Loading...
HomeMy WebLinkAbout11-00359 04-25-2011-BackupCity Hall The Restaurant Renovation Project ID 10G0001 EXHIBIT "A" CITY HALL THE RESTAURANT 2004 BISCAYNE BLVD MIAMI, FL 33137 PROJECTS..':. `COSTS _ , ...:.. ., .DETAITS. ,.. „�. � . ,., � , . <}.x £�� .. , , VENDOR. NEW SIDEWALKS AND CURB, CEMENT AND MASONRY WORK, MARKINGS AND BUMPERS $ 66,165.22 BREAK UP AND REPAVING 20TH STREET NORTH SIDE PARALL TO THE PARKING LOTS AND DRIVEWAYS CURBING ALL AREAS OF BOTH PARKING LOTS MARKING AND PLACING NEW BUMPERS FOR THE SPACES ROSE ENGINEERING LANDSCAPING PARKING LOT $ 17,500.00 TREES, BUSHES, GRASS, SOIL, MULCH, FERTILIZER JOHN McCANN CONTRACTOR IRRIGATION SYSTEM $ 2,500.00 IN ALL LANDSCAPEDBEDS JOHN McCANN CONTRACTOR NEW 12" WATER LINE $ 56,000.00 AS REQUESTED FROM WASA FOR THE WATER LINE TO GO DOWN 20TH ALONG THE LENGTH OFTHE PROPERTY AND BEYOND 5' PERSAINT.ENGINEERING TIJTAL COST ,$ 142,165.22