Loading...
HomeMy WebLinkAboutReport of Proposed Record Plat - Braman BMWTHE CITY OF MIAMI, FLORIDA DEPARTMENT OF PUBLIC WORKS May 15, 2013 REPORT OF PROPOSED RECORD PLAT OF BRAMAN BMW LOCATED BETWEEN BISCAYNE BOULEVARD AND NE 2 AVENUE, AND BETWEEN NE 20 STREET AND NE 21 STREET. The accompanying Plat entitled BRAMAN BMW was prepared by Biscayne Engineering Company, Inc. It is in correct form for submission to the City Commission and is forwarded with a recommendation that it be approved. PERTINENT INFORMATION REGARDING THE PLAT: (1) The property platted is a replat of the property described in the attached Legal Description. The area platted consists of one (1) tract of land containing approximately 142,622 square feet (3.274 acres ±). It is zoned T6-36A-O. (2) The location of the streets and their widths conform to the standards of the Department of Public Works of the City of Miami, Florida. (3) As certified to by Andrew D. Conner, Registered Surveyor and Mapper, this Plat complies with the plat filing laws of the State of Florida. (4) The Certificate of Title Examination dated January 31, 2013, signed by Eduardo M. Soto, Attorney, indicates that the fee simple title to the property platted is correctly vested in 2060 Biscayne Boulevard, LLC, a Florida limited liability company, and that the Plat has been correctly executed. (5) The area platted is encumbered by mortgage in favor of Bank of America, N.A., recorded in Official Records Book 27090, Page 3741. (6) In accordance with the requirements of Chapters 54 and 55 of the Code of the City of Miami, Florida, a Cashier's Check in the amount of $6,268.00, has been remitted by BRAMAN MOTORS for the subdivision improvements at BRAMAN BMW. The Cashier's Check and the Agreement between the City of Miami and the aforementioned owner will guaranty the following: No. DESCRIPTION UNIT QTY COST 1 Remove existing concrete sidewalk SY 24 $ 280.56 2 Milling existing asphalt 1-inch depth SY 75 $ 213.00 3 Resurface roadway and on street parking areas(1-inch apshaltic concrete pavement) TN 4 $ 377.32 4 Construct new 4-inch sidewalk including handicap ramp SY 71 $ 2,883.31 SUBTOTAL CONSTRUCTION COST $ 3,754.19 Contigency: 10% of Subtotal Construction Cost $ 375.00 TOTAL CONSTRUCTION COST $ 4,129.19 Engineering: 12% of Total Construction Cost $ 496.00 Indirect costs: 15% of Total Construction Cost $ 619.00 Inspections: 5% of Total Construction Cost $ 206.00 TOTAL PROJECT -COST $ 5,450.00 Amount of Improvement Bond/Cashier's ChecklLetter of Credit (115 , percent of the Cost of Improvements) $ 6,268.00 (7) The attached Resolution has been prepared for the acceptance of the Plat by City Commission of Miami Florida. Enrique Pousada, P.S.M. Surveyor