CITY OF MIAMI
CAPITAL IMPROVEMENTS PROGRAM
MULTI -YEAR CAPITAL PLAN FY2012-2013
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
-F.
e.§sige
; bettine
REIGHI
1 Is
e One Yetterte
aro =v tie' 6
ow.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
QPERAI NGINIPA�
iOt eratiiig; nt ac 1
0ne �' . One .fa rte
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
CAPITAL BUDGET MESSAGE
Tomas P. Regalado Johnny Martinez, PE
Mayor Chief Administrator / City Manager
The Mayor together with the City Commission and the City Administration are pleased to present the 2012-
2013 Capital Improvements Program and Multi -Year Capital Plan — the CIP.
As the City plans for the future, we continue to look forward by focusing our capital efforts on enhancing
our infrastructure, providing transportation alternatives, improving our facilities, increasing public safety
and providing the highest level of quality of life for our residents. We continue to utilize a capital planning
process that gives City government an effective, service and result -oriented program to focus on meeting
the needs of our citizens, as well as positioning the City for future growth. The preservation, management
and utilisation of these significant capital resources, both physical and fiscal, are the foundation on which
we build the Miami of today and of the future.
As a result of the City Commission's past approval of the CIP, the Department of Capital Improvements
has either completed or will complete during this year a number of projects that significantly improve the
quality of life of residents and visitors. These projects include 1814 Brickell Park, Museum Park, Gibson
Park, Coral Gate Park Community Center, Marlins Stadium Parking Garages, Fire Station 413, launch of
the Miami Trolley program in the Allapattah/Overtown areas, citywide roadway and streetscape restoration
projects and the construction of various Miami River Greenway segments.
In building upon the improvements of the last few years, the City Administration has set up a well -qualified
workforce of architects, engineers, construction managers, and financial managers in the Department of
Capital Improvements. They administer, manage and implement our capital and transportation programs,
with all City Departments playing integral roles. It is the Departments mission to implement the capital
program in the most efficient, expedient and cost effective manner possible.
The CIP contains individual capital projects that are organized by fund and programmed for the current
fiscal year and into the next five years. Revenue has been analyzed and projected for future years, then
assigned to those projects and needs that take precedence. With revenue sources such as the Homeland
Defense/Neighborhood Improvement Bonds, Streets Bond, Parking, Surcharge, updated City Impact Fee
Ordinance and the County's Transit Surtax and General Obligation Bond, the resources are all in place for
the continued physical renewal of the City of Miami.
The CIP, as presented, has been updated and revised to best address all of the currently identified needs in
the City within the limitations of the available funding revenues. The CIP by nature is a dynamic, evolving
document that will continually be refined as each of the projects within the program advances. This most
likely will include projects moving in and out of the years in which they are programmed, as well as the
introduction of new projects and possibly the modification or elimination of others. As City priorities,
project scopes of work, cost estimates and production schedules are advanced, the CIP will be modified to
reflect any necessary changes. It is in this context that we respectfully request your approval of the CIP
presented before you.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
HOW TO READ THIS DOCUMENT
This document contains the City of Miami's six -year Capital Improvement Plan (CIP) that runs from October 1,
2012 through September 30, 2018. The document is.organized into the five sections described below.
INTRODUCTION — The Introduction defines the purpose of the CIP and details the Plan development process.
This section contains the following five parts:
Purpose of the Capital Improvement .Plan provides a thorough explanation of the purpose of the Capital
Plan with a detailed description of the difference between capital and operating budget and the legal
authority given to the City for the preparation of the Plan via several City and State of Florida statutes.
CIP Development Process describes the efforts of the Department of Capital Improvement Program in the
delivery of the projects and the adjustments to the project funding allocation.
Prioritization Criteria detailed description of the method used to establish the criteria by which the projects
are considered for funding.
Capital Plan Framework shows the eleven distinct funds of the program used to establish the Capital Plan
2012-2013 Multi -Year Capital Plan Overview shows the distinct funds into which the Multi -Year Capital
Plan is organized. It also shows a pie chart of the Funding Summary by fund.
HIGHLIGHTS — During the fiscal year CIP and other City of Miami departments work on hundreds of projects.
This section describes those projects that are noteworthy because of their magnitude or impact to the community,
priority in meeting the City's strategic plan, or innovative qualities. The highlighted projects are presented
according to capital fund category.
FUNDING OVERVIEW —This section begins by describing the seven types of revenue sources: Federal Grants,
State Grants, Miami -Dade County Grants, Other Grant, City Bonds, CIP Fees/Revenues, Private Donations
/Other. These revenue sources are the funding vehicles for the Capital Improvement Plan. The funding status for
the CIP projects can be further described by three categories: Funded, Partially Funded or Unfunded. Several
reports at the end of the section identify the projects and the funding situation. This section also contains
discussions on significant bond issuance initiatives and the Miami Trolley project.
OPERATING IMPACT BY DEPARTMENT — The Operating Impact by Department section shows the estimated
annual operating cost impact through fiscal year 2018. This section describes the methodology used to calculate
the projected impacts on the departmental budgets. The operating impact information is presented at a summary
level as well as detailed for each project identified to have a potentially significant effect on the City's General
Operating Budget. Reports are grouped at the end of this section.
APPENDIX— Additional information helpful to understanding the Capital Plan, including an alphabetical project
index, lists of completed projects, and capital projects expenditures on current projects are contained in the
Appendix.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
INTRODUCTION
Purpose of the Capital Improvement Plan
The Multi -Year Capital Plan (the Capital Improvement Plan or CIP) is an official statement of public policy
regarding long-range physical development in the City of Miami. A capital improvement is defined as a
capital or "in -kind "expenditure of $5,000 or more, resulting in the acquisition, improvement or addition to
fixed assets in the form of land, buildings or improvements, more or less permanent in character, and durable
equipment with a life expectancy of at least three years. The Capital Plan is a proposed funding schedule for
six years, updated annually to add new projects, reevaluate project priorities and revise recommendations,
with the first year of the plan being the Capital Budget.
The Capital Budget
Miami's Capital Budget is distinct from the Operating Budget. The Capital Budget represents a legal
authorization to spend, during the first year of the plan, funds from Federal, State and various other sources
and is adopted separately from the six year plan by means of an appropriations resolution. The Capital
Budget authorizes capital expenditures while the Operating Budget authorizes the expenditure of funds for
employee salaries and the purchase of supplies and small equipment. Capital projects can have an impact on
the operating budget through additional costs, revenues or cost savings.
Legal Authority
Legal requirements for preparing Miami's Capital Plan are set forth in the Florida Statutes and the City of
Miami Code. A capital improvement programming process to support the Comprehensive Plan is required
by the Local Government Comprehensive Planning and Land Development Regulation Act, more
particularly, Section 163.3177, Florida Statutes (2012). Further, the Financial Integrity Ordinance, Chapter
18/Article IX/Divisions 1 and 2 of the Code of the City of Miami, Florida, as amended ("City Code"),
requires the development and approval of a multi -year capital plan.
CIP Development Process
The 2012-2013 Multi -Year Capital Plan is an update to the 2011-2012 Multi -Year Capital Plan which was
approved by the City Commission on June 28th, 2012. The new FY12-13 Plan contains the same fund and
program framework and project priorities as the prior Plan, but incorporates allocations for funding sources
becoming available in FY2013. The primary focus of the Capital Improvements Program Office since the
approval of the previous Plan has been the continued management of ongoing projects, initiation of
previously approved projects, and coordination with the Finance Team to identify and secure financing
opportunities.
The efforts of the Capital Improvements Program/Transportation Office align with several objectives of the
City's Strategy Map and are summarized below. The Strategy Map can be seen on the next page.
Provide
Sustainable
Tax Relief
Maximize Grant
Management &
Opportunities
Broaden
Revenue
Opportunities
Secure Private
& Public
Partnerships '
oftligt„..
Fnalar
Tarnopol -Won
Syntorna for
Future Growth
iRoNMIqm
•ovido Excellent
Recreation,
Eclunntion,
and Cultural
Proorerne
Improve Business
and Service
Delivery Processes
Wri71.23,7ti intiM7451M15,77.M1W7
•,
18 it A p
impy‘, •
Resters Maintain
and uIU
Urhnn ancP
Remidential
fIrs.ciji-e
lu
Achieve
Operational
Savings
fitn,r,
glr-1,\
kti
rk,,i011 '0
, ,"„40,Stv. •
e'":1*:4447
f
:oRAflA rgitt
Provide
Encoll ant
Public Serail
Intte egrasustainable
practices and resource,
efficiencies
Ins ill Customer -Focused, High Performance and Environmentally Friendly Culture.
'0Weriftbige0
Provide a
Quality Work
Environment
ebkitga kitg
±o•tn)
Develop
Strategic Skills
i
p ',ACU6,124.0 4,111A r,4,4C
./.4,-11N174",,D1-ccflAb
Provide
Employees
With Key Into
liatamigus,mitex
4 Employ
Goals with City
Goals
!Ifai algae
•
Provide Excellent
Customer Service
.41
Achieve
Cost -Effective
Municipal Services
Facilitate
Service Access
for Customers
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Provide Excellent Recreational, Educational & Cultural Programs — through
frequent communication with the Parks and Recreation Department, continued
implementation of high -priority parks capital projects including those identified
in the Homeland Defense/Neighborhood Improvement Bond Program.
Restore, Maintain & Beautifj' Residential & Urban Infrastructure —
continued management of ongoing construction and design for street, traffic
calming and drainage projects identified as top priorities through resident and
elected official input, particularly those identified in the Street Bond Program.
Systems for Future Growth — The Office of Transportation, through capital
funding, have developed the Miami Trolley Program which began with the
launch of the Health District, Health District/Stadium Route in March 2012.
Immediately after, the City launched the BrickellBiscayne Trolley route which
provides downtown Miami with an alternate transportation mode through the
central business and the financial districts. During summer 2012, the
Overtovm-Health District Route was launched connecting residential
neighborhoods to major employment centers. Furthermore, the City launched
an additional route that further expands the transit network to the west,
connecting downtown Miami to the retail district along NW 20th Street. The
recently launched Miami Trolley System is already the largest and most comprehensive municipal transportation system
in Miami -Dade County, providing businesses, residents and visitors with a quality transportation network for moving
around the City's core employment centers. In addition, the planned Coral Way route will further expand the regional
connectivity as it will connect to the neighbor City of Coral Gables' Trolley system.
The Office of Transportation has also focused on making non -motorized transportation options viable, safe, and
convenient for all users. Through the development of bicycle and pedestrian mobility plans and the incorporation of
bicycle and pedestrian improvements into the City's Capital -Improvements Program projects, the City has seen a
marked improvement in bicycle friendliness and use, creating_ then a more livable environment.
Provide Excellent Public Safety — through frequent communication with the Miami Police and Fire -Rescue
Departments, continue to implement significant public safety projects including the acquisition of Police
Swat Vehicles and the construction of Fire Station No. 13.
Improve Business and Service Delivery Processes — utilize resources made available through the Capital
Program Support Services contract to develop project scopes and estimates, and facilitate progress of the
Multi -Year Capital Plan. Further, the Capital Improvements Program Office seeks opportunities to develop
alternate contracting methodologies, through pre -approved contracts with industry professionals, to help
expedite the large volume of projects in the Capital Plan..
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Prioritization Criteria
In addition to the surveying of all of CIP's client departments to determine their capital project needs, CIP
uses a hierarchy of criteria to determine how projects are considered for funding on a yearly basis. Projects
with the highest rankings, or in the case of projects meeting more than one criterion, are given priority for
funding and implementation. The criterion used is listed as follows in the order of priority:
Life/Safety- These projects are normally related to structural issues at City facilities and demand immediate
attention. They are considered "emergency" projects as they are not always planned for or funded.
Legal Requirements- These projects are funded based on the need to comply with legally mandated
requirements set forth by Federal, State and local governments. These types of projects may be required as a
result of binding settlements with other governmental agencies to meet current codes, ordinances or health
and safety issues. An example of these projects is a federal mandate to comply with ADA requirements
either citywide or at a particular park or facility.
Essential Improvements- These types of projects demand funding for improvements necessary to the
functioning and/ or preservation of facilities or infrastructure. This criterion measures the extent to which a
facility or infrastructure has deteriorated and needs improvements relative to the overall condition of similar
structures. Bridge repairs, storm water infrastructure improvements and repairs, and roadway resurfacing
highlight a variety of public works related projects that would fall under this criterion. The majority of Street
Bonds -funded projects would fall under this category as the preservation and improvement of the existing
infrastructure is the overwhelming goal. Facility roof replacements, repairing of structural damage, and fire
station renovations and replacement are also examples of essential facility improvements.
Quality of Life Improvements- Projects of this type improve the overall quality of life for the residents of
Miami. Projects such as these would include traffic calming, streetscapes, fountains, parks, neighborhood
and entry signs, and landscaping.
Efficiency Improvements- This criterion measures those projects that when completed will increase
efficiency or result in overall cost savings to the city. Such projects may benefit a greater number of people
or more efficiently and effectively provide and support the defined functional requirements of the intended
use. Projects such as these include renovation to offices, layout or workspace within a building, planning or
zoning department where a smoother and more fluid processing of plans equates to time savings and
increased customer service.
Revenue Producing.- These projects when completed would generate additional revenues to the city.
Projects of this nature show an overall return on investments, and should be measured on the risk involved.
The criterion measures the number of people who will benefit from the project, both directly and indirectly,
and the associated costs versus revenues generated. Elements considered in the rating include the project type
and overall community needs. Such a project might include a new park with a community center and water
park.
Service Improvements- These types of projects demonstrate an increased delivery capability when
completed. This criterion measures the number of people served and the benefit derived from a project.
Replacements and renewals, which bring facilities up to acceptable standards and expand capacity, such as a
marina expansion and renovation are illustrations of these types of projects.
Service/Space Expansion- These are projects which result in expansion of space to serve the needs of the
community. Such projects, typically parks or public facilities, would include renovations, additions,
expansions or new construction of recreation centers, fire stations, police facilities, theatres and convention
centers.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Capital Plan Framework
The 2012-2013 Multi -Year Capital Plan is structured into eleven (11) distinct funds or programs, some with
subcategories. With the exception of the Funding Type by Job report, all reports in the Plan follow this
program framework. The programs are listed and described below.
O Community Redevelopment Area (CRA): This program accounts for the acquisition or
construction of major capital facilities and infrastructure for community redevelopment in the
defined Community Redevelopment Area.
O General Government Projects: This program consists of capital improvements, including
computers and communications, to the City of Miami's municipal office buildings and operations
facilities.
O Public Safety: The Public Safety fund or program accounts for the acquisition of equipment or
construction of major facilities that support the operations of the Police and Fire -Rescue
Departments.
O Disaster Recovery: This fund is utilized to account for revenue received from the Federal
Emergency Management Agency (FEMA), insurance and other agencies resulting from declared
disasters which required measures of relief in the areas of debris removal, roads and bridges,
buildings and equipment, parks, marinas, and stadiums. At the present time, there are no disaster
recovery projects planned or included in the FY12-13 Capital Plan.
O Public Facilities: The Public Facilities program includes improvements to public use facilities such
as stadiums, auditoriums and marinas. This fund also accounts for capital funding for redevelopment
projects and historic preservation efforts.
O Parks and Recreation: This program accounts for the acquisition, rehabilitation or construction of
capital facilities for recreational activities. The City of Miami's park system comprises over 100
parks.
O Streets and Sidewalks: The capital projects in the Streets and Sidewalks program provide
reconstruction, major maintenance and beautification to Miami's street system.
O Mass Transit: This program accounts for the acquisition of equipment or construction of capital
facilities that support the maintenance and operation of public transportation systems.
O Sanitary Sewers: This program includes projects that will improve the City's existing sanitary
sewer system.
O Storm Sewers: The Storm Sewer program accounts for projects that result in improved drainage and
stormwater management throughout the City of Miami.
O Solid Waste: This program includes projects for the acquisition of equipment or construction of
facilities for the collection and removal of solid waste.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Prouarn Overview
The total value of the six -year plan is $568 million, representing 362 projects (285 active and 77 future)
throughout the various programs. The following graph shows that the Streets and Sidewalks program
accounts for the largest portion of the total Capital Plan funding at $145 million or 25.47%. The Public
Facilities, the second largest, accounts for $111 million or 19.57% of the overall Plan value. The Parks and
Recreation, the third largest, accounts for $97 million or 17.09% of the overall Plan value.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
HIGHLIGHTS
Hiohliohts by Fund
The most significant project accomplishments of the hundreds of projects under development in CIP and
other City departments are highlighted in this section and grouped according to fund category. The
projects that are noted in this section are deemed to be significant based on:
D Scale or magnitude and/or anticipated impact to the community;
D High priority alignment with the City's Strategic Map;
D Accomplishment of a long standing need or objective; or,
❑ Representation of an innovative solution to a problem.
FUND 301 COMMUNITY REDEVELOPMENT AREA (CRA)
Gibson Park New Construction Phase II — The project entails the construction of a new 11,880 SF
gymnasium building that shall consist of a Gymnasium area, men restrooms, women restrooms, kitchen
concession area, equipment storage area, classrooms, computers lab, electrical, mechanical and janitor
rooms. The recommendation to award contract was approved in March of 2012. Project Location: 350
NW 13 St.
North 14 St. Multi Media Entertainment District Streetscape — The project is currently under
construction and consists of roadway reconstruction, new sidewalks, new storm water system, new 12
inch watermains, signing and pavement markings, landscape, hardscape and decorative lighting. The
section of N 14th Street from NE 2nd Ave to NE 1st Avenue the sidewalks decorative
pavement/crosswalks will be constructed using architectural pavers and PAC style lighting. The rest of
the project will have standard patterned concrete sidewalks and FPL approved tear drop street lighting
with double -acorn fixtures for pedestrian lighting. N Miami Avenue will be milled and resurfaced and
sidewalks will be reconstructed from N 15th Street to the I-395 R/W line. Increase to construction
contract due to unforeseen utility conflicts approved in September 2012.
Museum Park Baywaik and Promenade, Phases II and III— This project is being developed in
conjunction with the construction of the Art and Science
Museum to provide a World Class Park on the Bay. Museum
Park Baywalk phase includes the construction of a pedestrian
walkway along the bulkhead which can be used for emergency
access for fire trucks and other emergency vehicles. The
Decorative Walkway shall include associated site/civil, ..
landscaping, irrigation, pedestrian amenities and lighting work.
The Promenade phase includes the construction of a grand
pedestrian walkway along the northern boundary of the park,
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
adjacent to the proposed Science and Art Museums, which can be used for special events, emergency
access to fire trucks and other emergency vehicles. The work includes associated site/civil, landscaping,
irrigation and lighting. In addition, an asphalt parking lot for approximately 40 cars will be constructed
along with a restroom facility. Pending Award of Contract in order to commence construction of project.
Project Location: 1075 Biscayne Blvd.
Miami Women's Club Baywalk Project - Project involves a new seawall in front of the Miami
Woman's Club to include new sidewalks, pedestrian lighting and other amenities. Project is currently in
the design phase Project Location: 1737 North Bayshore Drive.- Baywalk at the east end of the Women's
Club property.
Old Fire Station No. 2 Restoration - Design and construction to rehabilitate and restore the old Fire
Station No. 2, a historic 1926 two story CBS structure
approximately 10,500 SF (5,250 SF per floor). The work includes
selective demolition, environmental cleanup, construction of new
structural and roof systems, second floor, all new MEP including
HVAC, new restrooms on both floors, restoration and installation
of historical elements, exterior site work, ADA and code
upgrades and related work. Design will be done in three phases.
Ph. 1: Condition Assessment Report & Recommendations. Ph. 2:
Design & Construction for strengthening of the structural systems
and new roof. Ph. 3: Design and Construction of adaptive re -use. Project is newly completed. Project
location: 1401 North Miami Avenue.
FUND 311 GENERAL GOVERNMENT IMPROVEMENTS
Public Works Maintenance Yard - The project consists of assessing an existing building including
recommendations for site remodeling or demolition and, the design and construction of anew Public
Works Maintenance Yard to include field offices, locker rooms, a kitchenette, storage and related spaces.
The site work will include parking, and outdoor storage under the I-95 right-of-way. Project is currently
under design. Project Location: 551 NW 71 Street; 7142 NW 5th Court; 7148 NW 5th Court.
Damaged Vehicle Replacement and Repair (GSA) - Replacement or repairs to vehicles damaged by
collision or other events. Project Location: Citywide
Citywide General Fleet Replacement - Replacement of general fleet vehicles. Project Location:
Citywide
MRC Security System Hardening — Design of a state of the art Security system at the Miami Riverside
Center which includes incorporating the existing security system equipment in the main building parking
garage into the new system and any and all necessary components for the system to operate at maximum
efficiency. The design of the project is currently funded, future funds to be identified for the construction
of the project. Project Location: 444 SW 2nd Avenue.
GSA Fleet Maintenance Garage Expansion - Acquisition and installation of an additional vehicle lift,
wheel balancing machine and other items that will help expanding the capabilities to service the City's
fleet vehicles. Project Location: 1390 N.W. 20 Street.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Comnuunications/Techn.oloay:
IT Modernization - The City continues the most far reaching technology modernization effort in its
history. Legacy business systems are being replaced with new software applications offering modern
technical designs to enable best business practices. The intemet, high bandwidth and wireless
telecommunication, geographic information systems, business intelligence databases, and modern desktop
and server hardware form the foundation for a reliable, agile, technology infrastructure.
Two major modernization efforts were the focal point of the Information Technology Department:
iMiami ERP system including Oracle R12 upgrade and the Land Management System, each contribute
directly to the accomplishment of City's strategic objectives.
Oracle R12 brings the latest version of the financials and human resources systems to the city along with
improvements in business processes and computer processing speed. In addition, the team launched the
implementation of Hyperion Budget and Planning system as well as Oracle Business Intelligence
applications.
FUND 312 PUBLIC SAFETY
Police:
Police Vehicles Replacement - Project Location: Citywide
Police Swat Vehicles - Project Location: Citywide
Police Headquarters Helipad and Roof Replacement - The City of Miami Helipad is the only FAA
approved rooftop helipad available to first respondent in the downtown area and, as such, it would be
critical should a large scale catastrophic event occur. The project consists of upgrading the current roof to
withstand hurricane winds and -upgrading the current helipad by elevating it 8 feet above the roof
supported by columns that would tie into the existing support columns of the building. Current funds will
only cover the design of the project, future funds will need to be identified for construction. Project
Location: 400 NW 2 Avenue.
Fire:
Firefighting Equipment — SAFER — Capital purchase of large equipment
that needs to be replaced as it wears out or gets damaged. This includes
generators, hydraulic tools, fans, etc. Project Location: Citywide
Fire Rescue Personal Protective Equipment - The department of Federal
Emergency Management Agency (FEMA), US Department of Homeland
Security, Grants Management Branch, has awarded the "Assistance to
Firefighters Grant Award for Fiscal Year 2010" to the City of Miami
Department of Fire -Rescue. The grant is going to assist the Department of
Fire -Rescue in purchasing Personal Protective Equipment. Project
Location: Citywide
Fire Station 13 - Design and construction of a New Fire Station facility
of approximately 11,105 square feet Gross Area. The building shall be a
one story, two bay apparatus fire rescue facility. The facility shall include
all typical fire station amenities for fire rescue personnel. The project also
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
includes site development such as parking spaces as per zoning requirements, landscaping, water main
improvement, street signalization and seek LEED Silver Certification. The Project design was completed
and the fire station is currently under construction. Project Location: 958-960-990 NE 79 Street.
Fire Station 14 — Design of a 10,000 SF two-story fire rescue facility on a portion of a public park. The
facility will include bays for four trucks, dormitories, offices, a recreation room, kitchen and
miscellaneous support spaces. Demolition includes the removal of the existing fire station trailer, related
utilities, and select street trees, possible relocation of electrical mains and sanitary force main. The site
work will include the addition of a parking lot, service apron, new curb cuts and signalization. As part of
the enhancement of thesurroundingpark, a mini -soccer field will be added. Project is currently in the
phase of recommendation to award to the selected consulting firm. Project Location:,1800 SW 21st Ave.
Replace Existing Fire Apparatus - Replace Fire Apparatus on a rotational Basis
FUND 325 PUBLIC FACILITIES
Stadium Parking Garage: The project consists of four parking garages - two at six stories high and two
at five stories high and six surface lots, along with retail space. The parking garages are constructed using
a standard foundation with spread footings, a precast joist system and cast in place decks. The parking
garage walls consist of tilt -up precast construction. The City of Miami is currently finalizing the
constructing of the parking surface lot serve the Florida Marlins Stadium. Project Location: Orange
Bowl site - 17th avenue and 7th Street.
New Dinner Key Marina Dockmaster Building — Demolition of existing dockmaster building and
Design and Construction of a LEED certified New Dockmaster Facility of approx. 11,296 Sq.Ft. (Gross
Area) with a new outdoor plaza of approximately 10,000 SF at Dinner Key Manna. The new facility is a
three story building to serve as the Dinner Key Marina and Harbomaster's (Mooring) administration
building. Construction contract pending execution and award to issue Notice to Proceed to contractor.
Project Location: 3400 Pan American Drive.
Marine Stadium Marina at Virginia Key — Design and Construction of a new marina facility that will
generate additional revenues for the City of Miami. This new marina will be a fixed dock facility and will
accommodate approximately 220 vessels. In addition, upland utility improvements and an administration
building of approximately 5,000 sq. ft Gross Area to support marina activities and administration is
proposed. Project is currently in the phase of selecting the design consulting firm. Project Location: 3301
Rickenbacker Causeway.
James L. Knight Center / Hyatt- Fire Alarm System Replacement — The project consists of the
complete upgrade of the fire alarm system for the entire facility. The work includes replacing the fire
alarm panel, detection (heat and smoke) devices and notification (audible and visible) devices. Project is
currently under pre -design phase. Project Location: 400 SE 2nd Avenue.
James L. Knight Center Chiller & Cooling Tower — This project consists of
removing and replacing four Chillers and all related pumps, piping and
electrical work at the James L. Knight Center. The
project also includes the Demolition of the existing '
cooling tower and replacing it with new cooling tower
assembly. Construction of the project is nearly
completed. Project Location: 400 SE 2nd Avenue.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
FUND 331 PARKS AND RECREATION
Gibson Park New Construction Phase I — Project consisted of the demolition of existing park facilities
including Recreation Building, play courts, pool and utility
building. Completed construction of Phase I which
includes new sports field with artificial turf, upgraded
sports lighting, 1,000 seat covered bleachers and press box,
a new Aquatic Center with new pool, restrooms, showers,
lockers and new pump building. A new covered walkway
will connect the Recreation Building (Phase II) to the
existing Library. The project meets LEED Silver standards.
The project also included Street Improvements to address
existing roadway conditions around the park; the reconstruction of NSW 12th Street with new drop-off
area, parking and landscaping. The Construction for Phase I of the project is completed. Project Location:
350 NW 13 Street.
1814 Brickell Avenue Park - The project consisted of permitting
and constructing a new park on a 35,500 SF property. Project
scope included landscaped areas an elevated landscaped court and a
children's play area. 1814 Brickell Park is also home to one the last
remaining pieces from the ruins of the World Trade Center, a 15-
foot-high concrete and steel sculpture designed by artist Christian
Bernard. The park now memorializes the 9/11 tragedy with a
celebration of life.
Coral Way NET Office Remodeling/Community Center - Design and remodeling of an existing
building into a new Community Center. Project includes Multipurpose spaces, a computer lab, offices, a
break room, restrooms and support spaces. Site modifications include demolition of an existing residential
building, three new play structures on a new playground, and a new parking lot. The bid documents are
currently being finalized in order to advertise project for construction. Project Location: 1300 SW 12th
Avenue.
Coral Gate Park Community Building — Recently completed
the construction of a new community building of
approximately 4,600 G.S.F., a new parking lot, landscape and
irrigation, new playground and utility services. The project is
seeking LEED Silver Certification. Project location: 1415 SW
32 Avenue.
Bryan Park Community Building - Demolition of the 600 SF Comfort Station and construction of a
1,500 SF community building. Project scope will also include upgrading the Miami -Dade Water and
Sewer utility lines in the vicinity of the park. Project is currently under design. Project Location: 2240
SW 12 Street.
Melreese Golf Training Center - The Melreese Golf
Training Center (First Tee Academy) will be located
adjacent to the existing practice range and new clubhouse.
It will be used primarily as an instructional golf facility.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
The facility will have approximately 5000 square feet and will include a large assembly/classroom area,
three enclosed bays facing the practice range, two offices, storage area, restrooms, a kitchenette, a
vending area and support spaces. It will also have a pre -fabricated canopy over the existing practice range
and connecting walkways to the new clubhouse and parking lot. The facility will be certified LEED
Silver. Project is currently under construction. Project Location: 1802 NW 37th Avenue.
Caribbean Marketplace Renovation — Project consists of the interior
demolition and renovation of the marketplace to create an open air market
with kiosks to sell goods to the public. The repairs will include new
plumbing, ventilation and electrical systems. The Project is currently under
Construction. Project Location: 5925-27 NE 2nd Avenue.
Lummus Landing Square - The project entails the design and construction of a new restroom/storage
building and three pavilions as improvements to Lummus Landing Square property. The one story facility
will be approximately 2,400 SF Gross Area. Also, the improvements will include landscape and
hardscape. The project is in the preliminary design phase. Project Location: 250 NW North River Drive
and 176 NW North River Drive.
Hadley Park New Youth Center - This project consists of furnishing of all labor, materials and
equipment for the design and construction of a new youth center structure of approximately 23,000 square
feet. The building will include an indoor basketball court, an exercise room with adjacent lockers and
restrooms, classrooms, meeting rooms, computer room, office spaces and storage. The building
lobby/reception area will interconnect with a new covered drop-off area that will abut a cultural plaza.
Other park improvements include a covered entry/drop-off for the existing Senior Center building and
improvements at the Carrie Meek Center. ADA reconstruction of parking areas of recreation building and
field Parking lot, pavement marking, signage and ADA concrete ramps. Project is currently under design
and has a potential funding shoeifall for construction. Project Location: 1300 NW 50th Street.
Moore Park New Construction — Project consists of a design criteria package and design build services
for a new 15,000 S.F. community building center that will incorporate office, classroom and recreational
spaces and site improvements that will synergize with the existing tennis center and playfields. The
project will also include a new daycare center of approximately 3,000 S.F, a new driveway with parking
spaces and drainage system and a new open park area/community gathering space. Project is currently in
the permitting phase. Project Location: 3600 NW 7th Avenue.
African Square Park - Splash Park - The project consists of the design and construction of a new
Splash Park. Project includes: partial regrading to maintain existing amphitheater; creating a new
interactive water playground in an approximately 2400 SF paved area; enclosing splash park area with a
48" high steel fence; extending electric and water utilities to splash park area; demolishing existing
restrooms and creating new accessible restrooms; providing accessible route to splash park; preserving
existing large trees and introducing new landscaping; renovating and painting exteriors of neighboring
electrical room and entry feature. Project is currently in pre -design phase. Project Location: 1400 NW
62nd Street.
West End Park Community Building - The scope of work is the design and construction of a new
community building of approximately 6,600 G.S.F. consisting of multipurpose. rooms, fitness room, art
and craft room, computer room, break room and restrooms. In addition, the project shall construct a
permanent canopy over the existing picnic area, and ADA improvements in the park. Project is currently
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
pending interlocal agreement with Miami -Dade County to receive GOB to supplement funding. Project
Location: 6030 SW 2nd Street also known as 250 SW 60th Avenue.
FUND 341 STREETS AND SIDEWALKS
Citywide Bicycle Rack & Signage Program - Installation of bicycle facilities including bicycle lane
markings, shared use lane markings, bicycle signage, and bicycle racks throughout the City. Project is
currently Phase 1 ARRA grant is in punch list close-out and Phase 2 non-ARRA is in design. Project
Location: Citywide.
Health District Bicycle and Pedestrian Mobility Study - Bicycle Pedestrian Mobility Study will
examine the issues related to improving bicycle and pedestrian opportunities in the Health District. The
project will include coordination with the stakeholders in the area, and create a plan for improvements.
Project is completed. Project Location: I-95 on the East, NW 17th Ave on the West, NW 20th St on the
North, SR 836 on the South.
Citywide Sidewalk Repair Project (PW)— Sidewalk and curb and gutter replacement citywide.
Currently identifying additional funds in order to procure and award contract in early 2013. Project
Location: Citywide.
Beacom Project Area Improvements — Roadway restoration including milling and resurfacing of
existing pavement, new curb and gutter along EOP with miscellaneous drainage improvements as needed.
Project is currently under design. Project Location: Between SW 22nd Avenue and Beacom Blvd.: SW
2nd Street, SW 2nd Terrace, SW 3rd Street and SW 4th Street.
Beacom Phase II - Roadway restoration including milling and resurfacing of existing pavement, new
curb and gutter along EOP with miscellaneous drainage improvements as needed. Where there is parking
in swale areas, propose swale block and provide ADA ramps at curb returns. Project is currently under the
pre -design phase. Project Location: Area generally bounded by SW I52 Street to the North, SW 27th
Avenue to the west and Beacom Boulevard to the East and South.
Miami River Greenway 5th Street Bridge Extension - The design will follow the Miami River
Greenways Design Guidelines already established and adopted for the previous segments. Construction
will include but not limited to: improvements to the existing drainage system where needed, new roadway
pavement, new curb and gutter, new sidewalks, new decorative street and pedestrian lighting, new
benches and trash receptacles, new landscaping and tree planting as well as the required directional and
infoiunational signage and hardscape. Project is currently under the Bid Phase. Project Location: NW 12
Avenue to NW 10 Avenue along NW South River Drive, NW 11 Avenue between NW South River Drive
and NW 7 Street, and along NW 7 Street between NW 11 Avenue and NW 10 Avenue.
Miami River Greenway from NW 10th Avenue to NW 12th Avenue - The design will follow the
Miami River Greenways Design Guidelines already established and adopted for the previous segments.
Construction will include but not limited to: improvements to the existing drainage system where needed,
new roadway pavement, new curb and gutter, new sidewalks, new decorative street and pedestrian
lighting, new benches and trash receptacles, new landscaping and tree planting as well as the required
directional and informational signage and hardscape. Project is currently under the Bidding Phase. Project
Location: NW South River Drive from NW 10 Avenue to the NW 12 Avenue Bridge, In addition, this
project will complete the missing segment of greenway along NW North River Drive directly in front of
the Lummus Park.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
MW 8th Street Roadway and Drainage Improvements - Milling and resurfacing, minor drainage
improvements (NW corner of NW 15th St & NW 8th St intersection; East side of NW 15th Ave, just
North of NW 8th St and SE corner of NW 8th Terr & NW 17 Ave intersection), reconstruct curb & gutter,
striping, signage and tree planting. Project is currently under the bidding phase. Project Location: NW 8th
St & NW 8th Terr from NW 15th Ave to NW 17th Ave.
SW 13th Street Roadway & Drainage Improvements — Curb and gutter construction (may require
roadway reconstruction to lower grades). Project is currently under construction. Project Location: SW 13
Street between SW 13 Avenue and SW 14 Avenue.
Bird Avenue Road Improvement— Project consists of Street beautification including milling and
resurfacing, designated bike lanes in each direction, ADA compliant sidewalks, landscaping within the
project limits, and drainage improvements as necessary. Project Location: Bird Avenue from US1 to SW
27 Avenue, Bird Avenue from US 1 to Aviation Avenue, Allamanda St. & Oak Avenue, Bird Avenue
from US1 to Aviation Avenue and along McDonald Street from US1 to Jackson Avenue.
Brickell Area Shared Use Path and Roadway Improvements - Brickell Ave lighting improvements,
median improvements, sidewalk/path improvements and art in public places. Project is currently under
design. Project Location: Brickell Ave from SE 15th Rd to SE 26th Rd.
Center Grove Street and Lighting Improvements - The design and installation of decorative street
lighting; the repair of broken and displaced sidewalks and the addition of ADA compliant accessible
ramps as required. In addition, Mary Street will receive new sidewalks in sections where none currently
exists contingent upon adjacent property owner frontage dedications. Project is currently under design.
Project location: Phase I - North Day Avenue - Oak Avenue and Virginia Street to SW 27th Avenue.
Phase II - Virginia to McDonald from Day, Avenue to Bird Avenue.
Miami River Greenway SW lst Court to South Miami Avenue
- Work involves road improvements including, but not limited to'
reconstruction of streets, including new sidewalks, new drainage,
striping, signage, landscaping, hardscape, decorative street and
pedestrian lighting, and ADA ramps based on the Miami River
Greenways Master Plan. Project is currently under construction.
Project Location: South Miami Avenue Rd from SW lst Court to
South Miami Avenue.
Miami River Greenway from Miami Circle Greenway to South Miami Avenue - The Scope of Work
involves road improvements including, but not limited to reconstruction of roads, including new
sidewalks, drainage, striping, signage, landscaping, hardscape, decorative street lighting, and ADA ramps
based on the Miami River Greenways Master Plan. Project is currently in design. Project Location: Area
bounded by SE 5th St from S Miami to Brickell Ave and SE lth Ave from SE 6th St to Miami River.
NW Ilth Street Roadway Improvement Project - The Scope of Work involves the milling and
resurfacing of the existing asphalt pavement, the replacement of associated pavement markings and
damaged sidewalk replacement if needed. Project is currently under construction. Project Location: NW
l i th Street from NW 27th Avenue to NW 42nd Avenue.
MW 14 Avenue and 28 Street Area Roadway Improvements Milling and resurfacing, swale
restoration, drainage improvements, minor curb and sidewalk repairs, and restriping as needed. The
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
project is currently under design. Project Location: NW 14th Ave from NW 28th St to 30th St; NW 28th
St from NW 12th Ave to 17th Ave; NW 14th Ave from NW 20th St to 21 st St; NW 1 l th Ave from NW
21 st St to 22nd St.
NW 18th Avenue Roadway Improvement Project Milling and resurfacing, swale restoration, drainage
improvements, minor curb and sidewalk repairs, ADA modification and striping as needed. The design
phase is complete; project is currently being priced for construction. Project Location: Area bounded by
NW 19th Terrace, NW 15th Street, NW 17th Avenue, and NW 19th Avenue.
NW 33rd Street Roadway Improvement Project Milling and resurfacing, swale restoration, drainage
improvements, minor curb and sidewalk repairs, ADA modification and striping as needed. Project is
currently under design. Project Location: Area bounded by NW 12th Avenue, NW 17th Avenue, NW
36th Street and NW 30th Street.
N W 9th Street Roadway Improvement Project - The Scope of Work involves the milling and
resurfacing of the existing asphalt pavement, the replacement of associated pavement markings and
damaged sidewalk replacement if needed. Project is currently under construction. Project Location: NW
9th Street from NW 22nd Ct to NW 28th Avenue; NW 22nd Ct to NW 28th Avenue between NW 7th St
and NW llth Street; NW 23rd Ct between NW 1 lth Street and NW 7th Street; NW 25th Avenue between
NW 1 lth Street and NW 7th Street.
SW 19th Terrace Improvements (SW 23 Avenue to SW 24th Avenue) Partially funded by CDBG -
The scope of work consists of improvements of the street (re -construct and milling and resurfacing,) The
work also includes improvements of existing curbs, sidewalks, driveways, ADA ramps, some drainage as
required and landscaping. Project is currently under construction. Project Location: SW 19th Terrace
between SW 22nd Avenue and SW 27th Avenue.
SW 22nd Avenue Medians - US 1 to Coral Way - Scope includes removal of the 4 ft. traffic separator
and turn lane. Proposing a new Grass Median within the center of the road and only milling and
resurfacing the existing lanes. Project is currently in the planning stages. Project Location: SW 22nd
Avenue between US-1 and Coral Way.
Traffic Calming SW 6th Street Project - The Scope of Work involves the design of two (2) traffic
calming devices. The improvements consist of milling and resurfacing within the improvement area,
ADA ramps, curbs, signing, pavements markings, landscaping and drainage, if necessary. Project
currently under design. Project Location: SW 6th Street & SW 39th Avenue -SW 6th Street & SW 39th
Court.
West Flagler Area Improvements — Partially funded by CDBG - The project scope includes roadway,
traffic and drainage improvements. Project is currently under design. Project Location: SW 30th Ave just
south of SW 2nd Street, West Flagler area: bounded by SW 27th Ave, SW 32nd Ave, SW 4th Street and
SW 8th Street, SW 38th Ave between SW 1st Street and Flagler, SW 1st Street between SW 37th Ave,
SW 38th Ave and Flagler Terrace between SW 31 Street and SW 32 Avenue; Within SW 8th Street, NW
7th Street, NW/SW 27th Avenue, and NW/SW 42nd Avenue; Also includes improvements to SW 17th
street and SW 36th CT.; Also milling and resurfacing along Flagler Terrace between SW 31 st and SW
32nd Ave and Improvements at 24 SW 38th Avenue.
Buena Vista East Lighting - Design and construction of new lighting by FPL and restoration by City
Contractor. Drainage Improvements for area bounded by NE 2nd Av, Miami Ave, NW 48th Street and
NW 42nd Street. New Welcome signage for Neighborhood and new Signage throughout Neighborhood
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
(Historic Signs). Project is currently under design. Project Location: NE 42 St to NE 48 Street between N
Miami Ave. & NE 2nd Ave.; NE 1st Ave. from NE 42 St to NE 48 St.; NE 46 Street is excluded because
it is County Road.
NE 2nd Court Roadway and Drainage Improvements Project - Drainage improvements, milling and
resurfacing, striping, landscaping. Project is currently under the design phase. Project Location: NE 2nd
Court from NE 82nd Terrace to NE 84th Street including dead-end.
I%W 12 Avenue / NW 12 Place Roadway Improvements - Development of a Linear Park with new
• sidewalk landscaping, hardscape and benches. Project is currently under design.. Project Location: West
side of NW 12th Ave between NW 62nd street and NW 71 st Street.
Overtown Greenway @ NW 11 Terrace - Partially Funded by CRA - The scope includes the design
and construction of urban pathways, decorative lighting, landscaping and ancillary site improvements to
the NW 1 lth Terrace and former FEC Railway corridor. This project is a phase of the Overtown
Greenprint Plan. The project is currently under design. Project Location: NW 1 lth Terrace between NW
2rd Avenue and NW 7th Avenue.
NE 2 Avenue Improvements — Provide all project management and engineering analysis and design
services necessary for preparing construction documents for the reconstruction of NE 2nd Avenue from
NE 20th Street to NE 84th Street. The project length is approximately
4.1 miles. The scope of work includes roadway reconstruction, storm
water system, curb and gutter, concrete sidewalk, signing and
pavement markings, decorative lighting, signalization and landscape.
Segment B 1 (NE 36 Street to NE 42 Street) is completed, Segments
B2 (NE 51 Street to NE 57 Street) and C (NE 57 Street to NE 69
Street) are currently under construction and Segments A (NE 20
Street to NE 36 Street), B3 (NE 42 Street to NE 51 Street) and D (NE
69 Street to NE 84 Street) are currently under design.
FUND 343 MASS TRANSIT
City of Miami Trolley Program - Capital Acquisition — The City of Miami with federal funding from
the American Recovery and Reinvestment Act (ARRA) of 2009, funding from the Florida Department of
Transportation (FDOT) and city funds, acquired rubber -tire circulators/shuttles to operate several routes
within the City boundaries to serve its constituents and visitors alike. To date the city has acquired 15
trolleys and is anticipating receiving and additional 19 trolleys by February 2013.
FUND 352 STORM SEWERS
Durham Terrace Drainage Project - The design and construction of a stormwater drainage system to •
mitigate severe flooding in the area. Milling and resurfacing of the roadway pavement will be performed.
Swales will be reworked and regraded to comply with Public Works Bulletin #28 and new landscaping
and trees will be added. Broken sidewalks will be replaced, as well as new ADA compliant pedestrian
ramps will be constructed. Project is currently under construction. Project Location: Area approximately
bounded by NW 7 Street, NW 3 Street, NW 38 Court and NW 42 Avenue.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Mary Brickell Village Drainage Improvements - To provide street improvements (Milling and
resurfacing) including drainage improvements, and limited roadside reconstruction at the following
locations: SW 9th Street from SW 1st Avenue to SE 1st Avenue (Brickell Plaza Drive), SW 10th Street
from SW 1st Avenue to SE 1st Avenue(Brickell Plaza Drive), SW 1 lth Street from SW 1st Avenue to SE
1st Avenue(Brickell Plaza Drive), SW 12th Street from SW 1st Avenue to SE 1st Avenue(Brickell Plaza
Drive), and Select Portions of SE 1st Avenue(Brickell Plaza Drive) between SW 9th Street and SW
12th Street. Project also consists of constructing a pump station at the intersection of SW loth Street and
SW 1st Avenue; and connecting isolated drainage system located at the intersection of SW 10th Street
and S Miami Avenue to the existing drainage system located at mid -block on SW loth Street between
SW lst Avenue and S Miami Avenue. Project is currently under design.
Citywide Storm Sewer Repair Project (PW) - Repair and installation of the storm sewer infrastructure
to alleviate flooding at critical areas with the City boundaries. Project Location: Citywide
Riverview Pump Station — Removal of two (2) pumps and motors and the installation of two (2) 35,000
GPM axial flow pumps and two (2) 500 hp electric motors including all electrical appurtenances and
upgrades. Project Location: NW 12 - 17 Avenue and Flagler - NW 7 Street
Garden Storm Sewer - Phase I - Storm water and roadway improvements to the project area bounded by
NW 28th St, NW 38th St, NW 22nd Ave. and NW 27th Ave. Project is currently under design.
Englewood Road and Storm Sewer Improvements - New drainage facilities consisting of a
combination of exfiltration drains, deep drainage wells, grease & oil interceptors and other pollution
control structures. Road improvements include milling and resurfacing, new or repair sidewalks, curb and
gutter, ADA ramps, re -grade or re -sodding swale areas, repair or replace damaged or disfigured traffic
signs, and tree planting. The design phase of the project is completed and included the preparation of a
General Development Report which evaluated the existing road and drainage conditions, developed
alternative improvements and cost estimates, and recommended a preferred alternative. Project Location:
Area generally bounded by SW 16th St, SW 27th Avenue, SW 22nd St, and SW 32nd Avenue. and
includes traffic circles at SW 30 avenue/16 terrace, SW 3lavenue/18 street, SW 31st Avenue/19th street,
SW 29 avenue/18 street, SW 29 avenue/19 street Raised Crosswalk at SW 20 street between 27th avenue
and 32nd avenue.
San Marco Island and Biscayne Island Drainage Improvements —
Project consists of drainage improvements, roadway reconstruction
and/or milling & resurfacing, striping, landscaping, and signage for
the islands. For San Marco Island, storm sewer system, a storm
water pump station, injection wells, and outfall discharges into
Biscayne Bay are included in the design as well as increasing the
initial number of drainage wells from 2 to 3, and adding a temporary
well for dewatering. The 5 sedimentation tanks initially proposed
were changed to 5 Pollution Control Structures. For Biscayne
Island- Decorative street lighting was added along N. Venetian
Drive on Biscayne Island, and pipe bursting technique were included for the repairs of three (3) existing
outfall pipes. Project is currently under construction. Project Location: San Marco and Biscayne Islands.
Silver Bluff Drainage Improvements — Drainage improvements. Project is currently in design phase.
Project Location: Area 1: SW 23rd Terrace to SW 25th Street from SW 27th Avenue to SW 23rd Avenue;
Area 2: SW 24th Terrace to SW 25th Terrace from SW 22nd Avenue to SW 21 st Avenue; Area 3: SW
14th Street to SW 16th Terrace from SW 21st Avenue to SW 18th Avenue.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Northwest Road and Storm Sewers Improvements — Design and construction of a storm sewer system
including: road improvements such as damaged sidewalk replacement, damaged curb and / or gutter
replacement, ADA compliant ramp construction, re -sod of swales, milling & resurfacing. The project is
currently under construction. Project Location: Area generally bounded by NW 71st St, NW 7th Ave,
NW 62nd St, and NW 12th Ave.
Kinloch Storm Sewer Improvements Project - This project consists of three parts:
(1) The General Development Report (GDR) to address flooding problems within the limits of the project.
This comprehensive report serves as a plan to design drainage systems to reduce flooding in these
communities. It also identified contributing factors to the flooding conditions, evaluated feasible measures
to reduce flood stages, established drainage requirements, and provided specific recommendations to
improve drainage conditions within the project limits. This phase of the project is completed.
(2) Phase I Design and Construction: consists of exfiltration trenches, manholes, inlets, cross drains,
swale trenches, and surface restoration. This phase of the project is constructed.
(3) Phase II Design and Construction: consists of a connection to an existing outfall, old exfiltration
trenches will be replaced with new ones, manholes, inlets, swale trenches and surface restoration. This
phase of the project is currently under design.
Road improvements for both phases include roadway
milling & resurfacing, ADA Ramps, damaged sidewalk
and curb and/or gutter replacement and swale restoration
on street blocks impacted by the drainage construction.
Project Location: Area bounded by SW/NW 42 Avenue,
SW/NW 47 Avenue, NW 7 Street, and SW 8 Street; and
NW 43rd Avenue from Flagler to 4th Terrace.
FUND 353 SOLID WASTE
Solid Waste Collection Equipment Upgrade — This project included the acquisition of new Hybrid
Autocar Automated Side Loader, Rubbish Truck, Freightliner M2, and Commercial Grinder for Virginia
Key Composting Facility. Project Location: Citywide.
Solid Waste Equipment Acquisition —The Solid Waste Department continues to purchase a large variety
of equipment, including Street Sweepers, Roll -Off Transfer Trucks, Litter Containers, Side Loader
Compactor Waste Collection Vehicles, and Rear Load Waste Collection Vehicles. This new equipment
will improve the efficiency of garbage and trash pickup within the City as well as help insure a clean city
for our residents and visitors.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
GRANT FUNDED TROLLEY PROGRAM
Trolley Program — Operation and Maintenance - The City of Miami has been awarded transit service
development funding by the Florida Department of Transportation (FDOT) for this project. The state
funds are intended to off -set 50% of the operating and maintenance costs associated with the first three
years of service. The City's match will originate from the transit portion of the transportation half -
cent surtax proceeds. The following are the implemented and/or proposed routes:
❑ Health District Health District/Stadium. - Launched March 2012
❑ Brickell/Biscayne — Launched April 2012
❑ Overtown/Health District — Launched for July 2012
❑ Allapattah/Overtown Circulator - Launched November 2012
❑ Coral Way Circulator - Scheduled for Spring 2013
Complementing the grants with Transit Half -Cent Surtax, the City of Miami launched its inaugural
routes of the Miami Trolley (Health District, Health District/Stadium, Brickell/Biscayne,
Overtown/Health District, Allapattah/Overtown). The latest survey indicates an average of 3,500
passengers daily, and more on event days. All Trolleys are accessible to riders using wheelchairs and
are ADA compliant. The Trolley provides the same high level of service to passengers with or
without disabilities and has a "free" fare.
The Health District and Health District/Stadium routes began
on March 1, 2012. The service runs approximately every 15
minutes from 6:30 am to 11 pm, Monday through Saturday,
and on Sundays when there is a special event at the Stadium.
The Health District Trolley route travels around the district
between NW 7th Avenue and NW 14th Avenue and NW 14th
Street and NW 20th Street. Routes include stops at the
following locations: UM Life Science Park, Lindsey Hopkins
Technical Education Center, Miami -Dade College Medical
Campus, Ryder Trauma Center, Jackson Memorial Hospital,
Veterans Affairs Miami Medical Center, UM Hospital and Clinics, UM Biomedical Research Building,
Bascom Palmer Eye Institute, Marlins Stadium.
The Brickell/Biscayne route was launched on April 27,
2012. The service runs approximately every 15
minutes from 6:30 am to 11 pm, Monday through
Saturday and on Sundays from 8:00 am to 8:00 pm.
The current. alignment runs along the eastern side of
Downtown Miami via Brickell Avenue and Biscayne
Boulevard. The Brickell/Biscayne route runs from the
Rickenbacker to the south, to the OMNI development
to the north while connecting several dense areas and
point of interests including the following locations:
Financial District, Mary Brickell Village, Brickell •
Key, Miami Convention Center, Bayfront Park,
Freedom Tower, Miami -Dade College Wolfson Campus, American Airlines Arena, Museum Park,
Adrienne Arsht Center for the Performing Arts, Miami International University Art and Design, Margaret
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Pace Park, and the Omni Bus Terminal. This route is planned to be extended south to the Mercy hospital
during the month of December 2012 and north to the Midtown and Design District areas in Spring 2013.
The projected ridership for this route is approximately 2,500 boardings per day.
The Overtown/Health District route was launched in
July 2012. The service runs approximately every 15
minutes from 6:30 am to 7:00 pm, Monday through
Friday. Route includes stops at the following locations:
UM Life Science Park, Lindsey Hopkins Technical
Education. Center, Miami -Dade College Medical
Campus, Ryder Trauma Center, Bascom Palmer Eye
Institute, Biomedical Research Institute UM, UM
Hospitals and Clinics, Seybold Pointe, Henry Reeves
Park, Rosa Parks Community School-Overtown,
Overtown Transit Village, Black Police Precinct &
Courthouse Museum, Booker T. Washington School.
The Allapattah/Overtown route was launched in November 2012. The service runs approximately every
15 minutes from 6:30 am to 7:00 pm, Monday through Saturday. The route will run east -west along NW
20 Street between NW 27 Avenue and NW 3 Avenue, north -south on 3 Avenue between NW 20 Street
and NW 14 Street and East-West on NW 14 Street between NW 3 Avenue and North Bayshore Drive to
the OMNI. The Allapattah — Overtown route provides a vital link to the City's growing Miami Trolley
system, as it connects to each of the City's existing trolley routes. On NW 20 Street between NW 7 and
10 Avenues, passengers can transfer to the Overtown, Health District and'Health District — Stadium
routes. At the OMNI, passengers can transfer to the Biscayne-Brickell route. The route complements the
Miami -Dade Transit system with stops adjacent to the Santa Clara Metrorail Station and the Metromover
system at the Adrienne Arsht Center Station. Trolley stops are located on most blocks, and coordinated
with existing Miami -Dade Transit stops.
The Coral Way Trolley route is planned to launch in 2013. The Coral Way-Brickell Trolley is planned to operate
along Coral Way serving the commercial, retail, and residential locations along the corridor. The trolley will
connect to the Brickell MetroraillMetromover Station at the SW 1st Court where a connection to the
Brickell/Biscayne Trolley will be provided. The route extends from PortMiami on the east to Ponce de Leon
Boulevard in the City of Coral Gables on the west, where a connection to the City of Coral Gables Trolley will be
provided. In addition, the trolley will operate along Flagler Street to serve the downtown core as well as an alternate
connection to the Port of Miami. The City, in collaboration with area stakeholders, is in the process of developing a
service plan for this route with the specific stop locations and hours of operations; and furthermore, we intend
seeking a funding contribution from the FDOT for 50 percent of the operational and maintenance cost of the service
for a 3-year start-up period. Based on a system wide modeling analysis completed in November 2010, this route is
anticipated to attract over 700 riders daily.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
`qt OF
tamp smut
,Iell
FUNDING OVERVIEW
Funding Sources
The Capital Improvement Plan contains funding from seven types of revenue sources:
❑ Federal Grants - Federal grants, such as Community Development Block Grants (CDBG), may be
used only for the purposes specified in Federal laws. The amount of funding available from Federal
sources is dedicated by National priorities. These grants derive from agencies at the federal level
such as the Federal Emergency Management Agency (FEMA) and Housing and Urban Development
(HUD).
D State Grants - State grants are awarded by State of Florida agencies such as the Florida Department
of Transportation (FDOT) and Florida Department of Environmental Protection (DEP). These grants
may be used only for the purposes specified in State laws.
• Miami -Dade County Grants - Miami -Dade County may contribute funding in the form of a grant
for specific projects to be undertaken by the City.
❑ Grant — Other - These are grants which do not derive from Federal, State or Miami -Dade County
resources. An example of this funding type is a grant or contribution from another municipality.
❑ City Bonds - Two types of bonds can be issued by the City for capital improvements: (1) General
Obligation Bonds and (2) Special Obligation Bonds:
▪ General obligation bonds are backed by the full faith and credit of the City of Miami and are
secured by the City's ad valorem taxing power. These bonds finance specific capital
improvement programs such as public safety, highway or storm sewers. The City's most recent
'general obligation bond issuance was approved by voters in November 2001. These bonds,
named the Homeland Defense/Neighborhood Improvement (HD) Bonds, provide for a total
infusion of $255 million worth of capital investment in the areas of public safety, parks and
recreation, streets, drainage, quality of life infrastructure improvements, and historic
preservation. The first issuance in the amount of $155 million took place in 2002 while the
second issuance took place in July 2007 and derived almost $51 million. The third issuance in
the amount of $50.6 million took place in May 2009.
• Special obligation bonds are secured by a limited revenue source.
■ In order to accelerate the construction of much needed road and drainage
infrastructure projects, the City leveraged recurring revenue streams from Local
Option Gas Tax, the Transit Half -Cent Surtax, and the Parking Surcharge into a
special obligation bond program. The first issuance of this bond program, known as
the "Streets Bonds", in the amount of $80 million took place at the end of calendar
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
year 2007. The second issuance in the amount of $57,634,240 took place in.
December 2009.
• In order to provide funds together with other available moneys, to finance the cost of
construction of parking appurtenant and ancillary facilities, including retail space,
surface lots and parking structures to the site adjacent to the Marlins Baseball
Stadium, the City leveraged recurring revenue streams from Convention
Development Tax, Parking Revenues and Parking Surcharge into a special
obligation bond program. The issuance of this bond program, known as the "Marlins
Stadium Project", in the amount of $72.57 million of Tax -Exempt Special
Obligation and $14.83 million of Taxable Special Obligation took place in July
2010.
D CIP Fees/Revenues - These funds are collected from current revenues produced by miscellaneous
county or city taxes and various fees. Notable funding sources included in this category are the
anneal General Fund contribution to capital projects, storm water utility trust funds, local option
gas tax, the transit 1/2 cent surtax, parking surcharge, and impact fees.
0 Private Donation/Other - This funding source includes any private funds contributed to the City
as well as the dedication or sale of land for capital facilities.
The chart below shows that City Bonds represent the largest share of funding in the Capital Plan, accounting
for 43.31% of overall Plan funds. CIP Fees/Revenues represent the second largest funding source, accounting
for 28.89% of the Plan's funding. Sources deriving from Miami -Dade County represent 8.41% of the Plan.
The remaining 19.39% of funding is from Federal, State, Grant -Other, and Private Donations/Other sources.
The "Funding Type by Job Number" Report in the Reports Section provides a listing of projects associated
with the various sources under each of the funding types described above.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Grant Funding for Miami Troller'
The City of Miami received a grant in the amount of $4.1 Million from the American Recovery and Reimbursement Act
(ARRA) for the purchase of Rubber Tire Trolley Vehicles and Capital Equipment as well as installation of bus benches
/ shelters as part of the Economic Stimulus Package enacted by the United States Congress in 2009. In addition, the
City of Miami received a grant in the amount of $1.9 Million from the Florida Department of Transportation (FDOT)
which requires a 33.3 percent match of city funds for the purchase of Classic American Trolleys, 32' in length. The City
also received a Brant in the amount of $1.5M from FDOT which requires a 50 percent match for Operation and
Maintenance cost associated with the Health District/Stadium and the BrickellBiscayne routes.
Funded. Partially Funded and Unfunded Projects
The projects in the CIP can be placed in one of three funding proportion categories: Funded, Partially Funded
or Unfunded. The "Cost Estimates versus Available Funding" listing in the Reports Section provides a
breakdown of funded, partially funded and unfunded projects by fund. It is important to note that the total
funded amounts in the CIP do not account for unfunded project estimates. The funding proportion is
determined by comparing a project's estimated costs against anticipated revenues and available dollars. It is
anticipated that revenues to address the unfunded gap will derive from future year allocations of general fund
revenues or other existing recurring revenues, successful pursuit of grants, or identification of new revenue
sources or financing options.
The portion of project estimates that is currently unfunded accounts for 34.69% of total estimated costs for
the projects identified in the "Cost Estimates versus Available Funding" listing. This percentage is derived
from projects that are completely unfunded 9.57% as well as the unfunded portion of partially funded
projects 25.12%. These needs will be evaluated annually based on priorities and availability of funding.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
City Of Miami - Capital Improvement Program
Active & Future Fund Source Management System
CIP Projects Only Funding Type by Job No.
Total Prior Approp.
FUNDING • Funding Approp.
y'; -t viittiti r11111ft1itig, StlltttlteS,1-t Oickii4.4
2012-2013 2013-2014
2014.- 2015
2015-2016 2016-2017 2017-2018
Grant - Federal
888902 Community Development Block Grant
B-30035A North Shorecrest Roads Improvements •$400,000 $400,000 $0 $0 $0
B-30365E Coral Way NET Office Remodeling D3 $1,000,000 $1,000,000 $0 $0 $0
B-30695 SW 1903 Terrace Improvements (SW 23 $300,000 $300,000 $0 $0 $0
B-30774 West Plaglcr Area Improvements - D4 $500,000 $500,000 $0 $0 $0
$o $0
$0 $0
$0 $0
$0 $0
$0
$0
$0
$0
888902 $2,200,000 S2,200,000 $0 50 50 50 50 50
888925 FEMA Recovery Assistance
B-50654 OvcrlownStormwaterPump Station $173,200 $173,200 $0 $0 $0 $0 $0 $0
888925 $173,200 $173,200 50 $0 50 50 50 50
888927 Federal Aviation Ad . Grant
B-7500I Watson Island Infrastructure $150,000 $150,000 $0 $0 $0 $0 $0 $0
888927 $150,000 $150,000 50 50 $0 $0 $0 50
888937 Urban Areas Security Initiative Grant
B-70415 MRC Security System Hardening -UASI $69,842 $69,842 $0 $0 $0 $0 $0 $0
888937 $69,842 $69,842 50 $0 $0 $0 $0 50
888939. FEMA Federal Assistance to Firefighters Grant
B-70411 Fire Rescue Personal Protective $656,466 $656,466 $0 $0 $0 $0 $0 $0
B-70418 FEMA Assistance to Firelighters Program $274,888 $274,888 $0 $0 $0 $0 $0 ' $0
888939 $931,354 $931,354 50 $0 $0 $0 50 50
888959 FEMA 2007 & Future Pre -Disaster Mitigation (PDM) Grant
B-30588 San Marco Island and Biscayne island $600,000 $600,000 $0 $0 $0 $0 $0 $0
888959 $600,000 $600,000 $0 $0 50 $0 50 SO
Grant - Federal
Grant - State
000008 CRA - FIND Grant
B-30538 Museum Park-1'artially Funded by CRA
$4,124,396 $4,124,396 $0 $0 50 50 50 50
$1,143,000 $1,143,000
$0 $0
$o $0 $0 $0
0001)08
888909 FL Dept of Environmental 1'rolcclion (FDEI')
13-30588
B-50672
13-50704
San Marco Island and 1iscayne Island
Belle Monde Storm Scwcr Project, l'h 2
Fairlawn Storm Scwcr Improvements
S1,143,000 $1,143,000 $0 $I) $0 $0 $0 $0
$500,000
$500,000
$1,450,000
$500,000
$500,000
$1,450,000
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $o $0
$0. $0 $0
$0 $0 $0
888909 52,450,0011 $2,450,000 50 510 $0 50 50 $0
888913 FDOTTransporlalion Enhancement Program
Active & Future
CIP Projects Only
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior
FUNDING Funding Approp.
Approp.
2012 - 2013 2013 - 2014
"9`),' �tdi4�±:'�3`�, �;C4',.��'��(��"3"��r'c•,?„l� Ill;Ill'l!i•�llllttllll�!ti+�5t�lnlltl!��, . , �.s.,r, �� ``+. °:.,, _. c'` !k
2014-2015 2015-2016
2016 - 2017 2017 - 2018
Grant - State (Cont.)
888913 FI)OT Transportation Enhancement Program
B-30130 Miami River Greenway SW I st Court to
B-30336 Miami River Greenway (5th Street
B-30624 Overlown Greenway n NW 11 Terrace -
13-30631
B-30651
B-3991I-
B-40643A
T3-40686
Miami River Greenway from Miami
Miami River Greenway from NW 10th to
Venetian Causeway Improvements
North Spring Garden Greenway
Miami River Grccnways/ Strectscapc
$1,000,000 $1,000,000 $0 $0 50 50 $0 $0
$1,000,000 $1,000,000 $0 . $0 $0 $0 $0 $0
$1,079,879 $1,079,879 $0 $0 $0 $0 $0 $0
$1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0
$2,339,739 $2,339,739 $0 $0 $0 $0 $0 $0
$1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0
$1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0
$1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0
888913 S9,419,618 S9,419,618 50 50 50 50 50 50
888917 FDOT Other
13-30542A IJSI Roadway Improvements and Wall $83,537 $83,537 $0 $0 $0 $0 $0 $0
B-38504 Overtown Sector Signage Project $120,001 . $120,001 $0 $0 $0 $0 $0 $0
13-707I5 City of Miami Trolley Program -Capital $1,899,151 $1,899,151 $0 $0 $0 $0 $0 $0
B-70715B Trolley Program Oracle Project: 40 $619,416 $619,416 $0 $0 $0 $0 $0 $0
13-70715C ' Trolley Program Oracle Project: 40 $852,185 $852,185 $0 $0 $0 $0 $0 $0
888917 S3,574,290 • $3,574,290 SO 50 SO 50 50 50
88892(1 FIND Waterways Assistance Program,FY(17 and Future
13-30541 B Kennedy Park Floating Duck I'111 $95,000 $95,000 $0 $0 $0 $0 $0 , $0
B-3054 1 C Kennedy Park Shoreline Stabilization $115,000 $1 15,000 $0 $0 $0 $0 $0 $0
B-30604 Miamarina Intracoastal Bulkhead $40,000 $40,000 $0 $0 $0 $0 $0 $0
B-30688 Marine Stadium Restoration $175,000 $175,000 $0 $0 $0 $0 $0 $0
B-30689 Marine Stadium Bulkhead Replacement $17,500 $17,500 $0 $0 $0 $0 $0 $0
B-30706 Miscellaneous Repairs 10% Set Aside $38,750 $38,750 $0 $0 $0 $0 $0 $0
B-30721 Spoil Island E Restoration and Floating $15,000 $15,000 $0 $0 $0 $0 $0 $0
T3-30731 Miami Women's Club Baywalk Project - $46,500 $46,500 $0 $0 $0 $0 $0 $0
I3-40171 Coconut Grove Viewing Platform Spoil $7,500 $7,500 $0 $0 $0 $0 $0 $0
B-40172 Coconut Grove Viewing Platform Spoil $7,500 $7,500 $0 - S0 $0 $0 $0 $0
B-40180 Marine Stadium Marina at Virginia Key $800,000 $800,000 $0 . $0 $0 $0 $0 $0
B-50722 Little River Waterfront 1'ark $117,500 $1 17,500 $0 $0 $0 $0 $0 $0
888920 S1,475,250 $1,475,250 SO 50 SO SO 50 .S0
888960 Sunshine Slate Financing Commission N her 1
B-30538 Museum Park - I'artially Funded by CRA . $75,534 $75,534 $0 $0 $0 $0 $0 $0
13-30541 Citywide Park Equipment & Site .$2,449,706 $2,449,706 $0 $0 $0 $0 $0 $0
13-30546A Gusman 1-tall Improvements - FY2012 $8,063 $8,063 $0 $0 $0 $0 $0 $0
B-35887 Moore Park New Construction $145,829 $145,829 $0 $0 $0 $0 $0 $0
888960 S2,679,132 S2,679,132 SO $0 $0 50 50 50
Active & Future
CIP Projects Only
FUNDING
City Of Miami -. Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding • Approp.
:404,1 0,44, oturi tiniliiigINtllnnlLgs: k W.
2012-2013 2013-2014
2014-2015 2015-2016 2016-2017 2017-2018
Grant - Slate (Cont.)
888961 Sunshine Slate Financing Commission Number 2
B-30305B Gibson 1'ark New Construction $8,000,467 $8,000,467 $0 $0 $0 $0 $0 $0
B-30325 Miamarina Emergency Pier Repairs $118,431 $1 18,431 $0 $0 $0 $0 $0 $0
I3-30538 Museum Park - Partially Funded by CRA $6,015,466 $6,015,466 $0 $0 $0 $0 $0 $0
B-30541 Citywide Park Equipment & Site $1,012,439 $1,012,439 $0 $0 $0 $0 $0 $0
B-30546A Gusman Hall Improvements - FY2012 $96,937 $96,937 $0 $0 $0 $0 $0 $0
13-30566A MelreeseGolf Training Center $230,000 $230,000 $0 $0 $0 $0 $0 $0
B-30588 San Marco Island and Biscayne Island $475,000 $475,000 $0 $0 $0 $0 $0 $0
B-30671 Caribbean Marketplace Renovation $75,41 1 $75,41 1 $0 $0 $0 $0 $0 $0
B-35002 Virginia Key Landfill Assessment $750,000 $750,000 $0 . $0 $0 $0 $0 $0
B-35806 Curtis Park New l'ool Facility and 13oal $505,070 $505,070 $0 $0 $0 $0 $0 $0
13-35812A Duarte Park 1uilding Renovation, $500,000 $560,000 $0 $0 $ll $0 $0 $0
B-35838 Kennedy Park Rcslrootn Building $21,000 $21,000 $0 $0 $0 $0 $0 $0
B-35853A Virrick Park New Pool Facility $300,000 $300,000 $0 $0 $0 $0 $0 $0
B-35883A Hadley Park Ncw Youth Ccntcr D5 $3,785,528 $3,785,528 $0 $0 $0 . $0 $0 $0
B-35887 Moore 1'ark New Construction $1,454,171 $1,454,17 1 $0 $0 $0 $0 $0 $0
B-60454 Fire Station it 14 (New) $3,845,377 $3,845,377 $0 $0 $0 $0 $0 $0
B-60464 New Dinner Key Marina Dockmastcr $6,569 $6,569 $0 $0 $0 $0 $0 $0
B-70100 Gusman Hall Improvements / Repairs $29,236 $29,236 $0 $0 $0 $0 $0 $0
B-70414 ,lames L. Knight Ccntcr / Hyatt- Fire $351,876 $351,876 $0 $0 $0 $0 $0 $0
B-72915A Police Headquarters Hclipad and Roof $400,000 $400,000 $0 $0 $0 $0 $0 $0
888961 $28,032,978 $28,032,978 $0 $0 $0 $0 $0 $0
888966 Sunshine State Financing Commission Number 3
13-74609 ERP Integration System $8,356,706 $8,356,706 $0 $0 $0 $0 $0 $0
B-74614 Land Management System $5,139,942 $5,139,942 $0 .80 $0 $0 $0 $0
888966
888967 Economic Stimulus Package 2009 - FDO"1'
13-78508B ARRA - NE 2nd Avenue Improvements
B-78508C ARRA - NE 2 Avenue Improvements
$13,496,648 $13,496,648 $0 $0 $0 $0 $0 $0
$3,955,018
$2,220,578
$3,955,018
$2,220,578
$0 $0 $0
$0 $0 $0
$0
$0
$0
$0
$0
$0
888967
888974 Economic Stimulus 2009 - FT) WI -lean
B-30694 ARRA Citywide Bicycle Rack & Signagc
$6,175,596
$6,175,596
$392,130 $392,130
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
888974 $392,130 $392,130 $0 $0 $0 $0 $0 $0
Grant - State
$68,838,642 $68,838,642 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total
Funding
Prior
Approp.
Approp.
2012 - 2013
2013 - 2014
2014-2015 2015-2016
2016-201.7 2017-2018
Grant - Miami -Dade County
373001 Safe Neighborhood Parks Bond
B-30541 Citywide Park equipment & Site $119,622 $1 19,622 $0 $0 $0 $0 $0 $0
B-30889 Lummus Park Miscellaneous Repairs - $8,462 $8,462 $0 $0 . $0 $0 $0 $0
373001 $128,084 $128,084 8() $0 80 8)) 80 80
373002 Safe Neighborhood Parks Bond 2008 & Future
B-30174 Virginia Kcy Beach Park Historic $49,472 $49,472 " $0 $0 $0 $0 $0 $0
B-30541 Citywide Park Equipment & Site $83,320 $83,320 $0 $0 $0 $0 $0 $0
373002 $132,792 $132,792 $0 $0 $0 80 $0 80
888896 Miami -Dade County DERM Virginia Key Grant
B-35002 Virginia Kcy Landfill Assessment $650,000 $650,000 $0 $0 $0 $0 $0 $0
888896 - $650,000 8650,00() $0 $0 $0 $0 $0 80
888938 Minmi-Datic County Grant/Contribution
B-3050113 Manuel Artime Dimmer Rack System $13,239 $13,239 $0 $0 $0 $0 $0 $0
B-30646 South Bayshore Drive Roadway and $450,000 $450,000 $0 $0 $0 $0 $0 $0
13-40268 EEC Quiet Zone Study $99,413 $99,418 $0 $0 $0 $0 $0 $0
888938
888947 MDC Building Better Communilics GOB
B-30008 Grove 1'ark Road and Storm Sewers $3,519,000 $3,519 000 $0 $0 $0 $0 $0 $0
B-3001 I Englewood Road and Storm Sewer $6,250,000 $681,000 $0 $1,800,000 $1,300,000 $2,469,000 $0 $0
B-30014 Northwest Road and Storm Scwcrs $4,931,000 $671,000 $0 $4,260,000 $0 $0 $0 $0
B-30504 Linear l'arks, Grcenways and Baywalk $961000 $0 $0 $961,000 $0 $0 $0 $0
B-30508 Virginia Key Beach Park Museum $15,500,000 $15,500,000 $0 $0 $0 $0 $0 $0
B-30531 Dorsey Memorial Library Restoration $250,000 $250,000 $0 $0 $0 $0 $0 $0
B-30690 West End Park New Community $1,500,000 $0 $0 $1,000,000 $500,000 $0 $0 $0
B-30783 Antonio Macco l'ark Multi-Purposc $1,500,000 $0 $0 $400,000 $1,100,000 $0 $0 $0
B-30784 Health District Rivcrwalk $961,000 $0 $0 $200,000 $761,000 $0 $0 $0
B-35858 Kinloch 1'ark - Senior Coinmunily Center $1,300,000 $0 $0 $300,000 $1,000,000 $0 $0 $0
888947 $36,672,000 $20,621,000 $I) $8,921,000 $4,661,000 82,469,001) 80 80
888953 Mi: '-Dade Metropolitan Plat ning Org (MPO)
B-30645C Health District 13icycic and Pedestrian $48,000 $48,000 $0 $0 $0 $0 $0 $0
B-30645D Baywalk Mobility Plan $48,000 $48,000 $0 $0 $0 $0 $0 $0
B-30645E Ovcrtown / Wynwood Bicycle $48,000 $48,000 $0 $0 $0 $0 $0 $0
$562,657 $562,657 80 $0 $0 80 $0 $0
888953
888964 County CI)T
I3-30508 Virginia Key Beach Park Museum
$144,000 8144,1100 $0 $0 $0 $0 80 80
$5,000,000 $5,000,000 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total
Funding
Prior
Approp.
Approp.
2012 - 2013
11401'hx i�r;'* +!sr`.b't,n,lttitiikeTtttltliiig411sttlnntesV "F" ,IyiNl• O
2013 - 2014
2014 - 2015 2015 - 2016
2016-2017 2017-2018
888964 $5,000,000 $5,000,000
888968 Economic Stimulus Package 2009 - Miami Dadc County (MDC)
B-30668 ARRA -Purchase of Trolley Vehicles $4,084,282 $4,084,282
$0
$O
$0
$0 $0 $0
$0
SI)
$l)
$0 $0 $0
888968 S4,084,282 $4,084,282 $0 50 $0 $0 80 $1)
888976 Miami -Dade County Dept Cultural Affairs
B-30671 Caribbean Marketplace Renovation $354,614 $354,614 $0 $0 $0 $0 $0 $0
888976 $354,614 $354,614 $0 $0 $0 $0 80 80
Grant - Miami -Dade County
$47,728,429 $31,677,429 80 58,921,001) $4,661,000 $2,469,000 80 80
Grant - Other
000004 CRA Operating Budget
B-30305B Gibson Park Ncw Construction $3,800,000 $3,800,000 $0 $0 $0 $0 $0 $0
B-30394 North 14 St. Multi Media Entertainment $6,000,000 $6,000,000 $0 $0 $0 $0 $0 $0
B-30538 Museum Park - Partially Funded by CRA $6,143,000 $6,143,000 $0 $0 . $0 $0 $0 $0
B-30538B Museum Park Environmental $1,800,000 $1,800,000 $0 $0 $0 $0 $0 $0
B-30579 Old Fire Station No. 2 Restoration - CRA $3,500,000 $3,500,000 $0 $0 $0 $0 $0 $0
13-30624 Overtown Grccnway a NW 11 Terrace - $1,120,080 $1,120,080 $0 $0 $0 $0 $0 $0
B-30731 Miami Women's Club Baywalk 1'roject- $46,500 $46,500 $0 $0 $0 $0 $0 $0
13-40169 300 NW 11 Street Community Center - $1,500,000 $1,500,000 $0 $0 $0 $0 $0 $0
(100004 $23,909,580 $23,909,580 80 80 50 8(1 80 80
888955 MSEA Contribution to Capital
B-30566A MelrecseGolf Training Center $2,155,560 $2,155,560 $0 $0 $0 $0 $0 $0
B-30648 Orange Bowl Site Parking Garage $1,073,804 $1,073,804 $0 $0 $0 $0 $0 $0
13-30671 Caribbean Marketplace Renovation $350,000 $350,000 $0 $(1 $0 $0 $0 $0
888955 S3,579,364 $3,579,364 50 50 50 80 $0 80
' 888957 Downtown Development Agency
B-30645A Transportation Program Support $25,000 $25,000 $0 $0 $0 $0 $0 $0
888957
888962 The Children's Trust
13-30174 Virginia Key Beach Park Historic
S25,000 $25,000 $0 $0 $0 $0 $0 SO
$260,000 $260,000 $0 $0 $0 $0 $0 $0
888962 $260,000 $260,000 $0 $0 $0 50 80 80
888965 I3ayfront Park Management Trust
B-40173 Bayf ont Park Electrical Repairs $309,000 $309,000 $0 $0 $0 $0 $0 $0
13-40177 Bayliont Park Pier Repairs- D2 $300,000 $300,000 $0 $0 $0 $0 $0 $0
888965 $609,000 $609,000 SO S0 $O $I) $0 $11
Active & Future
CIP Projects Only
FUNDING
City. Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
��Yt^a'�,��J�utr`ic.l!tiili�i ►!_CatitnntCy�,° d��w�,�,{����:
2013 - 2014
2014-2015
2015 - 2016
2016 - 2017 2017 - 2018
Grant - OBrer
$28,382,944 $28,382,944
City Ilonds
356004-1 Parking Revenue Bonds - Tax Exempt Scrics 2010A
13-30648 Orange Bowl Site Parking Garage $72,565,809
$72,565,809
$0
$0
50
$0
$0
$11
$0 $0 $0 $0 $0 $0
356004-1 $72,565,809 $72,565,809 $0 $0 $0 50 50 50
356004-2 Parking Revenue Bonds - Taxable Series 201011
B-30648 Orange Bowl Site Parking Garage $14,826,926 $14,826,926 $0 $0 $0 $0 S0 $0
356004-2 $14,826,926 $14,826,926 $11 $0 $0 80 St) 80
356005-1 Streets Bond Program - Series 1
B-30011 Englewood Road and Sloan Sewer $1,643,748 $1,643,748 $0 $0 $0 $0 $0 $0
B-30031 A SW 3rd Avenue Road Improvements $154,308 $154,308 $0 $0 $0 $0 $0 $0
B-30035A North Shorccresl Roads Improvements $150,000 $150,000 $0 $0 $0 $0 S0 $0
B-30035B Shorccresl Roadway Milling & $616,615 $616,615 $0 $0 $0 $0 S0 $0
B-30130 Miami River Grecnway SW I st Court to $407,530 $407,530 $0 $0 $0 $0 $0 $0
B-30167D Shenandoah Roadway Improvements $353,127 $353,127 $0 $0 $0 $0 $0 $0
B-30168A Silver BIu(TTraffic Calming Priority 3 - $96,100 $96,100 $0 $0 $0 $0 $0 SO
B-30377A District I - Sidewalk Repairs and ADA $250,692 $250,692 $0 $0 $0 $0 S0 $0
B-30377B District 2 - Sidewalk Repairs & ADA $250,691 $250,691 $0 $0 $0 $0 $0 $0
B-30377C District 3 - Sidewalk Repairs and ADA $250,691 $250,691 $0 • $0 $0 $0 $0 $0
B-30377D District 4 - Sidewalk Repairs & ADA $250,691 $250,691 $0 $0 $0 $0 $0 $0
B-30377E DistricU5 - Sidewalk Repairs & ADA $250,691 $250,691 $0 $0 $0 $0 S0 $0
B-30540 Little River Industrial Park $1,988,000 $1,988,000 $0 $0 $0 $0 $0 $0
B-30542A US1 Roadway Improvements and Wall $1,291,774 $1,291,774 $0 $0 $0 $0 $0 $0
B-30606 DWNTWN Beautification Project Phase $236,151 $236,151 $0 $0 $0 $0 $0 $0
B-30606D DWNTWN Beautification - Design $341,271 $341,271 $0 - $0 $0 $0 $0 $0
B-30606L DWNTWN Beautification (Lighting) $1,371,543 $1,371,543 $0 $0 $0 $0 $0 . $0
B-30606N DWNTWN Beautification -North $4,651,682 $4,651,682 $0 $0 $0 $0 . $0 $0
B-30606S DWNTWN Beautification - South $3,399,353 $3,399,353 $0 $0 $0 $0 $0 $0
B-30610 NW 7thCourt $170,283 $170,283 $0 $0 $0 $0 $0 $0
B-306I 3 District 3 - Miscellaneous Roadway $0 $0 $0 $0 $0 $0 $0 $0
B-30614 District 4 - Miscellaneous Roadway $36,001 $36,001 $0 $0 $0 $0 $0 $0
13-30629 Durham Terrace Drainage Project $542,287 $542,287 $0 $0 $0 $0 $0 $0
B-30643 Lummus l'ark Landing Project - Street, $1,368,535 $1,368,535 $0 $0 $0 $0 $0 $0
B-30662D US-t Median Closures at Bridgeport $230,000 $230,000 $0 $0 $0 $0 $0 $0
B-30677 D3 - Sidewalk ADA Retrofits $700,000 $700,000 $0 $0 $0 $0 $0 $0
B-30687 Coconut Grove Business Improvement $203 036 $203,036 $(I $0 $0 $0 $0 $0
B-30699 Beacom Project Area Improvements $721,100 $721,100 $0 $0 $0 $0 $0 $0
Active & Future
CLIP Projects Only
FUNDING
'City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
"rt. r:'i 41 Ur111'llil+lllltliat( itittittto,; -ak 9 riti=:,+ v<`4
201.3-2014
2014 - 2015
2015 - 2016 2016 - 2017 2017 - 2018
City Bonds (Cont.)
356005-1 Streets Bond Program - Series 1
B-30705 NW 24th Street Between NW I41h $223,165 $223,165 $0 $0 $0 $0 $0 $0
B-30712 NW 21 Avenue between NW 1st Street $275,000 $275,000 $0 $0 $0 $0 $0 $0
B-30718 1-95 South Miami Terminal Street $350,000 $350,000 $(1 $0 $0 $0 $0 $0
B-30719 SW I6th Avenue from Coral Way to 20 $135,000 $135,000 $0 $0 $0 $0 $0 $0
B-30722 NW31stStreet Roadway Improvement $311,000 $311,000 $0 $0 $0 $0 $0 $0
B-30725 NW I I th Street Roadway improvement $607,762 $607,762 $0 $0 $0 $0 $0 $0
B-30732 NW 9th Street Roadway Improvement $259,540 $259,540 $0 $0 $0 $0 $0 $0
B-30770 SW 22nd Avenue Medians - US 1 to $160,000 $160,000 $0 $0 $0 $0 $0 $0
13-30771 Traffic Calming SW 61h Street Project - $324,670 $324,670 $0' $0 $0 $0 $0 $0
13-30776 Silver BlulTDrainage Improvements -D4 $600,000 $600,000 $0 $0 $0 $0 $0 $0
B-30780 NW 14 Avenue and 28 Street Arca $449,01 1 $449,01 1 $0 $0 $0 $0 $0 $0
B-30781 NW II Street from 27 to 37 Avenue Arca $739,493 $739,493 $0 $0 $0 $0 $0 $0
B-30891 Buena Vista One -Way Street Conversion $250,000 $250,000 $0 $0 $0 $0 $0 $0
B-40300 SW 18th Terr. Road Improvements - D3 $17,929 $17,929 $0 $0 $0 $0 $0 $0
B-40643A . North Spring Garden Greenway $1,257,175 $1,257,175 $0 $0 $0 $0 $0 $0
B-40672D Flagami Traffic Calming Phase IV - D4 $459,881 $459,881 $0 $0 $0 $0 $0 $0
B-40686 Miami River Greenways/ Slreclscape $455,506 $455,506 $0 $0 $0 $0 $0 $0
B-40704A SW 32 Avenue Improvements $657,244 $657,244 $0 $0 $0 $0 $0 $0
B-431 14A Citywide Sidewalk Replacement Phase $846,200 $846,200 $0 $0 $0 $0 $0 $0
B-50672 Belle Meade Storm Sewer Project, Ph 2 $1,957,219 $1,957,219 $0 $0 $0 $0 $0 $0
B-50704 Fairlawn Storm Sewer Improvements $2,478,825 $2,478,825 $0 $0 $0 $0 $0 $0
B-78500B Buena Vista Bast Lighting $2,1 17,620 $2,117,620 $0 $0 $0 $0 $0 $0
356005-1 $36,858,140 836,858,140 $0 $0 $0 $0 $0 $0
356005-2 Streets Bond Program - Series 2
B-30014 Northwest Road and Storm Sewers $3,407,401 $3,407,401 $0 $0 $0 $0 $0 $0
13-30035A North Shorecrest Roads Improvements $597,178 $597,178 $0 $0 $0 $0 $0 $0
B-30035B Shorecrest Roadway Milling & $49,777 $49,777 $0 $0 $0 $0 $0 $0
B-30130 Miami River Greenway SW 1st Court to $150,000 $150,000 $0 $0 $0 $0 $0 $0
B-30167D Shenandoah Roadway Improvements $1,196,873 $1,196,873 $0 $0 $0 $0 $0 $0
13-30168A Silver BluffTrallic Calming Priority 3 - . $514,741 $514,741 $0 $0 $0 $0 $0 $0
13-30500 Civic Center NW 14th Street $2,500,000 $2,500,000 $0 $0 $0 $o $0 $0
B-30542A US1 Roadway Improvements and Wall $1,296,112 . $1,296,112 $0 $0 $0 $0 $0 $0
B-30588 San Marco Island and Biscayne Island $600,000 $600,000 $0 $0 $0 $0 $0 $0
B-30606 DWNTWN Beautification Project Phase $2,864,414 $2,864,414 $0 $0 $0 $0 $0 $0
B-30606D DWNTWN Beautification - Design $157,509 $157,509 $0 $0 $0 $0 $0 $0
B-30606L DWNTWN Beautification (Lighting) $3,104,372 $3,104,372 $0 $0 $0 $0 $0 $0
B-30606N DWNTWNBeautification - North $1,754,250 $1,754,250 30 $0 $0 $0 $0 $0
Active & Future.
CIP Projects Only,
FUNDING
City Of Miami - Capital Improvcinent Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding • . Approp. • 2012 - 2013
:�+} I+ttt�u,N+ iiritlll ul;;CiatiiniTli�a,'
wAie3 )','
2013-2014
2014-2015 20.15-2016 2016-2017 2017-2018
City Bonds (Cont)
356005-2 Streets Bond Program - Series 2
B-30606$ DWNTWN Beautification - South $680,000 $680,000 $0 $0 $0 $0 $0 $0
13-30610 , NW 7th Court $189,717 • $189,717 $0 $0 $0 $0 $0 $0
13-30611 District 1-MisccllaneoasRoadway $111,419 Si11,419 $0 $0 $0 $0 -" $0 $0
B-30613 District 3 - Miscellaneous Roadway $21,044 $21,044 $0 $0 $0 $0 $0 $0
B-30614 . District 4 - Miscellaneous Roadway $380 $380 $0 $0 $0 $0 $0 $0
B-30615 District 5 -Miscellaneous Roadway $1,004,511 $1,004,51 1 $0 $0 $0 $0 • $0 $0
13-30629 Durham Terrace Drainage Project $2,683,043 $2,683,043 $0 $0 $0 $0 $0 $0
B-30630 Palm Grove Road Improvements $2,379,918 $2,379,918 $0 $0 $0 $0 $0 $0
B-30637 . Maly Brickell Village Drainage $2,000,000 $2,000,000 $0 $0 $0 $0 $0 $0
13-30687 Coconut Grove 13usiness Improvement $2,896,602 $2,896,602 $0 $0 $0 $0 $0 $0
13-30693 Neighborhood Traffic Calming $35,892 $35,892 $0 $0 $0 $0 $0 $0
13-30695 SW 19th Terrace Improvements (SW 23 $67,191 $67,191 $0 $0 $0 $0 $0 $0
11-30705 NW 24th Street Between NW 14th $136,835). $136,835 $0 $0 $0 $0 $0 $0
B-30716 Tigertail Resurfacing - D2 $400,400. $400,400 $0 $0 $0 $0 $0 $0
B-30718 1-95 South Miami Terminal Street $509,000 $509,000 $0 $0 $0 $0 $0 $0
B-30724 NW 33rd Street Roadway Improvement $3;700,001 $3,700,001 $0 $0 $0 $0 $0 $0
B-30725 NW 111h Street Roadway Improvement $142,238 $142,238 $0 $0 $0 $0 $0 - $0
B-30726 NW 60th Avenue Roadway Improvement $888,000 $888,000 $0 $0 $0 $0 $0 $0
B-30727 NW 18th Avenue Roadway Improvement $1,810,000 $1,810,000 $0 $0 $0 $0 $0 a $0
B-30728 NW 17th Court Roadway Improvement $110,000 $110,000 $0 $0 $0 $0 $0 $0
13-30729 NW 171h Terrace Roadway Improvement $250,000 $250,000 $0 80 $0 $0 $0 $0
B-30730 NW 4th Terrace Roadway Improvement $75,000 $75,000 $0 $0 $0 $0 • $0 $0
B-30732 NW 9th Street Roadway Improvement $496,708 $496,708 $0 $0 $0 $0 $0 $0
13-30741 SW 16 Avenue Roadway &Drainage $198,000 $198,000 $0 $0 $0 '$0 $0 $0
B-30742 SW 5th Avcnuc Roadway & Drainage $19,000 $19,000 $0 $0 $0 $0 $0 $0
B-30743 SW 28th Road Roadway & Drainage $250,000 $250,000 $0 $0 $0 $0 $0 $0
B-30744 SW 23rd Roadway & Drainage $90,000 $90,000 $0 $0 $0 $0 $0 $0
13-30745 NW 8th Street Roadway and Drainage $402,000 $402,000 $0 $0 $0 $0 $0 $0
B-30746 NW 141h Court Roadway & Drainage $180,000 $180,000 $0 $0 $0 $0 $0 $0
13-30747 SW 13th Street Roadway & Drainage $400,000 $400,000 $0 $0 $0 $0 $0 $0
B-30760 SW 171h Avenue Roachvay & Drainage $600,000 $600,000 - $0 $0 $0 $0 $0 $0
B-30775 Shenandoah Area Improvements - D4 $48,108 $48,108 $0 $0 $0 $0 $0 $0
B-30880 NE 2nd Court Roadway and Drainage $300,001 $300,001 $0 $0 $0 $0 $0 $0
B-30892 Little Haiti Gateway Signs - D5 $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-39911 Venetian Causeway Improvements $2,196,465 $2,196,465 $0 $0 $0 $0 $0 $0
13-40300 SW 181h'I'crr.Road lmprovemenls-D3 $111,192 $111,192 $0 $0 $0 $0 $0 $0
B-40301 SW 1501 Street Road Improvements $84,969 $84,969 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
FUNDING Funding Approp. 2012 - 2013
p ;11. ,t1�nR 4''hif s.''1l OF T}st=^tu I�lltll L',1+11t1tllll�"„i!�y1111111tCy:::A`+ :; iFL:.; :sasr`w..;:;.`-k;u+, L'! j .
2013 - 2014
2014-2015
2015-2016
2016-2017 2017-2018
City Bonds (Conf.)
356005-2 Streets Bond Program - Series 2
13-40302 SW 1st Avenue Road Improvements - $314,579 $314,579 $0 $0 $0 $0 $0 $0
B-40303 SW 23rd Road Improvements - D3 $244,748 $244,748 $0 $0 $0 $0 $0 $0
B-40304 SW 1 I lh Street Road Improvements - D3 $81,549 $81,549 $0 $0 $0 $0 $0 $0
11-40305 SW 121h Street Road Improvements - D3 $55,026 $55,026 $0 $0 $0 $0 $0 $0
B-40306 SW 101h Street Road Improvements - D3 $347,385 $347,385 $0 $0 $0 $0 $0 $0
B-40307 SW 161h Street Road improvements - D3 $257,693 $257,693 $0 $0 $0 $0 $0 $0
B-40308 SW 17th Terrace Road Improvements - $225,567 $225,567 $0 $0 $0 $0 $0 $0
13-40309 SW 171h Strcct Road.Improvements - D3 $412,212 $412,212 $0 $0 $0 $0 $0 $0
i3-40310 SW 201h Road Improvements - D3 $1 16,682 $1 16,682 $0 $0 $0 $0 $0 $0
1340311 SW 22nd Road Improvements - D3 $96,406 $96,406 $0 $0 $0 80 $0 $0
B-40312 SW 22nd Terr. & SW 13th Ave Road $394,317 $394,317 $0 $0 $0 $0 $O $0
13-40313 SW 3rd Ave Road Improvements - D3 $191,983 $191,983 $0 $0 $0 $0 $0 $0
13-40314 NW 181h Place Road Improvements -133 $224,611 $224,61 1 $0 $0 $0 $0 $0 $0
B-40315 SW 15th Street Road improvements $245,349 $245,349 $0 $0 $0 $0 $0 $0
8-40316 SW 26111 Road Improvements Segment 1 $85,034 $85,034 $0 $0 $0 $0 $0 $0
B-40317 SW 28th Road Improvements -D3 $40,149 $40,149 $0 $0 $0 $0 $0 $0
13-40318 SW 1st Ave Road Improvements - $167,562 $167,562 $0 $0 $0 $0 $0 $0
B-40319 SW 25Ili Road Improvements - D3 . $1 18,561 $1 18,561 $0 $0 $0 $0 $0 $0
B-40320 SW 26th Road Improvements Segment 2 $498,804 $498,804 $0 $0 $0 . $0 $0 $0
i3-40321 ' SW 2nd Ave Road Improvements - D3 $721,333 $721,333 $0 $0 $0 $0 $0 $0
B-40322 SW 27th Road Improvements - D3 $498,804 $498,804 $0 $0 $0 $0 $0 $0
B40323 SW 1st Ave Road Improvements Segment $126,638 $126,638 $0 $0 $0 $0 $0 $0
B-40324 NW 1 1 th Ave Road Improvements - D3 $120,203 $120,203 $0 $0 $0 $0 $0 $0
B-40325 13eacom Phase 11 - D3 $1,500,000 $1,500,000 $0 $0 $0 $0 $0 $0
13-40326 The Roads Roadway improvements- D3 $500,000 $500,000 $0 $0 $0 $0 $0 $0
B-40327 Shenandoah Roadwaylmprovements- $1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0
13-40666B Mickel' Lighting Phase 11 - D2 $850,0.00 $850,000 $0 $0 $0 $0 $0 $0
13-40672D Flagami Traffic Calming Phase IV - D4 $738,131 $738,131 $0 $0 $0 $0 $0 $0
B-40672G Flagami Traffic Calming- D4 $590,000 $590,000 $0 $0 $0 $0 $0 $0
B-40686 Miami River Grecnways/Strcelscape $1,179,778 $1,179,778 $0 $0 $0 $0 $0 $0
13-40704A SW 32 Avenue 'Improvements $310,083 $310,083 $0 $0 $0 $0 $0 $0
356005-2
363001 1984 1'olice Mounts
B-72915 l'olice Headquarters 1-Iclipad and Roof
$56,013,448
$56,013,448 $0 SO 50 50
$1,771 $1,771 $0 $0 $0 $0
50
$0
5(1
$0
363001 $1,771 $1,771 50 50 50 50 50 50
369100 1991 Fire Bonds
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total
Funding
Prior
Approp.
Approp.
2012 - 2013
2013 - 2014
2014-2015
2015 - 2016
2016-2017 2017-2018
City Bonds (Cons.)
369100 1991 Fire Bonds
B-72802 Fire Stations & Other Fire Facilities $50,400 $50,400 $0 $0 $0 $0 $0 $0
369100
371100 Series 1995 Sanitary Sewer Bonds
B-30673 Marlins Stadium Arca Infrastructure
B-70600 Police Department Sanitary Sewer
$50,4110 $50,400 $0 $0 $0 $0 $0 $0
$12,536,710
$60,000
$12,536,710
$60,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
•
$0
$0
371100' $12,596,710 $12,596,71(1 $0 $0 $0 $0 80 80
385200-1 2002 homeland Defense Bonds (Series 1)
13-30143A Neighborhood Gateways - District 3 $24,680 $24,680 $0 $0 $0 $0 $0 $0
B-30170 Art Museum -Contribution to Park Master $700,000 $700,000 $0 $0 $0 $0 $0 $0
B-30325 Miamarina Emergency Pier Repairs $491,852 $491,852 $0 $0 $0 $0 $0 $0
B-30508 Virginia Key Beach Park Museum $27,127 $27,127 $0 $0 $0 $0 $0 $0
B-30538 Museum Park - Partially Funded by CRA . $90,000 $90,000 $0 $0 $0 $0 $0 $0
B-3054) Citywide Park Equipment&Site $19,940 $19,940 $0 $0 $0 $0 $0 $0
_ B-3067I Caribbean Marketplace Renovation $45,1 11 $45,1 1 1 $0 $0 $0 $0 $0 $0
B-335I4 Marine Stadium Marina Improvements $58,775 $58,775 $0 $0 $0 $0 $0 $0
B-35806 Curtis Park New Pool Facility and Boat $14,072 $14,072 . $0 $0 $0 $0 $0 . $0
B-35838 Kennedy Park Resiroom Building $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-35853A Virrick Park New 1'001 Facility $685,344 $685,344 $0 $0 $0 $0 $0 $0
B-35887 Moore Park New Construction $393,641 $393,641 $0 $0 $0 $0 $0 $0
B-35904 Neighborhood Parks lmprov. $260,307 $260,307 $0 $0 $0 $0 $0 $0
B-40643A North Spring Garden Grccnway $79,800 $79,800 $0 $0 $0 $0 $0 $0
B-40695L Miami River Grccnway Segment G and $5,085 $5,085 $0 $0 $0 $0 $0 $0
B-50704 Fairlawn Storm Sewer Improvements $614,000 . $614,000 . $0 $0 $0 $0 $0 $0
B-60453A Fire Station N 13 $52,992 $52,992 $0 $0 $0 $0 $0 $0
B-60454 Fire Station $ 14 (Ncw) $181,362 $181,362 $0 $0 $0 $0 $0 $0
B-72803 Fire Station Equipment and Furniture $3,798 $3,798 $0 $0 $0 $0 $0 $0
13-72813 Defense and Security Equipment $802,249 $802,249 $0 $0 $0 $0 $0 $0
B-78508 NE 2 Avenue improvements $1,050,600 $1,050,600 $0 $0 $0 $0 $0 $0
385200-1 $5,700,735 $5,700,735 80 $0 $11 $0 $0 80
385200-2 2002 Homeland Defense Bonds (Series 2)
B-30134A Bryan Park Community Building - D4 $6,992 $6,992 $0 $0 $0 $0 $0 $0
13-30174 Virginia Kcy Beach Park 1-listoric $1,046,765 $1,046,765 $0 $0 $0 $0 $0 $0
B-30305B Gibson 1'ark New Construction . $97,774 $97,774 $0 $0 $0 $0 $0 $0
B-30325 Miamarina Emergency Pier Repairs $604,679 $604,679 $0 $0 $0 $0 $0 $0
B-30538 Museum Park - Partially Funded by CRA $288,153 $288,153 $0 $0 $0 $0 $0 $0
B-30541 Citywide Park Equipment & Site $408,167 $408,167 $0 $0 $0 $0 $0 $0
Active & Future
COP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding .Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
t! ituii0li'ii itlllittINtfmiltemt4V4 : `4,?x04 ,
2013 - 2014
2014 - 2015
2015-2016 2016-2017 2017-2018
Cily Bonds (Cont.)
385200-2 2002 homeland Defense Ilontls (Series 2)
B-30671 Caribbean Marketplace Renovation $204,889 $204,889 $0 $0 $0 $0 $0 $0
B-30689 Marine Stadium Bulkhead Replacement $839,408 $839,408 $0 $0 $0 $0 $0 $0
B-30772 Bay of pigs Park Lighting- D4 $53,000 $53,000 $0 $0 _ $0 $0 $0 $0
B-30800 Pere Isle / l'BA Park Improvements $1 16,782 $1 16,782 $0 $0 $0 $0 $0 $0
B-30890 Little Ilaili Cultural Campus $25,255 $25,255 $0 $(1 $0 $0 $0 $0
B-35806 Curtis Park New Pool Facility and T3oat $108,439 $108,439 $0 $0 $0 $0 $0 $0
B-35853B Virrick Park Gymnasium Improvements $150,000 $150,000 $0 $0 $0 $0 $0 $0
13-39910E District 2 Quality of Life Park $578,237 $578,237 $0 $0 $0 $0 $0 $0
B-60453A Fire Station 1113 $5,006,636 $5,006,636 $0 $0 $0 $0 $0 $0
B-60464 New Dinner Key Marina Dockmaster $250,006 $250,006 $0 $0 $0 $0 $0 $0
B-72813 Defense anct Security Equipment . $983,364 $983,364 $0 $0 $0 $0 $0 $0
B-78502A Museum of Science - Development in $738,000 $738,000 $0 $0 $0 $0 $0 • $0
38520(1-2 $11,506,546 $11,506,546 $0 8(1 $0 $0 $0 811
385200-3 2002 homeland Defense Bonds (Series 3)
B-30134A Bryan Park Community Building - D4 $845,136 $845,136 $D $0 $0 $0 $0 $0
13-30178 Design Districl/FEC $100,000 $100,000 $D $0 $0 $0 $0 $0
B-30179 Downtown Baywalk Master Plan & $450,000 $450,000 $0 $0 $0 $0 $0 $(1
B-30373A Police Department Property Unit $1 16,235 $1 16,235 $0 $0 $0 $0 $0 $0
B-30538B Museum Park Environmental $200,000 $200,000 $0 $0 $0 $0 $0 $0
B-30541 Citywide Park Equipment & Site $457,515 $457,515 $0 $0 $0 $0 $0 $0
B-30541 B Kennedy Park Floating Dock ('1-11 $35,000 $35,000 $0 $0 $0 $0 $0 $0
B-30541C Kennedy Park Shoreline Stabilization $71,000 $71,000 $0 $0 $0 $0 $0 $0
B-30547E Parks ADA Modifications - District 2 $215,348 $215,348 $0 $0 $0 $0 $0 $0
B-30547G Parks ADA Modifications - District 4 $491,147 $491,147 $0 $0 $0 $0 $0 $0
B-30688 Marine Stadium Restoration $175,000 $175,000 $0 $0 $0 $0 $0 $0
B-30689 Marine Stadium Bulkhead Replacement $178,000 $178,000 $0 $0 $0 $0 $0 $0
B-30690 West End Park Ncw Community $435,470 $435,470 $0 $0 $0 $0 $0 $0
B-30696 Miamarina Pier A, B & C Fire Line $250,000 $250,000 $0 $0 $0 $0 $0 $0
B-30721 Spoil Island E Restoration and Floating $0 $0 $0 $0 $0 $0 $0 $0
B-30773 Martin Luther King (MLK) Blvd / 1-95 $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-30801 Manatee Bend Park Shoreline $50,027 $50,027 $0 $0 $0 $0 $0 $0
B-30802 1'allot Park Shoreline Improvements - D2 $50,000 $50,000 $0 $0 $0 $0 $0 $0
13-30820 Legion 1'ark Boat Ramp Repairs - D2 $14,124 $14,124 $0 $0 $0 $0 $0 $0
B-30826 Lincoln Park Improvements - D2 $40,000 $40,000 $0 $0 $0 $0 $0 $0
B-30882 African Square Park - Splash Park - D5 $600,000 $600,000 $0 $0 $0 $0 $0 $0
B-30884 NW 62 Street West of 1-95 Roadway $75,000 $75,000 $0 $0 $0 $0 $0 $0
B-30886 Lununus Landing Square - D5 $1,850,122 $1,850,122 $0 $0 $0 $0 $0 $0
Active & Future
• CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
2013 - 2014
2014 - 2015 2015 - 2016
2016 - 2017 2017 - 2018
City Bonds (Cont.)
385200-3 2002 Iloincland Defense Bonds (Series 3)
B-33514 Marine Stadium Marina Improvements $250,000 $250,000 $0 $0 $0 $0 $0 $0
B-35806 Curtis Park Ncw Pool Facility and Boat $1,297,16 1 $1,297,161 $0 $0 $0 $0 $0 $0
B-35812A Duarte Park Building Renovation, $752,797 $752,797 $0 $0 $0 $0 $0 $0
B-35838 Kennedy,Park Restroom Building $96,133 $96,133 $0 $0 $0 $0 $0 $0
f3-35853A Virrick Park New Pool Facility $797,175 $797,175 $0 $0 $0 $0 $0 $0
B-35868A Robert King 'High Park Furniture - D4 $45,000 $45,000 $0 $0 $0 $0 $0 $0
B-35883A Hadley Park New Youth Center D5 $1,591,277 $1,591,277 $0 $0 $0 $0 $0 $0
B-35887 Moore Park New Construction $5,168,221 $5,168,221 $0 $0 $0 $0 $0 $0
B-35904 Neighborhood Parks Improv. $510,916 $510,916 $0 $0 $0 $0 $0 $0
B-39910 Quality of Life District 2 - Various $206,131 $206,131 $0 $0 $0 $0 $0 $0
B-39910C North Venetian Drive Lighting (District $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-3991.01:I District 2 Quality or Life Park $409,751 $409,751 $0 $0 $0 $0 $0 $0
B-399101 Brickell Avenue Decorative Pedestrian $33,132 $33,132 $0 $0 $0 $0 $0 $0
B-39910K Bayside Historic Sign - D2 $33,000 $33,000 $0 $0 $0 $0 $0 $0
B-39910N Morningside A/C, Windows and Interior $170,000 $170,000 $0 $0 $0 $0 $0 $0
B-40180 Marine Stadium Marina at Virginia Key $940,007 $940,007 $0 $0 $0 $0 $0 $0
B-40643A North Spring Garden Grecnway $100,200 $100 200 $0 $0 $0 $0 $0 $0
I3-40686 Miami River Grcenways/ Strcelscapc $478,217 $478,217 $0 $0 $0 $0 $0 $0
B-50704 Fairlawn Storm Scwcr Improvements $821,000 $821,000 $0 $0 $0 $0 $0 $0
B-50706A Roadway, Drainage and TralTic $766,000 $766,000 $0 $0 $0 $0 $0 $0
B-60453A Fire Station 1113 $18,364 $18,364 $0 $0 $0 $0 $0 $0
13-60454 Fire Station #14 (New) $1,050,105 $1,050,105 $0 $0 $0 $0 $0 $0
13-60464 Ncw Dinner Key Marina Dockmastcr $3,213,164 $3,213,164 $0 $0 $0 $0 $0 $0
B-70100 Gusmanl-lalllmprovements/Repairs $394,169 $394,169 $0 $0 $0 $D $0 $0
T3-72813 Defense and Security Equipment $1,981,636 $1,981,636 $0 $0 $0 $0 $0 $0
13-75823 Biscayne Park Site Improvements $150,000 $150,000 $0 $0 • $0 $0 $0 - $0
B-75883 Peacock Park Site Improvements $800,000 $800,000 $0 $0 $0 $0 $0 $0
B-75973 Oakland Grove l'ark Playground $15,000 $15,000 $0 $0 $0 $0 $0 $0
B-78502A Museum of Science - Development in $1,262,000 $1,262,000 $0 $0 $0 $0 $0 $0
B-78508 NE 2 Avenue improvements $2,649,420 $2,649,420 $0 $0 $0 $0 $0 $0
385200-3 $32,899,100 .S32,899,100 80 80 80 80 80 80
385200-8 - 2002 Ilonrcland Defense Series 1 Interest Post 09-30-06
B-30305B Gibson Park New Construction $841,280 $841,280 $0 $0 $0 $0 $0 $0
13-30325 Miamarina Emergency Pier Repairs $146,827 $146,827 $0 $0 $0 $0 $0 $0
I3-30538 Museum Park - Partially Funded by CAA $256,436 $256,436 $0 $0 $0 $0 $0 $0
B-3071 1 Triangle Park Swings - D3 $8,500 $8,500 $0 $0 $0 $0 $0 $0
13-30889 Lummus l'ark Miscellaneous Repairs - $31,803 $31,803 . $0 $0 $0 $0 $0 $0
Active & 'Future
CIP Projects Only
FUNDING
City Of 1\'iianli - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total
Funding
Prior Approp.
Approp. 2012 - 2013
-40
Ptittit,e; liiid1ug Iayliltlltteg }zi
2013 - 2014
2014-2015
2015 - 2016
2016-2017 2017-2018
City Bonds (Cont.)
385200-8 2002 homeland Defense Series 1 Interest. Post 09-30-06
13-30893 Overtown Youth Center Miscellaneous
• B-35853A Virrick Park New Pool Facility
$35,625
$306,378
$35,625
$306,378
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
385200-8 $1,626,849
397001 1970 Pollution Control G.O.B. (303000) (399003)
13-60351 Fire Station 610 (New) $361,200
$1,626,849
$361,200
$0
$0
$0
$0
$0
$0
$0
$o
$0
$0
SO
$0
397001
399001 1976 & 78 Storm Sewer G 0 Bond
B-30183 Garden Storm Sewer - Phase 1
B-50643 Wagner Creek / Seybold Canal Dredging
$361,200
$250,000
$617,481
$361,2(10
$250,000
$617,481
$11
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
399001
$867,481
$867,481
80
S0
$0
80
80
50
City Bonds
CIP Fces/Revames
324100 Orange Bowl Ticket Surcharge
B-30648 Orange Bowl Site Parking Garage
245,875,115 245,875,115
$23,000
$23,000
$0
$0
$(1
$0
S(1
$0
$I1
$0
S0
$0
So
$0
324100
3560(11 Local Option Gas Tax
B-30035B Shorecrest Roadway Milling &
B-3055I Public Works Maintenance Yard
B-30588
B-30615
B-30630
B-30700
B-30991
B-30992
B-40168
B-40643A
B-43114A
B-50654
B-78500B
San Marco Island and Biscayne Island
District 5 - Miscellaneous Roadway
Palm Grove Road Improvements
FDEP Drainage Wells Compliance
Citywide Roadway Improvements
Riverview Pump Station
South 13ayshore Drive fiom Aviation
North Spring Garden Grcenway
Citywide Sidewalk Replacement Phase
Overlown Stormwater Pump Station
Buena Vista East Lighting
$23,000
$13,180
$2,000,000
$747,170
$193,767
$13,180
$500,000
$2,416,500
$500,000
$100,000
$325,000
$3,671,025
$200,000
$250,862
$23,00(1
$13,180
$2,000,000
$747,170
$193,767
$13,180
$500,000
$2,416,500
$500,000
$100,000
$325,000
$3,671,025
$200,000
$250,862
S0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
SO
$0
$0
$0
$0
$o
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$ (1
$0
$0
$0
$0
$0
$0
SO
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
S0
$0
$0
$0
$0
$0
$0
$0
s0
$0
$0
$0
$0
$0
S0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
356001
356002 Load Option Gas Tax 2009 and Falurrc
B-73102A Citywide Streets Milling & Resurfacing $484,400
$10,930,684 $10,930,684
$158,400
$0
$0
$326,000 $0
$0
$0
SO
SO
$0 $0 $0 $0
356002 $484,400 8158,40(1 $326,000 $0
SO
$0 S0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total
Funding
Prior
Approp.
Approp.
2012 - 2013
2013-2014 .2014-2015
2015 - 2016
2016-2017 2017-2018
CD' Fees/Revenues (Cont.) -
356003 Parking Surcharge
B-38504 Overtown Sector Signage Project
B-71210 Downtown Street Conversions
• $0 $0 $0 .-$0 $0 $0 $0- $0
$50,000 $50,000 $0 $0 $0 $0 $0 $0
356003 $50,000 $50,000 $0 $0 $0 80 81) 80
356007 Parking Surcharge 2007 .
B-30606N DWNTWN Beautification - North $549,715 $549,715 $0 $0 $0 $0 $0 $0
B-30606S DWNTWN Beautification - South $549,716 $549,716 .-. $0 $0 $0 $0 $0 $0
B-30621 Center Grove Street and Lighting $673,568 $673,568 $0 $0 $0 $0 $0 $0
13-30628 Bird Avenue Road lwprovenicnt $1,280,508 $1,289,508 $0 $0 $0 $0 $0 $0
B-30631 Miami River Greenway linen Miami $221,625 $221,625 $0 $0 $0 . $0 $0 $0
B-30637 Mary Brickell.Village Drainage $1,000,001 $1,000,001 $0 $0 $0 $0 $0 $0
B-31206 Sr 3rd Street Widening $280,205 $280,205 $0 $0 $0 $0 $0 $0
,8-38504 Overtown Sector Signage Project $3,619 $3,619 $0 $0 $0 ' $0 $0 $0
B-73102A . Citywide Streets Milling & Resurfacing $2,452,375 $1,023,775 $1,428,600 $0 $0 $0 $0 $0
356007
359101 Special Assessment District (SAD) Revenue
B-30680 Rockerman Canal Improvements
$7,011,332
$5,582,732 $1,428,600
$352,500 $272,490
$0 $0 80 $0 $0
$80,010 $0 $0 $0 $0 $0
359101 $352,500 - - $272,490 $80,010 8O $0 $0 80 .80
360001 Slormwalcr Utility Trust Fund %
B-30262 Citywide Storm Sewer Repair Project $1,372,476 $1,372,476 $0 $0 $0 $0 $0 $0
B-30680 Rockerman Canal 'Improvements $286,598 $286,598 $0 $0 $0 $0 $0 $0
13-50643 Wagner Creek / Seybold Canal Dredging $2,534,160 $2,534,160 $0 $0 $0 $0 $0 $0
B-50654 Overtown Stormwatcr Pump Station $360,152 $360,152 $0 $0 $0 $0 $0 $0
13-50672 Belle Meade Storm Sewer Project, Ph 2 $3,357,982 $3,357,982 $0 $0 $0. $0 $0 $0
360001 $7,911,368 • $7,911,368 80 $0 $0 $0 $0 $0
360003 Slorinwalcr Utility Trust Fund (FY07 and Future)
B-30008 Grove Park Road and Storm Sewers $119,000 $1 19,000 $0 $0 $0 $0 $0 $0
B-3001 1 Bnglewood,Road and Storm Sewer $273,961 $273,961 $0 $0 $0 $0 $0 $0
B-30014 Northwest Road and Storm Sewers $273,961 $273,961 $0 $0 $0 $0 $0 $0
B-30262 Citywide Storm Sewer Repair Project $3,438,685 $2,738,685 $700,000 $0 $0 $0 $0 $0
B-30588 San Marco Island and Biscayne Island $489,938 $489,938 $0 $0 $0 $0 $0 $0
B-30629 Durham Terrace Drainage Project $220,000 $220,000 $0 $0 $0 $0 $0 $0
B-30632 Drainage Master Plan Update - $715,384 $715,384 $0 $0 $0 $0 $0 $0
13-30637 Mary Brickcll Village Drainage . $100,000 $100,000 - $0 $0 $0 $0 $0 $0
B-30680 Rockerman Canal Improvements $272,726 $272,726 $0 $0 $0 $0 $0 $0
13-30700 MEP Drainage Wells Compliance $504,934 • $504,934 $0 $0 $0 - $0 $0 $0
B-50643 Wagner Creek / Scybold Canal Dredging $430,297 $430,297 $0 $0 $0 $0 $0 $0
Active & Future
CH' Projects Only
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior
FUNDING Funding Approp.
Approp.
2012-2013 2013-2014
1'
t-,'.%y?rLltlll Bfl�UlidlOj;LstI111HtCq�� ?,. , f 1j!dZ:� eti
2014 - 2015
2015-201.6 2016-2017 2017-2018
CIP Fees/Revenues (Cont.)
360003 Stormwater Utility Trust Fund (FY07 and Future)
B-50672 Belle Meade Storm Sewer Project, 1'h 2 $2,415,562 $2,415,562 $0 $0 $0 $0 $0 $0
13-50706A Roadway, Drainage and Traffic $154,916 $154,916 $0 $0 $0 $0 $0 $0
36(1003 89,409,364 $8,709,364 S700,000 80 80 80 80 80
367001 Impact Fees
13-30373A Police Department Property Unit $386,102 $386,102 $0 $0 $0 $0 $0 $0
B-30997 Police Swat Vehicles $13,134 $13,134 $0 $0 $0 $0 $0 $0
13-31206 SE3rdStreet Widening $177,892 $177,892 $0 $0 $0 $0. $0 $0
B-35806 Curtis Park New fool Facility and 13oat $9,295 $9,295 $0 $0 $0 $0 $0. $0
13-35838 Kennedy Park Restroom Building $4,900 $4,900 $0 $0 $0 $0 $0 $0
B-50654 Overtown Stormwater Pump Station $12,088 $12,088 $0 $0 $0 $0 $0 $0
B-50672 Belle Meade Storm Sewer 1'roject, Ph 2 $700,000 $700,000 $0 $0 $0 $0 $0 $0
B-6035I Fire Station 1110 (New) $195,737 $195,737 $0 $0 $0 $0 $0 $0
B-70107 Purchase and Installation of a RISO $25,000 $25,000 $0 $0 $0 $0 $0 $0
B-70108 Purchase of a video transmission server $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-72803 Fire Station Equipment and Furniture $82,022 $82,022 $0 $0 $0 $0 $0 $0
B-729I5 Police Headquarters 1-lelipad and Roof $56,321 $56,321_ $0 $0 $0 $0 $0 $0
B-74205B GSA Fleet Maintenance Garage $145,000 $145,000 $0 $0 $0 $0 $0 $0
367001
367011 Impact Fees - Ord 12750
B-30373A Police Department Property Unit $367,200 $367,200 $0 $0 $0 $0 $0 $0
B-30541 Citywide Park Equipment & Site $345,785 $345,785 $0 $0 $0 $0 $0 $0
B-3054ID Citywide Park Equipments & Site $397,101 $397,101 $0 $0 $0 $0 $0 $0
B-30988 North District Police Building Misc. $1,391 $1,391 $0 $0 $0 $0 $0 $0
I3-30995 Virginia Key Bike Trail Building - D2 $377,000 • $377,000 $0 $0 $0 $0 $0 $0
B-30997 Police Swat Vehicles $258,318 $258,318 $0 $0 $0 $0 $0 $0
B-35806 Curtis Park New l'ool Facility and T3oat $193,123 $193,123 $0 $0 $0 $0 $0 $0
B-35883A Hadley 1'ark New Youth Center D5 $500,000 $500,000 $0 $0 $0 $0 $0 $0
B-35887 Moore Park New Construction $443,600 $443,600 - $0 $0 $0 $0 $0 $0
B-60453A Fire Station 1113 $6,504 $6,504 $0 $0 $0 $0 $0 $0
13-60464 Ncw Dinner Key Marina Dockmaslcr $87,986 $87,986 $0 $0 $0 $0 $0 $0
B-72915 Police headquarters Hetipad and Roof $65,000 $65,000 $0 $0 $0 $0 $0 $0
B-74205B GSA Fleet Maintenance Garage $49,055 $49,055 $0 $0 $0 $0 $0 $0
13-75883 Peacock l'ark Site Improvements $124 $124 $0 $0 $0 $0 $0 $0
367011 S3,092,187 • $3,092,187 80 $0 $0 SO 80 80
375001 Fire Assessment Fee
B-70102A Fire Station No. 6 011ice Building- $74,619 $74,619 $0 $0 $0 $0 $0 $0
$1,907,491 S1,907,491 80 80 811 80 80 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013 2013 - 2014
1!l tlli l!r`Vtii llli &.1;41111iu1v!4 .., l?I,e:. .'; t e a. `
2014 - 2015 2015 - 2016 2016 - 2017 2017 - 2018
CIP Fees/Revenues (Cont.(
375001 Fire Assessment Fee
B-70104 Fire Station No. 10 Reslroom
B-70105
B-70106
B-72801
B-72802
13-72803
B-72804
13-72808
B-72809
13-74609
Refurbishing of Existing Apparatus
Firefighting Equipment and Gear
Computer Aided Dispatch (CAD)
Fire Stations & Other Fire Facilities
Fire Station Equipment and Furniture
Phone and Radio Equipment Upgrades
Light Fleet Replacement
Large Firefighting Equipment
13RP Integration System
$60,301
$230,000
$158,124
$120,866
$2,661,779
$175,000
$291,200
$374,867
$110,316
$305,015
$60,301
$230,000
$158,124
$120,866
$2,661,779
$175,000
$291,200
$374,867
$110,316
$305,015
$0
$0
$0
$0
$0
$0
$0
, $o
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$o
$0
$0
$0
$0
$0
$0
$o
$0
$0
$0
$0
$0
$0
$0
$0
$0
$o
$0
$0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$o $o
$0 $0
$0 $0
375001
375002 Fire Assessment Fee (FY07)
B-70104
B-72802
B-72803
B-72804
B-72808
13-72809
Fire Station No. 10 Reslroom
Fire Stations & Other Fire Facilities
Fire Station Equipment and Furniture
Phone and Radio Equipment Upgrades
Light Fleet Replacement
Large Firefighting Equipment
$4,562,087
$55,524
$556,814
$130,018
$60,000
$292,791
$216,500
$4,562,1187 SO
$55,524
$556,814
$130 018
$60,000
$292,791
$216,500
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$o
$0
$11
$0
$0
$0
$0
$0
$0
SO
$0
$0
$0
$0
$0
$0
$0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
3751102
382001 Contribution From Genci al Fund
B-30536
B-30538
B-30648
B-30994
B-30997
B-33506
B-60351
13-70421
B-72915
B-74200
B-74220
B-74606
13-74609
B-74614
Pedro Pan Monument (partially funded
Museum Park - Partially Funded by CRA
Orange Bowl Site Parking Garage
City of Miami Impact Fee Study -
Police Swat Vehicles
James L. Knight Center Miscellaneous
Fire Slalion if 10 (New)
Air Conditioners South District Sub
Police Headquarters Heliport and Roof
Citywide General Fleet Replacement
1'olicc Vehicle Replacement
Upgrade l'C Software & Hardware
1R1' Integration System
Land Management System
382001
$1,311,647
$12,286
$30,778
$405,500
$65,491
$40,000
$86,438
$341,186
$25,695
$1 17,229
$1,070,989
$9,141,422
$2,003,786
$5,486,772
$1,176,209
$1,311,647 $Il
$12286
$30,778
$405,500
$65,491
$40,000
$86,438
$341,186
$25,695
$117229
$1,070,989
$9,141,422
$2,003,786
$5,486,772
$1,176,209
$0
$0
$0
$0
$o
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
so
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$o
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$o
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$o $o
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
820,0113,781 $20,003,781
$0 $(1
$11
$0
$0 $I)
Active & Future
CH' Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp.
$�l�ttttn't!nl+ttllclln 1i11��1tllitlttCV;<;l
2012 - 2013 2013 - 2014
2014 - 2015
2015-2016 2016-2017 2017-2018
CIP Fees/Revenues (Cont.)
382007 Contribution From General Fund 2003
B-74609 ERP integration System $7,000,000 $7,000,000 $0 $0 $0
$0 $0 $0
382007 $7,000,000 $7,000,000 $0 50 $0 50 50 50
382008 Contribution From General Fund 2007 and Future
B-30365E Coral Way NET Office Remodeling D3 $15,000 $15,000 $0 $0 $0 $0 $0 $0
B-3036511 Generator for City Hall $25,000 $25,000 $0 $0 $0 $0 $0 .$0
B-30365J Beckham 1-tall Fire Damage Repair $6,770 $6,770 $0 $0 $0 $0 $0 $0
B-30373A Police Department Property Unit $120,107 $120,107 $0 $0 $0 $0 $0 $0
B-30501 A Manuel Artime Miscellaneous Project $3,300 $3,300 $0 $0 $0 $0 $0 $0
B-30536 1'edro Pan Monument (partially funded $15,320 $15,320 $0 $0 $0 $0 $0 $0
B-30541D . Citywide Park Equipments & Site $150,000 $0 $150,000 $0 $0 $0 $0 $0
13-30551 Public Works Maintenance Yard $1,268,254 $1,268,254 $0 $0 $0 $0 $0 $0
B-30554 Police Radios Replacement $843083 $843,083 $0 $0 $0 $0 $0 $0
B-30865 FY2013 Citywide Capital Needs - $340,000 $0 $340,000 $0 $0 $0 $0 $0
B-30865A Environmental Remediation Study $45,9D0 $0 $45,900 $0 $0 $0 $0 $0
B-30865B City 1-lall Terrace $350,000 $0 $350,000 $0 $0 $0 $0 $0
B-30865C City Hall Windows and Doors $360,000 $0 $360,000 . $0 $0 $0 $0 $0
B-30988 North District Police Building Misc. $24,635 $24,635 $0 $0 $0 $0 $0 $0
B-30997 Police Swat Vehicles $11,394 $11,394 $0 $0 $0 $0 $0 $0
13-431 14A Citywide Sidewalk Replacement Phase $399,990 $399,990 $0 $0 $0 $0 $0 $0
13-70104 Fire Station No, 10 Rcstroom $63,579 $63,579 $0 $0 $0 $0 $0 $0
B-70210 Fire Station 115 Exterior Walls Repair - $150,000 $150,000 $0 $0 $0 $0 $0 $0
B-70411 Fire Rescue Personal Protective $164,1 14 $1 64,1 14 $0 $0 $0 $0 $0 $0
B-70418 FEMA Assistance to Firefighters Program $68,722 $68,722 $0 $0 $0 $0 $0 $0
B-70421 Air Conditioners South District Sub $29,305 $29,305 $0 $0 $0 $0 $0 $0
B-72802 Fire Stations & Other Fire Facilities $603,967 $603,967 $0 $0 $0 $0 $0 $0
B-72803 Fire Station Equipment and Furniture $150,000 $150,000 $0 $0 $0 $0 $0 $0
B-72809A Firefighting Equipment - SAFER $91 1,500 $0 $91 1,500 $0 $0 $0 $0 $0
B-73202C Solid Waste Collection Equipment $4,402,827 $3,548,727 $854,100 $0 $0 $0 $0 • $0
B-74200 Citywide General Fleet Replacement $2,539,280 $2,189,280 $350,000 $0 $0 $0 $0 $0
B-74220 Police Vehicle Replacement $18,350,315 $16,498,315 $1,852,000 $0 $0 $0 $0 $0
B-74606 Upgrade PC Software & Hardware $916,896 $916,896 $0 $0 $0 $0 $0 $0
B-74609 ERI' Integration System $2,825,965 $2,825,965 $0 $0 $0 $0 $0 $0
B-74617 IT Modernization $2,800,000 $2,800,000 $0 $0 $0 $0 $0 $0
382008 $37,955,223 $32,741,723 $5,213,500 $0 $0 50 50 50
383001 CIF Misc. Revenue
13-50654 Overtown Stormwater Pump Station $46,358 $46,358 $0 $0 $0 $0 $0 $0
Active & Future
CJP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
Note
Future.14InttHu} tteistimutCa;Am.g,. 1,+ ' , 1i'474crAig,
2013 - 2014
2014-2015
2015-2016
2016 - 2017 2017 - 2018
383001 $46,358 S46,358 St)
383004 Miami CDT
50
$o
$0
$0
$0
B-30648 Orange Bowl Site Parking Garage $5,000,000 $5,000,000 $0 $0 $0 $0 $0 $0
383004 $5,000,000 S5,000,000 $0 $0 $0 $0 50 50
888923 Contribution From Special Revenue
13-30501A Manuel Arlime Miscellaneous Project $19,744 $19,744 $0 $0 $0 $0 $0 $0
B-3050I B Manuel Arlime Dimmer Rack System $35,1 15 $35,1 15 $0 $0 $0 $0 $0 $0
B-60464 New Dinner Kcy Marina Dockmasler • $4,163 $4,163 $0 $0 $0 $0 $0 $0
B-74609 ERP integration System $1,500,000 $1,500,000 $0 $0 $0 $0 $0 $0
888923 $1,559,022 S1,559,022 SO 50 50 SO 50 50
888924 DRI Fees Transportation
B-305381, Museum Park - DRI Transportation $2,296,404 $2,296,404 $0 $0 $0 $0 $0 $0
B-31206A SE 3rd St Widening (fka Dupont Plaza) $1,500,000 $1,500,000 $0 $0 $0 $0 $0 $0
B-31220 Downtown DRI Transportation $1,417,532 $1,417,532 $0 $0 $0 $0 $0 $0
888924 $5,213,936 $5,213,936 $0 $0 $0 SO 50 50
888926 Prior Year Fund Balance
B-50643 Wagner Creck / Scybold Canal Dredging $91,565 $91,565 $0 $0 $0 $0 $0 $0
888926 S91,565 $91,565 50 50 511 $11 5() 50
888930 'Transit Half -Cent Surtax
B-30183 Garden Storm Sewer - Phase I $149,920 $149,920 $0 $0 $0 $0 $0 $0
13-30336 Miami River Grecnway (5th Street $277,280 $277,280 $0 $0 $0 $0 $0 $0
B-30606 DWNTWN Beautification Project Phase $50,000 $50,000 $0 $0 $0 $0 $0 $0
B-30615 District 5 - Miscellaneous Roadway $150,916 $150,916 $0 $0 $0 $0 $0 $0
B-30630 Palm Grove Road Improvements $256,696 $256,696 $0 $0 $0 $0 $0 $0
B-30645A Transpoi ta Lion Program Support $81,788 $81,788 $0 $0 $0 $0 $0 $0
B-30695 SW 19th Terrace Improvements (SW 23 $170,000 $170,000 $0 $0 $0 $0 $0 $0
B-30716 Tigcrtail Resurfacing - D2 $2,702 $2,702 $0 $0 $0 $0 $0 $0
B-30774 West Hagler Area Improvements - D4 $98,933 $98,933 $0 $0 $0 $0 $0 $0
13-30775 Shenandoah Area Improvements - D4 $366,281 $366,281 $0 $0 $0 $0 $0 $0
B-30780 NW 14 Avenue and 28 Street Arca $335,798 $335,798 $0 $0 $0 $0 $0 $0
13-40695L Miami River Grecnway Segment G and $140,700 $140,700 $0 $0 $0 $0 $0 $0
B-40704A SW 32 Avenue Improvements $3 $3 $0 $0 $0 $0 $0 $0
B-50672 Belle Meade Storm Sewer Project, Ph 2 $1,300,000 $1,300,000 $0 $0 $0 $0 $0 $0
13-50706A Roadway, Drainage and Traffic $284,903 $284,903 $0 $0 $0 $0 $0 $0
B-78508 NE 2 Avenue improvements $55,001 $55,001 $0 $0 $0 $0 $0 $0
• 88893(1 $3,720,921 $3,720,921 50 50 $0 $0 50 $0
888931 'Transit Half -Cell( Surtax (FY07 and Fulm e)
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior
Funding Approp.
Approp.
2012 - 2013
2013 - 2014
2014 - 2015
2015-2016 2016-2017 2017-2018
CIP Pecs/Revenues (Cont.)
888931 Transit llalf-Cent Surtax (PY07 and Future)
B-30011 Englewood Road and Storm Sewer $618,102 $618,102 $0 $0 $0 $0 $0 $0
B-300I4 Northwest Road and Storm Sewers $618,104 - $618,104 $0 $0 $0 $0 $0 $0
13-30035B Shurccrest Roadway Milling & $458,525 $458,525 $0 $0 $0 $0 $0 $0
B-30168A Silver Bl ilrTraflic Calming Priority 3 - $10,000 $10,000 $0 $0 $0 $0 $0 $0
B-30336 Miami River Grecnway (5lh Street $979,360 $979,360 $0 $0 $0 $0 $0 $0
B-30518 Northwest 14th Street Slreclscape Project $439,001 $439,001 $0 $0 $0 $0 $0 $0
13-30540 Little River Industrial I'ark $12,000 $12,000 $0 $0 $0 $0 $0 $0
B-30588 San Marco Island and I3iscnyne Island $1,076,873 $1,076,873 $0. $0 $0 $0 $0 $0
B-30606N DWNTWN 13cautification - North $861,784 $861,784 $0 $0 $0 $0 $0 $0
B-30606S DWNTWNBcautilication - South $461,784 $461,784 $0 $0. $0 $0 $0 $0-
B-30613 District 3- Miscellaneous Roadway $1,838,644 $1,838,644 $0 $0 $0 $0 $0 $0
B-30621 Center Grove Street and Lighting $500,000 $500,000 $0 $0 $0 $0 $0 $0
B-30624 OvertownGrecnway n)NW 11 Terrace- $461,905 $461,905 $0 $0 $0 $0 $0 $0
B-30628 Bird Avenue Road Improvement $680,000 $680,000 $0 $0 $0 $0 $0 $0
13-30630 Palm Grove Road Improvements $1,201,546 $1,201,546 $0 $0 $0 $0 $0 $0
B-30645A Transportation Program Support $659,691 $659,691 $0 $0 $0 $0 $0 $0
13-3064513 Transportation Program Support $1,026,000 $1,026,000 $0 $0 $0 $0 $0 $0
B-30645C Health District Bicycle and Pedestrian $12,000 $12,000 $0 $0 $0 $0 $0 $0
B-30645D Baywalk Mobility Plan $12,000 $12,000 $0 $0 $0 $0 $0 $0
B-30645r Overtown / Wynwood Bicycle $12,000 $12,000 $0 $0 $0 $0 $0 $0
B-3064517 Miami. Regional Inlcrmodal T'lan $15,000 $0 $15,000 $0 $0 $0 $0 $0
B-30646 South Bayshore Drive Roadway and $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-30651 Miami River Grecnway from NW loth to $820,640 $820,640 $0 $0 $0 $0 $0 $0
-B-30662D US-1 Median Closures at Bridgeport $100,000 $100,000 - $0 $0 $0 $0 $0 $0
B-30694A Citywide Bicycle Rack & Signage $1 15,000 $1 15,000 $0 $0 $0 $0 $0 $0
B-30716 Tigerlail Rcsurlbcing -D2 $308,156 $308,156 $0 $0 $0 $0 $0 $0
B-30770 SW 22nd Avenue Medians -US 1 to $240,000 $240,000 $0 $0 $0 $0 $0 $0
B-30774 West Plagler Arca Improvements - D4 $700,928 $700,928 $0 $0 $0 $0 $0 $0
B-30780 NW 14 Avenue and 28 Street Area ' $83,467 $83,467 $0 $0 $0 $0 $0 $0
I3-30782 Allapatah Area Roadway Improvement - $500,000 $500,000 $0 $0 $0 $0 $0 $0
B-30822 I3rickell Arca Shared Use Path and $620,000 $620 000 $0 $0 $0 $0 $0 $0
13-30823 Fair Isle Arca Roadway and Drainage $180,000 $180,000 $0 $0 $0 $0 $0 $0
B-30883 NW 12 Avenue/NW 12 Place Roadway $999,976 $999,976 $0 $0 $0 $0 $0 $0
13-30888 Wynwood Arca Roadway Improvement - $500,000 $500,000 $0 $0 $0 $0 $0 $0
B-30990 Roadway Improvements $1,361,000 $1,361,000 $0 $0 $0 $0 $0 $0
13-30993 SW/NW 17th Avenue Traffic Corridor $200,000 $200,000 $0 $0 $0 $0 $0 $0
B-30998 Citywide Sidewalk Repair Project - 1'W $169,615 $169,615 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
Eitt ii 6Tni dit>,out11nitti!si40' ,
2013-2014 2014-2015 2015-2016 2016-2017
2017 - 2018
CIP Fees/Revenues (Cont.)
888931 Transit llalf-Cent Surtax (17Y07 and Future)
B-31206 SE 3rcl Street Widening $183,398 . $183,398 $0 $0 $0 $0 $0 $0
B-40268 FEC Quiet Zone Study $50,667 $50,667 $0 $0 $0 $0 $0 $0
B-40704A SW 32 Avenue Improvements $785,003 $785,003 $0 $0 $0 $0 $0 $0
B-43114A Citywide Sidewalk Replacement Phase $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-50672 Belle Meade Storm Sewer Project, I'll 2 $2,070,295 $2,070,295 $0 $0 $0 $0 $0 $0
B-50706A Roadway, Drainage and Traffic $2,426 $2,426 $0 $0 $0 $0 $0 $0
B-70245 Transportation Program Support Services $500,000 $0 $500,000 $0 $0 $0 $0 $0
B-70246 Transportation Program Support Services $500,000 $0 $500,000 $0 $0 $0 $0 $0
B-70715 City of Miami Trolley Program -Capital $1,021,972 $1,021,972 $0 $0 $0 $0 $0 $0
B-70715BI Trolley Program Oracle Project: 40 $619,416 $619,416 $0 $0 $0 $0 $0 $0
13-70715C1 Trolley Program Oracle Project: 40 $952,185 $952,185 $0 $0 $0 $0 $0 $0
13-70717 On -Demand Transportation Services - $249,857 $249,857 $0 $0 $0 $0 $0 $0
13-73102A Citywide Streets Milling & Resurfacing $3,074,600 $0 $3,074,000 $0 $0 $0 $0 $0
B-78508 NE 2 'Venue Improvements $1,230,811 $1,230,811 $0 $0 $0 $0 $0 $0
888931 $30,293,731 $26,204,131 $4,089,600 $0 80 80 80 80
888956 Contribution from Special Revcnne - SI4F 2007
B-30325 Miamarina Emergency Pier Repairs $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-30501 A Manuel Artiste Miscellaneous Project $215,505 $215,505 $0 $0 $0 $0 $0 $0
B-30501 B Manuel Artime Dimmer Rack System $296 $296 $0 $0 $0 $0 $0 $0
B-30602 Seminole Dinghy Dock Expansion $30,000 $30,000 $0 $0 $0 $0 $0 $0
B-30604 Miamarina Intracoastal Bulkhead . $21,051 $21,051 $0 $0 $0 $0 $0 $0
B-30689 Marine Stadium Bulkhead Replacement $71,695 $71,695 $0 $0 $0 $0 $0 $0
B-30706 Miscellaneous Repairs 10% Set Aside $1,925,839 $1,186,839 $739,000 $0 $0 $0 $0 $0
B-33514 Marine Stadium Marina Improvements $76,870 $76,870 $0 $0 $0 $0 $0 $0
B-50722 Little River Waterfront Park $600,000 $600,000 $0 $0 $0 $0 $0 $0
13-60464 New Dinner Key Marina Dockmastcr $655,921 $655,921 $0 $0. $0 $0 $0 $0
888956 S3,697,177 $2,958,177 $739,000 $(1 $0 80 80 80
888969 Subrogalion Auto Claim Revenues
B-30666 Damaged Vehicle Replacement Repairs $603,864, $603,864 $0 $0 $0 $0 $0 $0
888969 86(13,864 86(13,864 $0 80 80 80 $0 80
-888972 Rickcnbachcr Marina Rental Revenue
B-30706 Miscellaneous Repairs 1056 Set Aside $137,601 $137,601 $0 $0 $0 $0 $0 $0
888972 $137,601 $137,601 $0 $(I 80 $0 80 $0
888973 TVM 1'roduclion Basic Use Fcc
13-30182A Coconut Grove Waterfront Master Plan $219,631 $219,631 $0 $0 $0 $0 $0 $0
13-3054113 Kennedy Park Floating Dock l'I ll $140,000 $140,000 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total
Funding
Prior Approp.
Approp. 2012 - 2013
2013 - 2014
2(114-2015 2015-2016 2016-2017 2017-2018
CIP Fees/Revenues (Comrl.)
888973 TVM Production Basic Use Fee
B-30541 C Kennedy 1'ark Shoreline Stabilization $75,000 $75,000 $0 $0 $0 $0 $0 $0
B-3072I Spoil Island 13 Restoration and Floating $75,000 $75,000 $0 $0 $0 $0 $0 $0
B-30824 Spoil Island 13 & C Swim Arca $67,000 $67,000 $0 $0 $0 $0 $0 $0
B-30825 Biscayne Bay Spoil Island B Public $10,000 $10,000 $0 $0 $0 $0 $0 $0
13-30825A Biscayne Bay Spoil Island E Picnic $750 $750 - $0 $0 $0 $0 $0 ' $0
13-30825B Biscayne Bay Spoil Island 1: Public $750 $750 $0 $0 $0 $0 $0 $0
B-40171 Coconut Grove Viewing Platform Spoil $5,938 $5,938 $0 $0 $0 $0 $0 $0
13-40172 Coconut Grove Viewing Platform Spoil $5,931 $5,931 $0 $0 $0 $0 $0 $0
B-75883 Peacock Park Site Improvements $30,000 $30,000 $0 $0 $0 $0 $0 $0
888973 • $630,000 $630,000 SO $0 So $0 $0 SO
888977 DRl Pccs Air Quality
13-30538I3 Museum Park - DRI Air Quality $313,129 $313,129 $0 $0 $0 $0 $0 $0
888977
888978 DRI Fees Administration
B-305381) Museum Park - DRI lees
B-31206B SE 3rd Street Widening - DRI
$313,129 $313,129 $0 $0 $0 $0 $0 10
$600,000 $600,000 $0 $0 $0
$100,000 $100,000 $0 $0 $0
$0
$0
$0
$0
$0
$0
888978 $700,000 $700,000 $0 $0 $0 $0 SO SI)
C1P Fees/Revenues 164,1)12,368
151,435,658 112,576,711)
$0
$0 $0 SO $1)
Private Donations / Other
000001 General Fund Operating Budget
B-50654 Ovcrtown Stormwatcr Pump Station $60,000 $60,000 $0 $0 $0 $0 $0 $o
000001 $60,000 $60,000 $11 $0 $0 $I) SO $0
0110002 Special Revenue Operating Budget
B-30262 Citywide Storm Sewer Repair Project $290,400 $290,400 $0 $0 $0 $0 $0 $0
13-30346 Traffic Study Reviews - Oracle Project $41 1,622 $41 1,622 $0 $0 $0 $0 $0 $0
000002 $702,022 $702,022 $0 SO SO .. $0 $0- $0
888950 Donation Commissioner District 4
I3-30536 I'cdro Pan Monument (partially funded $21,416 $21,416 $0 $0 $0 $0 $0 $0
888950 $21,416 $21,416 SO $11 $0 SO $0 SO
888951 Other Public & Private Contributions
13-30374 Virginia Key Rowing Center $616,513 $616,513 $0 $0 $0 $0 $0 $0
13-40171 Coconut Grove Viewing tlatformSpoil $1,650 $1,650 $0 $0 $0 $0 $0 $0
B-40172 Coconut Grove Viewing Platform Spoil $1,650 $1,650 $0 $0 $0 $0 $0 $0
Active & Future
CIP Projects Only
FUNDING
City Of Miami - Capital Improvement Program
Fund Source Management System
Funding Type by Job No.
Total Prior Approp.
Funding Approp. 2012 - 2013
2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
888951 $619,813 $619,813 $0
888963 Proceeds from Conveyance of Easement
B-30182A Coconut GroveWaterliontMaster Plan $1,502,044 $1,502,044 $0 $0
SO
$Il
$0
$0
SO
SO
$0 $0 $0
888963 $1,502,044 $1,502,044 50 50 50 50 $0 $0
888979 Marlins Garage Structural Settlement
B-30648 Orange Bowl Site Parking Garage $2,147,209 $2,147,209 $0 $0 $0 $0 $0 $0
888979 $2,147,209 S2,147,209 $I) So SO SO SO SO
Private Donations / Other
$5,052,504 S5,052,504 SO $0 _ SO SO SO $0
Combined with Others
355001 1988 Sanitary Sewer Bonds
I3-30134AS Bryan -Park New Tennis/Community $50,000 $50,000 $0 $0 $0 $0 $0 $0
B-30365BS Coral Way NET Office Remodeling D3 $50,000 $50,000 $0 $0 $0 $0 $0 SO
B-30538S Museum Park -Sanitary Sewer $1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0
B-30671 A Caribbean Marketplace Renovation - $1 14,000 $1 14,000 $0 $0 $0 • $0 $0 $0
B-306905 West End Park New Community $100,000 $100,000 $0 $0 $0 . $0 $0 $0
B-30882S African Square Park.- Splash Park D5 - $100,000 $100,000 $0 $0 $0 $0 $0 $0
B-30886S LununusLanding Square -D5Sanitary $100,000 $100,000 .$0 $0 $0 $0 $0 $0
B-30995S Virginia Kcy Bike Trail Building - D2 - $50,000 $50,000 $0 $0 $0 $0 $0 $0
B-35806S Curtis Park New fool Facility and Boat $500,000 $500,000 $0 $0 $0 $0 $0 $0
13-35812AS Duarte Park Building Renovation, $50,000 $SQ000 $0 $0 $0 $0 $0 $0
B-35838S Kennedy Park Restroom Building $50,000 $50,000 $0 $0 $0 $0 $0 $0
B-35861AS Maximo Gomez/ Domingo lark $100,000 $1O0,000/ $0 $0 $0 $0 $0 $0
B-35883AS Hadley Park New Youth Center D5 - $200,000 $200,000 $0 $0 $0 $0 $0 $0
13-35887S Moore Park New Construction D5 - $500,000 $500,000 $0 $0 $0 $0 $0 $0
B-604545 Fire Station #14 (New) - D4 -Sanitary $100,000 $100,000 $0 $0 $0 $0 $0 $0
13-60464S New Dinner Kcy Marina Dockmaslcr $690,000 $690,000 $0 $0 $0 $0 $0 $0,
355001 $3,754,000 $3,754,000 $0 SO SO S0 SO $I)
Combined with ()fliers S3,754,000 $3,754,000 SO SO $0 S0 SO SO
Total
567,768,398 539,140,688
$12,576,710 , S8,921,0011
54,661,000 $2,469,000
SO • SO
Active & Future
CIP .Projects Only
FUND: 301.-CRA projects
Phase
Total
Funding
2012-2013 Capital improvement Plan
Funding; by Cost Component & Sources
Prior
Years
Current
2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$0.00
$0.00
$0.00
$1,381,982.00
$8,019,375.00
$0.00
$299,075.00
$2,889,868.00
$502,700.00
$0.00
$0.00
$0.00
$1,381,982.00
$8,019,375.00
$0.00
$299,075.00
$2,889,868.00
$502,700.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Woo
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total. $13,093,000.00 $13,093,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fund Fuld
No. Name
Total
Funding
Prior Current
Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
000004 CRA Operating Budget
385200-3 2002 Homeland Dcicnse Bonds (Series 3)
888920 FIND Waterways Assistance Program FY07
$12,846,500.00
$200,000.00
$46,500.00
$12, 846,500.00
$200,000.00
$46,500.00
$0.00
$0.00
$0.00
$o.00
$0.00
$0.00
Sow
$0.00
$0,00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Son
$0.00
$0.00
Total $13,1193,000.00 $13,093,000.00 $0.00 80.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 311-General Government
Phase
Total
Funding
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
Prior Current
Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$7,575,471.28 $7,564,636.28 $10,835.00
$1,268,254.37 $1,268,254.37 $0.00
$0.00 $0.00 $0.00
$19,906,626.40 $19,768,052.40 $138,574.00
$4,269,743.67 $3,387,993.67 $881,750.00
$43,303;787.89 $41,101,787.89 $2,202,000.00
$157,088.00 $130,000.00 $27,088.00
$149,999.99 $149,999.99 80.0(1
$87,803.00 $50,150.00 $37,653.00
$0.00
$0.00
$0.00
$0.00
80.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$o.00
$0.00
$0.00
$0.00
Total
$76,718,774.60 $73,420,874.60 $3,297,900.00 80.(10
$0.00 $0.00
$0.00 $0.00
Fund Fund
No. Name
•
Total Prior Current
Funding Years 2(112-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
356001 Local Option Gas Tax $2,000,000.00 $2,000,000.00- $0.00
367001 Impact Fees $270,000.00 $270,000.00 $0.00
367011 lmpactFees - Ord 12750 $49,055.26 $49,055.26 $0.00
375001 Fire Assessment Pee $305,015.00 $305,015.00 $0.00
382001 Contribution From General Fund $18,944,669.10 $18,944,669.10 $0.00
382007 Contribution From General Fund 2003 $7,000,000.00 $7,000,000.00 $0.00
382008 Contribution From General Fund 2007 and $29,843,380.70 $26,545,480.70 $3,297,900.00
385200-3 2002 Homeland Defense Bonds (Series 3) $206,131.35 $206,131.35 $0.00
888896 Miami -Dade County DERM Virginia Kcy $650,000.00 $650,000.00 $0.00
888902 Community Development Block Grant $1,000,000.00 $1,000,000.00 $0.00
888920 FIND Waterways Assistance 1'rogram PY07 $15,000.00 $15,000.00 $0.00
888923 Contribution From Special Revenue $1,500,000.00 $1,500,000.00 $0.00
888937 Urban Areas Security Initiative Grant $69,842.00 $69,842.00 ' $0.00
888951 Other Public & Private Contributions $3,300.00 $3,300.00 $0.00
888961 Sunshine Slate Financing Commission $750,000.00 $750,000.00 $0.00
888966 Sunshine Slate Financing Commission $13,496,648.12 $13,496,648.12 $0.00
888969 Subrogation Auto Claim Revenues $603,864.00 $603,864.00 $0.00
888973 TVM Production Basic Use Fee $11,869.07 $1 1,869.07 $0.00
$o.00
$0.00
$0.00
P0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0,00
)$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Moo
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
so.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total $76,718,774.60 $73,420,874.60
$3,297,900.00
$0.00
$0.00 $0.00
$0.00 $0.00
Active & Future
CIP Projects Only
FUND: 312-Public Safety
Phase
Total
Funding
20.12-201.3 Capital Improvement Plan
Funding by Cost Component & Sources
Prior Current
Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$9,202.19
$1,767,043.06
$20,000.00
$2,167,100.48
$1 1,614,084.45
$9,919,198.38
$437,681.96
$0.00
$517,495,47
$9,202.19
$1,767,043.06
$20,000.00
$2,167,100.48
$11,614,084.45
$9,007,698.38
$437,681.96
$0.00
$517,495.47
$0.00
$0.00
$0.00
$0.00
$0.00
$91 1,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Moo
$0.00
$0.00
$0.00
$0.00
$0.60
$0.00
$0.00
$0.00
$0.00
Total
$26,451,805.99 $25,540,305.99 5911,500.0(1 50.011
$0.00 $0.00
$0.00 $0.00
Fund Fund
No. Name
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
363001 1984 Police Boncls
367001 Impact Fees
367011 Impact Fees - Ord 12750
369100 1991 Fire Boncls
375001 Fire Assessment Fee
375002 Fire Assessment Fee (FY07)
382001 Contribution From General Fund
382008 Contribution From General Fund 2007 and
385200-1 2002 Homeland Defense Bonds (Series 1)
385200-2 2002 Homeland Defense Bonds (Series 2)
385200-3 2002 Homeland Defense Bonds (Series 3)
397001 1970 Pollution Control G.0.13. (303000)
888939 FEMA Federal Assistance to Firefighters
888961 Sunshine Slate Financing Commission
$1,771.00
$733,316.03
$698,412.85
$50,400.00
$4,257,071.87
$1,31 1,646.80
$524,110.16
$3,140,405.76
$1,040,400.59
$5,990,000.00
$3,166,339.93
$361,200.00
$931,354.00
$4,245,377.00
$1,771.00
$733,316.03
$698,412.85
$50, 100.00
$4,257,071.87
$1,31 1,646.80
$524,1 10.16
$2,228,905.76
$1,040,400.59
$5,990,000.00
$3,166,339.93
$361,200.00
$931,354.00
$4,245,377.00
$0.00
$0.00
$0.00
$0.00
$0.00.
$0.00
$0.00
$91 1,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.o0
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Total $26,451,805.99 $25,540,305.99 $911,500.00
$0.00
$0.00 $0.00
$0.00 $0.00
Active & Future
.C1P Projects Only
FUND: 325-Public Facilities
Pliase
2012-2013 Capital improvement Plan
.Funding by Cost Component Sr, Sources
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management
Land Acquisition
Planning
Design
Construction
Equipment
Administration
Other
Construction Engineering
$140,047.58
$0.00
$752,044.46
$12,484,128.68
$96,324,808.76
$146,650.00
$319,074.64
$150,000.00
$806,179.63
$140,047.58
$0.00
$752,044.46
$12,484,128.68
$95,585,808.76
$146,650.00
$319,074.64
$150,000.00
$ 806,179.63
$0.00
$0.00
$0.00
$0.00
$739,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Woo
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
N
$o.00
$0.00
$0.00
$0.00
$000
$0.00
$0.00
o.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
111,122,933.75 110,383,933.75 5739,000.0(1
$0.00
$0.00 $0.00
$0.00 $0.00
Fund Fund
No. Name
Prior Current:
Funding .Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Total
324100 Orange Bowl Ticket Surcharge $23,000.00 $23,000.00
356004-1 Parking Revenue Bonds - Tax Exempt Series $72,565,808.55 $72,565,808.55
356004-2 Parking Revenue Bonds - Taxable Series $14,826,926.45 $14,826,926.45
367011 impact Pecs - Ord 12750 $87,986.00 $87,986.00
382001 Contribution From General Fund $491,938.00 $491,938.00
382008 Contribution From General Fund 2007 and $3,300.00 $3,300.00
383004 Miami CDT $5,000,000.00 $5,000,000.00
385200-1 2002 Homeland Defense Bonds (Scrics 1) $550,627.00 $550,627.00
385200-2 2002 Homeland Defense Bonds (Series 2) $1,694,092.88 $1,694,092.88
385200-3 2002 Homeland Defense Bonds (Series 3) $5,400,339,97 $5,400,339.97
385200-8 2002 Homeland Defense Series 1 Interest $146,826.72 $146,826.72
888920 FIND Waterways Assistance Program FY07 $1,071,250.00 $1,071,250.00
888923 Contribution From Special Revenue $59,021.86 $59,021.86
888927 Fedcrnl Aviation Admin. Grant $150,000.00 $150,000.00
888938 Miami -Dade County Grant/Contribution $13,239.00 $13,239.00
888947 MDC Building Better Communities GOB $250,00000 $250,000.00
888955 MSEA Contribution to Capital $1,073,804.00 $1,073,804.00
888956 Contribution from Special Revenue - SRF $3,097,176.31 $2,358,176.31
888960 ,Sunshine State Financing Commission $8,063.09 $8,063.09
888961 Sunshine Slate Financing Commission $603,048.66 $603,048.66
888963 Proceeds from Conveyance ofEasement $1,502,044.46 $1,502,044.46
888972 Rickenbacker Marina Rental Revenue $137,601.00 $137,601.00
888973 TVM Production Basic Use Fee $219,630.93 $219,630.93
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$739,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 •
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$000
$000
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
.$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$000
$0.00
$0.00
$0.00
$0.00
$0.00-
$0.00
$0.00
$0 00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 •
$0,00
$0.00
$0.00
$0.00
$0.00
$0.00.
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Active & Future
CIP Projects Only
FUND: 325-Public Facilities
Fund Fund
No. Name
Total
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
Prior
Funding; Years
Current
2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
888979 Marlins Garage Structural Settlement
$2,147,208.87
$2,147,208.87
$0.00
$o.00
$0.00
$o.00
$0.00
$0.00
Total 111,122,933.75 110,383,933.75 $739,O00301 $0.00 $0.00 $0.00 50.00 $0.00
Active & -Future
CIP .Projects Only
FUND: 331-Parks and Recreation
Phase
Total
Funding
201.2-2013 Capital improvement Plan
Funding by Cost Component & Sources
Prior
Years
Current
2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management $1,375,897.41
Land Acquisition $500,000.00
Planning $0.00
Design $15,482,814.06
Construction $72,961,097.86
Equipment $3,44 6, 891.20
Administration $1,831,180.97
Other $291,045.00
Construction Engineering $2,094,832.29
$1,375,897.41
$500,000.00
$0.00
$15 482,814.06
$68,51 1,097.86
$3,446,891.20
$1,831,180.97
$291,045.00
$2,094,832.29
$0.00
$0.00
$0.00
$0.00
$150,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,700,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,600,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$o.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total $97,983,758.79 $93,533,758.79 515(1,000.0(1 $1,700,000.00 $2,600,000.00
$0.00
$0.00 $0.00
Fund Fund
No. Name
Total" -
Funding
Prior
Years
Current
2012-2(113 2013-2014 , 2014-2015 2015-2016 2016-2017 2017-2018
000004 CRA Operating Budget
000008 CRA - FIND. Grant
367001 Impact Fees
367011 Impact Fees - Ord 12750
373001 Safe Neighborhood Parks Bond
373002 SafeNcighborhood Parks Bond 2008 &
382001 Contribution From General Fund
382008 Contribution From General Fund 2007 and
385200-1 2002 Homeland Defense Bonds (Scrics.')
385200-2 2002 Homeland Defense Bonds (Series 2)
385200-3 2002 Homeland Defense Bonds (Series 3)
385200-8 2002 Homeland Defense Series 1 Interest
888920 FIND Waterways Assistance Program FY07
888924 DRI Fees Transliortation
888947 MDC Building Better Communities GOB
888951 Other Public & Private Contributions
888955 MSEA Contribution to Capital
888956 Contribution from Special Revenue - SRP
888960 Sunshine Slate Financing Commission
888961 Sunshine Stale Financing Commission
888962 The Children's Trust
888964 County CDT
888965 Baylionl Park Management Trust
$9,943,000.00
$1,14 3,000.00
$14,195.00
$2,256,733.04
$128,083.77
$132,792.00
$30,777.90
$150,000.00 .
$2,335,542.33
$3,822,452.42
$18,220,318.92
$1,480,022.13
$342,500.00
$2,296,403.60
$19,800000.00
$616,513.00
$2,505,560.00
$600,000.00
$2,671,069.00
$21,959,552.56
$260,000.00
$5000,000.00
$609,000.00
$9,943,000.00
$1,143,000.00
$14,195.00
$2,256,733.04
$128,083.77
$132,792.00
$30,777.90
$0.00
$2,335,542.33
$3,822,152.42
$18,220,318.92
$1,480,022.13
$342,500.00
$2,296,403.60
$15,500,000.00
$616,513.00
$2,505,560.00
$600,000.00
$2,671,069.00
$21,959,552.56
$260,000.00
$5,000,000.00
$609,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$150,000.00
$0,00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,700,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,600,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.0.0
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00-
$0.00
$000
$0 00
$0.00
$0,00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$ 0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Active & Future
CIP Projects Only
FUND: 331-Parks and Recreation
Fund Fund Total
No. Name Funding
201.2-201.3 Capital Improvement Plan
Funding by Cost Component & Sources
Prior Current
Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
888973 TVM Production Basic Use Pcc
888976 Miami -Dade County Dept Cultural AITairs
888977 DRI Fees Air Quality
888978 DRl Pecs Administration
$398,500.00
$354,614.00
$313,129.12
$600,000.00
$398,500.00
$354,614.00
$313,129.12
$600,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 .
$o.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total $97,983,758.79 $93,533,758.79 $150,000.00 $1,700,000.00 $2,600,000.00
$0.00
$0.00 $0.00
Active & Future
CIP Projects Only
FUND: 341-Strccts & Sidewalks
Phase
2012-2013 Capital 'improvement Ilan
Funding by Cost Component & Sources
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management $994,306.17 $632,306.17 $362,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laid Acquisition $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Planning $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Design $20,240,664.64 $20,189,164.64 $51,500.00 $0.00 $0.00 $0.00 $0.00 $0.00
Construction 110,291,585.03 103,540,385.03 $4,829,200.00 $1,161,000.00 $761,000.00 $0.00 $0.00 $0.00
Equipment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Administration $4,959,973.02 $4,908,473.02 $51,500.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other $338,702.47 $338,702.47 $0.00 $0.00 $0.00 $0.00 $0.00 30.00
Construction Engineering $7,783,688.29 $7,733,688.29 $50,000.00 $0,00 $0.00 $0.00 $0.00 $0.00
Total 144,608,919.62 137,342,719.62 $5,344,200.00 $1,161,000.00 $761,000.00 5(1.00 $0.00 $0.00
Fund Fund
No. Name
Total
Funding
Prior
Years
Current
2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
000002 Special Revenue Operating Budget $411,622.47 $41 1,622.47 $0.00
000004 CRA Operating Budget $1,120,080.00 $1,120,080.00 $0.00
356001 Local Option Gas Tax $6,983,513.78 $6,983,513.78 $0.00
356002 Local Option Gas Tax 2009 and Future $484,400.00 $158,400.00 $326,000.00
356003 1'arking Surcharge $50,000.00 $50,000.00 $0.00
356005-1 Streets Bond Program - Scrics 1 $29,636,060.67 $29,636,060.67 $0.00
356005-2 Streets Bond Program - Scrics 2 $47,323,004.82 $47,323,004.82 $0.00
356007 Parking Surcharge 2007 86,01 1,331.00 $4,582,731.00 $1,428,600.00
367001 impact Pees $177,891.86 $177,891 .86 $0.00
.382001 Contribution From General Fund • $12,285.67 $12,285.67 $0.00
382008 Contribution From General Fund 2007 and $415,310.28 $415,310.28 ' $0.00
385200-1 2002 Homeland Defense Bonds (Series 1) $1,160,165.30 $1,160,165.30 $0.00
385200-3 2002 Homeland Defense Bonds (Scrics 3) $4,118,968.95 $4,1 18,968.95 $0.00
888902 Community Development Block Grant $1,200,000.00 31,200,000.00 $0.00
888913 FDOT Transportation Enhancement Progran $9,419,618.00 $9,419,618.00 $0.00
888917 FDOT Other $203,538.00 $203,538.00 $0.00
888924 DRl Fees Transportation $2,917,532.00 $2,917,532.00 $0.00
888930 Transit Half -Cent Surtax $1,904,310.69 $1,904,310.69 $0.00
888931 Transit Half --Cent Surtax (FY07 and Future) $21,854,143.67 $18,264,543.67 $3,589,600.00
888938 Miami -Dade County Grant/Contribution $450,000.00 $450,000.00 $0.00
888947 MDC Building Better Communities GOB $1,922,000.00 $0.00 $0.00
888950 Donation Commissioner District 4 $21,416.00 $21,416.00 $0.00
888953 Miami -Dade Metropolitan I'lanningOrg $144,000.00 $144,000.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
' $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,161,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
Woo
$0.00
$0.00
Moo
$0.00
Woo
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$761,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
Moo
$0.00
Vino
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.0o
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0 00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
moo . $o.00
$0.0o $0.0o
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Woo woo
$0.00 $0.00
$0.00 $0,0o
$OAO $0.00
$0.00 $0.00
Active & Future
CIP Projects Only
FUND: 341-Streets & Sidewalks
201.2-2013 Capital Improvement Plan
Funding by Cost Component & Sources
Fetid Fund Total Prior Current
No. Name Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
888967 Economic Stimulus 1'ackage 2009 - FOOT
888974 Economic Stimulus 2009 - PD OI'I Icallh
888978 DRI Pees Administration
$6,175,596.46
$392,130.00
$100,000.00
$6,175,596.46
$392,130.00
$100,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total 144,608,919.62 137,342,719.62 $5,344,200.00 $1,161,000.00 $761,000.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 343-Mass Transit
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management $350,000.00 $0.00 $350,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
Land Acquisition $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Planning $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Design $980,996.20 $930,996.20 $50,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
Construction $3,293,059.00 $3,293,059.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment $6,956,281.63 $6,956,281.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Administration $84,691.00 $34,691.00 • $50,000.00 $(1.00 $0.00 $0.00 $0.00 $0.00
Other $0.00 • $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Construction Engineering $50,000.00 $0.00 $50,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
L
Total
51 1,715,027.83 511,215,027.83 5500,000.1)0
$0.00
$0.00 $0.00
$0.00 $0.00
Fund Fund
No. Name
Total
Tunding .
Prior
Years
Current
2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
888917 FDOT Other $3,370,751.63 53,370,751 .63
888930 Transill-lall=Cent Surtax $81,788.00 $81,788.00
888931 Transit l-Inlf-Cent Surtax (FYO7 and Future) $4,053,788.00 $3,553,788.00
888938 Miami -Dade County GrantlContribution $99,418.20 $99,118.20
888957 Downtown Development Agency $25,000.00 $25,000.00
888968 Economic Stimulus Package 2009 - Miami $4,084,282.00 $4,084,282.00
$0.00
$0.00
$500,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00-
$0.00
$0 00
$0.00
$0.00
$000
$0 00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Total
$11,715,027.83 511,215,1)27.83 $500,000.00
$0.00
$0.00 $0.00 $0.00 $0.00
Active & Future
CM Projects Only
FUND: 351-Sanitary Sewers
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management $589.00 $589.00
Land Acquisition $0.00 $0.00
Planning . $0.00 $0.00
Design $12,500,710.00 $12,500,710.00
Construction $3,821,000.00 $3,821,000.00
Equipment $0.00 $0.00
Administration $12,550.00 $12,550.00
Other $0.00 $0.00
Construction Engineering $15,861.00 $15,861.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$o.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total $16,350,710.00 $16,350,710.00 $0.00 $0.00 $0.00 $0.00 S0.00 $0.00
Fund Fund
No. Name
Total
Funding
Prior Current
Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
355001 1988 Sanilaiy Sewer Boncls $3,754,000.00 $3,754,000.00 $0.00
371100 Series 1995 Sanitary Sewer Boncls $12,596,710.00 $12,596,710.00 $0.00
Total $16,350,710.00 216,350,71(1.(10 $0.00 211.00 $0.00 $0.00 $0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$o.00
$0.00
$0.00 moo
$0.00 $0.00
Active & Future
CIP Projects Only
FUND: 352-Storm Sewers
Phase
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
Total Prior Current
Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management $300,597.48 $300,597.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Land Acquisition $64,884.94 $64,884.94 $0:00 $0.00 $0.00 $0.00 $0.00 $0.00
Planning - $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Design $10,306,296.95 $10,306,296.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Construction 846,689,310.74 $36,080,300.74 $780,010.00 $6,060,000.00 $1,300,000.00 82;169,000.00 $0.00 $0.00
Equipment $0.00 $0.00 $0.00 $0.00 • $0.00 $0.00 $0.00 $0.00
Administration $2,513,026.92 $2,513,026.92 $0.00 $0.00. $0.00 $0.00 $0.00 $0.00
Other $572,065.00 $572,065.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Construction Engineering $4,874,459.21 $4,874,459.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
L
Total $65,320,641.24 $54,711,631.24 $780,010.00 $6,060,000.00 $1,300,000.00 $2,469,000.00 $0.00 $0.00
Fund Fund Total , Prior Current
No. Name Funding Years 2012-2(113 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
000001 General Fund Operating Budget 360,000.00 . $60,000.00
000002 Special Revenue Operating Budget $290,400.00 $290,400.00
356001 Local Option Gas Tax $1,947,170.00 $1,947,170.00
356005-1 Sweets Bond Program - Series I $7,222,079.00 $7,222,079.00
356005-2 Streets Bond 1'rogram - Scrics 2 $8,690,444.00 $8,690,444.00
356007 Parking Surcharge 2007 $1,000,001.00 $1,000,001.00
359101 Special Assessment District (SAD) Revenue $352,500.00 $272,490.00
360001 Stormwatcr Utility Trust Fund $7,91 1,368.37 $7,91 1,368.37
360003 Slormwater Utility Trust Fund (FY07 and $9,409,364.17 $8,709,364.17
367001 Impact Fees $712,087.88 $712,087.88
383001 CIP Misc. Revenue $46,357.55 $46,357.55
385200-1 2002 Homeland Defense Bonds (Series 1) $614,000.00 $614,000.00
385200-3 2002 Homeland Defense Bonds (Series 3) $1,587,000.00 $1,587,000.00
399001 1976 & 78 Storm Sewer G 0 Bond $867,481.00 $867,481.00
888909 FL Dept of Environmental Protection (FDEI') $2,450,000.00 $2,450,000.00
888925 FEMA Recovery Assistance $173 200.00 $173,200.00
888926 Prior Year Fund Balance $91,565.00 $91,565.00
888930 'I.ransitHall-Cent Surtax $1,734,823.04 $1,734,823.04
888931 Transit 1-lalf-Cent Surtax (FY07 and Future) $4,385,800.24 $4,385,800.24
888947 MDC Building Better Communities GOB $14,700,000.00 $4,871,000.00
888959 FEMA 2007 & Future Pre -Disaster $599,999.99 $599,999.99
888961 Sunshine Stale Financing Commission $475,000.00 $475,000.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 80.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 80.00 80.00
$0.00 80.00 $0.00 $0.00 80.00 $0.00
$0.00 80.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$80,010.00 $o'oo $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
$700,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00. $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $6,060,000.00 $1,300,000.00 $2,469,000.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 , $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: 352-Storm Sewers
2012-2013 Capital Improvcmcnt Plan
Funding by Cost Component & Sources
Total
$65,320,641.24 $54,711,631.24 S780,(110.00 $6,060,000.00 $1,300,000.00 $2,469,000.00
$0.00 $0.00
Active & Future
CIP Projects Only
FUND: 353-Solid Waste
• Phase
Funding
2012-2013 Capital Improvement Plan
Funding by Cost Component & Sources
Total Prior Current
Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Land Acquisition $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Planning $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Design $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Construction $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment $4,402,827.21 $3,548,727.21 $854,100.00 $0.00 $0.00 $0.00 $0.00 $0.00
Administration $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Construction Engineering $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
L
Total $4,402,827.21 $3,548,727.21 $854,100.00
$0.00
$0.00 $0.00
$0.00 $0.00
Fund Fund
No. Name
Total
Funding
Prior Current
Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
382008 Contribution From General Fund 2007 and $4,402,827.21
$3,548,727.21
$854,100.00 . $0.00
moo moo
$0.00 $0.00
Total $4,402,827.21 $3,548,727.21 $854,100.00
$0.00
$0.00 80.011 $0.00 $0.00
Active & Future
CIP Projects Only
FUND: Totals
Phase
Total
Funding
• 2012-2013 Capital Improvement Plan
Funding by, Cost Component & Sources
Prior
Years
Current
2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
Management $10,746,111,11 $10,023,276.11 $722,835.00
Land Acquisition $3,600,182.37 $3,600,182.37 $0.00
Planning $772,044.46 $772,044.46 $0.00
Design $95,451,319.41 $95,211,245.41 $240,074.00
Construction 357,284,064.51 333,853,104.51 $7,379,960 00
Equipment $68,175,636.31 $64,208,036.31 $3,967,600.00
Administration $10,614,341.51 $10,485,753.51 $128,588.00
• Other $4,391,680.46 $4,391,680.46 $0.00
Construction Engineering $16,733,018.89 $16,595,365.89 $137,653.00
$0.00
$0.00
$0.00
$0.00
$8,921,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$4,661,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,469,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total 567,768,399.03 539,140,689.03 812,576,710.(10
$8,921,000.00 $4,661,000.00 $2,469,000.00
$0.00 $0.00
Fund Fund
No. Name
. Funding
Total Prior Current
Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
000001 General Fund Operating Budget $60,000.00 $60,000.00 $0.00
000002 Special Revenue Operating Budget $702,022.47 $702,022.47 $0.00
000004 CRA Operating Budget. $23,909,580.00 $23,909,580.00 $0.00
000008 CRA - FIND Grant $1,143,000.00 $1,143,000.00 $0.00
324100 Orange Bowl Ticket Surcharge $23,000.00 $23,000.00 $0.00
355001 1988 Sanitary Sewer Bonds $3,754,000.00 $3,754,000.00 $0.00
356001 Local Option Gas Tax $10,930,683.78 $10,930,683.78 $0.00
356002 Local Option Gas Tax 2009 and Future $484,400.00 $158,400.00 $326,000.00
356003 Parking Surcharge $50,000.00 $50,000.00 $0.00
356004-1 Parking Revenue Bonds -Tax Exempt Series $72,565,808.55 $72,565,808.55 $0.00
356004-2 Parking Revenue Bonds - Taxable Series $14,826,926.45 $14,826,926.45 $0.00
356005-1 Streets Bond Program - Series I $36,858,139.67 $36,858,139.67 $0.00
356005-2 Streets Bond Program - Series 2 $56,013,448.82 $56,013,448.82 $0.00
356007 Parking Surcharge2007 $7,011,332.00 $5,582,732.00 $1,4211,600.00
359101 Special Assessment District (SAD) Revenue $352,500.00 $272,490.00 $80,010.00
360001 Stormwatcr Utility Trust Fund $7,91 1,368.37 . $7,91 1,368.37 $0.00 -
360003 Stonnwatcr Utility Trust Fund (FY07 and $9,409,364.17 $8,709,364.17 $700,000.00
363001 1984 1'olicc Bonds $1,771.00 $1,771.00 $0.00
367001 Impact Fees $1,907,490.77 81,907490.77 $0.00
367011 Impact Fees - Ord 12750 $3,092,187.15 $3,092,187.15 $0.00
369100 1991 Fire Bonds ' $50,400.00 $50,400.00 $0.00
371 100 Series 1995 Sanitary Sewer Bonds $12,596,7.10.00 $12,596,710.00 $0.00
373001 Sale Neighborhood Parks 13ond $128,083.77 $128,083.77 $0.00
Woo
$0.00
$0.00
$0.0o
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0,00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
moo
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Active & Future
CIP Projects Only
2012-2013 Capital Improvement flan
Funding by Cost Component & Sources
FUND: Totals
Fund Fund Total Prior Current
No. Name Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018
373002 Safe Neighborhood Parks Bond 2008 & .$132,792.00 $132,792.00 $0.00 $0.00
375001 Fire Assessment Fee $4,562,086.87 $4,562,086.87 $0.00 $0.00
375002 Fire Assessment Fee (FY07) $1,311,646.80 $1,311,646.80 $0.00 $0.00
382001 Contribution From General Pund $20,003,780.83 $20,003,780.83 $0.00 $0.00
382007 Contribution From General Fund 2003 $7,000,000:00 $7,000,000.00 $0.00 $0.00
382008 Contribution From General Fund 2007 and $37,955,223.95 $32,741,723.95 $5,213,500.00 $0.00
383001 Cll' Misc. Revenue $46,357.55 $46,357.55 $0.0(I $0.00
383004 Miami CDT $5,000,000.00 $5,000,000.00 $0.00 -, $0.00
385200-1 2002 :Homeland Defense Bonds (Series I) $5,700,735.22 $5,700,735.22 $0.00 $0.00
385200-2 2002 Homeland Defense Bonds (Series 2) $1 1,506,545.30 $11,506,545.30 $0.00 $0.00
385200-3 2002 Homeland Defense Bonds (Series 3) $32,899,099.12 $32,899,099.12 $0.00 $0.00
385200-8 2002Homeland DcfenscSeries 1 Interest $1,626,848.85 31,626,848.85 $0.00 $0.00
397001 1970 Pollution Control G.O.B. (303000) $361,200.00 $361,200.00 $0.00 $0.00
399001 1976 & 78 Storm Sewer G O Bond $867,481,00 $867,481,00 $0.00 $0.00
888896 Miami -Dade County DORM Virginia Kcy $650,000.00 $650,000.00 $0.00 $0.00
888902 Community Development Block Grant $2,200,000.00 $2,200,000.00 $0.00 $0.00
888909. FL Dept of Environmental Protection (FOCI') $2,450,000.00 $2,450,000.00 $0.00 $0.00
888913 FDOT Transportation Enhancement Program $9,419,618.00 $9,419,618.00 $0.00 $0.00
888917 FDOT Other $3,574,289.63 $3,574,289.63 $0.00 $0.00
888920 FIND Waterways Assistance Program FY07 $1,475,250.00 $1,475,250.00 $0.00 $0.00
888923 Conlribulion From Special Revenue $1,559,021.80 $1,559,021.86 $0.00 $0.00
888924 DRI Fees Transportation $5,213,935.60 $5,213,935.60 $0.00 $0.00
888925 FEMA Recovery Assistancc $173,200.00 $173,200.00 $0.00 ' $0.00
888926 Prior Year Fund 13alnnce $91,565.00 . $91,565.00 $0.00 $0.00
888927 Federal Aviation Admin. Grant $150,000.00 $150,000.00 $0.00 $0.00
888930 Transit Half -Cent Surtax. $3,720,921.73 $3,720,921.73 $0.00 $0.00
888931 Transit I-lalf-Cent Surtax (PY07 and Future) $30,293,731.91 $26,204,131.91 $4,089,600.00 $0.00
888937 Urban Areas Security Initiative Grant $69,842.00 . $69,842.00 $0.00 $0 00.
888938 Miami -Dade County Grant/Contribution $562,657.20 $562,657.20 $0.00 $0.00
888939 FEMA Federal Assistancc to Firefighters $931,354.00 $931,354.00 $0.00 $0.00
888947 MDC Building Better Communities GOB $36,672,000.00 $20,621,000.00 $0.00 $8,921,000.00
888950 Donation Commissioner District 4 $21,416.00 $21,416.00 $0.00 $0.00
888951 Other Public & Private Contributions $619,813.00 $619,813.00 $0.00 $0.00
888953 Miami -Dade Metropolitan Planning Org $144,000.00 $144,000.00 $0.00 $0.00
888955 MSEA Contribution to Capital $3,579,364.00 .$3,579,364.00 $0.00 $0.00
888956 Contribution from Special Revenue - SRF $3,697,176.31 $2,958,176.31 $739,000.00 $0.00
888957 Downtown Development Agency -- $25,000.00 $25,000.00 $0.00 $0.00
888959 FEMA 2007 & Future Pre -Disaster $599,999.99 $599,99999 $0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0,00
$0.00
$0.00
$0.00
$4,661,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
-$2,469,000.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
Active & Future
C1P Projects Only
FUND: Totals
2012-2(113 Capital Improvement Plan
Funding by Cost Component & Sources
Fund Fund Total Prior Current
No. Name Funding Years 2012-2013 2013-2014 2014-2015 2015-2016 2016-2(117 2017-2018
888960 Sunshine State Financing Commission $2,679,132.09 $2,679,132.09 $0.00
888961 Sunshine State Financing Commission $28,032,978.22 $28,032,978.22 $0.00
888962 The Children's Trust $260,000.00 $260 000.00 $0.00
888963 Proceeds from Conveyance of Easement $1,502,044.46 $1,502,044.46 $0.00
888964 County CDT $5,000,000.00 $5,000,000.00 $0.00
888965 Bayfront Park Management Trust $609,000.00 $609,000.00 $0.00
888966 Sunshine Stale Financing Commission $13,496,648.12 $13,496,648.12 $0.00
888967 Economic Stimulus Package 2009 - FDOT $6,175,596.46 $6,175,596.46 $0.00
888968 Economic Stimulus Package 2009 - Miami $4,084,282.00 $4,084,282.00 $0.00
888969 Subrogation Auto Claim Revenues $603,864.00 $603,864.00 $0.00
888972 Rickenbacker Marina Rental Revenue $137,601.00 $137,601.00 $0.00
888973 TVM Production Basic Usc Fee $630,000.00 $630,000.00 $0.00
888974 Economic Stimulus 2009 - FD Of Health $392,130.00 $392,130.00 $0.00
888976 Miami -Dade County Dept Cultural Allairs $354,614.00 $354,614.00 $0.00
888977 DIU Pecs Air Quality $313,129.12 $313,129.12 $0.00
888978 DR! Fees Administration $700,000.00 $700,000.00 $0.00
888979 Marlins Garage Structural Settlement $2,147,208.87 $2,147,208.87 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Moo
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0,00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Total 567,768,399.03 539,140,689,03 812,576,71(1.01) 88,921,01)0.01) $4,661,000.00 $2,469,000.00 81).00 $0.00
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Active & Future
CJP Projects Only
B-No.
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Clicni Project Dist.
Total Cost
Estinmlc (S)
Total
Funds (S) Status
Phase
Fund
Status
Total Fund
minus
Total Cost
Estimate (S)
301-CRA projects
B-30394 Community Redevelopment
Agency
I3-30538B Community Redevelopment
Agency
B-30579 Community Redevelopment
Agency
B-30731 Community Redevelopment
Agency
B-40169
Community Rcdcvclopmcnt
Agency
North 14 St. Multi Media Entertainment 2
District Strcetscapc CRA 92-686001
Museum Park Environmental 1,2,3,4,5
Remediation/Seawall - CRA 92-686001
Old Fire Station No. 2 Restoration - CRA 2
92-686001
Miami Women's Club Baywalk Project - CRA 2
92-686001
300 NW 11 Street Community Center - CRA 5
92-689001
6,000,000
2,000,000
3,500,000
93,000
1,987,714
6,000,000 Active 5-Construction - Funded
2,000,000 Active 4-Bid
3,500,000 Active 3-Design
93,000 Active 3-Design
1,500,000 Active 3-Design
Funded
Funded
Funded
Partially Funded
311-General Government
B-30365E Community Development
B-30365J
B-30551
13-30666
I3-30865A
13-30865B
Building Department
Public Works
General Services
Administration
Grants Administration
General Services
Administration
B-30865C General Scrviccs
Administration
B-30994
B-35002
13-39910
13-40171
13-40172
B-70107
Public Facilities
Capital 'Improvement Program
Admin
Capital improvement Program
Admin
City Manager
City Manager
General Services
301-CRA projects
Coral Way NET Office Remodeling D3 - CD 3
91-02994
Beckham Hall Fire Damage Repair 1
Public Works Maintenance Yard 1,2,3,4,5
Damaged Vehicle Replacement / Repairs 1,2,3,4,5
Environmental Remediation Study 1,2,3,4,5
City Hall "Terrace 1,2,3,4,5
City Hall Windows and Doors
1,2,3,4,5
City ()Miami Impact Fee Study -Citywide 1,2,3,4,5
Virginia Key Landfill Assessment 2
Quality of Life District 2 - Various Projects 2
Coconut Grove Viewing 1'latfm m Spoil Island 2
C - D2
Coconut Grove Viewing Platform Spoil Island 2
E-1)2
Purchase and Installation ofa RISO Digital 1,2,3,4,5
13,580,714
1,015,000
6,770
3,268,254
603,864
45,900
350,000
360,000
65,490
1,400,000
206,131
15,088
15,080
25,000
13,093,000
1,015,000 Aclivc
6,770
3,268,254
603,864
Future
Active
Active
45,900 Active
350,000 Active
360,000 Active
65,490 Aclivc
1,400,000 Active
206,131 Future
15,088 Future
15,080 Future
25,000 Active
4-Bid
8-Future
3-Design
5-Construction
1-Study
3-Design
3-Design
1-Study
5-Construction
8-Future
8-Future
8-Future
5-Construction
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Funded
Fu ndcd
0
0
0
-487,714
-487,714
0
0
0
0
0
0
0
0
Active & Future
CIP Projects Only
11-No. Client
31I-General Government
Administration
B-70108
B-70415
B-74205 B
8-74220
B-74609
B-303651-1
B-30865
B-74200
13-74606
B-74614
B-74617
13-30365C
B-74219
General Services
Administration
General Services
Administration
Gcncral Services
Administration
General Services
Administration
Information Technology
General Services
Administration
Strategic Planning, Budgeting
General Services
Administration
Information Technology
Information Technology
Information Technology
Community Development
General Services
Administration
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Project
Duplicator
Purchase go video transmission server
MRC Security System Hardening - UASI
Funded 18-18001 I / 101h Plotx 18-180022
GSA Fleet Maintenance Garage Expansion
1'ol ice Vehicle Replacement
ERl' Integration System
Generator for City Hall
FY2013 Citywide Capital Needs -Budget
Dept.
Citywide General Fleet Replacement
Upgrade PC Sollware & Hardware
Lancl Management System
IT Modernization
City Property Building Maintenance
Property Mainlenancc Building Improvements
Dist.
"Total Cos(
Estimate (5)
1,2,3,4,5 100,000
2 69,842
194,055
1,2,3,4,5 27,491,737
1,2,3,4,5 25,474,457
1,2,3,4,5 186,819
1,2,3,4,5 1,245,900
1,2,3,4,5 3,969,887
1,2,3,4,5 7,174,921
1,2,3,4,5 7,913,018
1,2,3,4,5 4,100,000
1,2,3,4,5 700,000
1,2,3,4,5 300,000
Totes Fund
Funds($) Status Phase Slntns
100,000 Active . 5-Construction Funded
69,842 Active 3-Design Funded
194,055 Active 5-Construction . Funded
27,491,737 Active 5-Construction Funded
Total Fund
minus
Total Cost
Estimate (5)
0
0
0
0
25,474,457 Active 5-Construction Funded 0
25,000 Active 5-Const. (JOC) l'artially Funded-161,R19
340,000 Future 8-Future Partially Pundcd -905,900
3,610,268 Active 5-Construction 1artially Funded -359,618
2,920,682 Active 5-Construction Partially Funded
6,316,151 Aclivc 3-Design Partially Funded
2,800,000 Active 5-Construction Partially Funded
0 Finnic 8-Future UnFunded
0 Future 8-Future UnFunded
-4,254,238
-1,596,866
-1,300,000
-700,000
-300,000
3I2-Public Safety
13-30373A Police
B-30988 Police
13-30997 Police
B-60453A Fire Rescue
B-60454 Fire Rescue
I3-70102A Fire Rescue
311-Gcncral Government
Police Department Properly Unit Outdoor
Storage
North District Police Building Misc. Repairs -
D5
Police Swat Vehicles
Fire Station // 13
Fire Station 1/14 (Ncw)
Fire Station No. 6 Office Building- Structural
Analysis
86,297,217 76,718,774
1,2,3,4,5 989,644
5 26,026
1,2,3,4,5 - 322,845
2 5,084,496
4 5,076,843
5 74,619
989,644 Active 5-Const. (JOC) . Funded
26,026 Future
322,845 Future
5,084,496 Active
5,076,843 Active
74,619 Active
8-Future
8-Future
5-Constriction
2-Pre-Design
7-On-Hold
Funded
Funded
Funded
Funded
Funded
-9,578,442
0
0
0
0
0
0
Active & Future
CIP Projects Only
13-No. Client
Project
City Of Miami -.Capital Improvement Program
Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
Dist. Estimate (8) Funds (8) Slalns Phase Status Estimate (T)
312-Public Safety
13-70104 Fire Rescue Firc Station No. 10 Rcslroont Remodeling 1 179,403 179,403 Active 3-Design Funded 0
I3-70105 Fire Rescue Refurbishing of Existing Apparatus 1,2,3,4,5 230,000 230,000 Future 8-Future Funded 0
0-70106 Fire Rescue Firefighting Equipment and Gear 1,2,3,4,5 158,123 158,123 Fulurc 8-Fulurc Funded 0
13-70210 Fire Rescue Fire Station #5 Exterior Walls Repair - D1 1 150,000 150,000 Future 8-Future Funded 0
D-7041 1 Fire Rcscuc Fire Rescue Personal Protective Equipmcnl 1,2,3,4,5 820,580 820,580 Active 3-Design Funded 0
13-70418 Fire Rcscuc FEMA Assistance to Firelighters Program 1,2,3,4,5 343,610 343,610 Future 8-Fulurc Funded 0
FY201 1
B-70421 Police Air Conditioners South District Sub Station - 1,2,3,4,5 55,000 55,000 Active 5-Construction Funded 0
Miami Police Department
i3-72801 Fire Rescue Computer Aided Dispatch (CAD) 1,2,3,4,5 120,865 120,865 Active 3-Design Funded 0
C1-72802 Fire Rescue Fire Stations & Other Fire Facilities 1,2,3,4,5 3,872,960 3,872,960 Active 5-Construction Funded 0
B-72809A Fire Rescue Firefighting Equipment- SAFER 1,2,3,4,5 911,500 911,500 Active 5-Construction Funded 0
E-72813 Fire Rcscuc Defcnsc and Security Equipment Acquisition 1,2,3,4,5 3,767,249 3,767,2,19 Active 5-Construction Funded 0
13-72915 Police Police Headquarters l-lelipad and Roof 1,2,3,4,5 240,321 240,321 Active 4-13id (.IOC) Funded 0
Replacement
13-30554 Police l'olice Radios Replacement 1,2,3,4,5 6,150,000 843,082 Active 3-Design Partially Funded -5,306,917
13-60351 Firc Rescue Fire Station 1J 10 (New) 1 6,275,200 898,123 Future. 8-Future Partially Funded -5,377,076
13-72803 Fire Rescue Fire Station Equipment and Furniture 1,2,3,4,5 713,417 540,837 Active 5-Construction Partially Funded -172,579
Replacement
13-72804 Fire Rescue Phone and Radio Equipment Upgrades 1,2,3,4,5 1,209,200 351,200 Active 5-Construction 1'aitially Funded -858,000
13-72808 Fire Rescue Light Fleet Replacement 1,2,3,4,5 1,649,658 667,658 Active 5-Construction Partially Funded -982,000
13-72809 Fire Rescue Large Firefighting Equipment 1,2,3,4,5 660,316 326,816 Active 5-Construction Partially Funded -333,500
13-72915A Police 1'olice Headquarters 1-lelipad and Roof 1,2,3,4,5 1,600,000 400,000 Active 2-Pre-Design Partially Funded -1,200,000
Replacement
13-30709 Fire Rescue Fire Station Hardening / Facility Apparatus 1,2,3,4,5 622,481 (1 Future 8-Future UnFundedi '-622,481
Room Doors
13-72811 Fire Rescue Replace Existing Fire Engines 1,2,3,4,5 3,035,000 0 Future 8-Future. Unfunded -3,035,000
312-Public Safely
44,339,36(1 26,451,8(15
-17,887,554
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding '1'nlnl Fund
minus
Total Cost 'Total Fond Total Cost
Dist. Estimate ($) Funtls ($) Status Phase Status Estimate ($)
325-Public Facililics
B-30325 Public Facilities Miamarina Emergency Pier Repairs 2 1,461,788 1,46 1,788 Active 5-Consl. (JOC) Funded 0
13-30501A Public Facilities Manuel Arline Misccllancous Project 3 238,548 238,5,18 Aclivc 5-Construction Funded 0
B-30501B Public Facilities Manuel Artime Dimmer Rack System 1,2,3,4,5 48,(i50 48,650 Future 8-Future Funded 0
B-30546A Capital Improvement Program Gusman Hall Improvements - FY2012 1,2,3,4,5 105,000 105,000 Future 8-Future Funded 0
Admin
B-30604 Public Facilities Miamarina Intracoastal Bulkhead Assessment 2 61,050 61,050 Aclivc 1-Study Funded 0
B-30648 Capital Improvement Program Orange Bowl Site Parking Garage (Marlin 1,2,3,4,5 96,042,247 96,042,247 Aclivc 5-Construction Funded 0
Admin Stadium Parking Garage)
B-30696 Public Facilities Miamarina l'ier A, 13 & C Fire Line Rcpairs 2 250,000 250,000 Aclivc 5-Const. (JOC) Funded 0
B-60464 Public Facilities New Dinner Key Marina Dockmnster Building 2 4,217,808 4,217,808 Active 4-Bid Funded 0
B-70414 Public Facilities James L. Knight Center / Hyatt- Alarm 2 351,876 351,876 Aclivc 1-Study Funded 0
System Replacement
13-301 R2A Public Facililics Coconut Grove Waterfront Master flan 2 47,179,389 1,721,675 Aclivc 3-Design Partially Funded -45,457,714
Implementation - Phase'
B-30531 Capital Improvement Program Dorsey Memorial Library Restoration 2 454,511 250,000 Active 7-On-Hold Partially Funded -204,511
Admin
B-30602 Public Facililics Seminole Dinghy Dock Expansion 2 (i0,000 30,000 Future 8-Future Partially Funded-30,000
B-30688 Public Facilities Marine Stadium Restoration 2 511,716 350,000 Aclivc 7-011-11old 1artially Funded -161,716
B-30689 Public Facilities Marinc Stadium Bulkhead Replacement 2 2,094,393 1,106,603 Active 3-Design Partially Funded -987,789
B-30706 Public Facililics Miscellaneous Repairs 10% Set Aside 2 2,202,189 2,102,189 Active 5-Construction 1artially Funded-100,000
B-33506 Public Facilities James L. Knight Center Miscellaneous 1,2,3,4,5 1,700,000 86,438 Active 5-Consl. (1OC) Partially Funded -1,613,562
Improvements
B-33514 Public Facilities Marine Stadium Marina Improvements 2 1,315,550 385,645 Aclivc 3-Design Partially Funded -929,905
13-40180 Public Facilities Marine Stadium Marina at Virginia Kcy 2 33,180,900 1,7,10,007 Active _ 2-Pre-Design Partially Funded -31,440,893
13-70100 Public Facilities Gusman 1-lall lmprovcments / Rcpairs 2 10,000,000 423,405 Future 8-Future Partially Funded-9,576,594
B-75001 Public Facililics Wilson Island Infrastructure 2 647,190 I50,000 Future 8-Future Partially Funded 497,190
B-30735 Public Facilities Dinner Kcy Marina Dinghy Dock - 1)2 2 178,070 0 Future 8-Future Unfunded-178,070
B-35000 Public Facilities Watson Island Public 1'ark Improvements 2 2,600,000 0 Future 8-Future Unhunded -2,600,000
B-35003 Public Facilities Aliapaltah Community Elderly Center 1 287,000 0 Future 8-Future Unfunded -287,000
13-39903 Capital Improvement Program Waterfront Improvements Citywide 1,2,3,4,5 0 0 Future 8-Futurc Unfunded 0
Admin
325-Public Facililics
205,187,879 111,122,933
-94,064,945
Active & future
CI.P Projects Ouly
11-No. Client Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
Total
Funds ($) Slnlus Phase
Fund
Slams
Total Fund
minas
Total Cost
Eslimatc (,$)
331-Parks and Rccrcation
B-30I34A l'arks and Recreation
13-30170 Planning Department
B-30174 Virginia Kcy Park Trust
B-30305B 1'arks and Recreation
B-30508
B-30538D
B-30538E
Virginia Kcy 1'ark Trust
Capital Improvement Program
Minn)
Capital Improvement Program
Minn)
B-30538F Capital Improvement Program
Admin
Parks and Rccrcation
Parks and Recreation
Parks and Recreation
B-30541B
B-30541C
B-30541 D
B-30547G
B-30566A
13-3071 1
B-30772
B-30783
l'arks and Recreation
1'arks and Rccrcation
I'arks and Recreation
1'arks and Recreation
1'arks and Rccrcation
B-30800 1'arks and Rccrcation
13-30801
Parks and Recreation
l3ryan lark Community Building -D4. 4
Art Museum -Contribution to.Park Master flan 2
Virginia Kcy Beach Park Historic Restoration 2
Phase 2
Gibson I'ark New Construction (Partially 5
Funded by CRA 92-689001)
Virginia Kcy Beach Park Museum 2
Museum Park - DRl Fees Administration
Museum Park - DR1 Air Quality
Museum Park - DRI Transportation
Kennedy Park Floating Dock PI-11
l(cnnecly Park Shoreline Stabilization Phase]
Citywide Park Equipments & Site
1roprovcments FY 12
1'arks ADA Modifications - District 4
Mclrcesc Golr'fraining Center
Triangle I'ark Swings - D3
Bay of Pigs 1'ark Lighting - D4
Antonio Macco Park Multi -Purpose
Recreational Facility
Fern Isle / P13A Park Improvements Project-
D1
1,2,3,4,5
1,2,3,4,5
1,2,3,4,5
2
2
1,2,3,4,5
4
1
3
4
1
Manatee Bend 1'ark Shorclinc Improvements - 2
D2
B-30802 l'allol Park Shoreline Improvements - D2 2
B-30820 Legion Park Boat Ramp Repairs - D2 2
13-30824 Capital Improvement Program Spoil Island 13 & C Swim Area Improvement - 2
13-30826
13-30882
Parks and Rccrcation
Parks and Rccrcation
Admin
('arks and Rccrcation
Parks and Recreation
1)2
Lincoln Park Improvements - D2
Ali lean Square Park - Splash Park - D5
2
5
852,128
700,000
1,356,237
12,739,521
20,527,127
600,000
313,129
2,296,403
270,000
261,000
547,100
491,147
2,385,560
8,500
53,000
1,500,000
11(,,781
50,026
50,000
14,123
67,000
40,000
600,000
852,128 Aclivc
700,000 Active
1,356,237 Aclivc
12,739,521 Active
20,527,127 Active
600,000 Active
313,129 Active
2,296,403 Active
270,000
261,000
5,17,100
Aclivc
Active
Active
491,147 Active
2,385,560 Active
8,500 Active
53,000 Active
1,500,000 Future
I16,781 Future
50,026 Aclivc
50,000 Active
14,123 Active
67,000 Active
40,000 Active
600,000 Active
3-Design funded
3-Design Funded
5-Construction Funded
5-Construction Funded
7-On-Hold funded
4-Bid Funded
4-Bid Funded
4-Bid Funded
4-Bid Funded
4-Bid Funded
3-Design Funded
4-Bid (.IOC) Funded
5-Construction Funded
7-On-Hold Pundcd
3-Design Funded
8-Future Funded
8-17uture Pundcd
3-Design Funded
3-Design Pundcd
5-Construction Funded
2-Pre-Design Funded
3-Design - Funded
3-Design Funded
0
0
1)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Active & Future
GIP Projects Only
11-No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cnsl
Est hurtle (S)
Total
Funds (A) Status Phase
Fund
Stains
Total Fund
minus
Total Cost
Estimate (P)
331-Parks and Recreation
B-30886
1'arks and Recreation
13-30889 Parks and Recreation
13-30890 Public Facilities
T3-30893 1'arks and Recreation
B-30995 1'arks and Recreation
B-35812A 1'arks and Recreation
T3-35838
B-35853B
B-35858
B-35868A
13-35887
B-39910E
B-39910N
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
1'arks and Recreation
l'arks and Recreation
Parks and Recreation
B-40173 Bayfront l'ark Management
Trust
13-40177 Bayfront 1'ark Management
Trust
Parks and Recreation
Parks and Recreation
1'arks and Recreation
1'arks and Recreation
B-50722
B-75823
B-75883
T3-75973
13-78502A
Lunmios Landing Square - D5
Lumnuls Park Miscellaneous Repairs -1)5
(FY2013-PR) •
Little Haiti Cultural Campus Miscellaneous
Repairs - D5
Ovcrlown Youth Center Miscellaneous Repairs
-D5
Virginia Kcy Bike Trail Building-1)2
Duarte Park Building Renovation, Splash Park
and Sign
Kennedy Park Restroom Building
Improvements
Virrick Park Gymnasium 'Improvements D2
Kinloch Park - Senior Community Center
• Robert King High 1'ark Furniture -D4
Moore 1'ark Ncw Construction
District 2 Quality of Life Park improvements
Morningside A/C, Windows and Interior
remodeling - D2
Bayliont Park Electrical Repairs
Capital Improvement Program
Admin
13-30374 Parks and Recreation
t3-30538 1'arks and Recreation
Bayfront Park Pier Repairs - D2
Little River Waterfront 1'ark
Biscayne 1'ark Site Improvements
Peacock Park Site Improvements
Oakland Grove Park Playground Equipment
Museum of Science - Development in
Bicentennial Park -Phase 2
Virginia Kcy Rowing Center hnprovemcnls -
l'&R Project
Museum Park-1artially Funded by CRA
92-686001
5 925,061 925,061 Aclivc
5 40,264 40,264 Future
5 25,254 25,254 Active
5 35,624 35,624 Future
2 377,000 377,000 Active
1 1,312,797 1,312,797 Active
2 222,033 222,033 Active
2 150,000 150,000 Active
1 1,300,000 1,300,000 Active
4 45,000 45,000 Active
5 7,605,462 7,605,462 Active
2 987,988 987,988 Active
2 170,000 170,000 Active
2 ` 309,000 309,000 Active
2 300,000 300,000 Active
2 717,500 717,5(10 Active
2 150,000 150,000 Future
2 830,124 830,124 Aclivc
5 15,000 15,000 Future
1,2,3,4,5 2,000,000 2,000,000 Aclivc
2 883,622 616,513 Active
1,2,3,4,5 17,251,899 1,1,042,367 Active
3-Design
8-Future
3-Design
8-Future
2-Pre-Design
5-Const. (.IOC)
3-Design
5-Const. (.IOC)
7-On-l-lold
5-Construction
3-Design
5-Construction
5-Const. (JOC)
5-Consl. (JOC)
3-Design
3-Design
8-Future
3-Design
8-Future
5-Construction
2-Pre-Design
4-13id
Funded 0
Fundcd 0
Funded 0
Funded 0
Funded 0
Funded 0
Funded 0
Funded 0
Funded 0
Funded 0
Funded 0
Funded 0
Funded - 0
Funded 0
Funded 0
Funded 0
Funded 0
Funded 0
Funded , 0
Funded 0
Partially Funded -267,109
Partially Funded-3,2(19,532
Active & Future
CIP Projects Only
It -No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate (5)
Total
Funds ($) Status Phase
Fund
Status
lbini Fund
minus
Total Cost
Estimate (5)
331-Parks and Recreation
13-30541 Parks and Recreation
13-30547E
13-30671
B-30690
B-30721
1.1-30825
Parks and Recreation
Parks and Recreation
1'arks and Recreation
1'arks and Recreation
Parks and Recreation
B-30825A 1'arks ancl Recreation
13-30825B Parks and Recreation
B-35806 Parks and Recreation
13-35853A
13-35883A
B-35904
B-30587
B-35844
13-35872
Parks and Recreation
('arks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Parks and Recreation
Citywide Park Equipment & Silc
Improvements
('arks ADA Modifications - District 2 2
Caribbean Marketplace Renovation 5
West End 1'ark New Community T3uilding 4
Spoil Island E Restoration and Floating Dock 2
Biscayne Bay Spoil Island 13 Public Shelter - 2
D2
Biscayne Bay Spoil Island E Picnic Tables, 2
Benches & Umbrellas - D2
Biscayne. Bay Spoil Island E Public Trail - D2 2
Curtis Park New 1'ool Facility and Boat Ramp 1
Improvement
Virrick Park New Pool Facility
Hadley Park Ncw Youth Center D5
Neighborhood Parks Improv. Contingencies -
ADA Modifications
Virginia Key Beach Swimming Area 2
Lummus Park Historic Building Restoration 5
African Square Park Rec. Bldg. Improvements 5
2
5
1,2,3,4,5
1,2,3,4,5 5,293,595 4,896,494 Aclivc 5-Construction Partially Funded -397,100
1,278,018 215,348 Active 5-Const. (IOC) 1artially Funded
1,173,085 1,030,024 Active 5-Construction Partially Funded
2,252,675 1,935,470 Active 3-Design Partially Funded
416,400 90,000 Aclivc 3-Design Partially Funded
17,500 10,000 Future 8-Future Partially Funded
-1,062,670
-143,060
-317,205
-326,400
-7,500
8,250 750 Future 8-Future Partially Funded -7,500
8,250 750 Future 8-Future Partially Funded -7,500
2,468,436 2,127,159 Aclivc I -Study Partially Funded -341,277
3,457,462 2,088,897 Active 7-On-l-told Partially Funded -1,368,564
7,838,562 5,876,805 Active 3-Design Partially Funded -1,961,757
1,272,223 771,223 Future 8-Future Partially Funded -501,000
346,250 0 Future 8-Future UnFunded -346,250
225,770 0 Future 8-Future UnFunded -225,770
432,000 0 Future 8-Future UnFunded -432,000
341-Streets & Sidewalks
B-3003513 Capital Improvement l'rogram
Aclmin
11-30130 Capital Improvement
Aclmin
331-Turks and Recreation
Shorecresl Roadway Milling & Resurfacing
Project
Program Miami River Grecnway SW 1 st Court to South
Miami Avenue - D2
13-30143A Capital Improvement Program
Aclmin
B-30167D Capital Improvement Program
Admit)
13-30168A
Capital Improvement Program
Aclmin
Neighborhood Gateways - District 3
Shenandoah Roadway Improvements
Silver Blull frallic Calming Priority 3 -1)4
13-30178 Capital Improvement Program Design District/FEC
2
2
3
4
4
5
1117,980,896
1,138,096
1,557,530
24,680
1,550,000
620,841
100,000
97,058,697
1,138,096 Active
1,557,530 Active
5-Construction Funded
5-Construction Funded
24,680 Future 8-Future Funded
1,550,000 Active 5-Const. (1OC) Funded
620,841 Active 3-Design Funded
100,000 Future 8-Future Funded
-10,922,198
0
0
0
0
0
0
Active & Future
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Total•Cosl
Estimate (1 )
Total
Funds(S) Status Phase
Fund
Status
Total Fund
minus
Total Cost
Estimate (S)
341-Streets & Sidewalks
Admin
Capital Improvement Program Miami River Greenway (5lh Street bridge
Admin cxten.)
Traffic Study Reviews - Oracle Project
35-110007
13-30336
B-30346 Transportation & Transit
13-30377A
B-3037713 Capital Improvement Program
Admin
I3-30377C Public Works
13-30377D Capital improvement Program
Admin
13-3037713
13-30500
B-30504
B-30536-
B-30540
13-30542A
13-30606 Capital
Admin
B-30606D Capital
Admin
B-30606L Capita
13-30606N Capita
B-30606S Capita
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Adm in
Capital improvement Program
Admin
Capital improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
improvement Program
Improvement Program
1 improvement Program
'Improvement Program
Admin
!improvement Program
Capital Improvement Program District 1 -Sidewalk Repairs and ADA
Admin
District 2 - Sidewalk Repairs & ADA
District 3 - Sidewalk Repairs and ADA
District 4 - Sidewalk Repairs & ADA
District 5 - Sidewalk Repairs & ADA
Civic Center NW 14th Street
Linear ('arks, Greenways and Baywalk
improvements
Pedro 1'an Monument (partially funded with
D4 contribution)
Little River industrial Park
US1 Roadway Improvements and Wall
Replacement Phase 11
DWNTWN Beautification Project Phase 1
DWNTWN Beautification- Design Phase
DWNTWN Beautification (Lighting)
DWNTWN Beautification - North
DWNTWN l3cautilication- South
3
1,2,3,4,5
2
3
4
5
1,2,3,4,5
1,2,3,4,5
3
5
2
1,2,3,4,5
1,2,3,4,5
1,2,3,4,5
1,2,3,4,5
1,2.3,4,5
2,256,640
411,622
250,692
250,691
250,691
250,691
250,691
2,500,000
961,000
49,022
2,000,000
2,671,422
3,150,565
498,780
4,475,915
7,817,431
5,090,853
250,691 Active 5-Construction
2,500,000 Active 3-Design
961,000 Future 8-Future
49,022 Active 5-Construction
2,000,000 Active 5-Coast. (JOC)
2,671,422 Aclivc 5-ConsL (JOC)
3,150,565 Active 5-ConsL. (JOC)
498,780 Active 3-Design
4,475,915 Active 5-Coast. (JOC)
7,817,431 Aclivc 5-Coast. (JOC)
5,090,853 Aclivc 5-ConsL (.IOC)
2,256,640 Active
411,622 Active
250,692 Active
4-Bid Funded
I -Study Funded
5-Construction Funded
250,691 Active 5-Construction Funded
250,691 Aclivc 7-On-1-lold Funded
250,691 Aclivc 5-Construction Funded
Funded
Funded
Funded
Funded
Funded
Pundcd
Funded
Funded
Funded
Funded
Funded
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Admin
Active & Future
CIP Projects Only
11-No. Client
Project
City Of IVlianli - Capital Improvcmcnt Program
Cost Estimates versus Available :unding
Dist.
Total Cost
Estimate CO
Total
Funds (8) Stains Phase
Fund
Status
Total Fund
minas
Total Cost
Estimate (S)
341-Streets & Sidewalks
13-30610
13-3061 1
13-30613
13-30614
13-30615
13-30624
13-30628
13-30630
13-30631
13-30643
Capital Improvement 1'rogram
Admit)
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Acln)in -
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Aclmin
Parks and Recreation
13-3064513 Transportation & Transit
B-30645C Transportation & Transit
13-30645D Capital improvement Program
Admin
13-30645E Transportation & Transit
13-30645F Transportation & Transit
13-30651 Capital Improvement Program
Admin
13-30662D Capital Improvement Program
Aclnlin
13-30677 Capital Improvement Program
Admin
NW 7th Court
District I - Miscellaneous Roadway
Improvements
District 3 -Misccllancous Roadway
Improvements
District 4 - Miscellaneous Roadway
improvements
District 5 - Miscellaneous Roadway
Improvements
Overlown Grccnway n, NW 11 'Terrace -
1'artially Funded by CRA 92-689001
Bird Avenue Road Improvement
Pala Grove Road Improvements
5
1
3
4
5
5
2
2
Miami River Greenway from Miami Circle 2
Grccnway to South Miami Avenue
Lummus Park Landing Project - Street Project
Transportation Program Support Services -
Transpo 1alion Professional Services
Health District Bicycle and Pedestrian Mobility
Study
I3aywalk Mobility flan 2
Overtown / Wynwood Bicycle Pedestrian 5
Mobility flan
Miami Regional Inlennodal Plan
Miami River Grccnway from NW 101h to NW
121h Ave.
US-1 Median Closures at 13ridgeport and SW
30 Cl - D2
D3 - Sidewalk ADA Retrofits
360,000 360,000 Active
111,418 111,418 Future
1,859,688 1,859,688 Future
36,381 36,381 Future
1,3,19,194 1,349,194 Future
2,661,864 2,661,864 Aclivc
1,960,508 1,960,508 Active
3,851,3,10 3,851,340 Aclivc
1,221,625 1,221,625 Aclivc
2-Pre-Design
8-Future
8-Future
8-Fulurc
8-Future
3-Design
3-Design
3-Design
3-Design
5 1,368,535 1,368,535 Active 3-Design
1,2,3,4,5 1,026,000 1,026,000 Active 3-Design
1,2,3,4,5 60,000 60;000 Aclivc 1-Study
60,000 60,000 Active
60,000 60,000 Future
1,2,3,4,5 15,000
3 3,160,379
2 330,000
3
15,000 Future
3,160,379 Aclivc
330,000 Aclivc
1-Study
8-Future
8-Future
4-Bid
3-Design
Funded
Funded
Funded
Funded
Funded
Funded
l unded
Funded
Funded
Funded
Funded
Funded
handed
Funded
Funded
Funded
Funded
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
700,000 700,000 Aclivc 7-On-Hold Funded 0
Active & Future
CIP Projects Only
B-No.
Client
Prided
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate (S)
Total
livads(5) Status Phase.
Fund
Shins
Total Fund
minus
Total Cost
Estimate ($)
341-Streets & Sidewalks
Capital Improvement Program
Admin
B-30687
13-30693
B-30694
B-30694A
B-30695
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Transportation & Tiansit
Capital Improvement Program
Coconut Grove Business Improvement District
- Street Improvements
Neighborhood Traffic Calming
Improvements-D4-Study
ARRA Citywide Bicycle Rack & Signagc
Program
Citywide Bicycle Rack & Signagc Program
SW 19th Terrace Improvements (SW 23
Admin Avenue to SW 24th Avenue) Partial CD13G
91-02889 - D4
B-30699 Capital Improvement Program
Aclmin
B-30705 Capital Improvement Program
Admin
B-30712 Capital Improvement Program
Admin
B-30716 Capital Improvement Program
Admin
B-30718 Capital Improvement Program
Admin
B-30719 Capital Improvement Program
Admin
B-30722 Capital improvement 1'rogram
Admit)
B3-30725 Capital Improvement Program
Admin
B-30726 Capital Improvement Program
Admit)
13-30727. Capital Improvement Program
Aclmin
B-30728 Capital Improvement Program
Admin
r3-30729
Capital Improvement Program
Admin
Beacom Project Area 'Improvements
2 3,099,637
4 35,892
I ,2,3,4,5 392,130
1,2,3,4,5
4
3
NW 241h Street Between NW 14th Avenue 1
and NW 17thAvenue -DI
NW 21 Avenue between NW 1st Street and
NW 3rd Street - D3
Tigerlail Resurfacing - D2
1-95 South Miami Terminal Street
Improvements - D2
SW 16th Avenue from Coral Way to 20 Street
-173
3
2
2
3
NW 31 st Street Roadway Improvement Project 1
-DI
NW l Ith Street Roadway Improvement Project
-DI
NW 601h Avenue Roadway Improvement
Project - DI -
1
NW 18th Avenue Roadway Improvement 1
Project -171
NW 17111 Court Roadway Improvement Protect 1
-DI
NW 17th Terrace Roadway Improvement
Project - DI
115,000
537,191
3,099,637 Active
35,892 Active
392,130 Active
115,000 Active
537,191 Active
4-I3id (JOC) Funded
1-Study Funded
5-Consl. (JOC) Funded
3-Design Funded
5-Construction Funded
721,100 721,100 Active 3-Design Funded
360,000 360,000 Active 5-Consl. (.IOC) Funded
275,000 275,000 Active 5-Const. (.IOC) Funded
711,257 711,257 Active 5-Const. (JOC) Funded
859,000 859,000 Active 3-Design Funded
135,000 135,000 Active 5-Const. (JOC) Funded
311,000 311,000 Active 3-Design Funded
749,999 749,999 Active 5-Construction Funded
888,000 888,000 Aclivc 2-Pre-Design Funded
1,810,000 1,810,000 Aclivc 4-Bid Funded
110,000 110,000 Active 5-Consl. (JOC) Funded
250,000 250,000 Active 3-Design Funded
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Active & Future
CH' Projects Only
II -No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimate ($)
7'otal
Funds (9i) Status Phase
Fund
Status
Total Fond
minus
Total Cost
Estimate ($)
341-Sheets & Sidewalks
13-30730 Capital Improvement Program
Admin
13-30732
13-30741
13-30742
13-30743
13-30744
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
13-30745 Capital 'Improvement Program
Admin
13-30746 Capital Improvement Program
Admin
13-30747 Capital Improvement Program
Adm in
13-30760 Capital Improvement Program
Admin
B-30770 Capital Improvement Program
Admin
13-30771 Capital Improvement Program
Admin
13-30773 Capital improvement Program
Admin
13-30775 Capital Lnprovement Program
Admin
B-30780 Capital Improvement Program
Admin
13-30781 Capital Improvement Program
Admin
B-30782 Capital Improvement Program
Admin
NW 41h Terrace Roadway Improvement
Project - DI
NW 9th Street Roadway Improvement Project 1
-DI
SW 16 Avenue Roadway & Drainage
Lnproventenls - D3
SW 5th Avenue Roadway & Drainage
Improvements - D3
SW 281h Road Roadway & Drainage
Improvements - D3
SW 23rd Roadway & Drainage Improvements
- D3
NW 8th Street Roadway and Drainage
Improvements
NW 1411 Court Roadway & Drainage
Improvements - D3
SW 13th Street Roadway & Drainage
Improvements - D3
SW 17th Avenue Roadway & Drainage
Improvements - D3 & D4
SW 22nd Avenue Medians - US 1 to Coral
Way-D4
Traffic Calming SW 6th Street Project - D4
Martin Luther King (MLK) 13lvd / 1-95 Area
Improvements - D5
Shenandoah Arca Improvements - D4
3
3
3
3
3
3
3
3,4
4
4
5
4
NW 14 Avenue and 28 Street Arca Roadway I
Improvements - D 1
NW 1 1 Street lion 27 to 37 Avenue Area
Roadway Improvements - D I
1
Allapatah Arca Roadway Improvement - DI
75,000 75,000 Active 3-Design Funded
756,247 756,247 Active 5-Construction Funded
198,000 198,000 Active 5-Const. (JOC) Funded
19,000 19,000 Active 3-Design Funded
250,000 250,000 Active 5-Const. (JOC) Funded
90,000 90,000 Active 5-Consl. (.IOC) Funded
402,000 402,000 Active 4-13id Funded
180,000 180,000 Active 4-13id Funded
400,000 400,000 Active 5-ConsL (JOC) Funded
600,000 600,000 Active 3-Design Funded
400,000 400,000 Active 1-Study Funded
324,670 324,670 Active 3-Design Funded
100,000 I00,000 Active 3-Design Funded
414,388 414,388 Active - 3-Design . Funded
868,276 868,276 Active 3-Design Funded
739,493 739,493 Active 2-Pre-Design Funded
500,000 500,000 Active 3-Design Funded
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Active & Future
CIP Projects Only
Il-No.
Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Tidal Cost
Estimate (.$)
Total
Funds ($) Slahis 1'hnsc -
Fund
Status
Total Fund
minus
Tnlal Cost
Estimate ($)
341-Streets & Sidewalks
B-30784 Capital Improvement Program Health District Riverwalk
Admin
B-30822 Capital Improvement Program
Admin
B-30823 Capital Improvement Program
Admin
13-30883 Capital Improvement Program
Admin
B-30884 Capital Improvement Program
Admin
B-30888 Capital improvement Program
Admin
13-30891 Capital Improvement Program
Admin
B-30892 Capital Improvement Program
Admin
13-30990 Capital Improvement Program
Admin
13-30991 • Capital 'Improvement Program
Aclmin
13rickcll Area Shared Use Path and Roadway
improvements
Fair Isle Area Roadway and Drainage
Improvements - D2
NW 12 Avenue / NW 12 1'lacc Roadway
Improvements
NW 62 Street West: of 1-95 Roadway
Improvements- D5
Wynwood Area Roadway improvement - 135
13ucna Vista One -Way Street Conversion and
Signagc - D5
Little 1-laiti Gateway Signs - D5
Roadway Improvements
Citywide Roadway improvements
B-30993 Capital Improvement Program SW/NW 17th Avenue Traffic Corridor Study -
Admin •
B-30998 Public Works
B-31206A Capital Improvement Program
Admin
13-31206B
,1
13-31220
Capital Improvement Program
Admin
Capital Improvement Program
Admin
1
2
2
5
5
5
5
5
1,2,3,4,5
1:2,3,4,5
1,2,3,4,5
Citywide
Citywide Sidewalk Repair Project- I'W 1,2,3,4,5
SE 3rd St Widening (Ika Dupont Plaza) - DRl 2
Transportation
SE 3rd Street Widening - DRI Administration 2
Downtown DRI Transportation Component 2
13-39910C Capital Improvement Program North Venetian Drive Lighting (District 2
Admin
B-399101 Public Works
QOL)
Bi' ekcll Avenue Decorative Pedestrian
Crosswalk
B-39910K Capital Improvement Program Bayside Historic Sign - D2
2
2
961,000
620,000 620,000 Active
180,000 180,000 Aclivc
999,975 999,975 Active
75,000 75,000 Future
500,000 500,000 Future
250,000 250,000 Active
100,000 100,000 Active
1,36 I ,000 1,361,000 .Future
2,416,500 2,416,500 Future
200,000 200,000 Active
169,615
1,500,000
100,000
1,417,532
100,000
33,132
33,000
961,000 Future
169,615 Future
1,500,000 Active
100,000 Active
1,417,532 Active
100,000 Active
33,132 Active
33,000
8-Future
3-Design
5-Consl, (JOC)
3-Design
8-Future
8-Future
2-Pre-Design
3-Design
8-Future
8-Future
1-Study
8-Future
3-Design
3-Design
1-Study
3-Design
5-Construction
Active 3-Design
Funded 0
Funded 0
Funded 0
Funded 0
Funded 0
Funded 0
Funded -'0
Funded 0
Funded 0
Funded 0
Funded 0
Funded 0
Funded 0
Funded 0
Funded 0
Funded 0
Funded 0
Funded 0
Active & Future
OP Projects Only
13-No. Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding Tolnl Fund
minus
'Iolnl Cost Total - Fund Total Cost
Disl. Estimate (.R) Funds (5) Status 3'bnsc Status Estimate (S)
341-Streets & Sidewalks
Admin
B-39911 Capital Improvement Program Venetian Causeway Improvements 2 3,196,465 3,196,465 Active 5-Construction Funded
Admin
B-40I 68 Public Works South Bayshore Drive from Aviation Avenue 2 100,000 100,000 Active 2-Pre-Design Funded
to Kirk Avenue - D2 PW
B-40300 Capital Improvement Program SW 181h Tcrr. Road improvements - D3 3 129,121 129,121 Active 2-Pre-Design Funded
Admin
B-40301 Capital Improvement Program SW 151h Street Road Improvements Segment I 3 84,969 84,969 Active 3-Design Funded
Admin - D3
B-40302 Capital Improvement Program SW 1st Avenue Road 'Improvements - Segment 3 314,579 314,579 Active 2-Pre-Design Funded
Admin 1 - D3
13-40303 Capital Improvement Program SW 23rd Road Improvements - D3 3 244,748 244,748 Active 2-Pre-Design Funded
Admin
B-40304 Capital lmprovemenl Program SW 1 1 lh Street Road Improvements - D3 3 81,549 81,549 Active 3-Design Funded
Admin
13-40305 Capital Improvement 1'rogram SW 121h Street Road Improvements - D3 3 55,026 55,026 Active 3-Design Funded
Admin
B-40306 Capital Improvement Program SW 101h Street Road Improvements - D3 3 347,385 347,385 Active 3-Design Funded
Admin
B-40307 Capital Improvement Program SW 16th Street Road improvements - D3 3 257,693 257,693 Active 2-Pre-Design Funded
Admin
13-40308 Capital Improvement. Program SW 171h Terrace Road Improvements - D3 3 225,567 225,567 Active 3-Design Funded
Admin
B-40309 Capital Improvement Program SW 1711 Street Road Improvements - D3 3 412,212 412,212 Active 3-Design Funded
Admin
13-40310 Capital Improvement Program SW 201h Road improvements - D3 3 116,682 116,682 Aclivc 2-Pre-Design Funded
Admin
13-4031 1 Capital Improvement Program SW 22nd Road Improvements - D3 3 96,406 96,406 Active 2-Pre-Design Funded
Admin
13-40312 Capital Improvement Program SW 22nd Tcrr. & SW 131h Ave Road 3 394,317 394,317 Active 3-Design . Funded
Admin Improvements - D3
13-40313 Capital improvement Program SW3rdAve Road Improvements -D3 3 191,983 191,983 Active 3-Design Funded
Admin
B-40314 Capital Improvement Program NW 18111 Place Road Improvements - D3 3 224,611 224,611 Active 3-Design Funded
0
0
0'
0
0
0
0
0
0
0
0
0
0
0
0
Active & Future
CIP Projects Only
II -No. Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding Total Fond
minus
Total Cost Total Fond Total Cost
1)isl. Estimate ($) Funds ($) Sloths Phase Maths Estimate ($)
341-Streets & Sidewalks
Admin
13-40315 Capital improvement Program SW 15th Street Road lmprovemenls Segment 2 3 245,349 245,349 Active 3-Design Funded 0
Admin - D3
13-40316 Capital Improvement Program SW 261h Road Improvements Segment 1 - D3 3 85,034 85,034 Active 3-Design Funded 0
Admin
B-40317 Capital Improvement Program SW 28th Road Improvements - D3 3 40,149 40,149 Active 3-Design Funded 0
Admin
13-40318 Capital Improvement Program SW 1st Ave Road Improvements - Segment 2 - 3 167,562 167,562 Active 3-Design Funded 0
Admin D3
B-40319 Capital improvement Program SW 251h Road Improvements - D3 3 118,561 118,561 Active 3-Design Funded 0
Admin
T3-40320 Capital Improvement Program SW 261h Road Improvements Segment 2 - D3 3 498,804 498,804 Aclivc 3-Design Funded 0
Admin
13-40321 Capilal Improvement Program SW 2nd Ave Road Improvements-1)3 3 721,333 721,333 Active 3-Design Funded 0
Admin
B-40322 Capital improvement l'rogram SW 27th Road Improvements - D3 3 498,804 498,804 Aclivc 2-Pre-Design Funded 0
Admin -
B-40323 Capital Improvement Program SW 1 st Ave Road improvements Segment 3 - 3 126,638 126,638 Active 3-Design Funded 0
Admin D3
B-40324 Capital Improvement Program NW 11 lh Ave Road improvements - D3 3 120,203 120,203 Active 3-Dcsign Funded 0
Admin
13-40325 Capilal Improvement Program Beacom Phase 11 - D3 3 1,500,000 1,500,000 Active 2-Pre-Design Funded 0
Admin
B-40326 Capital improvement Program The Roads Roadway Improvements - D3 3 500,000 500,000 Aclivc 2-Pre-Design Funded 0
Admin
B-40327 Capital Improvement Program Shenandoah Roadway Imp ovemcnts - D3 3 1 ,obo,000 1,000,000 Aclivc 2-Pre-Design Funded 0
Admin
I3-40643A Capilal Improvement Program North Spring Garden Grecnway 5 2,762,175 2,762,175 Aclivc 5-Construction Funded 0
Admin
B-40666B Capilal Improvement Program 13rickell Lighting Phase 11 - D2 2 850,000 850,000 Active 5-Const. (JOC) Funded 0
Admin
13-40686 Capilal 'Improvement Program Miami River Grcenways/SncelscapeSegment 3 3,113,501 3,113,501 Active 5-Construction Funded 0
Admin D (EL11)
B-40695L Capilal Improvement Program Miami River Grecnway Segment G and 3 145,785 145,785 Aclivc 7-011-1-1old Funded 0
Active & Future
CIP Projects Only
B-No. Client
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Dist.
Total Cost
Estimale (8)
Total
Funds ($) Status Phase
Fund
Slnlus
Total Fund
minus
Total Cost
Estimate (5)
341-Streets & Sidewalks
Admin
B-40704A Capital Improvement Program
Admin
B-43114A Public Works
I3-70245 Transportation & Transit
13-71210
13-73102A
13-78500B
B-7850813
B-78508C
B-30031A
B-30035A
B-30179
B-30518
B-30621
Capital improvement Program
Admin
Capital Improvement Program
Admin
Capital improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin
Capital Improvement Program
Admin •
Capital Improvement Program
Admin
B-30646 Capital Improvement Program
Admin
B-30724 Capital Improvement Program
Admin
B-30774 Capital Improvement Program
Admin
B-30880 Capital Improvement Program
Admin
Segment E2 Decorative Lighting
SW 32 Avenue Improvements Additional
Services
Citywide Sidewalk Replacement Phase 29
Transportation Program Support Services -
Transportation
Downtown Street Conversions
Citywide Streets Milling & Resurfacing - CIP
Buena Vista East Lighting
ARRA -NE 2nd Avenue Improvements (571h
Street to 691h Street) Segment C
ARRA - NE 2 Avenue Improvements Scgmcnt
B2
SW 3rd Avenue Road Improvements Project
North Shorccrest Roads Improvements Project
- Partial CDBG 91-02910 - D2
Downtown Baywalk Master flan & Design
Northwest 14th Street Strcelscapc Project - CIP
Funded
Center Grove Street and Lighting
Improvements_
South Bayshorc Drive Roadway and Drainage
Improvements
NW 33rd Street Roadway improvement
Project - DI
West Nagler Area lmprovemcnts- D4
NE 2nd Court Roadway and Drainage
improvements Project - D5
2,4
1,752,333
1,2,3,4,5 5,017,214
1,2,3,4,5 500,000
2,5 50,000
1,2,3,4,5 6,011,375
5 2,368,482
5 3,955,018
5 2,220,578
3 2,274,800
2 1,207,178
2 11,248,770
5 2,617,649
2 2,702,729
2 9,260,130
5,664,273
4 3,061,314
5 488,405
1,752,333 Active
5,017,214 Active
500,000 Future 8-Future
50,000 Active 1-Study
6,01 1,375 Future 8-Futurc
2,368,482 Active 3-Design
3,955,018 Active 5-Construction
2,220,578 Active 5-Construction
154,308 Aclivc 7-On-I-loll
1,147,178 Active 5-Construction
450,000 Active I -Study
439,001 Active 3-Design
1,173,568 Active 3-Design
550,000 Active 3-Design
3,700,001 Active 3-Design
1,299,861 Active 3-Design
300,001 Active 3-Design
5-Const. (.IOC) Funded
5-Construction Funded
Funded
Funded
Funded
Funded
Funded
Funded
Partially Funded
Partially Funded
Partially Funded
Partially Funded
Partially Funded
Partially Funded
1artially Funded
Partially Funded
Partially Funded
0
0
0
0
0
0
0
-2,120,492
-60 000
-10,798,770
-2,178,648
-1,529,161
-8,710,130
-1,964,272
-1,761,453
-188,404
Active & Future
CIP Projects Only
11-No.
Client
Project
City Of'Miami - Capital Improvement Program
Cost Estimates versus Available Tending
Total Cost
1)ist. Estimate ($)
"Point
Funds ($) Status Phase
Fund
Slams
Tolnl Fund
minus
Total Cost
Eslimnfe (S)
341-Streets & Sidewalks
B-31206
B-38504
13-40672D
B-40672G
B-78508
B-30520
B-30612
B-30723
13-31212
13-312I3
13-31214
B-312I5
13-31217
13-40672E
B-40672F
Capital Improvement Program SE 3rd Street Widening
Admin
Capital Improvement Program Overtown Sector Signage Project
Admin
Capital
Admin
Capital
Admin
Capital
Admin
Improvement Progratn
Improvement Program
improvement Program
Flagami Traffic Calming Phase IV - D4
Flagami Traffic Calming -1)4
NE 2 Avenue Improvements
Capital Improvement Program 1-lainsworth Village Street Improvement
Admin
Capital Improvement Program District 2 - Miscellaneous Roadway
Admin Improvements
Capital Improvement Program NW 24th Avenue Roadway Improvement
Admin Project - D 1
Capital Improvement Program NE 1st Avenue Reconstruction - NE 41 St. to
Aclmin NE 43 SI.
Capital Improvement Program N. Miami Court Reconstruction
Admin
Capital Improvement Program NE 1 Court Rcconslruction
Admin
Capital Improvement Program NE Miami PlaceReconstruction
Admin
Capital Improvement Program NE 43 Street Reconstruction
Admin -
Capital Improvement Program Flagami Trallic Calming, Phase V - D4
Aclmin
Capital Improvement Program Flagami'll'aIlk Calming, Phase VI - D4
Aclmin
2 2,705,098
2,5 142,237
4 1,275,149
4 666,636
2,5 36,938,862
2 1,062,500
2 0
1 1,140,00(1
5 660,816
5 441,636
5 666,995
5 500,000
5 868,100
4 2,652,720
4 3,233,408
641,494 Active 3-Design
123,620 Active
Partially Funded
5-Construction \ Partially Funded
1,198,012 Active 5-Const. (.IOC) Partially Funded
590,000 Active
4,985,832 Active
0 Future
0 Future
0 Future
0 Future
0 Puturc
0 Future
0 Future
0 Puturc
0 Enure
0 Future
3-Design
3-Design
8-Future,
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
8-Future
Partially Funded
Partially Funded
UnFunded
UnFunded 0
UnFunded -1,140,000
UnFunded -660,816
UnFunded-441.,636
UnFunded -666,995
UnFunded -500,000
UnFunded -868,100
UnFunded -2,652,720
UnFunded -3,233,408
-74,726,530
341-Streets & Sidewalks
219,335,450 144,61)8,919
-2,063,6(13
-18,6 17
-77,137
-76,636
-31,953,030
-1,062,500
Active & Fiance
CIP Projects Only
B-No. Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Total Cost
nisi. Estinia lc ($)
'roof
Funds (A) Slat us Phase
Fund
Slnliis
'fatal Fund
minas
'rota] Cost
Estimate ($)
343-Mass Transit
13-30645A Transportation & Transit
13-30668
B-40268
B-70246
B-70715
B-7071513
B-70715131
13-70715C
B-70715CI
B-70717
Transportation &'Transit
Transportation & Transit
Transportation & Transit
Transportation & Transit
Transportation & Transit
Transportation &'Transit
Transportation & Transit
Transportation & Transit
"Transportation & Transit
Transportation Program Support Services -
Transil Professional Services
ARRA - Purchase of Trolley Vehicles •
FEC Quiet Zone Study
Transportation Program Support Services -
Transit Professional
City of Miami Trolley Program - Capital
Acquisition
Trolley Program Oracle Project: 40 FDOT
Brickell/Biscayne Trolley
'trolley Program Oracle Project: 40
13rickcll/Biscayne Trolley
'trolley Program Oracle Project: 40 FDOT
I-Icalth/Stadium Trolley
Trolley Program Oracle Project: 40
Health/Stadium Trolley
On -Demand Transportation Services - Oracle:
40 On Demand Trans')
1,2,3,4,5 766,479
1,2,3,4,5 4,084,282
2,5 150,085
1,2,3,4,5 500,000
1,2,3,4,5 2,921,122
2 619,416
2 619,416
1,3 852,185
1 952,185
1,2,3,4,5 249,857
766,479 Aclivc
4,08,1,282
150,085
500,000
Active
Active
Active
2,921,122 Aclivc
619,416 Aclivc
619,416 Aclivc
R52,185 Aclivc
952,185 Aclivc
249,857 Aclivc
3-Design Funded
5-Construction Funded
1-Study Funded
2-Pre-Design Funded
3-Design Funded
5-Construction Funded
5-Construction Funded
5-Construction Pundcd
5-Construction Funded
5-Construction Funded
0
0
0
0
0
0
0
0
0
0
351-Sanitary Sewers
13-30134AS Parks and Recreation
B-30365ES Community Development
B-30538S Capital Improvement Program
Admin
11-30671 A Parks and Recreation
13-30673 • Capital Improvement Program
Aclmin
B-30690S Parks and Recreation
13-30882S Parks and Recreation
343-Mass Transit
Bryan Park New Tennis/Community Center
D4 - Sanitary Sewer Component
Coral Way NET Office Remodeling D3 -
Sanilary Sewer Component
Museum lark - Sanitary Sewer Allocation
Caribbean Marketplace Renovation - Sanitary
Sewer Component
Marlins Stadium Arca infrastructure
improvements
West End Park New Community Building - 4
Sanitary Sewer
African Square 1'ark - Splash Park D5 - 5
Sanitary Scwcr Component
4
3
1,2,3,4,5
5
1,2,3,4,5
11,715,027
50,000
50,000
1,000 000
114,000
12,536,710
100,000
100,000
12,536,710 Aclivc
11,715,027
50,000 Active 3-Design
50,000 Future 8-Future
1,000,000 Active 4-Bid
114,000 Active 3-Design
5-Construction
100,000 Active 3-Design
100,000 Aclivc 3-Design
Funded
Funded
Funded
Funded
Funded
Funded
Funded
0
0
0
0
0
0
0
0
Active & Future
CIP Projects Only
II -No. Client
Project
City Of Miami - Capital Inlprovcment Program
- Cost Estimates versus Available Funding Total Fund
minus
Total Cost Total Fund Total Cost
. Dist. Estimate ($) Funds ($) Status Phase Slat us Estimate ($)
351-Sanitary Sewers
13-30886 Parks and Recreation Lumm1is Landing Square - D5 5 925,061 925,061 Active - 3-Design Funded 0
B-30886S ]'arks and Recreation Lummus Landing Square - D5 Sanitary Sewer 5 100,000 100,000 Active 3-Design Funded 0
Component -
13-30995S Parks and Recreation Virginia Key Bike Trail Building - D2 - 2 50,000 50,000 Active 2-Pre-Design Funded 0
Sanitary Sewer Component -
D-35806S Parks and Recreation Curtis Park New Pool Facility and 13oat Ramp I 500,000 500,000 Active I -Study Funded 0
DI - Sanitary Server Component -
I3-35812AS Parks and Recreation Duarte Park Building Renovation, Splash • 1 50,000 50,000 Active 5-Consl. (.IOC) Funded 0
PArk & Sign - D1 Sanitary Sewer Component
B-35838S Parks and Recreation Kennedy Park Restroom Building 2 50,000 50,000 Future 8-Future Funded 0
Improvements D2 - Sanitary Sewer Component
B-35861 AS Parks and Recreation Maximo Gomez/ Domingo Park Reslroom D3 3 100,000 100,000 Future 8-Future Funded 0
- Sanitary Sewer Component
B-35883AS Capital Improvement Program Hadley Park New Youth Center D5 - Sanitary 5 200,000 200,000 Active 3-Design Funded 0
• Admin Sewer Component
13-35887S ]'arks and Recreation Moore Park New Construction D5 - Sanitary 5 500,000 500,000 Active 3-Design Funded 0
Sewer Component
B-60454S Fire Rescue Fire Station 1114 (New) - D4 - Sanitary Sewer 4 100,000 100,000 Active 2-Pre-Design Funded 0
Component
13-60464S Public Facilities New Dinner Key Marina Dockmasler Building 2 690,000 690,000 . Active 4-Bid Funded 0
D2 - Sanitary Sewer Component. -
B-70600 Police Police Department Sanitary Sewer System 1,2,3,4,5 60,000 60,000 Active 3-Design Funded 0
Repairs -
351-Sanitary Sewers 17,275,771 17,275,771
}
352-Storm Sewers
13-3001 I Capital improvement Program Englewood Road and Storm Server 4 8,785,811 8,785,811 Active 5-Construction Funded
Admin improvements - Phase ill - D4
13-30014 Capital Improvement Program Northwest Road and Storm Sewers 5 9,230,466 9,230,466 Active - 5-Construction Funded
Admin Improvements - D5
13-30262 Public Works Citywide Storm Sewer Repair Project 1,2,3,4,5 5,101,561 5,101,561 Active 5-Construction Funded
B-30588 Capital Improvement l'rograrn San Marco Island and Biscayne Island 2 4,488,980 4,488,980 Active 5-Construction Funded
Achill Drainage Improvements - D2
B-30629 Capital Improvement Program Durham Terrace Drainage Project 4 3,445,330 3,445,330 Active 5-Construction Funded
Admin
0
0
0
0
Active & Future
CH' Projects Only
11-No. Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding
Total Cost
Dist. Estimate ($)
Total
Funds ($) Status Phase
Total Fond
minus
Fond Total Cost
States Estimate ($)
352-Storm Sewers
B-30680 Capital Improvement Program Rockermsn Canal Improvements 2 911,824 911,824 Active 3-Design Funded 0
Admin
13-30700 Capital Improvement T'rogram POET Drainage Wells Compliance 1,2,3,4,5 1,004,934 1,004,934 Active 3-Design Funded 0
Admin
B-30776 Capital Improvement Program Silver BlulTDrainage Improvements - D4 4 600,000 600,000 Active 3-Design Funded 0
Aclmin
B-30992 Public Works Riverview Pump Station 3 500,000 500,000 Active 3-Design Funded 0
B-50654 Public Works Overlown Storntwatcr Pump Station Upgrades 5 851,797 851,797 Active 3-Design Funded 0
B-50672 Capilal Improvement Program Belle Meade Storm Sewer Project, 1'h 2 2 12,301,058 12,301,058 Active 5-Const. (JOC) Funded 0
Admin
B-50704 Capital 1nsprovement Program Fairlawn Stone Sewer Improvements Project 4 5,363,825 5,363,825 Active 5-Construction Funded 0
Admin Phase 111
B-30008 Capital Improvement Program Grove Park Road and Storm Sewers 3 12,819,059 3,638,000 Active 7-On-Ilold Partially Funded -9,181,059
Admin Improvements - D3 (FormeIly Glenn Royal
Stormsewcr 1'3)
B-30I 83 Capital Improvement Program Garden Storm Sewer - Phase I 1 1,398,000 399,920 Active 3-Design Partially Funded -998,079
Admin
B-30632 Capital Improvement l'rogram Drainage Master Plan Update 1,2,3,4,5 716,819 715,384 Active 1-Study Partially Funded -1,435
Aclmin
B-30637 Capital improvement Program Maly Brickell Village Drainagelmprovcmcnts 1,2,3,4,5 3,278,827 3,100,001 Active 3-Design Partially Funded -178,826
Admin
13-50643 Capital Improvement Program Wagner Creek / Seybold Canal Dredging 1,5 23,087,275 3,673,503 Active 3-Design lartially Funded -19,413,771
Admin
13-50706A Capital Improvement Program Roadway, Drainage and Traffic Improvements 1,4 1,556,848• 1,208,245 Active 4-Bid (IOC) 1'mtinily Funded -348,602
Admin -D1 &D4
B-30007 Capital Improvement Program Auburn Storm Sewer Phase 111 4 7,0,19,000 0 Future 8-Future UnFunded -7,049,000
Admin
13-30009 Capital Improvement Program Lawnview Storm Sewer 3 5,719,000 0 Future 8-Future Unfunded -5,719,000
Admin
B-30012 Capital Improvement Program Auburn Storm Sewer 1'11. 1 & 11 4 5,320,000 0 Future 8-Future UnFunded -5,320,000
Admin
13-30013 Capital Improvement Program Reid Acres Storm Sewers 5 5,719,000 0 Future 8-Future UnFunded -5,719,000
Admin
B-30015 Capital Improvement Program Little River Storm Sewers I'll. 11 5 3,990,000 0 Future 8-Future Unfunded -3,990,000
Active & Future
Cll' Projects Only
11-No. Client
Project
City Of Miami - Capital Improvement Program
Cost Estimates versus Available Funding; 1'othl Fund
minus
"Total Cosl Tom Fund Total Cost
Dist. Estimate ($) Funds ($) Status Phase Stains Estimate ($)
352-Storm Sewers
Admin
13-30016 Capital Improvement Program Liberty Storm Sewers 5 5,586,000 0 Future 8-Fulurc Unfunded -5,586,000
Admin
13-30017 Capital Improvement Program fairway Storm Scwcrs 5 5,586,000 0 Future 8-Future UnFuuded -5,586,000
Admin
t}-30018 Capital Improvement Program NW 71 SL Main Trunk Storm Scwcr 5 9,975,000 0 Future 8-Future Unfunded -9,975,000
Admin
13-30216 Capital Improvement Program Avalon Storm Scwcr - Phase 111 2,4 4,500,000 0 Future 8-Pulurc UnFunticd-4,500,000
Admin
13-30637A Capital Improvement Program South Miami Avenue Drainage Improvements 2 204,444 0 Active 3-Design Unfunded -204,444
Admin - MDC
11-30647 Capital improvement Program Tamiami Roadway & Storm Scwcr Project 1,4 9,600,000 0 Future 8-fulurc Unfunded -9,600,000
Admin .
352-Storm Sewers 158,690,860
65,320,641-93,370;218
353-Solid Waste
B-73202C Solid Waste Solid Waste Collection Equipment 1,2,3,4,5 4,950,820 4,402,827 Active 5-Construction Partially Funded -547,992
353-Solid Waste 4,950,820 4,402,827 -547,992
Grand'l'olal 869,353,996 567,768,399 -301,585,597
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
., „
OPERATING IMPACT BY DEPARTMENT
SUMMARY
While the city's Capital Budget is distinct from the Operating Budget, there is an interrelationship that
exists since projects funded and implemented through the Capital Budget may impact the Operating
Budget to address increased fund needs for employee salaries and the purchase of supplies and minor
equipment to support and operate new or enhanced city facilities.
The potential operating impact of any proposed capital project is carefully considered as a part of the
capital program review process. In many cases, the most important component of a capital spending
decision is not the initial acquisition and development cost but the operating cost impact on the annual
budget over the lifetime of the facility or equipment. The completion of capital projects that represent
new or significantly enhanced facilities will impact the respective department's operating budget as
projects are completed and transferred back to the client department for operation and maintenance.
Many capital projects involve purchase or reconstruction of existing infrastructure to update equipment
and facilities to modem standards and, as such, do not carry significant operating impacts. There are,
however, some capital projects that may require additional operating expenditures for utilities, such as
electricity and water, or landscape and lighting maintenance that exceed current consumption levels.
Other completely new projects, such as park recreation centers, fire stations or police facilities require the
hiring of new personnel, purchase of new furniture and equipment, as well as routine maintenance and
payment of increased utility bills. Consequently, the impacts of capital projects on the annual operating
budget are estimated to the best accuracy possible and noted in the Capital Improvement Plan under this
separate section.
The methodology used to project these impacts on departmental budgets requires input from each client
department. Factors such as: hiring of new and/or part-time personnel to meet the needs of a new facility
and what level of desired service, increased utility or contract maintenance fees, potential increased
revenues resulting from new or enhanced facilities are considered in determining the impact to operation.
Each project is then assigned a projected dollar amount for personnel, operating, capital outlay, non -
operating, and revenues and those figures are entered in the fiscal year in which that project is estimated
to be completed. An escalation factor is then added to the present day operating cost projection and
calculated for the remainder of the five year capital plan. The individual projects are totaled to represent
the client departmental summary. Each department's summary is then incorporated into the total City
operating impact report.
In accordance with this approach, capital project impacts attempt to identify all associated operating costs.
The figures contained in this section are shared with the appropriate city budget staff for further
discussions with departments and consideration during preparation of the City's future annual operating
budget(s).
These costs are included in the following tables.
Cttp of f .tEmt
Capital Improvement Program
Operating Impact Report
Fiscal Years 2012-13 through 2017-18
Department
Parks & Recreation
Public Works 32,900 60,000 60,000 60,000 60,000 60,000
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
1,000 1,030
1,061 1,092
1.125 1,160
Public Facilities
GSA
Fire
Police
Report Totals
Total Operating Budget Impact
33,900 61,030
61,061 61,092
61,125 61,160
The cost impacts from the following projects will be funded from each depaitalent's operating budget. For some projects or depaitnients,
the operating impacts show a negative amount denoting savings. For example, the installation of high efficiency air conditioning units
may result in energy savings costs or a project may produce more revenues than expenses. The GSA Depattnient provides maintenance
to buildings operated and staffed by other departments such as Parks, Public Facilities and Public Works. The cost impacts to GSA
shown below represent costs which are not included in the operating impact figures shown for those departments. Additional information
can be found on the respective project detail sheets.
City ofiarni
Operating Budget
Impact Sumnzary
Parks Department
Project #
Title
B-40170 Kennedy Dog Park Irrigation
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
1,000 1,030
1,061 1,092
1,125 1,160
Totals 1,000 1,030 1,061 1,092 1,125 1,16
CO Of fateuti[
Projected
Operating Costs
Kennedy Dog Park Irrigation
B-40170
Operating Costs
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
0 0 0 0 0 0
1,000 1,030 1,061 1,092 1,125 1,160
0 0 0 0 0 0
1,000 1,030
1,061 1,092
1,125 1,160
Summary of Impact:
Operating Budget
Impact Summary
Public Works
Project #
Title
B-30168E SW 23rd St @ 16th Ct
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
700 800 800 800 800 800
B-30691 NW North River Drive 500 500 500 500 500 500
B-30704 NW 14th Avenue 1,500 5,900 5,900 5,900 5,900 5,900
B-30734 Virginia Street 3,900 7,700 7,700 7,700 7,700 7,700
B-40175 Kumquat Avenue 200 400 400 400 400 400
B-50705P2Kinloch Storm Sewer Imp. Phil 26,100 44,700 44,700 44,700 44,700 44,700
Totals
32,900 60,000 60,000 60,000 60,000 60,000
eitp of ftiiainf
Projected
Operating Costs
SW 23rd Street @ 16th Court Traffic Circle
B-30168E
Operating Costs
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
0 0 0 0 0 0
700 800 800 800 800 800
0 0 0 0 0 0
700 800 800 800 800 800
Summary of Impact:
This project requires maintenance on a monthly schedule to include trimming, cutting, mowing, fertilizing, curb edging, litter pickup, and
necessary replanting. The directional / warning signage must also be inspected and repaired, if necessary.
o
tatni
Projected
Operating Costs
NW North River Drive
B-30691
Operating Costs
Expenses
Personnel
Operating
Capital Outlay
Non -Operating.
Revenues
Total (Projected)
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
0 0 0 0 0 0
500 500 500 500 500 500
0 0 0 0 0 0
500 500 500 500 500 500
Summary of Impact:
This project requires additional maintenance on a yearly schedule to include vactor cleaning of a drainage structure and jet/vactor
cleaning of french drain system.
eitp of Aiaini
Projected
Operating Costs
NW 14th Avenue - 24th to 27th Street
B-30704
Operating Costs _
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
0 0 0 0 0 0
1,500 5,900. 5,900 5,900 5,900 5,900
0 0 0 0 0 0
0
1,500 5,900 5,900 5,900 5,900 5,900
Summary of Impact:
This project requires the repair / replacement of damaged curb and gutter, swales, and ADA ramps on a yearly schedule. Maintenance on
a yearly schedule also includes vactor cleaning of drainage structures and jet/vactor cleaning of drainage pipes and the new french drain
system.
1 itp of iftiatni
Projected
Operating Costs
Virginia Street - Bird Rd to US1
B-30734
Operating Costs
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total. (Projected)
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
0 0 0 0 0 0
3,900 7,700 7,700 7,700 7,700 7,700
0 0 0 0 0 0
n n n 0 0 0
3,900 7,700 7,700 7,700 7,700 7,700
Summary of Impact:
This project requires annual replacement of damaged sidewalk, vactor cleaning of pervious concrete and replacement of trees that die
(after the guarantee period) and trees that are damaged. ( Note: the trees are small and do not require trimming at this stage. The trees are
currently vulnerable to breakage and vehicular damage.)
City otanit
Projected
Operating Costs
Kumquat Ave - Pamona Ln. to Linden Ln.
B-40175
Operating Costs
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
0 0 0 0 0 0
200 400 400 400 400 400
0 0 0 0 0 0
0
200 400 400 400 400 400
Summary of Impact:
This project requires a yearly inspection and replacement of damaged advanced warning signs for the "speed tables".
CCttp ograft
Projected
Operating Costs
Kinloch Storm Sewer Improvements Ph II
B-50705P2
Operating Costs
Expenses
Personnel
Operating
Capital Outlay
Non -Operating
Revenues
Total (Projected)
Current Year 1 Year 2 Year 3 Year 4 Year 5
Year FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18
0 0 0 0 0 0
26,100 44,700 44,700 44,700 44,700 44,700
0 0 0 0 0 0
n n (1 0 0 .0
26,100 44,700
44,700 44,700
44,700 44,700
Summary of Impact:
This project requires the annual cleaing of drainage inlets by vactor, cleaning of pipes and french drain by jet/vactor, cleaning of pervious
concrete by vactor and replacement of damaged ADA ramps.
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
/
B-No.
Dist.
Project
Estimated
Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
300 NW 11 Street Community Center- CRA 92-689001
B-40169
5
1,987,714
1,500,000
FY2014
Active
African Square Park - Splash Park - D5
B-30882
5
600,000
600,000
FY2014
Active
African Square Park - Splash Park D5 - Sanitary Sewer
Component
B-30882S
5
100,000
100,000
FY2014
Active
African Square Park Rec. Bldg. Improvements
B-35872
5
432,000
0
FY2013
Future
Air Conditioners South District Sub Station - Miami Police
Department
B-70421
1,2,3,
4,5
55,000
55,000
FY2013
Active
Allapatah Area Roadway Improvement - D1
B-30782
1
500,000
500,000
FY2014
Active
Allapattah Community Elderly Center
B-35003
1
287,000
0
FY2018
Future
Antonio Maceo Park Mufti -Purpose Recreational Facility
B-30783
1
1,500,000
1,500,000
FY2016
Future
ARRA - NE 2 Avenue Improvements Segment B2
B-78508C
5
2,220,578
2,220,578
FY2013
Active
ARRA - NE 2nd Avenue Improvements (57th Street to 69th
Street) Segment C
B-78508B
5
3,955,018
3,955,018
FY2013
Active
ARRA - Purchase of Trolley Vehicles
6-30668
1,2,3,
4,5
4,084,282
4,084,282
FY2015
Active
ARRA Citywide Bicycle Rack & Signage Program ,
B-30694
1,2,3,
4,5
392,130
392,130
FY2013
Active
Art Museum -Contribution to Park Master Plan
B-30170
2
700,000
700,000
FY2014
Active
Aubum Storm Sewer Ph. I & II
B-30012
4
5,320,000
0
FY2015
Future
Auburn Storm Sewer Phase III
B-30007
4
7,049,000
0
FY2014
Future
Avalon Storm Sewer - Phase III
B-30216
2,4
4,500,000
0
FY2014
Future
Bay of Pigs Park Lighting - D4
B-30772
4
53,000
53,000
FY2013
Active
Bayfront Park Electrical Repairs
B-40173
2
309,000
309,000
FY2013
Active
Bayfront Park Pier Repairs - D2
B-40177
2
300,000
300,000
FY2014
Active
Bayside Historic Sign - D2
B-39910K
2
33,000
33,000
FY2013
Active
Baywalk Mobility Plan
B-30645D
2
60,000
60,000
FY2013
Active
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated
Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Beacom Phase II - D3
B-40325
3
1,500,000
1,500,000
FY2014
Active
Beacom Project Area Improvements
B-30699.
3
721,100
721,100
FY2014
Active
Beckham Hall Fire Damage Repair
B-30365J
1
6,770
6,770
FY2015
Future
Belle Meade Storm Sewer Project, Ph 2
B-50672
2
12,301,058
12,301,058
FY2013
Active
Bird Avenue Road Improvement
• B-30628
2
1,960,508
1,960,508
FY2013 '
Active
Biscayne Bay Spoil Island B Public Shelter- D2
B-30825
2
17,500
10,000
FY2014
Future
Biscayne Bay Spoil Island E Picnic Tables, Benches &
Umbrellas - D2
B-30825A
2
8,250
750
FY2014
Future
Biscayne Bay Spoil Island E Public Trail - D2
B-30825B
2
8,250
750
FY2014
Future
Biscayne Park Site Improvements
B-75823
2
150,000
150,000
FY2014
Future
Brickell Area Shared Use Path and Roadway Improvements
B-30822
2
620,000
620,000
FY2015
Active
Brickell Avenue Decorative Pedestrian Crosswalk
. B-399101
2
33,132
33,132
FY2013
I Active
Brickell Lighting Phase II - D2
B-40666B
2
850,000
850,000
FY2013
Active
Bryan Park Community Building - D4
B-30134A
4
852,128
852,128
FY2014
Active
Bryan Park New Tennis/Community Center D4 - Sanitary
Sewer Component
B-30134AS
4
50,000
50,000
FY2014
Active
Buena Vista East Lighting
B-78500E
5
2,368,482
2,368,482
FY2013
Active
Buena Vista One -Way Street Conversion and Signage - D5
B-30891
5
250,000
250,000
FY2014
Active
Caribbean Marketplace Renovation
B-30671
5
1,173,086
1,030,025
FY2013
Active
Caribbean Marketplace Renovation - Sanitary Sewer
Component
B-30671A
5
114,000
114,000
FY2013
Active
Center Grove Street and Lighting Improvements
B-30621
2
2,702,730
1,173,568
FY2013
Active
City Hall Terrace
B-30865B
1,2,3,
4,5
350,000
350,000
FY2014
Active
City Hall Windows and Doors
B-30865C
1,2,3,
4,5
360,000
360,000
FY2014
Active
City of Miami Impact Fee Study - Citywide
B-30994
1,2,3,
4,5
65,491
65,491
FY2013
Active
City of Miami Trolley Program - Capital Acquisition
B-70715
1,2,3,
4,5
2,921,123
2,921,123
FY2015
Active
City Property Building Maintenance •
B-30365C
1,2,3,
4,5
700,000
0
FY2013
Future
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist.
Project
Estimated
Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Citywide Bicycle Rack & Signage Program
B-30694A
1,2,3,
4,5
115,000
115,000
FY2014
Active
Citywide General Fleet Replacement
B-74200
1,2,3,
4,5
3,969,887
3,610,269
FY2014
Active
Citywide Park Equipment & Site Improvements
B-30541
1,2,3,
4,5
5,293,595
4,896,494
FY2016
Active
Citywide Park Equipments & Site Improvements FY12
B-30541D
1,2,3,
4,5
547,101
547,101
FY2017
Active
Citywide Roadway Improvements
B-30991
1,2,3,
4,5
2i,416,500
2,416,500
FY2013
Future
Citywide Sidewalk Repair Project - PW
B-30998
1,2,3,
4,5
169,615
169,615
FY2015
Future
Citywide Sidewalk Replacement Phase 29
B-43114A
1,2,3,
4,5
5,017,215
5,017,215
FY2015
Active
Citywide Storm Sewer Repair Project
B-30262
1,2,3,
4,5
5,101,561
5,101,561
FY2015
Active
Citywide Streets Milling & Resurfacing - CIP
B-73102A
1,2,3,
4,5
6,011,375
6,011,375
FY2015
Future
Citywide Trolley Program - Oracle: 40 CW Trolley
B-70715A
1,2,3,
4,5
19,332,851
19,332,851
FY2024
Active
Civic Center NW 14th Street
B-30500
1,2,3,
4,5
2,500,000
2,500,000
FY2014
Active
Coconut Grove Business Improvement District - Street
Improvements
B-30687
2
3,099,638
3,099,638
FY2014 .
Active
Coconut Grove Viewing Platform Spoil Island C - D2
B-40171
2
15,088
15,088
FY2013
Future
Coconut Grove Viewing Platform Spoil Island E - D2
B-40172
2
15,081
15,081
FY2013
Future
Coconut Grove Waterfront Master Plan Implementation -
Phase I
B-30182A
2
47,179,389
1,721,675
FY2014
Active
Computer Aided Dispatch (CAD)
B-72801
1,2,3,
4,5
120,866
120,866
FY2014
Active
Coral Way NET Office Remodeling D3 - CD 91-02994
B-30365E
3
1,015,000
1,015,000
FY2014
Active
Coral Way NET Office Remodeling D3 - Sanitary Sewer
Component
B-30365ES
3
50,000
50,000
FY2014
Future
Curtis Park New Pool Facility and Boat Ramp D1 - Sanitary
Sewer Component
B-358065
1
500,000
500,000
FY2015
Active
Curtis Park New Pool Facility and Boat Ramp Improvement
B-35806
1
2,468,437
2,127,160
FY2015
Active
D3 - Sidewalk ADA Retrofits
B-30677
3
700,000
700,000
FY2015
Active
Damaged Vehicle Replacement / Repairs
B-30666
1,2,3,
4,5
603,864
603,864
FY2015
Active
Defense and Security Equipment Acquisition
B-72813
1,2,3,
4,5
3,767,249
3,767,249
FY2014
Active
Design District/FEC
B-30178
5
100,000
100,000
FY2014
Future
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
•B-No.
Dist.
Project
Estimated
Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Dinner Key Marina Dinghy Dock - D2
B-30735
2
178,070
0
FY2014
Future
District 1 = Miscellaneous Roadway Improvements
B-30611
1
111,419
111,419
FY2015
Future
District 1 - Sidewalk Repairs and ADA
B-30377A
1
250,692
250,692
FY2013
Active
District 2 - Miscellaneous Roadway Improvements
B-30612
2
0
0
FY2015
Future
District 2 - Sidewalk Repairs &ADA
B-30377B
2
250,691
250,691
FY2013
Active
District 2 Quality of Life Park Improvements
B-39910E
2
987,988
987,988
FY2014
Active
District 3 - Miscellaneous Roadway Improvements
B-30613
3
1,859,688
1,859,688
FY2014
Future
District 3 - Sidewalk Repairs and ADA
B-30377C
3
250,691
250,691
FY2014
Active
District 4 - Miscellaneous Roadway Improvements
B-30614
4
36,381
36,381
FY2015
Future
District 4 - Sidewalk Repairs & ADA
B-30377D
4
250,691
250,691
FY2014
Active
District 5 - Miscellaneous Roadway Improvements
B-30615
5
1,349,195
1,349,195
FY2015
Future
District 5,- Sidewalk Repairs & ADA
B-30377E
5
250,691
250,691
FY2014
Active
Dorsey Memorial Library Restoration
B-30531
2
• 454,511
250,000
FY2013
Active
Downtown Baywalk Master Plan & Design
B-30179
2
11,248,770
450,000
FY2017
Active
Downtown DRI Transportation Component
B-31220
2
1,417,532
1,417,532
FY2013
Active
Downtown Street Conversions
B-71210
2,5
50,000
50,000
FY2013
Active
Drainage Master Plan Update
B-30632
1,2,3,
4,5
716,819
715,384
FY2014 •
Active
Duarte Park Building Renovation, Splash PArk & Sign - D1
Sanitary Sewer Component
B-35812AS
1
50,000
50,000
FY2013
Active
Duarte Park Building Renovation, Splash Park and Sign
B-35812A
1
1,312,797
1,312,797
FY2013
Active
Durham Terrace Drainage Project
B-30629
4
3,445,330
3,445,330
FY2013
Active
DWNTWN Beautification - Design Phase
B-30606D
1,2,3,
4,5
498,780
498,780
FY2014
Active
DWNTWNBeautification - North
B-30606N
1,2,3,
4,5
7,817,431
7,817,431
FY2014
Active
DWNTWN Beautification - South
B-30606S
1,2,3,
4,5
5,090,853
5,090,853
FY2014
Active
DWNTWN Beautification (Lighting)
B-30606L
1,2,3,
4,5
4,475,915
4,475,915
FY2014
Active
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project.
• • B-No.
Dist.
Project
Estimated
Cost
• Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
DWNTWN Beautification Project Phase I
B-30606
1,2,3,
4,5
3,150,565
3,150,565
FY2014
Active
Englewood Road and Storm Sewer Improvements - Phase III
-D4
B-30011
4
8,785,811
8,785,811
FY2013
Active
Environmental Remediation Study
B-30865A
1,2,3,
4,5
45,900
45,900
FY2015
Active
ERP Integration System
B-74609
1,2,3,
4,5
25,474,458
25,474,458
FY2015
Active
Fair Isle Area Roadway and Drainage Improvements - D2
B-30823
2
180,000
180,000
FY2015
Active
Fairlawn Storm Sewer Improvements Project Phase III
B-50704
4
5,363,825
5,363,825
FY2013
Active
Fairway Storm Sewers
B-30017
5
5,586,000
0
FY2017
Future
FDEP Drainage Wells Compliance
B-30700
1,2,3,
4,5
1,004,934
1,004,934
FY2014
Active
FEC Quiet Zone Study
B-40268
2,5
150,085
150,085
FY2013
Active
FEMAAssistance to Firefighters Program FY2011
B-70418
1,2,3,
4,5
343,6101
343,610
FY2014
Future.
Fem Isle / PBA Park Improvements Project - D1
B-30800
1
116,782
116,782
FY2014
Future
Fire Rescue Personal Protective Equipment
B-70411
1,2,3,
4,5
820,580
820,580
FY2013
Active
Fire Station #10 (New)
B-60351
1
6,275,200
898,123
FY2018
Future
Fire Station #13
B-60453A
2
5,084,496
5,084,496
FY2013
Active
Fire Station #14 (New)
B-60454
4
5,076,844
5,076,844
FY2015
Active
Fire Station #14 (New) - D4 - Sanitary Sewer Component
B-60454S
4
100,000
100,000
FY2015
Active
Fire Station #5 Exterior Walls Repair - D1
B-70210
1
150,000
150,000
FY2014
Future
Fire Station Equipment and Furniture Replacement
B-72803
1,2,3,
4,5
713,417
540,838
FY2014
• Active
Fire Station Hardening / Facility Apparatus Room Doors
B-30709
1,2,3,
4,5
622,481
0
FY2013
Future
Fire Station No. 10 Restroom Remodeling
B-70104
1
179,403
179,403
FY2014
Active
Fire Station No. 6 Office Building - Structural Analysis
B-70102A
5
74,619
74,619
FY2015
Active
Fire Stations & Other Fire Facilities
B-72802
1,2,3,
4,5
3,872,960
3,872,960
FY2015
Active
Firefighting Equipment - SAFER
B-72809A
1,2,3,
4,5
911,500
911,500
FY2015
Active
Firefighting Equipment and Gear
B-70106
1,2,3,
4,5
158,124
158,124
FY2013
Future
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
' B-No:
Dist.
Project
Estimated.
Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Flagami Traffic Calming - D4
B-40672G
4
666,636
590,000
FY2014
Active
Flagami Traffic Calming Phase IV - D4
B-40672D
4
1,275,150
1,198,012
FY2013
Active
Flagami Traffic Calming, Phase V - D4
B-40672E
4
2,652,720
0
FY2015
Future
Flagami Traffic Calming, Phase VI - D4
B-40672F
4
3,233,408
0
FY2015
Future
FY2013 Citywide Capital Needs - Budget Dept.
B-30865
1,2,3,
4,5
1,245,900
340,000
FY2013
Future
Garden Storm Sewer- Phase I
B-30183
1
1,398,000
399,920
FY2015
Active
Generator for City Hall
B-30365H
1,2,3,
4,5
186,819
25,000
FY2014
Active
Gibson Park New Construction (Partially Funded by CRA 92-
689001)
B-30305E
5
12,739,521
12,739,521
FY2014
Active
Grove Park Road and Storm Sewers Improvements - D3
(Formelly Glenn Royal Stormsewer P3)
B-30008
3
12,819,059
3,638,000
FY2017
Active
GSA Fleet Maintenance Garage Expansion
B-74205E
1
194,055
194,055
FY2013
Active
Gusman Hall Improvements - FY2012
B-30546A
1,2,3,
4,5
105,000
105,000
FY2013
Future
Gusman Hall Improvements / Repairs
B-70100
2
10,000,000
423,405
FY2018
Active
Hadley Park New Youth Center D5
B-35883A
5
7,838,562
5,876,805
FY2015
Active
Hadley Park New Youth Center D5 - Sanitary Sewer
Component
B-35883AS
5
200,000
200,000
FY2015
Active
Hainsworth Village Street Improvement
B-30520
2
1,062,500
0
FY2013
Future
Health District Bicycle and Pedestrian Mobility Study
B-30645C
1,2,3,
4,5
60,000
60,000
FY2013
Active
Health District Riverwalk
B-30784
1
961,000
961,000
FY2016
Future
1-95 South Miami Terminal Street Improvements - D2
B-30718
2
859,000
859,000
FY2013
Active
IT Modernization
B-74617
1,2,3,
4,5
4,100,000
2,800,000
FY2015
Active
James L. Knight Center / Hyatt- Fire Alarm System
Replacement
B-70414
2
351,876
351,876
FY2014
Active
James L. Knight Center Miscellaneous Improvements
B-33506
1,2,3,
4,5
1,700,000
86,438
FY2013
Active
Kennedy Park Floating Dock PHI
B-30541 B
2
270,000
270,000
FY2013
Active
Kennedy Park Restroom Building Improvements
B-35838
2
222,033
222,033
FY2014
Active
Kennedy Park Restroom Building Improvements D2 -
Sanitary Sewer Component
B-35838S
2
50,000
50,000
FY2014
Future
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
•B-No.• •
Dist
Project
Estimated
Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Kennedy Park Shoreline Stabilization Phase I
B-30541C
2
261,000
261,000
FY2013
Active
Kinloch Park - Senior Community Center
B-35858
1
1,300,000
1,300,000
FY2019
Active
Land Management System
B-74614
1,2,3,
4,5
7,913,018
6,316,151
FY2015
Active
Large Firefighting Equipment
B-72809
1,2,3,
4,5
660,316
326,816
FY2014
Active
Lawnview Storm Sewer
B-30009
3
5,719,000
0
FY2015
Future
Legion Park Boat Ramp Repairs - D2
B-30820
2
14,124
14,124
FY2013
Active
Liberty Storm Sewers
B-30016
5
5,586,000
0
FY2016
Future
Light Fleet Replacement
B-72808
1,2,3,
4,5
1,649,658
667,658
FY2014
Active
Lincoln Park Improvements - D2
B-30826
2
40,000
40,000
FY2014
Active
Linear Parks, Greenways and Baywalk Improvements
B-30504
1,2,3,
4,5
961,000
961,000
FY2015
Future
Little Haiti Cultural Campus Miscellaneous Repairs - D5
B-30890
5
25,255
25,255
FY2013
Active
Little Haiti Gateway Signs - D5
B-30892
5
100,000
100,000
FY2014
Active
Little River Industrial Park
B-30540
5
2,000,000
2,000,000
FY2013
Active
Little River Storm Sewers Ph. II
B-30015
5
3,990,000
0
FY2016
Future
Little River Waterfront Park
B-50722
2
717,500
717,500
FY2014
Active
Lummus Landing Square - D5
B-3D886
5
925,061
925,061
FY2015
Active
Lummus Landing Square - D5
B-30886
5
925,061
925,061
FY2015
Active
Lummus Landing Square - D5
B-30886
5
925,061
925,061
FY2015
Active
Lummus Landing Square - D5
B-30886
5
925,061
925,061
FY2015
Active
Lummus Landing Square - D5 Sanitary Sewer Component
B-30886S
5
100,000
100,000
FY2015
Active
Lummus Park Historic Building Restoration
B-35844
5
225,770
0
FY2013
Future
Lummus Park Landing Project - Street Project
B-30643
5
1,368,535
1,368,535
FY2014
Active
Lummus Park Miscellaneous Repairs - D5 (FY2013-PR)
B-30889
5
40,265
40,265
FY2014
Future
Manatee Bend Park Shoreline Improvements - D2
B-30801
2
50,027
50,027
FY2014
Active
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No: -
- Dist
Project
Estimated
Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Manuel Artime Dimmer Rack System
B-30501B
1,2,3,
4,5
48,650
48,650
FY2013
Future
Manuel Artime Miscellaneous Project
B-30501A
3
238,549
238,549
FY2013
Active
Marine Stadium Bulkhead Replacement
B-30689
2
2,094,393
1,106,603
FY2014
Active
Marine Stadium Marina at Virginia Key
B-40180
2
33,180,900
1,740,007
FY2018
Active
Marine Stadium Marina Improvements
B-33514
2
1,315,550
385,645
FY2014
Active
Marine Stadium Restoration
B-30688
2
511,716
350,000
FY2014
Active
Marlins Stadium Area Infrastructure Improvements
B-30673
1,2,3,
4,5
12,536,710
12,536,710
FY2013
Active
Martin Luther King (MLK) Blvd / 1-95 Area Improvements - D5
B-30773
5
100,000
100,000
FY2014
Active
Mary Brickell Village Drainage Improvements
B-30637
1,2,3,
4,5
3,278,827
3,100,001
FY2013
Active
Maximo Gomez / Domingo Park Restroom D3 - Sanitary
Sewer Component
B-35861AS
3
100,000
100,000
FY2015
Future
Melreese Golf Training Center
B-30566A
1
2,385,560
2,385,560
FY2013
Active
Miamarina Emergency Pier Repairs
B-30325
2
1,461,788
1,461,788
FY2014
Active
Miamarina Intracoastal Bulkhead Assessment
B-30604
2
61,051
61,051
FY2014
Active
Miamarina Pier A, B & C Fire Line Repairs
B-30696
2
250,000
250,000
FY2013
Active
Miami Regional Intermodal Plan
B-30645F
1,2,3,
4,5
15,000
15,000
FY2013
Future
Miami River Greenway (5th Street bridge exten.)
B-30336
3
2,256,640
2,256,640
FY2014
Active
Miami River Greenway from Miami Circle Greenway to South
Miami Avenue
B-30631
2
1,221,625
1,221,625
FY2014
Active
Miami River Greenway from NW 10th to NW 12th Ave.
B-30651
3
3,160,379
3,160,379
FY2013
Active
Miami River Greenway Segment G and Segment E2
Decorative Lighting
B-40695L
3
145,785
145,785
FY2015
Active
Miami River Greenway SW 1st Court to South Miami Avenue
-D2 -
B-30130
2
1,557,530
1,557,530
FY2013
Active
Miami River Greenways/ Streetscape Segment D (ELH)
B-40686
3
3,113,501
3,113,501
FY2013
Active
Miami Women's Club Baywalk Project - CRA 92-686001
B-30731
2
93,000
93,000
FY2014
Active
Miscellaneous Repairs 10% Set Aside
B-30706
2
2,202,190
2,102,190
FY2013
Active
Moore Park New Construction
B-35887
5
7,605,462
7,605,462
FY2014
Active
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No.
Dist
Project
Estimated
Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Moore Park New Construction D5 - Sanitary Sewer
Component
B-35887S
5
500,000
500,000
FY2014
Active
Momingside A/C, Windows and Interior remodeling - D2
B-39910N
2
170,000
170,000
FY2013
Active
MRC Security System Hardening - UASI Funded 18-180011 /
10th Floor 18-180022
6-70415
2
69,842
69,842
FY2014
Active
Museum of Science - Development in Bicentennial Park -
Phase 2
B-78502A
1,2,3,
4,5
2,000,000
2,000,000
FY2013
Active
Museum Park - DRI Air Quality
B-30538E
1,2,3,
4,5
313,129
313,129
FY2014
Active
Museum Park - DRI Fees Administration
B-30538D
1,2,3,
4,5
600,000
600,000
FY2014
Active
Museum Park - DRI Transportation
B-30538F
1,2,3,
4,5
2,296,404
2,296,404
FY2014
Active
Museum Park - Partially Funded by CRA 92-686001
B-30538
1,2,3,
4,5
17,251,900
14,042,367
FY2014
Active
Museum Park - Sanitary Sewer Allocation
B-30538S
1,2,3,
4,5
1,000,000
1,000,000
FY2013
Active
Museum Park Environmental Remediation/Seawall - CRA 92-
686001
B-30538E
1,2,3,
4,5
2,000,000
2,000,000
FY2013
Active
N. Miami Court Reconstruction
B-31213
5
441,636
0
FY2013
Future
NE 1 Court Reconstruction
B-31214
5
666,995
0
FY2014
Future
NE 1st Avenue Reconstruction - NE 41 St. to NE 43 St.
B-31212
5
660,816
0
FY2013
Future
NE 2 Avenue Improvements
B-78508
2,5
36,938,862
4,985,832
FY2015
Active
NE 2nd Court Roadway and Drainage Improvements Project -
D5
B-30880
5
488,405
300,001
FY2013
Active
NE 43 Street Reconstruction
B-31217
5
868,100
0
FY2014
Future
NE Miami Place Reconstruction
B-31215
5
500,000
• 0
FY2015
Future
Neighborhood Gateways - District 3
B-30143A
3
24,680
24,680
FY2014
Future
Neighborhood Parks Improv. Contingencies - ADA
Modifications
B-35904
1,2,3,
4,5
1,272,223
771,223
FY2015
Future
Neighborhood Traffic Calming Improvements-D4-Study
B-30693
4
35,892
35,892
FY2013
Active
New Dinner Key Marina Dockmaster Building '
B-60464
2
4,217,809
4,217,809
FY2014
Active
New Dinner Key Marina Dockmaster Building D2 - Sanitary
Sewer Component
B-604645
2
690,000
690,000
FY2014
Active
North 14 St. Multi Media Entertainment District Streetscape
CRA 92-686001
B-30394
2
6,000,000
6,000,000
FY2013
Active
North District Police Building Misc. Repairs - D5
B-30988
5
26,026
26,026
FY2014
Future
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project '
B-No.
Dist
Project
Estimated
Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
North Shorecrest Roads Improvements Project - Partial
CDBG 91-02910 - D2
B-30035A
2
1,207,178
1,147,178
FY2014
Active
North Spring Garden Greenway
B-40643A
5
2,762,175
2,762,175
FY2013
Active
North Venetian Drive Lighting (District 2 QOL)
B-39910C
2
100,000
100,000
FY2014
Active
Northwest 14th Street Streetscape Project - CIP Funded
B-30518
5
2;617,649
439,001
FY2013
Active
Northwest Road and Storm Sewers Improvements - D5
B-30014
5
9,230,466
9,230,466
FY2013
Active
NW 11 Street from 27 to 37 Avenue Area Roadway
Improvements - D1
B-30781
1
739,493
739,493
FY2013
Active
NW 11th Ave Road Improvements - D3
B-40324
3
120,203
120,203
FY2014
Active
NW 11 th Street Roadway Improvement Project - Di
B-30725
1
750,000
750,000
FY2013
Active
NW 12 Avenue / NW 12 Place Roadway Improvements
B-30883
• 5
999,976
999,976
FY2014
Active
NW 14 Avenue and 28 Street Area Roadway Improvements -
D1
B-30780
1
868,276
868,276
FY2014
Active
NW 14th Court Roadway & Drainage Improvements - D3
B-30746
3
180,000
180,000
FY2013
Active
NW 17th Court Roadway Improvement Project - D1
B-30728
1
110,000
110,000
FY2013
Active
NW 17th Terrace Roadway Improvement Project - D1
B-30729
1
250,000
250,000
FY2013
Active
NW 18th Avenue Roadway Improvement Project - D1
B-30727
1
1,810,000
1,810,000
FY2013
Active
NW 18th Place Road Improvements - D3
B-40314
3
224,611
224,611
FY2014
Active
NW 21 Avenue between NW 1st Street and NW 3rd Street -
D3
B-30712
3
275,000
275,000
FY2013
Active
NW 24th Avenue Roadway Improvement Project - D1
B-30723
1
1,140,000
0
FY2013
Future
NW 24th Street Between NW 14th Avenue and NW 17th
Avenue-D1
B-30705
1
360,000
360,000
FY2013
Active
NW 31 st Street Roadway Improvement Project - D1
B-30722
1
311,000
311,000
FY2013
Active
NW 33rd Street Roadway Improvement Project - D1
B-30724
1
5,664,2731
3,700,001
FY2013
Active
NW 4th Terrace Roadway Improvement Project - D1
B-30730
1
75,000
75,000
FY2013
Active
NW 60th Avenue Roadway Improvement Project - D1
B-30726
1
888,000
888,000
FY2014
Active
NW 62 Street West of 1-95 Roadway Improvements - D5
B-30884
5
75,000
75,000
FY2014
Future
NW 71 St. Main Trunk Storm Sewer
B-30018
5
9,975,000
0
FY2016
Future
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
i
B-No:
Dist.
Project
Estimated
Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
NW 7th Court
B-30610
5
360,000
360,000
FY2014
Active
NW 8th Street Roadway and Drainage Improvements
B-30745
3
402,000
402,000
FY2013
Active
NW 9th Street Roadway Improvement Project - D1
B-30732
1
756,248
756,248
FY2013
Active
Oakland Grove Park Playground Equipment
B-75973
5
15,000
15,000
FY2014
Future
Old Fire Station No. 2 Restoration - CRA 92-686001
B-30579
2
3,500,000
3,500,000
FY2014
Active
On -Demand Transportation Services - Oracle: 40 On
Demand Transp
B-70717
1,2,3,
4,5
249,857
249,857
FY2014
Active
Orange Bowl Site Parking Garage (Marlin Stadium Parking
Garage)
B-30648
1,2,3,
4,5
96,042,248
96,042,248
FY2013
Active
Overtown / Wynwood Bicycle Pedestrian Mobility Plan
B-30645E
5
60,000
60,000
FY2013
Future
Overtown Greenway @ NW 11 Terrace - Partially Funded by
CRA 92-689001
B-30624
5
2,661,864
2,661,864
FY2014
Active
Overtown Sector Signage Project
B-38504
2,5
142,238
123,620
FY2013.
Active
Overtown Stormwater Pump Station Upgrades
B-50654
5
851,797
851,797
FY2017
Active
Overtown Youth Center Miscellaneous Repairs - D5 '
B-30893
5
35,625
35,625
FY2014
Future
Pallot Park Shoreline Improvements - D2
B-30802
2
50,000
50,000
FY2014
Active
Palm Grove Road Improvements
B-30630
2
3,851,340
3,851,340
FY2015
Active
Parks ADA Modifications - District 2
B-30547E
2
1,278,019
215,348
FY2013
Active
Parks ADA Modifications - District 4
B-30547G
4
491,147
491,147
FY2013
Active
Peacock Park Site Improvements
B-75883
2
830,124
830,124
FY2014
Active
Pedro Pan Monument (partially funded with D4 contribution)
B-30536
3
49,022
49,022
FY2013
Active
Phone and Radio Equipment Upgrades
B-72804
1,2,3,
4,5
1,209,200
351,200
FY2014
Active
Police Department Property Unit Outdoor Storage
B-30373A
1,2,3,
4,5
989,644
. 989,644
FY2013
Active
Police Department Sanitary Sewer System Repairs
B-70600
1,2,3,
4,5
60,000
60,000
FY2014
Active
Police Headquarters Helipad and Roof Replacement
B-72915
1,2,3,
4,5
240,321
240,321
FY2014
Active
Police Headquarters Helipad and Roof Replacement
B-72915A
1,2,3,
4,5
1,600,000
400,000
FY2014
Active
Police Radios Replacement
B-30554
1,2,3,
4,5
6,150,000
843,083
FY2016
Active
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
• B-No.•
Dist.
Project
Estimated
Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Police Swat Vehicles
B-30997
1,2,3,
4,5
322,846
322,846
FY2014
Future
Police Vehicle Replacement
B-74220
1,2,3,
4,5
27,491,738
27,491,738
FY2014
Active
Property Maintenance Building Improvements
B-74219
1,2,3,
4,5
300,000
0
FY2016
Future
Public Works Maintenance Yard
B-30551
1,2,3,
4,5
3,268,254
3,268,254
FY2015
Active
Purchase and Installation of a RISO Digital Duplicator
B-70107
1,2,3,
4,5
25,000
25,000
FY2013
Active
Purchase of a video transmission server •
B-70108
1,2,3,
4,5
100,000
100,000
FY2013
Active
Quality of Life District 2 - Various Projects
B-39910
2
206,131
206,131
FY2014
Future
Refurbishing of Existing Apparatus
B-70105
1,2,3,
4,5
230,000
230,000
FY2013
Future
Reid Acres Storm Sewers
B-30013
5
5,719,000
0
FY2015
Future
Replace Existing Fire Engines
B-72811
1,2,3,
4,5
3,035,000
0
FY2014
Future
Riverview Pump Station
B-30992
3
500,000
500,000
FY2013
Active
Roadway Improvements
B-30990
1,2,3,
4,5
1,361,000
1,361,000
FY2019
Future
Roadway, Drainage and Traffic Improvements - D1 & D4
B-50706A
1,4
1,556,848
1,208,245
FY2014
Active
Robert King High Park Furniture - D4
B-35868A
4
45,000
45,000
FY2013
Active
Rockerman Canal Improvements
B-30680
2
911,824
911,824
FY2013
Active
San Marco Island and Biscayne Island Drainage
Improvements - D2
B-30588
2
4,488,981
4,488,981
FY2013
Active
SE 3rd St Widening (fka Dupont Plaza) - DRI Transportation
B-31206A
2
1,500,000
1,500,000
FY2015
Active
SE 3rd Street Widening
B-31206
2
2,705,098
641,495
FY2014
Active
SE 3rd Street Widening - DRI Administration
B-31206B
2
100,000
100,000
FY2015
Active
Seminole Dinghy Dock Expansion
B-30602
2
60,000
30,000
FY2015
Future
Shenandoah Area Improvements - D4
B-30775
4
414,389
414,389
FY2014
Active
Shenandoah Roadway Improvements
B-30167D
4
1,550,000
1,550,000
FY2013
Active
Shenandoah Roadway Improvements - D3
B-40327
3
1,000,000
1,000,000
FY2014
Active
Shorecrest Roadway Milling & Resurfacing Project
B-30035E
2
1,138,097
1,138,097
FY2013
Active
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
• Project
- - • B-No. •
Dist
Project
Estimated
Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Silver Bluff Drainage Improvements - D4
B-30776
4
600,000
600,000
FY2014
Active
Silver Bluff Traffic Calming Priority 3 - D4
B-30168A
4
620,841
620,841
FY2013
Active
Solid Waste Collection Equipment
B-73202C
1,2,3,
4,5
4,950,820
4,402,827
FY2014
Active
South Bayshore Dnve from Aviation Avenue to Kirk Avenue -
D2 PW
B-40168
2
100,000
100,000
FY2013
Active
South Bayshore Dnve Roadway and Drainage Improvements
B-30646
2
9,260,130
550,000
FY2015
Active
South Miami Avenue Drainage Improvements - MDC
B-30637A
2
204,444
0
FY2015
Active
Spoil Island B & C Swim Area Improvement - D2
B-30824
2
67,000
67,000
FY2014
Active
Spoil Island E Restoration and Floating Dock
B-30721
2
416,400
90,000
FY2013
Active
SW 10th Street Road Improvements - D3
B-40306
3
347,385
347,385
FY2014
Active
SW 11th Street Road Improvements - D3
B-40304
3
81,549
81,5491FY2014
Active
SW 12th Street Road Improvements - D3
B-40305
3
55,026
55,026
FY2014
Active
SVV 13th Street Roadway & Drainage Improvements - D3
B-30747
3
400,000
400,000
FY2013
Active
SW 15th Street Road Improvements Segment 1 - D3
B-40301
3
84,969
84,969
FY2014
Active
SW 15th Street Road Improvements Segment 2 - D3
B-40315
3
245,349
. 245,349
FY2014
Active
SW 16 Avenue Roadway & Drainage Improvements - D3
B-30741
3
198,000
198,000
FY2013
Active
SW 16th Avenue from Coral Way to 20 Street - D3
B-30719
3
135,000
. 135,000
FY2013
Active
SW 16th Street Road Improvements - D3
B-40307
3
257,693
257,693
FY2014
Active
SW 17th Avenue Roadway & Drainage Improvements - D3 &
D4
B-30760
3,4
600,000
600,000
FY2015
Active
SW 17th Street Road Improvements - D3
B-40309
3
412,212
412,212
FY2014
Active
SW 17th Terrace Road Improvements - D3
B-40308
3
225,567
225,567
FY2014
Active
SW 18th Terr. Road Improvements - D3
B-403D0
3
129,121
129,121
FY2014
Active
SW 19th Terrace Improvements (SW 23 Avenue to SW 24th
Avenue) Partial CDBG 91-02889 - D4
B-30695
4
537,191
537,191
FY2013
Active
SW 1st Ave Road Improvements - Segment 2 - D3
B-40318
3
167,562
167,562
FY2014
Active
SW 1st Ave Road Improvements Segment 3 - D3
B-40323
3
126,638
126,638
FY2014
Active
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
B-No. .
Dist.
Project
Estimated
Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
SW 1st Avenue Road Improvements - Segment 1 - D3
B-40302
3
314,579
314,579
FY2014
Active
SW 20th Road Improvements - D3
B-40310
3
116,682
116,682
FY2014
Active
SW 22nd Avenue Medians - US 1 to Coral Way - D4
B-30770
4
400,000
400,000
FY2013
Active
SW 22nd Road Improvements - D3
B-40311
3
96,406
96,406
FY2014
Active
SW 22nd Terr. & SW 13th Ave Road Improvements - D3
B-40312
3
394,317
394,317
FY2014
Active
SW 23rd Road Improvements - D3
B-40303
3
244,748
244,748
FY2014
Active
SW 23rd Roadway & Drainage Improvements - D3
B-30744
3
90,000
90,000
FY2013
Active
SW 25th Road Improvements - D3
B-40319
3
.118,561
118,561
FY2014
Active
SW 26th Road Improvements Segment 1 - D3
B-40316
3
85,034
85,034
FY2014
Active
SW 26th Road Improvements Segment 2 - D3 '
6-40320
3
498,804
498,804
FY2014
Active
SW 27th Road Improvements - D3
6-40322
3
498,804
498,804
FY2014
Active
SW 28th Road Improvements - D3
B-40317
3
40,149
• 40,149
FY2014
Active
SW 28th Road Roadway & Drainage Improvements - D3
B-30743
3
250,000
250,000
FY2013
Active
SW 2nd Ave Road Improvements- D3
B-40321
3
721,333
721,333
FY2014
Active
SW 32 Avenue. Improvements Additional Services
B-40704A
2,4
1,752,333
1,752,333
FY2013
Active
SW 3rd Ave Road Improvements - D3
B-40313
3
191,983
191,983
FY2014
Active
SW 3rd Avenue Road Improvements Project
B-30031A
3
2,274,800
154,308
FY2015
Active
SW 5th Avenue Roadway & Drainage Improvements - D3
B-30742 •
3
19,000
19,000
FY2013
Active
SW/NW 17th Avenue Traffic Corridor Study - Citywide
B-30993
1,2,3,
4,5
200,000
. 200,000
FY2013
Active
Tamiami Roadway & Storm Sewer Project
B-30647
1,4
9,600,000
0
FY2015
Future
The Roads Roadway Improvements - D3
B-40326
3
500,000
500,000
FY2014
Active
Tigertail Resurfacing - D2
B-30716
2
711,258
711,258
FY2013
Active
Traffic Calming SW 6th Street Project - D4
B-30771
4
324,670
324,670
FY2014
Active
Traffic Study Reviews - Oracle Project 35-110007
B-30346
1,2,3,
4,5
411,622
411,622
FY2015
Active
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
• B-No.
Dist
Project
Estimated.
Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Transportation Program Support Services - Transit
Professional
B-70246
1,2,3,
4,5
500,000
500,000
FY2016
Active
Transportation Program Support Services - Transit
Professional Services
B-30645A
1,2,3,
4,5
766,479
766,479
FY2013
Active
Transportation Program Support Services - Transportation
B-70245
1,2,3,
4,5
500,000
500,000
FY2016
Future
Transportation Program Support Services - Transportation
Professional Services
B-30645B
1,2,3,
4,5
1,026,000
1,026,000
FY2013
Active
Triangle Park Swings - D3
B-30711
3
8,500
8,500
FY2013
Active
Trolley Program Oracle Project: 40 Brickell/Biscayne Trolley
B-70715B1
2
619,416
619,416
FY2015
Active
Trolley Program Oracle Project: 40 FDOT Brickell/Biscayne
Trolley
B-707158
2
619,416
619,416
FY2015
Active
Trolley Program Oracle Project: 40 FDOT Health/Stadium
Trolley
B-70715C
1,3
852,185
852,185
FY2015
Active
Trolley Program Oracle Project: 40 Health/Stadium Trolley
B-70715C1
1
952,185
952,185
FY2015
Active
Upgrade PC Software & Hardware
' B-74606
1,2,3,
4,5
7,174,921
2,920,683
FY2015
Active
US-1 Median Closures at Bridgeport and SW 30 Ct - D2
B-30662D
2
330,000
330,000
FY2013
Active
US1 Roadway Improvements and Wall Replacement Phase
II
B-30542A
2
2,671,423
2,671:423
FY2013
Active
Venetian Causeway Improvements
B-39911
' 2
3,196,465
3,196,465
FY2013
Active
Virginia Key Beach Park Historic Restoration Phase 2
B-30174
2
1,356,237
1,356,237
FY2015
Active
Virginia Key Beach Park Museum
B-30508
2
20,527,127
20,527,127
FY2018
Active
Virginia Key Beach Swimming Area
B-30587
2
346,250
0
FY2015
Future
Virginia Key Bike Trail Building - D2 '
B-30995
2
377,000
377,000
FY2015
Active
Virginia Key Bike Trail Building - D2 - Sanitary Sewer
Component
B-309955
2
50,000
50,000
FY2014
Active
Virginia Key Landfill Assessment
B-35002
2
1,400,000
1,400,000
FY2015
Active
Virginia Key Rowing Center Improvements - P&R Project
B-30374
2
883,623
616,513
FY2016
Active
Virrick Park Gymnasium Improvements D2
B-35853B
2
150,000
150,000
FY2013
Active
Virrick Park New Pool Facility
B-35853A
2
3,457,462
2,088,897
FY2015
Active
Wagner Creek / Seybold Canal Dredging
B-50643
1,5
23,087,275
3,673,503
FY2014
Active
Waterfront Improvements Citywide
B-39903
1,2,3,
4,5
0
0
FY2013
Future
2012-2013 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
1
.B-No.
Dist.
Project
Estimated
Cost
Fund
Allocation
Estimated
Fiscal
Year End
Date
Status
Watson Island Infrastructure
B-75001
2
647,190
150,000
FY2016
Future
Watson Island Public Park Improvements
B-35000
2
2,600,000
0
FY2018
Future
West End Park New Community Building
B-30690
4
2,252,675
1,935,470
FY2015
Active
West End Park New Community Building - Sanitary Sewer
B-30690S
4
100,000
100,000
FY2015
Active
West FlaglerArea Improvements - D4 •
B-30774
4
3,061,315
1,299,862
FY2014
Active
Wynwood Area Roadway Improvement - D5
B-30888
5
500,000
500,000
FY2014
Future
2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
LIST OF COMPLETED PROJECTS F'Y20 i i • 20 12
Project Project Description
Number
Air Conditioner Unit for B-30365P Air Conditioner Unit for Overtown NET Office
Overtown NET Office
ARRA - Green Lab
Construction
B-30652A To renovate the Miami Green Lab, a green building
resource center for the community. Funds to be used
for landscaping, energy efficient HVAC and lighting,
electrical, plumbing and water efficient technology.
Green Lab B-30652 Renovation of the building at 151 NW 27th Avenue to
Construction create the Green Lab, an educational resource center
for green building and the offices of the Office of
Sustainable Initiatives.]
MRC Riverside Walk B-70413 Repair and replace eight light poles that have been
Light Poles vandalize by the river walk (along the river - east of the
Replacement slip).
Communication UPS B-30384C Create a redundant power back-up for the 911 system
Power by installing an additional UPS. Funding also includes
$400K funded by E911 and $425K funded by UASI.
North Police Substation B-30592A Project consists of providing hurricane protection for
Hurricane Protection the windows and main front entrance at the existing 2-
story police substation. Astorino is to provide Design
Analysis report for retrofitting building with storm
panels, shutters and/or impact resistant glass.
Fund
Allocation
($)
3,700
550,000
749,000
5,900
992,698
75,265
2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Dinner Key Marina -
Miscellaneous Repair
James L. Knight Center
Chiller & Cooling Tower
Oracle Project 41-
410004
Orange Bowl / Marlins
Re -Development
1814 Brickell Avenue
Park - D2
Athalie Range Park
Soccer / Football Field
Improvements
Brickell Park
Playground (South of
Icon)
Coral Gate Park
Community Building
Project Project Description
Number
325- PUBLIC FACILITIES
B-30596 Canopy and sign replacement at Dinner Key Marina.
B-40181 Remove and replace four Chillers and all related
pumps, piping and electrical work. Demolish existing
cooling tower and replace with new cooling tower
assembly.
B-30153J Cover expenses related to Baseball Stadium
Agreement dated 03/03/08. Premium for Pollution.
Legal liability Insurance policy for Baseball Stadium
site.
-331 PARKS 8� RECREATION
B-30685B Permitting and construction of a new park on a 35,500
SF property. The program includes landscaped areas
an elevated landscaped court and a children's play
area. Scope includes landscaping consisting of
groundcover, shrubs and mature trees, decorative
concrete hardscaping, benches, picket fencing, site
drainage, irrigation and lighting. There is an existing
water meter and electrical meter on site.
B-35907 Demolition of the existing baseball and softball fields.
Design and construction of a new combination
soccer/football and a regulation size pro -baseball
fields. The project will also include field and site
amenities such as sports lighting, 10' x 16' storage /
electrical room, landscaping/irrigation/drainage,
walkways and related work.E
B-39910P The Project onsist of the installation of a children's
playground at Brickell Park
B-35865A
The project consists of furnishing of all labor, material
and equipment for the construction of a new community
building of approximately 4,600 G.S.F. Also, the
project includes a new parking lot, landscape, irrigation,
demolition of existing building, new playground and
utility on site for services. Seek LEED Silver
Certification.
Fund
Allocation
($)
401,356
4,596,400
14,034,334
1,209,889
1,860,730
110,000
1,963,180 ,
2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Douglas Park
Improvements - CDBG
91-02980
Duarte Park Gazebo
and Roof Remodeling -
D1
Freedom Garden
Statue Rehabilitation -
D5
Hadley Park ADA and
Miscellaneous
Improvements - D5
Irrigation System at
Kennedy Dog Park - D2
Legion Park
Improvements - CDBG
Project 91-02980
Project Project Description
Number
B-39910R Scope of services includes: Canopy shelter next to
basket ball court; Extension of walking paths;
Replacement of canopy poles; Replacement of
electrical panel (baseball field); Fill gap under tennis
courts and buildings; Resurfacing basketball courts
(incl. rims, backboards, support structures and nets);
Resurfacing 3 tennis courts , incl. nets & posts;
Replacement of chain link fence around courts, incl.
gates; Exterior painting of Recreation & Restrooms
Buildings.
B-35812C The project consist of the design and construction of
modifications to a group of three open-air pavilions at
Juan Pablo Duarte. At all three pavilions, work includes
removal of the roofing and installation of new metal roof
. At the Southwest pavilion that houses the local
domino club, work includes removal of the existing
steel picket fence at the exterior of the pavilion and
installation of a non-structural louvered fence;
installation of a new steel picket fence and gate to
seperate the domino pavilion from the neighboring
pavilions; and installation of additional lighting and fans.
B-30885 Freedom Garden Statue Rehabilitation
B-30547K The project consists of ADA reconstruction of parking
areas for the recreation building parking lot to include
markings, signage and ADA concrete ramps. The
Miter J. Dawkins Olympic Pool Complex building work
includes ADA modifications inside the restroom, new
accessible doors hardware, new accessories benches,
controls and bars for the existing showers, accessible
benches for the locker area and accessible signage for
the team room.
B-40170 Installation of an electromechanical irrigation system
within the two Dog Park areas at Kennedy Park
B-399100 Scope of services includes: New park entrance along
Biscayne Boulevard; Parking Lot resurfacing;
Recreation Building Renovation (stage restrooms, ext.
doors, int. renov. of 1st and 3nd floors); Canopy for
playground equipment; Improvements per DOJ
agreement (per WAP plans)
Fund
Allocation
($)
177,000
199,400
75,000
70,000
55,945
390,000
2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project Project Project Description Fund
Number Allocation
($)
Legion Park Parking
Lot Renovation
B-35843 Parking Lot Renovations 57,842
Legion Park Windows B-39910M Replacement of existing jalousie windows and
and Paint Interior - D2 installation of accordion shutters and interior painting.
QOL
Morningside Park ADA B-35846A 1) RECREATION BUILDING RESTROOMS: Remove
and Restrooms and Replace all restroom fixtures, partitions and
Remodeling accessories. Replace with new ones .Repair piping as
necessary. Install new electrical fixtures and exit signs
as necessary. MEET ADA REQUIREMENTS. The
present fixture count is: MALE; 2 toilets 1 urinal, 2
lavatories, & 1Janitor sink in its closet. FEMALE; 3
toilets + 2 lavatories..❑
2) FIELD RESTROOM BUILDING : Demolish interior
Do not demolish ceiling ) and install new fixtures,
accessories, partitions, floor and wall tile, paint and
install new insect -screens on existing pre -cast
louvered -windows . Check and repair water lines and
check and repair sanitary lines as needed. Install new
electrical fixtures and exit signs as necessary. The
present fixture count is as follows: MALE; 3 toilets, 2
urinals, 2 lavatories and a janitor sink in a service
room. FEMALE; 5 toilets and 2 lavatories. Patch and
paint all interior surfaces. MEET ADA
REQUIREMENTS. 3) Correct walkways and parking
stalls to meet ADA requirements. 4) Additional access
openings on the shoreline.
Morningside Park New
Pool Facility
B-30585 Demolition of the existing pool facility and construction
of a new pool facility within the existing facility footprint.
The new facility will include the following key
components: pool heater system, swimming pool with a
maximum depth of 6 feet, splash park features, pool
bath house and pump building.
The new facility will be constructed to meet all
applicable codes, and will be fully handicap accessible.
49,034
562,120
200,000
2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project Project Project Description Fund
Number Allocation
($)
Parks ADA
Modifications - District
1 - Curtis Park
B-30547D Curtis Park - Provide at restrooms of Recreation
Building, Concessions Building and Stadium Building
permanent accessible rooms signage; accessible
accessories and flush valves, also insulation for hot
water pipes. At parking areas provide accessible
parking spaces with access aisle. Provide accessible
door entrance, water coolers and walkway to
accessible chess table. E
Juan Pablo Duarte Park - Provide one van accessible
space and one standard H/C space. Provide an
accessible route from the baseball field bleachers to
the existing Field House. Renovations to the existing
standalone restroom, including ADA compliance.
Restroom repairs within the Recreation Building.
Parks ADA B-30547H AFRICAN SQUARE: Re- stripe parking & provide 1
Modifications - District ADA Van space. Provide 1 ADA chess table. Provide 1
5 ADA ramp to the Amphitheatre Stage. Upgrade both R-
R to ADA Remodel the interior of both restrooms.
HADLEY: Provide 1 ADA Van space and 1ADA H/C
space. At the Rec Ctr. provide 1 ADA Van space and 2
ADA H/C spaces Re -Design showers and fixtures to
ADA . LEMON CITY: 1 ADA Van space. ADA route
between basketball and sidewalk. LUMMUS: 1 ADA
Van space. ADA route to bar-b-que & drinking fountain.
Hi-Lo ADA drinking fountain MOORE: ADA directional
signage at entry to Tennis Center. ADA hand rails at
the Tennis Center. ADA route to Day Care. ADA
picnic table on an ADA route. ADA route to the picnic
tables & playground. equipment. 1 ADA play equipment
on an ADA route. Provide ADA surface for play
equipment area. Re -design the showers, fixtures, to
ADA criteria.
Robert King High Park
New Bldg Const
B-35868 Construction of a new 5,768 SF Community Building
and Site Improvements including a new covered
basketball court, new tennis court and upgrades to
existing tennis and handball courts. The scope also
includes the upgrade of the existing sports lighting,
construction of a new perimeter fence, new walkways,
sand volleyball court, parking lot, playground and picnic
areas, landscaping and irrigation system and related
work.
167,439
211,137
2,214,938
2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project
Robert King High Park
Soccer Field and
Restrooms
Project Project Description
Number
B-30229 Construction of new soccer field including new
restroom facilities with liftstation, ADA parking lot and
walkways, bleachers and related work. The new soccer
field will include new sports lighting and irrigarion
system.
Williams Park Furniture B-75991 B Williams park: Office Furniture, 3 TVs, 3 Mounting Wall
- D5 Arms, 1 Blue -Ray Disc player, 1 Sound System
Receiver , 2 sets of speakers.:
Belle Meade Gateway
Enclosure •
Bob Hope Dr. Between
NW 20th Street to NW
17th Street - D1
Gibson Park Area
Street Improvements -
Street Component of B-
30305B
Kumquat Ave between
• Pamona Lane and
Linden Lane D2
NW 14th Avenue
Between NW 24th
Street to NW 27th
Street - Di
B-40183 Install steel picket fence with gates at five street
barricades •
B-30703 Project consist of milling and resurfacing of Bob Hope
Dr. Between NW 20th Street to NW 17th Street -
Project estimate based on milling and resurfacing only
with minor reconstruction if necessary. Project length of
approximately 1500 ft was reduced to 900 ft to meet
allocated budget
B-30305C Street Improvements to address existing roadway
conditions. Reconstruct NW 12th Street with new drop-
off area, parking and landscaping. The remaining
scope for this project are being performed under B-
30305B.
B-40175 Proposed two (2) speed tables to slow vehicular traffic.
B-30704 Project consist of roadway improvements to NW 14th
Avenue Between NW 24th Street to NW 27th Street -
Project estimate based on milling and resurfacing, new
curb and gutter on both sides, minor drainage
improvements and swale driveway improvements.
Project length approximately 700 ft and 22 ft existing
pavement.
Fund
Allocation
($)
1,341,312
40,000
85,997
190,000
1,000,000
43,725
240,000
2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project Project Project Description Fund
Number Allocation
($)
NW North River Drive - B-30691 Milling and resurfacing including re -striping. Inaddition,
D1 scope includes reconstruction of approx. 200 If. of
roadway with one new inlet and 50 L.F. of french drian.
SW 23 Street @ SW
16th Court
Two -Way Traffic
Conversion on NW 1
Street - D3
193,880
B-30168E Installation of traffic circle at SW 23rd Street and SW 80,000
16th Ct.
B-30740 Reconstruct handicap ramps to be ADA compliant and
adjust pavement markings on NW 1st street, west of
NW 6th avenue and also west of NW south river drive.
Virginia Street between B-30734 Sidewalks and Lighting
Bird Avenue and US1
and Misc. Grove Street
Sidewalks & Lighting -
D2
Citywide Drainage
Improvement Project
Kinloch Storm Sewer
Improvement Project
Phase II
B-30597 Drainage Improvements to address existing flooding
and roadway conditions:_
1) 2010 FEMA PDM Application❑
2) 2011 FEMA PDM Application
B-50705P2 Phase II Design and Construction: consists of a
connection to an existing outfall, old exfiltration
trenches will be replaced with new ones, manholes,
inlets, swale trenches and surface restoration. Road
improvements include roadway milling & resurfacing,
ADA Ramps, damaged sidewalk and curb and/or gutter
replacement and swale restoration on street blocks
impacted by the drainage construction.
19,000
473,275
9,854
1,119,133
Project
2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN
Project Project Description
Number
Virginia Key Weigh B-30698 Design and installation services associated with the
Station Replacement replacement of an existing dilapidated trailer and non -
Project operative weigh station( collectively referred to as
:improvements") at the Virginia Key composting/mulch
facility. Scope of work will include geotechnical
services, demolition and/or removal of existing
improvements, coordinating installation of the new
improvements, coordinating FPL services.
Fund
Allocation
($)
613,402
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
CAPITAL IMPROVEMENTS PROGRAM CURRENT PROJECTS COST TO DATE BY FUND
Project Name
Project Dist Award Award Name Fund Fund Actual Encumbrances Total Cost
Number (s) No. No. Description
City of Miami Impact Fee Study - 40-B30994 1,2,3 1103 Contribution From General Fund 31000 General
Citywide ,4,5 Government
Projects
$ 35,288.00 $ 14,342.00 $ 49,630.00
Citywide General Fleet Replacement 40-B74200 1,2,3 1103 Contribution From General Fund 31000 General
,4,5 Government
Projects
$ 1,070,989.00 $ - $ 1,070,989.00
Citywide General Fleet Replacement 40-B74200 1,2,3 1304 Contribution from General Fund FY 31000 General
,4,5 2007 Government
Projects
$ 881,310.08 $ $ 881,310.08
Citywide General Fleet Replacement 40-B74200 1,2,3 1426 Contribution from General Fund FY 31000 General $ 1,307,949.59 $ 345,356.70 $ 1,653,306.29
,4,5 2008 Government
Projects
Coconut Grove Viewing Platform Spoil 40-B40171 2 1767 Ransom Everglades School- Coconut 31000 General $ 88.36 $ - $ 88.36
Island C Grove Viewing Platform Spoil Island C Government
and Spoil Island E Projects
Coconut Grove Viewing Platform Spoil 40-840172 2 1767 Ransom Everglades School- Coconut 31000 General $ 80.71 $ - $ 80.71
Island E Grove Viewing Platform Spoil Island C Government
and Spoil Island E Projects
Coral Way Net Office - Structural 40-B30365E 3 1426 Contribution from General Fund FY 31000 General $ 1,659.12 $ $ 1,659.12
Evaluation 2008 Government
Projects
Damaged Vehicle Replacement/Repairs 40-B30666 1,2,3 1577 Subrogation Auto Claims B-30666 31000 General
,4,5 Government
Projects
$ 554,158.28 $ - $ 554,158.28
ERP Integration System 40-674609 1,2,3 1103 Contribution From General Fund 31000 General
,4,5 Government
Projects
$ 12,486,771.72 $ - $ 12,486,771.72
ERP Integration System 40-B74609 1,2,3 1105 Fire Assessment Fee
,4,5
31000 General
Government
Projects
$ 287,422.33 $ - $ 287,422.33
ERP Integration System 40-674609
1,2,3 1212 SRF Contribution to CIP - Prior to 31000 General
,4,5 2006 Government
Projects
$ 1,473,459.00 $
- $ 1,473,459.00
ERP Integration System
40-874609 1,2,3 1304 Contribution from General Fund FY 31000 General
,4,5 2007 Government
Projects
$ 2,028,914.05 $ (50,000.09) $ 1,978,913.96
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project Dist Award Award Name Fund Fund Actual Encumbrances Total Cost
Number (s) No. No. Description
ERP Integration System
40-B74609 1,2,3 1426 Contribution from General Fund FY 31000 General
,4,5 2008 Government
Projects
$ 825,964.95 $ - $ 825,964.95
ERP Integration System 40-674609
1,2,3 1565 Sunshine State Government 31000 General
,4,5 Financing Commission Loan 11 3 Government
Projects
$ 6,956,046.50 $ 46,764.79 $ 7,002,811.29
Generator for City Hall
40-B30365H 1,2,3 1426 Contribution from General Fund FY 31000 General
,4,5 2008 Government
Projects
$ 15,157.98 $ (0.02) $ 15,157.96
GSA Fleet Maintenance Garage
Expansion
40-B74205B 1 1108 Impact Fees Ord
31000 General
Government
Projects
52,787.00 $ 52,787.00
GSA,Fleet Maintenance Garage
Expansion
40-B74205B 1 1422 Impact Fees New Ordinance-2007
31000 General
Government
Projects
$ 45,312.71 $ - $ 45,312.71
IT Modernization
40-874617 1,2,3 1426 Contribution from General Fund FY 31000 General
,4,5 2008 Government
Projects
$ 2,104,711.50 $ 655,772.35 $ 2,760,483.85
Land Management System
Land Management System
40-B74614 1,2,3 1103 Contribution From General Fund 31000 General
,4,5 Government
Projects
Police Vehicle Replacement
$ 1,176,209.17 $ - $ 1,176,209.17
40-B74614 1,2,3 1565 Sunshine State Government 31000 General . $ 5,063,014.84 $ 2,923.99 $ 5,065,938.83
,4,5 Financing Commission Loan II 3 Government
Projects
40-874220
1,2,3 1103 Contribution From General Fund 31000 General
,4,5 Government
Projects
$ 9,141,422.27 $
- $ 9,141,422.27
Police Vehicle Replacement
40-B74220 1,2,3 1304 Contribution from General Fund FY 31000 General
,4,5 2007 Government
Projects
$ 4,433,407.45 $ - $ 4,433,407.45
Police Vehicle Replacement
40-B74220 1,2,3 1426 Contribution from General Fund FY 31000 General
,4,5 2008 Government
Projects
$ 10,661,927.97 $ (0.01) $ 10,661,927.96
PW Maintenance Yard 40-B30551 1,2,3 1113 Local Oprion Gas Tax
,4,5
31000 General
Government
Projects
3,121.83 $
$ 3,121.83
PW Maintenance Yard
40-B30551 1,2,3 1426 Contribution from General Fund FY 31000 General
,4,5 2008 Government
Projects
$ 1,268,254.37 $ - $ 1,268,254.37
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
Fund Fund
(s) No. No. Description
Actual Encumbrances Total Cost
Quality of Life District 2
40-839910 2 1584 Homeland Defense/Neighborhood
Improvement Bond Series 3
31000 General
Government
Projects
$ 54,926.75 $ - $ 54,926.75
RISO Digital Duplicator
40-870107 1,2,3 1108 Impact Fees Ord
,4,5
31000 General $ 19,937.10 $ $ 19,937.10
Government
Projects
Upgrade PC Software & Hardware
40-B74606 1,2,3 1103 Contribution From General Fund
,4,5
31000 General
Government
Projects
$ 2,003,786.30 $ - $ 2,003,786.30
Upgrade PC Software & Hardware
40-B74606 1,2,3 1304 Contribution from General Fund FY
,4,5 2007
31000 General
Government
Projects
$ 293,914.38 $
293,914.38
Upgrade PC Software & Hardware
40-674606 1,2,3 1426 Contribution from General Fund FY
,4,5 2008
31000 General
Government
Projects
$ 621,343.52 $
$ 621,343.52
Virginia Key Landfill Assessment
40-B35002 2 1348 Miami Dade County DERM Virginia
Key Landfill Assessment Grant
31000 General
Government
Projects
$ 650,000.00 $
650,000.00
Virginia Key Landfill Assessment
40-B35002 2 1496 Sunshine State Government
Financing Commission Loan II 2
Computer Aided Dispatch (CAD)
40-B72801 1,2,3 1105 Fire Assessment Fee
,4,5
31000 General $ 78,803.26 $ 1,538.37 $ 80,341.63
Government
Projects
32000 Public Safety $ 70,865.00 $ $ 70,865.00
Defense and Security Equipment
Acquisition
40-B72813 1,2,3 1049 HD Fire Rescue Homeland Defense 32000 Public Safety $ 800,279.21 $ - $ 800,279.21
,4,5 Preparedness Initiative Series 1
Defense and Security Equipment
Acquisition
40-B72813 1,2,3 1370 HD2 Fire Rescue Preparedness.
,4,5 Initiative
32000 Public Safety
983,298.61 $ $ 983,298.61
Defense and Security Equipment
Acquisition
40-872813 1,2,3 1584 Homeland Defense/Neighborhood 32000 Public Safety $ 190,730.93 $ 519,706.00 $ 710,436.93
,4,5 Improvement Bond Series 3
Fire Rescue Personal Protective
Equipment
40-B70411 1,2,3 1426 Contribution from General Fund FY 32000 Public Safety $ 110,927.07 $ $ 110,927.07
,4,5 2008
Fire Rescue Personal Protective
Equipment
40-B70411 1,2,3 1762 2010 FEMA/Assistance to Firefighters 32000 Public Safety $ 455,434.54 $ 786.88 $ 456,221.42
,4,5 Grant Program
Fire Station 1110 (New)
Fire Station 1110 (New)
40-B60351
40-B60351
1 1103 Contribution From General Fund 32000 Public Safety $ 341,185.98 $
1 1108 Impact Fees Ord 32000 Public Safety $ 195,737.08 $
$ 341,185.98
$ 195,737.08
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
(s) No.
Fund Fund Actual Encumbrances Total Cost
No. Description
Fire Station H10 Restroom Remodeling 40-670104 1 1017 Fire Assessment Fee
32000 Public Safety $ 12,246.16 $ 12,360.40 $ 24,606.56
Fire Station 1110 Restroom Remodeling 40-1370104 1 1105 Fire Assessment Fee
32000 Public Safety $ 3,258.74 $ - $ 3,258.74
Fire Station 1110 Restroom Remodeling 40-670104
1 1426 Contribution from General Fund FY 32000 Public Safety $ 6,230.07 $ - $ 6,230.07
2008
Fire Station 1114 (New)
Fire Station 1114 (New)
40-B60454
4 1051 HD Neighborhood Fire Stations & 32000 Public Safety $ 181,361.84 $ - $ 181,361.84
Training Facility Series 1
40-860454 4 1496 Sunshine State Government
Financing Commission Loan 11 2
32000 Public Safety $ 11,116.77 $ (0.01) $ 11,116.76
Fire Station 1114 (New)
40-B60454 4 1584 Homeland Defense/Neighborhood 32000 Public Safety $ 86.25 $ -
Improvement Bond Series 3
$ 86.25
Fire Station 13 (New)
Fire Station 13 (New)
Fire Station 13 (New)
40-B60453A
2 1051 HD Neighborhood Fire Stations & 32000 Public Safety $ 52,992.00 $ - $ 52,992.00
Training Facility Series 1
40-B60453A 2 1367 HD2 Neighborhood Fire Stations and 32000 Public Safety $ 1,310,582.72 $ 3,103,257.90 $ 4,413,840.62
Training Facility
40-B60453A
2 1422 Impact Fees New Ordinance-2007 32000 Public Safety
$ 6,504.09 $
- $ 6,504.09
Fire Station 13 (New)
40-B60453A 2 1584 Homeland Defense/Neighborhood 32000 Public Safety $ 18,363.56 $ - $ 18,363.56
Improvement Bond Series 3
Fire Station Equipment and Furniture 40-872803 1,2,3 1017 Fire Assessment Fee
Replacement ,4,5
32000 Public Safety $ 124,806.25 $ - $ 124,806.25
Fire Station Equipment and Furniture 40-872803 1,2,3 1105 Fire Assessment Fee
Replacement ,4,5
32000 Public Safety $ 156,630.87 $ $ 156,630.87
Fire Station Equipment and Furniture 40-672803 1,2,3 1108 Impact Fees Ord
Replacement ,4,5
32000 Public Safety $ 80,433.49 $ $ 80,433.49
Fire Station Equipment and Furniture
Replacement
40-B72803 1,2,3 1426 Contribution from General Fund FY 32000 Public Safety $ 149,999.18 $ $ 149,999.1E
,4,5. 2008
Fire Station No 6 Office Building 40-B70102A 5 1105 Fire Assessment Fee
Fire Stations & Other Fire Facilities 40-B72802 1,2,3 1017 Fire Assessment Fee
,4,5
32000 Public Safety •
32000 Public Safety
7,225.39 $ 150.00 $ 7,375.39
501,290.23 $ - $ 501,290.23
Fire Stations & Other Fire Facilities 40-B72802 1,2,3 1105 Fire Assessment Fee 32000 Public Safety $ 1,972,064.79 $ 100,358.00 $ 2,072,422.79
45
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
(s) No.
Fund Fund
No. Description
Actual
Encumbrances Total Cost
Fire Stations & Other Fire Facilities 40-B72802 1,2,3 1140 Fire Bonds
,4,5
32000 Public Safety $ 46,477.39 $
$ 46,477.39
Fire Stations & Other Fire Facilities
40-B72802 1,2,3 1426 Contribution from General Fund FY 32000 Public Safety $ 457,105.92 $ 110,118.40 $ 567,224.32
,4,5 2008
Large Firefighting Equipment
40-B72809 1,2,3 1017 Fire Assessment Fee
45
32000 Public Safety $ 116,435.48 $
- $ 116,435.48
Large Firefighting Equipment
40-672809 1,2,3 1105 Fire Assessment Fee
,4,5
32000 Public Safety $ 110,316.00 $
$ 110,316.00
Light Fleet Replacement
40-B72808 1,2,3 1017 Fire Assessment Fee
,4,5
Light Fleet Replacement
32000 Public Safety $ 286,161.65 $
0.01 $ 286,161.66
40-B72808 1,2,3 1105 Fire Assessment Fee
45
32000 Public Safety
$ 242,559.29 S
(0.01) $ 242,559.28
Police Department Property Unit
Outdoor Storage
Police Department Property Unit
Outdoor Storage
40-B30373A 1,2,3 1108 Impact Fees Ord
,4,5
32000 Public Safety $ 379,197.65 $ 6,904.35 $ 386,102.00
40-B30373A 1,2,3 1422 Impact Fees New Ordinance-2007 32000 Public Safety $ 352,907.07 $ 12,292.97 $ 365,200.04
,4,5
Police Department Property Unit
Outdoor Storage
40-B30373A 1,2,3 1426 Contribution from General Fund FY 32000 Public Safety $ 120,107.10 $
,4,5 2008
$ 120,107.10
Police Department Property Unit
Outdoor Storage
40-B30373A 1,2,3 1584 Homeland Defense/Neighborhood 32000 Public Safety $ 116,235.00 $
• ,4,5 Improvement Bond Series 3
$ 116,235.00
Police HQ Helipad
40-B72915 1,2,3 1103 Contribution From General Fund 32000 Public Safety
,4,5
107,798.72 $ 2,495.00 $ 110,293.72
Police HQ Helipad
40-672915 1,2,3 1108 Impact.Fees Ord
,4,5
32000 Public Safety $ 55,457.83 $
55,457.83
Police HQ Helipad 40-672915 1,2,3 1138 1984 Police Bonds
,4,5
32000 Public Safety
$ 495.23 $ $ 495.23
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
(s) No.
Fund Fund
No. Description
Actual
Encumbrances Total Cost
Police HQ Helipad
40-B72915 1,2,3 1422 Impact Fees New Ordinance-2007
,4,5
32000 Public Safety
$ 47,323.44 $
47,323.44
Police Radios Replacement
40-830554 1,2,3 1304 Contribution from General Fund FY
,4,5 2007
32000 Public Safety
531,082.65 $
- $ 531,082.65
Police Radios Replacement
40-B30554 1,2,3 1426 Contribution from General Fund FY
,4,5 2008
32000 Public Safety
$ 311,989.78 $
$ 311,989.78
Police SWAT Vehicle
40-B30997 1,2,3 1103 Contribution From General Fund
,4,5
32000 Public Safety
- $ 39,999.86 $ 39,999.86
Police SWAT Vehicle
40-B30997 1,2,3 1108 Impact Fees Ord
,4,5
32000 Public Safety
13,133.94 $ 13,133.94
Police SWAT Vehicle
40-B30997 1,2,3 1422 Impact Fees New Ordinance-2007
,4,5
32000 Public Safety
$ 230,228.09 $ 230,228.09
Police SWAT Vehicle
40-630997 1,2,3 1426 Contribution from General Fund FY
,4,5 2008
Radio Equipment Upgrades
40-B72804 1,2,3 1017 Fire Assessment Fee
,4,5
32000 Public Safety $
$ 11,394.11 $ 11,394.11
32000 Public Safety $ 51,300.50 $ - $ 51,300.50
Radio Equipment Upgrades
40-672804 1,2,3 1105 Fire Assessment Fee
,4,5
32000 Public Safety $ 176,951.84 $
$ 176,951.84
Coconut Grove Waterfront Master Plan 40-B30182A 2 1556 Coconut Grove Waterfront Master
PHI Plan - Coral Reef Yacht Club
34000 Public Facilities- $ 18,852.73 $
CIP
$ 18,852.73
Coconut Grove Waterfront Master Plan 40-B30182A 2 1557 Coconut Grove Waterfront Master
PHI
Plan - Biscayne Bay Yacht Club
34000 Public Facilities- $ 33,913.36 $ 22,971.13 $ 56,884.49
CIP
Coconut Grove Waterfront Master Plan 40-B30182A 2 1669 TVM Production -Basic Use Fee
PHI
Dorsey Memorial Library Restoration 40-B30531
Coconut Grove Expo -Burn Notice
2 1421 Dorsey Mamorial Library
34000 Public Facilities- $ 1,659.98 $ 24,948.35 $ 26,608.33
CIP
34000 Public Facilities- $ 13,650.00 $
CIP
- $ 13,650.00
Gusman Hall Improvements / Repairs 40-B70100 2 1584 Homeland Defense/Neighborhood
Improvement Bond Series 3
34000 Public Facilities- $ 333,972.75 $ - $ 333,972.75
CIP
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
Fund Fund Actual -
(s) No. No. Description
Encumbrances Total Cost
James L. Knight Center Miscellaneous
Improvements
40-B33506 1,2,3 1103 Contribution From General Fund 34000 Public Facilities- $ 45,921.62 $
,4,5 CIP
45,921.62
Manuel Artime Miscellaneous Project 40-B30501A
3 1212 SRF Contribution to CIP - Prior to 34000 Public Facilities- $ 17,931.71 $ 9,874.53 $ 27,806.24
2006 CIP
Manuel Artime Miscellaneous Project 40-B30501A
3 1350 SRF 2007 Contribution to Capital
34000 Public Facilities- $ 8,753.26 $ 40,402.34 $ 49,155.60
CIP
Marine Stadium Marina Bulkhead 40-B30689
Replacement
Marine Stadium Marina Bulkhead 40-B30689
Replacement
Marine Stadium Marina Bulkhead
Replacement
40-B30689
2 1386 HD2 Citywide Waterfront 34000 Public Facilities- $
Improvements CIP
2 1437 FY07 Marinas Capital Repairs and
160.13 $
34000 Public Facilities- $ 883.75 $
Capital Related Improvements CIP
- $ 160.13
- $ 883.75
2 1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 80,038.52 $ 31,682.62 $ 111,721.14
Improvement Bond Series 3 CIP
Marine Stadium Marina Bulkhead 40-1330689
Replacement
Marine Stadium Marina Improvements 40-B33514
2 1667 FIND - Marine Stadium Marina
Bulkhead Replacement,B-30689
2 1060 HD Citywide Waterfront
Improvements Series 1
3400D Public Facilities- $ 17,500.00 $
CIP
34000 Public Facilities- $ 56,136.06 $
CIP
$ 17,500.00
- $ 56,136.06
Marine Stadium Marina Improvements 40-1333514
2 1350 SRF 2007 Contribution to Capital 34000 Public Facilities- $ 4,516.94 $
CIP
- $ 4,516.94
Marine Stadium Marina Improvements 40-1333514
2 1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 4,991.94 $
Improvement Bond Series 3 CIP
$ 4,991.94
Marine Stadium Restoration
40-B30688 2 1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 16,082.67 $ 975.92 $ 17,058.59
Improvement Bond Series 3 CIP
Marine Stadium Restoration
40-B30688
2 1744 FIND- Marine Stadium RestorRATION 34000 Public Facilities- $
40-13306888 CIP
$ 975.93 $
Marine Stadium Marina at Virginia Key 40-B40180
2 1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 5,962.58
Improvement Bond Series 3 CIP
975.93
12,342.50 $ 18,305.08
Marine Stadium Marina at Virginia Key 40-B40180
Miamarina Emergency Pier Repairs 40-B30325
Miamarina Emergency Pier Repairs 40-B30325
Miamarina Emergency Pier Repairs 40-B30325
2 1843 FIND- Marine Stadium Marina at 34000 Public Facilities- $ 3,168.66 $ 12,342.49 $ 15,511.15
Virginia Key -Phase 1 B-40180 CIP
2 1060 HD Citywide Waterfront 34000 Public Facilities- $ 491,751.04 $ 100.96 $ 491,852.00
Improvements Series 1 CIP
2 1386 HD2 Citywide Waterfront 34000 Public Facilities- $ 604,679.01 $
Improvements CIP
2 1457 Homeland Defense 1& 2 Interest 34000 Public Facilities- $ 146,826.72 $
Post 9-30-06 & 9-30-07
CIP •
(0.01) $ 604,679.00
$ 146,826.72
Miamarina Emergency Pier Repairs 40-B30325
2 1496 Sunshine State Government 34000 Public Facilities- $ 117,102.06 $ 2,055.70 $ 119,157.76
Financing Commission Loan II 2 CIP
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
(s) No.
Fund Fund Actual Encumbrances Total Cost
No. Description
Miamarina Pier A, B & C Fire Line 40-B30696 2 1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 94,176.91 $ 155,818.93 $ 249,995.84
Repairs
Improvement Bond Series 3 CIP
Miamarina Seawall Repl. 40-B30604
2 1350 SRF 2007 Contribution to Capital 34000 Public Facilities- $ 21,050.97 $ - $ 21,050.97
CIP
Miamarina Seawall Repl.
40-830604 2 1558 Miamarina Seawall Replacement - 34000 Public Facilities- $ 15,426.05 $ 3,805.80 $ 19,231.85
Phase 1 CIP
Miscellaneous Repair - 10% Set Aside 40-B30706
2 1350 SRF 2007 Contribution to Capital 34000 Public Facilities- $ 7,064.42 $ - $ 7,064.42
CIP
Miscellaneous Repair- 10% Set Aside 40-630706
2 1437 FY07 Marinas Capital Repairs and 34000 Public Facilities- $ 667,254.43 $ 40,441.38 $ 707,695.81
Capital Related Improvements CIP
Miscellaneous Repair - 10% Set Aside 40-B30706 2 1668 Rickenbacker Marina Parking
34000' Public Facilities- $ 100.00 $
Revenue -Additional Parking CIP
100.00
Miscellaneous Repair- 10% Set Aside 40-1330706 2 1670 Rickenbacker Marina Rental Revenue- 34000 Public Facilities- $ 105,780.21 $ 6,458.15 $ 112,238.36
Boat Launching Ramp CIP
Miscellaneous Repair - 10% Set Aside 40-630706 2 1720 FIND -Citywide Derelict Vessel 34000 Public Facilities- $ 20,000.00 $' - $ 20,000.00
Removal CIP
Miscellaneous Repair - 10% Set Aside 40-B30706
2 1747 FIND-2010 Small Scale Derelict Vessel 34000 Public Facilities- $ 18,374.99 $ - $ 18,374.99
Removal CIP
New Dinner Key Marina Dockmaster 40-660464
Building
2 1386 FID2 Citywide Waterfront 34000 Public Facilities- $ 153,969.53 $ 40,741.30 $ 194,710.83
Improvements CIP
New Dinner Key Marina Dockmaster 40-860464 2 1437 FY07 Marinas Capital Repairs and 34000 Public Facilities- $ 11,661.94 $ - $ 11,661.94
Building Capital Related Improvements CIP
New Dinner Key Marina Dockmaster 40-B60464 2 1584 Homeland Defense/Neighborhood 34000 Public Facilities- $ 230,643.89 $ 43,941.56 $ 274,585.45 •
Building
Improvement Bond Series 3 CIP
Orange Bowl Site Parking Garage 40-630648 1,2,3 1103 Contribution From General Fund
34000 Public Facilities- $ 9,431.24 $ 396,068.76 $ 405,500.00
,4,5 CIP
Orange Bowl Site Parking Garage 40-B30648 1,2,3 1115 Orange Bowl Ticket Sur -Charge
34000 Public Facilities- $ 23,000.00 $ $ 23,000.00
,4,5 CIP
Orange Bowl Site Parking Garage
40-B30648 1,2,3 1184 MIAMI CDT MONTHLY PAYMENTS 34000 Public Facilities- $ 799,215.00 $ $ 799,215.00
,4,5 CIP
Orange Bowl Site Parking Garage
40-B30648 1,2,3 1420 Miami Sports & Exhibition Authority 34000 Public Facilities- $ 882,341.98
,4,5 Contribution to Capital CIP
75,040.94 $ 957,382.92
Orange Bowl Site Parking Garage 40-B30648 1,2,3 1676 Parking Revenue Bonds -Tax Exempt 34000 Public Facilities- $ 62,338,753.35 $ 7,335,597.80 $ 69,674,351.15
,4,5 Series 2010A CIP
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project Dist Award Award Name Fund Fund Actual Encumbrances Total Cost
Number (s) No. No. Description
Orange Bowl Site Parking Garage
40-830648 1,2,3 1686 Parking Revenue Bonds -Taxable 34000 Public Facilities- $ 12,164,775.84 $ 198,439.98 $ 12,363,215.82
,4,5 Series 2010B
CIP
Orange Bowl Site Parking Garage
40-630648 1,2,3 1885 Structural Design Settlement for 34000 Public Facilities- $ 2,016,985.88 $ - $ 2,016,985.88
,4,5 Marlins Stadium Parking Garages, CIP
B30648
African Square Park -Splash Park D5 40-B30882 5 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3
Recreation
16,219.75 $ 53,208.50 $ 69,428.25
Art Museum- Contribution to Park 40-1330170
Master Plan
2 1092 HD Miami Art Museum Series 1 35000 Parks &
Recreation
Bay of Pigs Park Lighting - D4 40-B30772 4 1570 HD2 Dist 4 Neighborhood QOL
Improvements
$ 621,415.30 $ - $ 621,415.30
35000 Parks &
Recreation
9,109.28 $ - $
9,109.28
Bayfront Park Electrical Repairs 40-340173
2 1788 Bayfront Park Trust Contribution to 35000 Parks & $ 51,838.49 $ 3,902.20 $ 55,740.69
Capital -Electrical Repairs, B-40173
Recreation
Bayfront Park Pier Repairs - D2 40-1340177
Bryan Park Community Building - D4 40-B30134A
2 1862 Bayfront Park Trust Contribution to 35000 Parks & $ 153,243.97 $ 133,278.89 $ 286,522.86
Capital -Pier Repairs, B-40177 Recreation
4 1570 HD2 Dist 4 Neighborhood QOL 35000 Parks & $ 4,006.37 $
Improvements Recreation
- $ 4,006.37
Bryan Park Community Building - D4 40-B30134A 4 1584 Homeland Defense/Neighborhood 35000 Parks & $ 57,136.65 $ 69,822.97 $ 126,959.62
Improvement Bond Series 3 Recreation
Caribbean Marketplace Renovations 40-B30671
5 1052 HD Little Haiti Park Land Acquisition 35000 Parks & $ 19,280.51 $ 18,358.00 $ 37,638.51
& Development Series 1 Recreation
Caribbean Marketplace Renovations 40-830671
5 1365 HD2 Little Haiti Park Land Acquisition 35000 Parks& $ 54,959.13 $ 149,929.87 $ 204,889.00
& Development Recreation
Caribbean Marketplace Renovations 40-1330671 5 1420 Miami Sports & Exhibition Authority 35000 Parks &
Contribution to Capital Recreation
Caribbean Marketplace Renovations 40-B30671 5 1860 MDC - Caribbean Marketplace
$ 146,128.66 $ 185,706.32 $ 331,834.98
35000 Parks & $ 45,359.90 $ 309,254.10 $ 354,614.00
Renovation, B-30671 Recreation
Citywide Park Equipment & Site Impr. 40-B30541D 1,2,3 1422 Impact Fees New Ordinance-2007 35000 Parks & $ 16,863.00 $ 229,409.00 $ 246,272.00
,4,5 Recreation
Citywide Park Equipment & Site Impr. 40-B30541D 1,2,3 1426 Contribution from General Fund FY 35000 Parks &
,4,5 2008 Recreation
100.00 $ 113,324.00 $ 113,424.00
Citywide Park Equipment &Site 40-B30541
Improvements
1,2,3 1085 HD District 4 Neighborhood QOL 35000 Parks &
,4,5 Improvements Series 1
Recreation
$ 17,941.89 $ $ 17,941.89
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
Fund Fund
(s) No. No. Description
Actual Encumbrances Total Cost
Citywide Park Equipment & Site 40-830541 1,2,3 1216 SNPB Conversion
Improvements
35000 Parks &
,4,5 Recreation
$ 111,031.46 $ $ 111,031.46
Citywide Park Equipment & Site
Improvements
40-630541 1,2,3 1368 HD2 Neighborhood Park
,4,5 Improvements & Acquisition
35000 Parks&
Recreation
$ 408,159.50 $ $ 408,159.50
Citywide Park Equipment & Site 40-830541 1,2,3 1422 Impact Fees New Ordinance-2007
Improvements
35000 Parks &
,4,5 Recreation
$ 345,785.24 $ - $ 345,785.24
Citywide Park Equipment & Site 40-830541 1,2,3 1464 Sunshine State Governmental
Improvements
,4,5 Financing Commission Loan
35000 Parks & $ 2,448,979.40 $
Recreation
- $ 2,448,979.40
Citywide Park Equipment & Site 40-B30541 1,2,3 1496 Sunshine State Government
Improvements
,4,5 Financing Commission Loan It 2
35000 Parks &
Recreation
$ 1,010,096.83 $ - $ 1,010,096.83
Citywide Park Equipment &-Site
Improvements
40-B30541 1,2,3 1502 SNPB - Armbrister Park Boundless
,4,5 Playground.
35000 Parks &
Recreation
$ 64,999.19 $ - $ 64,999.19
Citywide Park Equipment & Site 40-B30541 1,2,3 1503 SNPB - Roberto Clemente Park &
Improvements
,4,5 West End Parks Bleachers
Citywide Park Equipment & Site 40-B30541 1,2,3 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvements
,4,5 Improvement Bond Series 3
Recreation
35000 Parks & $ 18,320.00 $
Recreation
456,255.06 $
$ 18,320.00
$ 456,255.06
Curtis Park New Pool Facility and Boat 40-B35806 1 1108 Impact Fees Ord
Ramp Improvement
35000 Parks & $ 9,295.00 $ - $ 9,295.00
Recreation
Curtis Park New Pool Facility and Boat 40-B35806 1 ' 1368 HD2 Neighborhood Park
Ramp Improvement
35000 Parks &
Improvements & Acquisition Recreation
$ 5,712.95 $
5,712.95
Curtis Park New Pool Facility and Boat 40-635806
Ramp Improvement
1 1422 Impact Fees New Ordinance-2007 35000 Parks &
Recreation
201.56 $
$ 201.56
Curtis Park New Pool Facility and Boat 40-B35806
Ramp Improvement
1 1496 Sunshine State Government
Financing Commission Loan It 2
35000 Parks &
Recreation
$ 88,250.78 $ $ 88,250.78
Curtis Park New Pool Facility and Boat 40-B35806 1 1584 Homeland Defense/Neighborhood
Ramp Improvement
Improvement Bond Series 3
35000 Parks &
Recreation
$ 91,609.17 $ 63,485.93 $ 155,095.10
D2 Quality of Life Park Improvements
40-B39910E 2 1366 HD2 Dist. 2 Neighborhood QOL
Improvements
35000 Parks&
Recreation
577,734.79 $ $
577,734.79
D2 Quality of Life Park Improvements
40-839910E 2 1584 Homeland Defense/Neighborhood
Improvement Bond Series 3
35000 Parks &
Recreation
$ 361,739.84 $ - $ 361,739.84
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name Fund Fund
(s) No. No. Description
Actual
Encumbrances Total Cost
Duarte Park Bldg Renovation/Expansion 40-B35812A
1 1496 Sunshine State Government 35000 Parks &
Financing Commission Loan It 2 Recreation
$ 33,848.47 $ 423,592.55 $ 457,441.02
Duarte Park Bldg Renovation/Expansion 40-B35812A
1 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 523,606.83 $ 229,190.17 $ 752,797.00
Fern Isle / PBA Park Improvements - D1 40-630800
1 1368 HD2 Neighborhood Park
Improvements & Acquisition
35000 Parks & $
Recreation
- $ 19,220.00 $ 19,220.00
Gibson Park Master Plan
40-B303O5B 5 1368 HD2 Neighborhood Park 35000 Parks &
Improvements & Acquisition Recreation
$ 93,388.94 $
$ 93,388.94
Gibson Park Master Plan
40-B303O5B
5 1457 Homeland Defense 1& 2 Interest 35000 Parks &
Post 9-30-06 & 9-30-07 Recreation
$ 778,530.43 $ 174.99 $ 778,705.42
Gibson Park Master Plan
40-B3O305B
5 1496 Sunshine State Government 35000 Parks &
Financing Commission Loan it 2 Recreation
$ 8,000,467.00 $
- $ 8,000,467.00
Hadley Park Youth Center and Field
Improvements
40-B35883A
5 1422 Impact Fees New Ordinance-2007 35000 Parks &
Recreation
$ 22,094.38 $
- $ 22,094.38
Hadley Park Youth Center and Field
Improvements
40-B35883A 5 1496 Sunshine State Government
Financing Commission Loan It 2
35000 Parks &
Recreation
$ 243,379.62 $
- $ 243,379.62
Hadley Park Youth Center and Field
Improvements
40-B35883A 5 1584 Homeland Defense/Neighborhood 35000 Parks & _ $ 353,255.67 $ 166,036.52 $ 519,292.19
Improvement Bond Series 3 Recreation
Kennedy Park Floating Dock PH I
40-B30541B 2 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3 Recreation
$ 29,499.12 $ 53.93 $ 29,553.05
Kennedy Park Floating Dock PH I
40-B30541B
2 1669 TVM Production -Basic Use Fee 35000 Parks &
Coconut Grove Expo -Burn Notice Recreation
$ 7,695.00 $ 9,340.70 $ 17,035.70
Kennedy Park Floating Dock PH I
40-B30541B 2 1695 FIND - Kennedy Park Floating Dock PH 35000 Parks &
18-30541E Recreation
$ 32,120.29 $
0.03 $ 32,120.32
Kennedy Park Restrooms Building 40-835838
Improvements
2 1058 I -ID Neighborhood Park 35000 Parks &
Improvements & Acquisition Series1 Recreation
332.50 $
- $ 332.50
Kennedy Park Restrooms Building 40-B35838
Improvements
2 1108 Impact Fees Ord 35000 Parks & $ 4,899.61 $
Recreation
$ 4,899.61
Kennedy Park Restrooms Building 40-B35838
Improvements
2 1496 Sunshine State Government
Financing Commission Loan ft 2
35000 Parks & $ 6.65 $
Recreation
6.65
Kennedy Park Restrooms Building 40-B35838
Improvements
2 1584 Homeland Defense/Neighborhood
Improvement Bond Series 3
35000 Parks &
Recreation
$ 19,177.72 $ 21,457.16 $ 40,634.88
Kennedy Park Shoreline Stabilization
PH1
40-B30541C 2 1584 Homeland Defense/Neighborhood
Improvement Bond Series 3
35000 Parks &
Recreation
$ 47,036.96 $ $ 47,036.96
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
(s) No.
Fund Fund
No. Description
Actual
Encumbrances Total Cost
Kennedy Park Shoreline Stabilization 40-B30541C
PH1
2 1669 TVM Production -Basic Use Fee
Coconut Grove Expo -Burn Notice
35000 Parks &
Recreation
$ 1,247.31 $ 8,203.90 $ 9,451.21
Kennedy Park Shoreline Stabilization
PH1
Legion Park Boat Ramp Repairs - D2
40-B30541C
40-B30820
2 1696 FIND - Kennedy Park Shoreline
Stabilization PH 140-B30541C
2 1584 Homeland Defense/Neighborhood
Improvement Bond Series 3
35000 Parks &
Recreation
35000 Parks &
Recreation
$ 37,168.15 $
11,598.06 $
- $ 37,168.15
$ 11,598.06
Little River Waterfront Park (Bayfront & 40-B50722
Riverfront Lands Acquisition)
2 1350 SRF 2007 Contribution to Capital 35000 Parks &
Recreation
$ 477,794.00 $
477,794.00
Little River Waterfront Park (Bayfront & 40-1350722
Riverfront Lands Acquisition)
2 1848 2012 Little River Waterfront Park
35000 Parks &
Recreation
$ 117,500.00 $
$ 117,500.00
. Lummus Landing Square - D5
40-630886
5 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3
Recreation
21,644.42 $ 76,138.28 $ 97,782.70
Melreese Golf Training Center
Melreese Golf Training Center
Moore Park New Construction
40-B30566A 1 1420 Miami Sports & Exhibition Authority 35000 Parks &
Contribution to Capital Recreation
40-B30566A 1 1496 Sunshine State Government
Financing Commission Loan tl 2
35000 Parks &
Recreation
40-B35887 5 1052 HD Little Haiti Park Land Acquisition 35000 Parks &
& Development Series 1
Recreation
$ 1,681,718.46 $ 341,970.31 $ 2,023,688.77
$ 49,736.67 $ 254.25 $ 49,990.92
$ 149,511.50 $
$ 149,511.50
Moore Park New Construction
40-B35887
5 1058 1-ID Neighborhood Park 35000 Parks &
Improvements & Acquisition Seriesl Recreation
$ 25,000.00 $
$ 25,000.00
Moore Park New Construction
40-B35887 5 1087 HD District 5 Neighborhood QOL 35000 Parks &
Improvements Series 1
Recreation
$ 24,477.95 $ 522.05 $ 25,000.00
Moore Park New Construction
40-B35887 5 1422 Impact Fees New Ordinance-2007 35000 Parks &
Recreation
$ 81,079.29 $
$ 81,079.29
Moore Park New Construction
40-B35887
5 1464 Sunshine State Governmental
Financing Commission Loan
35000 Parks &
Recreation
$ 8,333.97 $
$ 8,333.97
Moore Park New Construction
40-B35887
5 1496 Sunshine State Government
Financing Commission Loan it 2
35000 Parks &
Recreation
$ 582,097.88 $ 348,597.88 $ 930,695.76
Moore Park New Construction
40-1335887 5 1584 Homeland Defense/Neighborhood 3500D Parks &
Improvement Bond Series 3
Recreation
$ 207,737.58 $ 4,960,483.42 $ 5,168,221.00
Morningside ADA, A/C, Windows and 40-1339910N
Interior Remodeling - D2
2 1584 Homeland Defense/Neighborhood 35000 Parks & $ 118,002.58 $
Improvement Bond Series 3
Recreation
$ 118,002.58
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project Dist Award Award Name Fund Fund Actual Encumbrances Total Cost
Number (s) No. No. Description
Museum of Science Development in 40-B78502A 1,2,3 1389 HD2 Museum of Science 35000 Parks &
Bicentennial Park
,4,5 Recreation
$ 738,000.00 $ $ 738,000.00
Museum of Science Development in 40-B78502A 1,2,3 1584 Homeland Defense/Neighborhood 35000 Parks &
Bicentennial Park ,4,5 Improvement Bond Series 3
Recreation
$ 713,625.00 $ $ 713,625.00
Museum Park 40-B30538 1,2,3 1055 HD Bicentennial Park Improvements 35000 Parks &
,4,5 Series 1 Recreation
$ 100,000.00 $ - $ 100,000.00
Museum Park 40-830538
1,2,3 1103 Contribution From General Fund 35000 Parks &
,4,5 Recreation
$ 50,777.90 $ - $ . 50,777.90
Museum Park 40-1330538 1,2,3 1375 HD2 Bicentennial Park Improvements 35000 Parks & $ 219,335.15 $ 58,818.08 $ 278,153.23
,4,5 Recreation
Museum Park 40-1330538 1,2,3 1457 Homeland Defense 1& 2 Interest 35000 Parks & $ 29,079.00 $ 207,357.12 $ 236,436.12
,4,5 Post 9-30-06 & 9-30-07 Recreation
Museum Park 40-B30538 1,2,3 1464 Sunshine State Governmental 35000 Parks & $ 75,534.00 $ $ 75,534.00
,4,5 Financing Commission Loan Recreation -
Museum Park 40-B30538 1,2,3 1496 Sunshine State Government 35000 Parks & _ $ 4,309,011.52 $ 16,842.46 $ 4,325,853.98
,4,5 Financing Commission Loan 112
Recreation
Museum Park - DRI Fees Administration 40-B30538D , 1,2,3 1231 Downtown Development 35000 Parks &
(SR Project 35-127001) ,4,5 Supplemental Fee Recreation
$ 10,820.60 $ $ 10,820.60
Museum Park Environmental
Remediation/Seawall
40-B30538B 1,2,3 1584 Homeland Defense/Neighborhood 35000 Parks & $ 996.00 $ - $ 996.00
,4,5 Improvement Bond Series 3
Recreation
Parks ADA Modifications - District 2 40-B30547E
2 1584 Homeland Defense/Neighborhood 35000 Parks & $ 179,626.95 $ 35,682.42 $ 215,309.37
Improvement Bond Series 3 Recreation
Parks ADA Modifications - District 4 40-B30547G 4 1584 Homeland Defense/Neighborhood 35000 Parks & $ 61,340.09 $ 29,067.44 $ 90,407.53
Improvement Bond Series 3 Recreation
Peacock Park Site Improvements
40-B75883 2 1422 Impact Fees New Ordinance-2007 35000 Parks & $ 123.05 $ - - $ 123.05
Recreation
Peacock Park Site Improvements 40-875883
2 1584 Homeland Defense/Neighborhood 35000 Parks & $ 67,213.10 $ 3,950.74 $ 71,163.84
Improvement Bond Series 3 Recreation
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
(s) No.
Fund Fund
No. Description
Actual
Encumbrances Total Cost
Robert King High Park Furniture - D4
40-B35868A 4 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3
Recreation
44,050.38 $
$ 44,050.38
Spoil Island B & C Swim Area
Improvement - D2
40-B30824
2 1669 TVM Production -Basic Use Fee
Coconut Grove Expo -Burn Notice
35000 Parks & $
Recreation
$ 18,164.80 $ 18,164.80
Spoil Island E Restoration and Floating 40-830721
Dock
2 1669 TVM Production -Basic Use Fee
Coconut Grove Expo -Burn Notice
35000 Parks &
Recreation
$ 17,415.12 $ 535.06 $ 17,950.18
Spoil Island E Restoration and Floating 40-B30721
Dock
2 1724 FIND -Spoil Island E Restoration &
Floating Dock 40-B30721
35000 Parks &
Recreation
$ 11,762.10 $ 3,232.15 $ 14,994.25
Virginia Key Beach Park Historic
Restoration PH 2
40-830174
2 1378 1-ID2 Virginia Key Park Improvements 35000 Parks &
Recreation
$ 861,571.21 $
- $ 861,571.21
Virginia Key Beach Park Historic
Restoration PH 2
40-830174
2 1463 HVKBPT Boundless Playground
Project
35000 Parks &
Recreation
$ 245,566.28 $
$ 245,566.28
Virginia Key Beach Park Historic
Restoration PH 2
40-830174
2 1882 SNPB Virginia Key Beach Park , B- 35000 Parks &
30174
Recreation
$ 48,844.79 $
$ 48,844.79
Virginia Key Beach Park Museum
40-830508
2 1053 HD Virginia Key Park Improvements 35000 Parks &
Series 1
Recreation
$ 25,116.00 $
- $ 25,116.00
Virginia Key Beach Park Museum
40-B30508
2 1497 CDT -Virginia Key Beach Park Museum 35000 Parks &
Recreation
$ 970,083.66 $ 36,212.08 $ 1,006,295.74
Virginia Key Bike Trail Building
40-B30995
2 1422 Impact Fees New Ordinance-2007 35000 Parks & $ 408.63 $
Recreation
(0.01) $
408.62
Virginia Key Rowing Center
Improvements
40-1330374
2 1318 Virginia Key Rowing Center
Improvements
35000 Parks &
Recreation
$ 158,780.40 $
- $ 158,780.40
Virrick Park Gymnasium Improvements 40-B35853B
D2
2 1368 HD2 Neighborhood Park
Improvements & Acquisition
35000 Parks &
Recreation
$ 53,171.97 $ 76,999.98 $ 130,171.95
Virrick Park New Pool Facility
40-B35853A 2 1058 HD Neighborhood Park 35000 Parks &
Improvements & Acquisition Seriesl Recreation
$ 196,071.06 $ 45,815.19 $ 241,886.25
Virrick Park New Pool Facility
40-B35853A 2 1496 Sunshine State Government
Financing Commission Loan it 2
Virrick Park New Pool Facility
35000 Parks &
Recreation
11,666.95 $
- $ 11,666.95
40-B35853A 2 1584 Homeland Defense/Neighborhood
Improvement Bond Series 3
35000 Parks &
Recreation
$ 3,696.85 $
0.01 $ 3,696.86
West End Park New Community
Building
40-830690
4 1584 Homeland Defense/Neighborhood 35000 Parks &
Improvement Bond Series 3
Recreation
$ 122,351.34 $ 101,073.47 $ 223,424.81
Bayside Historic Sign - D2
40-B39910K 2 1584 Homeland Defense/Neighborhood 36000 Streets &
Improvement Bond Series 3 Sidewalks
$ 21,413.26 $
$ 21,413.26
Baywalk Mobility Plan
40-B30645D 2 1297 Transit Half -Cent Surtax
36000 Streets & $ 3,327.95 $ 8,672.05 $ 12,000.00
Sidewalks
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project Dist Award Award Name Fund Fund Actual Encumbrances Total Cost
Number (s) No. No. Description
Baywalk Mobility Plan
40-B30645D 2 1837 MPO Baywalk Mobility Plan, 40- 36000 Streets &
B30645D Sidewalks
$ 13,311.80 $ 34,688.16 $ 47,999.96
Beacom Phase II - D3
40-B40325 3 1638 Street Bonds 2- 2009 Series
36000 Streets & $ - $ 78,996.37 $ 78,996.37
Sidewalks
Beacom Project Area Improvements 40-830699 3 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 17,773.19 $ 45,074.03 $ 62,847.22
Bird Avenue Road Improvement
40-330628 2 1297 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
108,800.98 $ 81,840.98 $ 190,641.96
Bird Avenue Road Improvement
40-630628 2 1419 Parking Surcharge 2007
36000 Streets &
Sidewalks
$ 19,629.12 $ 165,708.10 $ 185,337.22
Brickell Area Shared Use Path and
Roadway Improvements
40-630822 2 1297 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 40,219.54 $ 32,663.81 $ 42,883.35
Brickell Avenue Decorative Pedestrian 40-B399101
Crosswalks
2 1584 Homeland Defense/Neighborhood 36000 Streets &
Improvement Bond Series 3 Sidewalks
$ 32,440.00 $ - $ 32,440.00
Brickell Lighting Phase II - D2
40-B40666B 2 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 828,827.45 $ - $ 828,827.45
Buena Vista Heights East Roadway and 40-B78500B 5 1113 Local Oprion Gas Tax
36000 Streets &
Lighting Improvements Sidewalks
$ 13,449.82 $ - $ 13,449.82
Buena Vista Heights East Roadway and 40-B78500B
Lighting Improvements
5 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 1,131,585.69 $ 129,802.27 $ 1,261,387.96
Center Grove Lighting
40-B30621 2 1297 Transit Half -Cent Surtax
36000 Streets & $ 1,078.14 $
Sidewalks
$ 1,078.14
Center Grove Lighting
40-B30621 2 1419 Parking Surcharge 2007
36000 Streets &
Sidewalks
$ 220,252.73 $ 128,584.21 $ 348,836.94
Citywide Bicycle Rack & Signage
Program
40-B30694A 1,2,3 1297 Transit Half -Cent Surtax
,4,5
36000 Streets & $ 637.73 $ (0.02) $ 637.71
Sidewalks
Citywide Sidewalk Replacement PI1 29 40-B43114A 1,2,3 1113 Local Oprion Gas Tax
,4,5
36000 Streets &
Sidewalks
$ 3,373,187.16 $ 297,838.84 $ 3,671,026.00
Citywide Sidewalk Replacement PH 29 40-B43114A 1,2,3 1297 Transit Half -Cent Surtax
,4,5
36000 Streets &
Sidewalks
$ 70,932.74 $ $ 70,932.74
Citywide Sidewalk Replacement PH 29 40-B43114A 1,2,3 1379 Street Bonds - 2007 Series
45
36000 Streets &
Sidewalks
$ 846,200.01 $ (0.01) $ 846,200.00
Citywide Sidewalk Replacement PH 29 40-B43114A 1,2,3 1426 Contribution from General Fund FY 36000 Streets &
,4,5 2008 Sidewalks
$ 399,989.90 $ 10.10 $ 400,000.00
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
(s) No.
Fund Fund Actual Encumbrances Total Cost
No. Description
Civic Center Infrastructure
40-B30500 1,2,3 1638 Street Bonds 2- 2009 Series 36000 Streets & $ _2 68,415.58 $ 43,917.75 $ 312,333.33
,4,5 Sidewalks
Civic Center Infrastructure 40-B30500 1,2,3 1754 Civic Center Infrastructure, B-30500 36000 Streets & $ 31,315.61 $ - $ 31,315.61
,4,5 Sidewalks
Coconut Grove Business Improvement 40-1330687 2 1379 Street Bonds - 2007 Series
District
36000 Streets &
Sidewalks
$ 183,875.52 $ 19,160.10 $ 203,035.62
Coconut Grove Business Improvement 40-B30687 2 1638 Street Bonds 2- 2009 Series
District
36000 Streets &
Sidewalks
$ 385,930.91 $ 794,832.45 $ 1,180,763.36
D3 Sidewalk ADA Retrofits 40-1330677
3 1379 Street Bonds - 2007 Series 36000 Streets &
Sidewalks
District 1- Sidewalk Repairs & ADA 40-B30377A 1 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
21,011.55 $ 3.05 $ 21,014.60
$ 193,541.05 $ - $ 193,541.05
District 2 -.Sidewalk Repairs & ADA 40-B30377B 2 1379 Street Bonds - 2007 Series
36000 Streets &.
Sidewalks
$ 132,847.21 $ - $ 132,847.21
District 3 - Sidewalk Repairs and ADA 40-B30377C
3 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 79,318.67 $ 103,013.33 $ 182,332.00
District 4 - Sidewalk Repairs & ADA
40-B30377D 4 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 177,867.00 $ - $ 177,867.00
District 5 - Sidewalk Repairs & ADA 40-B30377E 5 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 189,745.94 $ - $ 189,745.94
Downtown Baywalk Master Plan & 40-030179
Design
2 1584 Homeland Defense/Neighborhood 36000 Streets &
Improvement Bond Series 3 Sidewalks
$ 316,054.68 $ 104,727.88 $ 420,782.56
DWNTWN Beautification - Design Phase 40-B30606D 1,2,3 1379 Street Bonds - 2007 Series
• 36000 Streets & $ 309,143.75 $ 13,349.05 $ 322,492.80
,4,5 Sidewalks
DWNTWN Beautification - North 40-B30606N 1,2,3 1297 Transit Half -Cent Surtax
36000 Streets & $ 861,784.00 $
,4,5 Sidewalks
$ 861,784.00
DWNTWN Beautification - North 40-B30606N 1,2,3 1379 Street Bonds - 2007 Series
,4,5
36000 Streets &
Sidewalks
$ 4,035,313.54 $ 243,983.07 $ 4,279,296.61
DWNTWN Beautification - North 40-B30606N 1,2,3 1419 Parking Surcharge 2007
,4,5
36000 Streets &
Sidewalks
$ 492,243.94 $ 2,939.26 $ 495,183.20
DWNTWN Beautification - North 40-B30606N 1,2,3 1638 Street Bonds 2- 2009 Series
,4,5
36000 Streets & $ 108,296.50 $ 19,682.69 $ 127,979.19
Sidewalks
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project Dist Award Award Name Fund Fund Actual Encumbrances Total Cost
Number (s) No. No. Description
DWNTWN Beautification - South 40-B30606S 1,2,3 1297 Transit Half -Cent Surtax
,4,5
36000 Streets &
Sidewalks
$ 459,441.98 $ 2,342.02 $ 461,784.00
DWNTWN Beautification - South 40-B30606S 1,2,3 1379 Street Bonds - 2007 Series
,4,5
36000 Streets &
Sidewalks
$ 3,079,743.29 $ 317,124.11 $ 3,396,867.40
DWNTWN Beautification - South 40-B30606S 1,2,3 1419 Parking Surcharge 2007
,4,5 -
36000 Streets &
Sidewalks
5 471,204.71 $ 78,511.29 $ 549,716.00
DWNTWN Beautification - South 40-B30606S 1,2,3 1638 Street Bonds 2- 2009 Series
36000 Streets & $ 466,406.41 $ 205,454.21 $ 671,860.62
,4,5 Sidewalks
DWNTWN Beautification (Lighting) 40-B30606L 1,2,3 1379 Street Bonds - 2007 Series
,4,5
36000 Streets &
Sidewalks
$ 1,343,918.22 $ 0.02 $ 1,343,918.24
DWNTWN Beautification (Lighting) 40-B30606L 1,2,3 1638 Street Bonds 2- 2009 Series
,4,5
36000 Streets &
Sidewalks
$ 196,031.34 $ 70,193.12 $ 266,224.46
DWNTWN Sidewalk & Street 40-B30606 1,2,3 1101 Transit Half -Cent Surtax 36000 Streets & $ 9,518.00 $ $ 9,518.00
Improvements ,4,5 Sidewalks
DWNTWN Sidewalk & Street 40-630606 1,2,3 1379 Street Bonds - 2007 Series 36000 Streets & $ 151,334.02 $ - $ 151,334.02
Improvements
,4,5 Sidewalks
DWNTWN Sidewalk & Street 40-B30606 1,2,3 1638 Street Bonds 2- 2009 Series 36000 Streets &
Improvements ,4,5 Sidewalks
$ 13,288.85 $ - $ 13,288.85
Fair Isle Area Roadway & Drainage
Improvements - D2
40-B30823 2 1297 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 2,945.02 $ 73,304.29 $ 76,249.31
Flagami Traffic Calming - D4
40-B40672G 4 1638 Street Bonds 2- 2009 Series
Flagami Traffic Calming Phase IV - D4 40-B40672D 4 1379 Street Bonds - 2007 Series
36000 Streets & $ 229,404.00 $ 256,338.95 $ 485,742.95
Sidewalks
36000 Streets & $ 57,655.45 $ 383,198.65 $ 440,854.10
Sidewalks
Flagami Traffic Calming Phase IV - D4 40-B40672D 4 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 94,333.12 $ 57,077.87 $ 151,410.99
Health District Bicycle and Pedestrian 40-B30645C 1,2,3 1297 Transit Half -Cent Surtax 36000 Streets &
Mobility Study ,4,5 Sidewalks
$ 11,861.09 $ - $ 11,861.09
Health District Bicycle and Pedestrian 40-B30645C 1,2,3 1745 MPO Health District Bicycle & 36000 Streets &
Mobility Study ,4,5 Pedestrian Mobility Study 40- Sidewalks
B30645C
$ 47,444.36 $ - $ 47,444.36
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
(s) No.
Fund Fund
No. Description
Actual
Encumbrances Total Cost
1-95 South Miami Terminal Street
Improvements - D2
1-95 South Miami Terminal Street
Improvements- D2
Little River Industrial Park
Little River Industrial Park
40-1330718
2 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
128,380.72 $ 16,588.59 $ 144,969.31
40-630718
2 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 274,608.39 $
- $ 274,608.39
40-630540
40-830540
5 1297 Transit Half -Cent Surtax
5 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
$ 12,000.00 $
$ 12,000.00
$ 1,017,001.39 $ 201,565.12 $ 1,218,566.51
Lummus Park Landing Area Project 40-830643
5 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 81,830.63 $ 22,686.35 $ 104,516.98
Miami River Greenway - NW 10 Ave to 40-B30651
NW 12 Ave
3 1297 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 409,699.96 $ 80,455.10 $ 490,155.06
Miami River Greenway - NW 10 Ave to 40-B30651
NW 12 Ave
Miami River Greenway from Miami 40-B30631
Circle Greenway to South Miami
Avenue
3 1857 FDOT - Mia River Grnwy- NW 10 Ave
to NW 12 Ave 13-30651
2 1789 FDOT-Miami River Greenway-Miami
Circle Greenway to South Miami Ave,
B-30631
36000 Streets & $
Sidewalks
36000 Streets & $
Sidewalks
80.25 $ 1,037,356.74 $ 1,037,436.99
- $ 124,482.96 $ 124,482.96
Miami River Greenway SW 1st Court to 40-630130
S. Miami Avenue
2 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 365,166.84 $ 42,363.16 $ 407,530.00
Miami River Greenway SW 1st Court to 40-630130
S. Miami Avenue
2 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 66,445.08 $ 54,280.56 $ 120,725.64
Miami River Greenway SW 1st Court to 40-B30130
5. Miami Avenue
2 1749 FDOT-Miami River Greenway-SW 1st 36000 Streets &
Ct. to South Miami Ave, 40-830130 Sidewalks
$ 443,998.78 $ 269,833.88 $ 713,832.66
Miami River Greenways - NW 5th Street 40-830336
Bridge Extension
3 1101 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 174,673.62 5 8,365.92 $ 183,039.54
Miami River Greenways - NW 5th Street 40-B30336
Bridge Extension
3 1297 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 83,354.72 $ 90,702.89 $ 174,057.61
Miami River Greenways - NW 5th Street 40-B30336
Bridge Extension
3 1858 FDOT- Miami River Greenway - NW 36000 Streets &
5th Street Bridge Extension, B-30336 Sidewalks
$ 77.65 $ 896,818.25 $ 896,895.90
Miami River Greenways/ Streetscape
Segment D (ELH)
Miami River Greenways/ Streetscape
Segment D (ELH)
40-B40686
40-B40686
3 1112 FOOT Greenway - East Little Havana
Bike Path (2001 Request)
3 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
$ 964,470.83 $ 356.75 $ 964,827.58
$ 326,884.11 $ 8,644.36 $ 335,528.47
Miami River Greenways/ Streetscape 40-840686
Segment D (ELH)
3 1584 Homeland Defense/Neighborhood 36000 Streets &
Improvement Bond Series 3 Sidewalks
$ 220,128.77 $ 14,266.54 $ 234,395.31
Miami River Greenways/ Streetscape 40-B40686
Segment D (ELH)
3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
70,216.40 $ 325,069.15 $ 395,285.55
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
(s) No.
Fund Fund
No. Description
Actual
Encumbrances Total Cost
NE 2 Avenue Improvements
40-B78508 2,5 1080 HD NE 2nd Avenue Improvements
Series 1
36000 Streets &
Sidewalks
$ 1,050,599.93 $
$ 1,050,599.93
NE 2 Avenue Improvements
40-678508 2,5 1101 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 55,000.00 $
$ 55,000.00
NE 2 Avenue Improvements
40-878508 2,5 1297 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 801,247.59 $ 370,253.84 $ 1,171,501.43
NE 2 Avenue Improvements
40-B78508 2,5 1584 Homeland Defense/Neighborhood 36000 Streets &
Improvement Bond Series 3 Sidewalks
$ 790,321.86 $ 395,013.19 $ 1,185,335.05
NE 2nd Court Roadway & Drainage 40-B30880
Improvements Project - D5
5 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 57,011.00 $ 5,325.06 $ 62,336.06
Neighborhood Gateways D3
40-B30143A 3 1090 HD Neighborhood Gateways
Improvements Series 1
36000 Streets &
Sidewalks
$ 828.83 $
$ 828.83
Neighborhood Traffic Calming
Improvements - D4
40-630693
4 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 29,978.29 $ 5,913.89 $ 35,892.18.
North Shorecrest Roads Improvements 40-B30035A
Project
2 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 143,860.07 $ 6,131.28 $ 149,991.35
North Shorecrest Roads Improvements 40-B30035A
Project
2 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 418,243.84 $ 98,021.76 $ 516,265.60
North Spring Garden Greenway
40-B40643A 5 1088 HD Greenways Improvements Series 36000 Streets &
1 Sidewalks
$ 79,799.58 $
- $ 79,799.58
North Spring Garden Greenway
40-B40643A
5 1113 Local Oprion Gas Tax
36000 Streets &
Sidewalks
$ 297,575.51 $
- $ 297,575.51
North Spring Garden Greenway
40-B40643A
5 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 806,774.85 $ 121,005.71 $ 927,780.56
North Spring Garden Greenway
40-B40643A 5 1584 Homeland Defense/Neighborhood 36000 Streets &
Improvement Bond Series 3
Sidewalks
5 100,180.30 $
19.70 $ 100,200.00
North Spring Garden Greenway
40-B40643A 5 1592 Florida Department of Transportation 36000 Streets &
Contract it APG62 Sidewalks
$ 1,000,000.00 $
- $ 1,000,000.00
Northwest 14th Street Streetscape 40-B30518
Project
5 1297 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 337,225.97 $ 52,660.82 $ 389,886.79
NW 11 St from 27 to 37 Avenue Area 40-830781
Roadway Improvements - D1
1 1379 Street Bonds - 2007 Series
36000 Streets & $
Sidewalks
- $ 67,257,28 $ 67,257.28
NW llth Avenue Road Improvements - 40-B40324
D3
3 1638 Street Bonds 2- 2009 Series
36000 Streets & $
Sidewalks
- $ 11,067.66 $ 11,067.66
NW llth Street Roadway Improvement 40-B30725
Project - D1
1 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 397,896.20 $ 27,976.51 $ 425,872.71
NW 11th Street Roadway Improvement 40-B30725
Project - D1
1 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 6,078.16 $ - $ 6,078.16
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
Fund Fund
(s) No. No. Description
Actual Encumbrances Total Cost
NW 12 Avenue/NW 12 Place Roadway 40-830883
Improvements
5 1297 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 69,831.17 $ 30,671.29 $ 100,502.46
NW 14 Avenue & 28 Street Area
Roadway Improvements - D1
40-830780 1 1101 Transit Half -Cent Surtax
36000 Streets & $ 1,512.98 $ (0.01) $ 1,512.97
Sidewalks
NW 14 Avenue & 28 Street Area
Roadway Improvements - D1
40-B30780 1 1297 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 45,352.95 $ 27,947.68 5 73,300.63
NW 14 Avenue & 28 Street Area
Roadway Improvements - D1
40-830780 1 1379 Street Bonds - 2007 Series
36000 Streets & $
Sidewalks
769.53 $ 36,270.09 $ 37,039.62
NW 14th Court Roadway & Drainage
Improvements -D3
4D-B30746 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
16,963.39 $ 3,657.71 $ 20,621.10
NW 17th Court Roadway Improvement 40-B30728
Project- D1
1 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 100,884.12 $ 8,466.98 $ 109,351.10
NW 17th Terrace Roadway
Improvement Project - D1
NW 18th Avenue Roadway
Improvement Project - D1
40-830729 1 1638 Street Bonds 2- 2009 Series
40-B30727 1 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
36000 Streets &
Sidewalks
$ 27,554.49 $ 200.33 $ 27,754.82
232,726.71 $ 38,055.27 $ 270,781.98
NW 18th Place Road Improvements D3 40-B40314
3 1638 Street Bonds 2- 2009 Series
NW 21 Avenue between NW 1st Street 40-B30712
and NW 3rd Street - D3
3 1379 Street Bonds - 2007 Series
36000 Streets & $ - $ 24,893.60 $ 24,893.60
Sidewalks
36000 Streets & $ 205,857.18 $ - $ 205,857.18
Sidewalks
NW 24th Street Between NW 14th
Avenue and NW 17th Avenue
40-B30705 1 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 82,428.40 $ 140,736.60 $ 223,165.00
NW 24th Street Between NW 14th
Avenue and NW 17th Avenue
40-830705 1 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 16,710.03 $ 118,455.25 $ 135,165.28
NW 31stStreet Roadway Improvement 40-830722
Project - D1
1 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 39,147.88 $ 70,247.09 $ 109,394.97
NW 33rd Street Roadway Improvement 40-830724
Project- D1
1 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 449,526.75 $ 44,044.92 $ 493,571.67
NW 4th Terrace Roadway Improvement 40-B30730
Project- D1
1 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 9,715.31 $ - $ 9,715.31
NW 60th Avenue Roadway
Improvement Project - D1-
40-830726 1 . 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 40,592.79 $ 148,707.98 $ 189,300.77
NW 7th Court
40-B30610 5 1638 Street Bonds 2- 2009 Series
36000 Streets & $
Sidewalks
581.00 $ 33,707.21 $ 34,288.21
NW 8th Street Roadway & Drainage
Improvements - D3 •
40-630745 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 32,553.51 $ 2,560.35 $ 35,113.86
NW 9th Street Roadway Improvement 40-B30732
Project - D1
1 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 240,581.15 5 18,958.74 5 259,539.89
NW 9th Street Roadway Improvement 40-B30732
Project - D1
1 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 324,373.55 $ 69,175.05 $ 393,548.60
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project Dist Award Award Name Fund Fund Actual Encumbrances Total Cost
Number (s) No. No. Description
Overtown Greenway @ NW 11 Terrace 40-830624 5 1297 Transit Half -Cent Surtax
3600D Streets &
Sidewalks
$ 195,860.30 $ 144,884.19 $ 340,744.49
Overtown Sector Signage Project
40-B38504 2,5 1419 Parking Surcharge 2007
36000 Streets &
Sidewalks
$ 3,618.72 $ - $ 3,618.72
Qvertown Sector Signage Project
40-B38504 2,5 1479 FDOT-Overtown Sector Signage
Project
3600D Streets &
Sidewalks
$ 99,955.99 $ 101.77 $ 100,057.76
Palm Grove Road Improvements
40-830630- 2 1101 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 29,915.62 $ 79,727.13 $ 109,642.75
Palm Grove Road Improvements
40-630630 2 1297 Transit Half -Cent Surtax
36000 Streets &
• Sidewalks
$ 681,957.82 $ 269,322.50 $ 951,280.32
Palm Grove Road Improvements
40-B30630 2 1638 Street Bonds 2- 2009 Series
36000 Streets & $ 1,603,365.10 $ 776,552.90 $ 2,379,918.00
Sidewalks
Peter Pan Monument
40-B30536 3 1103 Contribution From General Fund
36000 Streets &
Sidewalks
$ 12,285.67 $ - $ 12,285.67
Peter Pan Monument
40-B30536 3 1304 Contribution from General Fund FY 3600D Streets & $ 320.38 $ - $ 320.38
2007 Sidewalks
Peter Pan Monument
40-630536 3 1343 Donation of Surplus -Campaign Funds 36000 Streets &
From Commissioner Regalado Sidewalks
$ 21,368.49 $ - $ 21,368.49
Peter Pan Monument 40-630536
3 1426 Contribution from General Fund FY 36000 Streets &
2008 Sidewalks
$ 10,343.11 $ 0.01 $ 10,343.12
Roadway Improvements 40-830990 1,2,3 1297 Transit Half -Cent Surtax
,4,5
36000 Streets & $ 647.74 $ - $ 647.74
Sidewalks
S.E. 3rd Street Widening ( fka Dupont 40-831206 2 1104 Dupont Plaza Project
Plaza Traffic Recirculation)
36000 Streets &
Sidewalks
$ 401,866.00 $ - $ 401,866.00
S.E. 3rd Street Widening ( fka Dupont 40-B31206 2 1108 Impact Fees Ord
Plaza Traffic Recirculation)
36000 Streets &
Sidewalks
$ 177,891.86 $ - $ 177,891.86
S.E. 3rd Street Widening ( fka Dupont 40-B31206 2 1297 Transit Half -Cent Surtax
36000 Streets & $ 27,016.37 $ 88,863.99 $ 115,880.36
Plaza Traffic Recirculation) Sidewalks
S.E. 3rd Street Widening ( fka Dupont 40-831206 2 1419 Parking Surcharge 2007
Plaza Traffic Recirculation)
36000 Streets &
Sidewalks
$ 175,708.64 $ 17,998.39 $ 193,707.03
S.E. 3rd Street Widening (fka Dupont 40-B31206B 2 1231 Downtown Development 36000 Streets &
Plaza Traffic Recirulation) - DRI Supplemental Fee Sidewalks
Administration
$ 3,036.09 $
- $ 3,036.09
Shenandoah Area Improvements - D4 40-B30775 4 • 1101 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
816.93 $
- $ 816.93
Shenandoah Area Improvements - D4 40-B30775 4 1638 Street Bonds 2- 2009 Series
36000 Streets & $ 97.35 $ 36,985.59 $ 37,082.94
Sidewalks
Shenandoah Traffic Calming Priority 4 40-B30167D 4 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 276,438.23 $ 48,251.58 $ 324,689.81
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
(s) No.
Fund Fund
No. Description
Actual
Encumbrances Total Cost
Shenandoah Traffic Calming Priority 4 40-B30167D
4 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 747,627.35 $ 240,632.61 $ 988,259.96
Shorecrest Roadway Milling &
Resurfacing Project
40-B30035B 2 1113 Local Oprion Gas Tax
36000 Streets &
Sidewalks
1,695.86 $
$ 1,695.86
Shorecrest Roadway Milling &
Resurfacing Project
40-B30035 B
2 1297 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 187,393.08 $ 76,685.41 $ 264,078.49
Shorecrest Roadway Milling &
Resurfacing Project
40-B30035B 2 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 604,197.21 $ 12,417.90 $ 616,615.11
Shorecrest Roadway Milling &
Resurfacing Project
40-B30035B
2 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 49,776.92 $
(0.01) $ 49,776.91
Silver Bluff Traffic Calming Priority 3
40-B30168A 4 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 81,227.60 $ 9,407.83 $ 90,635.43
Silver Bluff Traffic Calming Priority 3
40-B30168A 4 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 348,885.41 $ 102,152.74 $ 451,038.15
South Bayshore Drive Roadway and 40-B30646
Drainage Improvements
2 1297 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 16,637.72 $
- $ 16,637.72
South Bayshore Drive Roadway and
Drainage Improvements.
40-B30646 2 1750 MD Cty-South Bayshore Drive 36000 Streets &
Roadway & Drainage Imp.40-830646 Sidewalks
$ 141,013.75 $ 308,986.25 $ 450,000.00
SW 10th Street Road Improvements - 40-640306
D3
3 1638 Street Bonds 2- 2009 Series
36000 Streets & $
Sidewalks
- $ 31,972.68 $ 31,972.68
SW 11th Street Road Improvements - 40-640304
D3
3 1638 Street Bonds 2- 2009 Series
36000 Streets & $
Sidewalks
7,527.21 $ 7,527.21
SW 12th Street Road Improvements - 40-B40305
D3
3 1638 Street Bonds 2- 2009 Series
36000 Streets & $
Sidewalks
- $ ,5,021.32 $ 5,021.32
SW 13th Street Roadway & Drainage 40-630747
Improvements - D3
3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 39,187.86 $ 157,651.86 $ 196,839.72
SW 15th Street Road Improvements D3 40-B40301
3 1638 Street Bonds 2- 2009 Series
36000 Streets & $
Sidewalks
- $ 16,684.67 $ 16,684.67
SW 15th Street Road Improvements 40-B40315
Segment 2 - D3
3 1638 Street Bonds 2- 2009 Series
36000 Streets & $
Sidewalks
- $ 26,741.73 $ 26,741.73
SW 16 Avenue from Coral Way to 20 40-B30719
Street - D3
3 1379 Street Bonds - 2007 Series
36000 Streets & $ 95,079.73 $ 7,811.06 $ 102,890.79
Sidewalks
SW 16 Avenue Roadway & Drainage 40-B30741 3 1638 Street Bonds 2- 2009 Series
Improvements - D3
SW 16th Street Road Improvements D3 40-B40307 3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
36000 Streets & $
Sidewalks
$ 44,005.25 $ 143,674.45 $ 187,679.70
- $ 20,255.54 $ 20,255.54
SW 17th Avenue Roadway & Drainage 40-B30760
Improvements - D3 & D4
3,4 1638 Street Bonds 2- 2009 Series
36000 Streets & $
Sidewalks
- $ 600,000.00 $ 600,000.00
SW 17th Street Road Improvements D3 40-B40309
3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ - $ 35,929.45 $ 35,929.45
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
(s) No.
Fund Fund
No. Description
Actual
Encumbrances Total Cost
SW 17th Terrace Road Improvements 40-B40308
D3
3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
- $ 16,540.21 $ 16,540.21
SW 18th Terr. Road Improvements-- D3 40-640300
3 1379 Street Bonds - 2007 Series
36000 Streets &
Sidewalks
$ 697.33 $ 8,055.40 $ 8,752.73
SW 18th Terr. Road Improvements - D3 40-B40300
3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
1,818.42 $ 1,818.42
SW 19th Terrace Improvements (SW 23 40-B30695
Avenue to SW 24th)
4 1101 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 36,057.75 $ 26,919.22 $ 62,976.97
SW 19th Terrace Improvements (SW 23 40-830695
Avenue to SW 24th)
SW 1st Ave Road Improvements - 404340318
Segments 2 - D3
4 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 64,685.08 $ 1,723.49 $ 66,408.57
3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
- $ 8,307.14 $ 8,307.14
SW 1st Ave Road Improvements
Segment 1- D3
40-B40302
3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
- $ 27,184.61 $ 27,184.61
SW 20th Road Improvements D3
40-B40310
3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 674.74 $ 8,717.06 $ 9,391.80
SW 22nd Ave Medians - US1 to Coral 40-830770
Way - D4
4 1297 Transit Half -Cent Surtax
SW 22nd Ave Medians - US1 to Coral 40-830770
Way - D4
4 1379 Street Bonds - 2007 Series
36000 Streets & $
Sidewalks
36000 Streets & $
Sidewalks
6,486.43 $
4,622.01 $
- $ 6,486.43
0.01 $ 4,622.02
SW 22nd Road Improvements D3
40-B40311
3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 13,549.61 $ 13,549.61
SW 22nd Terr. & 13th Ave Road
Improvements D3
40-B40312
3 1638 Street Bonds 2- 2009 Series
36000 Streets & $
Sidewalks
$ 36,437.65 $ 36,437.65
SW 23rd Road Improvements D3
40-B40303
3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 48.75 $ 17,725.91 $ 17,774.66
SW 23rd Road Roadway & Drainage 40-B30744
Improvements - D3
3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 10,041.71 $ 79,177.91 $ 89,219.62
SW 25th Road Improvements D3
40-840319
3 1638 Street Bonds 2- 2009 Series
36000 Streets & $
Sidewalks
$ 8,236.52 $ 8,236.52
SW 26th Road Improvements Segment 40-840320
2-D3
3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 20,269.55 $ 20,269.55
SW 27th Road Improvements D3
40-840322
3 1638 Street Bonds 2- 2009 Series
36000 Streets & $
Sidewalks
- $ 29,543.17 $ 29,543.17
SW 28th Road Roadway & Drainage 40-830743
Improvements - D3
3 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 97,581.93 $ 72,401.83 $ 169,983.76
SW 2nd Ave Road Improvements D3
40-B40321 3 1638 Street Bonds 2- 2009 Series
36000 Streets & $
Sidewalks
$ 34,812.41 $ 34,812.41
SW 32 Avenue Improvements
Additional Services
40-B40704A 2,4 1297 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 121,749.17 $ 251,404.75 $ 373,153.92
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project Dist Award Award Name Fund Fund Actual Encumbrances Total Cost
Number (s) No. No. Description
SW 32 Avenue Improvements 40-B40704A 2,4 1379 Street Bonds - 2007 Series 36000 Streets &
Additional Services Sidewalks
SW 32 Avenue Improvements 40-B40704A • 2,4 1638 Street Bonds 2- 2009 Series
Additional Services
36000 Streets &
Sidewalks
$ 529,143.61 $ 43,266.71 $ 572,410.32
$ 211,524.67 $ 66,054.61 $ 277,579.28
SW 3rd Ave Road Improvements D3 40-640313 3 1638 Street Bonds 2- 2009 Series
36000 Streets & $ - $ 17,725.45 $ 17,725.45
Sidewalks
SW 3rd Avenue Road Improvements 40-B30031A 3 1379 Street Bonds - 2007 Series
Project
36000 Streets &
Sidewalks
$ 137,532.09 $ - $ 137,532.09
SW Sth Avenue Roadway & Drainage 40-B30742 3 1638 Street Bonds 2- 2009 Series
Improvements - D3
36000 Streets & $ 345.19 $ 0.01 $ 345.20
Sidewalks
SW/NW 17th Avenue Traffic Corridor 40-630993 1,2,3 1297 Transit Half -Cent Surtax 36000 Streets & $ 20,395.84 $ 79,635.10 $ 100,030.94
Study - D2 ,4,5 Sidewalks
Tigertail Resurfacing - D2
40-B30716 2 1297 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 123,475.37 $ 9,632.98 $ 133,108.35
Tigertail Resurfacing - D2
40-B30716 2 1638 Street Bonds 2- 2009 Series
36000 Streets &
Sidewalks
$ 325,435.78 $ 60,828.49 $ 386,264.27
Traffic Calming SW 6th Street Project - 40-B30771 4 1379 Street Bonds - 2007 Series
D4
36000 Streets &
Sidewalks
$ 43,634.19 $ 120,477.57 $ 164,111.76
Transportation Program Support 40-B30645B 1,2,3 1297 Transit Half -Cent Surtax 36000 Streets & $ 615,042.90 $ 129,220.00 $ 744,262.90
Services - Transportation ,4,5 Sidewalks
US-1 Median Closures at Bridgeport and 40-B30662D 2 1297 Transit Half -Cent Surtax
SW 30 Ct - D2
36000 Streets &
Sidewalks
$ 6,473.89 $ - $ 6,473.89
US-1 Median Closures at Bridgeport and 40-B30662D 2 1379 Street Bonds - 2007 Series
SW 30 Ct - D2
36000 Streets &
Sidewalks
$ 44,249.30 $ 8,802.60 $ 53,051.90
US1 Milling/Resurfacing Improvements 40-B30542A 2 1379 Street Bonds - 2007 Series
and Wall Replacement PH II
36000 Streets &
Sidewalks
$ 1,015,265.34 $ 276,508.59 $ 1,291,773.93
U51 Milling/Resurfacing Improvements 40-B30542A 2 1638 Street Bonds 2- 2009 Series
and Wall Replacement PH II
36000 Streets &
Sidewalks
$ 1,137,633.62 $ 147,045.57 $ 1,284,679.19
US1 Milling/Resurfacing Improvements 40-B30542A 2 1765 US-1 Roadway Improvements and 36000 Streets &
and Wall Replacement PH II Wall Replacement Phase II, B-30542A Sidewalks
$ 83,537.00 $ $ 83,537.00
Venetian Causeway Improvements 40-B39911 2 1572 FDOT - Venetian Causeway
I nprovements,B-39911
36000 Streets &
Sidewalks
$ 643,941.16 $ 356,058.84 $ 1,000,000.00
Venetian Causeway Improvements
40-B39911 2 1638 Street Bonds 2- 2009 Series
36000 Streets & $ 1,014,880.34 $ 1,181,584.66 $ 2,196,465.00
Sidewalks
West Flagler Area Improvements - D4 40-B30774 4 1101 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 31,589.04 $ 47,840.80 $ 79,429.84
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
(s) No.
Fund Fund
No. Description
Actual
Encumbrances Total Cost
West Flagler Area Improvements - D4 40-1330774
4 1297 Transit Half -Cent Surtax
36000 Streets &
Sidewalks
$ 103,164.64 $ 98,489.69 $ 201,654.33
Caribbean Marketplace Renovation D5 40-B30671A
5 1122 Sanitary Sewer Bonds Series 1995
37000 Sanitary Sewers $
$ 114,000.00 $ 114,000.00
Coral Way NET Office Remodeling -
Sanitary Sewer
40-B30365ES 3 1122 Sanitary Sewer Bonds Series 1995
37000 Sanitary Sewers $
- $ 800.00 $
800.00
Marlins Stadium Area Infrastructure
Improvements
40-B30673 1,2,3 1122 Sanitary Sewer Bonds Series 1995
,4,5
37000 Sanitary Sewers $ 9,639,640.67 $
- $ 9,639,640.67
Police Department Sanitary Sewer
System Repairs
40-B70600 1,2,3 1122 Sanitary Sewer Bonds Series 1995
,4,5
37000 Sanitary Sewers $ 57,510.95 $
57,510.95
Belle Meade Storm Sewer Project, 40-B50672
Phase II
2 1101 Transit I-lalf-Cent Surtax
38000 Storm Sewers $ 1,291,956.80 $
8,043.20 $ 1,300,000.00
Belle Meade Storm Sewer Project, 40-850672
Phase II
2 1108 Impact Fees Ord
38000 Storm Sewers $ 695,669.06 $ 4,330.94 $ 700,000.00
Belle Meade Storm Sewer Project, 40-B50672
Phase II
2 1124 Stormwater Utility Trust Fund
38000 Storm Sewers $ 3,125,178.18 $ 60,129.34 $ 3,185,307.52
Belle Meade Storm Sewer Project, 40-B50672
Phase II
2 1297 Transit Half -Cent Surtax
38000 Storm Sewers $ 2,057,485.91 $ 12,809.09 $ 2,070,295.00
Belle Meade Storm Sewer Project, 40-650672
Phase II
2 1334 FDEP- Belle Meade Storm Sewers
Project,Phase II,B-50672
38000 Storm Sewers $ 500,000.00 $
- $ 500,000.00
Belle Meade Storm Sewer Project, 40-B50672
Phase II
2 1349 Stormwater Utility 2007 Trust Fund
38000 Storm Sewers $ 791,409.69 $ 4,237.30 $ 795,646.99
Belle Meade Storm Sewer Project, 40-B50672
Phase II
2 1379 Street Bonds - 2007 Series
38000 Storm Sewers ' $ 1,950,663.43 $ 6,555.57 $ 1,957,219.00
Belle Meade Storm Sewer Project, 40-B50672
Phase II
2 -1431 Stormwater Utility 2008 Trust Fund -
Contribution from Genral Fund
38000 Storm Sewers $ 874,459.94 $ 16,191.70 $ 890,651.64
Citywide Storm Sewer Repair Project
40-B30262 1,2,3 1124 Stormwater Utility Trust Fund
,4,5
38000 Storm Sewers $ 1,318,642.10 $ 49,737.90 $ 1,368,380.00
Citywide Storm Sewer Repair Project
40-B30262 1,2,3 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 1,783,039.77 $ 211,054.23 $ 1,994,094.00
,4,5 Contribution from Genral Fund
Durham Terrace Drainage Project
Durham Terrace Drainage Project
40-B30629 4 1379 Street Bonds - 2007 Series 38000 Storm Sewers $ 22,856.34 $ 44,365.48 $ 67,221.82
40-B30629 4 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 209,7.75.02 $ 7,305.60 $ 217,080.62
Contribution from Genral Fund
Durham Terrace Drainage Project 40-B30629
Englewood Storm Sewer - Phase III 40-B30011
4 1638 Street Bonds 2- 2009 Series
4 1297 Transit Half -Cent Surtax
38000 Storm Sewers $ 1,749,594.29 $ 280,259.04 $ 2,029,853.33
38000 Storm Sewers $ 186,234.36 $ 9,173.35 $ 195,407.71
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
(s) No.
Fund Fund
No. Description
Actual
Encumbrances Total Cost
Englewood Storm Sewer - Phase III 40-B30011
4 1361 Englewood Storm Sewer Phase III 38000 Storm Sewers $ 671,034.90 $ 9,288.72 $ 680,323.62
Englewood Storm Sewer - Phase III
Englewood Storm Sewer - Phase III
40-B30011
40-B30011
4 1379 Street Bonds - 2007 Series
4 1431 Stormwater Utility 2008 Trust Fund -
Contribution from Genral Fund
38000 Storm Sewers
38000 Storm Sewers
991,219.23 $ 158,959.49 $ 1,150,178.72
872.06 $ - $ 872.06
Fairlawn Storm Sewer Improvements 40-850704
Project PHIII
4 1069 HD Flagami Storm Water Mitigation 38000 Storm Sewers $ 609,326.12 $ 2,399.68 $ 611,725.80
Series 1
Fairlawn Storm Sewer Improvements 40-850704
Project PHIII
4- 1123 FDEP Fairlawn Storm Sewer Pump 38000 Storm Sewers $ 700,000.00 $
Station Project, Phase III
$ 700,000.00
Fairlawn Storm Sewer Improvements 40-B50704
Project PHIII
4 1379 Street Bonds - 2007 Series
38000 Storm Sewers $ 2,338,000.45 $
- $ 2,338,000.45
Fairlawn Storm Sewer Improvements 40-650704
Project PHIII
4 1488 F--DEP Fairlawn Storm Sewer
Improvements Projects, PH I11. B-
50704
38000 Storm Sewers $ 134,728.51 $ 115,271.49 $ 250,000.00
Fairlawn Storm Sewer Improvements 40-850704
Project PHIII
4 1547 FDEP Fairlawn PH III B-50704 & San 38000 Storm Sewers $ 500,000.00 $
Marco Island B-30588
$ 500,000.00
Fairlawn Storm Sewer Improvements 40-350704
Project PHIII
4 1584 Homeland Defense/Neighborhood 38000 Storm Sewers $ 434,367.02 $
Improvement Bond Series 3
$ 434,367.02
FDEP Drainage Wells Compliance
40-B30700 1,2,3 1113 Local Oprion Gas Tax
,4,5
38000 Storm Sewers $ 118,106.40 $ 39,614.19 $ 157,720.59
FDEP Drainage Wells Compliance
40-830700 1,2,3 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 53,217.86 $ 101,084.33 $ 154,302.19
,4,5 Contribution from Genral Fund
Garden Storm Sewer - Phase I
Garden Storm Sewer - Phase I
Garden Storm Sewer - Phase I
40-1330183
40-630183
40-B30183
1 1101 Transit Half -Cent Surtax
1 1157 1976 & 78 Storm Sewer G 0 Bond
1 1845 FEMA PDM Garden Storm Sewer B-
30183
38000 . Storm Sewers
38000 Storm Sewers
38000 Storm Sewers
9,504.78 $
18,877.06 $
78,242.32 $
- $
40,466.73 $
- $
9,504.78
59,343.79
78,242.32'
Grove Park Road and Storm Sewers 40-B30008
Improvements - D3.
3 1360 Glenroyal Storm Sewer Phase III
38000 Storm Sewers $ 658,870.16 $ 12,129.84 $ 671,000.00
Grove Park Road and Storm Sewers
Improvements - D3
40-630008
3 1431 Stormwater Utility 2008 Trust Fund -
Contribution from Genral Fund
38000 Storm Sewers $
54,082,80 $ 64,652.23 $ 118,735.03
Mary Brickell Village Drainage
Improvements
40-830637 . 1,2,3 , 1419 Parking Surcharge 2007
,4,5
38000 Storm Sewers $ 196,722.75 $ 27,149.38 $ 223,872.13
Mary Brickell Village Drainage 40-B30637 1,2,3 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers
Improvements
,4,5 Contribution from Genral Fund
$
13,241.41 $ - $ 13,241.41
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
(s) No.
Fund Fund
No. Description
Actual
Encumbrances Total Cost
Mary Brickell Village Drainage
Improvements
40-B30637
1,2,3 1638 Street Bonds 2- 2009 Series
,4,5
38000 Storm Sewers $ 55,254.46 $ 26,511.87 $ 81,766.33
Northwest Storm Sewers
Northwest Storm Sewers
40-830014
40-830014
5 1297 Transit Half -Cent Surtax
5 1362 Drainage & Storm System Imp.
Northwest Area
38000 Storm Sewers $ 66,821.14 $
- $ 66,821.14
38000 Storm Sewers $ 668,640.68 $ 548.06 $ 669,188.74
Northwest Storm Sewers
40-B30014
, 5 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 2,002.24 $
Contribution from Genral Fund
2,002.24
Northwest Storm Sewers
Overtown Stormwater Pump Station
Upgrades
40-830014
40-850654
5 1638 Street Bonds 2-.2009 Series
5 1097 CIP Miscellaneous Revenue
38000 Storm Sewers $ 2,001,435.27 $ 214,945.13 $ 2,216,380.40
38000 Storm Sewers $ 46,357.55 $ - $ 46,357.55
Overtown Stormwater Pump Station 40-850654
Upgrades
5 1108 Impact Fees Ord
38000 Storm Sewers $ 12,087.88 $
$ 12,087.88
Overtown Stormwater Pump/Station 40-B50654
Upgrades
5 1124 Stormwater Utility Trust Fund
38000 Storm Sewers $ 336,827.47 $
- $ 336,827.47
Overtown Stormwater Pump Station 40-850654
Upgrades
5 1127 FEMA Recovery Assistance
38000 Storm Sewers $ 173,200.00 $
- $ 173,200.00
Roadway, Drainage & Traffic 40-B50706A
Improvements D1 & D4
1,4 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers
Contribution from Genral Fund
10,987.50 $ 14,785.15 $ 25,772.65
Roadway, Drainage & Traffic 40-B50706A
Improvements D1 & D4
1,4 1584 Homeland Defense/Neighborhood 38000 Storm Sewers $ 252,078.74 $ 92,572.95 $ 344,651.69
Improvement Bond Series 3
Rockerman Canal Improvements
Rockerman Canal Improvements
40-B30680
40-830680
2 1124 Stormwater Utility Trust Fund 38000 Storm Sewers $ 194,422.93 $ 35,327.46 $ 229,750.39
2 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 44,086.40 $ 444.05 $ 44,530.45
Contribution from Genral Fund
Rockerman Canal Improvements
40-630680
2 1673 Special Assessement District-
Rockerman Canal Improvements B-
30680
San Marco & Biscayne Islands Drainage 40-B30588
Improvements
"2 1113 Local Oprion Gas Tax
38000 Storm Sewers $ 202,466.59 $ 5,202.48 $ 207,669.07
38000 Storm Sewers $ 213,131.44 $ 534,038.56 $ 747,170.00
San Marco & Biscayne Islands Drainage 40-B30588
Improvements
2 1297 Transit Half -Cent Surtax
38000 Storm Sewers $ 277,438.07 $ 573,411.39 $ 850,849.46
San Marco & Biscayne Islands Drainage 40-630588
Improvements
2 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 106,133.95 $ 383,804.05 $ 489,938.00
Contribution from Genral Fund
San Marco & Biscayne Islands Drainage 40-830588
2 1496 Sunshine State Government 38000 Storm Sewers $ 432,397.10 $ 42,602.90 $ 475,000.00
Improvements Financing Commission Loan 112
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name
(s) No.
Fund Fund Actual
No. Description
Encumbrances Total Cost
San Marco & Biscayne Islands Drainage 40-B30588
Improvements
2 1547 FDEP Fairlawn PH III B-50704 & San 38000 Storm Sewers $ 381,426.65 $ 118,573.35 $ 500,000.00
Marco Island 13-30588
San Marco & Biscayne Islands Drainage 40-1330588
Improvements
2 1638 Street Bonds 2- 2009 Series
38000 Storm Sewers $ 328,387.79 $ 161,795.84 $ 490,183.63
San Marco & Biscayne Islands Drainage 40-1330588
Improvements
2 1810 FEMA-San Marco and Biscayne Island 38000 Storm Sewers $ 266,450.57 $ 333,549.42 $ 599,999.99
Drainage hnprovements,8-30588
Silver Bluff Drainage Improvements - D4 40-1330776
4 1379 Street Bonds - 2007 Series
38000 Storm Sewers
26,493.51 $ 57,871.32 $ 84,364.83
Storm Drainage Master Plan Update
40-B30632 1,2,3 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $ 656,006.44 $
,4,5 Contribution from Genral Fund
0.02 $ 656,006.46
Wagner Creek/Seybold Canal Dredging 40-B50643
1,5 1124 Stormwater Utility Trust Fund
38000 Storm Sewers $ 1,725,126.25 $ 36,493.99 $ 1,761,620.24
Wagner Creek/Seybold Canal Dredging 40-B50643
1,5 1157 1976 & 78 Storm Sewer G 0 Bond 38000 Storm Sewers $ 144,964.70 $
- $ 144,964.70
Wagner Creek/Seybold Canal Dredging 40-B50643
1,5 1219 Prior YR Fund Balance(311950)
38000 Storm Sewers $ 26,075.76 $
- $ 26,075.76
Wagner Creek/Seybold Canal Dredging 40-850643
1,5 1431 Stormwater Utility 2008 Trust Fund- 38000 Storm Sewers $
Contribution from Genral Fund
782.72 $
- $ 782.72
Solid Waste Collection Equip
40-B73202C 1,2,3 1426 Contribution from General Fund FY • 39000 Solid Waste-CIP $ 2,061,480.25 $ 786,737.17 $ 2,848,217.42
,4,5 2008
City of Miami Trolley Program - Capital 40-870715
Acquisition
1,2,3 1131 FDOTJPA for Miami Streetcar &
4,5 Supplemental JPA For Miami Trolley
Program
39900 Mass Transit $ 1,860,506.99 $
(0.02) $ 1,860,506.97
City of Miami Trolley Program - Capital 40-B70715
Acquisition
1,2,3 1297 Transit Half -Cent Surtax
,4,5
39900 Mass Transit $ 998,133.08 $
0.02 $ 998,133.10
FEC Quiet Zone Study
FEC Quiet Zone Study
40-B40268
40-840268
2,5 1297 Transit Half -Cent Surtax 39900 Mass Transit $ _ 50,515.30 $ - $ 50,515.30
2,5 1770 MDC-Florida East Coast Railway Quiet 39900 Mass Transit $ 79,145.60 $ 20,272.60 $ 99,418.20
Zone Study
Transportation Program Support
Services - Transit Professional
40-B30645A 1,2,3 1101 Transit Half -Cent Surtax
,4,5
39900 Mass Transit
$ 246.20 $
(0.01) $
246.19
Transportation Program Support
40-B30645A 1,2,3 1297 Transit Half -Cent Surtax 39900 Mass Transit $ 243,111.53 $ 54,951.88 $ 298,063.41
Services - Transit Professional ,4,5
2012-2013 CAPITAL BUDGET AND MULTI -YEAR PLAN
Project Name
Project
Number
Dist Award Award Name Fund Fund
(s) No.
No. Description
Actual
Encumbrances Total Cost
Transportation Program Support 40-B30645A 1,2,3 1616 DDA-Transportation Program Support 39900 Mass Transit $ 25,000.00 $
Services - Transit Professional
,4,5 Services Brickeil Trolley Study
$ 25,000.00
ARRA - Citywide Bicycle Rack & Signage 40-630694
Program
1,2,3 1694 ARRA-Citywide Bicycle Rack &
,4,5 Signage Program 40-830694
98004 ARRA-Others- $ 389,737.69 $ 924.49 $ 390,662.18
Memo Only
ARRA - NE 2nd Avenue Improvements 40-B78508C
(Segment B2)
5 1743 ARRA-NE2nd Avenue 98004 ARRA-Others- $ 2,187,219.38 $ 10,062.97 $ 2,197,282.35
Improvement,Segment B2 51st to 57 Memo Only
Street 8-78508C
ARRA - NE 2nd Avenue Improvements 40-B78508B
(Segment C)
5 1653 ARRA-NE2nd Avenue 98004 ARRA-Others- $ 3,913,980.32 $
Improvement,Segment C-57th to 69 Memo Only
street 40 B-785D86
- $ 3,913,980.32