Loading...
HomeMy WebLinkAboutBid ContractBID NO. 09-10-010 NW 14TH STREET MULITMEDIA ENTERTAINEMENT DISTRICT STREETSCAPE PROJECT CIP PROJECT NO. : B- 30394 Due Date: Monday, March 22, 2010 Due Time: 2:00 P.M. Mayor Tomas P. Regalado Commissioner: Wilfredo (Willy) Gort, .District 1 Commissioner Marc Sarnoff, District 2 Commissioner Frank Carollo, District 3 Commissioner Francis .Suarez, .District 4 Commissioner Richard P. Dunn, District 5 City Manager, Pedro G. Hernandez, P.E. Issued By: City of Miami Capital Improvements Program 444 SW 2nd Avenue, 8th Floor Miami, FL 33130 TABLE OF CONTENTS NOTICE TO CONTRACTORS 6 Section 1- Instructions for Submission 7 1. Intention of City 7 2. Scope of Work 7 3. Location of Project(s) 7 4. Performance of the Work 7 5. Examination of Contract Documents and Site 7 6. Addendum 8 7. Bid Submission 8 8. Bid Guaranty 8 9. Preparation of Bid 9 10. Pre -Bid Conference 9 11. Postponement of Bid Opening Date 9 12. Acceptance or Rejection of Bids 9 13. Environmental "Regulations 10 14. Bid Award 10 15. Bid Protest 10 16. Local, Small, and Disadvantaged Firm Participation 11 17. First Source Hiring Agreements 11 18. Subcontractor and Small Business Participation Reporting 12 19. Cone of Silence 12 20. Public Entity Crime 12 21. Fraud and Misrepresentation 12 22. Collusion 12 23. Contractor in Arrears of Default 13 24. Cancellation of Solicitation 13 Section 2 - General Terms and Conditions 14 1. Definitions 14 2. Time is of the Essence 16 3. Contract Term 16 4. Notices 16 5. Priority of Provisions 17 6. Indemnification 17 7. Insurance 18 8. Performance and Payment Bond 21 9. Qualification of Surety 22 10. General Requirements 23 11. Method of Performing the Work 24 12. Work Staging and Phasing 24 13. Site Investigation and Representation 24 14. Contractor to Check Plans, Specifications and Data 25 15. Contractor's Responsibility -for Damages and Accidents 25 16. Accidents 26 17. Safety Precautions 26 18. Occupational Health and Safety 27 19. Labor and Materials 27 20. Rules, Regulations, and Licenses 27 2 NW 14 Street Streetscape Project Bid No.: 09-10-010 21. Consultant Services 27 22. Project Management 28 23. Superintendence and Supervision 28 24. Subcontractors 29 25. Authority of.the.Project Manager 29 26. Inspection of Work 30 27. Taxes 31 28. Separate Contracts 31 29. Lands of Work 31 30. Coordination of Work 32 31. . Differing Site Conditions 32 32. Existing Utilities 32 33. Contractor's Responsibility for Utility Properties and Service 33 34. Interfering Structures 33 35. Field Relocation 34 36. Contractor's Use of Project Site(s) 34 37 Warranty of Materials and Equipment 34 38. Material and Equipment Shipment, Handling, Storage and Protection 34 39. Manufacturer's Instructions 36 40. Manufacturer's Warranty 37 41. Reference Standards 37 42. Submittals 37 43. Shop Drawings 38 44. Product Data 40 45. Samples 40 46. Record Set 40 47. Supplemental .Drawings and Instructions 40 48. Contractor Furnished Drawings 40 49. Substitutions 41 50. City Furnished "Drawings 42 51. Interpretation of Drawings and Documents 42 52. Product and Material Testing 42 53. Field Directives 43 54. Changes in the Work or Contract Documents 43 55. Continuing the Work 43 56. .Change Orders 43 57.. Change Order Procedure 44 58. No Oral Changes 45 59. Value of Change Order Work 45 60. Extra Work Directive 47 61. As -Built Drawings 48 62. Worker's Identification 49 63. Removal of Unsatisfactory Personnel 49 64. Substantial Completion, Punch List, & Final Completion 49 65. Acceptance and Final Payment 50 66. NDPES Requirements 51 67. Force Majeure 51 68. Extension of Time 51 69. Notification of Claim 53 70. Extension of Time not Cumulative 53 3 NW 14 Street Streetscape Project Bid No.: 09-10-010 71. Contractor's Damages for Delay 53 72. Excusable Delay, Non-Compensable 54 73. Lines and Grades 54 74. Defective Work 54 75. Acceptance of Defective or Non -Conforming Work 54 76. Uncovering Finished Work 55 77. Correction of Work 55 78. Maintenance of Traffic and Public Streets 55 79. Location and Damage to Existing Facilities, Equipment or Utilities 57 80. Stop Work Order 57 81. Hurricane Preparedness 58 82. Use of Completed Portions 58 83. Cleaning Up; City's Right to Clean Up 59 84. Removal of Equipment 59 85. Set -offs, Withholdings, and Deductions 59 86. Event of Default 59 87. Notice of Default -Opportunity to Cure 60 88. Termination for Default 60 89. Remedies in the Event of Termination for Default 62 90. Termination for Convenience • 61 91. Resolution of Disputes 62 92. Mediation -Waiver of Jury Trial 63 93. City May Avail Itself of All Remedies 63 94. Permits, Licenses and Impact Fees 63 95. Compliance with Applicable Laws 64 96. Independent Contractor 64 97. Third Party Beneficiaries 64 98. Successors and Assigns 64 99. Materiality and Waiver of Breach 65 100. Severability 65 101. Applicable Law and Venue of Litigation 65 102. Amendments 65 103. Entire Agreement 65 104. Nondiscrimination, Equal Employment Opportunity, and Americans with Disabilities Act 66 105. Evaluation 66 106. Commodities manufactured, grown, or produced in the City of Miami, Miami -Dade County and the State of Florida 66 107. Royalties and Patents 66 108. Continuation of the Work 66 109. Review of Records 66 110. No Interest 67 111. Payments Related to Guaranteed Obligations 67 112. Consent of City Required for Subletting or Assignment 67 113. Agreement Limiting Time in Which to Bring Action Against the City 67 114. Defense of Claims 68 115. Contingency Clause 68 116. Mutual Obligations 68 117. Contract Extension 68 118. Non -Exclusivity 68 4 NW 14 Street Streetscape Project Bid No.: 09-10-010 119. Nature of the Agreement 68 120. Contract Documents Contains all Terms 69 121. Applicable Law and Venue of Litigation 69 122. Survival 69 Section 3 - Supplemental Terms and Conditions 70 1. Contract Time & Hours 70 2. LEED Certification (Not Applicable) 70 3. Progress Payments 70 4. Liquidated Damages 71 5. Schedule of Values 71 6. Project Schedules 72 7. Release of Liens/Subcontractor's Statement of Satisfaction 73 8. Progress Meetings 73 9. Request for Information 73 10. Project Site Facilities 74 11.. ..... Security 75 12. Construction Signage 75 13. Construction Photographs 14. City Furnished Property Section 4 - Bid Forms 77 1. Affirmative Action Plan 79 2. First Source Hiring 79 3. Non -Collusion 79 4. Drug Free Workplace 79 5. Lobbying 80 6. Debarment, Suspension and Other Responsibility Matters Certification —Trench Safety Act 81 7. Certificate of Authority 85 8. Certificate of Authority (if joint venture) 85 9. Certificate of Authority (if. individual) 85 Section 5- Attachments 85 BID BOND FORM (Page 1 of .3) 85 CERTIFICATE AS TO CORPORATE PRINICIPAL 89 SUPPLEMENT TO BID FORM: 88 QUESTIONNAIRE 88 SUPPLEMENT TO BID FORM: 94 OFFICE LOCATION AFFIDAVIT (Page 1 of 2) 94 SUPPLEMENT TO BID FORM: 95 Section 6 — Contract 99 CORPORATE RESOLUTION 97 FORM OF PERFORMANCE BOND (Page 1of 2) 98 CERTIFICATE AS TO CORPORATE PRINCIPAL 102 PERFORMANCE AND PAYMENT GUARANTY FORM 103 UNCONDITIONAL/IRREVOCABLE LETTER OF CREDIT (Page 1 of 2) 103 PERFORMANCE AND PAYMENT GUARANTY FORM 104 JOINT VENTURE FORM 106 5 NW 14 Street Streetscape Project Bid No.: 09-10-010 INVITATION TO BID NO. 09-10-010 NOTICE TO CONTRACTORS Sealed bids will be received by the City of Miami, Office of the City Clerk, City Hall, 1st Floor, 3500 Pan American Drive, Miami, Florida 33133-5504 for: NW 14th Street Multimedia Entertainment District Streetscape Project, B-30394 Bids Due: Monday, March 22, 2010, AT 2:00 P.M. Scope of Work: The Work consists of furnishing all materials, labor, and equipment necessary to achieve the following: Scope of work includes but is not limited to the installation of a 12 — inch ductile iron water main along NW/NE 14th street from the FEC railroad to NE 2nd Ave., new roadway reconstruction, new sidewalks, new storm water system, signing and pavement markings, landscape and hardscape. Along N 14 street from NE 2nd Ave to NE 1 st Avenue the sidewalk will be constructed using the superblock,Brick paver and design. The rest of the project will have standard patterned concrete sidewalk. N. Miami Avenue will be milled and resurfaced and sidewalk will be reconstructed from N 15th Street to the 1-395 RNV line. CIP has scheduled a non -mandatory pre -bid conference to be held at the following date, time and location: Location: MRC Building, 10th Floor City Manager's Main Conference Room, 444 SW 2nd Avenue, Miami, FI. 33130 Date/Time: Friday, March 5, 2010 at 10:00 AM Minimum Requirements: Prospective Bidder shall hold a current valid certified license as a General Contractor from the State of Florida and/or a Miami -Dade County General Engineering License and must have a minimum of five (5) years experience under its current business name, in the construction of similar projects including five (5) separate project references of similar size, scope, and complexity, supported by references within the past five (5) years. The Bidder must self -perform at least thirty percent (30%) of the physical construction work. The Bid documents can only be obtained by visiting the Capital Improvements Program's website; http://www.miamigov.com/Caoitallmorovements/pages/ProcurementOpportunities/Default.asp on or after, February 19, 2010 from the City of Miami Capital Improvements Program (CIP), at 444 SW 2nd Avenue, 8th Floor, Miami, Florida 33130. Please contact Cecelia Wilson at cwilson(a�miamigov.com to obtain a CD ROM. It is the sole responsibility of all firms to ensure the receipt of any addendum and it is recommended that firms periodically check the CIP webpaqe for updates and the issuance of addenda at: http://www.miamigov.com/Capitall mprovements/pages/ProcurementOpportunities/Default.asp All bids shall be submitted in accordance with the Instructions to Bidders. Bids must be submitted in duplicate originals, at the time, date, and place above, bids will be publicly opened. Any bids received after time and date specified will not be considered. The responsibility for submitting a bid/proposal before the stated time and date is solely and strictly the responsibility of the bidder/Bidder. The Cityis not responsible for any delay no matter what the cause. YOU ARE HEREBY ADVISED THAT THIS INVITATION TO BID IS SUBJECT TO THE "CONE OF SILENCE," IN ACCORDANCE WITH ORDINANCE NO. 12271. 6 NW 14 Street Streetscape Project Bid No.: 09-10-010 Section 1 Instructions for Submission 1. Intention of City It is the intention of City to describe in this Invitation to Bid ("ITB") the Project(s) to be completed in accordance with all codes and regulations governing all the Work to be performed under this Contract(s). Any work, labor, materials and/or equipment that may reasonably be inferred from the Contract as being required to produce the intended results shall be supplied by Contractor whether or not specifically called for in the Contract Documents. Where words, which have well-known technical or trade meanings are used to describe Work, materials or equipment, such words shall be interpreted in accordance with that meaning. Reference to standard specifications, manuals, or codes of any technical society, organization or association, or to the laws or regulations of any governmental authority, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code or laws or regulations in effect at the time of opening of Bids and Contractor shall comply therewith. City shall have no duties other than those duties and obligations expressly set forth within the Contract Documents. 2. Scope of Work The Work specified in this Bid consists of furnishing all labor, machinery, tools, means of transportation, supplies, equipment, materials, and services, and incidentals necessary to perform the following Work at a rate of progress that will ensure completion of the Work within the stipulated Contract Time. Scope of work includes but is not limited to the installation of a 12 — inch ductile iron water main along NW/NE 14th street from the FEC railroad to NE 2"d Ave., new roadway reconstruction, new sidewalks, new storm water system, signing and pavement markings, landscape and hardscape. Along N 14 street from NE 2"d Ave to NE let Avenue the sidewalk will be constructed using the superblock Brick paver and design. The rest of the project will have standard patterned concrete sidewalk. N. Miami Avenue will be milled and resurfaced and sidewalk will be reconstructed from N 15th Street to the 1-395 R/W line. 3. Location of Proiect(s) NW 14th Street from NE.2"d Avenue to FEC Track. North Miami Avenue from NW 15th Street to 1-395 right-of-way line.) 4. Performance of the Work Bidder must be capable of self- performing at least thirty percent (30%) of the physical construction Work. By submitting a Bid the Bidder certifies that it will utilize its own employees to meet this requirement. As part of the Bid, the Bidder must include the form entitled "Questionnaire". Failure to complete and submit this form or to meet this requirement shall result in the Bid being deemed non -responsive. Where the City determines that the Contractor is not meeting the minimum self -performance requirement during the performance of the Work, then the Contractor shall be deemed in default of the Contract and the City reserves the right to take any necessary and appropriate action permitted by law or by the Contract Documents. 5. Examination of Contract Documents and Site It is the responsibility of each Bidder, before submitting a response to this ITB to: 7 NW 14 Street Streetscape Project Bid No.: 09-10-010 • Carefully review the ITB, including any Addendum and notify the City of all conflicts, errors or discrepancies. • Visit the site(s) or structure(s) to become familiar with conditions that may affect costs, progress, performance or furnishing of the Work. • Take into account federal, state and local (City and Miami -Dade County including, without limitation the City Purchasing Ordinance and Florida Building Code) laws, regulations, ordinances that may affect a Bidder's ability to perform the Work. • Study and carefully correlate Contractor's observations with the requirements of the ITB. The submission of a Bid in response to this solicitation shall constitute an incontrovertible representation by Bidder that it will comply with the requirements of the Contract Documents and that without exception, the response is premised upon performing and furnishing Work required under the Contract Documents and that the Contract Documents are sufficient in detail to indicate and convey understanding of all terms and conditions for performance and fumishing of the Work. 6. Addendum Only questions answered by written Addendum will be binding. Oral and other interpretations or clarifications will be without legal binding effect and should not be relied upon in preparations of a Bid response. All questions about the meaning or intent of the Contract Documents are to be directed to the City's Capital Improvements Program (CIP) in writing, to the attention of Cecelia Wilson, cwilson(a�miamigov.com. Interpretations or clarifications considered necessary by CIP in response to such questions will be issued by the City by means of Addendum posted on the CIP webpage. Written questions should be received no less than ten (10) calendar days prior to the date Bids are due. There shall be no obligation on the part of CIP -to respond to questions received less than ten (10) calendar days prior to Bid opening. 7. Bid Submission All Bids must be received by the City of Miami, City Clerk's office located at City Hall, First Floor, 3500 Pan American Drive, Miami, Fla. 33133, before the time and date specified for bid opening, enclosed in a sealed envelope, legibly marked on the outside: BID NO.: 09-10-010 .BIDS FOR: NW 14th Street Multimedia Entertainment. District Streetscape Project, B-30394 Bidders must submit two originals. Failure to submit two originals may result in the rejection of the Bid as non -responsive. NOTE: This Bid requires the submission of City Form SU, which is available on the CIP webpage, identified in the ITB. Failure to submit City Form SU with the Bid will result in the Bid being rejected as non -responsive. 8. Bid Guaranty All Bids shall be accompanied by either an original Bid bond executed by a Surety meeting the requirements of the City, or by cash, money order, certified check, cashier's check, Unconditional/Irrevocable Letter of Credit, Bid Bond Voucher (for projects less than $200,000) issued to City of Miami's Purchasing Department, treasurer's check or bank draft of any national or state bank (United States), in the amount of five percent 5% of the total Bid amount, payable to City of Miami, Florida, and conditioned upon the successful Bidder executing the Contract and providing the required Performance Bond and Payment Bond and evidence of required insurance within fifteen (15) calendar days after notification of award of the Contract. The time for execution of the Contract and provision of the 8 NW 14 Street Streetscape Project Bid No.: 09-10-010 Performance Bond, Payment Bond and Certificate(s) of. Insurance may be extended by the City's Capital Improvements Program at its sole discretion. Bid Securities of the unsuccessful Bidders will be returned after award of Contract. A PERSONAL CHECK OR A COMPANY CHECK OF A BIDDER SHALL NOT BE DEEMED A VALID BID SECURITY. Security of the successful Bidder shall be forfeited to the City as liquidated damages, not as a penalty, for the cost and expense incurred should said Bidder fail to execute the Contract, and provide the required Performance Bond. 9. Preparation of Bid The Bid Forms contain one Project and the Bidder must provide a Unit Price Grand Total Amount to perform the Work required for the Project. All Bids must be made upon the City forms available on the CIP website. The Bid must be signed and acknowledged by the Bidder in accordance with the directions on the ITB. Failure to utilize the City's forms, or fully complete said forms will result in a determination that the Bid is non -responsive A Bid will be considered non -responsive if it is conditioned on modifications, changes, or revisions to the terms and conditions of the ITB. The Bid is to include the furnishing of all labor, materials, overhead expense and profit, equipment including, but not limited to, tools, services, permit fees, applicable taxes, overhead and profit for the completion of the Work except as may be otherwise expressly provided in the Contract Documents. Joint venture firms must complete and submit with their Bid the form titled "Information for Determining Joint Venture Eligibility", (Form A) and submit a copy of the formal agreement between all joint -venture parties. This joint venture agreement must indicate their respective roles, responsibilities and levels of participation for the Project. Failure to timely submit Form A, along with an attached written copy of the joint venture agreement may result in disqualification of the Bid. All joint venture firms must meet the requirements stipulated in the Florida Statutes. 10. Pre -Bid Conference (Site Visit to follow) A non -mandatory conference and site visit will be held on Friday, March 5, 2010 @ 10:00 a.m., at the MRC .Building, 10th Floor City Manager's Main Conference Room, 444 SW :2nd Avenue, Miami, FI. 33130 to discuss this solicitation. Since space is limited, it is recommended that one representative of each firm attend in order to become familiar with the Solicitation and conditions of usage. Attendees are requested to bring this Solicitation package to the conference. Copies of the solicitation will not be available at the pre -bid conference. 11. Postponement of Bid Opening Date The City reserves the right to postpone the date for receipt and opening of submissions and will make a reasonable effort to give prospective Bidders at least five (5) calendar days notice of any such postponement. The City shall make reasonable efforts to issue addenda within five (5) calendar days prior to the due date. 12. Acceptance or Rejection of Bids The City reserves the right to reject any or all Bids prior to award. Reasonable efforts will be made to either award the Contract or reject all Bids within ninety (90) calendar days after Bid opening date. A Bidder may not withdraw its Bid unilaterally nor change the Contract Price before the expiration of one hundred twenty (120) calendar days from the date of bid opening. A Bidder may withdraw its Bid after the expiration of one hundred twenty (120) calendar days from the date of Bid opening by delivering written 9 NW 14 Street Streetscape Project Bid No.: 09-10-010 notice of withdrawal to the Capital Improvements Program prior to award of the Contract by the City Commission. Once the City Commission makes the award, the Bid cannot be withdrawn under this Article. 13. Environmental Regulations The City reserves the right to consider a Bidder's history of citations and/or violations of environmental regulations in investigating a Bidder's responsibility, and further reserves the right to declare a Bidder not responsible if the history of violations warrant such determination in the opinion of the City. Bidder shall submit with its Bid, a complete history of all citations and/or violations, notices and dispositions thereof. The failure to submit any such documentation shall be deemed to be an affirmation by the Bidder that there are no citations or violations. Bidders shall notify the City immediately upon receipt of any notice of any such citation or violation which Bidder may receive after the Submittal opening date and during performance of the Work under this Contract. 14. Bid Award The City will issue the award of the Contract to the lowest responsive and responsible Bidder. The City may require demonstration of competency and, at its sole discretion, conduct site visits, require the Bidder to furnish documentation and/or require the contractor to attend a meeting to determine the Bidder's qualifications and ability to meet the terms and conditions of this Contract. The City shall consider, but not be limited to, such factors as financial capability, labor force, equipment, experience, knowledge of the trade work to be performed, the quantity of Work being performed by the Contractor and past performance on City projects. City Code Section 18-85, states that the City may offer to a responsible and responsive bidder/proposer, who maintains a local office, the opportunity of accepting a bid at the low bid amount, if the original bid amount submitted by the local vendor is not more than ten percent (10%) in excess of the lowest other responsible and responsive bidder/proposer. A Post Office box or working from a private residence will not be considered as maintaining a local office, unless the owner of the private residence possesses a City of Miami Occupation Licenses for the business at the address of the private residence. Where the solicitation contains multiple line items for separate projects or where the solicitation requires a Bidder to submit detailed price information or multiple line item pricing a Bid may be rejected as an unbalanced bid. The Bidder must be able to demonstrate a good record of performance and have sufficient financial resources to ensure that it can satisfactorily provide the goods and/or services required herein. The City, in its sole discretion, may determine a Bidder to be non -responsible where the Bidder has failed to perform in accordance with any other contracts with the City, past or current, or any other public entity or any other contract for construction services. Any Bidder who at the time of submission is involved in an ongoing bankruptcy as a debtor, or in a reorganization, liquidation, or dissolution proceeding, or if a trustee or receiver has been appointed over all or a substantial portion of the property of the Bidder, under federal bankruptcy law or any state insolvency, the Bidder may be declared non -responsive. Any Bidder who has filed a lawsuit against the City or where the City has filed a lawsuit or won a court judgment against a Bidder, such Bidder may be declared non -responsive. 15. Bid Protest Any actual or prospective contractual party who feels aggrieved in connection with the solicitation or award of a contract may protest in writing to the Director of Purchasing/Chief Procurement Officer who shall have the authority, subject to the approval of the City Manager and the City Attorney, to settle and resolve a protest with final approval by the City 10 NW 14 Street Streetscape Project Bid No.: 09-10-010 Commission. Bidders are alerted to Section 18-104 of the City's Code describing the protest procedures. Protests failing to meet the requirements for filing shall NOT be accepted. Failure of a party to timely file shall constitute a forfeiture of such party's right to file a protest. NO EXCEPTIONS. 16. Local, Small; and Disadvantaged Firm Participation The City strongly encourages Contractors to secure the participation of small businesses, Community Small Business Enterprises (CSBE), and/or Disadvantaged Business Enterprises (DBE) that are currently registered with and/or certified by other governmental agencies within Florida, such as under programs in effect for the Florida Department of Transportation, Miami -Dade or Broward Counties, and the Miami Dade County Public Schools. Similarly, the City also strongly encourages Contractors to secure the participation of firms located within the City's jurisdictional limits. Forms are provided for this purpose. 17. First Source Hiring Agreements Section 18-110 of the City Code states: (a) The City Commission approves implementation of the first -source hiring agreement policy and requires as a condition precedent to the execution of service contracts for facilities, services, and/or receipt of grants and loans, for projects of a nature that create new jobs, the successful negotiation of first source hiring agreements between the organization or individual receiving said contract and the Authorized Representative unless such an agreement is found infeasible by the City Manager and such finding approved by the City Commission at a public hearing. b) For the purpose of this section, the following terms, phrases, words and their derivations shall have the following meanings: Authorized Representative means the Private Industry Council of South Florida/South Florida Employment and Training Consortium, or its successor as local recipient of federal and state training and employment funds. Facilities means all publicly financed projects, including but without limitation, unified development projects, municipal public works, and municipal improvements to the extent they are financed through public money or services or the use of publicly owned property Grants and loans means, without limitation, urban development action grants (UDAG), economic development agency construction loans, loans from Miami Capital Development, Incorporated, and all federal and state grants administered by the City. Service contracts means contracts for the procurement of services by the City which include professional services. Services include, without limitation, • public works improvements, facilities, professional services, commodities, supplies, materials and equipment. (c) The Authorized Representative shall negotiate each first source hiring agreement (d) The primary beneficiaries of the first -source hiring agreement shall be participants of the City training and employment programs, and other residents of the City. Contractors are strongly encouraged to identify opportunities to hire qualified City residents if a Contract is awarded, and are expected to secure the cooperation of subcontractors in this effort as well. Approved community agencies are available to assist with recruitment and screening of job applicants, and may periodically monitor contractors' employment 11 NW 14 Street Streetscape Project Bid No.: 09-10-010 records during the term of the Contract. Resident job applicants are not expected to receive special consideration by the prospective employer, and must meet all hiring requirements normally imposed by the employer. During the term of the Contract, if awarded, the City may require the Contractor and its subcontractors to periodically review its manpower needs and resubmit First Source Hiring forms. 18. Subcontractor and Small Business Participation Reporting The City is collecting data on the participation of local small business. Based on this ongoing effort the City requires that with the submission of the first payment requisition the Contractor shall submit a report, using the CIP foram available on its webpage, on the use of Subcontractors. Such report shall include information on local and small business participation. Failure to submit the report may delay the issuance of payment to the Contractor. Contractor shall submit an updated report when a Subcontractor has been added or changed. 19. Cone of Silence Pursuant to Section 18-74 of the City of Miami ("City Code") and City of Miami Ordinance No. 12271, a "Cone of Silence" is imposed upon this ITB after advertisement and terminates at the time the City Manager issues a written recommendation to the Miami City Commission. The Cone of Silence prohibits any verbal communications regarding this ITB. Any communication concerning this ITB must be submitted in writing to CIP and Bidders must file a copy of such written communications with the Office of the City Clerk. Written communications may be in the form of e-mail, with a copy to the Office of the City Clerk at marciamiamiqov.com. This language is only an overview of the requirements of the Cone of Silence. Please review Section 18-74 of the City Code or City of Miami Ordinance No. 12271 for a complete and thorough description of the Cone of Silence. You may also contact the City Clerk at (305)-250-5360, to obtain a copy. 20. Public Entity Crime Any person, individual, corporation, entity, or affiliate who has been placed on the convicted Bidder list following a conviction for a public entity crime may not submit a proposal on a contract to provide any goods or services to a public entity, may not submit a Response on a contract with a public entity for the construction or repair of a public building or public works project, may not submit a response on a lease of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or Consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017 of Florida Statutes for Category Two for a period of 36 months from the date of being placed on the convicted Bidder / Bidder list. 21. Fraud and Misrepresentation Any person, individual, corporation, entity, or affiliate that attempts to meet its contractual obligations with the City through fraud, misrepresentation or material misstatement, may be debarred for up to five (5) years in accordance with the applicable provisions of the City Code. The City as a further sanction may terminate or cancel any other contracts with such individual, corporation or entity. Such individual or entity shall be responsible for all direct or indirect costs associated with termination or cancellation. 22. Collusion Where two (2) or more related parties, as defined in this Article, each submit a response to an ITB, such submissions shall be presumed to be collusive. The foregoing presumption may be rebutted by the presentation of evidence as to the extent of ownership, control and management of such related parties in preparation and submission under such ITB. 12 NW 14 Street Streetscape Project Bid No.: 09-10-010 Related parties shall mean employees, officers or the principals thereof which have a direct or indirect ownership interest in another firm or in which a parent company or the principals thereof of one Contractor have a direct or indirect ownership interest in another Contractor for the same project(s). ITB responses found to be collusive shall be rejected. 23. Contractor in Arrears of Default The Contractor represents and warrants that the Contractor is not in arrears to the City and is not a defaulter as a surety or otherwise upon any obligation to the City. In addition the contractor warrants that the Contractor has not been declared "not responsible" or "disqualified" by or debarred from doing business with any state or local government entity in the State of Florida, the Federal Government or any other State/local govemmental entity in the United States of America, nor is there any proceeding pending pertaining to the Contractor's responsibility or qualification to receive public agreements. The Contractor considers this warrant as stated in this Article to be a continual obligation and shall inform the City of any change during the term of the Contract. The City shall not consider .and will deem as non -responsible Bids submitted by Bidders where the City has determined that the Bidder is in monetary arrears to the City or otherwise in debt or default to the City at the time and date Bids are due. 24. Cancellation of Solicitation The City reserves the right to cancel, in whole or in part, any solicitation when it is in the best interest of the City. This determination will be at the discretion of the City and there will be no recourse from such cancellation. 13 NW 14 Street Streetscape Project Bid No.: 09-10-010 Section 2 — General Terms and Conditions 1. Definitions Basis of Design means a specific manufacturer's product that is named; including the make or model number or other designation, establishing the significant qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics for purposes of evaluating comparable products of other manufacturers. Bid means the response submitted by a bidder to this solicitation, which includes the price, authorized signature and all other information or documentation required by the Contract Documents at the time of submittal. Bidder means any individual, firm, incorporated or unincorporated business entity, or corporation tendering a Submittal, acting directly or through a duly authorized representative. Change Order means a written document ordering a change in the Contract Price or Contract Time or a material change in the Work. A change order must comply with the Contract Documents. City means the City of Miami, Florida, a Florida municipal corporation. In all respects hereunder, City's performance is pursuant to the City's capacity as Owner. In the event the City exercises its regulatory authority as a governmental body, the exercise of such regulatory authority and the enforcement of any rules, regulations, codes, laws and ordinances shall be deemed to have occurred pursuant to City's authority as a governmental body and shall not be attributable in any manner to the City as a party to this Contract. For the purposes of this Contract, "City" without modification shall mean the City Manager or Director, as applicable. City Commission means the legislative body of the City. City Manager means the duly appointed chief administrative officer of the City of Miami. Consultant means a firm that has entered into a separate agreement with the City for the provision of design/engineering services for a Project. Contract means the Invitation to Bid (ITB) solicitation and the Bid documents that have been executed by the Bidder and the City subsequent to approval of award by the City. Contractor means the person, firm, or corporation with whom the City has contracted and who will be responsible for the acceptable performance of any Work and for the payment of all legal debts pertaining to any. Work issued under this contract through the award of an ITB. Contract Documents means the Contract as may be amended from time to time, the plans and drawing, all addendum, clarifications, directives, change orders, payments and other such documents issued under or relating to the Project(s). Construction Change Directive means a written directive to effect changes to the Work, issued by the Consultant or the Director that may affect the ITB Contract price or time. Construction Schedule means a critical path schedule or other construction schedule, as defined and required by the Contract Documents. Consultant means the Architect or Engineer of Record contracted by the City to prepare the plans and specifications for the Projects. Consultant may also be referred to as Architect or Engineer of Record. Cure means the action taken by the Contractor promptly after receipt of written notice from the City of a breach of the Contract Documents which shall be performed at no cost to the City, to repair, replace, correct, or remedy all material, equipment, or other elements of the 14 NW 14 Street Streetscape Project Bid No.: 09-10-010 Work or the Contract Documents affected by such breach, or to otherwise make good and eliminate such breach, including, without limitation, repairing, replacing or correcting any portion of the Work or the Project(s) site(s) disturbed in performing such cure. Cure Period means the period of time in which the Contractor is required to remedy deficiencies in the Work or compliance with the Contract Documents after receipt of written Notice to Cure from the City identifying the deficiencies and the time to Cure. Design Documents means the construction plans and specifications included as part of this Bid prepared by the Consultant for this Project(s) under a separate Agreement with the City. Director means the Director of the Capital Improvements Program or designee, who has the authority and responsibility for managing the Project(s) under this Agreement. Drawings means the graphic and pictorial portions of the Work, which serve to show the design, location and dimensions of the Work to be performed, including, without limitation, all notes, schedules and legends on. such Drawings. Field Directive means a written approval for the Contractor to proceed with Work requested by the City or the Consultant, which is minor in nature and typically should not involve additional cost. Final Completion means the date subsequent to the date of Substantial Completion at which time the Contractor has completed all the Work in accordance with the Agreement as certified by the Consultant and/or the City and submitted all documentation required by the Contract Documents. Inspector means an authorized representative of the City assigned to make necessary inspections of materials furnished by Contractor and of the Work performed by Contractor. Materials mean goods or equipment incorporated in a Project(s), or used or consumed in the performance of the Work. Notice of Award means the written letter to the Contractor notify the Contractor that they have been awarded the Contract. Notice To Proceed means a written letter or directive issued by the Director or designee acknowledging that all conditions precedent have been met and directing that the Contractor may begin Work on the Project(s). Plans and/or Drawings means the official graphic representations of a Project(s). Project Or Work as used herein refers to all reasonably necessary and inferable construction and services required by the Contract Documents whether completed or partially completed, and includes all other labor, materials, equipment and services provided or to be provided by the Contractor to fulfill its obligations, including completion of the construction in accordance with the Drawings and Specifications. The Work may constitute the whole or a part of the Project(s). Project Manager means the individual assigned by CIP to manage the Project(s). Request For Information (RFI) means a request from the Contractor seeking an interpretation or clarification relative to the Contract Documents. The RFI, which shall be clearly marked RFI, shall clearly and concisely set forth the issue(s) or item(s) requiring clarification or interpretation and why the response is needed. The RFI must set forth the Contractor's interpretation or understanding of the document(s) in question, along with the reason for such understanding. Risk Administrator means the City's Risk Management Administrator, or designee, or the individual named by the City Manager to administer matters relating to insurance and risk of loss for the City. 15 NW 14 Street Streetscape Project Bid No.: 09-10-010 Specifications mean all of the definitions, instructions, descriptions, directions, requirements, provisions and standards (and all written supplements thereto) pertaining to the methods, (or manner) of performing and actual performance of the Work, or quantities and quality of accepted materials to be fumished under the Contract Documents. Subcontractor means a person, firm or corporation having a direct contract with Contractor including one who furnishes material worked to a special design according to the Contract Documents, but does not include one who merely furnishes Materials not so worked. Submittal means documents prepared and submitted by the Bidder to pre -qualify under this solicitation. Substantial Completion means that point at which the Work is at a level of completion in substantial compliance with the Agreement such that the City can use, occupy and/or operate the facility in all respects to its intended purpose. Substantial Compliance shall not be deemed to have occurred until any and all governmental entities, which regulate or have jurisdiction over the Work, have inspected, and approved the Work. Beneficial use or occupancy shall not be the sole determining factor in determining whether Substantial Completion has been achieved, unless a temporary certificate of occupancy has been issued. 2. Time is of the Essence Contractor will promptly perform its duties under the Contract and will give the Work as much priority as is necessary to cause the Work to be completed on a timely basis in accordance with the Contract Documents. All Work shall be performed strictly (not substantially) within the time limitations necessary to maintain the critical path and all deadlines established in the Contract Documents. All dates and periods of time set forth in the Contract Documents, including those for the commencement, prosecution, interim milestones, milestones, and completion of the Work, and for the delivery and installation of materials and equipment, were included because of their importance to the City. Contractor acknowledges and recognizes that the City is entitled to full and beneficial occupancy and use of the completed Project following expiration of the Contract Time. In agreeing to bear the risk of delays for completion of the Work except for extensions approved in accordance with Article 72, Excusable Delays, the Contractor understands that, except and only to the extent provided otherwise in the Contract Documents, the occurrence of events of delay within the Contractor's, control, the Work shall not excuse the Contractor from its obligation to achieve full completion of the Work within the Contract Documents Time, and shall not entitle the Contractor to an adjustment. All parties under the control or contract with the Contractor shall include but are not limited to materialmen, Subcontractors, suppliers, and laborers. The Contractor acknowledges that the City is purchasing the right to have the Contractor continuously working at the Project(s) site(s) for the full duration of the Project(s) to ensure the timely completion of the Work. 3. Contract Term The Contract shall commence upon issuance of the Notice of Award, which shall be issued subsequent to the execution of the Contract by the City. The Contract shall terminate upon notice by the City that the Contract has been closed -out after final completion or otherwise terminated by the City pursuant to the terms and conditions herein set forth. 4. Notices Whenever either party desires to give Written Notice unto the other relating to the Contract, such must be addressed to the party for whom it is intended at the place last specified; and 16 NW 14 Street Streetscape Project Bid No.: 09-10-010 the place for giving of notice shall remain such until it shall have been changed by written notice in compliance with the provisions of this Article. Notice shall be deemed given on the date received or within 3 days of mailing, if mailed through the United States Postal Service. Notice shall be deemed given on the date sent via e-mail or facsimile. Notice shall be deemed given via courier/delivery service upon the initial delivery date by the courier/delivery service. For the present, the parties designate the following as the respective places for giving of notice: For City of Miami: Ms. Alice N. Bravo, P.E. Director Capital Improvements Program City of Miami 444 S.W. 2nd Avenue, - 8th Floor Miami, Florida 33130 Mr. Albert Sosa, P.E. Assistant Director for Infrastructure Capital Improvements Program City of Miami 444 S.W. 2"d Avenue, - 8th Floor Miami, Florida 33130.. For Contractor: Solution Construction,. Inc. Mr. Andres Correa, President 7955 NW 12 Street, # 425 Dora!, FI 33126 During the Work the Contractor shall maintain continuing communications with Consultant and the Project Manager. The Contractor shall keep the City fully informed as to the progress of the Project(s) at all times through ongoing communications with the Project Manager. 5. Priority of Provisions If there is a conflict or inconsistency between any term, statement requirement, or provision of any exhibit attached hereto, any document or events referred to herein, or any document incorporated into the Contract Documents by reference and a term, statement, requirement, the specifications and plans prepared by the Consultant, or provision of the Contract Documents the following order of precedence shall apply: In the event of conflicts in the Contract Documents the priorities stated below shall govern; • Revisions and Change Orders to the Contract shall govern over the Contract • The Contract Documents shall govern over the Contract • Addendum to an ITB shall govern over an ITB • Scope of Work and Specifications shall govern over plans and drawings • Schedules; when identified as such shall govern over all other portions of the plans • Specific notes 'shall govern over all other notes, and all other portions of the plans, unless specifically stated otherwise • Larger scale drawings shall govern over smaller scale drawings • Figured or numerical dimensions shall govern over dimensions obtained by scaling • Where provisions of codes, manufacturer's specifications or industry standards are in conflict, the more restrictive or higher quality shall govern 6. Indemnification • • 17 NW 14 Street Streetscape Project Bid No.:.09-10-010 Contractor shall indemnify and hold harmless City, its officers, agents, directors, and employees, from liabilities, damages, losses, judgments, and costs, including, but not limited to reasonable.attorney's fees, to the extent caused by the negligence, recklessness or intentional wrongful misconduct of Contractor and persons employed or utilized by Contractor in the performance of this Contract. These indemnifications shall survive the term of this Contract. In the event that any action or proceeding is brought against City by reason of any such claim or demand, Contractor shall, upon written notice from City, resist and defend such action or proceeding by counsel satisfactory to City. The Contractor expressly understands and agrees that any insurance protection required by this Contract or otherwise provided by Contractor shall in no way limit the responsibility to indemnify, keep and save harmless and defend the City or its officers, employees, agents and instrumentalities as herein provided. The indemnification provided above shall obligate Contractor to defend, at its own expense, to and through appellate, supplemental or bankruptcy proceeding, or to provide for such defense, at City's option, any and all claims of liability and all suits and actions of every name and description which may be brought against City whether performed by Contractor, or persons employed or utilized by Contractor. This indemnity will survive the cancellation or expiration of the Contract. This indemnity will be interpreted under the laws of the State of Florida, including without limitation and interpretation, which conforms to the limitations of §725.06 and/or §725.08, Fla. Statutes, as applicable. Contractor shall require all Sub -Contractor agreements to include a provision that they will indemnify the City. The Contractor agrees and recognizes that the City shall not be held liable or responsible for any claims which may result from any actions or omissions of the Contractor in which the City participated either through review or concurrence of the Contractor's actions. In reviewing, approving or rejecting any submissions by the Contractor or other acts of the Contractor, the City in no way assumes or shares any responsibility or liability of the Contractor or Sub -Contractor, under this Agreement. Ten dollars ($10) of the payments made by the City constitute separate, distinct, and independent consideration for the granting of this Indemnification, the receipt and sufficiency of which is acknowledged by the Contractor. 7. Insurance Without limiting any of the other obligations or liabilities of Contractor, Contractor shall provide, pay for, and maintain in force until all of its Work to be performed under this Contract has been completed and accepted by City (or for such duration as is otherwise specified hereinafter), the insurance coverage's set forth herein. Applicable coverage's are in bold and underlined. 7.1. Workers' Compensation insurance is to apply for all employees in compliance with the Statutory "Workers' Compensation Law" of the State of Florida and all applicable federal laws. In addition, the policy(ies) must include: • Waiver of subrogation • Statutory State of Florida • Limits of Liability 7.2. Employers' Liability with a limit of One Million Dollars ($1,000,000.00) Dollars each bodily injury caused by an accident, each accident. One Million Dollars ($1,000,000.00) Dollars each bodily injury caused by disease, each employee. One Million Dollars ($1,000,000.00 Dollars each bodily injury caused by disease, policy limit. 18 NW 14 Street Streetscape Project Bid No.: 09-10-010 7.3. Commercial General Liability (CGL) (Primary & Non Contributory) with minimum limits of One Million Dollars ($1,000,000.00) each occurrence, combined single limit for Bodily Injury Liability and Property Damage Liability, with a general aggregate limit of Two Million Dollars ($2,000,000.00). Coverage must be afforded on a primary and non contributory basis and with a coverage form no more restrictive than the latest edition of the Comprehensive General Liability policy, without restrictive endorsements, as filed by the Insurance Services Office, and must include: • Products and/or Completed Operations for contracts with an Aggregate Limit of One Million Dollars ($1,000,000.00) per project. Contractor shall maintain in force until at least three years after completion of all Work required under the Contract, coverage for Products and Completed Operations, including Broad Form Property Damage. ■ Personal and Advertising Injury with an aggregate limit of One Million Dollars ($1,000,000). CGL Required Endorsements - o Employees included as insured o Contingent.Liability/Independent Contractors Coverage o Contractual Liability o Waver of Subrogation o Premises and/or Operations o Explosion, Collapse and Underground Hazards o Loading and Unloading o Mobile Equipment (Contractor's Equipment) whether owned, leased, borrowed or rented by Contractor or employees of the Contractor. City is to be expressly included as an Additional Insured pursuant to endorsement number CG 2010 11/85 or its equivalence. 7.4. Business Automobile Liability with minimum limits of One Million Dollars ($1,000,000.00) per occurrence combined single limit for Bodily Injury and Property Damage Liability. Coverage must be afforded on a form no more restrictive than the latest edition of the Business Automobile Liability policy, without restrictive endorsements, as filed by the Insurance Services Office, and must include: • Auto/All Owned Autos/Scheduled. ▪ Hired, Borrowed, and Non -Owned Vehicles. • Employers' Non -Ownership. • Employees included as insured ▪ City of Miami as Additional Insured 7_5. Umbrella Policy (Excess Following Form/True Excess Following Form/True Umbrella) • Bodily injury and property damage liability with limits of Five Million Dollars ($5,000,000) each occurrence and an aggregate limit of Five Million Dollars ($5,000,000). Excess coverage over the policies as follows: 19 NW 14 Street Streetscape Project Bid No.: 09-10-010 • Commercial General Liability ■ Business Automobile Liability • Employer's Liability City shall be listed as an additional insured. 7. 6. Installation Floater Required for the installation of machinery and/or equipment into an existing structure is required. The coverage shall be "All Risk" Specific Coverage Project Location coverage including installation and transit for 100 percent of the "installed replacement cost value," covering City as a named insured, with a deductible of not more than Two Thousand Five Hundred ($2,500.00) each claim. 7.7 Owners & Contractor's Protective Each Occurrence General Aggregate $1,000,000 $1,000,000 7. 8 Flood Insurance When the machinery or equipment is located within an identified special flood hazard area, flood insurance must be afforded for the lesser of the total insurable value of such buildings or structure, or, the maximum amount of flood insurance coverage available under the National Flood Program. 7.9 Builder's Risk Causes of loss: All Risk -Specific Coverage Project Location Valuation: Replacement Cost Deductible: $2,500, All other Perils 5% maximum on Wind, City of Miami included as an Additional Insured. A. Limit/Value at Location or Site $4, 400,000 B. Coverage Extensions: • Materials, supplies and similar property owned by others for which you are responsible. • 'Full coverage up to policy limits for equipment breakdown. • Temporary storage/transit coverage. • Full coverage up to policy limits for site preparation, re -excavation, re - preparation and re -grade in the event of a loss. • Fences, scaffolding, construction forms coverage and signs • Valuable papers coverage for blueprints, site plans and similar documents. •• Trees, shrubs, sod, plants while at premises. • Flood, including inundation, rain, seepage and water damage. Earthquake • Business Interruption • Subsidence • New ordinance or law; reimbursement for any resulting loss of value to the undamaged portion, and required demolition expenses, including construction necessary to repair, rebuild or re -construct damaged parts. • Escalation clause in the event of a total loss up to 5% of policy limit. • Temporary structures, cribbing and false work built or erected at construction site. • Unintentional errors and omissions in reporting clause 20 NW 14 Street Streetscape Project Bid No.: 09-10-010 } • Full coverage up to policy limits for testing including physical loss caused by pneumatic and hydrostatic testing. • Debris Removal. The above policies shall provide the City with written notice of cancellation or material change from the -insurer not less than (30) days prior to any such cancellation or material change. If the initial insurance expires prior to the completion of the Work, renewal copies of policies shall be furnished at least thirty (30) days prior to the date of their expiration. Notice of Cancellation and/or Restriction --The policy (ies) must be endorsed to provide the City with at least thirty (30) days notice of cancellation and/or restriction. Contractor shall furnish to the Capital Improvement Program the Certificates of Insurance or endorsements evidencing the insurance coverage specified above within fifteen (15) calendar days after notification of award of the Contract. The required Certificates of Insurance shall name the types of policies provided, refer specifically to this Contract, and state that such insurance is as required by this Contract. The official title of the Owner is the City of Miami, Florida. This official title shall be used in all insurance documentation. Companies authorized to do business in the State of . Florida, with the following qualifications, shall issue all insurance policies required above: The company must be rated no less than "A" as to management, and no Tess than "Class V" as to Financial Strength, by the latest edition of Best's Insurance Guide, published by A.M. Best Company, Oldwick, New Jersey, or its equivalent. All policies and /or certificates of insurance are subject to review and verification by Risk Management prior to insurance approval. The Risk Administrator or his/her authorized designee reserves the right to require modifications, increases, or changes in the required insurance requirements, coverage, deductibles or other insurance obligations by providing a thirty (30) day written notice to the Contractor in accordance with Section 2, General Conditions, Article 4, Notices. Contractor shall comply with such requests unless the insurance coverage is not then readily available in the national market. An additive or deductive change order will be issued to adjust the contract value as necessary. For insurance bonding issues and decisions, the City shall act through its Risk Administrator (unless otherwise stated). 8. Performance and Payment Bond Where required by the Contract Documents, the Contractor shall within fifteen (15) calendar days of being notified of award, furnish a Performance/Payment Bond ("Bond") containing all the provisions of the attached Performance/Payment forms. Each Bond shall be in the amount of one hundred percent (100%) of the Contract value guaranteeing to City the completion and performance of the Work covered in the Contract Documents as well as full payment of all suppliers, laborers, or subcontractors employed pursuant to this Project(s). Each Bond shall be with a Surety, which is qualified pursuant to Article 9, Qualification of Surety. Each Bond shall continue in effect for one year after Final Completion and acceptance of the Work with liability equalto one hundred percent (100%) of the Contract value, or an additional bond shall be conditioned that Contractor will, upon notification by City, correct any defective or faulty work or materials which appear within one year after Final Completion of the Project(s). The City must be listed as an Obligee. 21 NW 14 Street Streetscape Project Bid No.: 09-10-010 Pursuant to the requirements of Section 255.05(1)(a), Florida Statutes, as amended from time to time, Contractor shall ensure that the Bond(s) referenced above shall be recorded in the public records and provide City with evidence of such recording. Alternate Form of Security: In lieu of a Performance/Payment Bond, Contractor may furnish alternate forms of security, which may be in the form of cash, money order, certified check, cashier's check of unconditional letter of credit in the form attached. Such alternate forms of security shall be subject to the prior approval of City and for same purpose and shall be subject to the same conditions as those applicable above and shall be held by City for one year after completion and acceptance of the Work. 9. Qualification of Surety Bid Bonds, Performance/ Payment Bonds over Five Hundred Thousand Dollars ($500,000.00): Each Bond must be executed by a surety company of recognized standing, authorized to do business in the State of Florida as surety, having a resident agent in the State of Florida and having been in business with a record of successful continuous operation for at least five (5) years. The Surety shall hold a current certificate of authority as acceptable surety on federal bonds in accordance with United States Department of Treasury Circular 570, Current Revisions. If the amount of the Bond exceeds the underwriting limitation set forth in the circular, in order to qualify, the net retention of the Surety shall not exceed the underwriting limitation in the circular, and the excess risks must be protected by coinsurance, reinsurance, or other methods in accordance with Treasury Circular 297, revised September 1, 1978 (31 DFR Section 223.10, Section 223.111). Further, the Surety shall provide City with evidence satisfactory to City, that such excess risk has been protected in an acceptable manner. The City will accept a surety bond from a company with a rating of B+ or better for bonds up to $2 million, provided, however, that if any surety company appears on the watch list that is published quarterly by Intercom of the Office of the Florida Insurance Commissioner, the City shall review and either accept or reject the surety company based on the financial information available to the City. A surety company that is rejected by the City may be substituted by the Bidder or proposer with a surety company acceptable to the City, only if the bid amount does not increase. The following sets forth, in general, the acceptable parameters for Bonds: Policy- Financial Amount of Bond holders Size Ratings Category 500,001 to 1,000,000 B+ Class I 1,000,001 to2,000,000 B+ Class ....II 2,000,001 to 5,000,000 A Class ... III 5,000,001 to 10,000,000 A Class ...IV 10,000,001 to 25,000,000 A Class ....V 25,000,001 to 50,000,000 A Class ... VI 50,000,001 or more A Class .. VI I For projects of $500,000.00 or Tess, City may accept a Bid Bond, Performance Bond and Payment Bond from a Surety which has twice the minimum surplus and capital required by the Florida Insurance Code at the time the invitation to bid is issued, if the Surety is otherwise in compliance with the provisions of the Florida Insurance Code, and if the surety company holds a currently valid certificate of authority issued by the United States Department of the Treasury under Section 9304 to 9308 of Title 31 of the United States 22 NW 14 Street Streetscape Project Bid No.: 09-10-010 Code, as may be amended from time to time. A Certificate and Affidavit so certifying should be submitted with the Bid Bond and also with the Performance/Payment Bond. More stringent requirements of any grantor agency are set forth within the Bid. If there are no more stringent requirements, the provisions of this section shall apply. 10. General Requirements The employee(s) of the Contractor shall be considered to be at all times its employee(s), and not employee(s) or agent(s) of the City or any of its departments. The Contractor agrees that the Contractor will at all times employ, maintain and assign to the performance of a Project a sufficient number of competent and qualified professionals and other personnel to meet the requirements of the Work to be performed. The Contractor agrees to adjust staffing levels or to replace any staff personnel if so requested by the Project Manager, should the Project Manager make a determination that said staffing is unacceptable or that any individual is not performing in a manner consistent with the requirements for such a position. The Contractor shall perform the work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, clean-up, replacements, and restoration required as a result of damages caused during this construction. The Contractor represents that its personnel and Subcontractors have the proper skills, training, background, knowledge, experience, rights, authorizations, integrity, character and licenses as necessary to perform the Work, in a competent and professional manner. The Contractor shall provide temporary facilities and controls necessary to perform the Work and to ensure safe and proper access and use of the site by the Project Manager and the Consultant. The Contractor shall at all times cooperate with the City, or the Consultant and coordinate its respective Work efforts to most effectively and efficiently progress the performance of the Work. The City, the Consultant and other agencies authorized by the City, shall have full access to the Project(s) site(s) at all times. The Contractor shall be responsible for the good condition of the Work or materials until formal release from his obligations under the terms of the Contract Documents. All newly constructed work shall be carefully protectedfrom injury in any way. No wheeling or walking or placing of heavy loads on it shall be allowed and the Contractor at its own expense shall reconstruct all portions damaged. Contractor shall bear all losses incurred on account of the amount or character of the Work, or the character of the ground, being different from what he anticipated. The Contractor shall at all times conduct the Work in such manner andin such sequence as will ensure the least practicable local interference. Contractor shall not open up Work to the prejudice of Work already started, and the Project Manager may require the Contractor to finish a section on which Work is in progress before Work is started on any additional section. Contractor is to take necessary precautions and use caution when working in or around overhead transmission lines and underground utilities. Contractor is responsible to control dust and prevent it from becoming a public nuisance or causing off -site damage. Contractor shall take all necessary and prudent measure to control dust. The apparent silence of the Contract Documents as to any detail, or the apparent omission from them of a detailed description concerning any Work to be done and materials to be furnished, shall be regarded as meaning that only best practices are to prevail and only 23 NW 14 Street Streetscape Project Bid No.: 09-10-010 materials and workmanship of the best quality are to be used in the performance of the Work. 11. Method of Performing the Work The apparent silence of the Contract Documents as to any detail, or the apparent omission from them of a detailed description concerning any Work to be done and materials to be furnished, shall be regarded as meaning that only the best general practice is to prevail and that only material and workmanship of the best quality is to be used, and interpretation of the Contract Documents shall be made upon that basis. When measurements are affected by conditions already established or where items are to be fitted into constructed conditions, it shall be the Contractor's responsibility to verify all such dimensions at the site and the actual job dimensions shall take precedence. If the Project Manager or Consultant reasonably determines the rate of progress of the Work is not such as to ensure its completion within the designated completion time, or if, in the opinion of the Project Manager or Consultant, the Contractor is not proceeding with the Work diligently or expeditiously or is not performing all or any part of the Work according to the Project schedule accepted by or determined by the Project Manager or Consultant, the Project Manager or the Consultant shall have the right to order the Contractor to do either or both of the following: (1) improve its work force; and/or (2) improve its performance in accordance with the schedule to ensure completion of the Project(s) within the specified time. The Contractor shall immediately comply with such orders at no additional cost to the City. (3) The City at its sole option may also have Work performed by a third party contractor and deduct such cost from any monies due the Contractor. Where materials are transported in the performance of the Work, vehicles shall not be loaded beyond the capacity recommended by the vehicle manufacturer or permitted by Federal, State or local Iaw(s). When it is necessary to cross curbing or sidewalks, protection against damage shall be provided by the Contractor and any damaged curbing, grass areas, sidewalks or other areas shall be repaired at the expense of the Contractor to the satisfaction of the Project Manager or Consultant. The Contractor shall furnish to the Project Manager and the Consultant a complete listing of 24-hour telephone numbers at which responsible representatives of the Contractor and all of the Contractor's Subcontractor can be reached should the need arise at any time. -12. Work Staging and Phasing The Work to be performed shall be done in such a manner so as not to interfere with the normal City operations of the Project site or facility. The manner in which the Work is performed shall be subject to the approval of the Project Manager or Consultant, whom if necessary, shall have the authority to require changes in the manner in which the Work. is performed. There shall be no obstruction of City services without the prior written approval of the Project Manager or Consultant. All requests for such interruption or obstruction must be given in writing to the Project Manager or Consultant 24 hours in advance of the interruption of City operations. The Contractor shall familiarize itself with normal City operations where the Work is to be performed so that it can conduct the Work in the best possible manner to the complete satisfaction of the Project Manager and Consultant. A staging plan must be submitted to and approved by the Project Manager or the Consultant prior to the start of construction and issuance of the Notice to Proceed. Such staging plan shall be revised and resubmitted as necessary during construction. 13. Site Investigation and Representation The Contractor acknowledges that it has satisfied itself as to the nature and location(s) of the Work under the Contract Documents, the general and local conditions, particularly 24 NW 14 Street Streetscape Project Bid No.: 09-10-010 those bearing upon availability of transportation, disposal, handling and storage of materials, availability of labor, water, electric power, and roads, the conformation and conditions at the ground based on City provided reports, the type of equipment and facilities needed preliminary to and during the performance of the Work and all other matters which can in any way affect the Work or the cost thereof under the Contract Documents. The Contractor further acknowledges that it has satisfied itself based on any geotechnical reports the City may provide and inspection of the Project(s) site(s) as to the character, quality, and quantity of surface and subsurface materials to be encountered from inspecting the site and from evaluating information derived from exploratory work that may have been done by the City or included in this Contract Documents. Contractor should examine the soil conditions at the Project site to determine if any special shoring, sheeting, or other procedures necessary to protect adjacent property during excavation of subsoil materials or during filling of any area(s), or for any operation that may be required during the performance of the Work. Any failure by the Contractor to acquaint itself with all the provided information and information obtained by visiting the Project(s) site(s) will not relieve Contractor from responsibility for properly estimating the difficulty or cost thereof under the Contract Documents. In the event that the actual subsurface conditions vary from the actual City provided reports the Contractor shall notify the City and this Contract Documents amount may be adjusted up or down depending on the conditions. 14. Contractor to Check Plans, Specifications and Data Contractor shall verify all dimensions, quantities and details shown on the plans, specifications or other data received from Project Manager or Consultant as part of a Contract Documents, and shall notify the Project Manager and the Consultant of all errors, omissions and discrepancies found therein within three (3) calendar days of discovery. Contractor will not be allowed to take advantage of any error, omission or discrepancy, as full instructions will be furnished the Project Manager or by Consultant. Contractor shall not be liable for damages resulting from errors, omissions or discrepancies in the Contract Documents unless Contractor recognized such error, omission or discrepancy and knowingly failed to report it to Project Manager or Consultant. 15. Contractor's Responsibility for Damages and Accidents Contractor shall accept full responsibility for Work against all losses or damages of whatever nature sustained until Final Acceptance by City, and shall promptly repair or replace, at no additional cost to the City any Work, materials, equipment, or supplies damaged, lost, stolen, or destroyed from any cause whatsoever. Contractor shall accept full responsibility for Work against all losses or damages of whatever nature sustained until Final Acceptance by City, and shall promptly repair or replace, at no additional cost to the City, and to the satisfaction of the Project Manager, any Work, materials, equipment, or supplies damaged, lost, stolen, or destroyed from any cause whatsoever. Lawn Areas - All lawn areas disturbed by construction shall be replaced with like kind to a condition similar or equal to that existing before construction. Where sod is to be removed, it shall be carefully removed, and the same re -sodded, or the area where sod has been removed shall be restored with new sod in the manner described in the applicable section. Fences - Any fence, or part thereof, that is damaged or removed during the course of the work shall be replaced or repaired by the Contractor, and shall be left in as good a condition as before the starting of the work. Where fencing, walls, shrubbery, grass strips or area must be removed or destroyed incident to the construction operation, the Contractor shall, after completion of the work, 25 NW 14 Street Streetscape Project Bid No.: 09-10-010 replace or restore to the original condition all such destroyed or damaged landscaping and improvements. 16. Accidents The Contractor shall provide such equipment and facilities as are necessary or required, in the case of accidents, for first aid service to person who may be injured during the Project(s) duration. The Contractor shall also comply with the OSHA requirements as defined in the United States Labor Code 29 CFR 1926.50. In addition, the Contractor must report immediately to the Project Manager and Consultant every accident to persons or damage to property, and shall furnish in writing full information, including testimony of witnesses regarding any and all accidents. 17. Safety Precautions Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: • All employees on the Project(s) site(s) and other persons who may be affected thereby; • All the Work and all materials or equipment to be incorporated therein, whether in storage on or off the Project(s) site(s); and • Other property at the Project(s) Site(s) or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. Contractor shall designate a responsible member of its organization at the Project(s) site(s) whose duty shall be the prevention of accidents. This person shall be Contractor's superintendent unless otherwise designated in writing by Contractor to Project Manager. Contractor shall comply with all applicable laws, ordinances, rules, regulations and orders of any public body having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and utilities when prosecution of the Work may affect them. All damage, injury or loss to any property caused directly or indirectly, inwhole or in part, by Contractor, any Subcontractor or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, shall be remedied by Contractor. Contractor's duties and responsibilities for the safety and protection of the Work shall continue until such time as all the Work is completed and Project Manager or Consultant has issued the Contractor a notice of Final Acceptance. Contractor must adhere to the applicable environmental protection guidelines for the duration of a Project. If hazardous waste materials are used, detected or generated at any time, the Project Manager must be immediately notified of each and every occurrence. The Contractor shall comply with all codes, ordinances, rules, orders and other legal requirements of public authorities (including OSHA, EPA, DERM, the City, Miami -Dade County, State of Florida, and Florida Building Code), which bear on the performance of the Work. The Contractor shall take the responsibility to ensure that all Work is performed using adequate safeguards, including but not limited to: proper safe rigging, safety nets, fencing, scaffolding, barricades, chain link fencing, railings, barricades, steel plates, safety lights, and ladders that are necessary for the protection of its employees, as well as the public and City employees. All riggings and scaffolding shall . be constructed with good sound materials, of adequate dimensions for their intended use, and substantially braced, tied or secured to ensure absolute safety for those required to use it, as well as those in the vicinity. All riggings, scaffolding, platforms, equipment guards, trenching, shoring, ladders 26 NW 14 Street Streetscape Project Bid No.: 09-10-010 and similar actions or equipment shall be OSHA approved, as applicable, and in accordance with all federal state and local regulations. All open trenches or holes shall be properly marked and barricaded to assure the safety of both vehicular and pedestrian traffic. No open trenches or holes are to be left open during nighttime or non -working hours without the prior written approval of the Project Manager. If an emergency condition should develop during a Project, the Contractor must immediately notify the Project Manager and Consultant of each and every occurrence. The Contractor should also recommend any appropriate course(s) of action to the Project Manager and the Consultant. 18. Occupational Health and Safety In compliance with. Chapter 442, Florida Statutes, any toxic substance listed in Section 38F- 41.03 of the Florida Administrative Code delivered as a result of a Project must be accompanied by a Material Safety Data Sheet (MSDS) which may be obtained from the manufacturer. The MSDS must include the following information: • The chemical name and the common name of the substance. • The hazards or other risks in the use of the substance, including: o The potential for fire, explosion, corrosion, and reaction; o The known acute and chronic health effects of risks from exposure, including the medical conditions which are generally recognized as being aggravated by exposure to the substance; and o The primary routes of entry and symptoms of overexposure. • The proper precautions, handling practices, necessary personal protective equipment, and other safety precautions in the use of or exposure to the substances, including appropriate emergency treatment in case of overexposure. • The emergency procedure for spills, fire, disposal, and first aid. • A description in lay terms of the known specific potential health risks posed by the substance intended to alert any person reading this information. • The year and month, if available, that the information was compiled and the name, address, and emergency telephone number of the manufacturer responsible for preparing the information. 19. Labor and Materials Unless otherwise provided herein, Contractor shall provide and pay for all materials, labor, water, tools, equipment, light, power, transportation and other facilities and services necessary for the proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work. Contractor shall at all times enforce strict discipline and good order among its employees and Subcontractors at the Project(s) site(s) and shall not employ on the Project(s) any unfit person or anyone not skilled in the Work to which they are assigned. 20. Rules, Regulations, and. Licenses The successful Contractor shall comply with all laws and regulations applicable to provision of services specified in the Contract Documents. The Contractor shall be familiar with all federal, state and local laws that may in affect the goods and/or services offered. 21. Consultant Services The City, at its sole discretion may hire a Consultant who shall serve as the City's Representative for the Project(s) to be performed under the Contract Documents. The Contract Documents will state that an City's representative has been contracted with for the management of the Work under the Contract Documents and who will be the lead point of contact, the Consultant or the Project Manager. Where a Consultant has been identified, 27 NW 14 Street Streetscape Project Bid No: 09-10-010 the Consultant and the Project Manager will have authority to act on behalf of the City to the extent provided in the Contract Documents and as outlined in Article 25, Authority of the Project Manager, of the General Terms and Conditions. On the basis of the on -site observations, the Consultant will keep the Project Manager informed ofthe progressof the Work. In the capacity of interpreter, the Consultant will exercise the best efforts to ensure faithful performance by both the Project Manager and the Contractor and will not show partiality to either. The Project Manager will assist the Consultant in conducting inspections to determine the date or dates of Substantial Completion and Final Acceptance and will receive and review written warranties and related documents required by the Contract and the Contract Documents. The Consultant will be responsible for receiving all documentation for review and acceptance. Upon acceptance such documentation will be forwarded to the Project Manager. The Project Manager in conjunction with the Consultant will approve Schedules of Values, Project Schedules, Subcontractors and invoices. The City may contract for additional consultant services, including but not limited to construction examination and observation services. Such services are intended to be additional services and are not intended to and shall not be construed to supplant or alter the role and responsibilities of the Consultant. In case of the termination of employment of the Consultant, the City may, at its sole discretion, appoint another Consultant, whose status under the Contract shall be as that of the former Consultant. 22. Project Management Where a Contractor is awarded Work, the Contractor shall be responsible for all Project management, including any and all subcontracts necessary to ensure that the Work is performed in accordance with the Contract Documents. Project Management shall include, but is not limited to: obtaining bids from Subcontractors and suppliers; coordinating the securing of all permits; obtaining licenses and inspections; ensuring that Subcontractors comply with all City requirements; performing the Work in accordance with the Contract Documents to the satisfaction of the Project Manager; paying all Subcontractors; obtaining release of liens/claims fees; and obtaining temporary and final Certificates of Occupancy or Completion. 23. Superintendence and Supervision The orders of the City are given through Consultant or Project Manager, which instructions are to be strictly and promptly followed in every case. Contractor shall keep on the Project during its progress, a full-time competent English speaking superintendent and any necessary assistants, all satisfactory to Project Manager or Consultant. The superintendent shall not be changed except with the written consent of Project Manager or Consultant, unless the superintendent proves to be unsatisfactory to Contractor and ceases to be in its employ. The superintendent shall represent Contractor and all directions given to the superintendent shall be as binding as if given to Contractor and will be confirmed in writing by Project Manager or Consultant upon the written request of Contractor. Contractor shall give efficient supervision to the Work, using its best skill and attention. The Project Manager and the Consultant shall be provided telephone number(s) for the superintendent where the superintendent can be contacted during normal working hours as well as after hours for emergencies. On Projects in excess on thirty (30) calendar days the Contractor's superintendent shall record, at a minimum, the following information in a bound log: the day; date; weather conditions and how any weather condition affected progress of the Work; time of commencement of Work for the day; the Work being performed; materials, labor, personnel, equipment and Subcontractors at the Project(s) site(s); visitors to the Project site, including 28 NW 14 Street Streetscape Project Bid No.: 09-10-010 representatives of the City, Consultant, regulatory representatives; any special or unusual conditions or occurrences encountered; and the time of termination of Work for the day. All information shall be recorded in the daily log in indelible ink. The daily log shall be kept on the Project(s) site(s) and shall be available at all times for inspection and copying by Project Manager and Consultant. The Project Manager, Contractor and Consultant shall meet at least every two (2)weeks or as otherwise determined by the Project Manager, during the course of the Work to review and agree upon the Work performed and outstanding issues. The Contractor shall publish, keep, and distribute minutes and any comments thereto of each such meeting. If Contractor, in the course of performing the Work, finds any discrepancy between the Contract Documents and the physical conditions of the locality, or any errors, omissions, or discrepancies in the Plans, it shall be Contractor's duty to immediately inform Project Manager and Consultant, in writing, and Project Manager or Consultant, will promptly review the same. Any Work done after such discovery, until authorized, will be done at Contractor's sole risk. Contractor shall supervise and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents and Contract Documents. Contractor shall be solely responsiblefor the means, methods, techniques, sequences and procedures of construction. All Work, including trade Work shall be performed and supervised by properly licensed for the Work being performed. 24. Subcontractors Contractor is solely responsible for all acts and omissions of its Subcontractors Nothing in the Contract Documents shall create any contractual relationship between any Subcontractor and the City. Contractor is responsible for the timely payment of its Subcontractors and suppliers as required by. Florida Stature. Failure to comply with these payment requirements will place the Contractor in default of the Contract. Contractor shall not employ any subcontractor against whom City and or Program Manager may have a reasonable objection. Contractor shall not be required to employ any subcontractor against whom Contractor has a reasonable objection. Contractor shall utilize the Subcontractors identified in its Bid submission. The replacement, addition, or deletion of any Subcontractor(s) shall be subject to the prior written approval of the Project Manager. With the submission of its pay application the Contractor must identify the number of personnel they and the Subcontractor(s) are using who are working under H2B visas. Third tier subcontracting is only permitted with the prior written approval of the Project Manager. 25. Authority of the Project Manager The Director hereby authorizes the Project Manager and the Consultant designated in the Contract Documents to determine, all questions of any nature whatsoever arising out of, under or in connection with, or in any way relating to or on account of the Work, and questions as to the interpretation of the Work to be performed under this Contract Documents. The Contractor shall be bound by all determinations or orders of the Project Manager and/or Consultant and shall promptly respond to requests of the Project Manager and/or Consultant, including the withdrawal or modification of any previous order, and regardless of whether the Contractor agrees with the Project Manager's and/or Consultant's determination or requests. Where requests are made orally, the Project Manage and/or Consultant will follow up in writing, as soon thereafter as is practicable. 29 NW 14 Street Streetscape Project Bid No.: 09-10-010 The Project Manager and/or Consultant shall have authority to act on behalf of the City to the extent provided by the Contract Documents, unless otherwise modified in writing by the City. All instructions to the Contractor shall be issued in writing. All instructions to the Contractor shall be issued through the Director, Project Manager or the Consultant. The Project Manager and/or Consultant shall have access to the Project(s) Site(s) at all times. The Contractor shall provide safe facilities for such access so the Project Manager and Consultant may perform their functions under the Contract. The Project Manager and Consultant will make periodic visits to the Work Site to become generally familiar with the progress and quality of the Work, and to determine if the Work is proceeding in accordance with the Contract Documents. The Project Manager and Consultant will not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work, and will not be responsible for the Contractor's failure to carry out the Work in accordance with the Contract Documents. The Project Manager and Consultant will have authority to _reject Work that does not conform to the Contract Documents. Whenever, in his or her opinion, it is considered necessary or advisable to ensure the proper completion of the Contract Documents the Project Manager and Consultant will have authority to require special inspections or testing of the Work, whether or not such Work is fabricated, installed or completed. Neither the Project Manager's nor Consultant's authority to act under this paragraph, nor any decision made by him in good faith either to exercise or not to exercise such authority, shall give rise to any duty or responsibility of the Project Manager or Consultant to the Contractor, any subcontractor, supplier or any of their agents, employees, or any other person performing any of the Work. All interpretations and recommendations of the Project Manager and Consultant shall be consistent with the intent of the Contract Documents. The Project Manager and Consultant will not be responsible for the acts or omissions of the Contractor, any Subcontractor, or any of their agents or employees, or any other persons performing any of the Work. 26. Inspection of Work The Project Manager, Consultant, Inspectors, and other City representatives shall at all times have access to the Work during normal work hours, and Contractor shall provide proper facilities for such access and for inspecting, measuring and testing. Should the Contract Documents, Consultant/Inspector Project Manager's instructions, any laws, ordinances, or any public authority require any of the Work to be specially tested or approved, Contractor shall give Project Manager and Consultant timely notice of readiness of the Work for testing. If the testing or approval is to be made by an authority other than a City of contracted firm, timely notice shall be given of the date fixed for such testing. Testing shall be made promptly, and, where practicable, at the source of supply. If any of the Work should be covered up without approval or consent of Project Manager or Consultant, it must, if required by the Project Manager and/or Consultant, be uncovered for examination and properly restored at Contractor's expense. Unless otherwise provided, the Contractor shall make arrangements for such tests, inspections and approvals. The Contractor shall give the City and the Consultant timely notice of when and where tests and inspections are to be made so that the City and Consultant may be present for such procedures. All testing reports are to be sent directly to the Project Manager by the testing firm, with a copy to the Contractor. Re-examination of any of the Work may be ordered by the Project Manager and Consultant, and if so ordered, the Work must be uncovered by Contractor. If such Work is found to be in accordance with the Contract Documents, City shall pay the cost of reexamination and 30 NW 14 Street Streetscape Project Bid No.: 09-10-010 replacement by means of a Change Order. If such Work is not in accordance with the Contract Documents, Contractor shall pay such cost. The Contractor shall bear the cost of correcting destroyed or damaged construction, whether completed or partially completed, of the City or separate contractors caused by the Contractor's correction- or removal of Work which is not in accordance with the requirements of the Contract Documents. Inspectors shall have no authority to permit deviations from, or to relax any of the provisions of the Contract Documents or to delay the Work by failure to inspect the materials and Work with reasonable promptness without the written permission or instruction of Project Manager and Consultant. The payment of any compensation, whatever may be its character or form, or the giving of any gratuity or the granting of any favor by the Contractor to any Inspector, directly or indirectly, is strictly prohibited, and any such act on the part of the Contractor will constitute a breach of this Contract. 27. Taxes Contractor shall pay all applicable sales, consumer, use and other taxes required by law. Contractor is responsible for reviewing the pertinent state statutes involving state taxes and complying with all requirements. 28. Separate Contracts Prior to the commencement of the Work the Project Manager will notify the Contractor of all ongoing projects or projects scheduled to commence during the Work that may require coordination. The Contractor shall be responsible for coordinating the Work with any other project to minimize any potential adverse impact. Contractor shall not be entitled to any days of delay for failure to properly coordinate the Work. The Consultant and the Project Manager will assist the Contractor in coordinating the Work. However, the sole responsibility for coordination rests with the Contractor. If any part of Contractor's Work depends for proper execution or results upon the work of any other persons, Contractor shall inspect and promptly report to Project Manager and Consultant any defects in such work that render it unsuitable for such proper execution and results. Contractor's failure to so inspect and report shall constitute an acceptance of the other person's work as fit and proper for the reception of Contractor's Work, except as to defects which may develop in other contractor's work after the execution of Contractor's Work. Contractor shall conduct its operations and take all reasonable steps to coordinate the prosecution of the Work so as to create no interference or impact on any other contractor on the site. Should such interference or impact occur, Contractor shall be liable to the affected contractor for the cost of such interference or impact. To ensure the proper execution of subsequent Work, Contractor shall inspect the Work already in place and shall at once report to Project Manager and Consultant any discrepancy between the executed Work and the requirements of the Contract Documents. 29. Lands of Work City shall provide, as may be indicated in the Contract Documents, the lands upon which the Work is to be performed, rights -of -way and easements for access thereto and such other lands as are designated by City for the use of Contractor. Contractor shall provide, at Contractor's own expense and without liability to City, any additional land and access thereto that may be required for temporary construction facilities, or for storage of materials. Contractor shall furnish to City copies of written permission obtained by Contractor from the owners of such facilities. 31 NW 14 Street Streetscape Project Bid No.: 09-10-010 30. Coordination of Work The Project Site(s) may be occupied and may operate on a twenty-four hour seven day a week schedule. Contractor shall ensure that the performance of the Work does not impact any ongoing operations at Project(s) site(s), which also includes the delivery of any materials and equipment. Access to and egress from the Project Site(s) shall be coordinated with the Project Manager and the Consultant to minimize interference to regular and emergency operations of the facility. During progress of Work under this Contract, it may be necessary for other contractor's and persons employed by the City to Work in or about the Project. The City reserves the right to put such other contractors to work and to afford such access to the Project site of the Work to be performed hereunder at such times as the City deems proper. If this Contract requires a portion of the Work to be tied into work done under another Contractor(s), it will be necessary for Contractor to plan its Work and cooperate with other contractors insofar as possible to prevent any interference and delay. The Contractor is required to coordinate the Work with other contractors performing work at the Project(s) site. The Contractor shall not impede or interfere with the work of other contractors engaged in or about the Work and shall so arrange and conduct its Work that such other contractors may complete their work at the earliest date possible. 31. Differing Site Conditions In the event that during the course of the Work Contractor encounters subsurface or concealed conditions at the Project(s) site(s) which differ materially from those shown in the Contract Documents and from those ordinarily encountered and generally recognized as inherent in work of the character called for in the Contract Documents; or unknown physical conditions of the Project(s) site(s), of an unusual nature, which differ materially from that ordinarily encountered and generally recognized as inherent in work of the character called for in the Contract Documents, Contractor, without disturbing the conditions and before performing any Work affected by such conditions, shall, within twenty-four (24) hours of their discovery, notify the Project Manager and Consultant in writing of the existence of the aforesaid conditions. Project Manager and the Consultant shall, within two (2) business days after receipt of Contractor's written notice, investigate the site conditions identified by Contractor. If, in the sole opinion of Project Manager or the Consultant, the conditions do materially so differ and cause an increaseor decrease in Contractor's cost of, or the time required for, the performance of any part of the Work, whether or not charged as a result of the conditions, Project Manager or Consultant shall recommend an equitable adjustment to the Contract Documents Price or Contract Documents Time, or both. If the Project Manager and Contractor cannot agree on an adjustment in the Contract Price or Contract Time, the adjustment shall be referred to the Director for determination. Should the Director determine that the conditions of the Project(s) site(s) are not so materially different to justify a change in the terms of the Contract Documents, the Director shall so notify the Project Manager, Consultant, and Contractor in writing, stating the reasons, and such determination shall be final and binding upon the parties hereto. No request by Contractor for an equitable adjustment to the Contract Documents under this provision shall be allowed unless Contractor has given written notice in strict accordance with the provisions of this Article. No request for an equitable adjustment or change to the Contract price or Contract Time for differing site conditions shall be allowed if made after the date certified by Consultant or Project Manager as the date of substantial completion. 32. Existing Utilities Known utilities and structures adjacent to or encountered in the Work may be shown on the Drawings. Locations shown are taken from existing records and the best information available from existing plans and utility investigations; however, it is expected that there 32 NW 14 Street Streetscape Project Bid No.: 09-10-010 may be some discrepancies and omissions in the locations and quantities of utilities and structures shown. Those shown are for the convenience of the Contractor only, and no responsibility is assumed by either the City for their accuracy or completeness. No request for additional compensation or contract time resulting from encountering utilities not shown will be considered. The Contractor shall explore sufficiently ahead of the Work to allow time for any necessary adjustments The Contractor must coordinate all underground utility locations through "Sunshine State One CaII of Florida, Inc", who shall be contacted a minimum of 48 hours before the Contractor commences any digging. 33. Contractor's Responsibility for Utility Properties and Service Where the Contractor's operations could cause damage or inconvenience to railway, telephone, fiber optic, television, electrical power, oil, gas, water, sewer, or irrigation systems, the Contractor shall make all arrangements necessary for the protection of these utilities and services or any other known utilities. Notify all utility companies that are affected by the construction operation at least 48 hours in advance. Under no circumstanceexpose any utility without first obtaining permission from the appropriate agency. Once permission has been granted, locate, expose, and provide temporary support for all existing underground utilities and utility poles where necessary. The Contractor and his Subcontractors shall be solely and directly responsible to the owner and operators of such properties for any damage, injury, expense, Toss, inconvenience, delay, suits, actions, or claims of any character brought because of any injuries or damage which may result from the construction operations under the Contract Documents. Neither the City nor its officers or agents shall be responsible to the Contractor for damages as a result of the Contractor's failure to protect utilities encountered in the Work. In the event of interruption to domestic water, sewer, storm drain, or other utility services as a result of accidental breakage due to construction operations, promptly notify the proper authority. Cooperate with said authority in restoration of service as promptly as possible and bear all costs of repair. In no event shall interruption of any utility service be allowed unless granted by the owner of the utility. In the event water service lines that interfere with trenching are encountered, the Contractor may, by obtaining prior approval of the water utility, cut the service, dig through, and restore the service with similar and equal materials at the Contractor's expense and as approved by the Project Manager or Consultant. Replace, with material approved by the Project Manager or Consultant, at Contractor's expense, any and all other laterals, existing utilities or structures removed or damaged during construction, unless otherwise provided for in the Contract Documents and as approved by the Project Manager or Consultant. Replace with material approved by the Project Manager or Consultant, at Contractor's expense, any existing utilities damaged during the Work. 34. Interfering Structures An attempt has been made to show major structures on the furnished Drawings. While the information has been compiled from the best available sources, its completeness and accuracy cannot be guaranteed, and is presented as a guide. The Contractor shall field verify all locations. Contractor shall coordinate with any affected companies, including utility companies and take necessary precautions to prevent damage to existing structures whether on the surface, above ground, or underground, including have the owner of the interfering structures place temporary supports. 33 NW 14 Street Streetscape Project Bid No.: 09-10-010 35. Field Relocation During the process of the Work, it is expected that minor relocations of the Work may be necessary. Such relocations shall be made only by the direction of the Project Manager and Consultant at the Contractor's expense. If existing structures are encountered that will prevent construction as shown, the Contractor shall notify the Project Manager or Consultant before continuing with the Work in order that the Project Manager or Consultant may make such field revisions as necessary to avoid conflict with the existing structures. Where the Contractor fails to notify the Project Manager or Consultant when an existing structure is encountered, and proceeds with the Work despite this interference, the Contractor does so at his own risk. 36. Contractor's Use of Project Site(s) Limitations may be placed on the Contractor's use of the Project(s) site(s) and such limitations will be identified by the Project Manager. In addition to such limitations, the Project Manager may make storage available to the Contractor at his sole discretion based on availability of space. The Contractor shall also coordinate and schedule deliveries so as to minimize disruptions to City day-to-day operations. The Contractor shall limit its use of the Project site(s), so as to allow for the City's continuous operation. This is necessary, as the Project Site(s) may remain in operation during the Work. • The Contractor shall: o Confine operations at the Project(s) site(s) to the areas permitted by the Project Manager or Consultant; not disturb portions of the Project(s) site(s) beyond the specified areas; conform to Project(s) site(s) rules and regulations affecting the Work. o Keep existing driveways and entrances serving surrounding facilities clear and available to the City, its employees and the public at all times; not use areas for parking and/or storage of materials except as authorized by the Project Manager. o Assume all responsibility for its tools, equipment and materials, including any materials purchased for the Work and not accepted by the City, and its vehicles while performing Work for the City and/or while parked or stored at a City facility. The City assumes no liability for damage or loss to the items specified in this paragraph. Access to parking and egress from the Project(s) site(s) shall be subject to the approval of the Project Manager. 37 Warranty of Materials and Equipment Contractor warrants to City that all materials and equipment furnished under the Contract Documents will be new unless otherwise specified and that all of the Work will be of good quality, free from faults and defects and in conformance with the Contract Documents and Contract/Documents. All Work not conforming to these requirements, including substitutions not properly approved and authorized, may be considered defective. If required by the Project Manager or Consultant, Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. This warranty is not limited by any other provisions within the Contract Documents. 38. Material and Equipment Shipment, Handling, Storage and Protection Preparation for Shipment When practical, equipment shall be factory assembled. The equipment parts and assemblies that are shipped unassembled shall be furnished with assembly plan and instructions. The separate parts and assemblies shall be factory match -marked or tagged in 34 NW 14 Street Streetscape Project Bid No.: 09-10-010 a manner to facilitate assembly. All assemblies are to be made by the Contractor at no additional cost to the City. Generally, machined and unpainted parts subject to damage by the elements shall be protected with an application of a strippable protective coating, or other approved protective method. Equipment shall be packaged or crated in a manner that will provide protection from damage during shipping, handling, and storage. The outside of the package or crate shall be adequately marked or tagged to indicate its contents by name and equipment number, if applicable; approximate weight; state any special precautions for handling; and indicate the recommended requirements for storage prior to installation. Packaging and Delivery of Spare Parts and Special Tools Properly mark to identify the associated equipment by name, equipment, and part number. Parts shall be packaged in a .manner for protection against damage from the elements during shipping, handling, and storage. Ship in boxes that are marked to indicate the contents. Delivery of spare parts and special tools shall be made prior to the time associated equipment is scheduled for the initial test run. Shipment All equipment and material shall be shipped with freight and shipping paid, FOB job site. The Contractor shall request a 7-day advance notice of shipment from manufacturers, and, upon receipt of such notice, provide the Engineer with a copy of the current delivery information concerning equipment items and material items of critical importance to the Project schedule. Receiving The Contractor shall unload and record the receipt of all equipment and materials at the jobsite. All costs for receiving, inspection, handling, storage, insurance, inventory control, and equipment maintenance for the Contractor -supplied and City -supplied materials and equipment shall be included in the prices Bid and no extra compensation will be allowed. Inspection Immediately upon receipt of equipment and materials at the jobsite, the Contractor shall inspect for completeness and any evidence of damage during shipment. City supplied equipment and material shall be inspected and inventoried together with City's Inspector. Should there appear to be any shortage or damage, the Project Manager or Consultant shall be immediately notified; and the Contractor shall be fully responsible for informing the manufacturers and the transportation company of the extent of the shortage or damage. If the item or items require replacing or supplying missing parts, the Contractor shall take the necessary measures to expedite the replacement or supply the missing parts. Handling Equipment and materials received for installation on the Project(s) shall be handled in accordance with the manufacturer's recommendations, and in a manner that will prevent damage. Storage Equipment and materials shall be stored prior to installation. as recommended by the manufacturer. Generally, materials such as pipe shall be stored off the ground in approved storage yards. Items subject to damage by the elements, vandalism, or theft shall be stored 35 NW 14 Street Streetscape Project Bid No.: 09-10-010 in secure buildings. Items requiring environmental control for protection shall be provided with the necessary environmentally controlled storage facilities at no cost to the City. Insurance The Contractor's insurance shall adequately cover the value of materials delivered but not yet incorporated into the Work. Inventory Control Equipment and materials shall be stored in a manner to provide easy access for inspection and inventory control. The Contractor shall keep a running account of all materials in storage to facilitate inspection and to estimate progress payments for materials delivered but not installed in the Work. Equipment's Maintenance Prior to Acceptance by the City The contractor shall provide the required or manufacturer's recommended maintenance during storage, during the installation, and until such time as the City accepts the - equipment for full-time operation. Salvage Equipment Any salvageable pipe, fittings, or other miscellaneous material or equipment removed during construction and not reused in the Work shall be cleaned, hauled, and stored by the Contractor at his own expense, where directed by the Project Manager or Consultant, and shall remain the property of the City. All other material shall be disposed of by the Contractor at his own expense. 39. Manufacturer's Instructions The Contractor shall: Comply with manufacturer's requirements for the handling, delivery and storage of all materials. Where required by the Contract Documents, Contractor shall submit manufacturer's printed instructions for delivery, storage, assembly, and installation. Comply with the manufacturer's applicable instructions and recommendations for the performance of the Work, to the extent that these instructions and recommendations are more explicit or more stringent than requirements indicated in the Contract Documents including the Contract Documents. Inspect each item of material or equipment immediately prior to installation and reject damaged and defective items. Provide attachment and connection devices and methods for securing the Work; secure Work true to line plumb and level, and within recognized industry standards; allow for expansion and building movement; provide uniform joint width in exposed Work; arrange joints in exposed Work to obtain the best visual effect and refer questionable visual effect choices to the Consultant for final decision when applicable to the Work. Recheck measurements and dimensions of the Work, as an integral step in starting each portion of the Work. Install each unit or section of Work during favorable weather conditions, which shall ensure the best possible results in coordination with the entire Project(s) and isolate each unit of Work from incompatible Work as necessary to prevent potential interference among each section and/or deterioration of equipment. Coordinate enclosure of the Work, which requires inspections and tests so as to minimize the necessity of uncovering Work for that purpose. When required by the Contract Documents or the manufacturer, a qualified representative shall be present to observe field conditions, conditions of surface and installation, quality of 36 NW 14 Street Streetscape Project Bid No.: 09-10-010 workmanship, and applications. Manufacturer's representative shall provide the Contractor and the Project Manager or Consultant a written report of field observations. 40. Manufacturer's Warranty Contractor shall provide all manufacturers' warranties. All warranties, expressed and/or implied, shall be made available to the City for material and equipment covered by this Contract Documents. All material and equipment furnished shall be fully guaranteed by the Contractor against factory defects and workmanship. At no expense to the City, the Contractor shall correct any and all apparent and latent defects that may occur within the manufacturer's standard warranty. The Contract Documents may supersede the manufacturer's standard warranty. Manufacturer's warranties will become effective upon Final Acceptance of the Project(s). 41 Reference Standards Reference to the standards of any technical society, organization or body shall be construed to mean the latest standard adopted and published at the date of request for qualifications, even though reference may have been made to an earlier standard. Such reference is hereby made a part of the Contract Documents the same as if herein repeated in full and in the event of any conflict between any of these standards and those specified, the most stringent shall govern unless otherwise stated. 42. Submittals Contractor shall check and approve all shop drawing, samples, product data, schedule of values, and any and all other Submittals to make sure they comply with the Contract Documents prior to submission to the Project Manager and Consultant. Contractor by approving and submitting any Submittals, represents that they have verified the accuracy of the Submittals, and they have verified all of the Submittal information and documentation with the requirements of the Contract Documents. At time of submission the Contractor shall advise the Project Manager and Consultant in writing of any deviations from the Contract Documents. Failure of the Contractor to advise the Project Manager or Consultant of any deviations shall make the Contractor solely responsible for any costs incurred to correct, add or modify any portion of the Work to comply with the Contract Documents. Each Submittal shall contain a title block containing thefollowing information: Number and title of drawing, including Contract title and Number • Date of drawing and revisions • Name of Contractor and Subcontractor (if any) submitting drawings • Name of Project, Building or Facility, and Owner's Project number • Specification Section title and number • Contractor's Stamp of approval, signed by the Contractor or his checker •• Space above the title block for Project Manager' or Consultant's action stamp • Submittal or re -submittal number (whether first, second, third, etc.) • Date of submittal Contractor shall sign, in the proper block, each sheet of shop drawing and data and each sample label to certify compliance with the requirements of the Contract Documents. Submittals submitted without the stamp and signature shall be rejected and it will be considered that the Contractor has not complied with the requirements of the Contract Documents. Contractor shall bear the risk of any delays that may occur as a result of such rejection. City shall not be liable for any materials, fabrication of products or Work commenced that requires submittals until the Project Manager and/or Consultant has returned approved submittals to the Contractor. 37 NW 14 Street Streetscape Project Bid No.: 09-10-010 Contractor shall submit six (6) originals of each Submittal to the City. The City will return three marked/reviewed sets to the Contractor. A Contractor's letter of transmittal cover sheet must be attached to all Submittals' packages being transmitted to the City and Consultant. The Contractor's letters of transmittal shall properly list and identify all Submittal packages with number and description of each Submittal within the letter of transmittal. When catalogs, product data, diagrams or charts are submitted with more than one type of product manufactured, clearly identify the particular item being submitted, including options that are intended for use in that particular work or portion of work. Contractor shall note in submittals/shop drawings to make references to Drawings, drawings details, Specifications Sections, or any of the Contract Documents, as necessary for clarity. Project Manager and/or Consultant shall make every effort to review Submittals within fourteen (14) calendar days from the date of receipt by the Project Manager and/or Consultant. Project Manager and/or Consultant's review shall only be for conformance with design concepts and the information provided in the Contract Documents. The approval of a separate item shall not constitute approval of an assembly in which the item functions. The Project Manager and/or Consultant shall return the reviewed Submittal to the Contractor for their use and distribution. Acceptance of any submittal by the City or Consultant shall not relieve the Contractor of any responsibility for any deviations from the requirements of the Contract Documents unless the Contractor has given written notice to the Project Manager and/or Consultant of the specific deviations and the Consultant has issued written approval of such deviations. By approving and submitting shop drawings, product data and samples, the Contractor represents that all materials, field measurements and field construction criteria related thereto have been verified, checked and coordinated with the requirements of the Work and have been verified, checked and coordinated with this Contract Documents. Contractor shall be responsible for the distribution of all shop drawings, copies of product data and samples, which bear the Project Manager's or Consultant's stamp of approval. Distribution shall include, but not limited to; job site file, record documents file, Subcontractor, suppliers, and other affected parties or entities that require the information. The Contractor shall also provide copies of all plans approved and permitted by the required governing authorities. The Contractor shall not be relieved of responsibility for errors or omissions in any and all submittals by the Project Manager's or Consultant's acceptance thereof. The Contractor warrants the adequacy for the purpose intended of any shop drawings or portion of a Submittal that alters, modifies or adds to the requirements of the Contract Documents. Nothing in the Project Manager's or Consultant's review of Submittals shall be construed as authorizing additional work or increased cost to the City. 43. Shop Drawings Contractor shall submit Shop Drawings as required by the Contract Documents. The purpose of the Shop Drawings is to show, in detail, the suitability, efficiency, technique of manufacture, installation requirements, details of the item, and evidence of its compliance or noncompliance with this Contract Documents. Within five (5) calendar days after City's award of the Contract, Contractor shall submit to Project Manager or Consultant a complete list and submittal log of items for which Shop Drawings are to be submitted and shall identify the critical items and all submittal dates. Approval of this list by Project Manager or Consultant shall in no way relieve the Contractor from submitting complete Shop Drawings and providing materials, equipment, etc., fully in 38 NW 14 Street Streetscape Project Bid No.: 09-10-010 accordance with the Contract Documents. This procedure is required in order to expedite final approval of Shop Drawings. After the approval of the list of items required in above, Contractor shall promptly request Shop Drawings from the various manufacturers, fabricators, and suppliers. Contractor shall thoroughly review and check the Shop Drawings and each and every copy shall show its approval thereon. Contractor shall submit three (3) sets of shop drawings. Some shop drawings as either denoted in the Contract Documents or by the Florida Building Code (Code) or Florida Statute, such as structural drawings, require that they be prepared by a licensed engineer. It is the sole responsibility of the Contractor to ensure that the Shop Drawings meet all Code requirements. In addition to all shop drawings required by the Contract Documents the Contractor must provided shop drawings for; all drainage structures including catch basins, drainage pipe, ballast rock, and exfiltration trench filter fabric. If the Shop Drawings show or indicate departures from the Contract Documents, Contractor shall make specific mention thereof in its letter of transmittal. Failure to point out such departures shall not relieve Contractor from its responsibility to comply with the Contract and Documents. Project Manager or Consultant shall review and accept or reject with comments, Shop Drawings within fourteen (14) calendar days from the date received. Project Manager's or Consultant's approval of Shop Drawings will be general and shall not relieve Contractor of responsibility for the accuracy of such Shop Drawings, nor for the proper fitting and construction of the Work, nor for the furnishing of materials or Work required by the Contract Documents and not indicated on the Shop Drawings. No Work called for by Shop Drawings shall be performed until said Shop Drawings have been approved by Project Manager and/or Consultant. Approval shall not relieve Contractor from responsibility for errors or omissions of any sort on the Shop Drawings. No approval will be given to partial submittals of Shop Drawings for items which interconnect and/or are interdependent where necessary to properly evaluate the design. It is Contractor's responsibility to assemble the Shop Drawings for all such interconnecting and/or interdependent items, check them and then make one submittal to Project Manager and/or Consultant along with its comments as to compliance, noncompliance, or features requiring special attention. If catalog sheets or prints of manufacturers' standard drawings are submitted as Shop Drawings, any additional information or changes on such drawings shall be typewritten or lettered in ink. The minimum size for shop drawings shall be 11" X 17". Each shop drawing shall be clear, thoroughly detailed and shall have listed on it all Contract Documents references, drawing number(s), specification section number(s) and the shop drawing numbers of related work. Shop drawings must be complete in every detail, including location of the Work. Materials, gauges, methods of fastening and spacing of fastenings, connections with other work, cutting, fitting, drilling and any and all other necessary information per standard trade practices or as required for any specific purpose shall be shown. Where professional calculations and/or certification of performance criteria of materials, systems, and or equipment are required, the Project Manager and/or Consultant are entitled to rely upon the accuracy and completeness of such calculations and certifications submitted by the Contractor. Calculations, when required, shall be submitted in a neat clear and easy format to follow. Contractor shall keep one set of Shop Drawings marked with Project Manager's and/or Consultant's approval at the job site at all times. 39 NW 14 Street Streetscape Project Bid No: 09-10-010 44. Product Data Contractor shall submit four (4) copies of product data, warranty information and operating and maintenance manuals. Each copy must be marked to identify applicable products, models, options and other data. Contractor shall supplement manufacturer's standard data to provide information unique to the Work. Contractor shall only submit pages that are pertinent. Submittals shall be marked to identify pertinent products, with references to the specifications and the Contract Documents. Identify reference standards, performance characteristics and capacities, wiring and piping diagrams and controls, component parts, finishes, dimensions and required clearances. Contractor shall submit a draft of all. product data, warranty information and operating and maintenance manuals at 50% completion of construction. 45. Samples Contractor shall submit samples to illustrate the functional characteristics of the product(s). Submittals shall be coordinated for different categories of interfacing Work. Contractor shall include identification on each sample and provide full information. 46. Record Set Contractor shall maintain in a safe place at the Project(s) site(s) one record copy and one permit set of the Contract Documents, including, but not limited to, all Drawings, Specifications, shop drawings, amendments, Change Orders, RFIs, and Field Directives, as well as all written interpretations and clarifications issued by the Project Manager or Consultant, in good order and annotated to show all changes made during construction. The record documents shall be continuously updated by Contractor throughout the prosecution of the Work to accurately reflect all field changes that are made to adapt the Work to field conditions, changes resulting from Change Orders, Construction Change Directives, and Field Directives as well as all written interpretations and clarifications, and all concealed and buried installations of piping, conduit and utility services. Contractor shall certify the accuracy of the updated record documents. As a condition precedent to City's obligation to pay Contractor, the Contractor shall provide evidence, satisfactory to the Project Manager and the Consultant, that Contractor is fulfilling its obligation to continuously update the record documents. All buried items, outside the Project(s) site(s), shall be accurately located on the record documents as to depth and in relationship to not less than two (2) permanent features (e.g. interior or exterior wall faces). The record documents shall be clean and all changes, corrections and dimensions shall be given in a neat and legible manner in red. The record documents shall be available to the City and the Consultant for reference. Upon completion of the Work and as a condition precedent to Contractor's entitlement to final payment, the record documents shall be delivered to the Project Manager or Consultant by the Contractor. The Record Set of Drawing shall be submitted in both hard copy and as electronic plot files. 47. Supplemental Drawings and Instructions The Project Manager or Consultant shall have the right to approve and issue supplemental instructions setting forth written orders, instructions, or interpretations concerning the Contract Documents or its performance, provided such Supplemental Instructions involve no change in the Contract Documents Price or this Contract Documents Time. Project Manager or Consultant shall have the right to modify the details of the plans and specifications, to supplement the plans and specifications with additional plans, drawings or additional information as the Work proceeds, all of which shall be considered as part of the Contract Documents. In case of disagreement between the written and graphic portions of the Contract Documents; the written portion shall govern. 48. Contractor Furnished Drawings 40 NW 14 Street Streetscape Project Bid No.: 09-10-010 The Contract Documents may require the Contractor to furnish design, shop and/or as -built drawings depending on the nature and scope of the Work to be performed. The following applies to the different types of drawings. The Project Manager and/or Consultant shall, after review of the drawings, initial and mark the drawings in one.of the following manners: 1. ACCEPTED - No correction required. 2. PROCEED AS CORRECTED - Minor changes or corrections identified. Work can proceed subject to re -submittal and acceptance of the drawings. 3. REVISE AND RESUBMIT- Significant changes or corrections are recommended. Submittal must be revised and resubmitted for acceptance prior to Work proceeding. 4. REJECTED - Not in accordance with the Contract and/or Contract Documents due to excessive changes or corrections or other justifiable reason. Drawings must be corrected and resubmitted prior to any Work being performed. Revisions required by the permitting jurisdiction must also be reviewed and accepted by the Project Manager or Consultant prior to resubmission to the permitting agency. Acceptance by the City shall not relieve the Contractor from responsibility for errors and omissions in the drawings. 49. Substitutions Substitutions will only be considered after the award of the Contract. Whenever materials or equipment are specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular supplier, the naming of the item is intended to establish the type, function and quality required. Unless the name is followed by words indicating that no substitution is permitted, materials or equipment of other suppliers may be accepted by Project Manager if sufficient information is submitted by Contractor to allow City and Consultant to determine that the material or equipment proposed is equivalent or equal to that named. Requests for review of substitute items of material and equipment will not be accepted by City and Consultant from anyone other than Contractor. If Contractor wishes to furnish or use a substitute item of material or equipment, Contractor shall make application to the Consultant for acceptance thereof, certifying that the proposed substitute shall perform adequately the functions and achieve the results called for by the general design, be similar and of equal substance to that specified and be suited to the same use as that specified. The application shall state that the evaluation and acceptance of the proposed substitute will not prejudice Contractor's achievement of Substantial Completion on time, whether or not acceptance of the substitute for use in the Work will require a change in any of the Contract Documents to adapt the design to the proposed substitute and whether or not incorporation or use by the substitute in connection with the Work is subject to payment of any license fee or royalty. All variations of the proposed substitute from that specified will be identified in the application and available maintenance, repair and replacement service shall be indicated. The application also shall contain an itemized estimate of all costs that will result directly or indirectly from acceptance of such substitute, including costs for redesign and claims of other contractors affected by the resulting change, all of which shall be considered by the Project Manager and the Consultant in evaluating the proposed substitute. The Project Manager or Consultant may require the Contractor to furnish at Contractor's expense additional data about the proposed substitute. If a specific means, method, technique, sequence or procedure of construction is indicated in or required by Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence or procedure of construction acceptable to the City's Project Manager and/or Consultant, if the Contractor submits sufficient information to allow the Manager and/or Consultant to determine that the substitute proposed is equivalent to that 41 NW 14 Street Streetscape Project Bid No.: 09-10-010 indicated or required by the Contract Documents. The procedures for submission to and review by the Manager and/or Consultant shall be the same as those provided herein for substitute materials and equipment. The Manager and/or Consultant shall be allowed a reasonable time within which to evaluate each .proposed substitute.. The Manager and/or Consultant and the City shall be the sole judges of the acceptability of any substitute. No substitute shall be ordered, installed or utilized without the City's and the Consultant's prior written acceptance which shall be evidenced by either a Change Order or an approved submittal. The City and the Manager and/or Consultant may require the Contractor to furnish at Contractor's expense a special performance guarantee or other surety with respect to any substitute. If the City and the Manager and/or Consultant reject the proposed substitute, at their discretion, the City may require the Contractor to reimburse the City for the charges of the Manager and/or Consultant for evaluating the proposed substitute. Contractor shall maintain sole liability and responsibility for ensuring that all substitutions and any required design of such are in full compliance with and meet all the requirements of the Contract Documents. 50. City Furnished Drawings The City, at its sole discretion, may fumish design drawings. It shall be the sole responsibility of the Contractor to bring to the immediate attention of the Project Manager and the Consultant any discrepancies between the drawings and existing conditions, excluding hidden or unforeseen conditions, discovered prior to commencing and during the Work. The Contractor shall be solely responsible for verifying the accuracy of the drawings prior to commencing the Work, and shall be responsible for any errors or revisions of the Work, which might have been avoided by notifying the City prior to commencement. This shall also apply to any revisions or omissions identified by the Contractor. The Contractor shall submit all requests for information entitled Request for Information (RFI). The City shall respond to all RFI's in writing. The Contractor shall have no basis for any claim for additional costs resulting from their failure to identify any required revisions, omissions and/or errors, not identified in writing to the Project Manager or Consultant prior to commencing the Work. 51. Interpretation of Drawings and Documents Drawings and specifications are intended to be consistent, be mutually explanatory, and should be used together and not separately. During the performance of the Project(s), should any errors, omissions, conflicts, ambiguities or discrepancies be found in the drawings and/or specifications, the Project Manager or the Consultant will clarify in writing the intent of the drawings and/or specifications and the Contractor agrees to abide by the Project Manager's or Consultants interpretation and perform the Work in accordance with the decision of the Project Manager or the Consultant. In such event, the Contractor will be held to have included in its Contract Price the best materials suitable for the purpose and/or methods of construction. The drawings are to be addressed as a complete set and should not be used in parts. Contractor is responsible to coordinate the set of drawings with all trades to ensure that the Work will be performed correctly and coordinated among the trades. Contractor shall not scale the drawings. 52. Product and Material Testing All tests shall be performed by the Contractor, except where otherwise specifically stated in the Contract Documents. All costs for testing performed by the Contractor shall be at the .Contractor's expense. All reports are to be sent directly to the City's Project Manager with a copy to the Contractor. The City may, in its sole and absolute discretion, test materials and products at its own cost. However, should such materials or products fail to pass the 42 NW 14 Street Streetscape Project Bid No.: 09-10-010 test and/or meet the requirements of the Contract Documents, the Contractor shall reimburse the City for the cost of such tests and repair or replace said materials or products. In such instances the City may deduct such cost from any payments pending to the Contractor. The City may require that the Contractor provide the name and qualification of the company(ies) providing the testing services, inclusive of the testing. Iaboratory(ies). The City, in its sole discretion, may accept or reject the use of any company or laboratory that it determines does not possess the required licenses or expertise to perform their portion of the Work. 53. Field Directives The Project Manager or Consultant may at times issue field directives to the Contractor based on visits to the Project(s) Site(s). Such Field Directives shall be issued in writing and the Contractor shall be required to comply with the directive. Where the Contractor believes that the directive is outside the scope of the Work, the Contractor shall, within 48 hours, notify the Project Manager or Consultant that the work is outside the scope of the Work. At that time the Field Directive may be rescinded or the Contractor may be required to submit a request for a change to the Contract. Where the Contractor is notified of the City's position that the Work is within the scope and the Contractor disagrees, the Contractor shall notify the Project Manager or Consultant that the Contractor reserves the right to make a claim for the time and monies based on the Field Directive. At no time shall the Contractor refuse to comply with the directive. Failure to comply with the directive may result in a determination that the Contractor is in default of the Contract. 54. Changes in the Work or Contract Documents Without invalidating the Contract Documents and without notice to any Surety, City reserves and shall have the right, from time to time to make such increases, decreases or other changes in the character or quantity of the Work under the Contract Documents as may be considered necessary or desirable to complete fully and acceptably the proposed construction of a Project in a satisfactory manner. Any extra or additional Work within the scope of the Project(s) must be accomplished by means of appropriate Field Orders and Supplemental Instructions or Change Orders. Any changes to the terms of the Contract Documents must be contained in a written document, executed by the parties hereto. This section shall not prohibit the issuance of Change Orders executed only by City. 55. Continuing the Work Contractor shall carry on the Work and adhere to the progress schedule during all disputes or disagreements with City, including disputes or disagreements concerning a request for a Change Order, a request for a change in the Contract price or Contract time for completion. The Work shall not be delayed or postponed pending resolution of any disputes or disagreements. 56. Change Orders Changes in the quantity or character of the Work within the scope of the Project(s) which are not properly the subject of Field Orders or Supplemental Instructions, including all changes resulting in changes in the Contract Price, or the Contract Time, shall be authorized only by Change Orders approved in advance and issued in accordance with the provisions of the City. In the event satisfactory adjustment cannot be reached for any item requiring a change in the Contract Price or Contract Time, and a Change Order has not been issued, City reserves the right at its sole option to either terminate the Contract as it applies to the items in question and make such arrangements as may be deemed necessary to complete the disputed work; or submit the matter in dispute to the Director as set forth in Article 91, Resolution of Disputes. During the pendency of the dispute, and upon receipt of a Change 43 NW 14 Street Streetscape Project Bid No.: 09-10-010 Order approved by City, Contractor shall promptly proceed with the change in the Work involved and advise the Project Manager, Consultant, and Director in writing within seven (7) calendar days of Contractor's agreement or disagreement with the method, if any, provided in the Change Order for determining the proposed adjustment in the Contract Price or Contract Time. On approval of any Contract change increasing the Contract Price, Contractor shall ensure that the performance bond and payment bond (if applicable) are increased so that each reflects the total Contract Price as increased. Under circumstances determined necessary by City, Change Orders may be issued unilaterally by City. The City reserves the right to order changes which may result in additions to or reductions from the amount, type or value of the Work shown in the Contract and which are within the general scope of the Contract Documents. Any such changes will be known as Extra Work. No Extra Work shall be performed except pursuant to written orders of the Project Manager or Consultant expressly and unmistakably indicating his/her intention to treat the Work described therein as Extra Work. In the absence of such an order, the Project Manager or Consultant may direct, order or require the Contractor to perform any Work including that which the Contractor deems to be Extra Work. The Contractor shall nevertheless comply and shall promptly and in no event after, begin the performance thereof or incur cost attributable thereto and give written notice to the Project Manager stating why he deems such Work (hereinafter "Disputed Work") to be Extra Work. Said notice is for the purposes of (1) affording an opportunity to the Project Manager to cancel such order, direction or requirements promptly; (2) affording an opportunity to the Project Manager to keep an accurate record of materials, labor and other items involved; and (3) affording an opportunity to the City to take such action as it may deem advisable in Tight of such disputed Work. 57. Change Order Procedure Extra Work shall result in an equitable adjustment (increase or decrease) to the Contract representing the reasonable cost or the reasonable financial savings related to the change in Work. Extra Work may also result in an equitable adjustment in the Contract schedule for performance for both the Extra Work and any other Work affected by the Extra Work. The City shall initiate the Extra Work procedure by a notice to Contractor outlining the proposed Extra Work. Upon receipt of the notice to proceed with the Extra Work, the Contractor is required to immediately start the Extra Work. The Contractor is required to obtain permission for an extension to start the Extra Work if it is beyond the Contractor's ability to start within the allotted timeframe. The Contractor is required to provide the Project Manager with a detailed Change Proposal Request, using City Forms CPR Parts A-C (available on the CIP webpage), which shall include requested revisions to the Contract, including but not limited to adjustments in this Contract Price and Contract Time. The Contractor is required to provide sufficient data in support of the cost proposal demonstrating its reasonableness. In furtherance of this obligation, the City may require that the Contractor submit any or all of the following: a cost breakdown of material costs, labor costs, labor rates by trade, and Work classification and overhead rates in support of Contractor's Change Proposal Request. The Contractor's Change Proposal Request must include any schedule revisions and an explanation of the cost and schedule impact of the Extra Work on the Project(s). If the Contractor fails to notify the Project Manager or Consultant of the schedule changes associated with the Extra Work, it will be deemed to be an acknowledgment by Contractor that the proposed Extra Work will not have any scheduling consequences. The Contractor agrees the Change Proposal Request will in no event include a combined profit and overhead rate in excess of ten (10%) percent of the direct labor and material costs, unless the Project Manager 44 NW 14 Street Streetscape Project Bid No.: 09-10-010 determines that the complexity and risk of the Extra Work is such that an additional factor is appropriate. The Change Proposal Request may be accepted or modified by negotiations between the Contractor and the City. If an agreement on the Extra Work is reached, both parties shall execute the Extra Work order in writing via a Change Order. The execution by the Contractor of the Change Order shall serve as a release of the City from all claims and liability to the Contractor relating to, or in connection with, the Extra Work, including any impact, and any prior acts, neglect or default of the City relating to the Extra Work. Upon execution of a change order that affects the Contract Time the Contractor shall, within five (5) business days submit a revised Project schedule reflecting the changes against the baseline schedule. 58. No Oral Changes Except to the extent expressly set forth in the Contract, no change in or modification, termination or discharge of the Contract or, in any form whatsoever, shall be valid or enforceable unless it is in writing and signed by the parties charged, therewith or their duly authorized representative. 59. Value of Change Order Work The value of any Work covered by a Change Proposal Request or of any claim for an increase or decrease in the Contract Price shall be determined in one of the following ways: • Where the Work involved is covered by unit prices contained in the Contract, by application of unit prices to the quantities of items involved. • By mutual acceptance of a lump sum which Contractor and Project Manager acknowledge contains a component for overhead and profit. • On the basis of the "cost of Work," determined as provided in this, plus a Contractor's fee for overhead and profit which is determined as provided in this Article. • The term "cost of Work" means the sum of all direct costs necessarily incurred and paid by Contractor in the proper performance of the Work described in the Change Order. Except as otherwise may be agreed to in writing by the Project Manager, such costs shall be in amounts no higher than those prevailing in the locality of the Project, shall include only the following items and shall not include any of the costs itemized in herein. Payroll costs for employees in the direct employ of Contractor in the performance of the Work described in the Change Proposal Request under schedules of job classifications agreed upon by Project Manager and Contractor. Payroll costs for employees not employed full time on the Work covered by the Change Proposal Request shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include, but not be limited to, salaries and wages plus the cost of fringe benefits which shall include social security contributions, unemployment, excise and payroll taxes, workers' or workmen's compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay application thereto. Such employees shall include superintendents and foremen at the site. The expenses of performing the Work after regular working hours, on Sunday or legal holidays shall be included in the above to the extent authorized by City. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and manufacturers' field services required in connection therewith. All cash discounts shall accrue to Contractor unless City deposits funds with Contractor with which to make payments, in which case the cash discounts shall accrue to City. All trade discounts, rebates and refunds, and all returns from sale of surplus materials and equipment shall accrue to City and Contractor shall make provisions so that they may be obtained. Rentals of all construction equipment and machinery and the parts thereof whether rented from Contractor or others in accordance with rental agreements 45 NW 14 Street Streetscape Project Bid No.: 09-10-010 approved by City with the advice of Consultant and the costs of transportation, loading, unloading, installation, dismantling and removal thereof, all in accordance with the terms of said agreements. The rental of any such equipment, machinery or parts shall cease when the use thereof is no longer necessary for the Work. If required by the City, Contractor shall obtain competitive bids for the Change Order Work. Contractor and shall deliver such competitive bids to the City who will determine which bids will be accepted. If the Subcontractor is to be paid on the basis of cost of the Work plus a fee, the Subcontractor's cost of the Work shall be determined in the same manner as Contractor's cost of the Work. All Subcontractors shall be subject to the other provisions of the Contract Documents insofar as applicable. The term "cost of the Work" shall include any of the following: • Cost of special consultants, including, but not limited to, consultants, architects, testing laboratories, and surveyors employed for services specifically related to the performance of the Work described in the Change Order. • Supplemental costs including the following: • The proportion of necessary transportation, travel and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work except for local travel to and from the site of the Work. • Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office and temporary facilities at the site and hand tools not owned by the workmen, which are consumed in the performance of the Work, and less market value of such items used but not consumed which remains the property of Contractor. Sales, use, or similar taxes related to the Work, and for which Contractor is liable, imposed by any governmental authority. • Deposits lost for causes other than Contractor's negligence; royalty payments and fees for permits and licenses. • The cost of utilities, fuel and sanitary facilities at the site. Receipted minor expenses such as telegrams, long distance telephone calls, telephone service at the site, expressage and similar petty cash items in connection with the Work. • Cost of premiums for additional bonds and insurance required because of changes in the Work. The term "cost of the Work" shall not include any of the following: • Payroll costs and other compensation of Contractor's officers, executives, principals (of partnership and sole proprietorships), general managers, consultants, architects, estimators, lawyers, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks and other personnel employed by Contractor whether at the site or in its principal or a branch office for general administration of the Work and not specifically included in the agreed -upon schedule of job classifications., all of which are to be considered administrative costs covered by Contractor's fee. • Expenses of Contractor's principal and branch offices other than Contractor's office at the site. • Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. • Cost of premiums for all Bonds and for all insurance whether or not Contractor is required by the Contract Documents to purchase and maintain the same, except for additional bonds and insurance required because of changes in the Work. ■ Costs due to the negligence or neglect of Contractor, any Subcontractors, or anyone directly or indirectly employed by any of them or for whose acts any of 46 NW 14 Street Streetscape Project Bid No.: 09-10-010 them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied and making good any damage to property. • Other overhead or general expense costs of any kind and the cost of any item not specifically and expressly included in this Article. Contractor's fee allowed to Contractor for overhead and profit shall be determined as follows: • A mutually acceptable fixed fee or if none can be agreed upon, • A fee based on the following percentages of the various portions of the cost of the Work: • Where the Contractor self -performs the Work, Contractor's fee shall not exceed ten percent (10%). • Where a sub -contractor performs the Work, Contractor's fee shall not exceed seven and one half percent (7.5%); and if a subcontract is on the basis of cost of the Work plus a fee, the maximum allowable to the Subcontractor as a fee for overhead and profit shall not exceed ten percent (10%); and • No fee shall be payable for special consultants or supplemental costs. Contractor's overhead is considered to cover all indirect costs and shall also include the costs of insurance and bonds. The amount of credit to be allowed by Contractor to City for any such change which results in a net decrease in cost will be the amount of the actual net decrease. When both additions and credits are involved in any one change, the combined overhead and profit shall be figured on the basis of the net increase, if any, however, Contractor shall not be entitled to claim lost profits for any Work not performed. Whenever the cost of any Work is to be determined pursuant to this Article, Contractor will submit in a form acceptable to Project Manager or Consultant an itemized cost breakdown together with the supporting data. Where the quantity of any item of the Work that is covered by a unit price is increased or decreased by more than twenty percent (20%) from the quantity of such Work indicated in the Contract Documents, an appropriate Change Order may be issued to adjust the unit price, if warranted. Whenever a change in the Work is to be based on mutual acceptance of a lump sum, whether the amount is an addition, credit or no change -in -cost, Contractor shall submit an initial cost estimate acceptable to the Project Manager or Consultant. • Breakdown shall list the quantities and unit prices for materials, labor, equipment and other items of cost. • Whenever a change involves Contractor and one or more Subcontractors and the change is an increase in the Contract Price, overhead and profit percentage for Contractor and each Subcontractor shall be itemized separately. • Each Change Order must state within the body of the Change Proposal Request whether it is based upon unit price, negotiated lump sum, or "cost of the Work." 60. Extra Work Directive If the parties fail to reach agreement with respect to the proposed Extra Work, or in case or extenuating circumstances, the City may nevertheless issue a directive to the Contractor to do the proposed Extra Work. Immediately upon receipt of the Extra Work Directive, the Contractor shall be obligated to proceed with the Work set forth in that directive. Except as provided below, the Contractor shall be entitled to initiate a dispute pursuant to the Article 91, Resolution of Disputes, by furnishing a written statement to the Project Manager within five (5) days of the Extra Work Directive, based upon any aspect, of such 47 NW 14 Street Streetscape Project Bid No.: 09-10-010 Extra Work which the Contractor disputes. Such dispute must relate to specific matters raised or specific matters reserved by the Contractor in its proposal and have not been resolved prior to the issuance of the Extra Work Directive. The written statement must set forth all details of the Contractor's claim including the manner that the disputed item was specified in the Contractor's proposal. During the pendency of any dispute hereunder, the Contractor must proceed with Work as set forth in the Extra Work Directive unless otherwise advised by the Project Manager's written instructions. In the event there is a dispute as to price, the Contractor will be paid in accordance with the following paragraph. This payment(s) will be in full satisfaction of the Contractor's claim for an adjustment to the value of the Contract. Compensation for Extra Work in the event of the parties' inability to agree upon a mutually satisfactory price shall be as follows: • No payment will be made to the Contractor for Extra Work in excess of "Actual and Necessary Cost" which is to say time and materials plus a mark-up not to exceed 10%. This will not vary, whether the Extra Work is performed by the Contractor or his subcontractor. Any exceptions must be approved by the Project Manager. "Actual and Necessary Net Cost" shall be deemed to include the actual and necessary cost of the Extra Work for (i) labor, which includes wages, payroll deductions, if any, made by the Contractor as employer pursuant to bona fide collective bargaining labor agreements applicable to the Work; (ii) contributions to the State Unemployment Insurance Law, (iii) excise taxes pursuant to Federal Social Security Act; (iv) any increases in public liability and property damage insurance or performance and payment bonds occasioned solely by the Extra Work, (v) the actual and necessary operating expenses (except the expense of supplies and small tools not operated by mechanical or electrical power), power for such plant and a reasonable rental for the same (including small power tools), as determined by the Project Manager; and (vi) any additional materials necessary for the performance of the Extra Work. In case any Work or materials shall be required to be done or fumished under the provisions of this Article, the Contractor shall at the end of each day furnish to the City such documentation as the City may require to support all the costs of the Extra Work. If payments on account are desired as the Extra Work progresses, the Contractor shall render an itemized statement showing the total amount expended for each class of labor and for each kind of material on account of each item of Work as a condition precedent to the inclusion of such payment in a partial estimate. Upon the request of the City, the Contractor shall produce for audit by the City, books, vouchers, collective bargaining labor agreements, records or other documents showing the actual cost for labor and materials. Such documents shall not be binding on the City. The Project Manager shall determine any questions or dispute as to the correct cost of such labor or materials or plant. In case the Contractor is ordered to perform Work under this Article, which in the opinion of the Project Manager, it is impracticable to have performed by the Contractor's own employees, the Contractor will, subject to the approval of the Project Manager, be paid the actual cost to Contractor of such Work, and in addition thereto five (5%) percent to cover the Contractor's superintendence, administration and other overhead expenses. Payment of any amount under this Article shall be subject to subsequent audit and approval, disapproval, modification or revision by representatives of the City. 61 As -Built Drawings During the Work, Contractor shall maintain records of all deviations from the Drawings and Specifications as approved by the Project Manager or Consultant and prepare As -Built Record Drawings showing correctly and accurately all changes and deviations made during construction to reflect the Work as it was actually constructed. It is the responsibility of the Contractor to check.the As -Built Drawings for errors and omissions prior to submittal to the 48 NW 14 Street Streetscape Project Bid No.: 09-10-010 City and certify in writing that the As -Built Drawings are correct and accurate, including the actual location of all internal piping, electrical/signal conduits in or below the concrete floor. Indicate the size, depth and voltage in each conduit. Legibly mark to record actual construction: On -site structures and site Work as follows: • Depths of various elements of foundation in relation to finish first floor datum. • All underground piping and ductwork with elevations and dimensions and locations of valves, pull boxes, etc. Changes in location. Horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements. Actual installed pipe material, class, etc. • Location of internal utilities and appurtenances concealed in the construction, referenced to visible and accessible features of the structure. Air conditioning ducts with locations of dampers, access doors, fans and other items needing periodic maintenance. • Field changes in dimensions and details. • Changes made by Project Manager's or Consultant's written instructions or by Change Order. • Details not on original Contract Drawings. • Equipment, conduit, electrical panel locations. Project Manager's or Consultant's schedule changes according to Contractor's records and shop drawings. Specifications and Addenda: Legibly mark each section to record: • Manufacturer, trade name, catalog number and Supplier of each product and item of equipment actually installed. • Changes made by Project Manager's or Consultant's written instructions or by Change Order. Approved Shop Drawings: Provide record copies for each process equipment, piping, electrical system and instrumentation system. As -built documents shall be updated monthly as a condition precedent to payment. For construction of new building or building additions as -built drawings signed and sealed by a Florida licensed Registered Land Surveyor. . 62. Worker's Identification The Contractor's employees, who include any Subcontractor, shall wear an identification card provided by the Contractor. The identification card shall bear the employee's picture, name, title and name of the employer. Failure by a Contractor's employee to wear such identification may result in his removal from the Work until such time as the identification card is obtained and worn. Such removal shall not act as a basis for the Contractor to submit a claim for an extension of time. 63. Removal of Unsatisfactory Personnel The City may make written request to the Contractor for the -prompt removal and replacement of any personnel employed or retained by the Contractor, or any or Sub - Contractor engaged by the Contractor to provide and perform services or Work pursuant to the requirements of the Contract Documents. The Contractor shall respond to the City within seven (7) calendar days of receipt of such request with either the removal and replacement of such personnel or written justification as to why that may not occur. The City shall make the final determination as to the removal of unsatisfactory personnel from Work assigned by City. The Contractor agrees that the removal of any of its employees does not require the termination or demotion of employee(s). 64. Substantial. Completion, Punch List, & Final Completion 49 NW 14 Street Streetscape Project Bid No.: 09-10-010 The Work shall be substantially complete when the Project Manager, in the reasonable exercise of his/her discretion determines that the Work is complete and there are no material and/or substantial variations from the Contract Documents and the Work is fit for its intended purpose. Upon Substantial Completion, the Project Manager and the Contractor shall sign the Substantial Completion Inspection Form. The signing of this form shall not relieve the Contractor from its obligation to complete the Project. When the Contractor believes that the Work is substantially complete, the Contractor shall request in writing that the Project Manager or Consultant inspect the Work to determine if Substantial Completion has been achieved. No request for Substantial Completion inspection is to be submitted until the Contractor has obtained a Certificate(s) of Occupancy, Certificate of Completion or Use, or a Temporary Certificate of Occupancy or any other approvals from agencies having jurisdiction over the Work. The Project Manager or Consultant shall schedule the date and time for any inspection and notify the Contractor and any other parties deemed necessary. During this inspection, the Project Substantial Completion Inspection Form will be completed as necessary. Any remaining Construction Work shall be .identified on this form and shall be known as Punch List Work. The Punch List shall be signed by the Project Manager and/or Consultant, and the Contractor confirming that the Punch List contains the item(s) necessary to complete the Work. The failure or refusal of the Contractor to sign the Project Substantial Completion Inspection Form or Punch List shall not relieve the Contractor from complying with the findings of the Project Substantial Completion Inspection and completing the Project to the satisfaction of the City Where the Punch List is limited to minor omissions and defects, the Project Manager shall indicate that the Work is substantially complete subject to completion of the Punch List. Where the Project Manager or Consultant determines, on the appropriate form that the Work is not substantially complete, the Project Manager or Consultant shall provide a list of all open items necessary to achieve Substantial Completion. Upon completion of such Work, the Contractor shall request another Substantial Completion inspection. The Project Manager or Consultant, and the Contractor shall agree on the time reasonably required to complete all remaining Work included in the Punch List. Upon the receipt of all documentation, resolution of any outstanding issues and issuance of final payment, the Project Manager or Consultant shall notify the Contractor in writing of the closeout of the Project. The City will prepare a Certificate of Substantial Completion in the form which shall establish the Date of Substantial Completion. Once substantial completion is achieved the City shall be responsible for security, maintenance, heat, utilities, damage to the Project site, and insurance; and shall list all Work yet to be completed to satisfy the requirements of the Contract Documents for Final Completion. The failure to include any items of corrective Work on such list does not alter the responsibility of Contractor to complete all of the Work in accordance with the Contract Documents. Warranties required by the Contract Documents shall commence on the date of Final Acceptance completion of the Work or designated portion thereof unless otherwise provided in the Contract Documents. 65. Acceptance and Final Payment Upon receipt of written notice from Contractor that the Work is ready for final inspection and acceptance, Project Manager and/or Consultant shall, within ten (10) calendar days, make an inspection thereof. If Project Manager and/or Consultant find the Work acceptable, the. requisite documents have been submitted and the requirements of the Contract Documents fully satisfied, and all conditions of the permits and regulatory agencies have been met, a Final Certificate for Payment shall be issued by Project Manager, stating that the requirements of the Contract Documents have been performed and the Work is ready for acceptance under the terms and conditions thereof. 50 NW 14 Street Streetscape Project Bid No.: 09-10-010 Before issuance of the Final Certificate for Payment, Contractor shall deliver to the Project Manager or Consultant a final release of all liens arising out of the Contract Documents, receipts in full in lieu thereof; an affidavit certifying that all suppliers and Subcontractors have been paid in full and that all other indebtedness connected with the Work has been paid, and a consent of the surety to final payment; the final corrected as -built drawings; operations and maintenance data, and the final bill of materials, if required, and payment application. Contractor shall deliver the written Contractor's warranty and all Manufacturer's warranties prior to issuance of the Final Certificate for Payment. Prior to approval of final payment the Project Manager shall provide written confirmation to the Contractor that any and all training required by the Contract Documents has been provided to the satisfaction of the Project Manager. If, after the Work has been substantially completed, full completion thereof is materially delayed through no fault of Contractor, and Project Manager or Consultant so certifies, City shall, upon such certification of Consultant, and without terminating the Contract Documents, make payment of the balance due for that portion of the Work fully completed and accepted. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of claims. The acceptance of final payment shall constitute a waiver of all claims by Contractor, except those previously made in strict accordance with the provisions of the Contract and identified by Contractor as unsettled at the time of the application for final payment. 66. NDPES Requirements Contractor shall comply with the State of Florida rules and regulations for the National Pollutant Discharge Elimination System (NPDES) including but not limited to all permitting, Notices of Intent, and the Storm Water Pollution Prevention Plan (SWPPP). All costs for NPDES and SWPPP shall be included in the Bid prices. For further information on compliance requirements for NPDES and SWPPP contact the City of Miami Public Works Department at (305) 416-1200 or visit the State of Florida website at http://www.dep.state.fl.us/water/stormwater/npdes/. Contractor is responsible for obtaining, completing and paying for any required NPDES application or permits that may be required. 67. Force Majeure Should any failure to perform on the part of Contractor be due to a condition of force majeure as that term is interpreted under Florida law, the City may allow an extension of time reasonably commensurate with the cause of such failure to perform or cure. If the Contractor is delayed in performing any obligation under the Contract Documents due to a force majeure condition, the Contractor shall request a time extension from the City within two (2) working days of said force majeure occurrence. Any time extension shall be subject to mutual agreement and shall not be cause for any claim by the Contractor for extra compensation unless additional services are required. Do Not Include inclement weather except as permitted by Florida law and may not include the acts or omissions of Sub -contractors. 68. Extension of Time Any reference in this section to the Contractor shall be deemed to include suppliers, and permitted Sub -Contractors, whether or not in privities of contract with the Contractor for the purpose of this Article. If the Contractor is delayed at any time during the progress of the Work beyond the Contract Time and/or Notice to Proceed (NTP) by the neglect or failure of the City or by a Force Majeure, then the Contract Time set forth in the Contract shall be extended by the City subject to the following conditions: 51 NW 14 Street Streetscape Project Bid No.: 09-10-010 • The cause of the delay arises after issuance of the NTP and could not have been anticipated by the Contractor by reasonable investigation before proceeding with the Work; • The Contractor demonstrates that the completion of the Work will be actually and necessarily delayed; • The effect of such cause cannot be avoided or mitigated by the exercise of all reasonable precautions, efforts and measures whether before or after the occurrence of the cause of delay. Note: A delay meeting all the conditions of the above, shall be deemed an Excusable Delay. The City shall only consider weather related delays where adverse weather directly impacts the critical path of the Project Schedule. However, the City will also factor in other factor in considering an extension of time, including the length of the weather delay, and the adverse weather conditions as they relate to typical weather patterns during the period the Work is being performed. The City reserves the right to rescind or shorten any extension previously granted if subsequently, the Project Manager determines that any information provided by the Contractor in support of a request for an extension of time was erroneous; provided however, that such information or facts, if known, would have resulted in a denial of the request for an Excusable Delay. Notwithstanding the above, the Project Manager will not rescind or shorten any extension previously granted if the Contractor acted in reliance upon the granting of such extension and such extension was based on information which, although later found to have been erroneous, was submitted in good faith by the Contractor. The request for an Excusable Delay shall be made within ten (10) calendar days after the time when the Contractor knows or should have known of any cause for which it may claim an extension of time and shall provide any actual or potential basis for an extension of time, identifying such causes and describing, as fully as practicable at that time, the nature and expected duration of the delay and its effect on the completion of that part of the Work identified in the request. The Project Manager may require the Contractor to furnish such additional information or documentation, as the Project Manager shall reasonably deem necessary or helpful in considering the requested extension. The Contractor shall not be entitled to an extension of time unless the Contractor affirmatively demonstrates that it is entitled to such extension. The Project Manager shall endeavor to review and respond to the Contractor's request for Excusable Delays in a reasonable period of time; however, the Contractor shall be obligated to continue to perform the Work required regardless of whether the Project Manager has issued a decision or whether the Contractor agrees or disagrees with that decision. With regard to an injunction, strike or interference of public origin which may delay the Project, the Contractor shall promptly give the Project Manager a copy of the injunction or other orders and copies of the papers upon which the same shall have been granted. The City shall be afforded the right to intervene and become a party to any suit or proceeding in which any such injunction shall be obtained and move to dissolve the same or otherwise, as the City may deem proper. The permitting of the Contractor to proceed with the Work subsequent to the date specified in the Contract (as such date may have been extended by a change order), the making of any payment to the Contractor, the issuance of any Change Order, shall not waiver the City's rights under the Contract, including but not limited to the assessment of liquidated damages or declaring Contractor in default. 52 NW 14 Street Streetscape Project Bid No.: 09-10-010 69. Notification of Claim Any claim for a change in the Contract Time or Contract Price shall be made by written notice by Contractor to the Project Manager and to Consultant within ten (10) business days of the commencement of the event giving rise to the claim and stating the general nature and cause of the claim. Thereafter, within twenty (20) calendar days of the termination of the event giving rise to the claim, written notice of the extent of the claim with supporting information and documentation shall be provided unless the Project Manager or Consultant allows an additional period of time to ascertain more accurate data in support of the claim and such notice shall be accompanied by Contractor's written notarized statement that the adjustment claimed is the entire adjustment to which the Contractor has reason to believe it is entitled as a result of the occurrence of said event. All claims for changes in the Contract Time or Contract Price shall be determined by the Project Manager or Consultant in accordance with Article 71, Contractor's Damages for Delay hereof, if City and Contractor cannot otherwise agree. It is expressly and specifically agreed that any and all claims for changes to the Contract time or Contract price shall be waived if not submitted in strict accordance with -the requirements of this Article. The Contract time will be extended in an amount equal to time lost on critical Work items due to delays beyond the control of and through no fault or negligence of Contractor if a claim is made therefore as provided in this Article. Such delays shall include, but not be limited to, acts or neglect by any separate contractor employed by City, fires, floods, labor disputes, epidemics, abnormal weather conditions or acts of God. 70. Extension of Time not Cumulative In case the Contractor shall be delayed for any period of time by two or more of the causes mentioned in Article 72, Excusable, Delays, the Contractor shall not be entitled to a separate extension for each one of the causes; only one period of extension shall be granted for the delay. 71. Contractor's Damages for Delay No claim for damages or any claim, other than for an extension of time, shall be made or asserted against City by reason of any delays except as provided herein. Contractor shall not be entitled to an increase in the Contract price or payment or compensation of any kind from City for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference or hindrance from any cause whatsoever, whether such delay, disruption, interference or hindrance be reasonable or unreasonable, foreseeable or unforeseeable, or avoidable or unavoidable; provided, however, that this provision shall not preclude recovery of damages by Contractor for actual delays due solely to fraud, bad faith or active interference on the part of City or its Consultant. Otherwise, Contractor shall be entitled only to extensions of the Contract Time for completion of the Work as the sole and exclusive remedy for such resulting delay, in accordance with and to the extent specifically provided above. Except as may be otherwise specifically provided for in the Contract Documents, the Contractor agrees to make no claim for damages for delay of any kind in the performance of the Contract Documents whether occasioned by any act or omission of the City or any of its representatives (whether it is an Excusable Delay or otherwise) and the Contractor agrees that any such claim shall be compensated solely by an extension of time to complete performance of the Work. In this regard, the Contractor alone hereby specifically assumes the risk of such delays, including without limitation: delays in processing or approving shop drawings, samples or other submittals or the failure to render determinations, approvals, replies, inspections or tests of the Work, in a timely manner. Contractor shall not receive monetary compensation for City delay. Time extensions may be authorized by the City in certain situations. 53 NW 14 Street Streetscape Project Bid No.: 09-10-010 72. Excusable Delay, Non-Compensable Excusable Delay is (i) caused by circumstances beyond the control of Contractor, its Subcontractors, suppliers and vendors, and is also caused by circumstances beyond the control of the City or Consultant, or (ii) is caused jointly or concurrently by Contractor or its Subcontractors, suppliers or vendors and by the City or Consultant. Then Contractor shall be entitled only to a time extension and no compensation for the delay. Contractor is entitled to a time extension of the Contract time for each day the Work is delayed due to Excusable Delay. Contractor shall document its claim for any time extension as provided in Article 69, Notification of Claim, hereof. Failure of Contractor to comply with Article 69, Notification of Claim hereof as to any particular event of delay shall be deemed conclusively to constitute a waiver, abandonment or relinquishment of any and all claims resulting from that particular event of delay. 73. Lines and Grades The Contractor shall, at its own expense, establish all working and construction lines and grades as required from the Project control points set by the City, and shall be solely responsible for the accuracy thereof. 74. Defective Work Project Manager or Consultant shall have the authority to reject or disapprove Work which Project Manager or Consultant finds to be defective. If required by Project Manager or Consultant, Contractor shall promptly either correct all defective Work or remove such defective Work and replace it with non -defective Work. Contractor shall bear all direct, indirect and consequential costs of such removal or corrections including cost of testing laboratories and personnel. Should Contractor fail or refuse to remove or correct any defective Work or to make any necessary repairs in accordance with the requirements of the Contract Documents within the time indicated in writing by Project Manager or Consultant, City shall have the authority to cause the defective Work to be removed or corrected, or make such repairs as may be necessary at Contractor's expense. Any expense incurred by City in making such removals, corrections or repairs, shall be paid for out of any monies due or which may become due to Contractor, or may be charged against the Performance Bond,. In the event of failure of Contractor to make all necessary repairspromptly and fully, City may declare Contractor in default. If, within one (1) year after the date of Substantial Completion or such longer period of time as may be prescribed by the terms of any applicable special warranty required by the Contract Documents, or by any specific provision of the Contract, any of the Work is found to be defective or not in accordance with the Contract Documents, Contractor, after receipt of written notice from City, shall promptly correct such defective or nonconforming Work within the time specified by City without cost to City, to do so. Nothing contained herein shall be construed to establish a period of limitation with respect to any other obligation which Contractor might have under the Contract Documents including but not limited to any claim regarding latent defects. Failure to reject any defective Work or material shall not in any way prevent later rejection when such defect is discovered, or obligate City to final acceptance. 75. Acceptance of Defective or Non -Conforming Work The City, in its sole discretion, may elect in writing to accept defective or non -conforming Work instead of requiring its removal and correction. In such instances, a Change Order will be issued to reflect an appropriate reduction in the Contract sum, or, if the amount is determined after final payment, any difference in the amount shall be paid to the City by the Contractor. 54 NW 14 Street Streetscape Project Bid No.: 09-10-010 76. Uncovering Finished Work The Project Manager's, Inspector's and/or Consultant's right to make inspections shall include the right to order the Contractor to uncover or take down portions of finished Work. The Project Manager /or Consultant shall notify the Contractor in writing concerning all uncovered finished Work. Should the Work prove to be in accordance with the Contract Documents, the uncovering or taking down and the replacing and the restoration of the parts removed will be treated as Extra Work for the purpose of computing additional compensation and an extension of time. Should the Work examined prove unsatisfactory, such uncovering, taking down, replacing and restoration shall be at the expense of the Contractor. Such expenses shall also include repayment to the City for any and all expenses or costs incurred by it, including employee salaries or related cost, in connection with such uncovering, taking down, replacing and restoration at the Project site. 77. Correction of Work The Contractor shall promptly correct all Work rejected by the Project Manager or Consultant as defective or as failing to conform to the Contract Documents, whether observed before or after Substantial Completion and whether or not fabricated, installed or completed. The Contractor shall bear all cost of correcting such rejected Work, including the cost of the City's additional services thereby made necessary. The Contractor further agrees that after being notified in writing by the Project Manager or Consultant of any Work not in accordance with the requirements of the Contract Documents or any defects in the Work, the Contractor will commence and prosecute with due diligence all Work necessary to fulfill the terms of the Contract and to complete the Work within a reasonable period of time, as determined by the Project Manager or Consultant, and in the event of failure to so comply, the Contractor does hereby authorize the City to proceed to have such Work done at the Contractor's expense and that the Contractor will pay the cost thereof upon demand. The City shall be entitled to all costs, including reasonable attorneys' fees, necessarily incurred upon the Contractor's refusal to pay the above costs. Notwithstanding the foregoing paragraph, in the event of an emergency constituting an immediate hazard to the health or safety of personnel, property, or licensees, the City may undertake, at the Contractor's expense, without prior notice, all Work necessary to correct such hazardous condition when it was caused by Work of the Contractor not being in accordance with the requirements of the Contract. If, within one (1) year after the date of final completion of the Project or within such longer period of time as may be prescribed by law, by the Contract Documents, or by the terms of any applicable special warranty required by the Contract Documents, any of the Work is found to be defective or not in accordance with the Contract Documents, the Contractor shall correct it promptly after receipt of a written notice from the City to do so: The City shall give such notice promptly after discovery of the condition. All such defective or non -conforming Work shall be removed from the site if necessary and the Work shall be corrected to comply with the Contract Documents without cost to the City. 78. Maintenance of Traffic and Public Streets Scope of Work The Contractor shall be responsible for the maintenance of public streets and traffic control necessary to perform the Work under the Contract Documents. The cost of traffic control shall be included in the Contractor's Bid. Regulations As used herein, any reference to Miami -Dade County, its departments, or its published regulations, permits and data, shall be synonymous and interchangeable with other recognized governing bodies over particular areas or streets, or their 55 NW 14 Street Streetscape Project Bid No.: 09-10-010 departments, published regulations (i.e., Manual of Uniform Traffic Control Devices (MUTCD), FDOT Roadway and Bridge Standard Index Drawing Book), permits or data. The Contractor shall abide by all applicable laws, regulations, and codes thereof pertaining to Maintenance of Traffic (MOT) on public streets, detour of traffic, traffic control and other provisions as may be required for this Project. Maintenance of Traffic (MOT) • The Contractor shall be fully responsible for the MOT on public streets, detour of traffic (including furnishing and maintaining regulatory and informative signs along the detour route), traffic control, and other provisions, throughout the Project, as required by the Manual of Uniform Traffic Control Devices (MUTCD), and FDOT Roadway and Bridge Standard Index drawing Book. Traffic shall be maintained according to corresponding typical traffic control details as outlined in the previous noted standards. No street shall be completely blocked, nor blocked more than one-half at any time, keeping the other one-half open for traffic, without specific approval. • If required by the Project Manager or Consultant, Traffic Division or FDOT or as otherwise authorized by the Project Manager or Consultant, the Contractor shall make arrangements for the employment of uniformed off -duty policemen to maintain and regulate the flow of traffic through the work area. The number of men required and the number of hours on duty necessary for the maintenance and regulation of traffic flow shall be provided by the City of Miami Police Department. • The Contractor shall provide all barricades with warning lights, necessary arrow boards and signs, to warn motorists of the Work throughout the Project. Adequate approved devices shall be erected and maintained by the Contractor to detour traffic. • Excavated or other material stored adjacent to or partially upon a roadway pavement shall be adequately marked for traffic safety at all times. The Contractor shall provide necessary access to all adjacent property during construction. • The Contractor shall be responsible for the provision, installation and maintenance of all MOT and safety devices, in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) and FDOT Roadway and Bridge Standards index drawing book. In addition, the .Contractor shall be responsible for providing the Consultant with MOT plans for lane closures and/or detours for approval. These plans (sketches) shall be produced, signed and sealed by a professional Engineer registered in the State of Florida, employed by the Contractor and certified under FDOT Procedure NPIL No. 625-010-010. Where excavations are to be made in the vicinity of signalized intersections, attention is directed to the fact that vehicle loop detectors may have been embedded in the pavement. Verify these locations by inspecting the site of the Work and by contacting the Sunshine State One -Call Center (1-800-432-4770), 48 hours prior to any excavation. Any loop detector which is damaged, whether shown on the Plans or not, shall be repaired or replaced to the satisfaction of the Miami Dade County Signs and Signal Division (Phone No. 305-592-3470). • Where applicable, the Contractor shall notify the Traffic Division 24 hours in advance of the construction date or 48 hours in advance of construction within any signalized intersection. • Temporary pavement will be required over all cuts in pavement areas, and also where traffic is to be routed over swale or median areas. When the temporary pavement for routing traffic is no longer necessary, it shall be removed and the swale or median areas restored to their previous condition. 56 NW 14 Street Streetscape Project Bid No.: 09-10-010 • Pavement markings damaged during construction shall be remarked, as required by the Traffic Division. Maintenance of Traffic for Bypass Pumping • The Contractor shall take appropriate steps to ensure that all temporary pumps, piping and hoses are protected from vehicular traffic and pedestrian traffic. Lane Closures • Where construction of the Project shall involve lane closures public streets, the following shall apply: • Lane closures require a Lane Closure Permit, obtained two weeks prior to planned construction, with a minimum 48-hour prior notice to local police and emergency departments (some police jurisdictions may require considerably more notice). Lane closures of a one day or less duration will generally not be approved for major collector streets or for arterial streets during the hours of 7am to 9am and 4pm to 6pm weekdays. 79. Location and Damage to Existing Facilities, Equipment or Utilities As far as possible, all existing utility lines in the Project(s) area(s) will be shown on the plans. However, City does not guarantee that all lines are shown, or that the ones indicated are in their true location. It shall be the Contractor's responsibility to field verify all underground and overhead utility lines or equipment affecting or affected by the Project. No additional payment will be made to the Contractor because of discrepancies in actual and plan location of utilities, and damages suffered as a result thereof. The Contractor shall notify each utility company involved at least fourteen (14) calendar days prior to the start of construction to arrange for positive underground location, relocation or support of its utility where that utility may be in conflict with or endangered by the proposed construction. Relocation of water mains or other utilities for the convenience of the Contractor shall be paid by the Contractor. All charges by utility companies for temporary support of its utilities shall be paid for by the Contractor. All costs of permanent utility relocation to avoid conflict shall be the responsibility of the utility company involved. No additional payment will be made to the Contractor for utility relocations, whether or not said relocation is necessary to avoid conflict with other lines. The Contractor shall schedule the Work in such a manner that the Work is not delayed by the utility providers relocating or supporting their utilities. The Contractor shall coordinate its activities with any and all public and private utility providers occupying the right-of-way. No compensation will be paid to the Contractor for any loss of time or delay. All overhead, surface or underground structures and utilities encountered are to be carefully protected from injury or displacement. All damage to such structures is to be completely repaired within a reasonable time; needless delay will not be tolerated. The City reserves the right to remedy such damage by ordering outside parties to make such repairs at the expense of the Contractor. All such repairs made by the Contractor are to be made to the satisfaction of the utility owner. All damaged utilities must be replaced or fully repaired. All repairs are to be inspected by the utility owner prior to backfilling 80. Stop Work Order The City may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the Work for a period of up to ninety (90) days (or any lesser period), commencing no sooner than the date the order is delivered to the Contractor, and for any further period to which the parties may agree. Any such order shall be specifically identified as a "Stop Work Order" issued pursuant to this paragraph. Within the period of ninety (90) days (or the lesser period specified) after a Stop Work Order is delivered to the Contractor, or within any extension to which the parties have agreed the City shall either: 57 NW 14 Street Streetscape Project Bid No.: 09-10-010 • Cancel the Stop Work Order; or • Terminate the Work covered by such order as provided in Article 90, Termination for Convenience. If a Stop Work Order issued under this Article is canceled or the period of the order or any extension -thereof expires, the Contractor shall resume the Work without compensation to the Contractor for such suspension other than extending the time for Substantial Completion to the extent that, in the opinion of the Project Manger or Consultant, the Contractor may have been delayed by such suspension. In the event the Project Manger or Consultant determines that the suspension of Work was necessary due to Contractor's defective or incorrect Work, unsafe Work conditions caused by the Contractor or any other reason caused by Contractor's fault or omission, the Contractor shall not be entitled to an extension of time as a result of the issuance of a Stop Work Order. 81. Hurricane Preparedness During such periods of time as are designated by the United States Weather Bureau as being a hurricane warning, the Contractor, at no cost to the City, shall take all precautions necessary to secure the Project site in response to all threatened storm events, regardless of whether the Project Manager or Consultant has given notice of same. Compliance with any specific hurricane warning or alert precautions will not constitute additional work. Suspension of the Work caused by a threatened or actual storm event, regardless of whether the City has directed such suspension, will entitle the Contractor to additional Contract time as non-compensable, excusable delay, and shall not give rise to a claim for compensable delay. 82. Use of Completed Portions City shall have the right, at its sole option, to take possession of and use any completed or partially completed portions of the Project(s). Such possession and use shall not be deemed an acceptance or beneficial use or occupancy of any of the Work not completed in accordance with the Contract Documents. If such possession and use increases the cost of or delays the Work, Contractor shall be entitled to reasonable extra compensation, or reasonable extension of time or both, as determined by Project Manager or Consultant. In the event City takes possession of any completed or partially completed portions of the Project, the following shall occur: ■ City shall give notice to Contractor in writing at least thirty (30) calendar days prior to City's intended occupancy of a designated area. Contractor shall complete to the point of Substantial Completion the designated area and request inspection and issuance of a Certificate of Substantial Completion from Project Manager or Consultant. • Upon Project Manager or Consultant's issuance of a Certificate of Substantial Completion, City will assume full responsibility for maintenance, utilities, subsequent damages of City and public, adjustment of insurance coverage's and start of warranty for the occupied area. • Contractor shall complete all items noted on the Certificate of Substantial Completion within the time specified by Project Manager or Consultant on the Certificate of Substantial Completion, as specified in the Punch List and request final inspection and final acceptance of the portion of the Work occupied. Upon completion of final inspection and receipt of an application for final payment, Project Manager or Consultant shall issue a Certificate of Final Payment relative to the occupied area. ■ 58 NW 14 Street Streetscape Project Bid No.: 09-10-010 • If City finds it necessary to occupy or use a portion or portions of the Work prior to Substantial Completion thereof, such occupancy or use shall not commence prior to a time mutually agreed upon by City and Contractor and to which the insurance company or companies providing the property insurance have consented by endorsement to the policy or policies. Insurance on the unoccupied or unused portion or portions shall not be canceled or lapsed on account of such partial. occupancy or use. Consent of Contractor and of the insurance company or companies to such occupancy or use shall not be unreasonably withheld. 83. Cleaning Up; City's Right to Clean Up Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its operations. At the completion of a Project(s), Contractor shall remove all its waste materials and rubbish from and about the Project(s) as well as its tools, construction equipment, machinery and surplus materials. If Contractor fails to clean up during the prosecution of the Work or at the completion of the Work, City may do so and the cost thereof shall be charged to Contractor. If a dispute arises between Contractor and separate contractors as to their responsibility for cleaning up, City may clean up and charge the cost thereof to the contractors responsible therefore as the Project Manager and/or Consultant shall determine to be just. All combustible waste materials shall be removed from the Project(s) at the end of each day. Cleaning operations should be controlled to limit dust and other particles adhering to existing surfaces. 84. Removal of Equipment In case of termination of this Contract before completion for any cause whatsoever, Contractor, if notified to do so by City, shall promptly remove any part or all of Contractor's equipment and supplies from the property of City. If the Contractor does not comply with City's order, the City shall have the right to remove such equipment and supplies at the expense of Contractor. 85. Set -offs, Withholdings, and Deductions The City may set-off, deduct or withhold from any payment due the Contractor, such sums as may be specifically allowed in the Contract or by applicable law including, without limitation, the following: Any amount of any claim by a third party; • Any Liquidated Damages, and/or; • Any unpaid legally enforceable debt owed by the Contractor to the City. The City shall notify the Contractor in writing of any such withholdings. Any withholding, which is ultimately held to have been wrongful, shall be paid to the Contractor in accordance with the Local Government Prompt Payment Act. 86. Event of Default An event of default shall mean a breach of the Contract or by the Contractor. Without limiting the generality of the foregoing and in addition to those instances referred to herein as a breach, an Event of Default, shall include but not limited to, the following: • The Contractor has not performed the Work in a timely manner; • The Contractor has refused or failed, except in case for which an extension of time is provided, to supply properly skilled staff or provided sufficient quantities of staff to perform the Work; • The Contractor has failed to make prompt payment to Subcontractors or suppliers for any services or materials they have provided; • The Contractor has become insolvent or has assigned the proceeds received for the benefit of the Contractor's creditors, or the Contractor has taken advantage of 59 NW 14 Street Streetscape Project Bid No.: 09-10-010 any insolvency statute or debtor/creditor law or if the Contractor's affairs have been put in the hands of a receiver; • The Contractor has failed to obtain the approval of the City where required by the Contract Documents; The Contractor has failed in the representation of any warranties stated herein; • When, in the opinion of the City, reasonable grounds for uncertainty exist with respect to the Contractor's ability to perform the Work, the City shall notify the Contractor in writing that it must, within the time frame set forth in the City's request, provide adequate assurances and a plan of action to the City, in writing, of the Contractor's ability to perform in accordance with the terms of the Contract Documents. In the event that the Contractor fails to provide to the City the requested assurances within the prescribed time frame, the City may: o Treat such failure as a repudiation of the Contract and/or; o Resort to any remedy for breach provided herein or by law, including but not limited to, taking over the performance of the Work or any part thereof either by itself or through others. • In the event the City may, at its sole discretion terminate the Contract for default, the City or its designated representatives may immediately take possession of all applicable documentation and data. • Where the City erroneously terminates the Contract or for default, the terminations shall be converted to a Termination for Convenience, and the Contractor shall have no further recourse of any nature for wrongful termination. 87. Notice of Default -Opportunity to Cure In the event that the City determines that the Contractor is in default of their obligations under the Contract, the City may at its sole discretion notify the Contractor, specifying the basis for such default, and advising the Contractor that such default must be cured within a specified time frame or the Contract with the City may be terminated. The City is under no obligation to issue such notification. The City may grant an extension to the cure period if the City deems it appropriate and in the best interest of the City, without waiver of any of the City's rights hereunder. The City, at its sole discretion, may have a default corrected by its own forces or another contractor and any such costs incurred will be deducted from any sums due the Contractor under any contract with the City. 88. Termination for Default If Contractor fails to comply with any term or condition of the Contract Documents, or fails to perform any of its obligations hereunder, then Contractor shall be in default. Upon the occurrence of a default hereunder which is not cured within the time specified to cure the default if one has been granted by the City, the Director in addition to all remedies available to it by law, may immediately, upon written notice to Contractor, terminate this Contract whereupon any advances for which Work has not been performed, paid by the City to Contractor while Contractor was in default shall be immediately returned to the City. The Director may also suspend any payment or part thereof or order a Work stoppage until such time as the issues concerning compliance are resolved. Contractor understands and agrees that termination of this Contract under this Article shall not release Contractor from any obligation accruing prior to the effective date of termination. A finding of default and subsequent termination for cause may include, without limitation, any of the following: Contractor fails to obtain the insurance or bonding herein required by the Contract. • Contractor fails to comply with any of its duties under the Contract Documents, with any terms or conditions set forth in this Contract, beyond any specified period allowed to cure such default. 60 NW 14 Street Streetscape Project Bid No.: 09-10-010 • Contractor fails to commence the Work within the timeframes provided or contemplated herein, or fails to complete the Work in a timely manner as required by the Contract. If this Contract is terminated for default and the City has satisfied its obligations under the Contract Documents the• City is granted by the Contractor full use of the Work and any Work Product in connection with the City's completion and occupancy of the Project. Where it has been determined that the Contractor has been erroneously terminated under this Article, such termination shall be deemed to have been occurred under Article 90, Termination for Convenience. The City in its sole discretion may terminate the Contract without providing the Contractor a written Notice to Cure. 89. Remedies in the Event of Termination for Default If a Termination for Default occurs, the Contractor and the bond provider, if applicable) shall be notified of the effective date of the termination and shall be liable for all damages resulting from the default, including but not limited to re -procurement costs and other direct damages The Contractor shall stop Work as of the date of notification of the termination and immediately remove all labor, equipment and materials (not owned or paid for by the City) from the Work Site. The City assumes no liability for the Contractor's failure to remove such items from the Project(s) site(s) as required. The Contractor shall also remain liable for any liabilities and claims related . to the Contractor's default. As an altemative to termination, the City may bring suit or proceedings for specific performance or for an injunction 90. Termination for Convenience In addition to cancellation or termination as otherwise provided for in the Contract, the City may at any time, in its sole discretion, with or without cause, terminate the Contract by written notice to the Contractor. Such Written Notice shall state the date upon which Contractor shall cease all Work under the Contract and vacate the Project(s) site(s). The Contractor shall, upon receipt of such notice, unless otherwise directed by the City: Stop all Work on the Project(s) on the date specified in the notice ("the Effective Date"); • Take such action as may be necessary for the protection and preservation of the City's materials and property; • Cancel all cancelable orders for materials and equipment; • Assign to the City and deliver to the site, or any other location specified by the Project Manager, any non -cancelable orders for materials and equipment that can not otherwise be used except for Work under the Contract and have been specifically fabricated for the sole purpose of the Work and not incorporated in the Work; • Take no action that shall increase the amounts payable by the City under the Contract Documents; and • Take reasonable measures to mitigate the City's liability under the Contract Documents. • All charts, sketches, studies, drawings, reports and other documents, including electronic documents, related to Work authorized under the Contract, whether finished or not, must be turned over to the City. Failure to timely deliver the documentation shall be cause to withhold any payments due without recourse by Contractor until all documentation is delivered to the City. 61 NW 14 Street Streetscape Project Bid No.: 09-10-010 the event that the City exercises its right to terminate the Contract pursuant to the In the Contractor: Contract Documents, the City will pay whichever is less, of (1) the and onable portion of the Project(s) the actual cost or the fair completed insaccordanceewith the Contract through the • comp completion date, and (2) non -cancelable mancel(s) and of the equipmContract,n that hi snot of been any use to the City except in the pe incorporated in specifically fabricated for the sole purpose of the Contract but not incorp the Work; and To the extent practical, the fair and reasonable value shall be aunder d on he rice this • established a result maz mum cost set forth in the Coshall ntract ny payments Paragraph exceedbe offset by all payments made to the Contractor. The amount due hereunder may • All payments pursuant to this Article shall be accepted by the Contractor in full satisfaction of all claims against the City arising out of the termination including,cung deduct or set off against any sums due and payable r Further, the City may this Article any claims it may have against the Contractor. • consequential damages Contractor shall not be entitled to lost profits, overhead or as a result of a Termination for Convenience. • All payments made under the Contract arethe Contractordundertais Article the Upon the City's payment in full of the amounts dueWork Product to complete the Contractor grants the City full use of the k and any Project and subsequently occupy the Project 91. Resolution of Disputes Contractor understands and agrees that all disputes between it and the City based upon an Ile alleged violation of the terms of this Agreement by the City shall be submitted for resolution a g in the following manner. Manager in writing of the The initial step shall be for t aeContractor the City onotify amhe PPeeSO ctMeln identified in Article 4, claim or dispute and submitcopy Notices. the Contractor Should the Contractor and the Project Manager fail to resolve the dispute shall submit their dispute in writing, with all supporting documentation, to the Assistant Upon receipt of said notification the Director -Contracts, as identified in Article 4, Notices. Assist ant Director -Contracts shall review the issues relative to the claim or dispute and issue a written finding. Should the Contractor and the Assistant Director -Contracts fail to resolve the dispute the Contractor shall submit their dispute in writing within five (5) calendar days tothe Director. fining l tute cce nce of the finding Failure to submit such appeal of the writtenrficationalthe D r'ecto a shalpltaev review the issues by the Contractor. Upon receipt of said not relative to the claim or dispute and issue a written finding. 5 calendar days to the City further appeal in writing within five () acceptance City Contractor mustr submit any appeal of the written finding shall constitute Manager.findingof eFailure to submit such Appeal to the City Manager for his/her resolution, is required the oCContractor the Contrg entitled led 000 the City Manager's decision shall be prior to Contractor being entitled to seek judicial0 relief in connection therewith. Shouldthe amount of compensation hereunder exceed 1 , approv ed or disapproved by the City Commission. Contractor shall not be entitled to seek judicial relief unless: the (i) City it has first received City Manager's written decision, approved by Commission if applicable, or to City a (ii) a period of sixty (60) days has expired after submittll ing nnP ooi theh City Managernge, a detailed statement of the dispute, accompanied by 62 NW 14 Street Streetscape Project Bid No.: 09-10-010 a period of (90) days has expired where City Manager's decision is subject to City Commission for approval; or (iii) City has waived compliance with the procedure set forth in this Article by written instrument(s) signed by the City Manager. In the event the determination of a dispute under this Article is unacceptable to either party hereto, the party objecting to the determination must notify within the other party in writing fourteen (14) calendar days of receipt accompanied by a statement that any of the written dermination. The ice muststate Contract price the basis of the objection and must b or Contract time adjustment claimed is the result ofre ustment to which thedetermination. h Within csixtyparty (60) has reason to believe it is entitled to as calendar days after Final Completion of the Work, the parties shall participate in mediation t to prevent to address all objections to any determinations hereunder and toSh um any objection litigation. The mediator shall be mutually agreed upon by the parties.and not be resolved in mediation, the parties retain all their legal fg ally waives alremedies of ps rightds under State law. A party objecting to a determinationspec provided hereunder, including its rights and remedies this under State law, if said party fails to comply in strict accordance with the requirements ole. 92. Mediation Waiver of Jury Trial In an effort to engage in a cooperative effort to resolve conflict which may on of ise se during course of the construction of a Project(s), and/or following the comp agreede in the non -binding mediation arties to this Contract agree all unresolved disputes a be een them o shall be bmitted to P prior to the initiation litigation, mutual accepta writing by the parties. A certified Mediator, who the parties State f lFlorida. ThebparteIs conduct any Mediation Proceedings in Miami -Dade County,The will share the costs of a certified Mediator °all Sub-Co/50 rs retained for the Work, Contractor agrees to include such similar contract provisions with mechanism for dispute thereby providing for non -binding mediation as the primary resolution. In an effort to expedite the conclusion of any litigation the pa sing underies luntthis Contract.their right to jury trial or to file permissive counterclaims in any 93. Cit Ma Avail Itself of All Remedies herein specifically given to it now or The City may avail itself of each and every remedy existing at law or in equity, and each and every such remedy shall be in addition to every given or otherwise so existing and may be exercised from time other remedy so specifically be deemed expedient by the City. The to time and as often and in such order as may .shall not be deemed waiver of exercise or the beginning of the exercise, of one remedy The a a City's rights the right to exercise, at the same time or thereafter, of any other remedy. and remedies as set forth in the Contract Documents are not exclusive and are in addition equity. to any other rights and remedies in law or in 94. Permits Licenses and Impact Fees Pursuant to the Public Bid Disclosure Act, each license, permit or fee REQUIRED BY THE CITY AND PAYABLE TO THE CITY by virtue of this construction as part of the Contract is waived as follows: City's Master Permit Fee and applicable Major Trade Permit fees (i.e. Mech., Plumbing, Elec., & Fire) are waived. Any other permit fees not directly r lacerelate to the actual construction of the Project(s) (i.e. Permits for dumpsters, jobtrailers) are not waived"..."Licenses, permits and fees which may be required by Miami - Dade County, the State of Florida, or other governmental entities are not waivable." 63 NW 14 Street Streetscape Project Bid No.: 09-10-010 permits licenses Except as otherwise provided within the Contract Documents, ntecessary for the and tenses federal, state or local laws, rules and regulations tion required by Contractor pursuant to the Contract Documents shall be secured d andothe paid forrk undertaken by responsibility to have and maintain appropriate for ate by Contractor. It is validContrthe Work to be'performed and for Competency, on the Project(s) Certificate(s) in of Comp performede for all persons working jurisdiction which the WOretencyk is to bs equired. Contractor. whom a Certificate of Comp shall be paid by the City and/or Miami -Dade County fee levied Cbyontractor. the Impact fees levied by for the actual amount of the impact public entity shall reimbursed only includeumprofit ehbad byan invoice or other acceptabldocumentation issued by the public as evidenced of public entity. Reimbursement to Contractor in no event shall Contractor. 95. The Contractor shall comply with the most recent eddea of the Feqeral and requirements ofeaall a applicable laws, regulations, uilding and construction co tthe Couny, and the City. the State of Florida, requirements of the Florida Building the T Code and the City of Miami, governing and theattenCodesof the Contractor Dar is Cdiounty to the req anywhere Florida,, the City. and of Miami -Dade County business anywt► qualifications for Contractor and Sub -Contractor doing Inde endent Contractor Com liance with A Iicable Laws 96 agrees to perform Work as an The Contractor is engaged as c independent business and ag de business in a manner n accordance with the status of conddependent contractor, the independent contractor. 1 agrees that the Contractor will manner r Contractor covenants and ag to ee of the City, including, that status, that the Contractor willnot or,empe y an officer or employee f consistent with right or privilege applicable to anto ment insurance the City for any 9 ensation coverage; unemployment but not limited to: worker's comp social security coverage; retirement membership, or credit. the Contractor alone shall be of the City, compensation benefits any The Contractor's their shall thenot ie employees ioon the Cityandcosh account of the responsible for Work, direction thereof, and their compcompany, kinp liability or duty ityon firm, Con. Nothing in the Contract shall impose any the Contractor a a obligations of those of any person, or organization engaged byemployee, Contractor's acts, omissionso�ai�Ionities or obli9 contractors, specialist, trainee, subcontractor,ubcassociation, exile, corp independent unemployment expert, consultant, but not limited to: unemp Y nature, including, workplace legislation of any servant or agent 's for taxes of any against any agrees to indemnify and hold harmless the City worker's compensation and anti -discrimination, or wor insurance; the City. kind. The Contractor hereby a9 such liabilities, even if they arise from actions directed or taken by 97. Third r Contractor BeneficiariesNethis are no third party beneficiaries to hem nor City intends to directly or substantially benefit a third party of them Contract.ner Therparties agree that there against either o his Therefore, the P art shall be entitled to assert a claim a9 basedContru and that no thirdContract. The parties expressly acknowled this t is not intent to based anyn ghis orob igathird person or entity under create any rights or obligations in any 98. Successors and Assigns sold, delegated or the Contractor without the written consent ef the Contray. It t, is The performance of this Contract shall not be transferred pledged, shares assigned, in whole or in partby understood that a sale of the majority of the stock or partnership i assignment for the benefit of creditors shall each be deemed merger or bulk sale, an ass g 64 NW 14 Street Streetscape Project Bid No.: 09-10-010 transactions that would constitute an assignment or sale hereunder requiring prior City approval. Any transference without City approval shall be cause for the City to nullify this Contract. Any assignment without the City's consent shall be null and void. The Contractor shall have no recourse from such cancellation. The City mayy require bonding, other security, certified financial statements and tax returns from any proposed assignee and the execution of an assignment/ assumption agreement in a form satisfactory to the City Attorney as a condition precedent to considering approval of an assignment. The Contractor and the City each binds one another, their partners, successors, legal representatives and authorized assigns to the other party of this Contract and to the partners, successors, legal representatives and assigns of such party in respect to all covenants of this Agreement. 99. Materiality and Waiver of Breach City and Contractor agree that each requirement, duty, and obligation set forth in this Contract Documents is substantial and important to the formation of the Contract Documents and, therefore, is a material term hereof. City's failure to enforce any provision of the Contract Documents shall not be deemed a waiver of such provision or modification of the Contract Documents. A waiver of any breach of a provision of the Contract Documents shall not be deemed a waiver of any subsequent breach and shall not be construed to be a modification of the terms of the Contract Documents. 100. Severability In the event the any provision of the Contract Documents is determined by a Court of competent jurisdiction to be illegal or unenforceable, then such unenforceable or unlawful provision shall be excised from this Contract, and the remainder of the Contract Documents shall continue in full force and effect. Notwithstanding the foregoing, if the result of the deletion of such provision will materially and adversely affect the rights of either party, such party may elect, at its option, to terminate the Contract in its entirety. An election to terminate the Contract based upon this provision shall be made within seven (7) calendar days after the finding by the court becomes final. 101. Applicable Law and Venue of Litigation This Contract shall be enforceable in Miami -Dade County, Florida, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein exclusive venue for the enforcement of same shall lie in Miami -Dade County, Florida. 102. Amendments No modification, amendment, or alteration in the terms or conditions contained herein shall be effective unless contained in a written document prepared with the same or similar formality as this Contract and executed by the City Manager, Director or designee. 103. Entire Agreement The Contract Documents, as they may be amended from time to time, represent the entire and integrated Contract between the City and the Contractor and supersede all prior negotiations, representations or agreements, written or oral. This Contract may not be amended, changed, modified, or otherwise altered in any respect, at any time after the execution hereof, except by a written document executed with the same formality and equal dignity herewith. Waiver by either party of a breach of any provision of the Contract Documents shall not be deemed to be a waiver of any other breach of any provision of the Contract Documents. 65 NW 14 Street Streetscape Project Bid No.: 09-10-010 104. Nondiscrimination, Equal Employment Opportunity, and Americans with Disabilities Act Contractor shall not unlawfully discriminate against any person in its operations and activities or in its use or expenditure of funds in fulfilling its obligations under this Agreement. Contractor shall affirmatively comply with all applicable provisions of the Americans with Disabilities Act (ADA) in the course of providing any services funded by City, including Titles I and II of the ADA (regarding nondiscrimination on the basis of disability), and all applicable regulations, guidelines, and standards. In addition, Contractor shall take affirmative steps to ensure nondiscrimination in employment against disabled persons. Contractor's decisions regarding the delivery of services under the Contract Documents shall be made without regard to or consideration of race, age, religion, color, gender, sexual orientation, national origin, marital status, physical or mental disability, political affiliation, or any other factor which cannot be lawfully used as a basis for service delivery. 105. Evaluation Contractor acknowledges that upon completion of the of the Work under the Contract Documents and/or at any other time deemed appropriate by the City a performance evaluation report will be completed by the City. A copy of each performance evaluation shall also be forwarded to the Contractor. The performance evaluations will be kept in City files for evaluation on future solicitations. 106. Commodities manufactured, grown, or produced in the City of Miami, Miami - Dade County and the State of Florida Whenever two or more competitive sealed bids are received, one or more of which relates to commodities manufactured, grown, or produced within the City of Miami, Miami -Dade County and the State of Florida, and whenever all things stated in such received bids are equal with respect to price, quality, and service, the commodities manufactured, grown, or produced within the City of Miami, Miami -Dade County and the State of Florida shall be given preference. 107. Royalties and Patents All fees, royalties, and claims for any invention, or pretended inventions, or patent of any article, material, arrangement, appliance, or method that may be used upon or in any manner be connected with the construction of the Work or appurtenances, are hereby included in the prices stipulated in the Contract for said Work. 108. Continuation of the Work Any Work that commences prior to and will extend beyond the expiration date of the current contract period shall, unless terminated by mutual written agreement between the City and the involved contractor, continue until completion at the same prices, terms and conditions. 109. Review of Records City shall have the right to inspect and copy, at City's expense, the books and records and accounts of Contractor which relate in any way to the Project(s), and to any claim for additional compensation made by Contractor, and to conduct an audit of the financial and accounting records of Contractor which relate to a Project(s) and to any claim for additional compensation made by Contractor including but not limited to all payroll records, invoices for materials, and books of accounts. Such records shall conform to Generally Accepted Accounting Principles requirements (GAAP), and shall only address those transactions related to the Contract. Records subject to the provisions of Public Record Law, Florida Statutes Chapter 119, shall be kept in accordance with such statute. Otherwise Contractor shall retain and make 66 NW 14 Street Streetscape Project Bid No.: 09-10-010 available to City all such books and records and accounts, financial or otherwise, which relate to the Project(s) and to any claim for a period of five (5) years following Final Completion of the Project(s). The Contractor agrees to maintain an accounting system that provides for accounting records -that are supported with adequate documentation and adequate procedures for determining allowable costs. Contractors shall develop the proper forms and reports acceptable to the City for the administration and management of the Contract Documents. 110. No Interest Any monies not paid by City when claimed to be due to Contractor under the Contract Documents, including, but not limited to, any and all claims for damages of any type, shall not be subject to interest including, but not limited to prejudgment interest. However, the provisions of Section 218.74(4), Florida Statutes as such relates to the payment of interest, shall apply to valid and proper invoices. 111. Payments Related to Guaranteed Obligations The City may withhold from any payments to be made such sums as may reasonably be necessary to ensure completion of the Project(s) with respect to defective Work, equipment or materials which may be identified by the Project Manager. The City may deduct from any payment due the Contractor an amount equal to its cost incurred on account of the Contractor's failure to fully perform its obligations under the Contract. The Project Manager, prior to withholding or deducting any monies hereunder, shall give the Contractor notice of the defective Work, equipment or material and the basis for the withholding or deduction. Upon the Project Manager's determination that the Contractor has fulfilled its obligations, the City will pay the Contractor any monies owed, subject to Contractor's submission of, or compliance with, any remaining documentation or obligation, as the case may be, in accordance with the Contract Documents 112. Consent of City Required for Subletting or Assignment If the Contractor assigns, transfers, sublets or otherwise disposes of the Contract or its right, title or interest in or to the same or any part thereof without the previous consent in writing of the City, such action shall be an Event of Default. Nothing herein shall either restrict the right of the Contractor to assign monies due to, or to become due or be construed to hinder, prevent or affect any assignment by the Contractor for the benefit of its creditors, made pursuant to applicable law. 113. Agreement Limiting Time in Which to Bring Action Against the City In the event the Contractor may be deemed to have a cause of action against the City, no action shall lie or be maintained by the Contractor against the City upon any claim arising out of or based upon the Contract Documents by reason of any act or omission or requirement of the City or its agents, unless such action shall be commenced within six (6) months after the date of issuance of a final payment under the Contract, or if final payment has not been issued within six (6) months of substantial completion of the Work or upon any claim relating to monies required to be retained for any period after the issuance of the said certificate, unless such action is commenced within six (6) months after such monies become due and payable under the terms of the Contract Documents, or if the Contract is terminated or declared abandoned under the provisions of -the Contract unless such action is commenced within six (6) months after the date of such termination or declaration of abandonment by the City. 67 NW 14 Street Streetscape Project Bid No.: 09-10-010 114. Defense of Claims Should any claim be made or any legal action brought in any way relating hereto or to the Work hereunder, except as expressly provided herein, the Contractor shall diligently render to the City, after additional compensation is mutually agreed upon, any and all assistance which the City may require of -the Contractor. 115. Contingency Clause Funding for this Contract is contingent on the availability of funds and continued authorization for program activities and the Contract is subject to amendment or termination due to lack of funds, reduction of funds and/or change in regulations, upon thirty (30) days notice. 116. Mutual Obligations This document, change order, field directive, and written clarifications issued under the Contract, and the Contractor's submittals, shall constitute the Contract Documents between the parties with respect- hereto and supersedes all previous communications and representations or agreements, whether written or oral, with respect to the subject matter hereto unless acknowledged in writing by their duly authorized representatives. Nothing in the Contract shall be construed for the benefit, intended or otherwise, of any third party that is not a parent or subsidiary of a party or otherwise related (by virtue of ownership control or statutory control) to a party. In those situations where the Contract Documents imposes an indemnity obligation on the Contractor, the City, may at its expense, elect to participate in the defense of the claim if the City should so choose. Furthermore, the City may, at its own expense, defend or settle any such claim if the Contractor fails to diligently defend such claim, and thereafter seek indemnity for such cost from the Contractor. 117. Contract Extension The City reserves the right to exercise its option to extend the Contract for up to ninety (90) calendar days beyond the original Contract period. In such event, the City will notify the Contractors in writing of such extensions. 118. Non -Exclusivity It is the intent of the City to enter into a Contract with all successful Bidders that will satisfy its needs as described herein. However, the City reserves the right, as deemed in its best interest, to perform, or cause to be performed, the Work and services, or any portion thereof, herein described in any manner it sees fit, including but not limited to: award of other contracts, use of any contractor, or perform the Work with its own employees. 119. Nature of the Agreement The Contractor shall provide the services set forth in the Contract Documents. The Contractor shall provide full and prompt cooperation with the City in all aspects of the Work to be performed. The Contractor acknowledges that the Contract Documents require the performance of all things necessary for or incidental to the effective management and performance of a Project(s). All things not expressly mentioned in the Contract Documents, but necessary to carrying out its intent are required by the Contract Documents, and the Contractor shall perform the same as though they were specifically mentioned, described and delineated. The Contractor shall furnish all labor, materials, tools, supplies and other itemsrequired for the completion of the Contract. All Work shall be accomplished at the direction of and to the satisfaction of the Project Manager. 68 NW 14 Street Streetscape Project Bid No.: 09-10-010 120. Contract Documents Contains all Terms The Contract Documents and all documents incorporated herein by reference contain all the terms and conditions agreed upon by the parties hereto, and no other agreement, oral or otherwise, regarding the subject matter of the Contract Documents shall be deemed to exist or to bind any of the parties hereto, or to vary any of the terms contained herein. 121. Applicable Law and Venue of Litigation This Contract shall be enforceable in Miami -Dade County, Florida, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein exclusive venue for the enforcement of same shall lie in Miami -Dade County, Florida. 122. Survival The parties acknowledge that any of the obligations in the Contract Documents will survive the term, termination and cancellation hereof. Accordingly, the respective obligations of the Contractor and the City under the- Contract, which by nature would continue beyond the termination, cancellation or expiration thereof, shall survive termination, cancellation or expiration thereof. 69 NW 14 Street Streetscape Project Bid No.: 09-10-010 Section 3 - Supplemental Terms and Conditions 1. Contract Time & Hours The Contractor shall fumish al labor, materials, equipment, tools, services, and incidentals to complete all Work at a rate of progress that will ensure completion of the Work within the Contract Time. Contractor shall have 270 calendar days to achieve Substantial Completion from the date of the Notice to Proceed is issued. Contractor shall have an additional 60 calendar days for Final Completion of the Contract. Work shall be performed in accordance with Code of the City of Miami. Any Work to be performed outside of these times must be requested in writing to the Project Manager 48 hours prior to the requested change. The Project Manager will notify the Contractor in writing of any changes in approved Work hours. 2. LEED Certification (Not Applicable) 3. Progress Payments Contractor may make application for payment for Work completed during the Project(s) at intervals of not more than once a month or upon completion and Final Acceptance of the Work. All applications shall be submitted in triplicate and the Contractor shall only use the City's most current Contractor Payment Requisition Form. This form is available on the CIP webpage. Where the time frame for completion of the Work is less than or equal to one month or a Schedule of Values is not required, the Contractor shall submit the appropriate documentation as defined below. Supporting evidence to be included with any application for payment shall include, but is not limited to, an updated progress schedule as required by Article 5 of the Supplemental Terms and Conditions and a partial or final release of liens or consent of Surety relative to the Work, which is the subject of the application for payment and any other information required by the Project Manager or Consultant. Each application for payment shall be submitted in triplicate for approval. City shall make payment to Contractor within thirty (30) days after approval of Contractor's application for payment. Ten percent (10%) of all monies earned by Contractor shall be retained by City until Final Acceptance by the City. Any interest earned on retainage shall accrue to the benefit of City. All requests for retainage reduction shall be in writing in a separate stand alone document. City may withhold, in whole or in part, payment to such extent as may be necessary to protect itself from loss on account of: Defective Work not remedied. Claims filed or reasonable evidence indicating probable filing of claims by other parties against Contractor or City because of Contractor's performance. Failure of Contractor to make payments properly to Subcontractors or for material or labor. ■ Damage to another contractor not remedied. • Liquidated damages and costs incurred by City and/or Consultant for extended construction administration. ■ Failure of Contractor to provide any and all documents required by the Contract Documents. In instances where multiple Project are awarded the Contractor shall submit separate Applications for Payment for each Project. When the above grounds are removed or resolved satisfactory to the Project Manager, payment shall be made in whole or in part. 70 NW 14 Street Streetscape Project Bid No.: 09-10-010 The City will pay, and the Contractor shall accept as full compensation for the Work, the sums specified in the Contractor's submittal to the Contract Documents, as accepted by the City. Contractor may be paid for materials or equipment purchased and stored at the Project(s) Site(s) or another. location. Where a. payment request is made for materials or equipment not incorporated in the Project(s), but delivered and suitably stored at the site or at some other location agreed upon in writing, the written documentation must be submitted at the. time of request for payment. Payment shall be conditioned upon submission by the Contractor of paid invoices and an executed Material Purchased/Stored On -Premises form to establish the City's title to such materials or equipment, or otherwise protect the City's interest, including applicable insurance in the name of City and transportation to the site. Contractor retains sole liability to replace such stored materials or equipment as a result of damage or Toss for any reason. 4. Liquidated Damages The Contractor is obligated and guarantees to complete the Project in the time set forth in the Contract Documents or any approved extension of time. Where the Contractor fails to do so, the Contractor shall pay to the City liquidated damages as follows. In the event of a delay in completion beyond the timeframe set forth in the Contract Documents for Substantial Completion, the Contractor shall pay to the City for each and every calendar day of unexcused delay, the sum of one thousand dollars ($1,000.00) per calendar day, which is hereby agreed upon not as a penalty but as liquidated damages. In the event of a delay in completion beyond the timeframe set forth in the Contract Documents for Final Completion, the Contractor shall pay to the City for each and every calendar day of unexcused delay, the sum of five hundred fifty dollars ($500.00) per calendar day, which is hereby agreed upon not as a penalty but as liquidated damages. The Contractor will be notified of any approved exceptions or extensions. The total amount of liquidated damages shall not exceed the value of the applicable Contract Documents. The City shall have the right to deduct liquidated damages assessments from any payment due or which may thereafter become due to the Contractor under any contract the Contractor has with the City. In case the amount, which may become due hereunder, shall be less than the amount of liquidated damages due the City, the Contractor shall pay the difference upon demand by the City. .Should the Contractor fail to compensate the City for any liquidated damages, the City shall consider this as a form of indebtedness and may deny any future Work under the Contract or any other City contract until such indebtedness is paid in full to the City. The City shall notify the Contractor that it is incurring liquidated damages. 5. Schedule of Values The Contractor must submit three copies of a Schedule of Values, which must be submitted within ten (10) calendar days of the issuance of the Notice of Award. The Schedule of Values shall indicate a complete breakdown of labor and material of all categories of Work on the Project. Contractor's overhead and profit should be as separate line items. Each line item shall be identified with the number and title of the major specification section or major components of the items. The Project Manager or Consultant may require further breakdown after review of the Contractor's submittal The City reserves the right to require such information from the Contractor as may be necessary to determine the accuracy of the Schedule of Values. The combined total value for mobilization under the Schedules of Values shall not exceed 5% of the value of the Contract. The approved schedule of values shall be updated through the submittal of the City's Contractor Payment Application Form. 71 NW 14 Street Streetscape Project Bid No.: 09-10-010 6. Project Schedules Contractor shall submit a proposed Project schedule ("Schedule") as follows: a. Schedule identifying all tasks within the critical path. The proposed Project schedule shall be submitted within ten (10) calendar days of the Notice of Award and such submittal shall be subject to the Project Manager and Consultant's review. Subsequent to such review of said Schedule the Contractor shall establish said schedule as the baseline Schedule. b. The Schedule shall be prepared in the form of a horizontal bar chart with separate horizontal bars for each design task, construction task in the critical path in chronological order. Provide horizontal time scale in weeks from the start of construction and identify the first work day of each month. Identify listings of any major equipment installation milestones. c. All updates of Schedules shall be tracked against the baseline schedule and shall be at a minimum submitted with each pay application. An updated Schedule against the baseline shall also be submitted upon execution of each change order that impacts the Contract Time for completion. Failure to submit such Schedules shall result in the rejection of any submitted payment application. d. All Schedules shall be prepared in Microsoft Project 2003 or earlier unless otherwise approved by the Project Manager. At the time of submission of Schedules, Contractor shall submit a hard copy as well as an electronic version. Such electronic version shall not be submitted in a .pdf format and shall be capable of being incorporated into the City's master Project schedule. e. Subsequent to review of the initial Schedule submission the Contractor shall establish the reviewed Schedule as the "Baseline Schedule". Contractor shall then prepare and submit all updates to the Schedules utilizing the tracking mode within Microsoft Project. At a minimum the contents of the Baseline Schedule shall show or indicate the following: a. b. c. Complete sequence of design by activity reflecting the responsible for the activity. Complete sequence of construction by activity reflecting the Subcontractor(s) responsible for each activity Dates for the beginning and completion of each major element construction in no more than a two -week incremental scale. d. Items of work that must be accomplished to achieve substantial com 1). Major disciplines or trades of work 2). Filter downtime 3). Time required for Contractor's submittals, fabrication and deliv 4). Time required by the City to review all submittals. 5). Time required by City to support any pre -operational and start 6). Time required for the relocation of utilities, if required. 5. Percentage of completion for each item as of the date the prepared. 6. Dates for Contractor's submittals. 7. Dates for any required City -furnished materials or equipment. 8. Dates accepted submittals will be required from the City. In addition the Contractor shall provide: Subconsultant Contractor or of design and pletion. eries. -up testing. schedule was 72 NW 14 Street Streetscape Project Bid No.: 09-10-010 a. Provide a list of all long lead items and their anticipated dates of delivery (equipment, materials, etc.) Monthly updates shall reflect actual versus projected, and any revised projections b. Provide a projected dollar cash flow spend down for each month of construction. Monthly updates shall reflect any change orders as well as actual versus projected, and any revised projections. 7. Release of Liens/Subcontractor's Statement of Satisfaction The Contractor warrants and guarantees that title to all Work, materials and equipment covered by an application for payment, whether incorporated in the Project(s) or not, will pass to the City upon the receipt of such payment by the Contractor, free and clear of all liens, claims, security interests or encumbrances and that no Work, materials or equipment will have been acquired by the Contractor or by any other person performing Work at the site or furnishing materials and equipment for the Project(s), subject to an agreement under which an interest therein or an encumbrance thereon is retained by the seller or otherwise imposed by the Contractor or such other person. The Contractor shall, beginning with the second request for payment, attach a Partial Release of Lien/Subcontractor's Statement of Satisfaction for each application for payment. Failure to submit such documentation may delay payments. The City may, in its sole discretion withhold payments for Work performed by Subcontractor where no release of lien has been submitted. The Contractor shall submit with the final payment request, for any Project(s) where subcontractors have performed Work, a Final Release of Lien/Subcontractor's Statement of Satisfaction for each Subcontractor marked as a final. Failure to submit such documentation will result in delay in payment or the City withholding from the final payment such funds as necessary to satisfy any Subcontractor claims. Where the Contractor has submitted a Performance/Payment Bond the Contractor may, in lieu of the Release of Lien/Subcontractor's Statement of Satisfaction, submit a Consent of Surety to Requisition Payment. 8. Progress Meetings The City shall conduct a pre -construction conference prior to the commencement of the Work. Contractor shall hold progress and coordination meetings as required by the Project Manager or Engineer, to provide for the timely completion of the Work. Contractor shall arrange and conduct regular bi-weekly job site Project status meetings with the Project Manager and/or Consultant. Contractor shall use the job site meetings as a tool for the pre -planning of Work and enforcing schedules, and for establishing procedures, responsibilities, and identification of authority for all parties to clearly understand. During these meetings, Contractor shall identify the party or parties responsible for following up on any problems, delay items or questions, and Contractor shall note the action to be taken by such party or parties. Contractor shall revisit each pending item at each subsequent meeting until resolution is achieved. Contractor shall attempt to obtain from all present any potential problems or delaying event known to them for appropriate attention and resolution. Contractor shall be responsible for keeping minutes of the meeting and distribution of the minutes to all parties in attendance. The Contractor shall arrange for the participation of its subcontractors and/or vendors when the Project Manager requires their presence. The Contractor shall maintain minutes of the meeting and distribute copies of the minutes to all parties in attendance. The Contractor shall prepare and distribute to Project Manager and the Consultant an updated two -week look -ahead schedule of construction activities and submittals. 9. Request for Information 73 NW 14 Street Streetscape Project Bid No.: 09-10-010 The Contractor shall submit a Request for Information (RFI) where the Contractor believes that the Contract Document's specifications or drawings are unclear or conflict. All requests must be submitted in a manner that clearly identifies the drawing and/or specification section where clarification or interpretation is being requested. As part of the RFI, Contractor shall include its recommendation for resolution. The Architect and City shall • respond in writing. 10. Project Site Facilities The Contractor shall arrange for all Project(s) site facilities as maybe necessary to enable the Project Manager or Consultant to perform their respective duties and to accommodate any representatives of the City which the City may choose to have present at the Project(s). Contractor's, Subcontractor's, supplier's, materialmen's personnel shall not use the City restrooms that may be available at the Project(s) site without the prior consent of the manager of the facility or the Project Manager where there is no manager of a facility. The Contractor shall provide and maintain at his own expense, in a sanitary condition, such accommodations .for the use of . his employees as. is necessary to comply with the requirements including Chapter 46 of the Building Code and regulations of the State of Florida Department of Health and Rehabilitative Services or Dade County Health Department. The Contractor, his employees or his Sub -Contractors shall commit no public nuisance or use any facilities that have not been specifically provided for use by the Contractor. The Contractor shall fumish an adequate supply of drinking water for its and its Sub - Contractors' employees. There shall be adequate provisions made by the Contractor to ensure all disposable materials are properly disposed of and do not create a nuisance to the City or the public. The location of the temporary facilities shall be subject to the approval of the Project Manager or Consultant. 11. Temporary Facilities, Utilities, and Construction Contractor is required to provide any necessary temporary utilities to the site, such as electric, water, and sanitary services to the site for new construction or additions to a facility, or those that are necessary for the performance of the Work. Contractor shall make all arrangements with the local utility companies. The Contractor shall also be responsible for furnishing all materials and equipment necessary for the installation and maintenance of any temporary utilities. The Project Manager may authorize the use of existing utilities. Such decision will be made at the sole discretion of the Project Manager and the City. Contractor shall furnish, install and maintain temporary facilities required for construction, and shall remove them upon completion of the Work. All facilities shall comply with the respective federal, state and local codes and regulations and with utility company requirements. Materials for temporary facilities may be new or used, but must be adequate in capacity for the required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards. The Contractor shall be required to obtain all necessary permits required for any Project(s) site facilities and utilities. Contractor shall also be responsible to maintain such facilities in a safe and working condition. Contractor shall be responsible for payment for all fees and charges for the installation and use of all temporary facilities and utilities. All such facilities and utilities remain the property of the Contractor and the Contractor shall be responsible for removal and disposal of such facilities prior to Final Acceptance. Temporary fences: If, during the course of the Work, it is necessary to remove or disturb any fencing, the Contractor shall, at his own expense, provide a suitable temporary fence which shall be maintained until the permanent fence is replaced. The Project Manager will 74 NW 14 Street Streetscape Project Bid No.: 09-10-010 be solely responsible for the determination of the necessity for providing a temporary fence and the type of temporary fence to be used. Responsibility for Temporary Structures: In accepting this Contract, the Contractor assumes full responsibility for the sufficiency and safety of all temporary structures or work and for any damage which may result from their failure or theirimproper construction, maintenance or operation and will indemnify and save harmless the City from all claims, suits or actions and damages or costs of every description arising by reason of failure to comply with the above provisions. 12. Security The site where the Work is to be performed may not be a secure site and the public may have access to the site. The Contractor shall have sole responsibility for the security of all Work materials, tools, equipment and Work at the Project(s) site. The City shall not be liable for any damage or loss to such materials, tools, equipment and Work and the Contractor shall be responsible for the repair or replacement of all Work such materials, tools, and equipment. 13. Construction Signage Contractor will typically be expected to furnish and install a minimum of two signs in addition to construction related signs such as warning signs. The City shall provide the Contractor the wording and layout for the signs at the pre - construction conference. The Contractor shall furnish the two City signs at the Project(s) Site(s) as follows: ■ The first sign must be manufactured by Image 2000, 45 East 9t Court, Hialeah, Florida (305) 884-2240 or approved equal. The sign shall be 4 feet wide and 8 feet high and constructed of pressure sensitive 2 mil cast vinyl overmounted with 3 mil mylar and mounted to 1 MDO with painted back. The sign shall be mounted on 4 inch square wood or perforated "U" channel metal posts painted white, and be readable at eye level. The colors to be used on the sign are as follows: the background shall be white with blue lettering; the seal shall be white and gold with blue lettering form. • The second sign shall reflect other funding sources for the Project and shall reflect the Project information. The sign shall be 4 feet wide by 8 feet high by 3/4 inch (thick) exterior plywood, suitably mounted and readable at eye level. The colors shall be blue and white. The background shall be white and all lettering shall be blue Helvetica. All paint shall be rated outdoor enamel. The City will provide the City Seal in decal form. • The Contractor shall also post appropriate construction site warning signs at the Work Site. Such signs shall be posted to warn pedestrian and vehicle traffic. Signage shall also be placed waterside to alert boater to the construction- zone, requiring idle speed and a minimum clearance distance. Contractor shall provide drawings for the signage, which shall be subject to approval by the Consultant. • The Project Manager and the City shall approve the locations for all signage. 14. Construction Photographs Prior to commencement of the Work the Contractor will take digital photographs to document existing conditions and submit copies as required herein prior to the commencement of Work. Contractor shall submit with each application for payment photographs that accurately reflect the progress of all aspects the Work. The number of photographs to be taken will be based on the magnitude of Work being performed. Contractor shall submit one copy of each photograph in print and digitally. The photographs shall be printed on 8"X10" high resolution glossy commercial grade and weight color photographic print paper. Each photograph shall be imprinted on its face with the title 75 NW 14 Street Streetscape Project Bid No.: 09-10-010 of the Project, the date, and time the picture was taken. Digital photographs shall be taken using .jpeg format and will be submitted on a CD-ROM clearly identifying the name of the Project, the name of the Contractor, and the timeframe in which the pictures were taken. Initial set up prints, unless otherwise allowed by the Project Manager will ,be submitted in a three ring binder with each picture protected by a clear plastic sleeve. Subsequent prints are to be submitted in clear plastic sleeves that can be added to the binder. The three ring binder shall be of such size to be able to hold all print pictures. 15. City Furnished Property Where noted by the Contract Documents or as directed by the Project Manager the Contractor may be required to preserve all signage, street signs, parking meters, benches, traffic control signs, etc, and shall reinstall or provide them to the City as directed. 76 NW 14 Street Streetscape Project Bid No.: 09-10-010 (Page 1of 8) Section 4 - BID FORM Submitted: City of Miami, Florida Office of the City Clerk City Hall, 1st Floor 3500 Pan American Drive Miami, Florida 33133-5504 Date The undersigned, as Bidder, hereby declares that the only persons interested in this Bid as principal are named herein and that no person other than herein mentioned has any interest in this bid or in the Contract to be entered into; that this Bid is made without connection with any other person, firm, or parties making a Bid; and that it is, in all respects, made fairly and in good faith without collusion or fraud. The Bidder further declares that it has examined the site of the Work and informed itself fully of all conditions pertaining to the place where the Work is to be done; that it has examined the Contract Documents and all addenda thereto fumished before the opening of the bids, as acknowledged below; and that it has satisfied itself about the Work to be performed; and that it has submitted the required Bid Guaranty; and all other required information with the Bid; and that this Bid is submitted voluntarily and willingly. The Bidder agrees, if this Bid is accepted, to contract with the City, a political subdivision of the State of Florida, pursuant to the terms and conditions of the Contract Documents and to furnish all necessary materials, equipment, - machinery, tools, apparatus, means of transportation, and all labor necessary to construct and complete within the time limits specified the Work covered by the Contract Documents for the Project(s) entitled: Bid No: 09-10-010 Title: NW 14th Street Multimedia Entertainment District Streetscape Project B- 30394 The Bidder also agrees to fumish the required Performance Bond and Payment Bond or alternative form of security, if permitted by the City, each for not less than the total Bid price plus altemates, if any, and to furnish the required Certificate(s) of Insurance. The undersigned further agrees that the Bid guaranty accompanying the Bid shall be forfeited if Bidder fails to execute said Contract, or fails to furnish the required Performance Bond and Payment Bond or fails to furnish the required Certificate(s) of Insurance within fifteen (15) calendar days after being notified of the award of the Contract_ In the event of arithmetical errors, the Bidder agrees that these errors are errors which may be corrected by the City. In the event of a discrepancy between the price Bid in figures and the price Bid in words, the price in words shall govern. Bidder agrees that any unit price listed in the Bid is to be multiplied by the stated quantity requirements in order to arrive at the total. 77 NW 14 Street Streetscape Project Bid No.: 09-10-010 BID FORM: (Page 2 of 8) Note: Bidders are bidding on a Total Bid Price basis for the purpose of determining the lowest responsive and responsible Bidder. The Total Bid Price is the sum of the line item breakdown. Bidders must download the MS Excel version of the bid Form. City Form SU must also be submitted with your bid to be considered responsive. Both forms are available for download at: http://www.miam iqov.com/Capitallm provements/pages/ProcurementOpportunities/De fault.asp. Failure to submit the Spreadsheet and SU Form may result in the Bid being determined to be non -responsive. Our TOTAL BID PRICE includes the total cost for the Work specified in this solicitation, consisting of fumishing all materials, labor, equipment, supervision, mobilization, overhead & profit required, in accordance with the Bid Specifications. Total Bid Price: Written Amount 78 NW 14 Street Streetscape Project Bid No.: 09-10-010 Project No. B-30394 NW 14 Street Mulitmedia Entertainment District Streetscape Improvements N. 14th Street from FEC Railroad to NE 2nd Ave (ReconstructIon) BID FORM Addendum No. 4 N. Miami Ave from 1-395 to N. 15th Street (Mliling and Resurfacing) Item PAY ITEM : DESCFi1PTION � -° UNITS i ' AVERAGE UNIT 00ST O UANTITTY :.TOTAL AMOUNT_ ROADWAY AND HARDCAPE PAY ITEMS 1 • 102-14 TRAFFIC CONTROL OFFICER MH $30.80 2,160 $66,096.00 ' 2 `: 102-71-14 BARRIER WALL (TEMPORARY) (TYPE K) (F&I) (CONCRETE) LF $23.99 3,400 $81,572.80 3 s 102-71-24 BARRIER WALL (TEMPORARY) (F&I) (TYPE K) (RELOCATE) (CONCRETE) LF $2.04 4,700 $9,588.00 4 102-89-7 ' IMPACT ATTENUATOR (RE -DIRECTIVE OPTION) (TEMPORARY) LO $1,020.00 36 $38,720.00 $' 110-1-1 CLEARING AND GRUBBING (LS/AC) $30,626.77 2.590 $79,323.33 6 110-4 CONCRETE PAVEMENT REMOVAL SY $0.31 8,048 $2,529.49 6 . 120-1 EXCAVATION REGULAR CY $2.87 6,803 $18,150.40 7 120-6 EMBANKMENT CY $16.48 21 $346.00 8 " 160-4 STABILIZATION SY $5.51 13,674 $75,279.47 9, , 285-706 OPTIONAL BASE (BASE GROUP 06) (8" LIMEROCK AS PER CITY OF MIAMI) SY $7.18 12,242 $87,838.35 10` , 327-70-8 MILLING EXISTING ASPHALT (2-1/2" AVG. DEPTH) SY $2.98 3,929 $11,718.28 11 . 331-2 TYPE S ASPHALTIC CONCRETE (1") (AS PER CITY OF MIAMI) TN $98,23 849.0 $83,393.87 12; 334-1-13 SUPERPAVE ASPHALTIC CONCRETE (TRAFFIC "C") TN $103.68 1,400.8 $145,239.15 425-1-901 INLET (TYPE F3) (COMPLETE) (<10') EA $1,307.20 30 $39,216.06 14 425-1-902 INLET. (TYPE F3) (COMPLETE) (>10') EA $2,575.92 1 $2,575.92 15't ;: 425-1-907 INLET (TYPE F3) (COMPLETE) (TYPE D BOTTOM) (<10') EA $3,151.90 3 $9,455.70 16 425-2-101 MANHOLE (TYPE A) (< 10') EA $1,576.13 18 $28,370.38 17 .. ;- 425-2-101-D5 MANHOLE (TYPE D-5) (< 10') EA $2,574.56 1 $2,574.56 18,; 425-2-102 MANHOLE (TYPE A) (> 10') EA $2,231.42 3 $6,694.27 1:9: . 425-2-103 MANHOLE (PARTIAL) (< 10') EA $1,085.31 2 $2,170.61 2Q:, ` 425-5-1 MANHOLE (ADJUST) EA $427.64 22 $9,408.06 21 425-6 VALVE BOX (ADJUST) EA $94.95 37 $3,513.19 21-,' 430-171-101 PIPE CULV (OPT MATL)(ROUND)(UP TO 24") LF $41.14 1,487 $60,350.91 1,:: ::;:; , 'i 430-171-201 PIPE CULV (OPT MATL)(ELLIPTICAL)(UP TO 24") LF $77.04 43 $3,312.51 23' 430-94-1 DESILTING PIPE (UP TO 24") LF $5.10 383 $1,953.30 24: 443-70-4 FRENCH DRAIN (24') LF $121.68 540 $65,696.94 520-1-10 CURB AND GUTTER CONC. (TYPE F) LF $12.54 6,808 $85,372.32 a26i:';' 522-1 SIDEWALK CONC. (4" THICK) SY $34.81 4,770 $166,053.24 27 522-2 SIDEWALK CONC. (8" THICK) (DRIVEWAYS) SY $32.64 675 $22,032.00 28 526-1-2 ARCHITECTURAL PAVERS SY $54.57 818 $44,638.26 29' ' -''. 635-1-11 PULL BOX RELACEMENT (CONTINGENCY) EA $153.00 51 $7,803.00 TOTAL ROADWAY ITEMS= , % _.';$1,258;982 36 < } PAGE PAY ITEM DI SCRIPTION UNITS QUANTITY �, TOTALAMOUNT SIGNING AND PAVEMENT MARKING PAY ITEMS 30 :; 700-20-11 SIGN SINGLE POST (LESS THAN 12 SF) AS $198.90 70 $13,923.00 31' 700-20-13 SIGN SINGLE POST (20 + BACK-TO-BACK) AS $841.50 1 $841.50 32 . 700-20-41 SIGN EXISTING RELOCATE (SINGLE POST) AS $127.50 2 $255.00 33 700-20-61 SIGN EXISTING REMOVE(SINGLE POST) AS $1.02 58 $59.16 34 .. 706-3 RETRO-REFLECTIVE PAVEMENT MARKERS EA $4.08 353 $1,440.24 357,,,„_: `:' 710-11-111 TRAFFIC STRIPE SOLID (WHITE) (6") NM $1,632.00 1.170 $1,909.44 36 ; 710-11-122 TRAFFIC STRIPE SOLID (WHITE) (8") LF $0.26 3,632 $926.16 37 710-11-123 TRAFFIC STRIPE SOLID (WHITE) (12") - LF $1.28 3,600 $4,590.00 :'ice 38... -;' 710-11-124 TRAFFIC STRIPE SOLID (WHITE) (181 LF $0.46 2,136 $980.42 39 :; 710-11-125 TRAFFIC STRIPE SOLID (WHITE) (24") LF $2.55 838 $2,136.90 40 710-11-131 TRAFFIC STRIPE SKIP (WHITE) (6") (10'-30') GM $408.00 0.234 $95.47 > 41 2 710-11-151 TRAFFIC STRIPE SOLID (WHITE) (2'-4' DOTTED) LF $0.31 298 $90.58 42 . 710-11-160 PAVEMENT MESSAGE (PAINTED) EA $15.30 86 $1,315.80 43 . . 710-11-170 DIRECTIONAL ARROWS (PAINTED) EA $30.60 34 $1,040.40 :;44;;';;, 710-11-211 TRAFFIC STRIPE SOLID (YELLOW) (6") NM $2,652.00 1.448 $3,840.10 Note: 710-* items Includes 3 applications (one for MOT and two for final surface). TOTAL SIGNING AND PAVEMENT MARKINGS ITEMS=;�a i$334441;7i PAGE:.'i....'.•!..!,,..:0:..'!;"Ni.i40,,N:g...:. .:.:-::,. ::,:!.i*i.#01.:: : ,:';',1,:;.':f.:,:i:.' ' '.c.01)5TiOf`i!.:: ' '' '' :L .t. ,,._ .!.],i'fil.p::V'..:..'l.: , ','...;i':1,-i'•% "i'Aii.61,-.,:,.:'. ,..•,::.,,,,,,,..d.z.., ''!1.:.::[•,.!4;.:K: -1:P . :,.Y,',F,fVk,-,.?Y!1117,.'. .:;:;...::cupTi...!,..,. ."0,..;;....::':.::::•:;•. QUANTITY ,:..,..-, ,:,,I.!::.:-.,,,...,•i'il.,.:,:-.? ,!:: y.. . ::];:,',:!..i,::,,,i,:,,. ti-iiiACArviebi4:f ••., •::....-. : . ,•• .: . - . .-,,,.: ::.i:::.;:.,:::;:....:,:..:.:, .:I415;.." :' WATERMAIN PAY ITEMS 125-1 EXCAVATION FOR STRUCTURES CY $5.67 50 $283.30 4 ...,,.:i•:i 327-70-1 MILLING EXISTING ASPHALT (1" AVG. DEPTH) SY $1.89 3,200 $8,038.40 4:7:. .„ '.,,j,Z; 3 331-2 TYPE S ASPHALTIC CONCRETE (1") (AS PER CITY OF MIAMI) TN $113.88 250.0 $28,470.76 .i.::...kfi'.46.' 400-2-15 CLASS II CONCRETE (MISCELLANEOUS CONTINGENCY) ' CY $117.30 10 $1,173.00 47:.',4',:, 1050-11-422A UTILITY PIPE (F&I) (D.I.) (250 PSI) (WATER) (2") . LF 529.28 37 $1,082.62 481;NI-:.i4'ill1;; 1050 -11-422B UTILITY PIPE (F&I) (D.I.) (250 PSI) (WATER) (4") LF $55.97 17 $951.49 ,'.:.;5!...4 :'M'f: 1050-11-423 UTILITY PIPE (F&I) (DI) (250 PSI) (WATER) (6") LF $49.49 199 $9,848.51 ‘.,:?i.:•:;';;::A.9-,..::;:,:. 1050-11-424A UTILITY PIPE (F&I) (DI) (250 PSI) (WATER) (8") LF $62.62 30 $1,878.60 f:i,50:',;:,:.;',!. 1050-11-424B UTILITY PIPE (F&I) (DI) (250 PSI) (WATER) (12") LF $90.36 1,656 $149,636.16 5 ,.,•:::i:::: 1050-11-922 UTILITY PIPE (F&I) (SERVICE COOPER OR HOPE) (WATER) (2") LF $13.86 107 $1,483.02 52:,,,j,-.•4 1055-11-414 UTILITY FITTINGS (F&I) (D.I.) (ELBOW) (SIZE 8"-19.9") EA $268.09 49 $13,136.41 ..',•::!:1:'i,':53.::,',.::!':::::;;',, 1055-11-424 UTILITY FITTINGS (F&I) (DI) (TEE) (SIZE 8-19.9") EA $412.68 15 $6,190.20 04V-ia: ' 1055-11-434 UTILITY FITTINGS (F&I) (D.I.) (REDUCER) (SIZE 8"-19.9") EA $228.94 1 $228.94 I55 ........ '...:40'.W.;!-::V;i-i:: 1055-11-444 UTILITY FITTINGS (F&I) (D.I.) (SOLID SLEEVE) (SIZE 8"-19.9") EA $122.51 • 2 $245.02 1055-11-454 UTILITY FITTINGS (F&I) (D.I.)1CAP/PLUG) (SIZE 8"-19.9") EA $77.52 23 $1,782.96 A.1:.':::'..•.57 4,:liq ' 1080-11-201 UTILITY FIXTURES (F&I) (METER BOX) (SIZE 2" - 4.9") EA $1,545.83 6 $9,274.99 ..ii- MB''. 1080-11-203 UTILITY FIXTURES (F&I) (TAPPING SLEEVE & TAPPING VALVE) (SIZE 2" • 4.9" EA $2,858.89 10 $28,588.94 58'.:::i-j.i':i 1080-11-204A UTILITY FIXTURES (F&I) (VALVE ASSEMBLY) (SIZE 2" - 4.9") 'EA $624.48 1 $624.48 59.,.:i'-.:;:-:. 1080-11-204B UTILITY FIXTURES (F&I) (FLUSHING VALVE OUTLET) (SIZE 2" - 4.9") EA $479.30 8 $3,834.40 60 1080-11-208 UTILITY FIXTURES (F&I) (AIR RELEASE) (SIZE 2" • 4.9") EA $456.45 9 $4,108.04 61''.,';''.,:g:- 1080-11-303 UTILITY FIXTURES (F&I) (TAPPING SLEEVE & TAPPING VALVE) (SIZE 5" - 7.9" EA $2,106.82 3 $6,320.46 62'::-'-:'':'.r, 1080-11-304 UTILITY FIXTURES (F&I) (VALVE ASSEMBLY) (SIZE 5" - 7.9") EA $714.95 11 $7,864.49 63.,:-:-',:i,-.iX: 1080-11-403 UTILITY FIXTURES (F&I) (TAPPING SLEEVE & TAPPING VALVE) (SIZE 8" - 19..! EA $5,545.56 6 $33,273.35 63i',..:::. 1 1080-11-404 UTILITY FIXTURES (F&I) (VALVE ASSEMBLY) (SIZE 8" - 19.9") EA $1,937.13 10 $19,371.34 6..,1::,:':-...;Z 1080-11-503 UTILITY FIXTURES (F&I) (TAPPING SLEEVE & TAPPING VALVE) (SIZE 20" - 49 EA $9,322.63 1 $9,322.63 p ,,!:.:.• 1080-16A UTILITY FIXTURES (F&I) (REMOVE AND DISPOSE) (METER BOXES) EA $25.50 40 $1,020.00 ?.P;f!":','11':;,,i,:', 1080-16B UTILITY FIXTURES (F&9 (REMOVE AND DISPOSE) (VALVE BOXES) EA $76.50 12 $918.00 66..;.?3:$•% 1644-113-08 FIRE HYDRANT (F&I) (STD) (2 HOSE, 1 PUMPER) (6") EA $2,136.21 6 $12,817.26 -',..MII.i6K?.., 1644-900 FIRE HYDRANT (REMOVE) EA $459.00 6 $2,754.00 TOTAL WATER MAIN ITEMS= •,''• • • '''' PAY ITEM 580-1-1 580-1-2 580-1-A LANDSCAPE COMPLETE (SMALL PLANTS) AVERAGE UNIT LANDSCAPE PAY ITEMS QUANTITY LANDSCAPE COMPLETE (LARGE PLANTS) /11./UFII 11VC 1 r- 111_,ALIIII I CC131-11 I7C CVCTCRA ILITCCN FERTILIZE SYSTEM (HTFS) LS LS SF $7,710.13 $37,840.62 SUBTOTAL ALL AREAS $87.01 1 1 2,250 TOTAL LANDSCAPE ITEMS= $7,710.13 $37,840.62 $195,763.50 . 102-1 101-1 SUB TOTAL= MAINTENANCE OF TRAFFIC (5%) (TIME OF CONSTRUCTION = 270 DA) MOBILIZATION (5%) LS LS $62,060.00 $1 ,g5o.00 1 62,060.00 18,950.00 100% DESIGN COMPLETION ENGINEERING CONSTRUCTION BID FORM: (Page 3 of 8) DIRECTIONS: COMPLETE PART III (if applicable). Part 1: By submitting this Bid the Contractor acknowledges and certifies that reviewed, and incorporated all aspects of any and all Addenda into its Bi, in the Bid submittal. Part 11; Certifications The Bidder, by virtue of signing the Bid Form, affirms that the Bidder is aware of the following, and shall comply with all the stated requirements. 1. Affirmative Action Plan Successful bidder(s) shall establish an Affirmative Action Plan or an Affirmative Action Policy pursuant to Ordinance #10062 as amended. Effective date of implementation must be indicated on the policy: and 2. First Source Hiring Bidder certifies that it has read and understood the provisions of City of Miami Ordinance Section 18-110, pertaining to the implementation of a "First Source Hiring Agreement". Evaluation of bidder's responsiveness to Ordinance Section 18-110 may be a consideration in the award of a contract. 3. Non -Collusion Bidder certifies that the only persons interested in this Bid are named herein; that no other person has any interest in this Bid or in the Contract to which this Bid pertains; that this Bid is• made without connection or arrangement with any other person; and 4. Drug Free Workplace The undersigned Bidder hereby certifies that it will provide a drug -free workplace program by: (1) Publishing a statement notifying its employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the Bidder's workplace, and specifying the actions that will be taken against employees for violations of such prohibition; (2) Establishing a continuing drug -free awareness program to inform its employees about: (I) The dangers of drug abuse in the workplace; 79 NW 14 Street Streetscape Project Bid No.: 09-10-010 BID FORM: (Page 4 of 8 (ii)The Bidder's policy of maintaining a drug -free workplace; (iii )Any available drug counseling, rehabilitation, and employee assistance programs; and (iv) The penalties that may be imposed upon employees for drug abuse violations occurring in the workplace; (3) Giving all employees engaged in performance of the Contract a copy of the statement required by subparagraph (1); (4) Notifying all employees, in writing, of the statement required by subparagraph (1), that as a condition of employment on a covered Contract, the employee shall: (i) Abide by the terms of the statement; and (ii) Notify the employer in writing of the employee's conviction under a criminal drug statute for a violation occurring in the workplace no later than five (5) calendar days after such conviction; (5) Notifying the City in writing within ten (10) calendar days after receiving notice under subdivision (4) (ii) above, from an employee or otherwise receiving actual notice of such conviction. The notice shall include the position title of the employee; (6) Within thirty (30) calendar days after receiving notice under subparagraph (4) of a conviction, taking one of the following actions with respect to an employee who is convicted of a drug abuse violation occurring in the workplace: (i) Taking appropriate personnel action against such employee, up to and including termination; or (ii) Requiring such employee to participate satisfactorily in a .drug abuse assistance or rehabilitation program approved for such purposes by a federal, state, or local health, law enforcement, or other appropriate agency; and (7) Making a good faith effort to maintain a drug -free workplace program through implementation of subparagraphs(1) through (6); and 5. Lobbying The undersigned certifies to the best of his or her knowledge and belief, that: (1) No Federal appropriated funds have been paid, or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. (2)If any funds other than Federal appropriated funds have been paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. 80 NW 14 Street Streetscape Project Bid No.: 09-10-010 BID FORM: (Page 5 of 8) (3)This undersigned shall require that the language of this certification be included in the award documents for "All" sub -awards at all tiers (including subcontracts, sub -grants, and contracts under grants, loans, and cooperative agreements) and that all sub -recipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a pre -requisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure; and * Note: In these instances, "All" in the Final Rule is expected to be clarified to show that it applies to covered contract/grant transactions over $100,000 (per QMB). 6. Debarment, Suspension and Other Responsibility Matters • The Bidder certifies to the best of its knowledge and belief, that it and its principals: a. Are not presently debarred, suspended, proposed for debarment, and declared ineligible or voluntarily excluded from covered transactions by any Federal department or agency. b. Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection • with obtaining, attempting to obtain, or performing a public (Federal,. State, or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or falsification or destruction of records, making false statements, or receiving stolen property; c. Are not presently indicted for or otherwise criminally or civilly charged by a government entity (Federal, State, or local) with commission of any of the offenses enumerated in paragraph 1.b of this certification; and d. Have not within a three-year period preceding this application/proposal had one or more public transactions (Federal, State, or local) terminated for cause or default. Where the prospective Bidder is unable to certify to any of the statements in this certification, such Bidder shall submit an explanation to the City of Miami. Part III; Certification — Trench Safety Act The Bidder, by virtue of signing the Bid Form, affirms that the Bidder is aware of the Trench Safety Act, and will comply with all applicable trench safety standards. Such assurance shall be legally binding on all persons employed by the Bidder and subcontractors. The Bidder is also obligated to identify the anticipated method and cost of compliance with the applicable trench safety standards. Bidder acknowledges that included in the various items of the proposal and in the total Bid price are costs for complying with the Florida Trench Safety Act. These items are a breakout of the respective items involving trenching and will not be paid separately. They are not to be confused with bid items in the schedule of prices, nor be considered additional Work. 8i NW 14 Street Streetscape Project Bid No.: 09-10-010 BID FORM: (Page 6 of 8) The Bidder further identifies the costs and methods summarized below: Quantity Unit Description Unit Price Price Extended . Method 5' Ioyruto3 Lf 44,5490 Total $ 9-, Sc Attached is a Bid Bond , Cash [ ], Money Order [ ], Unconditional/Irrevocable Letter of Credit [ ], Treasurer's Check [ ], Bank Draft [ ], Cashier's Check [ ], Bid Bond Voucher [ ] or Certified Check [ ] No. Bank of for the sum of Dollars ($ )- The Bidder shall acknowledge this Bid and certifies to the above stated in Part III and IV by signing and completing the spaces provided below. - Firm's Name: ,dal � -h f Tile - i Signature: Printed Name/Title: + � CG�"TeCt l�rx --I evr4 City/State/Zip: Dora 1 ( 3312fia Telephone No.: (i & Facsimile No.: (7g6) ..c?-zi -b7Z E-Mail Address: Social Security No. or Federal Dun and I.D.No. : �Jd mC� �!'S'7/ a- Bradstreet No.: � ' If a partnership, names and addresses of partnejs: „ {.. ,s U[v tienCor>_ivc-i ,-1,LL [- (if applicable) 82 NW 14 Street Streetscape Project Bid No.: 09-10-010 BID FORM: (Page 7 of 8) CERTIFICATE OF AUTHORITY (IF CORPORATION) I HERE,)BY CF TIFY that at a meeting of the Board of Directors of .St1,4-1-are Lort5r,t c im ,i vtC , a corporation organized and existing under the laws of the State of 'Vbm ick , held on the a> -day of h l erc h apll 0 , a resolution w s duly passed and adopted authorizing (Name) yt.4 o c+ as (Title) /Piz-P.gi of the corporation to execute bids on behalf of the corporation and providing that his/her execution thereof, attested by the secretary of the corporation, shall be the official act and deed of the corporation. I further certify that said resolution remains in full force and effect. IN WITNES�,d911;iEREOF, I have hereunto set my hand this , day of 4007..ilj , 20 10 - Secretary: �1 Print: A/W / C6r1CLet. CERTIFICATE OF AUTHORITY (IF PARTNERSHIP) I HEREBY CERTIFY that at a meeting of the Board of Directors of , a partnership organized and existing under the laws of the State of , held on the _day of , a resolution was duly passed and adopted authorizing (Name) as (Title) of the to execute bids on behalf of the partnership and provides that his/her execution thereof, attested by a partner, shall be the official act and deed of the partnership. - I further certify that said partnership agreement remains in full force and effect. Partner: Print: IN WITNESS WHEREOF, I have hereunto set my hand this , day of , 20 CERTIFICATE OF AUTHORITY IF JOINT VENTURE) Joint ventures must submit a joint venture agreement indicating that the person signing this Bid is authorized to sign Bid documents on behalt of the joint venture. It there is no joint venture agreement each member of the joint venture must sign the Bid and submit the appropriate Certificate of Authority (corporate, partnership, or individual). CERTIFICATE OF AUTHORITY (IF INDIVIDUAL) I HEREBY CERTIFY that, 1 (Name) , individually and doing business as (d/b/a) (If Applicable) have executed and am bound by the terms of the Bid to which this attestation is attached. IN WITNESS WHEREOF, I have hereunto set my hand this , day of , 20 Signed: Print: 83 NW 14 Street Streetscape Project Bid No.: 09-10-010 BID FORM: (Page 8 of 8) NOTARIZATION STATE OF fhr,c/ COUNTY OF /7.fcle ) SS: The f%regoing instrument was acknowledged before me this 2a- day of mreh 20 , by y eS Cori' , who ' known to me or who has produced as identification and who (did / did not) take an oath. fri111411111111111ft,ir T i'7;r.r^ImI. lit, 4C LLO I ° t . Per z .ommission 29966 Expires: OCT. 01, 2013 BONDED THRU ATLANTIC BONDING CO, INC. PRINTED, STAMPED OR TYPED NAME OF NOTARY PUBLIC 84 NW 14 Street Streetscape Project Bid No.: 09-10-010 MRR-09-2010(TUE) 16:34 SOLUTION CONSTRUCTION, INC (FAX)7865240775 P.002/004 Section 5- Attachments BID BOND FORM (Page'( of 3) State of Florida County of Dade City of Miami ) ) SS Solution KNOWN At,_l.. PERSONS BY THESE PRESENTS, that Construction, Inc. as Principal, International Fidelity Insurance Company as Surety are held and firmly bound unto The City of Miami, in the penal sum of Five Percent of Amount Bid Dollars ($ 5% } lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents. THE COMMON OF THIS OBLIGATION IS SUCH, that whereas the Principal has subrnitted the accompanying Bid, dated March 22 20 10, for, NW 14th Street Multimedia Entertainment District Streetscape Project, C[P Project No. B- 30394 NOW THEREFORE: (a) if the principal shall not withdraw said Bid within one hundred twenty (120) days after date of opening the same, and shall within ten (10) days after the prescribed forms are presented to him for signature, enter into a written contract with the City, in accordance with the bid as accepted, and give bond with good and sufficient Surety or Sureties, as may be required, for the faithful performance and proper fulfillment of such contract; or, (b) In the event if the withdrawal of said Bid within the period specified, or the failure to enter Into such contract and give such bond within the time specified, if the principal shall pay the City the difference between the amount specified in said Bid and the amount for which the City may procure the required Work and supplies, if the latter amount be in excess of the former, then the above obligation shall be void and of no effect, otherwise to remain in full force and virtue. 35 NW 14 Street Streetscape Project Bid No.: D9-10-010 MAR-09-2010(TUE) 16:34 SOLUTION CONSTRUCTION, INC (FRX)7865240775 P. 003/004 BID BOND FORM (page. 2 of 3) IN WITNESS WHEREOF, the above bound parties have executed this instrument under their several seals. this 22nd day of March , A_ p„ 2010, the name and corporate seal of each party being hereto affixed and these presents duly signed by Its undersigned representative, pursuant to authority of its governing body. WITNESS: (If Sole Ownership, Partnership, or Joint Venture, two (2) Witnesses are required. If Corporation, Secretary only will attest and affix seal) As per attached power of attorney PRINCIPAL_ Solution Construction, Inc. acne of Finn) Affix Seal (Signaturefof aullorlzed officer) (Title) 7955 N.W. 12th Street, Suite 425 (Business Address) Doral, FL 33126 City State Surety: International Fidelity Insurance Company (Cr) rate Surety) Zip Surety Secretary (SI re of Authorized Officer) Warren M. Alter, Attorney -in -Fact.. (Title) One Newark Center NW 14 Street Streetscape Project Bid No.: 09-10-010 Affix Seal (Business Address) Newark, NJ 07102 City State Zip 86 MRR-09-2010(TUE) 1b:34 SOLUTION CONSTRUCTION,INC (FRX)7865240775 P.004/D04 BID BOND FORM (Page 3 of 3) 'CE^RTIFICATE AS TO CORPORATE PRINCIPAL 1, 14VU awe , certify that I am the Secretary of the Co oration ns(ned as Principal in the within bond; that,, i'r'.e s .l-e f1 t of said corporation; that I know his signature, and the Signature hereto Is genuine; and that said bond was duly signed, sealed and attested for and in behalf of said corporation by authority of its governing b STATE OF FLORIDA ) COUNTY OF DADE City OF MIAMI SS (Corporate Seal) Before me, a Notary Public duly commissioned, and qualified, personally appeared Warren M. Alter to me well known, who being by me first duly swnmternationn idelityays that he/she is the attomey-in-fact, for the fg nwrance company and that he/she has been authorized by them to execute the foregoing bond on behalf of the Contractor named therein in favor of The City of Miami, Florida. Subscribed and swom to before me this 22nd INSTRUCTIONS: Bid Bonds. must be accompanied by a Power of Attorney, in Compliance with Instructions to Bidders day ofMarch A, EL. Zp 10 Notary Public, State of Flo arge My Commission Expires: • DAWN AUSPITZ • '" `AY COMMISSION # DD940145 EXPIRES November 15, 2013 407) 398-0153 FioridallofaryService.com NW 14 Street Streetscape Project Sid No.; 09-10-010 „.. • -......••••.f.r? . RNE '.•'"q..:',;.:.._ SURA-1A • . • ,...:i i:.J.,.'6,..k:'; ::,..i:. • ',. ..•.:- • '' . C4' sq;•:c.I. :.9'..NTE1 ':3...2,-CITi-.,Fr.031 WARic .... ''''''.. •ONE1:4EWA-13g. 'Z' ,e:1!,5.7, _ •• ;: 6mt•()ij. 1-:!-:,;....—',..,,, • ,§gy,:o.<1•02-5?,,9,7.:'.., ' •PRESENTS --That INTERNATIONAL ilbELITir%.1NSuKAINCE COl4ANY.,:.:tecorpo;atii3n orginizeclandexistin 3,..:. ••'''''''''''A' , z..s.,1,••••',.. .:‘,:•.it:s:,•••::,1?,. ....41.t.;'•'........ z...,:Zs., ..':.:-:•.-:. ::::••••:•...• ''''':•.1:'' .:1''' ,laWs•Ofthe:Stite of hiew:!jisey.;.and having 1t:'iiiiiciiil Office:i.ntlieCili);of:IeWary, is..17., Jersey 4 does hereby cons ntgelan appoin p......• !, .... .,,,-•;.; '4,, • ikiii.Lakes, FL. ........... . : ............ : ...... ............ 2•• ".its true and lawfill:.attorney(s)•71n-fact to .execute,'seal.and deliverfoi-and on its behalf as surety any Bnd all boads.anduridertalciits;'COntratts Of indemnityand -•'•••• `other writints'obligatorrin the nature therepf;.•:4hichare orrrmay.-be allowed, required b‘fperniitted.by:law; Staturec•;.rule,',...rentulation;,contract or otherwise and • the .exe,cution sticb • mstrinnerit(s) in:pursuance -of these present -shall be:.as,11indini•••••iipon; thevsaid'INTERNX NALITIDELITY INSURANCE . . COMPANY as :fully and amply to all intents and purposes,.;as ifThe ;same had been rhily::executed-an&]..aelaioWledge&hy its,:•regtilarly elected officei7jatAt priricipai office. • :•••1'. • This Power of Attorneyjs executed, and anay be revoked pursuant to and by.authority:•of Articie:3-S.ection.3.•;. of theE .4Laws adopted by the Board° • .i.-Directors of INTERNATIONALfIDELITYINSURANCE COMPANY at a meeting-talleclandateld:on the 7th day.of:February.:1974 , . .:'The•Presideni..Or.:any•ViCe President, ExCentiVe Vice President; Secretary or Assistant Secretary shall have poWer.:and.aUthotitS1;.:n:„ • - • (1) To appoint Attorneys-in-ract, and to authorize them to execute on behalf of the Company and attach the Seal of the Company theieta, bpnds and )••••:- • ,.... • -•' undertakmgs contracts:.:of indemnityancLoMeriwritinge,b.bligatogin•the'riature thereofarid, rermive, at any:time,!any suckattOroeydn7fact arid;reyoiceMe authonty given . . . , • . . . • •: . , . . „ ' • • Faither,-MiSPoWer Of:Attorney is signed and Sealed by“facsimile pursuant tO resolution oftlieard of Directors of saitlCompahy. adopted at • „duly called:,andtheld on:•the.29thday of April",.1982:ofwhich the..following is atrue'..,excerpt:..,1.• . • .. 6 • '..;; • Now therefore the signatures of such officers and:lhe'seal•Of the Company May. be...affixed'to any such power idlattorney•Or any certificate relating thereto by::: :•- lacSimile,sand any such power of attorney:.of:certificate beafingituckfacsiniiletignatures or facsimile seal shall be.valid and:,bincling•uptiri the:Company.ancLariy. - .:• ..• Such power so executed and certified by:facsimile” signatures and:facsimile sealshalLbe valid and binding upon the Company in the..rurtire:With :resneet..to:• anybond or undertaking to which it ss attached .: . , . .. .. , .. , .. ... ..••••• IN TESTIM01.4.1."'• WHEREOF, INTERNATIONAI;'FICiEllIfiltDiSHRACE COMPANY haS•catted.this instrument tO be.,...,, - :- ;signed 6 and'. its corporate seal to be affixed by its authOriied-pflicer, this 1thdakftoAA200 oOctoberD,.•:•7.,:. ... „.,.. ..,. .... ..... . ' • ' ....- —: '........ ,;':••• A::..- •••:,...:, ":,i'.1.: •-•..... ..i..‘..• :',... .:.•.'... ....-.: .. ' ' "•*. TINTTEkNA.T1diAl;1-TpLITY:llNIStRANICE COkPANY, ......: ,.: . . . *.iTkii•oF ilmii itR,St' -zeoutity."-of Essex.' ::-.::-..:•-•-.. .......... • . • •••• On thisl6th day of October...2007, befOre:the'eanie the.italividtWhtiviedined the_'Mtc.ed—ing'insn-ument;, to mefiersonally•kritiwn,:zant;,-;beingl?yaptei'duly t*,,... 'sworn, said the he is' the therein described and authorized :..officer: of... e ,:i,..*:•."RsTTERNATIONAL FIDELITY. INSURANCE COMPANY;• that the . seal.affixed : said .inttrum6nt• is the'corporate.Seal of-said",Coapany; that the said Corporate Seal and.hiSS:.'sigiiihire Directors of said Company • :-' '" • • ;';:••• - •' • ,• . . , • .• . . . „. . . SUPPLEMENT TO BID FORM: QUESTIONNAIRE This Completed Form Must Be Submitted With The Bid, The City May, At Its Sole Discretion, Require That The Bidder Submit Additional Information Not Included In The Submitted Form. Such Information Must Be Submitted Within Seven (7) Calendar Days Of The City's Request. Failure To Submit The Form Or Additional Information Upon Request By The City Shall Result In The Rejection Of The Bid As Non -Responsive. Additional Pages May Be Used Following The Same Format And Numbering. By submitting its Bid the Bidder certifies the truth and accuracy of all information contained herein. A. Business Information 1. How many years has your company been in business under its current name and ownership? 6 (i5 a. Professional Licenses/Certifications (include name and number)* Issuance D to eC- fit gukivilfatta ec,(7.0.ggep 6121 og kibmi Di a , &mit yfh1IfI D l3C - 98 90 g J7 Ai (include active certifications of small or disadvantage business & name of certifying entity) b. Date company licensed by Dept. Of Professional Regulation: c. Qualified Business License: IVYes❑ No If Yes, Date Issued: 03 4601-/ c. What is your primary business? :iav, ni0.17 I%a 1'0Y t Ceec r (This answer should be specific_ For example; ving, drained& schools, interior renovations, etc.) d. Name of Qualifier, license number, and relationship to company: L in viz. 04i(f/)sfof, r a J 7' e. Names of previous Qualifiers during the past five (5) years including, license numbers, relationship to company and years a� qualifier for the company 2. Name and Licenses of any prior companies Name of. Company License No. /VA Issuance. Date 3. Typef Company: Corporation D"S" Corporation0LLCDSole ProprietorshipEOther: (Corporations will be required to provide a copy of their corporate resolution prior to executing a contract) 88 NW 14 Street Streetscape Project Bid No.: 09-10-010 4. Company Ownership a. identify all owners of the company Name Title % of ownership tah? 7 U/Cv Pr.�4/jtwi %o b . Is any owner identified above an owner in another company? ❑ Yes No If yes, identify the name of the owner, other company names, and % ownership c. identify all individuals authorized to sign for the company, indicating the level of their authority (check applicable boxes and for other provide specific levels of authority) Name Title Signatory Authority 7 Lim Run- Uira - All Cost No -Cost Other ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Explanation for Other: (Note: "All" refers to any type of document including but not limited to contracts, amendment, change proposal requests (CPR), change orders (CO), notices, claims, disputes, etc. "Cost" refers to CPRs, COs. No -cost refers to RFis, Notices, and other similar documents) 5. Employee Information Total No. of Employees:S Number of Managerial/Admin. Employees: g Number of Trades Personnel and total number per classification: (Apprentices must be listed separately for each classification) -5- *-019 e Oka A-(dylllepktad l0 Tyl letfe/" 7 -Dv nip h hL LLhwey How many employees are working under H2B visas? 0 89 NW 14 Street Streetscape Project Bid No.: 09-10-010 6. Has any owner or employee of the company ever been convicted of a federal offense or moral turpitude: If yes, please explain: NP 7. Insurance & Bond Information a. Insurance Carrier name & address: -0/3 ,f er/oru! / 365 P4%rmo Au, 6m/ 6 4k , f 33/?'f b. Insurance Contact Name, telephone, & e-mail: 7vah ea teS C36s) -353� c. Insurance Experience Modification Rating (EMR): ` Lacrhe ‹ae edu-cl (if no EMR rating please explain why) d. Number of Insurance Claims paid out in last 5 years & value: 1 e. Bond Carrier name & address: i4U e/. gun i t q79 Nto ! 'l -a tIon /-/ fl Li r ��1)/1/ f. Bond Carrier Contact Name, telephone, & e-mail: '.'en 77 - 3' c3 g. Number of Bond Claims paid out in last 5 years & value: 9 Y1l - 8. Have any claims lawsuits been file against your company in the past 5 years, If yes, identify all where your company has either settle or an adverse judgment has been issued against your company. identify the year basis for the claim or judgment & settlement unless the value of the settlement is covered by a written confidentiality agreement. 9. To the best of your knowledge is your company or any officers of your company currently under investigation by any law enforcement agency or public entity. If yes, provide details: COO 10. Has your company been assessed liquidated damages or defaulted on a project in the past five (5) years? ❑ Yes 10 No (If yes, provide an attachment that provides an explanation of the project and an explanation. 11. Has your company been cited for any OSHA violations in the past five (5) years. If yes, please provide an attachment including all details on each citation, in 90 NW 14 Street Streetscape Project Bid No.: 09-10-010 12. Provide an attachment listing all of the equipment, with a value of $5,000 or greater, owned by your company. B. Project Management & Subcontract Details 1. Project Manager for this Project: a. Name: Lain -1 Z b. Years with Company: 6 kftays c Licenses/Certifications: CC�.0 ts-v,s-s 0 d. Last 3 projects with the company including ing role, scope of work, & value of project: . �' l•elt� t:e P - eham+ - 2. Subcontractors: Name Trade 114,44 tqficker, eVituzal % of Work License No. Certification* ./ Gowo i Gpcirti (*active certifications of small or disadvantage business & name of certifying entity) 3. Scope of actual construction work to be performed by your company and the corresponding percentage of the work: (This does not include such items as insurance * bonds, dumpsters, trailers, and other similar non -construction work items) Sito+rtn _t?u-wr T.+4-1.altm / Ti.4, ;44— a � t,1922vtvt1t. C. Current and Prior Experience: 1. Current Experience including projects currently under construction, recently awarded, or pending award (Provide an attachment to this questionnaire that lists all such projects, including the owner's name, title and value of project, scope of work, projected or actual start date, projected completion date, and number of company trades personnel assigned to the project) 2. Prior Projects of a similar size, scope and : Provide an attachment to this Questionnaire that includes projects the Proposer considers of a similar, size, scope and complexity that the City should consider in determining the Bidders responsiveness and responsibility. This attachment must include the project that meets the minimum number of projects identified by the bid solicitation. Information provided must include the owner's name , address and contract person, including telephone & e-mail, title of project, location of project, scope, initial value and final cost of the project, projected and 9] NW 14 Street Streetscape Project Bid No.: 09-10-010 Project No: B- 30394 CITY OF MIAMI CAPITAL IMPROVEMENTS PROGRAM SUBCONTRACTOR UTILIZATION Project Title: NW 14th ST Multimedia Entertainment District Streetscape Sheet No. 1 of 1 This Form must be submitted with a Bidder's Bid submission. Failure to submit this Exhibit with the Bid will result in the bid being rejected as non -responsive. The City in its sole discretion allow the Bidder to submit the Exhibit after Bids are due. Provide the following information for each subcontractor regardless of tier.* Attach additional sheets if necessary. Name of Business Vila & Son Landscaping General Asphalt, Inc. Portion of Work Landscaping Asphalt Paving Dollar Amount $241.314.25 $228,550.10 Percent 8.1 8.5 Address/City/State/Zip 4850 NW 72nd Ave, Miami, FL 33166 13901 NW 118th Ave Miami, FL 33178 License Information** Type General Engineering Number CG-006077 E702 Business Certification**** SBE CSBE DBE LJ El El El 0 0 0 El 0 El 0 0 El 0 0 0 0 * All tiers must be shown, including multiple sub -tiers, if permitted by the Contract Documents. **List only those relevant to this Project. *** Must be certified by either Miami -Dade County, State of Florida, or the Federal Government El El Form SU El 0 0 final timeframes for completion in calendar days and the number of company trades personnel, by classification, that were assigned to the project. The delivery method, including, but not limited to; design -build, CM@Risk, Design -Bid -Build, etc. is to be identified for each Project. If there is a difference between the initial and final cost or initial and actual timeframe provide details on why the differences exist. A reference letter is to be completed by the owner of the Project and submitted as part of the Bid submission. D. Bidder's References Bidders are to include a minimum of five (5) references from projects listed in C.2 above. The attached form is to be used and is to be included with the Bid submission. The City; at its sole discretion may allow the Bidder to submit the references after the specked date for Bid submission. 92 NW 14 Street Streetscape Project Bid No.: 09-10-010 Qtp of iftiamt PEDRO G. HERNANDEZ, P.E. City Manager To Whom It May Concern Subject: Reference Letter Name of Bidder: Solution Construction, Inc. The above referenced contractor is submitting on a bid solicitation that -has been issued by the City of Miami. We require that the Bidder provide written references with their Bid submission and by providing you with this document the Contractor Is requesting that you provide the following reference Information. We would appreciate you providing the information requested below as well as any other Information your feel Is pertinent Name of Project: CooPEA' CITY gaMENr,1i Y Scope of work: 30" gcP, ,2 "{CP,(z,9doi0 ) g" PIP (5651,r) emerN W6i4" Value of project: $ 1, /31, 667. CO Date Completed: 1/3/2008 Was protect completed on time & within budget: ZI Yes ❑ N,o If no, was the contractor at fault or contribute to the delay(s) or increased cost? ❑ Yes ® No If yes, please provide details: Comments: r 1131,5 kit -. 9' 5-b\v i,bra C.3=.14 C9ca i 'A.p.2- n 11\Z I N, ► t' S 2 T.. W} +c- 442..oa ►kS �.�t=„ s.2� Thank you for your assistance n hel Ing us in evaluating our bid solicitation. Name of Individual completing is f m: Jason Samough Date: 4/7/2010 Signature: Title: Architectural Project Manager Telephone: 305-445-376 E-mail:jsamough@mcharry.com Sincerely, Gary Fabrikant Assistant Director 93 NW 14 Street Streetscape Project Bid No.: 09-10-010 Thank you for your assistance in helping us in evaluating our bid solicitation.��`� Name of individual completing this form: Date: `t/ Ii o Signature: - e ptp of ulna p To Whom it May Concern Subject Reference Letter Name of Bidder: Scope of work: PEDRO G. HERNANDEZ, P.E. City Manager The above referenced contractor is submitting on a bid solicitation that has been issued by the City of Miami. We require that the Bidder provide written references with their Bid submission and by providing you with this document the Contractor is requesting that you provide the following reference information. We would appreciate you providing the information requested below as well as any other Information your feel is pertinent: Name of Project: He'r7 PriPISE 3 e. rt4e luRiJei4 E sufAs>r, 64.5e, N'Blt,114 G,?ROIhiC--, pP.RrN iG-E,r 4sfweK Value of project: $ ' ', aDo • mo P ��S Date Completed: C:-)male:i {, 201 \ Was project completed on time & within budget: ❑ Yes ❑ . No C ..mfakfe) If no, was the contractor et fault or contribute to the delay(s) or -increased cost? ❑ Yes ❑ No If yes, please provide details: Comments: , ' -Ir "\ �J_1 F' -Tr ( bile- C 'ALP c�v. r� I .•,L•`.�rn: �l 'I•�c'.vr, Cl � v: � o,� C c��n S�(vG^ �•��n +C , 1L, 't-o l o -k_ +]n tip S 7^�2ee . I i�L ( n•v�� r1,., VI GC, 1/4,}12-4 Cs2Si]*A.'l tJti— 10xcs Clr!', 4\n9-Au-\.LC.tty- �� �[.�� Ov.i LIr:tL,r a�� Cc.)1 tA. 'fit fs'.„'t'J.: (P r; �i iU�a nc. `z •' Telephone: Sos- (4)8 E-mail: . Sincerely, Gary Fabrlkant Assistant Director Title: 93 NW 14 Street Streetscape Project Bid No.: 09-10-010 nrK-uI-�cuiututul Ib:d1 SULUTION CONSTRUCTION, INC (FR )78652d0775 P_001/ooi • PEDRO G. 4.ERNANDEZ, P.E. city Malieger To Whom it May Concern Subject: Reference Letter Name of Bidder. 504 tin O A/ ecmv..5Tteu C-nalt, INC- -The above referenced contractor is submitting on a bid solicitation that has been issued by the City of Miami. We require that the Bidder provide written referenoes with their Bid submission and by providing you with this document the Contractor is requesting that you provide the following reference information. We would appreciate you providing the information requested below as well as any other information your feel is pertinent: Name of Project ivES E$T4T' PAIN - PoiCce MA11✓ 4 LIFT S'r',471ON Scope of work /6" DIP (1,4061,A) ieb+<IA /4dK Value of projec $ 1i.5 2146, 470_ 00 Date Completed: 45//0/2oa1 Was project completed on time & within budget Cej Yes ❑ No If no, was the contractor at fault or contribute to the delay(s) or increased cost? ❑ Yes ❑ No If yes, please provide details: Comments: 1 Thank yo for you ,,ssistance in helping us In evaluating our bid solicitation. q� / Name of i • vidual +,�,�pleting this form: ..jr�A& E G 1JZ4L _ez. Date: Signature: Title:' /" dte.,r 7,7 Telephone: �D E-mail: GOy b Sincerely, I sroti , GG Gary Fabrfkant Assistant Director • 93 NW 74 Street Street3cape PrgjoCt Bid No.: Og-10-070 l °'d tL06'°l Wd�O 9 010Z.' 'idV Telephone: r SCO4 Sincerely, Gary Fabrikant Assistant Director ---- •- QCitp of filitami PEDRO G. HERNANDEZ, P.E. City Manager To Whom It May Concern Subject Reference Letter Name of Bidder. The above referenced contractor is submitting on a bid solicitation that has been issued by the City of Miami. We require that the Bidder provide written references with their Bid submission and by providing you with this document the Contractor Is requesting that you provide the following reference information. We would appreciate you providing the Information requested below as well as any other information your feel is pertinent: Name of Project e4+LwDA Bo-tA.?S C° 5EG-cm Scope of work. Ra mooRK ExPAxl7ro's 4 NioNAGE /Hp, C-r4AF 'tG L164ir REHOWNS) Value of project $ t,OO t, 000. 00 Date Co leted: /2/ /5/20t 0 Was prgect completed on time & within budget lair Yes ❑ No If no, was the contractor at fault or contribute to the delay(s) or increased cost? ❑ Yes 0 No If yes, please provide details: Comments couiri o43 s rrivt r o 3 t it/111)14.!'1ppNreaS c Thank you for your assistance in helping us in evaluating oubid solicitation. Name of individ al •m• a' :Is form: ga 4 .b 1 r3t5 Date: '} • 1 D Signature: • ' Title: Tihrtrotu M f?tut tati je S Ditha,rtit. E-mall: -ROO@ L 8C-6C •elarel 93 NW 14 Street Sireetscape Protect • . Bid No.: 09-10-010 To Whom it May Concern Subject Reference Letter Name of Bidder: citp of fftiami PEDRO G. HERNANDEZ, RE. City Manager The above referenced contractor is submitting on a bid solicitation that has been issued by the City of Miami. We require that the Bidder provide written references with their Bid submission and by providing you with this document the Contractor is requesting that you provide the following reference information. We would appreciate you providing the information requested below as well as any other information your feel is pertinent Name of Project: SAINT /%avlcA 61g15COS HEAP Scope of work: (r) 006 t.F) $" D ! P •R w idaRK * p�1,eic��tt,- Lor• • e'Jrick! • 5E0) 4 p P"A E Value of project: $ 415 Oa, 000 d © Date Completed: hPhe3/.?Q0 `% Was project completed on time & within budget J} , Yes ❑ No - _ If no, was the contractor at fault or contribute to the delay(s) or increased cost? 0 Yes ❑ No If yes, please provide details: Comments: Thank you for your assistance in helping us in evaluating our bid solicitation. Name of individual completing this . ••• 7Aekkii RA A -' Date: 61 iI I. Jzol o Title: SeAior l ro�,°c� 1` cronAje,ir Fri"cipgi E-mail:Zrauc�porkQ6�\ectvc aVI4r,p.Cn}y� Telephone: 305- 4 LW-08-19 Sincerely, Gary Fabrikant Assistant Director 93 NW 14 Street Streetscape Protect Bid No.: 09-10-010 Citp of iltianti PEDRO G. HERNANDEZ, P.E. City Manager To Whom it May Concem Subject Reference Letter Name of Bidder: The above referenced contractor is submitting on a bid solicitation that has been issued by the City of Miami. We require that the Bidder provide written references with their Bid submission and by providing you with this document the Contractor is requesting that you. provide the following reference information. We would appreciate you providing the information requested below as well as any other information your feel is pertinent: Name of Project: PTP PRIUNAGf /MP,foVErIEWS NW 17 Five. Scope of work: DRAIr4/4“ )N4P. J ROW //V. To /7 Ave Value of project $ 52 5, 566. 00 Date Completed: Was project completed on time & within budget ❑ 'Yes• ❑ No If no, was the contractor at fault or contribute to the delay(s) or increased cost? ❑ Yes ❑ No If yes, please provide details: Comments: ►' P LEASE 5 EE ATrACiaMEOT' Thank you for your assistance in helping us in evaluating our bid solicitation. Name of individual completing this form: Date: Signature: Title: Telephone: E-mail: Sincerely, Gary Fabrikant Assistant Director 93 NW 14 Street Streets' cape Project Bid No.: 09-10-010 CIIS - PROJECT EVALUATION Thursday, April 08, 2010 - 12:07:56 PM MIAMI-DADE COUNTY, FLORIDA Capital Improvements Information System Public Works Department Contractor Evaluation MCC Contract: PW 20090002 Contractor Solution Construction, Inc. Department Contact: Mercedes Barreras 305-375-1733 Page 1 of 2 Evaluation Type: Standard Evaluation FEIN: 20695712 Award Amount: $585,483.42 Evaluator ID: PRIMO Date: 4/8/2010 Period: Project conclusion or closeout Rating * 4 3 2 1 N/A Criteria Schedule - Quality of schedule & adherence to schedule resulting in timeliness and minimizing delay to the owner and community. 1- d 2- d Cost effectiveness & efficiency - Budget compliance & value of work. 3- Vision - Design - Concepts or adherence to criteria. 4- b/ Cooperation - Teamwork & relationship with owner, subs and suppliers. 5- ..d — i - Coordination - Ability to organize, schedule and complete tasks in adherence to the schedule. 6- ,J•Accuracy &Technical Skills - Cost estimating, scheduling, shop and other drawings, plans, manuals, project documentation and conflict resolution. 7- d Completeness - Compliance with contract documents, permits, Codes & standards. 8- d Responsiveness - Timely, clear & concise responses to owner comments and correspondence. 9- d -.-- - - Commitment- Intangibles & contribution to project success. 10- b! Personnel - Quality and dedication of project staff. 11- ,J Management - Leadership ability. 12- • d Quality - Work performed correctly the first time. Overall Performance Average: 3_5 Documentation that supports this evaluation and. Contractor's/Consultant's comments can be obtained by contacting: MERCEDES BARRERAS at Phone# 786-222-9912 Evaluation Reviewed by: Supervisor F. Division Chief E Assistant Director!- Director E The method of delivery of this evaluation to contractor/consultant: Certified Mail F EMail 1— Fax F Hand F • (Unresponsive Performance by contractor/consultant requires 2 delivery methods) Evaluation delivered to: Josue Perez-josue@solutionconstruction.net Rating Key 4 Superior performance - Exemplary quality, no intervention required - project completed on time or early at or below budget with no change orders or amendments other than owner requested changes. 3 Satisfactory performance - Minor errors noted, addressed with timely corrective action. No serious errors noted or http://intra/ciis/Contracts/fimContractorEvaluation.asp?Se1CICCNO=0&SelMode=Print&S... • 4/8/2010 CIIS - PROJECT EVALUATION Thursday, April 08, 2010 - 12:07:56 PM Page 2 of 2 corrective action needed. 2 , Guarded performance Errors end Omissions documented In writing with timely corrective action. 1 Unresponsive performance documented In writing without timely corrective action. N/A. No Information • http://intra/ciis/Contracts/frmContractorEvaluation. asp?Se1CICCNO=0&SelMode=Print&S,.. 4/8./2010 (Citp ofiniatni PEDRO yG, HERNANDF7, PIE. City Manager To Whom it May Concern Subject: Reference Letter :Name of Bidder: The above referenced contractor is submitting on a bid solicitation that has been issued by the City of Miami. We require that the Bidder provide written references with their Bid submission and by providing you with this document the Contractor is requesting that you provide the following reference We would appreciate you providing the information requested below as well as any other infortnatIon:yOur feel is pertinent Name of PrOject: 3" tAreg 4,10.4 • Scope of work: V"W6,e,-i:11 Value: of project $ O,77O.00 Date CoMpleteth A./ 0 V.. 2 200? , Was .project cOmpleted .on.tirne& within budget. .4 Yes 0 No If nO, Was the cOntr.adtorat faUltdr_contribute-to the delay() or Increased cost? Yes El No if yes, please provide details: .cortiltonts:. Thank you for your assistance in helping us in evaluating our bid solicitation. Name of individual completing this form : PEP(10 1/// 2.- Date: 41-OF /6 Signature: Je-101.:Li;le-/-3 'Title:: 66A)57' Azszer,Liognvegs-04. Telephone: 30,5":-157,.12--.' V.i.,94d)/7))4/V./P/2-cle Sincerely, • Gary Fabrikent •Assistant Director 93 .NW 14 Street.Streetscape PrOjeot Bid No.: 09-10-010 f't nn tructiinn April 20, 2009 • To Whom It May Concern: RE: Letter of Recommendation Solution Construction, Inc. 7955 NW 12 Street Suite 425 Doral, FL 33126 Please take this letter as recommendation for Solution Construction, Inc. Below is a Iist of projects and specific information pertaining to projects that they have completed with our company. Project Name: Hammock Plaza Project Number: 0708 Project Address: 11740 SW 147 Avenue, Miami, FL Contract Amount for Project: $781,274.00 Description of Project and Class of Work: Paving, drainage, water, sewer, curbs, sidewalks Project Completed on Time: yes Whether applicant was cooperative and facilitated changed to the project when required: yes Project Name: 72nd Avenue Flex Space Project Number: 0804 Project Address: 7860 NW 66 Street, Miami, FL Contract Amount for Project: $195,272.00 Description of Project and Class of Work: Paving, drainage, water & sewer, sidewalks Project Completed on Time: Yes Whether applicant was cooperative and facilitated changed to the project when required: Very cooperative • Project Name: • BBC Warehouse Project Number: 0614 Project Address: 3355 NW 114 Street, Miami, FL Contract Amount for Project: $950,000.00 Description of Project and. Class of Work: W Water, sewer, paving & drainage, sidewalks Project Completed on Time: Yes General Contractors • Construction Managers 7003 N. Waterway Drive 5te.218 Miami, FL 33155 • TeI.305.665.9826 Fax.305.665.9851 construction group Whether applicant was cooperative and facilitated changed to the project when required: Cooperative & Resourceful Project Name: Starbuck's Project Number: 0711 Project Address: .7725 — 7735 W 33rd Avenue, Hialeah, FL Contract Amount for Project: $170,500.00 Description of Project and Class of Work: Stamp asphalt, sidewalk, curbs, water, sewer, drainage Project Completed on Time: yes Whether applicant was cooperative and . facilitated changed to the project when required: yes • Project Name: Lincoln Marti Day School Project Number: 0900 Project Address: . 15690 SW 8 Street, Miami, FL Contract Amount for Project: $11.6,656.00 Description of Project and Class of Work: Paving & drainage, water & sewer, sidewalks, & water main Project Completed on. Time: Yes Whether applicant was cooperative and facilitated changed to the project when required: Yes, very cooperative -We would•gladly recommend Solution Construction, Inc. to be qualified with the Department of Transportation. If you should have any questions, or comments, please feel free to contact me at 305-665-9826. Sincerely, i •Guillermo Fernandez President • General Contractors • Construction Managers 7003 N.Waterway Drive Ste.218 Miami, FL 33155 • Te1305.665.9826 Fax.305.665.9851 MJAMIM COUNTY Miami Dade Parks & Recreation Design & Construction Division 11395 SW 791 Street . Miami, FL 33173 Tel No.: 305-596-4460 Fax No.: 305-595-4612 April 22, 2009 To Whom It May Concern: Re: Recommendation of work performed This letter is to verify that Solution Construction, Inc. is a vendor for Miami Dade County. This corpoutLion has provided their services to Miami -Dade Parks & Recreation _Design & Construction Division through contract #CICC7040-0/07 in a satisfactory, cooperative and timely inanner as per contract specifications. The following are projects this company has completed with our Division. Park Name Ives Estate Park 20901 NW 16h Ave. Westbrook Park 1325 SW 103rd PIace Metro Zoo 12400 SW 152nd St. .. Southem Estate Park 12199 SW 34t St. Rockridge Park 10810 SW 117th Ave. • Project Description Parking Lot, Roadway: & Pathway Walkway, Grading & Sodding Amazon & Beyond Project No. Actual Value Project Manager 123203-05-001 $544,981.23 Richard Cabrera 400801-07-002 592500-06-006 Telecommunication Room Upgrade Lighted Parking Lot, Walkway 491301-04-001 & Irrigation Park Development Phase 1 591201-04-002 $220,411.19 Dan Crawford $23 9,516.15 Jose Hernandez $447,535.75 Pedro Roman $765,420.28 Dave Thomason Should any additional information be needed please contact me at 305-596-4460 ext. 230. Sincerely, • Jay Fo Construction Manager 3 cc: Solution Construction, Inc. Vivian Forhat-Diaz, File The City of Coral Gables Public Works Department 2800 SW 72 AVENUE MIAMI, FLORIDA 33155 April 22, 2009 To whom it may concern: Solution Construction, Inc. completed the Coral Way and Segovia Street Roundabout Project, Coral Gables Florida PWD=E #80-03, at a cost of $704,000.00. The project consisted of: famishing all supervision, labor, material, equipment and tools, and performing all operations necessary for the construction of asphaltic concrete pavement, sidewalk, curb and gutter, drainage structure, sodding, roadway restoration and lighting for the construction of the roundabout. The project was completed before the time specified on the contract and Solution Construction, Inc. was cooperative and facilitated changes to the project when required. Solution Construction, Inc. also completed the Coral Gables Art Cinema Project which involved interior improvements and minor exterior alterations of existing space at the City of Coral Gables Museum Garage, to house the Coral Gables Cineniateque. Construction cost: $535,343.00. Solution Construction, Inc. is pro -active, very cooperative, responsive and responsible and we support their request for approval of their D.O.T. application. Sincerely, R. Alberto Delgado, P.E. Public Works Director P.O. Box 141549 CoiAi. GABLES, FwrIoA 33114-1549 PHONE (305) 460-5000 FAx (305) 460-5080 SUPPLEMENT TO BID FORM: OFFICE LOCATION AFFIDAVIT (Page 1 of 2) Please type or print clearly. This Affidavit must be completed in full, signed and notarized ONLY IF YOU MAINTAIN AN OFFICE WITHIN THE CORPORATE LIMITS OF THE CITY OF MIAMI. bfust-r-n (6h4r,i Legal Name of Firm: Entity Type: (Check One) ❑ Partnership ❑ Sole Proprietorship [' Corporation f I?rbO? Corporation Document No: Occupational License No: Date Established 10)i/7 Date of Issuance .:ffiegbocationf(€<slabl sbirn n of`t i ii e B� ier PRESENT Street Address: 741-CC ARV la S 4/ City: por -/ State: ft How long at this location: a y.,eav5 PREVIOUS Street Address: City: State How long at this location: According to Section 18-85 of the City of Miami Code, as amended: The "City Commission may offer to a responsible and responsive local bidder, who maintains an office in the City of Miami, the opportunity of accepting a Bid at the low bid amount, if the original bid amount submitted by the local bidder does not exceed 110 percent of the lowest other responsible and responsive bidder." The intention of this section is to benefit local bona fide bidders/Bidders to promote economic development within the corporate limits of the City of Miami. 1 (we) certify, under penalty of perjury, that the office location of our firm has not been established with the sole purpose of obtaining the advantage granted bona fide local bidders/Bidders by this section. 94 NW 14 Street Streetscape Project Bid No.: 09-10-010 SUPPLEM . T TO BID FORM: OFFICE i CATION AFFIDAVIT (Page 2 of 2) Authori e Signature ata4 Print Name p4-„,(czed Authorized Signature Print Name Title Title Authorized Signature Authorized Signature (Must be signed by the corporate secretary of a Corporation or one general partner of a partnership or the proprietor of a sole proprietorship or all partners of a joint venture.) NOTARIZATION STATE OF FLORIDA, COUNTY/OF DADE That:djYLPz personally appeared before me and acknowledged the foregoing instrument as,/her .ct and deed_ Thal/she has produced NOTARY PUBLIC: My Commission - pir as identification. NOTARY PUBLIC -STATE OF FLORIDA ""•1, Lazaro R. Perez c.smy i Commission # DD929966 +,,,,,,,.•� Expires: OCT. 01, 2013 0 /kBONDED MU ATLANTIC BONDING CO„ INC. Please submit with your Bid copies of Occupational License, professional and/or trade License to verify local status. The City of Miami also reserves the right to request a copy of the corporate charter, corporate income tax filing return and any other documents(s) to verify the location of the firm's office. 95 NW 14 Street Streetscape Project Bid No.: 09-10-010 SOLUTION Construction, Inc. LI C.# CGC1505066 To Whom It May Concern: Reference: Solution Construction, Inc. Solution Construction, Inc. has gained over 15 years experience within the construction industry as a General Contractor. The team at Solution Construction, Inc. withholds the knowledge and capabilities to manage and construct projects of various sizes and complexities for clients in the public and private sector. Our _Caw provides the highest level of construction expertise and hands on attention to detail available in the. construction industry with the clients' foresight in mind. Solution Construction, Inc. as either a Construction Manager or a General Contractor is committed to providing a large range of construction services. Whether your desires are preconstruction or construction services, Solution Construction, Inc. wiII specifically tailor its services to the clients needs_ We at Solution Construction, Inc. can provide preconstruction and construction services consisting of design and constructability reviews, value engineering, contract and document reviews, estimating, cost control, bid packaging, cash flow projections, scheduling, quality control, and much more. Solution Construction, Inc. will do whatever it takes to meet and/or exceed its clients' expectations. Thank An es Correa President 7955 NW 12 Street • Suite 425 • Dora!, Florida 33126 • Tel.: 786-621-8550 • Fax: 786-524-0775 Solution Construction, Inc_ Services & Ga in ed Experiences Solution Construction, Inc. services ensure more efficient site construction projects by providing coordination and expertise from conceptual planning to closeout. Owners, developers, and general contractors will gain the possibility for Solution Construction, Inc_ to provide preconstruction and construction services because of our expertise and creative problem solving abilities. We have gained extensive experience in the Sitework facets of construction and offer the following services: Preconstruction Services - Design Reviews - Constructability Reviews - Estimating • Value Engineering - Scheduling • Phasing/ Logistics - Long -lead Analysis/Procurement - Bid. and Award Construction Services • Project Administration & Supervision • Construction Site Tnspection • Testing and Controlled. Inspections • Meetings/Reporting • Site Safety and Security - Estimating • Scheduling Post Construction Services • Final As -built Drawings • Main Utility Connections • System Startup and Testing • Site Acceptance & Turnover References • Under separate cover please find a list of our references. SOLUTION Construction, inc. Pc a CCCIin:dli. Solution Construction, Inc. "List of References" • " Pedro Roman" Miami Dade County 11395 SW 79 Street Miami, FL 33173 Phone: 305.596.4460 Fax: 305.2704910 a "Latonya Hnrtson" Miami Dade County 275 NW 2"a Street Miami, FL 33128 Phone: 305.755.7932 Fax: 305.755.7864 • "Jay Forni" Miami Dade County 11395 SW 79 Street Miami, EL 33173 Phone: 3 05.596.4460 Ext. 238 Fax: 3052704910 • "Richard Cabrera" Miami Dade County 11395 SW 79 Street Miami, EL 33173 Phone: 3 05.596.4460 Fax: 3052704910 • " Dave Thomason Miami Dade County 11395 SW 79 Street Miami, FL 33173 Phone: 3 05.596.4460 Ext. 238 Fax: 3052704910 SOLUTION Construction, Inc. Lie_ a CCC lunar. • "Irina Tokar" City ofFort Lauderdale 100 N Andrews Avenue City Fort Lauderdale, FL 3301 Phone: 954.828.6891 Fax: 954.828.5407 • "Gustavo Santana" BllAW 1688 Meridian Avenue Ste. 303 Miami Beach, FL 33139 Phone: 305.604.5878 Fax: 305.604.5704 • "Irian Tinienez" Kimley Flom and Associates, Inc. 9130 South Dadeland Boulevard Miami, FL 33156. Phone: 305.670.9120 Fax: 305.670.9360 SOLUTION Construction, Inc. tJC a C.00ISIGuu. Emir . SE ' lu .■r-- d.iU ■E. arr •! ■C I'.upF..i SOLUTION Construction, Inc. LIG# CGC1505866 EQUIPMENT / SMALL TOOLS 2LUJ Eagle Vivo Trailer Grinder Four [4) Plate Compactors One [1) Sewer I aser Dne(1) Level Laser Two (2) Saws Two (2) 3" Water Pumps Two [2) 2" Water Pumps One [1) Chain Saw 1990 KWTruck 1991 KWTruck 1994 KWTruck 2000 KWService Truck 2091 Ford Water Truck 2003 lsuzu Loader Backoe [John Deere 310 SG) Case Model [CX29C5/N) Excavator Case Model 621 Mee! Loader Kobelco Excavator 3001 r Grader 592 Bomag Model Roller CompaU it rase Model 1150G Dozer Case Track Loader (4'10CT) Bob Cat John Deere 225CL Excavator John Deere 310G Backoe Kobelco 135SR 1992 Ford Truck 2006 Isuzu NPR 14' Dry Van 2006 isuzu NPR 14. Van Body 2LU7 GIVE Truck W45CY1 JD 225C RTS Excavator JD 310J - 31 DJXT Wneel Loader Backhoe JD 332 - L 1332 Compact Track Loader JD 270D- 270DLFF Excavator Trailer 42" Bucket Case Compact Track 'I'lSCT 7955 NW 12 Street • Suite 425 • Dora', Florida 33126 • Tel.: 786-621-8550 • Fax: 786-524-0775 Name of Owner/ Contractor Name of Project Type of Work Performed Contract Amount Pad, Water & Sewer System Beachamp . Construction Kane Concourse Water System Tie -In , $37,000.00 Miami Dade County Parks & Recreation Southern Estates Park Walkway, Parking Lot Tennis Courts, Lighting & Irrigation System $430,000.00 Miami Dade County Parks & Recreation Larry & Penny Thompson Park Campground Cabana Swimming Pool & Rest Room Bldg. $955,515.00 Miami Dade County Parks & Recreation Eureka Park • Walkway, Parking Lot Lighting System & Irrigation System $305,000.00 Miami Dade County Parks & Recreation Ives Estate Park Tot Lot Bike Path Roadway, Parking Lot, & Water Main Ext. . $333,200.00 Miami Dade County Parks & Recreation . Rock Ridge Park ' Parking Lot, Drainage Improvements, Park Furniture, Retention Excavation, Landscaping, & Playground $728,700.00 , Miami Dade County Parks & Recreation Francisco Human & Recreation Rights Domino Complex Cabana Shelters, Walk Ways, Parking Lot Resealing, & Picnic Shelters $3I8,410.00 City of Fort Lauderdale Mills Pond Park Electrical Light Poles Improvements . $308,265.00 City of Homestead Lily Bow Library Parking Lot, Water, Sewer, Drainage, Irrigation & Electrical System $336,000.00 City of Coral Gables Roundabout @ Segovia & Coral Way Traffic Light Removal, Drainage, & Roadway Improv_ $704,000.00 Miami Dade County Parks & Recreation Country Club of Miami Golf Course Tees Renovation $375,000.00 Miami Dade County Parks & Recreation Westbrook Park Soccer Field, Walks, & Playground $205,500.00 Miami Dade Water & Sewer Department 8" Water Main 8" Water Main along 25thAve. $880,770.00 Beachamp Construction Saint Monica Gardens HUD Water, Sewer, Drainage, Building Pad, & Parking Lot Improvements $440,000.00 Link Construction Lincoln Marti Charter School Water, Sewer, Drainage, & Parking $116,656.00 Name of Owner/ Contractor Name of Project Type of Work Performed Contract Amount Lot Improvements Village of El Portal Stoimwater . Improvements Phase II Storm Water along NW 3rd Ave. $413,000.00 Miami Dade County Public Works Department PTP Drainage Improvements Dra;nnb Improvements along NW 17 Ave $585,500.00 Link Construction Miami Springs Community Center Water, Sewer, Drainage, Demolition, & Parking Lot Improvement $315,000.00 Miami Dade Parks . Reufeati on Gwen Cherry. Park Drainage Improvement $200,000.00 Miami Dade County Public Works dept. 8" Water main 8" D.I. Installation $465,000.00 Cazo Construction Sugar Hill Apart. Water, Sewer Drainage & Parking Lot Improvement $380,000.00 City of Fort Lauderdale . South Andrews Avenue Water Main Improvements 15,100 LF. Water Main Imp. 45 LF. of 4" RJ DIP ? 470 LF. of 6"RJ DIP 660 LF. of 8" PO DIP 5,000T,F.of8:RJDIP 1,600 LF. of ] 2' RJ DIP 1,920 LF. of 16" RJ DIP 105 LF. of l 8"RJ DIP 3,300 LF. of 20" DIP • $3,054,467.00 City Of Coral Gables Segovia & Biltmore Way Roundabout Traffic Light Removal, Drainage, & Roadway Improv. $297,000.00 Miami Dade Public Works PTP Intersection Improvements Roadway Improvements $880,000.00 Miami Dade County Public Works PTP Intersection Improvements Roadway Improvements $860,000.00 Name of Owner/ Contractor Name of Project Type of Work Performed Contract Amount Pad, Water & Sewer System Beachamp Construction Kane Concourse Water System Tie -In $37,000.00 Miami Dade County Parks & Recreation Southern Estates Park Walkway, Parking Lot Tennis Courts, Lighting & Irrigation System $430,000.00 Miami Dade County Parks & Recreation Larry & Penny Thompson Park Campground Cabana Swimming Pool & Rest Room Bldg. $955,515.00 Miami Dade County Parks & Recreation Eureka Park • Walkway, Parking Lot Lighting System & Irrigation System $305,000.00 Miami Dade County Parks & Recreation Ives Estate Park Tot Lot Bike Path Roadway, Parking Lot, & Water Main Ext. $333,200.00 Miami Dade County Parks & Recreation Rock Ridge Park ' Parking Lot, Drainage Improvements, Park Furniture, Retention Excavation, Landscaping, & Playground $728,700.00 , Miami Dade County Parks & Recreation Francisco Human & Recreation Rights Domino Complex Cabana Shelters, Walk Ways, Parking Lot Resealing, & Picnic Shelters $318,410.00 City of Fort Lauderdale Mills Pond Park Electrical Light Poles Improvements . $308,265.00 City of Homestead Lily Bow Library Parking Lot, Water, Sewer, Drainage, Irrigation & Electrical System $336,000.00 City of Coral Gables Roundabout @ Segovia & Cora] Way Traffic Light Removal, Drainage, & Roadway Improv. $704,000.00 Miami Dade County Parks & Recreation Country Club of Miami Golf Course Tees Renovation . $375,000.00 Miami Dade County Parks & Recreation Westbrook Park Soccer Field, Walks, & Playground $205,500.00 Miami Dade Water & Sewer Department 8" Water Main 8" Water Main along 25th Ave. $880,770.00 Beachamp . Construction Saint Monica Gardens HUD Water, Sewer, Drainage, Building Pad, & Parking Lot Improvements $440,000.00 Link Construction Lincoln Marti Charter School Water, Sewer. Drainage, & Parking $116,656.00 Name of Owner/ Contractor Name of Project Type of Work Performed Contract Amount • Lot Improvements Village of El Portal Stormwater . Improvements Phase II Storm Water along NW 3rd Ave. $443,000.00 Miami Dade County Public Works Department PTP Drainage Improvements Drainage Improvements along NW 17 Ave $585,500.00 Link Construction Miami Springs Community Center Water, Sewer, Drainage, Demolition, & Parking Lot Improvement $315,000.00 Miami Dade Parks Recreation Gwen Cherry Park.. . Drainage .Improvement $200,000.00 Miami Dade County Public Works dept. 8" Water main 8" D.I. Installation $465,000.00 Cazo Construction Sugar Hill Apart Water, Sewer Drainage & Parking Lot Improvement $380,000.00 City of Fort Lauderdale • South Andrews Avenue Water Main Improvements ' 15,100 LF. Water Main Imp. 45 LF. of 4" RJ DIP 2,470 LF. of 6"RJ DIP 660 LF. of 8" PO DIP 5,000 LF. of 8: RJ DIP 1,600 LF. of 12' RJ DIP 1,920 LF. of 16" RJ DIP 1051.F. of 18 "RJ DIP 3,300 LF. of 20" DIP $3,054,467.00 City Of Coral Gables Segovia & Biltmore • Way Roundabout Traffic Light Removal, Drainage, & Roadway Improv. $297,000.00 Miami Dade Public Works PTP Intersection Improvements Roadway Improvements $880,000.00 Miami Dade County Public Works PTP Intersection Improvements Roadway Improvements $860,000.00 SOLUTION Construction, Inc. LIG#CGC1505866 y Licenses Certificates 7955 NW 12 Street • Suite 425 • Doral, Florida 33126 • Tel.: 786-621-8550 • Fax: 786-524-0775 ACORD,, CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DDIYYYY) 02/10/2010 PRODUCER 305.630.4777 FAX 305.279.3022 Gil Garden Avetrani Insurance Group 10689 N. Kendall Dr. Suite 208 Miami, FL 33176 THIS CERTIFICATE I5 ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE NAIC # INSURED Solution Construction Inc. 7955 NW 12 Street Suite 425 Doral, FL 33126-1831 INsussw FCCI Commercial Ins. Co. INSURER B: INSURER C: INSURER D: INSURER E: THE POUCIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POUCIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR ADO'L NSRD TYPE OF INSURANCE POLICY NUMBER POUCY EFFECTIVE DATE (MMIDD/YYYY) POLICY EXPIRATION DATE IMAUDD/YYYY) LIMITS A GENERALLJABIUTY COMMERCIAL GENERAL LIABILITY GL0009838-01 01/28/2010 01/28/2011 - EACH OCCURRENCE $ 1,000,000 AMAGX PREEM]SES (EaEoccNcu snce) $ 100,000 CLAIMS MADE I X I OCCUR MED EXP (Any one person) $ 5,000 PERSONAL & ADV INJURY 5 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEM. AGGREGATE UMITAPPUES PER )-"-I POLICY ri JECTT n LOC PRODUCTS - COMP/OP AGG $ 2,000,000 A AUTOMOBILE X — LueIUTY ANY AUTO ALL OWNED AUTOS SCHEDULED AUTOS HIRED AUTOS NON-OWNEDAUTOS CA0015254-01 01/28/2010 01/28/2011 COMBINED SINGLEOMIT (Ea acF�nl) $ 1,000,000 BODILY INJURY (Per persln) $ BODILY INJURY (Peraecident) $ PROPERTY DAMAGE (Per accident) $ GARAGE LIABILITY ANY AUTO AUTO ONLY - EA ACCIDENT $ OTHER THAN EA ACC $ AUTO ONLY: • AGG $ A EXCESS X I I UMBRELLA UABILJTY OCCUR n CLAIMS MADE DEDUCTIBLE RETENTION $ 0 UMI30010173-01 01/28/2010 01/28/2011 EACH OCCURRENCE s 5,000,000 AGGREGATE $ 5,000,000 $ 5 s A WORKERS COMPENSATION AND EMPLOYERS' LIABILJTY ANY ANYIPROPR1ETORCER/MEMBER PAREXNEREDIECUTIVE Y 1 N, LUDED? (Mandatory In NH) if yye@s, describe under SPECIAL PROVISIONS tolow 001-WC10A-63576 01/28/2010 01/28/2011 X IURYLIMf oETRH- E.L. EACH ACCIDENT $ 1,000,000 EL. DISEASE -EA EMPLOYEE $ 1,000,000 , EL DISEASE -POLICY LIMIT 5 1,000,000 OTHER DESCRIPTION OF OPERATIONS I LOCATIONS / VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS CERTIFICATE HOLDER CANCELLATION Solution Construction Inc and Dopico Construction Inc 7955 NW 12 Street Donal, FL 33126 ACORD 25 (2009101) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE Frank Gi1/MD 51---1404 ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD NMI SON, ALTER & ASSOCIATES March 27, 2009 RE: SOLUTION CONSTRUCTION, INC_ To Whom tf May Concern: This is to advise you that our office provides Bid, Performance, and Payment Bonds for Solution Construction, Inc. Their surety is International Fidelity Insurance Company which carries an A.M. Best Rating of A-ViI and listed in the Department of the Treasury's Federal Register. Based upon normal and standard underwriting criteria atthe time of the request, we should be in a position to provide Performance and Payment Bonds in the amount of $6,000,000 for single size projects and $12,000,000 total aggregate. We obviously reserve the right to review final contractual documents, bond forms and obtain satisfactory evidence of funding prior to final commitment to issue bonds_ "-= Solution Construction, Inc_ is an excellent contractor and we hold them in high regard. We feel extremely corfident in our contractor and encourage you to offer them an opportunity to execute any upcoming projects. L' This Letter is not an assumption of liability, nor is it a bid or performance and payment bond. It is issued only as a bonding reference requested by our respected client. 5 Since ly, If you should have any questions, please do not hesitate to give me a call. Warren M. Alter Resident Agent 800 Governor Square Boulevard Suite i0r Miami Lakes, FL 33016 F`.305_ 22.2d83 F;30 55B °eS0 t'rn ielsonL7Gnri • • . SOLUTION CONSTRUCTION INC May 21, 2009 Page two You may apply, in writing, for a Revised Certificate of Qualification at anytime prior to the expiration date of this certificate according to Section 14-22.0041(3), Florida Administrative Code. Please be advised if certification in additional classes of work is desired, documentation is neededtorshowtthat your company has done such work with your own forces and equipmet experience was gained with another contractor and that you have the necessary equipment for each additional class of work requested_ Sincerely, Juanita Moore, Manager Contracts Administration Office JM:cj SURETY CAPACITY ELIGIBILITY DETERMINATION* FIRM NAME Solution Construction, Inc. CURRENT RATIO FACTOR 2.00 Less than 1.00 - Not Eligible for Increased Bidding Capacity 1.00 or Greater - Eligible DATE 5/19/09 ABILITY SCORE 75 Less than 80 - Not Eligible for Increased Bidding Capacity. 80 - 90 - See Table for Surety Multiplier. Greater than 90 - Amount Shown on Surety Letter, y :�f✓ ^.!�t •i^ t��,l:: ^.F:.- `:Ri:;:l'N :• •`f:. .i' .tl, i�.i:: - TABLE ABILITY SCORE (as.� 80 81 82 SURETY MULTIPLIER (S.M.) 3.0 3,4 3.8 83 4.2 84 4.6 85 5,0 86 5.6 87 6.2 88 6.8 89 7.4 90 8.0 SURETY CAPACITY FORMULA , (SURETY MULTIPLIER X MAXIMUM CAPACITY RATING X CONSTRUCTION REVENUES/TOTAL REVENUES) (S.M.) (MCR) (CRV/TRV) #N/A X $12,050,000.00 X 1.00 EQUALS SURETY CAPACITY ELIGIBILTY #N/A >90 No limit to eligibility for surety backed Bid Capacity * Please see Rule 14-22 for information regarding surety calculations. Rev. 04/09 NOTICE OF ADMINISTRATIVE HEARING RIGHTS This document informs you that you may have the right to challenge the agency action described in the attached notice. If you wish to challenge the action, you may request an administrative hearing under sections 120.569 and 120.57, Florida SmintP.s An administrative hearing is similar to a trial. You must deliver your request by 5:00 p.m. no later than I[) days after you received the notice to: Clerk of Agency Proceedings Department of Transportation Haydon Burns Building 605 Suwannee Street, MS 58 Tallahassee, Florida 32399-0458 Facsimile: (850) 414-5264 If you disagree with the facts stated in the attached notice, you may request a formal administrative hearing under section 120.57(1), Florida Statutes. At a formal hearing, you may present evidence and arguments on all issues involved, and question the witnesses called by the department If you agree with the facts stated in the notice, you may request an informal administrative hearing under section 120.57(2), Florida Statutes. At an informal hearing, you may present your argument or a written statement for consideration by the department Your request for an administrative hearing must meet the requirements of Rule 28-106.201(2) or Rule 28-106.301(2), Florida Administrative Code, depending on whether you request a fui ncal or informal hearing. If you want a hearing to challenge the action, you must 1. Include a copy of the notice with your request 2. Prepare your request Legibly, on 8'/Z by 11 inch white paper; and 3. Include in your request all of the following items: a. State your name address, and telephone number of and/or that of your representative along with any Department of Transportation identifying number on the notice; b. Explain how your rights or interests will be affected by the action described in the notice; c. State when and how you received the notice; d. State all of the facts in the notice with which you disagree. If you do not disagree with any of the facts stated in the notice, you must say so; e. " State the facts you believe would justify a change to the agency's proposed action; f. State the rules or statutes you believe prohibit the agency's proposed action; g. Explain how the facts relate to those rules and statutes on which you are relying; and h. State the relief you want, plus the action you wish the agency to take or refrain from taking_ The Department will dismiss your request for an 'administrative hearing if it does not meet these requirements. If you have not submitted your request to the Clerk of Agency Proceedings by the deadline above, you will not be entitled to a hearing and the action described in the notice will be final. Mediation, where you and the department try to work out an agreement without a hearing, may be available. If no agreement is reached through mediation, you still have the same right to a hearing. If you have any questions, comments and/or concerns about requesting a hearing, you may contact the Clerk of Agency Proceedings at (850) 414-5393. CHUCK DRAGO . INTERIM SECRETARY 0 r CHARLIE GRIST GOVERNOR Florida Department of Transportation 605 Suwannee Street STEPHANIE C.KOPELOUSOS Tallahassee, FL 32399-0450 SECRETARY May 21, 2009 SOLUTION CONSTRUCTION INC 7955 NW 12 STREET DORAL, FLORIDA 33126 RE: CERTIFICATE OF QUALIFICATION Dear Sir/Madam: The Department of Transportation has qualified your company for the amount and the type of work indicated below. Unless your company is notified otherwise, this rating will expire 6/30/2010. However, the new application is due 4/30/2010. In accordance with S.337.14 (1) F.S. your next application must be filed within (4) months of the ending date of the applicant's audited annual financial statements and, if applicable, the audited interim financial statements. Section 337.14 (4) F.S. provides that your certificate will be valid for 18 months after your financial statement date. This gives a two month period to allow you to bid on jobs as weprodess your new application for qualification. To remain qualified with the Department, a new application must be submitted subsequent to any significant change in the financial position or the structure of your firm as described in Section 14-22.005(3), Florida Administrative Code. MAXIMUM CAPACITY RATING: $12,050,000.00 FDOT APPROVED WORK CLASSES: DRAINAGE FDOT APPROVED SPECIALITY CLASSES OF WORK: NONE Please be advised the Department. of Transportation has considered your company's qualification in all work classes requested. We have evaluated your company's organization, management, work experience, work performance and adequacy of equipment as directed by section 14-22.003, Florida Administrative Code. Based on this evaluation, the Department is not able, at this time, to prequalify your company for the work classes: FLEXIBLE PAVING, GRADING, HOT PLANT -MIXED BITUM. COURSES, PORTLAND CEMENT CONCRETE. ry THE BUILDING ERECTEAND/OR,„' CODE REQUIREMENTS AND WITH DEPARTMENT. THIS CERTIFICATE IS ft EXPRESS CONDITION THAT THE APPL CODES PERTAINING TO THE ERECTION, C Square Footage 1074SF No, of Seats/Rooms; ^1; or tiY die.' lL`q,--?cFiY'r�U,'egmv, i r,,.r,,,, y iw;� RA L ?ii7 hlDANCE WITH ZONING AND L COMMUNITY DEVELOPMENT ED LOCATION ONLY UPON THE E ORDINANCES AND/OR BUILDING OF BUILDINGS OR STRUCTURES, RESTRICTIONS; NO RETAIL SALES, NO OUTSIDE STORAGE OR DISPLAYS, DRY USE ONLY, MIAMI-DADE COUNTY 2009 LOCAL BUSINESS TAX RECEIPT 2010 TAX COLLECTOR MIAMI-DADE COUNTY - STATE OF FLORIDA FIRSTOCLASS U.S, PO 140 W. FLAGLER•ST. EXPIRES SEPT. 30, 2010 STAGE lst FLOOR MUST BE DISPLAYED AT PLACE OF BUSINESS PAID MIAMI, FL 33130 PURSUANT TO COUNTY CODE CHAPTER 8A - ART. 9 & 10 PERMIT�NO. 31 512442-5 THIS IS NOT A BILL — DO NOT PAY BUSINESS NAME / LOCATION RENEWAL SOLUTION CONSTRUCTION INC RECEIPT NO. 535322-2 7955 NW 12 ST STATE# CGC1505866 33126 DORAL 425 OWNER SOLUTION CONSTRUCTION INC Sec. Type of Business WORKER/S 196 GENERAL BUILDING CONTRACTOR 1 THIS 15 ONLY A LOCAL ODES BUSINESS NOT PERMIT THE HOLDER TO VIOLATE ANY EXISTING REGULATORY OR ZONING LAWS OF THE DO NOT FORWARD COUNTY OR cores. NOR DOES IT EXEMPT THE HOLDER FROM ANY OTHER PERMIT OR LICENSE REQUIRED BY LAW. THIS IS NOT A CERTIFICATION OF SOLUTION CONSTRUCTION INC THE ONS.HOLDER'S DuauPICA. LAIN RUIZ PRES 7955 NW 12 ST 425 PAYMENT RECEIVED DORAL FL 33126 MIAMI-DADE COUNTY TAX COLLECTOR' 07/09/2009 60120000259 000045.00 SEE OTHER SIDE 273 State ofFlorida Department of State I certify from the records of this of (ice that SOLUTION CONS 'RUCTION, INC_ is a corporation organized under the laws of the State of Florida, filed on March 17, 2003. The document number of this corporation is P03000030752. I further certify that said corporation has paid all fees due this office through December 31, 2008, that its most recent annual report was filed on July 22, 2008, and its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of Florida, at Tallahassee, the Capital, this the Twenty Fourth day of March, 2009 Secretai y of State Authentication ID: 000147207750-032409-P03000030752 To authenticate this certificate,visit the following site, enter this ID, and then follow the instructions displayed. https://efile.sunbiz.orecertanthver.html V■ ■C IY�I,u� !■ ■■ :Zips.MIGEZZiorlsoraMMIE .'I■■ SOLUTION Construction, Inc. LI C. # CGCI505866 Minority Certifications 7955 NW 12 Street • Suite 425 • Doral, Florida 33126 • Tel.: 786-621-8550 • Fax: 786-524-0775 ossmomm H I A M l•DADE 2arlos Alvarez, Mayor May 7, 2009 Andres Correa SOLUTION CONSTRUCTION, INC_ 7955 NW 12 St, 425 Dora!, FL 33126-0000 Dear Mr_ Correa: Small Business Development (SBD) submitted for certification. Your firm (CSBE) in the categories listed below. CERT. NO: APPROVAL DATE(s): EXPIRATION DATE: Small Business Development 111 NW 1st Street a 19th Floor Miami, Florida 33128-1906 T305-375-3111 F 305-375-3160 miamidade.gov 9890 04130/2009- CSBE 04/30/2010 has completed the review of your application and attachments is officially certified as a Community Small Business Enterprise This certification is valid for twelve (12) months, expiring as noted above. This certification affords your company the opportunity to benefit from participation in county contracts with small business measures. Please note the trade categories listed below. These are the only sheltered market areas that your company is eligible to bid or participate in under your current certification. If any changes occur within your company during the certification period (such - as ownership, address, telephone number, trade category, licensing, technical certification,. bonding capacity, or if the business ceases to exist) you are required to notify this department in writing, immediately.. It is of critical importance that current information regarding your company be updated. All inquiries or changes related to this cei tification should be directed to the SBD Certification Unit_ An application for re -certification (a much shorter process) must be submitted and forwarded. to this office within four (4) weeks of the referenced expiration date. Should your firm fail to re -certify, or lose its certification for any reason, the ability to work on contracts with measures will be affected. Sincerely, Penes o Small wnsley, Director usiness Development CATEGORIES: (Your firm may bid or participate on contracts only under these categories) COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION (CSBE -Level 2) HIGHWAY AND STREET CONSTRUCTION {CSSE - Level 2) OBDR0020 V20090316 ADA Coordination Agenda Coottrmatfon Animal Services Art in Public Maas Audit and Management Service Aviation BuAdtng Building Code Campllanzc Basins 5 Development CaptCtl bnpnnemeses ni,nu' Independent Transportation Tout Commis<ion om 13hko and Public Trust CarrmrunicaUons Community Action Agency Community unity & r nmomic Development Community Relations Consumer Services Conediens & Rehabilitation Cultural Affairs Elections Emergency Management Employe° Relations Eri>pnvremtatt Trust EnIerpri eT dntology Services Erwimnmenial Resources Management Fair Employment Practices Finance Fire Rescue General Semi= Adminisnatfon Government Information Center Historic Prtaservaiion HameiessTrust Housing Agency Housing Finance Authority Human Services Independent Review Panel International Trade Consortium Juvenile Services Medial] Examines MelnrMlaml Action Plan Metmpoliran Planning Organization Party and Recreation Planning and Zoning Ponce Procurement Management Property Appraisal Public Ubrary System Public Works Safe Neighborhood Parks Seaport Solid Waste Management Strategic Business Management Team Metro Transit Task Fortson Urban Frnnnmir Rwbaliralrnn May 15, 75107 Lain Ruiz SOLUTION CONS I KUC T iON, INC_ 7955 NW 12 St, 425 Doral, FL 33126-0000 Dear Lain Ruiz Business Development 111 NW 7st5treet - 19th Floor Miami, Florida 33128-7906 T 305-375 3111 F 305-375-3160 Imiamidadegov CERT_ N O: 9894 APPROVALDATE(s)_ 05/012O0T-DBE EXPIRATION DATE 04/30/2010 We dI e pleased to it tiui in f you that the Department of Business Development is now Small Business Affairs within the Department. of Procurernent Management As a result of The review of your dplllicadon and attachments submitted for certification as a Disadvantaged Business El [Lei pl ise (DRF) we hereby approve your firm as a DBE in the cdlegories iisied below. Your DBE cerraficatiun is valid for three (3) years, expiring as noted above and your firm will be included in our registry of certified businesses. While DBE certification ' qualifies your firm to bid and participate on projects with DBE participation requirements, please not r L this cerffrcalion does' not allow you to parfici)rdte on projects with Community Small Business Enterprise and/or CammunityBusiness Entrprise (CSBE/CBE) program requirements unless you are specifically certified in these progfa,ia_ Please note that certification as a small business enterprise continues to be valid for one (1) year. If any changes occur within your company during the certification period (such as ownership, address, telephone number, Trade catsg ory, licensing, technical certification, bonding capacity, or if the business menses to exist) you must notify this office in writing immediately_ It is imperative that we maintain current information on your company at Lill times_ All inquiries or chafiges related to this cerfficafion should be directed to the Cerfiitca6on Unit between the hours of 8:0D am. and 5:00 p.m. Mondayihrough Friday. This dep.') Lf el li will forward to you an applicaffon for re -certification (a much shorter process) within four (4) weeks of the above cviration date. We look forward to your participation in Miami -Dade Countys small and/or disadvantaged business programs_ 'PenelopeTownsley, Interim Director Small Business Affairs/Department of Procurement Management CATEGORIES: (Your firm maybid or participate on contracts only under these categories) Water &SanitarySew rsystems (DBE) Concrete Contractors (DBE) Commerciai And Institutional Building Construction (DBE) DBORCQ CITY OF MIAMI Capital Improvements Program NW 14th Street Multimedia Entertainment District Streetscape Improvements, B-30694 ADDENDUM NO.4 March 23, 2010 TO: ALL PROSPECTIVE BIDDERS: The following changes, additions, clarifications, and deletions amend the above -captioned Bid/Contract documents, and shall become an integral part of the bid responses and the subsequent contract. Please note the contents herein and affix same to the documents you have on hand. Request for Information Ql. Please provide specs and/or drawings for the tree grates. It only says as requested by the city. Al. Tree grates will not be used in this project. The bid form has been revised with a new line item replacing it. Please see Q2 for further clarification. Q2. What bid item is the "Addaptive TP Resin Bound Aggregate" to be included in? A2. The revised bid form posted as part of Addendum 3 has been replaced. Line Item 70 "Tree Grates as requested by the City of Miami" has been deleted and replaced to include the above item. You must use the version posted and marked "Addendum 4 "with your bid submittal. Failure to use the correct form will result in the bid being deemed non -responsive. Q3. How is the City going to pay for the mobilization and MOT item? The bid form shows 5%. Is this all the City is going to pay? Please clarify. A3. Section 3, Article 5, Schedule of Values, states that Mobilization shall not exceed 5% of the value of the Contract. MOT is included in the Contract and being a separate and distinct category it would be shown as such as required in the Schedule of Values, per Article 5. THIS ADDENDUM IS AN ESSENTIAL PORTION OF THE CONTRACT DOCU i " NTS AND SHALL BE MADE A PART THEREOF. Gary Fabrikant, As t2 1t Director Capital Improvements Program This Addendum should be signed and dated by Bidder and submitted as proof of receipt with the submission of bids. The Bidder by identifying the Addendum number in their bid proposal and by the signing and submission of their bid shall serve as proof of receipt of this Addendum. NW 14th Street Multimedia Streetscape Project NAME OF FIRM: SIGNATURE: DATE: Addendum No 4 Bid No.: 09-010-010 l U9ld ,i� r/I.6-k J7 i �� CITY OF MIAMI Capital Improvements Program NW 14th Street Multimedia Entertainment District Streetscape Improvements, B-30694 ADDENDUM NO. 3 March 18, 2010 TO: ALL PROSPECTIVE BIDDERS: The following changes, additions, clarifications, and deletions amend the above -captioned Bid/Contract documents, and shall become an integral part of the bid responses and the subsequent contract. Please note the contents herein and affix same to the documents you have on hand. Change in Bid Opening Date The original bid opening date of Monday, March 22, 2010 at 2:00 PM has been extended. The newdate and -time are Monday, March 29, 2010 at 3:00 PM. Additional Information .The following Utility Work Schedules are posted on the CIP website and are part of this Addendum: 1. Comcast Utility work schedule 2. FPL Utility work schedule 3.. AT&T Utility work schedule 4. TECO Gas Utility work schedule 5. Miami -Dade Sewer and Water Department work schedule 6. Utility Certification Revised Bid Form The Bid Form that was originally posted on February 19, 2010, has been revised and posted with this Addendum. Line Item # 4 did not list a description and has been corrected with the item listed. This form, must be used or your bid will be deemed non -responsive. Request for Information — Pre -Bid Meeting held on March 9, 2010 Q1. Will a field Office Trailer be required for the project? Al. No. Q2. Will a Staging area be provided by the City? A2. No Q3, Will Compaction methodology of drainage structures and roadway follow DOT's or City specs? A3. The City Specs will be followed however DOT specs will be referred too for items not identified on City Specs Q4. Will drainage trenches be left open overnight if contractor does not complete the proposed run? A4. All open trenches are required by City specs to be covered overnight. NW 14th Street Multimedia Streetscape Project Addendum No 3 Bid No.: D9-0104/10 Q5. Will MDWASA provide tapping to the main or tapping sleeve on the installed watermain-pipes? A5, Contractor will provide the sleeve and Tap, MDWASA will be providing the testing, the attached Addendum provides direction to the question. Q6. If there is a discrepancy between the given Bid Form and actual quantities on the plan, which one governs? A6. Actual items installed per plans and City specification will govern. Additional RFI's Note* Questions 11, 12, 13, 14 and 15 and 23 refer to attachments included with this Addendum and posted on the CIP website. Q7. Sheet 32 shows a plan view of proposed 18" diameter pipe, but in the section detail shows pipe to be 24". Please clarify which size to consider. A7. The correct pipe size is 18" diameter as shown in the Plan View sheet 32, Summary of Drainage Structure sheet 11 and Drainage Structure Sheet 46. Q8. Can a detail for the pavement restoration be provided for drainage? The plans only show restoration for the water main installation. A8. As stated in the Pre -bid meeting Bidders need to obtain a copy of the City of Miami Engineering Standards for Design and Construction. Detail Misc 35-88-6 shall be used for drainage pavement. restoration. Q9. item 102-89-7 has no description. Please clarify. A9. Item 102-89-7 if for Temporary Crash Cushion (Re -directive Option). Refer to FDOT Standard Index 415, Sheet 4 of 10 for additional details. Q10. Please confirm the Class of 12 Water Main. A10. The Pressure Class for Ductile Iron Pipe for size 4-inch through 12-inch is 350 psi. Q11. Where are the Technical Specifications for this Bid available? Is there a Measurement and Payment section? Al 1. Please refer to Water Main Plans General Note No.1, sheet W-2. We are providing an Addendum for the installation of Water Main (only) which includes the following Sections: T 1.00 Changing the Proposed Pipe Grade: Protection of Utilities and Other Facilities. T 2.00 Measurement and Payment Q12. There is an item on the bid form for "Excavation for Structures". The plans do not show any structure in the water system where is thisitem to be used? Al2. Attached is Addendum for the Installation of Water Main (only) which includes the following Sections: T 1.00 Changing the Proposed Pipe Grade: Protection of Utilities and Other Facilities. Q13. The plans reflect several fittings smaller than 8" but the bid form does not have an item for them. Where are these fittings to be paid for? A13. Attached is Addendum for the Installation of Water Main (only) which includes the following Section: T 2.00 Measurement and Payment. Q14. The bid form has an item for 2" service pipe and an item for 2"-4.9" meter boxes, but nothing for the other service materials. Where are they to be paid for? NW 14"' Street Multimedia Streetscape Project Addendum No 3 Bid No.: 09-010-0I0 A14. Same answer as above. Q15. Sheets WM-12 & 13 of the plans call for the connection to the existing 2" main and the new 12" main to be made by M-DWASD forces. Sheets WM-9 has the same type of interconnection but has no such notation. Who will make these interconnections? A15. M-D Water and Sewer forces will make all tap 20 inch or smaller. See attached Addendum same Section as above. Q16. Two-inch pipe is not made in Ductile Iron. Will polyethylene be an acceptable alternative? A16. Yes, refer to Miami -Dade Water and Sewer Design and Construction Standard Specifications and Details, latest edition. Q17. The Bid form and the plans identify several drainage manholes as Type "A". Per City of Miami standards a Type "A" manhole has a corbel. The drainage structure plans reflect a manhole without a corbel, which would be a Type "D". Which manhole is to be used? A17. Bidders shall follow the Drainage Structure Plans description which matches the Summary of Drainage Structure and Bid Form. Q18. As significant amount of the exfiltration trench on NE 14 St is as close as 3 feet to the right-of- way. Will an easement be provided to allow excavation to a (-) 2.00 elevation? A18. License Agreement will be obtained by the City Design Project Manager. An agreement is needed and not an easement. Q19. In some areas of 14 St the roadway is being lowered as much as 9 inches. Will there be compensation to replace manhole corbels if there is insufficient brick work to adjust the manholes? A19. Bidders should include the replacement of the manhole corbels if necessary under the related bid items for Manhole (Adjust). . Q20. Harmonization outside of Right-of-way depicted on plans what does "(requires license agreement)" mean? If this means what I think, such as an individual signed agreement with the property owner, who is responsible to acquire such license agreement.? If license agreement is not obtained what happens? A20. License Agreement will be obtained by the City Design Project Manager. If license agreement is not obtained, the Contractor will be directed to adjust entrances and match existing conditions. Q21. The pay Item "Concrete.Pavement Removal", what does this really mean sidewalk removal or is this concrete pavement in the street? If it is concrete pavement in the street how thick is it and where is it located? A21. In this project this item has been included to compensate for the removal of concrete sidewalk and curb and gutter. Q22. The roof drains being called out on the plans to be replaced by Contractor, does the City actually wants the contractor to replace the roof drain and reconnect it to the new drainage system? A22. The roof drains replacement is limited to the replacement of the existing material damaged during sidewalk reconstruction. Q23. Is there a specification for the roof drains that need to be replaced? Can this be provided? A23. A Roof Drain detail has been attached and is part of this Addendum. The Contractor must verify and match the size of the existing roof drain. Q24. Please confirm that all the 6" and 4" thick concrete sidewalks are to have the "Rock Salt Finish" as per detail on LH 10. A24. Yes, all 6" and 4" thick concrete sidewalk are to have the "Rock Salt Finish" as per detail on LH-10. NW 14th Street Multimedia Streetscape Project Addendum No 3 Bid No.: 09-010-010 Q25. The paver's construction detail does not show a concrete header at the back of the sidewalk, is this correct? A25. Yes, this is correct. The Paver -Edge material will hold the end of the pavers where it meets landscape areas. Where the pavers meet hardscape the hardscape will hold the edge. Q26. Is there a specific small business participation goal which must be met for this project? Are we only to complete the "Subcontractor Utilization Form" for reference purposes only? A26. There is not a specific goal to meet. The purpose of the SU form is to identify the subcontractors that will be used, verify the number of workers who are using H2B Visas, to provide information regarding the percentage of work the contractor is self -performing. Q27. Does this project require contractor's to provide public information services, since it is located in such a high -profile area? A27. No. THIS ADDENDUM IS AN ESSENTIAL PORTION OF THE CONT!' DOCUMENTS AND SHALL BE MADE A PART THEREOF. Gary Eabrikant, -nt Director Capital Improv_,. e, r Program This Addendum should be signed and dated by Bidder and submitted as proof of receipt with the submission of bids. The Bidder by identifying the Addendum number in their bid proposal and by the signing and submission of their bid shall serve as proof of receipt of this Addendum. NW 14th Street Multimedia Streetscape Project NAME OF FIRM: 0� �1/,1/ G lti 7 /( SIGNATURE: DATE: /O Addendum No 3 Bid No.: 09-010-010 ADDENDUM FOR THE INSTALLATION OF WATER MAIN NORTH 14T14 STREET FROM FEC RAILROAD CROSSING TO ALE 2A1D AVENUE CITY OF MIAMI PROJECT No. B-30194 Approved By: P.E.. Date: Page(s): Eithel M. Sierra P.E. No. 55401 03-11-2010 1-6 T1.00 CHANGING THE PROPOSED PIPE GRADE: PROTECTION OF UTILITIES AND OTHER FACILITIES The Contractor shall explore far enough in advance of' his main trench to determine the exact location and condition of utilities, structures or facilities so that, before the pipe is Installed, the Engineer may change the • line or grade of the pipe, should that become necessary to avoid a conflict. All costs for changing the grade of the proposed water main upward or downward greater than 2.5 feet in order to clear existing obstructions or utilities shall be included in established bid unit prices for pipe, fittings, valves, water services, etc., plus the volume of the additional excavation necessary (that volume in excess of the additional 2.5 feet), paid under established pay item 125-1, Excavation for Structures, CY, which is limited to all excavation, backfilling, labor, equipment, profit, and overhead to perform this change in pipe grade, downward greater than 2.5 feet. No additional compensation will be allowed. The Contractor shall backfill the trench (that volume in excess of the additional 2.5 feet) with selected backfill, as specified in Section 125-8 of the FDOT Specifications, as amended; to within 2.5 feet below the outside bottom elevation of the proposed pipe barrel, the cost of which backfill and excavation shall be included in the price for Excavation for Structures, and no additional payment shall be made for this work. Changing -the grade of the proposed water main by rising deflections, or the alignment by horizontal deflections will not be considered as extra work, or extra cost, to the Contractor unless specific backfilling procedure is described in the Contract Documents. Price of the pipe and fittings installation will be full compensation for all backfilling. Where it is necessary to temporarily interrupt house or building services, the Contractor shall notify the house or building owner or occupant, both before the interruption and again immediately before service is resumed. Before disconnecting any pipes or cables, the Contractor shall obtain permission from the owner, or shall make suitable arrangements for their disconnection by the owner. The Contractor shall be responsible for any damage to any such pipes, conduits or cables, and shall restore them to service promptly as soon as the work has progressed past the point involved. T2.00 MEASUREMENT AND PAYMENT Payment will be made under. Pay Item 125-1 For pipe trench overcut and utility structures excavation. The cubic yard volume of excavation is to be used as a basis of payment, and includes the material actually removed below the original ground line or stream bed. The price per cubic foot of excavation shall be full compensation for the completed work and shall include, but not be limited to, excavating to the specified depth, transporting and disposing of the unsuitable material as directed by the Engineer, placing, leveling and compacting suitable select backfill material to the level specified, and performing final cleaning, as may be necessary for the proper execution of the work. Pay Item 400-2-15 (Contingency Item) Concrete Class II. The quantity of concrete to be paid for will be the volume, in cubic yards in place, completed and accepted. Price and payment will be full compensation for each work related to the volume of concrete and shall include all forms, falsework, joints, weep holes, drains, pipes, conduits, bearing pads, setting anchors bolts and dowels, reinforcement, surface finish, and cleaning up, as shown in plans and M-D WASD Standard Detail G.S. 1.2. The price will also include saw cutting existing pavement, excavation, backfilling, clearing and grubbing as indicated in plans. Pay Items 1050-11-422A, 150-11-422B, and 105011-423 For furnishing and installing ductile iron pipe (push -on and/or restrained joints) and fittings (pipe diameter less than 8-inch), which will be paid for at the unit price bid times the number of linear feet installed and accepted, which payment shall be full compensation for. furnishing all materials and installation for the water main complete except for those out in another bid and shall include but not be limited to: pipe & fittings (pipe diameter less than 8-inch), pipe bedding; excavation and backfilling; flowable fill; removal and disposal of unsuitable material;.A-3 material and excavation and removal of existing material; removal and replacing miscellaneous structures; changing pipe grade; optional base, structural course "SP", prime coat, tack coat; pavement and base restoration; restoration of driveways, sidewalks, curb, gutters', concrete pavements (crosswalk), traffic separators, sprinkler systems and grassed areas; saw cutting existing pavement exploratory and construction excavation; sheeting and shoring to control trench width; de -watering the excavation; slab covered trench restoration and desilting; transportation and handling cost delivered ditch - side; unloading the ductile iron pipe and fittings from delivery trucks at the job site (trench side) and placing the pipe and fittings into position in the trench; making thrust restrained joints; cutting and installing cast iron nipples; fumishing and installing all joint materials including thrust -resistant materials and including vegetable soap lubricant; supporting and protecting existing utilities along the route of the lines themselves; furnishing and installing gaskets to restrain pipes at location specified in the plans or required by the Engineer, tapping the main for corporation stops, if necessary; plugging and placing out of service the existing water main at location indicated on the Plans (pipe diameter less than 8-inch); removing of concrete anchors and cast iron plugs; coordinating with existing users; fumishing all materials and equipment required to and test the main; cleaning, testing and disinfecting main; replacing utilities, catch basins, manholes, grass, shrubs, mail boxes, sidewalk, concrete crosswalk, curbs, fences, walls, sprinkler systems, and shoulder, gravel and/or concrete driveway, and all other similar items, to original locations and to equal or better than original condition; other details within Contract Plans and/or required by MDWASD Design and Construction Standard Specifications and Details; project record document and all other appurtenant and miscellaneous items and work including final cleanup for the complete and satisfactory installation. The quantity for payment shall be the horizontal projection of the center line of the permanently installed and accepted pipe, including the length of valves and fittings along the run, measured to the nearest one -tenth of a foot from P.I. to P.l. of fittings and to the seat of the bell at the end of any particular run. Pay Items 1050-11-424A and 1050-11-424B For furnishing and installing ductile iron pipe (push -on and/or restrained joints), which will be paid for at the unit price bid times the number of linear feet installed and accepted, which payment . shall be full compensation for furnishing all materials and installation for the water main complete except for those out in another bid and shall include but not be limited to: pipe, pipe bedding; excavation and backfiiling; flowable fill; removal and disposal of unsuitable material; A-3 material and excavation and removal of existing material; removal and replacing miscellaneous structures; changing pipe grade; optional base, structural course "SP", prime coat, tack coat pavement and base restoration; restoration of driveways, sidewalks, curb, gutters, concrete pavements (crosswalk), traffic separators, sprinkler systems and grassed areas; saw cutting existing pavement exploratory and construction excavation; sheeting and shoring to control trench width; de -watering the excavation; slab covered trench restoration and desilting; transportation and handling cost delivered ditch - side; unloading the ductile iron pipe and fittings from delivery trucks at the job site (trench side) and placing the pipe and fittings into position in the trench; making thrust restrained joints; cutting and installing cast iron nipples; furnishing and installing all joint materials including thrust -resistant materials and including vegetable soap lubricant supporting and protecting existing utilities along the route of the lines themselves; furnishing and installing gaskets to restrain pipes at location specified in the plans or required by the Engineer; tapping the main for corporation stops, if necessary; furnishing all materials and equipment required to and test the main; cleaning, testing and disinfecting main; replacing utilities, catch basins, manholes, grass, shrubs, mail boxes, sidewalk, concrete crosswalk, curbs, fences, walls, sprinkler systems, and shoulder, gravel and/or concrete driveway, and all other similar items, .to original locations and to equal or better than original condition; other details within Contract Plans and/or required by MDWASD Design and Construction Standard Specifications and Details; project record document and all other appurtenant and miscellaneous items and work including final cleanup for the complete and satisfactory installation. The quantity for payment shall be the horizontal projection of the center line of the permanently installed and accepted pipe, including the length of valves and fittings along the run, measured to the nearest one -tenth of a foot from P.I. to P.1. of fittings and to the seat of the bell at the end of any particular run. Pay Item 1050-11-922 For fumishing and installing 1-in short single, 1-in long single, 1-in short dual, 1-in long dual (copper or HDPE), 2-in short single, 2-in long single, 2-in short dual and 2-in long dual (HDPE) water services, respectively, will be paid for at the unit price bid .times the number of linear feet installed and accepted. The price shall be full compensation for each complete installation, ready for service, and shall include, but not be limited to, saw cutting existing pavement, all special sheeting and shoring; including cutting and threading as required; excavating and backfilling; flowable fill; removing and disposing of unsuitable material; A-3 material and excavating and removing of existing material; removing and replacing miscellaneous structures; tapping the main; furnishing and installing the corporation stops; changing pipe service grade; furnishing and installing concrete, changing water service grade; temporary paving or driving the steel casing pipe under pavement; fumishing and installing copper or HDPE tubing, couplings, unions, service terminal fittings, and other miscellaneous fittings; installing perforated spacers and tailpieces, fumishing all materials and equipment required to and test the service line; cleaning, testing and disinfecting, permanent pavement and base restoration; flowable fill; repairing and bringing existing sidewalk, driveways and curb and gutter to equal of better than original conditions; other details within the Contract Plans and/or required by MDWASD Design and Construction Standard Specifications and Details; and all other appurtenant and miscellaneous items and work to provide a complete, functional and satisfactory installation. Pay items 1055-11-414; 1055-11-424; 1055-11-434; 1055-11-444 For furnishing and installing fittings to the proposed water main (for pipe diameter over 8-inch) at locations indicated in the plans. The cost will be the unit price bid for each fitting installed and accepted. The price shall be full compensation for the.complete installation, ready for service, and shall include, but not be limited to: all transportation and handling cost delivered to ditch -side; changing fittings grade; excavating and backfilling; flowable fill; furnishing and installing gaskets and/or thrust blocks to restrain fittings at location specified in the plans or required by the Engineer; other details within Contract Plans and/or required by MDWASD Design and Construction Standard Specifications and Details; A-3 material and excavation and removing existing material and all other appurtenant and miscellaneous items and work to provide a complete, functional and satisfactory installation Pay Item 1055-11-454 For plugging and placing out of services existing (for pipe diameter over 8-inch) of existing water mains at locations indicated on the Plans. The price will be at the unit price bid for each cap or'plug. The price shall be full compensation for the complete installation, ready for service and shall include, but not be limited to; plugging and placing out of service the existing water main at location indicated on the Plans; removing of concrete anchors and cast iron plugs; coordinating with existing users; saw cutting existing pavement; excavation and backfilling; removal and disposal of unsuitable material; sheeting and shoring if necessary; de -watering the excavation; pavement and base restoration; removal of existing water mains and gravity sewers in conflict with proposed construction; other details within Plans and/or required by MDWASD Design and Construction Standard Specifications and Details; all appropriate items and work together with all other appurtenant and miscellaneous items and work to provide a complete, functional and satisfactory installation. Pay Items 1080-11-201 Include the cost of furnishing and installing water meter box, which payment shall be full compensation for all materials and shall include but not limited to: meter box and lid, excavating and removing of existing material; assisting M-WASD force during the installation of the new meter as specified on the M-D WASD service connection details; adjusting meter box to finish grade; constructing a 3'x3'x6" reinforced concrete slab for non -sidewalk condition; repairing and bringing existing sidewalk, driveways and curb and gutter to equal of better than original conditions; removing, cleaning, loading, delivering and unloading to the M-D WASD storage yard existing water meters. Include any payment and all incidental items and labor charged by M-D WASD for connecting the new water meter service. Include all other appurtenant and miscellaneous items and work including final cleanup for the complete and satisfactory installation. Pay Item 1080-11-203; 1080-11-303; 1080-11-403; and 1080-11-503 For furnishing and installing Tapping Sleeves and Tapping Valves complete connecting to the existing water main at the locations indicated on the Plans. The price will be at the unit price bid for each connection. The price shall be full compensation for the complete installation, ready for service and shall include, but not be limited to; all appropriate items and work including connection to the existing pipe; furnishing and installing tapping sleeve and valve; installing valve box; pressure testing the valve in both directions prior to installation; furnishing and installing polyethylene encasement saw cutting existing pavement, excavation, and backfilling; changing pipe or tapping valve/sleeve grade; sheeting and shoring; furnishing and installing permanent pavement and base restoration; coordinating with and assisting M-D WASD forces to perform taps; including payment of "Pipe Tapping Charges" to M-D WASD for their services; and other details within the Contract Plans and/or required by MDWASD Design and Construction Standard Specifications and Details; together with all other appurtenant and miscellaneous items and work to provide a complete, functional and satisfactory installation. M-D WASD forces will make all taps 20-in or smaller. Taps over 20-in in nominal size shall be made by the Contractor. The Contractor shall pay M-D WASD "Pipe Tapping Charges" as follows: Tap Size Value 1-in $100.00 1 1/rin $110.00 2-in $120.00 4-in $340.00 6-in $420.00 8-in $485.00 12-in $665.00 16-in $1,190.00 20-in $1,500.00 Overtime Charge $95.00 M-D WASD will charge $180.00 additional if their personnel arrive at the job site and are unable to perform the tap due to Contractors' negligence. The Contractor shall also furnish all necessary supports for the tapping crew such as excavation of the required pit for the tapping machine, and other work as required. Pay Items 1080-11-204A; 1080-11-204B; 1080-11-304; and 1080-11-404; For fumishing and insfalling valves and valve boxes, will be paid at the unit price bid times the number bf valves and valve boxes installed and accepted. The price shall be full compensation for all materials and installation for the complete, tested and operational valves and shall include but not be limited to; restraining mechanical joint plug where required; riser pipe; valve box; concrete materials; all materials, labor, and equipment for' testing; cutting, welding and installing valve operator extension shaft and associated components; furnishing and installing retainer glands to restrain valves at location specified in the plans or required by the Engineer; torque limiting device; tapping the flushing valve outlet to the cap fitting of the main where shown in the plans, polyethylene encasement if required; flanged joint materials; saw cutting existing pavement; , changing pipe or valve grade; restoring pavement and base; all sheeting and shoring; bi- directional testing of the valves prior to installation; constructing where required, thrust blocks and support pads; concrete for valve box collar and, if required; transportation, handling cost, and unloading valves from delivery truck ditch -side; other details within the Contract Plans and/or required by MDWASD Design and Construction Standard Specifications and Details; and all other appurtenant and miscellaneous items required for a complete, functional and satisfactory installation. Pay Item 1080-11-206 For furnishing and installing air release valve, will be paid at the unit price bid times the number of air. release valve installed and accepted. The price shall be full compensation for all materials and installation for the complete, tested and operational valves as specified in Plans and/or required by MDWASD Design and Construction Standard Specifications and Details; and all other appurtenant and miscellaneous items required for a complete, functional and satisfactory installation. Pay Item 1080-16A and 1080-16B Include the cost of removing and disposing existing meter boxes and existing valve boxes as indicated in plans, which payment shall be full compensation for all materials and 'shall include but not limited to: removing and disposing existing meters and valve boxes; cutting and removing valve riser's pipe to 18 inches below finish grade on all water mains being placed out of service; excavation; restoring .any necessary base, pavement, asphalt or concrete to finish grade; and all incidental items and labor required for removing existing meters and valve boxes. Includes also all other appurtenant and miscellaneous items and work including final cleanup for the complete and satisfactory removal. Pay Item 1644-113-08 For fumishing and installing Fire Hydrant assemblies complete. The price will be paid for at the unit price bid times the number of assemblies installed and accepted. The price shall be full compensation for all materials for the complete, tested, and operational fire hydrant, and shall include but not be limited to, all items described in the M-D WASD Standards; all required dewatering; transportation and handling cost delivered to the trench site; placing the hydrant in the trench and connecting it to the 6-in hydrant branch; installing the hydrant elbow and the concrete anchor, saw cutting existing pavement, special sheeting and shoring; including cutting and threading as required; excavating and backfilling; fumishing additional suitable backfill material, if required; fumishing and installing reinforced concrete slab, valve box and cover, permanent pavement and base restoration, if necessary; blue reflective pavement marker, repairing and bringing existing sidewalk and curb and gutter to equal or better than original conditions; lubricating the hydrants, if necessary; touch-up painting of fire hydrant, if required; making thrust resistant joints; fumishing and installing tie rods and eyebolts; any necessary pavement, asphalt or concrete, or landscape harmonization to connect to private property; other details within Plans and/orrequired by MDWASD Design and Construction Standard Specifications and Details; and all other appurtenant and miscellaneous items and work to provide a complete, functional and satisfactory installation. Pay Item 1644-900 For removal of existing Fire Hydrant assemblies complete. The price will be paid for at the unit price bid times the number of fire hydrants assemblies removed. The price shall be full compensation for removing, cleaning, loading, delivering and unloading to the M-D WASD storage yard existing fire hydrants and shall include, but not be limited to: plugging and placing out of service existing fire water line; transportation and handling costs; saw cutting existing pavement, special sheeting and shoring; including cutting and threading as required; excavation and backfilling; furnishing and installing reinforced concrete slab, permanent pavement and base restoration, if necessary; repairing and bringing existing sidewalk and curb and gutter to equal or better than original conditions; any necessary pavement, asphalt or concrete, or landscape harmonization to connect to private property; other details within Contract Plans and/or required by MDWASD Design and Construction Standard Specifications and Details; and all other appurtenant and miscellaneous items and work. EXISTING C.I.P. ROOF DRAIN STAINLESS STEEL BANDS PVC PIPE (0.D. EQUAL TO 0.D. OF C.I,P.) R/W 1' I(TYP.) (SEE NOTE 2) FERNCO ADAPTER (OR EQUAL) R/W .T.S. EXISTING CURB, GUTTER, AND SIDEWALK (TO BE REMOVED) EXISTING C.I.P. ROOF DRAIN SAWCUT ROOF DRAIN CAST IRON CURB OPENING NEENAH R-3262 OR EQUAL) PROPOSED 4" CONCRETE SIDEWALK PVC PIPE (SCHEDULE 40) EXISTING C.I.P. ROOF DRAIN ROOF DRAIN EXTENSION DETAIL (TYPE A) AN PROPOSED CURB & GUTTER Project No. 13-30394 NW 14 Street Mulitmedia Entertainment District Streetscape Improvements N. 14th Street from FEC Railroad to NE 2nd Ave (Reconstruction) BID FORM N. Miami Ave from 1-395 to N. 15th Street (Milling and Resurfacing) Addendum No. 3 ITEMDESCAIPTION:..; .1 ,1 1 a� 2, 102-14 102-71-14 102-71-24 102-89-7 110-1-1 110-4 120-1 120-6 160-4 TRAFFIC CONTROL OFFICER ROADWAY AND HARDCAPE PAY ITEMS BARRIER WALL (TEMPORARY) (TYPE K) (F&I) (CONCRETE) BARRIER WALL (TEMPORARY) (F&I) (TYPE K) (RELOCATE) (CONCRETE) IMPACT ATTENUATOR (RE -DIRECTIVE OPTION) (TEMPORARY) CLEARING AND GRUBBING CONCRETE PAVEMENT REMOVAL 285-706 327-70-8 331-2 334-1-13 425-1-901 425-1-902 425-1-907 425-2-101 425-2-101-D5 425-2-102 425-2.103 425-5-1 425-6 430-171-101 430-171-201 430-94-1 443-70-4 520-1-10 522-1 522-2 526-1-2 635-1-11 EXCAVATION REGULAR EMBANKMENT MH LF LF LO (LS/AC) SY CY STABILIZATION CY 2,160 3,400 4,700 36 2.590 8,048 6,803 OPTIONAL BASE (BASE GROUP 06) (8" LIMEROCK AS PER CITY OF MIAMI) MILLING EXISTING ASPHALT (2-1/2" AVG. DEPTH) TYPE S ASPHALTIC CONCRETE (1") (AS PER CITY OF MIAMI) SUPERPAVE ASPHALTIC CONCRETE (TRAFFIC "C") INLET (TYPE F3) (COMPLETE) (<10') INLET (TYPE F3) (COMPLETE) (>10') INLET (TYPE F3) (COMPLETE) (TYPE D BOTTOM) (<10') MANHOLE (TYPE A) (< 10') MANHOLE (TYPE D-5) (< 10') MANHOLE (TYPE A) (> 10') MANHOLE (PARTIAL) (< 10') MANHOLE (ADJUST) VALVE BOX (ADJUST) SY SY SY TN TN EA EA EA EA EA EA EA EA 21 13,674 12,242 3,929 849.0 1,400.8 PIPE CULV (OPT MATL)(ROUND)(UP TO 24°) EA PIPE CULV (OPT MATL)(ELLIPTICAL)(UP TO 24") DESILTING PIPE (UP TO 24") FRENCH DRAIN (24") CURB AND GUTTER CONC. (TYPE F) SIDEWALK CONC. (4" THICK) SIDEWALK CONC. (6" THICK) (DRIVEWAYS) ARCHITECTURAL PAVERS PULL BOX RELACEMENT (CONTINGENCY) •LF LF LF LF LF SY SY SY 30 1 3 18 1 3 2 22 37 1,467 43 383 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.0 8 $0.00 $0.00 $0.00 $D.00 $0.00 $0.00 $0.00 $0.00 540 6,808 4,770 EA 675 818 51 TOTAL ROADWAY ITEMS= $0.901 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 '•••$000 PAGE PAY ITEM s 1j .'1 "4�FSCRIPTION . 20 •A i t UNITS. N '- rn,- ( OUANTiT)' :' TOTAL AMOUNT. '.:30:,l') < SIGNING AND PAVEMENT MARKING PAY ITEMS -! 31 700-20-11 SIGN SINGLE POST (LESS THAN 12 SF) AS 700-20-13 SIGN SINGLE POST (20 + BACK-TO-BACK) AS 70 1 $0.00 $0.00 9' t;:32-; 33'.;';:; 700-20-41 SIGN EXISTING RELOCATE (SINGLE POST) AS ;; 34 700-20-61 SIGN EXISTING REMOVE(SINGLE POST) AS 2 $0.00 $0.00 r,. 706-3 RETRO-REFLECTIVE PAVEMENT MARKERS EA 58 353 5::? _:':. 36: 710-11-111 TRAFFIC STRIPE SOLID (WHITE) (6") NM 1.170 $0.00 : '-. 710-11-122 TRAFFIC STRIPE SOLID (WHITE) (8") LF LF 3,632 $0.00 ?%-<97._;.; 710-11-123 TRAFFIC STRIPE SOLID (WHITE) (12") LF 3,800 ,;..38-._„ .; s 39: 710-11-124 TRAFFIC STRIPE SOLID (WHITE) (18") LF 2,136 . $0.00 $0.00 ).� 40 710-11-125 TRAFFIC STRIPE SOLID (WHITE) (24") LF 838 $0.00 � 710-11-131 TRAFFIC STRIPE SKIP (WHITE) (6") (10'-30') GM $0.00 • :::::41..:<;;;; _ ;42:` 710-11-151 TRAFFIC STRIPE SOLID (WHITE) (2'-4' DOTTED) LF 0.234 296 $0.00 ::;'?; 710-11-160 PAVEMENT MESSAGE (PAINTED) EA 86 $0.00 ::43;:':'i`% 710-11-170 DIRECTIONAL ARROWS (PAINTED) EA 34 $0.00 „4:4`,:=`;' 710-11-211 TRAFFIC STRIPE SOLID (YELLOW) (61 NM 1.448 $0.00 Note: 710-' Items Includes 3 applications (one for MOT end two for final surface). TOTAL SIGNING AND PAVEMENT MARKINGS ITEMS=':::.... :: $0.00 :PAGE ' PAY ITEM ° � DESCRIPTION UNI TS'£f ' �AUERAGE UNIT y x• i COST Q UANTITY ai • TOTAL AMOUNT'' ' 45. WATERMAIN PAY ITEMS ; . ? 125-1 EXCAVATION FOR STRUCTURES CY $0.00 :°';:46.':?;,_>> 327-70-1 MILLING EXISTING ASPHALT (1" AVG. DEPTH) Sy 50 30 $0.00 `47:,:;::;;3< 331-2 TYPE 5 ASPHALTIC CONCRETE (1") (AS PER CITY OF MIAMq ,TN 250.0 $0.00 48 i' ' 400-2-15 CLASS II CONCRETE (MISCELLANEOUS CONTINGENCY) CY 10 $0.00- 47 ,� 1050.11-422A UTILITY PIPE (F&I) (D.I.) (250 PSI) (WATER) (2") LF 37 $0.00,•) ,.48:-:^;;: 1050 •11.4228 UTILITY PIPE (F&Q (O.L(250 PSI) (WATER) (4") LF 17 $0.00 49 ":;; ?:; :^?49°; 1050-11-423 UTILITY PIPE (F&I) (D.I.) (250 PSI) (WATER) (6") LF 199 $0.00 ''.? 1050-11-424A UTILITY PIPE (F&I) (D.I.) (250 PSI) (WATER) (8") LF $000 50.:?!.)`; 1050.11.424B UTILITY PIPE (F&I) (D.I.) (250 PSI) (WATER) (12") LF 30 1,656 $0.00' 51;. 1050-11-922 UTILITY PIPE (F&I) (SERVICE COOPER OR HDPE) (WATER) (2") LF 107 $0.00 • ;;:5?:.-- r::-::- 1055-11-414 UTILITY FITTINGS (F&I) (D.I.) (ELBOW) (SIZE 8"-19.91 EA 49 53;`,, , 1055-11-424 UTILITY FITTINGS (F&I) (D.I.) (TEE) (SIZE 8"-19.9") EA 15 $0.00 $0.00 ;; 54 ;5'; - 1055-11-434 UTILITY FITTINGS (F&I) (DI) (REDUCER) (SIZE 8"-19.9") EA 1 1055-11-444 UTILITY FITTINGS (F&I) (D.I.) (SOLID SLEEVE) (SIZE 8"-19.9") EA 2 $0.00 '156..«._;". 1055-11-454 UTILITY FITTINGS (F&I) (D.I) (CAP/PLUG) (SIZE 8"-19.9") EA 23 $0.00 $0.00 57 :>_>. 1080-11-201 UTILITY FIXTURES (F&I) (METER BOX) (SIZE 2" - 4.9") EA 6 $0.00' ? 58. f:.:f.. 1080-11-203 UTILITY FIXTURES (F&I) (TAPPING SLEEVE & TAPPING VALVE) (SIZE 2" - 4.9" - EA ::TO. ) • $0.00 s 58 :.< 1080-11-204A UTILITY FIXTURES (F&I) (VALVE ASSEMBLY) (SIZE 2" - 4.9") EA __•.- 1 $0.00 59 ' 1080.11-204B UTILITY FIXTURES (F&I) (FLUSHING VALVE OUTLET) (SIZE 2" - 4.9") EA 8 $0.00 60 5 1080-11-206 UTILITY FIXTURES (F&1) (AIR RELEASE) (SIZE 2" • 4.9") EA - 9 $0.00 61 ri 1080-11-303 UTILITY FIXTURES (F&I) (TAPPING SLEEVE & TAPPING VALVE) (SIZE 5" - 7.9" EA 3 • $0.00 ' c:62', : 1080-11-304 UTILITY FIXTURES (F&I) (VALVE ASSEMBLY) (SIZE 5" - 7.9") EA ., 11 $0.00 63 :: 1080-11-403 UTILITY FIXTURES (F&I) (TAPPING SLEEVE & TAPPING VALVE) (SIZE 8" - 19..1 EA • 6 - $0.00 83;'::: ? ` 1080-11-404 UTILITY FIXTURES (F&I) (VALVE ASSEMBLY) (SIZE 8" - 19.9") EA 10 $0.00 04 ( <; 1080-11-503 UTILITY FIXTURES (F&I) (TAPPING SLEEVE & TAPPING VALVE) (SIZE 20" - 49 EA 1 $0.00 1 1080-16A UTILITY FIXTURES (F&I) (REMOVE AND DISPOSE) (METER BOXES) EA 40 $0.00 •i66'., _i":; 1080-16B '1644-113-08 UTILITY FIXTURES (F&I) (REMOVE AND DISPOSE) (VALVE BOXES) EA 12 $0.00 •:,; _-66' , _ •'''' FIRE HYDRANT (F&I) (STD) (2 HOSE, 1 PUMPER) (6") EA 6 $0.00 <BT: :; 1644-900 FIRE HYDRANT (REMOVE) EA 6 $0.00 TOTAL WATER MAIN ITEMS= ...: $0.00 PAGE PAY ITEM 1 , DE SCRIPTION Nrrisr U I L o 4AVE RAGE UNtT., CO5T auANTfTY ' TOTACAMOUNT'. LANDSCAPE PAY ITEMS , 580-1-1 LANDSCAPE COMPLETE (SMALL PLANTS) LS 1 $0.00 ;ti,9_...%. . "`70;;"_ 580-1-2 LANDSCAPE COMPLETE (LARGE PLANTS) LS 1 $0.00 TREE GRATES (AS REQUESTED BY THE CITY OF MIAMI) EA 10 $0.00 TOTAL LIGHTING ITEMS= `- ...' .. :.:$0:00 SUBTOTAL ALL AREAS 71 i•.; 102-1 MAINTENANCE OF TRAFFIC (5%) (TIME OF CONSTRUCTION = 270 OA) LS 1 � iP;.:>>;72-:, ..,; 101-1 MOBILIZATION (5%) - LS 100% DESIGN COMPLETION ENGINEERING CONSTRUCTION $ _ CITY OF MIAMI Capital Improvements Program NW 14th Street Multimedia Entertainment District Streetscape Improvements, B-30694 ADDENDUM NO. 2 March 8, 2010 TO: ALL PROSPECTIVE BIDDERS: The following changes,- additions, clarifications, and deletions amend the above -captioned Bid/Contract documents, and shall become an integral part of the bid responses and the subsequent contract. Please note the contents herein and affix same to the documents you have on hand. Change In Bid Documents Section 5-Questionarie Article C-"Current and Prior Experience" paragraph 2, has been amended to read as follows: "Prior Projects of a similar size, scope and complexity: Provide an attachment to this Questionnaire that includes completed projects the Proposer considers of a similar, size, scope and complexity that the City should consider in determining the Bidders responsiveness and responsibility". Request for Information Q1. What is the Engineers cost estimate? Al. The project estimate including hard and soft costs is $3,400,500. THIS ADDENDUM IS AN ESSENTIAL PORTION OF THE CONTRACT DOCUMENTS AND SHALL BE MADE A PART THEREOF. Gary Fabn fit, Assistant Director Capital I provements Program This Addendum should be signed and dated by Bidder and submitted as proof of receipt with the submission of bids. The Bidder by identifying the Addendum number in their bid proposal and by the signing and submission of their bid shall serve as proof of receipt of this Addendum. NAME OF FIRM: b U-60i/�ns c. `or1 SIGNATURE: ✓ ��� DATE: III�i•� l0 NW 14th Street Multimedia Streets.cap.e. Project Addendum No 2 Bid No.:. 09-010-010 . CITY OF MIAMI Capital Improvements Program NW 14th Street Multimedia Entertainment District Streetscape Improvements, B-30694 ADDENDUM NO. 1 February 24, 2010 TO: ALL PROSPECTIVE BIDDERS: The following changes, additions, clarifications, and deletions amend the above -captioned Bid/Contract documents, and shall become an integral part of the bid responses and the subsequent contract. Please note the contents herein and affix same to the documents you have on hand. Change in Pre -Bid Meeting Date The non -mandatory Pre -Bid meeting originally scheduled for Friday, March 5, 2010 at 10:00 AM has been rescheduled. The new date and time is Tuesday, March 9, 2010 at 10:00 AM at the previously stated location. THIS ADDENDUM IS AN ESSENTIAL PORTION OF THE CONTRACT DOCUMENTS AND SHALL BE MADE A PART THEREOF. Gary Fabrikant,fAssistant Director Capital Improvements Program This Addendum should be signed and dated by Bidder and submitted as proof of receipt with the submission of bids. The Bidder by identifying the Addendum number in their bid proposal and by the signing and submission of their bid shall serve as proof of receipt of this Addendum. NAME OF FIRM: SIGNATURE: DATE: NW 14 Street Multimedia Streetscape•Project - • - ••••Addendum-No•1-•- • • - • --• - • • •--Bid-No.:--09-010-010- - - - -• ---- -• - r SOLUTION Construction, Inc. LI C. # CGC1.505r 7955 NW 12th Ave., Ste. 425 • Miami, Florida 33126 • Phone: 786.621.8550 • Fax: 786.524.0775 RFI #: 1 To: Cecilia Wilson CC: File From: 1 a7aro Perez Date: 3/9/2010 Project NW 14 ST Multimedia District Streets' treet cape Improvements B-30394 Sheet 32 shows a plan view of proposed 18" diameter pipe, but in the section detail shows pipe to be 24". Please clarify which size to consider. Please provide a spec for the roof drains to be replaced. - . Can a detail for the pavement restoration be provided for drainage? The plans only show restoration for the water main installation. - Item 102-89-7 has no description. Please clarify. Please contact us with any questions. Thank you, Lazaro Perez Bid Manager 1 Section 6- Contract Execution Form This Contract f4 3D (contract number) made this 141 7 day of 1if,CZey\&{ 'in the year 2010 in the amount of $1,977,272.45 by and between the City of Miami, Florida, hereinafter called the "City," and Solution Construction, Inc., hereinafter called the "Contractor". IN WITNESS WHEREOF, the parties have executed this Agreement as of the day and year first above written. WITNESS/A EST (Solution Co Mr.: Andres Coy' President Ign - ure Signature ruction, Inc.) .i / T' ,l I Print Name, Title Print Name, Title of Authorized Officer or Official ATTEST: CONTRACTOR Secretary (Affirm CONTRACTOR Seal, if available) ATTEST: 4�. (Corporate Seal) City of Miami, a municipal corporation of the State of Florida Priscilla Thompson, City, rk r✓ A C-rlos A. Migoya, City Manager —(CS APPROVED AS TO INSURANCE REQUIREMENTS: r• Director, Gary 'eshefsky Risk Management Department APPROVED AS TO LEGAL FORM AND CORRECTNESS: Juli- •. Bru, A orney DIRECTORS that the CORPORATE RESOLUTION WHEREAS, GLt-l7d A CZ"I .lG17d^% , Inc. desires to enter into a contract with the City of Miami for the purpose of performing the work described in the contract to which this resolution is attached; and WHEREAS, the Board of Directors at a duly held corporate meeting has considered the matter in accordance with the By -Laws of the corporation; Now, THEREFORE, BE IT RESOLVED BY THE BOARD OF (type title of officer) a-4,0-S eois hereby authorized (type name of officer) and instructed to enter into a contract, in the name and on behalf of this corporation, withthe City of Miami upon the terms contained in the proposed contract to which this resolution is attached and to execute the corresponding performance bond. DATED this day of , 20 Corporate Secretary (Corporate Seal) CERTIFICATE AS TO CORPORATE PRINCIPAL '';1 , certify that I am the Secretary of the corporation named as Principal in the foregoing Performance and Payment Bond (Performance Bond and Payment Bond); that 1» t S �� � , who signed the Bond(s) on behalf of the Principal, was then /1L r'of said corporation; that I know his/her signature; and his/her signature thereto is genuine; and that said Bond(s) was (were) duly signed, sealed and attested to on behalf of said corporation by authority of its goveming body. (SEAL) Secretary (on behalf of) .S /uflMJ 64.0i/C/?Br z+E. Corporation STATE OF FLORIDA ) SS COUNTY OF MIAMI-DADE ) Before me, a Notary Public duly commissioned, qualified and acting personally, appeared an-d ' '' to me well known, who being by me first duly sworn upon oath says that he/she has been authorized to execute the foregoing Performance and Payment Bond (Performance Bond and Payment Bond) on behalf of Contractor named therein in favor of City. �p Subscribed and Swom to before me this 4d day 20 My commission expires: QGr. f No ary = - o onda at Large NO' ARY PLBLIC-STATE OF FLORIDA Bonded by'' '" Aimet R _ . ' Lomnuslon #DD935858 5 " Expires: OCT. 30, 2013 BONDED Mr AT!.:1\17C B05DLNG CO., INC. Jun. 28. 2010 11:04AM ' Solution Contruction Inc 1 No. 0126 P. 8 n Bond Number 80066380 FORM OF P1=RFORMANCE BOND (Page 'I of 2) BY THIS BOND, We Solution Construction, Inc. The Guarantee Company of hereinafter called Contractor, and North America USA as Principal, , as Surety, are bound to the City of Miami, Florida, as Obligee, hereinafter called " City, in the amount of One Million Nine Hundred Seventy Seven Thousand Two Hundred Seventy Two and 45/100 Dollars ($1 ,977,2724for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally. WHEREAS, Contractor has by written agreement entered into a Contract, Bid/Contract No: 09-1.0-010, awarded the -Oh day of f c.e M b P a' , 20 i2 , with City which Contract Documents are by reference incorporated herein and made a part hereof, and specifically include provision for liquidated damages, and other damages identified, and for the purposes of this Bond are hereafter referred to as the "Contract"; THE CONDITION OF THIS BOND is that if Contractor 1. Per�{{ rash }}}}fi�e Coo rac . e ee Contractor and City " for construction of ]�dSt e 31�zmaantertaznment the Contract being made a part of this Bond by reference, at the times and in the manner prescribed in the Contract; and 2 _ Pays City all losses, liquidated damages, .expenses, costs and .attorney's fees Including appellate proceedings; that City sustains as a result of default by Contractor under the Contract; and 3.Performs the guarantee of all Work and materials furnished under the Contract for the time specified in the Contract; then THIS BOND 1S VOID, OTHERWISE IT REMAINS IN FULL FORCE AND EFFECT. . 4. Whenever Contractor shall be, and declared by City to be, in default under the Contract, City having performed City obligations hereunder, the Surety may promptly remedy the default, or shall promptly: Complete the Project in accordance with the terms and conditions of the Contract Documents; or. Jun. 28. 2010 11:05AM Solution Cot ruct ion Inc No. 0126 P. 9 FORM OF PERFORMANCE BOND (Page 2 of 2) 4.2, Obtain a bid or bids for completing the Project in accordance with the terms and conditions of the. Contract Documents, and upon determination by Surety of the lowest responsible Bidder, or, if City elects, upon determination by City and Surety jointly of the lowest responsible Bidder, arrange for a contract between such Bidder and City, and make available as Work progresses (even though there should be a default or a succession of defaults under the Contract or Contracts of completion arranged under this paragraph) sufficient funds to pay the cost of completion Tess the balance of the Contract Price; but not exceeding, including other costs and damages for which the Surety may be liable hereunder, the amount set forth in the first paragraph hereof. The term "balance of the Contract Price," as used in this paragraph, shall mean the total amount payable by City to Contractor under the Contract and any amendments thereto, less the amount properly paid by City to Contractor. No right of action shall accrue on this bond to or for the use of any person or corporation other than City named herein. The Surety hereby waives notice of and agrees that any changes in or under the Contract Documents and compliance or noncompliance with any formalities connected with the Contract or the changes does not affect Surety's obligation under thls Bond. Signed and sealed this day of , 20 WITNESSE Secretary By: (CORPORATE SEAL) IN TIC PRESEN E OF: 1 Solution Construction, Inc. 4)2 / ip-l i (Print Name and Title) INSURANCE COMPANY: The Guarantee Cpany of North America USA By: Agent and Attorney -in -Fact Warren M. Alter Address: 25800 Northwestern Highway, #720 (Street) Southfield, MI 48075 (City/State/Zip Code) 248-281-0281 Telephone No.: (_ �1 `1 F, GUARANTEE COMPANY\_,J NORTH AMERICA USA Southfield, Michigan POWER OF ATTORNEY KNOW ALL BY THESE PRESENTS: That THE GUARANTEE COMPANY OF NORTH AMERICA USA, a corporation organized and existing under the laws of the State of Michigan, having its principal office in Southfield, Michigan, does hereby constitute and appoint Warren M Alter, David T. Satine • Alter Surety Group, Inc. its true .and lawful attorney(s)-in-fact to execute, seal and deliver for and on its behalf as surety, any and all bonds and undertakings, contracts of. indemnity and other writings obligatory in the nature thereof, which are or may be allowed, required or permitted by law, statute, rule, regulation, contract or otherwise. • The execution of such instrument(s) in pursuance of these presents, shall be as binding upon THE GUARANTEE COMPANY OF NORTH AMERICA USA as fully and amply, to all intents and purposes, as if the same had been duly executed and acknowledged by its regularly elected officers at the principal office. The Power of Attomey is executed and maybe certified so, and may be revoked,pursuant to and by authority of Article IX, Section 9.03 of the By -Laws adopted by the Board of Directors of THE GUARANTEE COMPANY OF NORTH AMERICA USA at a meeting held on the 31'1 day of December, 2003. The President, or any Vice President, acting with any Secretary or Assistant Secretary, shall have power and authority: 1. To appoint Attomey(s)-in-fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the Company thereto, bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof; and 2 To revoke, at any time, any such Attomey-inifact and revoke the authority given, except as provided below 3. In connection with obligations in favor of the Kentucky Departmentof Highways only, it is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner — Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. Further, this Power of Attomey is signed and sealed by facsimile pursuant to resolution of the Board of Directors of the Company adopted at a meeting duly called and held on the 315 day of December 2003, of which the following is a true excerpt: RESOLVED that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any Power of Attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, contracts of indemnity and other writings obligatory in the nature thereof, and such signature and seal when so used shall have the same force and effect as though manually affixed. STATE OF MICHIGAN County of Oakland IN WITNESS WHEREOF, THE GUARANTEE COMPANY OF NORTH AMERICA USA has caused this instrument to be signed and its corporate seal to be affixed by its authorized officer, this 10th day of November, 2009. THE GUARANTEE COMPANY OF NORTH AMERICA USA Stephen C. Ruschak, Vice President Randall Musselman, Secretary On this 10th day of November, 2009 before me came the individuals who executed the preceding instrument, to me personally known, and being by me duly sworn, said that each is the herein described and authorized officer of The Guarantee Company of North America USA; that the seal affixed to said instrument is the Corporate Seal of said Company; that the Corporate Sea) and each signature were duly affixed by order of the Board of Directors of said Company. Cynthia A. Takai IN WITNESS WHEREOF, I have hereunto set myhand at The Guarantee Notary Public, State of Michigan Company of North America USA offices the day and year above written. County of Oakand My Commission Expires February 27, 2012 ii. a ' fC�J�� Acting in Oakland County I, Randall Musselman, Secretary of THE GUARANTEE COMPANY OF NORTH AMERICA USA, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attomey executed by THE GUARANTEE COMPANY OF NORTH AMERICA USA, which is still in full force and effect. IN WITI}JESS WHEREOF, I have (hereunto set my hand and attached the seal of said Company this day of Randall Musselman, Secretary Jun. 28. 2010.11:05AM Solu,t.ion Contruct ion Inc No, 0126 P. 10 Bond Number 80066380 FORM OF PAYMENT BONA (Page 1 of 2) BY THIS BOND, We Solution Construction, Inc. as Principal, The Guarantee Company of hereinafter called Contractor, and North America USA , .as Surety, are bound to the City of Miami Florida, as Obligee, hereinafter called City, in the amount of One Million Nine Hundred Seventy Seven Thousand Two Hundred Seventy 'rs,,n and 45/100 Dollars ($1,977,272.45 ) for the. payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and.severally. WHEREAS, Contractor has by written agreement entered into a Contract, Bid/Contract No. 09-10-01D, awarded the `7 `tV) day of 1-er.Ern%P1/ , 207D , with City which Contract Documents are by reference Incorporated herein and made a part hereof, and specifically include provision for liquidated damages, and other damages identified, and for the purposes of this Bond are hereafter referred to as the "'Contract'; THE CONDITION OF THIS BOND is that if Contractor. 1. Pays City all losses, liquidated damages, expenses, costs -and attomey's fees including appellate proceedings,- that City sustains because of default by Contractor under the Contract; and 2, Promptly makes payments to all claimants as defined by Florida Statute 255,05(1) for all labor; materials and supplies used directly or indirectly by Contractor In the performance of the Contract; THEN CONTRACTOR'S • OBLIGATION SHALL BE VOID; OTHERWISE, IT SHALL REMAIN IN FULL FORCE AND EFFECT SUBJECT, HOWEVER, TO THE FOLLOWING. CONDITIONS: 2.1. A claimant, except a laborer, who is not in privity with Contractor and who has not received payment for its tabor, materials, or supplies shall, within forty-flve (45) days after beginning to furnish labor, materials,or supplies for the prosecution of the Work, furnish to Contractor a notice that he intends to look.to the bond for protection.. 2.2. A claimant who is not in privity with Contractor and who has not received payment for its labor, materials, or supplies shall, within ninety (90) days after performance of the labor or after complete delivery of the materials or supplies, deliver to Contractor and to the Surety, written notice of the performance of the labor or delivery of the materials or supplies and of the nonpayment. 2.3. No action for the labor, materials, or supplies may be instituted against Contractor or the Surety unless the notices stated under the preceding conditions (2.1) and (2.2) have been given. 2.4. Any action under this Bond must be instituted in accordance with the longer of the applicable 'Notice and Time Limitations provisions prescribed In Section 255.05(2), or Section 95-11, Florida Statutes. Jun.28. 2010 11:05AM Solution Contructio.n Inc rfl No. 0126 P. 11 FORM OF PAYMNT BOND (Page 2 of 2) The Surety hereby waives notice of and agrees that any changes in or under the Contract Documents and compliance or noncompliance with any formalities connected with the Contract or the changes does not affect the Surety's obligation under this Bond. Signed and sealed this day of , 20 Contractor Solution Const uction, Inc. (Name orporption) (Corporate Seat) IN THE PRESENCE OF: gy. By: (Sig nature A1Md 44 - . (Print Name and Title) day of , 20 INSURAMPANY: The Gurante`p Company of North America USA tin/ Agent and Attorney In -Fact Warren M. Alter Address: 25800 Northwestern Highway, #720 (Street) Southfield, MI 48075 (City/State/Zip Code) Telephone No.: 248-281-0281 T.r E GUARANTEE COMPANY 6:t NORTH AMERICA USA Southfield, Michigan POWER OF ATTORNEY KNOW ALL BY THESE PRESENTS: That THE GUARANTEE COMPANY OF NORTH AMERICA USA, a corporation organized and existing under the laws of the State of Michigan, having its principal office in Southfield, Michigan, does hereby constitute and appoint Warren M. Alter, David T. Satine Alter Surety Group, Inc. its true and Lawful attorneys) -in -fact to execute, seal and deliver for and on its behalf as surety, any and all bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof, which are or may be allowed, required or permitted by law, statute; rule, regulation; contract or otherwise. The execution of such instrument(s) in pursuance of these presents, shall be as binding upon THE GUARANTEE COMPANY OF NORTH AMERICA USA as fully and amply, to all intents and purposes, as if the same had been duly executed and acknowledged by its regularly elected officers at the principal office. The Power of Attorney is executed•and may be certified so, and may be revoked, pursuant to and by authority of Article IX, Section 9.03 of the By -Laws adopted by the Board of Directors of THE GUARANTEE COMPANY OF NORTH AMERICA USA at a meeting held on the 31° day of December, 2003. The President, or any Vice President, acting with any Secretary or Assistant Secretary, shall have power and authority: 1. To appointAttorney(s)-in-fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the Company thereto, bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof; and 2. To revoke, at any time, any such Attomey-infact and revoke the authority given, except as provided below 3. In connection with obligations in favor of the Kentucky Department of Highways only. it is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner -- Department-of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. Further, this Power of Attomey is signed and sealed by facsimile pursuant to resolution of the Board of Directors of the Company adopted at a meeting duly called and held on the 31'' day of December 2003, of which the following is a.true excerpt: RESOLVED that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any Power of Attorney or certification thereof authorizing the execution and delivery of any bond; undertaking, contracts of indemnity and other writings obligatory in the nature thereof, and such signature and seal when so used.shall have the same force and effect as though manually affixed. • STATE OF MICHIGAN County of Oakland IN WITNESS WHEREOF, THE GUARANTEE COMPANY OF NORTH AMERICA USA has caused this instrument to be signed and its corporate seal to be affixed by its authorized officer, this 10th day of November, 2009. THE GUARANTEE COMPANY OF NORTH AMERICA USA 4„ Stephen C. Ruschak, Vice President Randall Musselman, Secretary On this 10th day of November, 2009 before me came the individuals who executed the preceding instrument, to me personally known, and being by me duly sworn, said that each is the herein described and authorized officer of The Guarantee Company of North America USA; that the seal affixed to said instrument is [he Corporate Seal of said Company; that the Corporate Seal and each signature were duly affixed by order of the Board of Directors of said Company. Cynthia A. Takai IN WITNESS WHEREOF, I have hereunto set my hand at The Guarantee Notary Public, Slate of Michigan Company of North America USA offices the day and year above written. County of Oakland My Commission Expires February 27, 2012 a • j !L�—a Acting in Oakland County flfdC.C4L).- I, Randall Musselman, Secretary of THE GUARANTEE COMPANY OF NORTH AMERICA USA, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney executed by THE GUARANTEE COMPANY OF NORTH AMERICA USA, which is still in full force and effect. IN WITIEJESS WHEREOF, I have !hereunto set my hand and attached the seal of said Company this day of Randall Musselman, Secretary PERFORMANCE AND PAYMENT GUARANTY FORM UNCONDITIONAL/IRREVOCABLE LETTER OF CREDIT: (Page 1 of 2) Date of Issue Issuing Bank's No. Beneficiary: Applicant: City of Miami 444 SW 2"d Avenue Miami, Florida 33130 Amount: in United States Funds Expiry: (Date) Bid/Contract Number We hereby authorize you to draw on (Bank, Issuer name) at by order (branch address) of and for the account of (contractor, applicant, customer) up to an aggregate amount, in United States Funds, of available by your drafts at sight, accompanied by: 1. A signed statement from the City Manager or his authorized designee, that the drawing is due to default in performance of certain obligations on the part of • (contractor, applicant, customer) agreed upon by and between the City of Miami, Florida and (contractor, applicant, customer), pursuant to Bid/Contract No. for (name of project) and Section 255.05, Florida Statutes. Drafts must be drawn and negotiated not later than (expiration date) NW 14 Street Streetscape Project Bid No.: 09-10-010 Page 103 PERFORMANCE AND PAYMENT GUARANTY FORM UNCONDITIONAUIRREVOCABLE LETTER OF CREDIT: (Page 2 of 2) Drafts must bear the clause: "Drawn under Letter of Credit No. (Number), of (Bank name) dated This Letter of Credit shall be renewed for successive periods of one (1) year each unless we provide the City of Miami with written notice of our intent to terminate the credit herein extended, which notice must be provided at least thirty (30) days prior to the expiration date of the original term hereof or any renewed one (1) year term. Notification to the City that this Letter of Credit will expire prior to performance of the Contractor's obligations will be deemed a default. This Letter of Credit sets forth in full the terms of our undertaking, and such undertaking shall not in any way be modified, or amplified by reference to any documents, instrument, or agreement referred to herein or to which this Letter of Credit is referred or this Letter of Credit relates, and any such reference.shall not be deemed to incorporate herein by reference any document, instrument, or agreement. We hereby agree with the drawers, endorsers, and bona fide holders of all drafts drawn under and in compliance with the terms of this credit that such drafts will be duly honored upon presentation to the drawee. Obligations under this Letter of Credit shall be released one (1) year after the Final Completion of the Project by the (contractor, applicant, customer) This Credit is subject to the "Uniform Customs and Practice for Documentary Credits," International Chamber of Commerce (1993 revision), Publication No. 500 and to the provisions of Florida law. If a conflict between the Uniform Customs and Practice for Documentary Credits and Florida law should arise, Florida law shall prevail. If a conflict between the law of another state or country and Florida law should arise, Florida law shall prevail. Authorized Signature NW 14 Street Streetscape Project Bid No.: 09-10-010 Page 104 INFORMATION FOR DETERMINING JOINT VENTURE ELIGIBILITY If the Proposer is submitting as a joint venture, please be advised that this form (3 pages) MUST be completed and the REQUESTED. written joint -venture agreement MUST be attached and submitted with this form. 1. Name of joint venture: 2. Address of joint venture: 3. Phone number of joint venture: 4. Identify the firms that comprise the joint venture: 5. Describe the role of the MBE firm (if applicable) in the joint venture: 6. Provide a copy of the joint venture's written contractual agreement. 7. Control of and participation in this Agreement. Identify by name, race, sex, and "firm" those individuals (and their titles) who are responsible for day-to-day management and policy decision making, including, but not limited to, those with prime responsibility for: (a) Financial decisions: (b) Management decisions, such as: (1) Estimating: (2) Marketing and sales: (3) Hiring and firing of management personnel: (4) Purchasing of major items or supplies: (c) Supervision of field operations: NW 14 Street Streetscape Project Bid No.: 09-10-010 Page 105 NOTE: If, after filing this form and before the completion of the joint venture's work on the subject Contract, there is any significant change in the information submitted, the joint venture must inform the County in writing. AFFIDAVIT "The undersigned swear or affirm that the foregoing statements are correct and include all material information necessary to identify and explain the terms and operation of our joint venture and the intended participation by each joint venturer in the undertaking. Further, the undersigned covenant and agree to provide to the County current, complete and accurate information regarding actual joint venture work and the payment therefore and any proposed changes in any of the joint venturer relevant to the joint venture, by authorized representatives of the County. Any material misrepresentation will be grounds for terminating any, Contract which may be awarded and for initiating action under Federal or State laws concerning false statements." Name of Firm: Name of Firm: Signature: Signature: Name: Name: Title: Title: Date: Date: Form A NW 14 Street Streetscape Project Bid No.: 09-10-010 Page 106