HomeMy WebLinkAboutDepartment Analyses, Color Maps & PZAB ResoPLANNING DEPARTMENT
ANALYSIS
Case No. 2012- 00863sc
CLOSING, VACATING, ABANDONING AND DISCONTINUING FOR PUBLIC USE A STREET
AT APPROXIMATELY A PORTION OF SOUTHWEST 11th STREET LOCATED BETWEEN
SOUTHWEST 3rd AVENUE AND THE 1-95 EXPRESSWAY, MIAMI, FLORIDA.
Pursuant to Section 55-15 (c) of the Miami City Code, the Planning Department has
reviewed the proposed public right-of-way vacation and closure to determine whether it
is in the public interest, or whether the general public would benefit from the vacation of
the right-of-way.
The following findings have been made:
The street closure and unification of the site will allow construction of a new sanitary
sewer pump station.
• The street to be closure is a "dead end" portion of SW 11th Street, between SW 3rd
Avenue and the 1-95 Expressway . Since the properties on both sides of the roadway
are vacant and this short "dead end" roadway is not part of the neighborhood
network, public service vehicles do not utilize this roadway.
® The new pump station is a significant public infrastructure improvement that will
provide enhanced, dependable service to the neighborhood.
• It is found that the Plat and Street Committee members voted 6 in favor and 0 in
denial of the request to close and vacate the portion of the street.
Based on these findings, the Planning and Zoning Department recommends
approval of the request.
0
150
300
M IAM 121 MAP
600 Feet
ADDRESS: 12-00863sc SW 3 AV 1-95 N & S OF 11 STREET
0
150
300
600 Feet
ADDRESS: 12-00863sc SW 3 AV 1-95 N & S OF 11 STREET
"MIAMI HEIGHTS SEWER PUMP STATION" SUBDIVISION
CLOSURE AND VACATION OF A PORTION OF SW 11 STREET LOCATED BETWEEN SW 3 AVENUE AND THE
1-95 EXPRESSWAY, MIAMI, FLORIDA
The Plat and Street Committee has reviewed the tentative plat of "MIAMI HEIGHTS SEWER PUMP
STATION" subdivision and determined that all technical requirements contained in the Miami City Code
Subdivision Regulations have been met and has approved the tentative plat. The Plat and Street
Committee has further considered the vacation and closure of a portion of SW 11 Street with respect to
the Miami City Code requirements and has voted to recommend 6 in favor and 0 in denial of this
vacation and closure request.
(i-tv innti
January 17, 2012
John W. Renfrow, P.E., Director
Miami -Dade Water and Sewer Department
3701 SW 38 Avenue
Miami, FL 33146
Please forward to:
.. Rafael. Cabrera, PLS
Survey Section Head, Engineering Division
at LeJeune Road Building
MIAMI-HEIGHTS SEWER PUMP STATION — TENTATIVE PLAT #1758-A
Located between SW 3 Avenue and 1-95, North and South of SW 11 Street
Ladies and Gentlemen:
JOHNNY MARTINEZ, P.E.
City Manager
The City of Miami Plat and Street Committee, at its meeting of January 5, 2012 approved the
above tentative plat, subject to the following revisions being made to the tentative plat,
additional information being provided and/or variances being granted. Please be advised that
the processing of your tentative plat cannot proceed until these conditions have been satisfied:
1. State plane coordinates will be required by Miami -Dade County for Final Plat, not
required on tentative plat.
2. For Final Plat provide certified corner record.
3. Tie in all fences and structures along proposed tract lines (encroachment, clear or on
Tine)
4. Provide complete tree information in tabular form, more columns, and list including
common and botanical name, height, diameter and spread.
5. Existing utilities in the street to be closed and vacated must be relocated or easements
must be provided.
6. Provide elevations along the lip of street gutter and at the drainage inlets.
7. Provide the underground information for the storm sewers, including pipe size and
inverts.
8. A letter from Comcast is required to determine if any adjustments to their facilities or
easements are required.
9. All encroachments across proposed tracts and/or boundary lines must be removed prior
to final plat submittal, if applicable.
10. An opinion of title, in the City of Miami opinion of title form, must be provided at the time
of the final plat submittal.
11. Current backup documentation will be required for all who execute the final plat.
.12. Tentative plat application must be made with Miami -Dade County after receiving
approval from the City of Miami Plat and Street Committee.
13. Be advisedthat. an Incomplete final plat packagewill not be accepted by the City of
Miami. It is the owner's responsibility to work with his surveyor and his attorney to assure
that everything is in order before submitting the final plat package.
DEPARTMENT OF PUBLIC WORKS
444 S.W. 2nd Avenue / Miami, Florida 33130 / (305) 416-1200 / Fax: (305) 416-1278
Mailing Address: P.O. Box 330708 Miami, FL 33233-0708
14. Be advised that if all the requirements for scheduling the final plat for City Commission
action are not in order, the final plat will not be scheduled for a City Commission
meeting.
15. A plat approval letter from the F.D.O.T. is required at the time of final plat submittal.
16. One fire hydrant must be relocated into the S.W. 3 Avenue right of way.
17. An opinion of title as to the reversionary rights for the right-of-way to be closed and
vacated will be required by the Planning, Zoning and Appeals Board. The opinion of title
must also address whether or not there are individuals, in addition to the abutting
property owners, having an interest in the right-of-way to be closed and vacated. A copy
of the opinion of title must be provided to the Public Works Department.
18. The PZAB will require a sketch and legal description with a square footage, on an
8 1/2'x11" paper, for the proposed closure. Contact the Office of the Hearing Boards, at
305-416-2030. Provide a copy to the Public Works Department.
19. The Plat and Street Committee has reviewed the tentative plat of Miami Heights Sewer
Pump Station Subdivision and determined that all technical requirements contained in
the Miami City Code Subdivision Regulations have been met and has approved the
tentative plat. The members of the Plat and Street Committee have further considered
the request for vacation and closure of the easement with respect to Miami City Code
requirements and have voted 6 in favor and 0 in denial of this vacation and closure.
request.
In addition to the above requirements, you should be aware of the following:
1. State and local laws require the installation of various physical improvements in the
public rights -of -way when property is platted.. These subdivision improvements
include paving, drainage, landscaping, sidewalks, etc. In some cases this could
represent a substantial investment on your part. REQUIRED: The submission of an
electronic copy of the tentative plat, in an AutoCAD version, to the City of Miami
Public Works Development and Roadway Plans Section will EXPEDITE the
preparation and enhance the ACCURACY of the subdivision improvement estimate
letter required for the final plat approval.
2. The alteration, relocation or installation of utilities such as storm and sanitary
sewers, electric, telephone, water, etc., caused by this plat will be at the property
owner's expense. Also, ,utility easements may be required on the property being
platted.
3. A building permit will not be issued on the property being platted until the final plat is
recorded or as authorized by City of Miami Code Section 55-10(h). Also, the
Certificate of Occupancy for any building construction will be issued only after r all the
required subdivision improvements have been completed.
4. Approval for fire flow requirements must be obtained from the Fire -Rescue
Department prior to the issuance of a building permit.
5. Additional items must be provided to the City of Miami Department of Public Works
before the final plat is submitted to the City Commission for approval. You will be
notified in writing as to what these items are by the Public Works Survey Section.
6. Tentative plat approval is only valid for two (2) years from the date of the Plat and
Street Committee meeting at which time it was approved..
If you have any questions concerning these requirements, please refer to the attached sheet for
the appropriate person to contact.
Sincerely,
zeribe Ihekwaba, Ph, D, P.E.
Director of Public Works
NI/JS/L'Jf�icdt
Enclosure: Contact Sheet
Nzeribe Ihekwaba, Ph. D, P.E., Director of Public Works
Plat and Street Committee Members
Surveys
Development and Roadway Plans
Central
c!±gTerm
PEDRO G. HERNANDEZ, P.E.
City Manager
December 15, 2009
Miami -Dade County
c/o John W. Renfrow, Director
Miami -Dade Water and Sewer Department
3701 SW 38 Avenue
Miami, FL 33146
MIAMIHEIGHTS SEWER PUMP STATION - TENTATIVE PLAT #1758
Located between SW 3 Avenue and 1-95 Expressway North and South of SW 11 Street
Dear Mr. Renfrow:
Your tentative plat entitled MIAMI H 'LIGHTS SEWER PUMP STATION is now being
processed. As stated in our July 2, 2009 letter, State and City laws require that the owner(s) of
land being platted or replatted enter into an agreement with the City to constructcertain
improvements. As a result of a field investigation by this department, it has been determined that
the following improvements shall be required. The bond is waived as per Section 55-12(6)
Waiver Provisions for governmental entities and agencies:
No.
DESCRIPTION
UNIT
QTY
COST
1
Remove existing concrete sidewalk
SY
85
$ 993.65
2
Remove existing concrete curb and gutter
SY
20
$ 233.80
3
Remove existing asphalt
SY
238
$ 2,782.22
4
Mill existing asphalt pavement 1-inch depth
SY
301
$ 653.17
5
Rework limerock base 3"
SY .
188
$ 494.44
6
New 8-inch iimerock base
CY
21
$ 945.00
7
Construct 4-inch concrete sidewalk
SY
104
$ 3,265.36
8
Construct 6-inch concrete sidewalk
SY
9
$ 358.38
9
Resurface roadway (1-inch asphaltic concrete pavement)
TN
28
$ 2,183.44
10
Construct 6-inch concrette curb and gutter
LF
117
$ 1,515.15
TOTAL:
$ 13,444.61
10% Contigency
$ 1,344.00
17% Engineering and indirect cost
$ 2,286.00
Total Estimated Cost of Improvements
$ 17,075.00
Yon and your engineer nmust confer .with the •Department _of Public Warks..Deveiopmer t
and Roadway Plans Section to discuss the proposed improvements. Your engineer and
DEPARTMENT OF PUBLIC WORKS
444 S.W. 2nd Avenue / Miami, Florida 33130 / (305) 416-1200 / Fax: (305) 416-1278
Mailing Address: P.O. Box 330708 Miami, FL 33233-0708
Miami -Dade Water and Sewer Department
M1iAAMi I-IFIGFITS SEWER P1.JMP STATION - TENTATIVE PLAT #1758
December 15, 2009
Page 2 of 3
architect will be required to prepare signed and sealed engineering, landscape, irrigation,
and hardscape plans with elevations in City of Miami Datum. These plans shall clearly
show dimensions between the base building lines and the City of Miami monument lines.
All plans must be submitted to the Department of Public Works Development and
Roadway Plans Section for review and approval prior to the application and issuance of
any permits. Reasonable time must be allocated for the proper review of the construction plans
by City personnel. A reproducible Mylar of the approved plans (standard size 24" x 36") shall
be submitted to the Department of Public Works Development and Roadway Plans Section prior
to the application and issuance of any building or construction permits on the property being
platted.
Construction of the subdivisionimprovements shall not commence until your contractor has
obtained the required permits and applicable covenants. A line & grade permit fee must be paid
by your contractor for new construction of any major alteration of buildings. A line & grade
permit is also required for new sidewalk, curb and gutter, fences and walls with reinforced
concrete foundations, and other structures to be constructed within ten (10) feet of the base
building line. An excavation permit fee must be paid by your contractor if new drainage
structures or other underground utilities are to be installed. Your contractor should check with
the Right of Way Permits Section of the Department of Public Works for maintenance -of traffic
permits. Any construction on a state road including relocation of utility or light poles will also
require a permit from the Florida Department of Transportation. Your surveyor will be
responsible for the layout and final measurements of the subdivision improvements. Field books
and reproducible Mylar sheets of the "as -built" survey shall be submitted to the Development
and Roadway Plans Section for approval prior to the release of the subdivision improvement
bond.
The landscaping estimate, when included, is based on full coverage of solid sod and planting of
specified trees. The owners) will be required to guarantee the landscaping for one year after the
subdivision improvements have been accepted by the Department of Public Works.
Water service requirements are not included in the improvements listed above. For information
concerning water mains and appurtenances; contact IYEami-Dade Water & Sewer Department at
305-665-7471.
When the final plat has been prepared by your surveyor, it is to be submitted to the Department
of Public Works (Survey. Section) for checking and processing. The following items are to
accompany the linen or Mylar tracing of the final plat and should be submitted to the Survey
Section no later than six (6) weeks prior to the Commission meeting at which your plat is
scheduled for City Commission approval.
1. final plat original (inked),
2. three (3) prints of final plat,
• -3. $350.00 check for platting fee,
4. paid tax receipts for property being platted,
Miami -Dade Water and Sewer Department
MIANII H KIGHTS SEWER PUMP STATION - TENTATIVE PLAT #1758
December 15, 2009
Page 3 of 3
5. approval letters from utility companies concerning easements and services,
6. letter of Credit, Performance Bond or Cashier's Check for amount of subdivision
improvements, .(forms provided by Public Works),
7. executed agreement, in triplicate, between owner(s) and City for subdivision improvements,
(forms provided by Public Works),
8. a recent opinion of title, in triplicate, from an attorney, (forms provided by Public Works),
and
9. proof that all liens on property have been paid.
If you have any questions pertaining to the subdivision improvements, contact Ms. Sylvia
Rodriguez, Engineer It, at 305-416-1215.
If you have any questions pertaining to the final plat and its submission to the City Commission
for approval, contact Mr. Horacio Pulido, Surveyor, at 305-416-1248.
Sincerely,
i11 Anido, P. E.
Interim Director, Public Works Department
BA/LJH/ /ser
isAon
cc: Rafael Cabrera, P.S.M
3575 S LeJeune Road
Miami, FL 33133
Surveys
Development and Roadway Plans
Central
•
'
O R
Miami Planning, Zoning and Appeals Board
Resolution: PZAB-R-1 2-044
File ID 12-00863sc November 7, 2012 Item PZAB.2
Mr. Ernest Martin offered the following resolution and moved its adoption:
A RESOLUTION OF THE MIAMI PLANNING, ZONING AND APPEALS BOARD
RECOMMENDING APPROVAL TO THE MIAMI CITY COMMISSION, CLOSING,
VACATING, ABANDONING AND DISCONTINUING FOR PUBLIC USE A STREET AT
APPROXIMATELY A PORTION OF SOUTHWEST 11TH STREET LOCATED
BETWEEN SOUTHWEST 3RD AVENUE AND THE 1-95 EXPRESSWAY, MIAMI,
FLORIDA.
Upon being seconded by Ms. Melody L. Torrens, the motion passed and was adopted
by a vote of 10-0:
Ms. Jennifer Ocana Barnes Yes
Ms. Maria Lievano-Cruz Yes
Mr. Charles A. Garavaglia Yes
Mr. Charles A. Gibson Absent
Ms. Maria Beatriz Gutierrez Yes
Mr. Ernest Martin Yes
Mr. Daniel Milian Yes
Mr. Juvenal Pina Yes
Ms. Janice Tarbert Yes
Ms. Melody L. Torrens Yes
Mr. David H. Young Yes
Francisco + ar'cia, Director
fanning and oning Department
STATE OF FLORIDA
COUNTY OF MIAMI-DADE
Personally appeared before me, the undersigned authority, Anel Rodriguez, Clerk of the Planning, Zoning and Appeals Board of the
City of Miami. Florida. and acknowledges that he executed the foregoing Resolution.
SWORN AND SUBSCRIBED BEFORE ME THIS I14 DAY OF$4011t1Kber. 2012.
Sartdrtt 4r3es �►
Print Notary Name Ifotary Public State of Florida
Personally know or Produced ID_
Type and number of I.D. produced
Did take an oath or Did not take an oath 1
My Commission Expires
Notary Public State of Fibrida
Sandra Forges
c My Commission DD859677