Ph. II
B-30015
5
3,990,000
0
FY2018
Future
171
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Little River Waterfront Park
B-50722
2
717,500
717,500
FY2015
Active
Little River Waterfront Park Acquisition PHII
B-50722A
2
735,000
735,000
FY2014
Active
Lummus Landing Square - D5
B-30886
5
1,007,000
925,061
FY2015
Active
Lummus Landing Square - D5 Sanitary Sewer Component
B-30886S
5
100,000
100,000
FY2015
Active
Lummus Park Landing Project - Street Project
B-30643
5
2,605,245
1,368,535
FY2015
Active
Lummus Park Playground
B-40522
5
125,000
0
FY2016
Future
Manatee Bend Park
B-40523
2
100,000
0
FY2016
Future
Manatee Bend Park Shoreline Improvements - D2
B-30801
2
675,827
88,527
FY2015
Active
Manuel Artime Dimmer Rack System
B-30501 B
1,2,3,
4,5
106,653
106,653
FY2014
Active
Manuel Artime Miscellaneous Project
B-30501A
3
92,883
92,883
FY2014
Active
Manuel Artime Window Replacement 970 Building - PF
B-30501C
2
173,607
150,379
FY2014
Active
Marine Stadium Bulkhead Replacement
B-30689
2
2,094,393
1,891,603
FY2015
Active
Marine Stadium Marina at Virginia Key
B-40180
2
33,180,900
1,740,007
FY2019
Active
Marine Stadium Marina Improvements
B-33514
2
1,315,550
255,645
FY2014
Active
Marine Stadium Restoration
B-30688
2
511,716
350,000
FY2017
Active
Marti Pool Park Pump Improvement
B-40526
3
100,000
0
FY2016
Future
Marti Pool Park Locker -rooms Renovation
B-40524
3
100,000
0
FY2016
Future
Marti Pool Park Pool Improvements
B-40525
3
110,000
0
FY2016
Future
Martin Luther King (MLK) Blvd / I-95 Area Improvements -
Murrals
B-30773
5
100,000
100,000
FY2015
Active
Mary Brickell Village Drainage Improvements
B-30637
1,2,3,
4,5
3,723,442
3,723,442
FY2016
Active
Maximo Gomez / Domino Park Restroom Improvements - D3
B-35861 B
3
48,368
48,368
FY2014
Active
Maximo Gomez / Domino Park Restroom Improvements - D3
B-35861 BS
3
100,000
100,000
FY2014
Active
Mechanical Upgrades to Riverview and Lawrence Pump
Stations - D3 - PW
B-40006
3
125,000
0
FY2014
Future
Melreese Golf Course Renovations
B-40527
1
200,000
200,000
FY2016
Future
172
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Melrose Park Playground
B-40528
5
125,000
0
FY2016
Future
Merrie Christmas Park Improvements
B-40529
2
600,000
0
FY2016
Future
Miamarina Pier 5 Canopies - PF
B-70010
2
435,000
435,000
FY2014
Active
Miamarina Pier A, B & C Fire Line Repairs
B-30696
2
380,000
380,000
FY2014
Active
Miami Regional Intermodal Plan
B-30645F
1,2,3,
4,5
48,000
48,000
FY2014
Active
Miami River Greenway (5th Street bridge exten.)
B-30336
3
2,256,640
2,256,640
FY2014
Active
Miami River Greenway from Miami Circle Greenway to South
Miami Avenue
B-30631
2
1,221,625
1,221,625
FY2015
Active
Miami River Greenway from NW 10th to NW 12th Ave.
B-30651
3
3,160,379
3,160,379
FY2015
Active
Miami River Greenway Segment G and Segment E2
Decorative Lighting
B-40695L
3
145,785
145,785
FY2014
Active
Miami River Greenway SW 1st Court to South Miami Avenue -
D2
B-30130
2
1,557,530
1,557,530
FY2014
Active
Miami River Greenways/ Streetscape Segment D (ELH)
B-40686
3
3,113,501
3,113,501
FY2014
Active
Miami Women's Club Baywalk Project - CRA 92-686001
B-30731
2
93,000
93,000
FY2015
Active
Miscellaneous Repairs 10% Set Aside
B-30706
2
2,158,594
2,158,594
FY2014
Active
Modification of Speed Humps on SW 11 St. between 30 Ave
and 31 Ct. - D4
B-30964
4
25,000
25,000
FY2014
Future
Moore Park New Construction
B-35887
5
7,605,462
7,605,462
FY2014
Active
Moore Park New Construction D5 - Sanitary Sewer
Component
B-358875
5
500,000
500,000
FY2014
Active
Moore Park Tennis Court Improvement
B-40531
5
380,000
0
FY2016
Future
Morningside Drainage Improvement Project D2 - PW
B-40004
2
6,260,000
0
FY2019
Future
Morningside Park Tennis Center Building
B-40534
2
650,000
0
FY2016
Future
Morningside Park Boat Ramp Improvements
B-40533
2
380,000
0
FY2016
Future
Morningside Park Court Renovations
B-40535
2
500,000
0
FY2016
Future
Morningside Park Floating Dock
B-40532
2
50,000
0
FY2016
Future
Morningside Park Walkways and ADA Compliance
B-40536
2
250,000
0
FY2016
Future
Morningside Pool Park Pool Facility Improvements
B-40537
2
1,000,000
0
FY2016
Future
173
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Mounted Stables Stall Repairs - Police Dept.
B-70131
1,2,3,
4,5
100,000
0
FY2019
Future
MRC NC Replacements
B-30865E
1,2,3,
4,5
289,823
289,823
FY2014
Active
MRC Building - UPS System
B-70324
1,2,3,
4,5
7,000
0
FY2016
Future
MRC Facility - Repair of HVAC VAV Boxes
B-70332
1,2,3,
4,5
120,000
0
FY2018
Future
MRC Security System Hardening - UASI Funded 18-180011 /
10th Floor 18-180022
B-70415
2
69,842
69,842
FY2015
Active
MRC Telecommunications Infrastructure Replacement
B-70956
1,2,3,
4,5
455,000
0
FY2019
Future
Museum of Science - Development in Bicentennial Park -
Phase 2
B-78502A
1,2,3,
4,5
2,000,000
2,000,000
FY2014
Active
Museum Park -DRI Air Quality
B-30538E
1,2,3,
4,5
313,129
313,129
FY2014
Active
Museum Park - DRI Fees Administration
B-30538D
1,2,3,
4,5
600,000
600,000
FY2014
Active
Museum Park- DRI Transportation
B-30538F
1,2,3,
4,5
2,296,404
2,296,404
FY2014
Active
Museum Park - FEMA Tree Funding Component
B-30538T
215,943
215,943
FY2014
Active
Museum Park - Partially Funded by CRA 92-686001
B-30538
1,2,3,
4,5
14,042,367
14,042,367
FY2014
Active
Museum Park - Sanitary Sewer Allocation
B-30538S
1,2,3,
4,5
1,000,000
1,000,000
FY2014
Active
Museum Park Environmental Remediation/Seawall - CRA 92-
686001
B-30538E
1,2,3,
4,5
2,000,000
2,000,000
FY2014
Active
N. Miami Court Reconstruction - D5
B-31213
5
441,636
0
FY2019
Future
NE 1 Court Reconstruction - D5
B-31214
5
666,995
0
FY2020
Future
NE 1st Avenue Reconstruction - NE 41 St. to NE 43 St. - D5
B-31212
5
660,816
0
FY2019
Future
NE 2 Avenue Improvements
B-78508
2,5
20,166,608
4,985,832
FY2016
Active
NE 2nd Court Roadway and Drainage Improvements Project -
D5
B-30880
5
400,000
400,000
FY2014
Active
NE 43 Street Reconstruction - D5
B-31217
5
868,100
0
FY2021
Future
NE Miami Place Reconstruction - D5
B-31215
5
500,000
0
FY2020
Future
Neighborhood Parks Improv. Contingencies - ADA
Modifications
B-35904
1,2,3,
4,5
1,272,223
771,223
FY2017
Future
New Citywide Fire Stations Digital Radio System
B-70217
1,2,3,
4,5
5,000,000
0
FY2017
Future
New Dinner Key Marina Dockmaster Building
B-60464
2
4,211,239
4,211,239
FY2014
Active
174
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
New Dinner Key Marina Dockmaster Building D2 - Sanitary
Sewer Component
B-60464S
2
690,000
690,000
FY2014
Active
New Fire Rescue Apparatus (North & South)
B-72810A
1,2,3,
4,5
573,740
573,740
FY2016
Future
New Public Works Operations Facilities
B-40001
1,2,3,
4,5
1,875,500
0
FY2016
Future
North 14 St. Multi Media Entertainment District Streetscape
CRA 92-686001
B-30394
2
6,000,000
6,000,000
FY2014
Active
North and South Police Stations Landscaping
B-70125
1,2,3,
4,5
50,000
0
FY2018
Future
North Bay Vista Park Playground
B-40538
5
75,000
0
FY2016
Future
North Spring Garden Greenway
B-40643A
5
2,762,175
2,762,175
FY2014
Active
North Venetian Drive Lighting (District 2 QOL)
B-39910C
2
100,000
100,000
FY2015
Active
Northwest 14th Street Streetscape Project - CI Funded
B-30518
5
2,617,649
439,000
FY2015
Active
NW 10 Ave from NW 40 St & NW 8 Ave from NW 46 St to
NW43St-D5
B-30899
5
280,888
0
FY2019
Future
NW 11 Street from 27 to 37 Avenue Area Roadway
Improvements - D1
B-30781
1
939,493
939,493
FY2014
Active
NW 11 th Ave Road Improvements - D3
B-40324
3
160,203
160,203
FY2014
Active
NW 12 Avenue / NW 12 Place Roadway Improvements
B-30883
5
1,199,976
1,199,976
FY2014
Active
NW 12 Avenue/NW 12 Place Roadway Improv. Tree
Component D5
B-30883T
5
46,000
46,000
FY2014
Active
NW 14 Ave & 28 St. Are Roadway Improvements- D1 - Tree
Component
B-30780T
1
26,000
26,000
FY2014
Active
NW 14 Avenue and 28 Street Area Roadway Improvements -
D1
B-30780
1
866,602
866,602
FY2014
Active
NW 16 Ave and 14 Ter and NW 16 Ave and 15 St - D1
B-30788
1
57,618
0
FY2016
Future
NW 17th Terrace Roadway Improvement Project - D1
B-30729
1
250,000
250,000
FY2014
Active
NW 18th Avenue Roadway Improvement Project - D1
B-30727
1
1,810,000
1,810,000
FY2014
Active
NW 18th Avenue Roadway Improvement Project - D1 Tree
Component
B-30727T
1
60,000
60,000
FY2014
Active
NW 18th Place Road Improvements - D3
B-40314
3
474,611
224,611
FY2014
Active
NW 20th Street from 7th Avenue to 20th Avenue
B-30789
1
500,000
0
FY2016
Future
NW 24th Avenue Roadway Improvement Project - D1
B-30723
1
1,140,000
700,000
FY2016
Future
NW 31 st Street Roadway Improvement Project - D1
B-30722
1
311,000
311,000
FY2014
Active
175
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
NW 32 Ct & NW 32 Place Milling and Resurfacing - D1
B-30787
1
303,375
0
FY2016
Future
NW 33rd Street Roadway Improvement Project - D1 Tree
Component
B-30724T
1
60,000
60,000
FY2016
Active
NW 33rd Street Roadway Improvement Project Phase I - D1
B-30724
1
3,700,000
3,700,000
FY2016
Active
NW 34 Ave over Comfort Canal - Bridge 876417 - PW
B-30416
1
178,700
178,700
FY2015
Active
NW 36 Avenue 15 to 16 Street Drainage Improvements - D1
B-30785
1
50,000
50,000
FY2014
Active
NW 40 St from NW 10 Ave to NW 12 Ave - D5
B-30900
5
129,641
98,981
FY2019
Future
NW 41 St from NW 7 Ave to NW 12 Ave - D5
B-30897
5
475,349
0
FY2017
Future
NW 43 Avenue between 9 to 11 Street Roadway
Improvements - D1
B-30786
1
78,224
78,224
FY2014
Active
NW 43 St from NW 10 Ave to NW 11 Ave - D5
B-30898
5
115,236
0
FY2019
Future
NW 44th Street between NW 7th and NW 8th Ave - D5
B-30983
5
185,000
185,000
FY2015
Active
NW 4th Terrace Roadway Improvement Project - D1
B-30730
1
75,000
75,000
FY2014
Active
NW 62 Street West of 1-95 Roadway Improvements - D5
B-30884
5
175,000
175,000
FY2014
Active
NW 70 Street Area Roadway & Minor Drainage
Improvements - D5
B-30904
5
2,052,550
100,510
FY2018
Future
NW 71 St. Main Trunk Storm Sewer
B-30018
5
9,975,000
0
FY2017
Future
NW 7th Court
B-30610
5
360,000
360,000
FY2014
Active
NW 9th Street Roadway Improvement Project - D1
B-30732
1
756,248
756,248
FY2014
Active
Oakland Grove Mini Park
B-40539
5
50,000
0
FY2016
Future
Oakland Grove Park - upgrades - D5
B-30981
5
44,887
44,887
FY2014
Active
Oakland Grove Park Playground Equipment
B-75973
5
15,000
15,000
FY2014
Future
Office of Communications - Fleet Upgrade
B-40961
1,2,3,
4,5
144,000
0
FY2015
Future
Office of Communications - Large Format Video Cameras
Replacement
B-40964
1,2,3,
4,5
90,000
0
FY2016
Future
Office of Communications - Robotics Cameras
B-40963
1,2,3,
4,5
30,000
0
FY2014
Future
Office of Communications - Studio Cameras
B-40965
1,2,3,
4,5
18,000
0
FY2016
Future
Office of Communications - Upgrade Systems to Media
Equipment
B-40962
1,2,3,
4,5
40,000
0
FY2017
Future
176
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Operation Yard Park Trailers
B-40541
1,2,3,
4,5
225,000
0
FY2016
Future
Overtown / Wynwood Bicycle Pedestrian Mobility Plan
B-30645E
2,5
60,000
60,000
FY2014
Active
Overtown Greenway @ NW 11 Terrace
B-30624
5
2,661,864
1,541,784
FY2015
Active
Overtown Greenway @ NW 11 Terrace - D5 Tree Funded
Component
B-30624T
5
100,000
100,000
FY2015
Active
Overtown Stormwater Pump Station Upgrades
B-50654
5
851,797
851,797
FY2014
Active
Pahse I: NE 78 St (N); NE 75 St (S); N Miami Ave (W); NE 2
Ave (E) - D5
B-30901
5
526,967
0
FY2017
Future
Pallot Park Seawall
B-40542
2
300,000
0
FY2016
Future
Pallot Park Shoreline Improvements - D2
B-30802
2
1,438,000
80,000
FY2015
Active
Palm Grove Road Improvements
B-30630
2
4,174,623
3,838,157
FY2015
Active
Palm Grove Road Improvements - Tree Component D2
B-30630T
2
70,000
70,000
FY2015
Active
Park Expansions and Land Acquisition - Citywide
B-40454
1,2,3,
4,5
1,000,000
1,000,000
FY2014
Future
Parks ADA Modifications - District 2
B-30547E
2
215,348
215,348
FY2014
Active
Parks ADA Modifications - District 4
B-30547G
4
491,147
491,147
FY2014
Active
PBA / Fern Isle Redevelopment
B-40543
1
4,500,000
0
FY2016
Future
Peacock Park Building Renovation
B-40544
2
150,000
0
FY2016
Future
Peacock Park Playground
B-40545
2
150,000
0
FY2016
Future
Peacock Park Site Improvements
B-75883
2
725,124
725,124
FY2014
Active
Phase I: Little River (N); NE 82 St (S); N Miami Ave (W); NE
2 Ave (E) - D5
B-30902
5
625,287
90,509
FY2019
Future
Phase I: NE 82 St (N); NE 79 St (S); N Miami Ave (W); NE 1
Ave (E) - D5
B-30903
5
504,158
0
FY2018
Future
Phase I: NW 29th Street (NW 7 Ave to NW 2 Ave) - D5
B-30896
5
597,219
0
FY2017
Future
Phase II: Little River (N); NE 82 St (S); N Miami Ave (W); NE
2 Ave (E) - D5
B-30902A
5
625,287
0
FY2019
Future
Phase II: NE 78 St (N); NE 75 St (S); N Miami Ave (W); NE 2
Ave (E) - D5
B-30901A
5
532,967
0
FY2018
Future
Phase II: NE 82 St (N); NE 79 St (S); N Miami Ave (W); NE 1
Ave (E) - D5
B-30903A
5
0
0
FY2019
Future
Phase II: NW 29 St (NW 7 Ave to NW 2 Ave) - D5
B-30896A
5
597,219
0
FY2017
Future
177
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Phase II: NW 33rd Street Roadway Improvement - D1
B-30736
1
2,375,000
0
FY2016
Future
Phase III: Little River (N); NE 82 St (S); N Miami Ave (W); NE
2 Ave (E) - D5
B-30902E
5
625,287
0
FY2020
Future
Phase III: NE 78 St (N); NE 75 St (S); N Miami Ave (W); NE 2
Ave (E) - D5
B-30901 B
5
532,967
0
FY2019
Future
Phone and Radio Equipment Upgrades
B-72804
1,2,3,
4,5
1,209,200
351,200
FY2014
Active
Pine Heights Park Playground
B-40546
1
75,000
0
FY2016
Future
Police Central Station Parking Garage
B-70118
1,2,3,
4,5
210,000
0
FY2017
Future
Police Department Property Unit Outdoor Storage
B-30373A
1,2,3,
4,5
1,069,644
1,069,644
FY2014
Active
Police Department Sanitary Sewer System Repairs
B-70600
1,2,3,
4,5
60,000
60,000
FY2014
Active
Police Headquarter & South District Storm Drains and
Parking Lot Asphalt
B-70121
1,2,3,
4,5
425,000
0
FY2017
Future
Police Headquarter Building Emergency Generator Shed
Replacement
B-70127
1,2,3,
4,5
25,000
0
FY2018
Future
Police Headquarter Elevators Renovation & Repairs
B-70116
1,2,3,
4,5
75,000
0
FY2017
Future
Police Headquarters 5th floor Interior renovations
B-70113
1,2,3,
4,5
496,956
0
FY2015
Future
Police Headquarters Helipad and Roof Replacement
B-72915A
1,2,3,
4,5
1,657,119
1,657,119
FY2015
Active
Police Headquarters Interview rooms sound proofing - Oracle
19-690002
B-70112
1,2,3,
4,5
55,000
55,000
FY2014
Active
Police Headquarters Presure Clean/Seal/Paint Exterior
B-70119
1,2,3,
4,5
275,000
0
FY2017
Future
Police Headquarters Record Unit Exterior Walls
Replacement
B-70136
1,2,3,
4,5
496,458
0
FY2015
Future
Police South District Air Conditioning Diffuser
B-70124
1,2,3,
4,5
275,000
0
FY2018
Future
Police South District Exterior Lighting
B-70132
1,2,3,
4,5
35,000
0
FY2019
Future
Police Station Headquarters Generator Slab
B-40273
2
10,000
10,000
FY2015
Active
Police Vehicle Acquisition - FY2014
B-74220E
1,2,3,
4,5
2,040,000
0
FY2016
Future
Police Vehicle Replacement
B-74220
1,2,3,
4,5
27,491,738
27,491,738
FY2014
Active
Property Maintenance Bobcats & Trailer
B-74219C
1,2,3,
4,5
40,000
40,000
FY2016
Future
Property Maintenance Security Improvements
B-74219E
1,2,3,
4,5
25,000
25,000
FY2017
Future
Public Works Fleet and Heavy Machinery Replacement
FY2014
B-40002
1,2,3,
4,5
499,000
0
FY2018
Future
178
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Public Works Maintenance Yard
B-30551
1,2,3,
4,5
4,719,387
3,268,254
FY2015
Active
Public Works Miscellaneous Sidewalk Replacement
B-43114E
1,2,3,
4,5
1,034,146
1,034,146
FY2018
Future
Pullman Mini Park Playground Replacement
B-40548
5
75,000
0
FY2016
Future
Purchase of a video transmission server
B-70108
1,2,3,
4,5
100,000
0
FY2015
Future
PW - Heavy Machinery Replacement - FY2015
B-40007
1,2,3,
4,5
95,000
0
FY2015
Future
PW Citywide Pavement Resurfacing Contract M0098 (FY14-
18)
B-40005
1,2,3,
4,5
6,912,761
0
FY2018
Future
PW Citywide Sidewalk Replacement Contract M-0096 (Fy14-
FY18)
B-40003
1,2,3,
4,5
7,435,000
0
FY2019
Future
PW Heavy Equipment and Machinery Replacement - FY2016
B-40008
1,2,3,
4,5
650,000
0
FY2016
Future
PW Updrage Operations Division Equipment- FY2017
B-40009
1,2,3,
4,5
300,000
0
FY2017
Future
Quality of Life District 2 - Various Projects
B-39910
2
60,132
60,132
FY2015
Active
Rainbow Village Park Playground
B-40549
5
75,000
0
FY2016
Future
Rebuilding Fire Station #1
B-70222
2
9,000,000
0
FY2016
Future
Rebuilding Fire Station #10
B-70223
1
6,000,000
0
FY2016
Future
Reeves Park Basketball Court
B-40553
5
35,000
0
FY2016
Future
Reeves Park Playground
B-40554
5
100,000
0
FY2016
Future
Reeves Park Sidewalks & Walkways
B-40555
5
75,000
0
FY2016
Future
Reeves Park Volleyball Court
B-40556
5
25,000
0
FY2016
Future
Refurbishing of Existing Apparatus
B-70105
1,2,3,
4,5
230,000
230,000
FY2015
Future
Re -grouping and polishing of all MRC Granite and Bathrooms
B-70330
1,2,3,
4,5
70,000
0
FY2018
Future
Reid Acres Storm Sewers
B-30013
5
5,719,000
0
FY2019
Future
Replace Existing Fire Engines
B-72811
1,2,3,
4,5
3,035,000
0
FY2017
Future
Replace Fireboat 1
B-70229
1,250,000
0
FY2017
Future
Replacement of 400 Desktop Computers - Police Dept.
B-70134
1,2,3,
4,5
324,172
0
FY2020
Future
Replacement of Fire Panel at MRC Facility
B-70335
1,2,3,
4,5
340,000
0
FY2018
Future
179
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Replacement of Sauna Water Heating System - Police Dept.
B-70135
1,2,3,
4,5
15,000
0
FY2020
Future
Replacement: City Clerk Systems
B-70968
1,2,3,
4,5
660,000
0
FY2017
Future
Riverside Park Restroom Renovation
B-40557
3
75,000
0
FY2016
Future
Riverview and Lawrence Pump Stations - D3
B-30992
3
1,824,095
1,824,095
FY2015
Active
Roadway Improvements
B-30990
1,2,3,
4,5
361,000
361,000
FY2020
Future
Roadway, Drainage and Traffic Improvements - D1 & D4 -
Partially Funded CDBG D4 91-03102
B-50706A
1,4
1,218,245
1,218,245
FY2014
Active
Robert King High Fencing and Miscelaneous Improvements
B-30962
4
102,468
102,468
FY2014
Active
Rockerman Canal Improvements
B-30680
2
896,815
896,815
FY2014
Active
Roof Repair at the MRC Facility
B-70336
1,2,3,
4,5
350,000
0
FY2018
Future
Roof Repairs at the GSA Communications Warehouse and
USAR Warehouse
B-70329
1,2,3,
4,5
60,000
0
FY2017
Future
San Marco Island and Biscayne Island Drainage
Improvements - D2
B-30588
2
4,488,981
4,488,981
FY2014
Active
Satellite Communications Antenna Installation
B-70417
2
20,000
0
FY2014
Future
SE 3rd St Widening (fka Dupont Plaza) - DRI Transportation
B-31206A
2
1,500,000
1,500,000
FY2015
Active
SE 3rd Street Widening
B-31206
2
2,044,987
641,495
FY2015
Active
SE 3rd Street Widening - DRI Administration
B-31206E
2
100,000
100,000
FY2015
Active
Security System for Central/Headquarter - Police Dept.
B-70123
1,2,3,
4,5
85,000
0
FY2017
Future
Security System for Police South District Substation
B-70133
1,2,3,
4,5
70,000
0
FY2020
Future
Seminole Dinghy Dock Expansion
B-30602
2
60,000
30,000
FY2015
Future
Server Virtualization
B-70962
1,2,3,
4,5
98,000
0
FY2018
Future
Sewell Park kayak Launch
B-40559
1
225,000
0
FY2016
Future
Sewell Park Parking Lot
B-40560
1
60,000
0
FY2016
Future
Sewell Park Playground
B-40561
1
75,000
0
FY2016
Future
Seybold House Demolition and Reconstruction - D5
B-30905
5
200,000
0
FY2015
Future
Shedavia Jenkins Parks Lighting
B-40562
1,5
125,000
0
FY2016
Future
180
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Shenandoah Area Improvements - D4
B-30775
4
468,650
366,281
FY2014
Active
Shenandoah Park Pool Renovation
B-40563
4
2,200,000
0
FY2016
Future
Shenandoah Roadway Improvements
B-30167D
4
1,550,000
1,550,000
FY2014
Active
Shenandoah Roadway Improvements - D3
B-40327
3
1,000,000
1,000,000
FY2015
Active
Silver Bluff Drainage Improvements- D4
B-30776
4
1,652,160
1,652,160
FY2014
Active
Silver Bluff Traffic Calming Priority 3 - D4
B-30168A
4
703,544
703,544
FY2015
Active
Simpson Park Building Roof Replacement
B-40564
2
65,000
0
FY2016
Future
Solid Waste Building Reinforcement for Hurricane
B-70476
1,2,3,
4,5
1,000,000
0
FY2017
Future
Solid Waste Collection Equipment
B-73202C
1,2,3,
4,5
5,009,526
5,009,427
FY2014
Active
Solid Waste Fleet Replacement
B-70478
1,2,3,
4,5
24,311,800
0
FY2017
Future
Solid Waste Mini -Dump Renovation
B-70477
1,2,3,
4,5
200,000
0
FY2017
Future
Solid Waste Sweeper
B-40271
1,2,3,
4,5
170,000
170,000
FY2015
Active
South Bayshore Drive from Aviation Avenue to Kirk Avenue -
D2 PW
B-40168
2
100,000
100,000
FY2014
Active
South Bayshore Drive Roadway and Drainage Improvements
B-30646
2
8,748,530
8,704,395
FY2015
Active
South District Police Sub Station Furniture
B-70122
1,2,3,
4,5
175,000
0
FY2017
Future
South Grove Phase 1 Roadway and Drainage Improvements -
D2
B-30827
2
286,830
286,830
FY2014
Active
South Grove Phase 2 Roadway and Drainage Improvements -
D2
B-30835
2
492,000
492,000
FY2014
Active
South Grove Phase 3 Roadway and Drainage Improvements -
D2
B-30836
2
1,231,787
1,231,787
FY2014
Active
South Miami Avenue - SE 6th and 5th Street Traffic
Modifications - D2
B-30837
2
771,545
771,545
FY2016
Future
South Miami Avenue Drainage Improvements - MDC
B-30637A
2
806,500
204,444
FY2016
Active
Southside Park Field
B-40565
3
450,000
0
FY2016
Future
Spoil Island B & C Swim Area Improvement - D2
B-30824
2
67,000
67,000
FY2015
Active
Spoil Island E Restoration and Floating Dock
B-30721
2
252,500
252,500
FY2015
Active
Spring Garden Point Park
B-40567
5
150,000
0
FY2016
Future
181
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Spring Garden Point Park Historic Building
B-40566
5
1,250,000
0
FY2016
Future
SW 10th Street Road Improvements - D3
B-40306
3
347,385
307,385
FY2014
Active
SW 12th St (SW 30th Ave and SW 30th Place) - D4
B-30968
4
36,102
36,102
FY2017
Future
SW 15th Street Road Improvements Segment 1 - D3
B-40301
3
84,969
84,969
FY2014
Active
SW 15th Street Road Improvements Segment 2 - D3
B-40315
3
245,349
245,349
FY2014
Active
SW 16th Street Road Improvements - D3
B-40307
3
257,693
257,693
FY2014
Active
SW 16th Terrace from SW 21 Ave to SW 22 Ave - D4
B-30967
4
206,386
150,467
FY2017
Future
SW 17th Avenue Roadway & Drainage Improvements - D3 &
D4
B-30760
3,4
600,000
600,000
FY2014
Active
SW 17th Terrace Road Improvements - D3
B-40308
3
225,567
225,567
FY2014
Active
SW 18th Avenue from SW 23rd Street to SW 23rd Terrace -
D4
B-30803
4
137,000
97,000
FY2015
Future
SW 18th Terr. Road Improvements - D3
B-40300
3
116,121
116,121
FY2014
Active
SW 19th Terr. Imp. -Partial CDBG 91-02889 - D4
B-30695
4
537,191
537,191
FY2014
Active
SW 1st Ave between SW 15th and SW 7th Street
B-30833
1,2,3,
4,5
775,600
368,212
FY2015
Active
SW 1st Ave Road Improvements - Segment 2 - D3
B-40318
3
167,562
167,562
FY2014
Active
SW 1st Ave Road Improvements Segment 3 - D3
B-40323
3
126,638
126,638
FY2014
Active
SW 1st Avenue Road Improvements - Segment 1 - D3
B-40302
3
230,928
230,928
FY2014
Active
SW 2 St from 53 Ave to 54 Ave - D4
B-30976
4
54,000
54,000
FY2017
Future
SW 20 Street (SW 31 Ave to SW 32 Ave) - D4
B-30970
4
56,178
0
FY2017
Future
SW 20th Road Improvements - D3
B-40310
3
116,682
116,682
FY2014
Active
SW 21 st St. & 24th Ave Roadway Improvement - D4
B-30979
4
140,000
60,000
FY2015
Future
SW 22nd Avenue Medians - US 1 to Coral Way - D4
B-30770
4
58,622
58,622
FY2014
Active
SW 22nd Terr. & SW 13th Ave Road Improvements - D3
B-40312
3
376,211
376,211
FY2014
Active
SW 23 Street btw 16 and 17 Ave for M&R - D3
B-30751
3
43,101
0
FY2017
Future
SW 23rd Road Improvements - D3
B-40303
3
244,748
244,748
FY2014
Active
182
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
SW 25th Road Improvements - D3
B-40319
3
118,561
118,561
FY2014
Active
SW 26th Road Improvements Segment 2 - D3
B-40320
3
498,804
498,804
FY2014
Active
SW 27th Road Improvements - D3
B-40322
3
498,804
498,804
FY2014
Active
SW 28th Road Improvements - D3
B-40317
3
40,149
40,149
FY2014
Active
SW 2nd Ave Road Improvements - D3
B-40321
3
721,333
721,333
FY2014
Active
SW 2nd Street and SW 40th Avenue Traffic Circle - D4
B-30779
4
250,000
250,000
FY2014
Active
SW 30th Court (SW 12th Street and SW 13th Street) - D4
B-30969
4
43,214
43,214
FY2018
Future
SW 32 Avenue Improvements Additional Services
B-40704A
2,4
1,752,327
1,752,327
FY2014
Active
SW 32 Avenue Improvements D2 Tree Component
B-40704AT
2
60,000
60,000
FY2014
Active
SW 3rd Ave Road Improvements - D3
B-40313
3
293,740
293,740
FY2014
Active
SW 5 St between 27 ave and 28 ave street improvement - D4
B-30966
4
288,090
0
FY2017
Future
SW 5th Street between 42 Ave and 43 Ave Improvement -
D4
B-30971
4
7,857
7,857
FY2016
Future
SW 64 Court Roadway & Drainage Improvements (from SW
6 St to SW 8 St) - D4
B-30972
4
132,522
132,522
FY2017
Future
SW/NW 17th Avenue Traffic Corridor Study - Citywide
B-30993
1,2,3,
4,5
200,000
200,000
FY2015
Active
Swale Restoration @ NW 2 Street between 34 Ave & 35 Ave -
D4
B-30975
4
28,809
28,809
FY2016
Future
The Roads Roadway Improvements - D3
B-40326
3
500,000
500,000
FY2015
Active
Tigertail Resurfacing - D2
B-30716
2
711,258
711,258
FY2014
Active
Town Park Playground
B-40569
5
100,000
0
FY2016
Future
Traffic Calming SW 6th Street Project - D4
B-30771
4
324,670
324,670
FY2014
Active
Traffic Circle - SW 12 St and 31 Ave (SR 2013005677) - D4
B-30973
4
201,663
0
FY2016
Future
Traffic Circle - SW 18th Ave. & SW 13th St. - D4
B-30778
4
122,557
112,557
FY2014
Active
Traffic Circle on SW 23 Ave and SW 26 Street - D4
B-30977
4
221,672
0
FY2017
Future
Traffic Study Reviews - Oracle Project 35-110007
B-30346
1,2,3,
4,5
411,622
411,622
FY2014
Active
Transportation Program Support Services - Transit
Professional
B-70246
1,2,3,
4,5
500,000
500,000
FY2016
Active
183
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Transportation Program Support Services - Transit
Professional Services
B-30645A
1,2,3,
4,5
418,077
418,077
FY2014
Active
Transportation Program Support Services - Transportation
B-70245
1,2,3,
4,5
500,000
294,958
FY2017
Active
Transportation Program Support Services - Transportation
Professional Services
B-30645E
1,2,3,
4,5
881,042
881,042
FY2014
Active
Transportation PSS - Transportation DRI Fees Administration
B-70245D
1,2,3,
4,5
155,042
0
FY2017
Active
Uniform Fire Station Data Closetsx12
B-70215
1,2,3,
4,5
48,000
0
FY2016
Future
Upgrade PC Software & Hardware
B-74606
1,2,3,
4,5
7,174,921
2,920,683
FY2015
Active
US1 Landscaping between 17 Ave and Viscaya - D2
B-30830
2
55,000
55,000
FY2014
Active
US-1 Median Closures at Bridgeport and SW 30 Ct - D2
B-30662D
2
440,576
440,576
FY2014
Active
Venetian Causeway Improvements
B-39911
2
3,196,465
3,196,465
FY2014
Active
Virginia Key Beach Park Access Control
B-40540
1,2,3,
4,5
35,000
0
FY2016
Future
Virginia Key Beach Park Historic Restoration Phase 2
B-30174
2
1,480,737
1,480,737
FY2014
Active
Virginia Key Beach Park Restrooms Replacement
B-40570
2
750,000
0
FY2016
Future
Virginia Key Bike and Kayak Facility - D2
B-30995
2
477,000
477,000
FY2014
Active
Virginia Key Bike Trail Building - D2 - Sanitary Sewer
Component
B-309955
2
50,000
50,000
FY2014
Active
Virginia Key Landfill Assessment
B-35002
2
1,400,000
1,400,000
FY2015
Active
Virginia Key Rowing Center Improvements - P&R Project
B-30374
2
1,327,023
616,513
FY2014
Active
Virginia Key Rowing Center Improvements - Sanitary Sewer
Component
B-303745
2
100,000
100,000
FY2014
Active
Virginia Key Rowing Center Park Building
B-40530
2
350,000
0
FY2016
Future
Virrick Park New Pool
B-40571
2
3,000,000
0
FY2016
Future
Wagner Creek / Seybold Canal Dredging
B-50643
1,5
23,353,488
5,373,502
FY2016
Active
Watson Island Infrastructure
B-75001
2
647,190
150,000
FY2018
Future
Watson Island Public Park Improvements
B-35000
2
2,600,000
0
FY2018
Future
West Buena Vista Park Building Restrooms improvements
B-40574
5
50,000
0
FY2016
Future
West Buena Vista Park Courts
B-40575
5
50,000
0
FY2016
Future
184
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
West Buena Vista Park Playground
B-40576
5
120,000
0
FY2016
Future
West End Park New Community Building
B-30690
4
2,598,521
2,598,521
FY2015
Active
West End Park New Community Building - Sanitary Sewer
B-306905
4
100,000
100,000
FY2015
Active
West Flagler Area Improvements - D4 - Oracle CDBG Project
91-03102
B-30774
4
1,358,173
1,358,173
FY2014
Active
Williams Park Playground
B-40577
5
175,000
0
FY2016
Future
Williams Park Pool Improvement
B-40578
5
175,000
0
FY2016
Future
Williams Park Sport Field Lights
B-40579
5
350,000
0
FY2016
Future
Wynwood Area Roadway Improvement - D5
B-30888
5
500,000
500,000
FY2017
Active
185
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
efie Yalu/re
186
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPENDIX 2
CAPITAL IMPROVEMENTS PROGRAM
CURRENT PROJECTS COST TO
DATE BY FUND
Cite sutavie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
CAPITAL IMPROVEMENTS PROGRAM CURRENT PROJECTS COST TO DATE BY FUND
Project Name
Project Dist (s) Award Award Name Fund No. Fund Description Actual Encumbrances Total Cost
Number NO.
City Hall Roof Terrace
40-B30865B 1,2,3,4, 1426 Contribution from General Fund FY 31000 General
5 2008 Government
Projects
$ 209,709.53 $ 99,858.61 $ 309,568.14
City Hall Windows and Doors
40-B30865C 1,2,3,4, 1426 Contribution from General Fund FY 31000 General
5 2008 Government
Projects
$ 157,159.03 $ 81,053.17 $ 238,212.20
City of Miami Impact Fee Study - Citywide 40-B30994
1,2,3,4, 1103 Contribution From General Fund 31000 General
5 Government
Projects
$ 35,288.00 $ 14,342.00 $ 49,630.00
Citywide General Fleet Replacement 40-B74200
1,2,3,4, 1103 Contribution From General Fund 31000 General
5 Government
Projects
$ 1,070,989.00 $ - $ 1,070,989.00
Citywide General Fleet Replacement 40-B74200 1,2,3,4, 1304 Contribution from General Fund FY 31000 General
5 2007 Government
co
Projects
Citywide General Fleet Replacement 40-B74200 1,2,3,4, 1426 Contribution from General Fund FY 31000 General
5 2008 Government
Projects
$ 881,388.33 $ $ 881,388.33
$ 1,653,874.07 $ - $ 1,653,874.07
Coconut Grove Viewing Platform Spoil Island C 40-B40171 2 1669 TVM Production -Basic Use Fee 31000 General
Coconut Grove Expo -Burn Notice Government
Projects
$ 3,388.36 $ 3,388.36
Coconut Grove Viewing Platform Spoil Island C 40-B40171 2 1767 Ransom Everglades School- Coconut 31000 General $ 88.36 $ 1,561.64 $ 1,650.00
Grove Viewing Platform Spoil Island Government
C and Spoil Island E Projects
Coconut Grove Viewing Platform Spoil Island C 40-B40171 2 1786 FIND- Coconut Grove Viewing
Platform Spoil Island C
31000 General
Government
Projects
$ 7,500.00 $ 7,500.00
Coconut Grove Viewing Platform Spoil Island E 40-B40172 2 1669 TVM Production -Basic Use Fee 31000 General
Coconut Grove Expo -Burn Notice Government
Projects
$ 3,380.71 $ 3,380.71
Coconut Grove Viewing Platform Spoil Island E 40-B40172 2 1767 Ransom Everglades School- Coconut 31000 General $ 80.71 $ 1,569.29 $ 1,650.00
Grove Viewing Platform Spoil Island Government
C and Spoil Island E Projects
Coconut Grove Viewing Platform Spoil Island E 40-B40172 2 1787 FIND- Coconut Grove Viewing 31000 General
Platform Spoil (sand E Government
Projects
$ 7,500.00 $ 7,500.00
Coral Way Net Office - Structural Evaluation 40-B30365E 3 1426 Contribution from General Fund FY 31000 General $ 12,674.57 $ $ 12,674.57
2008 Government
Projects
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNIE12:1O dflNJVB '1VNIDIBO 01
THIS DOCUMENT IS A SUBSTITUTION
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
Damaged Vehicle Replacement/Repairs 40-B30666
1,2,3,4, 1577 Subrogation Auto Claims B-30666 31000 General
5 Government
Projects
$ 633,447.06 $ 283.80 $ 633,730.86
Damaged Vehicle Replacement/Repairs 40-B30666
1,2,3,4, 1921 Surplus Goods & Fixed Assets Sales 31000 General
5 Government
Projects
$ 68,327.76 $ $ 68,327.76
Environmental Remediation Study
40-B30865A 1,2,3,4, 1426 Contribution from General Fund FY 31000 General
5 2008 Government
Projects
$ 13,425.03 $ 32,450.37 $ 45,875.40
ERP Integration System 40-B74609
1,2,3,4, 1103 Contribution From General Fund 31000 General
5 Government
Projects
$ 12,486,771.72 $ - $ 12,486,771.72
ERP Integration System
40-B74609 1,2,3,4, 1105 Fire Assessment Fee
5
31000 General
Government
Projects
$ 287,422.33 $ $ 287,422.33
ERP Integration System 40-B74609 1,2,3,4, 1212 SRF Contribution to CIP - Prior to 31000 General
5 2006 Government
w Projects
0D ERP Integration System 40-B74609 1,2,3,4, 1304 Contribution from General Fund FY 31000 General
5 2007 Government
Projects
$ 1,473,459.00 $ - $ 1,473,459.00
$ 2,028,914.05 $ (0.04) $ 2,028,914.01
ERP Integration System 40-B74609
1,2,3,4, 1426 Contribution from General Fund FY 31000 General
5 2008 Government
Projects
$ 825,964.95 $ $ 825,964.95
ERP Integration System
40-B74609 1,2,3,4, 1565 Sunshine State Government 31000 General
5 Financing Commission Loan # 3 Government
Projects
$ 7,210,560.20 $ 39,031.31 $ 7,249,591.51
Generator for City Hall
40-B30365H 1,2,3,4, 1103 Contribution From General Fund
5
31000 General
Government
Projects
$ 27,292.89 $ 27,292.89
Generator for City Hall
40-B30365H 1,2,3,4, 1426 Contribution from General Fund FY 31000 General
5 2008 Government
Projects
$ 25,147.73 $ 2,493.03 $ 27,640.76
GSA Fleet Maintenance Garage Expansion
40-B74205B 1 1108 Impact Fees Ord
31000 General
Government
Projects
$ 85,754.73 $ 92,436.66 $ 178,191.39
GSA Fleet Maintenance Garage Expansion
40-B74205B 1 1422 Impact Fees New Ordinance-2007 31000 General
Government
Projects
$ 48,428.02 $ 45,315.00 $ 93,743.02
IT Modernization 40-B74617
1,2,3,4, 1426 Contribution from General Fund FY 31000 General
5 2008 Government
Projects
$ 2,273,207.50 $ 161,523.10 $ 2,434,730.60
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNID1210 dflNJV9 -IVNI91210 01
THIS DOCUMENT IS A SUBSTITUTION
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
Land Management System 40-B74614
1,2,3,4, 1103 Contribution From General Fund 31000 General
5 Government
Projects
$ 1,176,209.17 $ - $ 1,176,209.17
Land Management System
40-B74614 1,2,3,4, 1565 Sunshine State Government 31000 General
5 Financing Commission Loan # 3 Government
Projects
$ 5,063,014.84 $ (0.01) $ 5,063,014.83
MRC A/C Replacements
40-B30865E 1,2,3,4, 1426 Contribution from General Fund FY 31000 General
5 2008 Government
Projects
$ 35,100.00 $ 35,100.00
Police Vehicle Replacement 40-B74220
1,2,3,4, 1103 Contribution From General Fund 31000 General
5 Government
Projects
$ 9,141,422.27 $ - $ 9,141,422.27
Police Vehicle Replacement 40-B74220
1,2,3,4, 1304 Contribution from General Fund FY 31000 General
5 2007 Government
Projects
$ 4,433,407.45 $ - $ 4,433,407.45
Police Vehicle Replacement 40-B74220 1,2,3,4, 1426 Contribution from General Fund FY 31000 General
5 2008 Government
w Projects
m PW Maintenance Yard 40-B30551 1,2,3,4, 1113 Local Oprion Gas Tax
5
31000 General
Government
Projects
$ 13,890,660.35 $ 24,700.72 $ 13,915,361.07
$ 30,226.44 $ 1,850.00 $ 32,076.44
PW Maintenance Yard 40-B30551
1,2,3,4, 1426 Contribution from General Fund FY 31000 General
5 2008 Government
Projects
$ 1,268,254.37 $ - $ 1,268,254.37
Quality of Life District 2
40-B39910 2 1584 Homeland Defense/Neighborhood 31000 General $ 54,926.75 $ $ 54,926.75
Improvement Bond Series 3 Government
Projects
Repairs and Maintenance of MRC AC Systems 40-B40410 1,2,3,4, 1426 Contribution from General Fund FY 31000 General
and Elevators and Fire Alarm Replacement 5 2008 Government
Projects
- $ 195,184.16 $ 195,184.16
Upgrade PC Software & Hardware 40-B74606
1,2,3,4, 1103 Contribution From General Fund 31000 General
5 Government
Projects
$ 2,003,786.30 $ - $ 2,003,786.30
Upgrade PC Software & Hardware 40-B74606
1,2,3,4, 1304 Contribution from General Fund FY 31000 General
5 2007 Government
Projects
$ 293,464.39 $ 449.99 $ 293,914.38
Upgrade PC Software & Hardware 40-B74606
1,2,3,4, 1426 Contribution from General Fund FY 31000 General
5 2008 Government
Projects
$ 621,343.52 $ $ 621,343.52
Virginia Key Landfill Assessment
40-B35002 2 1496 Sunshine State Government 31000 General
Financing Commission Loan # 2 Government
Projects
$ 94,619.03 $ 74,045.04 $ 168,664.07
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNIEI O dflNJVB '1VNIEI O 01
THIS DOCUMENT IS A SUBSTITUTION
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
Computer Aided Dispatch (CAD)
40-B72801 1,2,3,4, 1105 Fire Assessment Fee
5
32000 Public Safety $ 70,865.00 $ 46,378.00 $ 117,243.00
Defense and Security Equipment Acquisition 40-B72813 1,2,3,4, 1049 HD Fire Rescue Homeland Defense 32000 Public Safety $ 800,279.21 $
5 Preparedness Initiative Series 1
$ 800,279.21
Defense and Security Equipment Acquisition 40-B72813 1,2,3,4, 1370 HD2 Fire Rescue Preparedness
5 Initiative
32000 Public Safety $ 983,298.61 $ $ 983,298.61
Defense and Security Equipment Acquisition 40-B72813 1,2,3,4, 1584 Homeland Defense/Neighborhood 32000 Public Safety $ 710,436.93 $ $ 710,436.93
5 Improvement Bond Series 3
FEMA Assistance to Firefighters Program 2011 40-B70418 1,2,3,4, 1426 Contribution from General Fund FY 32000 Public Safety $ 4,147.97 $ 994.02 $ 5,141.99
5 2008
FEMA Assistance to Firefighters Program 2011 40-B70418 1,2,3,4, 1853 2011 FEMA/Assistance to Firefigters 32000 Public Safety $ 16,591.95 $ 3,976.08 $ 20,568.03
5 Grant Program
o Fire Facilities Generators (North & South) 40-B70718 1,2,3,4, 1422 Impact Fees New Ordinance-2007
5
32000 Public Safety
$
$ 78,856.95 $ 78,856.95
Fire Rescue Personal Protective Equipment
40-B70411 1,2,3,4, 1426 Contribution from General Fund FY 32000 Public Safety $ 110,927.07 $ $ 110,927.07
5 2008
Fire Station #1 Renovation and Miscellaneous 40-B60455B 2 1426 Contribution from General Fund FY 32000 Public Safety $
Repairs 2008
$ 15,019.45 $ 15,019.45
Fire Station #10 (New) 40-B60351
1 1103 Contribution From General Fund 32000 Public Safety $ 341,185.98 $ $ 341,185.98
Fire Station #10 (New)
40-B60351 1 1108 Impact Fees Ord
32000 Public Safety $ 195,737.08 $ $ 195,737.08
Fire Station #10 Restroom Remodeling
40-B70104 1 1017 Fire Assessment Fee
32000 Public Safety $ 13,550.65 $ 11,200.30 $ 24,750.95
Fire Station #10 Restroom Remodeling
40-B70104 1 1105 Fire Assessment Fee
32000 Public Safety
$ 3,258.74 $ $ 3,258.74
Fire Station #10 Restroom Remodeling 40-B70104
1 1426 Contribution from General Fund FY 32000 Public Safety $ 20,774.33 $ 115.74 $ 20,890.07
2008
co
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
Fire Station #12 Re -roofing 40-B70212
5 1105 Fire Assessment Fee 32000 Public Safety $ 1,222.86 $ 62,710.75 $ 63,933.61
Fire Station #14 (New) 40-B60454
4 1051 HD Neighborhood Fire Stations & 32000 Public Safety $ 181,361.84 $ $ 181,361.84
Training Facility Series 1
Fire Station #14 (New) 40-B60454
4 1496 Sunshine State Government 32000 Public Safety $ 31,855.64 $ (0.01) $ 31,855.63
Financing Commission Loan # 2
Fire Station #14 (New)
40-B60454 4 1584 Homeland Defense/Neighborhood 32000 Public Safety $ 1,573.91 $ 438,078.53 $ 439,652.44
Improvement Bond Series 3
Fire Station #5 Exterior Walls Repair - D1 40-B70210 1 1426 Contribution from General Fund FY 32000 Public Safety $ 24,363.08 $ 87,279.12 $ 111,642.20
2008
Fire Station 13 (New)
40-B60453A 2 1051 HD Neighborhood Fire Stations & 32000 Public Safety $ 52,992.00 $ $ 52,992.00
Training Facility Series 1
Fire Station 13 (New) 40-B60453A 2 1367 HD2 Neighborhood Fire Stations and 32000 Public Safety $ 4,088,753.18 $ 470,039.02 $ 4,558,792.20
Training Facility
Fire Station 13 (New)
40-B60453A 2 1422 Impact Fees New Ordinance-2007 32000 Public Safety $ 6,504.09 $ $ 6,504.09
Fire Station 13 (New)
40-B60453A 2 1584 Homeland Defense/Neighborhood 32000 Public Safety $ 18,363.56 $ $ 18,363.56
Improvement Bond Series 3
Fire Station Equipment and Furniture
40-B72803 1,2,3,4, 1017 Fire Assessment Fee
Replacement 5
32000 Public Safety $ 129,081.25 $ $ 129,081.25
Fire Station Equipment and Furniture
40-B72803 1,2,3,4, 1105 Fire Assessment Fee
Replacement 5
32000 Public Safety $ 174,387.70 $ $ 174,387.70
Fire Station Equipment and Furniture 40-B72803 1,2,3,4, 1108 Impact Fees Ord
Replacement 5
32000 Public Safety $ 80,433.49 $ $ 80,433.49
Fire Station Equipment and Furniture 40-B72803 1,2,3,4, 1426 Contribution from General Fund FY 32000 Public Safety $ 238,890.41 $ 58,512.25 $ 297,402.66
Replacement
5 2008
Fire Station No 6 Office Building
40-B70102A 5 1105 Fire Assessment Fee
32000 Public Safety
$ 7,225.39 $ 150.00 $ 7,375.39
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNIEI O dflNJVB '1VNIE12:1O 01
THIS DOCUMENT IS A SUBSTITUTION
CO
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
Fire Stations & Other Fire Facilities
40-B72802 1,2,3,4, 1017 Fire Assessment Fee
5
32000 Public Safety $ 501,290.23 $ $ 501,290.23
Fire Stations & Other Fire Facilities
40-B72802 1,2,3,4, 1105 Fire Assessment Fee 32000 Public Safety $ 1,991,258.10 $ 41,661.73 $ 2,032,919.83
5
Fire Stations & Other Fire Facilities 40-B72802
1,2,3,4, 1426 Contribution from General Fund FY 32000 Public Safety $ 656,039.09 $ 38,408.53 $ 694,447.62
5 2008
Firefighting Equipment and Gear
40-B70106 1,2,3,4, 1105 Fire Assessment Fee
5
32000 Public Safety
$
$ 17,197.23 $ 17,197.23
Large Firefighting Equipment
40-B72809 1,2,3,4, 1017 Fire Assessment Fee
5
32000 Public Safety $ 116,435.48 $ $ 116,435.48
Large Firefighting Equipment
40-B72809 1,2,3,4, 1105 Fire Assessment Fee
5
32000 Public Safety $ 110,316.00 $ $ 110,316.00
N Light Fleet Replacement
40-B72808 1,2,3,4, 1017 Fire Assessment Fee
5
32000 Public Safety $ 286,161.65 $ 0.01 $ 286,161.66
Light Fleet Replacement
40-B72808 1,2,3,4, 1105 Fire Assessment Fee
5
32000 Public Safety $ 242,559.29 $ (0.01) $ 242,559.28
Phone and Radio Equipment Upgrades
40-B72804 1,2,3,4, 1017 Fire Assessment Fee
5
32000 Public Safety $ 51,300.50 $ $ 51,300.50
Phone and Radio Equipment Upgrades
40-B72804 1,2,3,4, 1105 Fire Assessment Fee 32000 Public Safety $ 226,160.67 $ 13,607.68 $ 239,768.35
5
Police Department Property Unit Outdoor 40-B30373A 1,2,3,4, 1108 Impact Fees Ord 32000 Public Safety $ 379,197.65 $ 5,747.93 $ 384,945.58
Storage 5
Police Department Property Unit Outdoor 40-B30373A 1,2,3,4, 1422 Impact Fees New Ordinance-2007 32000 Public Safety $ 353,483.94 $ 11,964.77 $ 365,448.71
Storage 5
Police Department Property Unit Outdoor
Storage
40-B30373A 1,2,3,4, 1426 Contribution from General Fund FY 32000 Public Safety $ 120,107.10 $ $ 120,107.10
5 2008
Police Department Property Unit Outdoor 40-B30373A 1,2,3,4, 1584 Homeland Defense/Neighborhood 32000 Public Safety $ 116,235.00 $ $ 116,235.00
Storage 5 Improvement Bond Series 3
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VN1912IO dflNJVB '1VN1912IO 01
THIS DOCUMENT IS A SUBSTITUTION
CO
n -i -i
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN D O x
z O 7
CO z Cl
(71_ O
m z c
D
Project Name Project Dist (s) Award Award Name Fund No. Fund Description Actual Encumbrances Total Cost m •z
Number NO. —i n
x 7
Police Headquarters Helipad and Roof 40-B72915A 1,2,3,4, 1422 Impact Fees New Ordinance-2007 32000 Public Safety $ 288.82 $ $ 288.82 z 0 m
Replacement 5 o 67 4
_1 z =
x D c-1
Police Headquarters Helipad and Roof 40-B72915A 1,2,3,4, 1496 Sunshine State Government 32000 Public Safety $ 33,025.72 $ 36,732.50 $ 69,758.22 o Z
Replacement 5 Financing Commission Loan # 2 nn
c
K
Brickell Area Shared Use Path and Roadway 40-B30822T 2 1954 Citiwide Landscape 33000 Disaster $ $ 65,000.00 $ 65,000.00 z
Improvements -Tree Recovery
Coconut Grove Waterfront Master Plan PHI 40-B30182A 2 1556 Coconut Grove Waterfront Master 34000 Public Facilities- $ 137,956.50 $ 7,076.28 $ 145,032.78
Plan - Coral Reef Yacht Club CIP
Coconut Grove Waterfront Master Plan PHI 40-B30182A 2 1557 Coconut Grove Waterfront Master 34000 Public Facilities- $ 63,555.91 $ 11,286.70 $ 74,842.61
Plan - Biscayne Bay Yacht Club CIP
Coconut Grove Waterfront Master Plan PHI 40-B30182A
2 1669 TVM Production -Basic Use Fee 34000 Public Facilities- $ 36,025.42 $ 65,831.60 $ 101,857.02
Coconut Grove Expo -Burn Notice CIP
w Dinner Key Marina Dinghy Dock 40-B30735
2 1437 FY07 Marinas Capital Repairs and 34000 Public Facilities- $ 25,049.52 $ 18,032.48 $ 43,082.00
Capital Related Improvements CIP
Dorsey Memorial Library Restoration 40-B30531
2 1421 Dorsey Mamorial Library 34000 Public Facilities- $ 13,650.00 $ $ 13,650.00
CIP
Gusman Hall Improvements / Repairs 40-B70100
2 1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 372,947.53 $ $ 372,947.53
Improvement Bond Series 3 CIP
James L. Knight Center / Hyatt -Fire Alarm 40-B70414 2 1496 Sunshine State Government 34000 Public Facilities- $ 498.58 $ $ 498.58
System Replacement
Financing Commission Loan # 2 CIP
James L. Knight Center Miscellaneous
Improvements
40-B33506 1,2,3,4, 1103 Contribution From General Fund 34000 Public Facilities- $ 49,104.71 $ $ 49,104.71
5 CIP
Knight Center ADA Restroom Improvements 40-B30365N
2 1350 SRF 2007 Contribution to Capital 34000 Public Facilities- $ 109,530.27 $ 47,469.73 $ 157,000.00
CIP
Knight Center ADA Restroom Improvements 40-B30365N 2 1426 Contribution from General Fund FY 34000 Public Facilities- $ 5,265.92 $ 37,743.26 $ 43,009.18
2008 CIP
Manuel Artime Dimmer Rack System 40-B30501B 1,2,3,4, 1850 2011-2012 Capital Development 34000 Public Facilities- $ 2,145.11 $ $ 2,145.11
5
Grants Programs CIP
CO
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
Manuel Artime Miscellaneous Project
40-B30501A 3 1212 SRF Contribution to CIP - Prior to
34000 Public Facilities- $ 18,158.75 $ $ 18,158.75
2006 CIP
Manuel Artime Miscellaneous Project 40-B30501A
3 1350 SRF 2007 Contribution to Capital 34000 Public Facilities- $ 46,909.79 $ 76,916.18 $ 123,825.97
CIP
Manuel Artime Miscellaneous Project
40-B30501A 3 1426 Contribution from General Fund FY 34000 Public Facilities- $ 300.34 $ $ 300.34
2008 CIP
Marine Stadium Marina Bulkhead Replacement 40-B30689
2 1386 HD2 Citywide Waterfront 34000 Public Facilities- $ 10,236.67 $ $ 10,236.67
Improvements CIP
Marine Stadium Marina Bulkhead Replacement 40-B30689
2 1437 FY07 Marinas Capital Repairs and 34000 Public Facilities- $ 42,259.62 $ $ 42,259.62
Capital Related Improvements CIP
Marine Stadium Marina Bulkhead Replacement 40-B30689
2 1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 86,307.47 $ 23,495.32 $ 109,802.79
Improvement Bond Series 3 CIP
Marine Stadium Marina Improvements 40-B33514
2 1060 HD Citywide Waterfront 34000 Public Facilities- $ 56,136.06 $ $ 56,136.06
Improvements Series 1 CIP
Marine Stadium Marina Improvements
40-B33514 2 1350 SRF 2007 Contribution to Capital
34000 Public Facilities- $ 4,516.94 $ $ 4,516.94
CIP
Marine Stadium Marina Improvements 40-B33514
2 1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 4,991.94 $ $ 4,991.94
Improvement Bond Series 3 CIP
Marine Stadium Restoration 40-B30688
2 1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 16,082.67 $ (0.01) $ 16,082.66
Improvement Bond Series 3 CIP
Marine Stadium Marina at Virginia Key 40-B40180
2 1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 25,531.93 $ 752.19 $ 26,284.12
Improvement Bond Series 3 CIP
Marine Stadium Marina at Virginia Key
40-B40180 2 1843 FIND- Marine Stadium Marina at
34000 Public Facilities- $ 18,390.30 $ 252.18 $ 18,642.48
Virginia Key -Phase 1 B-40180 CIP
Miamarina Pier A, B & C Fire Line Repairs 40-B30696
2 1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 120,865.67 $ 258,383.63 $ 379,249.30
Improvement Bond Series 3 CIP
Miscellaneous Repair - 10% Set Aside 40-B30706 2 1350 SRF 2007 Contribution to Capital 34000 Public Facilities- $ 7,064.42 $ $ 7,064.42
CIP
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNID1210 dflNJVB -IVNID1210 01
THIS DOCUMENT IS A SUBSTITUTION
CO
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
Miscellaneous Repair - 10% Set Aside 40-B30706
2 1437 FY07 Marinas Capital Repairs and 34000 Public Facilities- $ 1,193,097.07 $ 131,610.77 $ 1,324,707.84
Capital Related Improvements CIP
Miscellaneous Repair - 10% Set Aside
40-B30706 2 1668 Rickenbacker Marina Parking 34000 Public Facilities- $ 100.00 $ $ 100.00
Revenue -Additional Parking CIP
Miscellaneous Repair - 10% Set Aside 40-B30706
2 1670 Rickenbacker Marina Rental 34000 Public Facilities- $ 112,238.36 $ $ 112,238.36
Revenue -Boat Launching Ramp CIP
New Dinner Key Marina Dockmaster Building 40-B60464
2 1212 SRF Contribution to CIP - Prior to 34000 Public Facilities- $
2006 CIP
$ 4,162.86 $ 4,162.86
New Dinner Key Marina Dockmaster Building 40-B60464 2 1350 SRF 2007 Contribution to Capital 34000 Public Facilities- $ 3,993.88 $ $ 3,993.88
CIP
New Dinner Key Marina Dockmaster Building 40-B60464 2 1386 HD2 Citywide Waterfront
34000 Public Facilities- $ 217,219.79 $ 32,785.93 $ 250,005.72
Improvements CIP
U' New Dinner Key Marina Dockmaster Building 40-B60464
2 1422 Impact Fees New Ordinance-2007 34000 Public Facilities- $ $ 87,986.00 $ 87,986.00
CIP
New Dinner Key Marina Dockmaster Building 40-B60464
2 1437 FY07 Marinas Capital Repairs and 34000 Public Facilities- $ 113,395.74 $ 5,475.14 $ 118,870.88
Capital Related Improvements CIP
New Dinner Key Marina Dockmaster Building 40-B60464
2 1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 466,743.99 $ 2,743,200.19 $ 3,209,944.18
Improvement Bond Series 3 CIP
African Square Park -Splash Park D5
40-B30882 5 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 87,204.32 $ 20,145.82 $ 107,350.14
Bay of Pigs Park Lighting - D4
40-B30772 4 1570 HD2 Dist 4 Neighborhood QOL
Improvements
35000 Parks &
Recreation
$ 18,068.45 $ 15,523.29 $ 33,591.74
Bayfront Park Electrical Repairs
40-B40173 2 1788 Bayfront Park Trust Contribution to 35000 Parks &
Capital -Electrical Repairs, B-40173 Recreation
$ 159,981.65 $ 110,191.73 $ 270,173.38
Bryan Park Community Building - D4
40-B30134A 4 1570 HD2 Dist 4 Neighborhood QOL 35000 Parks & $ 5,686.37 $ $ 5,686.37
Improvements Recreation
Bryan Park Community Building - D4
40-B30134A 4 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 112,884.92 $ 31,831.89 $ 144,716.81
CAN BE SEEN AT THE END OF THIS DOCUMENT.
CO
Project Name
Caribbean Marketplace Renovations
Caribbean Marketplace Renovations
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN T.
o 7
A p
m _ O
m z C
z D E
Project Dist (s) Award Award Name Fund No. Fund Description Actual Encumbrances Total Cost n c, z
Number NO. -1 —1D
m c >
m -0 v,
40-B30671 5 1052 HD Little Haiti Park Land Acquisition 35000 Parks & $ 30,272.44 $ $ 30,272.44 o A m
& Development Series 1 Recreation o F) 4
_1 z =
c
D —1
40-B30671 5 1365 HD2 Little Haiti Park Land 35000 Parks & $ 197,141.78 $ 7,747.22 $ 204,889.00 po O
z
Acquisition & Development Recreation c
E
Caribbean Marketplace Renovations
40-B30671 5 1420 Miami Sports & Exhibition Authority 35000 Parks & $ 164,680.88 $ 185,300.43 $ 349,981.31
Contribution to Capital Recreation
Caribbean Marketplace Renovations
40-B30671 5 1496 Sunshine State Government 35000 Parks &
Financing Commission Loan # 2 Recreation
$ 49,931.46 $ 17,484.57 $ 67,416.03
Caribbean Marketplace Renovations
40-B30671 5 1860 MDC - Caribbean Marketplace
Renovation, B-30671
35000 Parks &
Recreation
$ 354,614.00 $ $ 354,614.00
Citywide Park Equipment & Site Impr.
40-B30541D 1,2,3,4, 1422 Impact Fees New Ordinance-2007
5
35000 Parks &
Recreation
$ 900,983.71 $ 416,281.31 $ 1,317,265.02
Citywide Park Equipment & Site Impr.
40-B30541D 1,2,3,4, 1426 Contribution from General Fund FY 35000 Parks &
5 2008 Recreation
$ 127,508.65 $ (21,493.74) $ 106,014.91
Citywide Park Equipment & Site Improvements 40-B30541
1,2,3,4, 1085 HD District 4 Neighborhood QOL 35000 Parks &
5 Improvements Series 1 Recreation
$ 17,941.89 $ $ 17,941.89
Citywide Park Equipment & Site Improvements 40-B30541 1,2,3,4, 1368 HD2 Neighborhood Park 35000 Parks &
5 Improvements & Acquisition Recreation
$ 408,159.50 $ $ 408,159.50
Citywide Park Equipment & Site Improvements 40-B30541
1,2,3,4, 1422 Impact Fees New Ordinance-2007
5
35000 Parks &
Recreation
$ 345,785.24 $ $ 345,785.24
Citywide Park Equipment & Site Improvements 40-B30541 1,2,3,4, 1464 Sunshine State Governmental 35000 Parks &
5 Financing Commission Loan Recreation
$ 2,448,979.40 $ - $ 2,448,979.40
Citywide Park Equipment & Site Improvements 40-B30541 1,2,3,4, 1496 Sunshine State Government 35000 Parks &
5 Financing Commission Loan # 2 Recreation
$ 1,010,096.83 $ - $ 1,010,096.83
Citywide Park Equipment & Site Improvements 40-B30541
1,2,3,4, 1584 Homeland Defense/Neighborhood 35000 Parks &
5 Improvement Bond Series 3 Recreation
$ 456,255.06 $ $ 456,255.06
Coral Gate Mini Park - D4
40-B30777 4 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 15,237.23 $ 36,584.60 $ 51,821.83
CO
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
Curtis Park New Pool Facility and Boat Ramp 40-B35806 1 1108 Impact Fees Ord
Improvement
35000 Parks &
Recreation
$ 9,295.00 $ $ 9,295.00
Curtis Park New Pool Facility and Boat Ramp 40-B35806 1 1368 HD2 Neighborhood Park 35000 Parks &
Improvement Improvements & Acquisition Recreation
$ 27,899.58 $ 47,805.00 $ 75,704.58
Curtis Park New Pool Facility and Boat Ramp 40-B35806 1 1386 HD2 Citywide Waterfront 35000 Parks & $ 2,767.50 $ $ 2,767.50
Improvement Improvements Recreation
Curtis Park New Pool Facility and Boat Ramp 40-B35806 1 1422 Impact Fees New Ordinance-2007 35000 Parks & $ 2,244.56 $ $ 2,244.56
Improvement Recreation
Curtis Park New Pool Facility and Boat Ramp 40-B35806 1 1496 Sunshine State Government 35000 Parks & $ 121,030.91 $ $ 121,030.91
Improvement Financing Commission Loan # 2 Recreation
Curtis Park New Pool Facility and Boat Ramp 40-B35806 1 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Improvement Bond Series 3 Recreation
$ 177,228.30 $ 129,749.20 $ 306,977.50
D2 Quality of Life Park Improvements
40-B39910E 2 1366 HD2 Dist. 2 Neighborhood QOL
Improvements
35000 Parks &
Recreation
$ 577,734.79 $ $ 577,734.79
D2 Quality of Life Park Improvements
40-B39910E 2 1584 Homeland Defense/Neighborhood 35000 Parks & $ 361,739.84 $ $ 361,739.84
Improvement Bond Series 3 Recreation
Duarte Park Bldg Renovation/Expansion
40-B35812A 1 1496 Sunshine State Government 35000 Parks &
Financing Commission Loan # 2 Recreation
$ 482,385.31 $ 7,652.18 $ 490,037.49
Duarte Park Bldg Renovation/Expansion
40-B35812A 1 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 748,533.56 $ 4,263.44 $ 752,797.00
Fern Isle / PBA Park Improvements - D1
40-B30800 1 1368 HD2 Neighborhood Park 35000 Parks &
Improvements & Acquisition Recreation
$ 14,450.97 $ 10,469.03 $ 24,920.00
Gibson Park Master Plan
40-B30305B 5 1368 HD2 Neighborhood Park 35000 Parks & $ 97,774.00 $ $ 97,774.00
Improvements & Acquisition Recreation
Gibson Park Master Plan
40-B30305B 5 1457 Homeland Defense 1& 2 Interest 35000 Parks &
Post 9-30-06 & 9-30-07 Recreation
$ 796,058.02 $ (0.01) $ 796,058.01
Gibson Park Master Plan
40-B30305B 5 1496 Sunshine State Government 35000 Parks & $ 8,000,467.00 $ - $ 8,000,467.00
Financing Commission Loan # 2 Recreation
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNIE12:1O dfNJVB '1VNIDIBO 01
THIS DOCUMENT IS A SUBSTITUTION
CO
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual
Encumbrances Total Cost
Hadley Park Youth Center and Field
Improvements
40-B35883A
5 1422 Impact Fees New Ordinance-2007
35000 Parks &
Recreation
Hadley Park Youth Center and Field
Improvements
40-B35883A
5 1496 Sunshine State Government
Financing Commission Loan # 2
35000 Parks &
Recreation
n 0
n o
Z O E
W A p
r.Gl O
cn
m Z C
Z D �
-1 n
c >
$ 28,463.72 $ 0.01 $ 28,463.73 z O
p A co
o � �
_1 Z =
x n c
$ 274,669.41 $ (0.09) $ 274,669.32 o p
z
n
c
Hadley Park Youth Center and Field
Improvements
40-B35883A
5 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 410,455.48 $ 125,407.82 $ 535,863.30
Kennedy Park Restrooms Building
Improvements
40-B35838
2 1058 HD Neighborhood Park
Improvements & Acquisition Seriesl
35000 Parks &
Recreation
$ 332.50 $
$ 332.50
Kennedy Park Restrooms Building
Improvements
40-B35838
2 1108 Impact Fees Ord
35000 Parks &
Recreation
$ 4,899.61 $
$ 4,899.61
Kennedy Park Restrooms Building
Improvements
40-B35838
2 1496 Sunshine State Government
Financing Commission Loan # 2
35000 Parks &
Recreation
$ 2,619.55 $
$ 2,619.55
0D Kennedy Park Restrooms Building
Improvements
40-B35838
2 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 42,761.96 $ 9,639.30 $ 52,401.26
Kennedy Park Shoreline Stabilization PH1
40-B30541C
2 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 71,000.00 $
$ 71,000.00
Kennedy Park Shoreline Stabilization PH1
40-B30541C
2 1669 TVM Production -Basic Use Fee
Coconut Grove Expo -Burn Notice
35000 Parks &
Recreation
$ 34,219.65 $ 3,210.19 $ 37,429.84
Kinloch Park Building Addition - D1
40-B40457
1 1368 HD2 Neighborhood Park
Improvements & Acquisition
35000 Parks &
Recreation
$ 335.02 $
$ 335.02
Little River Waterfront Park (Bayfront &
Riverfront Lands Acquisition)
40-B50722
2 1350 SRF 2007 Contribution to Capital
35000 Parks &
Recreation
$ 477,794.00 $
$ 477,794.00
Lummus Landing Square - D5
40-B30886
5 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 51,267.07 $ 140,378.77 $ 191,645.84
Manatee Bend Park Shoreline Improvements - 40-B30801
D2
2 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 30,085.21 $ 19,054.19 $ 49,139.40
Manatee Bend Park Shoreline Improvements - 40-B30801
D2
2 1904 FIND- Manatee Bend Park Shoreline 35000 Parks &
Improvements, Phase I B-30801 Recreation
$ 38,500.00 $ 38,500.00
Z 0 in
CO
Project Name
Maximo Gomez/Domino Park Restroom
Improvements D3
m A o
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN c, 2
m Z C
D K
m
—1 n
Project Dist (s) Award Award Name Fund No. Fund Description Actual Encumbrances Total Cost m c a
Number NO. z 0 c
q 4
40-B35861B 3 1457 Homeland Defense 1& 2 Interest 35000 Parks & $ 523.36 $ 4,201.86 $ 4,725.22 = y
Post 9-30-06 & 9-30-07 Recreation o 0
o z
n
Maximo Gomez/Domino Park Restroom
Improvements D3
40-B35861B 3 1584 Homeland Defense/Neighborhood 35000 Parks & $ 1,887.07 $ 17,240.14 $ 19,127.21 K
Improvement Bond Series 3 Recreation z
Moore Park New Construction
40-B35887 5 1052 HD Little Haiti Park Land Acquisition 35000 Parks & $ 149,511.50 $ $ 149,511.50
& Development Series 1 Recreation
Moore Park New Construction
40-B35887 5 1058 HD Neighborhood Park 35000 Parks & $ 25,000.00 $ $ 25,000.00
Improvements & Acquisition Seriesl Recreation
Moore Park New Construction
40-B35887 5 1087 HD District 5 Neighborhood QOL 35000 Parks & $ 24,477.95 $ $ 24,477.95
Improvements Series 1 Recreation
Moore Park New Construction
40-B35887 5 1422 Impact Fees New Ordinance-2007 35000 Parks & $ 106,852.10 $ 0.03 $ 106,852.13
Recreation
m Moore Park New Construction
40-B35887 5 1464 Sunshine State Governmental 35000 Parks &
Financing Commission Loan Recreation
$ 104,341.77 $ 23,953.11 $ 128,294.88
Moore Park New Construction
40-B35887 5 1496 Sunshine State Government 35000 Parks &
Financing Commission Loan # 2 Recreation
$ 857,958.04 $ 95,540.00 $ 953,498.04
Moore Park New Construction
40-B35887 5 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 2,550,792.76 $ 2,617,428.24 $ 5,168,221.00
Museum of Science Development in 40-B78502A 1,2,3,4, 1389 HD2 Museum of Science 35000 Parks &
Bicentennial Park 5 Recreation
$ 738,000.00 $ $ 738,000.00
Museum of Science Development in
Bicentennial Park
40-B78502A 1,2,3,4, 1584 Homeland Defense/Neighborhood 35000 Parks &
5 Improvement Bond Series 3 Recreation
$ 713,625.00 $ $ 713,625.00
Museum Park 40-B30538
1,2,3,4, 1055 HD Bicentennial Park Improvements 35000 Parks &
5 Series 1 Recreation
$ 100,000.00 $ $ 100,000.00
Museum Park 40-B30538
1,2,3,4, 1103 Contribution From General Fund 35000 Parks &
5 Recreation
$ 50,777.90 $ $ 50,777.90
Museum Park 40-B30538
1,2,3,4, 1375 HD2 Bicentennial Park 35000 Parks &
5 Improvements Recreation
$ 252,942.99 $ 25,210.24 $ 278,153.23
N
O
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
Museum Park
40-B30538
1,2,3,4, 1457 Homeland Defense 1& 2 Interest
5 Post 9-30-06 & 9-30-07
35000 Parks &
Recreation
$ 121,567.10 $ 114,869.02 $ 236,436.12
Museum Park
40-B30538 1,2,3,4, 1464 Sunshine State Governmental
5 Financing Commission Loan
35000 Parks &
Recreation
$ 75,534.00 $ $ 75,534.00
Museum Park
40-B30538 1,2,3,4, 1496 Sunshine State Government
5 Financing Commission Loan # 2
35000 Parks &
Recreation
$ 4,496,625.12 $ 1,515,358.30 $ 6,011,983.42
Museum Park - DRI Air Quality (SR Project 35- 40-B30538E 1,2,3,4,
127003) 5
1231 Downtown Development
Supplemental Fee
35000 Parks &
Recreation
- $ 313,129.12 $ 313,129.12
Museum Park - DRI Fees Administration (SR
Project 35-127001)
40-B30538D 1,2,3,4, 1231 Downtown Development
5 Supplemental Fee
35000 Parks &
Recreation
$ 98,556.59 $ $ 98,556.59
Museum Park - DRI Transportation (SR Project
35-127004)
40-B30538F 1,2,3,4, 1231 Downtown Development
5 Supplemental Fee
35000 Parks &
Recreation
- $ 1,537,024.63 $ 1,537,024.63
Museum Park Environmental
Remediation/Seawall
40-B30538B 1,2,3,4, 1584 Homeland Defense/Neighborhood 35000 Parks &
5 Improvement Bond Series 3 Recreation
$ 200,000.00 $ $ 200,000.00
Pallot Park Shoreline Improvements
40-B30802 2 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 34,451.61 $ $ 34,451.61
Pallot Park Shoreline Improvements
40-B30802 2 1905 FIND- Pallot Park Shoreline
Improvements, Phase I B-30802
35000 Parks &
Recreation
$ 12,697.15 $ 15,228.10 $ 27,925.25
Parks ADA Modifications - District 2
40-B30547E 2 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 179,626.95 $ 35,682.42 $ 215,309.37
Parks ADA Modifications - District 4
40-B30547G 4 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 65,174.45 $ 29,067.44 $ 94,241.89
Peacock Park Site Improvements
40-B75883 2 1422 Impact Fees New Ordinance-2007 35000 Parks & $ 123.05 $ $ 123.05
Recreation
Peacock Park Site Improvements
40-B75883 2 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 91,522.19 $ 85,929.86 $ 177,452.05
Peacock Park Site Improvements
40-B75883 2 1669 TVM Production -Basic Use Fee
Coconut Grove Expo -Burn Notice
35000 Parks & $ 110.80 $ $ 110.80
Recreation
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNIDIBO dflNJt/8 '1VNIDIBO 01
THIS DOCUMENT IS A SUBSTITUTION
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
Spoil Island B & C Swim Area Improvement - D2 40-B30824 2 1669 TVM Production -Basic Use Fee 35000 Parks & $ 2,379.40 $ 15,885.40 $ 18,264.80
Coconut Grove Expo -Burn Notice Recreation
Spoil Island E Restoration and Floating Dock 40-B30721 2 1669 TVM Production -Basic Use Fee 35000 Parks & $ 19,723.19 $ $ 19,723.19
Coconut Grove Expo -Burn Notice Recreation
Virginia Key Beach Park Historic Restoration PH 40-B30174 2 1378 HD2 Virginia Key Park 35000 Parks &
2 Improvements Recreation
$ 891,728.02 $ 6,467.50 $ 898,195.52
Virginia Key Bike and Kayak Facility
40-B30995 2 1422 Impact Fees New Ordinance-2007 35000 Parks &
Recreation
$ 62,609.24 $ 20,361.14 $ 82,970.38
Virginia Key Rowing Center Improvements
40-B30374 2 1318 Virginia Key Rowing Center 35000 Parks &
Improvements Recreation
$ 182,680.66 $ 77,504.77 $ 260,185.43
West End Park New Community Building
40-B30690 4 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 186,719.56 $ 56,207.64 $ 242,927.20
N
O
Allapatah Area Roadway Improvement - D1 40-B30782 1 1297 Transit Half -Cent Surtax 36000 Streets & $ 25,204.38 $ 26,906.40 $ 52,110.78
Sidewalks
Bayside Historic Sign - D2
40-B39910K 2 1584 Homeland Defense/Neighborhood 36000 Streets & $ 21,413.26 $ $ 21,413.26
Improvement Bond Series 3 Sidewalks
Beacom Phase II - D3
40-B40325 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 81,014.64 $ 5,199.99 $ 86,214.63
Beacom Project Area Improvements
40-B30699 3 1379 Street Bonds - 2007 Series 36000 Streets & $ 601,258.45 $ 261,019.87 $ 862,278.32
Sidewalks
Bird Avenue Road Improvement
40-B30628 2 1297 Transit Half -Cent Surtax 36000 Streets & $ 187,538.06 $ 17,051.42 $ 204,589.48
Sidewalks
Bird Avenue Road Improvement
40-B30628 2 1419 Parking Surcharge 2007
36000 Streets &
Sidewalks
$ 143,121.49 $ 64,363.70 $ 207,485.19
Brickell Area Shared Use Path and Roadway 40-B30822 2 1297 Transit Half -Cent Surtax 36000 Streets & $ 139,519.62 $ 634,497.96 $ 774,017.58
Improvements Sidewalks
Buena Vista Heights East Roadway and Lighting 40-B78500B 5 1113 Local Oprion Gas Tax 36000 Streets & $ 15,089.23 $ $ 15,089.23
Improvements Sidewalks
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNIEI O dfl)IJVEI '1VNIEI O 01
THIS DOCUMENT IS A SUBSTITUTION
N
O
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN D o
z O in
W A p
Lel
m z c
Project Name Project Dist (s) Award Award Name Fund No. Fund Description Actual Encumbrances Total Cost z a E
Number NO. -I n -1
x , 7
Buena Vista Heights East Roadway and Lighting 40-B78500B 5 1379 Street Bonds - 2007 Series 36000 Streets & $ 1,295,035.27 $ 19,092.43 $ 1,314,127.70 z O c
70 co
Improvements Sidewalks o E z 4
m — _
x D C
Buena Vista One -Way Street Conversion and 40-B30891 5 1379 Street Bonds - 2007 Series 36000 Streets & $ 26,835.42 $ 14,364.94 $ 41,200.36 r o
Signage Sidewalks o z
c
Center Grove Lighting 40-B30621 2 1297 Transit Half -Cent Surtax 36000 Streets & $ 101,845.30 $ 49,504.54 $ 151,349.84
Sidewalks
Center Grove Lighting
40-B30621 2 1419 Parking Surcharge 2007
36000 Streets &
Sidewalks
$ 310,979.05 $ 58,504.49 $ 369,483.54
Citrus Grove Roadway Improvements
40-B30749 3 1379 Street Bonds - 2007 Series 36000 Streets & $ 116,665.84 $ 168,536.15 $ 285,201.99
Sidewalks
Citywide Bicycle Rack & Signage Program
40-B30694A 1,2,3,4, 1297 Transit Half -Cent Surtax
5
36000 Streets & $ 5,333.92 $ 2,879.99 $ 8,213.91
Sidewalks
N Civic Center Infrastructure 40-B30500 1,2,3,4, 1638 Street Bonds 2- 2009 Series
5
36000 Streets &
Sidewalks
$ 307,403.58 $ 43,917.75 $ 351,321.33
Coconut Grove Business Improvement District 40-B30687
2 1379 Street Bonds - 2007 Series 36000 Streets & $ 188,067.38 $ 14,968.24 $ 203,035.62
Sidewalks
Coconut Grove Business Improvement District 40-B30687 2 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 906,360.40 $ 942,829.47 $ 1,849,189.87
D3 Sidewalk ADA Retrofits
40-B30677 3 1379 Street Bonds - 2007 Series 36000 Streets & $ 21,011.55 $ $ 21,011.55
Sidewalks
District 3 - Sidewalk Repairs and ADA
40-B30377C 3 1379 Street Bonds - 2007 Series 36000 Streets & $ 79,318.67 $ 103,013.33 $ 182,332.00
Sidewalks
Downtown Baywalk Master Plan & Design 40-B30179 2 1584 Homeland Defense/Neighborhood 36000 Streets & $ 337,893.21 $ 75,484.21 $ 413,377.42
Improvement Bond Series 3 Sidewalks
DWNTWN Beautification - Design Phase
40-B30606D 1,2,3,4, 1379 Street Bonds - 2007 Series
5
36000 Streets &
Sidewalks
$ 309,525.86 $ 13,349.05 $ 322,874.91
DWNTWN Beautification - Design Phase
40-B30606D 1,2,3,4, 1638 Street Bonds 2- 2009 Series
5
36000 Streets & $ 844.61 $ $ 844.61
Sidewalks
N
O
n O =
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN z A o
N o
m z C
m
Z D E
Project Name Project Dist (s) Award Award Name Fund No. Fund Description Actual Encumbrances Total Cost > v z
Number NO. _ , 7
m C >
m v v3
z o c
DWNTWN Beautification - North 40-B30606N 1,2,3,4, 1297 Transit Half -Cent Surtax 36000 Streets & $ 861,784.00 $ $ 861,784.00 0 A m
5 Sidewalks o E 4
x z c
c
7 D 7,
O 0
DWNTWN Beautification - North 40-B30606N 1,2,3,4, 1379 Street Bonds - 2007 Series 36000 Streets & $ 4,254,448.22 $ 314,781.45 $ 4,569,229.67 o Z
5 Sidewalks c
E
z
DWNTWN Beautification - North 40-B30606N 1,2,3,4, 1419 Parking Surcharge 2007 36000 Streets & $ 492,398.28 $ 2,939.26 $ 495,337.54 71
5 Sidewalks
DWNTWN Beautification - North
40-B30606N 1,2,3,4, 1638 Street Bonds 2- 2009 Series
5
36000 Streets &
Sidewalks
$ 140,019.85 $ 2,487.20 $ 142,507.05
DWNTWN Beautification - South
40-B30606S 1,2,3,4, 1297 Transit Half -Cent Surtax
5
36000 Streets &
Sidewalks
$ 459,441.98 $ (0.01) $ 459,441.97
DWNTWN Beautification - South
40-B30606S 1,2,3,4, 1379 Street Bonds - 2007 Series
5
36000 Streets &
Sidewalks
$ 3,082,005.60 $ 81,119.51 $ 3,163,125.11
w DWNTWN Beautification - South
40-B30606S 1,2,3,4, 1419 Parking Surcharge 2007
5
36000 Streets &
Sidewalks
$ 471,204.71 $ (0.01) $ 471,204.70
DWNTWN Beautification - South
40-B30606S 1,2,3,4, 1638 Street Bonds 2- 2009 Series
5
36000 Streets &
Sidewalks
$ 584,586.89 $ 75,275.95 $ 659,862.84
DWNTWN Beautification (Lighting)
40-B30606L 1,2,3,4, 1379 Street Bonds - 2007 Series
5
36000 Streets &
Sidewalks
$ 1,346,217.62 $ 0.02 $ 1,346,217.64
DWNTWN Beautification (Lighting)
40-B30606L 1,2,3,4, 1638 Street Bonds 2- 2009 Series
5
36000 Streets &
Sidewalks
$ 274,706.57 $ 0.01 $ 274,706.58
DWNTWN Sidewalk & Street Improvements 40-B30606
1,2,3,4, 1101 Transit Half -Cent Surtax
5
36000 Streets &
Sidewalks
$ 9,802.12 $ 0.01 $ 9,802.13
DWNTWN Sidewalk & Street Improvements 40-B30606
1,2,3,4, 1379 Street Bonds - 2007 Series
5
36000 Streets &
Sidewalks
$ 151,334.02 $ $ 151,334.02
DWNTWN Sidewalk & Street Improvements 40-B30606
1,2,3,4, 1638 Street Bonds 2- 2009 Series
5
36000 Streets &
Sidewalks
$ 28,128.88 $ (0.01) $ 28,128.87
East Flagami Roadway Improvements - SW 2nd 40-B30961 4 1584 Homeland Defense/Neighborhood 36000 Streets & $ 208.43 $ 31,638.21 $ 31,846.64
Street and Sw 4th Improvement Bond Series 3 Sidewalks
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN CO A o
7 G') O
m
D Z c
E
• m
Project Name Project Dist (s) Award Award Name Fund No. Fund Description Actual Encumbrances Total Cost > co r
Number NO. _ 7
c D
rn
m v N
Fair Isle Area Roadway & Drainage 40-B30823 2 1297 Transit Half -Cent Surtax 36000 Streets & $ 72,273.02 $ 5,774.04 $ 78,047.06 o A N
Improvements-D2 Sidewalks _1 Z
c
N m —1
Flagami Traffic Calming - D4 40-B40672G 4 1638 Street Bonds 2- 2009 Series 36000 Streets & $ 326,008.17 $ 224,039.14 $ 550,047.31 o z
Sidewalks c
E
m
Z
Flagami Traffic Calming Phase IV - D4 40-B40672D 4 1379 Street Bonds - 2007 Series 36000 Streets & $ 416,441.57 $ 31,529.81 $ 447,971.38 71
Sidewalks
Flagami Traffic Calming Phase IV - D4
40-B40672D 4 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 180,232.30 $ 179,418.25 $ 359,650.55
1-95 South Miami Terminal Street Improvements 40-B30718
- D2
2 1379 Street Bonds - 2007 Series 36000 Streets & $ 139,535.35 $ 19,443.07 $ 158,978.42
Sidewalks
1-95 South Miami Terminal Street Improvements 40-B30718 2 1638 Street Bonds 2- 2009 Series
- D2
36000 Streets &
Sidewalks
$ 279,438.49 $ $ 279,438.49
N
O
• La Pastorita Traffic Calming and Miscellaneous 40-B30960 4 1379 Street Bonds - 2007 Series 36000 Streets & $
Improvements - D4 Sidewalks
$ 45,654.51 $ 45,654.51
La Pastorita Traffic Calming and Miscellaneous 40-B30960 4 1638 Street Bonds 2- 2009 Series
Improvements - D4
36000 Streets & $ 208.43 $ 5,231.53 $ 5,439.96
Sidewalks
Liberty Square T-Turnarounds - D5
40-B30980 5 1638 Street Bonds 2- 2009 Series
36000 Streets & $ 176.77 $ $ 176.77
Sidewalks
Little Haiti Gateway Signs - D5
40-B30892 5 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 16,953.65 $ 4,720.08 $ 21,673.73
Little Haiti Right of Way Improvements - D5 40-B30894 5 1379 Street Bonds - 2007 Series 36000 Streets & $ 3,642.30 $ 33,672.54 $ 37,314.84
Sidewalks
Little River Area Road and Drainage
Improvements
40-B30982 5 1379 Street Bonds - 2007 Series 36000 Streets & $
Sidewalks
$ 19,119.78 $ 19,119.78
Little River Industrial Park
40-B30540 5 1297 Transit Half -Cent Surtax 36000 Streets & $ 12,000.00 $ $ 12,000.00
Sidewalks
Little River Industrial Park
40-B30540 5 1379 Street Bonds - 2007 Series 36000 Streets & $ 1,219,650.47 $ 82,629.99 $ 1,302,280.46
Sidewalks
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
Lummus Park Landing Area Project
40-B30643 5 1379 Street Bonds - 2007 Series 36000 Streets & $ 131,256.32 $ 81,836.91 $ 213,093.23
Sidewalks
Miami Regional Intermodal Plan
40-B30645F 1,2,3,4, 1297 Transit Half -Cent Surtax
5
36000 Streets & $
Sidewalks
$ 14,813.02 $ 14,813.02
Miami Regional Intermodal Plan 40-B30645F 1,2,3,4,
5
1939 Miami Regional Intermodal Plan, B- 36000 Streets & $
30645F Sidewalks
$ 32,588.63 $ 32,588.63
Miami River Greenway - NW 10 Ave to NW 12 40-B30651 3 1297 Transit Half -Cent Surtax 36000 Streets & $ 514,503.36 $ 28,436.47 $ 542,939.83
Ave Sidewalks
Miami River Greenway - NW 10 Ave to NW 12 40-B30651 3 1857 FDOT - Mia River Grnwy- NW 10 36000 Streets &
Ave Ave to NW 12 Ave B-30651 Sidewalks
$ 378,131.28 $ 659,402.66 $ 1,037,533.94
Miami River Greenway from Miami Circle
Greenway to South Miami Avenue
40-B30631 2 1419 Parking Surcharge 2007
36000 Streets & $ 1,548.72 $ $ 1,548.72
Sidewalks
N
O
a' Miami River Greenway from Miami Circle 40-B30631 2 1789 FDOT-Miami River Greenway-Miami 36000 Streets & $ 94,798.85 $ 29,684.11 $ 124,482.96
Greenway to South Miami Avenue Circle Greenway to South Miami Sidewalks
Ave, B-30631
Miami River Greenway SW 1st Court to S. Miami 40-B30130 2 1379 Street Bonds - 2007 Series 36000 Streets & $ 392,053.48 $ 15,476.52 $ 407,530.00
Avenue Sidewalks
Miami River Greenway SW 1st Court to S. Miami 40-B30130 2 1638 Street Bonds 2- 2009 Series
Avenue
36000 Streets &
Sidewalks
$ 108,676.54 $ 39,988.45 $ 148,664.99
Miami River Greenway SW 1st Court to S. Miami 40-B30130
Avenue
2 1749 FDOT-Miami River Greenway-SW 36000 Streets &
1st Ct. to South Miami Ave, 40- Sidewalks
B30130
$ 664,556.57 $ 69,841.68 $ 734,398.25
Miami River Greenways - NW 5th Street Bridge 40-B30336 3 1101 Transit Half -Cent Surtax 36000 Streets & $ 187,984.78 $ 5,101.89 $ 193,086.67
Extension Sidewalks
Miami River Greenways - NW 5th Street Bridge 40-B30336 3 1297 Transit Half -Cent Surtax 36000 Streets & $ 235,525.92 $ (0.02) $ 235,525.90
Extension Sidewalks
Miami River Greenways - NW 5th Street Bridge 40-B30336
Extension
3 1858 FDOT- Miami River Greenway - NW 36000 Streets &
5th Street Bridge Extension, B- Sidewalks
30336
$ 771,114.33 $ 125,781.57 $ 896,895.90
Miami River Greenways/ Streetscape Segment D 40-B40686
(ELH)
3 1112 FDOT Greenway - East Little Havana 36000 Streets &
Bike Path (2001 Request) Sidewalks
$ 964,470.83 $ 356.75 $ 964,827.58
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNID1210 dfNJVB -IVNID1210 01
THIS DOCUMENT IS A SUBSTITUTION
N
O
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
Miami River Greenways/ Streetscape Segment D 40-B40686
(ELH)
3 1379 Street Bonds - 2007 Series 36000 Streets & $ 362,402.83 $ 0.02 $ 362,402.85
Sidewalks
Miami River Greenways/ Streetscape Segment D 40-B40686
(ELH)
3 1584 Homeland Defense/Neighborhood 36000 Streets & $ 224,911.63 $ 10,052.11 $ 234,963.74
Improvement Bond Series 3 Sidewalks
Miami River Greenways/ Streetscape Segment D 40-B40686 3 1638 Street Bonds 2- 2009 Series
(ELH)
36000 Streets &
Sidewalks
$ 87,330.68 $ 325,069.15 $ 412,399.83
NE 2 Avenue Improvements 40-B78508
2,5 1080 HD NE 2nd Avenue Improvements 36000 Streets &
Series 1 Sidewalks
$ 1,050,599.93 $ - $ 1,050,599.93
NE 2 Avenue Improvements 40-B78508
2,5 1101 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 55,000.00 $ $ 55,000.00
NE 2 Avenue Improvements 40-B78508
2,5 1297 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 854,297.95 $ 349,792.37 $ 1,204,090.32
NE 2 Avenue Improvements 40-B78508
2,5 1584 Homeland Defense/Neighborhood 36000 Streets &
Improvement Bond Series 3 Sidewalks
$ 1,057,864.03 $ 162,831.81 $ 1,220,695.84
NE 2nd Court Roadway & Drainage
Improvements Project- D5
40-B30880 5 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 81,552.04 $ 259,883.00 $ 341,435.04
North Spring Garden Greenway
40-B40643A 5 1088 HD Greenways Improvements Series 36000 Streets & $ 79,799.58 $ $ 79,799.58
1 Sidewalks
North Spring Garden Greenway
40-B40643A 5 1113 Local Oprion Gas Tax 36000 Streets & $ 298,341.81 $ $ 298,341.81
Sidewalks
North Spring Garden Greenway
40-B40643A 5 1379 Street Bonds - 2007 Series 36000 Streets & $ 928,348.89 $ 36,953.74 $ 965,302.63
Sidewalks
North Spring Garden Greenway
40-B40643A 5 1584 Homeland Defense/Neighborhood 36000 Streets & $ 100,180.30 $ 19.70 $ 100,200.00
Improvement Bond Series 3 Sidewalks
North Spring Garden Greenway
40-B40643A 5 1592 Florida Department of 36000 Streets & $ 1,000,000.00 $ - $ 1,000,000.00
Transportation Contract # APG62 Sidewalks
Northwest 14th Street Streetscape Project 40-B30518 5 1297 Transit Half -Cent Surtax 36000 Streets & $ 343,778.95 $ 50,265.99 $ 394,044.94
Sidewalks
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNIDIBO dflNJVB -IVNID1210 01
THIS DOCUMENT IS A SUBSTITUTION
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
NW 11 St from 27 to 37 Avenue Area Roadway 40-B30781 1 1379 Street Bonds - 2007 Series 36000 Streets & $ 80,019.28 $ 7,815.73 $ 87,835.01
Improvements - D1 Sidewalks
NW 11 St from 27 to 37 Avenue Area Roadway 40-B30781 1 1638 Street Bonds 2- 2009 Series
Improvements - D1
36000 Streets & $ 138.97 $ $ 138.97
Sidewalks
NW 11th Avenue Road Improvements - D3
40-B40324 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 14,229.21 $ 2,288.00 $ 16,517.21
NW 12 Avenue/NW 12 Place Roadway
Improvements
40-B30883 5 1297 Transit Half -Cent Surtax 36000 Streets & $ 122,090.50 $ 859,472.76 $ 981,563.26
Sidewalks
NW 14 Avenue & 28 Street Area Roadway 40-B30780 1 1101 Transit Half -Cent Surtax 36000 Streets & $ 20,198.51 $ 272,442.91 $ 292,641.42
Improvements - D1 Sidewalks
NW 14 Avenue & 28 Street Area Roadway 40-B30780 1 1297 Transit Half -Cent Surtax 36000 Streets & $ 72,687.37 $ 9,981.43 $ 82,668.80
Improvements - D1 Sidewalks
N
O
NW 14 Avenue & 28 Street Area Roadway 40-B30780 1 1379 Street Bonds - 2007 Series 36000 Streets & $ 174,756.51 $ 272,580.54 $ 447,337.05
Improvements - D1 Sidewalks
NW 17th Terrace Roadway Improvement
Project - D1
40-B30729 1 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 39,622.23 $ 200.32 $ 39,822.55
NW 18th Avenue Roadway Improvement Project 40-B30727 1 1638 Street Bonds 2- 2009 Series
- D1
36000 Streets &
Sidewalks
$ 1,265,610.73 $ 143,489.15 $ 1,409,099.88
NW 18th Place Road Improvements D3
40-B40314 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 15,368.11 $ 12,447.10 $ 27,815.21
NW 31st Street Roadway Improvement Project - 40-B30722
D1
1 1379 Street Bonds - 2007 Series 36000 Streets & $ 41,415.20 $ 70,247.11 $ 111,662.31
Sidewalks
NW 33rd Street Roadway Improvement Project - 40-B30724 1 1638 Street Bonds 2- 2009 Series
D1
36000 Streets &
Sidewalks
$ 494,056.64 $ 26,915.59 $ 520,972.23
NW 36 Avenue 15 to 16 Street Drainage - D1 40-B30785 1 1101 Transit Half -Cent Surtax 36000 Streets & $ 43.41 $ 3,156.93 $ 3,200.34
Sidewalks
NW 44th St between NW 7th and NW 8th 40-B30983 5 1379 Street Bonds - 2007 Series 36000 Streets & $
Avenue - D5 Sidewalks
$ 16,842.80 $ 16,842.80
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNIDIBO dflNDVB -IVNID1210 01
THIS DOCUMENT IS A SUBSTITUTION
N
O
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
NW 4th Terrace Roadway Improvement Project - 40-B30730 1 1638 Street Bonds 2- 2009 Series
D1
36000 Streets &
Sidewalks
$ 10,244.10 $ 14,176.34 $ 24,420.44
NW 62 Street West of 1-95 Roadway
Improvements
40-B30884 5 1379 Street Bonds - 2007 Series 36000 Streets & $ 2,487.97 $ $ 2,487.97
Sidewalks
NW 62 Street West of 1-95 Roadway
Improvements
40-B30884 5 1584 Homeland Defense/Neighborhood 36000 Streets & $ 18,597.44 $ 3,209.48 $ 21,806.92
Improvement Bond Series 3 Sidewalks
NW 7th Court
40-B30610 5 1379 Street Bonds - 2007 Series 36000 Streets & $ 657.02 $ $ 657.02
Sidewalks
NW 7th Court
40-B30610 5 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 34,484.89 $ 2,404.90 $ 36,889.79
NW 9th Street Roadway Improvement Project - 40-B30732
D1
1 1379 Street Bonds - 2007 Series 36000 Streets & $ 240,581.15 $ 18,958.74 $ 259,539.89
Sidewalks
0o NW 9th Street Roadway Improvement Project - 40-B30732
D1
1 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 379,027.09 $ 31,868.65 $ 410,895.74
Overtown Greenway @ NW 11 Terrace
40-B30624 5 1297 Transit Half -Cent Surtax 36000 Streets & $ 328,245.93 $ 34,339.47 $ 362,585.40
Sidewalks
Overtown/Wynwood Bicycle Pedestrian Mobility 40-B30645E
Plan
2,5 1297 Transit Half -Cent Surtax
36000 Streets & $ $ 12,000.00 $ 12,000.00
Sidewalks
Overtown/Wynwood Bicycle Pedestrian Mobility 40-B30645E 2,5 1899 Overtown/Wynwood Bicycle and 36000 Streets &
Plan Pedestrian Mobility Plan B-30645E Sidewalks
$ 19,740.59 $ 28,259.41 $ 48,000.00
Palm Grove Road Improvements
40-B30630 2 1101 Transit Half -Cent Surtax 36000 Streets & $ 69,331.09 $ 187,322.64 $ 256,653.73
Sidewalks
Palm Grove Road Improvements
40-B30630 2 1297 Transit Half -Cent Surtax 36000 Streets & $ 830,471.27 $ 180,643.59 $ 1,011,114.86
Sidewalks
Palm Grove Road Improvements
40-B30630 2 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 1,788,687.01 $ 591,230.99 $ 2,379,918.00
Roadway Improvements 40-B30990
1,2,3,4, 1297 Transit Half -Cent Surtax
5
36000 Streets & $ 647.74 $ $ 647.74
Sidewalks
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNIDIBO dflIJVB '1VNID18O 01
THIS DOCUMENT IS A SUBSTITUTION
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
S. Bayshore Drive from Aviation Avenue to Kirk 40-B40168
Avenue - D2
2 1113 Local Oprion Gas Tax 36000 Streets & $ 283.01 $ 0.02 $ 283.03
Sidewalks
S.E. 3rd Street Widening ( fka Dupont Plaza 40-B31206 2 1108 Impact Fees Ord
Traffic Recirculation)
36000 Streets &
Sidewalks
$ 177,891.86 $ $ 177,891.86
S.E. 3rd Street Widening ( fka Dupont Plaza 40-B31206 2 1297 Transit Half -Cent Surtax 36000 Streets & $ 94,586.79 $ 21,293.57 $ 115,880.36
Traffic Recirculation) Sidewalks
S.E. 3rd Street Widening ( fka Dupont Plaza 40-B31206 2 1419 Parking Surcharge 2007
Traffic Recirculation)
36000 Streets &
Sidewalks
$ 175,708.64 $ 15,831.28 $ 191,539.92
n
D O
S.E. 3rd Street Widening (fka Dupont Plaza
Traffic Recirulation) - DRI Administration
40-B31206B 2 1231 Downtown Development 36000 Streets & $ 36,107.58 $
Supplemental Fee Sidewalks
m
z
36,107.58
6-)o
Z c
D �
Shenandoah Area Improvements - D4 40-B30775 4 1101 Transit Half -Cent Surtax 36000 Streets & $ 21,187.21 $ 233,261.34 R. 254,448.53
Sidewalks m c a
iv z
0
m Shenandoah Area Improvements - D4 40-B30775 4 1638 Street Bonds 2- 2009 Series 36000 Streets & $ 36,010.43 $ 12,097.3b 48,107.82
Sidewalks
o c
z -
c
N D =
Shenandoah Roadway Improvements D3
Shenandoah Traffic Calming Priority 4
40-B40327 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 4,123.74 $ 25,657.0F $ z 29,780.82
40-B30167D 4 1379 Street Bonds - 2007 Series 36000 Streets & $ 280,900.43 $ 48,251.57 $ 329,152.00
Sidewalks
Shenandoah Traffic Calming Priority 4
40-B30167D 4 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 1,061,191.32 $ 20,163.67 $ 1,081,354.99
Silver Bluff Traffic Calming Priority 3
40-B30168A 4 1379 Street Bonds - 2007 Series 36000 Streets & $ 83,902.66 $ 9,407.83 $ 93,310.49
Sidewalks
Silver Bluff Traffic Calming Priority 3
40-B30168A 4 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 446,271.40 $ 12,471.87 $ 458,743.27
South Bayshore Drive Roadway and Drainage 40-B30646 2 1297 Transit Half -Cent Surtax 36000 Streets & $ 31,721.07 $ 0.01 $ 31,721.08
Improvements Sidewalks
South Bayshore Drive Roadway and Drainage 40-B30646
Improvements
2 1750 MD Cty-South Bayshore Drive 36000 Streets &
Roadway & Drainage Imp.40- Sidewalks
B30646
$ 206,997.28 $ 243,002.72 $ 450,000.00
N
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
SW 10th Street Road Improvements - D3
40-B40306 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 40,830.15 $ 186,856.70 $ 227,686.85
SW 15th Street Road Improvements D3
40-B40301 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 16,731.66 $ 2,118.47 $ 18,850.13
SW 15th Street Road Improvements Segment 2 - 40-B40315 3 1638 Street Bonds 2- 2009 Series
D3
36000 Streets &
Sidewalks
$ 26,852.07 $ 63,165.00 $ 90,017.07
SW 16th Street Road Improvements D3
40-B40307 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 21,433.33 $ 94,269.49 $ 115,702.82
SW 17th Avenue Roadway & Drainage
Improvements - D3 & D4
40-B30760 3,4 1638 Street Bonds 2- 2009 Series
36000 Streets & $
Sidewalks
- $ 600,000.00 $ 600,000.00
SW 17th Terrace Road Improvements D3
40-B40308 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 16,215.37 $ 82,814.89 $ 99,030.26
o SW 18th Terr. Road Improvements - D3
40-B40300 3 1379 Street Bonds - 2007 Series 36000 Streets & $ 11,088.89 $ 1,250.00 $ 12,338.89
Sidewalks
SW 18th Terr. Road Improvements - D3
40-B40300 3 1638 Street Bonds 2- 2009 Series
36000 Streets & $ 3,551.55 $ 70,561.60 $ 74,113.15
Sidewalks
SW 19th Terrace Improvements (SW 23 Avenue 40-B30695
to SW 24th)
4 1101 Transit Half -Cent Surtax 36000 Streets & $ 63,931.61 $ $ 63,931.61
Sidewalks
SW 19th Terrace Improvements (SW 23 Avenue 40-B30695 4 1638 Street Bonds 2- 2009 Series
to SW 24th)
36000 Streets &
Sidewalks
$ 64,685.08 $ 1,723.49 $ 66,408.57
SW 1st Ave Road Improvements - Segments 2 - 40-B40318 3 1638 Street Bonds 2- 2009 Series
D3
36000 Streets &
Sidewalks
$ 11,435.71 $ 133,955.60 $ 145,391.31
SW 1st Ave Road Improvements Segment 1- D3 40-B40302 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 28,760.75 $ 2,369.10 $ 31,129.85
SW 1st Ave Road Improvements Segment 3 - D3 40-B40323 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 9,565.28 $ 86,126.00 $ 95,691.28
SW 20th Road Improvements D3
40-B40310 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 13,495.78 $ 82,753.11 $ 96,248.89
CAN BE SEEN AT THE END OF THIS DOCUMENT.
—1-1
o =
O 7
A p
• O
Z c
f7
D
r m
m
z
n
c n
O c
A W
z =
m
0
z
N
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
SW 22nd Ave Medians - US1 to Coral Way - D4 40-B30770 4 1297 Transit Half -Cent Surtax 36000 Streets & $ 8,276.05 $ (0.02) $ 8,276.03
Sidewalks
SW 22nd Ave Medians - US1 to Coral Way - D4 40-B30770 4 1379 Street Bonds - 2007 Series 36000 Streets & $ 4,622.01 $ 16,855.44 $ 21,477.45
Sidewalks
SW 22nd Terr. & 13th Ave Road Improvements 40-B40312 3 1638 Street Bonds 2- 2009 Series
D3
36000 Streets &
Sidewalks
$ 40,499.14 $ 2,864.00 $ 43,363.14
SW 23rd Road Improvements D3
40-B40303 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 18,334.62 $ 86,840.35 $ 105,174.97
SW 25th Road Improvements D3
40-B40319 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 10,563.17 $ 87,692.00 $ 98,255.17
SW 26th Road Improvements Segment 2 - D3 40-B40320 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 23,752.77 $ 124,979.51 $ 148,732.28
SW 27th Road Improvements D3
40-B40322 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 35,543.90 $ 243,102.51 $ 278,646.41
SW 28th Road Improvements D3
40-B40317 3 1638 Street Bonds 2- 2009 Series
36000 Streets & $ 1,876.85 $ 20,899.50 $ 22,776.35
Sidewalks
SW 2nd Ave Road Improvements D3
40-B40321 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 35,110.47 $ 122,284.93 $ 157,395.40
SW 2nd Street and SW 40th Avenue Traffic 40-B30779 4 1297 Transit Half -Cent Surtax 36000 Streets & $ 18,692.05 $ 4,702.86 $ 23,394.91
Circle - D4 Sidewalks
SW 32 Avenue Improvements Additional 40-B40704A
Services
2,4 1297 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 419,943.02 $ 111,089.97 $ 531,032.99
SW 32 Avenue Improvements Additional 40-B40704A
Services
2,4 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 609,496.39 $ 26,565.81 $ 636,062.20
SW 32 Avenue Improvements Additional
Services
40-B40704A 2,4 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 253,604.23 $ 23,702.35 $ 277,306.58
SW 3rd Ave Road Improvements D3
40-B40313 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 22,129.39 $ 226,063.38 $ 248,192.77
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNIDIBO dflNJVB-IVNIDIBO 01
THIS DOCUMENT IS A SUBSTITUTION
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
SW/NW 17th Avenue Traffic Corridor Study - D2 40-B30993
1,2,3,4, 1297 Transit Half -Cent Surtax
5
36000 Streets &
Sidewalks
$ 83,555.56 $ 16,894.08 $ 100,449.64
The Roads Roadway Improvements D3
40-B40326 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 108,650.46 $ 146,886.44 $ 255,536.90
Tigertail Resurfacing - D2
40-B30716 2 1101 Transit Half -Cent Surtax 36000 Streets & $ 608.46 $ $ 608.46
Sidewalks
Tigertail Resurfacing - D2
40-B30716 2 1297 Transit Half -Cent Surtax 36000 Streets & $ 211,834.76 $ 34,273.36 $ 246,108.12
Sidewalks
Tigertail Resurfacing - D2
40-B30716 2 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 387,208.08 $ 9,056.38 $ 396,264.46
Traffic Calming SW 6th Street Project - D4 40-B30771 4 1379 Street Bonds - 2007 Series 36000 Streets & $ 198,862.82 $ 5,967.96 $ 204,830.78
Sidewalks
N_
N Traffic Circle - SW 18th Ave & SW 13th St. - D4 40-B30778 4 1379 Street Bonds - 2007 Series 36000 Streets & $ 5,061.95 $ 85,445.94 $ 90,507.89
Sidewalks
Transportation Program Support Services - 40-B30645B 1,2,3,4, 1297 Transit Half -Cent Surtax 36000 Streets &
Transportation 5 Sidewalks
$ 829,021.00 $ 51,965.78 $ 880,986.78
Transportation Program Support Svcs - 40-B70245 1,2,3,4, 1297 Transit Half -Cent Surtax 36000 Streets &
Transportation 5 Sidewalks
$ 36,501.10 $ 175,896.84 $ 212,397.94
US1 Landscaping between 17Avenue and
Viscaya - D2
40-B30830 2 1638 Street Bonds 2- 2009 Series
36000 Streets & $ 72.42 $ $ 72.42
Sidewalks
US-1 Median Closures at Bridgeport and SW 30 40-B30662D 2 1297 Transit Half -Cent Surtax 36000 Streets & $ 10,974.89 $ 0.01 $ 10,974.90
Ct - D2 Sidewalks
US-1 Median Closures at Bridgeport and SW 30 40-B30662D 2 1379 Street Bonds - 2007 Series 36000 Streets & $ 46,236.83 $ 8,802.60 $ 55,039.43
Ct - D2 Sidewalks
Venetian Causeway Improvements
40-B39911 2 1572 FDOT - Venetian Causeway 36000 Streets & $ 643,941.16 $ 356,058.84 $ 1,000,000.00
Improvements,B-39911 Sidewalks
Venetian Causeway Improvements
40-B39911 2 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 1,660,193.81 $ 536,271.19 $ 2,196,465.00
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNIEI O df NJHB '1VNIDI O 01
THIS DOCUMENT IS A SUBSTITUTION
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
West Flagler Area Improvements - D4
40-B30774 4 1101 Transit Half -Cent Surtax 36000 Streets & $ 94,321.42 $ 4,607.02 $ 98,928.44
Sidewalks
West Flagler Area Improvements - D4
40-B30774 4 1297 Transit Half -Cent Surtax 36000 Streets & $ 679,785.37 $ 184,795.14 $ 864,580.51
Sidewalks
Wynwood Area Roadway Improvement - D5 40-B30888 5 1297 Transit Half -Cent Surtax 36000 Streets & $ 1,415.13 $ 0.02 $ 1,415.15
Sidewalks
Caribbean Marketplace Renovation D5 40-B30671A
5 1122 Sanitary Sewer Bonds Series 1995 37000 Sanitary Sewers $ 114,000.00 $ $ 114,000.00
Coral Way NET Office Remodeling - Sanitary 40-B30365ES 3 1122 Sanitary Sewer Bonds Series 1995 37000 Sanitary Sewers $ 800.00 $ $ 800.00
Sewer
Little Haiti Soccer Field Bathroom -Sanitary 40-B30887S
5 1122 Sanitary Sewer Bonds Series 1995 37000 Sanitary Sewers $ 21,996.00 $ 20,847.15 $ 42,843.15
N_
Moore Park New Construction - Sanititary Sewer 40-B35887S 5 1122 Sanitary Sewer Bonds Series 1995 37000 Sanitary Sewers $ - $ 485,812.80 $ 485,812.80
Museum Park -Sanitary Sewer Allocation
40-B30538S 1,2,3,4, 1122 Sanitary Sewer Bonds Series 1995
5
37000 Sanitary Sewers $ - $ 1,000,000.00 $ 1,000,000.00
New Dinner Key Marina Dockmaster Building 40-B60464S
Sanitary Sewer
2 1122 Sanitary Sewer Bonds Series 1995 37000 Sanitary Sewers $ - $ 690,000.00 $ 690,000.00
Police Department Sanitary Sewer System
40-B70600 1,2,3,4, 1122 Sanitary Sewer Bonds Series 1995 37000 Sanitary Sewers $ 57,510.95 $ $ 57,510.95
Repairs 5
Belle Meade Storm Sewer Project, Phase II 40-B50672 2 1101 Transit Half -Cent Surtax
38000 Storm Sewers $ 1,291,956.80 $ 8,043.20 $ 1,300,000.00
Belle Meade Storm Sewer Project, Phase II 40-B50672
2 1108 Impact Fees Ord 38000 Storm Sewers $ 695,669.06 $ 4,330.94 $ 700,000.00
Belle Meade Storm Sewer Project, Phase II 40-B50672 2 1124 Stormwater Utility Trust Fund
38000 Storm Sewers $ 3,273,337.46 $ 83,914.15 $ 3,357,251.61
Belle Meade Storm Sewer Project, Phase II 40-B50672 2 1297 Transit Half -Cent Surtax 38000 Storm Sewers $ 2,057,485.91 $ 12,809.09 $ 2,070,295.00
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNID1210 dfl)IJVB '1VN19121O 01
THIS DOCUMENT IS A SUBSTITUTION
N
Project Name
Belle Meade Storm Sewer Project, Phase II
Belle Meade Storm Sewer Project, Phase II
Citywide Storm Sewer Repair Project
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN n -i -i
n O x
z 0 7
W A p
^ O
Ln n
Project Dist (s) Award Award Name Fund No. Fund Description Actual Encumbrances Total Cost z n c
Number NO. 1" m z
-1 n
x , 7
40-B50672 2 1379 Street Bonds - 2007 Series 38000 Storm Sewers $ 1,950,663.43 $ 6,555.57 $ 1,957,219.00 m c n
z o c
0 A co
O 4
40 B50672 2 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 951,514.50 $ 24,882.94 $ 976,397.44 = n -1
Contribution from Genral Fund o 0
o z
n
c
40-B30262 1,2,3,4, 1124 Stormwater Utility Trust Fund 38000 Storm Sewers $ 1,318,642.10 $ 49,737.90 $ 1,368,380.00
5
Citywide Storm Sewer Repair Project 40-B30262
1,2,3,4, 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 2,519,959.29 $ 469,989.71 $ 2,989,949.00
5 Contribution from Genral Fund
Englewood Storm Sewer - Phase III
40-B30011 4 1297 Transit Half -Cent Surtax
38000 Storm Sewers $ 201,446.05 $ 42,115.77 $ 243,561.82
Englewood Storm Sewer - Phase III 40-B30011
4 1361 Englewood Storm Sewer Phase III 38000 Storm Sewers $ 681,000.00 $ (0.01) $ 680,999.99
Englewood Storm Sewer - Phase III
40-B30011 4 1379 Street Bonds - 2007 Series
38000 Storm Sewers $ 1,242,858.90 $ 400,889.09 $ 1,643,747.99
Englewood Storm Sewer - Phase III
40-B30011 4 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 2,946.62 $ 134,958.36 $ 137,904.98
Contribution from Genral Fund
FDEP Drainage Wells Compliance
40-B30700 1,2,3,4, 1113 Local Oprion Gas Tax 38000 Storm Sewers $ 134,413.69 $ 53,518.88 $ 187,932.57
5
FDEP Drainage Wells Compliance
40-B30700 1,2,3,4, 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 148,095.13 $ 24,309.02 $ 172,404.15
5 Contribution from Genral Fund
Garden Storm Sewer - Phase I 40-B30183
1 1101 Transit Half -Cent Surtax 38000 Storm Sewers $ 13,970.23 $ $ 13,970.23
Garden Storm Sewer - Phase I 40-B30183
1 1157 1976 & 78 Storm Sewer G 0 Bond 38000 Storm Sewers $ 60,981.13 $ 6,470.17 $ 67,451.30
Garden Storm Sewer - Phase I 40-B30183
1 1845 FEMA PDM Garden Storm Sewer B- 38000 Storm Sewers $ 78,242.32 $ $ 78,242.32
30183
Grove Park Road and Storm Sewers 40-B30008
Improvements - D3
3 1360 Glenroyal Storm Sewer Phase III 38000 Storm Sewers $ 668,823.01 $ (0.01) $ 668,823.00
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
Grove Park Road and Storm Sewers 40-B30008
3 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 44,129.95 $ 0.01 $ 44,129.96
Improvements - D3 Contribution from Genral Fund
Mary Brickell Village Drainage Improvements 40-B30637 1,2,3,4, 1419 Parking Surcharge 2007 38000 Storm Sewers $ 215,597.54 $ 16,411.31 $ 232,008.85
5
Mary Brickell Village Drainage Improvements 40-B30637 1,2,3,4, 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 13,984.47 $ (0.01) $ 13,984.46
5 Contribution from Genral Fund
Mary Brickell Village Drainage Improvements 40-B30637 1,2,3,4, 1638 Street Bonds 2- 2009 Series 38000 Storm Sewers $ 106,721.46 $ 7,346.61 $ 114,068.07
5
Overtown Stormwater Pump Station Upgrades 40-B50654 5 1108 Impact Fees Ord
38000 Storm Sewers $ 12,087.88 $ $ 12,087.88
Overtown Stormwater Pump Station Upgrades 40-B50654
5 1124 Stormwater Utility Trust Fund 38000 Storm Sewers $ 336,827.47 $ $ 336,827.47
N_
°' Roadway, Drainage & Traffic Improvements D1 40-B50706A 1,4 1101 Transit Half -Cent Surtax 38000 Storm Sewers $ 27,613.45 $ 154,239.45 $ 181,852.90
& D4
Roadway, Drainage & Traffic Improvements D1 40-B50706A
& D4
1,4 1297 Transit Half -Cent Surtax
38000 Storm Sewers
$ 512.79 $ $ 512.79
Roadway, Drainage & Traffic Improvements D1 40-B50706A 1,4 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 31,470.24 $ 829.98 $ 32,300.22
& D4 Contribution from Genral Fund
Roadway, Drainage & Traffic Improvements D1 40-B50706A 1,4 1584 Homeland Defense/Neighborhood 38000 Storm Sewers $ 335,903.92 $ 430,096.08 $ 766,000.00
& D4 Improvement Bond Series 3
Rockerman Canal Improvements
40-B30680 2 1124 Stormwater Utility Trust Fund
38000 Storm Sewers $ 205,608.69 $ 33,152.46 $ 238,761.15
Rockerman Canal Improvements 40-B30680
2 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 45,680.78 $ 444.05 $ 46,124.83
Contribution from Genral Fund
Rockerman Canal Improvements
40-B30680 2 1673 Special Assessement District-
Rockerman Canal Improvements B-
30680
38000 Storm Sewers $ 203,269.05 $ 5,202.48 $ 208,471.53
San Marco & Biscayne Islands Drainage
Improvements
40-B30588 2 1113 Local Oprion Gas Tax
38000 Storm Sewers $ 723,395.21 $ 23,774.79 $ 747,170.00
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNIDIBO dflNJV '1VNIDIBO 01
THIS DOCUMENT IS A SUBSTITUTION
N
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
San Marco & Biscayne Islands Drainage
Improvements
40-B30588 2 1297 Transit Half -Cent Surtax
38000 Storm Sewers $ 687,911.95 $ 236,203.61 $ 924,115.56
San Marco & Biscayne Islands Drainage
40-B30588 2 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 340,798.55 $ 149,139.45 $ 489,938.00
Improvements Contribution from Genral Fund
San Marco & Biscayne Islands Drainage
40-B30588 2 1496 Sunshine State Government
Improvements Financing Commission Loan # 2
38000 Storm Sewers $ 432,397.10 $ 42,602.90 $ 475,000.00
San Marco & Biscayne Islands Drainage 40-B30588
2 1547 FDEP Fairlawn PH III B-50704 & San 38000 Storm Sewers $ 500,000.00 $ $ 500,000.00
Improvements Marco Island B-30588
San Marco & Biscayne Islands Drainage 40-B30588
Improvements
2 1638 Street Bonds 2- 2009 Series 38000 Storm Sewers $ 333,706.42 $ 161,795.84 $ 495,502.26
San Marco & Biscayne Islands Drainage
Improvements
40-B30588 2 1810 FEMA-San Marco and Biscayne 38000 Storm Sewers $ 599,999.99 $ $ 599,999.99
Island Drainage Improvements,B-
30588
0 Silver Bluff Drainage Improvements - D4
40-B30776 4 1101 Transit Half -Cent Surtax
38000 Storm Sewers
$ 2,568.91 $ $ 2,568.91
Silver Bluff Drainage Improvements - D4
40-B30776 4 1379 Street Bonds - 2007 Series
38000 Storm Sewers $ 395,425.26 $ 331,809.07 $ 727,234.33
Silver Bluff Drainage Improvements - D4
40-B30776 4 1638 Street Bonds 2- 2009 Series 38000 Storm Sewers $ 1,279.76 $ $ 1,279.76
Solid Waste Sweeper 40-B40271
1,2,3,4, 1431 Stormwater Utility 2008 Trust Fund-
5 Contribution from Genral Fund
38000 Storm Sewers
$
- $ 168,505.63 $ 168,505.63
Wagner Creek/Seybold Canal Dredging 40-B50643
1,5 1124 Stormwater Utility Trust Fund
38000 Storm Sewers $ 1,749,259.54 $ 28,243.99 $ 1,777,503.53
Wagner Creek/Seybold Canal Dredging 40-B50643
1,5 1157 1976 & 78 Storm Sewer G 0 Bond 38000 Storm Sewers $ 146,493.03 $ $ 146,493.03
Wagner Creek/Seybold Canal Dredging
40-B50643 1,5 1219 PriorYR Fund Balance(311950)
38000 Storm Sewers $ 26,221.18 $ $ 26,221.18
Wagner Creek/Seybold Canal Dredging 40-B50643
1,5 1431 Stormwater Utility 2008 Trust Fund -
Contribution from Genral Fund
38000 Storm Sewers
$ 5,514.59 $ $ 5,514.59
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNIDIBO df NJVB 1VNIDIBO 01
THIS DOCUMENT IS A SUBSTITUTION
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total Cost
Solid Waste Collection Equip
40-B73202C 1,2,3,4, 1426 Contribution from General Fund FY 39000 Solid Waste-CIP $ 3,580,877.61 $ 479,477.78 $ 4,060,355.39
5 2008
City of Miami Trolley Program - Capital 40-B70715
1,2,3,4, 1297 Transit Half -Cent Surtax
Acquisition 5
39900 Mass Transit $ 998,948.72 $ 0.02 $ 998,948.74
Transportation Program Support Services -
40-B30645A 1,2,3,4, 1101 Transit Half -Cent Surtax
Transit Professional 5
39900 Mass Transit
$ 587.72 $ (0.01) $ 587.71
Transportation Program Support Services -
40-B30645A 1,2,3,4, 1297 Transit Half -Cent Surtax
Transit Professional 5
39900 Mass Transit $ 369,632.44 $ 22,856.66 $ 392,489.10
Transportation Program Support Svc -Transit 40-B70246 1,2,3,4, 1297 Transit Half -Cent Surtax
Professional 5
39900 Mass Transit $ 609.60 $ 20,476.80 $ 21,086.40
CAN BE SEEN AT THE END OF THIS DOCUMENT.
1VNID1210 dfNJVB -IVNID1210 01
THIS DOCUMENT IS A SUBSTITUTION
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
efie Yalu/re
218
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPENDIX 3
LIST OF COMPLETED PROJECTS IN
FY2012-2013
Cite su tere
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
LIST OF COMPLETED PROJECTS FY2012 - 2013
Project
Project Project Description
Number
Fund
Allocation
($)
301 - CRA
Old Fire Station No. 2 B-30579 Design and construction to rehabilitate and restore the
Restoration - CRA 92- old Fire Station No. 2, a historic 1926 two story CBS
686001 structure approximately 10,500 SF (5,250 SF per
floor). The work includes selective demolition,
environmental clean up, construction of new structural
and roof systems, second floor, all new MEP including
HVAC, new restrooms on both floors, restoration and
installation of historical elements, exterior site work,
ADA and code upgrades and related work. Design will
be done in three phases. Ph. 1: Condition Assessment
Report & Recommendations. Ph. 2: Design &
Construction for strengthning of the structural systems
and new roof. Ph. 3: Design and Construction of
adaptive re -use.
Additional Services requested by owner: Adding
exterior doors to the project in compliance to Miami -
Dade County code.
3,500,000
311 - GENERAL GOVERNMENT
ARRA - Green Lab B-30652A To renovate the Miami Green Lab, a green building 550,000
Construction resource center for the community. Funds to be used
for landscaping, energy efficient HVAC and lighting,
electrical, plumbing and water efficient technology.
Air Conditioner Unit for B-30365P Replace the Air Conditioning Unit 3,700
Overtown NET Office
219
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Emergency Radio
Equipment
replacement
MRC Emergency
Repairs
MRC Gym ADA
Restrooms - 2nd Floor
MRC Riverside Walk
Light Poles
Replacement
Public Works Asphalt
Patch Truck
Purchase and
Installation of a RISO
Digital Duplicator
Technology
Infrastructure
Project Project Description
Number
B-70416 To replace the Police & Fire Radio repeaters and
communications system shutting down causing radio
communications to fail
B-30996
B-30365F
Miscellaneous emergency repairs at the Miami River
Center
ADA standalone bathroom/shower (in lieu of existing
bathroom retrofit) and ada compliant push button entry
to gym
B-70413 Repair and replace eight light poles that have been
vandalize by the river walk (along the river - east of
the slip).
B-30865D
B-70107
Purchase of Asphalt Patch Truck for Citywide needs.
Purchase and installation of a RISO Digital Duplicator.
This new piece of equipment will expand GSA's
Graphics Reproduction Division's capabilities enabling
them to produce an assortment of different envelopes
that are currently outsourced for production.
B-74610 Security implementation, outdated server and
networking equipment replacement.
Fund
Allocation
($)
25,000
16,545
1,570
5,900
150,000
19,937
9,116,151
312 -PUBLIC SAFETY
Air Conditioners South
District Sub Station -
Miami Police
Department
New Rescue Trucks -
Impact Fees North
District
B-70421 Replace A/C at South District Station which is currently
experiencing a problem with the air conditioners which
has resulted in an increased temperature in the
building.
B-72810N To fund purchase of 2 new rescue trucks with
enhanced capabilities and technology, to be housed at
fire station #6 and fire station #5. Rescue Trucks #25
& #26.
42,000
494,508
220
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
North District Police
Building Misc. Repairs -
D5
Police Headquarters
Helipad and Roof
Replacement
Police Radios
Replacement
Police Swat Vehicles
Project Project Description
Number
B-30988 North District Exterior Paint and Landscaping
Painting: Exterior of the Building and perimeter wall
sorrounding parking lot.
Landscaping:Install 15-16' HT Cuban Royal Palms;
Install 1 - 12'to 14' Oak ; Relocation of 1 tree Clearing
and grubbing, tree triming ; install Palmetto sod.
B-72915 Replace the helicopter landing pad and roof at the
police headquarters building.
B-30554 Requesting to purchase 1,500 new radios. The current
fleet of radios used by sworn personnel is over 6 years
old and approaching end -of life. The new radios will
be P-25 compliant, allowing greater radio system
interoperability and is in line with GSA's plan to
upgrade the radio system.
B-30997 Police SWAT Vehicle - One (1) Base GSA Model
#SWTMCC280862-10 with Adds/Deletes: (1) SS602;
(5) SS1022; (2) SS1012; (5) SS1002; (-1) SS1202; (1)
SS1205; (1) SS1216; (1) SS1504; (1) SS1505; (7)
SS2105 per Specs LDV JOB# S38SWTMCC28020812-
10
Fund
Allocation
($)
66,549
233,386
843,083
322,846
325 - PUBLIC FACILITIES
Dinner Key Marina
Electrical System
Upgrades
Dinner Key Marina
Maintenance
Workshop
James L Knight Center
Garage Improvements
(Garage #4)
James L. Knight Center
Chiller & Cooling
Tower Oracle Project
41-410004
B-30527
Modify the 480-volt wiring to the pier transformers,
eliminate the below deck electrical splices, and modify
the pier lighting system to improve reliability and
efficiency.
B-30596A Prefabricated metal maintenace & workshop building
for the D.K. Marina. Work includes the fabrication and
erection of the metal building, demolition, concrete
slab, landscaping and electrical.
B-30365B Contribution to MPA to automate the parking operation
at the Miami Tower to a new on foot system
B-40181 Remove and replace four Chillers and all related
pumps, piping and electrical work. Demolish existing
cooling tower and replace with new cooling tower
assembly.
50,750
44,108
391,800
4,596,400
221
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Miamarina Painting
and Misc. Repairs
Orange Bowl / Marlins
Re -Development
Orange Bowl
Redevelopment - A/E
Services &
Construction
Orange Bowl Site
Parking Garage (Marlin
Stadium Parking
Garage)
Project Project Description
Number
B-30325A Painting and miscellaneous repairs at Harbor Master
building
B-30153J Cover expenses related to Baseball Stadium
Agreement dated 03/03/08. Premium for Pollution
Legal liability Insurance policy for Baseball Stadium
site.
B-30153B Professional A/E services for demolition of the Orange
Bowl Stadium.
B-30648 Design and construct parking garage
Fund
Allocation
($)
61,890
14,034,334
1,889,600
96, 042, 248
331 - PARKS & RECREATION
1814 Brickell Avenue
Park - D2
1814 Brickell Avenue
Park
PlaygroundEquipment
Bayfront Park Pier
Repairs - D2
Blanche Park Kids
Section - Funded by
Parks
Blanche Park Master
Plan Improvements
Brickell Park
Playground (South of
Icon)
B-30685B Permitting and construction of a new park on a 35,500
SF property. The program includes landscaped areas
an elevated landscaped court and a children's play
area. Scope includes landscaping consisting of
groundcover, shrubs and mature trees, decorative
concrete hardscaping, benches, picket fencing, site
drainage, irrigation and lighting. There is an existing
water meter and electrical meter on site.
B-30685A Purchase of playground equipment for Brickell Avenue
Park.
B-40177 Replacing the deck and railing, and repairing the
mooring hardware and fenders at the three (3)
courtesy piers, and providing shore power to the
southernmost pier
B-75830B Install approximately 5,000 SF of artificial turf on the
playground area of Blanche Park, including drainable
base and removal and disposal of existing material.
Plant spanish stoppers along east fence.
B-75830A Master Plan Improvement at Blanche Park. Artificial
Turf Dog Area. Artificial Turf Kid Play Area.
B-39910P The Project onsist of the installation of a children's
playground at Brickell Park
1,209,888
42,048
300,000
50,000
545,200
110,000
222
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Coral Gate Park
Community Building
Coral Gate Park
Furniture, Security
SvstPm and
Douglas Park
Improvements - CDBG
91-02980
Duarte Park Gazebo
and Roof Remodeling -
D1
Freedom Garden
Statue Rehabilitation
D5
Project Project Description
Number
B-35865A The project consists of furnishing of all labor, material
and equipment for the construction of a new
community building of approximately 4,600 G.S.F.
Also, the project includes a new parking lot, landscape,
irrigation, demolition of existing building, new
playground and utility on site for services. Seek LEED
Silver Certification.
Fund
Allocation
($)
1,996,656
B-30821 Purchase of Furniture, Security System and other 142,000
improvements to the Coral Gate Park.
B-39910R Scope of services includes: Canopy shelter next to 177,000
basket ball court; Extension of walking paths;
Replacement of canopy poles; Replacement of
electrical panel (baseball field); Fill gap under tennis
courts and buildings; Resurfacing basketball courts
(incl. rims, backboards, support structures and nets);
Resurfacing 3 tennis courts , incl. nets & posts;
Replacement of chain link fence around courts, incl.
gates; Exterior painting of Recreation & Restrooms
Buildings.
B-35812C The project consist of the design and construction of 199,400
modifications to a group of three open-air pavilions at
Juan Pablo Duarte. At all three pavilions, work
includes removal of the roofing and installation of new
metal roof . At the Southwest pavilion that houses the
local domino club, work includes removal of the
existing steel picket fence at the exterior of the
pavilion and installation of a non-structural louvered
fence; installation of a new steel picket fence and gate
to seperate the domino pavilion from the neighboring
pavilions; and installation of additional lighting and
fans.
B-30885 Refurbish existing statue. Furnish and install black
granite slabs and tile to cover the statue base and
steps.
Gibson Park Furniture - B-30305D
D5
Hadley Park ADA and
Miscellaneous
Improvements - D5
B-30547K The project consists of ADA reconstruction of parking
areas for the recreation building parking lot to include
markings, signage and ADA concrete ramps. The
Miller J. Dawkins Olympic Pool Complex building work
includes ADA modifications inside the restroom, new
accessible doors hardware, new accessories benches,
controls and bars for the existing showers, accessible
benches for the locker area and accessible signage for
the team room.
36,573
22,020
70,000
223
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Irrigation System at
Kennedy Dog Park -
D2
Kennedy Park Floating
Dock PHI
Legion Park Boat
Ramp Repairs - D2
Legion Park
Improvements - CDBG
Project 91-02980
Legion Park Parking
Lot Renovation
Legion Park Windows
and Paint Interior - D2
QOL
Lincoln Park
Improvements - D2
Little Haiti Cultural
Campus Miscellaneous
Repairs - D5
Lummus Park
Miscellaneous Repairs -
D5 (FY2013-PR)
Maximo Gomez /
Domino Park Restroom
Project Project Description
Number
B-40170 Installation of an electromechanical irrigation system
within the two Dog Park areas at Kennedy Park
B-30541 B The existing floating dock located at the south end of
Kennedy Park is currently approximately 1,800 sf. The
dock requires replacement, and the Parks and
Recreation Department is requiring restoring the
extent of the floating dock to its historical footprint.
The primary purpose of the floating dock project is for
dingy and other non -motorized vessel temporary
mooring although motorized vessels will also
occasionally moor at the facility, and there is no
planned increase of temporary (launch/staging) slips
than are currently authorized by the aermittina
B-30820 Concrete Repairs to Boat Ramp.
B-39910Q Scope of services includes: New park entrance along
Biscayne Boulevard; Parking Lot resurfacing;
Recreation Building Renovation (stage restrooms, ext.
doors, int. renov. of 1st and 3nd floors); Canopy for
playground equipment; Improvements per DOJ
agreement (per WAP plans)
B-35843 Parking Lot Renovations
B-39910M Replacement of existing jalousie windows and
installation of accordion shutters and interior painting.
B-30826 Artificial grass and minimal lawn sprinklers at Lincoln
Park.
B-30890 Miscellaneous repairs including A/C replacement at
Park.
B-30889 Miscellaneous repairs including A/C replacement at
Park.
B-35861A Demolish Existing Stand -Alone Restroom building,
except Exterior wall containing Electrical -Utility
Installations ( that shall remain ). Build a New 320 +/-
Sq. Ft. Masonry Restroom Building containing facilities
for men and women, storage space, janitor closet, and
an exterior masonry dumpster enclosure. In addition,
comply with ADA Requirements.
Fund
Allocation
($)
55,945
299,242
14,124
390,000
57,842
49,034
80,000
25,255
40,265
215,770
224
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project Project Project Description Fund
Number Allocation
($)
Melreese Golf Training B-30566A The Melreese Golf Training Center (First Tee
Center Academy) will be located adjacent to the existing
practice range and new clubhouse. It will be used
primarily as an instructional golf facility. The facility
will have approximately 5000 square feet and will
include a large assembly/classroom area, three
enclosed bays facing the practice range, two offices,
storage area, restrooms, a kitchenette, a vending area
and support spaces. It will also have a pre -fabricated
canopy over the existing practice range and
connecting walkways to the new clubhouse and
parking lot. The facility will be certified LEED Silver.
Miami Circle Park
Improvements
Morningside A/C,
Windows and Interior
remodeling - D2
B-30365A Grant to Historical Museum of Southern Florida for
Improvements to Miami Circle Park. $50K Grant
serves as matching funds to a FIND Grant of $150K to
facilititate the park's creation
B-39910N Resurface floor with epoxy finish, change windows to
impact glass in Office, Arts and Craft; and Mulipurpose
rooms. Add new A/C equipment and duct work at
Multipurpose room and miscellaneous painting.
Morningside Park ADA B-35846A 1) RECREATION BUILDING RESTROOMS: Remove
and Restrooms and Replace all restroom fixtures, partitions and
Remodeling accessories. Replace with new ones .Repair piping as
necessary. Install new electrical fixtures and exit signs
as necessary. MEET ADA REQUIREMENTS. The
present fixture count is: MALE; 2 toilets 1 urinal, 2
lavatories, & 1Janitor sink in its closet. FEMALE; 3
toilets + 2 lavatories.
2) FIELD RESTROOM BUILDING : Demolish interior
( Do not demolish ceiling) and install new fixtures,
accessories, partitions, floor and wall tile, paint and
install new insect -screens on existing pre -cast
louvered -windows . Check and repair water lines and
check and repair sanitary lines as needed. Install new
electrical fixtures and exit signs as necessary. The
present fixture count is as follows: MALE; 3 toilets, 2
urinals, 2 lavatories and a janitor sink in a service
room. FEMALE; 5 toilets and 2 lavatories. Patch and
paint all interior surfaces. MEET ADA
REQUIREMENTS. 3) Correct walkways and parking
stalls to meet ADA requirements. 4) Additional access
openings on the shoreline.
2,385,560
50,000
170,000
562,120
225
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project Project Project Description Fund
Number Allocation
($)
Parks ADA
Modifications - District
3 - Jose Marti Park
B-30547F Provide H/C accessible space, van accessible space,
both on an accessible route. Provide an accessible
route to the chess tables, Provide ADA ramp to stage.
Provide 1 ADA compliant picnic table on an accessible
route, Provide ADA compliant restrooms at
theRecreation Center. Provide ADA compliant
Restrooms at the Pool Building; also provide ADA
compliant signage, ramps, water fountains, doors and
counters for the preceeding restrooms.
Parks ADA B-30547H AFRICAN SQUARE: Re- stripe parking & provide 1
Modifications - District ADA Van space. Provide 1 ADA chess table. Provide 1
5 ADA ramp to the Amphitheatre Stage. Upgrade both
R-R to ADA Remodel the interior of both restrooms.
HADLEY: Provide 1 ADA Van space and 1ADA H/C
space. At the Rec Ctr. provide 1 ADA Van space and
2 ADA H/C spaces Re -Design showers and fixtures to
ADA . LEMON CITY: 1 ADA Van space. ADA route
between basketball and sidewalk. LUMMUS: 1 ADA
Van space. ADA route to bar-b-que & drinking
fountain. Hi-Lo ADA drinking fountain MOORE: ADA
directional signage at entry to Tennis Center. ADA
hand rails at the Tennis Center. ADA route to Day
Care. ADA picnic table on an ADA route. ADA route
to the picnic tables & playground. equipment. 1 ADA
play equipment on an ADA route. Provide ADA
surface for play equipment area. Re -design the
showers, fixtures, to ADA criteria.
Robert King High Park B-30229 Construction of new soccer field including new
Soccer Field and restroom facilities with liftstation, ADA parking lot and
Restrooms walkways, bleachers and related work. The new soccer
field will include new sports lighting and irrigarion
system.
Virrick Park B-35853B Remove and replace the exiting roofing with like
Gymnasium products. New roof to consist of a modified bitumen
Improvements D2 built up roof over lightweight insulating concrete over
rigid insulation boards. Replace cornise at
gymnasium.
96,917
211,137
1,238,844
150,000
341 - STREETS & SIDEWALKS
ARRA - ADA Sidewalk B-30683C Sidewalk Improvements within District 3 Boundaries
Improvements District
3
132,035
226
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
ARRA - NE 2 Ave.
Improv. Segment B1
(36th Street to 42nd
Street)
ARRA - NE 2 Ave.
Improv. Segment B2
(51 st Street to 57th
Street)
ARRA Citywide Bicycle
Rack & Signage
Program
Baywalk Mobility Plan
Belle Meade Gateway
Enclosure
Bob Hope Dr. Between
NW 20th Street to NW
17th Street - D1
Brickell Avenue
Decorative Pedestrian
Crosswalk
Brickell Lighting Phase
II - D2
Project Project Description
Number
B-78508A Provide all project management and engineering
analysis and design services necessary for preparing
construction documents for the reconstruction of NE
2nd Avenue from NE 36th Street to NE 42nd Street.
The scope of work includes roadway reconstruction,
stormwater system, curb and gutter, concrete
sidewalk, signing and pavement markings, decorative
lighting, signalization and landscape, Reference B-
78508 for Non-ARRA Funded Segment and B-78058B
for ARRA Funded Segment from 59th to 69th Streets.
B-78508C The scope of work includes roadway reconstruction,
stormwater system, curb and gutter, concrete
sidewalk, signing and pavement markings, decorative
lighting, signalization and landscape.
B-30694 Installation of Bicycle racks citywide, and in public
schools. Installation of shared use pavement
markings, installation of "Bikes May Use Full Lane"
signs, installation of "Share the Road" signs,
installation of directional signage.
B-30645D Preparation of document showing how to implement a
continuous and publicly accessible Baywalk including
a feasibility and constructibility analysis, idenifying
alternative alignment options and jurisdictional
responsibilities, and as well as identifying and
prioritizing short and long term improvements.
Fund
Allocation
($)
510,979
2,220,578
392,130
60,000
B-40183 Install steel picket fence with gates at five street 50,479
barricades
B-30703 Project consist of milling and resurfacing of Bob Hope 152,370
Dr. Between NW 20th Street to NW 17th Street -
Project estimate based on milling and resurfacing only
with minor reconstruction if necessary. Project length
of approximately 1500 ft was reduced to 900 ft to meet
allocated budget
B-399101 Contribution to FDOT to facilitate the installation of 33,132
decorative pedestrian crosswalk along Brickell Avenue
B-40666B Replacement of (90) existing lighting poles. The poles
shall be replaced in such a way that all lights are
burning by dusk. Removed poles shall be delivered in
good conditions to City of Miami GSA. Contractor shall
provide 9 spare lights as requested by MDPWD.
850,000
227
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Project Project Description
Number
Calle Ocho B-30222A
Beautification - East of
37 Ave
Calle Ocho
Improvements
Car Sharing Feasibility
Study
Citywide Sidewalk
Replacement Phase 29
Coral Gate Community
Improvements - D4
District 2 - Sidewalk
Repairs & ADA
District 4 - Sidewalk
Repairs & ADA
District 5 - Sidewalk
Repairs & ADA
Gateway Signage and
landscape
improvements
Gibson Park Area
Street Improvements -
Street Component of B-
30305B
Kumquat Ave between
Pamona Lane and
Linden Lane D2
B-78509A
B-70716
B-43114A
B-30717
New landscape median with beautifications
/enhancements on sidewalk on SW 8th Street from
SW 27th to SW 37th Ave.
Provide road improvement and beautification.
Study and implementation of Car Sharing Program
Replacement of broken sidewalk, driveway, brick
sidewalk, curb and curb & gutter. Rework swale area
and adjustment of utilities boxes. This is a two year
contract with option to renew in 2(two) additional one
year periods pending funding availability.
Scope of work consists of roadway improvements
and construction of Traffic Calming devices. .
Improvements also include milling and resurfacing
within the improvement area, ADA curbs and ramps,
signing, pavements markings, landscaping and
drainage improvements.
Speed Traffic Engineering Study for the Coral Gate
community.
Speed Traffic Study for the Home Depot Area
B-30377B Sidewalk Repairs throughout District 2
B-30377D Sidewalk repairs and ADA improvements as needed
in various locations within project boundaries.
B-30377E Sidewalk repairs throughout District 5
B-30209 Provide gateway signage at locations to be determined
in coordination with CRA; miscellaneous landscape
improvements throughout CRA consistent with
approved master plan.
B-30305C Street Improvements to address existing roadway
conditions. Reconstruct NW 12th Street with new drop-
off area, parking and landscaping. The remaining
scope for this project are being performed under B-
30305B.
B-40175 Proposed two (2) speed tables to slow vehicular traffic.
Fund
Allocation
($)
315,554
778,372
25,000
5,017,215
200,000
250,691
250,691
250,691
201
1,000,000
43,725
228
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
MiMo Sidewalks and
Median Landscape
Uplighting
N. Miami Avenue
Reconstruction
NE 1st Avenue
Reconstruction
NE 38 Street
Reconstruction
NW 11th Street
Roadway Improvement
Project - D1
NW 14th Avenue
Between NW 24th
Street to NW 27th
Street - D1
NW 14th Court
Roadway & Drainage
Improvements - D3
NW 17th Court
Roadway Improvement
Project - D1
NW 21 Avenue
between NW 1st Street
and NW 3rd Street -
D3
Project Project Description
Number
B-30564
B-31216
B-31211
B-31209
To contribute City funds via a Locally Joint
Participation Agreement (JPA) with FDOT for the
Biscayne Boulevard Landscape Project from NE 37th
Street to NE 87th Street for construction of non-
standard sidewalks along the historic MiMo district and
installation of landscape uplighting in the median as
part of the FDOT roadway reconstruction project.
Fund
Allocation
($)
298,000
Street reconstruction per Miami Design District 24
planning study.
New scope of work is being discussed. WOA on 26,371
process.
Reconfigure the existing roadway section to follow as 144,873
much as possible the Miami Design District
Development Plan. Scope includes milling and
resurfacing, landscaping, lighting and drainage.
B-30725 Milling and resurfacing.
B-30704
B-30746
B-30728
B-30712
Project consist of roadway improvements to NW 14th
Avenue Between NW 24th Street to NW 27th Street -
Project estimate based on milling and resurfacing, new
curb and gutter on both sides, minor drainage
improvements and swale driveway improvements.
Project length approximately 700 ft and 22 ft existing
pavement.
Milling and resurfacing, minor drainage improvements
(NE corner of NW 14th Ct & NW 8th Terr intersection),
redoing curb & gutter, striping, signage and tree
planting.
750,000
240,000
180,000
Milling and resurfacing, ADA modifications, curb 110,000
replacement & removal, and striping.
Project scope includes milling and resurfacing of
existing pavement with new valley gutter and misc.
drainage as needed.
206,060
229
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
NW 24th Street
Between NW 14th
Avenue and NW 17th
Avenue - D1
NW 60th Avenue
Roadway Improvement
Project - D1
NW 8th Street
Roadway and Drainage
Improvements
North Shorecrest
Roads Improvements
Project - Partial CDBG
91-02910 - D2
Royal Road - Milling
and Resurfacing - D2
SW 11 th Street Road
Improvements - D3
SW 13th Street
Roadway & Drainage
Improvements - D3
SW 16 Avenue
Roadway & Drainage
Improvements - D3
SW 16th Avenue from
Coral Way to 20 Street
- D3
SW 17 Terrace
between SW 18 and 19
Avenues - D4
SW 23rd Roadway &
Drainage
Improvements - D3
Project Project Description
Number
B-30705 Project consist of roadway improvements to NW 24th
Street Between NW 14th Avenue and NW 17th
Avenue - Project estimate based on milling and
resurfacing, new curb and gutter on both sides, minor
drainage improvements and swale driveway
improvements. Project length approximately 1400 ft
and 22 ft existing pavement.
Fund
Allocation
($)
360,000
B-30726 Design Only: Milling and resurfacing. 888,000
B-30745 Milling and resurfacing, minor drainage improvements
(NW corner of NW 15th St & NW 8th St intersection;
East side of NW 15th Ave, just North of NW 8th St and
SF nnrnPr of NW Rth TPrr R NW 17 AvP intPrcPctinnl
B-30035A Road improvements including, but not limited to
roadway reconstruction and/or milling & resurfacing,
striping, swale restoration, new sidewalks, tree
planting, ADA ramps, addressing drainage
improvements if warranted, and signage.
402,000
1,092,178
B-40174 Scope of work is resufacing, stabilization and signage. 60,000
B-40304 Milling & resurfacing including driveway approaches,
some type F curb & gutter replacement, damaged
sidewalk replacement, and possible drainage
improvements.
81,549
B-30747 Add curbs (may require roadway reconstruction to 202,157
lower grades)
B-30741 Milling and resurfacing with minor drainage
improvements
B-30719 Project scope consist of Milling and Resurfacing of
approximetly 780 I.f. and includes misc. drainage
Improvements
B-30710 Drainage Improvement of SW 17th Terrace between
SW 18th Avenue and SW 19th Avenue, milling and
resurfacing and final striping of the resurfaced
pavement.
B-30744
Road reconstruction for sections whee there is
excessive root damage. Install root guards, milling
and resurface,clean drainage.
189,954
102,891
62,804
90,000
230
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
SW 25th Road Street
Improvement Project -
D3
SW 28th Road
Roadway & Drainage
Improvements - D3
SW 3 Avenue Two
Way Conversion
SW 3rd Avenue Road
Improvements Project
Shorecrest Roadway
Milling & Resurfacing
Project
Two -Way Traffic
Conversion on NW 1
Street - D3
US1 Roadway
Improvements and
Wall Replacement
Phase II
Virginia Street between
Bird Avenue and US1
and Misc. Grove Street
Sidewalks & Lighting -
D2
Project Project Description
Number
B-30720 Milling and resurfacing, curb replacement and misc.
drainage improvements
B-30743 Drainage and milling and resurfacing at north half of
block near Coral way. Ponding complaint
B-71212 One-way to two-way street conversion (matching funds
to developer contribution).
B-30031A Road improvements including, but not limited to
roadway reconstruction and/or milling & resurfacing,
pavement striping, swale restoration, curbs and/or
gutters repair, sidewalks repair, landscaping, signage,
ADA ramps, drainage improvements if warranted, and
bike lanes.
B-30035B The Scope of Work involves the construction of milling
and resurfacing of the existing asphalt pavement, the
replacement of associated pavement markings and
damaged sidewalk replacement. Area bounded by NE
87th St. and NE 83rd St (North), Little River (South),
Biscayne Bay (East), Little River (West). Project also
includes minor drainage improvements designed by
Public Works for NE 80th Street.
B-30740 Location is NW 1st street from NW 6th Avenue to NW
South River Drive
Reconstruct handicap ramps to be ADA compliant and
adjust pavement markings on NW 1st street, west of
NW 6th avenue and also west of NW south river
drive.
B-30542A Phase II of removing existing "pink wall" along US-1
from 19th Avenue to 17th Avenue. Replace with a
"Post & Panel" pre -cast concrete barrier wall from 19th
Avenue to 17th Avenue. Scope includes landscaping,
trellis installation, and uplighting.
B-30734 Lighting Improvements and Miscellaneous roadway
improvements
Fund
Allocation
($)
228,000
200,143
154,995
137,532
1,313,678
8,970
2,671,423
258,658
343 - MASTER TRANSIT
231
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project Project Project Description Fund
Number Allocation
($)
ARRA - Purchase of
Trolley Vehicles
B-30668 Purchase of Rubber Tire Trolley Vehicle and Capital
Equipment as well as installation of bus benches /
shelters.
FEC Quiet Zone Study B-40268 Establishment of a new Quiet Zone designation along
the Florida East Coast (FEC) Railway corridor from NE
71 Street (Little River) to the Port of Miami (POM).
This effort is driven by the FEC and POM
reconstruction of the 4.4 mile segment of the existing
rail corridor to allow for both cargo and passenger rail
in the near future. This effort will recommend safety
upgrades to the 18 existing and active grade crossings
in order to allow the City to petition the Federal
Railroad Administration (FRA) for a waiver to establish
a Quiet Zone. The Quiet Zone allows railroad trains to
be exempt from blowing their whistles at each
crossing.
Health District
4,084,282
150,085
B-30581 Operating and Maintenance Costs for the Health 1,170
Circulator Service District Transit Circulator
351 -SANITARY SEWER
Marlins Stadium Area B-30673 The project consists of the milling and resurfacing of
Infrastructure existing roads, replacement of broken sidewalk and
Improvements curbing, the addition of ADA compliant pedestrian
ramps, and lining of existing storm sewer pipes.
12,536,710
352 - STORM SEWERS
Citywide Drainage B-30597
Improvement Project
Drainage Improvements to address existing flooding
and roadway conditions
1) 2010 FEMA PDM Application
2) 2011 FEMA PDM Application
9,854
Drainage Master Plan B-30632 Updates to the Drainage Master Plan Update (DPMU) 715,384
Update to identify drainage basins and preliminary drainage
improvements within the City of Miami Limits.The
DMPU may include but not be limited to data
collection and verification, hydrologic /hydraulics
analysis of all the drainage basins, review of federal
water quality permit obligations and improvements,
recommendations for maintenance and public safety
enhancements, specific capital improvement project
prioritization, and identifying preliminary budgetary
needs.
232
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Durham Terrace
Drainage Project
Fairlawn Storm Sewer
Improvements Project
Phase III
Northwest Road and
Storm Sewers
Improvements - D5
Orange Bowl
Stormwater Pump
Station Upgrades
Project Project Description
Number
B-30629 The design and construction of a stormwater drainage
system to mitigate severe flooding in the area. Milling
and resurfacing of the roadway pavement will be
performed. Swales will be reworked and regraded to
comply with Public Works Bulletin #28 and new
landscaping and trees will be added. Broken sidewalks
will be replaced, as well as new ADA compliant ramps
will be constructed.
B-50704 Construction of a storm sewer system. Road
improvements such as damaged sidewalk
replacement, damaged curb and / or gutter
replacement, ADA compliant ramp construction, re -sod
of swales, milling & resurfacing.
B-30014 Construction of a storm sewer system. Road
improvements such as damaged sidewalk
replacement, damaged curb and / or gutter
replacement, ADA compliant ramp construction, re -sod
of swales, milling & resurfacing.
B-50653 FEMA-funded repairs and upgrades to the Orange
Bowl Stormwater Pump Station, including installation
of an emergency generator.
Fund
Allocation
($)
2,259,519
5,026,810
9,230,466
397,402
353 - SOLID WASTE
ARRA / Solid Waste
Biodiesel Refuse
Haulers
Solid Waste Collection
Equipment ARRA
Grant Match
B-73202B Pucharse biodiesel refuse haulers
B-73202A Purchase biodiesel refuse haulers
731,850
2,195, 550
233
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
efie Yalu/re
234
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPENDIX 4
LIST OF INITIATED PROJECTS IN
FY2012-2013
Cite sutavie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Active and Future Projects Initiated in Fiscal Year 2013 by Fund Type
Fund Type
Streets & Sidewalks
Sanitary Sewers
Public Facilities
General
Government
Sanitary Sewers
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Storm Sewers
Storm Sewers
Storm Sewers
Storm Sewers
Project
Grove Park Road
Improvements - D3
Gibson Park New
Construction - Sanitary
Sewer Component
Miamarina Painting and
Misc. Repairs ............................
Coral Way Community
Center Playground Oracle
Project 91-03275
Virginia Key Rowing Center
Improvements - Sanitary
Sewer Component
B-No.
B-30008A
B-30374S
FY2014 - D1 Roadway, B-30411
drainage and sidewalks
repairs
FY2014 - D2 Roadway,
drainage and sidewalks
repairs
FY2014 - D3 Roadway,
drainage and sidewalks
repairs
FY2014 - D4 Roadway,
drainage and sidewalks
repairs
FY2014 - D5 Roadway,
drainage and sidewalks
repairs
NW 34 Ave over Comfort
Canal - Bridge 876417 -
PW
D1 - Stromwater Projects
D2 - Stormwater Projects
D3 - Stormwater Projects
D4 - Stormwater Projects
B-30412
B-30413
B-30414
B-30415
B-30416
B-30421
B-30422
B-30423
B-30424
Scope
Construction of a positive storm sewer system.
Road improvements such as damaged sidewalk
replacement, damaged curb and/or gutter
replacement, ADA compliant ramp construction.
PHASE II Gymnasium - the work will consist of a
new Gymnasium Building with +/_ 12,000SF and
shall include Gymnasium Area, Men's and
Women's Restroom, Cooking Kitchen including
equipment, storage and Concession Area,
Equipment Storage Area, Mechanical, Electrical,
Janitor Rooms, Ticketing Office. Provide all
disciplines construction documents necessary to
permit and construct the proposed project, and
all related Site Work to be constructed as
PHASE II, including but not limited to: Drainage,
Parking Lot, Irrigation, Illumination, and Signage
to comply with Class II permit.
Painting and miscellaneous repairs at Harbor
Master building
ite modifications include demolition of an
existing residential building, three new play
structures on new playground, drainage at
parking concurrent with regrading and new
paving............ ................ ..................................................
Free Standing Two-story structure containing the
Miami Rowing Club 2,000 S.F. addition upstairs.
And a 2,000 S.F. open space on the ground
floor. The addition consists of an exercise room,
men & women restrooms / lockers / showers,
unisex restroom, storage space and an office.
Also, new ADA compliant fully accessible
concrete ramp to the second floor.
Miscellaneous Districtwide Roadway, Drainage
and Sidewalk Repairs as needed for FY2014
Miscellaneous Districtwide Roadway, Drainage
and Sidewalk Repairs as needed for FY2014
Miscellaneous Districtwide Roadway, Drainage
and Sidewalk Repairs as needed for FY2014
Miscellaneous Districtwide Roadway, Drainage
and Sidewalk Repairs as needed for FY2014
Miscellaneous Districtwide Roadway, Drainage
and Sidewalk Repairs as needed for FY2014
Bridge rehabilitation including girders, deck,
railing, and substructure.
Improvements to drainage infrastructure
including, but not limited to, exfiltration trenches,
inlets, swale trenches, and well structures.
Improvements to drainage infrastructure
including, but not limited to, exfiltration trenches,
inlets, swale trenches, and well structures.
Improvements to drainage infrastructure
including, but not limited to, exfiltration trenches,
inlets, swale trenches, and well structures.
Improvements to drainage infrastructure
ncluding, but not limited to, exfiltration trenches,
nlets, swale trenches, and well structures.
Dist.
Total Cost
3 $ 628,321 $
5
$ 117,000
Total Funds
628,321
$ 117,000
2 $ 61,890 $ 61,890
3 $ 500,000 $
2 $ 100,000 $ 100,000
1
2
3
4
1
1
1
2
3
4
$ 100,000
$ 100,000
$ 100,000
$ 100,000
$ 196,625
$ 178,700
$ 1,198,000
$ 1,198,000
$ 1,198,000
$ 1,198,000
90,000
90,000
90,000
82,143
$ 178,700
$ 1,198,000
$ 1,148,000
$ 1,198,000
$ 1,198,000
235
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Storm Sewers
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
............................................
Streets & Sidewalks
Streets & Sidewalks
................................................................................
Disaster Recovery
Public Facilities
Parks and
Recreation
Project
D5 - Stormwater Projects
D1 - Reconstruction of
Roadway identified as
"Very Poor" by PW
D2 - Reconstruction of
Roadway identified as
"Very Poor" by PW
D3 - Reconstruction of
Roadway identified as
"Very Poor" by PW
D4 - Reconstruction of
Roadway identified as
"Very Poor" by PW
D5 - Reconstruction of
Roadway identified as
"Very Poor" by PW
Civic Center NW 14th
Street - Tree Funded
Component
..................
Manuel Artime Window
Replacement 970 Building -
PF
Museum Park - DRI Fees
Administration
B-No.
B-30425
B-30431
B-30432
B-30433
B-30434
B-30435
B-30500T
...... ...... .
B-30501C
...................................
B-30538D
Scope
Improvements to drainage infrastructure
including, but not limited to, exfiltration trenches,
inlets, swale trenches, and well structures.
Citywide Payment resurfacing contract to
address needed roadway improvements
throughout the City on pavement resurfacing rted
"very poor". Locations are derived from residents
notification, 311 reports and field inspections.
Citywide Payment resurfacing contract to
address needed roadway improvements
throughout the City on pavement resurfacing rted
"very poor". Locations are derived from residents
notification, 311 reports and field inspections.
Citywide Payment resurfacing contract to
address needed roadway improvements
throughout the City on pavement resurfacing rted
"very poor". Locations are derived from residents
notification, 311 reports and field inspections.
Citywide Payment resurfacing contract to
address needed roadway improvements
throughout the City on pavement resurfacing rted
"very poor". Locations are derived from residents
notification, 311 reports and field inspections.
Citywide Payment resurfacing contract to
address needed roadway improvements
throughout the City on pavement resurfacing rted
"very poor". Locations are derived from residents
notification, 311 reports and field inspections.
Dist.
Total Cost
Total Funds
5 $ 1,078,000 $ 1,078,000
1 $ 4,114,165 $ 2,400,000
2
3
4
5
$ 2,500,000
$ 2,500,000
................................
$ 2,500,000
$ 2,500,000
$ 1,200,000
$ 2,400,000
......................................
$ 2,400,000
$ 2,400,000
Installation of landscaping along a proposed 1,2,3,4, $ 100,000 $ 100,000
median within the NW 14th Street project 5
Replace and seal windows throughout complex. 2 $ 173,607 $ 150,379
Construction of a multi -use park with restaurant, 1,2,3,4, $ 600,000 $ 600,000
underground parking, and museum sites. Scope 5
includes but not limited to: Museum Park
Baywalk: Includes the construction of a
pedestrian walkway along the bulkhead which
can be used for emergency access for fire trucks
and other emergency vehicles. Walkway shall
include associated site/civil, landscaping,
irrigation and lighting work.
Promenade: Includes the construction of a
pedestrian walkway along the northern boundary
of the park, adjacent to the proposed Science
and Art Museums, which can be used for special
events, emergency access to fire trucks and
other emergency vehicles. The work includes
associated site/civil, landscaping, irrigation and
lighting. In addition, an asphalt parking lot for
approximately 40 cars will be constructed along
with a restroom facility.
The drainage infrastructure includes the
construction of a stormwater management
system consisting of dry retention swales,
concrete modules, and exfiltration trenches with
associated catch basins and piping with the
connection of three existing outfalls.
The project includes: 1) stabilization of the
Seawall against further movement (outward lean
or tilt) and 2) undertaking the necessary
structural repairs to the concrete cap and
expansion joints, so that the entire Seawall
remains structurally sound, stable, and
236
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Parks and
Recreation
Parks and
Recreation
Project
B-No.
Museum Park - DRI Air B-30538E
Quality
Museum Park - DRI
Transportation
B-30538F
Scope Dist.
Construction of a multi -use park with restaurant,
underground parking, and museum sites. Scope
includes but not limited to: Museum Park
Baywalk: Includes the construction of a
pedestrian walkway along the bulkhead which
can be used for emergency access for fire trucks
and other emergency vehicles. Walkway shall
include associated site/civil, landscaping,
irrigation and lighting work.
Promenade: Includes the construction of a
pedestrian walkway along the northern boundary
of the park, adjacent to the proposed Science
and Art Museums, which can be used for special
events, emergency access to fire trucks and
other emergency vehicles. The work includes
associated site/civil, landscaping, irrigation and
lighting. In addition, an asphalt parking lot for
approximately 40 cars will be constructed along
with a restroom facility.
The drainage infrastructure includes the
construction of a stormwater management
system consisting of dry retention swales,
concrete modules, and exfiltration trenches with
associated catch basins and piping with the
connection of three existing outfalls.
The project includes: 1) stabilization of the
Seawall against further movement (outward lean
or tilt) and 2) undertaking the necessary
structural repairs to the concrete cap and
expansion joints, so that the entire Seawall
remains structurally sound, stable, and
Construction of a multi -use park with restaurant,
underground parking, and museum sites. Scope
includes but not limited to: Museum Park
Baywalk: Includes the construction of a
pedestrian walkway along the bulkhead which
can be used for emergency access for fire trucks
and other emergency vehicles. Walkway shall
include associated site/civil, landscaping,
irrigation and lighting work.
Promenade: Includes the construction of a
pedestrian walkway along the northern boundary
of the park, adjacent to the proposed Science
and Art Museums, which can be used for special
events, emergency access to fire trucks and
other emergency vehicles. The work includes
associated site/civil, landscaping, irrigation and
lighting. In addition, an asphalt parking lot for
approximately 40 cars will be constructed along
with a restroom facility.
The drainage infrastructure includes the
construction of a stormwater management
system consisting of dry retention swales,
concrete modules, and exfiltration trenches with
associated catch basins and piping with the
connection of three existing outfalls.
The project includes: 1) stabilization of the
Seawall against further movement (outward lean
or tilt) and 2) undertaking the necessary
structural repairs to the concrete cap and
expansion joints, so that the entire Seawall
remains structurally sound, stable, and
1,2,3,4,
5
1,2,3,4,
5
Total Cost
$ 313,129
2,296,404
Total Funds
$ 313.129
$ 2,296,404
237
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Disaster Recovery
Disaster Recovery
Disaster Recovery
...................................
Disaster Recovery
Disaster Recovery
Disaster Recovery
Disaster Recovery
Project
Museum Park - FEMA Tree
Funding Component
D1 FEMA Tree Funded
Proiects
D3 FEMA Tree Funded
Projects .,...,...,..
D4 - FEMA Tree Funded
Proiects
D5 FEMA Tree Funded
Component
Overtown Greenway @ NW
11 Terrace - D5 Tree
Funded Component
Palm Grove Road
Improvements - Tree
Component D2
B-No.
B-30538T
B-30611T
B-30613T
..........................
B-30614T
B-30615T
B-30624T
B-30630T
Scope
Construction of a multi -use park with restaurant,
underground parking, and museum sites. Scope
includes but not limited to: Museum Park
Baywalk: Includes the construction of a
pedestrian walkway along the bulkhead which
can be used for emergency access for fire trucks
and other emergency vehicles. Walkway shall
include associated site/civil, landscaping,
irrigation and lighting work.
Promenade: Includes the construction of a
pedestrian walkway along the northern boundary
of the park, adjacent to the proposed Science
and Art Museums, which can be used for special
events, emergency access to fire trucks and
other emergency vehicles. The work includes
associated site/civil, landscaping, irrigation and
lighting. In addition, an asphalt parking lot for
approximately 40 cars will be constructed along
with a restroom facility.
The drainage infrastructure includes the
construction of a stormwater management
system consisting of dry retention swales,
concrete modules, and exfiltration trenches with
associated catch basins and piping with the
connection of three existing outfalls.
The project includes: 1) stabilization of the
Seawall against further movement (outward lean
or tilt) and 2) undertaking the necessary
structural repairs to the concrete cap and
Tree Component of D1 Funded Projects.
Tree Component of D3 Funded Projects.
.............................................................................
Tree Component of D4 Funded Projects.
Tree Component of D5 Funded Projects.
FEMA Tree Fund: The scope includes the
design and construction of urban pathways,
landscaping and ancillary site improvements to
the NW 11th Terrace and former FEC Railway
corridor. This project is a phase of the Overtown
Greenprint Plan developed by TPL. There is
State of Florida LAP funding associated with this
project. (FPN 420917-1-58-01) of $958,000 for
fnnctri intinn nnly
FEMA Tree Fund: The project scope includes
but is not limited to milling and resurfacing of
asphalt pavement, repair of broken curbs,
gutters, sidewalks and driveway approaches;
additional drainage improvements to remove
ponding as needed; replacement of accessible
ramps to meet ADA regulations; landscaping
throughout the neighborhood; limited addition of
security lighting; and a traffic circle is located at
NE 5th Avenue and NE 77th Street.
Dist.
Total Cost
$ 215,943
Total Funds
$ 215.943
1 $ 169,930 $ 169,930
$ 255,930 $ 255,930
.......................................................................
4 $ 315,930 $ 315,930
5 $ 119,930 $ 119,930
5 $ 100,000 $ 100,000
2
70,000
70,000
238
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Streets & Sidewalks
Sanitary Sewers
Disaster Recovery
Disaster Recovery
Disaster Recovery
Disaster Recovery
Public Facilities
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Parks and
................. Recreation...................
Streets & Sidewalks
Streets & Sidewalks
Disaster Recovery
Parks and
Recreation
Project
Miami Regional Intermodal
Plan
Caribbean Marketplace
Renovation - Sanitary
Sewer Component
Coconut Grove Business
Improvement District D2
Tree Component
Beacom Project Area
Improvements - Tree
Component D3.......
NW 33rd Street Roadway
Improvement Project - D1
Tree Component
NW 18th Avenue Roadway
Improvement Project - D1
Tree Component
Dinner Key Marina Dinghy
Dock - D2
Phase II: NW 33rd Street
Roadway Improvement - D1
Citrus Grove Roadway
Improvements
SW 23 Street btw 16 and
17 Ave for M&R - D3
Coral Gate Mini Park - D4
Traffic Circle - SW 18th
Ave. & SW 13th St. - D4
SW 2nd Street and SW
40th Avenue Traffic Circle -
D4
NW 14 Ave & 28 St. Are
Roadway Improvements-
D1 - Tree Component
Antonio Maceo Park Multi -
Purpose Recreational
Facility
B-No.
B-30645F
B-30671A
B-30687T
B-30699T
B-30724T
B-30727T
B-30735
B-30736
B-30749
B-30751
B-30777
... ..........
B-30778
B-30779
B-30780T
B-30783
Scope
Dist.
The Miami Regional Intermodal Plan (MRIP) is a 1,2,3,4,
study of the transportation facilities in an area of 5
the City of Miami bounded by the Miami River to
the north, Brickell Avenue (SR 5/US 1) to the
east and SW 8 Street to the south, and NW 57
Avenue to the west. The grant will fund planning
activities to improve transportation connectivity
between destinations of regional importance:
MIC, Port of Miami River, the Miami Marlins
Ballpark and Downtown Miami. The areas east
and south of the Miami Intermodal Center (MIC)
do not have a comprehensive infrastructure plan
addressing the interrelationships between
mobility, job creation, and neighborhood
stabilization. The area will be assessed to
determine the need for capital projects including
roadway network improvements, ADA sidewalk
compliance, bicycle/pedestrian greenways,
bridge access, water taxi service, bus transit
corridors, truck/intermodal freight facilities, and
storm sewer infrastructure.
Interior demolition and renovation. The repairs 5 $ 114,000 $ 114,000
include new plumbing, ventilation and electrical
Total Cost
Total Funds
systems.
Installation of new trees with the Beacom Area
improvements
Installation of new trees within the NW 33rd St
Area improvements
The installation of trees within every street block
within the project limits where permitted and
financially feasible.
Design, environmental permitting and
construction of a 206 LF dinghy dock at the
Dinner Kev Marina.
Milling and resurfacing, drainage improvements,
ADA modifications and striping.
$ 48,000
48.000
2 $ 100,000 $ 100,000
3 $ 60,000 $ 60,000
1 $ 60,000 $ 60,000
1 $ 60,000 $ 60,000
2 $ 253,070 $ 253,070
1 $ 2,375,000 $
Projects include misc. roadway, drainage and 3 $ 556,791 $ 556,791
traffic improvements along various streets within
the project limits. See sub -projects for exact
locations.
Milling and Resurfacing SW 23 Street btw 16 3 $ 43,101 $ and 17 Ave
Mini Parks 4 $ 200,634 $ 100,000
Roadway improvements and construction of
traffic calming devices. Included milling and
resurfacing whiting the improvement area, ADA
curbs and ramps, signing, pavement marking,
landscaping and drainage improvements.
Includes traffic calming, milling and resurfacing,
new curb and gutter, concrete sidewalk and ADA
improvements, storm water drainage system if is
necessary, pavement marking, and signing, and
restoration of swales areas.
Milling and Resurfacing, reconstruction of NW
11th Ave, installation of Turf Block along NW
14th Ave and NW 28th Street, Instalation of
trees. strioino.
An approximately 4500 square foot multi-
purpose recreational facility that would include
meeting rooms, multi -purpose rooms, after
hoof oroarams. cultur
4 $ 122,557 $ 112,557
4
$ 250,000
$ 250,000
1 $ 26,000 $
1 $ 1,500,000 $
26,000
239
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Disaster Recovery
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Streets & Sidewalks
Streets & Sidewalks
Parks and
Recreation
Streets & Sidewalks
Public Facilities
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Project
Health District Riverwalk
NW 36 Avenue 15 to 16
Street Drainage
Improvements - D1
NW 43 Avenue between 9
to 11 Street Roadway
Improvements - D1
NW 32 Ct & NW 32 Place
Milling and Resurfacing -
D1
NW 16 Ave and 14 Ter and
NW 16 Ave and 15 St - D1
NW 20th Street from 7th
Avenue to 20th Avenue
Available to USE - D1
SW 18th Avenue from SW
23rd Street to SW 23rd
Terrace - D4
Brickell Area Shared Use
Path and Roadway
Improvements - Tree
comment .D2...
Biscayne Bay Spoil Island B
Public Shelter - D2
Biscayne Bay Spoil Island E
Picnic Tables, Benches &
Umbrellas - D2
B-No.
B-30784
B-30785
B-30786
B-30787
B-30788
B-30789
B-30790
B-30803
B-30822T
B-30825
B-30825A
Biscayne Bay Spoil Island E B-30825B
Public Trail - D2
Lincoln Park Improvements
- D2
South Grove Phase 1
Roadway and Drainage
Improvements - D2
US1 Landscaping between
17 Ave and Viscaya - D2
Douglas Park ADA
Improvement (restrooms) -
CD Proiect 91-03279
SW 1st Ave between SW
115th and SW 7th Street
Dinner Key Dredging -
Spoil Island C Floating
Dock Repair
South Grove Phase 2
Roadway and Drainage
Improvements - D2
South Grove Phase 3
Roadway and Drainage
Improvements - D2
South Miami Avenue - SE
6th and 5th Street Traffic
Modifications - D2
Scope
Construction will include but not limited to,
improvements to the existing drainage system
where needed, new roadway pavement, new
curb and gutter, new sidewalk, bicycle lanes,
new decorative street and pedestrian lighting,
new benches and trash receptacles, new
landscaping and tree planting as well as the
required directional informational signage and
hardscape. Riverwalk section to be developed
fnr 1 Mn 1 F ca 'tinn of arraccihla ,, tarfrnnt
Milling and resurfacing with minor drainage
improvements
M&R
Milling and resurfacing; repair pot holes (NW 32
Ct - 180 LF & NW 32nd Place - 150 LF
Full reconstruction at 2 intersections
Milling and Resurfacing, ADA Ramps and
Stripping
Milling and resurfacing and miscellaneous road
reconstruction, ADA improvement.
Milling and resurfacing; Minor drainage;
Replacement of broken concrete curb and
putter; ADA ramps where applicable
Installation of new landscaping and irrigation
along the median within the Brickell Ave
improvements
15' x 15' elevated Tikki hut observation deck
with ADA ramp
Design and installation of picnic tables, benches
and tiki umbrellas in spoil island "E" and spoil
island "C"
Design and construction of public trail for
swimming and snorkeling in spoil island "E".
Note 080613- Additional scope of work was
requested by JRodriguez to incorporate original
scope in Spoil Island "C".
B-30826 Artificial grass and minimal lawn sprinklers at
Lincoln Park.
B-30827
B-30830
B-30832
Milling and Resurfacing, swale and spot
drainage improvements.
Landscaping replacement along segment 1 of
the US -1 pink wall.
ADA improvements to the restrooms.
Dist.
1
Total Cost
$ 961,000
Total Funds
$ 961.000
1 $ 50,000 $ 50,000
1
1
1
1
1
2
2
$ 78,224
$ 303,375
$ 57,618
$ 500,000
$ 303,375
$ 137,000
85,930
$ 17,500
8,250
8,250
78,224
$ 303,375
2 $ 80,000 j $
2
2
2
$ 286,830
$ 55,000
$ 133,474
97,000
85,930
17,500
8,250
8,250
80,000
$ 286,830
$ 55,000
$ 133,474
B-30833 Curb replacement, ADA ramp improvements, 1,2,3,4, $ 775,600 [ $ 368,212
B-30834
B-30835
B-30836
B-30837
milling & resurfacing
Engineering design, construction drawings,
construction services administration and
environmental permiting with DEP, DERM and
Corp of Engineer to Dredge approximately 200
CY to Restore contours where the existing
floating dock of Spoil Island "C" is located. Also,
the scope includes the design of structural
repairs of the floating dock "C" due to shoaling
nrlarnaath of it
Milling and Resurfacing, Swale and Spot
Drainage Improvements
Milling and Resurfacing, swale and spot
drainage improvements
Roadway Traffic Circle Design and Construction
5
2
2
2
2
$ 308,375
$ 492,000
$ 1,231,787
$ 771,545
$ 492,000
$ 1,231,787
$ 771,545
240
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
General
Government
General
Government
General
Government
General
Government
General
Government
General
Government
General
Government
Disaster Recovery
Disaster Recovery
Parks and
Recreation
Parks and
Recreation
Streets & Sidewalks
Streets & Sidewalks
Parks and
Recreation
Project
FY2013 Citywide Capital
Needs - Budget Dept.
B-No.
B-30865
Environmental Remediation B-30865A
Study
City Hall Roof Terrace B-30865B
City Hall Windows and
Doors
Public Works Asphalt
Patch Truck
MRC A/C Replacements
Environmental Remediation
Study- Fire -Rescue
African Square Park -
Splash Park D5 Tree
Component
NW 12 Avenue/NW 12
Place Roadway Improv.
Tree Component D5........
Lummus Park
Miscellaneous Repairs - D5
(FY2013 PR)......
Little Haiti Cultural Campus
Miscellaneous Repairs - D5
Buena Vista One -Way
Street Conversion and
Signage - D5
B-30865C
B-30865D
B-30865E
B-30865F
B-30882T
B-30883T
........ .. .. .
B-30889
........ .. .. .
B-30890
..................................
B-30891
Little Haiti Gateway Signs - B-30892
D5
Overtown Youth Center B-30893
Miscellaneous Repairs - D5
Streets & Sidewalks ;Little Haiti Right of Way
Improvements - D5
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Phase I: NW 29th Street
(NW 7 Ave to NW 2 Ave) -
D5
Phase II: NW 29 St (NW 7
Ave to NW 2 Ave) - D5
NW 41 St from NW 7 Ave
to NW 12Ave-D5
NW 43 St from NW 10 Ave
to NW 11 Ave - D5
NW 10 Ave from NW 40 St
& NW 8 Ave from NW 46
St to NW 43 St - D5
1NW 40 St from NW 10 Ave
Ito NW 12Ave-D5
Scope
Dist.
Citywide Capital Needs - Approval from Budget 1,2,3,4,
Department must be obtained prior to 5
transferring funds for specific needs.
Environmental Remediation Studies 1,2,3,4,
5
Remove existing tile and roof materials for the 1,2,3,4,
terrace and canopy roof levels. Replace with 5
new roofing for the canopy area and roofing and
the walking surface for the terrace areas.
Replace existing windows with impact resistant 1,2,3,4,
glass and frame. 5
Purchase of Asphalt Patch Truck for Citywide 1,2,3,4,
needs. 5
Replace Air Conditioner systems at the MRC. 1,2,3,4,
5
Fire Rescue Environmental Remediation Studies 1,2,3,4,
and associated impacted site within a mile 5
radius.
The project consists of the design and 5
construction of a new Splash Park. Work
includes: 1. Partial re -grading to maintain
existing amphitheater; 2. Create a new
interactive water playground in an approximately
2400 SF paved area; 3. Enclose splash park
area with a 48" high steel fence; 4.
Extend electric and water utilities to splash park
area, and 5. Demolish existing restrooms and
create new accessible restrooms and provide
accessible route to splash park; 6. Preserve
existing large trees; 7. Renovate and Paint
exteriors of neighboring electrical room and entry
feature.
Installation of landscaping within the NW 12th
Ave Linear Park project
Miscellaneous repairs including A/C
replacement at Park.
Miscellaneous repairs including A/C
replacement at Park.
Converting two way streets to one way streets in
Historic Buena vista East Neighborhood,
including pavement marking and signing, per the
county's approved plan. Addional Scope of
Work, construct curb and gutter island plant at
New Welcome Signs for the Little Haiti
neighborhood
B-30894 New Sidewalks and Roadway Improvements
B-30896
B-30896A
B-30897
B-30898
B-30899
Replacement of existing broken sidewalk; ADA
ramps where applicable; Reqork base and new
pavement; Replacement of broken Curb and
Gutter; New median and bike lane per Miami 21
Replacement of existing broken sidewalk; ADA
ramps where applicable; Reqork base and new
pavement; Replacement of broken Curb and
Gutter; New median and bike lane per Miami 21
and Bicycle master Plan.........
Milling and resurfacing; drainage; ADA ramps
where applicable; repair of broken sidewalks
Milling and resurfacing; drainage; ADA ramps
where applicable; repair of broken sidewalks.
Milling and resurfacing; minor drainage; ADA
ramps where applicable; repair of broken
sidewalks
Total Cost
$ 1,245,900
466,900
314,176
$ 296,001
$ 144,823
$ 289,823
$ 140,000
$ 50,000
Total Funds
$ 466,900
$ 314,176
$ 296,001
$ 150,000
$ 289,823
$ 140,000
......................................
$ 50,000
5 $ 46,000 $ 46,000
5 $ 40,265 $ 40,265
5 $ 25,255 $ 25,255
5 $ 250,000 $ 250,000
5 $ 100,000 $ 100,000
5 $ 35,625 $ 35,625
5 $ 500,000 ; $
5
5
5
5
5
$ 597,219
$ 597,219
$ 475,349
$ 115,236
$ 280,888
500,000
B-30900 1Milling and resurfacing; ADA ramps where 51$ 129,641 ($ 98,981
lapplicable; repair of broken sidewalks.
241
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Streets & Sidewalks
............................................
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Parks and
Recreation
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Parks and
Recreation
Project
Pahse I: NE 78 St (N); NE
75 St (S); N Miami Ave
(W); NE 2 Ave (E) - D5
Phase II: NE 78 St (N); NE
75 St (S); N Miami Ave
(W); NE 2 Ave (E) - D5
Phase III: NE 78 St (N); NE
75 St (S); N Miami Ave
(W); NE 2 Ave (E) - D5
Phase I: Little River (N); NE
82 St (S); N Miami Ave
(W); NE 2 Ave (E) - D5
Phase II: Little River (N);
NE 82 St (S); N Miami Ave
(W); NE 2 Ave (E) - D5
Phase III: Little River (N);
NE 82 St (S); N Miami Ave
(W); NE 2 Ave (E) - D5
Phase I: NE 82 St (N); NE
79 St (S); N Miami Ave
(W); NE 1 Ave (E) - D5
NW 70 Street Area
Roadway & Minor Drainage
Improvements - D5
Seybold House Demolition
and Reconstruction - D5
Downtown Miami Bicycle
and Pedestrian Mobility
Improvement Proiect
Downtown Miami Signage
and Wayfinding System
La Pastorita Traffic
Calming and misc.
improvements - D4
East Flagami Roadway
Improvements - SW 2nd
Street and SW 4th Street -
D4
Robert King High Fencing
and Miscelaneous
Improvements
B-No.
B-30901
B-30901A
B-30901B
B-30902
B-30902A
B-30902B
B-30903
B-30904
B-30905
B-30940
B-30941
B-30960
B-30961
B-30962
Parks and ;Bay of Pigs Memorial Park B-30963
Recreation !Lighting -...... D4............................................................
Scope
Milling and resurfacing, Partial reconstruction;
New sidewalk where none exists; ADA ramps
where applicable; Minor drainage; R/W
certi i.cati.gn (aoor.oximate.I.v..50 easements) .........
Milling and resurfacing, Partial reconstruction;
New sidewalk where none exists; ADA ramps
where applicable; Minor drainage; R/W
certification (approximately 50 easements)
Milling and resurfacing, Partial reconstruction;
New sidewalk where none exists; ADA ramps
where applicable; Minor drainage; R/W
certification (aoproximatel.v..5.0 easements).......
Milling and resurfacing, partial reconstruction;
New sidewalk where none exists; ADA ramps
where applicable; Minor drainage; R/W
certification (approximately 70 easements)
Milling and resurfacing, partial reconstruction;
New sidewalk where none exists; ADA ramps
where applicable; Minor drainage; R/W
certification (aporoximately 70 easements)
Milling and resurfacing, partial reconstruction;
New sidewalk where none exists; ADA ramps
where applicable; Minor drainage; R/W
certification (aoproximately 70 easements)
Milling and resurfacing, partial reconstruction;
New sidewalk where none exists; ADA ramps
where applicable; Minor drainage; R/W
certification (aoproximately 70 easements)
Milling and resurfacing improvement with minor
drainage along minor streets and 24' trunk line
along 71st street. Project also includes sidewalk
and curb replacement as needed.
Demolition and reconstruction of the Seybold
Canal House
Bicycle lane and sharrow markings, improved
crosswalks throughout the Omni, Downtown,
and Brickell area.
Project developed based on the DDA Signage
and Wayfinding study. Through a FDOT
Transportation Enhancement Grant, the City will
finalize the design and install the wayfinding
signs throughout the DDA area.
The Scope of Work involves traffic circles, speed
humps, median closure and speed tables along
several roads. Milling and resurfacing roads only
where the speed humps are located. The scope
of work may be subject to change based on
subsequent engineering findings.
Design and construction of pavement widening,
rework base and new pavement, and repair of
broken sidewalk for the location generally
bounded along SW 2 Street from SW 41 Avenue
to SW 39 Avenue, and SW 4 Street from SW 40
Avenue to SW 38 Court.
Additional locations generally bounded by SW
41 Avenue, SW 40 Avenue, SW 39 Court, SW
39 Avenue from W. Flagler Street and SW 2
Street will include milling and resurfacing.
Replace fencing around tennis courts and
racquetball courts, install masonry dumpster
enclosure, install two traffic speed bumps, repair
electrical power to lighthouses and bridge gate,
install driveway approaches to soccer field,
install tennis net at new court and provide
parking stall striping to the north parking lot.
Instal I lights.
Dist.
Total Cost
5 $ 526,967 $
5 $ 532,967 $
5 $ 532,967 $
5 $ 625,287 $
5
5
5
5
5
2
2
4
4
4
$ 625,287
$ 625,287
$ 504,158
$ 2,052,550
$ 200,000
$ 287,500
$ 1,150,000
$ 675,000
422,264
$ 102,468
Total Funds
$ 287,500
$ 1,150,000
$ 675,000
$ 422,264
$ 102,468
4 $ 20,000 ; $ 20,000
242
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
................................................................................
Streets & Sidewalks
......................................
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Project
Modification of Speed
Humps on SW 11 St.
between 30 Ave and 31 Ct.
D4 .........
Coral Gate Speed Humps -
D4
SW 5 St between 27 ave
and 28 ave street
improvement - D4
SW 16th Terrace from SW
21 Ave to SW 22 Ave - D4
SW 12th St (SW 30th Ave
and SW 30th Place) - D4
SW 30th Court (SW 12th
Street and SW 13th Street)
D4
SW 20 Street (SW 31 Ave
to SW 32Ave )-D4
SW 5th Street between 42
Ave and 43 Ave
Improvement - D4
SW 64 Court Roadway &
Drainage Improvements
(from SW 6 St to SW 8 St) -
D4 .........
Traffic Circle - SW 12 St
and 31 Ave (SR
2013005677) - D4
Coral Gate Speed Humps -
Phase II - D4
Swale Restoration @ NW 2
Street between 34 Ave & 35
Ave - D4
Streets & Sidewalks ISW 2 St from 53 Ave to 54
Ave - D4
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Parks and
Recreation
Streets & Sidewalks
Streets & Sidewalks
Parks and
Recreation
Traffic Circle on SW 23
Ave and SW 26 Street - D4
Drainage improvements @
SW 4 St between 53 Ave &
54 Ave - D4
SW 21st St. & 24th Ave
Roadway Improvement - D4
Liberty Square T-
Turnarounds - D5
Oakland Grove Park -
upgrades - D5
Little River Area Road and
Drainage Improvements -
D5
NW 44th Street between
NW 7th and NW 8th Ave -
D5
Athalie Range Park HVAC
Replacement-,.. D5
B-No.
B-30964
B-30965
B-30966
B-30967
B-30968
B-30969
B-30970
B-30971
B-30972
B-30973
B-30974
B-30975
Scope
Modification of existing speed tables.
Installation of speed humps within the coral gate
neighborhood.
Roadway reconstruction, drainage and swales,
ADA ramps where needed.
Milling and resurfacing; replacement of broken
concrete curb and gutter; minor drainage
improvements where needed; repair of broken
sldewalik..s. ADA ramps where..aopl.i.cabl.e ..........
Milling and resurfacing
Milling and resurfacing of roadway and driveway
asphalt approaches.
Milling and Resurfacing
Drainage improvements; Swale improvements;
pavement milling and overlay (if necessary)
Drainage improvements; Swale improvements;
pavement milling and overlay (if necessary).
Design and construction of a traffic circle,
includes pavement anf minor drainage at that
intersection to accommodate the circle.
Design and construction of flat-topped speed
humps including, but not limited to road
reconstruction and/or milling & resurfacing,
striping, signage, Swale restoration, and clean
existing drainage structures. The scope of work
may be subject to change based on subsequent
Swale Restoration to resolve flooding issue
B-30976 Milling and resurfacing , minor drainage
B-30977
B-30982
B-30983
B-30984
Design and construction of flat-topped speed
humps including, but not limited to road
reconstruction and/or milling & resurfacing,
striping, signage, Swale restoration, and clean
existing drainage structures. The scope of work
may be subject to change based on subsequent
e nninpnrinn..findinn5
Replacement of existing slab covered trench
Construction of a traffic circle including
drainage.
two new guardhouses at NW 65th Street, six
street closuress/street T turn arounds and misc
pavement restoration with landscape......
Replace, remove and refinish existing fence,
benches landscaping and walkway
Milling and Resufacing, minor drainage, repair of
broken sidewalks and driveway approaches.
Scope of Project includes Milling and
resurfacing, Minor drainage, Repair of driveway
approaches, Swale restoration, ADA Ramps,
where applicable Repair of broken sidewalks.
HVAC Replacement
Dist.
Total Cost
4 $ 25,000 $
4 $ 53,000 $
4 $ 288,090 $
4 $ 206,386 $
4 $ 36,102 $
.......................................................................................
4 $ 43,214 $
.............................................
4 $ 56,178 $
4 $ 7,857 $
4 $ 132,522 $
4 $ 201,663 $
4 $ 108,034 $
4 $ 28,809 $
4 $ 54,000 ; $
4
4
4
5
5
5
5
5
$ 221,672
$ 51,065
$ 140,000
$ 250,000
$ 44,887
$ 180,900
$ 185,000
$ 193,043
Total Funds
25,000
53,000
150,467
36,102
43,214
7,857
132,522
28,809
54,000
$ 51,065
$ 60,000
$ 250,000
$ 44,887
$ 180,900
$ 185,000
$ 193,043
243
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Storm Sewers
Public Safety
Streets & Sidewalks
Streets & Sidewalks
Parks and
Recreation
Parks and
Recreation
Sanitary Sewers
General
Government
General
Government
Streets & Sidewalks
Storm Sewers
Project
Design District Roadway
and Stormwater
Improvement - D5
North District Police
Building Misc. Repairs - D5
SE 3rd St Widening (fka
Dupont Plaza) - DRI
Transportation
SE 3rd Street Widening -
DRI Administration
Duarte Park Building
Renovation, Splash Park
(Lighting)
Maximo Gomez / Domino
Park Restroom
Improvements - D3
B-No.
B-30985
B-30988
B-31206A
B-31206B
B-35812D
B-35861B
Maximo Gomez / Domino B-35861 BS
Park Restroom
Improvements - D3
New Public Works
Operations Facilities
Public Works Fleet and
Heavy Machinery
Replacement FY2014
PW Citywide Sidewalk
Replacement Contract M-
0096 (Fy14-FY18)
Morningside Drainage
mprovement Project D2 -
PW
B-40001
B-40002
B-40003
B-40004
Scope
Infrastructure improvement in the Design
District. Milling and resurfacing, swale
restoration, drainage improvements, minor curb,
and sidewalk repairs. The City will contribute
$500K to serve as a match to a State Grant of
1 M..aoo..roved .in.. FY2013.........
North District Exterior Paint and Landscaping
Painting: Exterior of the Building and perimeter
wall sorrounding parking lot.
Landscaping:Install 15-16' HT Cuban Royal
Palms; Install 1 - 12'to 14' Oak ; Relocation of 1
tree Clearing and grubbing, tree triming ; install
Palmetto sod.
Roadway improvements including but not limited
to road widening, reconstruction, milling and
resurfacing, signing and pavement markings,
concrete sidewalks, ADA ramps, driveway, curb
and gutter construction, landscaping, drainage
modifications, intersection traffic analysis and
signalization.
Roadway improvements including but not limited
to road widening, reconstruction, milling and
resurfacing, signing and pavement markings,
concrete sidewalks, ADA ramps, driveway, curb
and gutter construction, landscaping, drainage
modifications, intersection traffic analysis and
signalization.
Lighting installation.
The scope will consist in remodeling / renovation
of the existing bathrooms facilities within the
confine of the existing building.
New bathrooms will be ADA compliant. Repair
or replace existing roof structure as needed.
Replace all MEP within the foot print of the
building.
The scope will consist in remodeling / renovation
of the existing bathrooms facilities within the
confine of the existing building.
New bathrooms will be ADA compliant. Repair
or replace existing roof structure as needed.
Replace all MEP within the foot print of the
Design and Construction of an approximately
14,000 SF Two -Story facility that will serve as
Public Works Operations and Maintenance
Headouarters.
Purchase fifteen new automobiles for PW
nspectors; purchase two Bobcat S185 models
with standard bucket (T.H.); purchase two
Bobcat S185 trailers, purchase two 8-10 cubic
Yard. Dump trucks,
Citywide sidewalk improvement to address
needed sidewalk replacements and ADA
mprovements throughout the City. Location are
derived from resident notifications, 311 reports
and.. field. insoections..
Drainage improvements including, but not
imited to new system drainage, roadway
reconstruction and/or milling & resurfacing,
striping, damage and/or valley gutter
replacement, tree planting, swale restoration,
ADA ramps, and signage and a new drainage
numn..statl.on...tnr..this. l.ow.'avi 'avian area
Total Cost
$ 1,500,000
.................. ..................
$ 66,549
$ 1,500,000
$ 100,000
$ 15,000
$ 48,368
$ 100,000
Total Funds
$ 507,644
66,549
$ 1,500,000
$ 100,000
15,000
48,368
$ 100,000
$ 1,875,500 $
Dist.
5
5
2
2
1
3
3
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
50,000
244
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Streets & Sidewalks
Storm Sewers
General
Government
General
Government
General
Government
Storm Sewers
Public Safety
General
Government
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Project
PW Citywide Pavement
Resurfacing Contract
M0098 (FY14-18)
Mechanical Upgrades to
Riverview and Lawrence
Pump Stations - D3 - PW
PW - Heavy Machinery
Replacement - FY2015
PW Heavy Equipment and
Machinery Replacement -
FY2016
PW Updrage Operations
Division Equipment -
FY2017
Solid Waste Sweeper
Police Station
Headquarters Generator
Slab
Fire Alarm Replacement,
Air Conditioning Repairs
and maintenance
Park Expansions and Land
Acquisition - Citywide
Citywide Capital
Improvements Projects
Antonio Maceo Community
Building - D1
Kinloch Park Building
Addition - D1
Citywide Park Building AC
Replacement
Parks and ;African Square Park
Recreation ;Playground
Parks and
Recreation
African Square Park
Restroom & Building
Renovation
Parks and 1Allapattah Mini Park
Recreation ;Access Control
Parks and
Recreation
Parks and
Recreation
........................................
Parks and
Recreation
IAllapattah Mini Park Court
Armbrister Park Field
Bay of Pigs Park
Playground
B-No.
B-40005
B-40006
B-40007
B-40008
B-40009
B-40271
B-40273
B-40410
B-40454
B-40455
B-40456
B-40457
B-40458
Scope
Dist.
The Citywide Pavement Resurfacing Contract is 1,2,3,4,
used to address needed roadway improvements 5
and pavement throughout the City. Locations are
dirived from resident notifications, 311 reports
and field inspections.
Consultant services for Construction
Engineering Inspection for the Riverview and
Lawrence Pump Strations Construction
Project.
Purchase one bobcat S750 with a standard
bucket and vibrating roller, 40" planer
attachements; purchase one Bobcat S750 triler.
Purchase one new vaccum truck for PW
Operations Division; purchase five crew cab
trucks; purchase one John deere 62Y Articulting
wheel loader; purchase owheel loader trailer.
3
1,2,3,4,
5
,2,3,4,
5
Puchase one vaccum truck for PW Operations 1,2,3,4,
Division. This will replace a +20-year old vaccum 5
truck used for Drainage System Maintenance.
Purchase of one Sweeper
Construct a concrete slab at the Main Police
Building to safely store an emergency generator.
1,2,3,4,
5
2
Fire Alarm Replacement; Phase I: Replacement 1,2,3,4,
of 10 Air Handlers at the MRC Facility ; Phase II: 5
Replacement of Condenser Water Pipes for the
Water Tower at the MRC Facility; Phase III:
Machine Replacement for the Elevators at the
MRC Facilitiy
Park Expansions and Land Acquisition
1,2,3,4,
5
Citywide Parks Capital Improvements Project. 1,2,3,4,
5
Design and construct an approximately 3,350
square foot addition and remodel an existing
community center. The combined spaces will
house a computer room for 40 people, a fitness
room for 20 people, addition will be a multi-
purpose recreational facility that would include
meeting rooms, multi -purpose rooms, after
school programs, cultural and arts programs.
Site work will include the relocation of up to 13
trees and expansion of the parking lot for an
,4,4itinn,i',n ennrae
Design & construction of a new annex to the
existing community center building to provide
programs & services to the area senior
residents. The new building, of 3,000 sf, will
include multipurpose & activity spaces,
kitchenette, restrooms, storage, in addition to
expansion of existinn..oarkina. area .......................
AC Replacements
B-40459 Replace sand with Protective Insdustrial
Products (PIP) Floring in Playground
B-40460
Renovate restrooms and building
B-40461 ;Install new perimeter fencing
B-40462 Resurface basketball court
B-40463
Artificial Turf Football Field.
Replace Playground and Protective Insdustrial
Products (PIP) flooring Install
1
1
1,2,3,4,
5
Total Cost
$ 6,912,761
$ 125,000
$ 95,000
$ 650,000
$ 300,000
$ 170,000
$ 10,000
$ 1,426,200
$ 1,000,000
$ 413,946
$ 1,686,750
$ 1,461,850
Total Funds
$ 170,000
$.....................10,000
$ 1,426,200
$ 1,000,000
$ 263,946
$ 1,686,750
$ 1,461,850
$ 600,000 $
51 $ 125,000
5
$ 750,000
1; $ 30,000 1 $
11 $ 25,000 I $
2
5
$ 1,350,000
$ 100,000
245
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
...........................................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Project
Baywood Park Seawall
Repair
Baywood Park Site
Development
Belafonte Tacolcy Park
Belafonte Tacolcy Park
Belafonte Tacolcy Park
entire facility reconstruction
Bell Meade Park
Improvements ....
Biscayne Heights Park
(Shorecrest Park)
Improvements ....
Biscayne Park Soccer
Facility
Bryan Park Tennis Court
Kirk Munroe Tennis Park
Parks and ;Coral Gate Park Access
Recreation ;Control
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Coral Gate Park Baseball
Field
Crestwood Park Basketball
Courts Resurfacing
Curtis Park Access Control
(Fencing)
Curtis Park Access Control
(Roll up doors).......
Curtis Park Basketball and
Tennis Courts Resurfacing
Curtis Park Parking Lot
Curtis Park Playground
Curtis Park Restrooms
Renovation
Curtis Park Stadium
Restrooms Improvements.,.
Domino Park Building
Domino Park Restroom
Renovation
Domino Park Shade
Structure
Dorsey Park Ballfield
Douglas Park Irrigation
Svstem
Douglas Park Lighting
Douglas Park Playground
Duarte Park Basketball and
Tennis Courts Resurfacing
Duarte Park Lighting
Duarte Park Playground
Eaton Park Daycare
Improvements
Eaton Park Improvements
Fort Dallas Park (Lummus
Park Historic District)
Demolition...................................................e
Gibson Park Stadium
B-No.
B-40465
B-40466
B-40467
..................................
B-40468
B-40469
B-40470
B-40471
B-40472
B-40473
Scope
Repair seawall at Baywood Park
Patio area and lighted bollards for walkways at
Bavwood Park
Replace fencing around basketball courts
Resurface basketball courts
Entire facility reconstruction
New fencing and lighting
General and Water Fundation
Artificial Turf Soccer Field & Lights
Resurface tennis courts
B-40474 Resurfacing
B-40475 ;Install fencing around playground
B-40476
B-40477
B-40478
B-40479
B-40480
B-40481
B-40482
B-40483
B-40484
B-40485
B-40486
................................
B-40487
B-40488
B-40489
B-40490
B-40491
B-40492
B-40493
B-40494
B-40495
B-40496
B-40497
B-40498
Shades for bleaches at baseball field
Resurface Basketball courts
New perimeter fencing and interior fencing
Enclose with roll up doors back terrace
Resurface basketball and tennis courts
Resurface and redesign parking lot
Relocate and replace playground structure
Renovate restrooms in community building and
concession building
Convert restrooms into locker rooms with
shower.......
Resurface Floor
Restrooms Renovation
Install automatic shade awning
Renovate Baseball Field
Install & renovate irrigation system
Increase Security Lighting for Walking Path
Replace sand with Protective Insdustrial
Products (PIP) flooring
....................
Resurface basketball and tennis courts
Install more security lighting throughout park
Replace sand in fitness areas with Protective
Insdustrial Products (PIP) flooring
Shade structure for payground and resurface
parking lot.
New Building, non regulation size artificial turf
soccer field, new playground to include
Protective Industrial Products (PIP) flooring for
newQIayQ..r.4.u.nd...........................................................................................
Remove all pavillions / renovations
Install restroom building at stadium
Dist.
Total Cost
5 $ 150,000 $
5 $ 125,000 $
5 $ 35,000 $
.......................................................................................
5 $ 40,000 $
5 $ 5,000,000 $
2 $ 50,000 $
5 $ 100,000 $
2 $ 2,250,000 $
4 $ 45,000 $
2$ 30,000I$
4 $ 20,000 ; $
4
5
1
1
1
1
1
1
1
3
3
3
2
2
2
2
1
1
1
5
5
5
5
$ 30,000
$ 25,000
$ 225,000
$ 25,000
$ 125,000
$ 125,000
$ 200,000
$ 200,000
$ 1,250,000
$ 50,000
$ 250,000
$ 30,000
$ 45,000
$ 40,000
$ 50,000
130,000
75,000
$ 175,000
$ 120,000
$ 100,000
$ 1,500,000
$ 750,000
$ 850,000
Total Funds
246
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
...........................................
Project
Grapeland Park Picnic
Shelter
Grove Mini Park
Plavground
Hadley Park Ballfield
Parks and Hadley Park Bleachers
Recreation
Parks and Hadley Park Football Field
Recreation
Parks and Hadley Park Parking Lot
Recreation
Parks and
Recreation
Hadley Park Pool Locker
rooms improvment
Parks and Hadley Park Pool
Recreation Improvement
;Citywide - Land Acquisition
Recreation 1Park
Parks and
Parks and
Recreation
...........................................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
...........................................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
.............................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Legion Park Boat Ramp
Legion Park HVAC
(heating, ventilation, and air:
conditioning). Replace ............:
Legion Park Improvements
Legion Park Restrooms
Lemon City Park Daycare
Parking Lot
Lemon City Park Daycare
Playground
Lemon City Park
Improvements
Lemon City park Walkways
Little Haiti Soccer Park
Little Haiti Soccer Park
Stadium Bleacher
Modification
Little Haiti Soccer Park
Stadium Repairs
Little Haiti Freedom
Garden Park
Little River Commerce Park:
Building
Little River Pocket Park
Plavground
Lummus Park Playground
Manatee Bend Park
Marti Pool Park Locker -
rooms Renovation
Marti Pool Park Pool
Improvements ..........................
Marti Pool Park Pump
Improvement
Melreese Golf Course
Renovations
Melrose Park Playground
Merrie Christmas Park
Improvement$...,...,.. ..,...,....
Virginia Key Rowing Center
Park Building
Moore Park Tennis Court
Improvement ......
.................
Morningside Park Floating
Dock
Morningside Park Boat
Ramp Improvements
Morningside Park Tennis
Center Building
B-No.
B-40499
B-40500
B-40501
..................................
B-40502
B-40503
................................
B-40504
B-40505
B-40506
Scope
Construct picnic shelters & area
Replace sand with Protective Insdustrial
Products (PIP) flooring
Replace fencing at baseball and football fields
New Bleachers - Replacement
Artificial turf & lights
Create new parking lot by school and fire station
New flooring in locker rooms
Remarcite Pools (3) Pools, and add lane lines &
hooks
B-40507 ;Increase Park Acreage Citywide
B-40508
B-40509
B-40510
B-40511
.................................
B-40512
B-40513
B-40514
B-40515
B-40516
B-40517
B-40518
.... ......
B-40519
B-40520
B-40521
B-40522
B-40523
................................
B-40524
B-40525
B-40526
B-40527
B-40528
B-40529
B-40530
B-40531
B-40532
B-40533
B-40534
Morningside Park Court B-40535
Renovations
Renovate Boat Ramp
Replace AC units in building
3 Picnic shelters, classroom remodal, wiring
upgrades.
Renovate two restrooms
Resurface parking lot and upgrade access
control
Shade structure for playground
Expand A/C
Resurface asphalt Pathways
Shade structure for east bleachers
Concrete bleachers modifications
Stadium Repairs
Landscaping, irrifation, and site furnishingns.
Complete redevelopment of park to include
demolition and constructing new shelter
Install playground and PIP (Protective Industrial
Products) flooring
Install Playground and Protective Industrial
Products (PIP) Floorin
Install picnic shelters
Renovate Locker -rooms
Resurface Pool
Renovate pump room and pump systems
To maintian PGA status Greens and Fairways
must be replace every seven years.
Install new playground with PIP (Protective
Industrial Products) flooring
Soccer field & parking
Construct new restroom/locker room building
(Funding Shortfall)
Reconstruct Tennis Court
New floating dock sections
Repair existing pier at boat ramp
Construct new tennis center building
Tennis court renovations
Dist.
Total Cost
1 $ 850,000 $
2 $ 65,000 $
5 $ 80,000 $
.......................................................................................
5 $ 600,000 $
5 $ 1,750,000 $
5 $ 100,000 $
5 $ 80,000 $
5 $ 280,000 $
1,2,3,4„ $ 15,000,000 ; $
51
2
2
2
2
5
5
5
5
5
5
5
5
5
2
3
1
5
2
2
5
2
2
2
2
450,000
100,000
$ 250,000
$ 100,000
...................................................................
$ 100,000
$ 75,000
$ 40,000
$ 30,000
$ 170,000
$ 100,000
$ 160,000
$ 50,000
$ 500,000
$ 50,000
$ 125,000
$ 100,000
$ 100,000
$ 110,000
$ 100,000
$ 200,000
$ 125,000
$ 600,000
$ 350,000
$ 380,000
$ 50,000
$ 380,000
$ 650,000
$ 500,000
Total Funds
200,000
247
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
.............................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
.............................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
.............................
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
Project
Morningside Park
Walkways and ADA
Compliance
Morningside Pool Park Pool
Facility Improvements
North Bay Vista Park
Playground
Oakland Grove Mini Park
Virginia Key Beach Park
Access Control ....... ............
Operation Yard Park
Trailers
Pallot Park Seawall
PBA / Fern Isle
Redevelopment
Peacock Park Building
Renovation
Peacock Park Playground
Pine Heights Park
Playground
Citywide Parks Playground
Replacements
Pullman Mini Park
Playground Replacement
Rainbow Village Park
Playground
Athalie Range Park
Playground ................................
Athalie Range Park
Restroom Renovation
Athalie Range Park Pool
Heater
Reeves Park Basketball
Court
Reeves Park Playground
Reeves Park Sidewalks &
W alkways
Reeves Park Volleyball
Court
Riverside Park Restroom
Renovation
Citywide Park Buildings
Roof Repairs
Sewell Park kayak Launch
;Sewell Park Parking Lot
Sewell Park Playground
Shedavia Jenkins Parks
Lighting
Shenandoah Park Pool
Renovation
Simpson Park Building
Roof Replacement
Southside Park Field
Spring Garden Point Park
Historic Building
Spring Garden Point Park
Citywide Park Buildings
Termite Control
Town Park Playground
Virginia Key Beach Park
Restrooms Replacement
Virrick Park New Pool
B-No.
B-40536
B-40537
B-40538
B-40539
B-40540
B-40541
B-40542
................................
B-40543
B-40544
B-40545
B-40546
B-40547
B-40548
B-40549
B-40550
B-40551
B-40552
B-40553
B-40554
............................
B-40555
B-40556
B-40557
B-40558
Scope
Resurface walkways throught park and intall
cotouts for ADA compliance
Renovate pump room, locker rooms, and pump
systems
Instal new playground with PIP (Protective
Industrial Products) flooring__
Replace observation deck, and install kayak
lauch
Electric Entry Gate/Cards
New trailer and site
Extend and complete seawall
Site development
Recreation Building Renovation
Replace Playground & PIP (Protective Industrial
Products) flooring
Replace Playground Structure
Replace playgrounds as needed
Replace existing playground with and PIP
(Protective Industrial Products) flooring..,,..,,..
Replace playground structure
Replace sand with PIP (Protective Industrial
Products) flooring.......... ............ .........................
Renovate restrooms in building
Install new heater
Resurface Basketball Courts
Replace Playground Structure
........................................................
Level off trip hazards
Renovate Volleyball Court
Renovate restroom building
Ass needed
B-40559 Repairs and Renovations
B-40560 Resurface Parking Lot
B-40561
................................
B-40562
B-40563
...........................
B-40564
B-40565
B-40566
B-40567
............................
B-40568
B-40569
................................
B-40570
B-40571
Replace sand with PIP (Protective Industrial
Product) flooring.......
Install more security lighting throughout park
Expand pool renovation project
Roof Replacement
Artificial sport field & irrigation
Reconstruction Seybold House
Install new playground
...........................................................
Evaluation and Tenting
Replace playground structure
Replace Restrooms
New pool project
Dist.
Total Cost
2 $ 250,000 $
2 $ 1,000,000 $
5 $ 75,000 $
5 $ 50,000 $
1,2,3,4, $ 35,000 $
5
1,2,3,4, $ 225,000 $
5
2 $ 300,000 $
1 $ 4,500,000 $
2 $ 150,000 $
2
1
1,2,3,4,
5
5
5
5
5
5
5
3
1,2,3,4,
5
$ 150,000
$ 75,000
$ 1,500,000
$ 75,000
$ 75,000
$ 120,000
$ 80,000
$ 75,000
$ 35,000
$ 100,000
................................
$ 75,000
$ 25,000
$ 75,000
$ 350,000
1 $ 225,000 r $
1
1,5
4
2
3
5
2
2
$ 60,000 ; $
$ 75,000
$ 125,000
$ 2,200,000
................................
$ 65,000
$ 450,000
$ 1,250,000
$ 150,000
................................
$ 200,000
$ 100,000
$ 750,000
$ 3,000,000
Total Funds
Parks and Alice Wainwright Park
Recreation ;Restrooms
B-40572 1Restrooms Renovation
248
21 $ 350,000 I $
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
Disaster Recovery
General
Government
General
Government
General
Government
General
Government
General
Government
General
Government
Parks and
Recreation,...,...,
Public Safety
Public Facilities
Project
Grapeland Water Park
Renovations
West Buena Vista Park
Building Restrooms
improvements
West Buena Vista Park
Courts
West Buena Vista Park
Playground .........
Williams Park Playground
Williams Park Pool
Improvement ......
..................
Williams Park Sport Field
Lights
Jose Marti Roof Repair -
GSA
SW 32 Avenue
Improvements D2 Tree
Component
City Hall Studio Area - A/C
Unit Replacement
Office of Communications -
Fleet Upgrade
Office of Communications -
Upgrade Systems to Media
Equipment
Office of Communications -
Robotics Cameras
Office of Communications -
Large Format Video
Cameras Replacement
Office of Communications -
Studio Cameras
B-No.
B-40573
B-40574
B-40575
B-40576
B-40577
B-40578
................................
B-40579
B-40580
B-40704AT
B-40960
B-40961
B-40962
B-40963
B-40964
B-40965
Little River Waterfront Park B-50722A
Acquisition PHII..
................ ...............................
Fire Station #1 - B-60455B
Renovation and
Miscellaneous Repairs .............
Miamarina Pier 5 Canopies B-70010
- PF
Public Facilities ;Clean Vessel Act 2013 - PF B-70011
Public Safety
Public Safety
Police Headquarters
Interview rooms sound
proofing - Oracle 19-
690002
Police Headquarters 5th
floor Interior renovations
B-70112
B-70113
Scope
Renovate features / pumps / filtration
Restroom fixtures replacement
Courts Resurface
Install new playground with PIP (Protective
Industriall.. Pruducts) flooring
Replace playground & PIP (Protective Industrial
Products) floorin
Resurface Pool
Replace Sports Field Lights
Repairs to the Jose Marti Community Center
Roof.
Installation of additional trees along SW 25th
Terrace from SW 27th Ave to SW 32nd Ave.
Dist.
Total Cost
1 $ 750,000 $
5 $ 50,000 $
5 $ 50,000 $
5 $ 120,000 $
5 $ 175,000 $
5 $ 175,000 $
5 $ 350,000 $
3 $ 26,100 $
2
Replace City Hall Studio Area A/C Unit. this is 1,2,3,4,
required due to the amount of machinery running 5
in the area. The temperaure is quite high and the
unot is required for quality of life improvement for
staff and to prevent the overheating and breaking
down of the equipment.
Replacement of vehicles used by department to 1,2,3,4,
transport sensitive equipment for press 5
conferences and city events. Current vehicles
a e old and worn out
Upgrade the AVID PC systems used for editing 1,2,3,4,
and creation of video content for the City's 5
Website and TV Channel 77. The sytstems
currently in used is over 7 years old. The
upgrade is required tomaintain production quality
and ..meet .todav's...standard,
........
Upgrade Robotics Cameras at City Hall. Current 1,2,3,4,
systems is not to industry standards for today's 5
broadcasting and are over 10 years old.
Replace 3 Large Format Video Cameras that are 1,2,3,4,
in use constantly and cost of repairs increases 5
on a yearly basis.
Replacing current cameras that are over 10 1,2,3,4,
years old and are not up to industry standards for 5
today's broadcast auality.
2
Kitchen, Restroom, doors, windows, ceiling, 2
appliances, etc. See notes.
The scope of work includes the installation of
approximately 371 linear feet of new canopies
with steel structure and roofing lightweight
canvas along the Miamarina east pier 5. The
work also includes concrete Caisson foundation,
base plates, and electrical light fixtures.
2
$ 60,000
$ 51,632
$ 144,000 $
$ 40,000 $
$ 30,000 $
$ 90,000 $
$ 18,000 $
$ 735,000 $
$ 500,000 $
$ 435,000 $
2$
This project requires the reinforcing and sound 1,2,3,4,
prrofing of 8 interviews rooms.
Renovation and reconfiguration of the ceiling grit
lighting, HVAC distribution, repair and/or
replacement of damaged dry walls.
Replacement of entire carpet on 5th floor that
have been damaged by mold.
5
1,2,3,4,
5
41,168 $
$ 55,000
$ 496,956
Total Funds
60,000
735,000
500,000
435,000
41,168
55,000
249
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Project
Fire Pump Electrical
Rewiring - Police Dept.
Domestic Water Pump -
Police Dept.
Police Headquarter
Elevators Renovation &
Repairs
1-95 Lighting Project -
Police Dept.
Police Central Station
Parking Garage
Police Headquarters
Presure Clean/Seal/Paint
Exterior
Carpeting and Flooring -
Police Dept.
Police Headquarter &
South District Storm Drains
and Parking Lot Asphalt
B-No.
B-70114
Scope
To replaced burned out wiring and replace
underground wire that feeds the main fire pump
at the Central Station parking garage. This is a
requirement in compliance with the electrical
code. The amount of the project is approximately
B-70115 Domestic water pumps Replacement of at the
Central Station these pumps ensure that there is 5
normal and consistent pressure running through
the water lines and main valves throughout the
buildina.
The three existing overhead traction elevators 1,2,3,4,
(serial numbers 41347, 41348, 41349) need to 5
be replaced at the Central Station. The existing
machines are obsolete since their installation in
1975 and have been attempted for repair with no
avail. Replacement is needed to avoid a safety
hazard for employees and visitors. This is a daily
concern.
B-70116
B-70117
B-70118
B-70119
B-70120
B-70121
To replace the existing light fixtures at the lots 1,2,3,4,
located under 1-95 expressway between 5th and 5
8th Street with LED Tight fixtures that provide
longer lasting Tight and effective security. These
fixtures are also energy efficient and will reduce
City of Miami electrical costs. If the LED fixtures
are not installed, the security at the Tots will be in
jeopardy and may cause bodily injury.
The complete replacement of the damaged
lighting at the Central Station Parking Garage is
needed in order to secure safety since this is a
twenty four hour operation as well as ensure
co..rnoliance..to...electrical ..code.
The Police Central Station needs to be repaired
(presure clean/seal/paint exterior) to prevent air,
water and other environmental elements from
entering or exiting the structure. This is a critical
component of maintain the integrity of the
structure. The pressure cleaning and exterior of
the North District was last done in 1989. It is in
poor condition and it is not inviting for the
community. We have tried numerous times to
pressure clean the exterior but the paint
contivancely falls off the stucco which may
cause a greater problem if it is not painted and
re -sealed the precast which may in the longer
run cause additional expeditures due to damage
and the structure being compromised.
Dist.
1,2,3,4,
5
Total Cost
$ 35,000
1,2,3,4, $ 65,000 $
$ 75,000
$ 85,000
1,2,3,4, $ 210,000 $
5
1,2,3,4, $ 275,000 $
5
The carpeting at the North District and South 1,2,3,4,
District was originally installed in 1986 and has 5
never been replaced. The carpeting needs to be
replaced due to wear and tear from years of
usage. It is currently in deplorable conditions. It
is not condusive for a healthy work environment
and currently is a work hazard.
Headquarters & South District Storm Drains and 1,2,3,4,
Parking Lot Asphalt needs to be replaced due to 5
the fact that these drains are used to transport
excess moisture away from the designated area
where excess water would otherwise prevent the
normal use of the property. Moist grounds
surfaces limits the use of the parking lot and
areas which can become a breeding ground for
disease carrying insect infestations. The storm
drain system at the South District is caving in
causing pot holes as well as starting a sink hole.
This is making the asphalt crack in several
different places.
$ 65,000
$ 425,000
Total Funds
250
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
........ ..............
Public Safety
Public Safety
Public Safety
Project
South District Police Sub
Station Furniture
Security System for
Central/Headquarter -
Police Dept.
Police South District Air
Conditioning Diffuser
North and South Police
Stations Landscaping
Grapeland Heights
Electrical Panel - Police
Dept.
Police Headquarter
Building Emergency
Generator Shed
R.eollaC e m e nt .........
Forensic Lab Expansion -
Police Dept.
College of Police
Auditorium Lighting
College of Police Lobby
Lighting
B-No.
B-70122
B-70123
B-70124
B-70125
B-70126
B-70127
B-70128
B-70129
B-70130
Scope
The South District Sub Station (SDSS) is in dire
need of new furniture. The SDSS is furnished
with the original furniture when the station was
built. As a result we have cabinets, tables and
desks which are collapsing. Even worse are the
chairs; many of the chairs are dirty and have
exposed metal and wood making them a hazard.
Dist.
1,2,3,4,
5
Security System needs to replace and repair to 1,2,3,4,
include cameras and key card readers. Failure 5
to repair these items will cause a breach of
security for the building. The current system
was originally installed in 2000. In order to meet
Homeland Security regulations all first responder
facilities must be secure through a security
system.
South District Air Conditioning Diffuser needs to 1,2,3,4,
be replaced due to the fact that this is a 5
mechanical device that is designed to control the
characteristics of a fluid entrance to a
theromodynamic open system. Diffuser is
necessary in heating, ventilating and air
conditioning. It serves several purposes to
include deliver both conditioning and ventilating
air, evenly distributing the flow of air in the
desired directions, it is used to enhance missing
of room air into the primary air being discharged,
etc. Failure to replace will lead to poor air
distribution and increased noise. Due to the fact
that the roofing issues have not been addressed
we currently have water intrusion into the fifth
floor causing the drop ceiling and lighting to be
damaged beyond repairs. The water damage is
causing mold, damages to the existing
carpeting, mildew causing this to become a
hazard work environment.
New landscaping around the North & South 1,2,3,4,
station will enhance the appearance of the 5
property, at this time the landscaping is currently
dilapidated. Enhancing the landscaping is
essential to the surrounding businesses.
Installation of seven 200 amps, 3 phase feeder
panel to expand the electricity demands at the
Grapeland Heights Police Substation. The
current electrical system is original 1954 wiring
which is old antiquated and does not meet our
electrical demons. The existing electrical wire is
a unsafe and fire hazards to our employees, we
are continuously tripping the breakers at the
substation.
1,2,3,4,
5
To replace the current shed metal roof that is 1,2,3,4,
leaking with a new roof to prevent leaking and 5
possible damage to the generator at the Central
Station........
......:. . . .........
To expand the existing forensic lab to a second 1,2,3,4,
floor due to the increase of police related 5
investigations/cases and limited space currently
vailable.
To replace the existing damaged electronic 1,2,3,4,
ballast and light bulbs to a more efficient system 5
located at the College of Police auditorium.
To replace the existing damaged electronic 1,2,3,4,
ballast and light bulbs to a more efficient system 5
located at the College of Police 1st and 2nd floor
lobby ar
Total Cost
$ 175,000
$ 85,000
$ 275,000
$ 50,000
$ 125,000
$ 25,000
$ 1,200 000
$ 15,000
$ 20,000
Total Funds
251
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Project
Mounted Stables Stall
Repairs - Police Dept.
Police South District
Exterior Lighting
Security System for Police
South District Substation
Replacement of 400
Desktop Computers -
Police Dept.
Replacement of Sauna
Water Heating System -
Police Dept.
Police Headquarters
Record Unit Exterior Walls
Replacement
Fire Station #5 Exterior
Walls Repair - D1
Fire Station No. 3
Dormitories Build -out
Project
Fire Station No. 12 - Re-
roofing Project
Fire Station No.5 - Interior
Renovation Work Oracle
Project 91-03237
Fire Stations Computer
Aided Dispatch Svstem
Uniform Fire Station Data
Closets x12
Fire Station and AO PC
Replacement
New Citywide Fire Stations
Digital Radio System
B-No.
B-70131
B-70132
B-70133
B-70134
B-70135
B-70136
B-70213
B-70214
B-70215
................................
B-70216
B-70217
Scope
The mounted unit is in need of removing all the
wood in the stables and replace it with CBC.
The horses are chewing on the wood eating
some particles causing them colic and their
weight is compromising the structure of the
stables when they lean or kick it. By changing to
CBC we will save dollars by avoiding costly
ranairc and rinrtnrc hillc
Replacement of the existing building exterior
lighting that is damaged beyond repair at the
South Station, causing a safety issue for all
emoloveeS and visitors .........
Replace and repair the security system to
include cameras and key card readers. Failure
to repair these items will cause a breach of
security for the building. The current system
was originally installed in 2000. In order to meet
Homeland Security regulations all first responder
facilities must be secure through a security
Dist.
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
The Miami Police Department's Desktop PC 1,2,3,4,
infrastructure is in need of replacement. Most of 5
the desktops are out of warranty and do not have
enough memory to run newer applications
efficiently. The Miami Police Department has
not been included in the City IT Department's
Desktop PC replacement cycle. The
recommended replacement cycle is three years.
Most of our desktops have been in use for over
Replacement of Sauna Water Heating System 1,2,3,4,
for Both Men and Women's Locker Rooms: To 5
replace the existing electrical heating system for
both men/women's locker rooms that is currently
damaged beyond repair.
Replacement of the exterior wall that sustained 1,2,3,4,
major damaged to cause by water intrusion 5
Develop construction documents, bidding,
building, and providing construction
administration services for implementing repairs
of exterior walls of Fire Station #5 in accordance
with the deficiencies identified in the Scope
Definition Report of March 14, 2012 by Rizo
Carreno.& .Partners_
Construction of new dorms and restrooms.
Remove and replace both built-up flat roofs with
like materials. Re -caulk window at clearstory
walls for the high metal roof center portion of the
buildina.
Design and construction services for the interior
renovation of the fire station including officers
bathroom, kitchen and dining room flooring
replacement and cabinets restoration,
installation of a new roof, new ceiling and light
fixtures at the diver's room, new/larger door at
laundry room, replacement of desks and
shelving at offices, new gas water heaters,
replacement of broken glazing at existing
windows in areas affect by this scope of work,
and also limited improvements to the existing
Alarm Office Dispatch
1
Total Cost
$ 100,000
$ 35,000
$ 70,000
$ 324,172
$ 15,000
$ 496,458 $
$ 150,000 $
3 $ 100,000 $
5 $
77,000 $
1 $ 348,240 $
1,2,3,4, $ 2,400,000 $
5
Uniform Station Data Closets x12 1,2,3,4, $ 48,000 $
5
Station and AO PC Replacement on 2 year 1,2,3,4, $ 70,000 $
schedule vs. 4 vear 5
Digital radio system (Approximately 20M shared 1,2,3,4, $ 5,000,000 $
by GSA, PD, MFR) 5
Total Funds
150,000
100,000
77,000
348,240
252
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
.....................................................
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
........ ..................
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Streets & Sidewalks
Streets & Sidewalks
Mass Transit
Project
Citywide Fire Station
Replace out of Warranty
Mobile Data
Citywide Warranty and
Outdated Fire Station
Computers and Monitors
Citywide Bunker Gear (Fire
Station)
Fire Stations Warranty
Lifepak/EKG Units
Rebuilding Fire Station #1
Rebuilding Fire Station #10
Fire and Rescue Training
Center (Renovate/Rebuild)
Fire Station #15 (Fire Boat)
Citywide Fire Station
Pumpers
Fire Rescue
Apparatus Replacement
Replace Fireboat 1
Fire Station Training
Facility
Expand
Comunication/Alarm Office
Facility w/PD (Fire Station)
Facility Budget Requests
(Fire)
Fire Station
Eguipment/Furniture
Fire Station Hurricane
Hardening
Fire Station Light Fleet
Vehicle Replacement
Fire Station
Hardening/Security
Fire Station #5 Renovation
Fire Training Props
Fire Station Flat Panels 24"
Fire Station Paperless
Inspection System (i.e.
MobileEves software)
Fire Rescue Capital Needs
FY2014
Fire Department - FY2012
"Emergency Medical
Services (EMS)"
Transportation Program
Support Services -
Transportation
Transportation PSS -
Transportation DRI Fees
Administration
Transportation Program
Support Services - Transit
Professional
B-No.
B-70218
B-70219
B-70220
B-70221
B-70222
B-70223
B-70224
B-70225
B-70226
B-70227
B-70228
B-70229
B-70230
B-70231
B-70232
B-70233
B-70234
B-70235
B-70236
B-70237
B-70238
................................
B-70239
B-70240
B-70241
B-70242
B-70245
B-70245D
B-70246
Scope
Dist.
Replace out of warranty mobile data terminals 1,2,3,4,
5
Replace out warranty and outdated fire stations
computers and monitors
To comply with 10 year NFPA standard
Replace out of warranty lifepak/EKG units
Rebuild 20,000sf bldg. x $400sf
Rebuild 11,000sf bldg. x $400sf
Renovate/Rebuild
Land acquisition and fire station construction
Replace Pumpers F1, E2, E4 AND E8
Replace Frontline Rescues
Replace aging units as needed
Replace.....
Renovating building to bring into Code
Addition to existing Building
Repairs and Enhancements (renovate
bathrooms, kitchens, iron plumbing, flooring,
roofs,paint ng)..........................................................................................
Station furniture and appliances replacement
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
2
1
2
2
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
Apparatus door replacement to make compliant 1,2,3,4,
with operational needs 5
Replacement of both operational light fleet and 1,2,3,4,
40 hour light fleet 5
Video and card access
Major Renovations
Add state required props necessary for training
1,2,3,4,
5
1
2
Plans review and water officer 1,2,3,4,
5
Will allow field based retrival of building related 1,2,3,4,
information and greatly increasing efficiency 5
Capital needs
The purpose of the grant is to improve and
expand EMS by assisting the Fire Department in
the purchase of ten cardiac monitors,
accessories. and related items.
As part of the Transportation Program Support
Services (TPSS) contract, transportation related
professional services will be provided on an as -
needed basis, including development of a
As part of the Transportation Program Support
Services (TPSS) contract, transportation related
professional services will be provided on an as -
needed basis, including development of a
As part of the Transportation Program Support
Services (TPSS) contract, transit related
services will be provided on an as -needed basis.
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
Total Cost
$ 150,000
$ 105,000
274,800
946,000
$ 9000 000
$ 6,000,000
$ 17,000,000
$ 10,000,000
$ 1,960,000
$ 4,320,000
$
950,000
1..,250,000
750,000
$ 500,000
$ 1,750,000
$ 200,000
$ 384,000
$ 630,000
$ 935,000
$ 800,000
$ 350,000
$ 3,500
$ 80,000
$ 1,858,500
$ 317,333
500,000
155,042
$ 500,000
Total Funds
$.
$ 1,858,500
$ 238,000
$ 294,958
$ 500,000
253
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Mass Transit
Mass Transit
... . .............
General
Government
.................................................
General
Government
...............................
General
Government
General
Government
General
G...overnment..
General
Government
General
Government
General
Government
... .................
General
Government
General
Government
General
Government
General
Government
General
Government
General
G...overnment..
General
Government
General
G...overnment..
General
Government
Solid Waste
Solid Waste
Solid Waste
Public Safety
General
Government
Project
Beach Corridor Transit
Connection Study -
Citywide
Citywide Mass Transit
Studies
City of Miami Fleet Vehicle
Replacement
City of Miami Fleet Vehicle
Replacement (Trucks)
Carpet Replacement at the
MRC Facility
GSA Communications
Division - Back up Batteries
for Communications
Systems
MRC Building - UPS
System
GSA Fleet Facility - Fuel
Station Roof Replacement
GSA Communications
Division - Impact Windows
and Hurricane Grade
Electric Garage Doors
GSA Mechanics Shop -
Light Fleet Aligment & Lift
Mechanism for vehicles up
tq...3,500 Pounds
Fuel Pump Replacements
Roof Repairs at the GSA
Communications
Warehouse and USAR
Warehouse
Re -grouping and polishing
of all MRC Granite and
Bathrooms ..........
..................
Heavy Fleet Tow Truck
MRC Facility - Repair of
HVAC VAV Boxes
Bucket Truck for the
Electrical Division at GSA
City Hall Repairs
Replacement of Fire Panel
at MRC Facility....
Roof Repair at the MRC
Facility
Solid Waste Building
Reinforcement for
Hurricane
Solid Waste Mini -Dump
Renovation
Solid Waste Fleet
Replacement
Fire Facilities Generators
(North & South)
MRC Telecommunications
Infrastructure Replacement
B-No.
B-70247
B-70320
B-70321
B-70322
B-70323
B-70324
B-70325
B-70326
B-70327
B-70328
B-70329
B-70330
B-70331
B-70332
B-70333
B-70334
B-70335
B-70336
B-70476
B-70477
B-70478
B-70718
B-70956
Scope
Dist.
A feasibility study for a Mass Transit Connection 1,2,3,4,
between the City of Miami and the City of Miami 5
Beach. The study is intended to update and
refine pst proposals to provide a premium transit
connection between these two cities, and to
evaluate how best to advance this much needed
transit connection through the project
rinwAlnnmant nrnracc
Mass Transit Studies
1,2,3,4,
5
..........
Replacement of approximatly 100 cars of the 1,2,3,4,
City of Miami Fleet @ average cost of $17,000 5
Replacement of approximatly 70 Trucks of the
City of Miami vehicles @ Average Cost of
$25,000......
Carpet Replacement at the MRC Facility
GSA Communications Division - Backup
Batteries for Communications Systems
MRC Building - UPS System
GSA Fleet Facility - Fuel Station Roof
Replacement
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
: . . . .........
1 2 3,4,
5
GSA Communications Division - Impact 1,2,3,4,
Windows and Hurricane Grade Electric Garage 5
Doors
GSA Mechanics Shop - Light Fleet Alignment &
Lift Mechanism for vehicles up to 3,500 pounds
Fuel Pump Replacements
Roof Repairs at the GSA Communications
Warehouse and USAR Warehouse
ReOgrouting and polishing of all MRC Granite
and Bathrooms
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
,2,3,4,
5
Heavy Fleet Tow Truck for the City of Miami 1,2,3,4,
5
Repair of very old Heating/Ventilation/Air 1,2,3,4,
Conditioning (HVAC) Variable Air Volume (VAV) 5
System.
Purchase of a Bucket Truck for the Electrical 1,2,3,4,
Division at GSA 5
Replacement of roof and back portion of City 1,2,3,4,
Hall (excludes terraces since these are currently 5
being updated and repaired via an ongoing
oroiect)
Replace of existing Fire Panel in the MRC 1,2,3,4,
Facility. 5
Replacement of roof at the MRC Facility 1,2,3,4,
5
Replace windows; replace roof; upgrading two 1,2,3,4,
bathrooms on 2nd floor to make them ADA 5
compliant: purchasing generator
Mini -dump renovation (Guard house, etc)
Replace Filet: Automated; Saddle Dump; Rear
Loaders; Trash Trucks; Trash Cranes; Combo
Cranes; Mechanical Sweepers; Vacuum
Sweepers.
Upgrade the emergency standby generator
system at several fire stations.
Conversion of MRC telephone and services
equipment to voice over IP
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
Total Cost
$ 30,000
$ 318,402
$ 1,700 000
...................................................................
$ 1,750,000
$ 300,000
$ 42,000
$ 7,000
$ 25,000
$ 30,000
$ 65,000
200,000
60,000
$ 70,000
250,000
120,000
$ 162,000
$ 200,000
$ 340,000
$ 350,000
$ 1,000,000
$ 200,000
$ 24,311,800
$ 300,000
$ 455,000
Total Funds
30.000
$ 318,402
300,000
254
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
General
Government
General
Government
General
Government
General
Government
General
Government
Project
eGovernment/Web
Services City View
Replacement
eGoverment/Web Services
iBuild Miami Phases II and
eGovernment Services
Platform
CIP Document Mgmt &
Data Consolidation
Audit Compliance
B-No.
B-70957
B-70958
B-70961
Scope
Replace legacy Code Enforcement application
with web based application including integration
with Miami -Dade County 311 System; Inspector
Routing, Lien Processing, and Document
renository
Complete additional features and capabilities for
online building department permitting.
Dist.
1,2,3,4,
5
1,2,3,4,
5
Technology Assessment, Recommendation, and 1,2,3,4,
Development Services 5
Consolidate CIP document files into single 1,2,3,4,
server system.
Convert Traks to Oracle R12 including PM
module implementation; Install & configure
Oracle Business Intelligence - Project Analytics
Install physical separation of city's financial and
email.. systems at MPD Data Center
5
1,2,3,4,
5.
Total Cost
$ 2,464,000
$ 480,000
$ 1,480,000
$ 380,000
$ 22,000
Total Funds
255
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
1tze &IL 1tze Yalu/re
256
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPENDIX 5
CAPITAL PROJECTS
APPROPRIATIONS NEW
FY2012-2013
Cite su tere
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
CAPITAL PROJECTS NEW APPROPRIATIONS FY2012-2013
Project
Amount
Fund
Award / Source
Date
Reso
Number
B-60464 - New Dinner Key Marina
Dockmaster Building
87,986.00
34000 - Public
Facilities
Award - 1422 Impact Fees
Unallocated FY2012
10/25/12
12-0414
B-74220 - Police Vehicle Replacement
1,400,000.00
31000 -
General
Government
Award 1426 - Contribution from
General Fund FY 2012
10/25/12
12-0414
B-74220 - Police Vehicle Replacement
1,852,000.00
31000 -
General
Government
Award 1426 - Contribution from
General Fund FY 2013
10/25/12
12-0414
B-30865 - FY2013 Citywide Capital
Needs
1,245,900.00
31000 -
General
Government
Award 1426 - Contribution from
General Fund FY 2008 - New
FY2013 Allocation
10/25/12
12-0414
B-73202C - Solid Waste Collection
Equipment
854,100.00
39000 - Solid
Waste-CIP
Award 1426 - Contribution from
General Fund FY 2008 - New
FY2013 Allocation
10/25/12
12-0414
B-74200 - Citywide General Fleet
Replacement
350,000.00
31000 -
General
Government
Award 1426 - Contribution from
General Fund FY 2008 - New
FY2013 Allocation
10/25/12
12-0414
B-72809A - Firefighting Equipment -
SAFER
911,500.00
32000 - Public
Safety
Award 1426 - Contribution from
General Fund FY 2013
10/25/12
12-0414
B-30174 - Virginia Key Beach Park
Historic Restoration - PH II
49,472.00
35000 - Parks
& Recreation
Award 1882 - SNPB Virginia Key
Beach Park FY2012
10/25/12
12-0414
B-30648 - Orange Bowl Site Parking
Garages
2,147,208.87
34000 - Public
Facilities-CIP
Award TBD - Structural Design
Settlement for Marlins Stadium
Parking Garages
10/25/12
12-0414
B-60464S - New Dinner Key Marina
Dockmaster Building Sanitary Sewer
90,000.00
34000 - Public
Facilities
Award 1122 - Unallocated
Sanitary Sewer GO Bonds
10/25/12
12-0414
B-30706 - Miscellaneous Repair - 10%
Set Aside
739,000.00
34000 - Public
Facilities
Award 1437 - Marinas Capital
Repairs and Capital Related
Improvements - New FY2013
Allocation
10/25/12
12-0414
B-73102A - Citywide Streets Milling &
Resurfacing
1,428,600.00
36000 - Streets
& Sidewalks
Award 1419 - Parking Surcharge
2007 - New FY2013 Allocation
10/25/12
12-0414
B-30262 - Citywide Storm Sewer
Repair Project
700,000.00
38000 - Storm
Sewers
Award 1431 - Stormwater Utility
2008 Trust Fund -Contribution
from Genral Fund - New FY2013
Allocation
10/25/12
12-0414
B-70245 - Transportation Program
Support Services - Transportation
500,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -Cent
Surtax - New FY2013 Allocation
10/25/12
12-0414
B-73102A - Citywide Streets Milling &
Resurfacing
3,074,600.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -Cent
Surtax - New FY2013 Allocation
10/25/12
12-0414
B-70246 - Transportation Program
Support Services - Transit Professional
500,000.00
39900 - Mass
Transit
Award 1297 - Transit Half -Cent
Surtax - New FY2013 Allocation
10/25/12
12-0414
B-30666 - Damaged Vehicle
Replacement and Repair
38,937.00
31000 -
General
Government
Award 1577 - Subrogation Auto
Claims Revenue (June to Sept
FY2012 Collection)
10/25/12
12-0414
B-73102A - Citywide Streets Milling &
Resurfacing
326,000.00
36000 - Streets
& Sidewalks
Award 1552 - Local Option Gas
Tax 2009 - New FY2013
Allocation
10/25/12
12-0414
B-50722A - Little River Waterfront Park
Acquisition PHII
551,250.00
35000 - Parks
& Recreation
Award 1350- Special Revenue
Fund
01/10/13
13-0017
B-30802 - Pallot Park Shoreline
Improvements - D2
30,000.00
35000 - Parks
& Recreation
Award TBD - FIND Grant /
Approved via commission on
03/08/12 RESO# 12-0077
01/10/13
13-0017
B-30801 - Manatee Bend Park
Shoreline Improvements - D2
38,500.00
35000 - Parks
& Recreation
Award TBD - FIND Grant /
Approved via commission on
03/08/12 RESO# 12-0078
01/10/13
13-0017
257
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Amount
Fund
Award / Source
Date
Reso
Number
B-30666 - Damaged Vehicle
Replacement/Repairs
43,604.38
31000 -
General
Government
Award 1577 - Subrogation Auto
Claims
01/10/13
13-0017
B-30887S - Little Haiti Soccer Field
Bathroom - D5
265,000.00
37000 -
Sanitary Sewer
Award 1122 - Unallocated
Sanitary Sewer GO Bonds
02/28/13
13-0064
B-30374S - Virginia Key Rowing Center
Improvements
100,000.00
37000 -
Sanitary Sewer
Award 1122 - Unallocated
Sanitary Sewer GO Bonds
02/28/13
13-0064
B-40454 - Park Expansions and Land
Acquisition — Citywide
1,000,000.00
35000 - Parks
& Recreation
Award 1422 Impact Fees -
(Unallocated FY2013)
02/28/13
13-0064
B-40455 - Citywide Capital
Improvements Projects
1,000,000.00
35000 - Parks
& Recreation
Award 1422 Impact Fees -
(Unallocated FY2013)
02/28/13
13-0064
B-30541D - Citywide Park Equipment &
Site Improvements
932,493.00
35000 - Parks
& Recreation
Award 1422 Impact Fees -
(Unallocated FY2013)
02/28/13
13-0064
B-30825 - Biscayne Bay Spoil Island B-
Public Shelter - D2
7,500.00
35000 - Parks
& Recreation
Award TBD FIND - Grant under
$25k- City Manager Acceptance
Memo signed 11/29/12
02/28/13
13-0064
B-30825A - Biscayne Bay Spoil Island E
Picnic Tables, Benches & Umbrellas -
D2
7,500.00
35000 - Parks
& Recreation
Award TBD FIND - Grant under
$25k- City Manager Acceptance
Memo signed 11/29/12
02/28/13
13-0064
B-30825B - Biscayne Bay Spoil Island E
Public Trail - D2
7,500.00
35000 - Parks
& Recreation
Award TBD FIND - Grant under
$25k- City Manager Acceptance
Memo signed 11/29/12
02/28/13
13-0064
B-50643 - Wagner Creek/Seybold
Canal Dredging Phase 2B
700,000.00
38000 -
Stormsewer
Award TBD FIND - Accepted by
R-12-0079 on 3/8/2012
02/28/13
13-0064
B-30721 - Spoil Island E Floating Dock
Restoration Project, Phase II
(Construction)
57,500.00
35000 - Parks
& Recreation
Award TBD FIND - Accepted by
R-12-0076 on 3/8/2012
02/28/13
13-0064
B-72915A - Police Headquarters
Helipad and Roof Replacement
24,505.75
32000 - Public
Safety
Award 1422 Impact Fees -
(Unallocated FY2012)
02/28/13
13-0064
B-72915A - Police Headquarters
Helipad and Roof Replacement
219,921.76
32000 - Public
Safety
Award 1422 Impact Fees -
(Unallocated FY2013)
02/28/13
13-0064
B-30373A - Police Department Property
Unit Outdoor Storaae
80,000.00
32000 - Public
Safety
Award 1422 Impact Fees -
(Unallocated FY2013)
02/28/13
13-0064
B-30988 - North District Police Building
Misc. Repairs - D5
25,000.00
32000 - Public
Safety
Award 1422 Impact Fees -
(Unallocated FY2013)
02/28/13
13-0064
B-70718 - Fire Facilities Generators
(North & South)
86,740.50
32000 - Public
Safety
Award 1422 Impact Fees -
(Unallocated FY2012)
02/28/13
13-0064
B-72810A - New Fire Rescue Apparatus
(North & South)
113,043.66
32000 - Public
Safety
Award 1422 Impact Fees -
(Unallocated FY2012)
02/28/13
13-0064
B-72810A - New Fire Rescue Apparatus
(North & South)
460,696.16
32000 - Public
Safety
Award 1422 Impact Fees -
(Unallocated FY2013)
02/28/13
13-0064
B-30940 - Downtown Miami Bicycle
and Pedestrian Mobility Improvement
Proiect
250,000.00
36000 - Streets
& Sidewalks
Award TBD FDOT LAP Grant
accepted by R-12-0493
(12/13/121
02/28/13
13-0064
B-30940 - Downtown Miami Bicycle
and Pedestrian Mobility Improvement
Project
37,500.00
36000 - Streets
& Sidewalks
Award TBD Downtown
Development Agency - JPA
accepted by R-13-0038
(n1 (24/1)
02/28/13
13-0064
B-30941 — Downtown Miami Signage
and Wayfinding System
1,000,000.00
36000 - Streets
& Sidewalks
Award TBD — FDOT LAP Grant
accepted by R-11-0159
(4/14/111
02/28/13
13-0064
B-30941 — Downtown Miami Signage
and Wayfinding System
150,000.00
36000 - Streets
& Sidewalks
Award TBD Downtown
Development Agency - JPA
accepted by R-13-0039
(nhr24(11
02/28/13
13-0064
B-30666 - Damaged Vehicle
Replacement/Repairs
68,457.03
31000 -
General
Government
Award TBD - Surplus Goods &
Fixed Assets Sales
02/28/13
13-0064
B-30666 - Damaged Vehicle
Replacement/Repairs
(4,830.00)
31000 -
General
Government
Award 1577 - Subrogation Auto
Claims
02/28/13
13-0064
258
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Amount
Fund
Award / Source
Date
Reso
Number
B-30305BS - Gibson Park New
Construction
117,000.00
35000 - Parks
& Recreation
1122 - Unallocated Sanitary
Sewer
05/23/13
13-0206
B-74219B - Property Maintenance
Security Improvements
9,776.29
31000 -
General
Government
Award 1422 - Impact Fees New
Ordinance-2007 (Unallocated
FY2012 - 10% Balance)
05/23/13
13-0206
B-74219B - Property Maintenance
Security Improvements
15,223.71
31000 -
General
Government
Award 1422 - Impact Fees New
Ordinance-2007 (Unallocated
FY20131
05/23/13
13-0206
B-74219C - Property Maintenance
Bobcats & Trailer
40,000.00
31000 -
General
Government
Award 1422 - Impact Fees New
Ordinance-2007 (Unallocated
FY20131
05/23/13
13-0206
B-74219D - Property Maintenance -
Thermostats
8,000.00
31000 -
General
Government
Award 1422 - Impact Fees New
Ordinance-2007 (Unallocated
FY20131
05/23/13
13-0206
B-74205B - GSA Fleet Maintenance
Garage Expansion
105,096.81
31000 -
General
Government
Award 1422 - Impact Fees New
Ordinance-2007 (Unallocated
FY20131
05/23/13
13-0206
B-74205C - GSA Truck Wash Pit
80,000.00
31000 -
General
Government
Award 1422 - Impact Fees New
Ordinance-2007 (Unallocated
FY20131
05/23/13
13-0206
B-30706 - Miscellaneous Repair - 10%
Set Aside
46,000.00
34000 - Public
Facilities-CIP
Award 1896 - Florida Boating
Improvement Program
05/23/13
13-0206
B-50722A Little River Waterfront Park
LAQ PH II - D2
183,750.00
35000 - Parks
& Recreation
Award 1907 - Florida Inland
Navigation District (FIND) RESO
12-0119 dated 03/22/12
05/23/13
13-0206
B-30689 Marine Stadium Marina
Bulkhead Repl
785,000.00
34000 - Public
Facilities-CIP
Award 1897 - Florida Inland
Navigation District (FIND) RESO
12-0075 dated 03/08/2012
05/23/13
13-0206
B-30182A Coconut Grove Waterfront
MP I
330,000.00
34000 - Public
Facilities-CIP
Award 1669 - TVM Production
Basic Use Fee RESO 12-0350
dated 09/27/12
05/23/13
13-0206
B-30690 West End Park New
Community Building - D4
1,500,000.00
35000 - Parks
& Recreation
Award TBD - Miami Dade
County GOB. Grant being
accepted at same Commission
Meeting 05/23/2013
05/23/13
13-0206
B-40271 - Solid Waste Sweeper
170,000.00
38000 - Storm
Sewers
Award 1431 - Storm Water
Utility - FY12 remaining
allocation (Solid Waste)
05/23/13
13-0206
B-30992 - Riverview and Lawrence
Pump Stations
624,095.00
38000 - Storm
Sewers
Award 1431 - Storm Water
Utility - FY12 remaining
allocation (Public Works)
05/23/13
13-0206
B-30992 - Riverview and Lawrence
Pump Stations
700,000.00
38000 - Storm
Sewers
Award 1431 - Storm Water
Utility - FY13 remaining
allocation (Public Works)
05/23/13
13-0206
B-30780T - NW 14 Avenue & 28 Street
Area Roadway Imprv. Tree Component
D1
26,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30724T - NW 33rd Street Roadway
Improvement Project - Tree
Component - D1
60,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30727T - NW 18th Avenue Roadway
Improvement Project - Tree
Component - D1
60,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30611T - D1 FEMA Tree Funded
Projects
169,930.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-40704AT - SW 32 Avenue
Improvements - Tree Component - D2
60,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30687T - Coconut Grove Business
Improvement District - Tree
Component - D2
120,930.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30630T - Palm Grove Road
Improvements - Tree Component - D2
70,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
259
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Amount
Fund
Award / Source
Date
Reso
Number
B-30822T - Brickell Area Shared Use
Path and Roadway Improvements -
Tree Component - D2
65,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30699T - Beacom Project Area
Improvements - Tree Component - D3
60,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30613T - D3 FEMA Tree Funded
Projects
255,930.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30614T - D4 FEMA Tree Funded
Projects
315,930.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30883T - NW 12 Avenue/NW 12
Place Roadway Improv. Tree
Component - DS
46,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30624T - Overtown Greenway @ NW
11 Terrace - Tree Component - D5
100,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30882T - African Square Park -Splash
Park - Tree Component - D5
50,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30615T - D5 FEMA Tree Funded
Projects
119,930.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30500T - Civic Center Infrastructure
Tree Component - Citywide
100,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30999 - Citywide FEMA Tree Funding
215,943.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30666 Damaged Vehicle
Replacement/Repairs
64,605.87
31000 -
General
Government
Award 1577 - Subrogation Auto
Claims
05/23/13
13-0206
B-30680 - Rockerman Canal
Improvements
24,000.00
38000 - Storm
Sewers
Award 1673 - Special
Assessement District-
Rockerman Canal
Tmnrnvomontc
05/23/13
13-0206
B-75883 - Peacock Park Site
Improvements - D2
100,000.00
35000 - Parks
& Recreation
Award TBD - Special Revenue
Fund from Parks Project 29-
116002
05/23/13
13-0206
B-70245 - Transportation Program
Support Svcs - Transportation
(400,000.00)
36000 - Streets
and Sidewalks
Award 1297 - Transit Half -Cent
Surtax
06/27/13
13-0252
B-70246 - Transportation Program
Support Svc - Transit Professional
(500,000.00)
39900 - Mass
Transit
Award 1297 - Transit Half -Cent
Surtax
06/27/13
13-0252
B-73102A - Citywide Streets Milling &
Resurfacing - CIP
7,283.00
36000 - Streets
and Sidewalks
Award 1101 - Transit Half -Cent
Surtax (FPL Reimbursement
check dated 03/08/2013 B-
31208 Closed)
09/12/13
13-0335
B-73102A - Citywide Streets Milling &
Resurfacing - CIP
8,070.00
36000 - Streets
and Sidewalks
Award 1101 - Transit Half -Cent
Surtax (FPL Reimbursement
check dated 04/09/2013 B-
31208 Closed)
09/12/13
13-0335
B-30541B - Kennedy Floating Dock
14,621.00
35000 - Parks
& Recreation
Award 1350 - SRF Contribution
to Capital (Proj. 29-116002)
09/12/13
13-0335
B-43114B - Public Works Miscellaneous
Sidewalk Replacement
549,746.00
36000 - Streets
and Sidewalks
Award 1350 - SRF Contribution
to Capital (Lane Closure Fund
13000 / Proj. 20-650003)
09/12/13
13-0335
B-30541D - Citywide Park Equipment &
Site Improvements - FY2013
325,834.00
35000 - Parks
& Recreation
Award 1422 - Impact Fees
(Unallocated FY2013)
09/12/13
13-0335
B-30541D - Citywide Park Equipment &
Site Improvements - FY2013
86,011.20
35000 - Parks
& Recreation
Award 1422 - Impact Fees
(Unallocated FY2012)
09/12/13
13-0335
B-30865F - Environmental Remediation
Study for Fire Training Facility
140,000.00
31000 -
General
Government
Award 1426 - Contribution from
General Fund FY2013
09/12/13
13-0335
260
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Amount
Fund
Award / Source
Date
Reso
Number
B-40410 - Repairs and maintenance of
the air conditioning systems and
elevator gear boxes at the MRC
1,426,200.00
31000 -
General
Government
Award 1426 - Contribution from
General Fund FY2013
09/12/13
13-0335
B-30645F - Miami Regional Intermodal
Plan
33,000.00
36000 - Streets
and Sidewalks
Award 1939 - Miami Dade
County MPO
09/12/13
13-0335
B-30011 - Englewood Storm Sewer -
Phase III
1,800,000.00
38000 - Storm
Sewers
Award TBD MDC GOB FY2013
09/12/13
13-0335
B-30011 - Englewood Storm Sewer -
Phase III
1,300,000.00
38000 - Storm
Sewers
Award TBD MDC GOB FY2014
09/12/13
13-0335
B-30011 - Englewood Storm Sewer -
Phase III
2,469,000.00
38000 - Storm
Sewers
Award TBD MDC GOB FY2015
09/12/13
13-0335
B-30646 - South Bayshore Drive
Roadway and Drainage Improvements
2,000,000.00
36000 - Streets
and Sidewalks
TBD - JPA MD Cty-South
Bayshore Drive FY2013
09/12/13
13-0335
B-30646 - South Bayshore Drive
Roadway and Drainage Improvements
1,000,000.00
36000 - Streets
and Sidewalks
TBD - JPA MD Cty-South
Bayshore Drive FY2014
09/12/13
13-0335
B-30646 - South Bayshore Drive
Roadway and Drainage Improvements
2,000,000.00
36000 - Streets
and Sidewalks
TBD - JPA MD Cty-South
Bayshore Drive FY2015
09/12/13
13-0335
B-30646 - South Bayshore Drive
Roadway and Drainage Improvements
1,000,000.00
36000 - Streets
and Sidewalks
TBD - JPA MD Cty-South
Bayshore Drive FY2016
09/12/13
13-0335
B-30646 - South Bayshore Drive
Roadway and Drainage Improvements
1,854,395.00
36000 - Streets
and Sidewalks
TBD - JPA MD Cty-South
Bayshore Drive FY2013 Fund
EW 221
09/12/13
13-0335
B-72915A - Police Headquarters
Helipad and Roof Replacement
850,854.32
32000 - Public
Safety
TBD - College of Policing Design
Reimbursement MDCPS
09/12/13
13-0335
B-72915A - Police Headquarters
Helipad and Roof Replacement
161,836.89
32000 - Public
Safety
TBD - College of Policing Escrow
Balance
09/12/13
13-0335
B-30666 - Damaged Vehicle
Replacement/Repairs
18,807.13
31000 -
General
Government
Award 1577 - Subrogation
Revenues (April - July 2013)
09/12/13
13-0335
B-30706 - Miscellaneous Repair - 10%
Set Aside
28,975.00
34000 - Public
Facility
TBD - FDEP Invasive Species at
Marine Stadium Marina Grant
09/12/13
13-0335
46,519,960.33
261
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
efie Yalu/re
262
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPENDIX 6
CAPITAL PROJECTS TRANSFERS
APPROPRIATIONS FY20 1 2-20 1 3
Cite su tere
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
CAPITAL PROJECTS APPROPRIATIONS TRANSFERS FY2012-2013
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-75859 -
Lummus Park
Recreation
Building
Improvement
(8,461.77)
35000 - Parks &
Recreation
B-30889 - Lummus 8,461.77 35000 - Parks Award 1216 -
Park Miscellaneous & Recreation SNPB
Repairs D5 Conversion
10/25/12
12-0414
B-75859 -
Lummus Park
Recreation
Building
Improvement
(31,802.97)
35000 - Parks &
Recreation
B-30889 - Lummus 31,802.97 35000 - Parks Award 1457 -
Park Miscellaneous & Recreation Homeland
Repairs D5 Defense 1& 2
Interest Post 9-
30-06 & 9-30-
n7
10/25/12
12-0414
B-30295 - Little
Haiti Park -
Cultural Campus
(25,254.69)
35000 - Parks &
Recreation
B-30890 - Little 25,254.69 35000 - Parks Award 1365 -
Haiti Cultural & Recreation HD2 Little Haiti
Campus Park Land
Miscellaneous Acquisition &
Reapirs D5 Development
10/25/12
12-0414
B-73102A -
Citywide Streets
Milling &
Resurfacing
(221,625.00)
36000 - Streets
& Sidewalks
B-30631 - Miami 221,625.00 36000 - Award 1419 -
River Greenway Streets & Parking
from Miami Circle Sidewalks Surcharge 2007
Greenway to South
Miami Avenue
10/25/12
12-0414
B-40176 West
Flagler Street
Landscape JPA
(287,000.00)
36000 - Streets
& Sidewalks
B-50706A - 287,000.00 38000 - Award 1584 -
Roadway, Drainage Storm Sewers Homeland
and Traffic Defense Series
Improvements - D1 3
& D4
10/25/12
12-0414
B-30150 - Dinner
Key Gratings,
Gates & Locks
(4,162.86)
34000 - Public
Facilities
B-60464 - New 4,162.86 34000 - Award 1212 -
Dinner Key Marina Public SRF
Dockmaster Facilities Contribution to
Building CIP - Prior to
2006
10/25/12
12-0414
B-30150 - Dinner
Key Gratings,
Gates & Locks
(7,057.30)
34000 - Public
Facilities
B-60464 - New 7,057.30 34000 - Award 1437 -
Dinner Key Marina Public FY07 Marinas
Dockmaster Facilities Capital Repairs
Building and Capital
Related
Tm rnvomantc
10/25/12
12-0414
B-30247 - Dinner
Key Dredging
(116,723.52)
34000 - Public
Facilities
B-60464 - New 116,723.52 34000 - Award 1584 -
Dinner Key Marina Public Homeland
Dockmaster Facilities Defense/Neighb
Building orhood
Improvement
Rnnri Sariac 7
10/25/12
12-0414
B-30325 -
Miamarina
Emergency Pier
Repairs
(999.00)
34000 - Public
Facilities
B-60464 - New 999.00 34000 - Award 1386 -
Dinner Key Marina Public HD2 Citywide
Dockmaster Facilities Waterfront
Building Improvements
10/25/12
12-0414
B-30325 -
Miamarina
Emergency Pier
Repairs
(6,569.42)
34000 - Public
Facilities
B-60464 - New 6,569.42 34000 - Award 1496 -
Dinner Key Marina Public Sunshine State
Dockmaster Facilities Government
Building Financing
Commission
I nan It 7
10/25/12
12-0414
B-30567 -
Marinas
Equipment
Project
(4,160.00)
34000 - Public
Facilities
B-60464 - New 4,160.00 34000 - Award 1350 -
Dinner Key Marina Public SRF 2007
Dockmaster Facilities Contribution to
Building Capital
10/25/12
12-0414
B-30595 - Marine
Stadium Marina -
Miscellaneous
Repairs and
Equipment
(3,657.31)
34000 - Public
Facilities
B-60464 - New 3,657.31 34000 - Award 1437 -
Dinner Key Marina Public FY07 Marinas
Dockmaster Facilities Capital Repairs
Building and Capital
Related
Tmnrnvamantc
10/25/12
12-0414
B-30596A -
Dinner Key
Marina
Maintenance
Workshop
(54,295.72)
34000 - Public
Facilities
B-60464 - New 54,295.72 34000 - Award 1386 -
Dinner Key Marina Public HD2 Citywide
Dockmaster Facilities Waterfront
Building Improvements
10/25/12
12-0414
263
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-30596A -
Dinner Key
Marina
Maintenance
Workshop
(75,649.42)
34000 - Public
Facilities
B-60464 - New 75,649.42 34000 - Award 1437 -
Dinner Key Marina Public FY07 Marinas
Dockmaster Facilities Capital Repairs
Building and Capital
Related
Tmnrnvamantc
10/25/12
12-0414
B-30604 -
Miamarina
Seawall Repl.
(28,949.03)
34000 - Public
Facilities
B-60464 - New 28,949.03 34000 - Award 1350 -
Dinner Key Marina Public SRF 2007
Dockmaster Facilities Contribution to
Building Capital
10/25/12
12-0414
B-30706 -
Miscellaneous
Repair - 10% Set
Aside
(381,159.00)
34000 - Public
Facilities
B-60464 - New 381,159.00 34000 - Award 1437 -
Dinner Key Marina Public FY07 Marinas
Dockmaster Facilities Capital Repairs
Building and Capital
Related
Tmnrnvamantc
10/25/12
12-0414
B-30373A -
Police
Department
Property Unit
Outdoor Storage
(1,390.96)
32000 - Public
Safety
B-30988 North 1,390.96 32000 - Award 1422 -
District Police Public Safety Impact Fees
Building Misc. New Ordinance
Repairs - D5
10/25/12
12-0414
B-30373A -
Police
Department
Property Unit
Outdoor Storage
(9,892.90)
32000 - Public
Safety
B-30988 North 9,892.90 32000 - Award 1426 -
District Police Public Safety Contribution
Station Misc. from General
Repairs - D5 Fund FY 2008
10/25/12
12-0414
B-30384C -
Communication
UPS Power
(13,101.94)
32000 - Public
Safety
B-30988 North 13,101.94 32000 - Award 1426 -
District Police Public Safety Contribution
Station Misc. from General
Repairs - D5 Fund FY 2008
10/25/12
12-0414
B-30592A -
North District
Police Station
Wind Retrofit
(1,640.20)
32000 - Public
Safety
B-30988 North 1,640.20 32000 - Award 1426 -
District Police Public Safety Contribution
Station Misc. from General
Repairs - D5 Fund FY 2008
10/25/12
12-0414
B-30019B - NW
18th Street (30-
32 Avenue) - D1
(3,876.03)
36000 - Streets
& Sidewalks
B-30780 - NW 14 3,876.03 36000 - Award 1379 -
Avenue and 28 Streets & Street Bonds
Street Area Sidewalks Series 1
Roadway
Improvements - D1
10/25/12
12-0414
B-30019F - NW
15th St (NW 32
Avenue to NW
37 Avenue) - D1
(316,519.76)
36000 - Streets
& Sidewalks
B-30780 - NW 14 316,519.76 36000 - Award 1379 -
Avenue and 28 Streets & Street Bonds
Street Area Sidewalks Series 1
Roadway
Improvements - D1
10/25/12
12-0414
B-30500E - NW
24th Street (from
12th - 13th Ave) -
D1
(504.41)
36000 - Streets
& Sidewalks
B-30780 - NW 14 504.41 36000 - Award 1379 -
Avenue and 28 Streets & Street Bonds
Street Area Sidewalks Series 1
Roadway
Improvements - D1
10/25/12
12-0414
B 30019B NW
(1,673.94)
3
36000 Strccts
B 30780 NW 14 1,673.94 36000
Award 1638
Street Bonds
series 2
12 0111
18th Street
&S,dcwm,c
Avenue and 28
Street Arca
Streets &
10/25/12
(30
32 Avenue) D1
Roadway
Improvements D1
B-30226 -
Allapattah NW
22nd Court
Improvements -
D1
(190,425.86)
36000 - Streets
& Sidewalks
B-30780 - NW 14 190,425.86 36000 - Award 1101 -
Avenue and 28 Streets & Transit Half-
Street Area Sidewalks Cent Surtax
Roadway
Improvements - D1
10/25/12
12-0414
B-39910 -
Quality of Life
District 2
(5,200.00)
31000 - General
Government
B-75830A - Blanche 5,200.00 35000 - Parks Award 1584 -
Park Master Plan & Recreation Homeland
Improvements - D2 Defense Series
3
10/25/12
12-0414
B-30323 - Buena
Vista Heights PH
II
(250,000.00)
36000 - Streets
& Sidewalks
B-30891 - Buena 250,000.00 36000 - Award 1379 -
Vista One -Way Streets & Street Bonds
Street Conversion Sidewalks Series 1
and Signage - D5
10/25/12
12-0414
264
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-72802 - Fire
Stations & Other
Fire Facilities
(150,000.00)
32000 - Public
Safety
B-70210 - Fire 150,000.00 32000 - Award 1426 -
Station #5 Exterior Public Safety Contribution
Walls Repair - D1 from General
Fund
11/15/12
12-0445
B-30865 -
FY2013 Citywide
Capital Needs
(45,900.00)
31000 - General
Government
B-30865A - 45,900.00 31000 - Award 1426 -
Environmental General Contribution
Remediation Government from General
Fund FY13
11/15/12
12-0445
B-30865 -
FY2013 Citywide
Capital Needs
(150,000.00)
31000 - General
Government
B-30541D - 150,000.00 35000 - Parks Award 1426 -
Citywide Park & Recreation Contribution
Equipment & Site from General
Impr. Fund FY13
11/15/12
12-0445
B 30865
(350,000.00)
31000 Genera
B 71200 Citywidc
350,000.00
3
31000
Award 1126
Contribution
12 0115
FY2013 Citywidc
Capital Nccds
Covcrnmcnt
Ccncral Hcct
Rcplaccmcnt
Ccncral
11/15/12
Covcrnmcnt
f
from Ccncral
fund rY13
B-30865 -
FY2013 Citywide
Capital Needs
(350,000.00)
31000 - General
Government
B-30865B - City 350,000.00 31000 - Award 1426 -
Hall Terrace General Contribution
Government from General
Fund FY13
11/15/12
12-0445
B-30865 -
FY2013 Citywide
Capital Needs
(360,000.00)
31000 - General
Government
B-30865C - City 360,000.00 31000 - Award 1426 -
Hall Windows and General Contribution
Doors Government from General
Fund FY13
11/15/12
12-0445
B-73202 - Solid
Waste Collection
Equipment
(16,445.21)
39000 - Solid
Waste CIP
B-73202C - Solid 16,445.21 39000 - Solid Award 1426 -
Waste Collection Waste CIP Contribution
Equip from General
Fund
11/15/12
12-0445
B-30182A -
Coconut Grove
Waterfront
Master Plan PHI -
D2
(10,000.00)
34000 - Public
Facilities-CIP
B-30825 - Biscayne 10,000.00 35000 - Parks Award 1669 -
Bay Spoil Island B- & Recreation TVM Production
Public Shelter - D2 Basic Fees
11/15/12
12-0445
B-30182A -
Coconut Grove
Waterfront
Master Plan PHI -
D2
(750.00)
34000 - Public
Facilities-CIP
B-30825A - 750.00 35000 - Parks Award 1669 -
Biscayne Bay Spoil & Recreation TVM Production
Island E- Picnic Basic Fees
Tables, Benches &
Umbrellas - D2
11/15/12
12-0445
B-30182A -
Coconut Grove
Waterfront
Master Plan PHI -
D2
(750.00)
34000 - Public
Facilities-CIP
B-30825B - 750.00 35000 - Parks Award 1669 -
Biscayne Bay Spoil & Recreation TVM Production
Island E- Public Basic Fees
Trail - D2
11/15/12
12-0445
B-73102A -
Citywide Streets
Milling and
Resurfacing
(15,000.00)
36000 - Streets
& Sidewalks
B-30645F Miami 15,000.00 36000 - Award 1297 -
Regional Intermodal Streets & Transit Half -
Plan Sidewalks Cent Surtax
11/15/12
12-0445
B-30304 -
Shenandoah Park
Improvements
(100,000.00)
35000 - Parks &
Recreation
B-30777 - Coral 100,000.00 35000 - Parks Award 1584 -
Gate Mini -Park - D4 & Recreation Homeland
Defense Series
3
11/15/12
12-0445
B-35907 -
Athalie Range
Park
Soccer/Football
Complex
(65,520.00)
35000 - Parks &
Recreation
B-30671 - 65,520.00 35000 - Parks Award 1496 -
Caribbean & Recreation Sunshine State
Marketplace Government
Renovations - D5 Financing
Commission
I nan It 7
11/15/12
12-0445
B-30615 - D5
Miscellaneous
Street
Maintenance
(100,000.00)
36000 - Streets
& Sidewalks
B-30892 - Little 100,000.00 36000 - Award 1638 -
Haiti Gateway Signs Streets & Street Bonds
- D5 Sidewalks Series 2
11/15/12
12-0445
265
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-30246 -
Overtown Youth
Center - Patio
Enclosure
(35,624.76)
35000 - Parks &
Recreation
B-30893 - Overtown 35,624.76 35000 - Parks Award 1457 -
Youth Center & Recreation Homeland
Miscellaneous Defense 1& 2
Repairs - D5 Interest
11/15/12
12-0445
B-39910 -
Quality of Life
District 2
(40,000.00)
31000 - General
Government
B-30826 - Lincoln 40,000.00 35000 - Parks Award 1584 -
Park Improvements & Recreation Homeland
Defense Series
3
11/15/12
12-0445
B-30706 -
Miscellaneous
Repair - 10% Set
Aside
(100,000.00)
34000 - Public
Facilities
B-30325 - 100,000.00 34000 - Award 1437 -
Miamarina Public FY0710%
Emergency Pier Facilities Marinas
Repairs Revenues
11/15/12
12-0445
B-72802 - Fire
Stations & Other
Fire Facilities
(8,815.00)
32000 - Public
Safety
B-70104 - Fire 8,815.00 32000 - Award 1426 -
Station# 10 Public Safety Contribution
Bathroom from General
remodeling Fund
01/10/13
13-0017
B-30706 -
Miscellaneous
Repairs 10% Set
Aside
(178,070.00)
34000 - Public
Facilities
B-30735 - Dinner 178,070.00 34000 - Award 1437 -
Key Marina Dinghy Public FY07 Marinas
Dock Facilities Capital Repairs
and Capital
Related
Tmnrnvamantc
01/10/13
13-0017
B-70108 - Video
Transmission
Server
(100,000.00)
31000 - General
Government
B-74205B - GSA 100,000.00 31000 - Award 1422 -
Fleet Maintenance General Impact Fees
Garage Expansion Government New Ordinance
01/10/13
13-0017
B-70107 - RISO
Digital Duplicator
(5,062.90)
31000 - General
Government
B-74205B - GSA 5,062.90 31000 - Award 1108 -
Fleet Maintenance General Impact Fees
Garage Expansion Government
01/10/13
13-0017
B-72910 - The
College of
Policing
(15,960.00)
32000 - Public
Safety
B-72910A - The 15,960.00 32000 - Award 1584 -
College of Policing - Public Safety Homeland
EOC Facility Defense Series
3
01/10/13
13-0017
B-39910 - D2
Quality of Life
(150,000.00)
31000 - General
Government
B-75830A - Blanche 150,000.00 35000- Parks Award 1584 -
Park Master Plan & Recreation Homeland
Improvements Defense Series
3
01/10/13
13-0017
B-30020A - NW
1st Street - D3
(362,121.71)
36000 - Streets
& Sidewalk
B-30749 - Citrus 362,121.71 36000 - Award 1379 -
Grove Roadway Streets and Street Bonds
Improvements Sidewalk Series 1
01/10/13
13-0017
B-30020B - NW
2nd Street - D3
(74,470.84)
36000 - Streets
& Sidewalk
B-30749 - Citrus 74,470.84 36000 - Award 1379 -
Grove Roadway Streets and Street Bonds
Improvements Sidewalk Series 1
01/10/13
13-0017
B-30020C -
District 3 NW
Quadrant PHI
(120,198.45)
36000 - Streets
& Sidewalk
B-30749 - Citrus 120,198.45 36000 - Award 1379 -
Grove Roadway Streets and Street Bonds
Improvements Sidewalk Series 1
01/10/13
13-0017
B-30865 -
FY2013 Citywide
Capital Needs
(150,000.00)
31000 - General
Government
Project
B-30865D - Public 150,000.00 31000 - Award 1426 -
Works Asphalt General Contribution
Patch Truck Government from General
Project Fund
02/28/13
13-0064
B-30865 -
FY2013 Citywide
Capital Needs
(190,000.00)
31000 - General
Government
Project
B-30865E - MRC 190,000.00 31000 - Award 1426 -
NC Replacements General Contribution
Government from General
Project Fund
02/28/13
13-0064
266
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-30865C - City
Hall Windows
and Doors
(144,823.32)
31000 - General
Government
Project
B-30865E - MRC 144,823.32 31000 - Award 1426 -
NC Replacements General Contribution
Government from General
Project Fund
02/28/13
13-0064
B-60452 - Fire
Station #11
(New)
(213,259.50)
32000 - Public
Safety
B-70718 - Fire 213,259.50 32000 - Award 1422 -
Facilities Public Safety Impact Fees
Generators New Ordinance-
2007
02/28/13
13-0064
B-72809A -
Firefighting
Equipment -
SAFER
(250,000.00)
32000 - Public
Safety
B-72803 - Fire 250,000.00 32000 - Award 1426 -
Station Equipment Public Safety Contribution
and Furniture from General
Replacement Fund
02/28/13
13-0064
B-72809A -
Firefighting
Equipment -
SAFER
(100,000.00)
32000 - Public
Safety
B-72802 - Fire 100,000.00 32000 - Award 1426 -
Stations & Other Public Safety Contribution
Fire Facilities from General
Fund
02/28/13
13-0064
B-72809A -
Firefighting
Equipment -
SAFER
(500,000.00)
32000 - Public
Safety
B-60455B - Fire 500,000.00 32000 - Award 1426 -
Station #1 Public Safety Contribution
Renovation and from General
Miscellaneous Fund
Repairs
02/28/13
13-0064
B-72809A -
Firefighting
Equipment -
SAFER
(61,500.00)
32000 - Public
Safety
B-72809 - Large 61,500.00 32000 - Award 1426 -
Firefighting Public Safety Contribution
Equipment from General
Fund
02/28/13
13-0064
B-30365B -
James L. Knight
Center Garage
(9,200.00)
34000 - Public
Facilities
B-30541D - 9,200.00 35000 - Parks Award 1426 -
Citywide Park & Recreation Contribution
Equipment & Site from General
Improvement Fund
02/28/13
13-0064
B-30541D -
Citywide Park
Equipment & Site
Improvements
(14,621.00)
35000 - Parks &
Recreation
B-30541B - 14,621.00 35000 - Parks Award 1426 -
Kennedy Park & Recreation Contribution
Floating Dock PH I from General
Fund
02/28/13
13-0064
B-30138 - Model
City/Floral Park -
Street
Improvements
PH II - D5
(100,000.00)
36000 - Streets
& Sidewalks
B-30884 - NW 62 100,000.00 36000 - Award 1379 -
Street West of I-95 Streets and Streets Bonds
Roadway Sidewalks Series 1
Improvements - D5
02/28/13
13-0064
B-30323 - Buena
Vista Heights PH
II
(18,946.56)
36000 - Streets
& Sidewalks
B-30894 - Little 18,946.56 36000 - Award 1379 -
Haiti Right of Way Streets and Streets Bonds
Improvements - D5 Sidewalks Series 1
02/28/13
13-0064
B-30654 - D5
Model City Street
Resurfacing
Project NW 58
St/NW 58 Tr
(132,296.58)
36000 - Streets
& Sidewalks
B-30894 - Little 132,296.58 36000 - Award 1379 -
Haiti Right of Way Streets and Streets Bonds
Improvements - D5 Sidewalks Series 1
02/28/13
13-0064
B-30654A - D5
Overtown, Little
Haiti, and Model
City Street
Resurfacing
(224,814.57)
36000 - Streets
& Sidewalks
B-30894 - Little 224,814.57 36000 - Award 1379 -
Haiti Right of Way Streets and Streets Bonds
Improvements - D5 Sidewalks Series 1
02/28/13
13-0064
B-30674 - Little
Haiti Soccer Park
- Road
Improvement to
NE 4th Avenue
(123,942.29)
36000 - Streets
& Sidewalks
B-30894 - Little 123,942.29 36000 - Award 1379 -
Haiti Right of Way Streets and Streets Bonds
Improvements - D5 Sidewalks Series 1
02/28/13
13-0064
B-40672A -
Flagami Traffic
Calming
(including East
Little Havana
daviracz
(39,039.20)
36000 - Streets
& Sidewalks
B-30778 - Traffic 39,039.20 36000 - Award 1379 -
circle for SW 18 Streets and Streets Bonds
Avenue and SW 13 Sidewalks Series 1
Street - D4
02/28/13
13-0064
267
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-40672B -
Flagami Traffic
Calming
Improvement
(Phase 2)
(3,450.98)
36000 - Streets
& Sidewalks
B-30778 - Traffic 3,450.98 36000 - Award 1379 -
circle for SW 18 Streets and Streets Bonds
Avenue and SW 13 Sidewalks Series 1
Street - D4
02/28/13
13-0064
B-40672C -
Flagami Traffic
Calming PH III
(60,066.89)
36000 - Streets
& Sidewalks
B-30778 - Traffic 60,066.89 36000 - Award 1379 -
circle for SW 18 Streets and Streets Bonds
Avenue and SW 13 Sidewalks Series 1
Street - D4
02/28/13
13-0064
B-30167B -
Shenandoah
Traffic Calming
Phase 2 - D4
(42,123.94)
36000 - Streets
& Sidewalks
B-30168A - Silver 42,123.94 36000 - Award 1379 -
Bluff Traffic Streets and Streets Bonds
Calming Priority 3 - Sidewalks Series 1
D4
02/28/13
13-0064
B-30168B -
Silver Bluff
Traffic Calming -
Phase 2 - D4
(47,908.42)
36000 - Streets
& Sidewalks
B-30168A - Silver 47,908.42 36000 - Award 1379 -
Bluff Traffic Streets and Streets Bonds
Calming Priority 3 - Sidewalks Series 1
D4
02/28/13
13-0064
B-30664A -
District 4 -
Traffic Study at
La Pastorita
(2,671.71)
36000 - Streets
& Sidewalks
B-30168A - Silver 2,671.71 36000 - Award 1379 -
Bluff Traffic Streets and Streets Bonds
Calming Priority 3 - Sidewalks Series 1
D4
02/28/13
13-0064
B-30020D -
District 3 NW
Quadrant - Phase
II - ME
(84,035.64)
36000 - Streets
& Sidewalks
B-30699 - Beacom 84,035.64 36000 - Award 1379 -
Project Area Streets and Streets Bonds
Improvements Sidewalks Series 1
Phase I-D3
02/28/13
13-0064
B-30024A - SW
5th St. 12 - 13th
Ave.
(108,983.31)
36000 - Streets
& Sidewalks
B-30699 - Beacom 108,983.31 36000 - Award 1379 -
Project Area Streets and Streets Bonds
Improvements Sidewalks Series 1
Phase I - D3
02/28/13
13-0064
B-30026B -
Flagler Terrace
(12th Avenue -
17th Avenue)
(106,941.07)
36000 - Streets
& Sidewalks
B-30699 - Beacom 106,941.07 36000 - Award 1379 -
Project Area Streets and Streets Bonds
Improvements Sidewalks Series 1
Phase I - D3
02/28/13
13-0064
B-30034B - SW
llth Street (14-
17 Avenue)
(32,053.98)
36000 - Streets
& Sidewalks
B-30699 - Beacom 32,053.98 36000 - Award 1379 -
Project Area Streets and Streets Bonds
Improvements Sidewalks Series 1
Phase I - D3
02/28/13
13-0064
B-30990 -
Roadway
Improvements
(200,000.00)
36000 - Streets
& Sidewalks
B-30611 - D1 200,000.00 36000 - Award 1297 -
Miscellaneous Streets and Transit Half -
Street Maintenance Sidewalks Cent Surtax
02/28/13
13-0064
B-30990 -
Roadway
Improvements
(200,000.00)
36000 - Streets
& Sidewalks
B-30621 - Center 200,000.00 36000 - Award 1297 -
Grove Street and Streets and Transit Half -
Lighting Sidewalks Cent Surtax
Improvements - D2
02/28/13
13-0064
B-30990 -
Roadway
Improvements
(200,000.00)
36000 - Streets
& Sidewalks
B-30613 - D3 200,000.00 36000 - Award 1297 -
Miscellaneous Streets and Transit Half -
Street Maintenance Sidewalks Cent Surtax
02/28/13
13-0064
B-30990 -
Roadway
Improvements
(200,000.00)
36000 - Streets
& Sidewalks
B-30774 - West 200,000.00 36000 - Award 1297 -
Flagler Area Streets and Transit Half -
Improvements - D4 Sidewalks Cent Surtax
02/28/13
13-0064
B-30990 -
Roadway
Improvements
(200,000.00)
36000 - Streets
& Sidewalks
B-30883 - NW 12 200,000.00 36000 - Award 1297 -
Avenue/NW 12 Streets and Transit Half -
Place Roadway Sidewalks Cent Surtax
Improvements - D5
02/28/13
13-0064
268
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-73102A -
Citywide Streets
Milling and
Resurfacing
(514,000.00)
36000 - Streets
& Sidewalks
B-30611 - D1 514,000.00 36000 - Award 1297 -
Miscellaneous Streets and Transit Half -
Street Maintenance Sidewalks Cent Surtax
02/28/13
13-0064
B-73102A -
Citywide Streets
Milling and
Resurfacing
(514,000.00)
36000 - Streets
& Sidewalks
B-30621 - Center 514,000.00 36000 - Award 1297 -
Grove Street and Streets and Transit Half -
Lighting Sidewalks Cent Surtax
Improvements - D2
02/28/13
13-0064
B-73102A -
Citywide Streets
Milling and
Resurfacing
(514,000.00)
36000 - Streets
& Sidewalks
B-30613 - D3 514,000.00 36000 - Award 1297 -
Miscellaneous Streets and Transit Half -
Street Maintenance Sidewalks Cent Surtax
02/28/13
13-0064
B-73102A -
Citywide Streets
Milling and
Resurfacing
(314,000.00)
36000 - Streets
& Sidewalks
B-30614 - D4 314,000.00 36000 - Award 1297 -
Miscellaneous Streets and Transit Half -
Street Maintenance Sidewalks Cent Surtax
02/28/13
13-0064
B-73102A -
Citywide Streets
Milling and
Resurfacing
(200,000.00)
36000 - Streets
& Sidewalks
B-30779 - SW 2nd 200,000.00 36000 - Award 1297 -
Street and SW 40th Streets and Transit Half -
Avenue Traffic Sidewalks Cent Surtax
Circle - D4
02/28/13
13-0064
B-73102A -
Citywide Streets
Milling and
Resurfacing
(514,000.00)
36000 - Streets
& Sidewalks
B-30615 - D5 514,000.00 36000 - Award 1297 -
Miscellaneous Streets and Transit Half -
Street Maintenance Sidewalks Cent Surtax
02/28/13
13-0064
B-73102A -
Citywide Streets
Milling and
Resurfacing
(484,400.00)
36000 - Streets
& Sidewalks
B-43114B - Public 484,400.00 36000 - Award 1552 -
Works Streets and Local Option
Miscellaneous Sidewalks Gas Tax
Sidewalk
Replacement.
02/28/13
13-0064
B-30780 - NW 14
Avenue and 28
Street Area
Roadway
Improvements -
ni
(1,673.94)
36000 - Streets
& Sidewalks
B-30019B - NW 1,673.94 36000 - Award 1638 -
18th Street (30-32 Streets & Street Bonds
Avenue) - D1 Sidewalks Series 2
02/28/13
13-0064
B-30662A -
District 2 -
Traffic Calming
Study - SW 28th
St. between SW
'27nri Ava and
(15,058.43)
36000 - Streets
& Sidewalks
B-30662D - US-1 15,058.43 36000 - Award 1379 -
Median Closures at Streets & Streets Bonds
Bridgeport and SW Sidewalks Series 1
30 Ct - D2
02/28/13
13-0064
B-40183 - Belle
Meade Gateway
Enclosure - D2
(35,517.57)
36000 - Streets
& Sidewalks
B-30662D - US-1 35,517.57 36000 - Award 1379 -
Median Closures at Streets & Streets Bonds
Bridgeport and SW Sidewalks Series 1
30 Ct - D2
02/28/13
13-0064
B-30734 -
Virginia Street
between Bird Ave
and US1 - D2
(104,000.00)
36000 - Streets
& Sidewalks
B-30621 - Center 104,000.00 36000 - Award 1419 -
Grove Street and Streets & Parking
Lighting Sidewalks Surcharge
Improvements - D2
02/28/13
13-0064
B-30323 - Buena
Vista Heights PH
II - D5
(250,000.00)
36000 - Streets
& Sidewalks
B-30980 Liberty 250,000.00 36000 - Award 1638 -
Square T- Streets and Street Bonds
Turnarounds - D5 Sidewalks Series 2
05/23/13
13-0206
B-30323 - Buena
Vista Heights PH
II - D5
(100,000.00)
36000 - Streets
& Sidewalks
B-30880 - NE 2nd 100,000.00 36000 - Award 1638 -
Court Roadway & Streets and Street Bonds
Drainage Sidewalks Series 2
Improvements
Project - D5
05/23/13
13-0206
B-30291 -
Athalie Range #1
Mini Park
Improvements -
D5
(3,763.00)
35000 - Parks &
Recreation
B-30981 - Oakland 3,763.00 35000 - Parks Award 1584 -
Grove Park - & Recreation Homeland
upgrades - D5 Defense/Neighb
orhood
Improvement
Rnnrl Sariac
05/23/13
13-0206
269
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-30885 -
Freedom Garden
Statute
Rehabilitation -
D5
(38,427.08)
35000 - Parks &
Recreation
B-30981 - Oakland 38,427.08 35000 - Parks Award 1584 -
Grove Park - & Recreation Homeland
upgrades - D5 Defense/Neighb
orhood
Improvement
Rnnri Spriac
05/23/13
13-0206
B-75991B -
Williams Park
Furniture D5
(2,696.51)
35000 - Parks &
Recreation
B-30981 - Oakland 2,696.51 35000 - Parks Award 1457 -
Grove Park - & Recreation Homeland
upgrades - D5 Defense 1& 2
Interest Post 9-
30-06 & 9-30-
n7
05/23/13
13-0206
B-30138 - Model
City/Floral Park -
Street
Improvements
PH II - D5
(85,764.99)
36000 - Streets
& Sidewalks
B-30982 - Oakland 85,764.99 36000 - Award 1379 -
Grove Drainage - Streets and Street Bonds
D5 Sidewalks Series 1
05/23/13
13-0206
B-30323 - Buena
Vista Heights PH
II- D5
(95,135.01)
36000 - Streets
& Sidewalks
B-30982 - Oakland 95,135.01 36000 - Award 1379 -
Grove Drainage - Streets and Street Bonds
D5 Sidewalks Series 1
05/23/13
13-0206
B-30323 - Buena
Vista Heights PH
II- D5
(63,044.68)
36000 - Streets
& Sidewalks
B-30983 - NW 44th 63,044.68 36000 - Award 1379 -
Street between NW Streets and Street Bonds
7th and NW 8th Ave Sidewalks Series 1
- D5
05/23/13
13-0206
B-30323 - Buena
Vista Heights PH
II- D5
(121,955.32)
36000 - Streets
& Sidewalks
B-30983 - NW 44th 121,955.32 36000 - Award 1638 -
Street between NW Streets and Street Bonds
7th and NW 8th Ave Sidewalks Series 2
- D5
05/23/13
13-0206
B-39910 -
Quality of Life
District 2
(31,000.00)
31000 - General
Government
Projects
B-30541D - 31,000.00 35000 - Parks Award 1584 -
Citywide Park & Recreation Homeland
Equipment & Site Defense/Neighb
Improvements FY12 orhood
Improvement
Rnnri Spriac
05/23/13
13-0206
B-30734 -
Virginia Street
between Bird Ave
and US1 - D2
(110,616.97)
36000 - Streets
& Sidewalks
B-30621 - Center 110,616.97 36000 - Award 1419 -
Grove Lighting - D2 Streets and Parking
Sidewalks Surcharge
05/23/13
13-0206
B-30621 - Center
Grove Lighting -
D2
(110,616.97)
36000 - Streets
& Sidewalks
B-30827 - South 110,616.97 36000 - Award 1297 -
Grove Roadway Streets and Transit Half-
Improvements - D2 Sidewalks Cent Surtax
05/23/13
13-0206
B-30035B -
Shorecrest
Roadway Milling
& Resurfacing
Project - D2
(60,000.00)
36000 - Streets
& Sidewalks
B-30662D - US-1 60,000.00 36000 - Award 1101 -
Median Closures at Streets and Transit Half -
Bridgeport and SW Sidewalks Cent Surtax
30 Ct - D2
05/23/13
13-0206
B-30035A -
North Shorecrest
Roads
Improvements
Project - D2
(55,000.00)
36000 - Streets
& Sidewalks
B-30830 - US1 55,000.00 36000 - Award 1638 -
Landscaping Streets and Street Bonds
between 17 Ave and Sidewalks Series 2
Viscaya - D2
05/23/13
13-0206
B-30634 -
Brickell Key
Bridge - D2
(224,267.14)
36000 - Streets
& Sidewalks
B-30822 - Brickell 224,267.14 36000 - Award 1297 -
Area Shared Use Streets and Transit Half -
Path and Roadway Sidewalks Cent Surtax
Improvements - D2
05/23/13
13-0206
B-75883 -
Peacock Park
Site
Improvements -
D2
(100,000.00)
35000 - Parks &
Recreation
B-75830A - Blanche 100,000.00 35000 - Parks Award 1584 -
Park Master Plan & Recreation Homeland
Improvements - D2 Defense/Neighb
orhood
Improvement
Rnnri Spriac
05/23/13
13-0206
B-70718 - Fire
Facilities
Generators
(North & South)
(19,499.63)
32000 - Public
Facilities
B-60452 - Fire 19,499.63 32000 - Award 1422 -
Station #11 (New) Public Safety Impact Fees
New Ordinance -
2007
05/23/13
13-0206
270
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-72802 - Fire
Stations & Other
Fire Facilities
(19,499.63)
32000 - Public
Safety
B-70718 - Fire 19,499.63 32000 - Award 1105 -
Facilities Public Safety Fire Assessment
Generators (North & Fee
South)
05/23/13
13-0206
B-72802 - Fire
Stations & Other
Fire Facilities
(100,000.00)
32000 - Public
Safety
B-70211 - FS No. 3 100,000.00 32000 - Award 1105 -
Dormitories Build- Public Safety Fire Assessment
out Project Fee
05/23/13
13-0206
B-72802 - Fire
Stations & Other
Fire Facilities
(77,000.00)
32000 - Public
Facilities
B-70212 - FS No. 77,000.00 32000 - Award 1105 -
12 Re -roofing Public Safety Fire Assessment
project Fee
05/23/13
13-0206
B-30222A - Calle
Ocho
Beautification -
East of 37
Avenue - D4
(171,627.32)
35000 - Parks &
Recreation
B-30690 West End 171,627.32 35000 - Parks Award 1584 -
Park New & Recreation Homeland
Community Building Defense/Neighb
- D4 orhood
Improvement
Rnnrl Sarioc 2
05/23/13
13-0206
B-35871 - West
End Park Pool
Improvements -
D4
(8,310.85)
35000 - Parks &
Recreation
B-30690 West End 8,310.85 35000 - Parks Award 1368 -
Park New & Recreation HD2
Community Building Neighborhood
- D4 Park
Improvements
A Arm iicitinn
05/23/13
13-0206
B-30304 -
Shenandoah Park
Improvements -
D4
(483,112.83)
35000 - Parks &
Recreation
B-30690 West End 483,112.83 35000 - Parks Award 1584 -
Park New & Recreation Homeland
Community Building Defense/Neighb
- D4 orhood
Improvement
Rnnrl Sarioc 2
05/23/13
13-0206
B-30775 -
Shenandoah
Area
Improvements -
D4
(48,107.82)
36000 - Streets
& Sidewalks
B-30693 - 48,107.82 36000 - Award 1638 -
Neighborhood Streets and Street Bonds
Traffic Calming Sidewalks Series 2
Improvements - D4
05/23/13
13-0206
B-30222A - Calle
Ocho
Beautification -
East of 37
Avenue - D4
(422,264.00)
36000 - Streets
& Sidewalks
B-30961 - East 422,264.00 36000 - Award 1584 -
Flagami Roadway Streets and Homeland
Improvements SW Sidewalks Defense/Neighb
2nd Street and SW orhood
4th Street - D4 Improvement
Rnnrl Sarioc 2
05/23/13
13-0206
B-30025A - SW
5th Street (55-57
Avenue) - D4
(5,591.94)
36000 - Streets
& Sidewalks
B-30776 - Silver 5,591.94 38000 - Award 1379 -
Bluff Drainage Storm Sewers Street Bonds
Improvements - D4 Series 1
05/23/13
13-0206
B-30025B - D4-
Miscellaneous
Streets Paving
PHII
(34,082.73)
36000 - Streets
& Sidewalks
B-30776 - Silver 34,082.73 38000 - Award 1379 -
Bluff Drainage Storm Sewers Street Bonds
Improvements - D4 Series 1
05/23/13
13-0206
B-30627 - Coral
Gate Wall - D4
(2,671.71)
36000 - Streets
& Sidewalks
B-30776 - Silver 2,671.71 38000 - Award 1379 -
Bluff Drainage Storm Sewers Street Bonds
Improvements - D4 Series 1
05/23/13
13-0206
B-30710 - SW 17
Terrace between
SW 18 & 19
Avenues - D4
(2,195.82)
36000 - Streets
& Sidewalks
B-30776 - Silver 2,195.82 38000 - Award 1638 -
Bluff Drainage Storm Sewers Street Bonds
Improvements - D4 Series 2
05/23/13
13-0206
B-40672A -
Flagami Traffic
Calming
(including East
Little Havana
riaviracl - na
(246.53)
36000 - Streets
& Sidewalks
B-30776 - Silver 246.53 38000 - Award 1638 -
Bluff Drainage Storm Sewers Street Bonds
Improvements - D4 Series 2
05/23/13
13-0206
B-30235A - West
Little Havana,
Home Depot
Area Traffic
Circles - D4
(115,073.49)
36000 - Streets
& Sidewalks
B-30776 - Silver 115,073.49 38000 - Award 1101 -
Bluff Drainage Storm Sewers Transit Half -
Improvements - D4 Cent Surtax
05/23/13
13-0206
271
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-30629 -
Durham Terrace
Drainage Project -
D4
(430,137.78)
38000 - Storm
Sewers
B-30776 - Silver 430,137.78 38000 - Award 1379 -
Bluff Drainage Storm Sewers Street Bonds
Improvements - D4 Series 1
05/23/13
13-0206
B-30629 -
Durham Terrace
Drainage Project -
D4
(150,000.00)
38000 - Storm
Sewers
B-30776 - Silver 150,000.00 38000 - Award 1638 -
Bluff Drainage Storm Sewers Street Bonds
Improvements - D4 Series 2
05/23/13
13-0206
B-30629 -
Durham Terrace
Drainage Project -
D4
(76,155.82)
38000 - Storm
Sewers
B-30960 - La 76,155.82 36000 - Award 1379 -
Pastorita Traffic Streets and Street Bonds
Calming and misc. Sidewalks Series 1
improvements - D4
05/23/13
13-0206
B-30629 -
Durham Terrace
Drainage Project -
D4
(503,189.67)
38000 - Storm
Sewers
B-30960 - La 503,189.67 36000 - Award 1638 -
Pastorita Traffic Streets and Street Bonds
Calming and misc. Sidewalks Series 2
improvements - D4
05/23/13
13-0206
B-30664A -
District 4 -
Traffic Study at
La Pastorita
(37,094.23)
36000 - Streets
& Sidewalks
B-30960 - La 37,094.23 36000 - Award 1379 -
Pastorita Traffic Streets and Street Bonds
Calming and misc. Sidewalks Series 1
improvements - D4
05/23/13
13-0206
B-50704 -
Fairlawn Storm
Sewer
Improvements
Project PHIII
(8,560.28)
38000 - Storm
Sewers
B-30960 - La 8,560.28 36000 - Award 1379 -
Pastorita Traffic Streets and Street Bonds
Calming and misc. Sidewalks Series 1
improvements - D4
05/23/13
13-0206
B-35861A -
Maximo Gomez
Domino Park
Restroom - D3
(29,241.03)
35000 - Parks &
Recreation
B-35861B - Maximo 29,241.03 35000 - Parks Award 1457 -
Gomez / Domino & Recreation Homeland
Park Restroom Defense 1& 2
Improvements - D3 Interest Post 9-
30-06 & 9-30-
n7
05/23/13
13-0206
B-35861A -
Maximo Gomez
Domino Park
Restroom - D3
(19,127.21)
35000 - Parks &
Recreation
B-35861B - Maximo 19,127.21 35000 - Parks Award 1584 -
Gomez / Domino & Recreation Homeland
Park Restroom Defense/Neighb
Improvements - D3 orhood
Improvement
Rnnri Sarioc 2
05/23/13
13-0206
B-35861A5 -
Maximo
Gomez/Domingo
Park Restroom -
Sanititary Sewer -
n1
(100,000.00)
35000 - Parks &
Recreation
B-35861B5 - 100,000.00 37000 - Award 1122 -
Maximo Gomez / Sanitary Sanitary Sewer
Domino Park Sewer
Restroom
Improvements - D3
05/23/13
13-0206
B-35812B -
Duarte Park ADA
Modifications -
D1
(65,722.25)
35000 - Parks &
Recreation
B-40456 - Antonio 65,722.25 35000 - Parks Award 1584 -
Maceo Community & Recreation Homeland
Building - D1 Defense/Neighb
orhood
Improvement
Rnnri Sarioc 2
05/23/13
13-0206
B-40455 -
Citywide Capital
Improvements
Projects
(121,027.75)
35000 - Parks &
Recreation
B-40456 - Antonio 121,027.75 35000 - Parks Award 1422
Maceo Community & Recreation Impact Fees
Building - D1
05/23/13
13-0206
B-40455 -
Citywide Capital
Improvements
Projects
(33,476.25)
35000 - Parks &
Recreation
B-35865A - Coral 33,476.25 35000 - Parks Award 1422
Gate Park Bldg & Recreation Impact Fees
Improvements - D4
05/23/13
13-0206
B-35832 -
Kinlock Park
Community
Recreation
Building
Tmnrnvamantc -
(47,843.29)
35000 - Parks &
Recreation
B-40457 - Kinlock 47,843.29 35000 - Parks Award 1368 -
Park Building & Recreation HD2
Addition - D1 Neighborhood
Park
Improvements
A Arm 1icitinn
05/23/13
13-0206
B-40455 -
Citywide Capital
Improvements
Projects
(114,006.71)
35000 - Parks &
Recreation
B-40457 - Kinlock 114,006.71 35000 - Parks Award 1422
Park Building & Recreation Impact Fees
Addition - D1
05/23/13
13-0206
272
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-30703 - Bob
Hope Dr.
Between NW
20th Street to
NW 17th Street -
n1
(11,724.57)
36000 - Streets
& Sidewalks
B-30781 - NW 11 St 11,724.57 36000 - Award 1379 -
from 27 to 37 Streets and Street Bonds
Avenue Area Sidewalks Series 1
Roadway
Improvements - D1
05/23/13
13-0206
B-30691 - NW
North River Drive
- District 1
(13,002.50)
36000 - Streets
& Sidewalks
B-30781 - NW 11 St 13,002.50 36000 - Award 1638 -
from 27 to 37 Streets and Street Bonds
Avenue Area Sidewalks Series 2
Roadway
Improvements - D1
05/23/13
13-0206
B-30702 - NW
34th Avenue @
SR 836 Roadway
Improvements -
D1
(1,673.94)
36000 - Streets
& Sidewalks
B-30781 - NW 11 St 1,673.94 36000 - Award 1638 -
from 27 to 37 Streets and Street Bonds
Avenue Area Sidewalks Series 2
Roadway
Improvements - D1
05/23/13
13-0206
B-30703 - Bob
Hope Dr.
Between NW
20th Street to
NW 17th Street -
ni
(25,905.03)
36000 - Streets
& Sidewalks
B-30781 - NW 11 St 25,905.03 36000 - Award 1638 -
from 27 to 37 Streets and Street Bonds
Avenue Area Sidewalks Series 2
Roadway
Improvements - D1
05/23/13
13-0206
B-30226 -
Allapattah NW
22nd Court
Improvements -
D1
(147,693.96)
36000 - Streets
& Sidewalks
B-30781 - NW 11 St 147,693.96 36000 - Award 1101 -
from 27 to 37 Streets and Transit Half-
Avenue Area Sidewalks Cent Surtax
Roadway
Improvements - D1
05/23/13
13-0206
B-31221A - NW
16 Street
Improvement
Project - D1
(50,000.00)
36000 - Streets
& Sidewalks
B-30785 - NW 36 50,000.00 36000 - Award 1101 -
Avenue 15 to 16 Streets and Transit Half -
Street Drainage - Sidewalks Cent Surtax
D1
05/23/13
13-0206
B-31221A - NW
16 Street
Improvement
Project - D1
(56,939.17)
36000 - Streets
& Sidewalks
B-30786 NW 43 56,939.17 36000 - Award 1101 -
Avenue between 9 Streets and Transit Half -
St to 11 St Sidewalks Cent Surtax
Roadway
Improvements - D1
05/23/13
13-0206
B-30228 - NW
19th Terrace -
D1
(6,304.76)
36000 - Streets
& Sidewalks
B-30786 NW 43 6,304.76 36000 - Award 1101 -
Avenue between 9 Streets and Transit Half-
St to 11 St Sidewalks Cent Surtax
Roadway
Improvements - D1
05/23/13
13-0206
B-30328 - NW
20th Street
Streetscape - D1
(10,385.01)
36000 - Streets
& Sidewalks
B-30786 NW 43 10,385.01 36000 - Award 1101 -
Avenue between 9 Streets and Transit Half-
St to 11 St Sidewalks Cent Surtax
Roadway
Improvements - D1
05/23/13
13-0206
B-30507 - NW 32
Street, NW 23
Avenue, NW 24
Avenue - D1
(4,595.20)
36000 - Streets
& Sidewalks
B-30786 NW 43 4,595.20 36000 - Award 1101 -
Avenue between 9 Streets and Transit Half -
St to 11 St Sidewalks Cent Surtax
Roadway
Improvements - D1
05/23/13
13-0206
B-33514 - Marine
Stadium Marina
Improvements
(130,000.00)
34000 - Public
Facilities-CIP
B-30696 - 130,000.00 34000 - Award 1584 -
Miamarina Pier A, B Public Homeland
& C Fire Line Facilities-CIP Defense/Neighb
Repairs orhood
Improvement
Rnnri Spriac
05/23/13
13-0206
B-30645A -
Transportation
Program Support
Services - Transit
Professional
(30,000.00)
39900 - Mass
Transit
B-70246A - Beach 30,000.00 39900 - Mass Award 1101 -
Corridor Transit Transit Transit Half -
Connection Study - Cent Surtax
Citywide
05/23/13
13-0206
B-70500 -
Development/UD
P Consultants -
Watson Island,
Others
(22,292.89)
34000 - Public
Facilities-CIP
B-30365H - 22,292.89 31000 - Award 1103 -
Generator for City General Contribution
Hall Government From General
Projects Fund
05/23/13
13-0206
B-30365G -
Compond Fence
Modification for
Public Works
Operations Yard
(2,495.00)
31000 - General
Government
Projects
B-30365H - 2,495.00 31000 - Award 1426 -
Generator for City General Contribution
Hall Government from General
Projects Fund
05/23/13
13-0206
273
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-30385 -
Cooling Tower
support Bracket
Replacement
(1,067.35)
32000 - Public
Safety
B-30365H - 1,067.35 31000 - Award 1426 -
Generator for City General Contribution
Hall Government from General
Projects Fund
05/23/13
13-0206
B-70421 - Air
Conditioners
South District
Sub Station -
Miami Police
(5,000.00)
32000 - Public
Safety
B-30365H - 5,000.00 31000 - Award 1103 -
Generator for City General Contribution
Hall Government from General
Projects Fund
05/23/13
13-0206
B-30988 - North
District Police
Building Misc.
Repairs - D5
(10,000.00)
32000 - Public
Safety
B-40273 - Police 10,000.00 32000 - Award 1422
Station Public Safety Impact Fees
Headquarters
Generator Slab
05/23/13
13-0206
B-72910A - The
College of
Policing - EOC
Facility
(10,587.68)
32000 - Public
Safety
B-30988 - North 10,587.68 32000 - Award 1103 -
District Police Public Safety Contribution
Building Misc. From General
Repairs - D5 Fund
05/23/13
13-0206
B-72915 - Police
Headquarters
Helipad
(6,935.28)
32000 - Public
Safety
B-30988 - North 6,935.28 32000 - Award 1103 -
District Police Public Safety Contribution
Building Misc. From General
Repairs - D5 Fund
05/23/13
13-0206
B-70421 - Air
Conditioners
South District
Sub Station -
Miami Police
(8,000.00)
32000 - Public
Safety
B-30988 - North 8,000.00 32000 - Award 1103 -
District Police Public Safety Contribution
Building Misc. from General
Repairs - D5 Fund
05/23/13
13-0206
B-30706 - Misc
Repairs - 10%
Set Aside
(75,000.00)
34000 - Public
Facilities-CIP
B-30735 - Dinner
Key Marina Dinghy
Dock
75,000.00
34000 -
Public
Facilities-CIP
Award 1437-
FY07 10%
Marinas
Revenues
05/23/13
13-0206
B-30706 - Misc
Repairs - 10%
Set Aside
(52,000.00)
34000 - Public
Facilities-CIP
B-30325A -
Miamarina Painting
and Misc Repairs
52,000.00
34000 -
Public
Facilities-CIP
Award 1437-
FY07 10%
Marinas
Revenues
05/23/13
13-0206
B-30325 -
Miamarina
Emergency Pier
Repairs
(4,338.51)
34000 - Public
Facilities-CIP
B-30325A -
Miamarina Painting
and Misc Repairs
4,338.51
34000 -
Public
Facilities-CIP
Award 1437-
FY07 10%
Marinas
Revenues
05/23/13
13-0206
B-30325 -
Miamarina
Emergency Pier
Repairs
(5,551.08)
34000 - Public
Facilities-CIP
B-30325A -
Miamarina Painting
and Misc Repairs
5,551.08
34000 -
Public
Facilities-CIP
Award 1496 -
Sunshine State
Loan
05/23/13
13-0206
B-30365B -
James L. Knight
Center Garage
Improvements
(54,000.00)
34000 - Public
Facilities
B-30365N - Knight 54,000.00 34000 - Award 1426 -
Center ADA Public Contribution
Restroom Facilities from General
Improvements Fund
06/27/13
13-0252
B-40302 - SW
1st Avenue Road
Improvements
Segment 1 - D3
(83,651.00)
36000 - Streets
& Sidewalks
B-40313 - SW 3rd 83,651.00 36000 - Award 1638 -
Ave Road Streets & Street Bonds
Improvements - D3 Sidewalks Series 2
06/27/13
13-0252
B-40312 - SW
22nd Terr. &
13th Ave Road
Improvements -
D3
(18,106.00)
36000 - Streets
& Sidewalks
B-40313 - SW 3rd 18,106.00 36000 - Award 1638 -
Ave Road Streets & Street Bonds
Improvements - D3 Sidewalks Series 2
06/27/13
13-0252
B-30865B - City
Hall Roof Terrace
(35,823.83)
31000 - General
Government
Projects
B-30865C - City 35,823.83 31000 - Award 1426 -
Hall Windows and General Contribution
Doors Government from General
Projects Fund
06/27/13
13-0252
274
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-30031A - SW
3rd Avenue Road
Improvements
Project - D3
(16,775.91)
36000 - Streets
& Sidewalks
B-30008A - Grove 16,775.91 36000 - Award 1379 -
Park Road Streets & Streets Bonds
Improvements - D3 Sidewalks Series 1
06/27/13
13-0252
B-30031C - SW
15th Rd (Coral
Way -South
Miami Avenue) -
D3
(11,892.97)
36000 - Streets
& Sidewalks
B-30008A - Grove 11,892.97 36000 - Award 1379 -
Park Road Streets & Streets Bonds
Improvements - D3 Sidewalks Series 1
06/27/13
13-0252
B-30034B - SW
llth Street (14-
17 Avenue) - D3
(106,476.25)
36000 - Streets
& Sidewalks
B-30008A - Grove 106,476.25 36000 - Award 1379 -
Park Road Streets & Streets Bonds
Improvements - D3 Sidewalks Series 1
06/27/13
13-0252
B-30168C - SW
16th Avenue - D3
(1,396.51)
36000 - Streets
& Sidewalks
B-30008A - Grove 1,396.51 36000 - Award 1379 -
Park Road Streets & Streets Bonds
Improvements - D3 Sidewalks Series 1
06/27/13
13-0252
B-30583 -
Citywide Street
Resurfacing - D3
(6,663.50)
36000 - Streets
& Sidewalks
B-30008A - Grove 6,663.50 36000 - Award 1379 -
Park Road Streets & Streets Bonds
Improvements - D3 Sidewalks Series 1
06/27/13
13-0252
B-30712 - NW 21
Avenue between
NW 1st Street
and NW 3rd
Street - D3
(68,939.85)
36000 - Streets
& Sidewalks
B-30008A - Grove 68,939.85 36000 - Award 1379 -
Park Road Streets & Streets Bonds
Improvements - D3 Sidewalks Series 1
06/27/13
13-0252
B-30714 - NW 17
Avenue between
NW 3rd and NW
1st Street - D3
(244.65)
36000 - Streets
& Sidewalks
B-30008A - Grove 244.65 36000 - Award 1379 -
Park Road Streets & Streets Bonds
Improvements - D3 Sidewalks Series 1
06/27/13
13-0252
B-30719 - SW 16
Avenue from
Coral Way to 20
Street - D3
(32,109.21)
36000 - Streets
& Sidewalks
B-30008A - Grove 32,109.21 36000 - Award 1379 -
Park Road Streets & Streets Bonds
Improvements - D3 Sidewalks Series 1
06/27/13
13-0252
B-30740 - Two
Way Traffic
Conversion on
NW 1 Street - D3
(10,029.55)
36000 - Streets
& Sidewalks
B-30008A - Grove 10,029.55 36000 - Award 1638 -
Park Road Streets & Street Bonds 2-
Improvements - D3 Sidewalks 2009 Series
06/27/13
13-0252
B-30741 - SW 16
Avenue Roadway
& Drainage
Improvements -
D3
(8,045.90)
36000 - Streets
& Sidewalks
B-30008A - Grove 8,045.90 36000 - Award 1638 -
Park Road Streets & Street Bonds 2-
Improvements - D3 Sidewalks 2009 Series
06/27/13
13-0252
B-30742 - SW
5th Avenue
Roadway &
Drainage
Improvements -
n1
(18,654.80)
36000 - Streets
& Sidewalks
B-30008A - Grove 18,654.80 36000 - Award 1638 -
Park Road Streets & Street Bonds 2-
Improvements - D3 Sidewalks 2009 Series
06/27/13
13-0252
B-30743 - SW
28th Road
Roadway &
Drainage
Improvements -
nz
(94,857.49)
36000 - Streets
& Sidewalks
B-30008A - Grove 94,857.49 36000 - Award 1638 -
Park Road Streets & Street Bonds 2-
Improvements - D3 Sidewalks 2009 Series
06/27/13
13-0252
B-30747 - SW
13th Street
Roadway &
Drainage
Improvements -
n1
(197,843.20)
36000 - Streets
& Sidewalks
B-30008A - Grove 197,843.20 36000 - Award 1638 -
Park Road Streets & Street Bonds 2-
Improvements - D3 Sidewalks 2009 Series
06/27/13
13-0252
B-40305 - SW
12th Street Road
Improvements -
D3
(54,390.98)
36000 - Streets
& Sidewalks
B-30008A - Grove 54,390.98 36000 - Award 1638 -
Park Road Streets & Street Bonds 2-
Improvements - D3 Sidewalks 2009 Series
06/27/13
13-0252
275
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-40455 -
Citywide Capital
Improvements
Projects
(193,043.00)
35000 - Parks &
Recreation
B-30984 - Athalie 193,043.00 35000 - Parks Award 1422 -
Range Park HVAC and Impact Fees
Replacement - D5 Recreation
06/27/13
13-0252
B-40455 -
Citywide Capital
Improvements
Projects
(124,500.00)
35000 - Parks &
Recreation
B-30174 - Virginia 124,500.00 35000 - Parks Award 1422 -
Key Beach Park and Impact Fees
Historic Restoration Recreation
PH 2
06/27/13
13-0252
B-30645A -
Transportation
Program Support
Services - Transit
Professional
(51,200.29)
39900 - Mass
Transit
B-70246 - 51,200.29 39900 - Mass Award 1101 -
Transportation Transit Transit Half -
Program Support Cent Surtax
Svc - Transit
Professional
06/27/13
13-0252
B-30645A -
Transportation
Program Support
Services - Transit
Professional
(267,201.90)
39900 - Mass
Transit
B-70246 - 267,201.90 39900 - Mass Award 1297 -
Transportation Transit Transit Half -
Program Support Cent Surtax
Svc - Transit
Professional
06/27/13
13-0252
B-30645B -
Transportation
Program Support
Services -
Transportation
(144,957.75)
36000 - Streets
& Sidewalks
B-70245 - 144,957.75 36000 - Award 1297 -
Transportation Streets & Transit Half -
Program Support Sidewalks Cent Surtax
Svcs -
Transportation
06/27/13
13-0252
B-30706 -
Miscellaneous
Repair - 10% Set
Aside
(40,600.00)
34000 - Public
Facilities
B-30325 - 40,600.00 34000 - Award 1437 -
Miamimarina Public FY07 Marinas
Emergency Pier Facilities Capital Repairs
Repairs & Capital
Related
Tm rnvomantc
06/27/13
13-0252
B-30501A -
Manuel Artime
Miscellaneous
Project
(58,003.00)
34000 - Public
Facilities
B-30501B - Manuel 58,003.00 34000 - Award 1350 -
Artime Dimmer Public SRF
Rack System Facilities Contribution to
Capital
06/27/13
13-0252
B-40300 - SW
18th Terr. Road
Improvements -
D3
(13,000.00)
36000 - Streets
& Sidewalks
B-40311 - SW 22nd 13,000.00 36000 - Award 1638 -
Road Improvements Streets & Street Bonds
D3 Sidewalks Series 2
06/27/13
13-0252
B-30501A -
Manuel Artime
Miscellaneous
Project
(87,663.00)
34000 - Public
Facilities-CIP
B-30501C - Manuel 87,663.00 34000 - Award 1350 -
Artime Window Public SRF 2007
Replacement 970 Facilities-CIP Contribution to
Building - PF Capital
09/12/13
13-0335
B-33506 - James
L. Knight Center
Miscellaneous
Improvements
(37,716.13)
34000 - Public
Facilities-CIP
B-30501C - Manuel 37,716.13 34000 - Award 1103 -
Artime Window Public Contribution
Replacement 970 Facilities-CIP from General
Building - PF Fund
09/12/13
13-0335
B-30706 -
Miscellaneous
Repair - 10% Set
Aside
(200,000.00)
34000 - Public
Facilities-CIP
B-70010 - 200,000.00 34000 - Award 1437 -
Miamarina Pier 5 Public FY07 Marinas
Canopies - PF Facilities-CIP Capital Repairs
and Capital
Related
Tmnrnvamantc
09/12/13
13-0335
B-30365B -
James L. Knight
Center Garage
Impr
(25,000.02)
34000 - Public
Facilities-CIP
B-30501C - Manuel 25,000.02 34000 - Award 1426 -
Artime Window Public Contribution
Replacement 970 Facilities-CIP from General
Building - PF Fund
09/12/13
13-0335
B-30865E - MRC
NC Replacement
(45,000.00)
31000 - General
Government
B-30865C - City 45,000.00 31000 - Award 1426 -
Hall Windows and General Contribution
Doors - GSA Government from General
Fund
09/12/13
13-0335
B-74219D -
Property
Maintenance -
Thermostats
(8,000.00)
31000 - General
Government
B-74205C - GSA 8,000.00 31000 - Award 1422 -
Truck Wash Pit General Impact Fees
Government New Ordinance -
2007
(Unallocated
FV7n1'1)
09/12/13
13-0335
276
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-40455 -
Citywide Capital
Improvements
Projects
(50,000.00)
35000 - Parks
and Recreation
B-35806 - Curtis 50,000.00 35000 - Parks Award 1422 -
Park New Pool and Impact Fees
Facility and Boat Recreation
Ramp Improvement
- D1
09/12/13
13-0335
B-35812B -
Duarte Park ADA
Modifications -
D1
(15,000.00)
35000 - Parks
and Recreation
B-35812D - Duarte 15,000.00 35000 - Parks Award 1584 -
Park Building and Homleand
Renovation, Splash Recreation Defense
Park - D1
09/12/13
13-0335
B-75816 -
Armbrister Park
Site
Improvements -
D2
(65,000.00)
35000 - Parks
and Recreation
B-30680 - 65,000.00 38000 - Award 1584 -
Rockerman Canal Storm Sewers Homeland
Improvements - D2 Defense Series
3 - CIP 326015
09/12/13
13-0335
B-30687T -
Coconut Grove
Business
Improvements
District - Tree
rmmnnnnnr - fl7
(20,930.00)
33000 -
Disaster
Recovery
B-30822T - Brickell 20,930.00 33000 - TBD Award -
Area Shared Use Disaster FEMA Tree
Path and Roadway Recovery Funding
Improvements -
Tree Component
09/12/13
13-0335
B-75883 -
Peacock Park
Site
Improvements -
D2
(105,000.00)
35000 - Parks
and Recreation
B-30721 - Spoil 105,000.00 35000 - Parks Award 1584 -
Island E Restoration and Homeland
and Floating Dock - Recreation Defense Series
D2 3 - CIP 311712
09/12/13
13-0335
B-40455 -
Citywide Capital
Improvements
Projects
(100,000.00)
35000 - Parks
and Recreation
B-30995 - Virginia 100,000.00 35000 - Parks Award 1422 -
Key Beach North and Impact Fees
Point Mountain Bike Recreation
Trails - D2
09/12/13
13-0335
B-40306 - SW
loth Street Road
Improvements -
D3
(40,000.00)
36000 - Streets
& Sidewalks
B-40324 - NW llth 40,000.00 36000 Streets Award 1638 -
Avenue Road & Sidewalks Street Bonds 2 -
Improvements - D3 2009 Series
09/12/13
13-0335
B-30229 - Robert
King High Park
Soccer Field
(102,468.06)
35000 - Parks
and Recreation
B-30962 - Robert 102,468.06 35000 - Parks Award 1584 -
King High Fencing and Homeland
and Miscelaneous Recreation Defense Series
Improvements - D4 3
09/12/13
13-0335
B-30821 - Coral
Gate Park
Furniture,
Security System
and
Micrallanannc
(20,000.00)
35000 - Parks
and Recreation
B-30963 - Bay of 20,000.00 35000 - Parks Award 1584 -
Pigs Memorial Park and Homeland
Lighting - D4 Recreation Defense Series
3
09/12/13
13-0335
B-30770 - SW
22nd Ave
Medians - US1
to Coral Way -
D4
(186,000.00)
36000 - Streets
& Sidewalks
B-30776 - Silver 186,000.00 38000 - Award 1297 -
Bluff Drainage Storm Sewers Transit Half -
Improvements - D4 Cent Surtax
09/12/13
13-0335
B-30770 - SW
22nd Ave
Medians - US1
to Coral Way -
D4
(155,377.98)
36000 - Streets
& Sidewalks
B-30776 - Silver 155,377.98 38000 - Award 1379 -
Bluff Drainage Storm Sewers Street Bonds
Improvements - D4 Series 1
09/12/13
13-0335
B-30629 -
Durham Terrace
Drainage Project
(26,327.56)
38000 - Storm
Sewers
B-30776 - Silver 26,327.56 38000 - Award 1379 -
Bluff Drainage Storm Sewers Street Bonds
Improvements - D4 Series 1
09/12/13
13-0335
B-50704 -
Fairlawn Storm
Sewer
Improvements
Project PHIII
(130,454.79)
38000 - Storm
Sewers
B-30776 - Silver 130,454.79 38000 - Award 1379 -
Bluff Drainage Storm Sewers Street Bonds
Improvements - D4 Series 1
09/12/13
13-0335
B-50704 -
Fairlawn Storm
Sewer
Improvements
Project PHIII
(25,000.00)
38000 - Storm
Sewers
B-30964 -
Modification of
Speed humps on
SW 11 St. between
30 Ave and 31 Ct. -
na
25,000.00 36000 - Award 1584 -
Streets & Homeland
Sidewalks Defense Series
3 - CIP 311714
09/12/13
13-0335
277
THIS DOCUMENT IS A SUBSTITUTION
TO ORIGINAL. BACKUP ORIGINAL
CAN BE SEEN AT THE END OF THIS DOCUMENT.
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-50704 -
Fairlawn Storm
Sewer
Improvements
Project PHIII
(50,000.00)
38000 - Storm
Sewers
B-30779 - SW 2nd 50,000.00 36000 - Award 1584 -
Street and SW 40th Streets & Homeland
Avenue Traffic Sidewalks Defense Series
Circle - D4 3 - CIP 311714
09/12/13
13-0335
B-50704 -
Fairlawn Storm
Sewer
Improvements
Project PHIII
(10,000.00)
38000 - Storm
Sewers
B-30778 - Traffic 10,000.00 36000 - Award 1584 -
Circle - SW 18th Streets & Homeland
Ave & SW 13th St. - Sidewalks Defense Series
D4 3 - CIP 311714
09/12/13
13-0335
B-50704 -
Fairlawn Storm
Sewer
Improvements
Project PHIII
(10,000.00)
38000 - Storm
Sewers
B-50706A - 10,000.00 38000 - Award 1584 -
Roadway, Drainage Storm Sewers Homeland
& Traffic Defense Series
Improvements - D4 3 - CIP 311714
09/12/13
13-0335
B-50704 -
Fairlawn Storm
Sewer
Improvements
Project PHIII
(50,000.00)
38000 - Storm
Sewers
B-30960 - La 50,000.00 36000 - Award 1584 -
Pastorita Traffic Streets & Homeland
Calming and Sidewalks Defense Series
Miscellaneous 3 - CIP 311714
Improvements - D4
09/12/13
13-0335
B-50704 -
Fairlawn Storm
Sewer
Improvements
Project PHIII
(53,000.00)
38000 - Storm
Sewers
B-30965 - Coral 53,000.00 36000 - Award 1584 -
Gate Speed Humps - Streets & Homeland
D4 Sidewalks Defense Series
3 - CIP 311714
09/12/13
13-0335
B-35907 -
Athalie Range
Park Soccer /
Football Field
Improvements -
f1S
(42,528.41)
35000 - Parks
and Recreation
B-30671 - 42,528.41 35000 - Parks Award 1496 -
Caribbean and Sunshine State
Marketplace Recreation Government
Renovation D5 Financing
Commission
I nan i7
09/12/13
13-0335
B-75991A -
Williams Park
Community
Building - 5
(30,000.00)
35000 - Parks
and Recreation
B-30671 - 30,000.00 35000 - Parks Award 1496 -
Caribbean and Sunshine State
Marketplace Recreation Government
Renovation D5 Financing
Commission
I nan It?
09/12/13
13-0335
B-60464 - New
Dinner Key
Marina
Dockmaster
Building
(6,569.42)
34000 - Public
Facilities
B-30325 - 6,569.42 34000 - Award 1496 -
Miamarina Public Sunshine State
Emergency Pier Facilities Government
Repairs Financing
Commission
I man it 7 _
09/12/13
13-0335
B-30999 -
Citywide FEMA
Tree Funding
Account
(215,943.00)
33000 -
Disaster
Recovery
B-30538T - Museum 215,943.00 33000 - TBD Award -
Park - FEMA Tree Disaster FEMA Tree
Funding Component Recovery Funding
09/12/13
13-0335
(20,941,802.86)
20,941,802.86
278
SUBSTITUTED
Fiscal Year
2013-2014
City of Miami Capital Plan
City of Miami Capital
Improvements and
Transportation Program
OCTOBER 24, 2013
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
CAPITAL BUDGET MESSAGE
CITY of MIAMI, FLORIDA
Tomas P. Regalado Johnny Martinez, PE
Mayor Chief Administrator / City Manager
On behalf of our colleagues on the City Commission together with the City Administration, we are pleased
to present the 2013-2014 Capital Improvements Program and Multi -Year Capital Plan — the CIP.
As Miami plans for the future, we conti e to utilize a capital planning process that gives City government
an effective, service and result -oriented pr. tram to focus on meeting the needs of our citizens, as well as
positioning the City for future growth. This , IP outlines the City's current and proposed capital
improvement program for the upcoming year t . the year 2019. The preservation, management and
utilization of these significant capital resources t our CIP, both physical and fiscal, are the foundation on
which we build the Miami of today and of the futu
Under the guidance of Miami's elected officials, capita mprovements are based on core planning
principles, preservation of assets and customer service ne i s. The plan demonstrates the City's renewed
commitment to positively impact the lives and well-being o is residents and visitors by improving,
enhancing or expanding the streets on which we travel, the pa s on which we walk, the parks where we
play, the arts and social facilities to support our culture, the fire .,• d police facilities that keep us safe, and
the infrastructure that maintains our environment.
The City Administration has set up a team of well -qualified engineers, . chitects, construction managers,
and financial managers in the Department of Capital Improvements. The administer, manage and
implement our capital and transportation programs, with all City Departme ' s playing integral roles. It is
the Departments mission to implement the capital program in the most efficie , expedient and cost
effective manner possible.
Miami's CIP has been developed to best address all of the currently identified needs the City within the
limitations of the available funding revenues. Capital projects are organized by fund a d programmed for
the current fiscal year and into the next five years. Revenue has been analyzed and proje ed for future
years, then assigned to those projects and needs that take precedence. The CIP by nature i' a dynamic,
evolving document that will continually be refined as each of the projects within the program
advances. This most likely will include projects moving in and out of the years in which they a
programmed, as well as the introduction of new projects and possibly the modification or elimina .n of
others. As City priorities, project scopes of work, cost estimates and production schedules are adva ed,
the CIP will be modified to reflect any necessary changes. It is in this context that we respectfully reqest
your approval of the CIP presented before you.
CITY OF MIAMI
City Commiss .n
Chairman: M. Sarn
Vice -Chairman: W. Gor
Commissioner: F. Carollo
Commissioner: M. Spence-Jone
Commissioner: F. Suarez
City Attorney
Julie O. Bru
Auditor General
Theodore Guba
City Clerk
Todd Hannon
Other Agencies
Bayfront Park
Management Trust
Civil Service Board
Civilian
Investigative Panel
Community
Redevelopment
Agency
TABLE OF ORGANIZATION
Residents of Miami
Tomas P. Regalado
Executive Mayor
Assistant City Man
Chief Financial Offi -r
Finance
er /
Procurement
Risk Management
1
Management
and Budget'
Office of International
Business Development
1
Assistant City Manager/
Chief of Infrastructure
Building
iCIP & .nsportation
i
Informati
Technology
Planning & Zoning
{
1
Public Facilities
Public Works
Downtown
Development
Authority
Miami Parking
Authority
Fire Fighter's & Police
Officer's Retirement
Trust
General Employees &
Sanitation Employees'
Retirement Trust
,
Miami Sports &
Exhibition Authority
Virginia Key Beach Park
Trust
Liberty CityTrust
Johnny Martinez
Chief Administrator / City Manager
Assistant City Manager/
Chief of Operations
,
Code Enforcement
1
{
{
{
Community
Development
Grants
Administration
GSA
NET
Parks & ' creation
Solid Waste
1
Fire -Rescue
Police
}
}
Communications
EODP
e
}
Human Resources
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
TABLE OF CONTENTS
REFACE
pital Budget Message
Ta e of Organization
How ,• Read this Document
1. INTR ► DUCTION
Purp c e 1
CIP De elopment Process 1
Prioritiza on Criteria 2
Capital Pla Framework 3
2013-2014 . ti-Year Capital Plan Program Overview 4
2. HIGHLIGHTS
Highlights by Fund 7
3. FUNDING OVERVIEW
Funding Sources 21
Funded, Partially Funded an• Unfunded 23
Section Reports:
1-Funding Type by Job 25
2-Fund by Cost Component and Fun. I Source 49
3-Cost Estimates vs. Available Funding_ 67
4-Funded Proportion by Department/Job mber 99
4. OPERATING IMPACT
Operating Impact Summary 129
Section Reports:
1-Public Works Department Summary and Detail 132
2- Public Facilities Department Summary and Detail 145
5. CAPITAL PLAN FY2013-2014 APPROPRIATIONS
Purpose 149
Section Reports:
1-FY2013-2014 Capital Plan - New Appropriations to Projects 151
2-FY2013-2014 Capital Plan - Projects Appropriations Transfers 155
APPENDIX
1-Alphabetical Project Index 159
2-Capital Improvements Program Current Projects Cost to Date by Fund 187
3-List of Completed Projects in FY2012-2013 219
4-List of Initiated Projects in FY2012-2013 5
5-Capital Projects New Appropriations FY2012-2013 2
6-Capital Projects Appropriations Transfers FY2012-2013 273
Cite iutivie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
. INTRODUCTION
tne, Cite sutteie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
SUBSTITUTED
The Multi -Year Capital
regarding long-range physi
capital or "in -kind "expendit
fixed assets in the form of land,
equipment with a life expectancy
six years, updated annually to add n
with the first year of the plan being th
The Capital Budget
Miami's Capital Budget is distinct from the
authorization to spend, during the first year of
and is adopted separately from the six year plan b
Budget authorizes capital expenditures while the 0
employee salaries and the purchase of supplies and s
INTRODUCTION
Purpose of the Capital Improvement Plan
(the Capital Improvement Plan or CIP) is an official statement of public policy
1 development in the City of Miami. A capital improvement is defined as a
e of $5,000 or more, resulting in the acquisition, improvement or addition to
uildings or improvements, more or less permanent in character, and durable
at least three years. The Capital Plan is a proposed funding schedule for
projects, reevaluate project priorities and revise recommendations,
Capital Budget.
erating Budget. The Capital Budget represents a legal
e plan, funds from Federal, State and various other sources
means of an appropriations resolution. The Capital
rating Budget authorizes the expenditure of funds for
11 equipment. Capital projects can have an impact on
the operating budget through additional costs, revenues
Legal Authority
Legal requirements for preparing Miami's Capital Plan are set
Miami Code. A capital improvement programming process to s
by the Local Government Comprehensive Planning and Land Dev
particularly, Section 163.3177, Florida Statutes (2012). Further, the
18/Article IX/Divisions 1 and 2 of the Code of the City of Miami, Flori
requires the development and approval of a multi -year capital plan.
CIP Development Process
cost savings.
orth in the Florida Statutes and the City of
ort the Comprehensive Plan is required
pment Regulation Act, more
ancial Integrity Ordinance, Chapter
, as amended ("City Code"),
The 2013-2014 Multi -Year Capital Plan is an update to the 2012-2013 Multi -Year Ca. tal Plan which was
approved by the City Commission on December 13, 2012 via Resolution R-12-0498. e new FY13-14 Plan
contains the same fund and program framework and project priorities as the prior Plan, bu ncorporates
allocations for funding sources becoming available in FY2014. The primary focus of the Capital
Improvements Program Office since the approval of the previous Plan has been the continued anagement
of ongoing projects, initiation of previously approved projects, and coordination with the Financ Team to
identify and secure financing opportunities.
The goals and objectives of the plan are as follows:
1
SUBSTITUTED
Provide Excellent Recreational, Educational & Cultural
Programs — through frequent communication with the Parks and
Recreation Department, continued implementation of high -
priority parks capital projects based on the needs of the residents.
Restore, Mainta - & Beautify Residential & Urban Infrastructure —
continued manage -nt of ongoing construction and design for street, traffic
calming, bicycle faci ies, pedestrian walkways/greenways and drainage
projects identified as to .riorities through resident, elected official input and
studies developed by the ►-partments of Public Works and Capital
Improvements.
Sy ems for Future Growth — The Transportation section of the Capital
Imprc vements and Transportation Program, through capital funding, have
develo . - d the Miami Trolley Program which began with the launch of the
Health D trict, Health District/Stadium Route in March 2012. Immediately
after, the Cilaunched the Brickell/Biscayne Trolley route which provides
downtown Mi mi with an alternate transportation mode through the central
business and the mancial districts. During summer 2012, the Overtown-
Health District Ro e was launched connecting residential neighborhoods to
major employment cters. Furthermore, the City launched an additional
route that further exp. . s the transit network to the west, connecting
downtown Miami to the -tail district along NW 20th Street. On October 4,
2013, the final planned route was implante. connecting Coral Gables with the City of Miami
via a trolley route that will runs along Coral Way and connes to Downtown Miami and the Port of Miami.
The Miami Trolley System is already the largest and most co .rehensive municipal transportation system in
Miami -Dade County, providing businesses, residents and visitorwith a quality transportation network for
moving around the City's core employment centers.
Provide Excellent Public Safety — through frequent communication
with the Miami Police and Fire -Rescue Departments, continue to
implement significant public safety projects including the acquisition
of Police Swat Vehicles and the construction of Fire Station No. 13.
Improve Business and Service Delivery Processes — utilize
resources made available through the Capital Program Support
Services contract to develop project scopes and estimates,
and facilitate progress of the Multi -Year Capital Plan.
Further, the Capital Improvements Program Office seeks
opportunities to develop alternate contracting
methodologies, through pre -approved contracts with
industry professionals, to help expedite the large volume of
projects in the Capital Plan.
2
SUBSTITUTED
Prioritization Criteria
In a. • ition to the surveying of all of CIP's client departments to determine their capital project needs, CIP
uses a ierarchy of criteria to determine how projects are considered for funding on a yearly basis. Projects
with the i ighest rankings, or in the case of projects meeting more than one criterion, are given priority for
funding an. implementation. The criterion used is listed as follows in the order of priority:
Life/Safety- '1 ese projects are normally related to structural issues at City facilities and demand immediate
attention. They
re considered "emergency" projects as they are not always planned for or funded.
Legal Requireme - These projects are funded based on the need to comply with legally mandated
requirements set forth .y Federal, State and local governments. These types of projects may be required as a
result of binding settle -nts with other governmental agencies to meet current codes, ordinances or health
and safety issues. An ex. sle of these projects is a federal mandate to comply with ADA requirements
either citywide or at a partic ar park or facility.
Essential Improvements- The - types of projects demand funding for improvements necessary to the
functioning and/ or preservation o facilities or infrastructure. This criterion measures the extent to which a
facility or infrastructure has deterio ted and needs improvements relative to the overall condition of similar
structures. Bridge repairs, storm wate .nfrastructure improvements and repairs, and roadway resurfacing
highlight a variety of public works relat- i projects that would fall under this criterion. The majority of Street
Bonds -funded projects would fall under th .. category as the preservation and improvement of the existing
infrastructure is the overwhelming goal. Faci ty roof replacements, repairing of structural damage, and fire
station renovations and replacement are also e ples of essential facility improvements.
Quality of Life Improvements- Projects of this t le improve the overall quality of life for the residents of
Miami. Projects such as these would include traffic •.lming, streetscapes, fountains, parks, neighborhood
and entry signs, and landscaping.
Efficiency Improvements- This criterion measures those •rojects that when completed will increase
efficiency or result in overall cost savings to the city. Such p .oj ects may benefit a greater number of people
or more efficiently and effectively provide and support the de s ed functional requirements of the intended
use. Projects such as these include renovation to offices, layout o workspace within a building, planning or
zoning department where a smoother and more fluid processing o lans equates to time savings and
increased customer service.
Revenue Producing- These projects when completed would generate aitional revenues to the city.
Projects of this nature show an overall return on investments, and should b. measured on the risk involved.
The criterion measures the number of people who will benefit from the proje , both directly and indirectly,
and the associated costs versus revenues generated. Elements considered in the ating include the project type
and overall community needs. Such a project might include a new park with a co ' munity center and water
park.
Service Improvements- These types of projects demonstrate an increased delivery ca.ibility when
completed. This criterion measures the number of people served and the benefit derived om a project.
Replacements and renewals, which bring facilities up to acceptable standards and expand c...acity, such as a
marina expansion and renovation are illustrations of these types of projects.
Service/Space Expansion- These are projects which result in expansion of space to serve the ne: . s of the
community. Such projects, typically parks or public facilities, would include renovations, addition
expansions or new construction of recreation centers, fire stations, police facilities, theatres and cony: tion
centers.
3
SUBSTITUTED
Capital Plan Framework
The 013-2014 Multi -Year Capital Plan is structured into eleven (11) distinct funds or programs, some with
subca -Tories. With the exception of the Funding Type by Job report, all reports in the Plan follow this
program ramework. The programs are listed and described below.
O Co 'u munity Redevelopment Area (CRA): This program accounts for the acquisition or
cons' ction of major capital facilities and infrastructure for community redevelopment in the
define. ommunity Redevelopment Area.
1 General G b vernment Projects: This program consists of capital improvements, including
computers an communications, to the City of Miami's municipal office buildings and operations
facilities.
O Public Safety: The ' ublic Safety fund or program accounts for the acquisition of equipment or
construction of major cilities that support the operations of the Police and Fire -Rescue
Departments.
1 Disaster Recovery: This fu
Emergency Management Age
disasters which required measur
buildings and equipment, parks, m
is utilized to account for revenue received from the Federal
y (FEMA), insurance and other agencies resulting from declared
of relief in the areas of debris removal, roads and bridges,
nas, and stadiums.
1 Public Facilities: The Public Facilitie .rogram includes improvements to public use facilities such
as stadiums, auditoriums and marinas. ' is fund also accounts for capital funding for redevelopment
projects and historic preservation efforts.
O Parks and Recreation: This program account or the acquisition, rehabilitation or construction of
capital facilities for recreational activities. The C . of Miami's park system comprises over 100
parks.
O Streets and Sidewalks: The capital projects in the Stre s and Sidewalks program provide
reconstruction, major maintenance and beautification to ami's street system.
O Mass Transit: This program accounts for the acquisition of
uipment or construction of capital
facilities that support the maintenance and operation of public tr sportation systems.
O Sanitary Sewers: This program includes projects that will improve ' e City's existing sanitary
sewer system.
O Storm Sewers: The Storm Sewer program accounts for projects that resul •n improved drainage and
stormwater management throughout the City of Miami.
O Solid Waste: This program includes projects for the acquisition of equipment or onstruction of
facilities for the collection and removal of solid waste.
4
SUBSTITUTED
Projiram Overview
e total value of the six -year plan is $442 million, representing 625 projects (288 active and 337 future)
thrghout the various programs. The following graph shows that the Streets and Sidewalks program
acco its for the largest portion of the total Capital Plan funding at $155 million or 35.03%. The General
Govern ' ent, the second largest, accounts for $79 million or 17.97% of the overall Plan value. The Parks and
Recreatio the third largest, accounts for $76 million or 17.20% of the overall Plan value.
PROGRAM OVERVIEW BY FUND - $448 MILLION
Sanitary Sewers
$4,296,000
0.96%
Streets& Sid ewal
$160,106,947
35.70%
Solid Waste
$5,009,427
1.12%
Storm Sewers
$62,841,766
14.01%
Mass Transit.
$4,187,602
0.93%
General Government
$79,646,467
17.76%
Parks and Recreation
$75,941,989
16.93%
lilik
Disaster R- ... cry
Public Facilities $1,895,5
$15,371,919 O42%
3.43%
5
CRA projects
$9,593,000
2.14%
Public Safety- Fire
Rescue
$26,754,119
5.97%
Pub!' : Safety - Police
$2,791,763
0.62%
• General Government
■ CRA projects
■ Public Safety - Fire Rescue
• Public Safety - Police
• Parks and Recreation
■ Disaster Recovery
■ Public Facilities
■ MassTranst
■ Streets &Sidewelks
■ Sanitary Sewers
• Stor n Sewers
■ solid Waste
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
1tze &IL 1tze Yalu/re
6
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
2. HIGHLIGHTS
tree eilu, Cite iutivie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
HIGHLIGHTS
Highlifhts by Fund
The most significant project accompl hments of the hundreds of projects under development in CIP and
other City departments are highlighted i ' this section and grouped according to fund category. The
projects that are noted in this section are . -emed to be significant based on:
❑ Scale or magnitude and/or anticipated imp: ct to the community;
❑ High priority alignment with the City's Stra :ic Map;
❑ Accomplishment of a long standing need or ob -ctive; or,
❑ Representation of an innovative solution to a pro. em.
FUND 301 COMMUNITY REDEVELOPMENT AREA CRA)
Gibson Park New Construction Phase II — The project entails he construction of a new 22,700 SF
gymnasium building that shall consist of a Gymnasium area, men -strooms, women restrooms, kitchen
concession area, equipment storage area, classrooms, computers lab, ecreational space, electrical,
mechanical and janitor rooms. Project is currently under design with . estimated construction start date
of second quarter of 2014. Project Location: 350 NW 13 St.
Museum Park Baywalk and Promenade, Phases II and III — This p ect is being developed in
conjunction with the construction of the Art and Science Museum to provide World Class Park on the
Bay. Museum Park Baywalk phase includes the construction of a pedestrian wal ay along the bulkhead
which can be used for emergency access for fire trucks and other emergency ve cles. The Decorative
Walkway shall include associated site/civil, landscaping, irrigation, pedestrian am ities and lighting
work. The Promenade phase includes the construction of a grand
pedestrian walkway along the northern boundary of the park,
adjacent to the proposed Science and Art Museums, which can be
used for special events, emergency access to fire trucks and other
emergency vehicles. The work includes associated site/civil,
landscaping, irrigation and lighting. In addition, an asphalt
parking lot for approximately 40 cars will be constructed along
with a restroom facility. Project is currently under construction
with an expected completion time of winter 2013.
7
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Miami Women's Club Baywalk Project — Project involves a new seawall in front of the Miami
oman's Club to include new Baywalk sidewalk, pedestrian lighting and other amenities. Project is
d igned and permited ready for BID, with an expected construction start date of first quarter 2014. :
Pro -ct is located on 1737 North Bayshore Drive - Baywalk at the east end of the Women's Club property
IIOld Fire Station No. 2 Restoration — Design and
construction to rehabilitate and restore the old Fire
Station No. 2, a historic 1926 two story CBS
structure approximately 10,500 SF (5,250 SF per
floor). The work includes selective demolition,
It, environmental cleanup, construction of new
IIi structural and roof systems, second floor, all new
MEP including HVAC, new restrooms on both
ty.
'' floors, restoration and installation of historical
elements, exterior site work, ADA and code
4 upgrades and related work. Design will be done in
three phases. Ph. 1: Condition Assessment Report &
Recommendations. Ph. 2: Design & Construction
for strengthening of the structural systems and new
roof. Ph. 3: Design and Construction o daptive re -use. Project is completed. Project location: 1401
North Miami Avenue.
FUND 311 GENERAL GOVERNMENT IM' ' OVEMENTS
City Hall Window Replacement — Replacement o i 11 window and store fronts at City Hall with new
impact resistant window. Project is currently under co .truction and is expected to be completed by
winter 2013
City Hall Roof Terrace — Removal of second floor roof tern, e floor tiles and installation of new Sika
Sarnafil roof system and new tiles. Project is currently under co ' struction and expected to be completed
by the end of 2013.
Public Works Maintenance Yard — The project consists of assessin_ .n existing building including
recommendations for site remodeling or demolition and, the design and nstruction of a new Public
Works Maintenance Yard to include field offices, locker rooms, a kitchen- e, storage and related spaces.
The site work will include parking, and outdoor storage under the I-95 right- c -way. Project is currently
under design. Project Location: 551 NW 71 Street; 7142 NW 5th Court; 7148 5th Court.
Damaged Vehicle Replacement and Repair (GSA) — Replacement or repairs to icles damaged by
collision or other events. Project Location: Citywide
Citywide General Fleet Replacement — Replacement of general fleet vehicles. Project Location:
Citywide
MRC Security System Hardening — Design of a state of the art Security system at the Miami ': verside
Center which includes incorporating the existing security system equipment in the main building p. king
garage into the new system and any and all necessary components for the system to operate at maxi m
efficiency. The design of the project is currently funded, future funds to be identified for the construct n
of the project. Project Location: 444 SW 2nd Avenue.
8
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
GSA Fleet Maintenance Garage Expansion — Acquisition and installation of an additional vehicle lift,
heel balancing machine and other items that will help expanding the capabilities to service the City's
t vehicles. Project Location: 1390 N.W. 20 Street.
Communa R tions/Technology:
IT Moderni . , tion — The City continues the most far reaching technology modernization effort in its
history. Legac business systems are being replaced with new software applications offering modern
technical designs o enable best business practices. The internet, high bandwidth and wireless
telecommunication, t eographic information systems, business intelligence databases, and modern desktop
and server hardware the foundation for a reliable, agile, technology infrastructure.
Two major modernization -fforts were the focal point of the Information Technology Department:
iMiami ERP system includi Oracle R12 upgrade and the Land Management System, each contribute
directly to the accomplishmen •f City's strategic objectives.
Oracle R12 brings the latest versio of the financials and human resources systems to the city along with
improvements in business processes . s d computer processing speed. In addition, the team launched the
implementation of Hyperion Budget an. Planning system as well as Oracle Business Intelligence
applications.
FUND 312 PUBLIC SAFETY
Police:
Police Vehicles Replacement — Project Location: City , ide
Police Swat Vehicles — Project Location: Citywide
Police Headquarters Helipad and Roof Replacement — The
approved rooftop helipad available to first respondent in the down
critical should a large scale catastrophic event occur. The project co
withstand hurricane winds and upgrading the current helipad by elevat
supported by columns that would tie into the existing support columns o
design and expected to start construction by winter 2013. Project Location:
ty
of Miami Helipad is the only FAA
wn area and, as such, it would be
ists of upgrading the current roof to
g it 2 feet above the roof
he building. Project is fully
00 NW 2 Avenue.
Fire:
Firefighting Equipment — SAFER — Capital purchase of large equipment
that needs to be replaced as it wears out or gets damaged. This includes
generators, hydraulic tools, fans, etc. Project Location: Citywide
Fire Rescue Personal Protective Equipment — The department of
Federal Emergency Management Agency (FEMA), US Department of
Homeland Security, Grants Management Branch, has awarded the
"Assistance to Firefighters Grant Award for Fiscal Year 2010" to the
City of Miami Department of Fire -Rescue. The grant is going to assist
the Department of Fire -Rescue in purchasing Personal Protective
Equipment. Project Location: Citywide
9
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fire Stations Generator Replacements — Replacement of existing standby generator at fire stations 1, 6,
and 9. Project has been designed and advertised for construction with an anticipated construction start
e of January 2014.
Fire Station 13 — Design and construction of a New Fire Station facility of
approximately 11,105 square feet Gross Area. The building shall be a one
story, two bay apparatus fire rescue facility. The facility shall include all
typical fire station amenities for fire rescue personnel. The project also
includes site development such as parking spaces as per zoning
requirements, landscaping, water main improvement, street signalization and
seek LEED Silver Certification. The Project is currently under construction
with an estimated construction completion date of winter 2013. Project
Location: 958-960-990 NE 79 Street.
Fire Station 14 — Design o . 10,000 SF two-story fire rescue facility on a portion of a public park. The
facility will include bays for • r trucks, dormitories, offices, a recreation room, kitchen and
miscellaneous support spaces. D. olition includes the removal of the existing fire station trailer, related
utilities, and select street trees, pos *ble relocation of electrical mains and sanitary force main. The site
work will include the addition of a p king lot, service apron, new curb cuts and signalization. As part of
the enhancement of the surrounding pa , a mini -soccer field will be added. Project is currently under
design and construction will commence i late 2014: Project location 1800 SW 21st Ave.
Replace Existing Fire Apparatus — Replace ire Apparatus on a rotational Basis
FUND 325 PUBLIC FACILITIES
New Dinner Key Marina Dockmaster Building — Demolition of existing dockmaster building and
Design and Construction of a LEED certified New Dockmaster Facility of approx. 11,296 Sq.Ft. (Gross
Area) with a new outdoor plaza of approximately 10,000 SF Dinner Key Marina. The new facility is a
three story building to serve as the Dinner Key Marina and Har►.•master's (Mooring) administration
building. Project is currently under construction with an anticipat- construction completion date of
winter 2014, Project Location: 3400 Pan American Drive.
James L. Knight Center Chiller & Cooling Tower — This project con ists of
removing and replacing four Chillers and all related pumps, piping and
electrical work at the James L. Knight Center. The
project also includes the Demolition of the existing
cooling tower and replacing it with new cooling tower
assembly. Project has been completed and it is currently
in use. . Project Location: 400 SE 2nd Avenue.
FUND 331 PARKS AND RECREATION
Bay of Pigs Park Lighting — design and construction of new lighting system within the park. Prect has
been design and it is currently release for construction with an estimated completion dates of first i . arter
of 2014.
Coral Way NET Office Remodeling/Communit
Center — Design and remodeling of an existing
10
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
building into a new Community Center. Project includes Multipurpose spaces, a computer lab, offices, a
reak room, restrooms and support spaces. Site modifications include demolition of an existing residential
b .Iding, three new play structures on a new playground, and a new parking lot. Project is currently under
con ruction with an estimated completion date of June 2014. Project Location: 1300 SW 12th Avenue.
Bryan ' , rk Community Building — Demolition of the 600 SF Comfort Station and construction of a
1,500 SF mmunity building. Project scope will also include upgrading the Miami -Dade Water and
Sewer utilit Ines in the vicinity of the park. Project is designed and currently under permit review.
Project Locati• • : 2240 SW 12 Street.
Melreese Golf ining Center — The Melreese Golf
Training Center ( st Tee Academy) will be located
adjacent to the existing . ractice range and new clubhouse. It
will be used primarily as
facility will have approxim
include a large assembly/cl
bays facing the practice range,
restrooms, a kitchenette, a vendin
the existing practice range and conn
will be certified LEED Silver. Project
instructional golf facility. The
tely 5000 square feet and will
sroom area, three enclosed
two offices, storage area,
rea and support spaces. It will also have a pre -fabricated canopy over
cting walkways to the new clubhouse and parking lot. The facility
I complete. Project Location: 1802 NW 37th Avenue.
Caribbean
demolition and
with kiosks to sel
plumbing, ventilatio
Construction with an
Project Location: 5925-
rketplace Renovation — Project consists of the interior
novation of the marketplace to create an open air market
oods to the public. The repairs will include new
and electrical systems. The Project is currently under
ticipated completion date of December 2013.
NE 2nd Avenue.
Lummus Landing Square The project entails the design and
construction of a new restroom/storage building and three pa lions as improvements to Lummus Landing
Square property. The one story facility will be approximately 2, 00 SF Gross Area. Also, the
improvements will include landscape and hardscape. The project currently under design phase. Project
Location: 250 NW North River Drive and 176 NW North River Dn , e.
Hadley Park New Youth Center — This project consists of furnishing •' all labor, materials and
equipment for the design and construction of a new youth center structure . approximately 23,000 square
feet. The building will include an indoor basketball court, an exercise room .th adjacent lockers and
restrooms, classrooms, meeting rooms, computer room, office spaces and stora_e. The building
lobby/reception area will interconnect with a new covered drop-off area that will but a cultural plaza.
Other park improvements include a covered entry/drop-off for the existing Senior -nter building and
improvements at the Carrie Meek Center. ADA reconstruction of parking areas of rec ation building and
field Parking lot, pavement marking, signage and ADA concrete ramps. Design is comp -te and
permitted. Project has been advertised and construction bids are currently under evaluatio Project has a
potential funding shortfall for construction. Project Location: 1300 NW 50th Street.
Moore Park New Construction — Project consists of a design criteria package and design/buil• ervices
for a new 15,000 S.F. community building center that will incorporate office, classroom and recreaonal
spaces and site improvements that will synergize with the existing tennis center and playfields. The
project will also include a new daycare center of approximately 3,000 S.F, a new driveway with parkin
spaces and drainage system and a new open park area/community gathering space. Project is designed,
11
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
permitted and under construction with an estimated construction completion date of December 2013. .
roject Location: 3600 NW 7th Avenue.
Af an Square Park - Splash Park — The project consists of the design and construction of a new
Splas Park. Project includes: partial regrading to maintain existing amphitheater; creating a new
interacts e water playground in an approximately 2400 SF paved area; enclosing splash park area with a
48" high s,-el fence; extending electric and water utilities to splash park area; demolishing existing
restrooms . creating new accessible restrooms; providing accessible route to splash park; preserving
existing large ' -es and introducing new landscaping; renovating and painting exteriors of neighboring
electrical room a d entry feature. Project is currently in pre -design phase. Project Location: 1400 NW
62nd Street.
West End Park Com nity Building — The scope of work is the design and construction of a new
community building of approximately 6,600 G.S.F. consisting of multipurpose rooms, fitness room, art
and craft room, computer room, break room and restrooms. In addition, the project shall construct a
permanent canopy over the ex .ting picnic area, and ADA improvements in the park. The City recently
entered into an inter -local agree ' ent with Miami -Dade County receiving GOB to supplement funding.
Project Location: 6030 SW 2nd St -et also known as 250 SW 60th Avenue.
FUND 341 STREETS AND SIDEWA
Grove BID Sidewalk Improvements — Mar • Virginia, FLORIDA, Commodore, & Fuller -
Replacement of existing sidewalk pavers. Proje • is 100% design and permitted for all streets.
Construction is currently underway in Florida Stre t and Mary Street with an expected completion date of
fall 2013.
Tamiami Blvd. & 72nd St. Circle _The scope of work the design and construction of a traffic circle
at the intersection of Tamiami Blvd and NW 72nd Ave. Pro -ct is design and permitted. A construction
contractor has been selected and construction is expected to s,.rt by fall 2013.
Tamiami Canal Rd. & 6th St. Circle _The scope of work is the
circle at the intersection of Tamiami Canal and NW 6t'' street. Proje
construction contractor has been selected and construction is expecte
esign and construction of a traffic
is design and permitted. A
o start by fall 2013.
Citywide Bicycle Rack & Signage Program — Installation of bicycle faci
markings, shared use lane markings, bicycle signage, and bicycle racks thro
currently Phase 1 ARRA grant is in punch list close-out and Phase 2 non -A
Location: Citywide.
ties including bicycle lane
hout the City. Project is
is in design. Project
Health District Bicycle and Pedestrian Mobility Study — Bicycle Pedestrian Mobi Study will
examine the issues related to improving bicycle and pedestrian opportunities in the Hea District. The
project will include coordination with the stakeholders in the area, and create a plan for i 'rovements.
Project is completed. Project Location: I-95 on the East, NW 17th Ave on the West, NW 21 St on the
North, SR 836 on the South.
Citywide Sidewalk Repair Project (PW) — Sidewalk and curb and gutter replacement citywide.
Additional funds were recently identified in order to procure and award contract in 2013. Project
Location: Citywide.
12
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Beacom Project Area Improvements — Roadway restoration including milling and resurfacing of
xisting pavement, new curb and gutter along EOP with miscellaneous drainage improvements as needed.
ject is currently under construct with estimated completion date of fall 2013. Project Location:
Bet een SW 22nd Avenue and Beacom Blvd.: SW 2nd Street, SW 2nd Terrace, SW 3rd Street and SW
4th S et.
Beacom ' ase II — Roadway restoration including milling and resurfacing of existing pavement, new
curb and gu .-r along EOP with miscellaneous drainage improvements as needed. Where there is parking
in swale areas, .ropose swale block and provide ADA ramps at curb returns. Project is designed and
permitted. Const ' ction start date is anticipated for summer 2014. Project Location: Area generally
bounded by SW 1 treet to the North, SW 27th Avenue to the west and Beacom Boulevard to the East
and South.
Miami River Greenway th Street Bridge Extension — The design will follow the Miami River
Greenways Design Guideli s already established and adopted for the previous segments. Construction
will include but not limited to. mprovements to the existing drainage system where needed, new roadway
pavement, new curb and gutter, ew sidewalks, new decorative street and pedestrian lighting, new
benches and trash receptacles, ne andscaping and tree planting as well as the required directional and
informational signage and hardscape. Project is currently under construction with an anticipated
construction completion date of fall20' .. Project Location: NW 12 Avenue to NW 10 Avenue along
NW South River Drive, NW 11 Avenue i -tween NW South River Drive and NW 7 Street, and along NW
7 Street between NW 11 Avenue and NW 1 Avenue.
Miami River Greenway from NW loth Aven e to NW 12th Avenue — The design will follow the
Miami River Greenways Design Guidelines alreas established and adopted for the previous segments.
Construction will include but not limited to: improv: ents to the existing drainage system where needed,
new roadway pavement, new curb and gutter, new sid alks, new decorative street and pedestrian
lighting, new benches and trash receptacles, new landscaping and tree planting as well as the required
directional and informational signage and hardscape. Proje: is currently under construction with an
anticipated construction completion date of fall 2103. Projec ocation: NW South River Drive from NW
10 Avenue to the NW 12 Avenue Bridge, In addition, this proje t will complete the missing segment of
greenway along NW North River Drive directly in front of the Lu ' mus Park.
Bird Avenue Road Improvement — Project consists of Street beauti ation including milling and
resurfacing, designated bike lanes in each direction, ADA compliant sidewalks, landscaping within the
project limits, and drainage improvements as necessary. Project Location: Bird Avenue from US1 to SW
27 Avenue, Bird Avenue from US 1 to Aviation Avenue, Allamanda St. & • , k Avenue, Bird Avenue
from US1 to Aviation Avenue and along McDonald Street from US1 to Jackso • Avenue Project is
currently under design with an anticipated construction start date of first quarter 114.
Brickell Area Shared Use Path and Roadway Improvements — Brickell Ave lights
median landscape improvements, sidewalk/path improvements and art in public places.
designed and it is currently under construction. Project Location: Brickell Ave from SE
26th Rd.
improvements,
roject is
1'' Rd to SE
Center Grove Street and Lighting Improvements — The des ;t n and
installation of decorative street lighting; the repair of broke and
displaced sidewalks and the addition of ADA compliant accessu e
ramps as required. In addition, Mary Street will receive ne
sidewalks in sections where none currently exists contingent upon
13
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
adjacent property owner frontage dedications. Project is currently under design. Project location: Phase I -
orth Day Avenue - Oak Avenue and Virginia Street to SW 27th Avenue. Phase II - Virginia to
Donald from Day Avenue to Bird Avenue.
Miam• River Greenway SW 1st Court to South Miami Avenue — Work involves road improvements
includin but not limited to reconstruction of streets, including new sidewalks, new drainage, striping,
signage, 1. dscaping, hardscape, decorative street and pedestrian lighting, and ADA ramps based on the
Miami Rive reenways Master Plan. Project is currently under construction. Project Location: South
Miami Avenue ' d from SW 1st Court to South Miami Avenue.
Miami River Gre way from Miami Circle Greenway to South Miami Avenue — The Scope of Work
involves road improv ents including, but not limited to reconstruction of roads, including new
sidewalks, drainage, st .ing, signage, landscaping, hardscape, decorative street lighting, and ADA ramps
based on the Miami Rive reenways Master Plan. Project is currently in design. Project Location: Area
bounded by SE 5th St from Miami to Brickell Ave and SE lth Ave from SE 6th St to Miami River.
NW llth Street Roadway Imp s vement Project — The Scope of Work involves the milling and
resurfacing of the existing asphalt ► , vement, the replacement of associated pavement markings and
damaged sidewalk replacement if ne- .ed. Project construction is complete. Project Location: NW l lth
Street from NW 27th Avenue to NW 4 d Avenue.
NW 14 Avenue and 28 Street Area Road ay Improvements — Milling and resurfacing, swale
restoration, drainage improvements, minor cu . and sidewalk repairs, and restriping as needed. The
project is currently under construction with an e imated construction completion date of first quarter
2014. Project Location: NW 14th Ave from NW :th St to 30th St; NW 28th St from NW 12th Ave to
17th Ave; NW 14th Ave from NW 20th St to 21 st S NW l lth Ave from NW 21 st St to 22nd St.
NW 18th Avenue Roadway Improvement Project — ling and resurfacing, swale restoration,
drainage improvements, minor curb and sidewalk repairs, is D A modification and striping as needed. The
design phase is complete; project is currently under construct •n. Project Location: Area bounded by NW
19th Terrace, NW 15th Street, NW 17th Avenue, and NW 19th venue.
NW 33rd Street Roadway Improvement Project — Milling and re . rfacing, swale restoration, drainage
improvements, minor curb and sidewalk repairs, ADA modification a . striping as needed. Project is
100% designed. We are currently waiting for MD WASD to complete a ater main system betterment in
the area before we start construction. Project Location: Area bounded by 12th Avenue, NW 17th
Avenue, NW 36th Street and NW 30th Street.
NW 9th Street Roadway Improvement Project — The Scope of Work involves . e milling and
resurfacing of the existing asphalt pavement, the replacement of associated paveme markings and
damaged sidewalk replacement if needed. Project construction is complete. Project L. ation: NW 9th
Street from NW 22nd Ct to NW 28th Avenue; NW 22nd Ct to NW 28th Avenue betwee ' NW 7th St and
NW l lth Street; NW 23rd Ct between NW l lth Street and NW 7th Street; NW 25th Avene between
NW 1 lth Street and NW 7th Street.
SW 19th Terrace Improvements (SW 23 Avenue to SW 24th Avenue) Partially funded by 1 BG —
The scope of work consists of improvements of the street (re -construct and milling and resurfacing, The
work also includes improvements of existing curbs, sidewalks, driveways, ADA ramps, some draina:- as
required and landscaping. Project is construction is complete. Project Location: SW 19th Terrace betwez
SW 22nd Avenue and SW 27th Avenue.
14
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Traffic Calming SW 6th Street Project — The Scope of Work involves the design of two (2) traffic
aiming devices. The improvements consist of milling and resurfacing within the improvement area,
A ramps, curbs, signing, pavements markings, landscaping and drainage, if necessary. Project
con ruction is complete. Project Location: SW 6th Street & SW 39th Avenue -SW 6th Street & SW 39th
Court.
NW 12 A • nue / NW 12 Place Roadway Improvements — Development of a Linear Park with new
sidewalk laiv scaping, hardscape and benches. Project is currently under construction with an anticipated
construction c• pletion date of second quarter 2014. Project Location: West side of NW 12th Ave
between NW 62 • street and NW 71 st Street.
Overtown Greenwa @ NW 11 Terrace - Partially Funded by CRA — The scope includes the design
and construction of urb.. pathways, decorative lighting, landscaping and ancillary site improvements to
the NW 1 lth Terrace and ormer FEC Railway corridor. This project is a phase of the Overtown
Greenprint Plan. The projec is currently under design. Project Location: NW 1 lth Terrace between NW
2rd Avenue and NW 7th Ave e.
NE 2 Avenue Improvements — 'rovide all project management and engineering analysis and design
services necessary for preparing co truction documents for the reconstruction of NE 2nd Avenue from
NE 20th Street to NE 84th Street. The . oject length is approximately
4.1 miles. The scope of work includes r• , dway reconstruction, storm
water system, curb and gutter, concret sidewalk, signing and
pavement markings, decorative lighting, sign lization and landscape.
Segment B 1 (NE 36 Street to NE 42 Street) is ompleted, Segments
B2 (NE 51 Street to NE 57 Street) is complete egment C (NE 57
Street to NE 69 Street) is complete Segments A . 20 Street to NE
36 Street), B3 (NE 42 Street to NE 51 Street) and D E 69 Street to
NE 84 Street) are currently under design.
FUND 352 STORM SEWERS
Rockerman Canal Improvements _Phase I of this project includes e dredging of the western half of
the canal. This phase is complete. Phase II of the project includes the re oration of the south shoreline of
the canal at the park's sides. Work includes the stabilization of shoreline v . the installation of new riprap
and the planting of new mangroves. Project is fully designed all environmen -1 permits (MD-DERM,
ACOE, FDEP) are secured. Project has been advertise for construction and a c tractor has been selected.
Construction is anticipated to start in the fall of 2013.
Durham Terrace Drainage Project — The design and construction of a stormwater • ainage system to
mitigate severe flooding in the area. Milling and resurfacing of the roadway pavement ill be performed.
Swales will be reworked and regraded to comply with Public Works Bulletin #28 and ne andscaping
and trees will be added. Broken sidewalks will be replaced, as well as new ADA compliant ►-destrian
ramps will be constructed. Project is construction is complete. Project Location: Area approxi ' ately
bounded by NW 7 Street, NW 3 Street, NW 38 Court and NW 42 Avenue.
Mary Brickell Village Drainage Improvements — To provide street improvements (Milling and
resurfacing) including drainage improvements, and limited roadside reconstruction at the following
locations: SW 9th Street from SW 1st Avenue to SE 1st Avenue (Brickell Plaza Drive), SW loth Street
from SW 1st Avenue to SE 1st Avenue(Brickell Plaza Drive), SW 1 lth Street from SW 1st Avenue to SE
15
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
1st Avenue(Brickell Plaza Drive), SW 12th Street from SW 1st Avenue to SE 1st Avenue(Brickell Plaza
rive), and Select Portions of SE 1st Avenue(Brickell Plaza Drive) between SW 9th Street and SW
1 _th Street. Project also consists of constructing a pump station at the intersection of SW loth Street and
S st Avenue; and connecting isolated drainage system located at the intersection of SW 10th Street
and iami Avenue to the existing drainage system located at mid -block on SW loth Street between
SW 1st venue and S Miami Avenue. Project is currently designed and permitted. Project has been
advertise. . d construction bids are under review.
Citywide Sto
to alleviate floo
Sewer Repair Project (PW) — Repair and installation of the storm sewer infrastructure
g at critical areas with the City boundaries. Project Location: Citywide
Garden Storm Sew - Phase I — Storm water and roadway improvements to the project area bounded
by NW 28th St, NW ' :th St, NW 22nd Ave. and NW 27th Ave. Project is designed and permitted.
Construction is expected • start in early 2014.
San Marco Island and Bi
improvements, roadway recons
for the islands. For San Marco
storm water pump station, injection
into Biscayne Bay are included in the
the initial number of drainage wells fr
temporary well for dewatering. The 5 sedi
proposed were changed to 5 Pollution Co
Biscayne Island- Decorative street lighting w
Venetian Drive on Biscayne Island, and pipe b
were included for the repairs of three (3) existing
Project is currently under construction with a
construction completion date of fall 2013. Project Loc
Marco and Biscayne Islands.
ayne Island Drainage Improvements — Project consists
ction and/or milling & resurfacing, striping, landscaping,
land, storm sewer system, a
ells, and outfall discharges
sign as well as increasing
2 to 3, and adding a
ntation tanks initially
rol Structures. For
added along N.
ting technique
utfall pipes.
estimated
ion: San
of drainage
and signage
Silver Bluff Drainage Improvements — Drainage improveme ' s. Project is designed. Project Location:
Area 1: SW 23rd Terrace to SW 25th Street from SW 27th Aven to SW 23rd Avenue; is currently
under construction, Area 2: SW 24th Terrace to SW 25th Terrace frc SW 22nd Avenue to SW 21st
Avenue; Area 3: SW 14th Street to SW 16th Terrace from SW 21st A enue to SW 18th Avenue.is
expected to be completed by summer 2014
Northwest Road and Storm Sewers Improvements — Design and construe ion of a storm sewer system
including: road improvements such as damaged sidewalk replacement, da ged curb and / or gutter
replacement, ADA compliant ramp construction, re -sod of swales, milling & esurfacing. The project
construction is complete. Project Location: Area generally bounded by NW 71s t, NW 7th Ave, NW
62nd St, and NW 12th Ave.
Kinloch Storm Sewer Improvements Project — This project consists of three parts:
(1) The General Development Report (GDR) to address flooding problems within the limits If the project.
This comprehensive report serves as a plan to design drainage systems to reduce floods' . in these
communities. It also identified contributing factors to the flooding conditions, evaluated feasible easures
to reduce flood stages, established drainage requirements, and provided specific recommenda : ons to
improve drainage conditions within the project limits. This phase of the project is completed.
(2) Phase I Design and Construction: consists of exfiltration trenches, manholes, inlets, cross drain
swale trenches, and surface restoration. This phase of the project is constructed.
16
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
3) Phase II Design and Construction: consists of a connection to an existing outfall, old exfiltration
tr ches will be replaced with new ones, manholes, inlets, swale trenches and surface restoration. This
phase of the project is complete
Road improvements for both phases include roadway
milling & resurfacing, ADA Ramps, damaged sidewalk
and curb and/or gutter replacement and swale restoration
on street blocks impacted by the drainage construction.
Project Location: Area bounded by SW/NW 42 Avenue,
SW/NW 47 Avenue, NW 7 Street, and SW 8 Street; and
NW 43rd Avenue from Flagler to 4th Terrace.
FUND 353 SOLID WAS'I' : S
Solid Waste Collection Equip ; nt Upgrade — This project included the acquisition of new Hybrid
Autocar Automated Side Loader, bbish Truck, Freightliner M2, and Commercial Grinder for Virginia
Key Composting Facility. Project Lo ation: Citywide.
Solid Waste Equipment Acquisition — e Solid Waste Department continues to purchase a large
variety of equipment, including Street Swe- Hers, Roll -Off Transfer Trucks, Litter Containers, Side Loader
Compactor Waste Collection Vehicles, and R r Load Waste Collection Vehicles. This new equipment
will improve the efficiency of garbage and trash sickup within the City as well as help insure a clean city
for our residents and visitors.
GRANT FUNDED TROLLEY PROGRAM
Miami Trolley Program — Operation and Maintenance —e City of Miami was awarded transit
service development program funds by the Florida Departmen •f Transportation (FDOT) for the
implementation of a municipal rubber -tire circulator. The state ds are intended to offset fifty percent
of the operating and maintenance costs associated with the first thr- - years of service. The City's match
originates from the transit portion of the half -cent transit surtax proce . s. The City of Miami launched its
inaugural routes of the Miami Trolley early 2012 with only two routes, . ealth District and Health
District/Stadium and continues to develop the program to a total of seven •utes. The following are the
implemented and/or proposed routes:
❑ Health District and Stadium Routes - Launched in March 2012
❑ Brickell and Biscayne Routes — Launched in April 2012
❑ Overtown Route — Launched in July 2012
❑ Allapattah Route — Launched in November 2012
❑ Coral Way Route — Scheduled for an October 2013 launch
The latest ridership estimates indicate a system wide average of 7,000 passengers on a typica eekday,
up from 3,500 passengers last year. All Trolleys are accessible to riders using wheelchairs and . e ADA
compliant. Furthermore, each vehicle can carry up to two bicycles to promote the use of a multimcdal
system. The Trolley provides the same high level of service to passengers with or without disabiliti- . and
is Free for all users.
17
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
outes were launched on
s approximately every
Monday through
am to 8:00
in May 2013 as
he eastern
ulevard
and the
ns
FAUN DISTRICT/ STADIUM MAP
Affairs Miami Medic
Palmer Eye Institute,
The Health District and Stadium routes began on March 1,
2012. The service runs approximately every 15 minutes from
6:30 am to 11 pm, Monday through Saturday, and on Sundays
when there is a special event at the Stadium. The Health
District Trolley route travels around the district between NW
7th Avenue and NW 14th Avenue and NW 14th Street and
NW 20th Street. Routes include stops at the following
locations: UM Life Science Park, Lindsey Hopkins Technical
Education Center, Miami -Dade College Medical Campus,
Ryder Trauma Center, Jackson Memorial Hospital, Veterans
Center, UM Hospital and Clinics, UM Biomedical Research Building, Bascom
rlins Stadium. Combined, these routes average 1,400 daily riders.
The Brickell and Biscayne
April 27, 2012. The service ru
15 minutes from 6:30 am to 11
Saturday and on Sundays from 8:
pm. The alignment was reconfigure
follows: The Biscayne route runs alon
side of Downtown Miami via Biscayne
between NE 39th Street in the Design Distri
Brickell Metrorail Station. The Brickell route
from Mercy Hospital on South Bayshore Drive
Brickell Key in the north. Combined, the Brickell
Biscayne routes link several dense areas and point o
interests including the following locations: Financial
Convention Center, Bayfront Park, Freedom Tower, Mi
Airlines Arena, Museum Park, Adrienne Arsht Center for t
University of Art and Design, Margaret Pace Park, and the 0
was extended south to Mercy Hospital in December 2012 whil
Midtown and the Design District area in spring 2013. Initial ride
approximately 2,500 boardings per day. As of June 2013, these rou
passengers on a typical weekday.
BISCAYNEf BRIC KELL MAP
strict, Mary Brickell Village, Brickell Key, Miami
i-Dade College Wolfson Campus, American
e Performing Arts, Miami International
ni Bus Terminal. The original alignment
he Biscayne route was extended north to
hip projection for this corridor was
are transporting a combined 4,300
The Overtown route as launched in July 2012. The
service runs approximately every 15 minutes from
6:30 am to 7:00 pm, Mo s ay through Friday. Route
includes stops at the follo g locations: UM Life
Science Park, Lindsey Hopki Technical Education
Center, Miami -Dade College dical Campus, Ryder
Trauma Center, Bascom Palmer ' e Institute,
Biomedical Research Institute UM, M Hospitals and
Clinics, Seybold Pointe, Henry Reeve ' ark, Rosa
Parks Community School-Overtown, 0 ; rtown
Transit Village, Black Police Precinct & urthouse
Museum, Booker T. Washington School. Th
Overtown route is transporting an average of o -r 400
passengers per day.
The Allapattah route was launched in November 2012. The service runs approximately every 15 minute
from 6:30 am to 7:00 pm, Monday through Saturday. The route runs east -west along NW 20 Street
18
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
between NW 27 Avenue and NW 3 Avenue, north -south on 3 Avenue between NW 20 Street and NW 14
treet and East-West on NW 14 Street between NW 3 Avenue and North Bayshore Drive to the OMNI.
e Allapattah — Overtown route provides a vital link to the City's growing Miami Trolley system, as it
con ects to each of the City's existing trolley routes. On NW 20 Street between NW 7 and 10 Avenues,
passe ers can transfer to the Overtown, Health District and Health District — Stadium routes. At the
OMNI, ► , ssengers can transfer to the Biscayne-Brickell route. The route complements the Miami -Dade
Transit sy em with stops adjacent to the Santa Clara Metrorail Station and the Metromover system at the
Adrienne A t Center Station. Trolley stops are located on most blocks, and coordinated with existing
Miami -Dade sit stops. Ridership has grown since the route's inception to approximately 2,200
passengers per d
The Coral Way rout was launched on October 3, 2013. The Coral Way-Brickell Trolley operates along
Coral Way serving the •mmercial, retail, and residential locations along the corridor. The trolley
connects to the Brickell :trorail/Metromover Station at SW 1st Court where a connection to the Brickell
and Biscayne routes is provio -d. The route extends from PortMiami on the east to Ponce de Leon
Boulevard, in the City of Coral ables, on the west where a connection to the City of Coral Gables
Trolley is provided. In addition, t - trolley operates along Flagler Street to serve the downtown's Central
Business District as well as an alternate connection to Port Miami. Based on a system wide modeling
analysis completed in November 2010, is route is anticipated to attract over 700 riders daily.
PUBLIC/PRIVATE PARTNERSHIP FUN
D BICYCLE SHARE PROGRAM
The City of Miami Deco Bike Program is plann
program is planned to have sixty (60) stations and
Upper East Side Design District, Midtown, Edgewater,
Coconut Grove. The program will be managed and ma
program will provide an additional mobility option for resi
as the last mile for transit users. By providing
transportation options, the program will allow for people
to choose not to drive, and help reduce congestion. Deco
Bike also provides an effective way for residents to get an
opportunity for exercise in their daily lives. Deco Bike
already serves Miami Beach and will provide connectivity
between the two cities. The current agreement is for a ten
(10) year cycle with opportunities to expand beyond the
phase 1 limit. The current agreement provides a share of
advertising revenue to the City for each year of the ten
year cycle.
19
to launch in the first quarter of 2014. The Deco Bike
ive hundred (500) bicycles in an area serving the
ynwood, Downtown, Brickell, Calle Ocho, and
tained by Deco Bike, LLC. The Deco Bike
is and visitors to explore Miami and serve
r�
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
1tze &IL 1tze Yalu/re
20
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
3. FUNDING OVERVIEW
Cite iutreie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
FUNDING OVERVIEW
Funding Sources
The Capital Improvement contains funding from seven types of revenue sources:
❑ Federal Grants - Fede : grants, such as Community Development Block Grants (CDBG), may be
used only for the purpose pecified in Federal laws. The amount of funding available from Federal
sources is dedicated by Natial priorities. These grants derive from agencies at the federal level
such as the Federal Emergenc , Management Agency (FEMA) and Housing and Urban Development
(HUD).
❑ State Grants - State grants are aware ed by State of Florida agencies such as the Florida Department
of Transportation (FDOT) and Florida land Navigation District (FIND) Waterways Assistance
Program. These grants may be used onl or the purposes specified in State laws.
❑ Miami -Dade County Grants - Miami -Dade ounty may contribute funding in the form of a grant
for specific projects to be undertaken by the C
❑ Grant — Other - These are grants which do not de •ve from Federal, State or Miami -Dade County
resources. An example of this funding type is a grant r contribution from another municipality.
❑ City Bonds - Two types of bonds can be issued by the Ci , for capital improvements: (1) General
Obligation Bonds and (2) Special Obligation Bonds:
• General obligation bonds are backed by the full faith and cr: . it
secured by the City's ad valorem taxing power. These bonds
improvement programs such as public safety, highway or storm
general obligation bond issuance was approved by voters in Nove
named the Homeland Defense/Neighborhood Improvement (HD) B
infusion of $255 million worth of capital investment in the areas of pu
recreation, streets, drainage, quality of life infrastructure improvements,
preservation. The first issuance in the amount of $155 million took place
second issuance took place in July 2007 and derived almost $51 million. Th
the amount of $50.6 million took place in May 2009.
• Special obligation bonds are secured by a limited revenue source.
of the City of Miami and are
ance specific capital
ewers. The City's most recent
ber 2001. These bonds,
ds, provide for a total
is safety, parks and
d historic
2002 while the
third issuance in
• In order to accelerate the construction of much needed road and drainage
infrastructure projects, the City leveraged recurring revenue streams from Loy .1
Option Gas Tax, the Transit Half -Cent Surtax, and the Parking Surcharge into
special obligation bond program. The first issuance of this bond program, know
21
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
the "Streets Bonds", in the amount of $80 million took place at the end of calendar
year 2007. The second issuance in the amount of $57,634,240 took place in
December 2009.
CIP Fees/Revenues - These funds are collected from current revenues produced by miscellaneous
county or city taxes and various fees. Notable funding sources included in this category are the
nual General Fund contribution to capital projects, storm water utility trust funds, local option
g.. tax, the transit t/2 cent surtax, parking surcharge, and impact fees.
❑ Priva Donation/Other - This funding source includes any private funds contributed to the City
as well
the dedication or sale of land for capital facilities.
The chart below show that CIP Fees/Revenues represent the largest share of funding in the Capital Plan,
accounting for 43.80% o . overall Plan funds. City Bonds represent the second largest funding source,
accounting for 27.73% of ' e Plan's funding. Sources deriving from Miami -Dade County represent 6.43% of
the Plan. The remaining 22. i A % of funding is from Federal, State, Grant -Other, and Private Donations/Other
sources.
Private Donations / Other
$3,710,424
0.83%
Grant - Miami -Dade
County
$28,832,106
6.43%
City Bonds
$124,355,706
27.73%
Grant - Federal
$6,730,678
1.50%
MARY BY FUND TYPE - $448 MILLION
Combined with Others
$4,335,000
0.47%
EP Fees/R-'
$146,343,
43.80%
• Com Nine d with Others
■ G rant -State
■ CIP Fees/Revenues
■ Grant - Federal
• City Bonds
■ G rant - Miami -Dade County
Private Donations / Other
Grant - Other
The "Funding Type by Job Number" Report in the Reports Section provides a listing
with the various sources under each of the funding types described above.
Funded, Partially Funded and Unfunded Projects
projects associated
The projects in the CIP can be placed in one of three funding proportion categories: Funded, Parti. y Funded
or Unfunded. The "Cost Estimates versus Available Funding" listing in the Reports Section provide a
breakdown of funded, partially funded and unfunded projects by fund. It is important to note that the t
funded amounts in the CIP do not account for unfunded project estimates. The funding proportion is
determined by comparing a project's estimated costs against anticipated revenues and available dollars. It
22
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
anticipated that revenues to address the unfunded gap will derive from future year allocations of general fund
evenues or other existing recurring revenues, successful pursuit of grants, or identification of new revenue
s• .rces or financing options.
The p ion of project estimates that is currently unfunded accounts for 50.40% of total estimated costs for
the proj is identified in the "Cost Estimates versus Available Funding" listing. This percentage is derived
from proje .ts that are completely unfunded 30.30% as well as the unfunded portion of partially funded
projects 20. , %. These needs will be evaluated annually based on priorities and availability of funding.
COST ` TIMATE BY FUNDED PROPORTION - $904 MILLION
UNFUNDED
$273,903,043
30.30%
PARTIALLY FUNDED
$303,658,465
33.68%
FUNDED
$336,940,49
37.27%
PARTIALLY FUNDED -
ALLOCATED
$111,496,093
12.33%
PARTIALLY FUNDED
SHORTFALL
$181,70.0,293
20.10%
23
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
1tze &IL 1tze Yalu/re
24
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
ECTION REPORTS
Fu DING TYPE BY JOB
Cite sutavie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
Active & Future
CIP Projects Only
FUNDING
Grant - Federal
888899 FEMA Hazard Mitigation Grant
B-30183 Garden Storm Sewer - Phase I $750,000 $750,000 $0 $0 $0 i $0 $0
City Of Miami - Capital Improvement Program SUBSTITUTED
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 117 2017 - 2018
Future Funding Estimates
888899 $750,000 $750,000 $0 $0 $0 $0 $0 $0
888902 Community Development Block Grant
B-30365E
B-30695
B-30774
B-30832
B-70213
Coral Way NET Office Remodeling /
SW 19th Terr. Imp. -Partial CDBG
West Flagler Area Improvements - D4 -
Douglas Park ADA Improvement
Fire Station No.5 - Interior Renovation
$1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0
$300,000 $300,000 $0 $0 %1 $0 $0 $0
$350,000 $350,000 $0 $0 $0 $0 $0 $0
$133,474 $133,474 $0 $0 $0 $0 $0 $0
$348,240 $0 $348,240 $0 $0 $0 $0 $0
888902 $2,131,714 $1,783,474 $348,240 :, I $0 $0 $0 $0
888925 FEMA Recovery Assistance
B-50654 Overtown Stormwater Pump Station $173,200 $173,200 $0 $0 $0 $0 $0 $0
888925 $173,200 $173,200 $0 $0 $0 $0 $0 $0
888927 Federal Aviation Admin. Grant
ccii B-75001 Watson Island Infrastructure $150,000 $150,000 $0 $0 $0 $0 $0 $0
888927 $150,000 $150,000 $0 $0 $0 $0 $0 $0
888937 Urban Areas Security Initiative Grant
B-70415 MRC Security System Hardening - UASI $69,842 $.',842 $0 $0 $0 $0 $0 $0
888937
888939 FEMA Federal Assistance to Firefighters Grant
B-70411 Fire Rescue Personal Protective
B-70418 FEMA Assistance to Firefighters Program
$69,842 $69,842 $0 $0 $0 $0 $0 $0
$656,
$ 4,888
$656,466 $0 $0 $0 $0 $0 $0
$274,888 $0 $0 $0 $0 $0 $0
888939 $931,354 $931,354 $0 $0 $0 $0 $0 $0
888959 FEMA 2007 & Future Pre -Disaster Mitiga ' i n (PDM) Grant
B-30588 San Marco Island and Biscayne nd $600,000 $600,000 $0 $0 $0 $0 $0 $0
888959 $600,000 $600,000 $0 $0 $0 $0 $0 $0
888982 FEMA Tree Funding
B-30500T Civic Center 1 14th Street - Tree $100,000 $0 $100,000 $0 $0 $0 $0 $0
B-30538T Museum '-, rk -FEMA Tree Funding $215,943 $0 $215,943 $0 $0 $0 $0 $0
B-30611T D1FATreeFundedProjects $169,930 $0 $169,930 $0 $0 $0 $0 $0
B-30613T FEMA Tree Funded Projects $255,930 $0 $255,930 $0 $0 $0 $0 $0
B-30614T D4 - FEMA Tree Funded Projects $315,930 $0 $315,930 $0 $0 $0 $0 $0
B-3061 D5 FEMA Tree Funded Component $119,930 $0 $119,930 $0 $0 $0 $0 $0
B- ! .24T Overtown Greenway @ NW 11 Terrace $100,000 $0 $100,000 $0 $0 $0 $0 $0
-30630T Palm Grove Road Improvements - Tree $70,000 $0 $70,000 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
Grant - Federal (Cont.)
888982 FEMA Tree Funding
B-30687T
B-30699T
B-30724T
B-30727T
B-30780T
B-30822T
B-30882T
B-30883T
B-40704AT
Coconut Grove Business Improvement
Beacom Project Area Improvements -
NW 33rd Street Roadway Improvement
NW 18th Avenue Roadway
NW 14 Ave & 28 St. Are Roadway
Brickell Area Shared Use Path and
African Square Park - Splash Park D5
NW 12 Avenue/NW 12 Place Roadway
SW 32 Avenue Improvements D2 Tree
Total
Funding
$100,000
$60,000
$60,000
$60,000
$26,000
$85,930
$50,000
$46,000
$60,000
888982 $1,895,593
888983 FDEP Invasive Species at Marine Stadium Marina
B-30706 Miscellaneous Repairs 10% Set Aside $28,975
888983
Grant - Federal
Grant - State
000008 CRA - FIND Grant
B-30538 Museum Park - Partially Funded by CRA
000008
888909 FL Dept of Environmental Protection (FDEP)
B-30588
B-50672
B-70011
San Marco Island and Biscayne Island
Belle Meade Storm Sewer Project, Ph 2
Clean Vessel Act 2013 - PF
888909
888913 FDOT
B-30130
B-30336
B-30624
B-30631
B-30651
B-30940
B-30941
B-3991
B-
43A
-40686
Transportation Enhanceme 'rogram
Miami River Greenway 1st Court to
Miami River Green (5th Street
Overtown Gree.. • ay @ NW 11 Terrace
Miami Ri , Greenway from Miami
Mia • iver Greenway from NW loth to
ntown Miami Bicycle and Pedestrian
Downtown Miami Signage and
Venetian Causeway Improvements
North Spring Garden Greenway
Miami River Greenways/ Streetscape
$28,975
$6,730,678
$1,143,000
$1,143,000
$50
00
00,000
$20,584
$1,020,584
$1,000,000
$1,000,000
$1,079,879
$1,000,000
$2,339,739
$250,000
$1,000,000
$1,000,000
$1,000,000
$1,000,000
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Prior Approp.
Approp. 2012 - 2013 2013 - 2014
$0
$0
$0
$0
$0
$0
$0
$0
$0
$100,000
$60,000
$60,000
$60,000
$26,000
$85,930
$50,000
$46,000
$60,000
$0 $1,895,593
$0 $28,975
$0 $28,9
$4,457,870 $2 2,808
$1 43,000 $0
$1,143,000 $0
$500,000
$500,000
$0
$1,000,000
$1,000,000
$1,000,000
$1,079,879
$1,000,000
$2,339,739
$0
$0
$1,000,000
$1,000,000
$1,000,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
SUBSTITUTED
Future Funding Estimates
2014 - 2015 2015 - 2016 2016 - 017 2017 - 2018
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0
$0
$20,584
$0 $20,584
$0
$0
$0
$0
$0
$250,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0 $0
$0
$0
$0
$0
$0
$0
$1,000,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 117 2017 - 2018
SUBSTITUTED
Future Funding Estimates
888913 $10,669,618 $9,419,618 $250,000 $0 $1,000,000 $0 $0 $0
888917 FDOT Other
B-30500 Civic Center NW 14th Street $100,000 $100,000 $0 $0 $0 i $0 $0
B-70715 City of Miami Trolley Program - Capital $1,899,151 $1,899,151 $0 $0 $0 $0 $0 $0
888917 $1,999,151 $1,999,151 $0 $0 $0 $0 $0 $0
888920 FIND Waterways Assistance Program FY07 and Future
B-30541C Kennedy Park Shoreline Stabilization $115,000 $115,000 $0 $0 :;1 $0 $0 $0
B-30688 Marine Stadium Restoration $175,000 $175,000 $0 $0 $0 $0 $0 $0
B-30689 Marine Stadium Bulkhead Replacement $802,500 $17,500 $785,000 $0 $0 $0 $0 $0
B-30706 Miscellaneous Repairs 10% Set Aside $38,750 $38,750 $0 $0 $0 $0 $0 $0
B-30721 Spoil Island E Restoration and Floating $72,500 $15,000 $57,500 $0 $0 $0 $0
B-30731 MiamiWomen'sClubBaywalkProject- $46,500 $46,500 $0 $0 $0 $0 $0 $0
B-30801 Manatee Bend Park Shoreline $38,500 $0 $38,500 $0 $0 $0 $0 $0
B-30802 Pallot Park Shoreline Improvements - D2 $30,000 $0 $30,000 $0 $0 $0 $0 $0
B-30825 Biscayne Bay Spoil Island B Public $7,500 $0 $7,501 $0 $0 $0 $0 $0
B-30825A Bisca'ziyne Bay Spoil Island E Picnic $7,500 $0 $ 00 $0 $0 $0 $0 $0
v B-30825B Biscayne Bay Spoil Island E Public $7,500 $0 $7,500 $0 $0 $0 $0 $0
B-40171 Coconut Grove Viewing Platform Spoil $7,500 $7,500 $0 $0 $0 $0 $0 $0
B-40172 Coconut Grove Viewing Platform Spoil $7,500 $7,500 $0 $0 $0 $0 $0 $0
B-40180 Marine Stadium Marina at Virginia Key $800,000 $801 :10 $0 $0 $0 $0 $0 $0
B-50643 Wagner Creek/ Seybold Canal Dredging $1,700,000 $ ,000,000 $700,000 $0 $0 $0 $0 $0
B-50722 Little River Waterfront Park $117,500 $117,500 $0 $0 $0 $0 $0 $0
B-50722A Little River Waterfront Park Acquisition $183,750 $0 $183,750 $0 $0 $0 $0 $0
888920 $4,15 , 00 $2,340,250 $1,817,250 $0 $0 $0 $0 $0
888960 Sunshine State Financing Commission Number 1
B-30538 Museum Park - Partially Funded by CRA $75,534 $75,534 $0 $0 $0 $0 $0 $0
B-30541 Citywide Park Equipment & Site $2,449,706 $2,449,706 $0 $0 $0 $0 $0 $0
B-35887 Moore Park New Construction $145,829 $145,829 $0 $0 $0 $0 $0 $0
888960 $2,671,069 $2,671,069 $0 $0 $0 $0 $0 $0
888961 Sunshine State Financing
nunission Number 2
B-30305B Gibson Park 1. -w Construction $8,000,467 $8,000,467 $0 $0 $0 $0 $0 $0
B-30538 Museum 'ark - Partially Funded by CRA $6,015,466 $6,015,466 $0 $0 $0 $0 $0 $0
B-30541 Cit - de Park Equipment & Site $1,012,439 $1,012,439 $0 $0 $0 $0 $0 $0
B-30588 '.n Marco Island and Biscayne Island $475,000 $475,000 $0 $0 $0 $0 $0 $0
B-30671 Caribbean Marketplace Renovation $147,939 $147,939 $0 $0 $0 $0 $0 $0
B-3501 Virginia Key Landfill Assessment $750,000 $750,000 $0 $0 $0 $0 $0 $0
B-. 806 Curtis Park New Pool Facility and Boat $505,070 $505,070 $0 $0 $0 $0 $0 $0
-35812A Duarte Park Building Renovation, $560,000 $560,000 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
Grant - State (Cont.)
888961 Sunshine State Financing Commission Number 2
B-35838
B-35883A
B-35887
B-60454
B-70100
B-70414
B-72915A
Kennedy Park Restroom Building
Hadley Park New Youth Center D5
Moore Park New Construction
Fire Station #14 (New)
Gusman Hall Improvements / Repairs
James L. Knight Center / Hyatt- Fire
Police Headquarters Helipad and Roof
City Of Miami - Capital Improvement Program SUBSTITUTED
Fund Source Management System
Funding Type by Job No.
Total
Funding
$21,000
$3,785,528
$1,454,171
$3,845,377
$29,236
$351,876
$400,000
Prior Approp.
Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 017 2017 - 2018
$21,000
$3,785,528
$1,454,171
$3,845,377
$29,236
$351,876
$400,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Future Funding Estimates
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
888961 $27,353,569
888966 Sunshine State Financing Commission Number 3
B-74609 ERP Integration System $8,356,706
B-74614 Land Management System $5,139,942
888966
888981 Florida Boating Improvement Program
B-30706 Miscellaneous Repairs 10% Set Aside
$13,496,648
$27,353,569
$8,356,706
$5,139,942
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$13,496,648 $0
$0
$56,893 $0 .,000 $10,893
$0
$0
$0
$0
$0
$0
$0
$0
888981
888984 State of Florida Department of Health
B-70242 Fire Department - FY2012 "Emergency
888984
$56,893 $0 $46,000 $10,893
$238,000
$238,000
0
$0 $238,000
$0 $0 $238,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Grant - State
Grant - Miami -Dade County
373001 Safe Neighborhood Parks Bond
B-30541 Citywide Park Equipment & Site
$62,806,032 $59,423,305 $2,113,250 $269,477
$119,622
$119,622 $0
$0
$1,000,000
$0
$0
$0
$0
$0
$0
$0
373001
373002 Safe Neighborhood Parks Bond 2
B-30174 Virginia Key Beach P. Historic
B-30541 Citywide Park E. 'pment & Site
373002
888896 Miami -Dade ' ounty DERM Virginia Key Grant
B-35002 ginia Key Landfill Assessment
& Future
$119,622
$49,472
$83,320
$132,792
$650,000
896 $650,000
88893: Miami -Dade County Grant/Contribution
0501B Manuel Artime Dimmer Rack System $13,239
B-30637A South Miami Avenue Drainage
$204,444
$119,622 $0
$49,472 $0
$83,320 $0
$132,792 $0
$650,000 $0
$650,000 $0
$13,239
$204,444
$0
$0
$0
$0
$0
$0
$0 $0
$0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0 $0 $0 $0
$0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 017 2017 - 2018
SUBSTITUTED
Future Funding Estimates
Grant - Miami -Dade County (Cont.)
888938 Miami -Dade County Grant/Contribution
B-30646 South Bayshore Drive Roadway and $8,304,395 $450,000 $0 $2,000,000 $1,000,000 $2,000,0
$1,000,000 $1,854,395
888938 $8,522,078 $667,683 $0 $2,000,000 $1,000,000 $
888947 MDC Building Better Communities GOB
B-30008
B-30011
B-30504
B-30531
B-30690
B-30784
B-40456
B-40457
Grove Park Road and Storm Sewers
Englewood Road and Storm Sewer
Linear Parks, Greenways and Baywalk
Dorsey Memorial Library Restoration
West End Park New Community
Health District Riverwalk
Antonio Maceo Community Building -
Kinloch Park Building Addition - D1
0,000 $1,000,000 $1,854,395
$6,250,000 $681,000 $0 $0 $1,800,000 $1,300,000 $2,469,000 $0
$6,250,000 $681,000 $0 $1,800,000 $1,300,I:1 $2,469,000 $0 $0
$961,000 $0 $0 $0 $'.1,000 $0 $0 $0
$250,000 $250,000 $0 $0 $0 $0 $0 $0
$1,500,000 $0 $1,500,000 $0 $0 $0 $0 $0
$961,000 $0 $0 $200,000 $761,000 $0 $0
$1,500,000 $0 $0 $0 $1,500,000 $0 $0 $0
$1,300,000 $0 $0 300,000 $1,000,000 $0 $0 $0
888947 $18,972,000 $1,612,000 $1,500,000 $2,100,000 $6,761,000 $4,530,000 $2,469,000 $0
888953 Miami -Dade Metropolitan Planning Org (MPO)
N B-30645E Overtown / Wynwood Bicycle $48,000 $48,000 $0 $0 $0 $0 $0 $0
co
B-30645F Miami Regional Intermodal Plan $33,000 $0 $33,000 $0 $0 $0 $0 $0
888953 $81,000 $48,000 $33,000 $0 $0 $0 $0 $0
888976 Miami -Dade County Dept Cultural Affairs
B-30671 Caribbean Marketplace Renovation $354,614 54,614 $0 $0 $0 $0 $0 $0
888976 $354,614 $354,614 $0 $0 $0 $0 $0 $0
Grant - Miami -Dade County $28,832,1
Grant - Other
000004 CRA Operating Budget
B-30305B Gibson Park New Construction $3,800,000 $3,800,000 $0 $0 $0 $0 $0 $0
B-30394 North 14 St. Multi Media Ent- ainment $6,000,000 $6,000,000 $0 $0 $0 $0 $0 $0
B-30538 Museum Park - Partially nded by CRA $6,143,000 $6,143,000 $0 $0 $0 $0 $0 $0
B-30538B Museum Park Env .nmental $1,800,000 $1,800,000 $0 $0 $0 $0 $0 $0
B-30731 Miami Wome ': lub Baywalk Project - $46,500 $46,500 $0 $0 $0 $0 $0 $0
B-40169 300 NW Street Community Center - $1,500,000 $1,500,000 $0 $0 $0 $0 $0 $0
$3,584,711 $1,533,000 $4,100,000 $7,761,000 $6,530,000 $3,469,000 $1,854,395
000004 $19,289,500 $19,289,500 $0 $0 $0 $0 $0 $0
888948 Scho
oard of Miami -Dade County - Grant
B-72915 Police Headquarters Helipad and Roof $850,854 $0 $850,854 $0 $0 $0 $0 $0
888948 $850,854 $0 $850,854 $0 $0 $0 $0 $0
8955 MSEA Contribution to Capital
Active & Future
CIP Projects Only
FUNDING
Grant - Other (Cont.)
888955 MSEA Contribution to Capital
B-30671 Caribbean Marketplace Renovation $350,000 $350,000 $0 $0 $0 i $0 $0
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 117 2017 - 2018
SUBSTITUTED
Future Funding Estimates
888955 $350,000 $350,000 $0 $0 $0 $0 $0 $0
888957 Downtown Development Agency
B-30645A
B-30940
B-30941
Transportation Program Support
Downtown Miami Bicycle and Pedestrian
Downtown Miami Signage and
$25,000 $25,000 $0 $0
$37,500 $0 $37,500 $0
$150,000 $0 $0 $0
$0
$ 1,000
$0 $0 $0
$0 $0 $0
$0 $0 $0
888957 $212,500 $25,000 $37,500 $0 $150,000 $0 $0 $0
888962 The Children's Trust
B-30174 Virginia Key Beach Park Historic $260,000 $260,000 $0 0 $0 $0 $0 $0
888962 $260,000 $260,000 $0 $0 $0 $0 $0 $0
888965 Bayfront Park Management Trust
B-40173 Bayfront Park Electrical Repairs $309,000 $309,000 $0 $0 $0 $0 $0 $0
888965 $309,000 $309,000 $0 $0 $0 $0 $0 $0
Grant - Other
City Bonds
356005-1 Streets Bond Program - Series 1
B-30008A Grove Park Road Improvements - D3 $244,499 $244,499 $0 $0 $0 $0 $0 $0
B-30011 Englewood Road and Storm Sewer $1,643,748 $1,643,748 $0 $0 $0 $0 $0 $0
B-30130 Miami River Greenway SW 1st Courtto $407,5 . . $407,530 $0 $0 $0 $0 $0 $0
B-30167D Shenandoah Roadway Improvements $ ,127 $353,127 $0 $0 $0 $0 $0 $0
B-30168A Silver Bluff Traffic Calming Priority 3 - $188,804 $188,804 $0 $0 $0 $0 $0 $0
B-30377C District 3 - Sidewalk Repairs and AD $250,691 $250,691 $0 $0 $0 $0 $0 $0
B-30540 Little River Industrial Park $1,988,000 $1,988,000 $0 $0 $0 $0 $0 $0
B-30606 DWNTWN Beautification Pr.;"ctPhase $236,151 $236,151 $0 $0 $0 $0 $0 $0
B-30606D DWNTWN Beautificat . - Design $341,271 $341,271 $0 $0 $0 $0 $0 $0
B-30606L DWNTWN Beauti ation (Lighting) $1,371,543 $1,371,543 $0 $0 $0 $0 $0 $0
B-30606N DWNTWN B=.utification - North $4,651,682 $4,651,682 $0 $0 $0 $0 $0 $0
B-30606S DWNTW Beautification - South $3,399,353 $3,399,353 $0 $0 $0 $0 $0 $0
B-30610 NW Court $170,283 $170,283 $0 $0 $0 $0 $0 $0
B-30613 ► strict 3 - Miscellaneous Roadway $0 $0 $0 $0 $0 $0 $0 $0
B-30614 District 4 - Miscellaneous Roadway $36,001 $36,001 $0 $0 $0 $0 $0 $0
B-3064 Lummus Park Landing Project - Street $1,368,535 $1,368,535 $0 $0 $0 $0 $0 $0
B- :.62D US-1 Median Closures at Bridgeport $280,576 $280,576 $0 $0 $0 $0 $0 $0
-30677 D3 - Sidewalk ADA Retrofits $700,000 $700,000 $0 $0 $0 $0 $0 $0
$21,271,854 $20,233,500 $888,354 $0 $150,000 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Bonds (Cont.)
356005-1 Streets Bond Program - Series 1
B-30687 Coconut Grove Business Improvement
B-30699 Beacom Project Area Improvements
B-30718 I-95 South Miami Terminal Street
B-30722 NW 31st Street Roadway Improvement
B-30732 NW 9th Street Roadway Improvement
B-30749 Citrus Grove Roadway Improvements
B-30770 SW 22nd Avenue Medians - US 1 to
B-30771 Traffic Calming SW 6th Street Project -
B-30776 Silver Bluff Drainage Improvements - D4
B-30778 Traffic Circle - SW 18th Ave. & SW 13th
B-30780 NW 14 Avenue and 28 Street Area
B-30781 NW 11 Street from 27 to 37 Avenue Area
B-30884 NW 62 Street West of I-95 Roadway
B-30891 Buena Vista One -Way Street Conversion
w B-30894 Little Haiti Right of Way Improvements -
B-30960 La Pastorita Traffic Calming and misc.
B-30982 Little River Area Road and Drainage
B-30983 NW 44th Street between NW 7th and
B-40300 SW 18th Terr. Road Improvements - D3
B-40643A North Spring Garden Greenway
B-40672D Flagami Traffic Calming Phase IV - D4
B-40686 Miami River Greenways/ Streetscape
B-40704A SW 32 Avenue Improvements
B-50672 Belle Meade Storm Sewer Project, Ph 2
B-78500B Buena Vista East Roadway, Drainage,
356005-1
356005-2 Streets Bond Program - Series 2
B-30008A Grove Park Road Imp t ements - D3
B-30130 Miami River Gree, -fay SW 1st Court to
B-30167D Shenandoah ' oadway Improvements
B-30168A Silver 1 • ' Traffic Calming Priority 3 -
B-30500 Civ. ' enter NW 14th Street
B-30588 an Marco Island and Biscayne Island
B-30606 DWNTWN Beautification Project Phase
B-3061. 1 DWNTWN Beautification - Design
B .I606L DWNTWN Beautification (Lighting)
B-30606N DWNTWN Beautification - North
Total
Funding
$203,036
$1,053,114
$350,000
$311,000
$259,540
$556,791
$4,622
$324,670
$1,384,644
$102,557
$447,337
$751,218
$100,000
$250,000
$500,000
$121,810
$180,900
$63,045
$17,929
$1,257,175
$459,881
$455,5
$6 ,244
,957,219
$2,117,620
$31,518,652
$383,822
$150,000
$1,196,873
$514,740
$2,500,000
$600,000
$2,864,414
$157,509
$3,104,372
$1,754,250
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Prior Approp.
Approp. 2012 - 2013 2013 - 2014
$203,036
$1,053,114
$350,000
$311,000
$259,540
$556,791
$4,622
$324,670
$1,384,644
$102,557
$447,337
$751,218
$100,000
$250,000
$500,000
$121,810
$180,900
$63,0
,929
1,257,175
$459,881
$455,506
$657,244
$1,957,219
$2,117,620
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$31,518,652 $0
$383,822
$150,000
$1,196,873
$514,740
$2,500,000
$600,000
$2,864,414
$157,509
$3,104,372
$1,754,250
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
SUBSTITUTED
Future Funding Estimates
2014 - 2015 2015 - 2016 2016 - 117 2017 - 2018
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0 $0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
w
M
Active & Future
CIP Projects Only
FUNDING
City Bonds (Cont.)
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 117 2017 - 2018
356005-2 Streets Bond Program - Series 2
B-30606S DWNTWN Beautification - South $680,000
B-30610 NW 7th Court $189,717
B-30611 District 1 - Miscellaneous Roadway $14,234
B-30613 District 3 - Miscellaneous Roadway $21,044
B-30614 District 4 - Miscellaneous Roadway $97,565
B-30615 District 5 - Miscellaneous Roadway $1,004,511
B-30630 Palm Grove Road Improvements $2,379,918
B-30637 Mary Brickell Village Drainage $2,000,000
B-30687 Coconut Grove Business Improvement $2,896,602
B-30695 SW 19th Terr. Imp. -Partial CDBG $67,191
B-30716 Tigertail Resurfacing - D2 $400,400
B-30718 I-95 South Miami Terminal Street $509,000
B-30724 NW 33rd Street Roadway Improvement $3,700,000
B-30727 NW 18th Avenue Roadway Improvement $1,810,000
B-30729 NW 17th Terrace Roadway Improvement $250,000
B-30730 NW 4th Terrace Roadway Improvement $75,000
B-30732 NW 9th Street Roadway Improvement $496,708
B-30760 SW 17th Avenue Roadway & Drainage $600,000
B-30775 Shenandoah Area Improvements - D4 $0
B-30776 Silver Bluff Drainage Improvements - D4 $152,442
B-30781 NW 11 Street from 27 to 37 Avenue Area $40,581
B-30830 US1 Landscaping between 17 Ave and $55,01:
B-30880 NE 2nd Court Roadway and Drainage $4. i,000
B-30892 Little Haiti Gateway Signs - D5 100,000
B-30960 La Pastorita Traffic Calming and misc. $503,190
B-30980 Liberty Square T-Turnarounds - D5 $250,000
B-30983 NW 44th Street between NW 7 and $121,955
B-39911 Venetian Causeway Imps - •ments $2,196,465
B-40300 SW 18th Terr. Road provements - D3 $98,192
B-40301 SW 15th Street sad Improvements $84,969
B-40302 SW 1st Av. e Road Improvements - $230,928
B-40303 SW 2 z Road Improvements - D3 $244,748
B-40306 S l0th Street Road Improvements - D3 $307,385
B-40307 SW 16th Street Road Improvements - D3 $257,693
B-40308 SW 17th Terrace Road Improvements - $225,567
B-40 10 SW 20th Road Improvements - D3 $116,682
-40312 SW 22nd Terr. & SW 13th Ave Road $376,211
SUBSTITUTED
Future Funding Estimates
$680,000 $0 $0 $0 i $0 $0
$189,717 $0 $0 $0 $0 $0 $0
$14,234 $0 $0 $0 $0 $0 $0
$21,044 $0 $0 $0 $0 $0 $0
$97,565 $0 $0 $1 $0 $0 $0
$1,004,511 $0 $0 $0 $0 $0 $0
$2,379,918 $0 $0 $0 $0 $0 $0
$2,000,000 $0 $0 $0 $0 $0 $0
$2,896,602 $0 $0 $0 $0 $0 $0
$67,191 $0 t0 $0 $0 $0 $0
$400,400 $0 $0 $0 $0 $0 $0
$509,000 $0 $0 $0 $0 $0 $0
$3,700,000 $0 $0 $0 $0 $0 $0
$1,810,000 %1 $0 $0 $0 $0 $0
$250,000 $0 $0 $0 $0 $0 $0
$75,000 $0 $0 $0 $0 $0 $0
$496,708 $0 $0 $0 $0 $0 $0
$600,0$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0
$152,442 $0 $0 $0 $0 $0 $0
$40,581 $0 $0 $0 $0 $0 $0
$55,000 $0 $0 $0 $0 $0 $0
$400,000 $0 $0 $0 $0 $0 $0
$100,000 $0 $0 $0 $0 $0 $0
$503,190 $0 $0 $0 $0 $0 $0
$250,000 $0 $0 $0 $0 $0 $0
$121,955 $0 $0 $0 $0 $0 $0
$2,196,465 $0 $0 $0 $0 $0 $0
$98,192 $0 $0 $0 $0 $0 $0
$84,969 $0 $0 $0 $0 $0 $0
$230,928 $0 $0 $0 $0 $0 $0
$244,748 $0 $0 $0 $0 $0 $0
$307,385 $0 $0 $0 $0 $0 $0
$257,693 $0 $0 $0 $0 $0 $0
$225,567 $0 $0 $0 $0 $0 $0
$116,682 $0 $0 $0 $0 $0 $0
$376,211 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Bonds (Cont.)
356005-2 Streets Bond Program - Series 2
B-40313 SW 3rd Ave Road Improvements - D3
B-40314 NW 18th Place Road Improvements - D3
B-40315 SW 15th Street Road Improvements
B-40317 SW 28th Road Improvements - D3
B-40318 SW 1st Ave Road Improvements -
B-40319 SW 25th Road Improvements - D3
B-40320 SW 26th Road Improvements Segment 2
B-40321 SW 2nd Ave Road Improvements - D3
B-40322 SW 27th Road Improvements - D3
B-40323 SW 1st Ave Road Improvements Segment
B-40324 NW l lth Ave Road Improvements - D3
B-40325 Beacom Phase II - D3
B-40326 The Roads Roadway Improvements - D3
B-40327 Shenandoah Roadway Improvements -
B-40672D Flagami Traffic Calming Phase IV - D4
B-40672G Flagami Traffic Calming - D4
B-40686 Miami River Greenways/ Streetscape
B-40704A SW 32 Avenue Improvements
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 017 2017 - 2018
$293,740
$224,611
$245,349
$40,149
$167,562
$118,561
$498,804
$721,333
$498,804
$126,638
$160,203
$1,500,000
$500,000
$1,000,000
$738,131
$590,000
$1,179,778
$310,083
$293,740
$224,611
$245,349
$40,149
$167,562
$118,561
$498,804
$721,333
$498,804
$126,638
$160,203
$1,500,000
$500,000
$1,000,000
$738,131
$590,000
$1,179,778
$310,
SUBSTITUTED
Future Funding Estimates
$0 $0 $0 ::1 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
356005-2 $45,093,624 $4 i'3,624 $0 $0 $0 $0 $0 $0
369100 1991 Fire Bonds
B-72802 Fire Stations & Other Fire Facilities $46,477 $46,477 $0 $0 $0 $0 $0 $0
369100 $ ,,477 $46,477 $0 $0 $0 $0 $0 $0
371100 Series 1995 Sanitary Sewer Bonds
B-70600 Police Department Sanitary Sewer $60,000 $60,000 $0 $0 $0 $0 $0 $0
371100 $60,000 $60,000 $0 $0 $0 $0 $0 $0
385200-1 2002 Homeland Defense Bonds (S = es 1)
B-30538 Museum Park - Partial l unded by CRA $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-30541 Citywide ParkEqu': ent&Site $19,940 $19,940 $0 $0 $0 $0 $0 $0
B-30671 Caribbean Ma etplace Renovation $45,111 $45,111 $0 $0 $0 $0 $0 $0
B-33514 Marines ium Marina Improvements $58,775 $58,775 $0 $0 $0 $0 $0 $0
B-35806 Cu 'ark New Pool Facility and Boat $14,072 $14,072 $0 $0 $0 $0 $0 $0
B-35838 ennedy Park Restroom Building $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-35887 Moore Park New Construction $393,641 $393,641 $0 $0 $0 $0 $0 $0
B-3591 ' Neighborhood Parks Improv. $260,307 $260,307 $0 $0 $0 $0 $0 $0
B 1643A North Spring Garden Greenway $79,800 $79,800 $0 $0 $0 $0 $0 $0
B-40695L Miami River Greenway Segment G and $5,085 $5,085 $0 $0 $0 $0 $0 $0
w
Active & Future
CIP Projects Only
FUNDING
City Bonds (Cont.)
385200-1 2002 Homeland Defense Bonds (Series 1)
B-60453A
B-60454
B-72803
B-72813
B-78508
Fire Station #13
Fire Station #14 (New)
Fire Station Equipment and Furniture
Defense and Security Equipment
NE 2 Avenue Improvements
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 117 2017 - 2018
$52,992
$181,362
$3,798
$802,249
$1,050,600
SUBSTITUTED
Future Funding Estimates
$52,992 $0 $0 $0 ': $0 $0
$181,362 $0 $0 $0 $0 $0 $0
$3,798 $0 $0 $0 $0 $0 $0
$802,249 $0 $0 $0 $0 $0 $0
$1,050,600 $0 $0 $ $0 $0 $0
385200-1 $3,167,732 $3,167,732 $0 $0 $0 $0 $0 $0
385200-2 2002 Homeland Defense Bonds (Series 2)
B-30134A Bryan Park Community Building - D4 $6,992
B-30174 Virginia Key Beach Park Historic $1,046,765
B-30305B Gibson Park New Construction $97,774
B-30538 Museum Park - Partially Funded by CRA $278,153
B-30541 Citywide Park Equipment & Site $408,167
B-30671 Caribbean Marketplace Renovation $204,889
B-30689 Marine Stadium Bulkhead Replacement $839,408
B-30690 West End Park New Community $8,311
B-30772 Bay of Pigs Park Lighting - D4 $53,000
B-30800 Fern Isle / PBA Park Improvements $116,782
B-35806 Curtis Park New Pool Facility and Boat $108,439
B-35812D Duarte Park Building Renovation, $15,000
B-39910E District 2 Quality of Life Park $578,237
B-40457 Kinloch Park Building Addition - D1 $47,843
B-60453A Fire Station #13 $5,006 . 6
B-60464 New Dinner Key Marina Dockmaster 0,006
B-72813 Defense and Security Equipment $983,364
B-78502A Museum of Science - Development in $738,000
$6,992 $0 $0 $0 $0 $0 $0
$1,046,765 $0 ',! $0 $0 $0 $0
$97,774 $0 $0 $0 $0 $0 $0
$278,153 $0 $0 $0 $0 $0 $0
$408,167 $0 $0 $0 $0 $0 $0
$204,889 $0 $0 $0 $0 $0 $0
$839,408 $0 $0 $0 $0 $0 $0
$8,311 $0 $0 $0 $0 $0 $0
$53,000 $0 $0 $0 $0 $0 $0
$116,782 $0 $0 $0 $0 $0 $0
$108,9 $0 $0 $0 $0 $0 $0
15,000 $0 $0 $0 $0 $0 $0
$578,237 $0 $0 $0 $0 $0 $0
$47,843 $0 $0 $0 $0 $0 $0
$5,006,636 $0 $0 $0 $0 $0 $0
$250,006 $0 $0 $0 $0 $0 $0
$983,364 $0 $0 $0 $0 $0 $0
$738,000 $0 $0 $0 $0 $0 $0
385200-2 $10,787,766 $10,787,766 $0 $0 $0 $0 $0 $0
385200-3 2002 Homeland Defense Bonds series 3)
B-30134A Bryan Park Commu ' Building - D4 $845,136 $845,136 $0 $0 $0 $0 $0 $0
B-30178 DesignDistrict/F- $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-30179 Downtown D . ywalk Master Plan & $450,000 $450,000 $0 $0 $0 $0 $0 $0
B-30373A Polic- iepartmentProperty Unit $116,235 $116,235 $0 $0 $0 $0 $0 $0
B-30538B i i seum Park Environmental $200,000 $200,000 $0 $0 $0 $0 $0 $0
B-30541 Citywide Park Equipment & Site $457,515 $457,515 $0 $0 $0 $0 $0 $0
B-30541 Kennedy Park Shoreline Stabilization $71,000 $71,000 $0 $0 $0 $0 $0 $0
B-30 , 1D Citywide Park Equipments & Site $31,000 $31,000 $0 $0 $0 $0 $0 $0
30547E Parks ADA Modifications - District 2 $215,348 $215,348 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Bonds (Cont.)
385200-3 2002 Homeland Defense Bonds (Series 3)
B-30547G Parks ADA Modifications - District 4
B-30680
B-30688
B-30689
B-30690
B-30696
B-30721
B-30773
B-30777
B-30778
B-30779
B-30801
B-30802
B-30882
B-30884
B-30886
B-30960
B-30961
B-30962
B-30963
B-30964
B-30965
B-30981
B-33514
B-35806
B-35812A
B-35838
B-35861B
B-35883A
B-35887
B-35904
B-39910
B-39910C 'o
B-39910E
B-3991
B-
-40456
Rockerman Canal Improvements
Marine Stadium Restoration
Marine Stadium Bulkhead Replacement
West End Park New Community
Miamarina Pier A, B & C Fire Line
Spoil Island E Restoration and Floating
Martin Luther King (MLK) Blvd / I-95
Coral Gate Mini Park - D4
Traffic Circle - SW 18th Ave. & SW 13th
SW 2nd Street and SW 40th Avenue
Manatee Bend Park Shoreline
Pallot Park Shoreline Improvements - D2
African Square Park - Splash Park - D5
NW 62 Street West of I-95 Roadway
Lummus Landing Square - D5
La Pastorita Traffic Calming and misc.
East Flagami Roadway Improvements -
Robert King High Fencing and
Bay of Pigs Memorial Park Lighting - D4
Modification of Speed Humps on SW 11
Coral Gate Speed Humps - D4
Oakland Grove Park - upgrades - D5
Marine Stadium Marina Improvements
Curtis Park New Pool Facility and Boat
Duarte Park Building Renovation
Kennedy Park Restroom Build'
Maximo Gomez / Domi
a
Hadley Park New : th Center D5
Moore Park Ne onstruction
Neighbor •.d Parks Improv.
Qual' - of Life District 2 - Various
h Venetian Drive Lighting (District
District 2 Quality of Life Park
Bayside Historic Sign - D2
80 Marine Stadium Marina at Virginia Key
Antonio Maceo Community Building -
Total
Funding
$491,147
$65,000
$175,000
$178,000
$1,090,210
$380,000
$105,000
$100,000
$100,000
$10,000
$50,000
$50,027
$50,000
$600,000
$75,000
$925,061
$50,000
$422,264
$102,468
$20,000
$25,000
$53,0
,190
$120,000
$1,297,161
$752,797
$96,133
$19,127
$1,591,277
$5,168,221
$510,916
$60,132
$100,000
$409,751
$33,000
$940,007
$65,722
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Prior Approp.
Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 117 2017 - 2018
$491,147
$65,000
$175,000
$178,000
$1,090,210
$380,000
$105,000
$100,000
$100,000
$10,000
$50,000
$50,027
$50,000
$600,000
$75,000
$925,061
$50,000
$422
$ : ,468
$20,000
$25,000
$53,000
$42,190
$120,000
$1,297,161
$752,797
$96,133
$19,127
$1,591,277
$5,168,221
$510,916
$60,132
$100,000
$409,751
$33,000
$940,007
$65,722
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
SUBSTITUTED
Future Funding Estimates
Active & Future
CIP Projects Only
FUNDING
City Bonds (Cont.)
385200-3 2002
B-40643A
B-40686
B-50706A
B-60453A
B-60454
B-60464
B-70100
B-72813
B-75883
B-75973
B-78502A
B-78508
Homeland Defense Bonds (Series 3)
North Spring Garden Greenway
Miami River Greenways/ Streetscape
Roadway, Drainage and Traffic
Fire Station #13
Fire Station #14 (New)
New Dinner Key Marina Dockmaster
Gusman Hall Improvements / Repairs
Defense and Security Equipment
Peacock Park Site Improvements
Oakland Grove Park Playground
Museum of Science - Development in
NE 2 Avenue Improvements
Total
Funding
$100,200
$478,217
$776,000
$18,364
$1,050,105
$3,213,164
$394,169
$1,981,636
$595,000
$15,000
$1,262,000
$2,649,420
385200-3 $31,343,120
385200-8 2002 Homeland Defense Series 1 Interest Post 09-30-06
B-30305B
B-30538
B-30981
B-35861B
Gibson Park New Construction
Museum Park - Partially Funded by CRA
Oakland Grove Park - upgrades - D5
Maximo Gomez / Domino Park
$841,280
$236,436
$2,697
$29,241
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Prior Approp.
Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 017 2017 - 2018
$100,200
$478,217
$776,000
$18,364
$1,050,105
$3,213,164
$394,169
$1,981,636
$595,000
$15,000
$1,262,000
$2,649,420
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$31,343,120 $0
$841,280
$236,436
$2,69
$2', 41
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
$0
$0
$0
$0
$0
$0
$0
SUBSTITUTED
Future Funding Estimates
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
385200-8 $1,109,654
397001 1970 Pollution Control G.O.B. (303000) (399003)
B-60351 Fire Station #10 (New) $361,2
,109,654 $0
$361,200 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
397001 $ . 1,200
399001 1976 & 78 Storm Sewer G O Bond
B-30183 Garden Storm Sewer - Phase I $250,000
B-50643 Wagner Creek / Seybold Canal D - . ging $617,481
399001
City Bonds
CIP Fees/Revenues
356001 Local Optio as Tax
B-30551 ' blic Works Maintenance Yard
B-30588 San Marco Island and Biscayne Island
B-306 District 5 - Miscellaneous Roadway
B- i 00 Citywide - FDEP Drainage Wells
-30992 Riverview and Lawrence Pump Stations -
$867,481
$361,200 $0
$250,000 $0
$617,481 $0
$867,481 $0
124,355,706 124,355,706 $0
$2,000,000 $2,000,000
$747,170 $747,170
$193,767 $193,767
$500,000 $500,000
$500,000 $500,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Active & Future
CIP Projects Only
FUNDING
CIP Fees/Revenues (Cont.)
356001 Local Option Gas Tax
B-40168 South Bayshore Drive from Aviation $100,000 $100,000 $0 $0 $0 i $0 $0
B-40643A North Spring Garden Greenway $325,000 $325,000 $0 $0 $0 $0 $0 $0
B-50654 Overtown Stormwater Pump Station $200,000 $200,000 $0 $0 $0 $0 $0 $0
B-78500B Buena Vista East Roadway, Drainage, $250,862 $250,862 $0 $0 $0 $0 $0 $0
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 117 2017 - 2018
SUBSTITUTED
Future Funding Estimates
356001 $4,816,799 $4,816,799 $0 $0 i $0 $0 $0
356002 Local Option Gas Tax 2009 and Future
B-43114B Public Works Miscellaneous Sidewalk $484,400 $158,400 $326,000 $0 $0 $0 $0 $0
B-73102C Citywide Street Milling and Resurfacing $401,400 $0 $0 $401,400 $0 $0 $0 $0
356002 $885,800 $158,400 $326,000 $401, :1 $0 $0 $0 $0
356003 Parking Surcharge
B-71210 Downtown Street Conversions $50,000 $50,000 $0 $0 $0 $0 $0 $0
356003 $50,000 $50,000 $0 $0 $0 $0 $0 $0
356007 Parking Surcharge 2007
v B-30606N DWNTWN Beautification - North $549,715 $549,715 $0 $0 $0 $0 $0 $0
B-306065 DWNTWN Beautification - South $549,716 $549,716 $0 $0 $0 $0 $0 $0
B-30621 Center Grove Street and Lighting $888,185 $888,185 $0 $0 $0 $0 $0 $0
B-30628 Bird Avenue Road Improvement $1,280,505 $1,280 .15 $0 $0 $0 $0 $0 $0
B-30631 Miami River Greenway from Miami $221,625 1,625 $0 $0 $0 $0 $0 $0
B-30637 Mary Brickell Village Drainage $1,623,442 $1,000,000 $0 $623,442 $0 $0 $0 $0
B-30646 South Bayshore Drive Roadway and $300,000 $0 $0 $300,000 $0 $0 $0 $0
B-30833 SW 1st Ave between SW 15th and SW $368, $0 $0 $368,212 $0 $0 $0 $0
B-31206 SE 3rd Street Widening $ :0,205 $280,205 $0 $0 $0 $0 $0 $0
B-73102A Citywide Streets Milling & Resurfacing ' 2,452,375 $1,023,775 $1,428,600 $0 $0 $0 $0 $0
B-73102B Citywide Streets Milling and $6,207,946 $0 $0 $607,946 $1,400,000 $1,400,000 $1,400,000 $1,400,000
356007 $14,721,926 $5,793,726
359101 Special Assessment District (SAD ' evenue
B-30680 Rockerman Canal Im. ,.vements
$1,428,600 $1,899,600
$1,400,000 $1,400,000
$1,400,000 $1,400,000
$272,490 $248,490 $24,000 $0 $0 $0 $0 $0
359101 $272,490 $248,490 $24,000 $0 $0 $0 $0 $0
360001 Stormwater Utih and
B-30262 Cit se Storm Sewer Repair Project $1,372,476 $1,372,476 $0 $0 $0 $0 $0 $0
B-30680 ! .ckerman Canal Improvements $286,599 $286,599 $0 $0 $0 $0 $0 $0
B-50643 Wagner Creek/ Seybold Canal Dredging $2,534,159 $2,534,159 $0 $0 $0 $0 $0 $0
B-5065Overtown Stormwater Pump Station $360,152 $360,152 $0 $0 $0 $0 $0 $0
B- :.72 Belle Meade Storm Sewer Project, Ph 2 $3,357,982 $3,357,982 $0 $0 $0 $0 $0 $0
360001 $7,911,368 $7,911,368 $0 $0 $0 $0 $0 $0
w
CO
Active & Future
CIP Projects Only
FUNDING
CIP Fees/Revenues (Cont.)
360003 Stormwater Utility Fund (FY07 and Future)
B-30008
B-30011
B-30262
B-30421
B-30422
B-30423
B-30424
B-30425
B-30588
B-30637
B-30680
B-30700
B-30992
B-40271
B-50643
B-50672
B-50706A
Grove Park Road and Storm Sewers
Englewood Road and Storm Sewer
Citywide Storm Sewer Repair Project
D1 - Stromwater Projects
D2 - Stormwater Projects
D3 - Stormwater Projects
D4 - Stormwater Projects
D5 - Stormwater Projects
San Marco Island and Biscayne Island
Mary Brickell Village Drainage
Rockerman Canal Improvements
Citywide - FDEP Drainage Wells
Riverview and Lawrence Pump Stations -
Solid Waste Sweeper
Wagner Creek / Seybold Canal Dredging
Belle Meade Storm Sewer Project, Ph 2
Roadway, Drainage and Traffic
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 117 2017 - 2018
$119,000
$273,961
$4,038,685
$1,078,000
$1,078,000
$1,078,000
$1,078,000
$1,078,000
$489,938
$100,000
$272,726
$1,740,934
$1,324,095
$170,000
$430,297
$2,415,562
$154,916
SUBSTITUTED
Future Funding Estimates
$119,000 $0 $0 $0 '.S $0 $0
$273,961 $0 $0 $0 $0 $0 $0
$2,738,685 $700,000 $600,000 $0 $0 $0 $0
$0 $0 $0 $238,000 $280,000 $280,000 $280,000
$0 $0 $0 $238,001 $280,000 $280,000 $280,000
$0 $0 $0 $23',100 $280,000 $280,000 $280,000
$0 $0 $0 38,000 $280,000 $280,000 $280,000
$0 $0 $0 $238,000 $280,000 $280,000 $280,000
$489,938 $0 $0 $0 $0 $0 $0
$100,000 $0 t0 $0 $0 $0 $0
$272,726 $0 $0 $0 $0 $0 $0
$504,934 $0 $400,000 $209,000 $209,000 $209,000 $209,000
$624,095 $700,000 $0 $0 $0 $0 $0
$170,000 1 $0 $0 $0 $0 $0
$430,297 $0 $0 $0 $0 $0 $0
$2,415,562 $0 $0 $0 $0 $0 $0
$154,916 $0 $0 $0 $0 $0 $0
360003 $16,920,114 $8,294 4 $1,400,000 $1,000,000 $1,399,000 $1,609,000 $1,609,000 $1,609,000
367001 Impact Fees
B-30373A Police Department Property Unit $386,102 $386,102 $0 $0 $0 $0 $0 $0
B-31206 SE 3rd Street Widening $177,892 $177,892 $0 $0 $0 $0 $0 $0
B-35806 Curtis Park New Pool Facility and Boat $9 '5 $9,295 $0 $0 $0 $0 $0 $0
B-35838 Kennedy Park Restroom Building 4,900 $4,900 $0 $0 $0 $0 $0 $0
B-50654 Overtown Stormwater Pump Station $12,088 $12,088 $0 $0 $0 $0 $0 $0
B-50672 Belle Meade Storm Sewer Project, Ph $700,000 $700,000 $0 $0 $0 $0 $0 $0
B-60351 Fire Station #10 (New) $195,737 $195,737 $0 $0 $0 $0 $0 $0
B-70108 Purchase of a video transmis .n server $0 $0 $0 $0 $0 $0 $0 $0
B-72803 Fire Station Equipment - d Furniture $82,022 $82,022 $0 $0 $0 $0 $0 $0
B-74205B GSA Fleet Maint- ' nce Garage $250,063 $250,063 $0 $0 $0 $0 $0 $0
367001 $1,818,099 $1,818,099 $0 $0 $0 $0 $0 $0
367011 Impact Fees - : rd 12750
B-30174 V' , inia Key Beach Park Historic $124,500 $0 $124,500 $0 $0 $0 $0 $0
B-30373A Police Department Property Unit $447,200 $367,200 $80,000 $0 $0 $0 $0 $0
B-30541 Citywide Park Equipment & Site $345,785 $345,785 $0 $0 $0 $0 $0 $0
B-31-41D Citywide Park Equipments & Site $1,741,439 $483,112 $1,258,327 $0 $0 $0 $0 $0
-30984 Athalie Range Park HVAC Replacement $193,043 $0 $193,043 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
CIP Fees/Revenues (Cont.)
367011 Impact Fees - Ord 12750
Total
Funding
B-30995 Virginia Key Bike and Kayak Facility - $477,000
B-35806 Curtis Park New Pool Facility and Boat $243,123
B-35883A Hadley Park New Youth Center D5 $500,000
B-35887 Moore Park New Construction $443,600
B-40273 Police Station Headquarters Generator $10,000
B-40454 Park Expansions and Land Acquisition - $1,000,000
B-40455 Citywide Capital Improvements Projects $263,946
B-40456 Antonio Maceo Community Building - $121,028
B-40457 Kinloch Park Building Addition - D1 $114,007
B-60453A Fire Station #13 $6,504
B-60464 New Dinner Key Marina Dockmaster $87,986
B-70718 Fire Facilities Generators (North & $280,500
B-72810A New Fire Rescue Apparatus (North & $573,740
B-72915A Police Headquarters Helipad and Roof $244,428
B-74205B GSA Fleet Maintenance Garage $154,152
B-74205C GSA Truck Wash Pit $88,000
B-74219B Property Maintenance Security $25,000
B-74219C Property Maintenance Bobcats & Trailer $40,000
B-75883 Peacock Park Site Improvements $124
367011
375001 Fire Assessment Fee
B-70102A Fire Station No. 6 Office Building -
B-70104 Fire Station No. 10 Restroom
B-70105 Refurbishing of Existing Apparatus
B-70106 Firefighting Equipment and Gear
B-70211 Fire Station No. 3 Dormitories B -out
B-70212 Fire Station No. 12 - Re -roof g Project
B-70718 Fire Facilities Generato • orth &
B-72801 Computer Aided D.:.atch (CAD)
B-72802 Fire Stations : • her Fire Facilities
B-72803 Fire Stat Equipment and Furniture
B-72804 Pho . and Radio Equipment Upgrades
B-72808 ight Fleet Replacement
B-72809 Large Firefighting Equipment
B-746 ERP Integration System
$7,525,105
$74 : 9
0,301
$230,000
$158,124
$100,000
$77,000
$19,500
$120,866
$2,404,979
$175,000
$291,200
$374,867
$110,316
$305,015
City Of Miami - Capital Improvement Program SUBSTITUTED
Fund Source Management System
Funding Type by Job No.
Prior Approp.
Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 117 2017 - 2018
$477,000
$193,123
$500,000
$443,600
$0
$0
$0
$0
$0
$6,504
$87,986
$280,500
$113,044
$24,506
$49,055
$0
$9,776
$124
$0
$50,000
$0
$0
$10,000
$1,000,000
$263,946
$121,028
$114,007
$0
$0
$0
$460,696
$219,9
$ i ,097
$88,000
$15,224
$40,000
$0
3,381,315 $4,143,790
$74,619
$60,301
$230,000
$158,124
$100,000
$77,000
$19,500
$120,866
$2,404,979
$175,000
$291,200
$374,867
$110,316
$305,015
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Future Funding Estimates
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
375001 $4,501,787
$4,501,787
$0 $0
$0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
CIP Fees/Revenues (Cont.)
375002 Fire Assessment Fee (FY07)
B-70104
B-72802
B-72803
B-72804
B-72808
B-72809
Fire Station No. 10 Restroom
Fire Stations & Other Fire Facilities
Fire Station Equipment and Furniture
Phone and Radio Equipment Upgrades
Light Fleet Replacement
Large Firefighting Equipment
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 117 2017 - 2018
SUBSTITUTED
Future Funding Estimates
$55,524 $55,524 $0 $0 $0 .d $0 $0
$501,290 $501,290 $0 $0 $0 $0 $0 $0
$130,018 $130,018 $0 $0 $0 $0 $0 $0
$60,000 $60,000 $0 $0 $0 $0 $0 $0
$292,791 $292,791 $0 $0 $$0 $0 $0
$216,500 $216,500 $0 $0 $0 $0 $0 $0
375002 $1,256,123 $1,256,123 $0 $0 $0 $0 $0 $0
382001 Contribution From General Fund
B-30365H Generator for City Hall $27,293 $27,293 $0 '.: $0 $0 $0 $0
B-30501C Manuel Artime Window Replacement $37,716 $37,716 $0 $0 $0 $0 $0 $0
B-30538 Museum Park - Partially Funded by CRA $50,778 $50,778 $0 $0 $0 $0 $0 $0
B-30994 City of Miami Impact Fee Study - $65,491 $65,491 $0 $0 $0 $0 $0 $0
B-33506 James L. Knight Center Miscellaneous $48,722 $48,722 $1 $0 $0 $0 $0 $0
B-60351 Fire Station#10 (New) $341,186 $341,186 $0 $0 $0 $0 $0 $0
B-74200 Citywide General Fleet Replacement $1,070,989 $1,070,989 $0 $0 $0 $0 $0 $0
B-74220 Police Vehicle Replacement $9,141,422 $9,141,422 $0 $0 $0 $0 $0 $0
B-74606 Upgrade PC Software & Hardware $2,003,786 $2,003,78. $0 $0 $0 $0 $0 $0
B-74609 ERP Integration System $5,486,772 $5,48. 72 $0 $0 $0 $0 $0 $0
B-74614 Land Management System $1,176,209 $ , 76,209 $0 $0 $0 $0 $0 $0
382001 $19,450,364 $19,450,364 $0 $0 $0 $0 $0 $0
382007 Contribution From General Fund 2003
B-74609 ERP Integration System $7,00 i,000 $7,000,000 $0 $0 $0 $0 $0 $0
382007 7,000,000 $7,000,000 $0 $0 $0 $0 $0 $0
382008 Contribution From General Fund 2007 and ' ture
B-30365E Coral Way NET Office Remode g/ $15,000 $15,000 $0 $0 $0 $0 $0 $0
B-30365H Generator for City Hall $28,562 $28,562 $0 $0 $0 $0 $0 $0
B-30365J Beckham Hall Fire Da ge Repair $6,770 $6,770 $0 $0 $0 $0 $0 $0
B-30373A PoliceDepartme ropertyUnit $120,107 $120,107 $0 $0 $0 $0 $0 $0
B-30501A Manuel Artie -- Miscellaneous Project $3,300 $3,300 $0 $0 $0 $0 $0 $0
B-30501C Manuel ' ime Window Replacement $25,000 $25,000 $0 $0 $0 $0 $0 $0
B-30541D Ci 'de Park Equipments & Site $144,939 $9,200 $135,739 $0 $0 $0 $0 $0
B-30551 ublic Works Maintenance Yard $1,268,254 $1,268,254 $0 $0 $0 $0 $0 $0
B-30865A Environmental Remediation Study $466,900 $0 $45,900 $421,000 $0 $0 $0 $0
B-308 1 City Hall Roof Terrace $314,176 $0 $314,176 $0 $0 $0 $0 $0
865C City Hall Windows and Doors $296,001 $0 $296,001 $0 $0 $0 $0 $0
B-30865E MRC A/C Replacements $289,823 $0 $289,823 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
CIP Fees/Revenues (Cont.)
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 017 2017 - 2018
382008 Contribution From General Fund 2007 and Future
B-30865F
B-40410
B-40527
B-60455B
B-70104
B-70210
B-70241
B-70411
B-70418
B-70969
B-72802
B-72803
B-72809
B-73202C
B-74200
B-74220
B-74606
B-74609
B-74617
Environmental Remediation Study -
Fire Alarm Replacement, Air
Melreese Golf Course Renovations
Fire Station #1 - Renovation and
Fire Station No. 10 Restroom
Fire Station #5 Exterior Walls Repair -
Fire Rescue Capital Needs - FY2014
Fire Rescue Personal Protective
FEMA Assistance to Firefighters Program
IT - Financial Management Upgrade
Fire Stations & Other Fire Facilities
Fire Station Equipment and Furniture
Large Firefighting Equipment
Solid Waste Collection Equipment
Citywide General Fleet Replacement
Police Vehicle Replacement
Upgrade PC Software & Hardware
ERP Integration System
IT Modernization
$140,000
$1,426,200
$200,000
$500,000
$72,394
$150,000
$1,858,500
$164,114
$68,722
$500,000
$695,152
$400,000
$61,500
$5,009,427
$2,539,280
$18,350,315
$916,896
$2,825,965
$2,800,000
$0
$0
$0
$0
$72,394
$150,000
$0
$164,114
$68,722
$0
$595,152
$150,000
$0
$3,548,727
$2,189,280
$16,498,315
$916,896
$2,825,9
$2,: t 1,000
SUBSTITUTED
Future Funding Estimates
$140,000 $0 $0 d $0 $0
$1,426,200 $0 $0 $0 $0 $0
$0 $200,000 $0 $0 $0 $0
$500,000 $0 $0 $0 $0 $0
$0 $0 $1 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $1,858,500 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$500,000 t0 $0 $0 $0 $0
$100,000 $0 $0 $0 $0 $0
$250,000 $0 $0 $0 $0 $0
$61,500 $0 $0 $0 $0 $0
$854, S 1 $606,600 $0 $0 $0 $0
$ '1,000 $0 $0 $0 $0 $0
1,852,000 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
382008
383001 CIP Misc. Revenue
B-50654 Overtown Stormwater Pump Station
383001
383005 CIP Miscellaneous Revenue
B-30365E Coral Way NET Office Remodelin
B-72915A Police Headquarters Helipad a
$41,657,297 :; 1,455,758 $7,115,439 $3,086,100 $0 $0 $0 $0
$46 8 $46,358 $0 $0 $0 $0 $0 $0
46,358 $46,358 $0 $0 $0 $0 $0 $0
$276,833 $0 $0 $276,833 $0 $0 $0 $0
oof $161,837
$0 $161,837 $0 $0 $0 $0 $0
383005 $438,670 $0 $161,837 $276,833 $0 $0 $0 $0
888923 Contribution From Spec]. , ' evenue
B-30501A Manuel Art' - iscellaneous Project $19,744 $19,744 $0 $0 $0 $0 $0 $0
B-30501B Manuel '. ime Dimmer Rack System $35,115 $35,115 $0 $0 $0 $0 $0 $0
B-60464 New ►. inner Key Marina Dockmaster $4,163 $4,163 $0 $0 $0 $0 $0 $0
B-74609 ..'PIntegrationSystem $1,500,000 $1,500,000 $0 $0 $0 $0 $0 $0
923 $1,559,022 $1,559,022 $0 $0 $0 $0 $0 $0
88892 DRI Fees Transportation
0538F Museum Park - DRI Transportation $2,296,404 $2,296,404 $0 $0 $0 $0 $0 $0
B-31206A SE 3rd St Widening (fka Dupont Plaza) $1,500,000 $1,500,000 $0 $0 $0 $0 $0 $0
M
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program SUBSTITUTED
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 117 2017 - 2018
Future Funding Estimates
888924 $3,796,404 $3,796,404 $0 $0 $0 $0 $0 $0
888926 Prior Year Fund Balance
B-50643 Wagner Creek/ Seybold Canal Dredging $91,565 $91,565 $0 $0 $0 $0 $0
888926 $91,565 $91,565 $0 $0 $0 $0 $0 $0
888930 Transit Half -Cent Surtax
B-30183 Garden Storm Sewer - Phase I $149,920 $149,920 $0 $0 $0 $0 $0 $0
B-30336 Miami River Greenway (5th Street $277,280 $277,280 $0 $0 '.1 $0 $0 $0
B-30606 DWNTWN Beautification Project Phase $50,000 $50,000 $0 $0 $0 $0 $0 $0
B-30615 District 5 - Miscellaneous Roadway $150,916 $150,916 $0 $0 $0 $0 $0 $0
B-30630 Palm Grove Road Improvements $256,693 $256,693 $0 $0 $0 $0 $0 $0
B-30645A Transportation Program Support $588 $588 $0 $$0 $0 $0 $0
B-30662D US-1 Median Closures at Bridgeport $60,000 $60,000 $0 $0 $0 $0 $0 $0
B-30695 SW 19th Terr. Imp. -Partial CDBG $170,000 $170,000 $0 $0 $0 $0 $0 $0
B-30716 Tigertail Resurfacing - D2 $2,702 $2,702 $0 $0 $0 $0 $0 $0
B-30774 West Flagler Area Improvements - D4 - $98,933 $98,933 $0 $0 $0 $0 $0 $0
B-30775 Shenandoah Area Improvements - D4 $366,281 $366,281 l0 $0 $0 $0 $0 $0
B-30776 Silver Bluff Drainage Improvements - D4 $115,073 $115,073 $0 $0 $0 $0 $0 $0
B-30780 NW 14 Avenue and 28 Street Area $335,798 $335,798 $0 $0 $0 $0 $0 $0
B-30781 NW 11 Street from 27 to 37 Avenue Area $147,694 $147,694 $0 $0 $0 $0 $0 $0
B-30785 NW 36 Avenue 15 to 16 Street Drainage $50,000 $50 10 $0 $0 $0 $0 $0 $0
B-30786 NW 43 Avenue between 9 to 11 Street $78,224 8,224 $0 $0 $0 $0 $0 $0
B-40695L Miami River Greenway Segment G and $140,700 $140,700 $0 $0 $0 $0 $0 $0
B-50672 Belle Meade Storm Sewer Project, Ph 2 $1,300,000 $1,300,000 $0 $0 $0 $0 $0 $0
B-50706A Roadway, Drainage and Traffic $284 '43 $284,903 $0 $0 $0 $0 $0 $0
B-70246 Transportation Program Support Services 1,200 $51,200 $0 $0 $0 $0 $0 $0
B-70246A Beach Corridor Transit Connection $30,000 $30,000 $0 $0 $0 $0 $0 $0
B-73102A Citywide Streets Milling & Resurfaci _ $15,353 $0 $15,353 $0 $0 $0 $0 $0
B-78508 NE 2 Avenue Improvements $55,001 $55,001 $0 $0 $0 $0 $0 $0
888930 $4,187,259 $4,171,906 $15,353 $0 $0 $0 $0 $0
888931 Transit Half -Cent Surtax ( 17 and Future)
B-30011 Englewood Roa. : d Storm Sewer $618,102 $618,102 $0 $0 $0 $0 $0 $0
B-30336 Miami Rive eenway (5th Street $979,360 $979,360 $0 $0 $0 $0 $0 $0
B-30411 FY201D1 Roadway, drainage and $90,000 $0 $0 $90,000 $0 $0 $0 $0
B-30412 F 014 - D2 Roadway, drainage and $90,000 $0 $0 $90,000 $0 $0 $0 $0
B-30413 FY2014 - D3 Roadway, drainage and $90,000 $0 $0 $90,000 $0 $0 $0 $0
B-30414 FY2014 - D4 Roadway, drainage and $82,143 $0 $0 $82,143 $0 $0 $0 $0
B-36 NW 34 Ave over Comfort Canal - Bridge $178,700 $0 $0 $178,700 $0 $0 $0 $0
30431 D1 - Reconstruction of Roadway $2,400,000 $0 $0 $0 $600,000 $600,000 $600,000 $600,000
w
Active & Future
CIP Projects Only
FUNDING
CIP Fees/Revenues (Cont.)
888931 Transit Half -Cent Surtax (FY07 and Future)
B-30432 D2 - Reconstruction of Roadway
B-30433 D3 - Reconstruction of Roadway
B-30434 D4 - Reconstruction of Roadway
B-30435 D5 - Reconstruction of Roadway
B-30518 Northwest 14th Street Streetscape Project
B-30540 Little River Industrial Park
B-30588 San Marco Island and Biscayne Island
B-30606N DWNTWN Beautification - North
B-306065 DWNTWN Beautification - South
B-30611 District 1 - Miscellaneous Roadway
B-30613 District 3 - Miscellaneous Roadway
B-30614 District 4 - Miscellaneous Roadway
B-30615 District 5 - Miscellaneous Roadway
B-30621 Center Grove Street and Lighting
B-30624 Overtown Greenway @ NW 11 Terrace
B-30628 Bird Avenue Road Improvement
B-30630 Palm Grove Road Improvements
B-30645A Transportation Program Support
B-30645B Transportation Program Support
B-30645E Overtown / Wynwood Bicycle
B-30645F Miami Regional Intermodal Plan
B-30646 South Bayshore Drive Roadway and
B-30651 Miami River Greenway from NW loth to
B-30662D US-1 Median Closures at Bridgeport
B-30694A Citywide Bicycle Rack & Signage
B-30716 Tigertail Resurfacing - D2
B-30723 NW 24th Avenue Roadway Im. ovement
B-30770 SW 22nd Avenue Median S 1 to
B-30774 West Flagler Area I s ovements - D4 -
B-30779 SW 2nd Street a.. SW 40th Avenue
B-30780 NW 14 Av- e and 28 Street Area
B-30782 Allap. ' . Area Roadway Improvement -
B-30803 S 18th Avenue from SW 23rd Street to
B-30822 Brickell Area Shared Use Path and
B-30823 Fair Isle Area Roadway and Drainage
B-31 : 7 South Grove Phase 1 Roadway and
-30835 South Grove Phase 2 Roadway and
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 117 2017 - 2018
$1,200,000
$2,400,000
$2,400,000
$2,400,000
$439,000
$12,000
$1,076,873
$861,784
$461,784
$714,000
$3,252,644
$360,821
$514,000
$1,103,383
$461,905
$680,000
$1,201,546
$392,489
$881,042
$12,000
$15,000
$100,0
$8 :,640
100,000
$115,000
$308,156
$700,000
$54,000
$909,239
$200,000
$83,467
$500,000
$97,000
$844,267
$180,000
$286,830
$492,000
SUBSTITUTED
Future Funding Estimates
$0 $0 $0 $0 i $600,000 $600,000
$0 $0 $0 $600,000 $6t 1,000 $600,000 $600,000
$0 $0 $0 $600,000 $600,000 $600,000 $600,000
$0 $0 $0 $600,000 $600,000 $600,000 $600,000
$439,000 $0 $0 $1 $0 $0 $0
$12,000 $0 $0 $0 $0 $0 $0
$1,076,873 $0 $0 $0 $0 $0 $0
$861,784 $0 $0 $0 $0 $0 $0
$461,784 $0 $0 $0 $0 $0 $0
$200,000 $514,000 0 $0 $0 $0 $0
$2,038,644 $514,000 10,000 $0 $0 $0 $0
$0 $314,000 $46,821 $0 $0 $0 $0
$0 $514,000 $0 $0 $0 $0 $0
$700,000 $403, $0 $0 $0 $0 $0
$461,905 $0 $0 $0 $0 $0 $0
$680,000 $0 $0 $0 $0 $0 $0
$1,201,546 $0 $0 $0 $0 $0 $0
$392,4?' $0 $0 $0 $0 $0 $0
$ ,042 $0 $0 $0 $0 $0 $0
$12,000 $0 $0 $0 $0 $0 $0
$15,000 $0 $0 $0 $0 $0 $0
$100,000 $0 $0 $0 $0 $0 $0
$820,640 $0 $0 $0 $0 $0 $0
$100,000 $0 $0 $0 $0 $0 $0
$115,000 $0 $0 $0 $0 $0 $0
$308,156 $0 $0 $0 $0 $0 $0
$0 $0 $700,000 $0 $0 $0 $0
$54,000 $0 $0 $0 $0 $0 $0
$909,239 $0 $0 $0 $0 $0 $0
$0 $200,000 $0 $0 $0 $0 $0
$83,467 $0 $0 $0 $0 $0 $0
$500,000 $0 $0 $0 $0 $0 $0
$0 $0 $97,000 $0 $0 $0 $0
$844,267 $0 $0 $0 $0 $0 $0
$180,000 $0 $0 $0 $0 $0 $0
$0 $110,617 $176,213 $0 $0 $0 $0
$0 $0 $492,000 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
CIP Fees/Revenues (Cont.)
888931 Transit Half -Cent Surtax (FY07 and Future)
B-30836
B-30883
B-30888
B-30900
B-30902
B-30904
B-30967
B-30968
B-30969
B-30971
B-30972
B-30975
B-30976
B-30978
B-30979
B-30985
B-30990
B-30993
B-30998
B-31206
B-40704A
B-50672
B-50706A
B-70245
B-70246
B-70247
B-70715
B-73102A
B-78508
South Grove Phase 3 Roadway and
NW 12 Avenue / NW 12 Place Roadway
Wynwood Area Roadway Improvement -
NW 40 St from NW 10 Ave to NW 12
Phase I: Little River (N); NE 82 St (S); N
NW 70 Street Area Roadway & Minor
SW 16th Terrace from SW 21 Ave to SW
SW 12th St (SW 30th Ave and SW 30th
SW 30th Court (SW 12th Street and SW
SW 5th Street between 42 Ave and 43
SW 64 Court Roadway & Drainage
Swale Restoration @ NW 2 Street
SW 2 St from 53 Ave to 54 Ave - D4
Drainage improvements @ SW 4 St
SW 21st St. & 24th Ave Roadway
Design District Roadway and Stormwater
Roadway Improvements
SW/NW 17th Avenue Traffic Corridor
Citywide Sidewalk Repair Project - PW
SE 3rd Street Widening
SW 32 Avenue Improvements
Belle Meade Storm Sewer Project, Ph 2
Roadway, Drainage and Traffic
Transportation Program Support Services
Transportation Program Support Service
Citywide Mass Transit Studies
City of Miami Trolley Progra Capital
Citywide Streets Millin• Resurfacing
NE 2 Avenue Impro ents
City Of Miami - Capital Improvement Program
Fund Source Management System SUBSTITUTED
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 117 2017 - 2018
$1,231,787 $0
$1,199,976 $1,199,976
$500,000 $500,000
$98,981 $0
$90,509 $0
$100,510 $0
$150,467 $0
$36,102 $0
$43,214 $0
$7,857 $0
$132,522 $0
$28,809 $0
$54,000 $0
$51,065 $0
$60,000 $0
$500,000 $0
$361,000 $361,000
$200,000 $200,
$169,615 $
$183,398 $183,398
$785,000 $785,000
$2,070,2 $2,070,295
,426 $2,426
$294,958 $144,958
$448,800 $267,202
$318,402 $0
$1,021,972 $1,021,972
$6,734,037 $0
$1,230,811 $1,230,811
Future Funding Estimates
$0 $31,787 $600,000 $600,00 i $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $98,981 $0 $0 $0 $0
$0 $90,509 $i $0 $0 $0
$0 $100,510 $0 $0 $0 $0
$0 $150,467 $0 $0 $0 $0
$0 $36,102 $0 $0 $0 $0
$0 $43,214 $0 $0 $0 $0
$0 $7: 7 $0 $0 $0 $0
$0 32,522 $0 $0 $0 $0
$0 $28,809 $0 $0 $0 $0
$0 $54,000 $0 $0 $0 $0
$51,065 $0 $0 $0 $0
$0 $60,000 $0 $0 $0 $0
$0 $500,000 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$100,000 $50,000 $0 $0 $0 $0
$0 $181,598 $0 $0 $0 $0
$0 $318,402 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$504,600 $0 $1,324,955 $1,476,328 $1,633,000 $1,795,154
$0 $0 $0 $0 $0 $0
888931 $49,265,688 $23,182,951 $3,174,600 $4,678,700 $4,324,955 $4,476,328 $4,633,000 $4,795,154
888956 Contribution fr . Special Revenue - SRF 2007
B-30501A M uel Artime Miscellaneous Project $69,839 $69,839 $0 $0 $0 $0 $0 $0
B-30501B anuel Artime Dimmer Rack System $58,299 $58,299 $0 $0 $0 $0 $0 $0
B-30501C Manuel Artime Window Replacement $87,663 $87,663 $0 $0 $0 $0 $0 $0
B-306! Seminole Dinghy Dock Expansion $30,000 $30,000 $0 $0 $0 $0 $0 $0
0689 Marine Stadium Bulkhead Replacement $71,695 $71,695 $0 $0 $0 $0 $0 $0
B-30706 Miscellaneous Repairs 10% Set Aside $1,896,375 $808,759 $571,400 $516,216 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
CIP Fees/Revenues (Cont.)
888956 Contribution from Special Revenue - SRF 2007
B-30735 Dinner Key Marina Dinghy Dock - D2
B-33514 Marine Stadium Marina Improvements
B-43114B Public Works Miscellaneous Sidewalk
B-50722 Little River Waterfront Park
B-50722A Little River Waterfront Park Acquisition
B-60464 New Dinner Key Marina Dockmaster
B-70010 Miamarina Pier 5 Canopies - PF
B-70011 Clean Vessel Act 2013 - PF
B-75883 Peacock Park Site Improvements
888956
888969 Subrogation Auto Claim Revenues
B-30666 Damaged Vehicle Replacement / Repairs
Total
Funding
$253,070
$76,870
$549,746
$600,000
$551,250
$655,921
$435,000
$20,584
$100,000
$5,456,312
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Prior Approp.
Approp. 2012 - 2013 2013 - 2014
$178,070 $75,000
$76,870 $0
$0 $549,746
$600,000 $0
$0 $551,250
$655,921 $0
$200,000 $0
$0 $0
$0 $100,000
$2,837,116
$0
$0
$0
$0
$0
$0
$235,000
$20,584
$0
$1,847,396 $77 ,:00
$726,051 $603,864 $122,187 $0
SUBSTITUTED
Future Funding Estimates
2014 - 2015
$0
$0
$0
$0
$0
$0
$0
$0
2015 - 2016 2016 - 017 2017 - 2018
$0
$0
$0
$0
$0
$0
$0
$0
$0 $0
$0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
888969
888972 Rickenbacker Marina Rental Revenue
B-30706 Miscellaneous Repairs 10% Set Aside
888972
888973 TVM Production Basic Use Fee
B-30182A
B-30541C
B-30721
B-30824
B-30825
B-30825A
B-30825B
B-40171
B-40172
B-75883
Coconut Grove Waterfront Master Plan
Kennedy Park Shoreline Stabilization
Spoil Island E Restoration and Floating
Spoil Island B & C Swim Area
Biscayne Bay Spoil Island B Public
Biscayne Bay Spoil Island E Picnic
Biscayne Bay Spoil Island E Public
Coconut Grove Viewing Platform .oil
Coconut Grove Viewing Platf• Spoil
Peacock Park Site Impro -ments
888973
888977 DRI Fees Air Qu
B-30538E Museu- 'ark -DRI Air Quality
888977
888978 DR
B-3053
B- . 06B
ees Administration
Museum Park - DRI Fees
SE 3rd Street Widening - DRI
$726,051 $603,864 $122,1: $0
$137,601
$137,601
$549,631
$75,000
$75,000
$67
0,000
$750
$750
$5,938
$5,931
$30,000
$137,601
$137,601
9,631
$75,000
$75,000
$67,000
$10,000
$750
$750
$5,938
$5,931
$30,000
$0 $0
$0 $0
$330,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$820,000 $490,000 $330,000 $0
$313,129
$313,129
$600,000
$100,000
$313,129
$313,129
$600,000
$100,000
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0 $0
$0 $0
$0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0 $0 $0 $0
$0 $0 $0 $0
888978 $700,000 $700,000
$0 $0
$0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
CIP Fees/Revenues (Cont.)
888980 Surplus Goods & Fixed Assets Sales
B-30666 Damaged Vehicle Replacement / Repairs
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 117 2017 - 2018
SUBSTITUTED
Future Funding Estimates
$68,457 $0 $68,457 $0 $0
$0 $0
888980 $68,457 $0 $68,457 $0 $0 $0 $0 $0
CIP Fees/Revenues
Private Donations / Other
000000 Non-CIP Funding
B-70112 Police Headquarters Interview rooms
196,393,788 134,066,259 $20,157,659 $12,114,433 $7,123,955 $7,485,328 $7,642,000 $7,804,154
$55,000 $55,000 $0 $0 $0 $0 $0 $0
000000 $55,000 $55,000 $0 $0 $0 $0 $0 $0
000001 General Fund Operating Budget
B-50654 Overtown Stormwater Pump Station $60,000 $60,000 $0 $0 $0 $0 $0 $0
000001 $60,000 $60,000 $0 $0 $0 $0 $0 $0
000002 Special Revenue Operating Budget
B-30262 Citywide Storm Sewer Repair Project $290,400 $290,400 $0 $0 $0 $0 $0 $0
rn
B-30346 Traffic Study Reviews - Oracle Project
$411,622 $411,622 $0 $0 $0 $0 $0 $0
000002 $702,022 $702,022 $0 $0 $0 $0 $0 $0
888951 Other Public & Private Contributions
B-30374 Virginia Key Rowing Center $616,513 $ 6,513 $0 $0 $0 $0 $0 $0
B-30837 South Miami Avenue - SE 6th and 5th $771,545 $0 $0 $0 $771,545 $0 $0 $0
B-40171 Coconut Grove Viewing Platform Spoil $1,650 $1,650 $0 $0 $0 $0 $0 $0
B-40172 Coconut Grove Viewing Platform Spoil $1,6. 1 $1,650 $0 $0 $0 $0 $0 $0
888951 $ . ' 1,358 $619,813 $0 $0 $771,545 $0 $0 $0
888963 Proceeds from Conveyance of Easement
B-30182A Coconut Grove Waterfront Master P . $1,502,044 $1,502,044 $0 $0 $0 $0 $0 $0
888963 $1,502,044 $1,502,044 $0 $0 $0 $0 $0 $0
Private Donations / Other
Combined with Others
355001 1988 Sanitary S: - er Bonds
B-30134AS B r. n Park New Tennis/Community $50,000 $50,000 $0 $0 $0 $0 $0 $0
B-30305BS Gibson Park New Construction - $117,000 $0 $117,000 $0 $0 $0 $0 $0
B-30365E . Coral Way NET Office Remodeling D3 $50,000 $50,000 $0 $0 $0 $0 $0 $0
B-303 Virginia Key Rowing Center $100,000 $0 $100,000 $0 $0 $0 $0 $0
B .1538S Museum Park - Sanitary Sewer $1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0
B-30671A Caribbean Marketplace Renovation - $114,000 $114,000 $0 $0 $0 $0 $0 $0
$3,710,424 $2,938,879 $0 $0 $771,545 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
Combined with Others (Cont.)
355001 1988 Sanitary Sewer Bonds
B-30690S West End Park New Community $100,000 $100,000 $0 $0 $0 i $0 $0
B-30882S African Square Park - Splash Park D5 - $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-30886S Lummus Landing Square - D5 Sanitary $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-30887S Little Haiti Soccer Field Bathroom D5 $365,000 $100,000 $265,000 $0 $0 $0 $0 $0
B-30995S Virginia Key Bike Trail Building - D2 - $50,000 $50,000 $0 $0 $I $0 $0 $0
B-35806S Curtis Park New Pool Facility and Boat $500,000 $500,000 $0 $0 $0 $0 $0 $0
B-35812AS Duarte Park Building Renovation, $50,000 $50,000 $0 $0 $0 $0 $0 $0
B-35838S Kennedy Park Restroom Building $50,000 $50,000 $0 $0 $0 $0 $0 $0
B-35861BS Maximo Gomez / Domino Park $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-35883AS Hadley Park New Youth Center D5 - $200,000 $200,000 $0 t0 $0 $0 $0 $0
B-35887S Moore Park New Construction D5 - $500,000 $500,000 $0 $0 $0 $0 $0 $0
B-60454S Fire Station #14 (New) - D4 - Sanitary $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-60464S New Dinner Key Marina Dockmaster $690,000 $600,000 $90,000 $0 $0 $0 $0 $0
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 117 2017 - 2018
SUBSTITUTED
Future Funding Estimates
355001 $4,336,000 $3,764,000 $572:10 $0 $0 $0 $0 $0
Combined with Others $4,336,000 $3,764,000 572,000 $0 $0 $0 $0 $0
Total
448,436,588 352,824,2 $27,537,071 $16,483,910 $16,806,500 $14,015,328 $11,111,000 $9,658,549
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
1tze &IL 1tze Yalu/re
48
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
ECTION REPORTS
Cite sutteie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
Active & Future
CIP Projects Only
FUND: 301-CRA projects
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources SUBSTITUTED
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 201 017 2017-2018
Management $0.00 $0.00 $0.00 $0.00
Land Acquisition $0.00 $0.00 $0.00 $0.00
Planning $0.00 $0.00 $0.00 $0.00
Design $960,607.00 $960,607.00 $0.00 $0.00
Construction $5,269,375.00 $5,269,375.00 $0.00 $0.00
Equipment $0.00 $0.00 $0.00 $0.00
Administration $161,575.00 $161,575.00 $0.00 $0.00
Other $2,889,868.00 $2,889,868.00 $0.00 $0.00
Construction Engineering $311,575.00 $311,575.00 $0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.0
.00
$0.00
$0.00
$0.00
$0.
0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total $9,593,000.00 $9,593,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fund Fund Total Prior Current
No. Name Funding Years 2012-2013 113-2014 2014-2015 2015-2016 2016-2017 2017-2018
000004 CRA Operating Budget
385200-3 2002 Homeland Defense Bonds (Series 3)
co
888920 FIND Waterways Assistance Program FY07
$9,346,500.00
$200,000.00
$46,500.00
$9,346,500.00
$200,000.00
$46,500.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
$9,593,000.00 $9,593,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 311-General Government
Phase
Total
Funding
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
Prior Current
Years 2012-2013 2013-2014 2014-2015 2015-2016 201017 2017-2018
SUBSTITUTED
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$7,575,471.28
$1,268,254.37
$0.00
$20,467,626.40
$5,913,108.35
$44,023,553.47
$159,583.00
$149,999.99
$88,870.35
$7,564,636.28
$1,268,254.37
$0.00
$19,768,052.40
$3,264,286.81
$41,096,627.08
$132,495.00
$149,999.99
$51,217.35
$10,835.00
$0.00
$0.00
$278,574.00
$2,371,988.54
$2,926,926.39
$27,088.00
$0.00
$37,653.00
$0.00
$0.00
$0.00
$421,000.00
$276,833.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.0
.00
$0.00
$0.00
$0.00
$0.
0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
Fund Fund
No. Name
356001 Local Option Gas Tax
367001 Impact Fees
367011 Impact Fees - Ord 12750
375001 Fire Assessment Fee
382001 Contribution From General Fund
382007 Contribution From General Fund 2003
382008 Contribution From General Fund 2007 and
383005 CIP Miscellaneous Revenue
385200-3 2002 Homeland Defense Bonds (Series 3)
888896
888902
888920
888923
888937
888951
888961
888966
888969
888973
888980
Miami -Dade County DERM Virginia Key
Community Development Block Grant
FIND Waterways Assistance Program FY07
Contribution From Special Revenue
Urban Areas Security Initiative Grant
Other Public & Private Contributio
Sunshine State Financing Co
Sunshine State Financing
Subrogation Auto Cl.'
TVM Productio
Surplus Go s . s
Sion
mmission
Revenues
asic Use Fee
& Fixed Assets Sales
Total
$79,646,467.21 $73,295,569.28 $5,653,064.93
Total
Funding
$2,000,000.00
$250,062.90
$307,152.07
$305,015.00
$18,971,961.99
$7,000,000.00
$32,184,143.05
$276,833.00
$60,131.60
$650,000
$1,001 :10.00
15,000.00
$1,500,000.00
$69,842.00
$3,300.00
$750,000.00
$13,496,648.12
$726,051.38
$11,869.07
$68,457.03
Prior
Years
$2,000,000.00
$250,062.90
$58,831.55
$305,015.00
$18,971,961.99
$7,000,00
$26,54
43.05
$0.00
$60,131.60
$650,000.00
$1,000,000.00
$15,000.00
$1,500,000.00
$69,842.00
$3,300.00
$750,000.00
$13,496,648.12
$603,864.00
$11,869.07
$0.00
$79,646,467.21 $73,295,569.28
Current
2012-2013 013-2014 2014-2015 2015-2016 2016-2017 2017-2018
$697,833.00
$0.00
$0.00
$0.00
$0.00
$0.00
0
$2 20.52
$0.00
$0.00
$0.00
$5,214,100.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$122,187.38
$0.00
$68,457.03
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$421,000.00
$276,833.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$5,653,064.93 $697,833.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00
Active & Future
CIP Projects Only
FUND: 312-Public Safety
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 201017 2017-2018
SUBSTITUTED
Management $9,202.19 $9,202.19 $0.00 $0.00 $0.00
Land Acquisition $1,767,043.06 $1,767,043.06 $0.00 $0.00 $0.00
Planning $20,000.00 $20,000.00 $0.00 $0.00 $0.00
Design $2,035,034.84 $1,941,850.84 $93,184.00 $0.00 $0.00
Construction $13,637,090.67 $11,650,917.70 $1,986,172.97 $0.00 $0.00
Equipment $10,986,158.66 $8,017,462.50 $872,196.16 $2,096,500.00 $0.00
Administration $480,709.96 $447,531.96 $33,178.00 $0.00 $0.0
Other $0.00 $0.00 $0.00 $0.00 .00
Construction Engineering $610,642.86 $552,324.86 $58,318.00 $0.00 $0.00
$0.00
$0.00
$0.
0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
$29,545,882.24 $24,406,333.11 $3,043,049.13 $2,096,500.00 $0.00 $0.00 $0.00 $0.00
Fund Fund Total Prior Current
No. Name Funding Years 2012-2013 113-2014 2014-2015 2015-2016 2016-2017 2017-2018
000000 Non-CIP Funding $55,000.00
cn 367001 Impact Fees $663,861.05
367011 Impact Fees - Ord 12750 $1,562,371.83
369100 1991 Fire Bonds $46,477.39
375001 Fire Assessment Fee $4,196,771.13
375002 Fire Assessment Fee (FY07) $1,256,123.03
382001 Contribution From General Fund $341,185.98
382008 Contribution From General Fund 2007 and $4,090,489.10
383005 CIP Miscellaneous Revenue $161,836.89
385200-1 2002 Homeland Defense Bonds (Series 1) $1,040,400.
385200-2 2002 Homeland Defense Bonds (Series 2) $5,990 ! 10.00
385200-3 2002 Homeland Defense Bonds (Series 3) $3, .6,339.93
397001 1970 Pollution Control G.O.B. (303000) $361,200.00
888902 Community Development Block Grant $348,240.00
888939 FEMA Federal Assistance to Firefi • s $931,354.00
888948 School Board of Miami -Dade C. i my - Grant $850,854.32
888961 Sunshine State Financing fission $4,245,377.00
888984 State of Florida Depaent of Health $238,000.00
$55,000.00
$663,861.05
$791,753.91
$46,477.39
$4,196,771.13
$1,256,123
$34 85.98
$ , 20,489.10
$0.00
$1,040,400.59
$5,990,000.00
$3,166,339.93
$361,200.00
$0.00
$931,354.00
$0.00
$4,245,377.00
$0.00
$0.00
0
$771,.17.92
$0.00
$0.00
$0.00
$0.00
$911,500.00
$161,836.89
$0.00
$0.00
$0.00
$0.00
$348,240.00
$0.00
$850,854.32
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,858,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$238,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
$29,545,882.24 $24,406,333.11 $3,043,049.13 $2,096,500.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 313-Disaster Recovery
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 201017 2017-2018
SUBSTITUTED
Management $0.00 $0.00 $0.00 $0.00
Land Acquisition $0.00 $0.00 $0.00 $0.00
Planning $0.00 $0.00 $0.00 $0.00
Design $0.00 $0.00 $0.00 $0.00
Construction $1,895,593.00 $0.00 $1,895,593.00 $0.00
Equipment $0.00 $0.00 $0.00 $0.00
Administration $0.00 $0.00 $0.00 $0.00
Other $0.00 $0.00 $0.00 $0.00
Construction Engineering $0.00 $0.00 $0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.0
.00
$0.00
$0.00
$0.00
$0.
0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total $1,895,593.00 $0.00 $1,895,593.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fund Fund Total Prior Current
No. Name Funding Years 2012-2013 113-2014 2014-2015 2015-2016 2016-2017 2017-2018
888982 FEMA Tree Funding $1,895,593.00
$0.00 $1,895,593.00 $0.00
$0.00 $0.00
$0.00 $0.00
Total $1,895,593.00 $0.00 $1,895,5'..00 $0.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 325-Public Facilities
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 201017 2017-2018
SUBSTITUTED
Management $73,351.45 $73,351.45 $0.00 $0.00
Land Acquisition $0.00 $0.00 $0.00 $0.00
Planning $752,044.46 $752,044.46 $0.00 $0.00
Design $4,604,000.86 $4,274,000.86 $330,000.00 $0.00
Construction $8,956,210.12 $6,646,558.37 $1,506,375.00 $803,276.75
Equipment $147,067.17 $147,067.17 $0.00 $0.00
Administration $228,476.57 $228,476.57 $0.00 $0.00
Other $150,000.00 $150,000.00 $0.00 $0.00
Construction Engineering $460,768.33 $460,768.33 $0.00 $0.00
Total
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.0
.00
$0.00
$0.00
$0.00
$0
0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$15,371,918.96 $12,732,267.21 $1,836,375.00 $803,276.75 $0.00 $0.00 $0.00 $0.00
Fund Fund Total Prior Current
No. Name Funding Years 2012-2013 113-2014 2014-2015 2015-2016 2016-2017 2017-2018
367011 Impact Fees - Ord 12750
cn 382001 Contribution From General Fund
382008 Contribution From General Fund 2007 and
385200-1 2002 Homeland Defense Bonds (Series 1)
385200-2 2002 Homeland Defense Bonds (Series 2)
385200-3 2002 Homeland Defense Bonds (Series 3)
888909 FL Dept of Environmental Protection (FDEP)
888920 FIND Waterways Assistance Program FY07
888923 Contribution From Special Revenue
888927 Federal Aviation Admin. Grant
888938 Miami -Dade County Grant/Contribution
888947 MDC Building Better Communities GOB
888956 Contribution from Special Revenue - SRF
888961 Sunshine State Financing Commission
888963 Proceeds from Conveyance of Ease t
888972 Rickenbacker Marina Rental R- enue
888973 TVM Production Basic Us. ee
888981 Florida Boating Impr. -ement Program
888983 FDEP Invasive -cies at Marine Stadium
Total
$87,986.00
$86,438.00
$28,300.02
$58,775.00
$1,089,413.88
$5,400,339.97
$20,583.75
$1,816,250.00
$59,021.86
$150,000
$13. 9.00
50,000.00
$3,655,315.34
$381,111.75
$1,502,044.46
$137,601.00
$549,630.93
$56,893.00
$28,975.00
$87,986.00
$86,438.00
$28,300.02
$58,775.00
$1,089,413.88
$5,400,339
$0.00
$ ,131,250.00
$59,021.86
$150,000.00
$13,239.00
$250,000.00
$2,237,115.34
$381,111.75
$1,502,044.46
$137,601.00
$219,630.93
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
$785,000.00
$0.00
$0.00
$0.00
$0.00
$646,400.00
$0.00
$0.00
$0.00
$330,000.00
$46,000.00
$28,975.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$20,583.75
$0.00
$0.00
$0.00
$0.00
$0.00
$771,800.00
$0.00
$0.00
$0.00
$0.00
$10,893.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$15,371,918.96 $12,732,267.21 $1,836,375.00 $803,276.75 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 331-Parks and Recreation
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 201017 2017-2018
SUBSTITUTED
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$1,363,266.66
$2,235,000.00
$0.00
$12,739,475.33
$52,690,205.70
$3,243,391.20
$1,583,652.82
$260,307.00
$1,826,689.89
$1,363,266.66
$500,000.00
$0.00
$12,670,975.33
$45,749,615.95
$3,243,391.20
$1,583,652.82
$260,307.00
$1,826,689.89
$0.00
$1,735,000.00
$0.00
$68,500.00
$3,940,589.75
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$500,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,500,000.00
$0.00
$0.0
.00
$0.00
$0.00
$0.00
$0
0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
$75,941,988.60 $67,197,898.85 $5,744,089.75 $500,000.00 2,500,000.00
$0.00
$0.00 $0.00
Fund Fund
No. Name
000004 CRA Operating Budget
000008 CRA - FIND Grant
355001 1988 Sanitary Sewer Bonds
367001 Impact Fees
367011 Impact Fees - Ord 12750
373001 Safe Neighborhood Parks Bond
373002 Safe Neighborhood Parks Bond 2008 &
382001 Contribution From General Fund
382008 Contribution From General Fund 2007 and
385200-1 2002 Homeland Defense Bonds (Series 1)
385200-2 2002 Homeland Defense Bonds (Series 2)
385200-3 2002 Homeland Defense Bonds (Series 3)
385200-8 2002 Homeland Defense Series 1 Interest
888902 Community Development Block Grant
888920 FIND Waterways Assistance Prograv Y07
888924 DRI Fees Transportation
888947 MDC Building Better Co i unities GOB
888951 Other Public & Priva : ontributions
888955 MSEA Contribu '.n to Capital
888956 Contributio . rom Special Revenue - SRF
888960 Sunsh. State Financing Commission
888961 S shine State Financing Commission
888962 The Children's Trust
Total Prior Current
Funding Years 2012-2013 113-2014 2014-2015 2015-2016 2016-2017 2017-2018
$9,943,000.00 $9,943,000.00
$1,143,000.00 $1,143,000.00
$100,000.00 $100,000.00
$14,195.00 $14,195.00
$5,567,594.99 $2,442,744.24
$119,622.00 $119,62
$132,792.00 $13 92.00
$50,777.90 50,777.90
$344,939.00 $9,200.00
$933,070. $933,070.95
$3,708. 1.87 $3,708,351.87
$1. 9,207.54 $16,979,207.54
$1,109,653.66 $1,109,653.66
$133,474.00 $133,474.00
$579,750.00 $247,500.00
$2,296,403.60 $2,296,403.60
$4,300,000.00 $0.00
$616,513.00 $616,513.00
$350,000.00 $350,000.00
$1,251,250.00 $600,000.00
$2,671,069.00
$21,502,080.97
$260,000.00
$2,671,069.00
$21,502,080.97
$260,000.00
$0.00
0
$0.00
$0.00
$3,124,850.75
$0.00
$0.00
$0.00
$135,739.00
$0.00
$0.00
$0.00
$0.00
$0.00
$332,250.00
$0.00
$1,500,000.00
$0.00
$0.00
$651,250.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$200,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$300,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$2,500,000.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$75,941,988.60 $67,197,898.85 $5,744,089.75 $500,000.00 $2,500,000.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 331-Parks and Recreation
2012-2013 Capital Improvement Plan SUBSTITUTED
Funding by Cost Component & Sources
Fund Fund Total Prior Current
No. Name Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 201 017 2017-2018
888965 Bayfront Park Management Trust
888973 TVM Production Basic Use Fee
888976 Miami -Dade County Dept Cultural Affairs
888977 DRI Fees Air Quality
888978 DRI Fees Administration
$309,000.00
$258,500.00
$354,614.00
$313,129.12
$600,000.00
$309,000.00
$258,500.00
$354,614.00
$313,129.12
$600,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.
0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
01
01
Active & Future
CIP Projects Only
FUND: 341-Streets & Sidewalks
Phase
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 201 017 2017-2018
SUBSTITUTED
$818,717.74
$0.00
$0.00
$19,295,508.30
127,629,795.19
$0.00
$4,858,516.44
$338,702.47
$7,165,706.68
$701,985.74
$0.00
$0.00
$17,199,291.30
$84,231,019.49
$0.00
$4,328,554.44
$338,702.47
$6,608,959.68
$103,775.00
$0.00
$0.00
$98,800.00
$5,594,299.00
$0.00
$7,500.00
$0.00
$10,425.00
$12,957.00
$0.00
$0.00
$401,747.00
$6,723,162.05
$0.00
$97,266.00
$0.00
$121,126.00
$0.00
$0.00
$0.00
$471,260.00
$9,147,263.65
$0.00
$94,488.0
.00
488.00
$0.00
$0.00
$0.
$321 .0.00
$8 . 7,092.00
$0.00
$94,488.00
$0.00
$94,488.00
$0.00
$0.00
$0.00
$401,575.00
$6,395,205.00
$0.00
$118,110.00
$0.00
$118,110.00
$0.00
$0.00
$0.00
$401,575.00
$7,411,754.00
$0.00
$118,110.00
$0.00
$118,110.00
Total
160,106,946.82 113,408,513.12 $5,814,799.00 $7,356,258.05 9,807,499.65 $8,637,328.00 $7,033,000.00 $8,049,549.00
Fund Fund
No. Name
Total Prior Current
Funding Years 2012-2013 113-2014 2014-2015 2015-2016 2016-2017 2017-2018
000002 Special Revenue Operating Budget $411,622.47
356001 Local Option Gas Tax $869,629.36
356002 Local Option Gas Tax 2009 and Future $885,800.00
356003 Parking Surcharge $50,000.00
356005-1 Streets Bond Program - Series 1 $26,533,040.67
356005-2 Streets Bond Program - Series 2 $42,341,183.29
356007 Parking Surcharge 2007 $13,098,484.02
367001 Impact Fees $177,891.86
385200-1 2002 Homeland Defense Bonds (Series 1) $1,135,485.30
385200-3 2002 Homeland Defense Bonds (Series 3) $4,696,100
888902 Community Development Block Grant $650 S 10.00
888913 FDOT Transportation Enhancement Program $11 .69,618.00
888917 FDOT Other $100,000.00
888924 DRI Fees Transportation $1,500,000.00
888930 Transit Half -Cent Surtax $2,255,575.79
888931 Transit Half -Cent Surtax (FYO . nd Future) $42,816,329.46
888938 Miami -Dade County Gran " ontribution $8,304,395.00
888947 MDC Building Bette ' ommunities GOB $1,922,000.00
888951 Other Public & ate Contributions $771,544.65
888953 Miami -Dad = etropolitan Planning Org $81,000.00
888956 Contri..' ion from Special Revenue - SRF $549,746.00
888957 D. ' ntown Development Agency $187,500.00
888978 DRI Fees Administration $100,000.00
$411,622.47
$869,629.36
$158,400.00
$50,000.00
$26,533,040.67
$42,341,183
$4,79 25.97
77,891.86
$1,135,485.30
$4,696,100.95
$650,000.00
$9,419,618.00
$100,000.00
$1,500,000.00
$2,240,222.79
$17,733,592.46
$450,000.00
$0.00
$0.00
$48,000.00
$0.00
$0.00
$100,000.00
$0.00
0
$32. 100.00
$0.00
$0.00
$0.00
$1,428,600.00
$0.00
$0.00
$0.00
$0.00
$250,000.00
$0.00
$0.00
$15,353.00
$3,174,600.00
$0.00
$0.00
$0.00
$33,000.00
$549,746.00
$37,500.00
$0.00
$0.00
$0.00
$401,400.00
$0.00
$0.00
$0.00
$1,276,158.05
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$3,678,700.00
$2,000,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,400,000.00
$0.00
$0.00
$0.00
$0.00
$1,000,000.00
$0.00
$0.00
$0.00
$4,324,955.00
$1,000,000.00
$1,161,000.00
$771,544.65
$0.00
$0.00
$150,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,400,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$4,476,328.00
$2,000,000.00
$761,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,400,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$4,633,000.00
$1,000,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,400,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$4,795,154.00
$1,854,395.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Active & Future
CIP Projects Only
FUND: 341-Streets & Sidewalks
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
SUBSTITUTED
Total 160,106,946.82 113,408,513.12 $5,814,799.00 $7,356,258.05 $9,807,499.65 $8,637,328.00 $7,033,000
01
$8,049,549.00
Active & Future
CIP Projects Only
FUND: 343-Mass Transit
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 201017 2017-2018
SUBSTITUTED
Management $0.00 $0.00 $0.00 $0.00 $0.00
Land Acquisition $0.00 $0.00 $0.00 $0.00 $0.00
Planning $0.00 $0.00 $0.00 $0.00 $0.00
Design $962,508.81 $780,911.00 $0.00 $181,597.81 $0.00
Construction $318,402.19 $0.00 $0.00 $318,402.19 $0.00
Equipment $2,871,999.63 $2,871,999.63 $0.00 $0.00 $0.00
Administration $34,691.00 $34,691.00 $0.00 $0.00 $0.0
Other $0.00 $0.00 $0.00 $0.00 1.00
Construction Engineering $0.00 $0.00 $0.00 $0.00 $0.00
$0.00
$0.00
$0.
0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total $4,187,601.63 $3,687,601.63 $0.00 $500,000.00 $0.00 $0.00 $0.00 $0.00
Fund Fund Total Prior Current
No. Name Funding Years 2012-2013 013-2014 2014-2015 2015-2016 2016-2017 2017-2018
888917 FDOT Other $1,899,150.63 $1,899,150.63
cn 888930 Transit Half -Cent Surtax $81,788.00 $81,788.00
co
888931 Transit Half -Cent Surtax (FY07 and Future) $2,181,663.00 $1,681,663.00
888957 Downtown Development Agency $25,000.00 $25,000.00
$0.00 $0.00
$,.10 $0.00
$0.00 $500,000.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total $4,187,601.63 $3,687,601.6. $0.00 $500,000.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 351-Sanitary Sewers
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 201017 2017-2018
SUBSTITUTED
Management $2,129.00 $2,129.00 $0.00 $0.00 $0.00
Land Acquisition $0.00 $0.00 $0.00 $0.00 $0.00
Planning $0.00 $0.00 $0.00 $0.00 $0.00
Design $65,203.00 $65,203.00 $0.00 $0.00 $0.00
Construction $4,192,420.00 $3,620,420.00 $572,000.00 $0.00 $0.00
Equipment $0.00 $0.00 $0.00 $0.00 $0.00
Administration $13,871.00 $13,871.00 $0.00 $0.00 $0.0
Other $0.00 $0.00 $0.00 $0.00 i.00
Construction Engineering $22,377.00 $22,377.00 $0.00 $0.00 $0.00
$0.00
$0.00
$0.
0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
$4,296,000.00 $3,724,000.00 $572,000.00
Fund Fund Total Prior Current
No. Name Funding Years 2012-2013 113-2014 2014-2015 2015-2016 2016-2017 2017-2018
$0.00 $0.00 $0.00 $0.00 $0.00
355001 1988 Sanitary Sewer Bonds $4,236,000.00 $3,664,000.00 $572,000.00
cn 371100 Series 1995 Sanitary Sewer Bonds $60,000.00 $60,000.00 $1.10
co
$0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Total $4,296,000.00 $3,724,000.00 $ ,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 352-Storm Sewers
Phase
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 201s 017 2017-2018
SUBSTITUTED
$288,702.90
$64,884.94
$0.00
$6,952,662.82
$51,441,819.41
$170,000.00
$1,337,266.83
$0.00
$2,586,429.54
$288,702.90
$64,884.94
$0.00
$6,770,977.82
$30,052,062.46
$170,000.00
$1,297,266.83
$0.00
$2,586,429.54
$0.00
$0.00
$0.00
$0.00
$2,124,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$181,685.00
$3,701,756.95
$0.00
$40,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$4,499,000.00
$0.00
$0.0
.00
$0.00
$0.00
$0.00
$0.
0.00
$5. 8,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$4,078,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,609,000.00
$0.00
$0.00
$0.00
$0.00
Total
$62,841,766.44 $41,230,324.49 $2,124,000.00 $3,923,441.95 $4,499,000.00 $5,378,000.00 $4,078,000.00 $1,609,000.00
Fund Fund
No. Name
Total Prior Current
Funding Years 2012-2013 013-2014 2014-2015 2015-2016 2016-2017 2017-2018
000001 General Fund Operating Budget
000002 Special Revenue Operating Budget
356001 Local Option Gas Tax
356005-1 Streets Bond Program - Series 1
356005-2 Streets Bond Program - Series 2
356007 Parking Surcharge 2007
359101 Special Assessment District (SAD) Revenue
360001 Stormwater Utility Fund
360003 Stormwater Utility Fund (FY07 and Future)
367001 Impact Fees
383001 CIP Misc. Revenue
385200-3 2002 Homeland Defense Bonds (Series 3)
399001 1976 & 78 Storm Sewer G O Bond
888899 FEMA Hazard Mitigation Grant
888909 FL Dept of Environmental Protectio . DEP)
888920 FIND Waterways Assistance P e a am FY07
888925 FEMA Recovery Assistan
888926 Prior Year Fund Bal
888930 Transit Half-Ce urtax
888931 Transit Hal ent Surtax (FY07 and Future)
888938 Miam. ade County Grant/Contribution
888947 i C Building Better Communities GOB
888959 FEMA 2007 & Future Pre -Disaster
$60,000.00
$290,400.00
$1,947,170.00
$4,985,611.33
$2,752,442.35
$1,623,441.95
$272,490.00
$7,911,368.37
$16,920,114.17
$712,087
$46 . 7.55
41,000.00
$867,481.00
$750,000.00
$1,000,000.00
$1,700,000.00
$173,200.00
$91,565.00
$1,849,896.53
$4,267,696.24
$204,444.08
$12,500,000.00
$599,999.99
$60,000.00
$290,400.00
$1,947,170.00
$4,985,611.33
$2,752,442.35
$1,000,00
$24 90.00
$ ,' 11,368.37
$8,294,114.17
$712,087.88
$46,357.55
$841,000.00
$867,481.00
$750,000.00
$1,000,000.00
$1,000,000.00
$173,200.00
$91,565.00
$1,849,896.53
$3,767,696.24
$204,444.08
$1,362,000.00
$599,999.99
0
$0.00
0
$0.00
$0.00
$0.00
$0.00
$24,000.00
$0.00
$1,400,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$700,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$623,441.95
$0.00
$0.00
$1,000,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$500,000.00
$0.00
$1,800,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,399,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$3,100,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,609,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$3,769,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,609,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,469,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,609,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Active & Future
CIP Projects Only
FUND: 352-Storm Sewers
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
Fund Fund Total Prior Current
No. Name Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 201 017 2017-2018
SUBSTITUTED
888961 Sunshine State Financing Commission
$475,000.00 $475,000.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Total $62,841,766.44 $41,230,324.49 $2,124,000.00 $3,923,441.95 $4,499,000.00 $5,378,000.00 $4,078,000.00 $1,609,000.00
CD
rn
M
Active & Future
CIP Projects Only
FUND: 353-Solid Waste
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources SUBSTITUTED
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 201 017 2017-2018
Management $0.00 $0.00 $0.00 $0.00
Land Acquisition $0.00 $0.00 $0.00 $0.00
Planning $0.00 $0.00 $0.00 $0.00
Design $0.00 $0.00 $0.00 $0.00
Construction $0.00 $0.00 $0.00 $0.00
Equipment $5,009,427.21 $3,548,727.21 $854,100.00 $606,600.00
Administration $0.00 $0.00 $0.00 $0.00
Other $0.00 $0.00 $0.00 $0.00
Construction Engineering $0.00 $0.00 $0.00 $0.00
Total
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.0
.00
$0.00
$0.00
$0.00
$0.
0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$5,009,427.21 $3,548,727.21 $854,100.00 $606,600.00 $0.00 $0.00 $0.00 $0.00
Fund Fund Total Prior Current
No. Name Funding Years 2012-2013 113-2014 2014-2015 2015-2016 2016-2017 2017-2018
382008 Contribution From General Fund 2007 and $5,009,427.21 $3,548,727.21 $854,100.00 $606,600.00
$0.00 $0.00
$0.00 $0.00
Total
$5,009,427.21 $3,548,727.21 $854,1
00 $606,600.00 $0.00 $0.00 $0.00 $0.00
2012-2013 Capital Improvement Plan
Active & Future SUBSTITUTED
CIP Projects Only Funding by Cost Component & Sources
FUND: Totals
Total Prior Current
Phase Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 201. 017 2017-2018
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$10,130,841.22
$5,335,182.37
$772,044.46
$68,082,627.36
271,944,019.63
$66,451,597.34
$8,858,342.62
$3,788,877.46
$13,073,059.65
$10,003,274.22
$3,600,182.37
$772,044.46
$64,431,869.55
190,484,255.78
$59,095,274.79
$8,228,114.62
$3,788,877.46
$12,420,341.65
$114,610.00
$1,735,000.00
$0.00
$869,058.00
$19,991,018.26
$4,653,222.55
$67,766.00
$0.00
$106,396.00
$12,957.00
$0.00
$0.00
$1,186,029.81
$12,323,430.94
$2,703,100.00
$137,266.00
$0.00
$121,126.00
$0.00
$0.00
$0.00
$471,260.00
$16,146,263.65
$0.00
$94,488.0
.00
4,488.00
$0.00
$0.00
$0.
$321 .0.00
$13 ' 15,092.00
$0.00
$94,488.00
$0.00
$94,488.00
$0.00
$0.00
$0.00
$401,575.00
$10,473,205.00
$0.00
$118,110.00
$0.00
$118,110.00
$0.00
$0.00
$0.00
$401,575.00
$9,020,754.00
$0.00
$118,110.00
$0.00
$118,110.00
Total
448,436,592.11 352,824,234.90 $27,537,070.81 $16,483,909.75 16,806,499.65 $14,015,328.00 $11,111,000.00 $9,658,549.00
Fund Fund
No. Name
Total Prior Current
Funding Years 2012-2013 013-2014 2014-2015 2015-2016 2016-2017 2017-2018
000000 Non-CIP Funding
000001 General Fund Operating Budget
000002 Special Revenue Operating Budget
000004 CRA Operating Budget
000008 CRA - FIND Grant
355001 1988 Sanitary Sewer Bonds
356001 Local Option Gas Tax
356002 Local Option Gas Tax 2009 and Future
356003 Parking Surcharge
356005-1 Streets Bond Program - Series 1
356005-2 Streets Bond Program - Series 2
356007 Parking Surcharge 2007
359101 Special Assessment District (SAD) Revenue
360001 Stormwater Utility Fund
360003 Stormwater Utility Fund (FY07 an. uture)
367001 Impact Fees
367011 Impact Fees - Ord 12750
369100 1991 Fire Bonds
371100 Series 1995 Sa.' ary Sewer Bonds
373001 Safe Nei • :.rhood Parks Bond
373002 Safe ► -ighborhood Parks Bond 2008 &
375001 e Assessment Fee
375002 Fire Assessment Fee (FY07)
$55,000.00
$60,000.00
$702,022.47
$19,289,500.00
$1,143,000.00
$4,336,000.00
$4,816,799.36
$885,800.00
$50,000.00
$31,518,65
$45,09 ,.25.64
$1 , 21,925.97
$272,490.00
$7,911,368.37
$16,920,114.17
$1,818,098.69
$7,525,104.89
$46,477.39
$60,000.00
$119,622.00
$132,792.00
$4,501,786.13
$1,256,123.03
$55,000.00
$60,000.00
$702,022.47
$19,289,500.00
$1,143,000.00
$3,764,001.10
$4,8 99.36
158,400.00
$50,000.00
$31,518,652.00
$45,093,625.64
$5,793,725.97
$248,490.00
$7,911,368.37
$8,294,114.17
$1,818,098.69
$3,381,315.70
$46,477.39
$60,000.00
$119,622.00
$132,792.00
$4,501,786.13
$1,256,123.03
$0.00
0
$0.00
$0.00
$0.00
$572,000.00
$0.00
$326,000.00
$0.00
$0.00
$0.00
$1,428,600.00
$24,000.00
$0.00
$1,400,000.00
$0.00
$4,143,789.19
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$401,400.00
$0.00
$0.00
$0.00
$1,899,600.00
$0.00
$0.00
$1,000,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,400,000.00
$0.00
$0.00
$1,399,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,400,000.00
$0.00
$0.00
$1,609,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,400,000.00
$0.00
$0.00
$1,609,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,400,000.00
$0.00
$0.00
$1,609,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Active & Future
CIP Projects Only
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
FUND: Totals
Fund Fund Total Prior Current
No. Name Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 201 017 2017-2018
SUBSTITUTED
382001 Contribution From General Fund
382007 Contribution From General Fund 2003
382008 Contribution From General Fund 2007 and
383001 CIP Misc. Revenue
383005 CIP Miscellaneous Revenue
385200-1 2002 Homeland Defense Bonds (Series 1)
385200-2 2002 Homeland Defense Bonds (Series 2)
385200-3 2002 Homeland Defense Bonds (Series 3)
385200-8 2002 Homeland Defense Series 1 Interest
397001 1970 Pollution Control G.O.B. (303000)
399001 1976 & 78 Storm Sewer G O Bond
888896 Miami -Dade County DERM Virginia Key
888899 FEMA Hazard Mitigation Grant
888902 Community Development Block Grant
888909 FL Dept of Environmental Protection (FDEP)
888913 FDOT Transportation Enhancement Program
888917 FDOT Other
888920 FIND Waterways Assistance Program FY07
888923 Contribution From Special Revenue
888924 DRI Fees Transportation
888925 FEMA Recovery Assistance
888926 Prior Year Fund Balance
888927 Federal Aviation Admin. Grant
888930 Transit Half -Cent Surtax
888931 Transit Half -Cent Surtax (FY07 and Future)
888937 Urban Areas Security Initiative Grant
888938 Miami -Dade County Grant/Contribution
888939 FEMA Federal Assistance to Firefighters
888947 MDC Building Better Communities
888948 School Board of Miami -Dade C. my - Grant
888951 Other Public & Private Co .utions
888953 Miami -Dade Metropo ' . n Planning Org
888955 MSEA Contribut : to Capital
888956 Contributio ' om Special Revenue - SRF
888957 Downt. -m Development Agency
888959 F A 2007 & Future Pre -Disaster
888960 Sunshine State Financing Commission
8889- Sunshine State Financing Commission
$19,450,363.87 $19,450,363.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$7,000,000.00 $7,000,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$41,657,298.38 $31,455,759.38 $7,115,439.00 $3,086,100.00 $0.00 $0.1: $0.00 $0.00
$46,357.55 $46,357.55 $0.00 $0.00 $0.00 0.00 $0.00 $0.00
$438,669.89 $0.00 $161,836.89 $276,833.00 $0.00 $0.00 $0.00 $0.00
$3,167,731.84 $3,167,731.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$10,787,765.75 $10,787,765.75 $0.00 $0.00 $0.01 $0.00 $0.00 $0.00
$31,343,119.99 $31,343,119.99 $0.00 $0.00 .00 $0.00 $0.00 $0.00
$1,109,653.66 $1,109,653.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$361,200.00 $361,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$867,481.00 $867,481.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$650,000.00 $650,000.00 $0.00 $1.10 $0.00 $0.00 $0.00 $0.00
$750,000.00 $750,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$2,131,714.00 $1,783,474.00 $348,240.00 $0.00 $0.00 $0.00 $0.00 $0.00
$1,020,583.75 $1,000,000.00 $0.00 $20,583.75 $0.00 $0.00 $0.00 $0.00
$10,669,618.00 $9,419,618.00 $250,000 ! 1 $0.00 $1,000,000.00 $0.00 $0.00 $0.00
$1,999,150.63 $1,999,150.63 0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$4,157,500.00 $2,340,250.00 $ 17,250.00 $0.00 $0.00 $0.00 $0.00 $0.00
$1,559,021.86 $1,559,021.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
60 $3,796,403.-i $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$173,200.00 $173 10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$91,565.00 %' 1,565.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$150,000.00 $150,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$4,187,260. $4,171,907.32 $15,353.00 $0.00 $0.00 $0.00 $0.00 $0.00
$49,265•::.70 $23,182,951.70 $3,174,600.00 $4,678,700.00 $4,324,955.00 $4,476,328.00 $4,633,000.00 $4,795,154.00
.9,842.00 $69,842.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
8,522,078.08 $667,683.08 $0.00 $2,000,000.00 $1,000,000.00 $2,000,000.00 $1,000,000.00 $1,854,395.00
$931,354.00 $931,354.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$18,972,000.00 $1,612,000.00 $1,500,000.00 $2,100,000.00 $6,761,000.00 $4,530,000.00 $2,469,000.00 $0.00
$850,854.32 $0.00 $850,854.32 $0.00 $0.00 $0.00 $0.00 $0.00
$1,391,357.65 $619,813.00 $0.00 $0.00 $771,544.65 $0.00 $0.00 $0.00
$81,000.00 $48,000.00 $33,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
$350,000.00 $350,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$5,456,311.34 $2,837,115.34 $1,847,396.00 $771,800.00 $0.00 $0.00 $0.00 $0.00
$212,500.00 $25,000.00 $37,500.00 $0.00 $150,000.00 $0.00 $0.00 $0.00
$599,999.99 $599,999.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$2,671,069.00 $2,671,069.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$27,353,569.72 $27,353,569.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
FUND: Totals
Fund Fund Total Prior Current
No. Name Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 201 017 2017-2018
SUBSTITUTED
888962 The Children's Trust $260,000.00 $260,000.00 $0.00
888963 Proceeds from Conveyance of Easement $1,502,044.46 $1,502,044.46 $0.00
888965 Bayfront Park Management Trust $309,000.00 $309,000.00 $0.00
888966 Sunshine State Financing Commission $13,496,648.12 $13,496,648.12 $0.00
888969 Subrogation Auto Claim Revenues $726,051.38 $603,864.00 $122,187.38
888972 Rickenbacker Marina Rental Revenue $137,601.00 $137,601.00 $0.00
888973 TVM Production Basic Use Fee $820,000.00 $490,000.00 $330,000.00
888976 Miami -Dade County Dept Cultural Affairs $354,614.00 $354,614.00 $0.00
888977 DRI Fees Air Quality $313,129.12 $313,129.12 $0.00
888978 DRI Fees Administration $700,000.00 $700,000.00 $0.00
888980 Surplus Goods & Fixed Assets Sales $68,457.03 $0.00 $68,457.03
888981 Florida Boating Improvement Program $56,893.00 $0.00 $46,000.00
888982 FEMA Tree Funding $1,895,593.00 $0.00 $1,895,593.00
888983 FDEP Invasive Species at Marine Stadium $28,975.00 $0.00 $28,975.00
888984 State of Florida Department of Health $238,000.00 $0.00 $0.00
rn 1 Total 448,436,592.11 352,824,234.90 $27,537,07
cn
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.
$0.00 $0.00 .0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.01 $0.00
$0.00 d.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$10,89 .10 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$238,000.00 $0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
1 $16,483,909.75 $16,806,499.65 $14,015,328.00 $11,111,000.00 $9,658,549.00
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
1tze &IL 1tze Yalu/re
66
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
ECTION REPORTS
Cite sutteie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
rn
Active & Future
CIP Projects Only
B-No.
301-CRA projects
B-30394
B-30538B
B-30731
B-40169
Client
Community Redevelopment
Agency
Community Redevelopment
Agency
Community Redevelopment
Agency
Community Redevelopment
Agency
311-General Government
B-30365E Community Development
B-30365J Building Department
B-30666 General Services
Administration
B-30865A Grants Administration
B-30865B General Services
Administration
B-30865C General Services
Administration
B-30865E General Services
Administration
B-30865F Fire Rescue
B-30994
B-35002
B-39910
B-40171
Public Facilities
Capital Improvement ' ogram
Admin
Capital I i . ovement Program
Adm.
ity Manager
B-40 " 2 City Manager
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Project
North 14 St. Multi Media Entertainment
District Streetscape CRA 92-686001
Museum Park Environmental
Remediation/Seawall - CRA 92-686001
Miami Women's Club Baywalk Project - CRA
92-686001
Dist.
2
1,2,3,4,5
2
300 NW 11 Street Community Center - CRA 5
92-689001
301-CRA projects
Coral Way NET Office Remodeling /
Community Center D3 - CD 91-02994
Beckham Hall Fire Damage Repair
Damaged Vehicle Replacement / Repairs
Environmental Remediation Study
City Hall Roof Terrace
City Hall Windows and Doo
MRC A/C Replac-- ents
Enviro
ental Remediation Study -
F-'escue
City of Miami Impact Fee Study - Citywide
Virginia Key Landfill Assessment
Quality of Life District 2 - Various Projects
Coconut Grove Viewing Platform Spoil Island
C - D2
Coconut Grove Viewing Platform Spoil Island
E - D2
Total Cost
Estimate ($)
6,000,000
2,000,000
93,000
2,293,250
10,386,250
3 1,291,8
1 6,770
1,2,3,4 . 794,508
1,2,3,4,5 466,900
1,2,3,4,5 314,176
1,2,3,4,5 296,000
1,2,3,4,5 289,823
1,2,3,4,5 140,000
1,2,3,4,5 65,490
2 1,400,000
2 60,131
2 15,088
2 15,080
SUBSTITUTED
Total
Funds ($) Status Phase
6,000,000 Active
2,000,000 Active
93,000 Active
1,500,000 Active
93,000
Fund
Sta
Total Fund
minus
Total Cost
Estimate ($)
5-Construction Funded 0
5-Co ruction Funded 0
3-Design Funded 0
3-Design Partially Funded -793,250
1,291,833 Active 5-Construction Funded
6,770 Future 8-Future Funded
794,508 Active 5-Construction Funded
466,900 Active 1-Study Funded
314,176 Active 5-Const. (JOC) Funded
296,000 Active 5-Const. (JOC) Funded
289,823 Active 7-On-Hold Funded
140,000 Active 1-Study Funded
65,490 Active 1-Study Funded
1,400,000 Active 5-Construction Funded
60,131 Active 3-Design Funded
15,088 Active 5-Construction Funded
15,080 Active 5-Construction Funded
-793,250
0
0
0
0
0
0
0
0
0
0
0
0
0
Active & Future
CIP Projects Only
B-No.
Client
311-General Government
B-40410
B-70415
B-70969
B-74205B
B-74205C
B-74219B
B-74219C
coo B-74220 General Services
Administration
B-74609
General Services
Administration
General Services
Administration
Information Technology
B-30365H
B-30551
B-74200
B-74606
B-74614
B-74617
B-30365C
B-30365Q
B-40001
B-40002
B-40007
General Services
Administration
General Services
Administration
General Services
Administration
General Services
Administration
Information Technology
General Services
Administration
Public Works
General Services
Administration
Information Technology
Information Technology
Information Technology
Community Development
Community Develop
Public Wo
Publ.orks
Public Works
40008 Public Works
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Total Cost
Project Dist. Estimate ($)
Fire Alarm Replacement, Air Conditioning 1,2,3,4,5
Repairs and maintenance
MRC Security System Hardening - UASI 2
Funded 18-180011 / l0th Floor 18-180022
SUBSTITUTED
Total
Funds ($) Status Phase
1,426,200 1,426,200 Future 8-Future
69,842 69,842 Active 7-0 ' old
IT - Financial Management Upgrade Module 1,2,3,4,5 500,000 500,000 Active 5-Construction
GSA Fleet Maintenance Garage Expansion 1 404,214 404,214 Ac e 5-Construction
GSA Truck Wash Pit
Property Maintenance Security Improvements
Property Maintenance Bobcats & Trailer
Police Vehicle Replacement
ERP Integration System
Generator for City Hall
Public Works Maintenance Yard
Citywide General Fleet Re
cement
Upgrade PC So ' are & Hardware
Land Ma•.. gement System
IT odernization
City Property Building Maintenance
Coral Way Community Center Playground
Oracle Project 91-03275
New Public Works Operations Facilities
Public Works Fleet and Heavy Machinery
Replacement FY2014
PW - Heavy Machinery Replacement -
FY2015
PW Heavy Equipment and Machinery
Replacement - FY2016
1,2,3,4,5 88,000 88 •i0 Future 8-Future
1,2,3,4,5 25,000 25,000 Future 8-Future
1,2,3,4,5 4i,100 40,000 Future 8-Future
1,2,3,4,5 27,491,737 27,491,737 Active 5-Construction
2,3,4,5 25,474,457 25,474,457 Active 5-Construction
1,2,3,4,5 186,819 55,855 Active 5-Const. (JOC)
1,2,3,4,5 4,719,387 3,268,254 Active 1-Study
1,2,3,4,5 3,969,887 3,610,268 Active 5-Construction
1,2,3,4,5 7,174,921 2,920,682 Active 5-Construction
1,2,3,4,5 7,913,018 6,316,151 Active 3-Design
1,2,3,4,5 4,100,000 2,800,000 Active 5-Construction
1,2,3,4,5 700,000 0 Future 8-Future
3 500,000 0 Future 8-Future
1,2,3,4,5 1,875,500 0 Future 8-Future
1,2,3,4,5 499,000 0 Future 8-Future
1,2,3,4,5 95,000 0 Future 8-Future
1,2,3,4,5 650,000 0 Future 8-Future
Fund
Stat :
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Total Fund
minus
Total Cost
Estimate ($)
0
0
0
0
0
0
0
0
Funded 0
Partially Funded -130,963
Partially Funded -1,451,132
Partially Funded -359,618
Partially Funded -4,254,238
Partially Funded -1,596,866
Partially Funded -1,300,000
UnFunded -700,000
UnFunded -500,000
UnFunded -1,875,500
UnFunded -499,000
UnFunded -95,000
UnFunded -650,000
Active & Future
City Of Miami - Capital Improvement Program
SUBSTITUTED
CIP Projects Only Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
B-No. Client Project Dist. Estimate ($) Funds ($) Status Phase Stat Estimate ($)
311-General Government
B-40009 Public Works PW Updrage Operations Division Equipment - 1,2,3,4,5 300,000 0 Future 8-Future UnFunded -300,000
FY2017
B-40960 Communications City Hall Studio Area - A/C Unit Replacement 1,2,3,4,5 51,632 0 Future 8-Fu . e UnFunded -51,632
B-40961 Communications Office of Communications - Fleet Upgrade 1,2,3,4,5 144,000 0 Future -Future UnFunded -144,000
B-40962 Communications Office of Communications - Upgrade Systems 1,2,3,4,5 40,000 0 Future 8-Future UnFunded -40,000
to Media Equipment
B-40963 Communications Office of Communications - Robotics Cameras 1,2,3,4,5 30,000 0 Future 8-Future UnFunded -30,000
B-40964 Communications Office of Communications - Large Format 1,2,3,4,5 90,000 0 Future 8-Future UnFunded -90,000
Video Cameras Replacement
B-40965 Communications Office of Communications - Studio Cameras 1,2,3,4,5 18,000 0 Future 8-Future UnFunded -18,000
B-70108 General Services Purchase of a video transmission server 1,2,3,4,5 100,00 0 Future 8-Future UnFunded -100,000
Administration
B-70320 General Services City of Miami Fleet Vehicle Replacement 1,2,3,4,5 1,700,000 0 Future 8-Future UnFunded -1,700,000
co Administration
B-70321 General Services City of Miami Fleet Vehicle Replacement 1, ,4 5 1,750,000 0 Future 8-Future UnFunded -1,750,000
Administration (Trucks)
B-70322 General Services Carpet Replacement at the MRC Facility 1,2,3,4,5 300,000 0 Future 8-Future UnFunded -300,000
Administration
B-70323 General Services GSA Communications Divisio lack up 1,2,3,4,5 42,000 0 Future 8-Future UnFunded -42,000
Administration Batteries for Communicat s Systems
B-70324 General Services MRC Building - UP . ystem 1,2,3,4,5 7,000 0 Future 8-Future UnFunded -7,000
Administration
B-70325 General Services GSA Fle= acility - Fuel Station Roof 1,2,3,4,5 25,000 0 Future 8-Future UnFunded -25,000
Administration Re . : cement
B-70326 General Services GSA Communications Division - Impact 1,2,3,4,5 30,000 0 Future 8-Future UnFunded -30,000
Administration Windows and Hurricane Grade Electric Garage
Doors
B-70327 General Sere ' -s GSA Mechanics Shop - Light Fleet Aligment & 1,2,3,4,5 65,000 0 Future 8-Future UnFunded -65,000
Admin. .tion Lift Mechanism for vehicles up to 3,500
pounds
B-70328 General Services Fuel Pump Replacements 1,2,3,4,5 200,000 0 Future 8-Future UnFunded -200,000
Administration
B-7! 29 General Services Roof Repairs at the GSA Communications 1,2,3,4,5 60,000 0 Future 8-Future UnFunded -60,000
Administration Warehouse and USAR Warehouse
Active & Future
CIP Projects Only
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
SUBSTITUTED
Total Cost Total Fund
B-No. Client Project Dist. Estimate ($) Funds ($) Status Phase
311-General Government
B-70330 General Services Re -grouping and polishing of all MRC Granite 1,2,3,4,5 70,000 0 Future 8-Future UnFunded -70,000
Administration and Bathrooms
Total Fund
minus
Total Cost
Estimate ($)
B-70331 General Services Heavy Fleet Tow Truck 1,2,3,4,5 250,000 0 Future 8-F re UnFunded -250,000
Administration
B-70332 General Services MRC Facility - Repair of HVAC VAV Boxes 1,2,3,4,5 120,000 0 Future 8-Future UnFunded -120,000
Administration
B-70333 General Services Bucket Truck for the Electrical Division at 1,2,3,4,5 162,000 0 uture 8-Future UnFunded -162,000
Administration GSA
B-70334 General Services City Hall Repairs 1,2,3,4,5 200,000 0 Future 8-Future UnFunded -200,000
Administration
B-70335 General Services Replacement of Fire Panel at MRC Facility 1,2,3,4,5 340,000 0 Future 8-Future UnFunded -340,000
Administration
B-70336 General Services Roof Repair at the MRC Facility 1,2,3,4,5 350,000 0 Future 8-Future UnFunded -350,000
Administration
B-70956 Information Technology MRC Telecommunications Infrastructure 1,2,3 ',5 455,000 0 Future 8-Future UnFunded -455,000
Replacement
B-70957 Information Technology eGovernment/Web Services City View 1,2,3,4,5 2,464,000 0 Future 8-Future UnFunded -2,464,000
Replacement
B-70958 Information Technology eGoverment/Web Services iBuild ami 1,2,3,4,5 480,000 0 Future 8-Future UnFunded -480,000
Phases II and III
B-70959 Information Technology eGovernment Services ' atform 1,2,3,4,5 1,480,000 0 Future 8-Future UnFunded -1,480,000
B-70960 Information Technology CIP Document , a t & Data Consolidation 1,2,3,4,5 380,000 0 Future 8-Future UnFunded -380,000
B-70961 Information Technology Audit Co .. fiance 1,2,3,4,5 22,000 0 Future 8-Future UnFunded -22,000
B-70962 Information Technology Se Virtualization 1,2,3,4,5 98,000 0 Future 8-Future UnFunded -98,000
B-70963 Information Technology Cusiness Continuity Systems Consolidation 1,2,3,4,5 56,000 0 Future 8-Future UnFunded -56,000
B-70964 Information Technolote City Wide Personal Computer Replacement 1,2,3,4,5 1,560,000 0 Future 8-Future UnFunded -1,560,000
(20%)
B-70965 Information 'echnology Hyperion Financial Management Application 1,2,3,4,5 430,000 0 Future 8-Future UnFunded -430,000
B-70966 Info on Technology Kronos System Upgrade 1,2,3,4,5 105,000 0 Future 8-Future UnFunded -105,000
B-70967 ormatfion Technology Cloud Data Service - Data Storage 1,2,3,4,5 220,000 0 Future 8-Future UnFunded -220,000
B-70968 Information Technology Replacement: City Clerk Systems 1,2,3,4,5 660,000 0 Future 8-Future UnFunded -660,000
B-7 . OB General Services Police Vehicle Acquisition - FY2014 1,2,3,4,5 2,040,000 0 Future 8-Future UnFunded -2,040,000
Administration
Active & Future
CIP Projects Only
B-No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
312-Public Safety
B-30373A Police
B-40273 Police
B-60453A Fire Rescue
B-60455B Fire Rescue
B-70102A Fire Rescue
B-70104 Fire Rescue
B-70105 Fire Rescue
B-70106 Fire Rescue
B-70112 Police
B-70210 Fire Rescue
B-70211 Fire Rescue
B-70212 Fire Rescue
B-70213 Fire Rescue
B-70241 Fire Rescue
B-70411 Fire Rescue
B-70418 Fire Rescue
B-70718 Fire Rescue
B-72801 Fire Rescue
B-72802 Fire Resc
B-72803 Fire 'escue
B-72810 Fire Rescue
B-7 3 Fire Rescue
-72915A Police
311-General Government
Police Department Property Unit Outdoor
Storage
Police Station Headquarters Generator Slab
Fire Station #13
Fire Station #1 - Renovation and
1,2,3,4,5
2
2
2
Miscellaneous Repairs
Fire Station No. 6 Office Building - Structural 5
Analysis
Fire Station No. 10 Restroom Remodeling 1
Refurbishing of Existing Apparatus
Firefighting Equipment and Gear
Police Headquarters Interview rooms sound
proofing - Oracle 19-690002
Fire Station #5 Exterior Walls Repair - D1
Fire Station No. 3 Dormitories Build -out 3
Project
Fire Station No. 12 - Re -roofing
Fire Station No.5 - Interio
Oracle Project 91-03
oject
novation Work
Fire Rescue C. - al Needs - FY2014
Fire Res . e Personal Protective Equipment
F A Assistance to Firefighters Program
Y2011
Fire Facilities Generators (North & South)
Computer Aided Dispatch (CAD)
Fire Stations & Other Fire Facilities
Fire Station Equipment and Furniture
Replacement
New Fire Rescue Apparatus (North & South)
Defense and Security Equipment Acquisition
Police Headquarters Helipad and Roof
1,2,3,4,5
1,2,3,4,5
1,2,3,4,5
5
1
1,2,3,4,5
1,2,3,4,5
1,2,3,4,5
1,2,3,4,5
1,2,3,4,5
1,2,3,4,5
1,2,3,4,5
1,2,3,4,5
1,2,3,4,5
1,2,3,4,5
SUBSTITUTED
Total Cost Total
Estimate ($) Funds ($) Status Phase
109,953,419 79,646,467
1,069,644
10,000
5,084,496
500,000
74,619
188,218
230
0
158,123
55,000
150,000
100,000
77,000
348,240
1,858,500
820,580
343,610
300,000
120,865
3,647,898
790,837
573,739
3,767,249
1,657,118
1,069,644 Active
10,000
5,084,496
500,000
Active
Activ
five
619 Active
188,218
230,000
158,123
55,000
Active
Future
Active
Active
150,000 Active
100,000 Active
77,000 Active
348,240 Active
1,858,500
820,580
343,610
300,000
120,865
3,647,898
790,837
573,739
3,767,249
1,657,118
Future
Active
Active
Future
Active
Active
Active
Future
Active
Active
Fund
4-Bid
2-Pre-Design
5-Construction
2-Pre-Design
7-On-Hold
4-Bid (JOC)
8-Future
5-Construction
4-Bid (JOC)
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
5-Const. (JOC) Funded
5-Const. (JOC) Funded
5-Const. (JOC)
3-Design
8-Future
3-Design
3-Design
Funded
Funded
Funded
Funded
Funded
8-Future Funded
3-Design Funded
5-Construction Funded
5-Construction Funded
8-Future
5-Construct
3-Design
Funded
on Funded
Funded
Total Fund
minus
Total Cost
Estimate ($)
-30,306,952
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Active & Future
CIP Projects Only
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Total Cost Total
SUBSTITUTED
B-No. Client Project Dist. Estimate ($) Funds ($) Status Phase
312-Public Safety
Replacement
B-60351 Fire Rescue Fire Station #10 (New) 1 6,275,200 898,123 Active 3-Design Partially Funded -5,377,076
B-60454 Fire Rescue Fire Station #14 (New) 4 6,916,509 5,076,843 Active 2-P - Iesign Partially Funded -1,839,665
B-70242 Fire Rescue Fire Department - FY2012 "Emergency 1,2,3,4,5 317,333 238,000 Future 8-Future Partially Funded -79,333
Medical Services (EMS)"
B-72804 Fire Rescue Phone and Radio Equipment Upgrades 1,2,3,4,5 1,209,200 351,200 • ve 5-Construction Partially Funded -858,000
B-72808 Fire Rescue Light Fleet Replacement 1,2,3,4,5 1,649,658 667,65: Active 5-Construction Partially Funded -982,000
B-72809 Fire Rescue Large Firefighting Equipment 1,2,3,4,5 660,316 3::,316 Active 5-Construction Partially Funded -272,000
B-70113 Police Police Headquarters 5th floor Interior 1,2,3,4,5 496,956 0 Future 8-Future UnFunded -496,956
renovations
B-70114 Police Fire Pump Electrical Rewiring - Police Dept. 1,2,3,4,5 35,1:1 0 Future 8-Future UnFunded -35,000
B-70115 Police Domestic Water Pump - Police Dept. 1,2,3,4,5 65,000 0 Future 8-Future UnFunded -65,000
j B-70116 Police Police Headquarter Elevators Renovation & 1,2,3,4,5 75,000 0 Future 8-Future UnFunded -75,000
Repairs
B-70117 Police I-95 Lighting Project - Police Dept. , ,3,4,5 85,000 0 Future 8-Future UnFunded -85,000
B-70118 Police Police Central Station Parking Garage 1,2,3,4,5 210,000 0 Future 8-Future UnFunded -210,000
B-70119 Police Police Headquarters Presure Clean/Se.. aint 1,2,3,4,5 275,000 0 Future 8-Future UnFunded -275,000
Exterior
B-70120 Police Carpeting and Flooring - Po ' e Dept. 1,2,3,4,5 65,000 0 Future 8-Future UnFunded -65,000
B-70121 Police Police Headquarter : south District Storm 1,2,3,4,5 425,000 0 Future
Fund
Total Fund
minus
Total Cost
Estimate ($)
8-Future UnFunded
-425,000
Drains and Par g Lot Asphalt
B-70122 Police South Di s ct Police Sub Station Furniture 1,2,3,4,5 175,000 0 Future 8-Future UnFunded -175,000
B-70123 Police Sec ity System for Central/Headquarter - 1,2,3,4,5 85,000 0 Future 8-Future UnFunded -85,000
olice Dept.
B-70124 Police Police South District Air Conditioning Diffuser 1,2,3,4,5 275,000 0 Future 8-Future UnFunded -275,000
B-70125 Police North and South Police Stations Landscaping 1,2,3,4,5 50,000 0 Future 8-Future UnFunded -50,000
B-70126 Police Grapeland Heights Electrical Panel - Police 1,2,3,4,5 125,000 0 Future 8-Future UnFunded -125,000
Dept.
B-70127 '. ice Police Headquarter Building Emergency 1,2,3,4,5 25,000 0 Future 8-Future UnFunded -25,000
Generator Shed Replacement
B-701 Police Forensic Lab Expansion - Police Dept. 1,2,3,4,5 1,200,000 0 Future 8-Future UnFunded -1,200,000
0129 Police College of Police Auditorium Lighting 1,2,3,4,5 15,000 0 Future 8-Future UnFunded -15,000
City Of Miami - Capital Improvement Program
Active & Future
CIP Projects Only Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
B-No. Client Project Dist. Estimate ($) Funds ($) Status Phase Stat Estimate ($)
312-Public Safety
B-70130 Police College of Police Lobby Lighting 1,2,3,4,5 20,000 0 Future 8-Future UnFunded -20,000
B-70131 Police Mounted Stables Stall Repairs - Police Dept. 1,2,3,4,5 100,000 0 Future 8-Future UnFunded -100,000
B-70132 Police Police South District Exterior Lighting 1,2,3,4,5 35,000 0 Future 8-F re UnFunded -35,000
B-70133 Police Security System for Police South District 1,2,3,4,5 70,000 0 Future 8-Future UnFunded -70,000
Substation
SUBSTITUTED
B-70134 Police Replacement of 400 Desktop Computers - 1,2,3,4,5 324,172 0 F re 8-Future UnFunded -324,172
Police Dept.
B-70135 Police Replacement of Sauna Water Heating System - 1,2,3,4,5 15,000 0 Future 8-Future UnFunded -15,000
Police Dept.
B-70136 Police Police Headquarters Record Unit Exterior 1,2,3,4,5 496,458 0 Future 8-Future UnFunded -496,458
Walls Replacement
B-70214 Fire Rescue Fire Stations Computer Aided Dispatch System 1,2,3,4,5 2,� ! .,000 0 Future 8-Future UnFunded -2,400,000
B-70215 Fire Rescue Uniform Fire Station Data Closets x12 1,2,3,4,5 48,000 0 Future 8-Future UnFunded -48,000
B-70216 Fire Rescue Fire Station and AO PC Replacement 1,2,3,4 70,000 0 Future 8-Future UnFunded -70,000
B-70217 Fire Rescue New Citywide Fire Stations Digital Radio 1 ,4,5 5,000,000 0 Future 8-Future UnFunded -5,000,000
System
B-70218 Fire Rescue Citywide Fire Station Replace out of Wa nty 1,2,3,4,5 150,000 0 Future 8-Future UnFunded -150,000
Mobile Data
B-70219 Fire Rescue Citywide Warranty and Outd. • Fire Station 1,2,3,4,5 105,000 0 Future 8-Future UnFunded -105,000
Computers and Monitors
B-70220 Fire Rescue Citywide Bunker ar (Fire Station) 1,2,3,4,5 274,800 0 Future 8-Future UnFunded -274,800
B-70221 Fire Rescue Fire Stations anty Lifepak/EKG Units 1,2,3,4,5 946,000 0 Future 8-Future UnFunded -946,000
B-70222 Fire Rescue Rebui : ng Fire Station #1 2 9,000,000 0 Future 8-Future UnFunded -9,000,000
B-70223 Fire Rescue ' - .uilding Fire Station #10 1 6,000,000 0 Future 8-Future UnFunded -6,000,000
B-70224 Fire Rescue Fire and Rescue Training Center 2 17,000,000 0 Future 8-Future UnFunded -17,000,000
(Renovate/Rebuild)
B-70225 Fire Rescue Fire Station #15 (Fire Boat) 2 10,000,000 0 Future 8-Future UnFunded -10,000,000
B-70226 Fire Re i e Citywide Fire Station Pumpers 1,2,3,4,5 1,960,000 0 Future 8-Future UnFunded -1,960,000
B-70227 F. ' escue Fire Rescue 1,2,3,4,5 4,320,000 0 Future 8-Future UnFunded -4,320,000
B-70228 Fire Rescue Apparatus Replacement 1,2,3,4,5 950,000 0 Future 8-Future UnFunded -950,000
B-702 ' Fire Rescue Replace Fireboat 1 1,250,000 0 Future 8-Future UnFunded -1,250,000
0230 Fire Rescue Fire Station Training Facility 1,2,3,4,5 750,000 0 Future 8-Future UnFunded -750,000
Active & Future
CIP Projects Only
B-No.
Client
312-Public Safety
B-70231 Fire Rescue
B-70232 Fire Rescue
B-70233 Fire Rescue
B-70234 Fire Rescue
B-70235 Fire Rescue
B-70236 Fire Rescue
B-70237 Fire Rescue
B-70238 Fire Rescue
B-70239 Fire Rescue
B-70240 Fire Rescue
B-70417 Police
B-72811 Fire Rescue
313-Disaster Recovery
B-30500T Capital Improvement Program
Admin
B-30538T Capital Improvement Program
Admin
B-30611T Capital Improvement Program
Admin
B-30613T Capital Improvement Program
Admin
B-30614T Capital Improvement P
Admin
B-30615T
B-30624T
B-306
B-30687T
Capital Im
Adm.
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Project
Expand Comunication/Alarm Office Facility
w/PD (Fire Station)
Facility Budget Requests (Fire)
Fire Station Equipment/Furniture
Fire Station Hurricane Hardening
Fire Station Light Fleet Vehicle Replacement
Fire Station Hardening/Security
Fire Station #5 Renovation
Fire Training Props
Fire Station Flat Panels 24"
Fire Station Paperless Inspection System (i.e.
MobileEyes software)
Satellite Communications Antenna Installation 2
Dist.
1,2,3,4,5
Replace Existing Fire Engines
312-Public Safe
Civic Center NW 14th Street - Tree nded
Component
Museum Park - FEMA T
Component
D1 FEMA Tr= Funded Projects
e Funding
D MA Tree Funded Projects
gram D4 - FEMA Tree Funded Projects
ement Program D5 FEMA Tree Funded Component
pital Improvement Program Overtown Greenway @ NW 11 Terrace - D5
Admin Tree Funded Component
Capital Improvement Program Palm Grove Road Improvements - Tree
Admin Component D2
Capital Improvement Program Coconut Grove Business Improvement District
1,2,3,4,5
1,2,3,4,5
1,2,3,4,5
1,2,3,4,5
1,2,3,4,5
1
2
1,2,3,4,5
1,2,3,4,5
1,2,3
Total Cost
Estimate ($)
500,000
1,750,000
200,000
384,000
630,000
935,000
800,000
350,000
3,500
80
0
20,000
3,035,000
112,607,844
1,2,3,4,5 100,000
215,943
1 169,930
3 255,930
4 315,930
5 119,930
5 100,000
2 70,000
2 100,000
SUBSTITUTED
Total
Funds ($) Status Phase
0 Future
0 Future
0 Future
0 Future
0 F re
0 Future
0 Future
0 Future
0 Future
0 Future
0 Future
0 Future
29,545,882
100,000 Active
215,943 Active
169,930 Future
255,930 Future
315,930 Future
119,930 Future
100,000 Active
70,000 Active
100,000 Active
8-Future
8-Fu . e
-Future
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
Fund
Sta
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
4-Bid Funded
5-Construction Funded
8-Future Funded
8-Future Funded
8-Future Funded
8-Future Funded
3-Design Funded
3-Design Funded
5-Const. (JOC) Funded
Total Fund
minus
Total Cost
Estimate ($)
-500,000
-1,750,000
-200,000
-384,000
-630,000
-935,000
-800,000
-350,000
-3,500
-80,000
-20,000
-3,035,000
-83,061,961
0
0
0
0
0
0
0
0
0
01
Active & Future
CIP Projects Only
B-No. Client
313-Disaster Recovery
Admin
B-30699T
B-30724T
B-30727T
B-30780T
B-30822T
B-30882T
B-30883T
B-40704AT
Capital
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Improvement Program
Improvement Program
Improvement Program
Improvement Program
Improvement Program
Improvement Program
Improvement Program
Improvement Program
325-Public Facilities
B-30501A Public Facilities
B-30501B Public Facilities
B-30531
B-30696
B-30706
B-30735
B-33506
B-60464
B-70010
B-7001
0414
Capital Improvement Program
Admin
Public Facilities
Public Facilities
Public Facilities
Public Facilit
Pu • is Facilities
Public Facilities
Public Facilities
Public Facilities
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Project
D2 Tree Component
Beacom Project Area Improvements - Tree
Component D3
NW 33rd Street Roadway Improvement
Project - D1 Tree Component
NW 18th Avenue Roadway Improvement
Project - D1 Tree Component
NW 14 Ave & 28 St. Are Roadway
Improvements- D1 - Tree Component
Brickell Area Shared Use Path and Roadway
Improvements - Tree Component D2
African Square Park - Splash Park D5 Tree
Component
NW 12 Avenue/NW 12 Place Roadway
Improv. Tree Component D5
SW 32 Avenue Improvements D2 Tree
Component
Dist.
3
1
1
1
2
5
5
313-Disasecovery
Manuel Artime Miscella. ous Project
Manuel Artime D • er Rack System
Dorsey Me r .rial Library Restoration
amarina Pier A, B & C Fire Line Repairs
Miscellaneous Repairs 10% Set Aside
Dinner Key Marina Dinghy Dock - D2
James L. Knight Center Miscellaneous
Improvements
New Dinner Key Marina Dockmaster Building
Miamarina Pier 5 Canopies - PF
Clean Vessel Act 2013 - PF
James L. Knight Center / Hyatt- Fire Alarm
System Replacement
3
1,2,3,4,5
2
2
2
1,2,3,4,5
2
2
2
2
Total Cost
Estimate ($)
60,000
60,000
60,000
26,000
85,930
0
46,000
60,000
1,895,593
92,882
106,653
250,000
380,000
2,158,593
253,070
48,721
4,211,239
435,000
41,167
351,876
SUBSTITUTED
Total
Funds ($) Status Phase
60,000 Active
60,000 Active
60,000 Ac e
26 i 0 Active
85,930 Active
50,000 Active
46,000 Active
60,000 Active
1,895,593
92,882
106,653
250,000
380,000
2,158,593
253,070
48,721
4,211,239
435,000
41,167
351,876
Fund
Sta
5-Construe on Funded
-On-Hold Funded
5-Construction Funded
5-Construction Funded
5-Const. (JOC) Funded
3-Design Funded
5-Construction Funded
5-Const. (JOC) Funded
Active 5-Const. (JOC)
Active 3-Design
Active 3-Design
Active 5-Const. (JOC)
Active 5-Construction
Active 3-Design
Active 5-Construction
Active 5-Construction
Active 4-Bid (JOC)
Future 8-Future
Active 1-Study
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Total Fund
minus
Total Cost
Estimate ($)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0)
Active & Future
CIP Projects Only
B-No. Client
325-Public Facilities
B-30182A Public Facilities
B-30501C Public Facilities
B-30602 Public Facilities
B-30688 Public Facilities
B-30689 Public Facilities
B-33514 Public Facilities
B-40180 Public Facilities
B-70100 Public Facilities
B-75001 Public Facilities
B-30834 Public Facilities
B-35000 Public Facilities
B-35003 Public Facilities
331-Parks and Recreation
B-30134A Parks and Recreation
B-30174
Virginia Key Park Trust
B-30305B Parks and Recreation
B-30538
B-30538D Capital Improvement • •gram
Admin
B-30538E Capital Im.- •vement Program
Admi
B-30538F
pital Improvement Program
Admin
B-305 C Parks and Recreation
30541D Parks and Recreation
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Project
Coconut Grove Waterfront Master Plan
Implementation - Phase I
Manuel Artime Window Replacement 970
Building - PF
Seminole Dinghy Dock Expansion 2
Marine Stadium Restoration 2
Marine Stadium Bulkhead Replacement 2
Marine Stadium Marina Improvements 2
Marine Stadium Marina at Virginia Key 2
Gusman Hall Improvements / Repairs 2
Watson Island Infrastructure 2
Dinner Key Dredging - Spoil Island C Floating 2
Dock Repair
Watson Island Public Park Improvements
Allapattah Community Elderly Center
Dist.
2
2
2
325-Public F •. i ties
Bryan Park Community Build' • • - D4
4
Virginia Key Beach Par. ' istoric Restoration 2
Phase 2
Gibson Park ew Construction (Partially
Funded . CRA 92-689001)
Parks and Recreation eum Park - Partially Funded by CRA
92-686001
Museum Park - DRI Fees Administration
Museum Park - DRI Air Quality
Museum Park - DRI Transportation
Total Cost
Estimate ($)
47,179,389
173,607
60,000
511,716
2,094,393
1,315,550
33,180,900
10,000,000
647 0
08,375
2,600,000
287,000
106,687,324
852,128
1,480,737
5 12,739,521
1,2,3,4,5 14,042,367
1,2,3,4,5 600,000
1,2,3,4,5 313,129
1,2,3,4,5 2,296,403
Kennedy Park Shoreline Stabilization Phase I 2
Citywide Park Equipments & Site
Improvements FY12
261,000
1,2,3,4,5 1,917,378
SUBSTITUTED
Total
Funds ($) Status Phase
2,051,675 Active
150,379 Active
30,000 Future
350,000 Ac ' e
1,891,603 Active
25 ,.45 Active
,740,007 Active
423,405 Active
150,000 Future
0 Future
0 Future
0 Future
15,371,918
852,128 Active
1,480,737 Active
12,739,521 Active
14,042,367 Active
600,000 Active
313,129 Active
2,296,403 Active
261,000 Active
1,917,378 Active
Fund
Sta
Total Fund
minus
Total Cost
Estimate ($)
4-Bid Partially Funded -45,127,714
3-D-a'gn Partially Funded -23,227
8-Future Partially Funded -30,000
7-On-Hold Partially Funded -161,716
4-Bid Partially Funded -202,789
3-Design Partially Funded -1,059,905
7-On-Hold Partially Funded -31,440,893
5-Construction Partially Funded -9,576,594
8-Future Partially Funded -497,190
8-Future UnFunded -308,375
8-Future UnFunded -2,600,000
8-Future UnFunded -287,000
3-Design Funded
5-Construction Funded
5-Construction Funded
5-Construction Funded
5-Construction Funded
5-Construction Funded
5-Construction Funded
5-Construction Funded
3-Design Funded
-91,315,405
0
0
0
0
0
0
0
0
0
Active & Future
CIP Projects Only
B-No.
Client
331-Parks and Recreation
B-30547E
B-30547G
B-30671
B-30690
B-30721
B-30772
B-30800
B-30824
B-30825
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Capital Improvement Program
Admin
Parks and Recreat
on Biscayne Bay Spoil Island B Public Shelter -
D2
v B-30825A Parks and Recreation
B-30825B Parks and Recreation
B-30886S Parks and Recreation
B-30962
B-30963
B-30981
B-30984
B-30995
B-35806
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
B-35812A Parks and Recreat
B-35812D Parks a : ' ecreation
B-35838 Parks and Recreation
61B Parks and Recreat
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Project
Parks ADA Modifications - District 2
Parks ADA Modifications - District 4
Caribbean Marketplace Renovation
West End Park New Community Building
Spoil Island E Restoration and Floating Dock
Bay of Pigs Park Lighting - D4
Dist.
2
4
5
4
2
4
Fern Isle / PBA Park Improvements Project - 1
D1
Spoil Island B & C Swim Area Improvement - 2
D2
2
Biscayne Bay Spoil Island E Picnic Tables, 2
Benches & Umbrellas - D2
Biscayne Bay Spoil Island E Public Trail - D2
Lummus Landing Square - D5 Sanitary Sewe
Component
Robert King High Fencing and Mis aneous 4
Improvements
Bay of Pigs Memorial P Lighting - D4
Oakland Grove P. - upgrades - D5
Athalie Ra Park HVAC Replacement - D5
Virg. 'a Key Bike and Kayak Facility - D2
urtis Park New Pool Facility and Boat Ramp 1
Improvement
Duarte Park Building Renovation, Splash Park
and Sign
Duarte Park Building Renovation, Splash Park
(Lighting)
Kennedy Park Restroom Building
Improvements
on Maximo Gomez / Domino Park Restroom
Improvements - D3
4
5
5
2
1
1
2
3
Total Cost
Estimate ($)
215,348
491,147
1,102,553
2,598,521
252,500
53,000
116,781
67,000
7
8,250
8,250
100,000
102,468
20,000
44,886
193,043
477,000
2,177,159
1,312,797
15,000
222,033
48,368
SUBSTITUTED
Total
Funds ($) Status Phase
215,348
491,147
1,102,553
2,598,521
252,500
53,000
116,78
Active 3-Design
Active 4-Bid (JO
Active 5-C. struction
Active -Design
Active 4-Bid
ve 5-Const. (JOC)
Active 5-Construction
67,000 Active
17,500 Active
8,250 Active
8,250 Active
100,000 Active
102,468 Active
20,000
44,886
193,043
477,000
2,177,159
3-Design
7-On-Hold
3-Design
3-Design
3-Design
4-Bid (JOC)
Future 8-Future
Active 2-Pre-Design
Future 8-Future
Active 2-Pre-Design
Active 3-Design
1,312,797 Active
15,000 Future
222,033 Active
48,368 Active
5-Const. (JOC)
8-Future
4-Bid (JOC)
3-Design
Fund
Sta
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Total Fund
minus
Total Cost
Estimate ($)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
CO
Active & Future
CIP Projects Only
B-No. Client
331-Parks and Recreation
B-35887
B-39910E
B-40173
B-40454
B-40456
B-40457
B-40527
B-50722
B-50722A
B-75883
B-75973
B-78502A
B-30374
B-30541
B-30777
B-30801
B-30802
B-30832
Parks and Recreation
Parks and Recreation
Bayfront Park Management
Trust
Public Facilities
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Public Facilities
Parks and Recreation
Parks and Recreation
Capital Improvement Program
Admin
Parks and Recreation
Parks and Recreat
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Project Dist.
Moore Park New Construction
District 2 Quality of Life Park Improvements
Bayfront Park Electrical Repairs
5
2
2
Park Expansions and Land Acquisition - 1,2,3,4,5
Citywide
Antonio Maceo Community Building - D 1 1
Kinloch Park Building Addition - D 1 1
Melreese Golf Course Renovations 1
Little River Waterfront Park 2
Little River Waterfront Park Acquisition PHII 2
Peacock Park Site Improvements 2
Oakland Grove Park Playground Equipment 5
Museum of Science - Development in 1,2,3
Bicentennial Park - Phase 2
Virginia Key Rowing Center Improvements
P&R Project
on Citywide Park Equipment & Site
Improvements
Parks and Recreation
Parks and Recreation
Parks and Recreation
Community Development
B-30882 Parks and Recreati
B-30886 Parks and R- eation
B-35883A Parks . • Recreation
B-35904 ' . rks and Recreation
B-404
0905
Parks and Recreation
Parks and Recreation
1,2,3,4,5
Coral Gate Mini Park i 4 4
Manatee Bend P. Shoreline Improvements - 2
D2
Pall. ark Shoreline Improvements - D2 2
ouglas Park ADA Improvement (restrooms) - 2
CD Project 91-03279
African Square Park - Splash Park - D5 5
Lummus Landing Square - D5 5
Hadley Park New Youth Center D5 5
Neighborhood Parks Improv. Contingencies - 1,2,3,4,5
ADA Modifications
Citywide Capital Improvements Projects 1,2,3,4,5
Seybold House Demolition and Reconstruction 5
- D5
Total Cost
Estimate ($)
7,605,462
987,988
309,000
1,000,000
1,686,750
1,461,850
200,000
717,500
735
25,124
15,000
2,000,000
1,327,022
5,293,595
200,633
675,826
1,438,000
133,474
670,000
1,007,000
8,049,933
1,272,223
413,946
200,000
Total
Funds ($) Status
7,605,462
987,988
309,000
Active
Active
Active
1,000,000 Future
1,686,750 Active
1,46 50 Active
200,000 Future
717,500 Active
735,000 Active
725,124 Active
15,000 Future
2,000,000 Active
616,513 Active
4,896,494 Active
100,000 Active
88,526 Active
80,000 Active
133,474 Active
600,000
925,061
5,876,805
771,223
Active
Active
Active
Future
263,946 Active
0 Future
SUBSTITUTED
Phase
5-Construction
5-Const on
5-Cs st. (JOC)
8-Future
Fund
Funded
Funded
Funded
Funded
Total Fund
minus
Total Cost
Estimate ($)
0
0
0
0
3-Design Funded 0
2-Pre-Design Funded 0
8-Future Funded 0
7-On-Hold Funded 0
3-Design Funded 0
3-Design Funded 0
8-Future Funded 0
5-Construction Funded 0
3-Design Partially Funded -710,509
5-Construction Partially Funded -397,100
3-Design Partially Funded -100,633
3-Design Partially Funded -587,300
3-Design Partially Funded -1,358,000
4-Bid (JOC) Partially Funded -0
3-Design Partially Funded -70,000
3-Design Partially Funded -81,939
7-On-Hold Partially Funded -2,173,128
8-Future Partially Funded -501,000
3-Design Partially Funded -150,000
8-Future UnFunded -200,000
Active & Future
City Of Miami - Capital Improvement Program
SUBSTITUTED
CIP Projects Only Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
B-No. Client Project Dist. Estimate ($) Funds ($) Status Phase Stat Estimate ($)
331-Parks and Recreation
B-40458 Parks and Recreation Citywide Park Building AC Replacement 1,2,3,4,5 600,000 0 Future 8-Future UnFunded -600,000
B-40459 Parks and Recreation African Square Park Playground 5 125,000 0 Future 8-Future UnFunded -125,000
B-40460 Parks and Recreation African Square Park Restroom & Building 5 750,000 0 Future 8-F re UnFunded -750,000
Renovation
B-40461 Parks and Recreation Allapattah Mini Park Access Control 1 30,000 0 Future 8-Future UnFunded -30,000
B-40462 Parks and Recreation Allapattah Mini Park Court 1 25,000 0 F re 8-Future UnFunded -25,000
B-40463 Parks and Recreation Armbrister Park Field 2 1,350,000 1 Future 8-Future UnFunded -1,350,000
B-40464 Parks and Recreation Bay of Pigs Park Playground 5 100,000 0 Future 8-Future UnFunded -100,000
B-40465 Parks and Recreation Baywood Park Seawall Repair 5 150,000 0 Future 8-Future UnFunded -150,000
B-40466 Parks and Recreation Baywood Park Site Development 5 125,000 0 Future 8-Future UnFunded -125,000
B-40467 Parks and Recreation Belafonte Tacolcy Park 5 35 :10 0 Future 8-Future UnFunded -35,000
B-40468 Parks and Recreation Belafonte Tacolcy Park 5 40,000 0 Future 8-Future UnFunded -40,000
v
co B-40469 Parks and Recreation Belafonte Tacolcy Park entire facility 5 5,000,000 0 Future 8-Future UnFunded -5,000,000
reconstruction
B-40470 Parks and Recreation Bell Meade Park Improvements 50,000 0 Future 8-Future UnFunded -50,000
B-40471 Parks and Recreation Biscayne Heights Park (Shorecrest Park) 5 100,000 0 Future 8-Future UnFunded -100,000
Improvements
B-40472 Parks and Recreation Biscayne Park Soccer Facility 2 2,250,000 0 Future 8-Future UnFunded -2,250,000
B-40473 Parks and Recreation Bryan Park Tennis Court 4 45,000 0 Future 8-Future UnFunded -45,000
B-40474 Parks and Recreation Kirk Munroe Tenni ark 2 30,000 0 Future 8-Future UnFunded -30,000
B-40475 Parks and Recreation Coral Gate P. Access Control 4 20,000 0 Future 8-Future UnFunded -20,000
B-40476 Parks and Recreation Coral . e Park Baseball Field 4 30,000 0 Future 8-Future UnFunded -30,000
B-40477 Parks and Recreation -stwood Park Basketball Courts Resurfacing 5 25,000 0 Future 8-Future UnFunded -25,000
B-40478 Parks and Recreation Curtis Park Access Control (Fencing) 1 225,000 0 Future 8-Future UnFunded -225,000
B-40479 Parks and Recreatio Curtis Park Access Control (Roll up doors) 1 25,000 0 Future 8-Future UnFunded -25,000
B-40480 Parks and Rec ' .tion Curtis Park Basketball and Tennis Courts 1 125,000 0 Future 8-Future UnFunded -125,000
Resurfacing
B-40481 Pa - and Recreation Curtis Park Parking Lot 1 125,000 0 Future 8-Future UnFunded -125,000
B-40482 Parks and Recreation Curtis Park Playground 1 200,000 0 Future 8-Future UnFunded -200,000
B-4048 Parks and Recreation Curtis Park Restrooms Renovation 1 200,000 0 Future 8-Future UnFunded -200,000
B ' 1484 Parks and Recreation Curtis Park Stadium Restrooms Improvements 1 1,250,000 0 Future 8-Future UnFunded -1,250,000
B-40485 Parks and Recreation Domino Park Building 3 50,000 0 Future 8-Future UnFunded -50,000
Active & Future
CIP Projects Only
City Of Miami - Capital Improvement Program SUBSTITUTED
Cost Estimates versus Available Funding
Total Cost
B-No. Client Project Dist. Estimate ($)
331-Parks and Recreation
Total
Funds ($) Status Phase
Fund
Total Fund
minus
Total Cost
Estimate ($)
B-40486 Parks and Recreation Domino Park Restroom Renovation 3 250,000 0 Future 8-Future UnFunded -250,000
B-40487 Parks and Recreation Domino Park Shade Structure 3 30,000 0 Future 8-Future UnFunded -30,000
B-40488 Parks and Recreation Dorsey Park Ballfield 2 45,000 0 Future 8-F re UnFunded -45,000
B-40489 Parks and Recreation Douglas Park Irrigation System 2 40,000 0 Future 8-Future UnFunded -40,000
B-40490 Parks and Recreation Douglas Park Lighting 2 50,000 0 Future 8-Future UnFunded -50,000
B-40491 Parks and Recreation Douglas Park Playground 2 130,000 0 ure 8-Future UnFunded -130,000
B-40492 Parks and Recreation Duarte Park Basketball and Tennis Courts 1 75,000 ! Future 8-Future UnFunded -75,000
Resurfacing
B-40493 Parks and Recreation Duarte Park Lighting 1 175,000 0 Future 8-Future UnFunded -175,000
B-40494 Parks and Recreation Duarte Park Playground 1 120,000 0 Future 8-Future UnFunded -120,000
B-40495 Parks and Recreation Eaton Park Daycare Improvements 5 100.:10 0 Future 8-Future UnFunded -100,000
B-40496 Parks and Recreation Eaton Park Improvements 5 ,500,000 0 Future 8-Future UnFunded -1,500,000
co
o B-40497 Parks and Recreation Fort Dallas Park (Lummus Park Historic 5 750,000 0 Future 8-Future UnFunded -750,000
District) Demolition
B-40498 Parks and Recreation Gibson Park Stadium 850,000 0 Future 8-Future UnFunded -850,000
B-40499 Parks and Recreation Grapeland Park Picnic Shelter 1 850,000 0 Future 8-Future UnFunded -850,000
B-40500 Parks and Recreation Grove Mini Park Playground 2 65,000 0 Future 8-Future UnFunded -65,000
B-40501 Parks and Recreation Hadley Park Ballfield 5 80,000 0 Future 8-Future UnFunded -80,000
B-40502 Parks and Recreation Hadley Park Bleachers 5 600,000 0 Future 8-Future UnFunded -600,000
B-40503 Parks and Recreation Hadley Park Footb Field 5 1,750,000 0 Future 8-Future UnFunded -1,750,000
B-40504 Parks and Recreation Hadley Par 'arking Lot 5 100,000 0 Future 8-Future UnFunded -100,000
B-40505 Parks and Recreation Hadle ark Pool Locker rooms improvment 5 80,000 0 Future 8-Future UnFunded -80,000
B-40506 Parks and Recreation dley Park Pool Improvement 5 280,000 0 Future 8-Future UnFunded -280,000
B-40507 Parks and Recreation Citywide - Land Acquisition Park 1,2,3,4,5 15,000,000 0 Future 8-Future UnFunded -15,000,000
B-40508 Parks and Recreatis Legion Park Boat Ramp 2 450,000 0 Future 8-Future UnFunded -450,000
B-40509 Parks and Re • eation Legion Park HVAC (heating, ventilation, and 2 100,000 0 Future 8-Future UnFunded -100,000
air conditioning) Replace
B-40510 P s and Recreation Legion Park Improvements 2 250,000 0 Future 8-Future UnFunded -250,000
B-40511 Parks and Recreation Legion Park Restrooms 2 100,000 0 Future 8-Future UnFunded -100,000
B-405 Parks and Recreation Lemon City Park Daycare Parking Lot 5 100,000 0 Future 8-Future UnFunded -100,000
0513 Parks and Recreation Lemon City Park Daycare Playground 5 75,000 0 Future 8-Future UnFunded -75,000
Active & Future
CIP Projects Only
City Of Miami - Capital Improvement Program SUBSTITUTED
Cost Estimates versus Available Funding
Total Cost Total Fund
B-No. Client Project Dist. Estimate ($) Funds ($) Status Phase
331-Parks and Recreation
Total Fund
minus
Total Cost
Estimate ($)
B-40514 Parks and Recreation Lemon City Park Improvements 5 40,000 0 Future 8-Future UnFunded -40,000
B-40515 Parks and Recreation Lemon City park Walkways 5 30,000 0 Future 8-Future UnFunded -30,000
B-40516 Parks and Recreation Little Haiti Soccer Park 5 170,000 0 Future 8-F re UnFunded -170,000
B-40517 Parks and Recreation Little Haiti Soccer Park Stadium Bleacher 5 100,000 0 Future 8-Future UnFunded -100,000
Modification
B-40518 Parks and Recreation Little Haiti Soccer Park Stadium Repairs 5
B-40519 Parks and Recreation Little Haiti Freedom Garden Park 5
B-40520 Parks and Recreation Little River Commerce Park Building 5
B-40521 Parks and Recreation Little River Pocket Park Playground 5
B-40522 Parks and Recreation Lummus Park Playground 5
B-40523 Parks and Recreation Manatee Bend Park 2
B-40524 Parks and Recreation Marti Pool Park Locker -rooms Renovation 3
co
B-40525 Parks and Recreation Marti Pool Park Pool Improvements 3
B-40526 Parks and Recreation Marti Pool Park Pump Improvement 3
B-40528 Parks and Recreation Melrose Park Playground 5
B-40529 Parks and Recreation Merrie Christmas Park Improvements 2
B-40530 Parks and Recreation Virginia Key Rowing Center Park B ding 2
B-40531 Parks and Recreation Moore Park Tennis Court Imp '.vement 5
B-40532 Parks and Recreation Morningside Park Floa g Dock 2
B-40533 Parks and Recreation Morningside Par oat Ramp Improvements 2
B-40534 Parks and Recreation Morningsi. - 'ark Tennis Center Building 2
B-40535 Parks and Recreation Mo . gside Park Court Renovations 2
B-40536 Parks and Recreation orningside Park Walkways and ADA 2
Compliance
B-40537 Parks and Recreati.. Morningside Pool Park Pool Facility 2 1,000,000 0 Future 8-Future UnFunded -1,000,000
Improvements
B-40538 Parks al : ' ecreation North Bay Vista Park Playground 5 75,000 0 Future 8-Future UnFunded -75,000
160,000 0 F re 8-Future UnFunded -160,000
50,000 1 Future 8-Future UnFunded -50,000
500,000 0 Future 8-Future UnFunded -500,000
50,000 0 Future 8-Future UnFunded -50,000
125,000 0 Future 8-Future UnFunded -125,000
101 S 10 0 Future 8-Future UnFunded -100,000
100,000 0 Future 8-Future UnFunded -100,000
110,000 0 Future 8-Future UnFunded -110,000
100,000 0 Future 8-Future UnFunded -100,000
125,000 0 Future 8-Future UnFunded -125,000
600,000 0 Future 8-Future UnFunded -600,000
350,000 0 Future 8-Future UnFunded -350,000
380,000 0 Future 8-Future UnFunded -380,000
50,000 0 Future 8-Future UnFunded -50,000
380,000 0 Future 8-Future UnFunded -380,000
650,000 0 Future 8-Future UnFunded -650,000
500,000 0 Future 8-Future UnFunded -500,000
250,000 0 Future 8-Future UnFunded -250,000
B-40539 P. s and Recreation Oakland Grove Mini Park 5 50,000 0 Future 8-Future UnFunded -50,000
B-40540 Parks and Recreation Virginia Key Beach Park Access Control 1,2,3,4,5 35,000 0 Future 8-Future UnFunded -35,000
B-405 Parks and Recreation Operation Yard Park Trailers 1,2,3,4,5 225,000 0 Future 8-Future UnFunded -225,000
0542 Parks and Recreation Pallot Park Seawall 2 300,000 0 Future 8-Future UnFunded -300,000
Active & Future
City Of Miami - Capital Improvement Program
SUBSTITUTED
CIP Projects Only Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
B-No. Client Project Dist. Estimate ($) Funds ($) Status Phase Stat Estimate ($)
331-Parks and Recreation
B-40543 Parks and Recreation PBA / Fern Isle Redevelopment 1 4,500,000 0 Future 8-Future UnFunded -4,500,000
B-40544 Parks and Recreation Peacock Park Building Renovation 2 150,000 0 Future 8-Future UnFunded -150,000
B-40545 Parks and Recreation Peacock Park Playground 2 150,000 0 Future 8-F re UnFunded -150,000
B-40546 Parks and Recreation Pine Heights Park Playground 1 75,000 0 Future 8-Future UnFunded -75,000
B-40547 Parks and Recreation Citywide Parks Playground Replacements 1,2,3,4,5 1,500,000 0 Future 8-Future UnFunded -1,500,000
B-40548 Parks and Recreation Pullman Mini Park Playground Replacement 5 75,000 0 ture 8-Future UnFunded -75,000
B-40549 Parks and Recreation Rainbow Village Park Playground 5 75,000 ! Future 8-Future UnFunded -75,000
B-40550 Parks and Recreation Athalie Range Park Playground 5 120,000 0 Future 8-Future UnFunded -120,000
B-40551 Parks and Recreation Athalie Range Park Restroom Renovation 5 80,000 0 Future 8-Future UnFunded -80,000
B-40552 Parks and Recreation Athalie Range Park Pool Heater 5 75,000 0 Future 8-Future UnFunded -75,000
B-40553 Parks and Recreation Reeves Park Basketball Court 5 3 .,100 0 Future 8-Future UnFunded -35,000
B-40554 Parks and Recreation Reeves Park Playground 5 100,000 0 Future 8-Future UnFunded -100,000
co
N B-40555 Parks and Recreation Reeves Park Sidewalks & Walkways 5 75,000 0 Future 8-Future UnFunded -75,000
B-40556 Parks and Recreation Reeves Park Volleyball Court 5 25,000 0 Future 8-Future UnFunded -25,000
B-40557 Parks and Recreation Riverside Park Restroom Renovation 3 75,000 0 Future 8-Future UnFunded -75,000
B-40558 Parks and Recreation Citywide Park Buildings Roof Repairs 1,2,3,4,5 350,000 0 Future 8-Future UnFunded -350,000
B-40559 Parks and Recreation Sewell Park kayak Launch 1 225,000 0 Future 8-Future UnFunded -225,000
B-40560 Parks and Recreation Sewell Park Parking Lot 1 60,000 0 Future 8-Future UnFunded -60,000
B-40561 Parks and Recreation Sewell Park Playgrous: 1 75,000 0 Future 8-Future UnFunded -75,000
B-40562 Parks and Recreation Shedavia Jenki arks Lighting 1,5 125,000 0 Future 8-Future UnFunded -125,000
B-40563 Parks and Recreation Shenando- Park Pool Renovation 4 2,200,000 0 Future 8-Future UnFunded -2,200,000
B-40564 Parks and Recreation Si on Park Building Roof Replacement 2 65,000 0 Future 8-Future UnFunded -65,000
B-40565 Parks and Recreation Southside Park Field 3 450,000 0 Future 8-Future UnFunded -450,000
B-40566 Parks and Recreation Spring Garden Point Park Historic Building 5 1,250,000 0 Future 8-Future UnFunded -1,250,000
B-40567 Parks and Recre. on Spring Garden Point Park 5 150,000 0 Future 8-Future UnFunded -150,000
B-40568 Parks and ' ecreation Citywide Park Buildings Termite Control 1,2,3,4,5 200,000 0 Future 8-Future UnFunded -200,000
B-40569 Par, : and Recreation Town Park Playground 5 100,000 0 Future 8-Future UnFunded -100,000
B-40570 'arks and Recreation Virginia Key Beach Park Restrooms 2 750,000 0 Future 8-Future UnFunded -750,000
Replacement
B-4i " 1 Parks and Recreation Virrick Park New Pool 2 3,000,000 0 Future 8-Future UnFunded -3,000,000
-40572 Parks and Recreation Alice Wainwright Park Restrooms 2 350,000 0 Future 8-Future UnFunded -350,000
CO
w
Active & Future
CIP Projects Only
B-No.
Client
331-Parks and Recreation
B-40573
B-40574
Parks and Recreation
Parks and Recreation
B-40575 Parks and Recreation
B-40576 Parks and Recreation
B-40577 Parks and Recreation
B-40578 Parks and Recreation
B-40579 Parks and Recreation
B-40580 General Services
Administration
341-Streets & Sidewalks
B-30008A
B-30130
B-30167D
B-30168A
B-30178
B-30336
B-30346
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Transpo
ation & Trans
B-30377C Public Work
B-30416 Public orks
B-30500
Capital Improvement Program
Admin
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Grapeland Water Park Renovations 1
West Buena Vista Park Building Restrooms 5
improvements
West Buena Vista Park Courts 5
West Buena Vista Park Playground 5
Williams Park Playground 5
Williams Park Pool Improvement 5
Williams Park Sport Field Lights 5
Jose Marti Roof Repair - GSA 3
331-Parks and Recreation
Total Cost
Estimate ($)
750,000
50,000
50,000
120,000
175,000
175,000
350,000
26,100
SUBSTITUTED
Total
Funds ($) Status Phase
0 Future 8-Future
0 Future 8-Future
0 Future : -Future
0 Future 8-Future
0 F re 8-Future
Future 8-Future
Future 8-Future
0 Future 8-Future
144,107 10 75,941,988
Grove Park Road Improvements - D3 3 628,320 628,320 Future
Miami River Greenway SW 1st Court to South 1,557,530 1,557,530 Active
Miami Avenue - D2
Shenandoah Roadway Improvements 4 1,550,000 1,550,000 Active
Silver Bluff Traffic Calm' _ 'riority 3 - D4 4 703,544 703,544 Active
Design District/ C 5 100,000 100,000 Future
MiaRiver Greenway (5th Street bridge 3 2,256,640 2,256,640 Active
en.)
Traffic Study Reviews - Oracle Project
35-110007
District 3 - Sidewalk Repairs and ADA
NW 34 Ave over Comfort Canal - Bridge
876417 - PW - D1/Citywide
Civic Center NW 14th Street
B- , i 504 Capital Improvement Program Linear Parks, Greenways and Baywalk
Admin Improvements
1,2,3,4,5 411,622 411,622 Active
3 250,691
1 178,700
1,2,3,4,5 2,600,000
1,2,3,4,5 961,000
250,691 Active
178,700 Active
2,600,000 Active
961,000 Future
8-Future
5-Construct
3-Design
4-Bid (JOC)
8-Future
5-Construct
1-Study
7-On-Hold
2-Pre-Design
4-Bid
8-Future
Fund
Sta
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
UnFunded
Funded
on Funded
Funded
Funded
Funded
on Funded
Funded
Funded
Funded
Funded
Funded
Total Fund
minus
Total Cost
Estimate ($)
-750,000
-50,000
-50,000
-120,000
-175,000
-175,000
-350,000
-26,100
-68,165,711
0
0
0
0
0
0
0
0
0
0
0
CO
Active & Future
CIP Projects Only
B-No. Client
341-Streets & Sidewalks
B-30540
Capital Improvement Program
Admin
B-30606 Capital Improvement Program
Admin
B-30606D Capital Improvement Program
Admin
B-30606L Capital Improvement Program
Admin
B-30606N Capital Improvement Program
Admin
B-30606S Capital Improvement Program
Admin
B-30610 Capital Improvement Program
Admin
B-30613 Capital Improvement Program
Admin
B-30614 Capital Improvement Program
Admin
B-30615 Capital Improvement Program
Admin
B-30621 Capital Improvement Program
Admin
B-30628 Capital Improvement Program
Admin
B-30631 Capital Improvement Program
Admin
B-30645B Transportation & T
B-30645E Transport. on & Transit
B-30645F ransportation & Transit
B-30651
Capital Improvement Program
Admin
-30662D Capital Improvement Program
City Of Miami - Capital Improvement Program SUBSTITUTED
Cost Estimates versus Available Funding
Project
Little River Industrial Park
DWNTWN Beautification Project Phase I
DWNTWN Beaut
DWNTWN Beaut
DWNTWN Beaut
DWNTWN Beaut
NW 7th Court
fication - Design Phase
fication (Lighting)
fication - North
fication - South
District 3 - Miscellaneous Roadway
Improvements
District 4 - Miscellaneous Roadway
Improvements
District 5 - Miscellaneous Road
Improvements
Center Grove Street an. ighting
Improvements
Bird Avenu- ' oad Improvement
ami River Greenway from Miami Circle
Greenway to South Miami Avenue
Transportation Program Support Services -
Transportation Professional Services
Overtown / Wynwood Bicycle Pedestrian
Mobility Plan
Miami Regional Intermodal Plan
Dist.
Total Cost
Estimate ($)
5 2,000,000
1,2,3,4,5 3,150,565
1,2,3,4,5 498,780
1,2,3,4,5 4,475,915
1,2,3,4,5 7,817,431
1,2,3,4,5 5,090,853
5 60,000
3 3,273,688
4 494,386
5 1,863,194
2 1,991,568
2 1,960,505
2 1,221,625
1,2,3,4,5 881,042
2,5 60,000
1,2,3,4,5
Miami River Greenway from NW loth to NW 3
12th Ave.
US-1 Median Closures at Bridgeport and SW 2
48,000
3,160,379
440,576
Total
Funds ($) Status Phase
2,000,000 Active 3-Design
3,150,565 Active 5-Co., . (JOC)
498,780 Active 3-Design
4,475,915 ctive 3-Design
7 ? 7,431 Active 5-Const. (JOC)
5,090,853 Active 5-Const. (JOC)
360,000 Active 7-On-Hold
3,273,688 Future 8-Future
494,386 Future 8-Future
1,863,194 Future 8-Future
1,991,568 Active 4-Bid
1,960,505 Active 3-Design
1,221,625 Active 7-On-Hold
881,042 Active 3-Design
60,000 Active 1-Study
48,000 Active
3,160,379 Active
440,576 Active
1-Study
5-Construction
3-Design
Fund
Sta
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Total Fund
minus
Total Cost
Estimate ($)
0
0
0
0
Active & Future
CIP Projects Only
B-No.
Client
341-Streets & Sidewalks
B-30677
B-30694A
B-30695
B-30716
B-30718
B-30722
B-30724
B-30727
B-30729
B-30730
B-30732
B-30749
B-30760
B-30770
B-30771
B-30773
Admin
Capital Improvement Program
Admin
Transportation & Transit
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improveme
Admin
Capital
Ad.- n
Project
30 Ct - D2
City Of Miami - Capital Improvement Program SUBSTITUTED
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
D3 - Sidewalk ADA Retrofits 3 700,000
Citywide Bicycle Rack & Signage Program 1,2,3,4,5 115,000
SW 19th Terr. Imp. -Partial CDBG 91-02889 - 4 537,191
D4
Tigertail Resurfacing - D2 2 711,257
I-95 South Miami Terminal Street 2 859,000
Improvements - D2
NW 31st Street Roadway Improvement Project 1 311,00
- D1
NW 33rd Street Roadway Improvement 1 ,700,000
Project Phase I - D1
NW 18th Avenue Roadway Improvement
Project - D 1
NW 17th Terrace Roadway Improvement
Project - D 1
NW 4th Terrace Roadway Imp
Project - D 1
NW 9th Street Road
- D1
1,810,000
250,000
ment 1 75,000
Improvement Project 1 756,247
Citrus Gr. Roadway Improvements 3 556,791
17th Avenue Roadway & Drainage 3,4 600,000
Improvements - D3 & D4
ogram SW 22nd Avenue Medians - US 1 to Coral
Way - D4
provement Program Traffic Calming SW 6th Street Project - D4
Capital Improvement Program Martin Luther King (MLK) Blvd / I-95 Area
Admin Improvements - Murrals
B-3! 74 Capital Improvement Program West Flagler Area Improvements - D4 - Oracle
4 58,622
4 324,670
5 100,000
4 1,358,172
Total
Funds ($) Status Phase
Fund
700,000 Active 7-On-Hol. Funded
115,000 Active -Bid (JOC) Funded
537,191 Active 5-Construction Funded
711,257 Active 5-Const. (JOC) Funded
59,000 Active
311,000 Active
3,700,000 Active
1,810,000 Active
250,000 Active
75,000 Active
756,247 Active
3-Design Funded
3-Design Funded
7-On-Hold Funded
5-Construction Funded
3-Design Funded
5-Const. (JOC) Funded
3-Design Funded
556,791 Active 5-Const. (JOC) Funded
600,000 Active
58,622 Active
324,670 Active
100,000 Active
1,358,172 Active
5-Construction Funded
4-Bid (JOC) Funded
7-On-Hold Funded
3-Design Funded
5-Const. (JOC) Funded
Total Fund
minus
Total Cost
Estimate ($)
0
0
0
0
Admin CDBG Project 91-03102
Active & Future
CIP Projects Only
B-No. Client
341-Streets & Sidewalks
B-30779
B-30780
B-30781
B-30782
B-30784
B-30785
B-30786
B-30822
B-30823
B-30827
B-30830
B-30835
B-30837
B-30880
B-30883
B-30884
B-30
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvemen. 'rogram
Admin
Capital I
Ad
ovement Program
apital Improvement Program
Admin
8 Capital Improvement Program
Admin
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
SW 2nd Street and SW 40th Avenue Traffic 4
Circle - D4
NW 14 Avenue and 28 Street Area Roadway 1
Improvements - D1
NW 11 Street from 27 to 37 Avenue Area 1
Roadway Improvements - D1
Allapattah Area Roadway Improvement - D1 1
Health District Riverwalk
NW 36 Avenue 15 to 16 Street Drainage
Improvements - D1
1
1
NW 43 Avenue between 9 to 11 Street 1
Roadway Improvements - D1
Brickell Area Shared Use Path and Roadway 2
Improvements
Fair Isle Area Roadway and Drainage
Improvements - D2
South Grove Phase 1 Roadway an. 1rainage 2
Improvements - D2
US1 Landscaping betty- -n 17 Ave and Viscaya 2
- D2
South Grov. hase 2 Roadway and Drainage
Impro • ents - D2
uth Miami Avenue - SE 6th and 5th Street 2
Traffic Modifications - D2
NE 2nd Court Roadway and Drainage 5
Improvements Project - D5
NW 12 Avenue / NW 12 Place Roadway 5
Improvements
NW 62 Street West of I-95 Roadway 5
Improvements - D5
Wynwood Area Roadway Improvement - D5 5
Total Cost
Estimate ($)
250,000
866,602
939,493
500,000
961,000
50,000
78,224
844,267
180,000
286,830
55,000
492,000
771,544
400,000
1,199,975
175,000
500,000
SUBSTITUTED
Total
Funds ($) Status Phase
250,000 Active
866,602 Active
939,493 Active
500,000 Active
1,000 Future
50,000 Active
78,224 Active
844,267 Active
180,000 Active
286,830 Active
55,000 Active
492,000 Active
771,544 Future
400,000 Active
1,199,975 Active
175,000 Active
500,000 Active
3-Design
Fund
Funded
5-Co• 'ruction Funded
4-Bid Funded
3-Design Funded
8-Future Funded
3-Design Funded
3-Design Funded
5-Const. (JOC) Funded
5-Const. (JOC) Funded
2-Pre-Design Funded
4-Bid (JOC) Funded
2-Pre-Design Funded
8-Future Funded
5-Const. (JOC) Funded
5-Construction Funded
3-Design Funded
2-Pre-Design Funded
Total Fund
minus
Total Cost
Estimate ($)
Active & Future
CIP Projects Only
B-No.
Client
341-Streets & Sidewalks
B-30891
B-30892
B-30894
B-30940
B-30941
B-30960
B-30961
B-30964
B-30968
B-30969
B-30971
B-30972
B-30975
B-30976
B-30978
B-30980
B-3
Project
City Of Miami - Capital Improvement Program SUBSTITUTED
Cost Estimates versus Available Funding
Dist.
Capital Improvement Program Buena Vista One -Way Street Conversion and 5
Admin Signage - D5
Capital Improvement Program Little Haiti Gateway Signs - D5 5
Admin
Capital Improvement Program Little Haiti Right of Way Improvements - D5 5
Admin
Capital Improvement Program Downtown Miami Bicycle and Pedestrian 2
Admin Mobility Improvement Project
Capital Improvement Program Downtown Miami Signage and Wayfinding 2
Admin
System
Capital Improvement Program La Pastorita Traffic Calming and misc. 4
Admin improvements - D4
Capital Improvement Program East Flagami Roadway Improvements - SW 4
Admin
2nd Street and SW 4th Street - D4
Capital Improvement Program Modification of Speed Humps on SW 11 St.
Admin between 30 Ave and 31 Ct. - D4
Capital Improvement Program SW 12th St (SW 30th Ave and SW 30th Pla
Admin - D4
Capital Improvement Program SW 30th Court (SW 12th Street a.. SW 13th
Admin Street) - D4
Capital Improvement Program SW 5th Street betwee Ave and 43 Ave
Admin Improvement - D
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvemen
Admin
Capital I
Ad
SW 64 Co ' oadway & Drainage
Impro ents (from SW 6 St to SW 8 St) - D4
ale Restoration @ NW 2 Street between 34
Ave & 35 Ave - D4
ogram SW 2 St from 53 Ave to 54 Ave - D4
ovement Program Drainage improvements @ SW 4 St between
53 Ave & 54 Ave - D4
apital Improvement Program
Admin
Capital Improvement Program
Admin
Liberty Square T-Turnarounds - D5
Little River Area Road and Drainage
Improvements - D5
4
4
4
4
4
4
5
5
Total Cost
Estimate ($)
250,000
100,000
500,000
287,500
1,150,000
675,000
422,264
25,000
36,102
43,214
7,857
132,522
28,809
54,000
51,065
250,000
180,900
Total
Funds ($) Status Phase
250,000 Active
100,000 Active
500,000 Active
287,500 Active
1 0,000 Active
675,000 Active
422,264 Active
25,000 Future
36,102 Future
43,214 Future
7,857 Future
132,522 Future
28,809 Future
54,000 Future
51,065 Future
250,000 Active
180,900 Active
3-Design
3-D
3-Design
3-Design
3-Design
3-Design
3-Design
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
3-Design
3-Design
Fund
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Total Fund
minus
Total Cost
Estimate ($)
Active & Future
CIP Projects Only
B-No.
Client
341-Streets & Sidewalks
B-30983
B-30990
B-30993
B-30998
B-31206A
B-31206B
B-39910C
B-39910K
B-39911
B-40168
B-40300
B-40301
B-40302
B-40303
B-40307
B-40308
B-40310
-40312
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Public Works
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Public Works
Capital Improvement Program
Admin
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
NW 44th Street between NW 7th and NW 8th 5
Ave - D5
Roadway Improvements
1,2,3,4,5
SW/NW 17th Avenue Traffic Corridor Study - 1,2,3,4,5
Citywide
Citywide Sidewalk Repair Project - PW
1,2,3,4,5
SE 3rd St Widening (fka Dupont Plaza) - DRI 2
Transportation
SE 3rd Street Widening - DRI Administration 2
North Venetian Drive Lighting (District 2 2
QOL)
Bayside Historic Sign - D2 2
Venetian Causeway Improvements
South Bayshore Drive from Aviation - nue 2
to Kirk Avenue - D2 PW
SW 18th Terr. Road Impro ents - D3
Capital Improvement Program SW 15th Street
Admin - D3
Capital Improvement Program SW
Admin
Capital Improvement Pro
Admin
D3
3
ad Improvements Segment 1 3
Avenue Road Improvements - Segment 3
m SW 23rd Road Improvements - D3
Capital Impro ent Program SW 16th Street Road Improvements - D3
Admin
3
3
Ca. al Improvement Program SW 17th Terrace Road Improvements - D3 3
dmin
Capital Improvement Program SW 20th Road Improvements - D3
Admin
Capital Improvement Program SW 22nd Terr. & SW 13th Ave Road
3
3
Total Cost
Estimate ($)
185,000
361,000
200,000
SUBSTITUTED
Total Fund
Funds ($) Status Phase
185,000 Active 3-Design Funded
361,000 Future 8-F .re Funded
200,000 Active 1-Study Funded
169,615 169,615 uture 8-Future Funded
1,500,000 1,500 S 10 Active 3-Design Funded
100,000 100,000 Active 3-Design Funded
0
33,000
3,196,465
100,000
116,121
84,969
230,928
244,748
257,693
225,567
116,682
376,211
100,000 Active 3-Design Funded
33,000 Active 3-Design Funded
3,196,465 Active 5-Construction Funded
100,000 Active 2-Pre-Design Funded
116,121 Active 5-Construction Funded
84,969 Active 7-On-Hold Funded
230,928 Active 7-On-Hold Funded
244,748 Active 5-Construction Funded
257,693 Active 5-Construction Funded
225,567 Active 5-Construction Funded
116,682 Active 5-Construction Funded
376,211 Active 5-Construction Funded
Total Fund
minus
Total Cost
Estimate ($)
0
0
0
0
0
0
Active & Future
CIP Projects Only
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Total Cost Total
SUBSTITUTED
B-No. Client Project Dist. Estimate ($) Funds ($) Status Phase
341-Streets & Sidewalks
Admin Improvements - D3
B-40313 Capital Improvement Program SW 3rd Ave Road Improvements - D3 3
Admin
B-40315 Capital Improvement Program SW 15th Street Road Improvements Segment 2 3
Admin - D3
B-40317 Capital Improvement Program SW 28th Road Improvements - D3 3
Admin
B-40318 Capital Improvement Program SW 1st Ave Road Improvements - Segment 2 - 3
Admin D3
B-40319 Capital Improvement Program SW 25th Road Improvements - D3 3
Admin
B-40320 Capital Improvement Program SW 26th Road Improvements Segment 2 - D3 3
Admin
B-40321 Capital Improvement Program SW 2nd Ave Road Improvements - D3 3
Admin
B-40322 Capital Improvement Program SW 27th Road Improvements - D3
Admin
B-40323 Capital Improvement Program SW 1st Ave Road Improvements Sea 3 3
Admin D3
B-40324 Capital Improvement Program NW l lth Ave Road Improve. ents - D3 3
Admin
B-40325 Capital Improvement Program Beacom Phase I 13 3
Admin
B-40326 Capital Improvement Program The :.ads Roadway Improvements - D3 3
Admin
B-40327 Capital Improvement Pro . m Shenandoah Roadway Improvements - D3 3
Admin
B-40643A Capital Impro • ent Program North Spring Garden Greenway
Admin
B-40672D Car' al Improvement Program Flagami Traffic Calming Phase IV - D4
dmin
B-40672 Capital Improvement Program Flagami Traffic Calming - D4
Admin
5
4
4
-40686 Capital Improvement Program Miami River Greenways/ Streetscape Segment 3
Fund
Total Fund
minus
Total Cost
Estimate ($)
293,740 293,740 Active 5-Const ion Funded 0
245,349 245,349 Active -Construction Funded 0
40,149 40,149 Ac ' e 5-Construction Funded 0
167,562 167..2 Active 5-Construction Funded 0
118,561 118,561 Active 5-Construction Funded 0
04 498,804 Active 5-Construction Funded 0
721,333 721,333 Active 5-Construction Funded 0
498,804 498,804 Active 5-Construction Funded 0
126,638 126,638 Active 5-Construction Funded 0
160,203 160,203 Active 4-Bid (JOC) Funded 0
1,500,000 1,500,000 Active 7-On-Hold Funded 0
500,000 500,000 Active 5-Construction Funded 0
1,000,000 1,000,000 Active 5-Construction Funded 0
2,762,175 2,762,175 Active 5-Construction Funded 0
1,198,012 1,198,012 Active 5-Const. (JOC) Funded 0
590,000 590,000 Active 5-Const. (JOC) Funded 0
3,113,501 3,113,501 Active 5-Construction Funded 0
Active & Future
CIP Projects Only
B-No.
Client
341-Streets & Sidewalks
Admin
B-40695L Capital Improvement Program
Admin
B-40704A Capital Improvement Program
Admin
B-43114B Public Works
B-71210
B-73102A
B-73102B
B-78500B
B-30179
B-30411
B-30412
B-30413
B-30414
B-30431
B-30432
B-30433
B-30434
-30435
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Pro
Admin
Capital Improv- ent Program
Admin
Ca 1 Improvement Program
dmin
Capital Improvement Program
Admin
Capital Improvement Program
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Project Dist.
D (ELH)
Total Cost
Estimate ($)
Miami River Greenway Segment G and 3 145,785
Segment E2 Decorative Lighting
SW 32 Avenue Improvements Additional 2,4 1,752,327
Services
Public Works Miscellaneous Sidewalk 1,2,3,4,5 1,034,146
Replacement
Downtown Street Conversions 2,5 50,000
Citywide Streets Milling & Resurfacing - CIP 1,2,3,4,5 9,201,765
Citywide Streets Milling and Resurfacing -
Parking Surcharge
Buena Vista East Roadway, Drainage, Signage 5
and Lighting Improvements
Downtown Baywalk Master Plan & Design
FY2014 - D1 Roadway, drainage and 1
sidewalks repairs
FY2014 - D2 Roadway, dr.' age and 2
sidewalks repairs
FY2014 - D3 Ra. iway, drainage and 3
sidewalks
FY2l. - D4 Roadway, drainage and
ewalks repairs
m Di- Reconstruction of Roadway identified as 1
"Very Poor" by PW
D2 - Reconstruction of Roadway identified as 2
"Very Poor" by PW
D3 - Reconstruction of Roadway identified as 3
"Very Poor" by PW
D4 - Reconstruction of Roadway identified as 4
"Very Poor" by PW
4
D5 - Reconstruction of Roadway identified as 5
1,2,3,4,5 6,20 ,'4
2,368,482
11,248,770
100,000
100,000
100,000
100,000
4,114,165
2,500,000
2,500,000
2,500,000
2,500,000
SUBSTITUTED
Total
Funds ($) Status Phase
Fund
145,785 Active 7-On-Hol. Funded
1,752,327 Active -Const. (JOC) Funded
1,034,146 Fu . e 8-Future Funded
50 0 Active 1-Study Funded
9,201,765 Future 8-Future Funded
6,207,946 Future 8-Future
2,368,482 Active 3-Design
450,000 Active 1-Study
90,000 Future 8-Future
90,000 Future 8-Future
90,000 Future 8-Future
82,143 Future 8-Future
2,400,000 Future 8-Future
1,200,000 Future 8-Future
2,400,000 Future 8-Future
2,400,000 Future 8-Future
2,400,000 Future 8-Future
Funded
Funded
Partially Funded
Partially Funded
Partially Funded
Partially Funded
Partially Funded
Partially Funded
Partially Funded
Partially Funded
Partially Funded
Partially Funded
Total Fund
minus
Total Cost
Estimate ($)
0
0
0
0
0
0
0
-10,798,770
-10,000
-10,000
-10,000
-17,857
-1,714,165
-1,300,000
-100,000
-100,000
-100,000
Active & Future
CIP Projects Only
B-No.
Client
341-Streets & Sidewalks
B-30518
B-30611
B-30624
B-30630
B-30643
B-30646
B-30687
B-30699
B-30723
B-30775
B-30778
B-30803
B-30833
B-30836
B-30900
B-30902
Project
Admin "Very Poor" by PW
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Parks and Recreation
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Progra
Admin
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Northwest 14th Street Streetscape Project - CIP
Funded
District 1 - Miscellaneous Roadway
Improvements
Overtown Greenway @ NW 11 Terrace
Palm Grove Road Improvements
Lummus Park Landing Project - Street Project
South Bayshore Drive Roadway and Drainage
Improvements
Coconut Grove Business Improvement District
- Street Improvements
Beacom Project Area Improvements
NW 24th Avenue Roadway Improvement
Project - D 1
Shenandoah Area Improvement
Traffic Circle - SW
D4
SW 18th
23rd errace - D4
Ave. & SW 13th St. -
enue from SW 23rd Street to SW
W 1st Ave between SW 15th and SW 7th
Street
Capital Improvem- • 'rogram South Grove Phase 3 Roadway and Drainage
Admin Improvements - D2
Capital provement Program NW 40 St from NW 10 Ave to NW 12 Ave -
A.• m D5
Capital Improvement Program Phase I: Little River (N); NE 82 St (S); N
Admin Miami Ave (W); NE 2 Ave (E) - D5
04 Capital Improvement Program NW 70 Street Area Roadway & Minor
Admin Drainage Improvements - D5
Dist.
Total Cost
Estimate ($)
SUBSTITUTED
Total
Funds ($) Status Phase
5 2,617,649 439,000 Active
1 825,418 728,234 Future
5 2,661,864 1,541,784 A e
2 4,174,623 3,838 7 Active
5 2,605,245 1,368,535 Active
2 8,748,538,704,395 Active
2 ,503,015 3,099,637 Active
1,053,114 1,053,113 Active
1 1,140,000 700,000 Future
4 468,649 366,281 Active
4 122,557 112,557 Active
4 137,000 97,000 Future
1,2,3,4,5 775,600 368,212 Active
2 1,231,787 1,231,786 Active
5 129,641 98,981 Future
5 625,287 90,508 Future
5 2,052,550 100,510 Future
7-On-Ho
-Future
3-Design
5-Construction
3-Design
3-Design
5-Const. (JOC)
5-Construction
8-Future
5-Construction
5-Const. (JOC)
8-Future
3-Design
2-Pre-Design
8-Future
8-Future
8-Future
Fund
Total Fund
minus
Total Cost
Estimate ($)
Partially Funded -2,178,649
Partially Funded -97,184
Partially Funded -1,120,080
Partially Funded -336,465
Partially Funded -1,236,710
Partially Funded -44,135
Partially Funded -403,377
Partially Funded -0
Partially Funded -440,000
Partially Funded -102,368
Partially Funded -10,000
Partially Funded -40,000
Partially Funded -407,388
Partially Funded -0
Partially Funded -30,659
Partially Funded -534,778
Partially Funded -1,952,040
Active & Future
City Of Miami - Capital Improvement Program
SUBSTITUTED
CIP Projects Only Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
B-No. Client Project Dist. Estimate ($) Funds ($) Status Phase Stat Estimate ($)
341-Streets & Sidewalks
B-30965 Capital Improvement Program Coral Gate Speed Humps - D4 4 163,845 53,000 Future 8-Future Partially Funded -110,845
Admin
B-30967 Capital Improvement Program SW 16th Terrace from SW 21 Ave to SW 22 4 206,386 150,467 Future 8-Fu . e Partially Funded -55,918
Admin Ave - D4
B-30979 Capital Improvement Program SW 21st St. & 24th Ave Roadway 4 140,000 60,000 Future 8-Future Partially Funded -80,000
Admin Improvement - D4
B-31206 Capital Improvement Program SE 3rd Street Widening 2 2,044,987 641,494 ctive 3-Design Partially Funded -1,403,492
Admin
B-40306 Capital Improvement Program SW loth Street Road Improvements - D3 3 347,385 17,385 Active 5-Construction Partially Funded -40,000
Admin
B-40314 Capital Improvement Program NW 18th Place Road Improvements - D3 3 474,611 224,611 Active 4-Bid (JOC) Partially Funded -250,000
Admin
B-70245 Transportation & Transit Transportation Program Support Services - 1,2,3,4,5 00,000 294,957 Active 3-Design Partially Funded -205,042
co Transportation
B-73102C Capital Improvement Program Citywide Street Milling and Resurfacing - 1,2,3 1,625,000 401,400 Future 8-Future Partially Funded -1,223,600
Admin Local Option Gas Tax
B-78508 Capital Improvement Program NE 2 Avenue Improvements 2 5 20,166,607 4,985,832 Active 3-Design Partially Funded -15,180,775
Admin
B-30415 Capital Improvement Program FY2014 - D5 Roadway, drainage - d 1 196,625 0 Future 8-Future UnFunded -196,625
Admin sidewalks repairs
B-30520 Capital Improvement Program Hainsworth Village St ---tImprovement 2 1,062,500 0 Future 8-Future UnFunded -1,062,500
Admin
B-30612 Capital Improvement Program District 2 - ' iscellaneous Roadway 2 0 0 Future 8-Future UnFunded 0
Admin Impro ents
B-30736 Capital Improvement Program ase II: NW 33rd Street Roadway 1 2,375,000 0 Future 8-Future UnFunded -2,375,000
Admin Improvement - D 1
B-30751 Capital Improvemen ogram SW 23 Street btw 16 and 17 Ave for M&R - 3 43,101 0 Future 8-Future UnFunded -43,101
Admin D3
B-30787 Capital I ..rovement Program NW 32 Ct & NW 32 Place Milling and 1 303,375 0 Future 8-Future UnFunded -303,375
Ad ' Resurfacing - D 1
B-30788 apital Improvement Program NW 16 Ave and 14 Ter and NW 16 Ave and 1 57,618 0 Future 8-Future UnFunded -57,618
Admin 15 St - D 1
B-3! :9 Capital Improvement Program NW 20th Street from 7th Avenue to 20th 1 500,000 0 Future 8-Future UnFunded -500,000
Admin Avenue
Active & Future
CIP Projects Only
B-No. Client
341-Streets & Sidewalks
B-30896
B-30896A
B-30897
B-30898
B-30899
B-30901
B-30901A
B-30901B
B-30902A
B-30902B
B-30903
B-30903A
B-30966
B-30970
B-30973
B-30974
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Improvement Program
Improvement Program
Improvement Program
Improvement Program
Improvement Program
Improvement Program
Improvement Program
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Project
Phase I: NW 29th Street (NW 7 Ave to NW 2
Ave) - D5
Phase II: NW 29 St (NW 7 Ave to NW 2 Ave)
- D5
NW 41 St from NW 7 Ave to NW 12 Ave -
D5
NW 43 St from NW 10 Ave to NW 11 Ave -
D5
NW 10 Ave from NW 40 St & NW 8 Ave
from NW 46 St to NW 43 St - D5
Pahse I: NE 78 St (N); NE 75 St (S); N Miami
Ave (W); NE 2 Ave (E) - D5
Phase II: NE 78 St (N); NE 75 St (S); N
Miami Ave (W); NE 2 Ave (E) - D5
Phase III: NE 78 St (N); NE 75 St (S); N
Miami Ave (W); NE 2 Ave (E) - D5
Phase II: Little River (N); NE 82 St (S); N
Miami Ave (W); NE 2 Ave (E) - D5
Phase III: Little River (N); NE 82 : (S); N
Miami Ave (W); NE 2 Ave D5
Phase I: NE 82 St (N). ' 79 St (S); N Miami
Ave (W); NE 1 (E) - D5
Phase II: N ..:2 St (N); NE 79 St (S); N
Miam - ve (W); NE 1 Ave (E) - D5
Capital Improvement Program 5 St between 27 ave and 28 ave street
Admin
Capital Improvemen
Admin
Capital I erovement
Ad
apital Improvement
Admin
B-31! 7 Capital Improvement
Admin
improvement - D4
ogram SW 20 Street (SW 31 Ave to SW 32 Ave) - D4
Program Traffic Circle - SW 12 St and 31 Ave (SR
2013005677) - D4
Program Coral Gate Speed Humps - Phase II - D4
Program Traffic Circle on SW 23 Ave and SW 26 Street
- D4
Dist.
Total Cost
Estimate ($)
5 597,219
5 597,219
5 475,349
5 115,236
5 280,888
5 526,967
5 532,967
5 532,967
5 625,287
5 625,287
5 504,158
5 0
4 288,090
4 56,178
4 201,663
4 108,034
4 221,672
SUBSTITUTED
Total
Funds ($) Status Phase
0 Future 8-Future
0 Future 8-Fu
0 Future 8-Future
uture 8-Future
0 Future 8-Future
0 Future 8-Future
0 Future 8-Future
0 Future 8-Future
0 Future 8-Future
0 Future 8-Future
0 Future 8-Future
0 Future 8-Future
0 Future 8-Future
0 Future 8-Future
0 Future 8-Future
0 Future 8-Future
0 Future 8-Future
Fund
Total Fund
minus
Total Cost
Estimate ($)
UnFunded -597,219
UnFunded -597,219
UnFunded -475,349
UnFunded -115,236
UnFunded -280,888
UnFunded -526,967
UnFunded -532,967
UnFunded -532,967
UnFunded -625,287
UnFunded -625,287
UnFunded -504,158
UnFunded 0
UnFunded -288,090
UnFunded -56,178
UnFunded -201,663
UnFunded -108,034
UnFunded -221,672
Active & Future
CIP Projects Only
B-No.
Client
341-Streets & Sidewalks
B-31212
B-31213
B-31214
B-31215
B-31217
B-40003
B-40005
B-70245D
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Capital Improvement Program NE 1st Avenue Reconstruction - NE 41 St. to 5
Admin NE 43 St. - D5
Capital Improvement Program N. Miami Court Reconstruction - D5
Admin
Capital Improvement Program NE 1 Court Reconstruction - D5
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Public Works
Public Works
Transportation & Transit
343-Mass Transit
B-70246 Transportation & Transit
B-70246A Transportation & Transit
B-70247
B-70715
Transportation & Transit
Transportation & Transit
B-30645A Transportation & Tran
5
5
Total Cost
Estimate ($)
660,816
441,636
666,995
NE Miami Place Reconstruction - D5 5 500,000
NE 43 Street Reconstruction - D5 5 868,100
PW Citywide Sidewalk Replacement Contract 1,2,3,4,5 7,435,000
M-0096 (Fy14-FY18)
PW Citywide Pavement Resurfacing Contract 1,2,3,4,5 :' 12,761
M0098 (FY14-18)
Transportation PSS - Transportation DRI Fees 1,2,3 155,042
Administration
341-Streets & Sid
Transportation Program Suppo ervices-
Transit Professional
Beach Corridor Tra, . t Connection Study -
Citywide
Citywid- '1 ass Transit Studies
Ci - of Miami Trolley Program - Capital
Acquisition
Transportation Program Support Se
Transit Professional Services
ces -
alks
343-Mass Transit
230,219,000
1,2,3,4,5 500,000
1,2,3,4,5 30,000
1,2,3,4,5
318,402
1,2,3,4,5 2,921,122
1,2,3,4,5 418,077
SUBSTITUTED
Total
Funds ($) Status Phase
0 Future
0 Future
0 Future
uture
0 Future
0 Future
0 Future
0 Active
160,106,946
500,000 Active
30,000 Active
318,402 Active
2,921,122 Active
418,076 Active
8-Future
8-Fu
8-Future
8-Future
8-Future
8-Future
8-Future
3-Design
2-Pre-Des
8-Future
2-Pre-Des
gn
gn
3-Design
3-Design
Fund
Sta
Total Fund
minus
Total Cost
Estimate ($)
UnFunded -660,816
UnFunded -441,636
UnFunded -666,995
UnFunded -500,000
UnFunded -868,100
UnFunded -7,435,000
UnFunded -6,912,761
UnFunded -155,042
Funded
Funded
Funded
Funded
Partially Funded
-70,112,053
0
0
0
0
-0
4,187,601 4,187,601 -0
Active & Future
CIP Projects Only
B-No.
Client
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Project Dist.
351-Sanitary Sewers
B-30134AS Parks and Recreation Bryan Park New Tennis/Community Center 4
D4 - Sanitary Sewer Component
B-30305BS Capital Improvement Program
Admin
B-30365ES Community Development
B-30374S
B-30538S Capital Improvement Program
Admin
B-30671A Parks and Recreat
B-30690S Parks and Recreation
B-30882S Parks and Recreat
B-30887S Parks and Recreation
B-30995S Parks and Recreation
B-35806S Parks and Recreation
B-35812AS Parks and Recreation
B-35838S Parks and Recreation
B-35861BS Parks and Recreation
B-35883AS Capital Imp
Admin
B-35887S Par and Recreation
B-60454 Fire Rescue
-60464S Public Facilities
Gibson Park New Construction - Sanitary 5
Sewer Component
Coral Way NET Office Remodeling D3 - 3
Sanitary Sewer Component
Parks and Recreation Virginia Key Rowing Center Improvements -
Sanitary Sewer Component
Museum Park - Sanitary Sewer Allocation 1,2,3,4,5
on Caribbean Marketplace Renovation - Sanitary
Sewer Component
West End Park New Community Building - 4
Sanitary Sewer
on African Square Park - Splash Park D5 -
Sanitary Sewer Component
Little Haiti Soccer Field Bathroom D5
5
Virginia Key Bike Trail Building - D2 2
Sanitary Sewer Component
Curtis Park New Pool Facil • and Boat Ramp 1
D1 - Sanitary Sewer C. ponent
Duarte Park Bu.
PArk & Si
Ke
ng Renovation, Splash 1
- D1 Sanitary Sewer Component
y Park Restroom Building 2
provements D2 - Sanitary Sewer Component
Maximo Gomez / Domino Park Restroom 3
Improvements - D3
o - ent Program Hadley Park New Youth Center D5 - Sanitary 5
Sewer Component
Moore Park New Construction D5 - Sanitary 5
Sewer Component
Fire Station #14 (New) - D4 - Sanitary Sewer 4
Component
New Dinner Key Marina Dockmaster Building 2
Total Cost
Estimate ($)
50,000
117,000
50,000
100,000
1,000,000
114,000
100,000
100,000
365,000
50,000
500,000
50,000
50,000
100,000
200,000
500,000
100,000
690,000
SUBSTITUTED
Total
Funds ($) Status Phase
50,000 Active
117,000 Active
50,000 Active
100,000 Active
0,000 Active
114,000 Active
100,000 Active
100,000 Active
365,000 Active
50,000 Active
500,000 Active
50,000 Active
50,000 Active
100,000 Active
200,000 Active
500,000 Active
100,000 Active
690,000 Active
3-Design
5-C
Fund
Funded
truction Funded
5-Construction Funded
3-Design Funded
5-Construction Funded
5-Construction Funded
3-Design Funded
3-Design Funded
3-Design Funded
2-Pre-Design Funded
3-Design Funded
5-Const. (JOC) Funded
4-Bid (JOC) Funded
3-Design Funded
7-On-Hold Funded
5-Construction Funded
2-Pre-Design Funded
5-Construction Funded
Total Fund
minus
Total Cost
Estimate ($)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Active & Future
CIP Projects Only
B-No.
Client
351-Sanitary Sewers
Project
City Of Miami - Capital Improvement Program SUBSTITUTED
Cost Estimates versus Available Funding
D2 - Sanitary Sewer Component
B-70600 Police Police Department Sanitary Sewer System
Repairs
352-Storm Sewers
B-30011
B-30183
B-30262
B-30425
B-30588
B-30637
B-30680
B-30700
B-30776
B-30992
B-40271
B-50654
B-50672
B-50706A
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Public Works
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Public Works
Solid Waste
Public Works
Capital Improveme
Admin
Capital Iv +rovement
Ad
Dist.
351-Sanitary Sewers
Englewood Road and Storm Sewer
Improvements - Phase III - D4
Garden Storm Sewer - Phase I
Citywide Storm Sewer Repair Project
D5 - Stormwater Projects
San Marco Island and Biscayne Island
Drainage Improvements - D2
Mary Brickell Village Drainage Improvements
Rockerman Canal Improvements
Citywide - FDEP Drainage Ws Compliance
Silver Bluff Drain, _e Improvements - D4
Rivery • and Lawrence Pump Stations - D3
d Waste Sweeper
Overtown Stormwater Pump Station Upgrades
ogram Belle Meade Storm Sewer Project, Ph 2
Program Roadway, Drainage and Traffic Improvements
- D1 & D4 - Partially Funded CDBG D4
91-03102
B-30008 Capital Improvement Program Grove Park Road and Storm Sewers
Admin
Improvements - D3 (Formelly Glenn Royal
Stormsewer P3)
1,2,3,4,5
4
1
1,2,3,4,5
5
Total Cost
Estimate ($)
60,000
4,296,000
8,785,811
1,149,920
5,701,561
1,078
2 4,488,980
3,723,441
2 896,815
1,2,3,4,5 2,240,934
4 1,652,160
3
1,2,3,4,5
5
2
1,824,095
170,000
851,797
12,301,058
Total
Funds ($) Status Phase
60,000 Active
4,296,000
3-Design
Fund
Sta
Funded
Total Fund
minus
Total Cost
Estimate ($)
0
0
8,785,811 ; tive 5-Construction Funded 0
1,1 ,920 Active 4-Bid Funded 0
5,701,561 Active 5-Construction Funded 0
1,078,000 Future 8-Future Funded 0
4,488,980 Active 5-Construction Funded 0
3,723,441 Active 4-Bid Funded 0
896,815 Active 4-Bid Funded 0
2,240,934 Active 3-Design Funded 0
1,652,160 Active 5-Construction Funded 0
1,824,095 Active 3-Design Funded 0
170,000 Active 5-Construction Funded 0
851,797 Active 3-Design Funded 0
12,301,058 Active 5-Const. (JOC) Funded 0
1,4 1,218,245 1,218,245 Active 4-Bid (JOC) Funded 0
3
12,819,059 6,369,000 Active 7-On-Hold Partially Funded -6,450,059
City Of Miami - Capital Improvement Program
SUBSTITUTED
CIP Projects Only Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
B-No. Client Project Dist. Estimate ($) Funds ($) Status Phase Stat Estimate ($)
352-Storm Sewers
Active & Future
B-30421 Capital Improvement Program D1 - Stromwater Projects 1 1,198,000 1,078,000 Future 8-Future Partially Funded -120,000
Admin
B-30422 Capital Improvement Program D2 - Stormwater Projects 2 1,198,000 1,078,000 Future 8-Fu . e Partially Funded -120,000
Admin
B-30423 Capital Improvement Program D3 - Stormwater Projects 3 1,198,000 1,078,000 Future 8-Future Partially Funded -120,000
Admin
B-30424 Capital Improvement Program D4 - Stormwater Projects 4 1,198,000 1,078,000 uture 8-Future Partially Funded -120,000
Admin
B-30637A Capital Improvement Program South Miami Avenue Drainage Improvements 2 806,500 14,444 Active 4-Bid Partially Funded -602,055
Admin - MDC
B-30985 Capital Improvement Program Design District Roadway and Stormwater 5 1,500,000 500,000 Future 8-Future Partially Funded -1,000,000
Admin Improvement - D5
B-50643 Capital Improvement Program Wagner Creek / Seybold Canal Dredging 1,5 53,488 5,373,502 Active 3-Design Partially Funded -17,979,985
co Admin
v
B-30007 Capital Improvement Program Auburn Storm Sewer Phase III 4 7,049,000 0 Future 8-Future UnFunded -7,049,000
Admin
B-30009 Capital Improvement Program Lawnview Storm Sewer 3 5,719,000 0 Future 8-Future UnFunded -5,719,000
Admin
B-30012 Capital Improvement Program Auburn Storm Sewer Ph. I & II 4 5,320,000 0 Future 8-Future UnFunded -5,320,000
Admin
B-30013 Capital Improvement Program Reid Acres Storm Sew- 5 5,719,000 0 Future 8-Future UnFunded -5,719,000
Admin
B-30015 Capital Improvement Program Little River : orm Sewers Ph. II 5 3,990,000 0 Future 8-Future UnFunded -3,990,000
Admin
B-30016 Capital Improvement Program .erty Storm Sewers 5 5,586,000 0 Future 8-Future UnFunded -5,586,000
Admin
B-30017 Capital Improvemen ogram Fairway Storm Sewers 5 5,586,000 0 Future 8-Future UnFunded -5,586,000
Admin
B-30018 Capital I . ovement Program NW 71 St. Main Trunk Storm Sewer 5 9,975,000 0 Future 8-Future UnFunded -9,975,000
Ad
B-30216 apital Improvement Program Avalon Storm Sewer - Phase III 2,4 4,500,000 0 Future 8-Future UnFunded -4,500,000
Admin
B-404 Public Works Morningside Drainage Improvement Project 2 6,260,000 0 Future 8-Future UnFunded -6,260,000
D2 - PW
904 i 4,927 448,436,592
Active & Future
CIP Projects Only
B-No. Client
352-Storm Sewers
B-40006 Public Works
353-Solid Waste
B-73202C Solid Waste Solid Waste Collection Equipment 1,2,3,4,5 5,009,526 5,009,427 Activ- 5-Construction Partially Funded -99
B-70476 Solid Waste Solid Waste Building Reinforcement for 1,2,3,4,5 1,000,000 0 - sture 8-Future UnFunded -1,000,000
Hurricane
B-70477 Solid Waste Solid Waste Mini -Dump Renovation 1,2,3,4,5 200,000 0 Future 8-Future UnFunded -200,000
Project
City Of Miami - Capital Improvement Program
SUBSTITUTED
Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
Dist. Estimate ($) Funds ($) Status Phase Stat Estimate ($)
Mechanical Upgrades to Riverview and
Lawrence Pump Stations - D3 - PW
3 125,000 0 Future 8-Future UnFunded -125,000
352-Storm Sewers 149,182,867 62,841,766 -86,341,100
B-70478 Solid Waste Solid Waste Fleet Replacement 1,2,3,4,5 24,311,800 0 Future 8-Future UnFunded -24,311,800
353-Solid Waste
30,521,326 5,009,427
-25,511,899
Grand Total
CO
CO
-455,608,335
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
ECTION REPORTS
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
CO
CO
Active & Future
CIP Projects Only
Program: All
031-PWK-Public Works
FUNDED
B-30262 Citywide Storm Sewer Repair
B-30377C District 3 - Sidewalk Repairs and
B-30416 NW 34 Ave over Comfort Canal -
B-30992 Riverview and Lawrence Pump
B-30998 Citywide Sidewalk Repair Project -
B-40168 South Bayshore Drive from
B-43114B Public Works Miscellaneous
B-50654 Overtown Stormwater Pump Station
TOTAL FUNDED
PARTIALLY FUNDED
B-30551 Public Works Maintenance Yard
TOTAL PARTIALLY FUNDED
UNFUNDED
B-40001
B-40002
B-40003
B-40004
B-40005
B-40006
B-40007
B-40008
B-40009
New Public Works Operations
Public Works Fleet and Heavy
PW Citywide Sidewalk
Morningside Drainage
PW Citywide Pavement
Mechanical Upgrades to Riverview
PW - Heavy Machinery
PW Heavy Equipment and
PW Updrage Operations Division
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Total Prior Current
Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
SUBSTITUTED
$5,701,561
$250,691
$178,700
$1,824,095
$169,615
$100,000
$1,034,146
$851,797
$5,701,561
$250,691
$178,700
$1,824,095
$169,615
$100,000
$1,034,146
$851,797
$4,401,561
$250,691
$0
$1,124,095
$169,615
$100,000
$158,400
$851,797
$700,000
$0
$0
$700,000
$0
$0
$875,746
$0
$600,000
$0
$178,700
$0
$0
$0
$0
$0
Future Funding Estimates
$0
$0
$0
$0
$0
$0
$0
$10,110,605 $10,110,605 $7,056,159 $2,275,746 $778,700 $0
$4,719,387
$3,268,254 $3,268,254 $0
$4,719,387 $3,268,254 $3,268,254
$1,875,500
$499,000
$7,435,000
$6,260,000
$6,912,761
$125,000
$95,000
$650,000
$300,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Over/
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0 $0 $0 $0 ( $1,451,133)
$0 $0 $0 $0 $0 $0 ( $1,451,133)
0 $0 $0 $0 $0 $0 ( $1,875,500)
$0 $0 $0 $0 $0 $0 ( $499,000)
$0 $0 $0 $0 $0 $0 ( $7,435,000)
$0 $0 $0 $0 $0 $0 ( $6,260,000)
$0 $0 $0 $0 $0 $0 ( $6,912,761)
$0 $0 $0 $0 $0 $0 ( $125,000)
$0 $0 $0 $0 $0 $0 ( $95,000)
$0 $0 $0 $0 $0 $0 ( $650,000)
$0 $0 $0 $0 $0 $0 ( $300,000)
TOTAL UNFUNDED $24,152,261
$0 $0 $0 $0 $0 $0 $0 $0 ( $24,152,261)
Total 031-PWK-Public Works $38,982,2 . $13,378,859 $10,324,413 $2,275,746 $778,700 $0 $0 $0 $0 ( $25,603,394)
Active & Future
CIP Projects Only
Program: All
122-T&T-Transportation & Transit
FUNDED
B-30346 Traffic Study Reviews - Oracle
B-30645A Transportation Program Support
B-30645B Transportation Program Support
B-30645E Overtown / Wynwood Bicycle
B-30645F Miami Regional Intermodal Plan
B-30694A Citywide Bicycle Rack & Signage
B-70246 Transportation Program Support
B-70246A Beach Corridor Transit Connection
B-70247 Citywide Mass Transit Studies
B-70715 City of Miami Trolley Program -
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Total Prior Current
Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
SUBSTITUTED
$411,622
$418,077
$881,042
$60,000
$48,000
$115,000
$500,000
$30,000
$318,402
$2,921,123
$411,622
$418,077
$881,042
$60,000
$48,000
$115,000
$500,000
$30,000
$318,402
$2,921,123
$411,622
$418,077
$881,042
$60,000
$15,000
$115,000
$318,402
$30,000
$0
$2,921,123
$0
$0
$0
$0
$33,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$181,598
$0
$318,402
$0
Future Funding Estimates
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Over/
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
TOTAL FUNDED
PARTIALLY FUNDED
B-70245 Transportation Program Support
$5,703,266 $5,703,266 $5,170,266 $33,000 $500,000 $0 $0 $0 $0 $0
$500,000 $294,958 $144,958 $100,000 $50,000 $0 $0 $0 $0 ( $205,042)
TOTAL PARTIALLY FUNDED
UNFUNDED
B-70245D Transportation PSS - Transportation
TOTAL UNFUNDED
Total 122-T&T-Transportation & Transit
$500,000 $294,958 $144,958 $100,001 $50,000 $0 $0 $0 $0 ( $205,042)
$155,042 $0 $0 $0 $0 $0 $0 $0 $0 ( $155,042)
$155,042
$0
$o $o $0 $0 $0 $0 ( $155,042)
$6,358,308 $5,998,224 $ 15,224 $133,000 $550,000 $0 $0 $0 $0 ( $360,084)
City Of Miami - Capital Improvement Program
Active & Future Fund Source Management System
CIP Projects Only Funded Proportion by Department/Job No.
Program: All Total Total Prior Current
25-CMA-City Manager Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
FUNDED
B-40171 Coconut Grove Viewing Platform $15,088 $15,088 $15,088 $0 $0 $0 $0 $$0 $0
B-40172 Coconut Grove Viewing Platform $15,081 $15,081 $15,081 $0 $0 $0 $0 $0 $0 $0
SUBSTITUTED
Future Funding Estimates
Over/
TOTAL FUNDED $30,169 $30,169 $30,169 $0 $0 $0 $0 $0 $0 $0
Tota125-CMA-City Manager $30,169 $30,169 $30,169 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
Program: All
28-FIR-Fire Rescue
FUNDED
B-30865F Environmental Remediation Study -
B-60453A Fire Station #13
B-60454S Fire Station #14 (New) - D4 -
B-60455B Fire Station #1 - Renovation and
B-70102A Fire Station No. 6 Office Building -
B-70104 Fire Station No. 10 Restroom
B-70105 Refurbishing of Existing Apparatus
B-70106 Firefighting Equipment and Gear
B-70210 Fire Station #5 Exterior Walls
B-70211 Fire Station No. 3 Dormitories
B-70212 Fire Station No. 12 - Re -roofing
B-70213 Fire Station No.5 - Interior
B-70241 Fire Rescue Capital Needs -
B-70411 Fire Rescue Personal Protective
B-70418 FEMA Assistance to Firefighters
B-70718 Fire Facilities Generators (North &
B-72801 Computer Aided Dispatch (CAD)
B-72802 Fire Stations & Other Fire Facilities
B-72803 Fire Station Equipment and
B-72810A New Fire Rescue Apparatus (North
B-72813 Defense and Security Equipment
Total
Cost
$140,000
$5,084,496
$100,000
$500,000
$74,619
$188,218
$230,000
$158,124
$150,000
$100,000
$77,000
$348,240
$1,858,500
$820,580
$343,610
$300,000
$120,866
$3,647,899
$790,838
$573,740
$3,767,249
City Of Miami - Capital Improvement Program SUBSTITUTED
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current Future Funding Estimates Over/
Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017- 118 (Under)
$140,000 $0 $140,000
$5,084,496 $5,084,496 $0
$100,000 $100,000 $0
$500,000 $0 $500,000
$74,619 $74,619 $0
$188,218 $188,218 $0
$230,000 $230,000 $0
$158,124 $158,124 $0
$150,000 $150,000 $0
$100,000 $100,000 $0
$77,000 $77,000 $0
$348,240 $0 $348,240
$1,858,500 $0 $0 $1
$820,580 $820,580 $0
$343,610 $343,610 $0
$300,000 $300,000 t0
$120,866 $120,866 $0
$3,647,899 $3,547,899 $100,000
$790,838 $540,83 $250,000
$573,740 $1 . 144 $460,696
$3,767,249 t.,767,249 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
,500
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
TOTAL FUNDED
PARTIALLY FUNDED
B-60351
B-60454
B-70242
B-72804
B-72808
B-72809
Fire Station #10 (New)
Fire Station #14 (New)
Fire Department - FY2012
Phone and Radio Equipment
Light Fleet Replacement
Large Firefighting Equipment
$19,373,979 $19,373,979 $15,716,543 $1,798,936 $1,858,500
$6,275,200
$6,916,510
$317
$1 9,200
1,649,658
$660,316
TOTAL PARTIALLY FU i D $17,028,217
UNFUNDED
B-70214 Fire Stations .mputer Aided $2,400,000
B-70215 Uniform re Station Data Closets $48,000
B-70216 Fire : ation and AO PC $70,000
B-70217 few Citywide Fire Stations Digital $5,000,000
B-70 . Citywide Fire Station Replace out $150,000
0219 Citywide Warranty and Outdated $105,000
B-70220 Citywide Bunker Gear (Fire $274,800
$898,123
$5,076,844
$238,000
$351,200
$667,658
$388,316
$898,123
$5,076,844
$0
$351,200
$667,658
$326,816
$0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 ( $5,377,077)
$0 $0 $0 $0 $0 $0 ( $1,839,666)
$0 $238,000 $0 $0 $0 $0 ( $79,333)
$0 $0 $0 $0 $0 $0 ( $858,000)
$0 $0 $0 $0 $0 $0 ( $982,000)
$61,500 $0 $0 $0 $0 $0 ( $272,000)
$7,620,141 $7,320,641 $61,500 $238,000 $0 $0 $0 $0 ( $9,408,076)
$0 $0 $0 $0 $0 $0 $0 $0 ( $2,400,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $48,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $70,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $5,000,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $150,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $105,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $274,800)
0
w
City Of Miami - Capital Improvement Program
Active & Future Fund Source Management System
CIP Projects Only Funded Proportion by Department/Job No.
Program: All Total Total Prior Current
28-FIR-Fire Rescue Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017- 118 (Under)
UNFUNDED
B-70221
B-70222
B-70223
B-70224
B-70225
B-70226
B-70227
B-70228
B-70229
B-70230
B-70231
B-70232
B-70233
B-70234
B-70235
B-70236
B-70237
B-70238
B-70239
B-70240
B-72811
Fire Stations Warranty
Rebuilding Fire Station #1
Rebuilding Fire Station #10
Fire and Rescue Training Center
Fire Station #15 (Fire Boat)
Citywide Fire Station Pumpers
Fire Rescue
Apparatus Replacement
Replace Fireboat 1
Fire Station Training Facility
Expand Comunication/Alarm Office
Facility Budget Requests (Fire)
Fire Station Equipment/Furniture
Fire Station Hurricane Hardening
Fire Station Light Fleet Vehicle
Fire Station Hardening/Security
Fire Station #5 Renovation
Fire Training Props
Fire Station Flat Panels 24"
Fire Station Paperless Inspection
Replace Existing Fire Engines
$946,000
$9,000,000
$6,000,000
$17,000,000
$10,000,000
$1,960,000
$4,320,000
$950,000
$1,250,000
$750,000
$500,000
$1,750,000
$200,000
$384,000
$630,000
$935,000
$800,000
$350,000
$3,500
$80,000
$3,035,000
SUBSTITUTED
Future Funding Estimates
Over/
$0 $0 $0 $0 $0 $0 $i $0 ( $946,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $9,000,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $6,000,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $17,000,000)
$0 $0 $0 $0 $0 :1 $0 $0 ( $10,000,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $1,960,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $4,320,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $950,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $1,250,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $750,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $500,000)
$0 $0 $0 :1 $0 $0 $0 $0 ( $1,750,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $200,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $384,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $630,000)
$0 $0 0 $0 $0 $0 $0 $0 ( $935,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $800,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $350,000)
$0 $ $0 $0 $0 $0 $0 $0 ( $3,500)
$0 $0 $0 $0 $0 $0 $0 $0 ( $80,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $3,035,000)
TOTAL UNFUNDED $68,891,300
$o $o $o $o $o $o $o $o ( $68,891,300)
Tota128-FIR-Fire Rescue $105,293,496 $26,9' ,120 $23,037,184 $1,860,436 $2,096,500 $0 $0 $0 $0 ( $78,299,376)
City Of Miami - Capital Improvement Program
Active & Future Fund Source Management System
CIP Projects Only Funded Proportion by Department/Job No.
Program: All Total Total Prior Current
29-POL-Police Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
FUNDED
B-30373A Police Department Property Unit
B-40273 Police Station Headquarters
B-70112 Police Headquarters Interview
B-70600 Police Department Sanitary Sewer
B-72915A Police Headquarters Helipad and
$1,069,644
$10,000
$55,000
$60,000
$1,657,119
SUBSTITUTED
Future Funding Estimates
Over/
$1,069,644 $989,644 $80,000 $0 $0 $0 $► $0 $0
$10,000 $0 $10,000 $0 $0 $0 $0 $0 $0
$55,000 $55,000 $0 $0 $0 $0 $0 $0 $0
$60,000 $60,000 $0 $0 $0 $0 $0 $0 $0
$1,657,119 $424,506 $1,232,613 $0 $0 :1 $0 $0 $0
TOTAL FUNDED $2,851,763 $2,851,763 $1,529,150 $1,322,613 $0 $0 $0 $0 $0 $0
UNFUNDED
B-70113 Police Headquarters 5thfloor $496,956 $0 $0 $0 $0 0 $0 $0 $0 ( $496,956)
B-70114 Fire Pump Electrical Rewiring - $35,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $35,000)
B-70115 Domestic Water Pump - Police $65,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $65,000)
B-70116 Police Headquarter Elevators $75,000 $0 $0 $0 i $0 $0 $0 $0 ( $75,000)
B-70117 I-95 Lighting Project - Police Dept. $85,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $85,000)
B-70118 Police Central Station Parking $210,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $210,000)
B-70119 Police Headquarters Presure $275,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $275,000)
o B-70120 Carpeting and Flooring - Police $65,000 $0 $0 t 0 $0 $0 $0 $0 $0 ( $65,000)
-P B-70121 Police Headquarter & South District $425,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $425,000)
B-70122 South District Police Sub Station $175,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $175,000)
B-70123 Security System for $85,000 $0 $1 $0 $0 $0 $0 $0 $0 ( $85,000)
B-70124 Police South District Air $275,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $275,000)
B-70125 North and South Police Stations $50,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $50,000)
B-70126 Grapeland Heights Electrical Panel $125,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $125,000)
B-70127 Police Headquarter Building $25,000 :1 $0 $0 $0 $0 $0 $0 $0 ( $25,000)
B-70128 Forensic Lab Expansion - Police $1,200,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $1,200,000)
B-70129 College of Police Auditorium $15,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $15,000)
B-70130 College of Police Lobby Lighting $20,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $20,000)
B-70131 Mounted Stables Stall Repairs - $100 i0 $0 $0 $0 $0 $0 $0 $0 $0 ( $100,000)
B-70132 Police South District Exterior : 5,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $35,000)
B-70133 Security System for Police South $70,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $70,000)
B-70134 Replacement of 400 Desktop $324,172 $0 $0 $0 $0 $0 $0 $0 $0 ( $324,172)
B-70135 Replacement of Sauna Wat- $15,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $15,000)
B-70136 Police Headquarters R- ord Unit $496,458 $0 $0 $0 $0 $0 $0 $0 $0 ( $496,458)
B-70417 Satellite Commu ' ations Antenna $20,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $20,000)
T r AL UNFUNDED $4,762,586 $0 $0 $0 $0 $0 $0 $0 $0 ( $4,762,586)
Tota129-POL-Police $7,614,349 $2,851,763 $1,529,150 $1,322,613 $0 $0 $0 $0 $0 ( $4,762,586)
City Of Miami - Capital Improvement Program
Active & Future Fund Source Management System
CIP Projects Only Funded Proportion by Department/Job No.
Program: All Total Total Prior Current
32-SWA-Solid Waste Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
FUNDED
B-40271 Solid Waste Sweeper $170,000
SUBSTITUTED
Future Funding Estimates
$170,000 $170,000 $0 $0 $0 $0
Over/
$0 $0
TOTAL FUNDED $170,000 $170,000 $170,000 $0 $0 $0 $0 $0 $0 $0
PARTIALLY FUNDED
B-73202C Solid Waste Collection Equipment $5,009,526 $5,009,427 $3,548,727 $854,100 $606,600 $0 i $0 $0
$99)
TOTAL PARTIALLY FUNDED $5,009,526 $5,009,427 $3,548,727 $854,100 $606,600 $0 $0 $0 $0
UNFUNDED
B-70476 Solid Waste Building $1,000,000 $0 $0 $0 $0 0 $0 $0 $0 ( $1,000,000)
B-70477 Solid Waste Mini -Dump $200,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $200,000)
B-70478 Solid Waste Fleet Replacement $24,311,800 $0 $0 $0 $0 $0 $0 $0 $0 ( $24,311,800)
$99)
TOTAL UNFUNDED $25,511,800 $0 $0 $0
$0 $0 $0 $0 ( $25,511,800)
Tota132-SWA-Solid Waste $30,691,326 $5,179,427 $3,718,727 $854,100 606,600 $0 $0 $0 $0 ( $25,511,899)
0
01
0
rn
Active & Future
CIP Projects Only
Program: All
35-CCF-Public Facilities
FUNDED
B-30501A Manuel Artime Miscellaneous
B-30501B Manuel Artime Dimmer Rack
B-30696 Miamarina Pier A, B & C Fire Line
B-30706 Miscellaneous Repairs 10% Set
B-30735 Dinner Key Marina Dinghy Dock -
B-30994 City of Miami Impact Fee Study -
B-33506 James L. Knight Center
B-40454 Park Expansions and Land
B-50722A Little River Waterfront Park
B-60464 New Dinner Key Marina
B-60464S New Dinner Key Marina
B-70010 Miamarina Pier 5 Canopies - PF
B-70011 Clean Vessel Act 2013 - PF
B-70414 James L. Knight Center / Hyatt -
TOTAL FUNDED
PARTIALLY FUNDED
B-30182A Coconut Grove Waterfront Master
B-30501C Manuel Artime Window
B-30602
B-30688
B-30689
B-33514
B-40180
B-70100
B-75001
Seminole Dinghy Dock Expansion
Marine Stadium Restoration
Marine Stadium Bulkhead
Marine Stadium Marina
Marine Stadium Marina at Virginia
Gusman Hall Improvements /
Watson Island Infrastructure
TOTAL PARTIALLY FUNDED
UNFUNDED
B-30834 Dinner Key Dredging - Spoil Isl
B-35000 Watson Island Public Park
B-35003 Allapattah Community derly
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Total Prior Current
Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
SUBSTITUTED
$92,883
$106,653
$380,000
$2,158,594
$253,070
$65,491
$48,722
$1,000,000
$735,000
$4,211,239
$690,000
$435,000
$41,168
$351,876
$92,883
$106,653
$380,000
$2,158,594
$253,070
$65,491
$48,722
$1,000,000
$735,000
$4,211,239
$690,000
$435,000
$41,168
$351,876
$92,883
$106,653
$380,000
$985,110
$178,070
$65,491
$48,722
$0
$0
$4,211,239
$600,000
$200,000
$0
$351,876
$0
$0
$0
$646,375
$75,000
$0
$0
$1,000,000
$735,000
$0
$90,000
$0 $235
$0
$0
$0
$0
$0
$527,109
$0
$0
$0
$0
$0
$0
$0
1,168
$0
Future Funding Estimates
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Over/
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$10,569,696 $10,569,696 $7,220,044 $2,546,37. $803,277 $0 $0 $0 $0 $0
$47,179,389
$173,607
$60,000
$511,716
$2,094,393
$1,315,550
$33,180,900
$10,000,000
$647,190
$2,051,675 $1,721,675 $330,000 $0 $0 $0 $0 $0 ( $45,127,714)
$150,379 $150,37 $0 $0 $0 $0 $0 $0 ( $23,228)
$30,000 $ !,i00 $0 $0 $0 $0 $0 $0 ( $30,000)
$350,000 350,000 $0 $0 $0 $0 $0 $0 ( $161,716)
$1,891,603 $1,106,603 $785,000 $0 $0 $0 $0 $0 ( $202,790)
$255,. $255,645 $0 $0 $0 $0 $0 $0 ( $1,059,905)
$1 0,007 $1,740,007 $0 $0 $0 $0 $0 $0 ( $31,440,893)
$423,405 $423,405 $0 $0 $0 $0 $0 $0 ( $9,576,595)
$150,000 $150,000 $0 $0 $0 $0 $0 $0 ( $497,190)
$95,16 45 $7,042,714
$308,375
$2,600,000
$287,000
$5,927,714 $1,115,000
$o $o $0 $0 $0 ( $88,120,031)
$0 $0 $0 $0 $0 $0 $0 $0 ( $308,375)
$0 $0 $0 $0 $0 $0 $0 $0 ( $2,600,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $287,000)
TOTA . NFUNDED $3,195,375
$0 $0 $0 $0 $0 $0 $0 $0 ( $3,195,375)
Total 3 CF-Public Facilities $108,927,816 $17,612,410 $13,147,758 $3,661,375 $803,277 $0 $0 $0 $0 ( $91,315,406)
$466,900
$0 $45,900 $421,000
$0 $0
Active & Future
CIP Projects Only
Program: All
37-GA-Grants Administration
FUNDED
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total
Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017- 118 (Under)
SUBSTITUTED
B-30865A Environmental Remediation Study $466,900
TOTAL FUNDED
$466,900
Total Prior Current
$466,900
$466,900
$0
$0
$45,900
$45,900
$421,000
$421,000
Future Funding Estimates
$0 $0 $
$0 $0 $0
$0
$0
Over/
$0
$0
Tota137-GA-Grants Administration $466,900
0
$0 $0 $0
Active & Future
CIP Projects Only
Program: All
42-GSA-General Services
FUNDED
B-30666 Damaged Vehicle Replacement /
B-30865B City Hall Roof Terrace
B-30865C City Hall Windows and Doors
B-30865E MRC A/C Replacements
B-40410 Fire Alarm Replacement, Air
B-70415 MRC Security System Hardening -
B-74205B GSA Fleet Maintenance Garage
B-74205C GSA Truck Wash Pit
B-74219B Property Maintenance Security
B-74219C Property Maintenance Bobcats &
B-74220 Police Vehicle Replacement
TOTAL FUNDED
PARTIALLY FUNDED
B-30365H Generator for City Hall
B-74200 Citywide General Fleet
Total
Cost
$794,508
$314,176
$296,001
$289,823
$1,426,200
$69,842
$404,215
$88,000
$25,000
$40,000
$27,491,738
City Of Miami - Capital Improvement Program SUBSTITUTED
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current Future Funding Estimates Over/
Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
$794,508
$314,176
$296,001
$289,823
$1,426,200
$69,842
$404,215
$88,000
$25,000
$40,000
$27,491,738
$603,864
$0
$0
$0
$0
$69,842
$299,118
$0
$9,776
$0
$25,639,738
$190,644
$314,176
$296,001
$289,823
$1,426,200
$0
$105,097
$88,000
$15,224
$40,000
$1,852,000
$31,239,503 $31,239,503 $26,622,338 $4,617,165
$186,819
$3,969,887
$55,855
$3,610,269
$55,855
$3,260,269 $35
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 ( $130,964)
0 $0 $0 $0 $0 $0 ( $359,618)
TOTAL PARTIALLY FUNDED
UNFUNDED
B-40580 Jose Marti Roof Repair - GSA
B-70108 Purchase of a video transmission
B-70320 City of Miami Fleet Vehicle
B-70321 City of Miami Fleet Vehicle
B-70322 Carpet Replacement at the MRC
B-70323 GSA Communications Division -
B-70324 MRC Building - UPS System
B-70325 GSA Fleet Facility - Fuel Station
B-70326 GSA Communications Division -
B-70327 GSA Mechanics Shop - Light Fleet
B-70328 Fuel Pump Replacements
B-70329 Roof Repairs at the GSA
B-70330 Re -grouping and polis g of all
B-70331 Heavy Fleet Tow ck
B-70332 MRC Facilit, - Repair of HVAC
B-70333 Bucket ' ck for the Electrical
B-70334 Ci - all Repairs
B-70335 ' eplacement of Fire Panel at MRC
B-71 6 Roof Repair at the MRC Facility
-74220B Police Vehicle Acquisition -
$4,156,706
$26,100
$100,000
$1,700,000
$1,750,000
$300,000
$42,000
$7,000
$25 0
0,000
$65,000
$200,000
$60,000
$70,000
$250,000
$120,000
$162,000
$200,000
$340,000
$350,000
$2,040,000
$3,666,124 $3,316,124 350,000 $0 $0 $0 $0 $0 ( $490,582)
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0 $0 $0 $0 $0 $0 $0 ( $26,100)
$0 $0 $0 $0 $0 $0 $0 ( $100,000)
$0 $0 $0 $0 $0 $0 $0 ( $1,700,000)
$0 $0 $0 $0 $0 $0 $0 ( $1,750,000)
$0 $0 $0 $0 $0 $0 $0 ( $300,000)
$0 $0 $0 $0 $0 $0 $0 ( $42,000)
$0 $0 $0 $0 $0 $0 $0 ( $7,000)
$0 $0 $0 $0 $0 $0 $0 ( $25,000)
$0 $0 $0 $0 $0 $0 $0 ( $30,000)
$0 $0 $0 $0 $0 $0 $0 ( $65,000)
$0 $0 $0 $0 $0 $0 $0 ( $200,000)
$0 $0 $0 $0 $0 $0 $0 ( $60,000)
$0 $0 $0 $0 $0 $0 $0 ( $70,000)
$0 $0 $0 $0 $0 $0 $0 ( $250,000)
$0 $0 $0 $0 $0 $0 $0 ( $120,000)
$0 $0 $0 $0 $0 $0 $0 ( $162,000)
$0 $0 $0 $0 $0 $0 $0 ( $200,000)
$0 $0 $0 $0 $0 $0 $0 ( $340,000)
$0 $0 $0 $0 $0 $0 $0 ( $350,000)
$0 $0 $0 $0 $0 $0 $0 ( $2,040,000)
City Of Miami - Capital Improvement Program SUBSTITUTED
Active & Future Fund Source Management System
CIP Projects Only Funded Proportion by Department/Job No.
Program: All Total Total Prior Current Future Funding Estimates Over/
42-GSA-General Services Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
TOTAL UNFUNDED $7,837,100 $0 $0 $0 $0 $0 $0 $0 $0 ( $7,837,100)
Total 42-GSA-General Services $43,233,309 $34,905,627 $29,938,462 $4,967,165 $0 $0 $0 0 $0 ( $8,327,682)
0
CO
City Of Miami - Capital Improvement Program
Active & Future Fund Source Management System
CIP Projects Only Funded Proportion by Department/Job No.
Program: All Total Total Prior Current
45-CMD-Community Development Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 18 (Under)
FUNDED
B-30365E Coral Way NET Office Remodeling
B-30365E Coral Way NET Office Remodeling
B-30832 Douglas Park ADA Improvement
$1,291,833
$50,000
$133,474
$1,291,833
$50,000
$133,474
$1,015,000
$50,000
$133,474
SUBSTITUTED
Future Funding Estimates
$0 $276,833 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0
$0
Over/
$0 $0
$0 $0
$0 $0
TOTAL FUNDED $1,475,307 $1,475,307 $1,198,474 $0 $276,833 $0 $0 $0 $0 $0
UNFUNDED
B-30365C City Property Building Maintenance $700,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $700,000)
B-30365Q Coral Way Community Center $500,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $500,000)
TOTAL UNFUNDED $1,200,000 $0 $0 $0 $0 $0 $0 $0 $0 ( $1,200,000)
Total45-CMD-Community Development $2,675,307 $1,475,307 $1,198,474 $0 $276,833 $0 $0 $0 $0 ( $1,200,000)
0
Active & Future
CIP Projects Only
Program: All
46-IT-Information Technology
FUNDED
B-70969 IT - Financial Management
B-74609 ERP Integration System
TOTAL FUNDED
PARTIALLY FUNDED
B-74606 Upgrade PC Software & Hardware
B-74614 Land Management System
B-74617 IT Modernization
Total
Cost
City Of Miami - Capital Improvement Program SUBSTITUTED
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current Future Funding Estimates Over/
Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017- 118 (Under)
$500,000 $500,000 $0 $500,000
$25,474,458 $25,474,458 $25,474,458 $0
$25,974,458 $25,974,458 $25,474,458 $500,000
$7,174,921
$7,913,018
$4,100,000
$2,920,683
$6,316,151
$2,800,000
$2,920,683
$6,316,151
$2,800,000
$0 $0
$0 $0
$0 $0
$0
$0
$0
$0
$0
$0 $0
$0 $0
$0
$0
$0 $0 $0 $0 $0 $0 ( $4,254,238)
$0 $0 $0 $0 $0 $0 ( $1,596,867)
$0 $0 $0 $0 $0 $0 ( $1,300,000)
TOTAL PARTIALLY FUNDED
UNFUNDED
B-70956
B-70957
B-70958
B-70959
B-70960
B-70961
B-70962
B-70963
B-70964
B-70965
B-70966
B-70967
B-70968
MRC Telecommunications
eGovernment/Web Services City
eGoverment/Web Services iBuild
eGovernment Services Platform
CIP Document Mgmt & Data
Audit Compliance
Server Virtualization
Business Continuity Systems
City Wide Personal Computer
Hyperion Financial Management
Kronos System Upgrade
Cloud Data Service - Data Storage
Replacement: City Clerk Systems
$19,187,939 $12,036,834 $12,036,834
$455,000
$2,464,000
$480,000
$1,480,000
$380,000
$22,000
$98,000
$56,000
$1,560,000
$430,000
$105,000
$220,000
$660,000
TOTAL UNFUNDED $8,410,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$o $o $o $o $o $o ( $7,151,105)
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0 $0 $0 $0 ( $455,000)
$0 $0 $0 $0 $0 ( $2,464,000)
$0 $0 $0 $0 $0 ( $480,000)
$0 $0 $0 $0 $0 ( $1,480,000)
$0 $0 $0 $0 $0 ( $380,000)
$0 $0 $0 $0 $0 ( $22,000)
$0 $0 $0 $0 $0 ( $98,000)
$0 $0 $0 $0 $0 ( $56,000)
$0 $0 $0 $0 $0 ( $1,560,000)
$0 $0 $0 $0 $0 ( $430,000)
$0 $0 $0 $0 $0 ( $105,000)
$0 $0 $0 $0 $0 ( $220,000)
$0 $0 $0 $0 $0 ( $660,000)
$o $o $o $o $o $o $o $o ( $8,410,000)
Total 46-IT-Information Technology $53,572,3
$38,011,292 $37,511,292 $500,000 $0 $0 $0 $0 $0 ( $15,561,105)
City Of Miami - Capital Improvement Program
Active & Future Fund Source Management System
CIP Projects Only Funded Proportion by Department/Job No.
Program: All Total Total Prior Current
56-BLD-Building Department Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 7-2018 (Under)
FUNDED
SUBSTITUTED
Future Funding Estimates
Over/
B-30365J Beckham Hall Fire Damage Repair $6,770 $6,770 $6,770 $0 $0 $0 $0 $0 $0 $0
TOTAL FUNDED $6,770 $6,770 $6,770 $0 $0 $0 $0 $0 $0 $0
Total 56-BLD-Building Department $6,770 $6,770 $6,770 $0 $0 $0 i $0 $0 $0
Active & Future
CIP Projects Only
Program: All
58-P&R-Parks and Recreation
FUNDED
B-30134A Bryan Park Community Building -
B-30134A Bryan Park New
B-30305B Gibson Park New Construction
B-30374S Virginia Key Rowing Center
B-30538 Museum Park - Partially Funded by
B-30541C Kennedy Park Shoreline
B-30541D Citywide Park Equipments & Site
B-30547E Parks ADA Modifications - District
B-30547G Parks ADA Modifications - District
B-30671 Caribbean Marketplace Renovation
B-30671A Caribbean Marketplace Renovation
B-30690 West End Park New Community
B-30690S West End Park New Community
B-30721 Spoil Island E Restoration and
B-30772 Bay of Pigs Park Lighting - D4
B-30800 Fern Isle / PBA Park Improvements
B-30825 Biscayne Bay Spoil Island B Public
B-30825A Biscayne Bay Spoil Island E Picnic
B-30825B Biscayne Bay Spoil Island E Public
B-30882S African Square Park - Splash Park
B-30886S Lummus Landing Square - D5
B-30887S Little Haiti Soccer Field Bathroom
B-30962
B-30963
B-30981
B-30984
B-30995
Robert King High Fencing and
Bay of Pigs Memorial Park
Oakland Grove Park - upgrades -
Athalie Range Park HVAC
Virginia Key Bike and Kayak
B-30995S Virginia Key Bike Trail Building -
B-35806 Curtis Park New Pool Facility and
B-35806S Curtis Park New Pool Facility . d
B-35812A Duarte Park Building Re ation,
B-35812A Duarte Park Building enovation,
B-35812D Duarte Park Bu .ing Renovation,
B-35838 Kennedy P Restroom Building
B-35838S Kenn- : Park Restroom Building
B-35861B . ximo Gomez / Domino Park
B-3586 Maximo Gomez / Domino Park
B- " 887 Moore Park New Construction
-35887S Moore Park New Construction D5 -
50,000
$2,177,160
$500,000
$1,312,797
$50,000
$15,000
$222,033
$50,000
$48,368
$100,000
$7,605,462
$500,000
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Total Prior Current
Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
SUBSTITUTED
$852,128
$50,000
$12,739,521
$100,000
$14,042,367
$261,000
$1,917,378
$215,348
$491,147
$1,102,553
$114,000
$2,598,521
$100,000
$252,500
$53,000
$116,782
$17,500
$8,250
$8,250
$100,000
$100,000
$365,000
$102,468
$20,000
$44,887
$193,04
$852,128 $852,128
$50,000 $50,000
$12,739,521 $12,739,521
$100,000 $0
$14,042,367 $14,042,367
$261,000 $261,000
$1,917,378 $523,312
$215,348 $215,348
$491,147 $491,147
$1,102,553 $1,102,553
$114,000 $114,000
$2,598,521 $1,098,521
$100,000 $100,000
$252,500 $195,000
$53,000 $53,000
$116,782 $116,782
$17,500 $10,000
$8,250 $750
$8,250 $7
$100,000 $ ! 1,000
$100,000 $100,000
$365,000 $100,000
$10 68 $102,468
20,000 $20,000
$44,887 $44,887
$193,043 $0
$47 ,i00 $477,000 $477,000
$50,000 $50,000
$2,177,160 $2,127,160
$500,000 $500,000
$1,312,797 $1,312,797
$50,000 $50,000
$15,000 $15,000
$222,033 $222,033
$50,000 $50,000
$48,368 $48,368
$100,000 $100,000
$7,605,462 $7,605,462
$500,000 $500,000
$0
$0
$0
$100,000
$0
$0
$1,394,066
$0
$0
$0
$0
$1,500,000
$0
$57,500
$0
$7,500
$7,500
$7,500
$0
$0
$265,000
$0
$0
$0
$193,043
$0
$0
$50,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Future Funding Estimates
$0
$0
$0
$0
0
Over/
Active & Future
CIP Projects Only
Program: All
58-P&R-Parks and Recreation
FUNDED
B-39910E District 2 Quality of Life Park
B-40456
B-40457
B-40527
B-50722
B-75883
B-75973
Antonio Maceo Community
Kinloch Park Building Addition -
Melreese Golf Course Renovations
Little River Waterfront Park
Peacock Park Site Improvements
Oakland Grove Park Playground
TOTAL FUNDED
PARTIALLY FUNDED
B-30374 Virginia Key Rowing Center
B-30541 Citywide Park Equipment & Site
B-30643 Lummus Park Landing Project -
B-30777 Coral Gate Mini Park - D4
B-30801 Manatee Bend Park Shoreline
B-30802 Pallot Park Shoreline Improvements
B-30882 African Square Park - Splash Park -
B-30886 Lummus Landing Square - D5
B-35883A Hadley Park New Youth Center D5
B-35904 Neighborhood Parks Improv.
B-40455 Citywide Capital Improvements
TOTAL PARTIALLY FUNDED
UNFUNDED
B-30905
B-40458
B-40459
B-40460
B-40461
B-40462
B-40463
B-40464 Bay of Pigs Park Playp .und
B-40465 Baywood Park Se • all Repair
B-40466 Baywood Pa . Site Development
B-40467 Belafo acolcy Park
B-40468 Be : onte Tacolcy Park
B-40469 C elafonte Tacolcy Park entire
0 Bell Meade Park Improvements
-40471 Biscayne Heights Park (Shorecrest
B-40472 Biscayne Park Soccer Facility
B-4
Seybold House Demolition and
Citywide Park Building AC
African Square Park Playground
African Square Park Restroom &
Allapattah Mini Park Access
Allapattah Mini Park Court
Armbrister Park Field
Total
Cost
$987,988
$1,686,750
$1,461,850
$200,000
$717,500
$725,124
$15,000
City Of Miami - Capital Improvement Program SUBSTITUTED
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current Future Funding Estimates Over/
Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
$987,988
$1,686,750
$1,461,850
$200,000
$717,500
$725,124
$15,000
$987,988
$65,722
$47,843
$0
$717,500
$625,124
$15,000
$0
$121,028
$114,007
$0
$0
$100,000
$0
$0
$0
$300,000
$200,000
$0
$0
$0
$0
$1,500,000
$1,000,000
$0
$0
$0
$0
$54,867,675 $54,867,675 $47,950,531 $3,917,144 $500,000 $2,500,0
$1,327,023
$5,293,595
$2,605,245
$200,634
$675,827
$1,438,000
$670,000
$1,007,000
$8,049,934
$1,272,223
$413,946
$616,513
$4,896,494
$1,368,535
$100,000
$88,527
$80,000
$600,000
$925,061
$5,876,805
$771,223
$263,946
$616,513
$4,896,494
$1,368,535
$100,000
$50,027
$50,000
$600,000
$925,061
$5,876,80
$77 23
$0
$0
$0
$0
$38,500
$30
0
$0
$0
$0
$0
$0 $263,946
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0 $0 $0 $0
$0 $0 $0 $0 ( $710,510)
$0 $0 $0 $0 ( $397,101)
$0 $0 $0 $0 ( $1,236,710)
$0 $0 $0 $0 ( $100,634)
$0 $0 $0 $0 ( $587,300)
$0 $0 $0 $0 ( $1,358,000)
$0 $0 $0 $0 ( $70,000)
$0 $0 $0 $0 ( $81,939)
$0 $0 $0 $0 ( $2,173,129)
$0 $0 $0 $0 ( $501,000)
$0 $0 $0 $0 ( $150,000)
$22,953,427 $15,587,104 $15,254,658 $332,446 $0 $0 $0 $0 $0 ( $7,366,323)
$200,000
$600,000
$125 •i0
0,000
$30,000
$25,000
$1,350,000
$100,000
$150,000
$125,000
$35,000
$40,000
$5,000,000
$50,000
$100,000
$2,250,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$200,000)
$600,000)
$125,000)
$750,000)
$30,000)
$25,000)
( $1,350,000)
(
(
(
( $35,000)
( $40,000)
( $5,000,000)
( $50,000)
( $100,000)
( $2,250,000)
$100,000)
$150,000)
$125,000)
Active & Future
CIP Projects Only
Program: All
58-P&R-Parks and Recreation
UNFUNDED
B-40473
B-40474
B-40475
B-40476
B-40477
B-40478
B-40479
B-40480
B-40481
B-40482
B-40483
B-40484
B-40485
B-40486
B-40487
B-40488
B-40489
B-40490
B-40491
B-40492
B-40493
B-40494
B-40495
B-40496
B-40497
B-40498
B-40499
B-40500
B-40501
B-40502
B-40503
B-40504
B-40505
B-40506
B-40507
B-40508
B-40509
City Of Miami - Capital Improvement Program SUBSTITUTED
Fund Source Management System
Funded Proportion by Department/Job No.
Total Total Prior Current
Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
Bryan Park Tennis Court $45,000
Kirk Munroe Tennis Park $30,000
Coral Gate Park Access Control $20,000
Coral Gate Park Baseball Field $30,000
Crestwood Park Basketball Courts $25,000
Curtis Park Access Control $225,000
Curtis Park Access Control (Roll up $25,000
Curtis Park Basketball and Tennis $125,000
Curtis Park Parking Lot $125,000
Curtis Park Playground $200,000
Curtis Park Restrooms Renovation $200,000
Curtis Park Stadium Restrooms $1,250,000
Domino Park Building $50,000
Domino Park Restroom Renovation $250,000
Domino Park Shade Structure $30,000
Dorsey Park Ballfield $45,000
Douglas Park Irrigation System $40,000
Douglas Park Lighting $50,000
Douglas Park Playground $130,000
Duarte Park Basketball and Tennis $75,000
Duarte Park Lighting $175,000
Duarte Park Playground $120,000
Eaton Park Daycare Improvements $100,000
Eaton Park Improvements $1,500,000
Fort Dallas Park (Lummus Park $750,000
Gibson Park Stadium $850,000
Grapeland Park Picnic Shelter $850 :10
Grove Mini Park Playground 65,000
Hadley Park Ballfield $80,000
Hadley Park Bleachers $600,000
Hadley Park Football Fiel. $1,750,000
Hadley Park Parking ..t $100,000
Hadley Park Poo ocker rooms $80,000
Hadley Par 'ool Improvement $280,000
Citywi. - Land Acquisition Park $15,000,000
L- -ion Park Boat Ramp $450,000
Legion Park HVAC (heating, $100,000
B ! 10 Legion Park Improvements $250,000
-40511 Legion Park Restrooms $100,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Future Funding Estimates
$0
$0
$0
$0
Over/
$0 ( $45,000)
$0 $0 ( $30,000)
$0 $0 ( $20,000)
$0 $0 ( $30,000)
$0 $0 ( $25,000)
$0 $0 ( $225,000)
$0 $0 ( $25,000)
$0 $0 ( $125,000)
$0 $0 ( $125,000)
$0 $0 ( $200,000)
$0 $0 ( $200,000)
$0 $0 ( $1,250,000)
$0 $0 ( $50,000)
$0 $0 ( $250,000)
$0 $0 ( $30,000)
$0 $0 ( $45,000)
$0 $0 ( $40,000)
$0 $0 ( $50,000)
$0 $0 ( $130,000)
$0 $0 ( $75,000)
$0 $0 ( $175,000)
$0 $0 ( $120,000)
$0 $0 ( $100,000)
$0 $0 ( $1,500,000)
$0 $0 ( $750,000)
$0 $0 ( $850,000)
$0 $0 ( $850,000)
$0 $0 ( $65,000)
$0 $0 ( $80,000)
$0 $0 ( $600,000)
$0 $0 ( $1,750,000)
$0 $0 ( $100,000)
$0 $0 ( $80,000)
$0 $0 ( $280,000)
$0 $0 ( $15,000,000)
$0 $0 ( $450,000)
$0 $0 ( $100,000)
$0 $0 ( $250,000)
$0 $0 ( $100,000)
Active & Future
CIP Projects Only
Program: All
58-P&R-Parks and Recreation
UNFUNDED
B-40512 Lemon City Park Daycare Parking
B-40513 Lemon City Park Daycare
B-40514 Lemon City Park Improvements
B-40515 Lemon City park Walkways
B-40516 Little Haiti Soccer Park
B-40517 Little Haiti Soccer Park Stadium
B-40518 Little Haiti Soccer Park Stadium
B-40519 Little Haiti Freedom Garden Park
B-40520 Little River Commerce Park
B-40521 Little River Pocket Park
B-40522 Lummus Park Playground
B-40523 Manatee Bend Park
B-40524 Marti Pool Park Locker -rooms
B-40525 Marti Pool Park Pool Improvements
B-40526 Marti Pool Park Pump
B-40528 Melrose Park Playground
B-40529 Merrie Christmas Park
B-40530 Virginia Key Rowing Center Park
B-40531 Moore Park Tennis Court
B-40532 Morningside Park Floating Dock
B-40533 Morningside Park Boat Ramp
B-40534 Morningside Park Tennis Center
B-40535 Morningside Park Court
B-40536 Morningside Park Walkways and
B-40537 Morningside Pool Park Pool
B-40538 North Bay Vista Park Playground
B-40539 Oakland Grove Mini Park $50
B-40540 Virginia Key Beach Park Access 5,000
B-40541 Operation Yard Park Trailers $225,000
B-40542 Pallot Park Seawall $300,000
B-40543 PBA / Fern Isle Redevelop . nt $4,500,000
B-40544 Peacock Park Buildin enovation $150,000
B-40545 Peacock Park Pla, a ound $150,000
B-40546 Pine Height ' ark Playground $75,000
B-40547 Citywi•• 'arks Playground $1,500,000
B-40548 Pu an Mini Park Playground $75,000
B-40549 ' ainbow Village Park Playground $75,000
B-41 ' 0 Athalie Range Park Playground $120,000
-40551 Athalie Range Park Restroom $80,000
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Total Prior Current
Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
SUBSTITUTED
$100,000
$75,000
$40,000
$30,000
$170,000
$100,000
$160,000
$50,000
$500,000
$50,000
$125,000
$100,000
$100,000
$110,000
$100,000
$125,000
$600,000
$350,000
$380,000
$50,000
$380,000
$650,000
$500,000
$250,000
$1,000,000
$75,000
0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Future Funding Estimates
$0
$0
$0
$0
Over/
$0 ( $100,000)
$0 ( $75,000)
$0 ( $40,000)
$0 ( $30,000)
$0 ( $170,000)
$0 ( $100,000)
$0 ( $160,000)
$0 ( $50,000)
$0 ( $500,000)
$0 ( $50,000)
$0 ( $125,000)
$0 ( $100,000)
$0 ( $100,000)
$0 ( $110,000)
$0 ( $100,000)
$0 ( $125,000)
$0 ( $600,000)
$0 ( $350,000)
$0 ( $380,000)
$0 ( $50,000)
$0 ( $380,000)
$0 ( $650,000)
$0 ( $500,000)
$0 ( $250,000)
$0 ( $1,000,000)
$0 ( $75,000)
$0 ( $50,000)
$0 ( $35,000)
$0 ( $225,000)
$0 ( $300,000)
$0 ( $4,500,000)
$0 ( $150,000)
$0 ( $150,000)
$0 ( $75,000)
$0 ( $1,500,000)
$0 ( $75,000)
$0 ( $75,000)
$0 ( $120,000)
$0 ( $80,000)
City Of Miami - Capital Improvement Program
Active & Future Fund Source Management System
CIP Projects Only Funded Proportion by Department/Job No.
Program: All Total Total Prior Current
58-P&R-Parks and Recreation Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
UNFUNDED
B-40552 Athalie Range Park Pool Heater $75,000
B-40553 Reeves Park Basketball Court $35,000
B-40554 Reeves Park Playground $100,000
B-40555 Reeves Park Sidewalks & $75,000
B-40556 Reeves Park Volleyball Court $25,000
B-40557 Riverside Park Restroom $75,000
B-40558 Citywide Park Buildings Roof $350,000
B-40559 Sewell Park kayak Launch $225,000
B-40560 Sewell Park Parking Lot $60,000
B-40561 Sewell Park Playground $75,000
B-40562 Shedavia Jenkins Parks Lighting $125,000
B-40563 Shenandoah Park Pool Renovation $2,200,000
B-40564 Simpson Park Building Roof $65,000
B-40565 Southside Park Field $450,000
B-40566 Spring Garden Point Park Historic $1,250,000
B-40567 Spring Garden Point Park $150,000
B-40568 Citywide Park Buildings Termite $200,000
B-40569 Town Park Playground $100,000
B-40570 Virginia Key Beach Park Restrooms $750,000
B-40571 Virrick Park New Pool $3,000,000
B-40572 Alice Wainwright Park Restrooms $350,000
B-40573 Grapeland Water Park Renovations $750,000
B-40574 West Buena Vista Park Building $50,000
B-40575 West Buena Vista Park Courts $50,000
B-40576 West Buena Vista Park Playground $120,000
B-40577 Williams Park Playground $175,000
B-40578 Williams Park Pool Improvement $175,:10
B-40579 Williams Park Sport Field Lights 50,000
Future Funding Estimates
Over/
$0 $0 $0 $0 $0 $0 $►. $0 ( $75,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $35,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $100,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $75,000)
$0 $0 $0 $0 $0 :1 $0 $0 ( $25,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $75,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $350,000)
$0 $0 $0 $0 $1 $0 $0 $0 ( $225,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $60,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $75,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $125,000)
$0 $0 $0 ::1 $0 $0 $0 $0 ( $2,200,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $65,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $450,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $1,250,000)
$0 $0 0 $0 $0 $0 $0 $0 ( $150,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $200,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $100,000)
$0 $0 $0 $0 $0 $0 $0 ( $750,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $3,000,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $350,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $750,000)
0 $0 $0 $0 $0 $0 $0 $0 ( $50,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $50,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $120,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $175,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $175,000)
$0 $0 $0 $0 $0 $0 $0 $0 ( $350,000)
TOTAL UNFUNDED $62,010,000
$o $o $0 $0 $0 $0 $0 $0 ( $62,010,000)
Total 58-P&R-Parks and Recr on $139,831,102 $70,454,779 $63,205,189 $4,249,590 $500,000 $2,500,000 $0 $0 $0 ( $69,376,323)
Active & Future
CIP Projects Only
Program: All
87-COM-Communications
UNFUNDED
B-40960 City Hall Studio Area - A/C Unit
B-40961 Office of Communications - Fleet
B-40962 Office of Communications -
B-40963 Office of Communications -
B-40964 Office of Communications - Large
B-40965 Office of Communications - Studio
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Total Prior Current
Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
SUBSTITUTED
$51,632
$144,000
$40,000
$30,000
$90,000
$18,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Future Funding Estimates
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Over/
$51,632)
$144,000)
$40,000)
$30,000)
$90,000)
$18,000)
TOTAL UNFUNDED
$373,632 $0 $0 $0 $0 $0 $0 $0 $0 ( $373,632)
Total87-COM-Conununications $373,632
$0 $0
$0 $0
$0 $0 $0 ( $373,632)
Active & Future
CIP Projects Only
Program: All
99-CIP-Capital Improvement
FUNDED
B-30008A Grove Park Road Improvements -
B-30011 Englewood Road and Storm Sewer
B-30130 Miami River Greenway SW 1st
B-30167D Shenandoah Roadway
B-30168A Silver Bluff Traffic Calming
B-30178 Design District/FEC
B-30183 Garden Storm Sewer - Phase I
B-30305B Gibson Park New Construction -
B-30336 Miami River Greenway (5th Street
B-30425 D5 - Stormwater Projects
B-30500 Civic Center NW 14th Street
B-30500T Civic Center NW 14th Street - Tree
B-30504 Linear Parks, Greenways and
B-30531 Dorsey Memorial Library
B-30538D Museum Park - DRI Fees
B-30538E Museum Park - DRI Air Quality
B-30538F Museum Park - DRI Transportation
B-305385 Museum Park - Sanitary Sewer
B-30538T Museum Park - FEMA Tree
B-30540 Little River Industrial Park
B-30588 San Marco Island and Biscayne
B-30606 DWNTWN Beautification Project
B-30606D DWNTWN Beautification - Design
B-30606L DWNTWN Beautification
B-30606N DWNTWN Beautification - North
B-306065 DWNTWN Beautification - South
B-30610 NW 7th Court
B-30611T D1 FEMA Tree Funded Projects
B-30613 District 3 - Miscellaneous Roadway
B-30613T D3 FEMA Tree Funded Project
B-30614 District 4 - Miscellaneous ' adway
B-30614T D4 - FEMA Tree Fun. . Projects
B-30615 District 5 - Misce . neous Roadway
B-30615T D5 FEMA •e Funded Component
B-30621 Center ►, ove Street and Lighting
B-30624T 0 • own Greenway @ NW 11
B-30628 Cird Avenue Road Improvement
B-31. 0T Palm Grove Road Improvements -
30631 Miami River Greenway from
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Total Prior Current
Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 18 (Under)
SUBSTITUTED
$628,321
$8,785,811
$1,557,530
$1,550,000
$703,544
$100,000
$1,149,920
$117,000
$2,256,640
$1,078,000
$2,600,000
$100,000
$961,000
$250,000
$600,000
$313,129
$2,296,404
$1,000,000
$215,943
$2,000,000
$4,488,981
$3,150,565
$498,780
$4,475,915
$7,817,431
$5,090,853
$360 el()
69,930
$3,273,688
$255,930
$494,387
$315,930
$1,863,195
$119,930
$1,991,568
$100,000
$1,960,505
$70,000
$1,221,625
$628,321
$8,785,811
$1,557,530
$1,550,000
$703,544
$100,000
$1,149,920
$117,000
$2,256,640
$1,078,000
$2,600,000
$100,000
$961,000
$250,000
$600,000
$313,129
$2,296,404
$1,000,000
$215,943
$2,000,000
$4,488,981
$3,150,565
$498
$4 5,915
7,817,431
$5,090,853
$360,000
$169,930
$3,273,688
$255,930
$494,387
$315,930
$1,863,195
$119,930
$1,991,568
$100,000
$1,960,505
$70,000
$1,221,625
$628,321
$3,216,811
$1,557,530
$1,550,000
$703,544
$100,000
$1,149,920
$0
$2,256,640
$0
$2,600,000
$0
$0
$250,000
$600,000
$313,129
$2,296,404
$1,000,000
,000
$2,0
,488,981
$3,150,565
$498,780
$4,475,915
$7,817,431
$5,090,853
$360,000
$0
$2,059,688
$0
$133,566
$0
$1,349,195
$0
$1,588,185
$0
$1,960,505
$0
$1,221,625
$0
$0
$0
$0
$0
$0
$0
$117,000
$0
$0
$0
$100,000
$0
$0
$0
0
$0
$0
$215,943
$0
$0
$0
$0
$0
$0
$0
$0
$169,930
$514,000
$255,930
$314,000
$315,930
$514,000
$119,930
$403,383
$100,000
$0
$70,000
$0
$0
$1,800,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$700,000
$0
$46,821
$0
$0
$0
$0
$0
$0
$0
$0
Future Funding Estimates
$0
$1,300,000
$0
$0
$0
$0
$0
$0
$0
38,000
$0
$0
$961,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$2,469,000
$0
$0
$0
$0
$0
$0
$280,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$280,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$280,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Over/
Active & Future
CIP Projects Only
Program: All
99-CIP-Capital Improvement
FUNDED
B-30637 Mary Brickell Village Drainage
B-30651 Miami River Greenway from NW
B-30662D US-1 Median Closures at
B-30677 D3 - Sidewalk ADA Retrofits
B-30680 Rockerman Canal Improvements
B-30687T Coconut Grove Business
B-30695 SW 19th Terr. Imp. -Partial CDBG
B-30699 Beacom Project Area Improvements
B-30699T Beacom Project Area Improvements
B-30700
B-30716
B-30718
B-30722
B-30724
Citywide - FDEP Drainage Wells
Tigertail Resurfacing - D2
I-95 South Miami Terminal Street
NW 31st Street Roadway
NW 33rd Street Roadway
B-30724T NW 33rd Street Roadway
B-30727 NW 18th Avenue Roadway
B-30727T NW 18th Avenue Roadway
B-30729 NW 17th Terrace Roadway
B-30730 NW 4th Terrace Roadway
B-30732 NW 9th Street Roadway
B-30749 Citrus Grove Roadway
B-30760 SW 17th Avenue Roadway &
B-30770 SW 22nd Avenue Medians - US 1
B-30771 Traffic Calming SW 6th Street
B-30773 Martin Luther King (MLK) Blvd /
B-30774 West Flagler Area Improvements -
B-30776 Silver Bluff Drainage
B-30779 SW 2nd Street and SW 40th
B-30780 NW 14 Avenue and 28 Street Area
B-30780T NW 14 Ave & 28 St. Are Road
B-30781 NW 11 Street from 27 to 3
B-30782 Allapattah Area Road
B-30784 Health District erwalk
B-30785 NW 36 Ave. ie 15 to 16 Street
B-30786 NW 43 venue between 9 to 11
B-30822 B ' ell Area Shared Use Path and
B-3082 Crickell Area Shared Use Path and
B-3 23 Fair Isle Area Roadway and
-30824 Spoil Island B & C Swim Area
y
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Total Prior Current
Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
SUBSTITUTED
$3,723,442
$3,160,379
$440,576
$700,000
$896,815
$100,000
$537,191
$1,053,114
$60,000
$2,240,934
$711,258
$859,000
$311,000
$3,700,000
$60,000
$1,810,000
$60,000
$250,000
$75,000
$756,248
$556,791
$600,000
$58,622
$324,670
$100,000
$1,358,173
$1,652 .0
50,000
$866,602
$26,000
$939,493
$500,000
$961,000
$50,000
$78,224
$844,267
$85,930
$180,000
$67,000
$3,723,442
$3,160,379
$440,576
$700,000
$896,815
$100,000
$537,191
$1,053,114
$60,000
$2,240,934
$711,258
$859,000
$311,000
$3,700,000
$60,000
$1,810,000
$60,000
$250,000
$75,000
$756,248
$556,791
$600,000
$58 •' 2
4,670
$100,000
$1,358,173
$1,652,160
$250,000
$866,602
$26,000
$939,493
$500,000
$961,000
$50,000
$78,224
$844,267
$85,930
$180,000
$67,000
$3,100,000
$3,160,379
$440,576
$700,000
$872,815
$0
$537,191
$1,053,114
$0
$1,004,934
$711,258
$859,000
$311,000
$3,700,000
$0
$1,810,000
$0
$250,000
$75,0
$7
248
556,791
$600,000
$58,622
$324,670
$100,000
$1,358,173
$1,652,160
$50,000
$866,602
$0
$939,493
$500,000
$0
$50,000
$78,224
$844,267
$0
$180,000
$67,000
$0
$0
$0
$0
$24,000
$100,000
$0
$0
$60,000
$0
$0
$0
$0
$0
$60,000
$0
60,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$200,000
$0
$26,000
$0
$0
$0
$0
$0
$0
$85,930
$0
$0
$623,442
$0
$0
$0
$0
$0
$0
$0
$0
$400,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Future Funding Estimates
$0
$0
$0
$0
$0
$0
$0
$0
09,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$200,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$209,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$761,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$209,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$209,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Over/
Active & Future
CIP Projects Only
Program: All
99-CIP-Capital Improvement
FUNDED
B-30827
B-30830
B-30835
B-30836
B-30837
B-30880
South Grove Phase 1 Roadway and
US 1 Landscaping between 17 Ave
South Grove Phase 2 Roadway and
South Grove Phase 3 Roadway and
South Miami Avenue - SE 6th and
NE 2nd Court Roadway and
B-30882T African Square Park - Splash Park
B-30883 NW 12 Avenue / NW 12 Place
B-30883T NW 12 Avenue/NW 12 Place
B-30884 NW 62 Street West of I-95
B-30888 Wynwood Area Roadway
B-30891 Buena Vista One -Way Street
B-30892 Little Haiti Gateway Signs - D5
B-30894 Little Haiti Right of Way
B-30940 Downtown Miami Bicycle and
B-30941 Downtown Miami Signage and
B-30960 La Pastorita Traffic Calming and
B-30961 East Flagami Roadway
B-30964 Modification of Speed Humps on
B-30968 SW 12th St (SW 30th Ave and SW
B-30969 SW 30th Court (SW 12th Street and
B-30971 SW 5th Street between 42 Ave and
B-30972 SW 64 Court Roadway & Drainage
B-30975 Swale Restoration @ NW 2 Street
B-30976 SW 2 St from 53 Ave to 54 Ave -
B-30978 Drainage improvements @ SW 4 St
B-30980 Liberty Square T-Turnarounds - D5
B-30982 Little River Area Road and
B-30983 NW 44th Street between NW 7th
B-30990 Roadway Improvements
B-30993 SW/NW 17th Avenue Tra
B-31206A SE 3rd St Widening ice. Dupont
B-31206B SE 3rd Street W. • -ping - DRI
B-35002 Virginia Ke andfill Assessment
B-35883A Hadle ' ark New Youth Center D5
B-39910 • , ity of Life District 2 - Various
B-39911' North Venetian Drive Lighting
B-3' • 10K Bayside Historic Sign - D2
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Total Prior Current
Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
SUBSTITUTED
$286,830
$55,000
$492,000
$1,231,787
$771,545
$400,000
$50,000
$1,199,976
$46,000
$175,000
$500,000
$250,000
$100,000
$500,000
$287,500
$1,150,000
$675,000
$422,264
$25,000
$36,102
$43,214
$7,857
$132,522
$28,809
$54,000
$51,065
$250:10
80,900
$185,000
$361,000
$200,000
$1,500,000
$100,000
$1,400,000
$200,000
$60,132
$100,000
$33,000
-39911 Venetian Causeway Improvements $3,196,465
$286,830
$55,000
$492,000
$1,231,787
$771,545
$400,000
$50,000
$1,199,976
$46,000
$175,000
$500,000
$250,000
$100,000
$500,000
$287,500
$1,150,000
$675,000
$422,264
$25,000
$36,102
$43,214
$7,857
$132 2
8,809
$54,000
$51,065
$250,000
$180,900
$185,000
$361,000
$200,000
$1,500,000
$100,000
$1,400,000
$200,000
$60,132
$100,000
$33,000
$3,196,465
$0
$55,000
$0
$0
$0
$400,000
$0
$1,199,976
$0
$175,000
$500,000
$250,000
$100,000
$500,000
$0
$0
$675,000
$422,264
$25,0
$0
$0
$0
$0
$0
$0
$0
$250,000
$180,900
$185,000
$361,000
$200,000
$1,500,000
$100,000
$1,400,000
$200,000
$60,132
$100,000
$33,000
$3,196,465
$110,617
$0
$0
$0
$0
$0
$50,000
$0
$46,000
$0
$0
$0
$0
$0
$287,500
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$176,213
$0
$492,000
$31,787
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$36,102
$43,214
$7,857
$132,522
$28,809
$54,000
$51,065
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Future Funding Estimates
$0
$0
$0
$600,000
$771,545
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,150,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$600,000
Over/
Active & Future
CIP Projects Only
Program: All
99-CIP-Capital Improvement
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Total Prior Current
Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017- 118 (Under)
SUBSTITUTED
Future Funding Estimates
Over/
FUNDED
B-40300
B-40301
B-40302
B-40303
B-40307
B-40308
B-40310
B-40312
B-40313
B-40315
B-40317
B-40318
B-40319
B-40320
B-40321
B-40322
B-40323
B-40324
B-40325
B-40326
B-40327
SW 18th Terr. Road Improvements
SW 15th Street Road Improvements
SW 1st Avenue Road
SW 23rd Road Improvements - D3
SW 16th Street Road Improvements
SW 17th Terrace Road
SW 20th Road Improvements - D3
SW 22nd Terr. & SW 13th Ave
SW 3rd Ave Road Improvements -
S W 15th Street Road Improvements
SW 28th Road Improvements - D3
SW 1st Ave Road Improvements -
SW 25th Road Improvements - D3
SW 26th Road Improvements
SW 2nd Ave Road Improvements -
SW 27th Road Improvements - D3
SW 1st Ave Road Improvements
NW 1 lth Ave Road Improvements -
Beacom Phase II - D3
The Roads Roadway Improvements
Shenandoah Roadway
B-40643A North Spring Garden Greenway
B-40672D Flagami Traffic Calming Phase IV -
B-40672G Flagami Traffic Calming - D4
B-40686 Miami River Greenways/
B-40695L Miami River Greenway Segment G
B-40704A SW 32 Avenue Improvements
B-40704A SW 32 Avenue Improvements D2
B-50672 Belle Meade Storm Sewer Project,
B-50706A Roadway, Drainage and Traffic
B-71210 Downtown Street Conversi. s
B-73102A Citywide Streets Milli r - &
B-73102B Citywide Streets ling and
B-78500B Buena Vista 'ast Roadway,
B-78502A Museu v of Science - Development
PAR
$116,121
$84,969
$230,928
$244,748
$257,693
$225,567
$116,682
$376,211
$293,740
$245,349
$40,149
$167,562
$118,561
$498,804
$721,333
$498,804
$126,638
$160,203
$1,500,000
$500,000
$1,000,000
$2,762,175
$1,198,012
$590,000
$3,113,501
$145,785
$1,752 . 7
60,000
12,301,058
$1,218,245
$50,000
$9,201,765
$6,207,946
$2,368,482
$2,000,000
TOTAL FUNDED $164,217,670
ALLY FUNDED
$116,121
$84,969
$230,928
$244,748
$257,693
$225,567
$116,682
$376,211
$293,740
$245,349
$40,149
$167,562
$118,561
$498,804
$721,333
$498,804
$126,638
$160,203
$1,500,000
$500,000
$1,000,000
$2,762,175
$1,198
$ 0,000
3,113,501
$145,785
$1,752,327
$60,000
$12,301,058
$1,218,245
$50,000
$9,201,765
$6,207,946
$2,368,482
$2,000,000
$116,121
$84,969
$230,928
$244,748
$257,693
$225,567
$116,682
$376,211
$293,740
$245,349
$40,149
$167,562
$118,561
$498,804
$721,333
$498,804
$126,638
$160,203
$1,500,00
$51! 100
,000,000
$2,762,175
$1,198,012
$590,000
$3,113,501
$145,785
$1,752,327
$0
$12,301,058
$1,218,245
$50,000
$1,023,775
$0
$2,368,482
$2,000,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$60,000
$0
$0
$0
$1,948,553
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$607,946
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,324,955
$1,400,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,476,328
$1,400,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,633,000
$1,400,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,795,154
$1,400,000
$0
$0
$164,217,670 $130,101,264 $6,328,646 $5,231,778 $8,154,500 $7,195,328 $3,522,000 $3,684,154
$0
-30008 Grove Park Road and Storm Sewers $12,819,059
$6,369,000 $800,000 $0 $0 $1,800,000 $1,300,000 $2,469,000 $0 ( $6,450,059)
Active & Future
CIP Projects Only
Program: All
99-CIP-Capital Improvement
PARTIALLY FUNDED
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Total Prior Current
Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
SUBSTITUTED
B-30179 Downtown Baywalk Master Plan & $11,248,770
B-30411 FY2014 - D1 Roadway, drainage $100,000
B-30412 FY2014 - D2 Roadway, drainage $100,000
B-30413 FY2014 - D3 Roadway, drainage $100,000
B-30414 FY2014 - D4 Roadway, drainage $100,000
B-30421 D1 - Stromwater Projects $1,198,000
B-30422 D2 - Stormwater Projects $1,198,000
B-30423 D3 - Stormwater Projects $1,198,000
B-30424 D4 - Stormwater Projects $1,198,000
B-30431 D1 - Reconstruction of Roadway $4,114,165
B-30432 D2 - Reconstruction of Roadway $2,500,000
B-30433 D3 - Reconstruction of Roadway $2,500,000
B-30434 D4 - Reconstruction of Roadway $2,500,000
B-30435 D5 - Reconstruction of Roadway $2,500,000
B-30518 Northwest 14th Street Streetscape $2,617,649
B-30611 District 1 - Miscellaneous Roadway $825,419
B-30624 Overtown Greenway @ NW 11 $2,661,864
B-30630 Palm Grove Road Improvements $4,174,623
B-30637A South Miami Avenue Drainage $806,500
B-30646 South Bayshore Drive Roadway $8,748,530
B-30687 Coconut Grove Business $3,503,015
B-30723 NW 24th Avenue Roadway $1,140,000
B-30775 Shenandoah Area Improvements - $468,650
B-30778 Traffic Circle - SW 18th Ave. & $122,557
B-30803 SW 18th Avenue from SW 23rd $137,000
B-30833 SW 1st Ave between SW 15th and $775,600
B-30900 NW 40 St from NW 10 Ave to NW $129..41
B-30902 Phase I: Little River (N); NE 82 St . 5,287
B-30904 NW 70 Street Area Roadway & $2,052,550
B-30965 Coral Gate Speed Humps - D4 $163,845
B-30967 SW 16th Terrace from SW Ave $206,386
B-30979 SW 21st St. & 24th Roadway $140,000
B-30985 Design District ' s . dway and $1,500,000
B-31206 SE 3rd Stre- idening $2,044,987
B-40306 SW 10 " " treet Road Improvements $347,385
B-40314 N 18th Place Road Improvements $474,611
B-50643 Wagner Creek / Seybold Canal $23,353,488
B-7 02C Citywide Street Milling and $1,625,000
-78508 NE 2 Avenue Improvements $20,166,608
$450,000
$90,000
$90,000
$90,000
$82,143
$1,078,000
$1,078,000
$1,078,000
$1,078,000
$2,400,000
$1,200,000
$2,400,000
$2,400,000
$2,400,000
$439,000
$728,234
$1,541,784
$3,838,157
$204,444
$8,704,395
$3,099,638
$700,000
$366 -.1
2,557
$97,000
$368,212
$98,981
$90,509
$100,510
$53,000
$150,467
$60,000
$500,000
$641,495
$307,385
$224,611
$5,373,502
$401,400
$4,985,832
$450,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$439,000
$214,234
$1,541,784
$3,838,157
$204,4
$5 ,000
,099,638
$0
$366,281
$112,557
$0
$0
$0
$0
$0
$53,000
$0
$0
$0
$641,495
$307,385
$224,611
$4,673,502
$0
$4,985,832
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$51k i00
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$700,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$2,300,000
$0
$700,000
$0
$0
$97,000
$368,212
$98,981
$90,509
$100,510
$0
$150,467
$60,000
$500,000
$0
$0
$0
$0
$401,400
$0
$0
$90,000
$90,000
$90,000
$82,143
$0
$0
$0
$0
$0
Future Funding Estimates
$0
$0
$0
$0
$0
$238,000
$238,000
$238,001
$23 : , 000
.00,000
$0 $0
;,1 $600,000
$600,000
$600,000
$0
$0
$0
$0
$0
$1,000,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$ 0,000
$280,000
$280,000
$280,000
$600,000
$0
$600,000
$600,000
$600,000
$0
$0
$0
$0
$0
$2,000,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$280,000
$280,000
$280,000
$280,000
$600,000
$600,000
$600,000
$600,000
$600,000
$0
$0
$0
$0
$0
$1,000,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Over/
$0 ( $10,798,770)
$0
$0
$0
$0
$280,000
$280,000
$280,000
$280,000
$600,000
$600,000
$600,000
$600,000
$600,000
$0
$0
$0
$0
$0
$1,854,395
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
(
(
(
(
(
(
(
( $120,000)
( $1,714,165)
( $1,300,000)
( $100,000)
( $100,000)
( $100,000)
( $2,178,649)
( $97,185)
( $1,120,080)
(
(
(
(
(
(
(
(
(
(
(
( $1,952,040)
( $110,845)
( $55,919)
( $80,000)
( $1,000,000)
( $1,403,492)
( $40,000)
( $250,000)
( $17,979,986)
( $1,223,600)
( $15,180,776)
$10,000)
$10,000)
$10,000)
$17,857)
$120,000)
$120,000)
$120,000)
$336,466)
$602,056)
$44,135)
$403,377)
$440,000)
$102,369)
$10,000)
$40,000)
$407,388)
$30,660)
$534,778)
Active & Future
CIP Projects Only
Program: All
99-CIP-Capital Improvement
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Total Prior Current
Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
SUBSTITUTED
Future Funding Estimates
Over/
TOTAL PARTIALLY FUNDED $122,185,189
UNFUNDED
B-30007
B-30009
B-30012
B-30013
B-30015
B-30016
B-30017
B-30018
B-30216
B-30415
B-30520
B-30736
B-30751
B-30787
B-30788
B-30789
B-30896
Auburn Storm Sewer Phase III
Lawnview Storm Sewer
Auburn Storm Sewer Ph. I & II
Reid Acres Storm Sewers
Little River Storm Sewers Ph. II
Liberty Storm Sewers
Fairway Storm Sewers
NW 71 St. Main Trunk Storm
Avalon Storm Sewer - Phase III
FY2014 - D5 Roadway, drainage
Hainsworth Village Street
Phase II: NW 33rd Street Roadway
SW 23 Street btw 16 and 17 Ave
NW 32 Ct & NW 32 Place Milling
NW 16 Ave and 14 Ter and NW 16
NW 20th Street from 7th Avenue to
Phase I: NW 29th Street (NW 7
B-30896A Phase II: NW 29 St (NW 7 Ave to
B-30897 NW 41 St from NW 7 Ave to NW
B-30898 NW 43 St from NW 10 Ave to NW
B-30899 NW 10 Ave from NW 40 St & NW
B-30901 Pahse I: NE 78 St (N); NE 75 St
B-30901A Phase II: NE 78 St (N); NE 75 St
B-30901B Phase III: NE 78 St (N); NE 75 St
B-30902A Phase II: Little River (N); NE 82 St
B-30902B Phase III: Little River (N); NE 82
B-30903 Phase I: NE 82 St (N); NE 79 St
B-30966 SW 5 St between 27 ave and 28 a
B-30970 SW 20 Street (SW 31 Ave to
B-30973 Traffic Circle - SW 12 nd 31
B-30974 Coral Gate Speed . mps - Phase II
B-30977 Traffic Circle e SW 23 Ave and
B-31212 NE 1st nue Reconstruction - NE
B-31213 N. i mi Court Reconstruction -
B-31214 1 Court Reconstruction - D5
B-31 NE Miami Place Reconstruction -
1217 NE 43 Street Reconstruction - D5
$7,049,000
$5,719,000
$5,320,000
$5,719,000
$3,990,000
$5,586,000
$5,586,000
$9,975,000
$4,500,000
$196,625
$1,062,500
$2,375,000
$43,101
$303,375
$57,618
$500,000
$597,219
$597,219
$475,349
$115,236
$280,888
$526,967
$532,967
$532,967
$625,2
$. ,287
$504,158
$288,090
$56,178
$201,663
$108,034
$221,672
$660,816
$441,636
$666,995
$500,000
$868,100
$55,470,537 $22,501,920 $1,214,000 $5,219,222 $6,152,000 $6,820,000 $7,589,000 5,974,395 ( $66,714,652)
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
( $7,049,000)
( $5,719,000)
( $5,320,000)
( $5,719,000)
( $3,990,000)
( $5,586,000)
( $5,586,000)
( $9,975,000)
( $4,500,000)
( $196,625)
( $1,062,500)
( $2,375,000)
( $43,101)
$303,375)
$57,618)
$500,000)
$597,219)
$597,219)
$475,349)
$115,236)
$280,888)
$526,967)
$532,967)
$532,967)
$625,287)
$625,287)
$504,158)
$288,090)
$56,178)
$201,663)
$108,034)
$221,672)
$660,816)
$441,636)
$666,995)
$500,000)
$868,100)
City Of Miami - Capital Improvement Program
Active & Future Fund Source Management System
CIP Projects Only Funded Proportion by Department/Job No.
Program: All Total Total Prior Current
99-CIP-Capital Improvement Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
SUBSTITUTED
Future Funding Estimates
Over/
TOTAL UNFUNDED $67,408,947
$0 $0 $0 $0 $0 $0 $0 $0 ( $67,408,947)
Total 99-CIP-Capital Improvement $353,811,806 $219,688,207 $152,603,184 $7,542,646 $10,451,000 $14,306,500 $14,015,328 $11,111
N
01
0 $9,658,549 ( $134,123,599)
$309,000 $309,000 $0
$0 $0 $0
Active & Future
CIP Projects Only
Program: All
Al-BPM-Bayfront Park Management
FUNDED
B-40173 Bayfront Park Electrical Repairs
TOTAL FUNDED
Total
Cost
$309,000
$309,000
City Of Miami - Capital Improvement Program
Fund Source Management System
Funded Proportion by Department/Job No.
Total Prior Current
SUBSTITUTED
Future Funding Estimates
Over/
Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
$309,000 $309,000
$309,000 $309,000
$0 $0 $0 $0
$0 $0 $0 $0 $0
$0
$0
$0
$0
Total Al-BPM-Bayfront Park $309,000
M
0)
$0 $0 $0
City Of Miami - Capital Improvement Program
Active & Future Fund Source Management System
CIP Projects Only Funded Proportion by Department/Job No.
Program: All Total Total Prior Current
A2-VKP-Virginia Key Park Trust Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017- i 18 (Under)
FUNDED
B-30174 Virginia Key Beach Park Historic
$1,480,737 $1,480,737
$1,356,237 $124,500
SUBSTITUTED
Future Funding Estimates
Over/
$0 $0 $0 $1 $0 $0
TOTAL FUNDED $1,480,737 $1,480,737 $1,356,237 $124,500 $0 $0 $0 $0 $0 $0
Total A2-VKP-Virginia Key Park Trust $1,480,737 $1,480,737 $1,356,237 $124,500 $0 $0 $0 $0 $0 $0
$904,044,927 $448,436,591 $352,824,233 $27,537,071 $16,483,9 $16,806,500 $14,015,328 $11,111,000 $9,658,549 ( $455,608,336)
City Of Miami - Capital Improvement Program
Active & Future Fund Source Management System
CIP Projects Only Funded Proportion by Department/Job No.
Program: All Total Total Prior Current
A3-CRA-Community Redevelopment Cost Funded Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017 118 (Under)
FUNDED
B-30394 North 14 St. Multi Media
B-30538B Museum Park Environmental
B-30731 Miami Women's Club Baywalk
$6,000,000
$2,000,000
$93,000
$6,000,000
$2,000,000
$93,000
$6,000,000
$2,000,000
$93,000
SUBSTITUTED
Future Funding Estimates
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0
$0
Over/
$0 $0
$0 $0
$0 $0
TOTAL FUNDED $8,093,000 $8,093,000 $8,093,000
PARTIALLY FUNDED
$0 $0 $0 $0 $0 $0 $0
B-40169 300 NW 11 Street Community $2,293,250 $1,500,000 $1,500,000 $0 $0 $0 $0 $0 $0 ( $793,250)
TOTAL PARTIALLY FUNDED $2,293,250 $1,500,000 $1,500,000
$0 $0 $I $0 $0 $0 ( $793,250)
Total A3-CRA-Community $10,386,250 $9,593,000 $9,593,000 $0 $0 $0 $0 $0 $0 ( $793,250)
Grand Total
M
co
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
OPERATING IMPACT
Cite sutteie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
OPERATING IMPACT BY DEPARTMENT
SUMMARY
While the city's Capita :udget is distinct from the Operating Budget, there is an interrelationship that
exists since projects fundeand implemented through the Capital Budget may impact the Operating
Budget to address increased . nd needs for employee salaries and the purchase of supplies and minor
equipment to support and opere new or enhanced city facilities.
The potential operating impact of a • proposed capital project is carefully considered as a part of the
capital program review process. In many cases, the most important component of a capital spending
decision is not the initial acquisition an development cost but the operating cost impact on the annual
budget over the lifetime of the facility or - uipment. The completion of capital projects that represent
new or significantly enhanced facilities will pact the respective department's operating budget as
projects are completed and transferred back to e client department for operation and maintenance.
Many capital projects involve purchase or reconst tion of existing infrastructure to update equipment
and facilities to modern standards and, as such, do nocarry significant operating impacts. There are,
however, some capital projects that may require additio ' al operating expenditures for utilities, such as
electricity and water, or landscape and lighting maintenan, e that exceed current consumption levels.
Other completely new projects, such as park recreation cent s, fire stations or police facilities require the
hiring of new personnel, purchase of new furniture and equip ent, as well as routine maintenance and
payment of increased utility bills. Consequently, the impacts o apital projects on the annual operating
budget are estimated to the best accuracy possible and noted in the apital Improvement Plan under this
separate section.
The methodology used to project these impacts on departmental budgets -quires input from each client
department. Factors such as: hiring of new and/or part-time personnel to mt the needs of a new facility
and what level of desired service, increased utility or contract maintenance fe-., potential increased
revenues resulting from new or enhanced facilities are considered in determinin the impact to operation.
Each project is then assigned a projected dollar amount for personnel, operating, cap .1 outlay, non -
operating, and revenues and those figures are entered in the fiscal year in which that pr ect is estimated
to be completed. An escalation factor is then added to the present day operating cost pro -ction and
calculated for the remainder of the five year capital plan. The individual projects are totaleto represent
the client departmental summary. Each department's summary is then incorporated into the t al City
operating impact report.
In accordance with this approach, capital project impacts attempt to identify all associated operating osts.
The figures contained in this section are shared with the appropriate city budget staff for further
129
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
iscussions with departments and consideration during preparation of the City's future annual operating
get(s).
These
sts are included in the following tables.
130
SUBSTITUTED
? `f City of
Capital Improvement Program
Operating Impact Report
Fiscal Years 2013-14 through 2018-19
Depar ent
Parks & Recreation
Public Works 21,500 69,145 70,347 76,587 77,866 79,494
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
Public Facilities 0 67,000 66,950 67,956 68,062 66,790
GSA
Fire
Police
Report Totals
Total Operating Budget Impact 21,500 136,145 137,297 144,543 145,928 146,284
The cost impacts from the following projects will be funded from each department's operat q g budget. For some projects or departments,
the operating impacts show a negative amount denoting savings. For example, the installation of high efficiency air conditioning units
may result in energy savings costs or a project may produce more revenues than expenses. The k SA Department provides maintenance
to buildings operated and staffed by other departments such as Parks, Public Facilities and Public orks. The cost impacts to GSA
shown below represent costs which are not included in the operating impact figures shown for those o_-partments. Additional information
can be found on the respective project detail sheets.
131
eitp of iftliatni
SUBSTITUTED
Operating Budget
Impact Summary
Public Works Department
Current Year 1 Year 2 Year 3 Year 4 Year 5
Project # Title Year FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
B-301 67D Shen..doah Roadway Improvements
B-30712 NW21 - venue from NW ST to NW 3 ST
B-30728 NW 17 Co Roadway Improvements
B-30745 NW 8 Street .inage and Roadway Improvements
B-30746 NW 14 Street D .: age and Roadway Improvements
B-30747 SW 13 Street from 13 AVE to SW 14 AVE
B-30771 Traffic Calming SW 3ve & SW 6 ST
B-40672D.01 Traffic Calming Flagami i vd. & SW 4 ST
B-40672G.03 Traffic Calming SW 53 A ? SW 4 ST
B-40672G.04 Flagami Calming Improvements4
B-78500B.02 Buena Vista Historic Distict-Drain, e Improvements
B-78500B.03 Buena Vista Decorative Lighting
O 10,250 10,557 10,874 11,200 11,536
O 10,250 10,557 10,874 11,200 11,536
O 1,175 1,210 1,246 1,284 1,322
O 13,850 14,265 14,693 15,134 15,900
O 2,310 2,379 2,450 2,524 2,600
O 2,310 2,379 2,450 2,524 2,600
O 1,500 1,500 2,500 2,500 2,500
O 1,500 1,500 2,500 2,500 2,500
O 1,500 1,500 2,500 2,500 2,500
O 1,500 1,500 2,500 2,500 2,500
O 1,500 1,500 2,500 2,500 2,500
21.500 21,500 21,500 21,500 21,500 21,500
Totals 21,500 69,145 70,347 76, :7 77,866 79,494
132
SUBSTITUTED
eftp of �liatrri
Projected
Operating Costs
Shenandoah Roadway Improvements
B-30167D
Current Year 1 Year 2 Year 3 Year 4 Year 5
Operating Costs Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel 0 0 0 0 0 0
Operating 0 10,250 10,557 10,874 11,200 11,536
Capital Outlay 0 0 0 0 0 0
Non -Operating
Revenues
Total (Projected)
Summary of Impact:
0 10,250 10,557 10,874 11,200 11,536
Estimated costs for additional maintenance of drainage structures
133
d drainage system.
SUBSTITUTED
eftp of �liatrri
Projected
Operating Costs
NW 21 Avenue from NW 1 ST to NW 3 ST
B-30712
Current Year 1 Year 2 Year 3 Year 4 Year 5
Operating Costs Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel 0 0 0 0 0 0
Operating 0 10,250 10,557 10,874 11,200 11,536
Capital Outlay 0 0 0 3 0 0
Non -Operating
Revenues
Total (Projected)
Summary of Impact:
0 10,250 10,557 10,877 11,200 11,536
Estimated costs for additional maintenance of drainage structures d drainage system.
134
SUBSTITUTED
eftp of �liatrri
Projected
Operating Costs
NW 17 Court Roadway Improvements
B-30728
Current Year 1 Year 2 Year 3 Year 4 Year 5
Operating Costs Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel 0 0 0 0 0 0
Operating 0 1,175 1,210 1,246 1,284 1,322
Capital Outlay 0 0 0 0 0 0
Non -Operating
Revenues
Total (Projected)
Summary of Impact:
0 1,175 1,210 1,246 1,284 1,322
Estimated costs for additional maintenance of drainage structures d drainage system.
135
SUBSTITUTED
eftp of �liatrri
Projected
Operating Costs
NW 8 Street Drainage and Roadway Improvements
B-30745
Current Year 1 Year 2 Year 3 Year 4 Year 5
Operating Costs Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel 0 0 0 0 0 0
Operating 0 13,850 14,265 14,693 15,134 15,900
Capital Outlay 0 0 0 0 0 0
Non -Operating
Revenues
Total (Projected)
Summary of Impact:
Estimated costs for additional maintenance of drainage structures an
13,850 14,265 14,693 15,134 15,900
drainage system.
136
SUBSTITUTED
eftp of �liatrri
Projected
Operating Costs
NW 14 Street Drainage and Roadway Improvements
B-30746
Current Year 1 Year 2 Year 3 Year 4 Year 5
Operating Costs Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel 0 0 0 0 0 0
Operating 0 2,310 2,379 2,450 2,524 2,600
Capital Outlay 0 0 0 0 0 0
Non -Operating
Revenues
Total (Projected)
Summary of Impact:
0 2,310 2,379 2,450 2,524 2,600
Estimated costs for additional maintenance of drainage structures . d drainage system.
137
SUBSTITUTED
eftp of �liatrri
Projected
Operating Costs
SW 13 Street from SW 13 AVE to SW 14 AVE
B-30747
Current Year 1 Year 2 Year 3 Year 4 Year 5
Operating Costs Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel 0 0 0 0 0 0
Operating 0 2,310 2,379 2,450 2,524 2,600
Capital Outlay 0 0 0 0 0 0
Non -Operating
Revenues
Total (Projected)
Summary of Impact:
0 2,310 2,379 2,450 2,524 2,600
Estimated costs for additional maintenance of drainage structures
138
d drainage system.
SUBSTITUTED
eftp of �liatrri
Projected
Operating Costs
I \ Traffic Calming SW 39 Ave & SW 6 St
B-30771
Current Year 1 Year 2 Year 3 Year 4 Year 5
Operating Costs Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel 0 0 0 0 0 0
Operating 1,500 1,500 2,500 2,500 2,500
Capital Outlay 0 0 0 0 0 0
Non -Operating 0 0 0 0 0 0
Revenues
Total (Projected)
0 1,500 1,500 2,500 2,500 2,500
Summary of Impact:
Additional cost for traffic circle maintenance
139
SUBSTITUTED
eftp of �liatrri
Projected
Operating Costs
I \ Traffic Calming Flagami Blvd. & SW 4 ST
B-40672D.01
Current Year 1 Year 2 Year 3 Year 4 Year 5
Operating Costs Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel 0 0 0 0 0 0
Operating 1,500 1,500 2,500 2,500 2,500
Capital Outlay 0 0 0 0 0 0
Non -Operating 0 0 0 0 0 0
Revenues
Total (Projected)
0 1,500 1,500 2,500 2,500 2,500
Summary of Impact:
Additional cost for traffic circle maintenance
140
SUBSTITUTED
eftp of �liatrri
Projected
Operating Costs
I \ Traffic Calming SW 53 AVE & SW 4 ST
B-40672G.03
Current Year 1 Year 2 Year 3 Year 4 Year 5
Operating Costs Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel 0 0 0 0 0 0
Operating 1,500 1,500 2,500 2,500 2,500
Capital Outlay 0 0 0 0 0 0
Non -Operating 0 0 0 0 0 0
Revenues
Total (Projected)
0 1,500 1,500 2,500 2,500 2,500
Summary of Impact:
Additional cost for traffic circle maintenance
141
SUBSTITUTED
eftp of �liatrri
Projected
Operating Costs
Flagami Calming Improvements D-4
B-40672G.04
Current Year 1 Year 2 Year 3 Year 4 Year 5
Operating Costs Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel 0 0 0 0 0 0
Operating 0 1,500 1,500 2,500 2,500 2,500
Capital Outlay 0 0 0 0 0 0
Non -Operating 0 0 0 0 0 0
Revenues
Total (Projected)
0 1,500 1,500 2,500 2,500 2,500
Summary of Impact:
Additional cost for traffic circle maintenance
142
SUBSTITUTED
eftp of �liatrri
Projected
Operating Costs
Buena Vista Historic District -Drainage Improvements
B-78500B.02
Current Year 1 Year 2 Year 3 Year 4 Year 5
Operating Costs Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel 0 0 0 0 0 0
Operating 0 1,500 1,500 2,500 2,500 2,500
Capital Outlay 0 0 0 0 0 0
Non -Operating
Revenues
Total (Projected)
Summary of Impact:
0 1,500 1,500 2,500 2,500 2,500
Estimated costs for additional maintenance of 4 drainage structure.. nd 100 linear feet of drainage pipe.
143
SUBSTITUTED
eftp of �liatrri
Projected
Operating Costs
Buena Vista Decorative Lighting
B-78500B.03
Current Year 1 Year 2 Year 3 Year 4 Year 5
Operating Costs Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel 0 0 0 0 0 0
Operating 0 21,500 21,500 21,500 21,500 21,500
Capital Outlay 0 0 0 0 0 0
Non -Operating
Revenues
Total (Projected)
Summary of Impact:
1,500 21,500
21,500 21,500
Estimated costs for energy and maintenance costs to Florida Power : Light for 85 Decorative Light Posts
144
21,500 21,500
SUBSTITUTED
(itp of ififUnit
Public Facilities
Project # Title
Operating Budget
Impact Summary
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
B-30182A Co 'nut Grove Waterfront Master Plan Implementation - Phase I 0 140,000 142,800 145,656 148,562 151,540
B-30365N James . Knight Center Restroom Improvements 0-62,000-64,500 -66,000 -68,000 -71,500
B-30501 B Manuel time Dimmer Rack System 0-11,000 -11,350 -11,700 -12,500 -13,250
Totals 0 67,000 66,950 67,956 68,062 66,790
145
SUBSTITUTED
eftp of �liatrri
Projected
Operating Costs
Coconut Grove Waterfront Master Plan Implementation - Phase I
B-30182A
Current Year 1 Year 2 Year 3 Year 4 Year 5
Operating Costs Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
Expenses
Personnel 0 0 0 0 0 0
Operating 0 0 0 0 0 0
Capital Outlay 0 0 0 0 0 0
Non -Operating 0 140,000 142,800 145,656 148,562 151,540
Revenues
Total (Projected)
Summary of Impact:
0 140,000 142,800 145,656 148,562 151,540
Rate increase will be justified because of the new Dockmaster offi
146
SUBSTITUTED
eftp of �liatrri
Projected
Operating Costs
James L. Knight Center Restroom Improvements
B-30365N
Current Year 1 Year 2 Year 3 Year 4 Year 5
Operating Costs Year FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
Expenses
Personnel 0 0 0 0 0 0
Operating 0 0 0 0 0 0
Capital Outlay 0 0 0 0 0 0
Non -Operating
Revenues
Total (Projected)
Summary of Impact:
62,000 64,500 66,000 68,000 71,500
0-62,000-64,500 -66,000 -68,000 -71,500
upgraded convention hall restrooms will help substantiate rate incr:. se.
147
SUBSTITUTED
eftp of �liatrri
Projected
Operating Costs
Manuel Artime Dimmer Rack System
B-30501B
Current Year 1 Year 2 Year 3 Year 4 Year 5
Operating Costs Year FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
Expenses
Personnel 0 0 0 0 0 0
Operating 0 0 0 0 0 0
Capital Outlay 0 0 0 0 0 0
Non -Operating
Revenues
Total (Projected)
Summary of Impact:
11,000 11,350 11,700 12,500 13,250
0-11,000-11,350 -11,700 -12,500 -13,250
Upgraded dimmer system should help substantiate additional rate I crease.
148
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
5. C ITAL PLAN FY2013-2014
APPROPRIATIONS
Cite Yeefivie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
CA TAL PLAN FY2013-2014 APPROPRIATIONS
The purpose of this sect• is to amend Capital Projects Appropriations Resolution No 13-0335,
adopted September 12, 201 ' by appropriating new funding sources and reprogramming existing
funding.
These new appropriations, as well + s reprogramming of existing funding to continue projects,
require that the Capital Improvemen . Appropriations Resolution No. 13-0335 be amended to
reflect said changes to the capital appr• .nations. New appropriations of revenues from
Contribution from General Fund, Marina Capital Repairs and Capital Related Improvements,
Transit Half -Cent Surtax, Parking Surchar: - Local Option Gas Tax, Contribution from Swire
Properties, Inc., Settlement for Fire Damage, tormwater Utility are being established to fund
various Capital Improvements projects. New ap ropriations of grants from Florida Department
of Environmental Protection, Florida Boating Imp ovement, State of Florida Department of
Health, Miami -Dade County GOB are being establi ed to fund various Capital Improvements
projects.
The FY2013-2014 Capital Plan — Projects Appropriation ansfers contains the reprogramming
if existing funding among Capital Projects.
The FY2013-2014 Capital Plan - New Appropriations to Projects ontains the new funding
sources installments for Fiscal Year 2013-2014 that have already b- -n identified by the Budget
Department.
These new funding sources and reprogramming of existing funding are re
but are not reflected in Oracle, the City's Financial Software, since they req
approval.
149
ted in the CIP Plan
e commission
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
1tze &IL 1tze Yalu/re
150
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
CIP PLAN NEW APPROPRIATION FOR FY13-14
Project
Amount
Fund
Award / Source
B-30865A FY2014 Citywide
Environmental Re mediation Study
421,000.00
31000 -
General
Govern ment
Award 1426 - Contribution
From General Fund FY2014
B-74220B - Police Vehicle
Acquisition
2,040,000.00
31000 -
General
Govern ment
Award 1426 - Contribution
From General Fund FY 2014
B-70241 Fire Rescue Cap-tal needs
FY2014
1,858,500.00
32000 - Public
Safety
Award 1426 - Contribution
From General Fund FY 2014
B-70969 - IT - Financial
Management Upgratle Module
500,000.00
31000 -
General
Government
Award 1426 - Contribution
from General Fund FY 2013
B-30706 Miscellaneous Repair -
10% Set Aside
516,216.00
34000 - Public
Facilities-CIP
Award 1437 - FY07 Marinas
Capital Repairs antl Capital
Related I m prove m ents
B-70010 - Miamarina Pier 5
Canopies - PF
5,000.00
34000 - Public
Facilities-CIP
Award 1437 - FY07 Marinas
Capital Repairs antl Capital
Related Improvements
B-70011 - Clean Vessel Act - 2013
20,58A 00
34000 - Public
Facilities-CIP
Award 1437 - FY07 Marinas
Capital Repairs antl Capital
Releted Improvements
B-70011 - Clean Vessel Act - 2013
20,583.75
34K00 - Public
Facili ies-CIP
Award TBD - Florida
Department of En viron mental
Protection
B-40457 - Kinloch Park Building
Addition - D1
300,000.00
35000 - '. rks &
Recreation
Award TBD - Miami -Dade
County GOB FY2014
B-40527 - Melreese Golf Course
Renovations
200,000.00
35000 - Parks &
Recreation
Award 1426 - Contribution
om General Fund FY 2014
B-30416 -NW 34 Ave over Comfort
Canal - Bridge 876417 - PW -
D1/Citywide
178,700.00
36000 - Streets
& Sidewalks
Awer. 1297 - Transit Half -
Cent F014
B-30411 - FY2014 - D1 Roadway,
tl rain age end sitlewalks repairs
90,000.00
36000 - Streets
& Sidewalks
Award 129 - Transit Half-
Cent FY2014
B-30723 - NW 24th Avenue
Roatlwey Improvement Protect D1
700,000.00
36000 - Streets
& Sidewalks
Award 1297 - Tren- t Haif-
Cent FY2014
151
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
CIP PLAN NEW APPROPRIATION FOR FY13-14
Project
Amount
Fund
Award / Source
B-30412 - Y2014 - D2 Roadway,
tl rain age and sidewalks repairs
90,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Halt-
Cent FY2014
B-30827 - South drove Phase 1
Roadway and Drainage
Improvements - D2
176,213.03
36000 - Streets
& Sidewalks
Award 1297 - Transit Halt -
Cent FY2014
B-30835 - South Grove `ase 2
Roadway and Drainage
Improvements - D2
492,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Halt -
Cent FY2014
B-30836 - South Grove Phase
Roadway and Drainage
Improvements - D2
31,786.97
36000 - Streets
& Sidewalks
Award 1297 - Transit Halt -
Cent FY2014
B-30413 - FY2014 - D3 Roadway,
d r a i n a g e and s i tl e w e l k s repairs
90,000.00
36000 - Streets
& Sidewalks
Awerd 1297 - Transit Halt-
Cent FY2014
B-30613 - D3 Miscellaneous Street
Maintenance
$0,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30414 - FY2014 - D4 Roadway,
tl rain age and sidewalks repairs
82,14 .00
36000 - Streets
& Sidewalks
Award 1297 - Transit Halt-
Cent FY2014
B-30967 - SW 16th Terrace From
SW 21 Ave to SW 22 Ave - D4
150,467.01
36000 - Streets
&Sid -walks
Award 1297 - Transit Halt -
Cent FY2014
B-30968 - SW 12th St (SW 30th
Ave and SW 30th Place) - D4
36,102.00
36000 - . eets
& Sidewalks
Award 1297 - Transit Halt -
Cent FY2014
B-30969 -SW 30th Court (SW 12th
Street and SW 13th Street) - D4
43,214.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Halt -
\ ent FY2014
B-30971 - SW 5th Street between
42 Ave and 43 Ave Improvement -
D4
7,857.00
36000 - Streets
& Sidewalks
Awar. 1297 - Transit Halt-
Cent F 014
B-30972 - SW 64 Court Roadway &
Drainage Improvements (From SW
6 St to SW 8 St) - D4
132,522.00
36000 - Streets
& Sidewalks
Award 129 - Transit Halt -
Cent FY2014
B-30975 - Swale Restoration @ NW
2 Street between 34 Ave & 35 Ave -
D4
28,809.00
36000 - Streets
& Sidewalks
Award 1297 - Iran t Hait-
Cent FY2014
152
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
CIP PLAN NEW APPROPRIATION FOR FY13-14
Project
Amount
Fund
Award / Source
B-30976 - W 2 St From 53 Ave to
54 Ave - D4
54,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half-
Cent FY2014
B-30978 - Drainage improvements
@ SW 4 St between 53 Ave & 54
Ave - D4
51,065.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half-
Cent FY2014
B-30979 - SW 21st St. 24th Ave
Roedwey Improvement ��
60,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half-
Cent FY2014
B-30803 - SW 18th Avenue fro
SW 23rd Street to SW 23rd Terra e
D4
97,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30614 - D4 Miscellaneous Street
Maintenance
46,820.99
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30902 - Phase I: Little River (N);
NE 82 St (S); N Miami Ave (W); NE
2 Ave (E) - D5
10,508.83
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
Cent FY2014
B-30904 - NW 70 Street Area
Roedway& Minor Drainage
Improvements - D5
100,51. 00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half-
Cent FY2014
B-30900 - NW 40 St from NW 10
Ave to NW 12 Ave - D5
98,981.17
3W0 - Streets
& Si. -walks
Award 1297 - Transit Half -
Cent FY2014
B-30985 - Design District Roadway
and Stormwater I mpro ve ment - D5
500,000.00
38000 - orm
Sewers
Award 1297 - Transit Half -
Cent FY2014
B-70245 -Transportation Progra m
Support Services - Transportation
Professional
50,000.00
36000 - Streets
& Sidewalks
Award 1297 - Transit Half -
ent FY2014
B-70246 - Transportation Program
Support Services - Transit
Pr o f e s s i o n a l
181,597.81
38000 - Mass
Transit
Awar., 1297 - Transit Half -
Cent F 014
B-70247 -Citywide Mass Transit
Studies
318,402.19
38000 - Mass
Transit
Award 129 - Transit Half -
Cent FY2014
B-73102B - Citywide Streets Milling
and Resurfacing Parking
Su r c h a r g e
607,946.05
36000 - Streets
& Sidewalks
Award 1419 - Parki g
Surcharge - FY2014
153
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
CIP PLAN NEW APPROPRIATION FOR FY13-14
Project
Amount
Fund
Award / Source
B-30646 - outh Bayshore Drive
Roadway an. Drainage
Improvements
300,000.00
36000 - Streets
& Sidewalks
Awartl 1419 - Parking
Surcharge - FY2014
B-30833 - SW 1s Ave between SW
15th and SW 7th St eet - D2
368,212.00
36000 - Streets
& Sidewalks
Award 1419 - Parking
Surcharge - FY2014
B-30637 - Mary Brickell illage
Drainage Improvements
623,441.95
38000 - Storm
Sewers
Award 1419 - Parking
Surcharge - FY2014
B-73102C - Citywide Streets Mi ing
and Resurta cing - Local Option Ga
Tax
401,400.00
36000 - Streets
& Sidewalks
Award 1552 - Local Option
Gas Tax 2009-Contribution
From GF FY14
B-30837 - South Mia mi Avenue - SE
6th and 5th Street Traffic
Modifications - D2
771,544.65
36000 - Streets
& Sidewalks
Award TBD - Contribution
Prom Swire Properties, Inc. -
Brickell City Center
B-30706 Miscellaneous Repair -
10%Set As,de
0,893.00
34000 - Public
Facilities-CIP
Award 1950 - Fioritla Boating
mprovementGrant
B-70242 - Fire Department -
FY2012 Emergency Medical
Services (EMS)
238,00. 00
32000 - Public
Safety
Award TBD - State of Florida
Department of Health Grant
B-30365E - Coral Way NET Office
Remotl cling / Com munity Center D3
- CD 91-02994
276,833.00
31 K00 -
Gene al
Govern ent
Award TBD - Settlement for
Fire Damage - Coral Way Net
Office (Misc. CIP Revenue)
B-30262 - Citywide Storm Sewer
Repair Project
600,000.00
38000 - Storm
Sewers
Award 1431 - St— mwater
Utility FY2014
B-30700 - Citywide FDEP Drainage
Wells Compliance
400,000.00
38000 - Storm
Sewers
Award 1431 - St— mwater
ility FY2014
B-73202C - Solid Waste Collection
Equipment
606,600.00
39000 - Solid
Waste-CIP
Award 1426 - Contribution
from Ge eral Fond FY 2014
NEW APPROPRIATION TOTAL I
15,995,454.40
154
F . m Project
B-30247 - Dinne Key
Dredging
8-305418 - Kennedy
Park Floating Dock PH
I
B-30541D - Citywide
Park Equipment & Site
Improvement
B-60464 - New Dinner
Key Marina
Dockmaster Building
B-40455 - Citywide
Capital Improvements
Projects
B-40455 - Citywide
Capital Improvements
Projects
B-40455 - Citywide
Capital Improvements
Projects
8-30984 - Athalie
Range Park HVAC
Replacement - D5
B-40454 - Park
Expansions and Land
Acquisition - Citywide
B-30611 - D1
Miscellaneous Street
Ma intenance
B-30611 - D1
Miscellaneous Street
Ma intenance
B-30611 - D1
Miscellaneous Street
Maintenance
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPROPRIATION TRANSFERS - CIP PLAN FY2013-2014
Amount
From Fund
(14,926.91) 34000 - Public
Facilities
To Project
B-30834 - Dinner Key
Dredging - Spoil Island C
Floating Dock Repair
(14,621.00) 34000 - Public 8-30541D - Citywide
Facilities Park Equipment & Site
Improvements
(9, 00.00) 34000 - Public 8-303658 - James L.
Facilities Knight Center Garage
(116,723.52) 000 - Public 8-30247 - Dinner Key
Fa "ities Dredging
(6,590.00) 35000 - Parks
& Recreation
(35,000.00) 35000 - Parks
& Recreation
(70,000.00) 35000 - Parks
& Recreation
(193, 043.00) 35000 - Parks &
Recreation
(1,000,000.00) 35000 - Parks
& Recreation
(14,234.00) 36000 -
Streets &
Sidewa Iks
(430,000.00) 36000 -
Streets &
Sidewa Iks
(149,222.00) 36000 -
Streets &
Sidewa Iks
B-35812D - Duarte Park
wilding (Lighting) - D1
B-3090 - Seybold
House de olition and
Reconstruct 'n - D5
B-30882 - African
Square Park - Splas' -
D5
8-40455 - Citywide
Capital Improvements
Projects
B-40463 - Armbrister
Park Field
B-30723 - NW 24th
Avenue Roadway
Improvement Project -
D1
B-30723 - NW 24th
Avenue Roadway
Improvement Project -
D1
B-30787 - NW 32 Ct &
NW 32 Place Milling and
Resurfacing - D1
155
Amount
To Fund
14,926.91 34000 -
Public
Facilities
14,621.00 34000 -
Public
Facilities
9,200.00 34000 -
Public
Facilities
116,723.52 34000 -
Public
Facilities
6,590.00 35000 -
Parks &
Recreation
35,000.00 35000 -
Parks &
Recreation
70,000.00 35000 -
Parks &
Recreation
Award / Source
Award 1584 - Homeland
Defense / Neighborhood
Improvement Bond Series
3
Award 1426 - Contribution
from General Fund.
Reverse 02/28/2013
Appropriation
Award 1426 - Contribution
from General Fund.
Reverse 02/28/2013
Appropriation
Award 1584 - Homeland
Defense/Neighborhood
Improvement Bond Series
3 - Reverse 10/15/2012
Appropriation
Award 1422 - Impact Fees
Award 1422 - Impact Fees
Award 1422 - Impact Fees
193,043.00 35000 - Award 1422 - Impact
Parks & Fees. Reverse
Recreation 06/27/2013 Appropriation
1,000,0.00 35000 - Award 1422 - Impact Fees
Parks &
Recreation
14,234.00 36 S I 0 - Award 1638 - Street
Stree. & Bonds Series 2
Sidewa s
430,000.00 36000 -
Streets &
Sidewa Iks
149,222.00 36000 -
Streets &
Sidewa Iks
ward 1297 - Transit Half-
C= t Surtax
Award 12 - Transit Half -
Cent Surta
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPROPRIATION TRANSFERS - CIP PLAN FY2013-2014
.m Project
Amount
From Fund
To Project
Amount
To Fund
Award / Source
B-30611 - D1
Miscellaneous Stre=t
Maintenance
(57,618.00)
36000 -
Streets &
Sidewalks
B-30788 - NW 16 Ave
and 14 Ter and NW 16
Ave and 15 St - D1
57,618.00
36000 -
Streets &
Sidewalks
Award 1297 - Transit Half -
Cent Surtax
B-35812D - Duarte
Park Building
Renovation, Splash
Park - D1
(15,000.00)
35000 - Park
and
Recreation
B-35812B - Duarte Park
ADA Modifications - D1
15,000.00
35000 -
Parks and
Recreation
Award 1584 - Homleand
Defense - Reverse
09/12/2013 Appropriation
B-30724 - NW 33rd
Street Roadway
Improvement Project
Phase I - D1
(77 .00.00)
36000 -
Streets &
Sidewalks
B-30736 Phase II: NW
33rd Street Roadway
Improvement - D1
775,000.00
36000 -
Streets &
Sidewalks
Award 1638 - Street
Bonds Series 2
B-73102A - Citywide
Streets Milling &
Resurfacing - CIP
(1,403,492.00)
•000 -
St -ets &
Side alks
B-31206 - SE 3rd Street
Widening - D2
1,403,492.00
36000 -
Streets &
Sidewalks
Award 1419 - Parking
Surcharge - FY12 & FY13
B-73102A - Citywide
Streets Milling &
Resurfacing - CIP
(775,600.00)
36000 -
Streets &
Sidewalks
B-30833 - SW 1st Ave
between SW 15th and
SW 7th Street - D2
775,600.00
36000 -
Streets &
Sidewalks
Award 1419 - Parking
Surcharge - FY2013
B-73102A - Citywide
Streets Milling &
Resurfacing - CIP
(273,283.00)
36000 -
Streets &
Sidewalks
B- ' 102C - Citywide
Stree— Milling &
Resurfacing - CIP
Parking S• charge
273,283.00
36000 -
Streets &
Sidewalks
Award 1419 - Parking
Surcharge - FY2013
B-30613 - D3
Miscellaneous Street
Maintenance
(43,101.00)
36000 -
Streets &
Sidewalks
B-30751 - S 3 Street
btw 16 and 17 e for
M&R - D3
43,101.00
36000 -
Streets &
Sidewalks
Award 1297 - Transit Half -
Cent Surtax
B-30613 - D3
Miscellaneous Street
Maintenance
(250,000.00)
36000 -
Streets &
Sidewalks
B-40314 - NW 18th Plac
Road Improvements D3
250,000.00
36000 -
Streets &
Sidewalks
Award 1297 - Transit Half -
Cent Surtax
B-30614 - D4
Miscellaneous Street
Maintenance
(20,000.00)
36000 -
Streets &
Sidewalks
B-30963 - Bay of Pigs
Memorial Park Lighting -
D4
8,000.00
36000 -
Streets &
Sidewalks
Award 1297 - Transit Half -
Cent Surtax
B-30614 - D4
Miscellaneous Street
Maintenance
(36,000.99)
36000 -
Streets &
Sidewalks
B-30965 - Coral Gate
Speed Humps - D4
36,000.99
36000 -
reets &
Si. -walks
Award 1379 - Streets
Bond Series 1
B-30614 - D4
Miscellaneous Street
Maintenance
(74,844.01)
36000 -
Streets &
Sidewalks
B-30965 - Coral Gate
Speed Humps - D4
74,844.01
36000 -
Streets &
Sidewalks
Award 1297 - Transit Half -
Cent Surtax
B-30614 - D4
Miscellaneous Street
Maintenance
(32,712.00)
36000 -
Streets &
Sidewalks
B-30964 - Modification of
Speed Humps on SW 11
St. between 30 Ave and
31 Ct. - D4
32,712.00
36000 -
Streets &
Sidewalks
Awar. 1297 - Transit Half -
Cent S tax
156
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPROPRIATION TRANSFERS - CIP PLAN FY2013-2014
m Project
Amount
From Fund To Project
Amount
To Fund
Award / Source
B-30614 - D4 (186,443.99) 36000 -
Miscellaneous Stre=t Streets &
Maintenance Sidewalks
B-30614 - D4 (41,646.01) 36000 -
Miscellaneous Street Streets &
Maintenance Sidewalks
B-30614 - D4 (5 •18.99) 36000 -
Miscellaneous Street Streets &
Maintenance Sidewalks
B-30776 - Silver Bluff
Drainage
Improvements - D4
(26, 327.56)
000 -
St -ets &
Side alks
B-30775 - Shenandoah (80,000.00) 36000 -
Area Improvements - Streets &
D4 Sidewalks
B-30168A - Silver Bluff (40,000.00) 36000 -
Traffic Calming Priority Streets &
3 Sidewalks
B-30966 - SW 5 St 186,443.99 36000 -
between 27 ave and 28 Streets &
ave street improvement - Sidewalks
D4
B-30966 - SW 5 St 41,646.01 36000 -
between 27 ave and 28 Streets &
ave street improvement - Sidewalks
D4
B-30967 - SW 16th 55,918.99 36000 -
Terrace from SW 21 Ave Streets &
to SW 22 Ave - D4 Sidewalks
B-30629 - Durham
Terrace Drainage Project
Award 1297 - Transit Half -
Cent Surtax
Award 1638 - Street
Bonds Series 2
Award 1638 - Street
Bonds Series 2
26,327.56 36000 - Award 1379 - Street
Streets & Bonds Series 1 - Reverse
Sidewalks 09/12/2013 Appropriation
B-30979 - SW 21st St. & 80,000.00 36000 -
24th Ave Roadway Streets &
Improvement - D4 Sidewalks
B-
Aven
23rd st
terrace
803 - SW 18th
, between SW
et and 23rd
4
40,000.00 36000 -
Streets &
Sidewa Iks
Award 1101 - Transit Half -
Cent Surtax
Award 1379 - Streets
Bond Series 1
B-30615 - D5 (1,004,511.28) 36000 -
Miscellaneous Street Streets &
Maintenance Sidewalks
B-30615 - D5 (115,568.72) 36000 -
Miscellaneous Street Streets &
Maintenance Sidewalks
B-30615 - D5 (398,431.28) 36000 -
Miscellaneous Street Streets &
Maintenance Sidewalks
B-30615 - D5 (193,767.33) 36000 -
Miscellaneous Street Streets &
Maintenance Sidewalks
B-30615 - D5 (5,020.39) 36000 -
Miscellaneous Street Streets &
Maintenance Sidewalks
B-30615 - D5 (115,236.00) 36000 -
Miscellaneous Street Streets &
Maintenance Sidewalks
B-30624 - Ov= own 1,004,511.28 36000 - Award 1638 - Street
Greenway @ NI 11 Streets & Bonds Series 2
Terrace Sidewalks
B-30624 - Overtown 115,568.72 36000 -
Greenway @ NW 11 Streets &
Terrace Sidewalks
B-30896 - Phase I: NW 3 :,431.28 36000 -
29th Street (NW 7 Ave Streets &
to NW 2 Ave) - D5 Sidewalks
B-30896 - Phase I: NW
29th Street (NW 7 Ave
to NW 2 Ave) - D5
193,767.33 36000 -
reets &
Si. -walks
B-30896 - Phase I: NW 5,020.39 36000 -
29th Street (NW 7 Ave Streets &
to NW 2 Ave) - D5 Sidewalks
Award 1297 - Transit Half -
Cent Surtax
Award 1297 - Transit Half -
Cent Surtax
Award 1113 - Local Option
Gas Tax
Award 1101 - Transit Half -
Cent Surtax
B-30898 - NW 43 St 115,236.00 36000 - Awar. 1101 - Transit Half -
from NW 10 Ave to NW Streets & Cent S tax
11 Ave - D5 Sidewalks
157
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPROPRIATION TRANSFERS - CIP PLAN FY2013-2014
.m Project
Amount
From Fund
To Project
Amount
To Fund
Award / Source
B-30615 - D5 (30,659.83) 36000 -
Miscellaneous Stre. t Streets &
Maintenance Sidewalks
B-30900 - NW 40 St 30,659.83 36000 - Award 1101 - Transit Half -
from NW 10 Ave to NW Streets & Cent Surtax
12 Ave - D5 Sidewalks
B-30538D - Museum (155,042.25) 35000 - Parks
Park - DRI Fees & Recreation
Administration
B-70245D - 155,042.25 36000 - Award 1231 - Downtown
Transportation PSS - Streets & Development
Transportation - DRI Sidewalks Supplemental Fee
Fees Administration
B-30693 - (4:, 07.82) 36000-
Neighborhood Traffic Streets &
Calming Sidewalks
Improvements - D4
B-30775 - Shenandoah 48,107.82 36000 - Award 1638 - Street
Area Improvements - D4 Streets & Bonds Series 2. Reverse
Sidewalks 05/23/2013 Appropriation
B-30373A - Police (20,000.00) 000 - Public
Department Property Sa -ty
Unit Outdoor Storage
B-40273 - Police Station 20,000.00 32000 - Award 1422 - Impact Fees
Generator Slab Public Safety
APPROPRIATION
TRANSFERS TOTAL
(8,326,892.88)
8,326,892.88
158
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPENDIX
Cite sutteie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
ALPHA
APPENDIX 1
ICAL PROJECT INDEX
Cite Yeetteie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
- , _ ALPHABETICAL PROJECT
�r&aka&r r r +�_�t,«�
iw +! .e �:w'waiw�r 7lF L_ .1" F : i ''_.`� •
INDEX
.,awl 3 {�
^yFr: 4,.:yls.+ ._ I..
rf
- ter ! • .:L
-- t. F,—.`Fa---
- I
. L s .� i ..:'
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
300 NW 11 Street Community • -nter - CRA 92-689001
B-40169
5
2,293,250
1,500,000
FY2015
Active
African Square Park - Splash Park - 05
B-30882
5
670,000
600,000
FY2015
Active
African Square Park - Splash Park D5 - S. itary Sewer
Component
B-308825
5
100,000
100,000
FY2015
Active
African Square Park - Splash Park D5 Tree Co .onent
B-30882T
5
50,000
50,000
FY2015
Active
African Square Park Playground
B-40459
5
125,000
0
FY2016
Future
African Square Park Restroom & Building Renovation
B-40460
5
750,000
0
FY2016
Future
Alice Wainwright Park Restrooms
B-40572
2
350,000
0
FY2016
Future
Allapattah Area Roadway Improvement - D1
B-3b 82
1
500,000
500,000
FY2014
Active
Allapattah Community Elderly Center
B-35003
1
287,000
0
FY2018
Future
Allapattah Mini Park Access Control
B-40461
1
30,000
0
FY2016
Future
Allapattah Mini Park Court
B-40462
1
25,000
0
FY2016
Future
Antonio Maceo Community Building - D1
B-40456
1
686,750
1,686,750
FY2016
Active
Apparatus Replacement
B-70228
1,2,3,
4,5
95e 100
0
FY2017
Future
Armbrister Park Field
B-40463
2
1,350,000
0
FY2016
Future
Athalie Range Park HVAC Replacement - D5
B-30984
5
193,043
193,043
FY2015
Future
Athalie Range Park Playground
B-40550
5
120,000
0
FY2016
Future
Athalie Range Park Pool Heater
B-40552
5
75,000
0
FY2016
Future
Athalie Range Park Restroom Renovation
B-40551
5
80,000
0
F 016
Future
Auburn Storm Sewer Ph. I & II
B-30012
4
5,320,000
0
FY201 °
Future
Auburn Storm Sewer Phase III
B-30007
4
7,049,000
0
FY2021
' ture
159
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Audit Comp -nce
B-70961
1,2,3,
4,5
22,000
0
FY2016
Future
Avalon Storm Se er - Phase III
B-30216
2,4
4,500,000
0
FY2020
Future
Bay of Pigs Memorial ` - rk Lighting - D4
B-30963
4
20,000
20,000
FY2015
Future
Bay of Pigs Park Lighting - 1'
B-30772
4
53,000
53,000
FY2014
Active
Bay of Pigs Park Playground
B-40464
5
100,000
0
FY2016
Future
Bayfront Park Electrical Repairs
B-40173
2
309,000
309,000
FY2014
Active
Bayside Historic Sign - D2
B-39910K
2
33,000
33,000
FY2014
Active
Baywood Park Seawall Repair
B-40465
5
150,000
0
FY2016
Future
Baywood Park Site Development
B-40466
5
125,000
0
FY2016
Future
Beach Corridor Transit Connection Study - Citywide
B-70246A
1,2,3,
4,5
30,000
30,000
FY2015
Active
Beacom Phase II - D3
: 40325
3
1,500,000
1,500,000
FY2016
Active
Beacom Project Area Improvements
B-306'9
3
1,053,114
1,053,114
FY2014
Active
Beacom Project Area Improvements - Tree Component D3
B-30699T
3
60,000
60,000
FY2014
Active
Beckham Hall Fire Damage Repair
B-30365J
6,770
6,770
FY2014
Future
Belafonte Tacolcy Park
B-40467
5
35,000
0
FY2016
Future
Belafonte Tacolcy Park
B-40468
5
40,000
0
FY2016
Future
Belafonte Tacolcy Park entire facility reconstruction
B-40469
5
5,000,110
0
FY2016
Future
Bell Meade Park Improvements
B-40470
2
50,000
0
FY2016
Future
Belle Meade Storm Sewer Project, Ph 2
B-50672
2
12,301,058
11 301,058
FY2014
Active
Bird Avenue Road Improvement
B-30628
2
1,960,505
1,960,.05
FY2015
Active
Biscayne Bay Spoil Island B Public Shelter - D2
B-30825
2
17,500
17,500
FY2015
Active
Biscayne Bay Spoil Island E Picnic Tables, Benches &
Umbrellas - D2
B-30825A
2
8,250
8,250
FY 115
Active
Biscayne Bay Spoil Island E Public Trail - D2
B-30825E
2
8,250
8,250
FY2016
Active
Biscayne Heights Park (Shorecrest Park) Improvements
B-40471
5
100,000
0
FY2016
Fu re
160
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Biscayne P. k Soccer Facility
B-40472
2
2,250,000
0
FY2016
Future
Brickell Area Sha -d Use Path and Roadway Improvements
B-30822
2
844,267
844,267
FY2014
Active
Brickell Area Shared .e Path and Roadway Improvements -
Tree Component D2
B-30822T
2
85,930
85,930
FY2014
Active
Bryan Park Community Buil. ng - D4
B-30134A
4
852,128
852,128
FY2015
Active
Bryan Park New Tennis/Commun. Center D4 - Sanitary
Sewer Component
B-30134AS
4
50,000
50,000
FY2015
Active
Bryan Park Tennis Court
B-40473
4
45,000
0
FY2016
Future
Bucket Truck for the Electrical Division at G ` '
B-70333
1,2,3,
4,5
162,000
0
FY2018
Future
Buena Vista East Roadway, Drainage, Signage a . Lighting
Improvements
B-78500E
5
2,368,482
2,368,482
FY2014
Active
Buena Vista One -Way Street Conversion and Signage D5
B-30891
5
250,000
250,000
FY2014
Active
Business Continuity Systems Consolidation
B-70963
1,2,3,
4,5
56,000
0
FY2018
Future
Caribbean Marketplace Renovation
-30671
5
1,102,553
1,102,553
FY2014
Active
Caribbean Marketplace Renovation - Sanitary Sewer
Component
B-306 A
5
114,000
114,000
FY2014
Active
Carpet Replacement at the MRC Facility
B-70322
1,2,3,
4,5
300,000
0
FY2016
Future
Carpeting and Flooring - Police Dept.
B-70120
1,2,
4,5
65,000
0
FY2017
Future
Center Grove Street and Lighting Improvements
B-30621
2
1,991,568
1,991,568
FY2014
Active
CIP Document Mgmt & Data Consolidation
B-70960
1,2,3,
4,5
80,000
0
FY2019
Future
Citrus Grove Roadway Improvements
B-30749
3
556, :1
556,791
FY2014
Active
City Hall Repairs
B-70334
1,2,3,
4,5
200,000
0
FY2018
Future
City Hall Roof Terrace
B-30865E
1,2,3,
4,5
314,176
314,176
FY2014
Active
City Hall Studio Area - NC Unit Replacement
B-40960
1,2,3,
4,5
51,632
0
FY2015
Future
City Hall Windows and Doors
B-30865C
1,2,3,
4,5
296,001
296,001
FY2014
Active
City of Miami Fleet Vehicle Replacement
B-70320
1,2,3,
4,5
1,700,000
0
FY '16
Future
City of Miami Fleet Vehicle Replacement (Trucks)
B-70321
1,2,3,
4,5
1,750,000
0
FY2016
Future
City of Miami Impact Fee Study - Citywide
B-30994
1,2,3,
4,5
65,491
65,491
FY2014
Ac..ve
161
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
City of Mia . Trolley Program - Capital Acquisition
B-70715
1,2,3,
4,5
2,921,123
2,921,123
FY2015
Active
City Property Buil..ng Maintenance
B-30365C
1,2,3,
4,5
700,000
0
FY2020
Future
City Wide Personal Co puter Replacement (20%)
B-70964
1,2,3,
4,5
1,560,000
0
FY2016
Future
Citywide - FDEP Drainage -Ils Compliance
B-30700
1,2,3,
4,5
2,240,934
2,240,934
FY2021
Active
Citywide - Land Acquisition Park
B-40507
1,2,3,
4,5
15,000,000
0
FY2016
Future
Citywide Bicycle Rack & Signage Prog : m
B-30694A
1,2,3,
4,5
115,000
115,000
FY2014
Active
Citywide Bunker Gear (Fire Station)
B-70220
1,2,3,
4,5
274,800
0
FY2016
Future
Citywide Capital Improvements Projects
B-40455
1,2,3,
4,5
413,946
263,946
FY2015
Active
Citywide Fire Station Pumpers
B-70226
1,2,3,
4,5
1,960,000
0
FY2016
Future
Citywide Fire Station Replace out of Warranty Mobile Data
B-70218
1,2,3,
4,5
150,000
0
FY2018
Future
Citywide General Fleet Replacement
: 74200
1,2,3,
4,5
3,969,887
3,610,269
FY2014
Active
Citywide Mass Transit Studies
B-702-
1,2,3,
4,5
318,402
318,402
FY2016
Active
Citywide Park Building AC Replacement
B-40458
,2,3,
A,5
600,000
0
FY2016
Future
Citywide Park Buildings Roof Repairs
B-40558
1,2, ,
4,5
350,000
0
FY2016
Future
Citywide Park Buildings Termite Control
B-40568
1,2,3,
4,5
200,000
0
FY2016
Future
Citywide Park Equipment & Site Improvements
B-30541
1,2,3,
4,5
5, 93,595
4,896,494
FY2014
Active
Citywide Park Equipments & Site Improvements FY12
B-30541 D
1,2,3,
4,5
1,917, -8
1,917,378
FY2017
Active
Citywide Parks Playground Replacements
B-40547
1,2,3,
4,5
1,500,000
0
FY2016
Future
Citywide Sidewalk Repair Project- PW
B-30998
1,2,3,
4,5
169,615
169,615
FY2015
Future
Citywide Storm Sewer Repair Project
B-30262
1,2,3,
4,5
5,701,561
5,701,.61
FY2018
Active
Citywide Street Milling and Resurfacing - Local Option Gas
Tax
B-73102C
1,2,3,
4,5
1,625,000
401,400
FY2018
Future
Citywide Streets Milling & Resurfacing - CIP
B-73102A
1,2,3,
4,5
9,201,765
9,201,765
FY 417
Future
Citywide Streets Milling and Resurfacing - Parking Surcharge
B-73102E
1,2,3,
4,5
6,207,946
6,207,946
FY2018
Future
Citywide Warranty and Outdated Fire Station Computers and
Monitors
B-70219
1,2,3,
4,5
105,000
0
FY2018
Fu re
162
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Civic Cente W 14th Street
B-30500
1,2,3,
4,5
2,600,000
2,600,000
FY2014
Active
Civic Center N ' 4th Street - Tree Funded Component
B-30500T
1,2,3,
4,5
100,000
100,000
FY2014
Active
Clean Vessel Act 201 - PF
B-70011
2
41,168
41,168
FY2016
Future
Cloud Data Service - Data .rage
B-70967
1,2,3,
4,5
220,000
0
FY2016
Future
Coconut Grove Business Improv- ent District - Street
Improvements
B-30687
2
3,503,015
3,099,638
FY2016
Active
Coconut Grove Business Improvemen Iistrict D2 Tree
Component
B-30687T
2
100,000
100,000
FY2014
Active
Coconut Grove Viewing Platform Spoil Islan. C - D2
B-40171
2
15,088
15,088
FY2014
Active
Coconut Grove Viewing Platform Spoil Island E - 2
B-40172
2
15,081
15,081
FY2014
Active
Coconut Grove Waterfront Master Plan Implementatio -
Phase I
B-30182A
2
47,179,389
2,051,675
FY2014
Active
College of Police Auditorium Lighting
B-70129
1,2,3,
4,5
15,000
0
FY2019
Future
College of Police Lobby Lighting
-70130
1,2,3,
4,5
20,000
0
FY2019
Future
Computer Aided Dispatch (CAD)
B-72: 1 1
1,2,3,
4,5
120,866
120,866
FY2014
Active
Coral Gate Mini Park - D4
B-30777
4
200,634
100,000
FY2014
Active
Coral Gate Park Access Control
B-40475
20,000
0
FY2016
Future
Coral Gate Park Baseball Field
B-40476
4
30,000
0
FY2016
Future
Coral Gate Speed Humps - D4
B-30965
4
' 63,845
53,000
FY2014
Future
Coral Gate Speed Humps - Phase 11 - D4
B-30974
4
108,6 4
0
FY2017
Future
Coral Way Community Center Playground Oracle Project 91-
03275
B-30365Q
3
500,000
0
FY2014
Future
Coral Way NET Office Remodeling / Community Center D3 -
CD 91-02994
B-30365E
3
1,291,833
291,833
FY2014
Active
Coral Way NET Office Remodeling D3 - Sanitary Sewer
Component
B-30365ES
3
50,000
51,100
FY2014
Active
Crestwood Park Basketball Courts Resurfacing
B-40477
5
25,000
0
FY2016
Future
Curtis Park Access Control (Fencing)
B-40478
1
225,000
0
FY 116
Future
Curtis Park Access Control (Roll up doors)
B-40479
1
25,000
0
FY2016
Future
Curtis Park Basketball and Tennis Courts Resurfacing
B-40480
1
125,000
0
FY2016
Fu. re
163
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Curtis Park ew Pool Facility and Boat Ramp D1 - Sanitary
Sewer Compo ,ent
B-35806S
1
500,000
500,000
FY2015
Active
Curtis Park New ".ol Facility and Boat Ramp Improvement
B-35806
1
2,177,160
2,177,160
FY2015
Active
Curtis Park Parking Lo
B-40481
1
125,000
0
FY2016
Future
Curtis Park Playground
B-40482
1
200,000
0
FY2016
Future
Curtis Park Restrooms Renovatio
B-40483
1
200,000
0
FY2016
Future
Curtis Park Stadium Restrooms Impro -ments
B-40484
1
1,250,000
0
FY2016
Future
D1 - Reconstruction of Roadway identified a "Very Poor" by
PW
B-30431
1
4,114,165
2,400,000
FY2018
Future
D1- Stromwater Projects
B-30421
1
1,198,000
1,078,000
FY2016
Future
D1 FEMA Tree Funded Projects
B-30611T
1
169,930
169,930
FY2018
Future
D2 - Reconstruction of Roadway identified as "Very Poor" by
PW
B-30432
2
2,500,000
1,200,000
FY2018
Future
D2 - Stormwater Projects
: 30422
2
1,198,000
1,078,000
FY2016
Future
D3 - Reconstruction of Roadway identified as "Very Poor" by
PW
B-304'3
3
2,500,000
2,400,000
FY2018
Future
D3 - Sidewalk ADA Retrofits
B-30677
3
700,000
700,000
FY2012
Active
D3 - Stormwater Projects
B-30423
1,198,000
1,078,000
FY2016
Future
D3 FEMA Tree Funded Projects
B-30613T
3
255,930
255,930
FY2018
Future
D4 - FEMA Tree Funded Projects
B-30614T
4
' 15,930
315,930
FY2018
Future
D4 - Reconstruction of Roadway identified as "Very Poor" by
PW
B-30434
4
2,500,440
2,400,000
FY2018
Future
D4 - Stormwater Projects
B-30424
4
1,198,000
1,078,000
FY2016
Future
D5 - Reconstruction of Roadway identified as "Very Poor" by
PW
B-30435
5
2,500,000
= 400,000
FY2018
Future
D5 - Stormwater Projects
B-30425
5
1,078,000
1,07c, 100
FY2017
Future
D5 FEMA Tree Funded Component
B-30615T
5
119,930
119,930
FY2018
Future
Damaged Vehicle Replacement/ Repairs
B-30666
1,2,3,
4,5
794,508
794,508
FY 415
Active
Defense and Security Equipment Acquisition
B-72813
1,2,3,
4,5
3,767,249
3,767,249
FY2014
Active
Design District Roadway and Stormwater Improvement - D5
B-30985
5
1,500,000
500,000
FY2016
Fu . re
164
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Design Dist .. t/FEC
B-30178
5
100,000
100,000
FY2015
Future
Dinner Key Dred..ng - Spoil Island C Floating Dock Repair
B-30834
2
308,375
0
FY2015
Future
Dinner Key Marina Din.'hy Dock- D2
B-30735
2
253,070
253,070
FY2015
Active
District 1 - Miscellaneous R. -dway Improvements
B-30611
1
825,419
728,234
FY2017
Future
District 2 - Miscellaneous Roadw- Improvements
B-30612
2
0
0
FY2019
Future
District 2 Quality of Life Park Improve -nts
B-39910E
2
987,988
987,988
FY2014
Active
District 3 - Miscellaneous Roadway Improve gents
B-30613
3
3,273,688
3,273,688
FY2018
Future
District 3 - Sidewalk Repairs and ADA
B-30377C
3
250,691
250,691
FY2015
Active
District 4 - Miscellaneous Roadway Improvements
B-30614
4
494,387
494,387
FY2017
Future
District 5 - Miscellaneous Roadway Improvements
B-30615
5
1,863,195
1,863,195
FY2017
Future
Domestic Water Pump - Police Dept.
-70115
1,2,3,
4,5
65,000
0
FY2017
Future
Domino Park Building
B-40A s5
3
50,000
0
FY2016
Future
Domino Park Restroom Renovation
B-40486
3
250,000
0
FY2016
Future
Domino Park Shade Structure
B-40487
30,000
0
FY2016
Future
Dorsey Memorial Library Restoration
B-30531
2
250,000
250,000
FY2014
Active
Dorsey Park Ballfield
B-40488
2
45,000
0
FY2016
Future
Douglas Park ADA Improvement (restrooms) - CD Project 91-
03279
B-30832
2
133, 4
133,474
FY2015
Active
Douglas Park Irrigation System
B-40489
2
40,000
0
FY2016
Future
Douglas Park Lighting
B-40490
2
50,000
0
FY2016
Future
Douglas Park Playground
B-40491
2
130,000
0
FY2016
Future
Downtown Baywalk Master Plan & Design
B-30179
2
11,248,770
450,000
FY2017
Active
Downtown Miami Bicycle and Pedestrian Mobility
Improvement Project
B-30940
2
287,500
287,500
F :115
Active
Downtown Miami Signage and Wayfinding System
B-30941
2
1,150,000
1,150,000
FY2016
Active
Downtown Street Conversions
B-71210
2,5
50,000
50,000
FY2014
A •ve
165
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Drainage i •rovements @ SW 4 St between 53 Ave & 54
B-30978
4
51,065
51,065
FY2016
Future
Ave - D4
Duarte Park Bas -tball and Tennis Courts Resurfacing
B-40492
1
75,000
0
FY2016
Future
Duarte Park Building '- novation, Splash PArk & Sign - D1
B-35812AS
1
50,000
50,000
FY2014
Active
Sanitary Sewer Compon= t
Duarte Park Building Reno : tion, Splash Park (Lighting)
B-35812D
1
15,000
15,000
FY2014
Future
Duarte Park Building Renovation, plash Park and Sign
B-35812A
1
1,312,797
1,312,797
FY2014
Active
Duarte Park Lighting
B-40493
1
175,000
0
FY2016
Future
Duarte Park Playground
B-40494
1
120,000
0
FY2016
Future
DWNTWN Beautification - Design Phase
B-30606D
1,2,3,
498,780
498,780
FY2014
Active
4,5
DWNTWN Beautification - North
B-30606N
1,2,3,
7,817,431
7,817,431
FY2015
Active
4,5
DWNTWN Beautification - South
B-306065
1,2,3,
5,090,853
5,090,853
FY2014
Active
4,5
DWNTWN Beautification (Lighting)
: 30606L
1,2,3,
4,475,915
4,475,915
FY2014
Active
4,5
DWNTWN Beautification Project Phase I
B-30.16
1,2,3,
3,150,565
3,150,565
FY2016
Active
4,5
East Flagami Roadway Improvements - SW 2nd Street and
B-30961
4
422,264
422,264
FY2014
Active
SW 4th Street - D4
Eaton Park Daycare Improvements
B-40495
100,000
0
FY2016
Future
Eaton Park Improvements
B-40496
5
1,500,000
0
FY2016
Future
eGoverment/Web Services iBuild Miami Phases II and III
B-70958
1,2,3,
480,000
0
FY2017
Future
4,5
eGovernment Services Platform
B-70959
1,2,3,
1,480,E 40
0
FY2017
Future
4,5
eGovernment/Web Services City View Replacement
B-70957
1,2,3,
2,464,000
0
FY2016
Future
4,5
Englewood Road and Storm Sewer Improvements - Phase III
B-30011
4
8,785,811
' 785,811
FY2014
Active
- D4
Environmental Remediation Study
B-30865A
1,2,3,
466,900
46: •00
FY2015
Active
4,5
Environmental Remediation Study - Fire -Rescue
B-30865F
1,2,3,
140,000
140,000
FY2016
Active
4,5
ERP Integration System
B-74609
1,2,3,
25,474,458
25,474,458
FY1115
Active
4,5
Expand Comunication/Alarm Office Facilityw/PD (Fire
B-70231
1,2,3,
500,000
0
FY2016
Future
Station)
4,5
Facility Budget Requests (Fire)
B-70232
1,2,3,
1,750,000
0
FY2018
F re
4,5
166
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Fair Isle Are- Roadway and Drainage Improvements - D2
B-30823
2
180,000
180,000
FY2014
Active
Fairway Storm S- ers
B-30017
5
5,586,000
0
FY2020
Future
FEMA Assistance to Fi -fighters Program FY2011
B-70418
1,2,3,
4,5
343,610
343,610
FY2014
Active
Fern Isle / PBA Park Improv= ents Project - D1
B-30800
1
116,782
116,782
FY2014
Active
Fire Alarm Replacement, Air Con..tioning Repairs and
maintenance
B-40410
1,2,3,
4,5
1,426,200
1,426,200
FY2016
Future
Fire and Rescue Training Center (Ren. ate/Rebuild)
B-70224
2
17,000,000
0
FY2017
Future
Fire Department - FY2012 "Emergency Med al Services
(EMS)"
B-70242
1,2,3,
4,5
317,333
238,000
FY2016
Future
Fire Facilities Generators (North & South)
B-70718
1,2,3,
4,5
300,000
300,000
FY2014
Future
Fire Pump Electrical Rewiring - Police Dept.
B-70114
1,2,3,
4,5
35,000
0
FY2017
Future
Fire Rescue
B-70227
1,2,3,
4,5
4,320,000
0
FY2016
Future
Fire Rescue Capital Needs - FY2014
: 70241
1,2,3,
4,5
1,858,500
1,858,500
FY2016
Future
Fire Rescue Personal Protective Equipment
B-704 1
1,2,3,
4,5
820,580
820,580
FY2014
Active
Fire Station #1 - Renovation and Miscellaneous Repairs
B-60455E
2
500,000
500,000
FY2015
Active
Fire Station #10 (New)
B-60351
6,275,200
898,123
FY2018
Active
Fire Station #13
B-60453A
2
5,084,496
5,084,496
FY2014
Active
Fire Station #14 (New)
B-60454
4
6,'16,510
5,076,844
FY2016
Active
Fire Station #14 (New) - D4 - Sanitary Sewer Component
B-60454S
4
100,0.0
100,000
FY2016
Active
Fire Station #15 (Fire Boat)
B-70225
2
10,000,000
0
FY2018
Future
Fire Station #5 Exterior Walls Repair - D1
B-70210
1
150,000
150,000
FY2014
Active
Fire Station #5 Renovation
B-70237
1
800,000
0
FY2018
Future
Fire Station and AO PC Replacement
B-70216
1,2,3,
4,5
70,000
0
FY2017
Future
Fire Station Equipment and Furniture Replacement
B-72803
1,2,3,
4,5
790,838
790,838
FY 114
Active
Fire Station Equipment/Furniture
B-70233
1,2,3,
4,5
200,000
0
FY2017
Future
Fire Station Flat Panels 24"
B-70239
1,2,3,
4,5
3,500
0
FY2017
Fu . re
167
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Fire Station ardening/Security
B-70236
1,2,3,
4,5
935,000
0
FY2016
Future
Fire Station Hurn.-ne Hardening
B-70234
1,2,3,
4,5
384,000
0
FY2017
Future
Fire Station Light Flee Vehicle Replacement
B-70235
1,2,3,
4,5
630,000
0
FY2018
Future
Fire Station No. 10 Restroo , Remodeling
B-70104
1
188,218
188,218
FY2014
Active
Fire Station No. 12 - Re -roofing ' .ject
B-70212
5
77,000
77,000
FY2014
Active
Fire Station No. 3 Dormitories Build-o . Project
B-70211
3
100,000
100,000
FY2014
Active
Fire Station No. 6 Office Building - Structura ' nalysis
B-70102A
5
74,619
74,619
FY2016
Active
Fire Station No.5 - Interior Renovation Work Orac - Project
91-03237
B-70213
1
348,240
348,240
FY2014
Active
Fire Station Paperless Inspection System (i.e. MobileE -s
software)
B-70240
1,2,3,
4,5
80,000
0
FY2018
Future
Fire Station Training Facility
B-70230
1,2,3,
4,5
750,000
0
FY2018
Future
Fire Stations & Other Fire Facilities
-72802
1,2,3,
4,5
3,647,899
3,647,899
FY2014
Active
Fire Stations Computer Aided Dispatch System
B-70 4
1,2,3,
4,5
2,400,000
0
FY2016
Future
Fire Stations Warranty Lifepak/EKG Units
B-70221
1,2,3,
4,5
946,000
0
FY2016
Future
Fire Training Props
B-70238
-
350,000
0
FY2016
Future
Firefighting Equipment and Gear
B-70106
1,2,3,
4,5
158,124
158,124
FY2015
Active
Flagami Traffic Calming - D4
B-40672G
4
90,000
590,000
FY2014
Active
Flagami Traffic Calming Phase IV - D4
B-40672D
4
1,198,4' 2
1,198,012
FY2014
Active
Forensic Lab Expansion - Police Dept.
B-70128
1,2,3,
4,5
1,200,000
0
FY2019
Future
Fort Dallas Park (Lummus Park Historic District) Demolition
B-40497
5
750,000
0
FY2016
Future
Fuel Pump Replacements
B-70328
1,2,3,
4,5
200,000
0
FY2017
Future
FY2014 - D1 Roadway, drainage and sidewalks repairs
B-30411
1
100,000
90,000
FY2014
Future
FY2014 - D2 Roadway, drainage and sidewalks repairs
B-30412
2
100,000
90,000
FY 414
Future
FY2014 - D3 Roadway, drainage and sidewalks repairs
B-30413
3
100,000
90,000
FY2014
Future
FY2014 - D4 Roadway, drainage and sidewalks repairs
B-30414
4
100,000
82,143
FY2014
Fu re
168
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
FY2014 - D Roadway, drainage and sidewalks repairs
B-30415
1
196,625
0
FY2015
Future
Garden Storm S- er- Phase I
B-30183
1
1,149,920
1,149,920
FY2014
Active
Generator for City Hal
B-30365H
1,2,3,
4,5
186,819
55,855
FY2014
Active
Gibson Park New Construc . n - Sanitary Sewer Component
B-30305BS
5
117,000
117,000
FY2015
Active
Gibson Park New Construction ( rtially Funded by CRA 92-
689001)
B-30305E
5
12,739,521
12,739,521
FY2015
Active
Gibson Park Stadium
B-40498
5
850,000
0
FY2016
Future
Grapeland Heights Electrical Panel - Police 'ept.
B-70126
1,2,3,
4,5
125,000
0
FY2018
Future
Grapeland Park Picnic Shelter
B-40499
1
850,000
0
FY2016
Future
Grapeland Water Park Renovations
B-40573
1
750,000
0
FY2016
Future
Grove Mini Park Playground
B-40500
2
65,000
0
FY2016
Future
Grove Park Road and Storm Sewers Improvements - D3
(Formelly Glenn Royal Stormsewer P3)
-30008
3
12,819,059
6,369,000
FY2011
Active
Grove Park Road Improvements - D3
B-300b :A
3
628,321
628,321
FY2019
Future
GSA Communications Division - Back up Batteries for
Communications Systems
B-70323
1,2,3,
4,5
42,000
0
FY2016
Future
GSA Communications Division - Impact Windows and
Hurricane Grade Electric Garage Doors
B-70326
1,2,
4,5
30,000
0
FY2016
Future
GSA Fleet Facility - Fuel Station Roof Replacement
B-70325
1,2,3,
4,5
25,000
0
FY2016
Future
GSA Fleet Maintenance Garage Expansion
B-74205E
1
.04,215
404,215
FY2015
Active
GSA Mechanics Shop - Light Fleet Aligment & Lift
Mechanism for vehicles up to 3,500 pounds
B-70327
1,2,3,
4,5
65,640
0
FY2016
Future
GSA Truck Wash Pit
B-74205C
1,2,3,
4,5
88,000
88,000
FY2016
Future
Gusman Hall Improvements / Repairs
B-70100
2
10,000,000
423,405
FY2018
Active
Hadley Park Ballfield
B-40501
5
80,000
0
FY2016
Future
Hadley Park Bleachers
B-40502
5
600,000
0
FY2016
Future
Hadley Park Football Field
B-40503
5
1,750,000
0
FY=S16
Future
Hadley Park New Youth Center D5
B-35883A
5
8,049,934
5,876,805
FY2015
Active
Hadley Park New Youth Center D5 - Sanitary Sewer
Component
B-35883AS
5
200,000
200,000
FY2015
A •ve
169
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Hadley Par' 'arking Lot
B-40504
5
100,000
0
FY2016
Future
Hadley Park Poo mprovement
B-40506
5
280,000
0
FY2016
Future
Hadley Park Pool Loc' - r rooms improvment
B-40505
5
80,000
0
FY2016
Future
Hainsworth Village Street I .rovement
B-30520
2
1,062,500
0
FY2019
Future
Health District Riverwalk
B-30784
1
961,000
961,000
FY2016
Future
Heavy Fleet Tow Truck
B-70331
1,2,3,
4,5
250,000
0
FY2018
Future
Hyperion Financial ManagementApplicatio
B-70965
1,2,3,
4,5
430,000
0
FY2017
Future
1-95 Lighting Project- Police Dept.
B-70117
1,2,3,
4,5
85,000
0
FY2017
Future
1-95 South Miami Terminal Street Improvements - D2
B-30718
2
859,000
859,000
FY2014
Active
IT - Financial Management Upgrade Module
B-70969
1,2,3,
4,5
500,000
500,000
FY2015
Active
IT Modernization
:-74617
1,2,3,
4,5
4,100,000
2,800,000
FY2015
Active
James L. Knight Center / Hyatt- Fire Alarm System
Replacement
B-70 ' 4
2
351,876
351,876
FY2015
Active
James L. Knight Center Miscellaneous Improvements
B-33506
1,2,3,
4,5
48,722
48,722
FY2014
Active
Jose Marti Roof Repair - GSA
B-40580
26,100
0
FY2015
Future
Kennedy Park Restroom Building Improvements
B-35838
2
222,033
222,033
FY2014
Active
Kennedy Park Restroom Building Improvements D2 -
Sanitary Sewer Component
B-358385
2
50,000
50,000
FY2014
Active
Kennedy Park Shoreline Stabilization Phase 1
B-30541C
2
261,► l0
261,000
FY2014
Active
Kinloch Park Building Addition - D1
B-40457
1
1,461,850
1,461,850
FY2015
Active
Kirk Munroe Tennis Park
B-40474
2
30,000
0
FY2016
Future
Kronos System Upgrade
B-70966
1,2,3,
4,5
105,000
0
FY2018
Future
La Pastorita Traffic Calming and misc. improvements - D4
B-30960
4
675,000
675,000
FY2014
Active
Land Management System
B-74614
1,2,3,
4,5
7,913,018
6,316,151
F 015
Active
Large Firefighting Equipment
B-72809
1,2,3,
4,5
660,316
388,316
FY2014
Active
Lawnview Storm Sewer
B-30009
3
5,719,000
0
FY2019
F ure
170
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Legion Par :oat Ramp
B-40508
2
450,000
0
FY2016
Future
Legion Park HVA (heating, ventilation, and air conditioning)
Replace
B-40509
2
100,000
0
FY2016
Future
Legion Park Improvem nts
B-40510
2
250,000
0
FY2016
Future
Legion Park Restrooms
B-40511
2
100,000
0
FY2016
Future
Lemon City Park Daycare Parkin. of
B-40512
5
100,000
0
FY2016
Future
Lemon City Park Daycare Playground
B-40513
5
75,000
0
FY2016
Future
Lemon City Park Improvements
B-40514
5
40,000
0
FY2016
Future
Lemon City park Walkways
B-40515
5
30,000
0
FY2016
Future
Liberty Square T-Turnarounds - D5
B-30980
5
250,000
250,000
FY2014
Active
Liberty Storm Sewers
B-30016
5
5,586,000
0
FY2020
Future
Light Fleet Replacement
: 72808
1,2,3,
4,5
1,649,658
667,658
FY2014
Active
Linear Parks, Greenways and Baywalk Improvements
B-30 04
1,2,3,
4,5
961,000
961,000
FY2018
Future
Little Haiti Freedom Garden Park
B-40519
5
50,000
0
FY2016
Future
Little Haiti Gateway Signs - D5
B-30892
100,000
100,000
FY2014
Active
Little Haiti Right of Way Improvements - D5
B-30894
5
500,000
500,000
FY2015
Active
Little Haiti Soccer Field Bathroom D5
B-308875
5
'65,000
365,000
FY2014
Active
Little Haiti Soccer Park
B-40516
5
170,110
0
FY2016
Future
Little Haiti Soccer Park Stadium Bleacher Modification
B-40517
5
100,000
0
FY2016
Future
Little Haiti Soccer Park Stadium Repairs
B-40518
5
160,000
0
FY2016
Future
Little River Area Road and Drainage Improvements - D5
B-30982
5
180,900
180, :00
FY2015
Active
Little River Commerce Park Building
B-40520
5
500,000
0
FY2016
Future
Little River Industrial Park
B-30540
5
2,000,000
2,000,000
FY 114
Active
Little River Pocket Park Playground
B-40521
5
50,000
0
FY2016
Future
Little River Storm Sewers Ph. II
B-30015
5
3,990,000
0
FY2018
Fu . re
171
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Little River )` aterfront Park
B-50722
2
717,500
717,500
FY2015
Active
Little River Wate ont Park Acquisition PHII
B-50722A
2
735,000
735,000
FY2014
Active
Lummus Landing Squ- e - D5
B-30886
5
1,007,000
925,061
FY2015
Active
Lummus Landing Square - 1 Sanitary Sewer Component
B-30886S
5
100,000
100,000
FY2015
Active
Lummus Park Landing Project - eet Project
B-30643
5
2,605,245
1,368,535
FY2015
Active
Lummus Park Playground
B-40522
5
125,000
0
FY2016
Future
Manatee Bend Park
B-40523
2
100,000
0
FY2016
Future
Manatee Bend Park Shoreline Improvements - D
B-30801
2
675,827
88,527
FY2015
Active
Manuel Artime Dimmer Rack System
B-30501 B
1,2,3,
4,5
106,653
106,653
FY2014
Active
Manuel Artime Miscellaneous Project
B-30501A
3
92,883
92,883
FY2014
Active
Manuel Artime Window Replacement 970 Building - PF
0501C
2
173,607
150,379
FY2014
Active
Marine Stadium Bulkhead Replacement
B-30.a9
2
2,094,393
1,891,603
FY2015
Active
Marine Stadium Marina at Virginia Key
B-40180
2
33,180,900
1,740,007
FY2019
Active
Marine Stadium Marina Improvements
B-33514
-
1,315,550
255,645
FY2014
Active
Marine Stadium Restoration
B-30688
2
511,716
350,000
FY2017
Active
Marti Pool Park Pump Improvement
B-40526
3
00,000
0
FY2016
Future
Marti Pool Park Locker -rooms Renovation
B-40524
3
100,1,0
0
FY2016
Future
Marti Pool Park Pool Improvements
B-40525
3
110,000
0
FY2016
Future
Martin Luther King (MLK) Blvd / I-95 Area Improvements -
Murrals
B-30773
5
100,000
100,000
FY2015
Active
Mary Brickell Village Drainage Improvements
B-30637
1,2,3,
4,5
3,723,442
3,72 ,,42
FY2016
Active
Maximo Gomez / Domino Park Restroom Improvements - D3
B-35861 B
3
48,368
48,368
FY2014
Active
Maximo Gomez / Domino Park Restroom Improvements - D3
B-35861 BS
3
100,000
100,000
FY 114
Active
Mechanical Upgrades to Riverview and Lawrence Pump
Stations - D3 - PW
B-40006
3
125,000
0
FY2014
Future
Melreese Golf Course Renovations
B-40527
1
200,000
200,000
FY2016
Fu. re
172
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Melrose Pa Playground
B-40528
5
125,000
0
FY2016
Future
Merrie Christmas 'ark Improvements
B-40529
2
600,000
0
FY2016
Future
Miamarina Pier 5 Can..ies - PF
B-70010
2
435,000
435,000
FY2014
Active
Miamarina Pier A, B & C Fi _ Line Repairs
B-30696
2
380,000
380,000
FY2014
Active
Miami Regional Intermodal Plan
B-30645F
1,2,3,
4,5
48,000
48,000
FY2014
Active
Miami River Greenway (5th Street bri. •'e exten.)
B-30336
3
2,256,640
2,256,640
FY2014
Active
Miami River Greenway from Miami Circle G ; enway to South
Miami Avenue
B-30631
2
1,221,625
1,221,625
FY2015
Active
Miami River Greenway from NW 10th to NW 12th 've.
B-30651
3
3,160,379
3,160,379
FY2015
Active
Miami River Greenway Segment G and Segment E2
Decorative Lighting
B-40695L
3
145,785
145,785
FY2014
Active
Miami River Greenway SW 1st Court to South Miami Avenu- -
D2
B-30130
2
1,557,530
1,557,530
FY2014
Active
Miami River Greenways/ Streetscape Segment D (ELH)
-40686
3
3,113,501
3,113,501
FY2014
Active
Miami Women's Club Baywalk Project - CRA 92-686001
B-30 ' 1
2
93,000
93,000
FY2015
Active
Miscellaneous Repairs 10% Set Aside
B-30706
2
2,158,594
2,158,594
FY2014
Active
Modification of Speed Humps on SW 11 St. between 30 Ave
and 31 Ct. - D4
B-30964
25,000
25,000
FY2014
Future
Moore Park New Construction
B-35887
5
7,605,462
7,605,462
FY2014
Active
Moore Park New Construction D5 - Sanitary Sewer
Component
B-358875
5
00,000
500,000
FY2014
Active
Moore Park Tennis Court Improvement
B-40531
5
380,110
0
FY2016
Future
Morningside Drainage Improvement Project D2 - PW
B-40004
2
6,260,000
0
FY2019
Future
Morningside Park Tennis Center Building
B-40534
2
650,000
0
FY2016
Future
Morningside Park Boat Ramp Improvements
B-40533
2
380,000
0
FY2016
Future
Morningside Park Court Renovations
B-40535
2
500,000
0
FY2016
Future
Morningside Park Floating Dock
B-40532
2
50,000
0
FY /16
Future
Morningside Park Walkways and ADA Compliance
B-40536
2
250,000
0
FY2016
Future
Morningside Pool Park Pool Facility Improvements
B-40537
2
1,000,000
0
FY2016
Fu re
173
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Mounted St-.les Stall Repairs - Police Dept.
B-70131
1,2,3,
4,5
100,000
0
FY2019
Future
MRC NC Replac. ments
B-30865E
1,2,3,
4,5
289,823
289,823
FY2014
Active
MRC Building - UPS stem
B-70324
1,2,3,
4,5
7,000
0
FY2016
Future
MRC Facility - Repair of H `C VAV Boxes
B-70332
1,2,3,
4,5
120,000
0
FY2018
Future
MRC Security System Hardening UASI Funded 18-180011 /
10th Floor 18-180022
B-70415
2
69,842
69,842
FY2015
Active
MRC Telecommunications Infrastructu - Replacement
B-70956
1,2,3,
4,5
455,000
0
FY2019
Future
Museum of Science - Development in Bicen -nnial Park -
Phase 2
B-78502A
1,2,3,
4,5
2,000,000
2,000,000
FY2014
Active
Museum Park -DRI Air Quality
B-30538E
1,2,3,
4,5
313,129
313,129
FY2014
Active
Museum Park - DRI Fees Administration
B-30538D
1,2,3,
4,5
600,000
600,000
FY2014
Active
Museum Park- DRI Transportation
B-30538F
1,2,3,
4,5
2,296,404
2,296,404
FY2014
Active
Museum Park - FEMA Tree Funding Component
0538T
215,943
215,943
FY2014
Active
Museum Park - Partially Funded by CRA 92-686001
B-30 '8
1,2,3,
4,5
14,042,367
14,042,367
FY2014
Active
Museum Park - Sanitary Sewer Allocation
B-30538S
1,2,3,
4,5
1,000,000
1,000,000
FY2014
Active
Museum Park Environmental Remediation/Seawall - CRA 92-
686001
B-30538E
1,2,
4,5
2,000,000
2,000,000
FY2014
Active
N. Miami Court Reconstruction - D5
B-31213
5
441,636
0
FY2019
Future
NE 1 Court Reconstruction - D5
B-31214
5
'66,995
0
FY2020
Future
NE 1st Avenue Reconstruction - NE 41 St. to NE 43 St. - D5
B-31212
5
660,: 6
0
FY2019
Future
NE 2 Avenue Improvements
B-78508
2,5
20,166,608
4,985,832
FY2016
Active
NE 2nd Court Roadway and Drainage Improvements Project -
D5
B-30880
5
400,000
400,000
FY2014
Active
NE 43 Street Reconstruction - D5
B-31217
5
868,100
0
FY2021
Future
NE Miami Place Reconstruction - D5
B-31215
5
500,000
0
FY2020
Future
Neighborhood Parks Improv. Contingencies - ADA
Modifications
B-35904
1,2,3,
4,5
1,272,223
771,223
FY '17
Future
New Citywide Fire Stations Digital Radio System
B-70217
1,2,3,
4,5
5,000,000
0
FY2017
Future
New Dinner Key Marina Dockmaster Building
B-60464
2
4,211,239
4,211,239
FY2014
A ..ve
174
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
New Dinne ey Marina Dockmaster Building D2 - Sanitary
Sewer Comp. lent
B-60464S
2
690,000
690,000
FY2014
Active
New Fire Rescue ' pparatus (North & South)
B-72810A
1,2,3,
4,5
573,740
573,740
FY2016
Future
New Public Works Op ations Facilities
B-40001
1,2,3,
4,5
1,875,500
0
FY2016
Future
North 14 St. Multi Media En rtainment District Streetscape
CRA 92-686001
B-30394
2
6,000,000
6,000,000
FY2014
Active
North and South Police Stations :ndscaping
B-70125
1,2,3,
4,5
50,000
0
FY2018
Future
North Bay Vista Park Playground
B-40538
5
75,000
0
FY2016
Future
North Spring Garden Greenway
B-40643A
5
2,762,175
2,762,175
FY2014
Active
North Venetian Drive Lighting (District 2 QOL)
B-39910C
2
100,000
100,000
FY2015
Active
Northwest 14th Street Streetscape Project - CI Funde.
B-30518
5
2,617,649
439,000
FY2015
Active
NW 10 Ave from NW 40 St & NW 8 Ave from NW 46 St to
NW43St-D5
B-30899
5
280,888
0
FY2019
Future
NW 11 Street from 27 to 37 Avenue Area Roadway
Improvements - D1
: 30781
1
939,493
939,493
FY2014
Active
NW 11 th Ave Road Improvements - D3
B-403'4
3
160,203
160,203
FY2014
Active
NW 12 Avenue / NW 12 Place Roadway Improvements
B-30883
5
1,199,976
1,199,976
FY2014
Active
NW 12 Avenue/NW 12 Place Roadway Improv. Tree
Component D5
B-30883T
46,000
46,000
FY2014
Active
NW 14 Ave & 28 St. Are Roadway Improvements- D1 - Tree
Component
B-30780T
1
26,000
26,000
FY2014
Active
NW 14 Avenue and 28 Street Area Roadway Improvements -
D1
B-30780
1
:66,602
866,602
FY2014
Active
NW 16 Ave and 14 Ter and NW 16 Ave and 15 St - D1
B-30788
1
57,8
0
FY2016
Future
NW 17th Terrace Roadway Improvement Project - D1
B-30729
1
250,000
250,000
FY2014
Active
NW 18th Avenue Roadway Improvement Project - D1
B-30727
1
1,810,000
810,000
FY2014
Active
NW 18th Avenue Roadway Improvement Project - D1 Tree
Component
B-30727T
1
60,000
60,'00
FY2014
Active
NW 18th Place Road Improvements - D3
B-40314
3
474,611
224,611
FY2014
Active
NW 20th Street from 7th Avenue to 20th Avenue
B-30789
1
500,000
0
FY '16
Future
NW 24th Avenue Roadway Improvement Project - D1
B-30723
1
1,140,000
700,000
FY2016
Future
NW 31 st Street Roadway Improvement Project - D1
B-30722
1
311,000
311,000
FY2014
Ac .ve
175
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
NW 32 Ct NW 32 Place Milling and Resurfacing - D1
B-30787
1
303,375
0
FY2016
Future
NW 33rd Street ".adway Improvement Project - D1 Tree
Component
B-30724T
1
60,000
60,000
FY2016
Active
NW 33rd Street Road -y Improvement Project Phase I - D1
B-30724
1
3,700,000
3,700,000
FY2016
Active
NW 34 Ave over Comfort C. al - Bridge 876417 - PW
B-30416
1
178,700
178,700
FY2015
Active
NW 36 Avenue 15 to 16 Street D -inage Improvements - D1
B-30785
1
50,000
50,000
FY2014
Active
NW 40 St from NW 10 Ave to NW 12 ' e - D5
B-30900
5
129,641
98,981
FY2019
Future
NW 41 St from NW 7 Ave to NW 12 Ave - r ,
B-30897
5
475,349
0
FY2017
Future
NW 43 Avenue between 9 to 11 Street Roadway
Improvements - D1
B-30786
1
78,224
78,224
FY2014
Active
NW 43 St from NW 10 Ave to NW 11 Ave - D5
B-30898
5
115,236
0
FY2019
Future
NW 44th Street between NW 7th and NW 8th Ave - D5
B-30983
5
185,000
185,000
FY2015
Active
NW 4th Terrace Roadway Improvement Project - D1
: 30730
1
75,000
75,000
FY2014
Active
NW 62 Street West of 1-95 Roadway Improvements - D5
B-30c:4
5
175,000
175,000
FY2014
Active
NW 70 Street Area Roadway & Minor Drainage
Improvements - D5
B-30904
5
2,052,550
100,510
FY2018
Future
NW 71 St. Main Trunk Storm Sewer
B-30018
9,975,000
0
FY2017
Future
NW 7th Court
B-30610
5
360,000
360,000
FY2014
Active
NW 9th Street Roadway Improvement Project - D1
B-30732
1
56,248
756,248
FY2014
Active
Oakland Grove Mini Park
B-40539
5
50,110
0
FY2016
Future
Oakland Grove Park - upgrades - D5
B-30981
5
44,887
44,887
FY2014
Active
Oakland Grove Park Playground Equipment
B-75973
5
15,000
15,000
FY2014
Future
Office of Communications - Fleet Upgrade
B-40961
1,2,3,
4,5
144,000
0
FY2015
Future
Office of Communications - Large Format Video Cameras
Replacement
B-40964
1,2,3,
4,5
90,000
0
FY2016
Future
Office of Communications - Robotics Cameras
B-40963
1,2,3,
4,5
30,000
0
FY 114
Future
Office of Communications - Studio Cameras
B-40965
1,2,3,
4,5
18,000
0
FY2016
Future
Office of Communications - Upgrade Systems to Media
Equipment
B-40962
1,2,3,
4,5
40,000
0
FY2017
Fu re
176
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Operation : rd Park Trailers
B-40541
1,2,3,
4,5
225,000
0
FY2016
Future
Overtown / Wyn •od Bicycle Pedestrian Mobility Plan
B-30645E
2,5
60,000
60,000
FY2014
Active
Overtown Greenway •b NW 11 Terrace
B-30624
5
2,661,864
1,541,784
FY2015
Active
Overtown Greenway @ N 1 Terrace - D5 Tree Funded
Component
B-30624T
5
100,000
100,000
FY2015
Active
Overtown Stormwater Pump Statfi. Upgrades
B-50654
5
851,797
851,797
FY2014
Active
Pahse I: NE 78 St (N); NE 75 St (S); N iami Ave (W); NE 2
Ave (E) - D5
B-30901
5
526,967
0
FY2017
Future
Pallot Park Seawall
B-40542
2
300,000
0
FY2016
Future
Pallot Park Shoreline Improvements - D2
B-30802
2
1,438,000
80,000
FY2015
Active
Palm Grove Road Improvements
B-30630
2
4,174,623
3,838,157
FY2015
Active
Palm Grove Road Improvements - Tree Component D2
B-30630T
2
70,000
70,000
FY2015
Active
Park Expansions and Land Acquisition - Citywide
: 40454
1,2,3,
4,5
1,000,000
1,000,000
FY2014
Future
Parks ADA Modifications - District 2
B-305A E
2
215,348
215,348
FY2014
Active
Parks ADA Modifications - District 4
B-30547G
4
491,147
491,147
FY2014
Active
PBA / Fern Isle Redevelopment
B-40543
4,500,000
0
FY2016
Future
Peacock Park Building Renovation
B-40544
2
150,000
0
FY2016
Future
Peacock Park Playground
B-40545
2
50,000
0
FY2016
Future
Peacock Park Site Improvements
B-75883
2
725, '4
725,124
FY2014
Active
Phase I: Little River (N); NE 82 St (S); N Miami Ave (W); NE
2 Ave (E) - D5
B-30902
5
625,287
90,509
FY2019
Future
Phase I: NE 82 St (N); NE 79 St (S); N Miami Ave (W); NE 1
Ave (E) - D5
B-30903
5
504,158
0
FY2018
Future
Phase I: NW 29th Street (NW 7 Ave to NW 2 Ave) - D5
B-30896
5
597,219
0
FY2017
Future
Phase II: Little River (N); NE 82 St (S); N Miami Ave (W); NE
2 Ave (E) - D5
B-30902A
5
625,287
0
FY2019
Future
Phase II: NE 78 St (N); NE 75 St (S); N Miami Ave (W); NE 2
Ave (E) - D5
B-30901A
5
532,967
0
FY '18
Future
Phase II: NE 82 St (N); NE 79 St (S); N Miami Ave (W); NE 1
Ave (E) - D5
B-30903A
5
0
0
FY2019
Future
Phase II: NW 29 St (NW 7 Ave to NW 2 Ave) - D5
B-30896A
5
597,219
0
FY2017
Fu re
177
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Phase II: N 33rd Street Roadway Improvement - D1
B-30736
1
2,375,000
0
FY2016
Future
Phase III: Little R er (N); NE 82 St (S); N Miami Ave (W); NE
2 Ave (E) - D5
B-30902E
5
625,287
0
FY2020
Future
Phase III: NE 78 St (N , NE 75 St (S); N Miami Ave (W); NE 2
Ave (E) - D5
B-30901 B
5
532,967
0
FY2019
Future
Phone and Radio Equipme Upgrades
B-72804
1,2,3,
4,5
1,209,200
351,200
FY2014
Active
Pine Heights Park Playground
B-40546
1
75,000
0
FY2016
Future
Police Central Station Parking Garage
B-70118
1,2,3,
4,5
210,000
0
FY2017
Future
Police Department Property Unit Outdoor St. age
B-30373A
1,2,3,
4,5
1,069,644
1,069,644
FY2014
Active
Police Department Sanitary Sewer System Repai
B-70600
1,2,3,
4,5
60,000
60,000
FY2014
Active
Police Headquarter & South District Storm Drains and
Parking Lot Asphalt
B-70121
1,2,3,
4,5
425,000
0
FY2017
Future
Police Headquarter Building Emergency Generator Shed
Replacement
B-70127
1,2,3,
4,5
25,000
0
FY2018
Future
Police Headquarter Elevators Renovation & Repairs
: 70116
1,2,3,
4,5
75,000
0
FY2017
Future
Police Headquarters 5th floor Interior renovations
B-701 3
1,2,3,
4,5
496,956
0
FY2015
Future
Police Headquarters Helipad and Roof Replacement
B-72915A
,2,3,
A,5
1,657,119
1,657,119
FY2015
Active
Police Headquarters Interview rooms sound proofing - Oracle
19-690002
B-70112
1,2, ,
4,5
55,000
55,000
FY2014
Active
Police Headquarters Presure Clean/Seal/Paint Exterior
B-70119
1,2,3,
4,5
275,000
0
FY2017
Future
Police Headquarters Record Unit Exterior Walls
Replacement
B-70136
1,2,3,
4,5
96,458
0
FY2015
Future
Police South District Air Conditioning Diffuser
B-70124
1,2,3,
4,5
275,110
0
FY2018
Future
Police South District Exterior Lighting
B-70132
1,2,3,
4,5
35,000
0
FY2019
Future
Police Station Headquarters Generator Slab
B-40273
2
10,000
10,000
FY2015
Active
Police Vehicle Acquisition - FY2014
B-74220E
1,2,3,
4,5
2,040,000
0
FY2016
Future
Police Vehicle Replacement
B-74220
1,2,3,
4,5
27,491,738
27,491,738
FY2014
Active
Property Maintenance Bobcats & Trailer
B-74219C
1,2,3,
4,5
40,000
40,000
FY 116
Future
Property Maintenance Security Improvements
B-74219E
1,2,3,
4,5
25,000
25,000
FY2017
Future
Public Works Fleet and Heavy Machinery Replacement
FY2014
B-40002
1,2,3,
4,5
499,000
0
FY2018
Fu re
178
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Public Wor . Maintenance Yard
B-30551
1,2,3,
4,5
4,719,387
3,268,254
FY2015
Active
Public Works Mi ellaneous Sidewalk Replacement
B-43114E
1,2,3,
4,5
1,034,146
1,034,146
FY2018
Future
Pullman Mini Park Pla :round Replacement
B-40548
5
75,000
0
FY2016
Future
Purchase of a video transm sion server
B-70108
1,2,3,
4,5
100,000
0
FY2015
Future
PW - Heavy Machinery Replace -nt- FY2015
B-40007
1,2,3,
4,5
95,000
0
FY2015
Future
PW Citywide Pavement Resurfacing C. ntract M0098 (FY14-
18)
B-40005
1,2,3,
4,5
6,912,761
0
FY2018
Future
PW Citywide Sidewalk Replacement Contra.t M-0096 (Fy14-
FY18)
B-40003
1,2,3,
4,5
7,435,000
0
FY2019
Future
PW Heavy Equipment and Machinery Replacement- FY2016
B-40008
1,2,3,
4,5
650,000
0
FY2016
Future
PW Updrage Operations Division Equipment- FY201
B-40009
1,2,3,
4,5
300,000
0
FY2017
Future
Quality of Life District 2 - Various Projects
B-39910
2
60,132
60,132
FY2015
Active
Rainbow Village Park Playground
-40549
5
75,000
0
FY2016
Future
Rebuilding Fire Station #1
B-70 '2
2
9,000,000
0
FY2016
Future
Rebuilding Fire Station #10
B-70223
1
6,000,000
0
FY2016
Future
Reeves Park Basketball Court
B-40553
35,000
0
FY2016
Future
Reeves Park Playground
B-40554
5
100,000
0
FY2016
Future
Reeves Park Sidewalks & Walkways
B-40555
5
75,000
0
FY2016
Future
Reeves Park Volleyball Court
B-40556
5
25,640
0
FY2016
Future
Refurbishing of Existing Apparatus
B-70105
1,2,3,
4,5
230,000
230,000
FY2015
Future
Re -grouping and polishing of all MRC Granite and Bathrooms
B-70330
1,2,3,
4,5
70,000
0
FY2018
Future
Reid Acres Storm Sewers
B-30013
5
5,719,000
0
FY2019
Future
Replace Existing Fire Engines
B-72811
1,2,3,
4,5
3,035,000
0
FY2017
Future
Replace Fireboat 1
B-70229
1,250,000
0
FY=S17
Future
Replacement of 400 Desktop Computers - Police Dept.
B-70134
1,2,3,
4,5
324,172
0
FY2020
Future
Replacement of Fire Panel at MRC Facility
B-70335
1,2,3,
4,5
340,000
0
FY2018
F re
179
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Replaceme t of Sauna Water Heating System - Police Dept.
B-70135
1,2,3,
4,5
15,000
0
FY2020
Future
Replacement: Ci Clerk Systems
B-70968
1,2,3,
4,5
660,000
0
FY2017
Future
Riverside Park Restro. Renovation
B-40557
3
75,000
0
FY2016
Future
Riverview and Lawrence P , p Stations - D3
B-30992
3
1,824,095
1,824,095
FY2015
Active
Roadway Improvements
B-30990
1,2,3,
4,5
361,000
361,000
FY2020
Future
Roadway, Drainage and Traffic Impro ; ments - D1 & D4 -
Partially Funded CDBG D4 91-03102
B-50706A
1,4
1,218,245
1,218,245
FY2014
Active
Robert King High Fencing and Miscelaneou• Improvements
B-30962
4
102,468
102,468
FY2014
Active
Rockerman Canal Improvements
B-30680
2
896,815
896,815
FY2014
Active
Roof Repair at the MRC Facility
B-70336
1,2,3,
4,5
350,000
0
FY2018
Future
Roof Repairs at the GSA Communications Warehouse and
USAR Warehouse
B-70329
1,2,3,
4,5
60,000
0
FY2017
Future
San Marco Island and Biscayne Island Drainage
Improvements - D2
-30588
2
4,488,981
4,488,981
FY2014
Active
Satellite Communications Antenna Installation
B-70 7
2
20,000
0
FY2014
Future
SE 3rd St Widening (fka Dupont Plaza) - DRI Transportation
B-31206A
2
1,500,000
1,500,000
FY2015
Active
SE 3rd Street Widening
B-31206
-
2,044,987
641,495
FY2015
Active
SE 3rd Street Widening - DRI Administration
B-31206E
2
100,000
100,000
FY2015
Active
Security System for Central/Headquarter - Police Dept.
B-70123
1,2,3,
4,5
85,000
0
FY2017
Future
Security System for Police South District Substation
B-70133
1,2,3,
4,5
70,440
0
FY2020
Future
Seminole Dinghy Dock Expansion
B-30602
2
60,000
30,000
FY2015
Future
Server Virtualization
B-70962
1,2,3,
4,5
98,000
0
FY2018
Future
Sewell Park kayak Launch
B-40559
1
225,000
0
FY2016
Future
Sewell Park Parking Lot
B-40560
1
60,000
0
FY2016
Future
Sewell Park Playground
B-40561
1
75,000
0
FY 416
Future
Seybold House Demolition and Reconstruction - D5
B-30905
5
200,000
0
FY2015
Future
Shedavia Jenkins Parks Lighting
B-40562
1,5
125,000
0
FY2016
Fu re
180
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Shenandoa Area Improvements - D4
B-30775
4
468,650
366,281
FY2014
Active
Shenandoah Pa Pool Renovation
B-40563
4
2,200,000
0
FY2016
Future
Shenandoah Roadwa mprovements
B-30167D
4
1,550,000
1,550,000
FY2014
Active
Shenandoah Roadway Imp .'vements- D3
B-40327
3
1,000,000
1,000,000
FY2015
Active
Silver Bluff Drainage Improveme - D4
B-30776
4
1,652,160
1,652,160
FY2014
Active
Silver Bluff Traffic Calming Priority 3 - 04
B-30168A
4
703,544
703,544
FY2015
Active
Simpson Park Building Roof Replacement
B-40564
2
65,000
0
FY2016
Future
Solid Waste Building Reinforcement for Hurrican-
B-70476
1,2,3,
4,5
1,000,000
0
FY2017
Future
Solid Waste Collection Equipment
B-73202C
1,2,3,
4,5
5,009,526
5,009,427
FY2014
Active
Solid Waste Fleet Replacement
B-70478
1,2,3,
4,5
24,311,800
0
FY2017
Future
Solid Waste Mini -Dump Renovation
-70477
1,2,3,
4,5
200,000
0
FY2017
Future
Solid Waste Sweeper
B-40 '1
1,2,3,
4,5
170,000
170,000
FY2015
Active
South Bayshore Drive from Aviation Avenue to Kirk Avenue -
D2 PW
B-40168
2
100,000
100,000
FY2014
Active
South Bayshore Drive Roadway and Drainage Improvements
B-30646
8,748,530
8,704,395
FY2015
Active
South District Police Sub Station Furniture
B-70122
1,2,3,
4,5
175,000
0
FY2017
Future
South Grove Phase 1 Roadway and Drainage Improvements -
D2
B-30827
2
`86,830
286,830
FY2014
Active
South Grove Phase 2 Roadway and Drainage Improvements -
D2
B-30835
2
492,110
492,000
FY2014
Active
South Grove Phase 3 Roadway and Drainage Improvements -
D2
B-30836
2
1,231,787
1,231,787
FY2014
Active
South Miami Avenue - SE 6th and 5th Street Traffic
Modifications - D2
B-30837
2
771,545
771,545
FY2016
Future
South Miami Avenue Drainage Improvements- MDC
B-30637A
2
806,500
20,,A44
FY2016
Active
Southside Park Field
B-40565
3
450,000
0
FY2016
Future
Spoil Island B & C Swim Area Improvement - D2
B-30824
2
67,000
67,000
FY 415
Active
Spoil Island E Restoration and Floating Dock
B-30721
2
252,500
252,500
FY2015
Active
Spring Garden Point Park
B-40567
5
150,000
0
FY2016
Fu re
181
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Spring Gar. -n Point Park Historic Building
B-40566
5
1,250,000
0
FY2016
Future
SW 10th Street - •ad Improvements - D3
B-40306
3
347,385
307,385
FY2014
Active
SW 12th St (SW 30th ve and SW 30th Place) - D4
B-30968
4
36,102
36,102
FY2017
Future
SW 15th Street Road Impro -ments Segment 1 - D3
B-40301
3
84,969
84,969
FY2014
Active
SW 15th Street Road Improveme is Segment 2 - D3
B-40315
3
245,349
245,349
FY2014
Active
SW 16th Street Road Improvements - 03
B-40307
3
257,693
257,693
FY2014
Active
SW 16th Terrace from SW 21 Ave to SW 2 `ve - D4
B-30967
4
206,386
150,467
FY2017
Future
SW 17th Avenue Roadway & Drainage Improvem nts - D3 &
D4
B-30760
3,4
600,000
600,000
FY2014
Active
SW 17th Terrace Road Improvements - D3
B-40308
3
225,567
225,567
FY2014
Active
SW 18th Avenue from SW 23rd Street to SW 23rd Terrace -
D4
B-30803
4
137,000
97,000
FY2015
Future
SW 18th Terr. Road Improvements - D3
: 40300
3
116,121
116,121
FY2014
Active
SW 19th Terr. Imp. -Partial CDBG 91-02889 - D4
B-30. `5
4
537,191
537,191
FY2014
Active
SW 1st Ave between SW 15th and SW 7th Street
B-30833
,2,3,
4,5
775,600
368,212
FY2015
Active
SW 1st Ave Road Improvements - Segment 2 - D3
B-40318
167,562
167,562
FY2014
Active
SW 1st Ave Road Improvements Segment 3 - D3
B-40323
3
126,638
126,638
FY2014
Active
SW 1st Avenue Road Improvements - Segment 1 - D3
B-40302
3
'30,928
230,928
FY2014
Active
SW 2 St from 53 Ave to 54 Ave - D4
B-30976
4
54,4'0
54,000
FY2017
Future
SW 20 Street (SW 31 Ave to SW 32 Ave) - D4
B-30970
4
56,178
0
FY2017
Future
SW 20th Road Improvements - D3
B-40310
3
116,682
116,682
FY2014
Active
SW 21 st St. & 24th Ave Roadway Improvement - D4
B-30979
4
140,000
64,400
FY2015
Future
SW 22nd Avenue Medians - US 1 to Coral Way - D4
B-30770
4
58,622
58,622
FY2014
Active
SW 22nd Terr. & SW 13th Ave Road Improvements - D3
B-40312
3
376,211
376,211
FY 414
Active
SW 23 Street btw 16 and 17 Ave for M&R - D3
B-30751
3
43,101
0
FY2017
Future
SW 23rd Road Improvements - D3
B-40303
3
244,748
244,748
FY2014
Ac .ve
182
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
SW 25th R.: d Improvements - D3
B-40319
3
118,561
118,561
FY2014
Active
SW 26th Road I .rovements Segment 2 - D3
B-40320
3
498,804
498,804
FY2014
Active
SW 27th Road Improv ents - D3
B-40322
3
498,804
498,804
FY2014
Active
SW 28th Road Improvemen\. - D3
B-40317
3
40,149
40,149
FY2014
Active
SW 2nd Ave Road Improvement - D3
B-40321
3
721,333
721,333
FY2014
Active
SW 2nd Street and SW 40th Avenue -ffic Circle - D4
B-30779
4
250,000
250,000
FY2014
Active
SW 30th Court (SW 12th Street and SW 13 , Street) - D4
B-30969
4
43,214
43,214
FY2018
Future
SW 32 Avenue Improvements Additional Service-
B-40704A
2,4
1,752,327
1,752,327
FY2014
Active
SW 32 Avenue Improvements D2 Tree Component
B-40704AT
2
60,000
60,000
FY2014
Active
SW 3rd Ave Road Improvements - D3
B-40313
3
293,740
293,740
FY2014
Active
SW 5 St between 27 ave and 28 ave street improvement - D4
-30966
4
288,090
0
FY2017
Future
SW 5th Street between 42 Ave and 43 Ave Improvement -
D4
B-30•'1
4
7,857
7,857
FY2016
Future
SW 64 Court Roadway & Drainage Improvements (from SW
6 St to SW 8 St) - D4
B-30972
4
132,522
132,522
FY2017
Future
SW/NW 17th Avenue Traffic Corridor Study - Citywide
B-30993
1,2,
4,5
200,000
200,000
FY2015
Active
Swale Restoration @ NW 2 Street between 34 Ave & 35 Ave -
D4
B-30975
4
28,809
28,809
FY2016
Future
The Roads Roadway Improvements - D3
B-40326
3
'00,000
500,000
FY2015
Active
Tigertail Resurfacing - D2
B-30716
2
711, •8
711,258
FY2014
Active
Town Park Playground
B-40569
5
100,000
0
FY2016
Future
Traffic Calming SW 6th Street Project - D4
B-30771
4
324,670
324,670
FY2014
Active
Traffic Circle - SW 12 St and 31 Ave (SR 2013005677) - D4
B-30973
4
201,663
0
FY2016
Future
Traffic Circle - SW 18th Ave. & SW 13th St. - D4
B-30778
4
122,557
112,557
FY2014
Active
Traffic Circle on SW 23 Ave and SW 26 Street - D4
B-30977
4
221,672
0
FY 417
Future
Traffic Study Reviews - Oracle Project 35-110007
B-30346
1,2,3,
4,5
411,622
411,622
FY2014
Active
Transportation Program Support Services - Transit
Professional
B-70246
1,2,3,
4,5
500,000
500,000
FY2016
Ac .ve
183
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Transportat ,• n Program Support Services - Transit
Professional `- rvices
B-30645A
1,2,3,
4,5
418,077
418,077
FY2014
Active
Transportation P ram Support Services - Transportation
B-70245
1,2,3,
4,5
500,000
294,958
FY2017
Active
Transportation Progra , Support Services - Transportation
Professional Services
B-30645E
1,2,3,
4,5
881,042
881,042
FY2014
Active
Transportation PSS - Transportation DRI Fees Administration
B-70245D
1,2,3,
4,5
155,042
0
FY2017
Active
Uniform Fire Station Data Close 12
B-70215
1,2,3,
4,5
48,000
0
FY2016
Future
Upgrade PC Software & Hardware
B-74606
1,2,3,
4,5
7,174,921
2,920,683
FY2015
Active
US1 Landscaping between 17 Ave and Visc- a - D2
B-30830
2
55,000
55,000
FY2014
Active
US-1 Median Closures at Bridgeport and SW 30 • - D2
B-30662D
2
440,576
440,576
FY2014
Active
Venetian Causeway Improvements
B-39911
2
3,196,465
3,196,465
FY2014
Active
Virginia Key Beach Park Access Control
B-40540
1,2,3,
4,5
35,000
0
FY2016
Future
Virginia Key Beach Park Historic Restoration Phase 2
: 30174
2
1,480,737
1,480,737
FY2014
Active
Virginia Key Beach Park Restrooms Replacement
B-40 '0
2
750,000
0
FY2016
Future
Virginia Key Bike and Kayak Facility - D2
B-30995
2
477,000
477,000
FY2014
Active
Virginia Key Bike Trail Building - D2 - Sanitary Sewer
Component
B-309955
-
50,000
50,000
FY2014
Active
Virginia Key Landfill Assessment
B-35002
2
1,400,000
1,400,000
FY2015
Active
Virginia Key Rowing Center Improvements - P&R Project
B-30374
2
1,' 7,023
616,513
FY2014
Active
Virginia Key Rowing Center Improvements - Sanitary Sewer
Component
B-303745
2
100,110
100,000
FY2014
Active
Virginia Key Rowing Center Park Building
B-40530
2
350,000
0
FY2016
Future
Virrick Park New Pool
B-40571
2
3,000,000
0
FY2016
Future
Wagner Creek / Seybold Canal Dredging
B-50643
1,5
23,353,488
5,373,.02
FY2016
Active
Watson Island Infrastructure
B-75001
2
647,190
150,000
FY2018
Future
Watson Island Public Park Improvements
B-35000
2
2,600,000
0
FY 118
Future
West Buena Vista Park Building Restrooms improvements
B-40574
5
50,000
0
FY2016
Future
West Buena Vista Park Courts
B-40575
5
50,000
0
FY2016
Fu re
184
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
West Buen- Vista Park Playground
B-40576
5
120,000
0
FY2016
Future
West End Park w Community Building
B-30690
4
2,598,521
2,598,521
FY2015
Active
West End Park New Community Building - Sanitary Sewer
B-306905
4
100,000
100,000
FY2015
Active
West Flagler Area Improve -nts-D4- Oracle CDBGProject
91-03102
B-30774
4
1,358,173
1,358,173
FY2014
Active
Williams Park Playground
B-40577
5
175,000
0
FY2016
Future
Williams Park Pool Improvement
B-40578
5
175,000
0
FY2016
Future
Williams Park Sport Field Lights
B-40579
5
350,000
0
FY2016
Future
Wynwood Area Roadway Improvement - D5
B-30888
5
500,000
500,000
FY2017
Active
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
1tze &IL 1tze Yalu/re
186
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPENDIX 2
CAPITA ► IMPROVEMENTS PROGRAM
CURR T PROJECTS COST TO
TE BY FUND
Cite sutavie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
Project Name
City Hall Roof Terrace
City Hall Windows and Doors
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
CAPITAL IMPROVEMENTS PROGRAM CURRENT PROJECTS COST TO DATE BY FUND
Project Dist (s) Award Award Name
Number NO.
Fund No. Fund Description Actual Encu ances Total Cost
40-B30865B 1,2,3,4, 1426 Contribution from General Fund FY 31000 General
5 2008 Government
Projects
40-B30865C 1,2,3,4, 1426 Contribution from General Fund FY 31000 General
5 2008 Government
Projects
$ 209,70 3 $ 99,858.61 $ 309,568.14
157,159.03 $ 81,053.17 $ 238,212.20
City of Miami Impact Fee Study - Citywide
Citywide General Fleet Replacement
40-B30994 1,2,3,4, 1103 Contribution From General Fund
5
40-B74200 1,2,3,4, 1103 Contribution From General Fund
5
31000 Gener
G. ernment
rojects
00 General
Government
Projects
Citywide General Fleet Replacement 40-B74200 1,2,3,4, 1304 Contribution from General F d FY 31000 General
5 2007 Government
co
Projects
$ 35,288.00 $ 14,342.00 $ 49,630.00
$ 1,070,989.00 $ - $ 1,070,989.00
$ 881,388.33 $
$ 881,388.33
Citywide General Fleet Replacement 40-B74200 1,2,3,4, 1426 Contribution fro. General Fund FY 31000 General
5 2008 Government
Projects
Coconut Grove Viewing Platform Spoil Island C 40-B40171
Coconut Grove Viewing Platform Spoil Island C 40-B40171
2 1669 TV . 'roduction-Basic Use Fee
onut Grove Expo -Burn Notice
31000 General
Government
Projects
$ 1,653,874.07 $
- $ 1,653,874.07
$ 3,388.36 $ 3,388.36
1767 Ransom Everglades School- Coconut 31000 General $ 88.36 $ 1,561.64 $ 1,650.00
Grove Viewing Platform Spoil Island Government
C and Spoil Island E Projects
Coconut Grove Viewing Platform Spoil Island C 40-B40171 2 1786 FIND- Coconut Grove Viewing
Platform Spoil Island C
Coconut Grove Viewing Platform Spoil Island E :-B40172 2 1669 TVM Production -Basic Use Fee
Coconut Grove Expo -Burn Notice
Coconut Grove Viewing Platform Spo sland E 40-B40172
31000 General
Government
Projects
31000 General
Government
Projects
$ 7,500.00 $ 7,500.00
$ 3,380.71 $ 3,380.71
2 1767 Ransom Everglades School- Coconut 31000 General $ 80.71 $ 1,569.29 $ 1,650.00
Grove Viewing Platform Spoil Island Government
C and Spoil Island E Projects
Coconut Grove Viewing P : form Spoil Island E 40-B40172 2 1787 FIND- Coconut Grove Viewing
Platform Spoil (sand E
Coral Way Office - Structural Evaluation
31000 General
Government
Projects
40-B30365E 3 1426 Contribution from General Fund FY 31000 General
2008 Government
Projects
$ 7,500.00 $ 7,500.00
$ 12,674.57 $ $ 12,674.57
C
03
C
m
v
Project Name
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual
Encumbrances T. I Cost
Damaged Vehicle Replacement/Repairs 40-B30666
Damaged Vehicle Replacement/Repairs 40-B30666
Environmental Remediation Study
1,2,3,4, 1577 Subrogation Auto Claims B-30666 31000 General
5 Government
Projects
1,2,3,4, 1921 Surplus Goods & Fixed Assets Sales 31000 General
5 Government
Projects
40-B30865A 1,2,3,4, 1426 Contribution from General Fund FY 31000 General
5 2008 Government
Projects
$ 633,447.06 $ 83.80 $ 633,730.86
$ 68,327 6 $ $ 68,327.76
13,425.03 $ 32,450.37 $ 45,875.40
ERP Integration System 40-B74609
ERP Integration System
1,2,3,4, 1103 Contribution From General Fund 31000 Gener
5 G. ernment
rojects
40-B74609 1,2,3,4, 1105 Fire Assessment Fee
5
00 General
Government
Projects
ERP Integration System 40-B74609 1,2,3,4, 1212 SRF Contribution to CIP - Prio o 31000 General
5 2006 Government
w Projects
$ 12,486,771.72 $ - $ 12,486,771.72
$ 287,422.33 $ $ 287,422.33
$ 1,473,459.00 $
- $ 1,473,459.00
133
0D ERP Integration System 40-B74609 1,2,3,4, 1304 Contribution fro• General Fund FY 31000 General
5 2007 Government
Projects
ERP Integration System 40-B74609
1,2,3,4, 1426 Co
5 108
ution from General Fund FY
31000 General
Government
Projects
$ 2,028,914.05 $
$ 825,964.95 $
(0.04) $ 2,028,914.01
C
$ 825,964.95
m
ERP Integration System
Generator for City Hall
Generator for City Hall
40-B74609 1,2,3,4, 1565 Sunshine State Government
Financing Commission Loan # 3
40-B30365H 1,2,3,4, 1103 Contribution From General Fund
5
31000 General
Government
Projects
31000 General
Government
Projects
B30365H 1,2,3,4, 1426 Contribution from General Fund FY 31000 General
5 2008 Government
Projects
GSA Fleet Maintenance Garage Expa : on 40-B74205B 1 1108 Impact Fees Ord
GSA Fleet Maintenance rage Expansion
31000 General
Government
Projects
40-B74205B 1 1422 Impact Fees New Ordinance-2007 31000 General
Government
Projects
IT Moderniz ion 40-B74617 1,2,3,4, 1426 Contribution from General Fund FY 31000 General
5 2008 Government
Projects
$ 7,210,560.20 $ 39,031.31 $ 7,249,591.51
$ 27,292.89 $ 27,292.89
$ 25,147.73 $ 2,493.03 $ 27,640.76
$ 85,754.73 $ 92,436.66 $ 178,191.39
$ 48,428.02 $ 45,315.00 $ 93,743.02
$ 2,273,207.50 $ 161,523.10 $ 2,434,730.60
Project Name
Land Management System
Land Management System
MRC A/C Replacements
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
40-B74614 1,2,3,4, 1103 Contribution From General Fund
5
40-B74614 1,2,3,4, 1565 Sunshine State Government
5
Financing Commission Loan # 3
40-B30865E 1,2,3,4, 1426 Contribution from General Fund FY
5
2008
Fund No. Fund Description Actual
31000 General
Government
Projects
31000 General
Government
Projects
31000 General
Government
Projects
Encumbrances T. al Cost
$ 1,176,209.17 $
$ 5,063,01
4
- $ 1,176,209.17
(0.01) $ 5,063,014.83
$ 35,100.00 $ 35,100.00
Police Vehicle Replacement
Police Vehicle Replacement
Police Vehicle Replacement
co
m PW Maintenance Yard
PW Maintenance Yard
Quality of Life District 2
40-B74220 1,2,3,4, 1103 Contribution From General Fund
5
40-B74220
40-B74220
1,2,3,4, 1304 Contribution from General Fund FY
5
2007
1,2,3,4, 1426 Contribution from General F d FY
5
40-B30551 1,2,3,4,
5
40-B30551 1,2,3,4,
40-B39910
2008
1113 Local Oprion G. ax
1426 Co
5 108
ibution from General Fund FY
1584 Homeland Defense/Neighborhood
Improvement Bond Series 3
Repairs and Maintenance of MRC AC Systems 40-B40410 1,2,3,4, 1426 Contribution from General Fund FY
and Elevators and Fire Alarm Replacement
Upgrade PC Software & Hardware
Upgrade PC Software & Hardware
Upgrade PC Software & rdware
5
2008
B74606 1,2,3,4, 1103 Contribution From General Fund
5
40-B74606
40-B74606
1,2,3,4, 1304 Contribution from General Fund FY
5
2007
1,2,3,4, 1426 Contribution from General Fund FY
5
2008
Virginia Ke ndfill Assessment 40-B35002 2 1496 Sunshine State Government
Financing Commission Loan # 2
31000 Gene
G. 'ernment
Projects
00 General
Government
Projects
31000 General
Government
Projects
31000 General
Government
Projects
31000 General
Government
Projects
31000 General
Government
Projects
31000 General
Government
Projects
31000 General
Government
Projects
31000 General
Government
Projects
31000 General
Government
Projects
31000 General
Government
Projects
$ 9,141,422.27 $
$ 4,433,407.45 $
- $ 9,141,422.27
- $ 4,433,407.45
$ 13,890,660.35 $ 24,700.72 $ 13,915,361.07
$ 30,226.44 $ 1,850.00 $ 32,076.44
$ 1,268,254.37 $
$ 54,926.75 $
$ 1,268,254.37
$ 54,926.75
- $ 195,184.16 $ 195,184.16
$ 2,003,786.30 $
- $ 2,003,786.30
$ 293,464.39 $ 449.99 $ 293,914.38
$ 621,343.52 $
$ 621,343.52
$ 94,619.03 $ 74,045.04 $ 168,664.07
C
03
C
m
v
Project Name
Computer Aided Dispatch (CAD)
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
40-B72801 1,2,3,4, 1105 Fire Assessment Fee
5
Fund No. Fund Description Actual
Encumbrances T. .I Cost
32000 Public Safety $ 70,865.00 $ 4•, 78.00 $ 117,243.00
Defense and Security Equipment Acquisition 40-B72813 1,2,3,4, 1049 HD Fire Rescue Homeland Defense 32000 Public Safety $ 800,27•. 1 $ $ 800,279.21
5 Preparedness Initiative Series 1
Defense and Security Equipment Acquisition 40-B72813 1,2,3,4, 1370 HD2 Fire Rescue Preparedness 32000 Public Safety
5 Initiative
983,298.61 $ $ 983,298.61
Defense and Security Equipment Acquisition 40-B72813 1,2,3,4, 1584 Homeland Defense/Neighborhood 32000 Public ..fety $ 710,436.93 $ $ 710,436.93
5 Improvement Bond Series 3
FEMA Assistance to Firefighters Program 2011 40-B70418 1,2,3,4,
1426 Contribution from General Fund FY •00 Public Safety $ 4,147.97 $ 994.02 $ 5,141.99
5 2008
FEMA Assistance to Firefighters Program 2011 40-B70418 1,2,3,4, 1853 2011 FEMA/Assistance to Fir gters 32000 Public Safety $ 16,591.95 $ 3,976.08 $ 20,568.03
5 Grant Program
o Fire Facilities Generators (North & South) 40-B70718 1,2,3,4, 1422 Impact Fees Ne •rdinance-2007 32000 Public Safety $
5
Fire Rescue Personal Protective Equipment 40-B70411
Fire Station #1 Renovation and Miscellaneous 40-B60455B
$ 78,856.95 $ 78,856.95
1,2,3,4, 1426 Co •ution from General Fund FY 32000 Public Safety $ 110,927.07 $
5 •08
1426 Contribution from General Fund FY 32000 Public Safety $
Repairs 2008
$ 110,927.07
$ 15,019.45 $ 15,019.45
Fire Station #10 (New) 40-B60351
Fire Station #10 (New)
Fire Station #10 Restroom Remodeli
Fire Station #10 Restroo emodeling
Fire Station
Restroom Remodeling
1 1103 Contribution From General Fund 32000 Public Safety $ 341,185.98 $ $ 341,185.98
B60351 1 1108 Impact Fees Ord
40-B70104 1 1017 Fire Assessment Fee
40-B70104 1 1105 Fire Assessment Fee
40-B70104
32000 Public Safety $ 195,737.08 $ $ 195,737.08
32000 Public Safety $ 13,550.65 $ 11,200.30 $ 24,750.95
32000 Public Safety
$ 3,258.74 $ $ 3,258.74
1 1426 Contribution from General Fund FY 32000 Public Safety $ 20,774.33 $ 115.74 $ 20,890.07
2008
tn
C
03
tn
—I
—I
—I
v
co
Project Name
Fire Station #12 Re -roofing
Fire Station #14 (New)
Fire Station #14 (New)
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
40-B70212 5 1105 Fire Assessment Fee
Fund No. Fund Description Actual Encumbrances T. al Cost
32000 Public Safety
$ 1,222.86 $ 6 , 10.75 $ 63,933.61
40-B60454 4 1051 HD Neighborhood Fire Stations & 32000 Public Safety $ 181,36 .:4 $ $ 181,361.84
Training Facility Series 1
40-B60454 4 1496 Sunshine State Government
Financing Commission Loan # 2
Fire Station #14 (New) 40-B60454
Fire Station #5 Exterior Walls Repair - D1 40-B70210
Fire Station 13 (New) 40-B60453A
32000 Public Safety
31,855.64 $ (0.01) $ 31,855.63
4 1584 Homeland Defense/Neighborhood 32000 Public:.fety $ 1,573.91 $ 438,078.53 $ 439,652.44
Improvement Bond Series 3
1 1426 Contribution from General Fund FY •00 Public Safety $ 24,363.08 $ 87,279.12 $ 111,642.20
2008
2 1051 HD Neighborhood Fire Stati. & 32000 Public Safety $ 52,992.00 $ $ 52,992.00
Training Facility Series 1
Fire Station 13 (New) 40-B60453A 2 1367 HD2 Neighborh
Fire Station 13 (New)
Training Fa
40-B60453A 2 1422 Im
Fire Station 13 (New) 40-B60453A
Fire Station Equipment and Furniture
y
d Fire Stations and 32000 Public Safety $ 4,088,753.18 $ 470,039.02 $ 4,558,792.20
t Fees New Ordinance-2007
32000 Public Safety
$ 6,504.09 $
$ 6,504.09
1584 Homeland Defense/Neighborhood 32000 Public Safety $ 18,363.56 $ $ 18,363.56
Improvement Bond Series 3
40-B72803 1,2,3,4, 1017 Fire Assessment Fee
Replacement 5
Fire Station Equipment and Furniture
B72803 1,2,3,4, 1105 Fire Assessment Fee
Replacement 5
Fire Station Equipment and Furnitur- 40-B72803 1,2,3,4, 1108 Impact Fees Ord
Replacement 5
32000 Public Safety $ 129,081.25 $ $ 129,081.25
32000 Public Safety $ 174,387.70 $ $ 174,387.70
32000 Public Safety $ 80,433.49 $ $ 80,433.49
Fire Station Equipment
Replacement
Furniture 40-B72803 1,2,3,4, 1426 Contribution from General Fund FY 32000 Public Safety $ 238,890.41 $ 58,512.25 $ 297,402.66
5 2008
Fire Station o 6 Office Building
40-B70102A 5 1105 Fire Assessment Fee
32000 Public Safety
$ 7,225.39 $ 150.00 $ 7,375.39
a3iniiis9ns
Project Name
Fire Stations & Other Fire Facilities
Fire Stations & Other Fire Facilities
Fire Stations & Other Fire Facilities
Firefighting Equipment and Gear
Large Firefighting Equipment
Large Firefighting Equipment
CO
N Light Fleet Replacement
Light Fleet Replacement
Phone and Radio Equipment Upgrades
Phone and Radio Equipment Upgrades
Police Department Property Unit Outdoor
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
40-B72802 1,2,3,4, 1017 Fire Assessment Fee
5
40-B72802 1,2,3,4, 1105 Fire Assessment Fee
5
Fund No. Fund Description Actual
Encumbrances T. .I Cost
32000 Public Safety $ 501,290.23 $ $ 501,290.23
32000 Public Safety $ 1,991,25
41,661.73 $ 2,032,919.83
40-B72802 1,2,3,4, 1426 Contribution from General Fund FY 32000 Public Safety 656,039.09 $ 38,408.53 $ 694,447.62
5 2008
40-B70106 1,2,3,4, 1105 Fire Assessment Fee
5
40-B72809 1,2,3,4, 1017 Fire Assessment Fee
5
40-B72809 1,2,3,4, 1105 Fire Assessment Fee
5
40-B72808 1,2,3,4, 1017 Fire Assessment
5
40-B72808 1,2,3,4, 1105 Fire ssessment Fee
5
40-B72804 1,2,3,4, 1017 Fire Assessment Fee
32000 Public .fety $ $ 17,197.23 $ 17,197.23
00 Public Safety $ 116,435.48 $ $ 116,435.48
32000 Public Safety $ 110,316.00 $ $ 110,316.00
32000 Public Safety $ 286,161.65 $ 0.01 $ 286,161.66
32000 Public Safety $ 242,559.29 $ (0.01) $ 242,559.28
32000 Public Safety $ 51,300.50 $ $ 51,300.50
40-B72804 ,2,3,4, 1105 Fire Assessment Fee 32000 Public Safety $ 226,160.67 $ 13,607.68 $ 239,768.35
5
B30373A 1,2,3,4, 1108 Impact Fees Ord 32000 Public Safety $ 379,197.65 $ 5,747.93 $ 384,945.58
Storage 5
Police Department Property Unit Out
or 40-B30373A 1,2,3,4, 1422 Impact Fees New Ordinance-2007 32000 Public Safety $ 353,483.94 $ 11,964.77 $ 365,448.71
Storage 5
Police Department Prop-- Unit Outdoor
Storage
40-B30373A 1,2,3,4, 1426 Contribution from General Fund FY 32000 Public Safety $ 120,107.10 $ $ 120,107.10
5 2008
Police Depar ent Property Unit Outdoor 40-B30373A 1,2,3,4, 1584 Homeland Defense/Neighborhood 32000 Public Safety $ 116,235.00 $ $ 116,235.00
Storage 5 Improvement Bond Series 3
C
03
-I
-I
-I
v
CO
Project Name
Police Headquarters Helipad and Roof
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual
Encumbrances T. I Cost
40-B72915A 1,2,3,4, 1422 Impact Fees New Ordinance-2007 32000 Public Safety $ 288.82 $ $ 288.82
Replacement 5
Police Headquarters Helipad and Roof
Replacement
40-B72915A 1,2,3,4, 1496 Sunshine State Government
5 Financing Commission Loan # 2
32000 Public Safety $ 33,02 2 $ 36,732.50 $ 69,758.22
Brickell Area Shared Use Path and Roadway 40-B30822T 2 1954 Citiwide Landscape 33000 Disaster
Improvements -Tree Recovery
$ 65,000.00 $ 65,000.00
Coconut Grove Waterfront Master Plan PHI 40-B30182A 2 1556 Coconut Grove Waterfront Master 34000 Public .cilities- $ 137,956.50 $ 7,076.28 $ 145,032.78
Plan - Coral Reef Yacht Club CI
Coconut Grove Waterfront Master Plan PHI 40-B30182A
2 1557 Coconut Grove Waterfront Master 000 Public Facilities- $ 63,555.91 $ 11,286.70 $ 74,842.61
Plan - Biscayne Bay Yacht Club CIP
Coconut Grove Waterfront Master Plan PHI 40-B30182A 2 1669 TVM Production -Basic Use F
34000 Public Facilities- $ 36,025.42 $ 65,831.60 $ 101,857.02
Coconut Grove Expo -Bur • otice CIP
w Dinner Key Marina Dinghy Dock 40-B30735
Dorsey Memorial Library Restoration
2 1437 FY07 Marinas C
Capital Rela
al Repairs and
34000 Public Facilities- $ 25,049.52 $ 18,032.48 $ 43,082.00
Improvements CIP
40-B30531 2 1421 Do r y Mamorial Library
Gusman Hall Improvements / Repairs 40-B70100
34000 Public Facilities- $ 13,650.00 $ $ 13,650.00
CIP
1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 372,947.53 $ $ 372,947.53
Improvement Bond Series 3 CIP
James L. Knight Center / Hyatt -Fire Alarm 40-B70414 2 1496 Sunshine State Government 34000 Public Facilities- $ 498.58 $ $ 498.58
System Replacement
James L. Knight Center Miscellaneous
Improvements
Financing Commission Loan # 2 CIP
B33506 1,2,3,4, 1103 Contribution From General Fund 34000 Public Facilities- $ 49,104.71 $ $ 49,104.71
5 CIP
Knight Center ADA Restroom Improv- ents 40-B30365N
Knight Center ADA Restr
Manuel Arti
2 1350 SRF 2007 Contribution to Capital 34000 Public Facilities- $ 109,530.27 $ 47,469.73 $ 157,000.00
CIP
m Improvements 40-B30365N 2 1426 Contribution from General Fund FY 34000 Public Facilities- $ 5,265.92 $ 37,743.26 $ 43,009.18
2008 CIP
Dimmer Rack System
40-B30501B 1,2,3,4, 1850 2011-2012 Capital Development 34000 Public Facilities- $ 2,145.11 $ $ 2,145.11
5
Grants Programs CIP
C
03
C
m
CO
Project Name
Manuel Artime Miscellaneous Project
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
40-B30501A 3 1212 SRF Contribution to CIP - Prior to
Manuel Artime Miscellaneous Project 40-B30501A
Manuel Artime Miscellaneous Project
Fund No. Fund Description Actual Encumbrances T. al Cost
34000 Public Facilities- $ 18,158.75 $ $ 18,158.75
2006 CIP
3 1350 SRF 2007 Contribution to Capital 34000 Public Facilities- $ 46,90•. 9 $ 76,916.18 $ 123,825.97
CIP
40-B30501A 3 1426 Contribution from General Fund FY 34000 Public Facilities-
2008 CIP
Marine Stadium Marina Bulkhead Replacement 40-B30689
Marine Stadium Marina Bulkhead Replacement 40-B30689
300.34 $
$ 300.34
2 1386 HD2 Citywide Waterfront 34000 Publi .cilities- $ 10,236.67 $ $ 10,236.67
Improvements C
2 1437 FY07 Marinas Capital Repairs and •00 Public Facilities- $ 42,259.62 $ $ 42,259.62
Capital Related Improvements CIP
Marine Stadium Marina Bulkhead Replacement 40-B30689
Marine Stadium Marina Improvements 40-B33514
Marine Stadium Marina Improvements
2 1584 Homeland Defense/Neighbo ood 34000 Public Facilities- $ 86,307.47 $ 23,495.32 $ 109,802.79
Improvement Bond Seri:. CIP
2 1060 HD Citywide W. rfront
Improveme• s Series 1
40-B33514 2 1350 SRF 107 Contribution to Capital
Marine Stadium Marina Improvements 40-B33514
Marine Stadium Restoration 40-B30688
Marine Stadium Marina at Virginia Key
Marine Stadium Marina at Virginia
34000 Public Facilities- $ 56,136.06 $ $ 56,136.06
CIP
34000 Public Facilities- $ 4,516.94 $ $ 4,516.94
CIP
1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 4,991.94 $ $ 4,991.94
Improvement Bond Series 3 CIP
2 1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 16,082.67 $ (0.01) $ 16,082.66
Improvement Bond Series 3 CIP
B40180 2 1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 25,531.93 $ 752.19 $ 26,284.12
Improvement Bond Series 3 CIP
40-B40180 2 1843 FIND- Marine Stadium Marina at
Miamarina Pier A, B & C re Line Repairs 40-B30696
Miscellane
s Repair - 10% Set Aside
34000 Public Facilities- $ 18,390.30 $ 252.18 $ 18,642.48
Virginia Key -Phase 1 B-40180 CIP
2 1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 120,865.67 $ 258,383.63 $ 379,249.30
Improvement Bond Series 3 CIP
40-B30706 2 1350 SRF 2007 Contribution to Capital 34000 Public Facilities- $ 7,064.42 $ $ 7,064.42
CIP
C
03
C
m
CO
Project Name
Project
Number
Miscellaneous Repair - 10% Set Aside 40-B30706
Miscellaneous Repair - 10% Set Aside
Miscellaneous Repair - 10% Set Aside
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual
Encumbrances T. I Cost
2 1437 FY07 Marinas Capital Repairs and 34000 Public Facilities- $ 1,193,097.07 $ 13 ,.10.77 $ 1,324,707.84
Capital Related Improvements CIP
40-B30706 2 1668 Rickenbacker Marina Parking 34000 Public Facilities- $ 10
Revenue -Additional Parking CIP
40-B30706 2 1670 Rickenbacker Marina Rental
New Dinner Key Marina Dockmaster Building 40-B60464
New Dinner Key Marina Dockmaster Building 40-B60464
34000 Public Facilities -
Revenue -Boat Launching Ramp CIP
2 1212 SRF Contribution to CIP - Prior to
2006
2 1350 SRF 2007 Contribution to Capital
New Dinner Key Marina Dockmaster Building 40-B60464 2 1386 HD2 Citywide Waterfront
34000 Public cilities- $
CI
0
$ 100.00
112,238.36 $ $ 112,238.36
$ 4,162.86 $ 4,162.86
00 Public Facilities- $ 3,993.88 $
CIP
$ 3,993.88
34000 Public Facilities- $ 217,219.79 $ 32,785.93 $ 250,005.72
Improvements CIP
U' New Dinner Key Marina Dockmaster Building 40-B60464
New Dinner Key Marina Dockmaster Building 40-B60464
New Dinner Key Marina Dockmaster Building 40-B60464
African Square Park -Splash Park D5
Bay of Pigs Park Lighting - D4
Bayfront Park Electrical Repairs
Bryan Park Community B ding - D4
Bryan Park munity Building - D4
2 1422 Impact Fees Ne ordinance-2007 34000 Public Facilities- $
CIP
$ 87,986.00 $ 87,986.00
2 1437 FYO arinas Capital Repairs and 34000 Public Facilities- $ 113,395.74 $ 5,475.14 $ 118,870.88
pital Related Improvements CIP
1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 466,743.99 $ 2,743,200.19 $ 3,209,944.18
Improvement Bond Series 3 CIP
40-B30882 5 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
B30772 4 1570 HD2 Dist 4 Neighborhood QOL
Improvements
35000 Parks &
Recreation
40-B40173 2 1788 Bayfront Park Trust Contribution to 35000 Parks &
Capital -Electrical Repairs, B-40173 Recreation
$ 87,204.32 $ 20,145.82 $ 107,350.14
$ 18,068.45 $ 15,523.29 $ 33,591.74
$ 159,981.65 $ 110,191.73 $ 270,173.38
40-B30134A 4 1570 HD2 Dist 4 Neighborhood QOL 35000 Parks & $ 5,686.37 $ $ 5,686.37
Improvements Recreation
40-B30134A 4 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 112,884.92 $ 31,831.89 $ 144,716.81
C
03
C
m
v
CO
Project Name
Caribbean Marketplace Renovations
Caribbean Marketplace Renovations
Caribbean Marketplace Renovations
Caribbean Marketplace Renovations
Caribbean Marketplace Renovations
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual
Encumbrances T. I Cost
40-B30671 5 1052 HD Little Haiti Park Land Acquisition 35000 Parks & $ 30,272.44 $ $ 30,272.44
& Development Series 1 Recreation
40-B30671 5 1365 HD2 Little Haiti Park Land
Acquisition & Development
35000 Parks &
Recreation
40-B30671 5 1420 Miami Sports & Exhibition Authority 35000 Parks &
Contribution to Capital Recreation
40-B30671 5 1496 Sunshine State Government 35000 Parks
Financing Commission Loan # 2 R- eation
40-B30671 5 1860 MDC - Caribbean Marketplace
Renovation, B-30671
Citywide Park Equipment & Site Impr. 40-B30541D 1,2,3,4,
5
Citywide Park Equipment & Site Impr.
00 Parks &
Recreation
1422 Impact Fees New Ordinance 07 35000 Parks &
Recreation
40-B30541D 1,2,3,4, 1426 Contribution fro. General Fund FY 35000 Parks &
5 2008 Recreation
Citywide Park Equipment & Site Improvements 40-B30541
1,2,3,4, 1085 HD ► strict 4 Neighborhood QOL 35000 Parks &
5 provements Series 1 Recreation
Citywide Park Equipment & Site Improvements 40-B30541 1,2,3,4, 1368 HD2 Neighborhood Park
Improvements & Acquisition
Citywide Park Equipment & Site Improvements 40-B30541
Citywide Park Equipment & Site Improvements
1,2,3,4, 1422 Impact Fees New Ordinance-2007
5
35000 Parks &
Recreation
35000 Parks &
Recreation
B30541 1,2,3,4, 1464 Sunshine State Governmental 35000 Parks &
5 Financing Commission Loan Recreation
Citywide Park Equipment & Site Impr. 'ements 40-B30541 1,2,3,4, 1496 Sunshine State Government 35000 Parks &
5 Financing Commission Loan # 2 Recreation
Citywide Park Equipmen Site Improvements 40-B30541 1,2,3,4, 1584 Homeland Defense/Neighborhood 35000 Parks &
5 Improvement Bond Series 3 Recreation
Coral Gate i Park-D4
40-B30777 4 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 197,14
8
7,747.22 $ 204,889.00
164,680.88 $ 185,300.43 $ 349,981.31
$ 49,931.46 $ 17,484.57 $ 67,416.03
$ 354,614.00 $ $ 354,614.00
$ 900,983.71 $ 416,281.31 $ 1,317,265.02
$ 127,508.65 $ (21,493.74) $ 106,014.91
$ 17,941.89 $ $ 17,941.89
$ 408,159.50 $ $ 408,159.50
$ 345,785.24 $ $ 345,785.24
$ 2,448,979.40 $ - $ 2,448,979.40
$ 1,010,096.83 $ - $ 1,010,096.83
$ 456,255.06 $ $ 456,255.06
$ 15,237.23 $ 36,584.60 $ 51,821.83
C
03
C
m
CO
Project Name
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
Curtis Park New Pool Facility and Boat Ramp 40-B35806 1 1108 Impact Fees Ord
Improvement
Fund No. Fund Description Actual Encumbrances T. al Cost
35000 Parks &
Recreation
Curtis Park New Pool Facility and Boat Ramp 40-B35806 1 1368 HD2 Neighborhood Park 35000 Parks &
Improvement Improvements & Acquisition Recreation
Curtis Park New Pool Facility and Boat Ramp 40-B35806 1 1386 HD2 Citywide Waterfront 35000 Parks &
Improvement Improvements Recreation
$ 9,295.00 $ $ 9,295.00
$ 27,89
8
2,767.50 $
47,805.00 $ 75,704.58
$ 2,767.50
Curtis Park New Pool Facility and Boat Ramp 40-B35806 1 1422 Impact Fees New Ordinance-2007 35000 Parks : $ 2,244.56 $ $ 2,244.56
Improvement R-- eation
Curtis Park New Pool Facility and Boat Ramp 40-B35806 1 1496 Sunshine State Government •00 Parks & $ 121,030.91 $ $ 121,030.91 C
Improvement Financing Commission Loan # 2 Recreation w
Curtis Park New Pool Facility and Boat Ramp 40-B35806 1 1584 Homeland Defense/Neighbo ood 35000 Parks & $ 177,228.30 $ 129,749.20 $ 306,977.50 tin)
Improvement Improvement Bond Seri-: Recreation
D2 Quality of Life Park Improvements
40-B39910E 2 1366 HD2 Dist. 2 Nei: , •orhood QOL 35000 Parks & $ 577,734.79 $ $ 577,734.79 C
Improvemer Recreation
m
D2 Quality of Life Park Improvements
Duarte Park Bldg Renovation/Expansion
Duarte Park Bldg Renovation/Expansion
Fern Isle / PBA Park Improvements - D1
Gibson Park Master Plan
Gibson Park Master Pla
Gibson Par aster Plan
40-B39910E 2 1584 Ho • - and Defense/Neighborhood 35000 Parks & $ 361,739.84 $ $ 361,739.84
provement Bond Series 3 Recreation
40-B35812A 1 1496 Sunshine State Government
Financing Commission Loan # 2
35000 Parks &
Recreation
40-B35812A 1 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
B30800 1 1368 HD2 Neighborhood Park 35000 Parks &
Improvements & Acquisition Recreation
$ 482,385.31 $ 7,652.18 $ 490,037.49
$ 748,533.56 $ 4,263.44 $ 752,797.00
$ 14,450.97 $ 10,469.03 $ 24,920.00
40-B30305B 5 1368 HD2 Neighborhood Park 35000 Parks & $ 97,774.00 $ $ 97,774.00
Improvements & Acquisition Recreation
40-B30305B 5 1457 Homeland Defense 1& 2 Interest 35000 Parks &
Post 9-30-06 & 9-30-07 Recreation
$ 796,058.02 $ (0.01) $ 796,058.01
40-B30305B 5 1496 Sunshine State Government 35000 Parks & $ 8,000,467.00 $ - $ 8,000,467.00
Financing Commission Loan # 2 Recreation
Project Name
Hadley Park Youth Center and Field
Improvements
Hadley Park Youth Center and Field
Improvements
Hadley Park Youth Center and Field
Improvements
Kennedy Park Restrooms Building
Improvements
Kennedy Park Restrooms Building
Improvements
Kennedy Park Restrooms Building
Improvements
CO
0D Kennedy Park Restrooms Building
Improvements
Project
Number
40-B35883A
40-B35883A
40-B35883A
40-B35838
40-B35838
40-B35838
40-B35838
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
5 1422 Impact Fees New Ordinance-2007
5 1496 Sunshine State Government
Financing Commission Loan # 2
Fund No. Fund Description Actual
35000 Parks &
Recreation
35000 Parks &
Recreation
5 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
2 1058 HD Neighborhood Park 35000 Parks
Improvements & Acquisition Seriesl R- reation
2 1108 Impact Fees Ord
000 Parks &
Recreation
2 1496 Sunshine State Government 35000 Parks &
Financing Commission L.. n # 2 Recreation
2 1584 Homeland Defe
e/Neighborhood 35000 Parks &
Improvem-- Bond Series 3
Recreation
Kennedy Park Shoreline Stabilization PH1
Kennedy Park Shoreline Stabilization PH1
Kinloch Park Building Addition - D1
Little River Waterfront Park (Bayfront &
Riverfront Lands Acquisition)
Lummus Landing Square - D5
40-B30541C
40-B30541C
40-B40457
2 1584 Ho. eland Defense/Neighborhood
mprovement Bond Series 3
35000 Parks &
Recreation
1669 TVM Production -Basic Use Fee 35000 Parks &
Coconut Grove Expo -Burn Notice Recreation
1 1368 HD2 Neighborhood Park
Improvements & Acquisition
B50722 2 1350 SRF 2007 Contribution to Capital
40-B30886
Manatee Bend Park Sh ine Improvements - 40-B30801
D2
Manatee B- d Park Shoreline Improvements - 40-B30801
D2
35000 Parks &
Recreation
35000 Parks &
Recreation
5 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
2 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
2 1904 FIND- Manatee Bend Park Shoreline 35000 Parks &
Improvements, Phase I B-30801 Recreation
Encumbrances T. al Cost
$ 28,463.72 $
$ 274,66
1
0.01 $ 28,463.73
(0.09) $ 274,669.32
410,455.48 $ 125,407.82 $ 535,863.30
$ 332.50 $
$ 4,899.61 $
$ 2,619.55 $
$ 332.50
$ 4,899.61
$ 2,619.55
C
CO
$ 42,761.96 $ 9,639.30 $ 52,401.26 C
m
$ 71,000.00 $ $ 71,000.00
$ 34,219.65 $ 3,210.19 $ 37,429.84
$ 335.02 $
$ 477,794.00 $
$ 335.02
$ 477,794.00
$ 51,267.07 $ 140,378.77 $ 191,645.84
$ 30,085.21 $ 19,054.19 $ 49,139.40
$ 38,500.00 $ 38,500.00
Project Name
Maximo Gomez/Domino Park Restroom
Improvements D3
Maximo Gomez/Domino Park Restroom
Improvements D3
Moore Park New Construction
Moore Park New Construction
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual
Encumbrances T. .I Cost
40-B35861B 3 1457 Homeland Defense 1& 2 Interest 35000 Parks & $ 523.36 $ , 01.86 $ 4,725.22
Post 9-30-06 & 9-30-07 Recreation
40-B35861B 3 1584 Homeland Defense/Neighborhood 35000 Parks & $ 1,88 $ 17,240.14 $ 19,127.21
Improvement Bond Series 3 Recreation
40-B35887 5 1052 HD Little Haiti Park Land Acquisition 35000 Parks & 149,511.50 $ $ 149,511.50
& Development Series 1 Recreation
40-B35887 5 1058 HD Neighborhood Park 35000 Parks : $ 25,000.00 $ $ 25,000.00
Improvements & Acquisition Seriesl R- eation
Moore Park New Construction
40-B35887 5 1087 HD District 5 Neighborhood QOL . •00 Parks & $ 24,477.95 $ $ 24,477.95
Improvements Series 1 Recreation
Moore Park New Construction
CO
(0 Moore Park New Construction
Moore Park New Construction
Moore Park New Construction
40-B35887 5 1422 Impact Fees New Ordinance- .07 35000 Parks & $ 106,852.10 $ 0.03 $ 106,852.13
Recreation
40-B35887 5 1464 Sunshine State .vernmental 35000 Parks &
Financing C. mission Loan Recreation
40-B35887 5 1496 Su ine State Government
nancing Commission Loan # 2
35000 Parks &
Recreation
40-B35887 5 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
Museum of Science Development in 40-B78502A 1,2,3,4, 1389 HD2 Museum of Science 35000 Parks &
Bicentennial Park 5 Recreation
Museum of Science Development in
Bicentennial Park
B78502A 1,2,3,4, 1584 Homeland Defense/Neighborhood 35000 Parks &
5 Improvement Bond Series 3 Recreation
Museum Park 40-B30538
Museum Park 40-B30538
Museum P. 40-B30538
1,2,3,4, 1055 HD Bicentennial Park Improvements 35000 Parks &
5 Series 1 Recreation
1,2,3,4, 1103 Contribution From General Fund 35000 Parks &
5 Recreation
1,2,3,4, 1375 HD2 Bicentennial Park 35000 Parks &
5 Improvements Recreation
$ 104,341.77 $ 23,953.11 $ 128,294.88
$ 857,958.04 $ 95,540.00 $ 953,498.04
$ 2,550,792.76 $ 2,617,428.24 $ 5,168,221.00
$ 738,000.00 $ $ 738,000.00
$ 713,625.00 $ $ 713,625.00
$ 100,000.00 $ $ 100,000.00
$ 50,777.90 $ $ 50,777.90
$ 252,942.99 $ 25,210.24 $ 278,153.23
C
03
C
m
Project Name
Museum Park
Museum Park
Museum Park
Project
Number
40-B30538
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
1,2,3,4, 1457 Homeland Defense 1& 2 Interest
5
Post 9-30-06 & 9-30-07
40-B30538 1,2,3,4, 1464 Sunshine State Governmental
5
Financing Commission Loan
40-B30538 1,2,3,4, 1496 Sunshine State Government
5
Museum Park - DRI Air Quality (SR Project 35- 40-B30538E 1,2,3,4,
127003) 5
Museum Park - DRI Fees Administration (SR
Project 35-127001)
Museum Park - DRI Transportation (SR Project
35-127004)
N
O
o Museum Park Environmental
Remediation/Seawall
Financing Commission Loan # 2
1231 Downtown Development
Supplemental Fee
40-B30538D 1,2,3,4, 1231 Downtown Development
5
Supplemental Fee
40-B30538F 1,2,3,4, 1231 Downtown Development
5
40-B30538B 1,2,3,4,
5
Supplemental Fee
Fund No. Fund Description Actual
35000 Parks &
Recreation
35000 Parks &
Recreation
35000 Parks &
Recreation
35000 Parks
R reation
00 Parks &
Recreation
35000 Parks &
Recreation
1584 Homeland Defe. e/Neighborhood 35000 Parks &
Improveme. Bond Series 3 Recreation
Encumbrances T al Cost
$ 121,567.10 $
$ 75,53
0
69.02 $ 236,436.12
$ 75,534.00
4,496,625.12 $ 1,515,358.30 $ 6,011,983.42
- $ 313,129.12 $ 313,129.12
$ 98,556.59 $
$ 98,556.59
- $ 1,537,024.63 $ 1,537,024.63
$ 200,000.00 $
$ 200,000.00
Pallot Park Shoreline Improvements
Pallot Park Shoreline Improvements
Parks ADA Modifications - District 2
Parks ADA Modifications - District 4
Peacock Park Site Improvements
Peacock Park Site Impro -ments
40-B30802
40-B30802
40-B30547E
2 1584 Ho
and Defense/Neighborhood
provement Bond Series 3
1905 FIND- Pallot Park Shoreline
Improvements, Phase I B-30802
35000 Parks &
Recreation
35000 Parks &
Recreation
2 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
B30547G 4 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
40-B75883
40-B75883
Peacock Pa Site Improvements 40-B75883
2 1422 Impact Fees New Ordinance-2007
35000 Parks &
Recreation
2 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
2 1669 TVM Production -Basic Use Fee
Coconut Grove Expo -Burn Notice
35000 Parks &
Recreation
$ 34,451.61 $
$ 34,451.61
$ 12,697.15 $ 15,228.10 $ 27,925.25
$ 179,626.95 $ 35,682.42 $ 215,309.37
$ 65,174.45 $ 29,067.44 $ 94,241.89
$ 123.05 $
$ 123.05
$ 91,522.19 $ 85,929.86 $ 177,452.05
$ 110.80 $
$ 110.80
C
co
C
m
v
N
O
Project Name
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances T. al Cost
Spoil Island B & C Swim Area Improvement - D2 40-B30824 2 1669 TVM Production -Basic Use Fee 35000 Parks & $ 2,379.40 $ ,:85.40 $ 18,264.80
Coconut Grove Expo -Burn Notice Recreation
Spoil Island E Restoration and Floating Dock 40-B30721 2 1669 TVM Production -Basic Use Fee 35000 Parks & $ 19,72 . 9 $ $ 19,723.19
Coconut Grove Expo -Burn Notice Recreation
Virginia Key Beach Park Historic Restoration PH 40-B30174 2 1378 HD2 Virginia Key Park 35000 Parks &
2 Improvements Recreation
Virginia Key Bike and Kayak Facility
40-B30995 2 1422 Impact Fees New Ordinance-2007 35000 Parks
R. eation
Virginia Key Rowing Center Improvements 40-B30374 2 1318 Virginia Key Rowing Center
Improvements
West End Park New Community Building
00 Parks &
Recreation
40-B30690 4 1584 Homeland Defense/Neighbo ood 35000 Parks &
Improvement Bond Seri-: Recreation
Allapatah Area Roadway Improvement - D1 40-B30782 1 1297 Transit Half-Cen urtax
Bayside Historic Sign - D2
Beacom Phase II - D3
Beacom Project Area Improvements
Bird Avenue Road Improvement
Bird Avenue Road Improvement
36000 Streets &
Sidewalks
40-B39910K 2 1584 Ho • and Defense/Neighborhood 36000 Streets &
provement Bond Series 3 Sidewalks
40-B40325 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
891,728.02 $ 6,467.50 $ 898,195.52
$ 62,609.24 $ 20,361.14 $ 82,970.38
$ 182,680.66 $ 77,504.77 $ 260,185.43
$ 186,719.56 $ 56,207.64 $ 242,927.20
$ 25,204.38 $ 26,906.40 $ 52,110.78
$ 21,413.26 $ $ 21,413.26
$ 81,014.64 $ 5,199.99 $ 86,214.63
40-B30699 3 1379 Street Bonds - 2007 Series 36000 Streets & $ 601,258.45 $ 261,019.87 $ 862,278.32
Sidewalks
B30628 2 1297 Transit Half -Cent Surtax 36000 Streets & $ 187,538.06 $ 17,051.42 $ 204,589.48
Sidewalks
40-B30628 2 1419 Parking Surcharge 2007
36000 Streets &
Sidewalks
$ 143,121.49 $ 64,363.70 $ 207,485.19
Brickell Area Shared Use '.th and Roadway 40-B30822 2 1297 Transit Half -Cent Surtax 36000 Streets & $ 139,519.62 $ 634,497.96 $ 774,017.58
Improvements Sidewalks
Buena Vista eights East Roadway and Lighting 40-B78500B 5 1113 Local Oprion Gas Tax 36000 Streets &
Improv-' ents Sidewalks
$ 15,089.23 $ $ 15,089.23
a31n111S9ns
Project Name
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances T. al Cost
Buena Vista Heights East Roadway and Lighting 40-B78500B 5 1379 Street Bonds - 2007 Series 36000 Streets & $ 1,295,035.27 $
Improvements Sidewalks
92.43 $ 1,314,127.70
Buena Vista One -Way Street Conversion and 40-B30891 5 1379 Street Bonds - 2007 Series 36000 Streets & $ 26,83 .A 2 $ 14,364.94 $ 41,200.36
Signage Sidewalks
Center Grove Lighting
Center Grove Lighting
40-B30621 2 1297 Transit Half -Cent Surtax 36000 Streets &
Sidewalks
40-B30621 2 1419 Parking Surcharge 2007
36000 Street
Si. -walks
101,845.30 $ 49,504.54 $ 151,349.84
$ 310,979.05 $ 58,504.49 $ 369,483.54
Citrus Grove Roadway Improvements 40-B30749 3 1379 Street Bonds - 2007 Series .100 Streets & $ 116,665.84 $ 168,536.15 $ 285,201.99
Sidewalks C
Citywide Bicycle Rack & Signage Program 40-B30694A 1,2,3,4, 1297 Transit Half -Cent Surtax 36000 Streets & $ 5,333.92 $ 2,879.99 $ 8,213.91
5 Sidewalkso
iv
N Civic Center Infrastructure 40-B30500 1,2,3,4, 1638 Street Bonds 2- :19 Series 36000 Streets & $ 307,403.58 $ 43,917.75 $ 351,321.33 C
C
5 Sidewalks
m
Coconut Grove Business Improvement District 40-B30687 2 1379 Str- Bonds - 2007 Series 36000 Streets & $ 188,067.38 $ 14,968.24 $ 203,035.62 v
Sidewalks
Coconut Grove Business Improvement District 40-B30687 2 1638 Street Bonds 2- 2009 Series
D3 Sidewalk ADA Retrofits
District 3 - Sidewalk Repairs and ADA
Downtown Baywalk Master Plan & D
g
DWNTWN Beautification Iesign Phase
DWNTWN B
utification - Design Phase
36000 Streets &
Sidewalks
$ 906,360.40 $ 942,829.47 $ 1,849,189.87
40-B30677 3 1379 Street Bonds - 2007 Series 36000 Streets & $ 21,011.55 $ $ 21,011.55
Sidewalks
B30377C 3 1379 Street Bonds - 2007 Series 36000 Streets & $ 79,318.67 $ 103,013.33 $ 182,332.00
Sidewalks
40-B30179 2 1584 Homeland Defense/Neighborhood 36000 Streets & $ 337,893.21 $ 75,484.21 $ 413,377.42
Improvement Bond Series 3 Sidewalks
40-B30606D 1,2,3,4, 1379 Street Bonds - 2007 Series
5
40-B30606D 1,2,3,4, 1638 Street Bonds 2- 2009 Series
5
36000 Streets &
Sidewalks
$ 309,525.86 $ 13,349.05 $ 322,874.91
36000 Streets & $ 844.61 $ $ 844.61
Sidewalks
N
0
Project Name
DWNTWN Beautification - North
DWNTWN Beautification - North
DWNTWN Beautification - North
DWNTWN Beautification - North
DWNTWN Beautification - South
DWNTWN Beautification - South
DWNTWN Beautification - South
DWNTWN Beautification - South
DWNTWN Beautification (Lighting)
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
40-B30606N 1,2,3,4, 1297 Transit Half -Cent Surtax
5
40-B30606N 1,2,3,4, 1379 Street Bonds - 2007 Series
5
40-B30606N 1,2,3,4, 1419 Parking Surcharge 2007
5
40-B30606N 1,2,3,4, 1638 Street Bonds 2- 2009 Series
5
40-B30606S 1,2,3,4, 1297 Transit Half -Cent Surtax
5
40-B30606S 1,2,3,4, 1379 Street Bonds - 2007 Series
5
40-B30606S 1,2,3,4, 1419 Parking Surchar 2007
5
40-B30606S 1,2,3,4, 1638 Str- ' Bonds 2- 2009 Series
5
40-B30606L 1,2,3,4, 1379 Street Bonds - 2007 Series
DWNTWN Beautification (Lighting) 40-B30606L
DWNTWN Sidewalk & Street Improvements
1,2,3,4, 1638 Street Bonds 2- 2009 Series
5
B30606 1,2,3,4, 1101 Transit Half -Cent Surtax
5
DWNTWN Sidewalk & Street Improv- ' ents 40-B30606 1,2,3,4, 1379 Street Bonds - 2007 Series
5
DWNTWN Sidewalk & S
t Improvements 40-B30606
1,2,3,4, 1638 Street Bonds 2- 2009 Series
5
Fund No. Fund Description Actual
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Street
Si. walks
Encumbrances T. .I Cost
$ 861,784.00 $ $ 861,784.00
$ 4,254,44: $ 314,781.45 $ 4,569,229.67
492,398.28 $ 2,939.26 $ 495,337.54
$ 140,019.85 $ 2,487.20 $ 142,507.05
00 Streets & $ 459,441.98 $ (0.01) $ 459,441.97 C
Sidewalks
36000 Streets & $ 3,082,005.60 $ 81,119.51 $ 3,163,125.11
Sidewalks
36000 Streets & $ 471,204.71 $ (0.01) $ 471,204.70 C
Sidewalks m
v
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
$ 584,586.89 $ 75,275.95 $ 659,862.84
$ 1,346,217.62 $ 0.02 $ 1,346,217.64
$ 274,706.57 $ 0.01 $ 274,706.58
$ 9,802.12 $ 0.01 $ 9,802.13
$ 151,334.02 $ $ 151,334.02
$ 28,128.88 $ (0.01) $ 28,128.87
East Flagam oadway Improvements - SW 2nd 40-B30961 4 1584 Homeland Defense/Neighborhood 36000 Streets & $ 208.43 $ 31,638.21 $ 31,846.64
Street . - i Sw 4th Improvement Bond Series 3 Sidewalks
Project Name
Fair Isle Area Roadway & Drainage
Improvements - D2
Flagami Traffic Calming - D4
Flagami Traffic Calming Phase IV - D4
Flagami Traffic Calming Phase IV - D4
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual
Encumbrances T. - Cost
40-B30823 2 1297 Transit Half -Cent Surtax 36000 Streets & $ 72,273.02 $ , 74.04 $ 78,047.06
Sidewalks
40-B40672G 4 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
40-B40672D 4 1379 Street Bonds - 2007 Series 36000 Streets &
Sidewalks
40-B40672D 4 1638 Street Bonds 2- 2009 Series
1-95 South Miami Terminal Street Improvements 40-B30718
- D2
2 1379 Street Bonds - 2007 Series
1-95 South Miami Terminal Street Improvements 40-B30718 2 1638 Street Bonds 2- 2009 Series
- D2
N
O
• La Pastorita Traffic Calming and Miscellaneous 40-B30960 4 1379 Street Bonds - 2
Improvements - D4
Series
La Pastorita Traffic Calming and Miscellaneous 40-B30960 4 1638 Str-- Bonds 2- 2009 Series
Improvements - D4
Liberty Square T-Turnarounds - D5
Little Haiti Gateway Signs - D5
Little Haiti Right of Way Improvements - D5
Little River Area Road and Drainage
Improvements
Little River Industrial Par
Little River I
ustrial Park
40-B30980 5 1638 Street Bonds 2- 2009 Series
40-B30892 5 1638 Street Bonds 2- 2009 Series
36000 Street
Si. alks
3
00 Streets &
Sidewalks
36000 Streets &
Sidewalks
$ 326,00: $ 224,039.14 $ 550,047.31
416,441.57 $ 31,529.81 $ 447,971.38
$ 180,232.30 $ 179,418.25 $ 359,650.55
$ 139,535.35 $ 19,443.07 $ 158,978.42
$ 279,438.49 $ $ 279,438.49
36000 Streets & $
Sidewalks
$ 45,654.51 $ 45,654.51
36000 Streets & $ 208.43 $ 5,231.53 $ 5,439.96
Sidewalks
36000 Streets & $ 176.77 $ $ 176.77
Sidewalks
36000 Streets &
Sidewalks
$ 16,953.65 $ 4,720.08 $ 21,673.73
B30894 5 1379 Street Bonds - 2007 Series 36000 Streets & $ 3,642.30 $ 33,672.54 $ 37,314.84
Sidewalks
40-B30982 5 1379 Street Bonds - 2007 Series 36000 Streets & $
Sidewalks
$ 19,119.78 $ 19,119.78
40-B30540 5 1297 Transit Half -Cent Surtax 36000 Streets & $ 12,000.00 $ $ 12,000.00
Sidewalks
40-B30540 5 1379 Street Bonds - 2007 Series 36000 Streets & $ 1,219,650.47 $ 82,629.99 $ 1,302,280.46
Sidewalks
C
03
C
m
N
O
Project Name
Lummus Park Landing Area Project
Miami Regional Intermodal Plan
Miami Regional Intermodal Plan
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual
Encumbrances T. I Cost
40-B30643 5 1379 Street Bonds - 2007 Series 36000 Streets & $ 131,256.32 $ 8 ,:36.91 $ 213,093.23
Sidewalks
40-B30645F 1,2,3,4, 1297 Transit Half -Cent Surtax
5
36000 Streets & $ - $ 14,813.02 $ 14,813.02
Sidewalks
40-B30645F 1,2,3,4, 1939 Miami Regional Intermodal Plan, B- 36000 Streets &
5 30645F Sidewalks
Miami River Greenway - NW 10 Ave to NW 12 40-B30651 3 1297 Transit Half -Cent Surtax 36000 Street
Ave Si. alks
Miami River Greenway - NW 10 Ave to NW 12 40-B30651 3 1857 FDOT - Mia River Grnwy- NW 10 :.00 Streets &
Ave Ave to NW 12 Ave B-30651 Sidewalks
Miami River Greenway from Miami Circle
Greenway to South Miami Avenue
Miami River Greenway from Miami Circle
Greenway to South Miami Avenue
40-B30631 2 1419 Parking Surcharge 2007
40-B30631
$ 32,588.63 $ 32,588.63
$ 514,503.36 $ 28,436.47 $ 542,939.83
$ 378,131.28 $ 659,402.66 $ 1,037,533.94
36000 Streets & $ 1,548.72 $ $ 1,548.72
Sidewalks
2 1789 FDOT-Miami Riv Greenway-Miami 36000 Streets &
Circle Green ..y to South Miami Sidewalks
Ave, B-
31
$ 94,798.85 $ 29,684.11 $ 124,482.96
Miami River Greenway SW 1st Court to S. Miami 40-B30130 2 1379 Str-• Bonds - 2007 Series
Avenue
Miami River Greenway SW 1st Court to S. Miami 40-B30130 2 1638 Street Bonds 2- 2009 Series
Avenue
Miami River Greenway SW 1st Court to S. Miami 40-B30130
Avenue
Miami River Greenways - NW 5th Street Bridge
Extension
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
2 1749 FDOT-Miami River Greenway-SW 36000 Streets &
1st Ct. to South Miami Ave, 40- Sidewalks
B30130
$ 392,053.48 $ 15,476.52 $ 407,530.00
$ 108,676.54 $ 39,988.45 $ 148,664.99
$ 664,556.57 $ 69,841.68 $ 734,398.25
B30336 3 1101 Transit Half -Cent Surtax 36000 Streets & $ 187,984.78 $ 5,101.89 $ 193,086.67
Sidewalks
Miami River Greenways - NW 5th Str-• Bridge 40-B30336 3 1297 Transit Half -Cent Surtax 36000 Streets & $ 235,525.92 $ (0.02) $ 235,525.90
Extension Sidewalks
Miami River Greenways - 5th Street Bridge 40-B30336
Extension
3 1858 FDOT- Miami River Greenway - NW 36000 Streets &
5th Street Bridge Extension, B- Sidewalks
30336
Miami River . eenways/ Streetscape Segment D 40-B40686 3 1112 FDOT Greenway - East Little Havana 36000 Streets &
(ELH) Bike Path (2001 Request) Sidewalks
$ 771,114.33 $ 125,781.57 $ 896,895.90
$ 964,470.83 $ 356.75 $ 964,827.58
C
03
C
m
N
0
Project Name
Project
Number
Miami River Greenways/ Streetscape Segment D 40-B40686
(ELH)
Miami River Greenways/ Streetscape Segment D 40-B40686
(ELH)
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances T. al Cost
3 1379 Street Bonds - 2007 Series 36000 Streets & $ 362,402.83 $ 0.02 $ 362,402.85
Sidewalks
3 1584 Homeland Defense/Neighborhood 36000 Streets & $ 224,91 ..3 $ 10,052.11 $ 234,963.74
Improvement Bond Series 3 Sidewalks
Miami River Greenways/ Streetscape Segment D 40-B40686 3 1638 Street Bonds 2- 2009 Series
(ELH)
NE 2 Avenue Improvements 40-B78508
NE 2 Avenue Improvements 40-B78508
NE 2 Avenue Improvements 40-B78508
NE 2 Avenue Improvements
NE 2nd Court Roadway & Drainage
Improvements Project- D5
North Spring Garden Greenway
North Spring Garden Greenway
North Spring Garden Greenway
North Spring Garden Greenway
North Spring Garden Gr-• way
36000 Streets &
Sidewalks
2,5 1080 HD NE 2nd Avenue Improvements 36000 Street
Series 1 Si. walks
2,5 1101 Transit Half -Cent Surtax
2,5 1297 Transit Half -Cent Surtax
40-B78508 2,5
1584 Homeland Defe .e/Neighborhood
Improvemer :ond Series 3
40-B30880 5 1638 Str- ' Bonds 2- 2009 Series
87,330.68 $ 325,069.15 $ 412,399.83
$ 1,050,599.93 $ - $ 1,050,599.93
00 Streets & $ 55,000.00 $ $ 55,000.00 t/i
Sidewalks C
w
36000 Streets & $ 854,297.95 $ 349,792.37 $ 1,204,090.32 (/1
Sidewalks
36000 Streets & $ 1,057,864.03 $ 162,831.81 $ 1,220,695.84 C
Sidewalks
m
36000 Streets & $ 81,552.04 $ 259,883.00 $ 341,435.04
Sidewalks
40-B40643A 5 1088 HD Greenways Improvements Series 36000 Streets &
1 Sidewalks
$ 79,799.58 $ $ 79,799.58
40-B40643A 5 1113 Local Oprion Gas Tax 36000 Streets & $ 298,341.81 $ $ 298,341.81
Sidewalks
B40643A 5 1379 Street Bonds - 2007 Series 36000 Streets & $ 928,348.89 $ 36,953.74 $ 965,302.63
Sidewalks
40-B40643A 5 1584 Homeland Defense/Neighborhood 36000 Streets & $ 100,180.30 $ 19.70 $ 100,200.00
Improvement Bond Series 3 Sidewalks
40-B40643A 5 1592 Florida Department of 36000 Streets & $ 1,000,000.00 $ - $ 1,000,000.00
Transportation Contract # APG62 Sidewalks
Northwest Street Streetscape Project 40-B30518 5 1297 Transit Half -Cent Surtax 36000 Streets & $ 343,778.95 $ 50,265.99 $ 394,044.94
Sidewalks
N
O
Project Name
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual
Encumbrances T. .I Cost
NW 11 St from 27 to 37 Avenue Area Roadway 40-B30781 1 1379 Street Bonds - 2007 Series 36000 Streets & $ 80,019.28 $ ,:15.73 $ 87,835.01
Improvements - D1 Sidewalks
NW 11 St from 27 to 37 Avenue Area Roadway 40-B30781 1 1638 Street Bonds 2- 2009 Series
Improvements - D1
NW 11th Avenue Road Improvements - D3
NW 12 Avenue/NW 12 Place Roadway
Improvements
40-B40324 3 1638 Street Bonds 2- 2009 Series
36000 Streets & $ 13:.•7 $ $ 138.97
Sidewalks
36000 Streets &
Sidewalks
40-B30883 5 1297 Transit Half -Cent Surtax 36000 Stree
Si. walks
NW 14 Avenue & 28 Street Area Roadway 40-B30780 1 1101 Transit Half -Cent Surtax
Improvements - D1
NW 14 Avenue & 28 Street Area Roadway
Improvements - D1
00 Streets &
Sidewalks
14,229.21 $ 2,288.00 $ 16,517.21
$ 122,090.50 $ 859,472.76 $ 981,563.26
$ 20,198.51 $ 272,442.91 $ 292,641.42
40-B30780 1 1297 Transit Half -Cent Surtax 36000 Streets & $ 72,687.37 $ 9,981.43 $ 82,668.80
Sidewalks
NW 14 Avenue & 28 Street Area Roadway 40-B30780 1 1379 Street Bonds
Improvements - D1
NW 17th Terrace Roadway Improvement
Project - D1
Series
40-B30729 1 1638 Str Bonds 2- 2009 Series
NW 18th Avenue Roadway Improvement Project 40-B30727 1 1638 Street Bonds 2- 2009 Series
- D1
NW 18th Place Road Improvements D3
NW 31st Street Roadway Improvement Project -
D1
40-B40314 3 1638 Street Bonds 2- 2009 Series
B30722 1 1379 Street Bonds - 2007 Series
NW 33rd Street Roadway Improvem Project - 40-B30724 1 1638 Street Bonds 2- 2009 Series
D1
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
$ 174,756.51 $ 272,580.54 $ 447,337.05
$ 39,622.23 $ 200.32 $ 39,822.55
$ 1,265,610.73 $ 143,489.15 $ 1,409,099.88
$ 15,368.11 $ 12,447.10 $ 27,815.21
$ 41,415.20 $ 70,247.11 $ 111,662.31
$ 494,056.64 $ 26,915.59 $ 520,972.23
NW 36 Avenue 15 to 16 . reet Drainage - D1 40-B30785 1 1101 Transit Half -Cent Surtax 36000 Streets & $ 43.41 $ 3,156.93 $ 3,200.34
Sidewalks
NW 44th S
Avenu
tween NW 7th and NW 8th 40-B30983 5 1379 Street Bonds - 2007 Series 36000 Streets & $
5 Sidewalks
$ 16,842.80 $ 16,842.80
C
03
m
v
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual
Encumbrances T. .I Cost
NW 4th Terrace Roadway Improvement Project - 40-B30730
D1
NW 62 Street West of 1-95 Roadway
Improvements
NW 62 Street West of 1-95 Roadway
Improvements
NW 7th Court
NW 7th Court
1 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 10,244.10
40-B30884 5 1379 Street Bonds - 2007 Series 36000 Streets & $ 2,487
Sidewalks
40-B30884 5 1584 Homeland Defense/Neighborhood 36000 Streets &
Improvement Bond Series 3 Sidewalks
1476.34 $ 24,420.44
$ 2,487.97
18,597.44 $ 3,209.48 $ 21,806.92
40-B30610 5 1379 Street Bonds - 2007 Series 36000 Street $ 657.02 $ $ 657.02
Si. " alks
40-B30610 5 1638 Street Bonds 2- 2009 Series
NW 9th Street Roadway Improvement Project - 40-B30732
D1
N
O
00 Streets &
Sidewalks
$ 34,484.89 $ 2,404.90 $ 36,889.79
1 1379 Street Bonds - 2007 Series 36000 Streets & $ 240,581.15 $ 18,958.74 $ 259,539.89
Sidewalks
0o NW 9th Street Roadway Improvement Project - 40-B30732 1 1638 Street Bonds 2
D1
Overtown Greenway @ NW 11 Terrace
9 Series
40-B30624 5 1297 Tra Half -Cent Surtax
Overtown/Wynwood Bicycle Pedestrian Mobility 40-B30645E
Plan
2,5 1297 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
$ 379,027.09 $ 31,868.65 $ 410,895.74
$ 328,245.93 $ 34,339.47 $ 362,585.40
36000 Streets & $ $ 12,000.00 $ 12,000.00
Sidewalks
Overtown/Wynwood Bicycle Pedestrian Mobility 40-B30645E 2,5 1899 Overtown/Wynwood Bicycle and 36000 Streets &
Plan Pedestrian Mobility Plan B-30645E Sidewalks
Palm Grove Road Improvements
Palm Grove Road Improvements
Palm Grove Road Improve ents
Roadway Im ovements
$ 19,740.59 $ 28,259.41 $ 48,000.00
B30630 2 1101 Transit Half -Cent Surtax 36000 Streets & $ 69,331.09 $ 187,322.64 $ 256,653.73
Sidewalks
40-B30630 2 1297 Transit Half -Cent Surtax 36000 Streets & $ 830,471.27 $ 180,643.59 $ 1,011,114.86
Sidewalks
40-B30630 2 1638 Street Bonds 2- 2009 Series
40-B30990
1,2,3,4, 1297 Transit Half -Cent Surtax
5
36000 Streets &
Sidewalks
$ 1,788,687.01 $ 591,230.99 $ 2,379,918.00
36000 Streets & $ 647.74 $ $ 647.74
Sidewalks
a31n111S9ns
Project Name
Project
Number
S. Bayshore Drive from Aviation Avenue to Kirk 40-B40168
Avenue - D2
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual
Encumbrances T. .I Cost
2 1113 Local Oprion Gas Tax 36000 Streets & $ 283.01 $ 0.02 $ 283.03
Sidewalks
S.E. 3rd Street Widening ( fka Dupont Plaza 40-B31206 2 1108 Impact Fees Ord
Traffic Recirculation)
36000 Streets &
Sidewalks
S.E. 3rd Street Widening ( fka Dupont Plaza 40-B31206 2 1297 Transit Half -Cent Surtax 36000 Streets &
Traffic Recirculation) Sidewalks
S.E. 3rd Street Widening ( fka Dupont Plaza 40-B31206 2 1419 Parking Surcharge 2007
Traffic Recirculation)
36000 Street
Si. walks
S.E. 3rd Street Widening (fka Dupont Plaza 40-B31206B 2 1231 Downtown Development 600 Streets &
Traffic Recirulation) - DRI Administration Supplemental Fee Sidewalks
$ 177,89 .:6 $ $ 177,891.86
94,586.79 $ 21,293.57 $ 115,880.36
$ 175,708.64 $ 15,831.28 $ 191,539.92
$ 36,107.58 $ $ 36,107.58
Shenandoah Area Improvements - D4
N
O
m Shenandoah Area Improvements - D4
Shenandoah Roadway Improvements D3
Shenandoah Traffic Calming Priority 4
Shenandoah Traffic Calming Priority 4
Silver Bluff Traffic Calming Priority 3
Silver Bluff Traffic Calming Priority 3
40-B30775 4 1101 Transit Half -Cent Surtax 36000 Streets & $ 21,187.21 $ 233,261.32 $ 254,448.53
Sidewalks
40-B30775 4 1638 Street Bonds 2
9 Series
40-B40327 3 1638 Str- ' Bonds 2- 2009 Series
40-B30167D 4 1379 Street Bonds - 2007 Series
40-B30167D 4 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
$ 36,010.43 $ 12,097.39 $ 48,107.82
$ 4,123.74 $ 25,657.08 $ 29,780.82
$ 280,900.43 $ 48,251.57 $ 329,152.00
$ 1,061,191.32 $ 20,163.67 $ 1,081,354.99
B30168A 4 1379 Street Bonds - 2007 Series 36000 Streets & $ 83,902.66 $ 9,407.83 $ 93,310.49
Sidewalks
40-B30168A 4 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 446,271.40 $ 12,471.87 $ 458,743.27
South Bayshore Drive Ro. way and Drainage 40-B30646 2 1297 Transit Half -Cent Surtax 36000 Streets & $ 31,721.07 $ 0.01 $ 31,721.08
Improvements Sidewalks
South Bays e Drive Roadway and Drainage 40-B30646
Improv- ents
2 1750 MD Cty-South Bayshore Drive 36000 Streets &
Roadway & Drainage Imp.40- Sidewalks
B30646
$ 206,997.28 $ 243,002.72 $ 450,000.00
C
03
C
m
v
Project Name
SW 10th Street Road Improvements - D3
SW 15th Street Road Improvements D3
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
40-B40306 3 1638 Street Bonds 2- 2009 Series
40-B40301 3 1638 Street Bonds 2- 2009 Series
SW 15th Street Road Improvements Segment 2 - 40-B40315 3 1638 Street Bonds 2- 2009 Series
D3
SW 16th Street Road Improvements D3
SW 17th Avenue Roadway & Drainage
Improvements - D3 & D4
SW 17th Terrace Road Improvements D3
N
o SW 18th Terr. Road Improvements - D3
SW 18th Terr. Road Improvements - D3
40-B40307 3 1638 Street Bonds 2- 2009 Series
40-B30760 3,4 1638 Street Bonds 2- 2009 Series
40-B40308 3 1638 Street Bonds 2- 2009 Series
40-B40300 3 1379 Street Bonds - 2
Series
40-B40300 3 1638 Str- • Bonds 2- 2009 Series
SW 19th Terrace Improvements (SW 23 Avenue 40-B30695 4 1101 Transit Half -Cent Surtax
to SW 24th)
SW 19th Terrace Improvements (SW 23 Avenue 40-B30695 4 1638 Street Bonds 2- 2009 Series
to SW 24th)
SW 1st Ave Road Improvements -Segments 2 -
D3
SW 1st Ave Road Improvements Seg
B40318 3 1638 Street Bonds 2- 2009 Series
nt 1- D3 40-B40302
3 1638 Street Bonds 2- 2009 Series
SW 1st Ave Road Improv- ents Segment 3 - D3 40-B40323 3 1638 Street Bonds 2- 2009 Series
SW 20th Ro . Improvements D3
40-B40310 3 1638 Street Bonds 2- 2009 Series
Fund No. Fund Description Actual
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Street
Si. alks
Encumbrances T. .I Cost
$ 40,830.15 $ 18.,:56.70 $ 227,686.85
$ 16,73 :6 $ 2,118.47 $ 18,850.13
26,852.07 $ 63,165.00 $ 90,017.07
$ 21,433.33 $ 94,269.49 $ 115,702.82
00 Streets & $
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
- $ 600,000.00 $ 600,000.00
$ 16,215.37 $ 82,814.89 $ 99,030.26
$ 11,088.89 $ 1,250.00 $ 12,338.89
36000 Streets & $ 3,551.55 $ 70,561.60 $ 74,113.15
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
$ 63,931.61 $ $ 63,931.61
$ 64,685.08 $ 1,723.49 $ 66,408.57
$ 11,435.71 $ 133,955.60 $ 145,391.31
$ 28,760.75 $ 2,369.10 $ 31,129.85
$ 9,565.28 $ 86,126.00 $ 95,691.28
$ 13,495.78 $ 82,753.11 $ 96,248.89
C
03
—I
—I
tn
—I
v
N
Project Name
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances T. al Cost
SW 22nd Ave Medians - US1 to Coral Way - D4 40-B30770 4 1297 Transit Half -Cent Surtax 36000 Streets & $ 8,276.05 $ (0.02) $ 8,276.03
Sidewalks
SW 22nd Ave Medians - US1 to Coral Way - D4 40-B30770 4 1379 Street Bonds - 2007 Series 36000 Streets & $ 4,62 1 $ 16,855.44 $ 21,477.45
Sidewalks
SW 22nd Terr. & 13th Ave Road Improvements 40-B40312 3 1638 Street Bonds 2- 2009 Series
D3
SW 23rd Road Improvements D3
40-B40303 3 1638 Street Bonds 2- 2009 Series
SW 25th Road Improvements D3 40-B40319
SW 26th Road Improvements Segment 2 - D3 40-B40320
SW 27th Road Improvements D3 40-B40322
SW 28th Road Improvements D3 40-B40317
SW 2nd Ave Road Improvements D3
36000 Streets &
Sidewalks
36000 Stree
Si. -walks
40,499.14 $ 2,864.00 $ 43,363.14
$ 18,334.62 $ 86,840.35 $ 105,174.97
3 1638 Street Bonds 2- 2009 Series : •00 Streets & $ 10,563.17 $ 87,692.00 $ 98,255.17
Sidewalks N
3 1638 Street Bonds 2- 2009 Series 36000 Streets & $ 23,752.77 $ 124,979.51 $ 148,732.28
Sidewalks
3 1638 Street Bonds 29 Series 36000 Streets & $ 35,543.90 $ 243,102.51 $ 278,646.41
Sidewalks
C
C
3 1638 Str- Bonds 2- 2009 Series 36000 Streets & $ 1,876.85 $ 20,899.50 $ 22,776.35
Sidewalks T
v
40-B40321 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 35,110.47 $ 122,284.93 $ 157,395.40
SW 2nd Street and SW 40th Avenue Traffic 40-B30779 4 1297 Transit Half -Cent Surtax 36000 Streets & $ 18,692.05 $ 4,702.86 $ 23,394.91
Circle - D4 Sidewalks
SW 32 Avenue Improvements Additional
Services
B40704A 2,4 1297 Transit Half -Cent Surtax 36000 Streets & $ 419,943.02 $ 111,089.97 $ 531,032.99
Sidewalks
SW 32 Avenue Improvements Additi. .I 40-B40704A
Services
SW 32 Avenue Improve
Services
SW 3rd Ave
is Additional
ad Improvements D3
2,4 1379 Street Bonds - 2007 Series
40-B40704A 2,4 1638 Street Bonds 2- 2009 Series
40-B40313 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
$ 609,496.39 $ 26,565.81 $ 636,062.20
$ 253,604.23 $ 23,702.35 $ 277,306.58
$ 22,129.39 $ 226,063.38 $ 248,192.77
Project Name
Project
Number
SW/NW 17th Avenue Traffic Corridor Study - D2 40-B30993
The Roads Roadway Improvements D3
Tigertail Resurfacing - D2
Tigertail Resurfacing - D2
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
1,2,3,4, 1297 Transit Half -Cent Surtax
5
40-B40326 3 1638 Street Bonds 2- 2009 Series
Fund No. Fund Description Actual
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
40-B30716 2 1101 Transit Half -Cent Surtax 36000 Streets &
Sidewalks
40-B30716 2 1297 Transit Half -Cent Surtax 36000 Street
Si.' alks
Encumbrances T. - Cost
$ 83,555.56 $ 1..94.08 $ 100,449.64
$ 108,65
6 $ 146,886.44 $ 255,536.90
608.46 $
$ 608.46
$ 211,834.76 $ 34,273.36 $ 246,108.12
Tigertail Resurfacing - D2 40-B30716 2 1638 Street Bonds 2- 2009 Series 3- 600 Streets & $ 387,208.08 $ 9,056.38 $ 396,264.46
Sidewalks N
Traffic Calming SW 6th Street Project - D4 40-B30771 4 1379 Street Bonds - 2007 Series 36000 Streets & $ 198,862.82 $ 5,967.96 $ 204,830.78
Sidewalks N
N Traffic Circle - SW 18th Ave & SW 13th St. - D4 40-B30778 4 1379 Street Bonds - 26: Series 36000 Streets & $ 5,061.95 $ 85,445.94 $ 90,507.89
Sidewalks
C
Transportation Program Support Services - 40-B30645B 1,2,3,4, 1297 Tra Half -Cent Surtax 36000 Streets & $ 829,021.00 $ 51,965.78 $ 880,986.78
Transportation 5 Sidewalks m
0
Transportation Program Support Svcs - 40-B70245
Transportation
US1 Landscaping between 17Avenue and
Viscaya - D2
US-1 Median Closures at Bridgeport and SW 30
Ct - D2
US-1 Median Closures at Bridgeport
Ct - D2
Venetian Causeway Impr. ements
Venetian Ca eway Improvements
1,2,3,4, 1297 Transit Half -Cent Surtax
40-B30830 2 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 36,501.10 $ 175,896.84 $ 212,397.94
36000 Streets & $ 72.42 $ $ 72.42
Sidewalks
B30662D 2 1297 Transit Half -Cent Surtax 36000 Streets & $ 10,974.89 $ 0.01 $ 10,974.90
Sidewalks
SW 30 40-B30662D 2 1379 Street Bonds - 2007 Series 36000 Streets & $ 46,236.83 $ 8,802.60 $ 55,039.43
Sidewalks
40-B39911 2 1572 FDOT - Venetian Causeway 36000 Streets & $ 643,941.16 $ 356,058.84 $ 1,000,000.00
Improvements,B-39911 Sidewalks
40-B39911 2 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 1,660,193.81 $ 536,271.19 $ 2,196,465.00
Project Name
West Flagler Area Improvements - D4
West Flagler Area Improvements - D4
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances Total 'ost
40-B30774 4 1101 Transit Half -Cent Surtax 36000 Streets & $ 94,321.42 $ 4,60 .02 $ 98,928.44
Sidewalks
40-B30774 4 1297 Transit Half -Cent Surtax 36000 Streets & $ 679,785.3 $ 184,795.14 $ 864,580.51
Sidewalks
Wynwood Area Roadway Improvement - D5 40-B30888 5 1297 Transit Half -Cent Surtax 36000 Streets &
Sidewalks
Caribbean Marketplace Renovation D5 40-B30671A
Coral Way NET Office Remodeling - Sanitary
Sewer
1,415.13 $
0.02 $ 1,415.15
5 1122 Sanitary Sewer Bonds Series 1995 37000 Sanitary -wers $ 114,000.00 $ $ 114,000.00
40-B30365ES 3 1122 Sanitary Sewer Bonds Series 1995 37
Little Haiti Soccer Field Bathroom -Sanitary 40-B30887S
Sanitary Sewers $
800.00 $
$ 800.00
5 1122 Sanitary Sewer Bonds Series 19 37000 Sanitary Sewers $ 21,996.00 $ 20,847.15 $ 42,843.15
co Moore Park New Construction - Sanititary Sewer 40-B35887S 5 1122 Sanitary Sewer Bo
Museum Park -Sanitary Sewer Allocation 40-B30538S 1,2,3,4,
5
s Series 1995 37000 Sanitary Sewers $
1122 Sanit. Sewer Bonds Series 1995 37000 Sanitary Sewers $
$ 485,812.80 $ 485,812.80
$ 1,000,000.00 $ 1,000,000.00
New Dinner Key Marina Dockmaster Building 40-B60464S 2 122 Sanitary Sewer Bonds Series 1995 37000 Sanitary Sewers $ - $ 690,000.00 $ 690,000.00
Sanitary Sewer
Police Department Sanitary Sewer System 40-B70600 ,2,3,4, 1122 Sanitary Sewer Bonds Series 1995 37000 Sanitary Sewers $ 57,510.95 $ $ 57,510.95
Repairs 5
Belle Meade Storm Sewer Project, Phase II
50672 2 1101 Transit Half -Cent Surtax
Belle Meade Storm Sewer Project, Ph, . II 40-B50672
38000 Storm Sewers $ 1,291,956.80 $ 8,043.20 $ 1,300,000.00
2 1108 Impact Fees Ord 38000 Storm Sewers $ 695,669.06 $ 4,330.94 $ 700,000.00
Belle Meade Storm Sewe roject, Phase II 40-B50672 2 1124 Stormwater Utility Trust Fund
38000 Storm Sewers $ 3,273,337.46 $ 83,914.15 $ 3,357,251.61
Belle Meade . orm Sewer Project, Phase II 40-B50672 2 1297 Transit Half -Cent Surtax 38000 Storm Sewers $ 2,057,485.91 $ 12,809.09 $ 2,070,295.00
C
co
C
m
v
N
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances To,tdl Cost
Belle Meade Storm Sewer Project, Phase II 40-B50672
Belle Meade Storm Sewer Project, Phase II
2 1379 Street Bonds - 2007 Series
38000 Storm Sewers $ 1,950,663.43 $ F S55.57 $ 1,957,219.00
40-B50672 2 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 951,51
Contribution from Genral Fund
Citywide Storm Sewer Repair Project 40-B30262
Citywide Storm Sewer Repair Project 40-B30262
Englewood Storm Sewer - Phase III
1,2,3,4, 1124 Stormwater Utility Trust Fund
5
24,882.94 $ 976,397.44
38000 Storm Sewers 1,318,642.10 $ 49,737.90 $ 1,368,380.00
1,2,3,4, 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm -wers $ 2,519,959.29 $ 469,989.71 $ 2,989,949.00
5 Contribution from Genral Fund
40-B30011 4 1297 Transit Half -Cent Surtax
Englewood Storm Sewer - Phase III 40-B30011
Englewood Storm Sewer - Phase III
00 Storm Sewers $ 201,446.05 $ 42,115.77 $ 243,561.82
4 1361 Englewood Storm Sewer Pha III 38000 Storm Sewers $ 681,000.00 $ (0.01) $ 680,999.99
40-B30011 4 1379 Street Bonds - 2
Englewood Storm Sewer - Phase III 40-B30011
FDEP Drainage Wells Compliance
FDEP Drainage Wells Compliance
Garden Storm Sewer - Phase I
Series
38000 Storm Sewers $ 1,242,858.90
4 1431 Sto water Utility 2008 Trust Fund- 38000 Storm Sewers
ontribution from Genral Fund
400,889.09 $ 1,643,747.99
2,946.62 $ 134,958.36 $ 137,904.98
40-B30700 1,2,3,4, 1113 Local Oprion Gas Tax 38000 Storm Sewers $ 134,413.69 $ 53,518.88 $ 187,932.57
40-B30700 1,2,3,4, 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 148,095.13 $ 24,309.02 $ 172,404.15
5 Contribution from Genral Fund
B30183
Garden Storm Sewer - Phase I 40-B30183
Garden Storm Sewer - P• se I
Grove Park ' .ad and Storm Sewers
Improv- ents - D3
1 1101 Transit Half -Cent Surtax
38000 Storm Sewers
1 1157 1976 & 78 Storm Sewer G 0 Bond 38000 Storm Sewers
40-B30183 1 1845 FEMA PDM Garden Storm Sewer B- 38000 Storm Sewers
30183
40-B30008
13,970.23 $
$ 13,970.23
60,981.13 $ 6,470.17 $ 67,451.30
78,242.32 $
$ 78,242.32
3 1360 Glenroyal Storm Sewer Phase III 38000 Storm Sewers $ 668,823.01 $ (0.01) $ 668,823.00
a3iniiis9ns
Project Name
Project
Number
Grove Park Road and Storm Sewers 40-B30008
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual Encumbrances T. al Cost
3 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 44,129.95 $ 0.01 $ 44,129.96
Improvements - D3 Contribution from Genral Fund
Mary Brickell Village Drainage Improvements 40-B30637 1,2,3,4, 1419 Parking Surcharge 2007
5
38000 Storm Sewers $ 215,59 . 4 $ 16,411.31 $ 232,008.85
Mary Brickell Village Drainage Improvements 40-B30637 1,2,3,4, 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers
5 Contribution from Genral Fund
Mary Brickell Village Drainage Improvements 40-B30637 1,2,3,4, 1638 Street Bonds 2- 2009 Series
5
Overtown Stormwater Pump Station Upgrades 40-B50654 5 1108 Impact Fees Ord
Overtown Stormwater Pump Station Upgrades 40-B50654
N
13,984.47 $ (0.01) $ 13,984.46
38000 Stor ewers $ 106,721.46 $ 7,346.61 $ 114,068.07
00 Storm Sewers $ 12,087.88 $ $ 12,087.88
5 1124 Stormwater Utility Trust Fu 38000 Storm Sewers $ 336,827.47 $
°' Roadway, Drainage & Traffic Improvements D1 40-B50706A 1,4 1101 Transit Half-Ce urtax
& D4
Roadway, Drainage & Traffic Improvements D1 40-B50706A
& D4
1,4 1297 Tr. - it Half -Cent Surtax
$ 336,827.47
38000 Storm Sewers $ 27,613.45 $ 154,239.45 $ 181,852.90
38000 Storm Sewers
$ 512.79 $
$ 512.79
Roadway, Drainage & Traffic Improvements D1 40-B50706A 1,4 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 31,470.24 $ 829.98 $ 32,300.22
& D4 Contribution from Genral Fund
Roadway, Drainage & Traffic Improvements D1 40-B50706
1,4 1584 Homeland Defense/Neighborhood 38000 Storm Sewers $ 335,903.92 $ 430,096.08 $ 766,000.00
& D4 Improvement Bond Series 3
Rockerman Canal Improvements
B30680 2 1124 Stormwater Utility Trust Fund
Rockerman Canal Improvements 40-B30680
Rockerman Canal Impro -ments
San Marco
Improv- ents
scayne Islands Drainage
38000 Storm Sewers $ 205,608.69 $ 33,152.46 $ 238,761.15
2 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 45,680.78 $ 444.05 $ 46,124.83
Contribution from Genral Fund
40-B30680 2 1673 Special Assessement District-
Rockerman Canal Improvements B-
30680
40-B30588 2 1113 Local Oprion Gas Tax
38000 Storm Sewers $ 203,269.05 $ 5,202.48 $ 208,471.53
38000 Storm Sewers $ 723,395.21 $ 23,774.79 $ 747,170.00
VI
C
03
VI
-I
-I
-I
v
N
Project Name
San Marco & Biscayne Islands Drainage
Improvements
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
40-B30588 2 1297 Transit Half -Cent Surtax
San Marco & Biscayne Islands Drainage 40-B30588
Fund No. Fund Description Actual
Encumbrances T. I Cost
38000 Storm Sewers $ 687,911.95 $ 23., 03.61 $ 924,115.56
2 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 340,79: $ 149,139.45 $ 489,938.00
Improvements Contribution from Genral Fund
San Marco & Biscayne Islands Drainage 40-B30588
2 1496 Sunshine State Government 38000 Storm Sewers 432,397.10 $ 42,602.90 $ 475,000.00
Improvements Financing Commission Loan # 2
San Marco & Biscayne Islands Drainage 40-B30588
2 1547 FDEP Fairlawn PH III B-50704 & San 38000 Storm -wers $ 500,000.00 $ $ 500,000.00
Improvements Marco Island B-30588
San Marco & Biscayne Islands Drainage 40-B30588
Improvements
San Marco & Biscayne Islands Drainage
Improvements
2 1638 Street Bonds 2- 2009 Series 3
00 Storm Sewers $ 333,706.42 $ 161,795.84 $ 495,502.26
C
40-B30588 2 1810 FEMA-San Marco and Biscay - 38000 Storm Sewers $ 599,999.99 $ $ 599,999.99 03
Island Drainage Improve • -nts,B-
30588
0 Silver Bluff Drainage Improvements - D4
Silver Bluff Drainage Improvements - D4
40-B30776 4 1101 Transit Half-Cen surtax 38000 Storm Sewers $ 2,568.91 $ $ 2,568.91
C
40-B30776 4 1379 Stre- Bonds - 2007 Series 38000 Storm Sewers $ 395,425.26 $ 331,809.07 $ 727,234.33 m
v
Silver Bluff Drainage Improvements - D4 40-B30776
Solid Waste Sweeper 40-B40271
Wagner Creek/Seybold Canal Dredging
1638 Street Bonds 2- 2009 Series 38000 Storm Sewers $ 1,279.76 $ $ 1,279.76
2,3,4, 1431 Stormwater Utility 2008 Trust Fund-
5 Contribution from Genral Fund
B50643 1,5 1124 Stormwater Utility Trust Fund
Wagner Creek/Seybold Canal Dredgin: 40-B50643
Wagner Creek/Seybold C- al Dredging
38000 Storm Sewers
$
- $ 168,505.63 $ 168,505.63
38000 Storm Sewers $ 1,749,259.54 $ 28,243.99 $ 1,777,503.53
1,5 1157 1976 & 78 Storm Sewer G 0 Bond 38000 Storm Sewers $ 146,493.03 $ $ 146,493.03
40-B50643 1,5 1219 PriorYR Fund Balance(311950)
Wagner Cre- Seybold Canal Dredging 40-B50643
1,5 1431 Stormwater Utility 2008 Trust Fund -
Contribution from Genral Fund
38000 Storm Sewers $ 26,221.18 $ $ 26,221.18
38000 Storm Sewers
$ 5,514.59 $ $ 5,514.59
Project Name
Solid Waste Collection Equip
Project
Number
2013-2014 CAPITAL BUDGET AND MULTI -YEAR PLAN
Dist (s) Award Award Name
NO.
Fund No. Fund Description Actual
Encumbrances T. I Cost
40-B73202C 1,2,3,4, 1426 Contribution from General Fund FY 39000 Solid Waste-CIP $ 3,580,877.61 $ 47
5 2008
City of Miami Trolley Program - Capital 40-B70715
1,2,3,4, 1297 Transit Half -Cent Surtax
Acquisition 5
Transportation Program Support Services -
40-B30645A 1,2,3,4, 1101 Transit Half -Cent Surtax
Transit Professional 5
Transportation Program Support Services -
40-B30645A 1,2,3,4, 1297 Transit Half -Cent Surtax
Transit Professional 5
77.78 $ 4,060,355.39
39900 Mass Transit $ 998,94 2 $ 0.02 $ 998,948.74
39900 Mass Transit 587.72 $
(0.01) $ 587.71
39900 Mass .nsit $ 369,632.44 $ 22,856.66 $ 392,489.10
Transportation Program Support Svc -Transit 40-B70246 1,2,3,4, 1297 Transit Half -Cent Surtax ' •00 Mass Transit
Professional 5
$ 609.60 $ 20,476.80 $ 21,086.40 c1)
C
03
V)
-I
-I
-I
v
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
1tze &IL 1tze Yalu/re
218
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPENDIX 3
LIST O ' COMPLETED PROJECTS IN
Y2012-2013
Cite su tere
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
Project Project Project Description Fund
umber Allocation
($)
3,500,000
SUBSTITUTED
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
LIST OF COMPLETED PROJECTS FY2012 - 2013
301 - CRA
Old Fire Station No. 2 B-30579 De '.n and construction to rehabilitate and restore the
Restoration - CRA 92- old F - Station No. 2, a historic 1926 two story CBS
686001 structu : approximately 10,500 SF (5,250 SF per
floor). Th work includes selective demolition,
environmen .I clean up, construction of new structural
and roof systes, second floor, all new MEP including
HVAC, new rest .oms on both floors, restoration and
installation of hist. cal elements, exterior site work,
ADA and code upgr.'es and related work. Design will
be done in three phas ,. Ph. 1: Condition Assessment
Report & Recommendati. ns. Ph. 2: Design &
Construction for strengthni ; of the structural systems
and new roof. Ph. 3: Design . d Construction of
adaptive re -use.
Additional Services requested by .owner: Adding
exterior doors to the project in com. ance to Miami -
Dade County code.
311 - GENERAL GOVERNMENT
ARRA - Green Lab B-30652A To renovate the Miami Green Lab, a green buildin. 550,000
Construction resource center for the community. Funds to be use
for landscaping, energy efficient HVAC and lighting,
electrical, plumbing and water efficient technology.
Air Conditioner Unit for B-30365P Replace the Air Conditioning Unit 3,700
Overtown NET Office
219
SUBSTITUTED
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
roject
Emergen. Radio
Equipment
replacement
MRC Emergency
Repairs
MRC Gym ADA
Restrooms - 2nd Floor
MRC Riverside Walk
Light Poles
Replacement
Public Works Asphalt
Patch Truck
Purchase and
Installation of a RISO
Digital Duplicator
Technology
Infrastructure
Air Conditioners South
District Sub Station -
Miami Police
Department
New Rescue Trucks -
Impact Fees North
District
Project Project Description
Number
B-70416 To replace the Police & Fire Radio repeaters and
communications system shutting down causing radio
communications to fail
B-30996
-30365F
Miscellaneous emergency repairs at the Miami River
Center
ADA standalone bathroom/shower (in lieu of existing
bathroom retrofit) and ada compliant push button entry
to gym
B-7041 Repair and replace eight light poles that have been
vandalize by the river walk (along the river - east of
e slip).
B-30865D
B-70107
Purche of Asphalt Patch Truck for Citywide needs.
Purchase a
This new piec
Graphics Repro
them to produce a
that are currently
installation of a RISO Digital Duplicator.
of equipment will expand GSA's
uction Division's capabilities enabling
assortment of different envelopes
ou .ourced for production.
B-74610 Security implementation, . tdated server and
networking equipment repla -ment.
312 -PUBLIC SAFETY
B-70421 Replace A/C at South District Station which I currently
experiencing a problem with the air conditione which
has resulted in an increased temperature in the
building.
B-72810N To fund purchase of 2 new rescue trucks with
enhanced capabilities and technology, to be housed at
fire station #6 and fire station #5. Rescue Trucks #25
& #26.
Fund
Allocation
($)
25,000
16,545
1,570
5,900
150,000
19,937
9,116,151
42,000
494,508
SUBSTITUTED
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
roject
North Di ict Police
Building MI c. Repairs -
D5
Police Headquarters
Helipad and Roof
Replacement
Police Radios
Replacement
Police Swat Vehicles
Dinner Key Marina
Electrical System
Upgrades
Dinner Key Marina
Maintenance
Workshop
James L Knight Center
Garage Improvements
(Garage #4)
James L. Knight Center
Chiller & Cooling
Tower Oracle Project
41-410004
Project Project Description
Number
B-30988 North District Exterior Paint and Landscaping
Painting: Exterior of the Building and perimeter wall
sorrounding parking lot.
Landscaping:Install 15-16' HT Cuban Royal Palms;
Install 1 - 12'to 14' Oak ; Relocation of 1 tree Clearing
and grubbing, tree triming ; install Palmetto sod.
-72915 Replace the helicopter landing pad and roof at the
police headquarters building.
B-30554
equesting to purchase 1,500 new radios. The current
f : et of radios used by sworn personnel is over 6 years
old nd approaching end -of life. The new radios will
be P-:5 compliant, allowing greater radio system
interop ability and is in line with GSA's plan to
upgrade t - radio system.
B-30997 Police SWAT V- icle - One (1) Base GSA Model
#SWTMCC28086 10 with Adds/Deletes: (1) SS602;
(5) SS1022; (2) SS1 c 12; (5) SS1002; (-1) SS1202; (1)
SS1205; (1) SS1216; SS1504; (1) SS1505; (7)
SS2105 per Specs LDV •B# S38SWTMCC28020812-
10
325 - PUBLIC FACILITI
B-30527 Modify the 480-volt wiring to the pier nsformers,
eliminate the below deck electrical splic , and modify
the pier lighting system to improve reliabil and
efficiency.
B-30596A Prefabricated metal maintenace & workshop bui 'ing
for the D.K. Marina. Work includes the fabrication nd
erection of the metal building, demolition, concrete
slab, landscaping and electrical.
B-30365B Contribution to MPA to automate the parking operation
at the Miami Tower to a new on foot system
B-40181 Remove and replace four Chillers and all related
pumps, piping and electrical work. Demolish existing
cooling tower and replace with new cooling tower
assembly.
Fund
Allocation
($)
66,549
233,386
843,083
322,846
50,750
44,108
391,800
4,596, 1 00
221
SUBSTITUTED
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
roject
Miamari . Painting
and Misc. -pairs
Orange Bow Marlins
Re-Developme
Orange Bowl
Redevelopment - A/E
Services &
Construction
Orange Bowl Site
Parking Garage (Marlin
Stadium Parking
Garage)
1814 Brickell Avenue
Park - D2
1814 Brickell Avenue
Park
PlaygroundEquipment
Bayfront Park Pier
Repairs - D2
Blanche Park Kids
Section - Funded by
Parks
Blanche Park Master
Plan Improvements
Brickell Park
Playground (South of
Icon)
Project Project Description
Number
B-30325A Painting and miscellaneous repairs at Harbor Master
building
B-30153J Cover expenses related to Baseball Stadium
Agreement dated 03/03/08. Premium for Pollution
Legal liability Insurance policy for Baseball Stadium
site.
B-30153B Professional A/E services for demolition of the Orange
Bowl Stadium.
B-30648 Iesign and construct parking garage
331 - PAR S & RECREATION
B-30685B Permitting and co
SF property. The pr
an elevated landscap
area. Scope includes la
groundcover, shrubs and
concrete hardscaping, bench
drainage, irrigation and lightin
water meter and electrical meter
truction of a new park on a 35,500
ram includes landscaped areas
court and a children's play
scaping consisting of
ture trees, decorative
s, picket fencing, site
There is an existing
n site.
B-30685A Purchase of playground equipment f. Brickell Avenue
Park.
B-40177 Replacing the deck and railing, and repairinthe
mooring hardware and fenders at the three (3
courtesy piers, and providing shore power to the
southernmost pier
B-75830B Install approximately 5,000 SF of artificial turf on the
playground area of Blanche Park, including drainable
base and removal and disposal of existing material.
Plant spanish stoppers along east fence.
B-75830A Master Plan Improvement at Blanche Park. Artificial
Turf Dog Area. Artificial Turf Kid Play Area.
B-39910P The Project onsist of the installation of a children's
playground at Brickell Park
222
Fund
Allocation
($)
61,890
14,034,334
1,889,600
96, 042, 248
1,209,888
42,048
300,000
50,000
545,200
110,00
SUBSTITUTED
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
roject
Coral Ga - Park
Communit :uilding
Coral Gate Park
Furniture, Security
SvstPm and
Douglas Park
Improvements - CDBG
91-02980
Duarte Park Gazebo
and Roof Remodeling -
D1
Freedom Garden
Statue Rehabilitation
D5
Project Project Description
Number
B-35865A The project consists of furnishing of all labor, material
and equipment for the construction of a new
community building of approximately 4,600 G.S.F.
Also, the project includes a new parking lot, landscape,
irrigation, demolition of existing building, new
playground and utility on site for services. Seek LEED
Silver Certification.
-30821 Purchase of Furniture, Security System and other
improvements to the Coral Gate Park.
B-399 •R Scope of services includes: Canopy shelter next to
basket ball court; Extension of walking paths;
eplacement of canopy poles; Replacement of
e-ctrical panel (baseball field); Fill gap under tennis
co s and buildings; Resurfacing basketball courts
(incl. ms, backboards, support structures and nets);
Resurfa. ing 3 tennis courts , incl. nets & posts;
Replace -nt of chain link fence around courts, incl.
gates; Exte .r painting of Recreation & Restrooms
Buildings.
B-35812C The project consi of the design and construction of
modifications to a ..up of three open-air pavilions at
Juan Pablo Duarte. A all three pavilions, work
includes removal of the oofing and installation of new
metal roof . At the South -st pavilion that houses the
local domino club, work incl es removal of the
existing steel picket fence at t - exterior of the
pavilion and installation of a non tructural louvered
fence; installation of a new steel piket fence and gate
to seperate the domino pavilion from he neighboring
pavilions; and installation of additional .hting and
fans.
B-30885 Refurbish existing statue. Furnish and insta black
granite slabs and tile to cover the statue base : d
steps.
Gibson Park Furniture - B-30305D
D5
Hadley Park ADA and
Miscellaneous
Improvements - D5
B-30547K The project consists of ADA reconstruction of parking
areas for the recreation building parking lot to include
markings, signage and ADA concrete ramps. The
Miller J. Dawkins Olympic Pool Complex building work
includes ADA modifications inside the restroom, new
accessible doors hardware, new accessories benches,
controls and bars for the existing showers, accessible
benches for the locker area and accessible signage for
the team room.
223
Fund
Allocation
($)
1,996,656
142,000
177,000
199,400
36,573
22,020
70,000
SUBSTITUTED
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
roject
Irrigation ystem at
Kennedy Do • Park -
D2
Kennedy Park oating
Dock PHI
Legion Park Boat
Ramp Repairs - D2
Legion Park
Improvements - CDBG
Project 91-02980
Legion Park Parking
Lot Renovation
Legion Park Windows
and Paint Interior - D2
QOL
Lincoln Park
Improvements - D2
Little Haiti Cultural
Campus Miscellaneous
Repairs - D5
Lummus Park
Miscellaneous Repairs -
D5 (FY2013-PR)
Maximo Gomez /
Domino Park Restroom
Project Project Description
Number
B-40170
B-30541 B
B-30820
Installation of an electromechanical irrigation system
within the two Dog Park areas at Kennedy Park
The existing floating dock located at the south end of
Kennedy Park is currently approximately 1,800 sf. The
dock requires replacement, and the Parks and
Recreation Department is requiring restoring the
extent of the floating dock to its historical footprint.
The primary purpose of the floating dock project is for
dingy and other non -motorized vessel temporary
mooring although motorized vessels will also
occasionally moor at the facility, and there is no
planned increase of temporary (launch/staging) slips
an are currently authorized by the aermittina
ncrete Repairs to Boat Ramp.
B-39910Q Scop- of services includes: New park entrance along
Biscayn Boulevard; Parking Lot resurfacing;
Recreatio Building Renovation (stage restrooms, ext.
doors, int. r ov. of 1st and 3nd floors); Canopy for
playground eq►'pment; Improvements per DOJ
agreement (per AP plans)
B-35843 Parking Lot Renova ons
B-39910M Replacement of existing :lousie windows and
installation of accordion sh ters and interior painting.
B-30826 Artificial grass and minimal lawn
Park.
B-30890
rinklers at Lincoln
Miscellaneous repairs including A/C re
Park.
acement at
B-30889 Miscellaneous repairs including A/C replacemen at
Park.
B-35861A Demolish Existing Stand -Alone Restroom building,
except Exterior wall containing Electrical -Utility
Installations ( that shall remain ). Build a New 320 +/-
Sq. Ft. Masonry Restroom Building containing facilities
for men and women, storage space, janitor closet, and
an exterior masonry dumpster enclosure. In addition,
comply with ADA Requirements.
224
Fund
Allocation
($)
55,945
299,242
14,124
390,000
57,842
49,034
80,000
25,255
40,265
215,770
SUBSTITUTED
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
roject Project Project Description Fund
Number Allocation
($)
Melrees- Golf Training B-30566A The Melreese Golf Training Center (First Tee
Center Academy) will be located adjacent to the existing
practice range and new clubhouse. It will be used
primarily as an instructional golf facility. The facility
will have approximately 5000 square feet and will
include a large assembly/classroom area, three
enclosed bays facing the practice range, two offices,
storage area, restrooms, a kitchenette, a vending area
and support spaces. It will also have a pre -fabricated
canopy over the existing practice range and
connecting walkways to the new clubhouse and
parking lot. The facility will be certified LEED Silver.
Miami Circle Park B-30365A rant to Historical Museum of Southern Florida for
Improvements I •rovements to Miami Circle Park. $50K Grant
ser -s as matching funds to a FIND Grant of $150K to
faciliti te the park's creation
Morningside A/C,
Windows and Interior
remodeling - D2
B-39910N Resurface loor with epoxy finish, change windows to
impact glas 'n Office, Arts and Craft; and Mulipurpose
rooms. Add n 1 A/C equipment and duct work at
Multipurpose roo, and miscellaneous painting.
Morningside Park ADA B-35846A 1) RECREATION BUILDING RESTROOMS: Remove
and Restrooms and Replace all restroom ixtures, partitions and
Remodeling accessories. Replace with 'ew ones .Repair piping as
necessary. Install new electri .I fixtures and exit signs
as necessary. MEET ADA REQ. IREMENTS. The
present fixture count is: MALE; 2 .ilets 1 urinal, 2
lavatories, & 1Janitor sink in its clos:t. FEMALE; 3
toilets + 2 lavatories.
2) FIELD RESTROOM BUILDING : De polish interior
( Do not demolish ceiling) and install new xtures,
accessories, partitions, floor and wall tile, p.' t and
install new insect -screens on existing pre-cas
louvered -windows . Check and repair water lines nd
check and repair sanitary lines as needed. Install -w
electrical fixtures and exit signs as necessary. The
present fixture count is as follows: MALE; 3 toilets, 2
urinals, 2 lavatories and a janitor sink in a service
room. FEMALE; 5 toilets and 2 lavatories. Patch and
paint all interior surfaces. MEET ADA
REQUIREMENTS. 3) Correct walkways and parking
stalls to meet ADA requirements. 4) Additional access
openings on the shoreline.
2,385,560
50,000
170,000
562,120
225
SUBSTITUTED
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
roject Project Project Description Fund
Number Allocation
($)
Parks Al A B-30547F Provide H/C accessible space, van accessible space,
Modificatio - District both on an accessible route. Provide an accessible
3 - Jose Mart ark route to the chess tables, Provide ADA ramp to stage.
Provide 1 ADA compliant picnic table on an accessible
route, Provide ADA compliant restrooms at
theRecreation Center. Provide ADA compliant
Restrooms at the Pool Building; also provide ADA
compliant signage, ramps, water fountains, doors and
counters for the preceeding restrooms.
Parks ADA B-305-H AFRICAN SQUARE: Re- stripe parking & provide 1
Modifications - District ADA Van space. Provide 1 ADA chess table. Provide 1
5 A DA ramp to the Amphitheatre Stage. Upgrade both
R ' to ADA Remodel the interior of both restrooms.
HA ) EY: Provide 1 ADA Van space and 1ADA H/C
space. At the Rec Ctr. provide 1 ADA Van space and
2 ADA C spaces Re -Design showers and fixtures to
ADA . LE •N CITY: 1 ADA Van space. ADA route
between bas etball and sidewalk. LUMMUS: 1 ADA
Van space. Al route to bar-b-que & drinking
fountain. Hi-Lo AAA drinking fountain MOORE: ADA
directional signage -t entry to Tennis Center. ADA
hand rails at the Ten Center. ADA route to Day
Care. ADA picnic tabl on an ADA route. ADA route
to the picnic tables & pla .round. equipment. 1 ADA
play equipment on an ADA .ute. Provide ADA
surface for play equipment arz... Re -design the
showers, fixtures, to ADA criteri
Robert King High Park B-30229 Construction of new soccer field inclu.' g new
Soccer Field and restroom facilities with liftstation, ADA p. king lot and
Restrooms walkways, bleachers and related work. The ew soccer
field will include new sports lighting and irrig. 'on
system.
Virrick Park B-35853B Remove and replace the exiting roofing with like
Gymnasium products. New roof to consist of a modified bitumen
Improvements D2 built up roof over lightweight insulating concrete over
rigid insulation boards. Replace cornise at
gymnasium.
341 - STREETS & SIDEWALKS
ARRA - ADA Sidewalk B-30683C Sidewalk Improvements within District 3 Boundaries
Improvements District
3
226
96,917
211,137
1,238,844
150,000
132,03
SUBSTITUTED
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
roject
ARRA- 2Ave.
Improv. Seoment B1
(36th Street t. 42nd
Street)
ARRA - NE 2 Ave.
Improv. Segment B2
(51 st Street to 57th
Street)
ARRA Citywide Bicycle
Rack & Signage
Program
Baywalk Mobility Plan
Belle Meade Gateway
Enclosure
Bob Hope Dr. Between
NW 20th Street to NW
17th Street - D1
Brickell Avenue
Decorative Pedestrian
Crosswalk
Brickell Lighting Phase
II - D2
Project Project Description
Number
B-78508A Provide all project management and engineering
analysis and design services necessary for preparing
construction documents for the reconstruction of NE
2nd Avenue from NE 36th Street to NE 42nd Street.
The scope of work includes roadway reconstruction,
stormwater system, curb and gutter, concrete
sidewalk, signing and pavement markings, decorative
lighting, signalization and landscape, Reference B-
78508 for Non-ARRA Funded Segment and B-78058B
for ARRA Funded Segment from 59th to 69th Streets.
B-785c:C The scope of work includes roadway reconstruction,
stormwater system, curb and gutter, concrete
idewalk, signing and pavement markings, decorative
hting, signalization and landscape.
B-30694 Instation of Bicycle racks citywide, and in public
schoo Installation of shared use pavement
marking installation of "Bikes May Use Full Lane"
signs, instation of "Share the Road" signs,
installation o .irectional signage.
B-30645D Preparation of d
continuous and pu
a feasibility and cons
alternative alignment o
responsibilities, and as w
prioritizing short and long
ument showing how to implement a
icly accessible Baywalk including
uctibility analysis, idenifying
ions and jurisdictional
I as identifying and
to improvements.
B-40183 Install steel picket fence with ga -s at five street
barricades
B-30703 Project consist of milling and resurfac g of Bob Hope
Dr. Between NW 20th Street to NW 17t Street -
Project estimate based on milling and res facing only
with minor reconstruction if necessary. Projelength
of approximately 1500 ft was reduced to 900 ft o meet
allocated budget
B-399101 Contribution to FDOT to facilitate the installation o
decorative pedestrian crosswalk along Brickell Aven
B-40666B Replacement of (90) existing lighting poles. The poles
shall be replaced in such a way that all lights are
burning by dusk. Removed poles shall be delivered in
good conditions to City of Miami GSA. Contractor shall
provide 9 spare lights as requested by MDPWD.
227
Fund
Allocation
($)
510,979
2,220,578
392,130
60,000
50,479
152,370
33,132
850,000
SUBSTITUTED
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
roject
Calle Oc'o
Beautificat
37 Ave
n - East of
Calle Ocho
Improvements
Car Sharing Feasibili
Study
Citywide Sidewalk
Replacement Phase 29
Coral Gate Community
Improvements - D4
District 2 - Sidewalk
Repairs & ADA
District 4 - Sidewalk
Repairs & ADA
District 5 - Sidewalk
Repairs & ADA
Gateway Signage and
landscape
improvements
Gibson Park Area
Street Improvements -
Street Component of B-
30305B
Kumquat Ave between
Pamona Lane and
Linden Lane D2
Project Project Description
Number
B-30222A New landscape median with beautifications
/enhancements on sidewalk on SW 8th Street from
SW 27th to SW 37th Ave.
B-78509A
B-70716
-43114A
Provide road improvement and beautification.
Study and implementation of Car Sharing Program
Replacement of broken sidewalk, driveway, brick
sidewalk, curb and curb & gutter. Rework swale area
and adjustment of utilities boxes. This is a two year
contract with option to renew in 2(two) additional one
year periods pending funding availability.
B-30717 Scop- of work consists of roadway improvements
and con ruction of Traffic Calming devices. .
Improvem: nts also include milling and resurfacing
within the improvement area, ADA curbs and ramps,
signing, pave nts markings, landscaping and
drainage improv ents.
Speed Traffic Engi 'eering Study for the Coral Gate
community.
Speed Traffic Study fo he Home Depot Area
B-30377B Sidewalk Repairs througho District 2
B-30377D Sidewalk repairs and ADA imp .'vements as needed
in various locations within project oundaries.
B-30377E Sidewalk repairs throughout District 5
B-30209 Provide gateway signage at locations to b- .etermined
in coordination with CRA; miscellaneous Ian• .cape
improvements throughout CRA consistent with
approved master plan.
B-30305C Street Improvements to address existing roadway
conditions. Reconstruct NW 12th Street with new drop-
off area, parking and landscaping. The remaining
scope for this project are being performed under B-
30305B.
B-40175 Proposed two (2) speed tables to slow vehicular traffic.
228
Fund
Allocation
($)
315,554
778,372
25,000
5,017,215
200,000
250,691
250,691
250,691
201
1,000,000
,725
roject
MiMo Si
Median La
Uplighting
SUBSTITUTED
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
walks and
scape
N. Miami Avenue
Reconstruction
NE 1st Avenue
Reconstruction
NE 38 Street
Reconstruction
NW 11th Street
Roadway Improvement
Project - D1
NW 14th Avenue
Between NW 24th
Street to NW 27th
Street - D1
NW 14th Court
Roadway & Drainage
Improvements - D3
NW 17th Court
Roadway Improvement
Project - D1
NW 21 Avenue
between NW 1st Street
and NW 3rd Street -
D3
Project Project Description
Number
B-30564 To contribute City funds via a Locally Joint
Participation Agreement (JPA) with FDOT for the
Biscayne Boulevard Landscape Project from NE 37th
Street to NE 87th Street for construction of non-
standard sidewalks along the historic MiMo district and
installation of landscape uplighting in the median as
part of the FDOT roadway reconstruction project.
-31216 Street reconstruction per Miami Design District
planning study.
B-312 New scope of work is being discussed. WOA on
process.
B-31209 R
muc
Devel
resurfac
onfigure the existing roadway section to follow as
as possible the Miami Design District
ment Plan. Scope includes milling and
g, landscaping, lighting and drainage.
B-30725 Milling and res facing.
B-30704 Project consist of road improvements to NW 14th
Avenue Between NW 24t Street to NW 27th Street -
Project estimate based on fling and resurfacing, new
curb and gutter on both sides, inor drainage
improvements and swale drive improvements.
Project length approximately 700 and 22 ft existing
pavement.
B-30746 Milling and resurfacing, minor drainage i •rovements
(NE corner of NW 14th Ct & NW 8th Terri rsection),
redoing curb & gutter, striping, signage and tr
planting.
B-30728 Milling and resurfacing, ADA modifications, curb
replacement & removal, and striping.
B-30712 Project scope includes milling and resurfacing of
existing pavement with new valley gutter and misc.
drainage as needed.
Fund
Allocation
($)
298,000
24
26,371
144,873
750,000
240,000
180,000
110,000
206,060
SUBSTITUTED
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
roject
NW 24th treet
Between N ,k 14th
Avenue and W 17th
Avenue - D1
NW 60th Avenue
Roadway Improvement
Project - D1
NW 8th Street
Roadway and Drainage
Improvements
North Shorecrest
Roads Improvements
Project - Partial CDBG
91-02910 - D2
Royal Road - Milling
and Resurfacing - D2
SW 11 th Street Road
Improvements - D3
SW 13th Street
Roadway & Drainage
Improvements - D3
SW 16 Avenue
Roadway & Drainage
Improvements - D3
SW 16th Avenue from
Coral Way to 20 Street
- D3
SW 17 Terrace
between SW 18 and 19
Avenues - D4
SW 23rd Roadway &
Drainage
Improvements - D3
Project Project Description
Number
B-30705 Project consist of roadway improvements to NW 24th
Street Between NW 14th Avenue and NW 17th
Avenue - Project estimate based on milling and
resurfacing, new curb and gutter on both sides, minor
drainage improvements and swale driveway
improvements. Project length approximately 1400 ft
and 22 ft existing pavement.
-30726 Design Only: Milling and resurfacing.
B-3074 Milling and resurfacing, minor drainage improvements
(NW corner of NW 15th St & NW 8th St intersection;
st side of NW 15th Ave, just North of NW 8th St and
S .nrnPr of NW Rth TPrr R NW 17 AvP intPrcPctinnl
B-30035A Roaimprovements including, but not limited to
roadw. reconstruction and/or milling & resurfacing,
striping, wale restoration, new sidewalks, tree
planting, AAA ramps, addressing drainage
improvemen if warranted, and signage.
B-40174 Scope of work i resufacing, stabilization and signage.
B-40304 Milling & resurfacing inuding driveway approaches,
some type F curb & gutte replacement, damaged
sidewalk replacement, and .possible drainage
improvements.
B-30747 Add curbs (may require roadway : construction to
lower grades)
B-30741 Milling and resurfacing with minor draina
improvements
B-30719 Project scope consist of Milling and Resurfacing of
approximetly 780 I.f. and includes misc. drainage
Improvements
B-30710 Drainage Improvement of SW 17th Terrace between
SW 18th Avenue and SW 19th Avenue, milling and
resurfacing and final striping of the resurfaced
pavement.
B-30744
Road reconstruction for sections whee there is
excessive root damage. Install root guards, milling
and resurface,clean drainage.
230
Fund
Allocation
($)
360,000
888,000
402,000
1,092,178
60,000
81,549
202,157
189,954
102,891
62,804
,000
roject
SW 25th
Improvem
D3
SUBSTITUTED
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
oad Street
eit Project -
SW 28th Road
Roadway & Draina
Improvements - D3
SW 3 Avenue Two
Way Conversion
SW 3rd Avenue Road
Improvements Project
Shorecrest Roadway
Milling & Resurfacing
Project
Two -Way Traffic
Conversion on NW 1
Street - D3
US1 Roadway
Improvements and
Wall Replacement
Phase II
Virginia Street between
Bird Avenue and US1
and Misc. Grove Street
Sidewalks & Lighting -
D2
Project Project Description
Number
B-30720 Milling and resurfacing, curb replacement and misc.
drainage improvements
B-30743 Drainage and milling and resurfacing at north half of
block near Coral way. Ponding complaint
B-71212 One-way to two-way street conversion (matching funds
to developer contribution).
B-3
31A Road improvements including, but not limited to
roadway reconstruction and/or milling & resurfacing,
pavement striping, swale restoration, curbs and/or
•utters repair, sidewalks repair, landscaping, signage,
*A ramps, drainage improvements if warranted, and
bik: lanes.
B-30035B The S •e of Work involves the construction of milling
and resu .cing of the existing asphalt pavement, the
replaceme of associated pavement markings and
damaged sid alk replacement. Area bounded by NE
87th St. and N 83rd St (North), Little River (South),
Biscayne Bay (Ea t), Little River (West). Project also
includes minor drai ge improvements designed by
Public Works for NE : nth Street.
B-30740 Location is NW 1st street fr
South River Drive
NW 6th Avenue to NW
Reconstruct handicap ramps to b DA compliant and
adjust pavement markings on NW 1 street, west of
NW 6th avenue and also west of NW -•uth river
drive.
B-30542A Phase II of removing existing "pink wall" alo • • US-1
from 19th Avenue to 17th Avenue. Replace wi a
"Post & Panel" pre -cast concrete barrier wall fro ' 1
Avenue to 17th Avenue. Scope includes landscap
trellis installation, and uplighting.
B-30734 Lighting Improvements and Miscellaneous roadway
improvements
343 - MASTER TRANSIT
9th
g,
Fund
Allocation
($)
228,000
200,143
154,995
137,532
1,313,678
8,970
2,671,423
258,658
SUBSTITUTED
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
roject Project Project Description Fund
Number Allocation
($)
ARRA - • rchase of B-30668 Purchase of Rubber Tire Trolley Vehicle and Capital
Trolley Ve ' les Equipment as well as installation of bus benches /
shelters.
FEC Quiet Zone ' udy B-40268 Establishment of a new Quiet Zone designation along
Health District
Circulator Service
the Florida East Coast (FEC) Railway corridor from NE
71 Street (Little River) to the Port of Miami (POM).
This effort is driven by the FEC and POM
reconstruction of the 4.4 mile segment of the existing
rail corridor to allow for both cargo and passenger rail
in the near future. This effort will recommend safety
upgrades to the 18 existing and active grade crossings
in order to allow the City to petition the Federal
ailroad Administration (FRA) for a waiver to establish
a ouiet Zone. The Quiet Zone allows railroad trains to
be e empt from blowing their whistles at each
cross!
4,084,282
150,085
B-30581 Operating nd Maintenance Costs for the Health 1,170
District Tran 't Circulator
351-SANITA Y SEWER
Marlins Stadium Area B-30673 The project consists of t - milling and resurfacing of
Infrastructure existing roads, replaceme of broken sidewalk and
Improvements curbing, the addition of ADA ompliant pedestrian
ramps, and lining of existing stm sewer pipes.
Citywide Drainage
Improvement Project
352 - STORM SEWERS
12,536,710
B-30597 Drainage Improvements to address existin• flooding 9,854
and roadway conditions
1) 2010 FEMA PDM Application
2) 2011 FEMA PDM Application
Drainage Master Plan B-30632 Updates to the Drainage Master Plan Update (DPMU
Update to identify drainage basins and preliminary drainage
improvements within the City of Miami Limits.The
DMPU may include but not be limited to data
collection and verification, hydrologic /hydraulics
analysis of all the drainage basins, review of federal
water quality permit obligations and improvements,
recommendations for maintenance and public safety
enhancements, specific capital improvement project
prioritization, and identifying preliminary budgetary
needs.
232
715,384
SUBSTITUTED
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
roject
Durham efface
Drainage ' eject
Fairlawn Storm Sewer
Improvements Project
Phase III
Northwest Road and
Storm Sewers
Improvements - D5
Orange Bowl
Stormwater Pump
Station Upgrades
ARRA / Solid Waste
Biodiesel Refuse
Haulers
Solid Waste Collection
Equipment ARRA
Grant Match
Project Project Description
Number
B-30629 The design and construction of a stormwater drainage
system to mitigate severe flooding in the area. Milling
and resurfacing of the roadway pavement will be
performed. Swales will be reworked and regraded to
comply with Public Works Bulletin #28 and new
landscaping and trees will be added. Broken sidewalks
will be replaced, as well as new ADA compliant ramps
will be constructed.
B- 0704 Construction of a storm sewer system. Road
improvements such as damaged sidewalk
replacement, damaged curb and / or gutter
replacement, ADA compliant ramp construction, re -sod
f swales, milling & resurfacing.
B-30014 Con ruction of a storm sewer system. Road
impro -ments such as damaged sidewalk
replace -nt, damaged curb and / or gutter
replaceme 't, ADA compliant ramp construction, re -sod
of swales, m ing & resurfacing.
B-50653 FEMA-funded repa and upgrades to the Orange
Bowl Stormwater Pu • Station, including installation
of an emergency gener or.
353 - SOLID WASTE
B-73202B Pucharse biodiesel refuse haulers
B-73202A Purchase biodiesel refuse haulers
233
Fund
Allocation
($)
2,259,519
5,026,810
9,230,466
397,402
731,850
2,195, 550
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
1tze &IL 1tze Yalu/re
234
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
LIST
APPENDIX 4
F INITIATED PROJECTS IN
Y2012-2013
Cite sutavie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
Fund Type
Streets & Sid- alks
Sanitary Sewers
Public Facilities
General
Government
Sanitary Sewers
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Storm Sewers
Storm Sewers
Storm Sewers
Storm Sewers
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Active and Future Projects Initiated in Fiscal Year 2013 by Fund Type
Project
Grove Park Road
Improvements - D3
Gi. on Park New
Cons uction - Sanitary
Sewer •.mponent
Miamarina Painting and
Misc. Repairs ............................
Coral Way Community
Center Playground Oracle
Project 91-03275
B-No.
B-30008A
B-30305BS
0325A
B-303..Q
Virginia Key Rowing Center' B-30374S
Improvements - Sanitary
Sewer Component
FY2014 - D1 Roadway,
drainage and sidewalks
repairs
FY2014 - D2 Roadway,
drainage and sidewalks
repairs
FY2014 - D3 Roadway,
drainage and sidewalks
repairs
FY2014 - D4 Roadway,
drainage and sidewalks
repairs
FY2014 - D5 Roadway,
drainage and sidewalks
repairs
NW 34 Ave over Comfort
Canal - Bridge 876417 -
PW
D1 - Stromwater Projects
D2 - Stormwater Projects
D3 - Stormwater Projects
D4 - Stormwater Projects
B-30411
B-30412
B-30413
B-30414
B-30415
B-30416
B-30421
B-30422
B-30423
B-30424
Scope
Construction of a positive storm sewer system.
Road improvements such as damaged sidewalk
replacement, damaged curb and/or gutter
replacement, ADA compliant ramp construction.
PHASE II Gymnasium - the work will consist of a
new Gymnasium Building with +/_ 12,000SF and
shall include Gymnasium Area, Men's and
Women's Restroom, Cooking Kitchen including
equipment, storage and Concession Area,
Equipment Storage Area, Mechanical, Electrical,
Janitor Rooms, Ticketing Office. Provide all
disciplines construction documents necessary to
permit and construct the proposed project, and
all related Site Work to be constructed as
PHASE II, including but not limited to: Drainage,
Parking Lot, Irrigation, Illumination, and Signage
to comply with Class II permit.
Painting and miscellaneous repairs at Harbor
Master building ........
ite modifications include demolition of an
existing residential building, three new play
structures on new playground, drainage at
-parking concurrent with regrading and new
vino.
F Standing Two-story structure containing the
Mia Rowing Club 2,000 S.F. addition upstairs.
And a = 000 S.F. open space on the ground
floor. Th: addition consists of an exercise room,
men & wo -n restrooms / lockers / showers,
unisex restro. , storage space and an office.
Also, new ADA ompliant fully accessible
concrete ramp to e second floor.
Miscellaneous Distri ide Roadway, Drainage
and Sidewalk Repairs .. needed for FY2014
Miscellaneous Districtwide oadway, Drainage
and Sidewalk Repairs as nee. -d for FY2014
Miscellaneous Districtwide Road .y, Drainage
and Sidewalk Repairs as needed fo FY2014
Miscellaneous Districtwide Roadway, D :inage
and Sidewalk Repairs as needed for FY2I 4
Miscellaneous Districtwide Roadway, Drainag
and Sidewalk Repairs as needed for FY2014
Bridge rehabilitation including girders, deck,
railing, and substructure.
Improvements to drainage infrastructure
including, but not limited to, exfiltration trenches,
inlets, swale trenches, and well structures.
Improvements to drainage infrastructure
including, but not limited to, exfiltration trenches,
inlets, swale trenches, and well structures.
Improvements to drainage infrastructure
including, but not limited to, exfiltration trenches,
inlets, swale trenches, and well structures.
Improvements to drainage infrastructure
ncluding, but not limited to, exfiltration trenches,
nlets, swale trenches, and well structures.
235
Dist.
3
Total Cost
$ 628,321
Total Funds
$ 628,321
5 $ 117,000 $
2
3
2
1
2
3
4
1
1
2
3
4
$ 61,890 $
$ 500,000 $
$ 100,000 $
$ 100,000
$ 100,000
$ 100,000
$ 100,000
$ 196,625
$ 178,700
$ 1,198,000
$ 198,000
$ 1,198,0
$ 1,198,000
117,000
61,890
100,000
90,000
90,000
90,000
82,143
$ 178,700
$ 1,198,000
$ 1,148,000
1,198,000
$ 1,198,000
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Stor Sewers
Streets & Side : ks
Streets & Sidewalks
Streets & Sidewalks
............................................
Streets & Sidewalks
Streets & Sidewalks
................................................................................
Disaster Recovery
Public Facilities
Parks and
Recreation
Project
D5 - Stormwater Projects
D1 - Reconstruction of
Roadway identified as
Very Poor" by PW
D2 - R- onstruction of
Roadway .entified as
"Very Poor" PW
D3 - Reconstruction .f
Roadway identified as
"Very Poor" by PW
D4 - Reconstruction of
Roadway identified as
"Very Poor" by PW
D5 - Reconstruction of
Roadway identified as
"Very Poor" by PW
Civic Center NW 14th
Street - Tree Funded
Component
Manuel Artime Window
Replacement 970 Building -
PF
Museum Park - DRI Fees
Administration
B-No.
B-30425
B-30431
B-30432
B-30433
-30434
B-30435
Scope
Improvements to drainage infrastructure
including, but not limited to, exfiltration trenches,
inlets, swale trenches, and well structures.
Citywide Payment resurfacing contract to
address needed roadway improvements
throughout the City on pavement resurfacing rted
'very poor". Locations are derived from residents
notification, 311 reports and field inspections.
Citywide Payment resurfacing contract to
address needed roadway improvements
throughout the City on pavement resurfacing rted
'very poor". Locations are derived from residents
notification, 311 reports and field inspections.
Citywide Payment resurfacing contract to
address needed roadway improvements
throughout the City on pavement resurfacing rted
"very poor". Locations are derived from residents
notification, 311 reports and field inspections.
Citywide Payment resurfacing contract to
address needed roadway improvements
throughout the City on pavement resurfacing rted
"very poor". Locations are derived from residents
notification, 311 reports and field inspections.
Citywide Payment resurfacing contract to
dress needed roadway improvements
thr. ghout the City on pavement resurfacing rted
'very .00r". Locations are derived from residents
notificaion, 311 reports and field inspections.
Installation •f landscaping along a proposed
median withi the NW 14th Street project
Replace and sea indows throughout complex.
Construction of a multi
underground parking, an
includes but not limited to:
Baywalk: Includes the constru
pedestrian walkway along the b
can be used for emergency acces
and other emergency vehicles. Walk
include associated site/civil, landscapi
irrigation and lighting work.
Promenade: Includes the construction of a
pedestrian walkway along the northern boun
of the park, adjacent to the proposed Science
and Art Museums, which can be used for special
events, emergency access to fire trucks and
other emergency vehicles. The work includes
associated site/civil, landscaping, irrigation and
lighting. In addition, an asphalt parking lot for
approximately 40 cars will be constructed along
with a restroom facility.
The drainage infrastructure includes the
construction of a stormwater management
system consisting of dry retention swales,
concrete modules, and exfiltration trenches with
associated catch basins and piping with the
connection of three existing outfalls.
The project includes: 1) stabilization of the
Seawall against further movement (outward lean
or tilt) and 2) undertaking the necessary
structural repairs to the concrete cap and
expansion joints, so that the entire Seawall
remains structurally sound, stable, and
236
e park with restaurant, 1,2,3,4,
useum sites. Scope 5
seum Park
on of a
head which
or fire trucks
ay shall
y
Dist.
Total Cost
Total Funds
5 $ 1,078,000 $ 1,078,000
1 $ 4,114,165 $ 2,400,000
2
3
4
5
$ 2,500,000
$ 2,500,000
................................
$ 2,500,000
$ 2,500,000
$ 1,200,000
$ 2,400,000
......................................
$ 2,400,000
$ 2,400,000
1,2,3,4, $ 100,000 $ 100,000
5
2 $ 173,607 $ 150,379
600,000 $ 600,000
Fund Type
Pa s and
Recr-:lion
Parks and
Recreation
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project B-No.
Museum Park - DRI Air
Quality
Museum Park - DRI
Transportation
B-30538E
B-30538F
Scope Dist.
Construction of a multi -use park with restaurant,
underground parking, and museum sites. Scope
includes but not limited to: Museum Park
Baywalk: Includes the construction of a
pedestrian walkway along the bulkhead which
can be used for emergency access for fire trucks
and other emergency vehicles. Walkway shall
include associated site/civil, landscaping,
irrigation and lighting work.
Promenade: Includes the construction of a
pedestrian walkway along the northern boundary
of the park, adjacent to the proposed Science
and Art Museums, which can be used for special
events, emergency access to fire trucks and
other emergency vehicles. The work includes
associated site/civil, landscaping, irrigation and
lighting. In addition, an asphalt parking lot for
approximately 40 cars will be constructed along
with a restroom facility.
The drainage infrastructure includes the
construction of a stormwater management
system consisting of dry retention swales,
concrete modules, and exfiltration trenches with
associated catch basins and piping with the
connection of three existing outfalls.
The project includes: 1) stabilization of the
Seawall against further movement (outward lean
or tilt) and 2) undertaking the necessary
uctural repairs to the concrete cap and
e .. nsion joints, so that the entire Seawall
rem.' s structurally sound, stable, and
Constri tion of a multi -use park with restaurant,
undergro d parking, and museum sites. Scope
includes b . not limited to: Museum Park
Baywalk: Inc! .es the construction of a
pedestrian walk ay along the bulkhead which
can be used for e ' ergency access for fire trucks
and other emergen vehicles. Walkway shall
include associated sit civil, landscaping,
irrigation and lighting wo
Promenade: Includes the 'nstruction of a
pedestrian walkway along the northern boundary
of the park, adjacent to the pro•.sed Science
and Art Museums, which can be ed for special
events, emergency access to fire trks and
other emergency vehicles. The work 'cludes
associated site/civil, landscaping, irriga i.n and
lighting. In addition, an asphalt parking to
approximately 40 cars will be constructed a
with a restroom facility.
The drainage infrastructure includes the
construction of a stormwater management
system consisting of dry retention swales,
concrete modules, and exfiltration trenches with
associated catch basins and piping with the
connection of three existing outfalls.
The project includes: 1) stabilization of the
Seawall against further movement (outward lean
or tilt) and 2) undertaking the necessary
structural repairs to the concrete cap and
expansion joints, so that the entire Seawall
remains structurally sound, stable, and
237
1,2,3,4,
5
1,2,3,4,
5
Total Cost
$ 313,129
$ 2,296,404
Total Funds
$ 313.129
$ 2,296,404
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Disast Recovery
Disaster Recovery
Disaster Recovery
...................................
Disaster Recovery
Disaster Recovery
Disaster Recovery
Disaster Recovery
Project
B-No.
Museum Park - FEMA Tree B-30538T
Funding Component
D1 FEMA Tree Funded
Proiects
D3 FEMA Tree Funded
Projects ..............................
D4 - FEMA Tree Funded
Projects
D5 FEMA Tree Funded
Component
Overtown Greenway @ NW
11 Terrace - D5 Tree
Funded Component
Palm Grove Road
Improvements - Tree
Component D2
B-30611T
B-30613T
B-30614T
B-30615T
B-30624T
B-30630T
Scope
Construction of a multi -use park with restaurant,
underground parking, and museum sites. Scope
includes but not limited to: Museum Park
Baywalk: Includes the construction of a
pedestrian walkway along the bulkhead which
can be used for emergency access for fire trucks
and other emergency vehicles. Walkway shall
include associated site/civil, landscaping,
irrigation and lighting work.
Promenade: Includes the construction of a
pedestrian walkway along the northern boundary
of the park, adjacent to the proposed Science
and Art Museums, which can be used for special
events, emergency access to fire trucks and
other emergency vehicles. The work includes
associated site/civil, landscaping, irrigation and
lighting. In addition, an asphalt parking lot for
approximately 40 cars will be constructed along
with a restroom facility.
The drainage infrastructure includes the
construction of a stormwater management
system consisting of dry retention swales,
concrete modules, and exfiltration trenches with
associated catch basins and piping with the
connection of three existing outfalls.
The project includes: 1) stabilization of the
eawall against further movement (outward lean
or 'It) and 2) undertaking the necessary
stru ral repairs to the concrete cap and
Tree 'mponent of D1 Funded Projects.
Tree Com
nent of D3 Funded Projects.
Tree Compon- 't of D4 Funded Projects.
Tree Component o 15 Funded Projects.
FEMA Tree Fund: The ope includes the
design and construction . urban pathways,
landscaping and ancillary s .- improvements to
the NW 11th Terrace and for -r FEC Railway
corridor. This project is a phase .f the Overtown
Greenprint Plan developed by TPL There is
State of Florida LAP funding associ. -d with this
project. (FPN 420917-1-58-01) of $951 •00 for
fnnctri Irtinn nnly
FEMA Tree Fund: The project scope inclues
but is not limited to milling and resurfacing o
asphalt pavement, repair of broken curbs,
gutters, sidewalks and driveway approaches;
additional drainage improvements to remove
ponding as needed; replacement of accessible
ramps to meet ADA regulations; landscaping
throughout the neighborhood; limited addition of
security lighting; and a traffic circle is located at
NE 5th Avenue and NE 77th Street.
238
Dist.
Total Cost
215,943
Total Funds
$ 215.943
1 $ 169,930 $ 169,930
3 $ 255,930 $ 255,930
4 $ 315,930 $ 315,930
5 $ 119,930 $ 119,930
5 $ 100,000 $ 100,000
2
$ 70,000
70,000
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Streets : Sidewalks
Sanitary Sewers
...................................
Disaster Recovery
.................................
Disaster Recovery
...................................
Disaster Recovery
.................................
Disaster Recovery
Public Facilities
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Parks and
Recreation
............................................
Streets & Sidewalks
Streets & Sidewalks
Disaster Recovery
Parks and
Recreation
Project
B-No.
Miami Regional Intermodal B-30645F
Plan
Caribbean Marketplace
Renovation - Sanitary
Sewer Component
Coconut Grove Business
Improvement District D2
Tree Component
Beacom Project Area
Improvements - Tree
Component D3.........................
NW 33rd Street Roadway
Improvement Project - D1
Tree Component
NW 18th Avenue Roadway
Improvement Project - D1
Tree Component
Dinner Key Marina Dinghy
Dock - D2
Phase II: NW 33rd Street
Roadway Improvement - D1
Citrus Grove Roadway
Improvements
SW 23 Street btw 16 and
17 Ave for M&R - D3
Coral Gate Mini Park - D4
Traffic Circle - SW 18th
Ave. & SW 13th St. - D4
SW 2nd Street and SW
40th Avenue Traffic Circle -
D4
NW 14 Ave & 28 St. Are
Roadway Improvements-
D1 - Tree Component
Antonio Maceo Park Multi -
Purpose Recreational
Facility
30671A
B-30699T
B-30724T
B-30727T
B-30735
B-30736
B-30749
B-30751
B-30777
............................
B-30778
B-30779
B-30783
Scope
Dist.
The Miami Regional Intermodal Plan (MRIP) is a 1,2,3,4,
study of the transportation facilities in an area of 5
the City of Miami bounded by the Miami River to
the north, Brickell Avenue (SR 5/US 1) to the
east and SW 8 Street to the south, and NW 57
Avenue to the west. The grant will fund planning
activities to improve transportation connectivity
between destinations of regional importance:
MIC, Port of Miami River, the Miami Marlins
Ballpark and Downtown Miami. The areas east
and south of the Miami Intermodal Center (MIC)
do not have a comprehensive infrastructure plan
addressing the interrelationships between
mobility, job creation, and neighborhood
stabilization. The area will be assessed to
determine the need for capital projects including
roadway network improvements, ADA sidewalk
compliance, bicycle/pedestrian greenways,
bridge access, water taxi service, bus transit
corridors, truck/intermodal freight facilities, and
storm sewer infrastructure.
Interior demolition and renovation. The repairs 5 $ 114,000 $ 114,000
nclude new plumbing, ventilation and electrical
systems. ........................................
2 $ 100,000 $ 100,000
3 $ 60,000 $ 60,000
1 $ 60,000 $ 60,000
The installion of trees within every street block 1 $ 60,000 $ 60,000
within the pr.'-ct limits where permitted and
financially feast le.
Total Cost
Total Funds
Installation of new trees with the Beacom Area
provements
Insta .tion of new trees within the NW 33rd St
Area i .rovements
Design, environme
construction of a 20
Dinner Ke Marina.
Milling and resurfacing, d
ADA modifications and stri
6
al permitting and
F dinghy dock at the
nage improvements,
9.
Projects include misc. roadway,
traffic improvements along variou
the project limits. See sub -project
locations.
Milling and Resurfacing SW 23 Street b
and 17 Ave
Mini Parks
rainage and
treets within
s exact
16
Roadway improvements and construction of
traffic calming devices. Included milling and
resurfacing whiting the improvement area, ADA
curbs and ramps, signing, pavement marking,
landscaping and drainage improvements.
Includes traffic calming, milling and resurfacing,
new curb and gutter, concrete sidewalk and ADA
improvements, storm water drainage system if is
necessary, pavement marking, and signing, and
restoration of swales areas.
Milling and Resurfacing, reconstruction of NW
11th Ave, installation of Turf Block along NW
14th Ave and NW 28th Street, Instalation of
An approximately 4500 square foot multi-
purpose recreational facility that would include
meeting rooms, multi -purpose rooms, after
h..l .r..r.m I r.l ,n. , .r..r.m
239
48,000
48.000
2 $ 253,070 $ 253,070
$ 2,375,000 $ -
3 $ 556,791 $ 556,791
3$ 43,101 $
4 $ 200,634 $ 100,000
..............................................................................
4 $ 122,557 $ 112,557
4
1
1
250,000
26
0
$ 1,500,000
$ 250,000
26,000
Fund Type
Streets : Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Disaster Recovery
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Streets & Sidewalks
Streets & Sidewalks
Parks and
Recreation
Streets & Sidewalks
Public Facilities
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Health District Riverwalk
NW36',venue 15to16
Street Dr. • age
Improveme - D1
NW 43 Avenu between 9
to 11 Street Ro. •way
Improvements - D
NW 32 Ct & NW 3 lace
Milling and Resurfacin -
D1
NW 16 Ave and 14 Ter an.
NW 16 Ave and 15 St - D1
NW 20th Street from 7th
Avenue to 20th Avenue
Available to USE - D1
SW 18th Avenue from SW
23rd Street to SW 23rd
Terrace - D4
Brickell Area Shared Use
Path and Roadway
Improvements - Tree
Comment .D2...
Biscayne Bay Spoil Island B
Public Shelter - D2
Biscayne Bay Spoil Island E
Picnic Tables, Benches &
Umbrellas - D2
B-No.
B-30784
B-30785
B-30786
B-30787
B-30788
30789
...................
B- 790
B-3080
B-30822T
B-30825
B-30825A
Biscayne Bay Spoil Island E B-30825B
Public Trail - D2
Lincoln Park Improvements
- D2
South Grove Phase 1
Roadway and Drainage
Improvements - D2
US1 Landscaping between
17 Ave and Viscaya - D2
Douglas Park ADA
Improvement (restrooms) -
CD Proiect 91-03279
SW 1st Ave between SW
115th and SW 7th Street
Dinner Key Dredging -
Spoil Island C Floating
Dock Repair
South Grove Phase 2
Roadway and Drainage
Improvements - D2
South Grove Phase 3
Roadway and Drainage
Improvements - D2
South Miami Avenue - SE
6th and 5th Street Traffic
Modifications - D2
Scope
Construction will include but not limited to,
improvements to the existing drainage system
where needed, new roadway pavement, new
curb and gutter, new sidewalk, bicycle lanes,
new decorative street and pedestrian lighting,
new benches and trash receptacles, new
landscaping and tree planting as well as the
required directional informational signage and
hardscape. Riverwalk section to be developed
fnr 1 Mn 1 F ca 'tinn of arrpccihla w tprfrnnt
Milling and resurfacing with minor drainage
improvements
M&R
Milling and resurfacing; repair pot holes (NW 32
Ct - 180 LF & NW 32nd Place - 150 LF
Full reconstruction at 2 intersections
Milling and Resurfacing, ADA Ramps and
Stripping
Milling and resurfacing and miscellaneous road
reconstruction, ADA improvement.
Milling and resurfacing; Minor drainage;
Replacement of broken concrete curb and
putter; ADA ramps where applicable
stallation of new landscaping and irrigation
alg the median within the Brickell Ave
imp vements
15' x 15 levated Tikki hut observation deck
with ADA p
Design and in
and tiki umbrella in spoil island "E" and spoil
island "C"
Ilation of picnic tables, benches
Design and constructio ' of public trail for
swimming and snorkelin. 'n spoil island "E".
Note 080613- Additional sc..e of work was
requested by JRodriguez to i orporate original
scone in Spoil Island "C".
B-30826 Artificial grass and minimal lawn .rinklers at
Lincoln Park.
B-30827
B-30830
B-30832
Milling and Resurfacing, swale and s..t
drainage improvements.
Landscaping replacement along segment 1 ,f
the US -1 pink wall.
ADA improvements to the restrooms.
Dist.
1
1
1
1
1
Total Cost
$ 961,000
$ 50,000
$ 78,224
$ 303,375
$ 57,618
Total Funds
$ 961.000
50,000
78,224
$ 303,375
1 $ 500,000 $ -
1 $ 303,375 $ -
4 $ 137,000 $ 97,000
2 $ 85,930 $ 85,930
2 $ 17,500 $ 17,500
2 $ 8,250 $ 8,250
2
8,250
2 $ 80,000 j $
2
2
2
$ 286,830
$ 55,000
$ 133,474
8,250
80,000
$ 286,830
$ 55,000
$ 133,474
B-30833 Curb replacement, ADA ramp improvements, 1,2,3, „ $ 775,600 ; $
milling & resurfacing
B-30834
B-30835
B-30836
B-30837
Engineering design, construction drawings,
construction services administration and
environmental permiting with DEP, DERM and
Corp of Engineer to Dredge approximately 200
CY to Restore contours where the existing
floating dock of Spoil Island "C" is located. Also,
the scope includes the design of structural
repairs of the floating dock "C" due to shoaling
nrlprnpath of it
Milling and Resurfacing, Swale and Spot
Drainage Improvements
Milling and Resurfacing, swale and spot
drainage improvements
Roadway Traffic Circle Design and Construction
240
2
2
2
2
308,375
$ 492,000
$ 1,231,787
$ 771,545
368,212
492,000
$ 1,231,787
$ 7 .,545
Fund Type
G eral
Gover ent
Genera
Government
General
Government
General
Government
General
Government
General
Government
General
Government
Disaster Recovery
Disaster Recovery
Parks and
Recreation
Parks and
Recreation
Streets & Sidewalks
Streets & Sidewalks
Parks and
Recreation
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
FY2013 Citywide Capital
Needs - Budget Dept.
Environmental Remediation
Study
City Hall Roof Terrace
City - II Windows and
Doors
Public W . ks Asphalt
Patch Truc
MRC A/C Re.. cements
B-No.
B-30865
B-30865A
B-30865B
B-30865C
B-30865D
B-30865E
Environmental Re ediation B-30865F
Study- Fire -Rescue
African Square Park -
Splash Park D5 Tree
Component
NW 12 Avenue/NW 12
Place Roadway Improv.
Tree Component D5........
Lummus Park
Miscellaneous Repairs - D5
(FY2013 PR).......
Little Haiti Cultural Campus
Miscellaneous Repairs - D5
Buena Vista One -Way
Street Conversion and
Signage - D5
Little Haiti Gateway Signs -
D5
B-30882T
B-30883T
........ .. .. .
B-30889
........ .. .. .
B-30890
..................................
B-30891
Scope
Citywide Capital Needs - Approval from Budget
Department must be obtained prior to
transferring funds for specific needs.
Dist.
1,2,3,4,
5
Environmental Remediation Studies 1,2,3,4,
5
Remove existing tile and roof materials for the 1,2,3,4,
terrace and canopy roof levels. Replace with 5
new roofing for the canopy area and roofing and
tile walking surface for the terrace areas.
Replace existing windows with impact resistant
glass and frame.
Purchase of Asphalt Patch Truck for Citywide
needs.
1,2,3,4,
5
1,2,3,4,
5
Replace Air Conditioner systems at the MRC. 1,2,3,4,
5
Fire Rescue Environmental Remediation Studies 1,2,3,4,
and associated impacted site within a mile 5
radius.
The project consists of the design and
construction of a new Splash Park. Work
includes: 1. Partial re -grading to maintain
existing amphitheater; 2. Create a new
interactive water playground in an approximately
2400 SF paved area; 3. Enclose splash park
area with a 48" high steel fence; 4.
Extend electric and water utilities to splash park
area, and 5. Demolish existing restrooms and
create new accessible restrooms and provide
cessible route to splash park; 6. Preserve
sting large trees; 7. Renovate and Paint
ext= fors of neighboring electrical room and entry
featu
Installatiof landscaping within the NW 12th
Ave Linear ark project
Miscellaneous -pairs including A/C
replacement at ' : rk.
Miscellaneous repair including A/C
replacement at Park.
Converting two way streets .. one way streets in
Historic Buena vista East Ne •hborhood,
including pavement marking ansigning, per the
county's approved plan. Addional cope of
Work, construct curb and gutter isla . plant at
intersections.
B-30892 New Welcome Signs for the Little Haiti
neighborhood
Overtown Youth Center B-30893
Miscellaneous Repairs - D5
;Little Haiti Right of Way
Improvements - D5
Phase I: NW 29th Street
(NW 7 Ave to NW 2 Ave) -
D5
B-30894 New Sidewalks and Roadway Improvements
B-30896
Phase II: NW 29 St (NW 7 B-30896A
Ave to NW 2 Ave) - D5
NW 41 St from NW 7 Ave
to NW 12Ave-D5
1NW 43 St from NW 10 Ave
Ito NW 11 Ave - D5
NW 10 Ave from NW 40 St
& NW 8 Ave from NW 46
St to NW 43 St - D5
1NW 40 St from NW 10 Ave
Ito NW 12 Ave - D5
B-30897
Replacement of existing broken sidewalk; ADA
ramps where applicable; Regork base and new
pavement; Replacement of broken Curb and
Gutter; New median and bike lane per Miami 21
and Bicycle master clan.
Replacement of existing broken sidewalk; ADA
ramps where applicable; Regork base and new
pavement; Replacement of broken Curb and
Gutter; New median and bike lane per Miami 21
and Bicycle ..master .clan .........
Milling and resurfacing; drainage; ADA ramps
where applicable; repair of broken sidewalks
B-30898 Milling and resurfacing; drainage; ADA ramps
where applicable; repair of broken sidewalks.
B-30899
Milling and resurfacing; minor drainage; ADA
ramps where applicable; repair of broken
sidewalks
B-30900 1Milling and resurfacing; ADA ramps where
;applicable; repair of broken sidewalks.
241
Total Cost
$ 1,245,900
$ 466,900
$ 314,176
$ 296,001
$ 144,823
Total Funds
$ 466,900
$ 314,176
$ 296,001
$ 150,000
$ 289,823 $ 289,823
$ 140,000 $ 140,000
.......................................................................
5 $ 50,000 $ 50,000
5 $ 46,000 $ 46,000
5 $ 40,265 $ 40,265
5 $ 25,255 $ 25,255
5 $ 250,000 $ 250,000
51 $ 100,000 $
5
$ 35,625
100,000
$ 35,625
5; $ 500,000 ; $
5
5
5
$ 597,219
$ 597,219
$ 475,3
51 $ 115,236
5
$ 280,888
500,000
5 $ 129,641 $ 8,981•
�
Fund Type
Streets : Sidewalks
............................................
Streets & Sidew. ks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Parks and
Recreation
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Parks and
Recreation
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Pahse I: NE 78 St (N); NE
75 St (S); N Miami Ave
(W); NE 2 Ave (E) - D5
Phase II: NE 78 St (N); NE
75 St (S); N Miami Ave
W); NE 2 Ave (E) - D5
Ph III: NE 78 St (N); NE
75 St ); N Miami Ave
(W);NAve(E)-D5
Phase I: Li - River (N); NE
82 St (S); N . mi Ave
(W);NE2Ave -D5
Phase II: Little River );
NE 82 St (S); N Miami ve
(W); NE 2 Ave (E) - D5
Phase III: Little River (N);
NE 82 St (S); N Miami Ave
(W); NE 2 Ave (E) - D5
Phase I: NE 82 St (N); NE
79 St (S); N Miami Ave
(W); NE 1 Ave (E) - D5
NW 70 Street Area
Roadway & Minor Drainage
Improvements - D5
Seybold House Demolition
and Reconstruction - D5
Downtown Miami Bicycle
and Pedestrian Mobility
Improvement Proiect
Downtown Miami Signage
and Wayfinding System
La Pastorita Traffic
Calming and misc.
improvements - D4
East Flagami Roadway
Improvements - SW 2nd
Street and SW 4th Street -
D4
Robert King High Fencing
and Miscelaneous
Improvements
B-No.
B-30901
B-30901A
B-30901B
B-30902
B-30902A
B-30902B
B-3i•03
B-30904
B-30905
B-30940
B-30941
B-30960
B-30961
B-30962
Parks and ;Bay of Pigs Memorial Park B-30963
Recreation !Lighting -...... D4............................................................
Scope
Milling and resurfacing, Partial reconstruction;
New sidewalk where none exists; ADA ramps
where applicable; Minor drainage; R/W
certi i.cati.gn (aoor.oximate.I.v..50 easements) .........
Milling and resurfacing, Partial reconstruction;
New sidewalk where none exists; ADA ramps
where applicable; Minor drainage; R/W
certification (approximately 50 easements)
Milling and resurfacing, Partial reconstruction;
New sidewalk where none exists; ADA ramps
where applicable; Minor drainage; R/W
certification (aoproximatelv..5.0 easements).......
Milling and resurfacing, partial reconstruction;
New sidewalk where none exists; ADA ramps
where applicable; Minor drainage; R/W
certification (approximately 70 easements)
Milling and resurfacing, partial reconstruction;
New sidewalk where none exists; ADA ramps
where applicable; Minor drainage; R/W
certification (aporoximately 70 easements)
Milling and resurfacing, partial reconstruction;
New sidewalk where none exists; ADA ramps
where applicable; Minor drainage; R/W
certification (aoproximately 70 easements)
Milling and resurfacing, partial reconstruction;
New sidewalk where none exists; ADA ramps
where applicable; Minor drainage; R/W
certification (aoproximately 70 easements)
Milling and resurfacing improvement with minor
. ainage along minor streets and 24' trunk line
al... 71st street. Project also includes sidewalk
and rb replacement as needed.
Demoliti. and reconstruction of the Seybold
Canal Hou
Bicycle lane ansharrow markings, improved
crosswalks throuout the Omni, Downtown,
and Brickell area.
Project developed ba' -d on the DDA Signage
and Wayfinding study. rough a FDOT
Transportation Enhance -nt Grant, the City will
finalize the design and insta the wayfinding
signs throughout the DDA are.
The Scope of Work involves tra 'c circles, speed
humps, median closure and speeables along
several roads. Milling and resurfacinroads only
where the speed humps are located. 'e scope
of work may be subject to change base. • n
subsequent engineering findings.
Design and construction of pavement widenin
rework base and new pavement, and repair of
broken sidewalk for the location generally
bounded along SW 2 Street from SW 41 Avenue
to SW 39 Avenue, and SW 4 Street from SW 40
Avenue to SW 38 Court.
Additional locations generally bounded by SW
41 Avenue, SW 40 Avenue, SW 39 Court, SW
39 Avenue from W. Flagler Street and SW 2
Street will include milling and resurfacing.
Replace fencing around tennis courts and
racquetball courts, install masonry dumpster
enclosure, install two traffic speed bumps, repair
electrical power to lighthouses and bridge gate,
install driveway approaches to soccer field,
install tennis net at new court and provide
parking stall striping to the north parking lot.
Instal I lights.
242
Dist.
5
5
5
5
5
Total Cost
$ 526,967
$ 532,967
$ 532,967
$ 625,287
$ 625,287
$ 625,287
$ 504,158
$ 2,052,550
5 $ 200,000 $
2
2
4
4
4
$ 287,500
$ 1,150,000
$ 675,000
422,264
$ 102, ,8
Total Funds
$ 287,500
$ 1,150,000
$ 675,000
$ 422,264
$ 102,468
4; $ 20,000 ; $ 0,000
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Streets : Sidewalks
Streets & Sidew. ks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
............................................
Streets & Sidewalks
......................................
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Streets & Sidewalks
Parks and
Recreation
Streets & Sidewalks
Streets & Sidewalks
Parks and
Recreation
Project
Modification of Speed
Humps on SW 11 St.
between 30 Ave and 31 Ct.
D4
...................................................
Coral Gate Speed Humps
D4
a
W 5 St between 27 ave
28 ave street
.vement - D4
SW ,th Terrace from SW
21 Ave • SW 22 Ave - D4
SW 12th St ( 30th Ave
and SW 30th P ., e) - D4
SW 30th Court (S 2th
Street and SW 13th S : et)
D4
SW 20 Street (SW 31 Ave
o SW 32 Ave - D4
SW 5th Street between 42
Ave and 43 Ave
m•rovement - D4
SW 64 Court Roadway &
Drainage Improvements
(from SW 6 St to SW 8 St) -
D4 .........
Traffic Circle - SW 12 St
and 31 Ave (SR
201.3005677) - D4
Coral Gate Speed Humps -
Phase II - D4
Swale Restoration @ NW 2
Street between 34 Ave & 35
Ave - D4
SW 2 St from 53 Ave to 54
Ave - D4
Traffic Circle on SW 23
Ave and SW 26 Street - D4
Drainage improvements @
SW 4 St between 53 Ave &
54 Ave - D4
SW 21st St. & 24th Ave
Roadway Improvement - D4
Liberty Square T-
Turnarounds - D5
Oakland Grove Park -
u••rades-D5
Little River Area Road and
Drainage Improvements -
D5
NW 44th Street between
NW 7th and NW 8th Ave -
D5
B-No.
B-30964
B-30965
B-30966
B-30967
B-30968
B-30969
B-30970
B-30971
B- a972
B-30973
B-30974
B-30975
B-30976
B-30977
B-30978
B-30979
B-30980
B-30981
B-30982
B-30983
Athalie Range Park HVAC B-30984
Replacement - D5
....................................
Scope
Modification of existing speed tables.
Installation of speed humps within the coral gate
nei • hborhood.
Roadway reconstruction, drainage and swales,
ADA ramps where needed.
Milling and resurfacing; replacement of broken
concrete curb and gutter; minor drainage
improvements where needed; repair of broken
sidewalks. ADA ramps where ao0l.i.cab..l.e ..........
Milling and resurfacing
Milling and resurfacing of roadway and driveway
asphalt approaches.
Milling and Resurfacing
Drainage improvements; Swale improvements;
pavement milling and overlay (if necessary)
Drainage improvements; Swale improvements;
pavement milling and overlay (if necessary).
Design and construction of a traffic circle,
ludes pavement anf minor drainage at that
In secti0n to accommodate the circle.
Des 'n and construction of flat-topped speed
hump ncluding, but not limited to road
reconstri tion and/or milling & resurfacing,
striping, si• age, Swale restoration, and clean
existing drai -ge structures. The scope of work
may be subjec o change based on subsequent
Swale Restoration
resolve flooding issue
Milling and resurfacing ,
'nor drainage
Design and construction of fl. -topped speed
humps including, but not Iimite• o road
reconstruction and/or milling & re rfacing,
striping, signage, Swale restoration, : nd clean
existing drainage structures. The sco• - of work
may be subject to change based on sub -quent
e nnineerinn..findinns..
Replacement of existing slab covered trenc
Construction of a traffic circle including
drainage.
two new guardhouses at NW 65th Street, six
street closuress/street T turn arounds and misc
pavement restoration with landscape......
Replace, remove and refinish existing fence,
benches Iandsca•in• andwalkwa
Milling and Resufacing, minor drainage, repair of
broken sidewalks and driveway approaches.
Scope of Project includes Milling and
resurfacing, Minor drainage, Repair of driveway
approaches, Swale restoration, ADA Ramps,
where applicable Repair of broken sidewalks.
HVAC Replacement
243
Dist.
Total Cost
Total Funds
4 $ 25,000 $ 25,000
..............................................................................
4 $ 53,000 $ 53,000
4 $ 288,090 $ -
4 $ 206,386 $ 150,467
4 $ 36,102
$ 36,102
..............................................................................
4 $ 43,214 $ 43,214
4 $ 56,178 $ -
4 $ 7,857 $ 7,857
4 $ 132,522 $ 132,522
4 $ 201,663 $ -
4 $ 108,034 $ -
4 $ 28,809 $ 28,809
4 $ 54,000 $ 54,000
4 $ 221,672 $ -
4 $ 51,065 $ 51,065
4 $ 140,000 $ 60,000
250,000 $ 250,000
5 $ 44,887 $ 44,887
5 $ 180,900 $ 180,900
5 $ 185, 00 $ 185,000
5 $ 193,043 $ 193,043
Fund Type
Stor Sewers
Public Safety
Streets & Sidewalks
Streets & Sidewalks
Parks and
Recreation
Parks and
Recreation
Sanitary Sewers
General
Government
General
Government
Streets & Sidewalks
Storm Sewers
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Design District Roadway
and Stormwater
Improvement - D5
orth District Police
'Iding Misc. Repairs - D5
SE 3rd St Wideni . (fka
Dupont Plaza) - DR
Transportation
SE 3rd Street Widening -
DRI Administration
Duarte Park Building
Renovation, Splash Park
(Lighting)
Maximo Gomez / Domino
Park Restroom
Improvements - D3
Maximo Gomez / Domino
Park Restroom
Improvements - D3
New Public Works
Operations Facilities
Public Works Fleet and
Heavy Machinery
Replacement FY2014
PW Citywide Sidewalk
Replacement Contract M-
0096 (Fy14-FY18)
Morningside Drainage
mprovement Project D2 -
PW
B-No.
B-30985
B-30988
B-31206A
B-3 •06B
B-35812D
B-35861B
B-35861BS
B-40001
B-40002
B-40003
B-40004
Scope
Infrastructure improvement in the Design
District. Milling and resurfacing, swale
restoration, drainage improvements, minor curb,
and sidewalk repairs. The City will contribute
$500K to serve as a match to a State Grant of
1 M..aoo.roved .in.. FY2013.........
North District Exterior Paint and Landscaping
Painting: Exterior of the Building and perimeter
wall sorrounding parking lot.
Landscaping:Install 15-16' HT Cuban Royal
Palms; Install 1 - 12'to 14' Oak ; Relocation of 1
tree Clearing and grubbing, tree triming ; install
Palmetto sod.
Roadway improvements including but not limited
to road widening, reconstruction, milling and
resurfacing, signing and pavement markings,
concrete sidewalks, ADA ramps, driveway, curb
and gutter construction, landscaping, drainage
modifications, intersection traffic analysis and
signalization.
Roadway improvements including but not limited
to road widening, reconstruction, milling and
resurfacing, signing and pavement markings,
concrete sidewalks, ADA ramps, driveway, curb
and gutter construction, landscaping, drainage
odifications, intersection traffic analysis and
si. ,alization.
Lighting ,stallation.
The scope wil onsist in remodeling / renovation
of the existing ba rooms facilities within the
confine of the exist '. building.
New bathrooms will . - ADA compliant. Repair
or replace existing roof tructure as needed.
Replace all MEP within the foot print of the
building.
Dist.
5
5
2
2
1
3
Total Cost
$ 1,500,000
$ 66,549
$ 1,500,000
$ 100,000
15,000
$ 48,368
The scope will consist in remo. -ling / renovation
of the existing bathrooms facilitie within the
confine of the existing building.
New bathrooms will be ADA complian Repair
or replace existing roof structure as nee. -d.
Replace all MEP within the foot print of th-
�uiildinn
Design and Construction of an approximately 1,2,3,4, $ 1,875,500 $
14,000 SF Two -Story facility that will serve as 5
Public Works Operations and Maintenance
Headquarters.
Purchase fifteen new automobiles for PW
nspectors; purchase two Bobcat S185 models
with standard bucket (T.H.); purchase two
Bobcat S185 trailers, purchase two 8-10 cubic
Yard. Dumo..tru.cks,
Citywide sidewalk improvement to address
needed sidewalk replacements and ADA
mprovements throughout the City. Location are
derived from resident notifications, 311 reports
and.. field. inspections..
Drainage improvements including, but not
imited to new system drainage, roadway
reconstruction and/or milling & resurfacing,
striping, damage and/or valley gutter
replacement, tree planting, swale restoration,
ADA ramps, and signage and a new drainage
numn..stati.on...tnr..this. l.ow. 'avian
244
$ 100,000
3
1,2,,4,
1,2,3,4,
5
Total Funds
$ 507,644
66,549
$ 1,500,000
$ 100,000
15,000
48,368
$ 100,000
50,000
Fund Type
Streets Sidewalks
Storm Sewers
General
Government
General
Government
General
Government
Storm Sewers
Public Safety
General
Government
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
PW Citywide Pavement
Resurfacing Contract
M0098 (FY14-18)
echanical Upgrades to
Ri -rview and Lawrence
Pu • Stations - D3 - PW
PW - Hea Machinery
Replaceme - FY2015
PW Heavy Equipm: nt and
Machinery Replace -nt -
FY2016
PW Updrage Operations
Division Equipment -
FY2017
Solid Waste Sweeper
Police Station
Headquarters Generator
Slab
Fire Alarm Replacement,
Air Conditioning Repairs
and maintenance
Park Expansions and Land
Acquisition - Citywide
Citywide Capital
Improvements Projects
Antonio Maceo Community
Building - D1
Kinloch Park Building
Addition - D1
Citywide Park Building AC
Replacement
Parks and African Square Park
Recreation ;Playground
Parks and
Recreation
African Square Park
Restroom & Building
Renovation
Parks and IAllapattah Mini Park
Recreation ;Access Control
Parks and
Recreation
Parks and
Recreation
........................................
Parks and
Recreation
IAllapattah Mini Park Court
Armbrister Park Field
Bay of Pigs Park
Playground
B-No.
B-40005
B-40006
B-40007
B-40008
B-40009
B-41•71
B-40410
B-40454
B-40455
B-40456
B-40457
B-40458
Scope
Dist.
The Citywide Pavement Resurfacing Contract is 1,2,3,4,
used to address needed roadway improvements 5
and pavement throughout the City. Locations are
dirived from resident notifications, 311 reports
and field inspections.
Consultant services for Construction
Engineering Inspection for the Riverview and
Lawrence Pump Strations Construction
Project.
Purchase one bobcat S750 with a standard
bucket and vibrating roller, 40" planer
attachements; purchase one Bobcat S750 triler.
Purchase one new vaccum truck for PW
Operations Division; purchase five crew cab
trucks; purchase one John deere 62Y Articulting
wheel loader; purchase owheel loader trailer.
3
1,2,3,4,
5
,2,3,4,
5
Puchase one vaccum truck for PW Operations 1,2,3,4,
Division. This will replace a +20-year old vaccum I 5
truck used for Drainage System Maintenance.
Purchase of one Sweeper
1,2,3,4,
5
Construct a concrete slab at the Main Police 2
Building to safely store an emergency generator.
' e Alarm Replacement; Phase I: Replacement 1,2,3,4,
of Air Handlers at the MRC Facility ; Phase II: 5
Repl. ement of Condenser Water Pipes for the
Water •wer at the MRC Facility; Phase III:
Machine "-placement for the Elevators at the
MRC Facilit
Park Expansion and Land Acquisition 1,2,3,4,
5
Citywide Parks Capita Improvements Project. 1,2,3,4,
Design and construct an ap• oximately 3,350
square foot addition and remo. -I an existing
community center. The combine spaces will
house a computer room for 40 peo 'le, a fitness
room for 20 people, addition will be . ulti-
purpose recreational facility that would clude
meeting rooms, multi -purpose rooms, aft
school programs, cultural and arts program
Site work will include the relocation of up to 1
trees and expansion of the parking lot for an
,4,4itinn,i',n ennrae
Design & construction of a new annex to the
existing community center building to provide
programs & services to the area senior
residents. The new building, of 3,000 sf, will
include multipurpose & activity spaces,
kitchenette, restrooms, storage, in addition to
expansion of existinn..narkinn. area .......................
AC Replacements
B-40459 Replace sand with Protective Insdustrial
Products (PIP) Floringin Playground
B-40460
Renovate restrooms and building
B-40461 ;Install new perimeter fencing
B-40462 Resurface basketball court
B-40463
Artificial Turf Football Field.
Replace Playground and Protective Insdustrial
Products (PIP) flooring Install
245
5
1
1
1,2,3,4,
5
Total Cost
$ 6,912,761
$ 125,000
$ 95,000
$ 650,000
$ 300,000
170,000
10,000
1,426,200
$ 1,000,000
$ 413,946
$ 1,686,750
$ 1,461,850
Total Funds
$ 170,000
$ 10,000
$ 1,426,200
$ 1,000,000
$ 263,946
$ 1,686,750
$ 1,461,850
$ 600,000 $
51 $ 1 ,000
5
$ 750, i ! 0 $
1; $ 30,000 I $
11 $ 25,000 I $
2
5
$ 1,350,000
$ 100,000
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Pa and
Recr--tion
Parks ¶d
Recreatio
Parks and
Recreation
...........................................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Project
Baywood Park Seawall
Repair
Baywood Park Site
Develo.ment
Belafonte Tacolcy Park
elafonte Tacolcy Park
Be . onte Tacolcy Park
entire acility reconstruction
Bell Mea. - Park
Improveme ' s .... .........
Biscayne Hei. is Park
(Shorecrest Pa
Improvements ..
Biscayne Park Socc
Facilit
Bryan Park Tennis Cou
Kirk Munroe Tennis Park
Coral Gate Park Access
Control
Coral Gate Park Baseball
Field
Crestwood Park Basketball
Courts Resurfacing
Curtis Park Access Control
(Fencing)
Curtis Park Access Control
(Roll pp doors).....
Curtis Park Basketball and
Tennis Courts Resurfacing
Curtis Park Parking Lot
Curtis Park Playground
Curtis Park Restrooms
Renovation
Curtis Park Stadium
Restrooms Improvements.,.,
Domino Park Building
Domino Park Restroom
Renovation
Domino Park Shade
Structure
Dorsey Park Ballfield
Douglas Park Irrigation
S stem
Douglas Park Lighting
Douglas Park Playground
Duarte Park Basketball and
Tennis Courts Resurfacing
Duarte Park Lighting
Duarte Park Playground
Eaton Park Daycare
m.rovements
Eaton Park Improvements
Fort Dallas Park (Lummus
Park Historic District)
Demolition...................................................e
Gibson Park Stadium
B-No.
B-40465
B-40466
B-40467
..................................
B-40468
B-40469
B-40470
B-40471
B-40472
B-40473
B-40474
40475
B
476
B-404
B-40478
B-40479
B-40480
B-40481
B-40482
B-40483
B-40484
B-40485
B-40486
................................
B-40487
B-40488
B-40489
B-40490
B-40491
B-40492
B-40493
B-40494
B-40495
B-40496
B-40497
B-40498
Scope
Repair seawall at Baywood Park
Patio area and lighted bollards for walkways at
Ba ood Park
Replace fencing around basketball courts
Resurface basketball courts
Entire facility reconstruction
New fencing and lighting
General and Water Fundation
Artificial Turf Soccer Field & Lights
Resurface tennis courts
Resurfacing
Install fencing around playground
Shades for bleaches at baseball field
Resurface Basketball courts
ew perimeter fencing and interior fencing
Enc se with roll up doors back terrace
Resurfa
basketball and tennis courts
Resurface anedesign parking lot
Relocate and repl.. e playground structure
Renovate restrooms in ommunity building and
concession buildin
Convert restrooms into loc -r rooms with
shower.......
Resurface Floor
Restrooms Renovation
Install automatic shade awning
Renovate Baseball Field
Install & renovate irrigation system
Increase Security Lighting for Walking Path
Replace sand with Protective Insdustrial
Products (PIP) flooring
....................
Resurface basketball and tennis courts
Install more security lighting throughout park
Replace sand in fitness areas with Protective
Insdustrial Products (PIP) flooring
Shade structure for payground and resurface
arkin. lot.
New Building, non regulation size artificial turf
soccer field, new playground to include
Protective Industrial Products (PIP) flooring for
newo 1ayoro.u.nd...........................................................................................
Remove all pavillions / renovations
Install restroom building at stadium
246
Dist.
5
5
5
5
5
2
5
2
4
2
4
4
5
1
1
1
1
1
1
3
3
3
2
2
2
1
1
1
5
5
5
5
Total Cost
$ 50,000
$ 100,000
$ 2,250,000
$ 45,000
$ 30,000
$ 20,000
$ 30,000
$ 25,000
$ 225,000
$ 25,000
$ 125,000
$ 125,000
$ 200,000
$ 200,000
$ 1,250,000
$ 50,000
$ 250,000
$ 30,000
$ 45,000
$ 40,000
$ 50,000
$ 130,000
75,000
$ 175,000
$ 1 ',000
100,0
$ 1,500,000
$ 750,000
$ 850,000
Total Funds
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
P. and
Recr:. tion
Parks . d
Recreati
Parks and
Recreation
...........................................
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
...........................................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
.............................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
.............................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Project
Grapeland Park Picnic
Shelter
Grove Mini Park
Pla .round
Hadley Park Ballfield
adley Park Bleachers
Ha ey Park Football Field
Hadley ark Parking Lot
Hadley Par Pool Locker
rooms im.ro ent
Hadley Park P
Im.rovement
Citywide - Land Ac. isition
Park
Legion Park Boat Ram
Legion Park HVAC
(heating, ventilation, and air:
conditioning)Replace............:
Legion Park Improvements
Legion Park Restrooms
Lemon City Park Daycare
Parkin. Lot
Lemon City Park Daycare
Playground
Lemon City Park
m.rovements
Lemon City park Walkways
Little Haiti Soccer Park
Little Haiti Soccer Park
Stadium Bleacher
Modification
Little Haiti Soccer Park
Stadium Repairs .........
Little Haiti Freedom
Garden Park
Little River Commerce Park
Buildin
Little River Pocket Park
Pla .round
Lummus Park Playground
Manatee Bend Park
Marti Pool Park Locker -
rooms Renovation
Marti Pool Park Pool
Improvement$ ...........................
Marti Pool Park Pump
m.rovement
Melreese Golf Course
Renovations
Melrose Park Playground
Merrie Christmas Park
Improvement$ ........... ............
Virginia Key Rowing Center
Park Buildin
Moore Park Tennis Court
Improvement ......
.................
Morningside Park Floating
Dock
Morningside Park Boat
Ram . Im . rovements
Morningside Park Tennis
Center Buildin
Morningside Park Court
Renovations
B-No.
B-40499
B-40500
B-40501
..................................
B-40502
B-40503
................................
B-40504
B-40505
B-40506
B-40507
B-40508
................................
B-40509
40510
B-40 1
.................................
B-40512
B-40513
B-40514
B-40515
.... .........
B-40516
B-40517
B-40518
.... ......
B-40519
B-40520
B-40521
B-40522
B-40523
................................
B-40524
B-40525
B-40526
B-40527
B-40528
B-40529
B-40530
B-40531
B-40532
B-40533
B-40534
B-40535
Scope
Construct picnic shelters & area
Replace sand with Protective Insdustrial
Products PIP floorin
Replace fencing at baseball and football fields
New Bleachers - Replacement
Artificial turf & lights
Create new parking lot by school and fire station
New flooring in locker rooms
Remarcite Pools (3) Pools, and add lane lines &
hooks
Increase Park Acreage Citywide
Renovate Boat Ramp
Replace AC units in building
3 Picnic shelters, classroom remodal, wiring
upgrades.
Renovate two restrooms
Resurface parking lot and upgrade access
control
hade structure for playground
Exp
d NC
Resurfa
asphalt Pathways
Shade struc
re for east bleachers
Concrete bleac
Stadium Repairs
Landscaping, irrifation, an
Complete redevelopment of
demolition and constructin
rs modifications
ite furnishingns.
pa
new
to include
elter
Install playground and PIP (Protect
Products floorin
Install Playground and Protective Indus
Products PIP Floorin
Install picnic shelters
Renovate Locker -rooms
Resurface Pool
.............................
Renovate pump room and pump systems
e Industrial
al
To maintian PGA status Greens and Fairways
must be replace every seven years.
Install new playground with PIP (Protective
Industrial Products floorin
Soccer field & parking
Construct new restroom/locker room building
Fundin. Shortfall
Reconstruct Tennis Court
New floating dock sections
Repair existing pier at boat ramp
Construct new tennis center building
Tennis court renovations
247
Total Funds
200,000
Dist.
Total Cost
1 $ 850,000 $
2 $ 65,000 $
5 $ 80,000 $
.......................................................................................
5 $ 600,000 $
5 $ 1,750,000 $
5 $ 100,000 $
5 $ 80,000 $
5 $ 280,000 $
1,2,3,4, $ 15,000,000 $
5
2 $ 450,000 $
2 $ 100,000 $
2 $ 250,000 $
2 $ 100,000 $
.......................................................................................
5 $ 100,000 $
5 $ 75,000 $
5 $ 40,000 $
5 $ 30,000 $
..........................................................................
5 $ 170,000 $
5 $ 100,000 $
5 $ 160,000 $
5 $ 50,000 $
5 $ 500,000 $
5 $ 50,000 $
5 $ 125,000 $
2 $ 100,000 $
3 $ 100,000 $
$ 110,000 $
3 $ 100,000 $
1 200,000 $
5 $ 125,000 $
2 $ •00,000 $
2 $ 35, ..
5 $ 380,00$
2 $ 50,000 $
2 $ 380,000 $
2 $ 650,000 $
2 $ 500,000 $
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Pa s and
Recr--tion
Parks an
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
.............................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
.............................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
.............................
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Project
Morningside Park
Walkways and ADA
Com.liance
Morningside Pool Park Pool;
Facility Improvements
orth Bay Vista Park
P ryground
Oa .nd Grove Mini Park
Virginia ey Beach Park
Access C trol....... ............
Operation : rd Park
Trailers
Pallot Park Sea . II
PBA / Fern Isle
Redevelo.ment
Peacock Park Building
Renovation
Peacock Park Playground
Pine Heights Park
Pla .round
Citywide Parks Playground
Replacements
B-No.
B-40536
B-40537
B-40538
B-40539
B-40540
B-40541
B-40542
................................
B-40543
B-40544
B-40545
40546
B-4e 47
Pullman Mini Park B-40548
Playground Replacement..
Rainbow Village Park B-40549
Playground
Athalie Range Park B-40550
Playground .............. ............ ;..
Athalie Range Park B-40551
Restroom Renovation
Athalie Range Park Pool B-40552
Heater
Reeves Park Basketball B-40553
Court
Reeves Park Playground B-40554
Reeves Park Sidewalks & B-40555
Walkwa
Reeves Park Volleyball B-40556
Court
Riverside Park Restroom B-40557
Renovation
Citywide Park Buildings B-40558
Roof Repairs
Sewell Park kayak Launch B-40559
Sewell Park Parking Lot B-40560
Sewell Park Playground B-40561
Shedavia Jenkins Parks B-40562
Lighting
Shenandoah Park Pool B-40563
Renovation
Simpson Park Building B-40564
Roof Re.lacement
Southside Park Field B-40565
Spring Garden Point Park B-40566
Historic Buildin
Spring Garden Point Park B-40567
Citywide Park Buildings B-40568
Termite Control
Town Park Playground B-40569
Virginia Key Beach Park B-40570
Restrooms Re.lacement
Virrick Park New Pool B-40571
Alice Wainwright Park B-40572
Restrooms
Scope
Resurface walkways throught park and intall
cotouts for ADA compliance
Renovate pump room, locker rooms, and pump
systems
Instal new playground with PIP (Protective
Industrial Products) flooring__
Replace observation deck, and install kayak
auch
Electric Entry Gate/Cards
Dist.
2
2
5
5
1,2,3,4,
5
:. . . .........
New trailer and site 1,2,3,4,
5
Extend and complete seawall 2
Site development 1
Recreation Building Renovation 2
Replace Playground & PIP (Protective Industrial
Products floorin
Replace Playground Structure
Replace playgrounds as needed
Replace existing playground with and PIP
(Protective Industrial Products) flooring..,,..,,..
eplace playground structure
Rep : ce sand with PIP (Protective Industrial
Produ....... ).flooring.......... ............
Renovat restrooms in building
Install new h:.ter
Resurface Bask- .all Courts
Replace Playground ructure
........................................
Level off trip hazards
Renovate Volleyball Court
Renovate restroom building
Ass needed
Repairs and Renovations
Resurface Parking Lot
Replace sand with PIP (Protective Industrial
Product) flooring.......
Install more security lighting throughout park
Expand pool renovation project
...........................................................
Roof Replacement
Artificial sport field & irrigation
Reconstruction Seybold House
Install new playground
...........................................................
Evaluation and Tenting
Replace playground structure
Replace Restrooms
New pool project
Restrooms Renovation
248
2
1
1,2,3,4,
5
5
5
5
5
5
5
5
5
5
3
1
1,5
2
3
5
5
1,2,3,4,
5
5
2
2
2
Total Cost
$ 250,000
$ 1,000,000
$ 75,000
$ 50,000
$ 35,000
$ 225,000
$ 300,000
$ 4,500,000
$ 150,000
$ 150,000
$ 75,000
$ 1,500,000
$ 75,000
$ 75,000
$ 120,000
$ 80,000
$ 75,000
$ 35,000
$ 100,000
................................
$ 75,000
$ 25,000
$ 75,000
$ 350,000
$ 225,000
$ 60,000
$ 75,000
$ 125,000
$ 2,200,000
................................
$ 65,000
$ 450,000
1,2^i,000
$ 150,0
................................
$ 200,000
$ 100,000
$ 750,000
$ 3,000,000
$ 350,000
Total Funds
Fund Type
Pa s and
Recr-:tion
Parks . d
Recreatio
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
Parks and
Recreation
............. ..................
Parks and
Recreation
Parks and
Recreation
Disaster Recovery
General
Government
General
Government
General
Government
General
Government
General
Government
General
Government
Parks and
.,...,.. Recreation.,...,...,
Public Safety
..................................
Public Facilities
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Grapeland Water Park
Renovations
West Buena Vista Park
Building Restrooms
improvements
West Buena Vista Park
ourts
st Buena Vista Park
Pla •. round ............ ..............
Willi ' s Park Playground
Williams ark Pool
Improveme .. ......
..................
Williams Parport Field
Lights
;Jose Marti Roof • -.air -
'GSA
SW 32 Avenue
Improvements D2 Tree
Component
City Hall Studio Area - A/C
Unit Replacement
Office of Communications -
Fleet Upgrade
Office of Communications -
Upgrade Systems to Media
Equipment
Office of Communications -
Robotics Cameras
Office of Communications -
Large Format Video
Cameras Replacement
Office of Communications -
Studio Cameras
B-No.
B-40573
B-40574
B-40575
B-40576
B-40577
B-40578
B-40579
Scope
Dist.
Renovate features / pumps / filtration 1
Restroom fixtures replacement 5
Courts Resurface
Install new playground with PIP (Protective
Industrial Pruducts) flooring ..,...,...,.
Replace playground & PIP (Protective Industrial
Products) flooring
Resurface Pool
Replace Sports Field Lights
B-40580 Repairs to the Jose Marti Community Center
Roof.
B-40704AT
B-40960
B-40961
B-40962
B-40963
B-40964
B-40965
Little River Waterfront Park B-50722A
Acquisition PHII
. ...............................
Fire Station #1 - B-60455B
Renovation and
Miscellaneous Repairs
Miamarina Pier 5 Canopies B-70010
- PF
Public Facilities ;Clean Vessel Act 2013 - PF B-70011
Public Safety
Public Safety
Police Headquarters
Interview rooms sound
proofing - Oracle 19-
690002
Police Headquarters 5th
floor Interior renovations
B-70112
B-70113
Installation of additional trees along SW 25th
Terrace from SW 27th Ave to SW 32nd Ave.
5
5
5
5
5
Total Cost
$ 750,000 $
$ 50,000 $
$ 50,000 $
$ 120,000
$ 175,000
$ 175,000
$ 350,000
3; $
2
Replace City Hall Studio Area A/C Unit. this is 1,2,3,4,
required due to the amount of machinery running 5
in the area. The temperaure is quite high and the
unot is required for quality of life improvement for
staff and to prevent the overheating and breaking
down of the equipment.
Replacement of vehicles used by department to 1,2,3,4,
transport sensitive equipment for press 5
nferences and city events. Current vehicles
ar old and worn out
Upg de the AVID PC systems used for editing 1,2,3,4,
and cr:.tion of video content for the City's 5
Website -nd TV Channel 77. The sytstems
currently i sed is over 7 years old. The
upgrade is r- 'uired tomaintain production quality
and ..meet .toda... standard,
Upgrade Robotic Cameras at City Hall. Current 1,2,3,4,
systems is not to i • ustry standards for today's 5
broadcasting and are .ver 10 years old.
Replace 3 Large Format ideo Cameras that are 1,2,3,4,
in use constantly and cost . repairs increases 5
on a yearly basis.
Replacing current cameras tha -re over 10 1,2,3,4,
years old and are not up to indust standards for 5
todav's broadcast aualitv.
Kitchen, Restroom, doors, windows, ceili
appliances, etc. See notes.
The scope of work includes the installation of
approximately 371 linear feet of new canopies
with steel structure and roofing lightweight
canvas along the Miamarina east pier 5. The
work also includes concrete Caisson foundation,
base plates, and electrical light fixtures.
26,100
$ 60,000
$ 51,632
$ 144,000
$ 40,000 $
$ 30,000 $
90,000 $
18,000 $
2 $ 735,000 $
2 $ 500,000 $
2 $ 435,000 $
2' $
This project requires the reinforcing and sound 1,2,3,4,
prrofing of 8 interviews rooms. 5
Renovation and reconfiguration of the ceiling grit
lighting, HVAC distribution, repair and/or
replacement of damaged dry walls.
Replacement of entire carpet on 5th floor that
have been damaged by mold.
249
1,2,3,4,
5
41,168 $
$ 55,000
$ 496,9' ' ; $
Total Funds
60,000
735,000
500,000
435,000
41,168
55,000
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Pub Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Project
Fire Pump Electrical
Rewiring - Police Dept.
omestic Water Pump -
ice Dept.
Police He quarter
Elevators R ovation &
Repairs
I-95 Lighting Project -
Police Dept.
Police Central Station
Parking Garage
Police Headquarters
Presure Clean/Seal/Paint
Exterior
Carpeting and Flooring -
Police Dept.
Police Headquarter &
South District Storm Drains
and Parking Lot Asphalt
B-No.
B-70114
B-70115
B-70116
B-70117
B-70118
B-70119
B-70120
B-70121
Scope
Dist.
To replaced burned out wiring and replace 1,2,3,4,
underground wire that feeds the main fire pump 5
at the Central Station parking garage. This is a
requirement in compliance with the electrical
code. The amount of the project is approximately
Domestic water pumps Replacement of at the 1,2,3,4,
Central Station these pumps ensure that there is 5
normal and consistent pressure running through
the water lines and main valves throughout the
The three existing overhead traction elevators 1,2,3,4,
(serial numbers 41347, 41348, 41349) need to 5
be replaced at the Central Station. The existing
machines are obsolete since their installation in
1975 and have been attempted for repair with no
avail. Replacement is needed to avoid a safety
hazard for employees and visitors. This is a daily
concern.
To replace the existing light fixtures at the lots
located under 1-95 expressway between 5th and
8th Street with LED Tight fixtures that provide
longer lasting Tight and effective security. These
fixtures are also energy efficient and will reduce
City of Miami electrical costs. If the LED fixtures
are not installed, the security at the Tots will be in
eopardy and may cause bodily injury.
1,2,3,4,
5
Th= complete replacement of the damaged 1,2,3,4,
lights : at the Central Station Parking Garage is 5
needen order to secure safety since this is a
twenty fohour operation as well as ensure
co.rnoliance.. •...electrical ..code......................................................................................
The Police C tral Station needs to be repaired 1,2,3,4,
(presure clean -al/paint exterior) to prevent air, 5
water and other e vironmental elements from
entering or exiting t - structure. This is a critical
component of maintas the integrity of the
structure. The pressure leaning and exterior of
the North District was last one in 1989. It is in
poor condition and it is not i icing for the
community. We have tried nu erous times to
pressure clean the exterior but t , paint
contivancely falls off the stucco wh h may
cause a greater problem if it is not p. ted and
re -sealed the precast which may in the . nger
run cause additional expeditures due to .. age
and the structure being compromised.
The carpeting at the North District and South 1,2,3,4,
District was originally installed in 1986 and has 5
never been replaced. The carpeting needs to be
replaced due to wear and tear from years of
usage. It is currently in deplorable conditions. It
is not condusive for a healthy work environment
and currently is a work hazard.
Headquarters & South District Storm Drains and 1,2,3,4,
Parking Lot Asphalt needs to be replaced due to 5
the fact that these drains are used to transport
excess moisture away from the designated area
where excess water would otherwise prevent the
normal use of the property. Moist grounds
surfaces limits the use of the parking lot and
areas which can become a breeding ground for
disease carrying insect infestations. The storm
drain system at the South District is caving in
causing pot holes as well as starting a sink hole.
This is making the asphalt crack in several
different places.
250
Total Cost
35,000
$ 65,000
$ 75,000
85,000
$ 210,000
$ 275,000
65,000
$ 425,000
Total Funds
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Pub Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
............ ..............
Public Safety
Public Safety
Public Safety
Project
South District Police Sub
Station Furniture
Se rity System for
Cent : /Headquarter -
Police -pt.
Police South District Air
Conditioning Diffuser
North and South Police
Stations Landscaping
Grapeland Heights
Electrical Panel - Police
Dept.
Police Headquarter
Building Emergency
Generator Shed
Reollac e m e nt .........
Forensic Lab Expansion -
Police Dept.
ollege of Police
Auditorium Lighting
College of Police Lobby
Lighting
B-No.
B-70122
B-70123
B-70124
B-70125
B-70126
B-70127
B-70128
B-70129
B-70130
Scope Dist.
The South District Sub Station (SDSS) is in dire
need of new furniture. The SDSS is furnished
with the original furniture when the station was
built. As a result we have cabinets, tables and
desks which are collapsing. Even worse are the
chairs; many of the chairs are dirty and have
exposed metal and wood making them a hazard.
1,2,3,4,
5
Security System needs to replace and repair to 1,2,3,4,
include cameras and key card readers. Failure 5
to repair these items will cause a breach of
security for the building. The current system
was originally installed in 2000. In order to meet
Homeland Security regulations all first responder
facilities must be secure through a security
system.
South District Air Conditioning Diffuser needs to
be replaced due to the fact that this is a
mechanical device that is designed to control the
characteristics of a fluid entrance to a
theromodynamic open system. Diffuser is
necessary in heating, ventilating and air
conditioning. It serves several purposes to
include deliver both conditioning and ventilating
air, evenly distributing the flow of air in the
desired directions, it is used to enhance missing
f room air into the primary air being discharged,
e . Failure to replace will lead to poor air
dis •bution and increased noise. Due to the fact
that t - roofing issues have not been addressed
we curr: tly have water intrusion into the fifth
floor caus •g the drop ceiling and lighting to be
damaged b- and repairs. The water damage is
causing mold, amages to the existing
carpeting, milde causing this to become a
hazard work envir. • ment.
1,2,3,4,
5
New landscaping aro d the North & South 1,2,3,4,
station will enhance the appearance of the 5
property, at this time the I. dscaping is currently
dilapidated. Enhancing the dscaping is
essential to the surrounding bi finesses.
Installation of seven 200 amps, 3 •hase feeder 1,2,3,4,
panel to expand the electricity dema .s at the 5
Grapeland Heights Police Substation. ' he
current electrical system is original 195 ring
which is old antiquated and does not meet •ur
electrical demons. The existing electrical wir is
a unsafe and fire hazards to our employees, w
are continuously tripping the breakers at the
substation.
To replace the current shed metal roof that is 1,2, ' 4,
leaking with a new roof to prevent leaking and
possible damage to the generator at the Central
Station,.......
To expand the existing forensic lab to a second 1,2,3,4,
floor due to the increase of police related 5
investigations/cases and limited space currently
To replace the existing damaged electronic 1,2,3,4,
ballast and light bulbs to a more efficient system 5
located at the College of Police auditorium.
To replace the existing damaged electronic 1,2,3,4,
ballast and light bulbs to a more efficient system 5
located at the College of Police 1st and 2nd floor
251
Total Funds
Total Cost
175,000
$ 85,000
$ 275,000
$ 50,000
$ 125,000
25,000
$ 1,200,000
$ 1 000
$ 20,000
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Pub Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
....................................................
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Project
Mounted Stables Stall
Repairs - Police Dept.
Pol . e South District
Exterl. Lighting
Security Sy -m for Police
South District ubstation
Replacement of 400
Desktop Computers -
Police Dept.
Replacement of Sauna
Water Heating System -
Police Dept.
Police Headquarters
Record Unit Exterior Walls
Replacement
Fire Station #5 Exterior
Walls Repair - D1
Fire Station No. 3
Dormitories Build -out
Project
Fire Station No. 12 - Re-
roofing Project
Fire Station No.5 - Interior
Renovation Work Oracle
Project 91-03237
Fire Stations Computer
Aided Dispatch S stem
Uniform Fire Station Data
Closets x12..........
.................
Fire Station and AO PC
Replacement
New Citywide Fire Stations
Digital Radio System
B-No.
B-70131
B-70132
B-70133
B-70134
B-70135
B-70136
B-70210
B-70211
B-70212
B-70213
B-70214
B-70215
.... ..... .
B-70216
B-70217
Scope
The mounted unit is in need of removing all the
wood in the stables and replace it with CBC.
The horses are chewing on the wood eating
some particles causing them colic and their
weight is compromising the structure of the
stables when they lean or kick it. By changing to
CBC we will save dollars by avoiding costly
ranairc and rinrtnrc hillc
Replacement of the existing building exterior
lighting that is damaged beyond repair at the
South Station, causing a safety issue for all
emolovees and visitors .........
Replace and repair the security system to
include cameras and key card readers. Failure
to repair these items will cause a breach of
security for the building. The current system
was originally installed in 2000. In order to meet
Homeland Security regulations all first responder
facilities must be secure through a security
Dist.
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
The Miami Police Department's Desktop PC 1,2,3,4,
infrastructure is in need of replacement. Most of 5
the desktops are out of warranty and do not have
enough memory to run newer applications
efficiently. The Miami Police Department has
not been included in the City IT Department's
Desktop PC replacement cycle. The
recommended replacement cycle is three years.
ost of our desktops have been in use for over
R
for
replac
both me
damaged
acement of Sauna Water Heating System 1,2,3,4,
Men and Women's Locker Rooms: To 5
he existing electrical heating system for
omen's locker rooms that is currently
and repair.
Replacement . the exterior wall that sustained 1,2,3,4,
major damaged t cause by water intrusion 5
Develop construction •ocuments, bidding,
building, and providing ..nstruction
administration services fo implementing repairs
of exterior walls of Fire Stat , n #5 in accordance
with the deficiencies identifie. 'n the Scope
Definition Report of March 14, 22 by Rizo
Carreno .&..Pa.rtners_
Construction of new dorms and rest
Remove and replace both built-up flat roo with
like materials. Re -caulk window at clearsto
walls for the high metal roof center portion of t
Design and construction services for the interior
renovation of the fire station including officers
bathroom, kitchen and dining room flooring
replacement and cabinets restoration,
installation of a new roof, new ceiling and light
fixtures at the diver's room, new/larger door at
laundry room, replacement of desks and
shelving at offices, new gas water heaters,
replacement of broken glazing at existing
windows in areas affect by this scope of work,
and also limited improvements to the existing
Alarm Office Dispatch
Uniform Station Data Closets x12
1
Total Cost
100,000
$ 35,000
$ 70,000
$ 324,172
$ 15,000
$ 496,458 $
$ 150,000 $
3 $ 100,000 $
5 $ 77,000 $
$ 348,240 $
1,2,3,4,
5
1,2,3,4,
5
Station and AO PC Replacement on 2 year 1,2,3,4,
5
Digital radio system (Approximately 20M shared 1,2,3,4,
by GSA, PD, MFR) 5
schedule vs. 4 ear
252
Total Funds
150,000
100,000
77,000
348,240
$ 2,400,00
$ 48,000
$ 70,000
$ 5,000,000
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Pub Safety
Public Saf
Public Safety
Public Safety
Public Safet
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
........ . ........
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Public Safety
Streets & Sidewalks
Streets & Sidewalks
Mass Transit
Project
Citywide Fire Station
Replace out of Warranty
Mobile Data
Citywide Warranty and
Outdated Fire Station
Computers and Monitors
itywide Bunker Gear (Fire
tion)
Fir tations Warranty
Life.. EKG Units
Rebuil. ,. Fire Station #1
Rebuildin. Fire Station #10
Fire and Res e Training
Center Renova -/Rebuild
Fire Station #15 (''re Boat)
Citywide Fire Station
Pumpers
Fire Rescue
Apparatus Replacement
Replace Fireboat 1
Fire Station Training
Facilit
Expand
Comunication/Alarm Office
Facility w/PD (Fire Station)
Facility Budget Requests
(Fire)
Fire Station
E.ui.ment/Furniture
Fire Station Hurricane
Hardening
Fire Station Light Fleet
Vehicle Replacement
Fire Station
Hardening/Security......
Fire Station #5 Renovation
Fire Training Props
Fire Station Flat Panels 24"
Fire Station Paperless
Inspection System (i.e.
MobileE es software
Fire Rescue Capital Needs
FY2014
Fire Department - FY2012
"Emergency Medical
Services (EMS)"
Transportation Program
Support Services -
Transportation
Transportation PSS -
Transportation DRI Fees
Administration
Transportation Program
Support Services - Transit
Professional
B-No.
B-70218
B-70219
B-70220
B-70221
B-70222
B-70223
B-70224
B-70225
B-70226
B-70227
B-70228
0229
B- 30
B-7023
B-70232
B-70233
B-70234
B-70235
B-70236
B-70237
B-70238
................................
B-70239
B-70240
B-70241
B-70242
B-70245
B-70245D
B-70246
Scope
Dist.
Replace out of warranty mobile data terminals 1,2,3,4,
5
Replace out warranty and outdated fire stations
computers and monitors
To comply with 10 year NFPA standard
Replace out of warranty lifepak/EKG units
Rebuild 20 000sf bld
Rebuild 11,000sf bldg. x $400sf
Renovate/Rebuild
Land acquisition and fire station construction
Replace Pumpers F1, E2, E4 AND E8
Replace Frontline Rescues
Replace aging units as needed
Replace.....
Renovating building to bring into Code
Addition to existing Building
R-.airs and Enhancements (renovate
bath .oms, kitchens, iron plumbing, flooring,
roofs,.. inti ng).
Station niture and appliances replacement
Apparatus d
with operation
Replacement
40 hour li.ht fleet
Video and card acce
Major Renovations
Add state required props nec
r replacement to make compliant
needs
of th operational light fleet and
sary for training
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
2
2
2
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
2
Plans review and water officer 1,2,3,4,
5
Will allow field based retrival of builds . related 1,2,3,4,
information and greatly increasing effici: cy 5
Capital needs
The purpose of the grant is to improve and
expand EMS by assisting the Fire Department in
the purchase of ten cardiac monitors,
m.
As part of the Transportation Program Support
Services (TPSS) contract, transportation related
professional services will be provided on an as -
needed basis, including development of a
As part of the Transportation Program Support
Services (TPSS) contract, transportation related
professional services will be provided on an as -
needed basis, including development of a
1,2,3,4,
5
1,2,3,4,
5
1,2,3,
Total Cost
150,000
$ 105,000
$ 274,800
$ 946,000
$ 6,000,000
$ 17,000,000
$ 10,000,000
$ 1,960,000
$ 4,320,000
$ 950,000
$ 1,250,000...
$ 750,000
$ 500,000
$ 1,750,000
$ 200,000
$ 384,000
$ 630,000
$ 935,000
$ 800,000
$ 350,000
$ 3,500
$ 80,000
$ 1,858,500
$ 317,333
500,000
1,2,3,4, $ 155,042
5
As part of the Transportation Program Support 1,2,3,4, $
Services (TPSS) contract, transit related 5
services will be provided on an as -needed basis.
253
500,000
Total Funds
$ 1,858,500
$ 238,000
$ 294,958
$ 500,000
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Fund Type
Mas Transit
Mass Transit
General
Government
.................................................
General
Government
...............................
General
Government
General
Government
General
Government..
General
Government
General
Government
General
Government
General
Government
General
Government
General
Government
General
Government
General
Government
General
Government..
General
Government
General
G...overnment..
General
Government
Solid Waste
Solid Waste
Solid Waste
Public Safety
General
Government
Project
Beach Corridor Transit
Connection Study -
Citywide
Cit ide Mass Transit
Studi
City of ami Fleet Vehicle
Replace nt
City of Miami eet Vehicle
Replacement ( cks)
Carpet Replacemen
MRC Facilit
GSA Communications
Division - Back up Batterie
for Communications
Systems
t the
MRC Building - UPS
System
GSA Fleet Facility - Fuel
Station Roof Replacement
GSA Communications
Division - Impact Windows
and Hurricane Grade
Electric Garage Doors
GSA Mechanics Shop -
Light Fleet Aligment & Lift
Mechanism for vehicles up
to...3,500 Pounds
Fuel Pump Replacements
Roof Repairs at the GSA
Communications
Warehouse and USAR
Warehouse
Re -grouping and polishing
of all MRC Granite and
Bathrooms .........
Heavy Fleet Tow Truck
MRC Facility - Repair of
HVAC VAV Boxes
Bucket Truck for the
Electrical Division at GSA
City Hall Repairs
Replacement of Fire Panel
at MRC Facility..
Roof Repair at the MRC
Facilit
Solid Waste Building
Reinforcement for
Hurricane
Solid Waste Mini -Dump
Renovation
Solid Waste Fleet
Replacement
Fire Facilities Generators
(North & South)
MRC Telecommunications
Infrastructure Replacement
B-No.
B-70246A
B-70247
B-70323
B
0324
B-70
5
B-70326
B-70327
B-70328
B-70329
B-70330
B-70331
B-70332
B-70333
B-70334
B-70335
B-70336
B-70476
B-70477
B-70478
B-70718
B-70956
Scope
Dist.
A feasibility study for a Mass Transit Connection 1,2,3,4,
between the City of Miami and the City of Miami 5
Beach. The study is intended to update and
refine pst proposals to provide a premium transit
connection between these two cities, and to
evaluate how best to advance this much needed
transit connection through the project
rlpwpinnmpnt nrnrpcc
Mass Transit Studies
Replacement of approximatly 100 cars of the
City of Miami Fleet @ average cost of $17,000
Replacement of approximatly 70 Trucks of the
City of Miami vehicles @ Average Cost of
$25.000......
Carpet Replacement at the MRC Facility
1,2,3,4,
5
1,2,3,4,
5
GSA Communications Division - Back up 1,2,3,4,
Batteries for Communications Systems 5
MRC Building - UPS System
GSA Fleet Facility - Fuel Station Roof
Replacement
GSA Communications Division - Impact
Windows and Hurricane Grade Electric Garage
ors
1,2,3,4,
5
: . . . .........
1,2,3,4,
5
1,2,3,4,
5
GSA -chanics Shop - Light Fleet Alignment & 1,2,3,4,
Lift Mech nism for vehicles up to 3,500 pounds 5
Fuel Pump Re. cements
Roof Repairs at th- SA Communications
Warehouse and USA Warehouse
1,2,3,4,
5
1,2,3,4,
5
ReOgrouting and polishing . all MRC Granite 1,2,3,4,
and Bathrooms
5
Heavy Fleet Tow Truck for the Cit of Miami 1,2,3,4,
5
Repair of very old Heating/Ventilation 'r 1,2,3,4,
Conditioning (HVAC) Variable Air Volu (VAV) 5
System.
Purchase of a Bucket Truck for the Electrica 1,2,3,4,
Division at GSA 5
Replacement of roof and back portion of City 1,2,3,4,
Hall (excludes terraces since these are currently 5
being updated and repaired via an ongoing
oroiect)
Replace of existing Fire Panel in the MRC 1,2,3,
Facility. 5
Replacement of roof at the MRC Facility 1,2,3,4,
5
Replace windows; replace roof; upgrading two 1,2,3,4,
bathrooms on 2nd floor to make them ADA 5
com.liant .urchasin..enerator
Mini -dump renovation (Guard house, etc)
Replace Filet: Automated; Saddle Dump; Rear
Loaders; Trash Trucks; Trash Cranes; Combo
Cranes; Mechanical Sweepers; Vacuum
Upgrade the emergency standby generator
system at several fire stations.
Conversion of MRC telephone and services
equipment to voice over IP
254
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
1,2,3,4,
5
Total Cost
30,000
$ 318,402
$ 1,700 000
$ 1,750,000
$ 300,000
$ 42,000
$ 7,000
$ 25,000
$ 30,000
$ 65,000
$ 200,000
$ 60,000
$ 70,000
$ 250,000
$ 120,000
$ 162,000
$ 200,000
340,000
350,000
$ 1,000,000
$ 20 000
$ 24,311,8
$ 300,000
$ 455,000
Total Funds
30.000
318,402
$ 300,000
Fund Type
G eral
Gover ent
General
Government
General
Government
General
Government
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
eGovernment/Web
Services City View
Replacement
eGoverment/Web Services
':uild Miami Phases II and
I I
eG. ernment Services
Platfo
CIP Do. ment Mgmt &
Data Con .lidation
General ;Audit Compliance
Government
B-No.
B-70957
B-70958
B-70959
B-70960
B-70961
Scope
Dist.
Replace legacy Code Enforcement application 1,2,3,4,
with web based application including integration 5
with Miami -Dade County 311 System; Inspector
Routing, Lien Processing, and Document
renository
Complete additional features and capabilities for 1,2,3,4,
online building department permitting. 5
Technology Assessment, Recommendation, and 1,2,3,4,
Development Services 5
Consolidate CIP document files into single 1,2,3,4,
server system.
Convert Traks to Oracle R12 including PM
module implementation; Install & configure
Oracle Business Intelligence - Project Analytics
5
Total Cost
$ 2,464,000
$ 480,000
$ 1,480,000
$ 380,000
Install physical separation of city's financial and 1,2,3,4,1 $ 22,000 ; $
;emailsystems at MPD Data. Center ........ 5..
255
Total Funds
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
1tze &IL 1tze Yalu/re
256
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPENDIX 5
APITAL PROJECTS
AP "ROPRIATIONS NEW
2012-2013
Cite �fuetivie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
CAPITAL PROJECTS NEW APPROPRIATIONS FY2012-2013
Project
Amount
Fund
Award / Source
Date
Reso
Number
B-60464 - -w Dinner Key Marina
Dockmaster :. ilding
87,986.00
34000 - Public
Facilities
Award - 1422 Impact Fees
Unallocated FY2012
10/25/12
12-0414
B-74220 - Police ehicle Replacement
1,400,000.00
31000 -
General
Government
Award 1426 - Contribution from
General Fund FY 2012
10/25/12
12-0414
B-74220 - Police Vehic = Replacement
1,852,000.00
31000 -
General
Government
Award 1426 - Contribution from
General Fund FY 2013
10/25/12
12-0414
B-30865 - FY2013 Citywide ,pital
Needs
1,245,900.00
31000 -
General
Government
Award 1426 - Contribution from
General Fund FY 2008 - New
FY2013 Allocation
10/25/12
12-0414
B-73202C - Solid Waste Collection
Equipment
854,100.00
39000 - Solid
Waste-CIP
Award 1426 - Contribution from
General Fund FY 2008 - New
FY2013 Allocation
10/25/12
12-0414
B-74200 - Citywide General Fleet
Replacement
350,000.00
31000 -
General
Government
Award 1426 - Contribution from
General Fund FY 2008 - New
FY2013 Allocation
10/25/12
12-0414
B-72809A - Firefighting Equipment -
SAFER
911,500.00
32000 - Public
Safety
Award 1426 - Contribution from
General Fund FY 2013
10/25/12
12-0414
B-30174 - Virginia Key Beach Park
Historic Restoration - PH II
9,472.00
35000 - Parks
& Recreation
Award 1882 - SNPB Virginia Key
Beach Park FY2012
10/25/12
12-0414
B-30648 - Orange Bowl Site Parking
Garages
2,147,2b:.87
34000 - Public
Facilities-CIP
Award TBD - Structural Design
Settlement for Marlins Stadium
Parking Garages
10/25/12
12-0414
B-60464S - New Dinner Key Marina
Dockmaster Building Sanitary Sewer
90,000.00
3- 000 - Public
Fac 'ties
Award 1122 - Unallocated
Sanitary Sewer GO Bonds
10/25/12
12-0414
B-30706 - Miscellaneous Repair - 10%
Set Aside
739,000.00
34000 - ' blic
Facilities
Award 1437 - Marinas Capital
Repairs and Capital Related
Improvements - New FY2013
Allocation
10/25/12
12-0414
B-73102A - Citywide Streets Milling &
Resurfacing
1,428,600.00
36000 - Streets
& Sidewalks
Award 1419 - Parking Surcharge
007 - New FY2013 Allocation
10/25/12
12-0414
B-30262 - Citywide Storm Sewer
Repair Project
700,000.00
38000 - Storm
Sewers
Aw. d 1431 - Stormwater Utility
2008 ' rust Fund -Contribution
from G- ral Fund - New FY2013
Allocation
10/25/12
12-0414
B-70245 - Transportation Program
Support Services - Transportation
500,000.00
36000 - Streets
& Sidewalks
Award 1297 Transit Half -Cent
Surtax - New 013 Allocation
10/25/12
12-0414
B-73102A - Citywide Streets Milling &
Resurfacing
3,074,600.00
36000 - Streets
& Sidewalks
Award 1297 - Tran 't Half -Cent
Surtax - New FY201 , Ilocation
10/25/12
12-0414
B-70246 - Transportation Program
Support Services - Transit Professional
500,000.00
39900 - Mass
Transit
Award 1297 - Transit Ha -Cent
Surtax - New FY2013 Allo tion
10/25/12
12-0414
B-30666 - Damaged Vehicle
Replacement and Repair
38,937.00
31000 -
General
Government
Award 1577 - Subrogation Au '
Claims Revenue (June to Sept
FY2012 Collection)
10/25/12
12-0414
B-73102A - Citywide Streets Milling &
Resurfacing
326,000.00
36000 - Streets
& Sidewalks
Award 1552 - Local Option Gas
Tax 2009 - New FY2013
Allocation
I /25/12
12-0414
B-50722A - Little River Waterfront Park
Acquisition PHII
551,250.00
35000 - Parks
& Recreation
Award 1350- Special Revenue
Fund
01/1 • 13
13-0017
B-30802 - Pallot Park Shoreline
Improvements - D2
30,000.00
35000 - Parks
& Recreation
Award TBD - FIND Grant /
Approved via commission on
03/08/12 RESO# 12-0077
01/10/13
13-0017
B-30801 - Manatee Bend Park
Shoreline Improvements - D2
38,500.00
35000 - Parks
& Recreation
Award TBD - FIND Grant /
Approved via commission on
03/08/12 RESO# 12-0078
01/10/13
13-, • 17
257
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Amount
Fund
Award / Source
Date
Reso
Number
B-306:• - Damaged Vehicle
Replace 'ent/Repairs
43,604.38
31000 -
General
Government
Award 1577 - Subrogation Auto
Claims
01/10/13
13-0017
B-30887S - . ittle Haiti Soccer Field
Bathroom - D
265,000.00
37000 -
Sanitary Sewer
Award 1122 - Unallocated
Sanitary Sewer GO Bonds
02/28/13
13-0064
B-30374S - Virgin . Key Rowing Center
Improvements
100,000.00
37000 -
Sanitary Sewer
Award 1122 - Unallocated
Sanitary Sewer GO Bonds
02/28/13
13-0064
B-40454 - Park Expansi.'ns and Land
Acquisition — Citywide
1,000,000.00
35000 - Parks
& Recreation
Award 1422 Impact Fees -
(Unallocated FY2013)
02/28/13
13-0064
B-40455 - Citywide Capital
Improvements Projects
1,000,000.00
35000 - Parks
& Recreation
Award 1422 Impact Fees -
(Unallocated FY2013)
02/28/13
13-0064
B-30541D - Citywide Park Equipm- ,t &
Site Improvements
932,493.00
35000 - Parks
& Recreation
Award 1422 Impact Fees -
(Unallocated FY2013)
02/28/13
13-0064
B-30825 - Biscayne Bay Spoil Island B-
Public Shelter - D2
7,500.00
35000 - Parks
& Recreation
Award TBD FIND - Grant under
$25k- City Manager Acceptance
Memo signed 11/29/12
02/28/13
13-0064
B-30825A - Biscayne Bay Spoil Island E
Picnic Tables, Benches & Umbrellas -
D2
7,500.00
35000 - Parks
& Recreation
Award TBD FIND - Grant under
$25k- City Manager Acceptance
Memo signed 11/29/12
02/28/13
13-0064
B-30825B - Biscayne Bay Spoil Island E
Public Trail - D2
7,511.00
35000 - Parks
& Recreation
Award TBD FIND - Grant under
$25k- City Manager Acceptance
Memo signed 11/29/12
02/28/13
13-0064
B-50643 - Wagner Creek/Seybold
Canal Dredging Phase 2B
700,000.00
3:100 -
Sto , sewer
Award TBD FIND - Accepted by
R-12-0079 on 3/8/2012
02/28/13
13-0064
B-30721 - Spoil Island E Floating Dock
Restoration Project, Phase II
(Construction)
57,500.00
35000 - •-rks
& Recreatio
Award TBD FIND - Accepted by
R-12-0076 on 3/8/2012
02/28/13
13-0064
B-72915A - Police Headquarters
Helipad and Roof Replacement
24,505.75
32000 - Public
Safety
Award 1422 Impact Fees -
nallocated FY2012)
02/28/13
13-0064
B-72915A - Police Headquarters
Helipad and Roof Replacement
219,921.76
32000 - Public
Safety
A .rd 1422 Impact Fees -
(Un. located FY2013)
02/28/13
13-0064
B-30373A - Police Department Property
Unit Outdoor Storaae
80,000.00
32000 - Public
Safety
Awar. 1422 Impact Fees -
(Unallo -ted FY2013)
02/28/13
13-0064
B-30988 - North District Police Building
Misc. Repairs - D5
25,000.00
32000 - Public
Safety
Award 14' Impact Fees -
(Unallocate. FY2013)
02/28/13
13-0064
B-70718 - Fire Facilities Generators
(North & South)
86,740.50
32000 - Public
Safety
Award 1422 , pact Fees -
(Unallocated '012)
02/28/13
13-0064
B-72810A - New Fire Rescue Apparatus
(North & South)
113,043.66
32000 - Public
Safety
Award 1422 Imp. t Fees -
(Unallocated FY201)
02/28/13
13-0064
B-72810A - New Fire Rescue Apparatus
(North & South)
460,696.16
32000 - Public
Safety
Award 1422 Impact ' -es -
(Unallocated FY2013)
02/28/13
13-0064
B-30940 - Downtown Miami Bicycle
and Pedestrian Mobility Improvement
Proiect
250,000.00
36000 - Streets
& Sidewalks
Award TBD FDOT LAP Gr. t
accepted by R-12-0493
(12/13/121
02/28/13
13-0064
B-30940 - Downtown Miami Bicycle
and Pedestrian Mobility Improvement
Project
37,500.00
36000 - Streets
& Sidewalks
Award TBD Downtown
Development Agency - JPA
accepted by R-13-0038
(n1 (24/1)
02/28/13
13-0064
B-30941 — Downtown Miami Signage
and Wayfinding System
1,000,000.00
36000 - Streets
& Sidewalks
Award TBD — FDOT LAP Grant
accepted by R-11-0159
(4/14/111
02 8/13
13-0064
B-30941 — Downtown Miami Signage
and Wayfinding System
150,000.00
36000 - Streets
& Sidewalks
Award TBD Downtown
Development Agency - JPA
accepted by R-13-0039
(n1r24(1)
02/28/
13-0064
B-30666 - Damaged Vehicle
Replacement/Repairs
68,457.03
31000 -
General
Government
Award TBD - Surplus Goods &
Fixed Assets Sales
02/28/13
-0064
B-30666 - Damaged Vehicle
Replacement/Repairs
(4,830.00)
31000 -
General
Government
Award 1577 - Subrogation Auto
Claims
02/28/13
13-0' .4
258
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Amount
Fund
Award / Source
Date
Reso
Number
B-303► BS - Gibson Park New
Constru 'on
117,000.00
35000 - Parks
& Recreation
1122 - Unallocated Sanitary
Sewer
05/23/13
13-0206
B-74219B - •roperty Maintenance
Security Impr. ements
9,776.29
31000 -
General
Government
Award 1422 - Impact Fees New
Ordinance-2007 (Unallocated
FY2012 - 10% Balance)
05/23/13
13-0206
B-74219B - PropertMaintenance
Security Improvemen
15,223.71
31000 -
General
Government
Award 1422 - Impact Fees New
Ordinance-2007 (Unallocated
FY20131
05/23/13
13-0206
B-74219C - Property Mai enance
Bobcats & Trailer
40,000.00
31000 -
General
Government
Award 1422 - Impact Fees New
Ordinance-2007 (Unallocated
FY20131
05/23/13
13-0206
B-74219D - Property Maintena e -
Thermostats
8,000.00
31000 -
General
Government
Award 1422 - Impact Fees New
Ordinance-2007 (Unallocated
FY20131
05/23/13
13-0206
B-74205B - GSA Fleet Maintenance
Garage Expansion
105,096.81
31000 -
General
Government
Award 1422 - Impact Fees New
Ordinance-2007 (Unallocated
FY20131
05/23/13
13-0206
B-74205C - GSA Truck Wash Pit
80,000.00
31000 -
General
Government
Award 1422 - Impact Fees New
Ordinance-2007 (Unallocated
FY20131
05/23/13
13-0206
B-30706 - Miscellaneous Repair - 10%
Set Aside
46,000.00
34000 - Public
Facilities-CIP
Award 1896 - Florida Boating
Improvement Program
05/23/13
13-0206
B-50722A Little River Waterfront Park
LAQ PH II - D2
183, 0.00
35000 - Parks
& Recreation
Award 1907 - Florida Inland
Navigation District (FIND) RESO
12-0119 dated 03/22/12
05/23/13
13-0206
B-30689 Marine Stadium Marina
Bulkhead Repl
785,000.00
'4000 - Public
Fa ilities-CIP
Award 1897 - Florida Inland
Navigation District (FIND) RESO
12-0075 dated 03/08/2012
05/23/13
13-0206
B-30182A Coconut Grove Waterfront
MP I
330,000.00
34000 - •ublic
Facilities-, P
Award 1669 - TVM Production
Basic Use Fee RESO 12-0350
dated 09/27/12
05/23/13
13-0206
B-30690 West End Park New
Community Building - D4
1,500,000.00
35000 - Parks
& Recreation
Award TBD - Miami Dade
County GOB. Grant being
cepted at same Commission
M--ting 05/23/2013
05/23/13
13-0206
B-40271 - Solid Waste Sweeper
170,000.00
38000 - Storm
Sewers
Awar. 1431 - Storm Water
Utility - 12 remaining
allocation olid Waste)
05/23/13
13-0206
B-30992 - Riverview and Lawrence
Pump Stations
624,095.00
38000 - Storm
Sewers
Award 143 - Storm Water
Utility - FY12 -maining
allocation (Pub) Works)
05/23/13
13-0206
B-30992 - Riverview and Lawrence
Pump Stations
700,000.00
38000 - Storm
Sewers
Award 1431 - St. m Water
Utility - FY13 remai ' ing
allocation (Public Wo 1
05/23/13
13-0206
B-30780T - NW 14 Avenue & 28 Street
Area Roadway Imprv. Tree Component
D1
26,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tre Funding
05/23/13
13-0206
B-30724T - NW 33rd Street Roadway
Improvement Project - Tree
Component - D1
60,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Fun.'ng
05/23/13
13-0206
B-30727T - NW 18th Avenue Roadway
Improvement Project - Tree
Component - D1
60,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
• 5/23/13
13-0206
B-30611T - D1 FEMA Tree Funded
Projects
169,930.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/ - /13
13-0206
B-40704AT - SW 32 Avenue
Improvements - Tree Component - D2
60,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/1
13-0206
B-30687T - Coconut Grove Business
Improvement District - Tree
Component - D2
120,930.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
--0206
B-30630T - Palm Grove Road
Improvements - Tree Component - D2
70,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-02z 6
259
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Amount
Fund
Award / Source
Date
Reso
Number
B-308- T - Brickell Area Shared Use
Path an. • oadway Improvements -
Tree Com. ' nent - D2
65,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30699T - B- -com Project Area
Improvements - ree Component - D3
60,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30613T - D3 FE Tree Funded
Projects
255,930.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30614T - D4 FEMA Tre- Funded
Projects
315,930.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30883T - NW 12 Avenue/N 2
Place Roadway Improv. Tree
Component - DS
46,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30624T - Overtown Greenway @
11 Terrace - Tree Component - D5
100,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30882T - African Square Park -Splash
Park - Tree Component - D5
50,000.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30615T - D5 FEMA Tree Funded
Projects
19,930.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30500T - Civic Center Infrastructure
Tree Component - Citywide
100,E 10.00
33000 -
Disaster
Recovery
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30999 - Citywide FEMA Tree Funding
215,943.N
33000 -
isaster
R- overy
TBD Award - FEMA Tree Funding
05/23/13
13-0206
B-30666 Damaged Vehicle
Replacement/Repairs
64,605.87
310N0 -
Gene :I
Govern ent
Award 1577 - Subrogation Auto
Claims
05/23/13
13-0206
B-30680 - Rockerman Canal
Improvements
24,000.00
38000 - orm
Sewers
Award 1673 - Special
Assessement District-
Rockerman Canal
Tmnrnvomontc
05/23/13
13-0206
B-75883 - Peacock Park Site
Improvements - D2
100,000.00
35000 - Parks
& Recreation
Award TBD - Special Revenue
nd from Parks Project 29-
1 .002
05/23/13
13-0206
B-70245 - Transportation Program
Support Svcs - Transportation
(400,000.00)
36000 - Streets
and Sidewalks
Awa d 1297 - Transit Half -Cent
Surta
06/27/13
13-0252
B-70246 - Transportation Program
Support Svc - Transit Professional
(500,000.00)
39900 - Mass
Transit
Award 12.7 - Transit Half -Cent
Surtax
06/27/13
13-0252
B-73102A - Citywide Streets Milling &
Resurfacing - CIP
7,283.00
36000 - Streets
and Sidewalks
Award 1101 - . nsit Half -Cent
Surtax (FPL Reimursement
check dated 03/08 013 B-
31208 Closed)
09/12/13
13-0335
B-73102A - Citywide Streets Milling &
Resurfacing - CIP
8,070.00
36000 - Streets
and Sidewalks
Award 1101 - Transit Ha -Cent
Surtax (FPL Reimburseme
check dated 04/09/2013 B-
31208 Closed)
09/12/13
13-0335
B-30541B - Kennedy Floating Dock
14,621.00
35000 - Parks
& Recreation
Award 1350 - SRF Contribution
to Capital (Proj. 29-116002)
49/12/13
13-0335
B-43114B - Public Works Miscellaneous
Sidewalk Replacement
549,746.00
36000 - Streets
and Sidewalks
Award 1350 - SRF Contribution
to Capital (Lane Closure Fund
13000 / Proj. 20-650003)
09/ ' /13
13-0335
B-30541D - Citywide Park Equipment &
Site Improvements - FY2013
325,834.00
35000 - Parks
& Recreation
Award 1422 - Impact Fees
(Unallocated FY2013)
09/12/13
13-0335
B-30541D - Citywide Park Equipment &
Site Improvements - FY2013
86,011.20
35000 - Parks
& Recreation
Award 1422 - Impact Fees
(Unallocated FY2012)
09/12/13
1 '335
B-30865F - Environmental Remediation
Study for Fire Training Facility
140,000.00
31000 -
General
Government
Award 1426 - Contribution from
General Fund FY2013
09/12/13
13-033•
260
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Amount
Fund
Award / Source
Date
Reso
Number
B-404 .1 - Repairs and maintenance of
the air c6 ditioning systems and
elevator g--r boxes at the MRC
1,426,200.00
31000 -
General
Government
Award 1426 - Contribution from
General Fund FY2013
09/12/13
13-0335
B-30645F - M : mi Regional Intermodal
Plan
33,000.00
36000 - Streets
and Sidewalks
Award 1939 - Miami Dade
County MPO
09/12/13
13-0335
B-30011 - Englewo.. Storm Sewer -
Phase III
1,800,000.00
38000 - Storm
Sewers
Award TBD MDC GOB FY2013
09/12/13
13-0335
B-30011 - Englewood Sto Sewer -
Phase III
1,300,000.00
38000 - Storm
Sewers
Award TBD MDC GOB FY2014
09/12/13
13-0335
B-30011 - Englewood Storm S- er -
Phase III
2,469,000.00
38000 - Storm
Sewers
Award TBD MDC GOB FY2015
09/12/13
13-0335
B-30646 - South Bayshore Drive
Roadway and Drainage Improvements
2,000,000.00
36000 - Streets
and Sidewalks
TBD - JPA MD Cty-South
Bayshore Drive FY2013
09/12/13
13-0335
B-30646 - South Bayshore Drive
Roadway and Drainage Improvements
1,000,000.00
36000 - Streets
and Sidewalks
TBD - JPA MD Cty-South
Bayshore Drive FY2014
09/12/13
13-0335
B-30646 - South Bayshore Drive
Roadway and Drainage Improvements
'00,000.00
36000 - Streets
and Sidewalks
TBD - JPA MD Cty-South
Bayshore Drive FY2015
09/12/13
13-0335
B-30646 - South Bayshore Drive
Roadway and Drainage Improvements
1,000,E 10.00
36000 - Streets
and Sidewalks
TBD - JPA MD Cty-South
Bayshore Drive FY2016
09/12/13
13-0335
B-30646 - South Bayshore Drive
Roadway and Drainage Improvements
1,854,395.0E
36000 - Streets
. d Sidewalks
TBD - JPA MD Cty-South
Bayshore Drive FY2013 Fund
EW 221
09/12/13
13-0335
B-72915A - Police Headquarters
Helipad and Roof Replacement
850,854.32
320.•0 - Public
Safet
TBD - College of Policing Design
Reimbursement MDCPS
09/12/13
13-0335
B-72915A - Police Headquarters
Helipad and Roof Replacement
161,836.89
32000 - •. blic
Safety
TBD - College of Policing Escrow
Balance
09/12/13
13-0335
B-30666 - Damaged Vehicle
Replacement/Repairs
18,807.13
31000 -
General
Government
Award 1577 - Subrogation
Revenues (April - July 2013)
09/12/13
13-0335
B-30706 - Miscellaneous Repair - 10%
Set Aside
28,975.00
34000 - Public
Facility
:D - FDEP Invasive Species at
M. ine Stadium Marina Grant
09/12/13
13-0335
46,519,960.33
261
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTENTIONALLY BLANK
1tze &IL 1tze Yalu/re
262
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
APPENDIX 6
CAPITA ► PROJECTS TRANSFERS
APPROPR A TIONS FY2012-2013
Cite su tere
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Cite iutivie
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
CAPITAL PROJECTS APPROPRIATIONS TRANSFERS FY2012-2013
Fr. Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-75859 -
Lummus Park
Recreation
Building
Improvement
(8,461.77)
35000 - Parks &
Recreation
B-30889 - Lummus 8,461.77 35000 - Parks Award 1216 -
Park Miscellaneous & Recreation SNPB
Repairs D5 Conversion
10/25/12
12-0414
B-75859 -
Lummus Park
Recreation
Building
Improvement
(31,802.97)
35000 - Parks &
Recreation
B-30889 - Lummus 31,802.97 35000 - Parks Award 1457 -
Park Miscellaneous & Recreation Homeland
Repairs D5 Defense 1& 2
Interest Post 9-
30-06 & 9-30-
n7
10/25/12
12-0414
B-30295 - Little
Haiti Park -
Cultural Campus
(25,2 .69)
35000 - Parks &
Recreation
B-30890 - Little 25,254.69 35000 - Parks Award 1365 -
Haiti Cultural & Recreation HD2 Little Haiti
Campus Park Land
Miscellaneous Acquisition &
Reapirs D5 Development
10/25/12
12-0414
B-73102A -
Citywide Streets
Milling &
Resurfacing
(221,625.00)
36011 - Streets
& Side alks
B-30631 - Miami 221,625.00 36000 - Award 1419 -
River Greenway Streets & Parking
from Miami Circle Sidewalks Surcharge 2007
Greenway to South
Miami Avenue
10/25/12
12-0414
B-40176 West
Flagler Street
Landscape JPA
(287,000.00)
36000 - Streets
& Sidewalks
B-50706A - 287,000.00 38000 - Award 1584 -
•oadway, Drainage Storm Sewers Homeland
.,d Traffic Defense Series
Im: ovements - D1 3
& D,
10/25/12
12-0414
B-30150 - Dinner
Key Gratings,
Gates & Locks
(4,162.86)
34000 - Public
Facilities
B-6046, - New 4,162.86 34000 - Award 1212 -
Dinner Ke• Marina Public SRF
Dockmaster Facilities Contribution to
Building CIP - Prior to
2006
10/25/12
12-0414
B-30150 - Dinner
Key Gratings,
Gates & Locks
(7,057.30)
34000 - Public
Facilities
B-60464 - New 7,057.30 34000 - Award 1437 -
Dinner Key Marina Public FY07 Marinas
Dockmaster Facilities Capital Repairs
Building and Capital
Related
Tm rnvomantc
10/25/12
12-0414
B-30247 - Dinner
Key Dredging
(116,723.52)
34000 - Public
Facilities
B-60464 - New 16,723.52 34000 - Award 1584 -
Dinner Key Marina Public Homeland
Dockmaster Facilities Defense/Neighb
Building orhood
Improvement
Rnnri Sariac 7
10/25/12
12-0414
B-30325 -
Miamarina
Emergency Pier
Repairs
(999.00)
34000 - Public
Facilities
B-60464 - New 999.01 34000 - Award 1386 -
Dinner Key Marina blic HD2 Citywide
Dockmaster F. ilities Waterfront
Building Improvements
10/25/12
12-0414
B-30325 -
Miamarina
Emergency Pier
Repairs
(6,569.42)
34000 - Public
Facilities
B-60464 - New 6,569.42 34000 - Award 1496 -
Dinner Key Marina Public Sunshine State
Dockmaster Facilities Government
Building nancing
C. ' mission
Ina It
10/25/12
12-0414
B-30567 -
Marinas
Equipment
Project
(4,160.00)
34000 - Public
Facilities
B-60464 - New 4,160.00 34000 - Awar. 350 -
Dinner Key Marina Public SRF 206
Dockmaster Facilities Contributi. to
Building Capital
10/25/12
12-0414
B-30595 - Marine
Stadium Marina -
Miscellaneous
Repairs and
Equipment
(3,657.31)
34000 - Public
Facilities
B-60464 - New 3,657.31 34000 - Award 1437 -
Dinner Key Marina Public FY07 Marinas
Dockmaster Facilities Capital Repairs
Building and Capital
Related
Tmnrnvamantc
0/25/12
12-0414
B-30596A -
Dinner Key
Marina
Maintenance
Workshop
(54,295.72)
34000 - Public
Facilities
B-60464 - New 54,295.72 34000 - Award 1386 -
Dinner Key Marina Public HD2 Citywide
Dockmaster Facilities Waterfront
Building Improvements
10/25/1
12-0414
263
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-31 .96A -
Dinne ey
Marina
Maintenan.-
Workshop
(75,649.42)
34000 - Public
Facilities
B-60464 - New 75,649.42 34000 - Award 1437 -
Dinner Key Marina Public FY07 Marinas
Dockmaster Facilities Capital Repairs
Building and Capital
Related
Tmnrnvamantc
10/25/12
12-0414
B-30604 -
Miamarina
Seawall Repl.
(28,949.03)
34000 - Public
Facilities
B-60464 - New 28,949.03 34000 - Award 1350 -
Dinner Key Marina Public SRF 2007
Dockmaster Facilities Contribution to
Building Capital
10/25/12
12-0414
B-30706 -
Miscellaneous
Repair - 10% Set
Aside
381,159.00)
34000 - Public
Facilities
B-60464 - New 381,159.00 34000 - Award 1437 -
Dinner Key Marina Public FY07 Marinas
Dockmaster Facilities Capital Repairs
Building and Capital
Related
Tmnrnvamantc
10/25/12
12-0414
B-30373A -
Police
Department
Property Unit
Outdoor Storage
(1,390. • •)
32000 - Public
Safety
B-30988 North 1,390.96 32000 - Award 1422 -
District Police Public Safety Impact Fees
Building Misc. New Ordinance
Repairs - D5
10/25/12
12-0414
B-30373A -
Police
Department
Property Unit
Outdoor Storage
(9,892.90)
32000 - •ublic
Safety
B-30988 North 9,892.90 32000 - Award 1426 -
District Police Public Safety Contribution
Station Misc. from General
Repairs - D5 Fund FY 2008
10/25/12
12-0414
B-30384C -
Communication
UPS Power
(13,101.94)
32000 - Public
Safety
:-30988 North 13,101.94 32000 - Award 1426 -
Di rict Police Public Safety Contribution
Stat .n Misc. from General
Repai - D5 Fund FY 2008
10/25/12
12-0414
B-30592A -
North District
Police Station
Wind Retrofit
(1,640.20)
32000 - Public
Safety
B-30988 N. h 1,640.20 32000 - Award 1426 -
District Police Public Safety Contribution
Station Misc. from General
Repairs - D5 Fund FY 2008
10/25/12
12-0414
B-30019B - NW
18th Street (30-
32 Avenue) - D1
(3,876.03)
36000 - Streets
& Sidewalks
B-30780 - NW 14 3,876.03 36000 - Award 1379 -
Avenue and 28 Streets & Street Bonds
Street Area Sidewalks Series 1
Roadway
Improvements - D1
10/25/12
12-0414
B-30019F - NW
15th St (NW 32
Avenue to NW
37 Avenue) - D1
(316,519.76)
36000 - Streets
& Sidewalks
B-30780 - NW 14 31. 519.76 36000 - Award 1379 -
Avenue and 28 Streets & Street Bonds
Street Area Sidewalks Series 1
Roadway
Improvements - D1
10/25/12
12-0414
B-30500E - NW
24th Street (from
12th - 13th Ave)
D1
(504.41)
36000 - Streets
& Sidewalks
B-30780 - NW 14 504.41 .000 - Award 1379 -
Avenue and 28 St : -ts & Street Bonds
Street Area Side .Iks Series 1
Roadway
Improvements - D1
10/25/12
12-0414
B 30019B NW
36000 Strccts
B 30780 NW 14 1,673.94 36000
Award 1638
-trcct Bonds
2
12 0111
18th Street
(1,673.94)
&S,dcwm,c
Avcnuc 28
Strccts &
10/25/12
(30
32 Avcnuc) D1
and
Street Arca
Improvcmcnts D1
: rics
B-30226 -
Allapattah NW
22nd Court
Improvements -
D1
(190,425.86)
36000 - Streets
& Sidewalks
B-30780 - NW 14 190,425.86 36000 - Award 1 .11 -
Avenue and 28 Streets & Transit Ha -
Street Area Sidewalks Cent Surtax
Roadway
Improvements - D1
10/25/12
12-0414
B-39910 -
Quality of Life
District 2
(5,200.00)
31000 - General
Government
B-75830A - Blanche 5,200.00 35000 - Parks Award 1584 -
Park Master Plan & Recreation Homeland
Improvements - D2 Defense Series
3
125/12
12-0414
B-30323 - Buena
Vista Heights PH
II
(250,000.00)
36000 - Streets
& Sidewalks
B-30891 - Buena 250,000.00 36000 - Award 1379 -
Vista One -Way Streets & Street Bonds
Street Conversion Sidewalks Series 1
and Signage - D5
10/25/12
2-0414
264
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-7 ;02 - Fire
Statio & Other
Fire Fac 'ties
(150,000.00)
32000 - Public
Safety
B-70210 - Fire 150,000.00 32000 - Award 1426 -
Station #5 Exterior Public Safety Contribution
Walls Repair - D1 from General
Fund
11/15/12
12-0445
B-30865 -
FY2013 Citywide
Capital Needs
(45,900.00)
31000 - General
Government
B-30865A - 45,900.00 31000 - Award 1426 -
Environmental General Contribution
Remediation Government from General
Fund FY13
11/15/12
12-0445
B-30865 -
FY2013 Citywide
Capital Needs
150,000.00)
31000 - General
Government
B-30541D - 150,000.00 35000 - Parks Award 1426 -
Citywide Park & Recreation Contribution
Equipment & Site from General
Impr. Fund FY13
11/15/12
12-0445
B 30865
(350,000. b 1)
31000 Ccncra
B 71200 Citywidc
350,000.00
3
31000
Award 1126
Contribution
FY2013 Citywidc
Covcrnmcnt
Hcct
Ccncral
11/15/12
12 0115
Capital Nccds
cncral
• - - - - -- - -
Government from Ccncral
fund rY13
B-30865 -
FY2013 Citywide
Capital Needs
(350,000.00)
31000 - eneral
Governm- gt
B-30865B - City 350,000.00 31000 - Award 1426 -
Hall Terrace General Contribution
Government from General
Fund FY13
11/15/12
12-0445
B-30865 -
FY2013 Citywide
Capital Needs
(360,000.00)
31000 - General
Government
'-30865C - City 360,000.00 31000 - Award 1426 -
H. 1 Windows and General Contribution
Doo Government from General
Fund FY13
11/15/12
12-0445
B-73202 - Solid
Waste Collection
Equipment
(16,445.21)
39000 - Solid
Waste CIP
B-73202C - olid 16,445.21 39000 - Solid Award 1426 -
Waste Colle '.n Waste CIP Contribution
Equip from General
Fund
11/15/12
12-0445
B-30182A -
Coconut Grove
Waterfront
Master Plan PHI -
D2
(10,000.00)
34000 - Public
Facilities-CIP
B-30825 - Biscayne 10,000.00 35000 - Parks Award 1669 -
Bay Spoil Island B- & Recreation TVM Production
Public Shelter - D2 Basic Fees
11/15/12
12-0445
B-30182A -
Coconut Grove
Waterfront
Master Plan PHI -
D2
(750.00)
34000 - Public
Facilities-CIP
B-30825A - 750.00 35000 - Parks Award 1669 -
Biscayne Bay Spoil & Recreation TVM Production
Island E- Picnic Basic Fees
Tables, Benches &
Umbrellas - D2
11/15/12
12-0445
B-30182A -
Coconut Grove
Waterfront
Master Plan PHI -
D2
(750.00)
34000 - Public
Facilities-CIP
B-30825B - 750.00 .000 - Parks Award 1669 -
Biscayne Bay Spoil & -creation TVM Production
Island E- Public Basic Fees
Trail - D2
11/15/12
12-0445
B-73102A -
Citywide Streets
Milling and
Resurfacing
(15,000.00)
36000 - Streets
& Sidewalks
B-30645F Miami 15,000.00 36000 - Award 1297 -
Regional Intermodal Streets & Transit Half -
Plan Sidewalks -nt Surtax
11/15/12
12-0445
B-30304 -
Shenandoah Park
Improvements
(100,000.00)
35000 - Parks &
Recreation
B-30777 - Coral 100,000.00 35000 - Parks Award 1 84 -
Gate Mini -Park - D4 & Recreation Homelan.
Defense Se s
3
11/15/12
12-0445
B-35907 -
Athalie Range
Park
Soccer/Football
Complex
(65,520.00)
35000 - Parks &
Recreation
B-30671 - 65,520.00 35000 - Parks Award 1496 -
Caribbean & Recreation Sunshine State
Marketplace Government
Renovations - D5 Financing
Commission
I nan It 7
1 15/12
12-0445
B-30615 - D5
Miscellaneous
Street
Maintenance
(100,000.00)
36000 - Streets
& Sidewalks
B-30892 - Little 100,000.00 36000 - Award 1638 -
Haiti Gateway Signs Streets & Street Bonds
- D5 Sidewalks Series 2
11/15/12
12-0445
265
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-30- 6 -
Overto Youth
Center - '.tio
Enclosure
(35,624.76)
35000 - Parks &
Recreation
B-30893 - Overtown 35,624.76 35000 - Parks Award 1457 -
Youth Center & Recreation Homeland
Miscellaneous Defense 1& 2
Repairs - D5 Interest
11/15/12
12-0445
B-39910 -
Quality of Life
District 2
(40,000.00)
31000 - General
Government
B-30826 - Lincoln 40,000.00 35000 - Parks Award 1584 -
Park Improvements & Recreation Homeland
Defense Series
3
11/15/12
12-0445
B-30706 -
Miscellaneous
Repair - 10% Set
Aside
00,000.00)
34000 - Public
Facilities
B-30325 - 100,000.00 34000 - Award 1437 -
Miamarina Public FY0710%
Emergency Pier Facilities Marinas
Repairs Revenues
11/15/12
12-0445
B-72802 - Fire
Stations & Other
Fire Facilities
(8,815.0
32000 - Public
afety
B-70104 - Fire 8,815.00 32000 - Award 1426 -
Station# 10 Public Safety Contribution
Bathroom from General
remodeling Fund
01/10/13
13-0017
B-30706 -
Miscellaneous
Repairs 10% Set
Aside
(178,070.00)
34000 - •ublic
Facilities
B-30735 - Dinner 178,070.00 34000 - Award 1437 -
Key Marina Dinghy Public FY07 Marinas
Dock Facilities Capital Repairs
and Capital
Related
Tmnrnvamantc
01/10/13
13-0017
B-70108 - Video
Transmission
Server
(100,000.00)
31000 - General
Government
74205B - GSA 100,000.00 31000 - Award 1422 -
Fleet Maintenance General Impact Fees
Garage Expansion Government New Ordinance
01/10/13
13-0017
B-70107 - RISO
Digital Duplicator
(5,062.90)
31000 - General
Government
B-74205B - ,.SA 5,062.90 31000 - Award 1108 -
Fleet Maintenance General Impact Fees
Garage Expansi. Government
01/10/13
13-0017
B-72910 - The
College of
Policing
(15,960.00)
32000 - Public
Safety
B-72910A - The 15,960.00 32000 - Award 1584 -
College of Policing - Public Safety Homeland
EOC Facility Defense Series
3
01/10/13
13-0017
B-39910 - D2
Quality of Life
(150,000.00)
31000 - General
Government
B-75830A - Blanche 151 000.00 35000- Parks Award 1584 -
Park Master Plan & Recreation Homeland
Improvements Defense Series
3
01/10/13
13-0017
B-30020A - NW
1st Street - D3
(362,121.71)
36000 - Streets
& Sidewalk
B-30749 - Citrus 362,121.71 3.100 - Award 1379 -
Grove Roadway Str--ts and Street Bonds
Improvements Side :Ik Series 1
01/10/13
13-0017
B-30020B - NW
2nd Street - D3
(74,470.84)
36000 - Streets
& Sidewalk
B-30749 - Citrus 74,470.84 36000 - Award 1379 -
Grove Roadway Streets and .treet Bonds
Improvements Sidewalk S_ ies 1
01/10/13
13-0017
B-30020C -
District 3 NW
Quadrant PHI
(120,198.45)
36000 - Streets
& Sidewalk
B-30749 - Citrus 120,198.45 36000 - Award 1 9 -
Grove Roadway Streets and Street Bon..
Improvements Sidewalk Series 1
01/10/13
13-0017
B-30865 -
FY2013 Citywide
Capital Needs
(150,000.00)
31000 - General
Government
Project
B-30865D - Public 150,000.00 31000 - Award 1426 -
Works Asphalt General Contribution
Patch Truck Government from General
Project Fund
0 - 28/13
13-0064
B-30865 -
FY2013 Citywide
Capital Needs
(190,000.00)
31000 - General
Government
Project
B-30865E - MRC 190,000.00 31000 - Award 1426 -
NC Replacements General Contribution
Government from General
Project Fund
02/28/13
3-0064
266
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-3s ;65C - City
Hall dows
and Doo
(144,823.32)
31000 - General
Government
Project
B-30865E - MRC 144,823.32 31000 - Award 1426 -
NC Replacements General Contribution
Government from General
Project Fund
02/28/13
13-0064
B-60452 - Fire
Station #11
(New)
(213,259.50)
32000 - Public
Safety
B-70718 - Fire 213,259.50 32000 - Award 1422 -
Facilities Public Safety Impact Fees
Generators New Ordinance-
2007
02/28/13
13-0064
B-72809A -
Firefighting
Equipment -
SAFER
250,000.00)
32000 - Public
Safety
B-72803 - Fire 250,000.00 32000 - Award 1426 -
Station Equipment Public Safety Contribution
and Furniture from General
Replacement Fund
02/28/13
13-0064
B-72809A -
Firefighting
Equipment -
SAFER
(100,000.66)
32000 - Public
Safety
B-72802 - Fire 100,000.00 32000 - Award 1426 -
Stations & Other Public Safety Contribution
Fire Facilities from General
Fund
02/28/13
13-0064
B-72809A -
Firefighting
Equipment -
SAFER
(500,000.00)
32000 - •ublic
Safety
B-60455B - Fire 500,000.00 32000 - Award 1426 -
Station #1 Public Safety Contribution
Renovation and from General
Miscellaneous Fund
Repairs
02/28/13
13-0064
B-72809A -
Firefighting
Equipment -
SAFER
(61,500.00)
32000 - Public
Safety
:-72809 - Large 61,500.00 32000 - Award 1426 -
Fi -fighting Public Safety Contribution
Equ ,ment from General
Fund
02/28/13
13-0064
B-30365B -
James L. Knight
Center Garage
(9,200.00)
34000 - Public
Facilities
B-30541D - 9,200.00 35000 - Parks Award 1426 -
Citywide Par & Recreation Contribution
Equipment & Si - from General
Improvement Fund
02/28/13
13-0064
B-30541D -
Citywide Park
Equipment & Site
Improvements
(14,621.00)
35000 - Parks &
Recreation
B-30541B - 14,621.00 35000 - Parks Award 1426 -
Kennedy Park & Recreation Contribution
Floating Dock PH I from General
Fund
02/28/13
13-0064
B-30138 - Model
City/Floral Park -
Street
Improvements
PH II - D5
(100,000.00)
36000 - Streets
& Sidewalks
B-30884 - NW 62 106 000.00 36000 - Award 1379 -
Street West of I-95 Streets and Streets Bonds
Roadway Sidewalks Series 1
Improvements - D5
02/28/13
13-0064
B-30323 - Buena
Vista Heights PH
II
(18,946.56)
36000 - Streets
& Sidewalks
B-30894 - Little 18,946.56 000 - Award 1379 -
Haiti Right of Way St . -ts and Streets Bonds
Improvements - D5 Side .Iks Series 1
02/28/13
13-0064
B-30654 - D5
Model City Street
Resurfacing
Project NW 58
St/NW 58 Tr
(132,296.58)
36000 - Streets
& Sidewalks
B-30894 - Little 132,296.58 36000 - Award 1379 -
Haiti Right of Way Streets and treets Bonds
Improvements - D5 Sidewalks ies 1
02/28/13
13-0064
B-30654A - D5
Overtown, Little
Haiti, and Model
City Street
Resurfacing
(224,814.57)
36000 - Streets
& Sidewalks
B-30894 - Little 224,814.57 36000 - Award 1 9 -
Haiti Right of Way Streets and Streets Bo .s
Improvements - D5 Sidewalks Series 1
02/28/13
13-0064
B-30674 - Little
Haiti Soccer Park
- Road
Improvement to
NE 4th Avenue
(123,942.29)
36000 - Streets
& Sidewalks
B-30894 - Little 123,942.29 36000 - Award 1379 -
Haiti Right of Way Streets and Streets Bonds
Improvements - D5 Sidewalks Series 1
0 28/13
13-0064
B-40672A -
Flagami Traffic
Calming
(including East
Little Havana
daviracz
(39,039.20)
36000 - Streets
& Sidewalks
B-30778 - Traffic 39,039.20 36000 - Award 1379 -
circle for SW 18 Streets and Streets Bonds
Avenue and SW 13 Sidewalks Series 1
Street - D4
02/28/13
3-0064
267
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-4I .72B -
Flaga ' Traffic
Calming
Improvem: t
(Phase 2)
(3,450.98)
36000 - Streets
& Sidewalks
B-30778 - Traffic 3,450.98 36000 - Award 1379 -
circle for SW 18 Streets and Streets Bonds
Avenue and SW 13 Sidewalks Series 1
Street - D4
02/28/13
13-0064
B-40672C -
Flagami Traffic
Calming PH III
(60,066.89)
36000 - Streets
& Sidewalks
B-30778 - Traffic 60,066.89 36000 - Award 1379 -
circle for SW 18 Streets and Streets Bonds
Avenue and SW 13 Sidewalks Series 1
Street - D4
02/28/13
13-0064
B-30167B -
Shenandoah
Traffic Calming
Phase 2 - D4
(42,123.94)
36000 - Streets
& Sidewalks
B-30168A - Silver 42,123.94 36000 - Award 1379 -
Bluff Traffic Streets and Streets Bonds
Calming Priority 3 - Sidewalks Series 1
D4
02/28/13
13-0064
B-30168B -
Silver Bluff
Traffic Calming -
Phase 2 - D4
(47,908. )
36000 - Streets
& Sidewalks
B-30168A - Silver 47,908.42 36000 - Award 1379 -
Bluff Traffic Streets and Streets Bonds
Calming Priority 3 - Sidewalks Series 1
D4
02/28/13
13-0064
B-30664A -
District 4 -
Traffic Study at
La Pastorita
(2,671.71)
36000 - .treets
& Sidewa
B-30168A - Silver 2,671.71 36000 - Award 1379 -
Bluff Traffic Streets and Streets Bonds
Calming Priority 3 - Sidewalks Series 1
D4
02/28/13
13-0064
B-30020D -
District 3 NW
Quadrant - Phase
II - ME
(84,035.64)
36000 - Streets
& Sidewalks
:-30699 - Beacom 84,035.64 36000 - Award 1379 -
Pr.'ect Area Streets and Streets Bonds
Imp .vements Sidewalks Series 1
Phase - D3
02/28/13
13-0064
B-30024A - SW
5th St. 12 - 13th
Ave.
(108,983.31)
36000 - Streets
& Sidewalks
B-30699 - 6-acom 108,983.31 36000 - Award 1379 -
Project Area Streets and Streets Bonds
Improvements Sidewalks Series 1
Phase I - D3
02/28/13
13-0064
B-30026B -
Flagler Terrace
(12th Avenue -
17th Avenue)
(106,941.07)
36000 - Streets
& Sidewalks
B-30699 - Beacom 106,941.07 36000 - Award 1379 -
Project Area Streets and Streets Bonds
Improvements Sidewalks Series 1
Phase I - D3
02/28/13
13-0064
B-30034B - SW
llth Street (14-
17 Avenue)
(32,053.98)
36000 - Streets
& Sidewalks
B-30699 - Beacom 3 053.98 36000 - Award 1379 -
Project Area Streets and Streets Bonds
Improvements Sidewalks Series 1
Phase I - D3
02/28/13
13-0064
B-30990 -
Roadway
Improvements
(200,000.00)
36000 - Streets
& Sidewalks
B-30611 - D1 200,000.00 000 - Award 1297 -
Miscellaneous Str--ts and Transit Half -
Street Maintenance Side .Iks Cent Surtax
02/28/13
13-0064
B-30990 -
Roadway
Improvements
(200,000.00)
36000 - Streets
& Sidewalks
B-30621 - Center 200,000.00 36000 - Award 1297 -
Grove Street and Streets and ransit Half -
Lighting Sidewalks t Surtax
Improvements - D2
02/28/13
13-0064
B-30990 -
Roadway
Improvements
(200,000.00)
36000 - Streets
& Sidewalks
B-30613 - D3 200,000.00 36000 - Award 1 e7 -
Miscellaneous Streets and Transit Ha
Street Maintenance Sidewalks Cent Surtax
02/28/13
13-0064
B-30990 -
Roadway
Improvements
(200,000.00)
36000 - Streets
& Sidewalks
B-30774 - West 200,000.00 36000 - Award 1297 -
Flagler Area Streets and Transit Half -
Improvements - D4 Sidewalks Cent Surtax
0 - 28/13
13-0064
B-30990 -
Roadway
Improvements
(200,000.00)
36000 - Streets
& Sidewalks
B-30883 - NW 12 200,000.00 36000 - Award 1297 -
Avenue/NW 12 Streets and Transit Half -
Place Roadway Sidewalks Cent Surtax
Improvements - D5
02/28/13
3-0064
268
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-7 02A -
Citywi e Streets
Milling a d
Resurfaci
(514,000.00)
36000 - Streets
& Sidewalks
B-30611 - D1 514,000.00 36000 - Award 1297 -
Miscellaneous Streets and Transit Half -
Street Maintenance Sidewalks Cent Surtax
02/28/13
13-0064
B-73102A -
Citywide Streets
Milling and
Resurfacing
(514,000.00)
36000 - Streets
& Sidewalks
B-30621 - Center 514,000.00 36000 - Award 1297 -
Grove Street and Streets and Transit Half -
Lighting Sidewalks Cent Surtax
Improvements - D2
02/28/13
13-0064
B-73102A -
Citywide Streets
Milling and
Resurfacing
514,000.00)
36000 - Streets
& Sidewalks
B-30613 - D3 514,000.00 36000 - Award 1297 -
Miscellaneous Streets and Transit Half -
Street Maintenance Sidewalks Cent Surtax
02/28/13
13-0064
B-73102A -
Citywide Streets
Milling and
Resurfacing
(314,000.66)
36000 - Streets
& Sidewalks
B-30614 - D4 314,000.00 36000 - Award 1297 -
Miscellaneous Streets and Transit Half -
Street Maintenance Sidewalks Cent Surtax
02/28/13
13-0064
B-73102A -
Citywide Streets
Milling and
Resurfacing
(200,000.00)
36000 - .treets
& Sidewa
B-30779 - SW 2nd 200,000.00 36000 - Award 1297 -
Street and SW 40th Streets and Transit Half -
Avenue Traffic Sidewalks Cent Surtax
Circle - D4
02/28/13
13-0064
B-73102A -
Citywide Streets
Milling and
Resurfacing
(514,000.00)
36000 - Streets
& Sidewalks
:-30615 - D5 514,000.00 36000 - Award 1297 -
Mi ellaneous Streets and Transit Half -
Stre Maintenance Sidewalks Cent Surtax
02/28/13
13-0064
B-73102A -
Citywide Streets
Milling and
Resurfacing
(484,400.00)
36000 - Streets
& Sidewalks
B-43114B - •ublic 484,400.00 36000 - Award 1552 -
Works Streets and Local Option
Miscellaneous Sidewalks Gas Tax
Sidewalk
Replacement.
02/28/13
13-0064
B-30780 - NW 14
Avenue and 28
Street Area
Roadway
Improvements -
ni
(1,673.94)
36000 - Streets
& Sidewalks
B-30019B - NW 1,673.94 36000 - Award 1638 -
18th Street (30-32 Streets & Street Bonds
Avenue) - D1 Sidewalks Series 2
02/28/13
13-0064
B-30662A -
District 2 -
Traffic Calming
Study - SW 28th
St. between SW
'27nri Ava and
(15,058.43)
36000 - Streets
& Sidewalks
B-30662D - US-1 1' 058.43 36000 - Award 1379 -
Median Closures at Streets & Streets Bonds
Bridgeport and SW Sidewalks Series 1
30 Ct - D2
02/28/13
13-0064
B-40183 - Belle
Meade Gateway
Enclosure - D2
(35,517.57)
36000 - Streets
& Sidewalks
B-30662D - US-1 35,517.57 3.100 - Award 1379 -
Median Closures at Str_-ts & Streets Bonds
Bridgeport and SW Side :Iks Series 1
30 Ct - D2
02/28/13
13-0064
B-30734 -
Virginia Street
between Bird Ave
and US1 - D2
(104,000.00)
36000 - Streets
& Sidewalks
B-30621 - Center 104,000.00 36000 - Award 1419 -
Grove Street and Streets & •arking
Lighting Sidewalks S. charge
Improvements - D2
02/28/13
13-0064
B-30323 - Buena
Vista Heights PH
II - D5
(250,000.00)
36000 - Streets
& Sidewalks
B-30980 Liberty 250,000.00 36000 - Award 18 -
Square T- Streets and Street Bon..
Turnarounds - D5 Sidewalks Series 2
05/23/13
13-0206
B-30323 - Buena
Vista Heights PH
II - D5
(100,000.00)
36000 - Streets
& Sidewalks
B-30880 - NE 2nd 100,000.00 36000 - Award 1638 -
Court Roadway & Streets and Street Bonds
Drainage Sidewalks Series 2
Improvements
Project - D5
0 23/13
13-0206
B-30291 -
Athalie Range #1
Mini Park
Improvements -
D5
(3,763.00)
35000 - Parks &
Recreation
B-30981 - Oakland 3,763.00 35000 - Parks Award 1584 -
Grove Park - & Recreation Homeland
upgrades - D5 Defense/Neighb
orhood
Improvement
Rnnrl Sariac 7
05/23/13
3-0206
269
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-36:85 -
Freed. Garden
Statute
Rehabilita.'on -
D5
(38,427.08)
35000 - Parks &
Recreation
B-30981 - Oakland 38,427.08 35000 - Parks Award 1584 -
Grove Park - & Recreation Homeland
upgrades - D5 Defense/Neighb
orhood
Improvement
Rnnri Spriac 7
05/23/13
13-0206
B-75991B -
Williams Park
Furniture D5
(2,696.51)
35000 - Parks &
Recreation
B-30981 - Oakland 2,696.51 35000 - Parks Award 1457 -
Grove Park - & Recreation Homeland
upgrades - D5 Defense 1& 2
Interest Post 9-
30-06 & 9-30-
n7
05/23/13
13-0206
B-30138 - Model
City/Floral Park -
Street
Improvements
PH II - D5
(85,764.99)
36000 - Streets
& Sidewalks
B-30982 - Oakland 85,764.99 36000 - Award 1379 -
Grove Drainage - Streets and Street Bonds
D5 Sidewalks Series 1
05/23/13
13-0206
B-30323 - Buena
Vista Heights PH
II- D5
(95,135. )
36000 - Streets
& Sidewalks
B-30982 - Oakland 95,135.01 36000 - Award 1379 -
Grove Drainage - Streets and Street Bonds
D5 Sidewalks Series 1
05/23/13
13-0206
B-30323 - Buena
Vista Heights PH
II- D5
(63,044.68)
36000 Streets
& Sidewa s
B-30983 - NW 44th 63,044.68 36000 - Award 1379 -
Street between NW Streets and Street Bonds
7th and NW 8th Ave Sidewalks Series 1
D5
05/23/13
13-0206
B-30323 - Buena
Vista Heights PH
II- D5
(121,955.32)
36000 - Streets
& Sidewalks
:-30983 - NW 44th 121,955.32 36000 - Award 1638 -
S eet between NW Streets and Street Bonds
7th nd NW 8th Ave Sidewalks Series 2
D5
05/23/13
13-0206
B-39910 -
Quality of Life
District 2
(31,000.00)
31000 - General
Government
Projects
B-30541D 31,000.00 35000 - Parks Award 1584 -
Citywide Par & Recreation Homeland
Equipment & e Defense/Neighb
Improvements 2 orhood
Improvement
Rnnri Spriac
05/23/13
13-0206
B-30734 -
Virginia Street
between Bird Ave
and US1 - D2
(110,616.97)
36000 - Streets
& Sidewalks
B-30621 - Center 110,616.97 36000 - Award 1419 -
Grove Lighting - D2 Streets and Parking
Sidewalks Surcharge
05/23/13
13-0206
B-30621 - Center
Grove Lighting -
D2
(110,616.97)
36000 - Streets
& Sidewalks
B-30827 - South 1 I,616.97 36000 - Award 1297 -
Grove Roadway Streets and Transit Half-
Improvements - D2 Sidewalks Cent Surtax
05/23/13
13-0206
B-30035B -
Shorecrest
Roadway Milling
& Resurfacing
Project - D2
(60,000.00)
36000 - Streets
& Sidewalks
B-30662D - US-1 60,000.00 '.000 - Award 1101 -
Median Closures at St -ets and Transit Half -
Bridgeport and SW Side alks Cent Surtax
30 Ct - D2
05/23/13
13-0206
B-30035A -
North Shorecrest
Roads
Improvements
Project - D2
(55,000.00)
36000 - Streets
& Sidewalks
B-30830 - US1 55,000.00 36000 - Award 1638 -
Landscaping Streets and Street Bonds
between 17 Ave and Sidewalks -ries 2
Viscaya - D2
05/23/13
13-0206
B-30634 -
Brickell Key
Bridge - D2
(224,267.14)
36000 - Streets
& Sidewalks
B-30822 - Brickell 224,267.14 36000 - Award 97 -
Area Shared Use Streets and Transit H. -
Path and Roadway Sidewalks Cent Surta
Improvements - D2
05/23/13
13-0206
B-75883 -
Peacock Park
Site
Improvements -
D2
(100,000.00)
35000 - Parks &
Recreation
B-75830A - Blanche 100,000.00 35000 - Parks Award 1584 -
Park Master Plan & Recreation Homeland
Improvements - D2 Defense/Neighb
orhood
Improvement
Rnnri Spriac
i . /23/13
13-0206
B-70718 - Fire
Facilities
Generators
(North & South)
(19,499.63)
32000 - Public
Facilities
B-60452 - Fire 19,499.63 32000 - Award 1422 -
Station #11 (New) Public Safety Impact Fees
New Ordinance -
2007
05/23/13
13-0206
270
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-7 02 - Fire
Statio . & Other
Fire Faci les
(19,499.63)
32000 - Public
Safety
B-70718 - Fire 19,499.63 32000 - Award 1105 -
Facilities Public Safety Fire Assessment
Generators (North & Fee
South)
05/23/13
13-0206
B-72802 - Fire
Stations & Other
Fire Facilities
(100,000.00)
32000 - Public
Safety
B-70211 - FS No. 3 100,000.00 32000 - Award 1105 -
Dormitories Build- Public Safety Fire Assessment
out Project Fee
05/23/13
13-0206
B-72802 - Fire
Stations & Other
Fire Facilities
(77,000.00)
32000 - Public
Facilities
B-70212 - FS No. 77,000.00 32000 - Award 1105 -
12 Re -roofing Public Safety Fire Assessment
project Fee
05/23/13
13-0206
B-30222A - Calle
Ocho
Beautification -
East of 37
Avenue - D4
(171,627. •)
35000 - Parks &
•ecreation
B-30690 West End 171,627.32 35000 - Parks Award 1584 -
Park New & Recreation Homeland
Community Building Defense/Neighb
- D4 orhood
Improvement
Rnnrl Sarioc 7
05/23/13
13-0206
B-35871 - West
End Park Pool
Improvements -
D4
(8,310.85)
35000 - 'arks &
Recreatio
B-30690 West End 8,310.85 35000 - Parks Award 1368 -
Park New & Recreation HD2
Community Building Neighborhood
- D4 Park
Improvements
A Arm iicitinn
05/23/13
13-0206
B-30304 -
Shenandoah Park
Improvements -
D4
(483,112.83)
35000 - Parks &
Recreation
:-30690 West End 483,112.83 35000 - Parks Award 1584 -
Pa New & Recreation Homeland
Co unity Building Defense/Neighb
- D4 orhood
Improvement
Rnnrl Sarioc 2
05/23/13
13-0206
B-30775 -
Shenandoah
Area
Improvements -
D4
(48,107.82)
36000 - Streets
& Sidewalks
B-30693 - 48,107.82 36000 - Award 1638 -
Neighborhoo. Streets and Street Bonds
Traffic Calming Sidewalks Series 2
Improvements - ..,
05/23/13
13-0206
B-30222A - Calle
Ocho
Beautification -
East of 37
Avenue - D4
(422,264.00)
36000 - Streets
& Sidewalks
B-30961 - East 422,264.00 36000 - Award 1584 -
Flagami Roadway Streets and Homeland
Improvements SW Sidewalks Defense/Neighb
2nd Street and SW orhood
4th Street - D4 Improvement
Rnnrl Sarioc 2
05/23/13
13-0206
B-30025A - SW
5th Street (55-57
Avenue) - D4
(5,591.94)
36000 - Streets
& Sidewalks
B-30776 - Silver 591.94 38000 - Award 1379 -
Bluff Drainage Storm Sewers Street Bonds
Improvements - D4 Series 1
05/23/13
13-0206
B-30025B - D4-
Miscellaneous
Streets Paving
PHII
(34,082.73)
36000 - Streets
& Sidewalks
B-30776 - Silver 34,082.73 000 - Award 1379 -
Bluff Drainage St o Sewers Street Bonds
Improvements - D4 Series 1
05/23/13
13-0206
B-30627 - Coral
Gate Wall - D4
(2,671.71)
36000 - Streets
& Sidewalks
B-30776 - Silver 2,671.71 38000 - Award 1379 -
Bluff Drainage Storm Sewers .treet Bonds
Improvements - D4 S ies 1
05/23/13
13-0206
B-30710 - SW 17
Terrace between
SW 18 & 19
Avenues - D4
(2,195.82)
36000 - Streets
& Sidewalks
B-30776 - Silver 2,195.82 38000 - Award 1 8 -
Bluff Drainage Storm Sewers Street Bon,
Improvements - D4 Series 2
05/23/13
13-0206
B-40672A -
Flagami Traffic
Calming
(including East
Little Havana
riaviracl - na
(246.53)
36000 - Streets
& Sidewalks
B-30776 - Silver 246.53 38000 - Award 1638 -
Bluff Drainage Storm Sewers Street Bonds
Improvements - D4 Series 2
0 23/13
13-0206
B-30235A - West
Little Havana,
Home Depot
Area Traffic
Circles - D4
(115,073.49)
36000 - Streets
& Sidewalks
B-30776 - Silver 115,073.49 38000 - Award 1101 -
Bluff Drainage Storm Sewers Transit Half -
Improvements - D4 Cent Surtax
05/23/13
3-0206
271
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-36.29 -
Durha Terrace
Drainag Project
D4
(430,137.78)
38000 - Storm
Sewers
B-30776 - Silver 430,137.78 38000 - Award 1379 -
Bluff Drainage Storm Sewers Street Bonds
Improvements - D4 Series 1
05/23/13
13-0206
B-30629 -
Durham Terrace
Drainage Project
D4
(150,000.00)
38000 - Storm
Sewers
B-30776 - Silver 150,000.00 38000 - Award 1638 -
Bluff Drainage Storm Sewers Street Bonds
Improvements - D4 Series 2
05/23/13
13-0206
B-30629 -
Durham Terrace
Drainage Project
D4
(76,155.82)
38000 - Storm
Sewers
B-30960 - La 76,155.82 36000 - Award 1379 -
Pastorita Traffic Streets and Street Bonds
Calming and misc. Sidewalks Series 1
improvements - D4
05/23/13
13-0206
B-30629 -
Durham Terrace
Drainage Project
D4
(503,189. )
38000 - Storm
Sewers
B-30960 - La 503,189.67 36000 - Award 1638 -
Pastorita Traffic Streets and Street Bonds
Calming and misc. Sidewalks Series 2
improvements - D4
05/23/13
13-0206
B-30664A -
District 4 -
Traffic Study at
La Pastorita
(37,094.23)
36000 - .treets
& Sidewa
B-30960 - La 37,094.23 36000 - Award 1379 -
Pastorita Traffic Streets and Street Bonds
Calming and misc. Sidewalks Series 1
improvements - D4
05/23/13
13-0206
B-50704 -
Fairlawn Storm
Sewer
Improvements
Project PHIII
(8,560.28)
38000 - Storm
Sewers
:-30960 - La 8,560.28 36000 - Award 1379 -
P. torita Traffic Streets and Street Bonds
Cal 'ng and misc. Sidewalks Series 1
impro -ments - D4
05/23/13
13-0206
B-35861A -
Maximo Gomez
Domino Park
Restroom - D3
(29,241.03)
35000 - Parks &
Recreation
B-35861B - aximo 29,241.03 35000 - Parks Award 1457 -
Gomez / Do o & Recreation Homeland
Park Restroom Defense 1& 2
Improvements - ► Interest Post 9-
30-06 & 9-30-
n7
05/23/13
13-0206
B-35861A -
Maximo Gomez
Domino Park
Restroom - D3
(19,127.21)
35000 - Parks &
Recreation
B-35861B - Maximo 19,127.21 35000 - Parks Award 1584 -
Gomez / Domino & Recreation Homeland
Park Restroom Defense/Neighb
Improvements - D3 orhood
Improvement
Rnnri Sarioc 2
05/23/13
13-0206
B-35861A5 -
Maximo
Gomez/Domingo
Park Restroom -
Sanititary Sewer
n1
(100,000.00)
35000 - Parks &
Recreation
B-35861B5 - 10: 000.00 37000 - Award 1122 -
Maximo Gomez / Sanitary Sanitary Sewer
Domino Park Sewer
Restroom
Improvements - D3
05/23/13
13-0206
B-35812B -
Duarte Park ADA
Modifications -
D1
(65,722.25)
35000 - Parks &
Recreation
B-40456 - Antonio 65,722.25 000 - Parks Award 1584 -
Maceo Community & • •creation Homeland
Building - D1 Defense/Neighb
orhood
Improvement
Rnnri Sarioc 2
05/23/13
13-0206
B-40455 -
Citywide Capital
Improvements
Projects
(121,027.75)
35000 - Parks &
Recreation
B-40456 - Antonio 121,027.75 35000 - Par Award 1422
Maceo Community & Recreation mpact Fees
Building - D1
05/23/13
13-0206
B-40455 -
Citywide Capital
Improvements
Projects
(33,476.25)
35000 - Parks &
Recreation
B-35865A - Coral 33,476.25 35000 - Parks Award 1 2
Gate Park Bldg & Recreation Impact Fe -
Improvements - D4
05/23/13
13-0206
B-35832 -
Kinlock Park
Community
Recreation
Building
Tmnrnvamantc -
(47,843.29)
35000 - Parks &
Recreation
B-40457 - Kinlock 47,843.29 35000 - Parks Award 1368 -
Park Building & Recreation HD2
Addition - D1 Neighborhood
Park
Improvements
k Arm 1icitinn
0 ' 23/13
13-0206
B-40455 -
Citywide Capital
Improvements
Projects
(114,006.71)
35000 - Parks &
Recreation
B-40457 - Kinlock 114,006.71 35000 - Parks Award 1422
Park Building & Recreation Impact Fees
Addition - D1
05/23/13
3-0206
272
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-31 03 - Bob
Hope 6 .
Between W
20th Stree to
NW 17th St et -
n1
(11,724.57)
36000 - Streets
& Sidewalks
B-30781 - NW 11 St 11,724.57 36000 - Award 1379 -
from 27 to 37 Streets and Street Bonds
Avenue Area Sidewalks Series 1
Roadway
Improvements - D1
05/23/13
13-0206
B-30691 - NW
North River Drive
- District 1
(13,002.50)
36000 - Streets
& Sidewalks
B-30781 - NW 11 St 13,002.50 36000 - Award 1638 -
from 27 to 37 Streets and Street Bonds
Avenue Area Sidewalks Series 2
Roadway
Improvements - D1
05/23/13
13-0206
B-30702 - NW
34th Avenue @
SR 836 Roadway
Improvements -
D1
(1,673.94)
36000 - Streets
& Sidewalks
B-30781 - NW 11 St 1,673.94 36000 - Award 1638 -
from 27 to 37 Streets and Street Bonds
Avenue Area Sidewalks Series 2
Roadway
Improvements - D1
05/23/13
13-0206
B-30703 - Bob
Hope Dr.
Between NW
20th Street to
NW 17th Street -
ni
(25,905.s )
36000 - Streets
& Sidewalks
B-30781 - NW 11 St 25,905.03 36000 - Award 1638 -
from 27 to 37 Streets and Street Bonds
Avenue Area Sidewalks Series 2
Roadway
Improvements - D1
05/23/13
13-0206
B-30226 -
Allapattah NW
22nd Court
Improvements -
D1
(147,693.96)
36000 - .treets
& Sidewa
B-30781 - NW 11 St 147,693.96 36000 - Award 1101 -
from 27 to 37 Streets and Transit Half-
Avenue Area Sidewalks Cent Surtax
Roadway
Improvements - D1
05/23/13
13-0206
B-31221A - NW
16 Street
Improvement
Project - D1
(50,000.00)
36000 - Streets
& Sidewalks
:-30785 - NW 36 50,000.00 36000 - Award 1101 -
A -nue 15 to 16 Streets and Transit Half -
Streit Drainage - Sidewalks Cent Surtax
D1
05/23/13
13-0206
B-31221A - NW
16 Street
Improvement
Project - D1
(56,939.17)
36000 - Streets
& Sidewalks
B-30786 N 43 56,939.17 36000 - Award 1101 -
Avenue betw- -n 9 Streets and Transit Half -
St to 11 St Sidewalks Cent Surtax
Roadway
Improvements - D1
05/23/13
13-0206
B-30228 - NW
19th Terrace -
D1
(6,304.76)
36000 - Streets
& Sidewalks
B-30786 NW 43 6,304.76 36000 - Award 1101 -
Avenue between 9 Streets and Transit Half-
St to 11 St Sidewalks Cent Surtax
Roadway
Improvements - D1
05/23/13
13-0206
B-30328 - NW
20th Street
Streetscape - D1
(10,385.01)
36000 - Streets
& Sidewalks
B-30786 NW 43 16 385.01 36000 - Award 1101 -
Avenue between 9 Streets and Transit Half-
St to 11 St Sidewalks Cent Surtax
Roadway
Improvements - D1
05/23/13
13-0206
B-30507 - NW 32
Street, NW 23
Avenue, NW 24
Avenue - D1
(4,595.20)
36000 - Streets
& Sidewalks
B-30786 NW 43 4,595.20 000 - Award 1101 -
Avenue between 9 Str:-ts and Transit Half -
St to 11 St Side •.Iks Cent Surtax
Roadway
Improvements - D1
05/23/13
13-0206
B-33514 - Marine
Stadium Marina
Improvements
(130,000.00)
34000 - Public
Facilities-CIP
B-30696 - 130,000.00 34000 - Award 1584 -
Miamarina Pier A, B Public omeland
& C Fire Line Facilities-CIP II fense/Neighb
Repairs orh.od
Impr. ement
Rnnri lac
05/23/13
13-0206
B-30645A -
Transportation
Program Support
Services - Transit
Professional
(30,000.00)
39900 - Mass
Transit
B-70246A - Beach 30,000.00 39900 - Mass Award 1 11 -
Corridor Transit Transit Transit Ha
Connection Study - Cent Surtax
Citywide
05/23/13
13-0206
B-70500 -
Development/UD
P Consultants -
Watson Island,
Others
(22,292.89)
34000 - Public
Facilities-CIP
B-30365H - 22,292.89 31000 - Award 1103 -
Generator for City General Contribution
Hall Government From General
Projects Fund
0 23/13
13-0206
B-30365G -
Compond Fence
Modification for
Public Works
Operations Yard
(2,495.00)
31000 - General
Government
Projects
B-30365H - 2,495.00 31000 - Award 1426 -
Generator for City General Contribution
Hall Government from General
Projects Fund
05/23/13
3-0206
273
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-31 85 -
Coolin. Tower
support : acket
Replacem-.t
(1,067.35)
32000 - Public
Safety
B-30365H - 1,067.35 31000 - Award 1426 -
Generator for City General Contribution
Hall Government from General
Projects Fund
05/23/13
13-0206
B-70421 - Air
Conditioners
South District
Sub Station -
Miami Police
(5,000.00)
32000 - Public
Safety
B-30365H - 5,000.00 31000 - Award 1103 -
Generator for City General Contribution
Hall Government from General
Projects Fund
05/23/13
13-0206
B-30988 - North
District Police
Building Misc.
Repairs - D5
(10,000.00)
32000 - Public
Safety
B-40273 - Police 10,000.00 32000 - Award 1422
Station Public Safety Impact Fees
Headquarters
Generator Slab
05/23/13
13-0206
B-72910A - The
College of
Policing - EOC
Facility
(10,587..'
32000 - Public
afety
B-30988 - North 10,587.68 32000 - Award 1103 -
District Police Public Safety Contribution
Building Misc. From General
Repairs - D5 Fund
05/23/13
13-0206
B-72915 - Police
Headquarters
Helipad
(6,935.28)
32000 - •ublic
Safety
B-30988 - North 6,935.28 32000 - Award 1103 -
District Police Public Safety Contribution
Building Misc. From General
Repairs - D5 Fund
05/23/13
13-0206
B-70421 - Air
Conditioners
South District
Sub Station -
Miami Police
(8,000.00)
32000 - Public
Safety
: 30988 - North 8,000.00 32000 - Award 1103 -
Di rict Police Public Safety Contribution
Buil. g Misc. from General
Repair - D5 Fund
05/23/13
13-0206
B-30706 - Misc
Repairs - 10%
Set Aside
(75,000.00)
34000 - Public
Facilities-CIP
B-30735 - I' ner
Key Marina Di .hy
Dock
75,000.00
34000 -
Public
Facilities-CIP
Award 1437-
FY07 10%
Marinas
Revenues
05/23/13
13-0206
B-30706 - Misc
Repairs - 10%
Set Aside
(52,000.00)
34000 - Public
Facilities-CIP
B-30325A -
Miamarina Painting
and Misc Repairs
52,000.00
34000 -
Public
Facilities-CIP
Award 1437-
FY07 10%
Marinas
Revenues
05/23/13
13-0206
B-30325 -
Miamarina
Emergency Pier
Repairs
(4,338.51)
34000 - Public
Facilities-CIP
B-30325A -
Miamarina Painting
and Misc Repairs
, 38.51
34000 -
Public
Facilities-CIP
Award 1437-
FY07 10%
Marinas
Revenues
05/23/13
13-0206
B-30325 -
Miamarina
Emergency Pier
Repairs
(5,551.08)
34000 - Public
Facilities-CIP
B-30325A -
Miamarina Painting
and Misc Repairs
5,551.08
3• 100 -
Pub
Facili' -s-CIP
Award 1496 -
Sunshine State
Loan
05/23/13
13-0206
B-30365B -
James L. Knight
Center Garage
Improvements
(54,000.00)
34000 - Public
Facilities
B-30365N - Knight 54,000.00 34000 - Award 1426 -
Center ADA Public ontribution
Restroom Facilities fr. General
Improvements Fun.
06/27/13
13-0252
B-40302 - SW
1st Avenue Road
Improvements
Segment 1 - D3
(83,651.00)
36000 - Streets
& Sidewalks
B-40313 - SW 3rd 83,651.00 36000 - Award 1.'8 -
Ave Road Streets & Street Bon.
Improvements - D3 Sidewalks Series 2
06/27/13
13-0252
B-40312 - SW
22nd Terr. &
13th Ave Road
Improvements -
D3
(18,106.00)
36000 - Streets
& Sidewalks
B-40313 - SW 3rd 18,106.00 36000 - Award 1638 -
Ave Road Streets & Street Bonds
Improvements - D3 Sidewalks Series 2
0. 27/13
13-0252
B-30865B - City
Hall Roof Terrace
(35,823.83)
31000 - General
Government
Projects
B-30865C - City 35,823.83 31000 - Award 1426 -
Hall Windows and General Contribution
Doors Government from General
Projects Fund
06/27/13
3-0252
274
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-30 1A - SW
3rd Av. ue Road
Improve 'ents
Project - D'
(16,775.91)
36000 - Streets
& Sidewalks
B-30008A - Grove 16,775.91 36000 - Award 1379 -
Park Road Streets & Streets Bonds
Improvements - D3 Sidewalks Series 1
06/27/13
13-0252
B-30031C - SW
15th Rd (Coral
Way -South
Miami Avenue) -
D3
(11,892.97)
36000 - Streets
& Sidewalks
B-30008A - Grove 11,892.97 36000 - Award 1379 -
Park Road Streets & Streets Bonds
Improvements - D3 Sidewalks Series 1
06/27/13
13-0252
B-30034B - SW
llth Street (14-
17 Avenue) - D3
06,476.25)
36000 - Streets
& Sidewalks
B-30008A - Grove 106,476.25 36000 - Award 1379 -
Park Road Streets & Streets Bonds
Improvements - D3 Sidewalks Series 1
06/27/13
13-0252
B-30168C - SW
16th Avenue - D3
(1,396.
36000 - Streets
Sidewalks
B-30008A - Grove 1,396.51 36000 - Award 1379 -
Park Road Streets & Streets Bonds
Improvements - D3 Sidewalks Series 1
06/27/13
13-0252
B-30583 -
Citywide Street
Resurfacing - D3
(6,663.50)
36000 - treets
& Sidewal
B-30008A - Grove 6,663.50 36000 - Award 1379 -
Park Road Streets & Streets Bonds
Improvements - D3 Sidewalks Series 1
06/27/13
13-0252
B-30712 - NW 21
Avenue between
NW 1st Street
and NW 3rd
Street - D3
(68,939.85)
36000 - Streets
& Sidewalks
: 30008A - Grove 68,939.85 36000 - Award 1379 -
Pa Road Streets & Streets Bonds
Imp . vements - D3 Sidewalks Series 1
06/27/13
13-0252
B-30714 - NW 17
Avenue between
NW 3rd and NW
1st Street - D3
(244.65)
36000 - Streets
& Sidewalks
B-30008A - .rove 244.65 36000 - Award 1379 -
Park Road Streets & Streets Bonds
Improvements - I3 Sidewalks Series 1
06/27/13
13-0252
B-30719 - SW 16
Avenue from
Coral Way to 20
Street - D3
(32,109.21)
36000 - Streets
& Sidewalks
B-30008A - Grove 32,109.21 36000 - Award 1379 -
Park Road Streets & Streets Bonds
Improvements - D3 Sidewalks Series 1
06/27/13
13-0252
B-30740 - Two
Way Traffic
Conversion on
NW 1 Street - D3
(10,029.55)
36000 - Streets
& Sidewalks
B-30008A - Grove 11 '29.55 36000 - Award 1638 -
Park Road Streets & Street Bonds 2-
Improvements - D3 Sidewalks 2009 Series
06/27/13
13-0252
B-30741 - SW 16
Avenue Roadway
& Drainage
Improvements -
D3
(8,045.90)
36000 - Streets
& Sidewalks
B-30008A - Grove 8,045.90 3.100 - Award 1638 -
Park Road Str--ts & Street Bonds 2-
Improvements - D3 Side -Iks 2009 Series
06/27/13
13-0252
B-30742 - SW
5th Avenue
Roadway &
Drainage
Improvements -
11
(18,654.80)
36000 - Streets
& Sidewalks
B-30008A - Grove 18,654.80 36000 - Award 1638 -
Park Road Streets & treet Bonds 2-
Improvements - D3 Sidewalks 2b 89 Series
06/27/13
13-0252
B-30743 - SW
28th Road
Roadway &
Drainage
Improvements -
nz
(94,857.49)
36000 - Streets
& Sidewalks
B-30008A - Grove 94,857.49 36000 - Award 1.'8 -
Park Road Streets & Street Bon.. 2-
Improvements - D3 Sidewalks 2009 Series
06/27/13
13-0252
B-30747 - SW
13th Street
Roadway &
Drainage
Improvements -
n1
(197,843.20)
36000 - Streets
& Sidewalks
B-30008A - Grove 197,843.20 36000 - Award 1638 -
Park Road Streets & Street Bonds 2-
Improvements - D3 Sidewalks 2009 Series
,
0: 27/13
13-0252
B-40305 - SW
12th Street Road
Improvements -
D3
(54,390.98)
36000 - Streets
& Sidewalks
B-30008A - Grove 54,390.98 36000 - Award 1638 -
Park Road Streets & Street Bonds 2-
Improvements - D3 Sidewalks 2009 Series
06/27/13
3-0252
275
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-4. 55 -
Citywi.- Capital
Improve ents
Projects
(193,043.00)
35000 - Parks &
Recreation
B-30984 - Athalie 193,043.00 35000 - Parks Award 1422 -
Range Park HVAC and Impact Fees
Replacement - D5 Recreation
06/27/13
13-0252
B-40455 -
Citywide Capital
Improvements
Projects
(124,500.00)
35000 - Parks &
Recreation
B-30174 - Virginia 124,500.00 35000 - Parks Award 1422 -
Key Beach Park and Impact Fees
Historic Restoration Recreation
PH 2
06/27/13
13-0252
B-30645A -
Transportation
Program Support
Services - Transit
Professional
(51,200.29)
39900 - Mass
Transit
B-70246 - 51,200.29 39900 - Mass Award 1101 -
Transportation Transit Transit Half -
Program Support Cent Surtax
Svc - Transit
Professional
06/27/13
13-0252
B-30645A -
Transportation
Program Support
Services - Transit
Professional
(267,201. • I)
39900 - Mass
Transit
B-70246 - 267,201.90 39900 - Mass Award 1297 -
Transportation Transit Transit Half -
Program Support Cent Surtax
Svc - Transit
Professional
06/27/13
13-0252
B-30645B -
Transportation
Program Support
Services -
Transportation
(144,957.75)
36000 - .treets
& Sidewa
B-70245 - 144,957.75 36000 - Award 1297 -
Transportation Streets & Transit Half -
Program Support Sidewalks Cent Surtax
Svcs -
Transportation
06/27/13
13-0252
B-30706 -
Miscellaneous
Repair - 10% Set
Aside
(40,600.00)
34000 - Public
Facilities
:-30325 - 40,600.00 34000 - Award 1437 -
Mi: mimarina Public FY07 Marinas
Em- ency Pier Facilities Capital Repairs
Repai & Capital
Related
Tm rnvomantc
06/27/13
13-0252
B-30501A -
Manuel Artime
Miscellaneous
Project
(58,003.00)
34000 - Public
Facilities
B-30501B - anuel 58,003.00 34000 - Award 1350 -
Artime Dimm. Public SRF
Rack System Facilities Contribution to
Capital
06/27/13
13-0252
B-40300 - SW
18th Terr. Road
Improvements -
D3
(13,000.00)
36000 - Streets
& Sidewalks
B-40311 - SW 22nd 13,000.00 36000 - Award 1638 -
Road Improvements Streets & Street Bonds
D3 Sidewalks Series 2
06/27/13
13-0252
B-30501A -
Manuel Artime
Miscellaneous
Project
(87,663.00)
34000 - Public
Facilities-CIP
B-30501C - Manuel 8 663.00 34000 - Award 1350 -
Artime Window Public SRF 2007
Replacement 970 Facilities-CIP Contribution to
Building - PF Capital
09/12/13
13-0335
B-33506 - James
L. Knight Center
Miscellaneous
Improvements
(37,716.13)
34000 - Public
Facilities-CIP
B-30501C - Manuel 37,716.13 000 - Award 1103 -
Artime Window Pu. is Contribution
Replacement 970 Facil .'es-CIP from General
Building - PF Fund
09/12/13
13-0335
B-30706 -
Miscellaneous
Repair - 10% Set
Aside
(200,000.00)
34000 - Public
Facilities-CIP
B-70010 - 200,000.00 34000 - Award 1437 -
Miamarina Pier 5 Public 07 Marinas
Canopies - PF Facilities-CIP -pital Repairs
an. Capital
Rela': d
Tmnrn - mantc
09/12/13
13-0335
B-30365B -
James L. Knight
Center Garage
Impr
(25,000.02)
34000 - Public
Facilities-CIP
B-30501C - Manuel 25,000.02 34000 - Award 1 6 -
Artime Window Public Contributi.
Replacement 970 Facilities-CIP from Gener.
Building - PF Fund
09/12/13
13-0335
B-30865E - MRC
NC Replacement
(45,000.00)
31000 - General
Government
B-30865C - City 45,000.00 31000 - Award 1426 -
Hall Windows and General Contribution
Doors - GSA Government from General
Fund
0 • 12/13
13-0335
B-74219D -
Property
Maintenance -
Thermostats
(8,000.00)
31000 - General
Government
B-74205C - GSA 8,000.00 31000 - Award 1422 -
Truck Wash Pit General Impact Fees
Government New Ordinance -
2007
(Unallocated
FV7n1'1)
09/12/13
3-0335
276
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-4.155 -
Citywl: a Capital
Improv- ' ents
Projects
(50,000.00)
35000 - Parks
and Recreation
B-35806 - Curtis 50,000.00 35000 - Parks Award 1422 -
Park New Pool and Impact Fees
Facility and Boat Recreation
Ramp Improvement
D1
09/12/13
13-0335
B-35812B -
Duarte Park ADA
Modifications -
D1
(15,000.00)
35000 - Parks
and Recreation
B-35812D - Duarte 15,000.00 35000 - Parks Award 1584 -
Park Building and Homleand
Renovation, Splash Recreation Defense
Park - D1
09/12/13
13-0335
B-75816 -
Armbrister Park
Site
Improvements -
D2
(65,000.00)
35000 - Parks
and Recreation
B-30680 - 65,000.00 38000 - Award 1584 -
Rockerman Canal Storm Sewers Homeland
Improvements - D2 Defense Series
3 - CIP 326015
09/12/13
13-0335
B-30687T -
Coconut Grove
Business
Improvements
District - Tree
f mmnnnant - f17
(20,930.81)
33000 -
Disaster
-covery
B-30822T - Brickell 20,930.00 33000 - TBD Award -
Area Shared Use Disaster FEMA Tree
Path and Roadway Recovery Funding
Improvements -
Tree Component
09/12/13
13-0335
B-75883 -
Peacock Park
Site
Improvements -
D2
(105,000.00)
35000 - 'arks
and Recre: Lion
B-30721 - Spoil 105,000.00 35000 - Parks Award 1584 -
Island E Restoration and Homeland
and Floating Dock - Recreation Defense Series
D2 3 - CIP 311712
09/12/13
13-0335
B-40455 -
Citywide Capital
Improvements
Projects
(100,000.00)
35000 - Parks
and Recreation
-30995 - Virginia 100,000.00 35000 - Parks Award 1422 -
K- Beach North and Impact Fees
Poin. Mountain Bike Recreation
Trails D2
09/12/13
13-0335
B-40306 - SW
loth Street Road
Improvements -
D3
(40,000.00)
36000 - Streets
& Sidewalks
B-40324 - llth 40,000.00 36000 Streets Award 1638 -
Avenue Road & Sidewalks Street Bonds 2 -
Improvements D3 2009 Series
09/12/13
13-0335
B-30229 - Robert
King High Park
Soccer Field
(102,468.06)
35000 - Parks
and Recreation
B-30962 - Robert 102,468.06 35000 - Parks Award 1584 -
King High Fencing and Homeland
and Miscelaneous Recreation Defense Series
Improvements - D4 3
09/12/13
13-0335
B-30821 - Coral
Gate Park
Furniture,
Security System
and
Micrallanannc
(20,000.00)
35000 - Parks
and Recreation
B-30963 - Bay of 2 000.00 35000 - Parks Award 1584 -
Pigs Memorial Park and Homeland
Lighting - D4 Recreation Defense Series
3
09/12/13
13-0335
B-30770 - SW
22nd Ave
Medians - US1
to Coral Way -
D4
(186,000.00)
36000 - Streets
& Sidewalks
B-30776 - Silver 186,000.00 000 - Award 1297 -
Bluff Drainage St. Sewers Transit Half -
Improvements - D4 Cent Surtax
09/12/13
13-0335
B-30770 - SW
22nd Ave
Medians - US1
to Coral Way -
D4
(155,377.98)
36000 - Streets
& Sidewalks
B-30776 - Silver 155,377.98 38000 - Award 1379 -
Bluff Drainage Storm Sewers treet Bonds
Improvements - D4 ies 1
09/12/13
13-0335
B-30629 -
Durham Terrace
Drainage Project
(26,327.56)
38000 - Storm
Sewers
B-30776 - Silver 26,327.56 38000 - Award 1 9 -
Bluff Drainage Storm Sewers Street Bon
Improvements - D4 Series 1
09/12/13
13-0335
B-50704 -
Fairlawn Storm
Sewer
Improvements
Project PHIII
(130,454.79)
38000 - Storm
Sewers
B-30776 - Silver 130,454.79 38000 - Award 1379 -
Bluff Drainage Storm Sewers Street Bonds
Improvements - D4 Series 1
0 12/13
13-0335
B-50704 -
Fairlawn Storm
Sewer
Improvements
Project PHIII
(25,000.00)
38000 - Storm
Sewers
B-30964 -
Modification of
Speed humps on
SW 11 St. between
30 Ave and 31 Ct. -
n4
25,000.00 36000 - Award 1584 -
Streets & Homeland
Sidewalks Defense Series
3 - CIP 311714
09/12/13
3-0335
277
SUBSTITUTED
2013-2014 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
From Project
Amount
From Fund
To Project
Amount
To Fund
Award /
Source
Date
Reso
Number
B-51 04 -
Fairla Storm
Sewer
Improvem: nts
Project PHII
(50,000.00)
38000 - Storm
Sewers
B-30779 - SW 2nd 50,000.00 36000 - Award 1584 -
Street and SW 40th Streets & Homeland
Avenue Traffic Sidewalks Defense Series
Circle - D4 3 - CIP 311714
09/12/13
13-0335
B-50704 -
Fairlawn Storm
Sewer
Improvements
Project PHIII
(10,000.00)
38000 - Storm
Sewers
B-30778 - Traffic 10,000.00 36000 - Award 1584 -
Circle - SW 18th Streets & Homeland
Ave & SW 13th St. - Sidewalks Defense Series
D4 3 - CIP 311714
09/12/13
13-0335
B-50704 -
Fairlawn Storm
Sewer
Improvements
Project PHIII
(10,000.00)
38000 - Storm
Sewers
B-50706A - 10,000.00 38000 - Award 1584 -
Roadway, Drainage Storm Sewers Homeland
& Traffic Defense Series
Improvements - D4 3 - CIP 311714
09/12/13
13-0335
B-50704 -
Fairlawn Storm
Sewer
Improvements
Project PHIII
(50,000.66)
38000 - Storm
Sewers
B-30960 - La 50,000.00 36000 - Award 1584 -
Pastorita Traffic Streets & Homeland
Calming and Sidewalks Defense Series
Miscellaneous 3 - CIP 311714
Improvements - D4
09/12/13
13-0335
B-50704 -
Fairlawn Storm
Sewer
Improvements
Project PHIII
(53,000.00)
38000 - torm
Sewers
B-30965 - Coral 53,000.00 36000 - Award 1584 -
Gate Speed Humps - Streets & Homeland
D4 Sidewalks Defense Series
3 - CIP 311714
09/12/13
13-0335
B-35907 -
Athalie Range
Park Soccer /
Football Field
Improvements -
f1S
(42,528.41)
35000 - Parks
and Recreation
:-30671 - 42,528.41 35000 - Parks Award 1496 -
C. 'bbean and Sunshine State
Marketplace Recreation Government
Reno :tion D5 Financing
Commission
I nan IC)
09/12/13
13-0335
B-75991A -
Williams Park
Community
Building - 5
(30,000.00)
35000 - Parks
and Recreation
B-30671 - 30,000.00 35000 - Parks Award 1496 -
Caribbean and Sunshine State
Marketplace Recreation Government
Renovation D5 Financing
Commission
I nan It?
09/12/13
13-0335
B-60464 - New
Dinner Key
Marina
Dockmaster
Building
(6,569.42)
34000 - Public
Facilities
B-30325 - 6,569.42 34000 - Award 1496 -
Miamarina Public Sunshine State
Emergency Pier Facilities Government
Repairs Financing
Commission
I man it 7 _
09/12/13
13-0335
B-30999 -
Citywide FEMA
Tree Funding
Account
(215,943.00)
33000 -
Disaster
Recovery
B-30538T - Museum 21 943.00 33000 - TBD Award -
Park - FEMA Tree Disaster FEMA Tree
Funding Component Recovery Funding
09/12/13
13-0335
(20,941,802.86)
20,941,802.86
278