Loading...
HomeMy WebLinkAboutBinder Section G2. Supporting DocumentsDEVELOPMENT IMPACT STUDY Akerman October 31, 2011 VIA HAND DELIVERY Mr. David Holtzman, Vice President Dacra Development 3841 NE 2nd Avenue, Ste. 400 Miami, FL 33137 Javier Fernandez Associate Akerman Senterfitt One Southeast Third Avenue Suite 2500 Miami, FL 33131-1714 Tel: 305.374.5600 Fax: 305.374.5095 Re: Preliminary Fiscal & Economic Impact Analysis for Design District Special Area Plan ("SAP") Dear Mr. Holtzman: Akerman Senterfitt ("AS") has performed this preliminary analysis to estimate the fiscal and economic benefits that the initial, mixed -use development concept studied by Miami Design District Associates ("MDDA") for the SAP will provide to the City of Miami and other jurisdictions in which it will be located, including Miami -Dade County, the Miami -Dade Public School District, and the Children's Trust. This letter provides the findings of our preliminary analysis. The initial development concept studied for the SAP will be developed in phases over a period of years. During the development period, the rates associated with ad valorem taxes are likely to be adjusted annually and other fee schedules may also be adjusted. Changes in the economic environment could also result in construction costs, sales prices, rent levels and hotel room rates that differ from those assumed below. These differences could result in fiscal and economic benefits actually being generated that vary significantly from the estimates set forth in this report. i SAP DESCRIPTION The proposed SAP encompasses a land mass in excess of 17 acres located within the Miami Design District, which is roughly bounded by portions of Biscayne Boulevard, Federal Highway, and NE 2nd Avenue to the east, portions of NE 41st and 42nd Streets to the north, N. Miami Avenue to the west, and NE 38th Street to the south (the "District"). The initial development akerman.com BOCA RATON DALLAS DENVER FORT LAUDERDALE JACKSONVILLE LAS VEGAS LOS ANGELES MADISON MIAMI NAPLES NEW YORK ORLANDO PALM BEACH SALT LAKE CITY TALLAHASSEE TAMPA TYSONS CORNER WASHINGTON, D.C. WEST-PAL-M-BEACH — {22551499;1} Mr. David Holtzman October 31, 2011 Page 2 concept for the SAP contemplates the development of 532,000 sq. ft. of new department store and street retail space, approximately 100 hotel rooms, 85 residential units, as well as the renovation of 310,000 of existing commercial space throughout the district. This preliminary program will besupported by a network of existing and newly constructed, underground and above -grade parking structures containing approximately 2,000 spaces. The residential units envisioned in the conceptual plan for the SAP will include a total of 85 units averaging approximately 1,350 square feet in size. It is anticipated that the proposed residential condominium units will sell at an average square foot price of approximately $400, yielding gross sales proceeds of approximately $46 million. Non-residential uses within the SAP will include a 100-key hotel, 530,000 square feet of new street retail and department store space, and 310,000 square feet of renovated mixed - commercial space. The hotel is expected to operate at a stabilized rate of occupancy of 75% at an average daily rate of $300, yielding annual gross revenues slightly in excess of $8.2 million. The 530,000 square feet of new street retail and department store space are expected to be a regional draw, with the result that sales productivity per square foot will approximate S700. Annual projected retail sales will likely exceed S370 million. The anticipated rental rate for this element of the project is expected to average $75 per square foot. This element of the project is expected to compliment the existing retail and entertainment area that has already emerged at the Shops at Midtown Miami, located just south of the District on NE 36th Street. Development of aforementioned elements of the conceptual plan are estimated at 5300 million in hard costs. An additional S12 million will likely be expended on furniture, fixtures and equipment (FF&E) for the proposed uses, with an additional S37.5 million of expenditures for soft costs inclusive of architectural and engineering fees, marketing, leasing, and sales commissions, project overhead, etc. Accordingly, the project will cost a total of 5350 million to develop exclusive of land cost and developer fees. SUMMARY OF FINDINGS The materials that follow summarize the fiscal and economic benefits that the proposed Design District SAP will generate. As discussed above, the project will be developed in phases; however, since an exact phasing plan has not yet been formulated, the estimates presented below address the project in its entirety. All monetary figures are expressed in 2011 Dollars. Fiscal Benefits The term "fiscal benefits" refers to the positive impact that the proposed project will have on the finances of the City of Miami and the other jurisdictions in which it will be located. The benefits that it will provide will be both non -recurring and recurring in nature, with the former occurring during the construction period and the latter when construction is completed. The estimates shown are based on current millage and fee rates. {22551499;1} Mr. David Holtzman October 31, 2011 Page 3 City of Miami Non -recurring benefits ■ $1.65 million in City building permit fees ■ S260,500 in City police impact fees • 5152,545 in City fire impact fees ■ $72,735 in City general services impact fees ■ $509,830 in City park impact fees ' • 529,868 in City impact fee administrative surcharges Total non -recurring City benefits: Recurring benefits 2,675,478 ■ $2,271,300 annually in City General Fund ad valorem taxes ■ $279,000 annually in City Debt Service ad valorem taxes • 715,000 annually in parking surcharge revenues Total recurring City benefits: Non -Quantifiable benefits 3,265,300 ■ Trade -related fees for roofing, electrical, plumbing, mechanical, pool and elevator work performed during construction (non -recurring) • Increased City utility taxes and franchise fees (recurring) ■ Increased occupational license fees (recurring) ■ Increased revenue sharing funds (recurring) Other Jurisdictions Miami -Dade County ■ S1,441,500 annually in General Fund ad valorem taxes (recurring) • $85,500 annually in Debt Service Fund ad valorem taxes (recurring) ■ $53,850 annually in Library ad valorem taxes (recurring) ■ $410,000 annually in tourist taxes (recurring) ■ S3,710,000 annually in local option sales taxes (recurring) ■ Increased water and sewer connection fees (non -recurring) ■ Increased revenue sharing funds (recurring) ■ Increased water and sewer service fees (recurring) Miami -Dade Public Schools ■ $298,978 in impact fees (non -recurring) • S2,329,500 annually in Operating Fund ad valorem taxes (recurring) {22551499;1 } Mr. David Holtzman October 31, 2011 Page 4 • $72,000 annually in Debt Service Fund ad valorem taxes (recurring) Children's Trust 150,000 annually in ad valorem taxes (recurring) Economic Benefits The term "economic benefits" relates to the positive impact that the proposed project will have on the economy of the City rather than its finances. The economic benefits it will provide will also be non -recurring and recurring in nature. Non -recurring benefits ■ At least 80 percent of the 5350 million that will be spent on hard and soft costs, as well as FF&E, to develop the project will be spent within the City of Miami, producing an overall economic impact of at least $530 million when the multiplier effect is considered. • Project expenditures will include an estimated 5140 million for construction labor, an amount sufficient to pay for 2,314 man-years of construction work at the average annual pay rate of a Miami -Dade County construction worker, which approximates S60,500 per year. It is further anticipated that each direct construction job will result in the creation of at least 0.75 indirect or induced jobs. Indirect jobs will be in businesses related to construction such as building supplies or equipment rental, while induced jobs will be businesses where those occupying the direct and indirect jobs will spend their earnings such as the local supermarket or personal service establishment. A substantial portion of the jobs created by the development of the proposed project are likely to be filled by City of Miami residents. Recurring ■ When the project is completed, a total of S16.2 million will be spent annually by condominium residents in retail and food establishments, by hotel guests for a variety of items including food and beverage, transportation, entertainment and attractions and retail goods and by workers at the project for meals and other items purchased during the work day. It is anticipated that at least 85 percent of these expenditures will be within the City of Miami resulting in an overall economic impact annually approximating $13.8 million. • A total of 1,230 people will be employed at the proposed project, inclusive of people involved in project operations, maintenance and parking. Based on the information compiled by the Florida Agency for Workforce Innovation, it is expected that these workers will earn approximately $57 million. The direct jobs at the project will stimulate the creation of 800 indirect and induced jobs. Residents of the City of Miami are likely to occupy a significant number of the direct, indirect, and induced jobs that result from the development of the project. {22551499;1 } Mr. David Holtzman October 31, 2011 Page 5 CONCLUSION This preliminary analysis demonstrates that the proposed project will be highly beneficial to the City of Miami both fiscally and economically. Sincerely, Javier Fnandez cc: Craig Robins, President & Chief Executive Officer Steven Gretenstein, Chief Operating Officer {22551499;1 } Miami Design District SAP Development Fee Estimate Table V.5 Juris. County County County County County County County Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Fee Category Road Road Road Road Road School School Police Fire/Rescue Parks/Recreation General Svcs Police Fire/Rescue Parks/Recreation General Svcs Police Fire/Rescue Parks/Recreation General Svcs Police Fire/Rescue Parks/Recreation General Svcs Impact Fee Surcharge Building permit Building permit Portion of development Residential - apartment Residential -condominium Commercial Retail Residential - apartment Residential -condominium Low Rise Residential Low Rise Residential Low Rise Residential Low Rise Residential Hotel Hotel Hotel Hotel Commercial Commercial Commercial Commercial Retail (<_25K) Retail (<_25K) Retail (.25K) Retail (<_25K) (Basic Permit) (Basic Permit) Rate per 0 unit 2,102 unit 3,199 unit 0 sq ft 8 sq ft 0 unit 3,509 144 619 5,998 363 87 40 0 16 0.4520 0.1810 0.0000 0.0760 0.4520 0.1810 0.0000 0.0760 0.0300 0.0100 0.0050 unit unit unit unit unit unit unit sq ft sq ft sq ft sq ft sq ft sq ft sq ft 30 mil 270 mil l,31/201 ; Area (sq ft) Units 530.000 0 0 0 530,000 530,000 530.000 530.000 cost 85 85 85 85 85 100 100 100 100 Downtown Development Supplemental Fee (See Section 13-52 et seq., City of Miami Code of Ordinances) Transportation Air Quality DRI Cost Recovery DRI Administration Transportation Air Quality DRI Cost Recovery DRI Administration Transportation Air Quality DRI Cost Recovery' DRI Administration Transportation Air Quality DRI Cost Recovery DRI Administration Commercial Commercial Commercial Commercial Retail Retail Retail Retail Residential Residential Residential Residential Hotel Hotel Hotel Hotel 0.719 0.031 0.115 0.230 0.936 0.051 0.115 0.230 0.203 0.011 0.115 0.230 0.361 0.018 0.115 0.230 sq ft sq ft sq ft sq ft sq ft sq ft sq ft sq ft sq ft sq ft sq ft sq ft sq ft sq ft sq ft sq ft TOTAL City and County Fees Estimated Fee 0 178, 658 319,937 0 4,476,115 0 298,278 12,240 52,615 509,830 30,855 8,700 4,000 0 1,600 0 0 0 0 239,560 95.930 0 40,280 29.868 300,000 1,350,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7,948,466 TOTAL Downtown Development Supplemental Fee (See Section 13-52 et seq., City of Miami Code of Ordinances) 0 * Assumes a project cost of $300,000,000 48466 * _ -C:1NRPorfbltActi e\JFERNAND'EZ\2254439'1 1.XLS I0/30/20'1-18-.14 PM