HomeMy WebLinkAbout10-00797 Backup 6-28-2010BISCAYNE PARK 150 N.E. 19TH STREET, MIAMI, FL PROJECT ANALYSIS FORM Capital Improvements & Transportation PROGRAM 331-Parks and Recreation CIP NON-CIP [} AREA Date Prepared: 9-Nov-2009 VERSION 5-General Government & Services PROJECT NAME: Biscayne Skate Park (CRA Funded) PROJECT NO: B-30675 ADDRESS] LOCATION: 150 NE 19th Street DISTRICT: 2 PROJECT TEAM: Vertical PROJECT CONTRACTED COST: CATEGORY: CRA - Community Redevelopment Area PROJECT E53. COST: $ 2,154,375.00 CLIENT DEPT: 5B-P&R-Parks and Recreation CURRENT FUNDS: $ 1,000,000.00 CLIENT CONTACT: Ed Btanco TEL.: (305) 416-1253 FUTURE FUNDS: DESIGN MANAGER: Bryan Thompson (CIP) TEL.: 305-4161049 FUND SHORTFALL: $ (1,154,375,00) CONSTR. MANAGER: Nelson Cuadras (CIP) TEL: 305-416-1254 PROCUREMENT: Design/Build EST. DESIGN START: 02/01/10 EST. DESIGN END: 12/01/10 EST. BID ADV.: EST. AWARD DATE: EST. CONSTRUCTION START: O1/1Gill EST. CONSTRUCTION END: 01/10/12 PRODUCTION PHASE (3-DES) % of Pre -Design % al NE Esr. Design o/ of Contracted % of P.O. Design Consultant: 0000 To be Assigned CODE Cons! Est. Design Const Const Design ConsL 1 Outside Consult -Prime Basic Des. Fee 1.01 9,3% $ 160,000 9.3% $ 160,000 2 CIP-Design Management 1.04 5.0% $ 85,625 5.0% $ 85,625 3 Gan. Production Phase Canting. 1.01 1.5 % $ . 25,000 1,5% 5 25,000 rn 4 i- rn O o — PRODUCTION TOTALS Estimated $ 270,625 - Estimated $ 270,625 Estimated Contracted R. CONST. PHASE (4-CON) P.O. Construction ( Contractor: 000D To be Assigned l CODE Pre- Design Estimated A/EEstimated Contracted (Format Bid, informal i- Constnrctfon by PM Construction by PM Construction by CM Bid or JOC Method) U q 1 Cunt. Cost (Prime Contractor) 2.00 91% $ 1,552,500 91% $ 1,552,500 2 Const. Contingency Allowance 2.00 5° $ 160,000 9% $ 160,000 4 x 3 ¢ 0 al CONSTRUCTION TOTALS Estimated $ 1,712,500 Estimated $ 1,712,500 Estimated Contracted CONST. ADMIN. (8-CEO) CODE Pre -Design Est. CEO NE Estimated CEO Contracted CEO P.O. CEO 1 Const. Enz. Obs. (CEO) Consult. 3.01 2 Coast. Mgnt by CIP Const. Mgr 3.04 5.0% $ 85,625 5.0% $ 85,625 3 Const. Insp. by CIP Inspector 3.02 1- 4 JOC Admin.-The Gordian Group 3.03 0 :U 5 , O tx - CONSTRUCTION ADMINISTRATION TOTALS Estimated $ 85,625 Estimated $ 85,625 Estimated Contracted — a- I ADMIN. EXPENSES (6-ADM) I CODE ll Pre -Design ADM NE Estimated ADMMN CM Estimated ADMIN P.C. ADM 1 CIP Dept. (Gen. Admin. Fees) 4.00 5.0% $ 85,625 5.0% $ 85,625 2 ADMINISTRATIVE EXPENSES TOTALS Estimated $ 85,625 Estimated S B5,625 Estimated Contracted ADDITIONAL PROJECT TASKS CODE Pre -Design Tasks NE Estimated Tasks CM Estimated Tasks P.O. TASKS 1 AODlTIONAL PROJECT TASKS TOTALS Estimated Estimated Estimated Contracted Pre-Desiqn ' Estimated Estimated Contracted B-30675 PROJECT GRAND TOTAL $ 2,154,375 $ 2,154,375 The project consists of the remodeling of a 65,000 SF parcel into a new park with a dedicated 16,000 SF concrete skate park, An existing building will be demolished and some renovation of the parking tot may be required. Site improvements will include a fenced enclosure, landscaping, shade trees, sidewalks, benches and shade structures. In addition, a ul 3,000 SF accessory building with festroams, park offices, a retail space fo' skateboard related merchandise, a concessions area and support spaces will be built. The building and a- park will be LEED Silver accredited. 0 U rn Operating Cost Associated with Project: YEAR 1 YEAR 2 YEAR 3 'YEAR 4 NEAR 5 PAP FORM Printed on: 11i0912.00S Page 1 of 2 F'AF FORM CREATED ON t0/JVO6