Loading...
HomeMy WebLinkAboutTabulation of BidsTABULATION OF BIDS IFB 338289 BULK CO2 GAS ITEM NO. 1 2 3 DESCRIPTION Bulk CO2 gas on a Stay -Fill program approximately 4202 Ibs per year, for the Pool located at Jose Marti Park. To include all rental, installation, delivery and hazardous material fees included. Jose Marti Park located at 351 SW 4 Street, Miami, FL 33130 Delivery Time from Receipt of Order (Calendar Days). Bulk CO2 gas on a Stay -Fill program, approximately 9600 Ibs per year, for the Pool located at Hadley Park. All rental, installation, delivery and hazardous material fees included. Hadley Park located at 1300 NW 50th St. Miami, FL 33142 Delivery Time from Receipt of Order (Calendar Days). Bulk CO2 tankers on a Stay -Fill program for the Pool located at Athalie Range Park. Approx. 9600 Pounds, All rental, installation, delivery and hazardous material fees included. Range Park is located at 525 NW 62 St, Miami, FL 33150. Delivery Time from Receipt of Order (Calendar Days). Prepared by: Terry Byrnes, CPPB 5/1/13 5%-partment Director/Designee UOM Month Month Month QTY. 12 12 12 CARLON INC., d/b/a BROWARD NELSON FOUNTAIN SERVICE Best and UNIT PRICE Final Offer $167.50 $167.50 1 $287.50 $287.50 1 $287.50 $287.50 1 TOTAL $2,010.00 $3,450.00 $3,450.00 Approved TABULATION OF BIDS IFB 338289 BULK CO2 GAS 5 6 7 Bulk CO2, 26,000 lbs. per year, on a Stay -Fill program, to include rental, delivery, and HAZMAT Fees for Grapeland Pool located at 1550 NW 37 Avenue Delivery Time from Receipt of Order (Calendar Days). Bulk CO2 gas on a Stay -Fill program, estimated at 2000 Lbs. per month, for the pool at Gibson Park (unlimited refills), 411 NW 13 St, Miami Delivery Time from Receipt of Order (Calendar Days). 400 Lbs. Bulk CO2 Tanker on a Stay - Fill Program (unlimited refills) Miami Rowing Club Pool, estimated at 1000 Lbs. per month Delivery Time from Receipt of Order (Calendar Days). Bulk CO2 Gas on a Stay -Fill Program for the Pool at Shenandoah Park (unlimited refills, estimated at 1000 Lbs. per month,), 1800 SW 21st Avenue, Miami, FL Delivery Time from Receipt of Order (Calendar Days). TOTALS Month Month Month Month 12 12 12 12 $600.00 $600.00 1 $287.50 $287.50 1 $167.50 $167.50 1 $167.50 $167.50 Prepared by: Terry Byrnes, CPPB Approved 5/1/13 1 $1,965.00 $7,200.00 $3,450.00 $2,010.00 $2,010.00 $23,580.00 artment Director/Designee