Loading...
HomeMy WebLinkAboutR-13-0251City of Miami Legislation Resolution: R-13-0251 City Hall 3500 Pan American Drive Miami, FL 33133 www.miamigov.com File Number: 13-00653 Final Action Date: 6/27/2013 A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), ACCEPTING THE ASSUMPTION OF THE PROFESSIONAL SERVICES AGREEMENT WITH KADERABEK COMPANY BY VERTICAL V-SOUTHEAST, INC., AS SUCCESSOR IN INTEREST, FOR THE PROVISION OF GEOTECHNICALAND CONSTRUCTION MATERIAL TESTING SERVICES FOR MISCELLANEOUS PROJECTS; FURTHER AUTHORIZING THE CITY MANAGER TO EXECUTE AN ASSUMPTION AGREEMENT, IN SUBSTANTIALLY THE ATTACHED FORM, FOR SAID PURPOSE. WHEREAS, on February 11, 2011, pursuant to Request for Qualifications No. 08-09-069, the City of Miami ("City") entered into a Professional Services Agreement ("PSA") with Kaderabek Company ("KACO"), for the provision of Geotechnical and Construction Material Testing Services for Miscellaneous Projects; and WHEREAS, KACO has been purchased by NV5 Holdings, Inc., through its subsidiary, Vertical V-Southeast, Inc.; and WHEREAS, the City has been notified that as part of the acquisition, Vertical V-Southeast, Inc. acquired the name rights of KACO and has retained all existing professional staff and maintains the same level of accreditation, licensing and insurance coverages; and WHEREAS, as of the bill of sale date, Vertical V-Southeast, Inc. assumed all of the rights, obligations and duties of KACO and is the successor in interest of KACO; and WHEREAS, Section 10, Article 10.03, entitled "SUCCESSORS AND ASSIGNS", of the PSA, allows for the assumption of the PSA with the City's written consent, acting by and through its City Commission; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by reference and incorporated as if fully set forth in this Section. Section 2. The acceptance of the assumption of the PSA with KACO by Vertical V-Southeast, Inc., for the provision of Geotechnical and Construction Material Testing Services for Miscellaneous Projects, is authorized. Section 3. The City Manager is authorized {1} to execute an Assumption Agreement, in substantially the attached form, for said purpose. Section 4. This Resolution shall become effective immediately upon its adoption and signature of City of Miami Page 1 of 2 File Id: 13-00653 (Version: 11 Printed On: 9/1/2017 File Number: 13-00653 Enactment Number: R-13-0251 the Mayor. {2} Footnotes: {1} The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions. {2} If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. City of Miami Page 2 of 2 File Id: 13-00653 (Version: 1) Printed On: 9/1/2017