Loading...
HomeMy WebLinkAboutEbsary Foundation CompanyEBSARY foundation company MARINE AND ENGINEERING CONSTRUCTION 2154 rtw. Muth River orivc. Mlaml. Fk,dda 33125-2297 Ok 130513250530 • CCD e502 • Nu 13051325- 684 Ebsary Foundation Company Lump Sum Final GMP Pricing Propsal For: Design Build Services for Seawall Stabilization and Repair Project RFP # 11-12-033 Date: 9/21/2012 $IDBASESCOPE`OFWOW '• : ,.. Bid Itein D.escriptiori . Unit';' ; •Est, Unit Price .: .. Bid Total ' _ Remarks 100 Bond LS 1.0 $ 74,000.00 $ 74,000.00 Bond and Insurance Premiums 200 DESIGN - Predesign Mobilization and Exploration LS 1.0 $ 90,000.00 $ 90,000.00 All predesign and development - exploratory work and Permit Application 300 DESIGN - Initial Design and Submittal LS 1.0 $ 30,000.00 $ 30,000.00 Primary Design Coordination and Design Submittals 400 DESIGN - Final Design Approval and Permit Issue LS 1.0 $ 24,000.00 $ 24,000.00 Final Design Approval and Permit Pick Up 500 DESIGN - Construction Administration LS 1.0 $ 19,000.00 $ 19,000.00 FOR Construction Administration and Inspection 600 DESIGN - Substantial & Final Completion Deliverables LS 1.0 $ 7,000.00 $ 7,000.00 Final Approved Drawings 700 Permit Fees LS 1.0 $ 50,000.00 $ 50,000.00 Allowance Account for Permits 800 Construction Mobilization LS 1.0 $ 85,000.00 $ 85,000.00 Mobilization of Construction Activities 900 Site Work & Demolition , WF 1,450.0 $ 170.00 $ 246,500.00 Earthwork, exploratory excavation, demolition, hauling 1000 Backfill Between Seawalls WF 1,450.0 $ 40.00 $ 58,000.00 Backfilling with Flowable Fill 1100 Seawall Concrete Cap Repair WF 1,450.0 $ 240.00 $ 348,000.00 Spall Repair, Expansion Joint Repairs, Epoxy Injection, Concrete Coating 1200 Grouted Soil Anchors WF 1,450.0 $ 895.00 $ 1,297,750.00 Core Drilling, Anchor Installation, Anchor Caps 1300 Site Restoration LS 1.0 $ 40,000.00 $ 40,000.00 Final Site Restoration, Grading and Cleanup TOTAL = $ 2,369,250.00 Two Million Three Hundred Sixty Three Thousand Dollars and 00/100 EXCLUSIONS: Landscaping, Grass and Tree Removal and Replacement Utility Work (Electrical and Plumbin Promenade Concrete or Paving Paving Site Access (landside Access is required for a minimum of 40ft from Bulkhead Face) Utility Relocation or Restoration Bulkhead Sheetpile Replacement or Remediation using the Grouted Anchors to Pull the Wall back into plumb location. We anticipate the Wall moving some during the prestressing, but there is no guarantee how much movement Handling and Removal of Contaminants Asphalt or Paving INCLUSIONS Design, Permitting, Labor, equipment, materials and supervision to Perform the Scope Quality Control and Inspection Prevailing Wages and Insurance Taxes Submittals The proposed bid base scope or work is Final Lump Sum Pricing for each item. All General Conditions, Overhead and Profit are included in each bid item. The above pricing is the Final pricing for each item Temporary Rip -Rap Relocation during installation, Rip -Rap to be Stockpiled on site and replaced after work is complete. Cleanup after each night of work We appreciate the opportunity to quote this project. If you should have any questions please contact the undersigned at your convenience. Very Truly Yours, EBSARY FOUNDATION COMPANY rV Matthew J. Shiring, P.E. Vice President 9/21/20121:57 PM