Loading...
HomeMy WebLinkAboutExhibit 1r • * • I Cat! ILgs , •-• 4.! • • =6,-^ — 4.rt CAPITA111qP11 VPIENTS .'",^,2,—,-,eme act. tVi ,..,..‘i La HuiT 1..yl-AR min pLAN • , 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN TABLE OF CONTENTS PREFACE Capital Budget Message How to Read this Document 1. II' TRODUCTION Purpose 1 CIP Development Process .1 Prioritization Criteria ..4 Capital Plan Framework .5 2011-2012 Multi -Year Capital Plan Program Overview 6 2. HIGHLIGHTS Highlights by Fund .7 3. FUNDING OVERV'_LE,W Funding Sources 14 Funded, Partially Funded and Unfunded 16 Discussion on Miami Trolley 17 Section Reports: 1-Funding Type by Job 21 2-Fund by Cost Component and Funding Source 39 3-Cost Estimates vs. Available Funding .55 APPENDIX Alphabetical Project Index 70 List of Completed Projects in FY2010-2011 .87 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN CAPITAL BUDGET MESSAGE CITY of MIAMI. FLORIDA Tomas P. Regalado Johnny Martinez, PE Mayor v Chief Administrator / City Manager Together with the City Commission, we are pleased to present the 2011-2012 Capital Improvements Program and Multi -Year Capital Plan —the CIP. We continue to utilize a capital planning process that gives City government an effective, service and result -oriented program to focus on meeting the needs and quality of life of our residents and visitors, as well as positioning the City for future growth. The preservation, management and utilization of these significant capital resources, both physical and fiscal, are the foundation on which we build the Miami of today and the future, which is the heart of South Florida, and the gateway to the rest of the Country. As a result of the City Commission's past approval of the CIP, the Capital Improvements Department has either completed or will complete during this year a number of projects that significantly improve the quality of life of residents and visitors. These projects include the Brickell Key Bridge Rehabilitation Project, Launch of the Miami Trolley Program in the Health District and Brickell/Biscayne Areas, Marlins Stadium Parking Garages, NE 2 Ave Improvements, Williams Park, US-1 Privacy Wall. Under the guidance of Miami's elected officials, capital improvements are once again based on core planning principles and fundamental urban needs: infrastructure, transportation and quality of life. This Plan shows the City's continued commitment to positively impact the lives and well-being of its residents and visitors by improving, enhancing and expanding the streets on which we travel, the paths on which we walk, the parks where we play, the arts and social facilities to support our culture, the fire and police facilities that keep us safe, and the infrastructure that maintains our environment, with the ultimate intent of enhancing the neighborhoods and commercial corridors that are the cornerstones of our community. In building upon the improvements of the last few years, the City Administration has set up a well -qualified workforce of architects, engineers, construction managers, and financial managers in the Department of Capital Improvements. They administer, manage and implement our capital and transportation programs, with all City Departments playing integral roles. The CIP contains individual capital projects that are organized by fund and programmed for the current fiscal year and into the next five years: Revenue has been analyzed and projected for future years, then assigned to those projects and needs that take precedence. 2011-2012 CAPITAL BUDGET AND MTJLTI-YEAR CAPITAL PLAN The CIP, as presented, has been updated and revised to best address all of the currently identified needs in the City within the limitations of the available funding revenues. The CIP by nature is a dynamic, evolving document that will continually be refined as each of the projects within the program advances. This most likely will include projects moving in and out of the years in which they are programmed, as well as the introduction of new projects and possibly the modification or elimination of others. As City priorities, project scopes of work, cost estimates and production schedules are advanced, the CIP will be modified to reflect any necessary changes. It is in this context that we respectfully request your approval of the CIP presented before you. To Greater emphasize the role of these improvements in shaping the Miami of the future, the Capital Improvements and Transportation offices continue with their sole purpose of planning, coordinating,. executing and monitoring capital projects and the expenditure of capital funds. This department has a clear mandate to work with staff from other departments, the Administration and City officials to develop and implement a Capital Program that balances key community needs, policy directives, and the physical condition of assets and facilities. To that end, the Department is finding innovative ways to speed the delivery of these improvements to the public. With revenue sources such as the Homeland Defense/Neighborhood Improvement Bonds, Streets Bond, Parking Surcharge, updated City Impact Fee Ordinance and the County's Transit Surtax and General Obligation Bond, the resources are all in place for the continued physical renewal of the City of Miami. 1/4 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN HOW TO READ THIS DOCUMENT This document contains the City of Miami's six -year Capital Improvement Plan (CIP) that runs from October 1, 2011 through September 30, 2017. The document is organized into the five sections described below. INTRODUCTION — The Introduction defines the purpose of the CIP and details the Plan development process. This section contains the following six parts: Purpose of the Capital Improvement Plan provides a thorough explanation of the purpose of the Capital Plan with a detailed description of the difference between capital and operating budget and the legal authority given to the City for the preparation of the Plan via several City and State of Florida statutes. CIP Development .Process describes the efforts of the Department of Capital Improvement Program in the delivery of the projects and the adjustments to the project funding allocation. Prioritization Criteria detailed description of the method used to establish the criteria by which the projects are considered for funding. Capital Plan Framework shows the eleven distinct funds or program used to establish the Capital Plan 2011-2012 Multi -Year Capital Plan Overview shows the distinct funds into which the Multi Year Capital Plan is organized. It also shows a pie chart of the Funding Summary by fund. HIGHLIGHTS — During the fiscal year CIP and other City of Miami departments work on hundreds of projects. This section describes those projects that are noteworthy because of their magnitude or impact to the community, priority in meeting the City's strategic plan, or innovative qualities. The highlighted projects are presented according to capital fund category. FUNDING OVERVIEW —This section begins by describing the seven types of revenue sources: Federal Grants, State Grants, Miami -Dade County Grants, Other Grant, City Bonds, CIP Fees/Revenues, Private Donation /Other. These revenue sources are the funding vehicles for the Capital Improvement Plan. The funding status for the CIP projects can be further described by three categories: Funded, Partially Funded or Unfunded. Several reports at the end of the section identify the projects and the funding situation. This section also contains discussions on significant bond issuance initiatives and the Miami Trolley project. APPENDIX— Additional information helpful to understanding the Capital Plan, including an alphabetical project index and, lists of completed and unfunded projects, are contained in the Appendix. 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN CTI 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN INTRODUCTION Purpose of the Capital Improvement Plan The Multi -Year Capital Plan (the Capital Improvement Plan or CIP) is an official statement of public policy regarding long-range physical development in the City of Miami. A capital improvement is defined as a capital or "in -kind "expenditure of $5,000 or more, resulting in the acquisition, improvement or addition to fixed assets in the foiui of land, buildings or improvements, more or less peiuianent in character, and durable equipment with a life expectancy of at least three years. The Capital Plan is a proposed funding schedule for six years, updated annually to add new projects, reevaluate project priorities and revise recommendations, with the first year of the plan being the Capital Budget. The Capital Budget Miami's Capital Budget is distinct from the Operating Budget. The Capital Budget represents a legal authorization to spend, during the first year of the plan, finds from Federal, State and various other sources and is adopted separately from the six year plan by means of an=apprppriations resolution. The Capital Budget authorizes capital expenditures while the Operating Budget authorizes the expenditure of funds for employee salaries and the purchase of supplies and sinall equipment. Capital projects can have an impact on the operating budget through additional costs, revenues or cost savings. Legal Authority Legal requirements for preparing Miami's Capital Plan are set forth in the Florida Statutes and the City of Miami Code. A capital improvement programming process to support the Comprehensive Plan is required by the Local Government Comprehensive Planning and Land Development Regulation Act, more particularly Section 163..3177 of the Florida Statutes (2005). Further, the Financial Integrity Ordinance, Chapter 18, Article IX / Di -Vision 2 oftl e City Code, requires the development and approval of a multi -year capital plzii. CIP Development Process The 2011-2012 Multi -Year Capital Plan is an update to the 2010-2011 Multi -Year Capital Plan which was approved by the City Commission on February 24th, 2011. The new FY11-12 Plan contains the same fund and program framework and project priorities as the prior Plan, but incorporates allocations for funding sources becoming available in FY2012. The primary focus of the Capital Improvements Program Office since the approval of the previous Plan has been the continued management of ongoing projects, initiation of previously approved projects, and coordination. with the Finance Team to identify and secure financing opportunities. 1 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN The efforts of the Capital Improvements Program/Transportation Office align with several objectives of the City's Strategy Map and are summarized below. The Strategy Map can be seen on the next page. Provide Excellent Recreational, Educational & Cultural Programs — through frequent communication with the Parks and Recreation Department, continued implementation of high -priority parks capital projects including those identified in the Homeland Defense/Neighborhood Improvement Bond Program. Restore, Maintain & Beautify Urban & Residential Infrastructure — continued management of ongoing construction and design for street, traffic calming and drainage projects identified as top priorities through resident and elected official input, particularly those identified in the Street Bond Program. Foster Transportation Systems for Future Growth — The Transportation Office, through capital funding, continued the development of the Miami Trolley Program which began with initiation of the Health/Stadium District Route and the Brickell/Biscayne Route, and will be followed by the planed Overtown Route, Allapattah Route and the Coral Way Route. Provide Excellent Public Safety — through frequent communication with the Miami Police and Fire -Rescue Departments, continue to implement significant public safety projects including the construction of Fire Station 13 and the design of Fire Station 14. Improve Business and Service Delivery Processes — utilize resources made available through the Capital Program Support Services contract to develop project scopes and estimates, and facilitate progress of the Multi -Year Capital Plan. Further, the Capital Improvements Program Office seeks opportunities to develop alternate contracting methodologies, through pre -approved contracts with industry professionals, to expedite the large volume of projects in the Capital Plan. 2 ‘.• • , \ 4 • v A .,114414 13Z4), 4,5*MA:4' Ptovkli Sustainable Tax Relief Enhance Existing Revenue Maximize Grant Management & Opportunities Poverty [ Sweden Revenue Opportunities • F Secure Private & Public Partnerships ..(!!'nvicla Excellent Trona! $.0 i t Ion •••• ffh,C.,.tom n, SYtiteths for • t:10iierx tio , a (3 rowth entiOilturet :'1-71.110i Restore Maintain and Beautify Urban and Raxitlential Infreetructure • Achiever . Operational • Savings Improve Business and Service Delivery Processes Provide Excellent Public Snfety • integrate sustainable practices end resource efficiencies Instill Custorner-Focused, High Performance and Environmentally Frten fly Coritilre j:0-L.Lata Provide a Duality Work Environment Develop Strategic Skills Pftr',4x .1 $: .ciANIZA11.• Provide Excellent Customer Service Achieve Cot -Effective Municipal Services Deliver Technology and E-Solutions Provide Align Employee Employees Goals with City With Key Into Goals Facilitate Service Access tor Customers `.;•:••; •.• 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Prioritization Criteria In addition to the surveying of all of CIP's client departments to determine their capital project needs, CIP uses a hierarchy of criteria to 'determine how projects are considered for funding on a yearly basis. Projects with the highest rankings, or in the case of projects meeting more than one criterion, are given priority for funding and implementation. The criterion used is listed as follows in the order of priority: Life/Safety- These projects are normally related to structural issues at City facilities and demand immediate attention. They are considered "emergency" projects as they are not always planned for or funded. Legal Requirements- These projects are funded based on the need to comply with legally mandated requirements set forth by Federal, State and local governments. These types of projects may be required as a result of binding settlements with other governmental agencies to meet current codes, ordinances or health and safety issues. An example of these projects may be federally mandated compliance with ADA requirements either citywide or at a particular park or facility. Essential Improvements- These types of projects demand funding for. improvements necessary to the functioning and/ or preservation of facilities or infrastructure. This criterion measures the extent to which a facility or infrastructure has deteriorated and needs improvements relative to the overall condition of similar structures. Bridge repairs, storm water infrastructure improvements and repairs, and roadway resurfacing highlight a variety of public works related projects that would fall under this criterion. The majority of Street Bonds -funded projects would fall under this category as the preservation and improvement of the existing infrastructure is the overwhelming goal. Facility roof replacements, repairing of structural damage, and fire station renovations and replacement are also examples of essential facility improvements. Quality of Life Improvements- Projects of this type improve the overall quality of life for the residents of Miami. Projects such as these would include traffic calming,:streetscapes, fountains, neighborhood and entry signs, and landscaping. Efficiency Improvements- This criterion measures those projects that when completed will increase efficiency or result in overall cost saV ings;;to the city. Such projects may benefit a greater number of people or more efficiently and effectively provideand support the defined functional requirements of the intended use. Projects such as these include renovation to offices, layout or workspace within a building, planning or zoning department where a smoother and more fluid processing of plans equates to time savings and increased customer service: Revenue Producing- These projects when completed would generate additional revenues to the city. Projects of this nature show an overall_return on investments, and should be measured on the risk involved. The criterion measures the ember of people who will benefit from the project, both directly and indirectly, and the associated costs versus :revenues generated. Elements considered in the rating include the project type and overallcommunity needsSich a project might include a new park with a community center and water park. Service Improvements- These types of projects demonstrate an increased delivery capability when completed. This criterion measures the number of people served and the benefit derived from a project. Replacements and renewals, which bring facilities up to acceptable standards and expand capacity, such as a marina expansion and renovation are illustrations of these types of projects. Service/Space Expansion- These are projects which result in expansion of space to serve the needs of the community. Such projects, typically parks or public facilities, would include renovations, additions, expansions or new construction of recreation centers, fire stations, police facilities, theatres and convention centers. 4 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Capital Plan Framework The 2011-2012 Multi -Year Capital Plan is structured into eleven (11) distinct funds or programs, some with subcategories. With the exception of the Funding Type by Job report, all reports in the Plan follow this program framework. The programs are listed and described below. • Community Redevelopment Area (CRA): This program accounts for the acquisition or construction of major capital facilities and infrastructure for community redevelopment in the defined Community Redevelopment Area. • General Government Projects: This program consists of capital improvements, including computers and communications, to the City of Miami's municipal office buildings and operations facilities. Q Public Safety: The Public Safety fund or program accounts for the acquisition of equipment or construction of major facilities that support the operations of the Police and Fire -Rescue Departments. O Disaster Recovery: The fund is utilized to account for revenue received from the Federal Emergency Management Agency (FEMA), insurance and other agencies resulting from declared disasters which required measures of relief in the areas of debris removal, roads and bridges, buildings and equipment, parks, marinas, and stadiums: At the present time, there are no disaster recovery projects planned or included in the FY11-12 Capital Plan. O Public Facilities: The Public Facilities program includes improvements to public use facilities such as stadiums, auditoriums and marinas. This fund also accounts for capital funding for redevelopment projects and historic preservation efforts. 0 Parks and Recreation: This program accounts for the acquisition, rehabilitation or construction of capital facilities for recreational activities. The City of Miami's park system comprises over 100 parks. 0 Streets and Sidewalks: The capital projects in the Streets and Sidewalks program provide reconstruction, Major maintenance and beautification to Miami's street system. 0 Mass Transit: This program accounts for the acquisition of equipment or construction of capital facilitiesthat support the maintenance and operation of public transportation systems. 0 Sanitary Sewers: This program includes projects that will improve the City's existing sanitary sewer system. Storm,Sewers: The Storm Sewer program accounts for projects that result in improved drainage throughout the City of Miami. CI Solid Waste:.This program includes projects for the acquisition of equipment or construction of facilities for the collection and removal of solid waste. 5 2011-20I2 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Pro 'rarn Overview The total value of the six -year plan is $411 million, representing 248 projects throughout the various programs. The following graph shows that the Streets and Sidewalks program accounts for the largest portion of the total Capital Plan funding at $127 million or 30.9%. The Parks and Recreation, the second largest, accounts for $85.3 million or 20.8% of the overall Plan value. The General Government program is the third largest fund accounting for $80.7 million, or 19.6% of the total Plan. PROGRAM OVERVIEW BY FUND $411 MILLION Sanitary Sew Ma Ir n it S63,6' G.clx L9St Solid w3sr.e S' , 53? 252 \ Sii,2 3,D53 Pubic. Safes 52:,1154, tx ELSE 1 t 6 2011-2012. CAPITAL BUDGET AND MLZTI-YEAR CAPITAL PLAN 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN HIGHLIGHTS HiQlr{i;{zts by Fund The most significant project accomplishments of the hundreds of projects under development in CLP and other City departments are highlighted in this section and grouped according to fund category.. The • projects that are noted in this section are deemed to be significant based on: • Scale or magnitude and/or anticipated impact to the community; ❑ High priority alignment with the City's Strategic Map; • Accomplishment of a long standing need or objective; or, D Representation of an innovative solution to a problem. FUND 301 COMMUNITY REDEVELOPMENT AREA (CRA) NW 2nd Avenue Roadway Improvements — This project included the design, and construction of the needed improvements including but not limited to roadway reconstruction, pavement milling and resurfacing, repair of broken driveway approaches and sidev, alk, new ADA compliant pedestrian ramps, and repair of curb and gutter as needed, NW 2nd Avenue is under the jurisdiction, Miami -Dade County Public Works. Project Location The area bounded by NW 1st Avenue to NW 3rd Avenue from NW 10th Street to NW 14th Street. NW "l Oth and I Th Streets are not included. NW 3rd Avenue Overtown Business Corridor Streetscape — Overtown is one of the oldest communities in the City and::vital to the economic engine of Miami. This project consisted of the reconstruction of the roadway, sidewalk reconstruction, decorative lights, landscaping and hardscape of the corridor. Project Location: NW 3rd Avenue from NW 8th Street to NW 14th Street. Old Fire,Station No. 2 Restoration - Design and construction to rehabilitate and restore the old Fire Station No. 2, a historic 1926.two story CBS structure approximately 10,500 SF (5,250 SF per floor). The work includes selective demolition; environmental cleanup, construction of new structural and roof systems, second floor, all nev. MEP including HVAC, new restrooms on both floors, restoration and installation of historical elements, exterior site work, ADA and code upgrades and related work. Design will be done in three phases: Ph. 1: Condition Assessment Report & Recommendations. Ph. 2: Design & Construction for strengthening of the structural systems and new roof. Ph. 3: Design and Construction of adaptive re -use. Design Phase of project is complete and construction is underway. Project location: 1401 North Miami Avenue FUND 311 GENERAL GOVERNMENT IMPROVEMENTS Solid 'Waste Collection Equipment Upgrade — This project included the acquisition of new Hybrid Autocar Automated Side Loader, Rubbish Truck, Freightliner M2, and Commercial Grinder for Virginia Key Composting Facility. 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Communications/Technology: IT Modernization - The City continued the most far reaching technology modernization effort in its history. Legacy business systems are being replaced with new software applications offering modern technical designs to enable best business practices. The internet, high bandwidth and wireless telecommunication, geographic infatuation systems, business intelligence databases, and modern desktop and server hardware form the foundation for a reliable; agile; technology infrastructure. Two major modernization efforts were the focal point of the Information Technology Department: iMiami ERP system including Oracle R12 upgrade and the Land Management System, each contribute directly to the accomplishment of City's strategic objectives. Oracle R12 brings the latest version of the financials and human resources systems to the. city along with improvements in business processes and computer processing speed. In addition, the team, launched the implementation of Hyperion Budget and Planning system as well as Oracle Business Intelligence applications. FUND 312 PUBLIC SAFETY Police: South Police Substation Hurricane Protection.- The project consisted of providing hurricane protection for the windows and the circular main front entrance at the 2-story police substation. Project included the preparation of a design analysis report to retrofit the building \;'ith protective screening and impact resistant window/glass system. Project also included the purchase and Installation of a selected system based on the phase I report. Project Location: 2200 West1Flagler Street Fire: Fire Station 13 - Design and construction of a New Fire Station facility of approximately 11,105 square feet Gross Area. The building shall be one story and two bay apparatus fire rescue facility. The facility shall include all typical Ere:station amenities for fire rescue personnel. The project shall include site development such as parking spaces as per zoning requirements, landscaping, water main improvement and street signalization. Seek LEED Silver Certification. The Project design was completed is currently in construction Project Location: 958 960-990 NE 79 Street. Fire Station 11— Completed;the design and construction of approximately.11,749 square feet two stories and tw obay apparatus fire rescue facility. The facility includes all typical fire station amenities for fire rescue personnel plus two lieutenants and a captain. The project included: allowance for demolition of an existing fire station and site development including parking spaces for 15-18 vehicles and landscaping; a water main improvement and new signalization. The project also included design and construction of a temporary site for firefighter relocation in two trailers with temporary signalization, electrical, water, sewer, fire truck parking area, some landscape, chainlink and wood fences for security. Project Location: 5920 W Flagler Street Fire Stations 1, 6, 8 & 9 Emergency Generator Replacement —For Fire Stations 1, 6, 8 and 9, we completed design to replace the existing standby generator with a larger generator capable of providing emergency power to the entire facility. Provide other related code required upgrades such as larger louver vents, day tank, transfer switch and concrete pad. 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN FUND 325 PUBLIC FACILITIES Stadium Parking Garage: The City of Miami is currently finalizing the constructing of the parking surface lot to serve the Florida Marlins Stadium. The project consists of four parking garages - two at six stories high and two at five stories high and six surface lots, along with retail space. The parking garages are constructed using a standard foundation with spread footings, a precast joist system and cast in place decks. The parking garage walls consist of tilt -up precast construction. Marine Stadium Marina at Virginia Key - This type of marina facilities currently under design is for pleasure crafts. Fixed docks supported by concrete piles are proposed. The docks construction will utilize concrete, fiberglass decking and aluminum. This new marina will accommodate approximately 220 vessels. In addition, upland utility improvements and an administration building of approximately 5,000 sq. ft Gross Area to support marina activities and administration. Project "Location: 3301 Rickenbacker Causeway Miamarina Piers A, B & C Fire Line Repairs — Completed the design to remove and replace 1,200 linear feet of corroded iron pipe, and corresponding connections, fittings and support brackets below piers A,BandC. James L. Knight Center Chiller & Cooling Tower — This project currently under construction consists of removing and replacing four Chillers and all related pumps, piping and electrical work at the James L. Knight Center. The project also includes the Demolition of the existingcooling tower and replacing it with new cooling tower assembly. Project Location: 400 SE 2nd Avenue: Historic Preservation.: Gusman Center — The Gusman Center housing the Olympia Theater has been one of Miami's beloved cultural centers since 1926. TuckediitoMiami's contemporary skyline is an enchanting Mediterranean courtyard with shimmering stars and golden balconies: Majestic turrets and towers suggest another era when perfoiuiances were eVents, and grand theaters provided a dreamlike escape from the modern world. The Olympia Theater at the Gusman Center for the Performing Arts is not just a "venue" — is the jewel of South Florida arts and entertainment facilities. affording South Florida's diverse community and its international guests a unique cultural experience that defies comparison. As such, the City of Miami plans to implement major renovations to the theater to rehabilitate the structure and upgrade it to have state of the art equipment:. FUND;331 PARKS AND RECREATION 1814 Brickell Avenue Park Land Acquisition and site development - Acquisition of property located at 1814 Brickell Avenue for park land purposes. The project will consist of permitting and construction of a new park on a 35,500 SF property. The program includes landscaped areas an elevated landscaped court and a children's play area: Scope includes landscaping consisting of groundcover, shrubs and mature trees, decorative concrete hardscaping, benches, picket fencing, site drainage, irrigation and lighting. The park will also house the City's 9/11 memorial. Duarte Park ADA Modifications — The scope of work was comprised of several phases. At the Parking Lot: providing accessible parking spaces and access aisle. At the Recreational Building: replacing the entrance door knob hardware with accessible lever operated hardware at the Computer room. At women's and men's bathrooms: Providing permanent ADA signage, gab bars at handicap stalls, paper towel dispensers and at the women's only replace the toilet flush control on the open side of the toilet's clear space. At the recreation area: replacing the drinking fountain with hi -low accessible drinking fountain. 9 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN At the Pavilion area: providing an accessible picnic table. At the Field house restrooms: providing ADA permanent signage, accessible stalls, replacing all bathroom accessories, replacing all plumbing fixtures and adjusting plumbing rough accordingly replace entry door with accessible door and hardware. At the Field: relocating and replacing drinking fountain with Hi-Lo accessible drinking fountain and providing an accessible route from the Field House to the Basketball and Baseball bleachers. Project Location: 1700 NW 28th Street aka 2800 NW 17th Avenue. Juan Pablo Duarte Park - Provided one van accessible space and one standard H/C space. Scope of work also included: providing an accessible route from the baseball field bleachers to the existing Field House, and Renovating existing standalone restroom to meet ADA compliance. Restroom repairs within the Recreation Building. Project Location: 2800 NW 17th Avenue. Curtis Park A.D.A. Modifications — This multi -phase project included: Providing at restrooms of Recreation Building, Concessions Building and Stadium Building permanent accessible rooms signage, accessible accessories and flush valves, also insulation for hot water pipes. At parking areas: providing accessible parking spaces with access aisle. Also included in the scope was providing accessible door entrance, water coolers and walkway to accessible chess table. Project Location: 1901 NW 24th Street Bicentennial / Museum Park Mooring Bollards - Designed and installed ship bollards for Bicentennial Park on the north side of FEC slip. These improvements will allow for the mooring of tall ships and historical sailing vessels. In addition the facility can be used to host competitive sailing evens such at the Volvo Ocean Race in May of 2012. Gibson Park — This major project currently under construction includes the demolition of existing park facilities including Recreation Building, play courts, pool and utility building. The project will provide new sports field with artificial turf.: upgraded sports lighting, 1,000 seat covered bleachers and press box. Also included will be a new Aquatic :Center with ne«- pool, restrooms, showers, lockers and new pump building; the construction a ne - Recreation Building' with administrative and fitness spaces; a new open park area with pavilions, play areas and other park amenities. A new covered walkway will connect the Recreation Building to the existing Library. The project is to meet LEED Silver standards. Project also includes Street Improvements to address existing roadway conditions around the park; the reconstruction of NW 12th Street with new drop-off area, parking and landscaping. Orange B044 CamnirtteeAthleticField at Moore Park - To commemorate its 75th anniversary the Orange BoWl Committee proposed to`.build with the City of Miami a youth sports/high school football stadium at Moore Park, the place where The tradition of the Orange Bowl game was born. The new facility includes:; football field of synthetic turf, running track with facilities for track & field events, electronic score board;: field sports lighting, 1,500-seat aluminum bleachers, 6,000 sf building with restrooms, clubrooms, concession area for home and visitor teams,nin addition to ticket booth, storage spaces and press box with A system; Roberto Clemente Park — The project consisted of the furnishing of all labor, materials and equipment for a new Recreation Building of approximately 9,000 sq. ft. (Gross Area) at Roberto Clemente Park. The new building has spaces for Neighborhood Enhancement Team (NET) that includes two staff offices, one large open office, and reception area. The new building also has the Parks Department spaces such as art and craft room/homework room, computer room for 8 to 12 stations, multipurpose rooms, children room and warming kitchen and staff office. The shared areas are the conference room for 8 to 10 people, the staff room and the public rooms for approximately 300 kids during summer programs, electrical room, pump room, maintenance storage, covered terrace, playground area and water playground area. Project Location: 101 NW 34th Street. 10 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Coral Gate Park Community Building - The project consists of furnishing of all labor, material and equipment for the construction of a new community building of approximately 4,600 G.S.F. Also, the project includes a new parking lot, landscape, irrigation, demolition of existing building, new playground and utility on site for services. Seek LEED Silver Certification. The construction of the project is almost complete. Project location: 1415 SW 32 Avenue. Williams Park Community Center — The project consisted of demolishing the existing 2,500 SF community center and constructing a new community center (approximately 5,000 SF) with three multipurpose rooms, an art and crafts room, a computer room, a manager's office, public restrooms and various support spaces. Project also included remodeled portions of the walkways and bleachers to satisfy accessibility requirements; remodeling the pool building restrooms/shower rooms to satisfy accessibility requirements and provide a year-round changing facility and, remodeling a portion of the site surrounding the new community center and parking area to remediate drainage problems. The project is to be LEED Silver. Project Location: 1717 NW 5 Avenue. FUND 341 STREETS AND SIDEWALKS NE 2 Avenue Improvements — Provide all project management and engineering analysis and design services necessary for preparing construction documents for the reconstruction of NE 2nd Avenue from NE 20th Street to NE 84th Street. The project length is approximately 4.1 miles. The scope of work includes roadway reconstruction, storm water system, curb and gutter, concrete sidewalk, signing and pavement markings, decorative lighting; signalization and landscape. Segment B1 (NE' 36 Street to NE 42 Street) is completed, Segments B2 (NE 42 Street to NE e7 Street) and C (NE 57 Street to NE 69 Street) are currently under construction and Segments A (NE 20 Street to NE 36 Street), B3 (NE 42 Street to NE 51 Street) and D (NE 69 Street to NE 84 Street) are currently under design. Brickell Key Bridge Rehabilitation Project - The purpose of this service was to provide structural inspection, survey, design:of repairs, detailed construction plans, technical special provisions, prepare permit packages, cost estimates; utility coordination, FRI's and RAFs, shop drawing reviews and reviewing proposed repair products. NW N. River Dr. 22nd Ave.-24th Ave - Milling and resurfacing including re -striping. In addition, scope included reconstruction of approximately 200 linear feet of roadway with one new inlet and 50 L.F. of french drain. NW 2nd:Avenue Roadway Improvements - This project includes the design, and construction of the needed improvements including but not limited to roadway reconstruction, pavement milling and resurfacing,.repair of broken driveway approaches and sidewalk, new ADA compliant pedestrian ramps, and repair of curb and gutter as needed. NW 2nd Avenue is under the jurisdiction Miami -Dade County Public Works. Project. Location: area bounded by NW 1st Avenue to NW 3rd Avenue from NW loth Street to NW 14th Street. NW 10th and llth Streets are not included. NW 17 Avenue between NW 3rd and NW 1st Street —Installation of Guardrail to increase pedestrian safety along this busy corridor. Traffic Calming — Studies were performed for various neighborhoods within the City. As a result, a variety of traffic calming devices such as but not limited to traffic circles, chokers, medians and intersection improvements were recommended to address speeding and cut through traffic as well as to 11 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN improve overall quality of life in our residential neighborhoods. Traffic calming circles or other calming devices have been completed or will begin construction throughout the city. Downtown Street Infrastructure — This infrastructure project addresses the need to restore long neglected street infrastructure in Downtown Miami. The project includes milling and resurfacing of the existing roads, replacement of sidewalks and curbing, addition of ADA compliant pedestrian ramps, and lining of existing storm sewer pipes. US 1 (Pink Wall) Replacement — Phase II — Following the successful completion of Phase 1 between 17th Avenue to the Planetarium on the east side of US 1 (a distance of some 3,100 it.), the City of Miami is finalizing Phase II of the project between 17t Avenue and just west of Natoma Street (19a' Avenue). The scope of this project included the demolition and removal of the existing. privacy fence/wall, installation of a concrete post and panel type wall, barrier wall installation. drainage, landscaping, and minor roadway improvements. FUND 343 MASS TRANSIT City of Miami Trolley Program - Capital Acquisition — The City of Miami with federal funding from the American Recovery and Reinvestment Act (ARRA) of 2009, funding from the Florida Department of Transportation (FDOT) and city funds, acquired rubber -tire circulator/shuttle to operate several routes within the City boundaries to serve its constituents and visitors alike. Trolley Program — Operation and Maintenance- The City of Miami has been awarded transit service development funding by the Florida Department of Transportation (FDOT) for this project. The state funds are intended to off -set 50% of the operatingand maintenance costs associated with the first three years of service. The City's match will originate from the transit portion of the transportation half - cent surtax proceeds. The following ate the implemented and/or proposed routes: ❑ Health District, Health District/Stadium - Launched March 2012 ❑ BrickelllBiscayne Launched April 2012 ❑ Overtown/Health .District — Scheduled for July 2012 ❑ Coral Way Circulator `: Scheduled for Winter 2012/2013 ❑ AllapatahlOvertown Circulator — Scheduled for Winter 2012/2013 FUND 352 STORM SEWERS Englewood Road and Storm. Sewer Improvements - The new drainage facilities may consist of a combination, of exfiltration drains, deep drainage wells, grease & oil interceptors and other pollution control structures. Road improvements include milling and resurfacing, new or repair sidewalks, curb and gutter, ADA ramps, re -grade or re -sodding swale areas, repair or replace damaged or disfigured traffic signs, and tree planting;': The design phase of the project is completed and included the preparation of a General Development Report which evaluated the existing road and drainage conditions, developed alternative improvements and cost estimates, and recommended a preferred alternative. The construction of the project is scheduled to begin in the Fall. Project Location: Area generally bounded by SW 16th St, SW 27th Avenue, SW 22nd St, and SW 32nd Avenue. and includes traffic circles at SW 30 avenue/16 terrace, SW 31avenue/18 street, SW 31st Avenue/19th street, SW 29 avenue/18 street, SW 29 avenue/19 street Raised Crosswalk at SW 20 street between 27th avenue and 32nd avenue. North Bayshore Drainage (Partially Funded by CRA) — This project was part of the Omni CRA initiative to develop drainage alternatives to address the existing flooding & roadway conditions. 12 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Improvements under study include the design and construction of a new storm sewer pump station; the rebuilding of the intersection @ N Bayshore Dr & NE 18 St; and new pavement @ N Bayshore Dr, between NE 17 & 18 Street Northwest Road and Storm Sewers Improvements — Design and construction of a storm sewer system including: road improvements such as damaged sidewalk replacement, damaged curb and / or gutter replacement, ADA compliant ramp construction, re -sod of swales, milling & resurfacing. The project is currently under construction. Project Location: Area generally bounded by NW 71st St, NW 7th Ave, NW 62nd St, and MW 12th Ave. Fairlawn Storm Sewer Improvements Project Phase III — The project consisted of the construction of a storm sewer system, road improvements such as damaged sidewalk replacement, damaged curb and / or gutter replacement, ADA compliant ramp construction, re -sod of swales, milling & resurfacing. Project location: selected roads bounded by W. Flagler Street to SW 8th Street, SW 47th Avenue to SW 57th Avenue. Kinloch Storm Sewer Improvements Project - This project consists of three parts: (1) The General Development Report (GDR) to address flooding problems within the limits of the project. This comprehensive report serves as a plan to design drainage systems to reduce flooding in these communities. It also identified contributing factors to the flooding conditions, evaluated feasible measures to reduce flood stages, established drainage requirements, and provided specific recommendations to improve drainage conditions within the project limits. This phase of -the .project is completed. (2) Phase I Design and Construction: consists of exfiltration. trenches, manholes, inlets, cross drains, swale trenches, and surface restoration. This phase of the project is constructed. (3) Phase II Design and Construction: consists of a connection to an existing outfall, old exfiltration trenches will be replaced with. new ones manholes, inlets, swale trenches and surface restoration. This phase of the project is currently under design. Road improvements for both phases include roadway milling & resurfacing, ADA Ramps, damaged sidewalk and curb and/or gutter ;replacement and swale restoration on street blocks impacted by the drainage construction. ,Project Location: Area bounded by SW/NW 42 Avenue, SW/NW 47 Avenue, MW 7 Street, and SW 8 Street; and NVT 43rd Avenue from Flagler to 4th Terrace. FUND353 SOLID WASTE Solid Waste Equipment Acquisition —The Solid Waste Department continues to purchase a large variety of equipment including Street Sweepers, Roll -Off Transfer Trucks, Litter Containers, Side Loader Compactor Waste Collection' Vehicles, and Rear Load Waste Collection Vehicles. This new equipment will improve the efficiency of garbage and trash pickup within the City as well as help insure a clean city for our residents and visitors. 13 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN a FU 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN • ,. it 4. C, FUNDING OVERVIEW Fu.r1dif1Q Sources The Capital Improvement Plan contains funding from seven types of revenue sources: ❑ Federal Grants - Federal grants, such as Community Development Block Grants (CDBG), may be used only for the purposes specified in Federal laws. The amount of funding available from Federal sources is dedicated by National priorities. These grants derive from agencies at the federal level such as the Federal Emergency Management Agency (FEMA) and Housing and Urban Development (HUD). ❑ State Grants - State grants are awarded by State of Florida agencies such as the Florida Department of Transportation (FDOT) and Florida Department of Environmental Protection (DEP). These grants may be used only for the purposes specified in State laws. • Miami -Dade County Grants - Miami -Dade County. may contribute funding in the form of a grant for specific projects to be undertaken by the:City. D Grant — Other - These are giants «hick do not derive from Federal. State or Miami -Dade County resources. An example of this funding type is a grant or contribution from another municipality. ❑ City Bonds - Two types of bonds canbe. issued by the City for capital improvements: (1) General Obligation Bonds and_(2) Special Obligation Bonds: i General obligation bonds are backed by the full faith and credit of the City of Miami and are secured by the City's ad valorem taxing power. These bonds finance specific capital improvement'prog-ams such as public safety, highway or storm sewers. The City's most recent general obligationond issuance was approved by voters in November 2001. These bonds, named the Homeland Defense/Neighborhood Improvement (HD) Bonds, provide for a total infusion of $25 5 million worth of capital investment in the areas of public safety, parks and recreation, streets,; drainage, quality of life infrastructure improvements, and historic preservation. The first issuance in the amount of $155 million took place in 2002 while the second issuance took place in July 2007 and derived almost $51 million. The third issuance in the amount of $50,599,645 took place in May 2009. ▪ Special obligation bonds are secured by a limited revenue source. ■ In order to accelerate the construction of much needed road and drainage infrastructure projects, the City leveraged recurring revenue streams from Local Option Gas Tax, the Transit Half -Cent Surtax, and the Parking Surcharge into a special obligation bond program. The first issuance of this bond program, known as the "Streets Bonds", in the amount of $80 million took place at the end of calendar 14 2011-2012 CAPITAL BUDGET ANDML-LTI-YEAR CAPITAL PLAN year 2007. The second issuance in the amount of $57,634,240 took place in December 2009. • In order to provide funds together with other available moneys, to finance the cost of construction of parking appurtenant and ancillary facilities, including retail space, surface lots and parking structures to the site adjacent to the Marlins Baseball Stadium, the City leveraged recurring revenue streams from Convention Development Tax, Parking Revenues and Parking Surcharge into a special obligation bond program. The issuance of this bond program, known as the "Marlins Stadium Project", in the amount of $72.57 million of Tax -Exempt Special Obligation and $14.83 million of Taxable Special Obligation took place in July 2010. CIP Fees/Revenues - These funds are collected from current revenues produced by miscellaneous county or city taxes and various fees. Notable funding sources included in this::category are the annual General Fund contribution to capital projects, storm water utility trust Rands, local option gas tax, the transit''/2 cent surtax, fire assessment fee, and impact fees. Private•Donation/Other - This funding source includes any private funds contributed to the City as well as the dedication or sale of land for capital facilities. The chart below shows that City Bonds represent the largest share of funding in the Capital Plan, accounting for 33.6% of overall Plan funds. CIP Fees/Revenues represent the second largest funding source, accounting for 30.7% of the Plan's funding. Sources deriving from Miami -Dade County represent 9.4% of the Plan. The remaining 26.3% of funding is from Federal, State Grant Other and Private-Donations/Other sources. SUMMARY13 Grant- Federal 55,475.79 13% The "Funding Type by Job Number" Report in the Reports Section provides a listing of projects associated with the various sources under each of the funding types described above. 15 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Funded, Partially Funded and Unfunded Projects The projects in the CIP can be placed in one of three funding proportion categories: Funded, Partially Funded or Unfunded. The "Cost Estimates versus Available Funding" listing in the Reports Section provides a breakdown of funded, partially funded and unfunded projects by fund. It is important to note that the total funded amounts in the CEP do not account for unfunded project estimates. The funding proportion is determined by comparing a project's estimated costs against anticipated revenues and available dollars. It is anticipated that revenues to address the unfunded gap will derive from future year allocations of general fund revenues or other existing recurring revenues, successful pursuit of grants, or identification of new revenue sources or financing options. The portion of project estimates that is currently unfunded accounts for 42.6% of total estimated costs for the projects identified in the "Cost Estimates versus Available Funding" listing. This percentage is derived from projects that are completely unfunded 10.9% as well as the unfunded portion of partially funded 31.7% projects. These needs will be evaluated annually based on priorities and availability of funding. 16 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Discussion on Miami Troller The City of Miami received a grant in the amount of $4.1 Million from the American Recovery and Reimbursement Act (ARRA) for the purchase of Rubber Tire Trolley Vehicles and Capital Equipment as well as installation of bus benches / shelters as part of the Economic Stimulus Package enacted by the United States Congress in 2009. In addition, the City of Miami received a grant in the amount of S 1.9 Million from the Florida Department of Transportation (FDOT) which requires a 33.3% match of city funds for the purchase of Classic American Trolleys, 32' in length. The City also received a grant in the amount of $1.5M from FDOT which requires a 50% match for Operation and Maintenance cost associated with the Health District/Stadium and the BrickellBiscayne routes. Complimenting the grants with Transit Half -Cent Surtax, the City of Miami launched its inaugural routes of the Miami Trolley (Health District, Health District/Stadium, BrickellBiscayne). The latest survey indicates an average of 2,000 passengers daily, and more on event days. All Trolleys are accessible to riders using wheelchairs and are ADA Compliant. The Trolley provides the same high level of service to passengers with or without disabilities. The following are some accessibility features provided as part of our serice: ❑ Trolley Stops Announcements ❑ Boarding Assistance Assistance for Passengers with Visual and Mobility Impairments For the Safety and Security of All Trolley Passengers, the following Policies are in place: ❑ Eating, drinking, and smoking are not allowed on the trolley. ❑ Caustic or flammable materials are not allowed on board. • Service animals trained_to'assist persons with disabilities are welcome. Other pets must be kept in a secured carrier. The Health District, Health District/Stadium routes began on March 1, 2012. The service runs approximately every15 minutes from 6:30 am to 11 pm, Mondaythrough Saturday. The. Health District Trolley ,route will travel around the district between NW 7t1Avenue and NW 14th Avenue and NW 14th Street and -NW 20th Street. Roues include stops at the following locations: UM Life Science Park, Lindsey Hopkins Technical Education Center, Miami -Dade College Medical Campus, Ryder Trauma Center, Jackson Memorial Hospital, Veterans Affairs Miami Medical Center, UM Hospital and Clinics, UM Biomedical Research Building, Bascom Palmer Eye Institute, Marlins Stadium. a ST; CTf s—..=.DVVM M .P 17 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN E?;eC-Fi•R:6./o-RFvKELL. ?•'.h.P The Overtown/Health District route is scheduled to launch in July 2012. The service will run approximately every 15 minutes from 6:30 am to 7:00 pm, Monday through Friday. Routes include stops at the following locations: UM Life Science Park, Lindsey Hopkins Technical Education Center, Miami -Dade College Medical Campus,. Ryder Trauma Center, Bascom Palmer Eye: Institute, Biomedical Research Institute UM, UM Hospials and Clinics, Seybold Pole Henry Reeves Park, Rosa Parks Cornmunity'.°School- Overtown, Overtown Transit -Village, Black Police Precinct & Courthouse ::Museum, Booker T. Washington School. The Brickell/Biscayne route, serving the downtown area, was launched on April 27, 2012. The service runs approximately every 15 minutes from 6:30 am to 11 pm, Monday through Saturday and on Sundays during Miami HEAT playoff games. Routes include stops at the following locations: Financial District, Mary Brickell Village, Brickell Key, Miami Convention Center, Bayfront Park, Freedom Tower, Miami -Dade College Wolfson Campus, American Airlines Arena Museum Park_ Adrienne Arsht Center, Miami International University Art and Design, Margaret Pace Park, Oinni Bus Terminal.. 18 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN 19 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN t f6: • • : : u-,bx 7.7.0 • • • - NW 20 ST " Health District -Stadium Trolley Health District Trolley 0 ECTION REPORTS - FUNDING TYPE BY JOB NO. Active & Future CIP Projects Only FUNDING Grant - Federal City Of Miami - Capital Improvement Program Fund Source Management System Funding Type by Job No. Total Funding 000007 American Recovery Reinvestment Act (ARRA) CD B-40181 James L. Knight Center Chiller & Cooling $2,497,123 i. $2,497,123 $0 $0 $0 $0 $0 $0 000007 $2,497,123 $2,497,123 50 $0 $0 $0 $0 $0 888902 Community Development Block Grant B-30035A North Shorccrest Roads Improvements l'rojcct $400,000 : $400,000 $0 $0 $0 $0 $0 $0 B-30365E Coral Way NI 1 OfliceRemodeling - CD $1,000,000' $1,000,000 $0 $0 $0 $0 $0 $0 888902 51,400,000 $1,400,000 $0 $0 $0 5(1 $0 11) 888925 FEMA Recovery Assistance 13-50654 Overtown Stormwater Pump Station Upgiadcs $173,200:` i) $173,200 $0 $0 $0 $0 $0 $0 Prior Approp. Approp. 2011 -2012 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016. 2016 - 2017 888925 $173;200 1173,20(1 $0 $I) $0 $0 51) 50 888927 Federal Aviation Admin. Grant B-75001 WaLson Island Infrastructure $150,000 $150,000 $0 $0 $0 $0 $0 $0 888927 ro 888939 FEMA Federal Assistance to Firefighters Grant B-70411 Fire Rescue Personal Protective Equipment $150,000 $656,466 $150,000 $656,466 .'10.. $11 $0 $Il $0 $0 $0 $0 $0 $0 $0 $0 888939 $656,466 888959 FEMA 2007 & Future Pre -Disaster Mitigation (PDM) Grant B-30588 San Marco Island and Biscayne Island Drainage $600,000 $656,466 $() $0 $() $0 SO $0 $0 5600 000 $0 $0 $0 $(1 $0 888959 5600,00)) $0 560(1i000 50 $0 . $0 $0 $0 Grant - Federal $5,476,789 $4,876,789 $600,110)) $1) $II $Il $0 $0 Grant - State 888907 Florida Recreation Assistance Program B-30585 . Morningside I'ark New fool Facility $200,000 ' $200,000 $0 $0 $0 $0 $0 $0 888907 888909 FL Dept of Environmental Protection (leDEP) 13-30588 San Marco Island and Biscayne Island Drainage $2110,000 5200,1)00 $0 $0 $0 $0 $0 $0 $500,000 $500,000 $0 $0 $0 $0 $0 $0 888909 888913 FDOT Transportation Enhancement Program B-30130 Miami River Greenway SW 1 st Court to South B-30336 Miami River Grecnway (5th Street bridge B-30624 Overtown Greenway rt NW II Terrace - B-30631 Miami River Grecnway from Miami Circle B-30651 Miami River Grecnway from NW l0lh to NW $500,000 $500,000 $II $0 $0 $1l $11 $0 51,000,000 11,000,000 50 50 50 50 50 50 51,000,000 50 51,000,000 50 $0 $0 $0 $0 $1,079,879 $0 $1,079,879 $(1 $0 $0 $0 $0 $1,000,000 $0 $1,000,000 $0 $0 $0 $0 - $0 $2,339,739 $0 $2,339,739 $0 $0 50. $0 50 Active & Future CI.I' Projects Only City Of Miami - Capital Improvement Program Fund Source Management System Funding Type by Job No. Total Prior FUNDING Funding Grant - State (Cont.) 888913 FDOT Transportation Enhancement Program., 13-39911 Venetian Causeway Improvements B-40643A North Spring Garden Grccnway • B-40686 Miami River Grecnways/ Slreelscapc'Segment $1,000,000::: $1,000,000 `. $1,000,000;•; Approp. $1,000,000 $1,000,000 $1,000,000 Approp. 2011 -2012 $0 $0 $0 2012 - 2013 $0 $0 $0 2013-2014 $0 $0 so 2014 - 2015 $0 $0 $0 2015-2016 2016-2017 $0 $0 $0 $0 $0 $0 888913 55,419,618 1(1 888917 FDOT Other B-30542A US Roadway Improvements and Wall 483,537 $83,537 '• $U $U $0 $0 $0 $U B-70715 City of Miami Trolley Program - Capital $1,899,151 $1,899,151 $0 $0 $0 $0 $0 $0 B-75005 Watson Island. Aviation & Visitor Center $4,460,746- _• : ' $4,460,746 $0 $0 $0 $0 $0 $O 888917 56,443,434 $6,443,434 • $(1 1(1 $0 $0 141 5() 888920 FIND Waterways Assistance Program FYU7 and Future B-30541 B Kennedy Park Floating Dock t'111 $35,000 $35,000 $0 $0 $0 $0 $0 $(1 B-30541C Kennedy Park Shoreline Stabilization Phase! $4(1,000 $40,000 $0 . $0 $0 $U $0 $0 13-30604 Miamarina Intracoastal Bulkhead Assessment $40,000 $40,000 $0• $0 $0 $0 $0 $0 B-30688 Marine Stadium Restoration $175,000 $175,000 $0 $0 $0 $0 $0 $O B-30689 Marine Stadium 1ulkhead Replacement $17,500 $17,500 $0 $0 $0 $0 $0 $0 B-30706 Miscellaneous Repairs 10% Set Aside $38,750 $38,750 $0 $0 $0 • $0 $0 $0 13-30721 Spoil Island L Restoration and Floating Dock $15,000 $15,000 $U $0 $0 $0 $0 $0 B-30731 Miami Women's Club Baywalk Project -CRA $46,500 $46,500 $0 $0 $0 $0 $0 $0 B-40171 Coconut Grove Viewing Platform Spoil Island $7,500 $7,500 • .• $0 $0 $0 $0 $0 $0 B-40172 Coconut Grove Viewing Platform Spoil Island $7,500 $7,500 $0 $0 $0 $0 $0 $0 B-40180 Marine Stadium Marina at Virginia Key $800,000 $0 $800 000 $0 $0 $0 $0 $0 $9,419,6;U3 $4,000,000 $0 .50 $0 $0 888920 51,222,75(1 $422,750 $800,000 $0 5(1 $0 $0 $0 888960 Sunshine Slate Financing Commission Number 1 13-30538 Museum Park - l'arlially Funded by CRA $75,534 $75,534 $0 $0 $0 $0 $0 $0 B-30541 Citywide Park Equipment & Site Improvements $2,449,706 $2,449,706 $0 $0 $0 $0 $O $0 13-30546A Gusman Hall Improvements.- FY2012 $8,063 $8,063 $0 $0 $0 $0 $0 $0 . B-35887 Moore Park New Construction $145,829 $145,829 $0 $0 •$0 $0 R0 $0 888960 $2,679,132 $2,679,132 $0 $0 • 141 $0 $0 $0 888961 Sunshine Slate Financing Commission Number 2 B-30305B Gibson Park New Construction (Partially $8,000,467 $8,000,467 $0 $0 $0 $0 $0 $0 B-30325 Miamarina Emergency l'icr Repairs $66,897 $66,897 $0 $0 $0 $0 $0 $0 13-30538 Museum Park - Partially Funded by CRA $6,015,466 $6 015,466 $0 $0 $(1 $0 $0 $0 B-30541 Citywide Park Equipment & Site Improvements $1,012,439 $1,012,439 $0 $0 $0 $0 $0 $0 B-30546A Gusman Hall Improvements - FY2012 $96,937 $96,937 $0 $0 $0 $0 $0 $0 B-30566A Melrecse Gulf Training Center $230,000 $230000 $0 $0 $0 $0 $1) $0 B-30588 San Marco Island and Biscayne island Drainage $475,000 $475,000 $0 $0 $0 $0 $0 $0 Active & Future CIP Projects Only City Of Miami - Capital Improvement Program Fund Source Management System Funding Type by Job No. 'Total FUNDING Funding Grant - Stale (Cont.) 888961 Sunshine State Financing Commission Number:2 B-35002 Virginia Key Landfill Assessment B-35806 Curtis Park New fool Facility B-35812A Duarte Park Building Renovation, Splash Park B-35838 Kennedy l'ark Restroom Building, B-35853A Virrick Park New Pool Facility B-35865A Coral Gale Park Community Building • B-35883A Hadley Park New Youth Center B-35887 Moore Park New Construction 13-60454 Fire Station 814 (New) B-70100 Gusmmn hall Improvements / Repairs B-70414 James L. Knight Center / Myatt- Fire Alarm 13-70416 Emergency Radio Equipment replacement B-72915A Police Headquarters 1-lelipad and Roof $750,000; :': $505,070 ,' < $300;000 $75,000 s3,785,528 $1,454,174 $29;236 $484,979 $25 000 $400,000 Prior Approp. $750,000 $505,070 $560,000 $21,000 $300,000 :.::'$75,000_: $3,785,528 $1,454,174 $3,8,15,377 $29,236 $4 34,979 $25,000 $400,000 Approp. 2011 - 2012. ` YS �1 f �S)IS.l �t�v l.f4, M41i iL 2012-2013 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 2013 - 2014 2014 - 2015 2015-2016 2016-2017 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $t) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $(l $0 $0 888961 $28,132,570 $28,132,570 SO 811 $0 $11 SO 511 888966 Sunshine Stale Financing Cununissimr N her 3 B-74609 ERP integration System $8 356,706 $8,356,706 $0 $0 $0 $0 $0 $0 B-74610 Technology Infrastructure $6,467,852 $6,467,852 $0.:', $0 $0 $0 $0 $0 B-74614 Land Management System $5,139,942 $5,139,942 $0: $0 $0 $0 $0 $0 888966. 519,964,51111 S19,964,500 ;$0 $0 SO St) $11 50 888967 Economic St lus Package 2009 - FDO'I' B-78508B ARRA - NE 2nd Avenue improvements (57th $3,955,018 $3,955,01 8 ,. $0 $0 $0 $0 $0 $0 B-78508C ARRA - NE 2 Avenue Improvements Segment $2,220,578 S2,220,578 $0 - $0 • $0 $0 . $0 • $0 888967 $6,175,596 S6,175,596 $0 SO - SO $O $0 $0 888974 Economic Stimulus 201)9 - Ft) Of Health B-30694 ARRA Citywide Bicycle Rack & Signage $392,130 $392,13(1 $0 $0 . $0 $0 $0 $0 888974 5392,131) $392,130 $0 SO $1) $0 $0 $0 Grant - Stale Grant - Miami -Dade County 373001 Safe Neighborhood Parks Bond B-30541 Citywide Park Equipment & Site Improvements $75,129,730 $68,910,112 $6,219,618 $119,622 $119,622 $0 $0 SO $1) $11 $0 $0 $0 $0 $0 $0 37311111 373002 Safe Neighborhood Parks Bond 21)1)8 & Future B-30541 Citywide 1'ark Equipment &. Si(c improvements $119,622 $119,622 $0 $II $1) $0 SO $0 $83,320 $83,320 $0 $0 $0 $0 $0 $0 Active & Future CIP Projects Only FUNDING City Of Miami - Capital Improvement Program Fund Source Management System Funding Type by Job No. Total Prior Funding Approp. Approp. 201.1 - 2012 4t1+'tltut`t_(11 tll���t�iJ' r�ltIWig Rit ;) i 1 k Y 2012-2013 2013-2014 201.4 - 2015 2015-2016 2016-2017 373002 11183,320 $83,320 $0 50 $0 $11 $0 $0 888896 Miami -Dade County DERM Virginia Key Grant' B-35002 Virginia Key Landfill Assessment $650,000 $650,000 $0 $0 $0 $O $0 $0 888896 $650,000 5650,011(1 50 511 $0 $I) $0 $0 888938 Miami -Dade County Grant/Cott(ribution B-30646 South Bayshore Drive Roadway and Drainage $450,000`....`., $450,000 $0 $0 $0 $0 $0 $0 B-40268 FEC Quiet Zone Study $1..?9;418' . .$99,418 so so $0 $0 $0 $0 888938 15549,418 $549,418 50 $I) $0 $0 $0 $0 888947 MDC Building Better C 'ties GOB i3-30011 Englewood Road and Storm Sewer $6,250,000:::, . $681,000 $0 $5,569,000 $0 $0 $0 $0 B-30014 Northwest Road and Storm Sewers $4,93.I;000 $671,000 $0 $4,260,000 $0 $0 $0 $0 B-30504 Linear Parks, Grecnways and Baywaik $96 1,000 $0 $0 $96I,000 $0 $0. $0 $0 B-30508 Virginia Key Beach !'ark Museum $15,500,000 $15,500,000 $0 $0 $0 $0 $0 $0 8-3053I Dorsey Memorial Library Restoration $250,000 $250000 $0 . $0 $0 $0 $0 $0 888947 $27,892,000 517,102,000 $0 $10,790,0011 $0 50 $0 $0 A 888953 Miami -Dade Metropolitan Planning Org (MPO) B-30645C Health District Bicycle and Pedestrian $48,000 $48,000 $0 $0 $0 $0 $0 $0 13-30645D Baywalk Mobility flan $48,000 $0 $48,000 $0 $0 $0 $0 $0 888953 $96,000 $48,000 548,0(10 $0 $0 $II $11 $11 888964 County CDT B-30508 Virginia Key Beach Park Museum $5,000,000 $5000,000 • $0 $0 $0 $0 $0 • $0 888964 55,000000 $5,000,000 $0 $0 $0 50 $11 9;1) 888968 Economic Stimulus Package 21)09 - Miami Dade Comity (MIC) B-30668 ARRA - Purchase of3'rol)cy Vehicles $4,084,282 $4,084,282 $0 $0 $0 $0 $0 $0 888968 $4,084,282 $4,084,282 $0 $0 $I) 511 $0 $11 888976 Miami -Dade County Dept Cultural Affairs B-30671 Caribbean Marketplace Renovation $354,614 $0 $354,614 $0 $0 $0 $0 $0 888976 $354,614 $0 $354,614 $0 50 $I) 50 $0 Grant - Mintni-Dade Comity $38,829,256 $27,636,642 $402,614 $10,790,1100 $0 $0 . $11 $11 Grant - Other 000004 CRA Operating Budget B-30305B Gibson Park New Construction (Partially $1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0 B-30394 North 14 St. Multi Media Entertainment $6,000,000 $6,000,000 $0 $0 $0 $0 $0 $0 13-30538 Museum Park - Partially Funded by CRA $5,000000 $0 $5,000,000 $0 $0 $0 $0 $0 B-30579 Old Fire Station No. 2 Restoration - CRA $3,500,000 $3,500000 $0 $0 $0 $0 $0 $0 Active & Future CIP Projects Only FUNDING Grant - Other (Cont.) 000004 CRA Operating Budget B-30624 Overtown Greenway n N W 11 'Terrace - $1,120,080` 1' . $1,120 080 $0 $0 $0 $0 $0 $0 13-30731 Miami Womens Club Baywalk Piojccl CRA $46,500 ':k;; $46,500 $0 $0 $0 $0 $0 $0 I3-40169 300 NW 11 Street CommunityCcnler-CRA $1,500,000:.'- $1,500,000 $0 $0 $0 $0 $0 $0 000004 $18,166,580r°:- 813,166,580 $5,000,000 $0 $0 $0 $0 $0 888932 Greater Miami CVII B-75005 Watson Island Aviation & Visitor Center $284',569 : $284569 $0 $1) $0 $0 $0 $0 888932 8281569 S284,569 80 $0 $0 $0 $0 $0 City Of Miami - Capital Improvement Program Fund Source Management System Funding Type by Job No. Total Funding Prior Approp. Approp. 2011 - 2012 "ri3)' - �+,� 1 It sir '�: - 1 ... 1' �. . � _ 2012 - 2013 2013-2014 2014 - 2015 2015 - 2016 2016 - 2017 888955 MSEA Contribution to Capital B-30566A Mclreese Golf Training Center B-3067I Caribbean Marketplace Renovation 82,155,56(1 $2,155,560 $0 $0 $0 $0 $0 $0 $350,000 $350,000 $0 $0 $0 $0 $0 $0 888955 888957 Downtown Development Agency B-30645A 'Transportation Program Support Services - $25,000 .. $25,000 $0 $0 $0 $0 $0 $0 $2,51)5,560 S2,505,560 $1) $0 $0 $11 $1) $I) 888957 $25,000 $25,000. $0 511 8(1 $0 $0 511 888962 The Children's "Trust B-30174 Virginia Kcy Beach Park Historic Restoration $260,000 $260,000 . -$0 • $0 $0 $0 $0 $0 888962 $260,000 $260,000 901. $0 $0 $0. $0 $0 888965 Bayfront Park Management Trost B-40173 Bayiiont Park Electrical Repairs $309,000 $309,000 :$0 $0 •$0 $0 $0 $0 888965 $309,000 8309,1)1)0 $II 81) $0 $0 $0 80 888975 Hyatt - Chiller/Cooling'1'ower B-40181 James L. Knight Center Chiller & Cooling $2,024,277 $0 $2,024,277 $0 $Il $0 $0 $0 888975 $2,024,277 $0 $2,024,277 $II $0 $0 $0 $II Grant - Other $23,574,986 $16,550,709 $7,024,277 $0 $ll $0 $0 $0 City Bonds 356005-1 Streets Bond Program - Series 1 13-30011 Englewood Road and Storm Sewer $1,643,748 $1,643,748 $0 $0 $0 $0 $0 $0 B-30035A North Sharecrest Roads Improvements Project $150,000 $150,000 $0 $0 $0 $0 $0 $0 B-3003513 Shorecrest Roadway Milling & Resurfacing $616,615 $616,615 $0 $0 $0 $0 $0 $0 B-30130 Miami River Greenway SW 1st Court to South $407,530 $407,530 $0 $0 • $0 $0 $0 $0 B-30167B Shenandoah Traffic Calming - Phase 2 -1)4 $182,100 $182,100 $0 $0 $0 $0 $0 $0 B-30167D Shenandoah Roadway Improvements $353, 127 $353,127 $0 $0 $0 $0 $0 $0 B-30168A Silver 13luffTraffic Calming Priority 3 - D4 $96,100 $96,100 $0 $0 $0 $0 $0 $0 Active & Future CIP Projects Only FUNDING City Bonds (Cont.l 356005-1 Streets Bond Program - Scrics I 13-30377A District I - Sidewalk Repairs and ADA • $250,692; $250,692 $0 $0 $0 $0 $0 $0 B-30377B District 2 - Sidewalk Repairs & ADA $250,691.:',: $250,691 $0 $0 $0 $0 $0 $0 B-30377C District 3 - Sidewalk Repairs anil Al)A $250,691 $250,691 $0 $0 $0 $0 $0 $0 13-30377D District 4 - Sidewalk Repairs &ADA $250,69.1;:'.. • $250,691 $0 $0 $0 $0 $0 $0 B-30377E District 5 - Sidewalk Repairs & tWA $250 69 t $250,691 $0 $0 $0 $0 $0 . $0 I3-30542A US I Roadway lniprovenients and Wall. $1,291,7'74 $.1;291 774 $0 $0 $0 $0 $0 $0 B-30606 DWNTWN Beautification Project Phase I $236,151 ' $236,151 $0 $0 $0 $0 $0 $0 B-30606D DWNTWNBeautification- Designl'hase $341,271 $341,271 $0 $0 $0 $0 $0 $0 B-30606L DWNTWN. Beautification (Lighting) $1,371,543-' $1,371,543 $0 $0 $0 $0 $0 $0 13-30606N DWNTWN Beautification - North $4,65,682 $4,651;682 $0 $0 .$0 $0 $t) $0 B-30606S DWNTWNBeautification - South $3,399,353 $3,399,353 $0 $0 $0 • $0 $0 $0 13-30613 District 3 - Miscellaneous Roadway $17,929 $17,929 $0 $0 $0 $0 $0 $0 B-30614 District 4 - Miscellaneous Roadway $36,001 $36,001 $0 $0 $0 $0 $0 $0 13-30615 District 5 - Miscellaneous Roadway $170,283 $1.70,283 $0 30 10 $0 $0 $0 cn B-30629 Durham Terrace Drainage Project $542,287 $542,287 $0 $0 $0 $0 $0 $0 B-30643 Lumnnts Park Landing Project - Street Project $1,368,535 $1,368,535 $0 $0 $0 $0 $0 $0 B-30662D US-1 Median Closures at Bridgeport and SW $230,000 $230,000 $0 . $0 $0 $0 $0 $0 B-30687 Coconut Grove Business Improvement District - $203,036 $203,036 $0 i.30 $0 $0 $0 $0 B-30699 Beacom Project Area Improvements $721,100 $721,100 $0 • $0 $0 $0 $0 $0 B-30703 Bob Hope Dr. Between NW 20th Street to NW $85,000 $85,000 $0 $0 $0 $0 $0 $0 B-30704 NW I4th Avenue 13etwccn NW 24th Street to $75,000 $75,000 . `$0 $0 $0 $0 $0 $0 B-30705 NW 24th Street Between NW 14th Avcnuc and $223,165 $223,165 • $0 $0 $0 $0 $0 $0 B-30718 1-95 South Miami Terminal Street $350,000 $350,000 $0-;:,so : $0 $0 $0 $0 13-30719 SW 16th Avenue from Coral Way to 20 Street - $135,000 $135,000 $0 $0 S0 $0 a $0 $0 B-30722 NW 3) st Street Roadway Improvement Project $31 1,000 $31 1,000 $0 $0 $0 $0 $0 $0 B-30725 NW 1 1 th Street Roadway Improvement Project $607,762 $607,762 $0 $0 $0 $0 $0 $0 B-30732 NW 9th Street Roadway Improvement Project - $259,540 $259,540 $0 $0 $0 30 $0 $0 B-30770 SW 22nd Avenue Medians - US 1 to Coral Way $160,000 $160,000 $0 $0 $0 -$0 $0 $0 13-30771 Traffic Calming SW 6th Street Project - D4 $324,670 $324,670 $0 $0 $0 $0 $0 $0 13-30776 Silver BIufTDrainage Improvements - D4 $600,000 $600,000 $0 $0 $0 $0 $0 $0 13-30780 NW 14 Avenue and 28 Street Area Roadway $126,437 $126,437 $0 $0 $0 $0 $0 $0 B-30781 NW 1 I Street from 27 to 37 Avenue Area $739,493 $739,493 $0 $0 $0 $0 $0 $0 13-40183 Belle Meade Gateway Enclosure $85,997 $85,997 $0 $0 $0 $0 $0 $0 B-40643A North Spring Garden Grecnway $1,257,175 $1,257,175 $0 $0 $0 $0 $0 $0 B-40672D FlagamiTrallic Calming Phase IV - D4 $459,881 $459,881 $0 $0 $0 $0 $0 $0 13-40686 Miami River Grcenways/ Strectscapc Segment $455,506 $455,506 $0 $0 $0 $0 $0 $0 13-40704A SW 32 Avenue Improvements Additional $657,244 $657,244 $0 $0 $0 $0 $0 $0 City Of Miami - Capital Improvement Program Fund Source Management System Funding Type by Job No. Prior Funding Approp. Tout Approp. 2011 - 2012 2012 - 2013 2013 - 2014 2014 - 2015 ,} « II z5 v �� ,rs y tl �y� , �:�litt�i�����rt��la���(��t►��t�� r! rs� ,' 2015-2016 2016-2017 Active & Future C1P Projects Only FUNDING City Bonds (Cont.) 356005-1 Streets Bond Program - Series 1 I3-431 14A Citywide Sidewalk Replacement Phase 29: - City Of Miami - Capital Improvement Program Fund Source Management System Funding.Typc by Job No. "Total Funding Approp. Prior Approp. 2011 -2012 2012-2013 5846,200'+.? 5846 200 $0 $0 2013 - 2014 $0 2014-2015 2015-2016 2016-2017 $0 $0 $0 356005-1 $27,042,691 ` :.. $27,042,691 $0 $0 $I) $Ii $I) $0 356005-2 Streets Band Program - Series 2 B-30014 Northwest Road and Storm Sewers - . $3,407, 101. - $3,407,401 $0 $0 $0 $0 $0 $0 B-30035A North Shorecrest Roads lmprovemems Projccl $597;178 $597,178 $0 $0 $0 $0 $0 $0 I3-30035B Shorecrest Roadway Milling & Resurlacing $49,777 $49,777 $0 $0 $0 $O $O $0 13-30130 Miami River Greenway SW IstCourttoSouth- `$150,000 $150,000 $0 $0 $0 $0 $0 $0 B-301671) Shenandoah Roadway Improvements $1,196,873:9i: $1,196,873 $0 $0 $0 $0 $0 $0 B-30168A Silver BlulrTrarnc Calming 1'riurity.3 - D4 . $514;741 $514,741 $0 $O $0 $0 $0 $0 B-30500 Civic Center NW 14th Street $2,500,000 $2,500,000 $0 $0 $0 $0 $0 $0 13-30542A - USI Roadway lmprovernents and Wall $1,296,112 $1,296,112 $0 $0 $0 $0 $0 $0 B-30588 San Marco Island and Biscayne Island Drainage $600,000 $600,000 $0 - $0 $0 $0 $0 $0 B-30606 DWNTWN Beautification I'rojecl Phase I $2,864,414 $2,864,414 $0.. $0 $0 $0 $0. $0 B-30606D DWNTWNBeautification- DesignPhase $157,509 $1--57,509 $0 $0 $0 $0 $0 $0 13-30606L DWNTWN Beautification (Lighting) $3,104,372 $3,104,372 . . $0 - $0 $0 $0 $0 $0 13-30606N DWNTWNBeautification - North $1,754,250 $1,754,250 $0 $0 $0 $0 $0 $0 13-30606S DWNTWN Beautification - South $680,000 $680,000 $0 $0 $0 $0 $0 $0 13-30611 District 1 - Misccllaneous Roadway $111,419 $11 1,419 $0 10 $0 $O $0 $0 13-30613 District 3 - Miscellaneous Roadway $8,802,400 $8,802,400 $0 $0 $0 $0 $0 $0 13-30614 District 4 - Miscellaneous Roadway $380 $380 $0 $0 $0 $0 $0 $0 I3-30615 District 5 - Miscellaneous Roadway $1,294,228 $1,294,228 $0 $0 $0 $O $0 $0 13-30629 Durham Terrace Drainage I'roject $2,683,043 $2,683,043 $0 $0 $0 $0 $0 $0 13-30630 Paint Grove Road Improvements $2,379,918 $2,379,918 $0 $0 $0 $0 $0 $0 13-30637 Mary I3rickell Village Drainage Improvements $2,000,000 $2,000,000 $0 $0 $0 $0 $0 $0 B-30687 Coconut Grove 13usiness Improvement District - $2,896,602 $2,896,602 $0 $(1 $0 $O $(1 $0 0-30693 Neighborhood Traffic Calming $35,892 $35,892 $0 $0 $0 $0 $0 $0 13-30703 Bob Hope Dr. Between NW 20th Street to NW $105,000 $105,000 $0 $0 $0 $0 $0 $0 13-30704 NW 14th Avenue Between NW 24th Street to $165,000 $165,000 $0 $0 $0 $0 $0 $0 13-30705 NW 24th Strcct Between NW 14th Avenue and $136,835 $136,835 $0 $0 $0 $0 $0 $0 B-30716 Tigerlail Resurfacing - D2 $400,400 $400,100 $0 $0 $0 $0 $0 $0 13-30717 Coral Galc Community Improvements - D4 $200,000 $200,000 $0 $0 $0 $0 $0 $0 B-30718 1-95 South Miami Terminal Street $509,000 $509,000 $0 $0 $0 $0 $0 $0 B-30724 NW 33rd Street Roadway Improvement Project $3,700,001 $3,700,001 $0 $0 $0 $0 $0 $0 B-30725 NW 11lh Street Roadway Improvement Project $142,238 $142,238 $0 $(1 $0 $0 $(1 $0 13-30726 NW 601h Avenue Roadway improvement $888 000 $888 000 $0 $0 $0 $0 $0 $0 B-30727 NW 181h Avenue Roadway Improvement $1,810,000 $1,810,000 $0 $0 $0 $0 $0 $0 B-30728 NW 171h Court Roadway Improvement Project $110,000 $1 10,000 $0 $0 $0 $0 $0 $0 Active & Future CEP Projects Only FUNDING City Bonds (Cont.) 356005-2 B-30729 B-30730 B-30732 B-30741 B-30743 B-30745 B-30746 B-30747 B-30760 B-30775 B-30880 13-39911 13-40174 Streets Bond Program - Series 2 NW 17th'I'errace Roadway Improvement • NW 41h Terrace Roadway Improvc}neiit Project NW 9th Street Roadway Improvement Project - SW 16 Avenue Roadway & Drainage SW 281h Road Roadway & . . NW 8th Street Roadway and Drainage . NW 1411Court Roadway & Drainage SW 13th Street Roadway & Drainage SW 17th Avenue Roadway & Drainage Shenandoah Area Improvements - D4 NE 2nd Court Roadway and Drainage Venetian Causeway Improvements Royal Road - Milling and Resurfacing - D2 B-40666B Brickell Lighting Phase 11- D2 (3-40672D Plagami Traffic Calming Phase IV - D4 B-40672G Plagami Traffic Calming - D4 (Including 1 I lh 13-40686 Miami River Greenways/ Strcelscape Segment I3-40704A SW 32 Avenue improvements Additional City Of Miami - Capital Improvement Program Fund Source Management System Funding Type by Job No. Total Funding $250,000:. ; :., $250,000 $75,00(1)`i'! $75,000 $496,708 $496,708 $198,000 $250;000:' $259,000 $402 U00 $402,000: $180,000 $180,000 $400,000 $400,000 $600,0001: $600,000 $48:108 $48,108 $300,001 $300,001 $2,196,465 $2,196,465 $60,000 .$60,000 $850,000 $850,000 $738,131 $738,131 $590,000 $590,000 $1,179,778 $1,179,778 $310,083 $310,083 Prior Approp. Approp. 2011.- 2012 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0.:. ,, y i wJ.:.< F t 's?r c ` t t I! 11tll�lat�.,`t'tiiitli ii 's1 �tf1 itt+s iv tiM 'r ce': 2012 - 2(113 $0 $0 $0 $0 $0 $(l $0 $0 $0 $0 $0 $0 so $0 $0 $0 $0 $0 2013-2014 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $(1 2014-2015 $0 $0 $0 $0 $0 $0 $(1 $0 $0 $0 $0 $0 so $0 $0 $0 $0 $0 2015 - 2016 2016 - 2017 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 356(105-2 3631)01 1984 Police Bonds 13-72915 Police lleadquarters llclipad and Roof $56,367,257 $56,367,257 $1,771 $1,771 $0 . $0 $0 $(1 50 $0 $(1 $0 $0 $11 $0 $0 3630111 36910(1 1991 Fire Bonds B-72802 Fire Stations & Other Fire Facilities $1,771 $50,400 $1,771 $50,400 $11 $0 $0 $0 $0 $0 $0 $l) $0 $0 $0 $0 36910(1 371100 Series 1995 Sanitary Sewer Bonds B-70600 l'olice Department Sanitary Sewer System 385200-1 13-30078 B-30325 B-30508 13-30538 B-3054 I B-30671 B-33514 $50,400 $50,400 $Il $0 $60,000 $0 $60,000 $0 $0 $0 $(I $0 $(I $0 $0 $0 371100 2(102 Homeland Dcfcnse Bonds (Series 1) Homeland Defense Legal Services Support Mianiarina Emergency I'icr Repairs Virginia Kcy Beach I'ark Museum Museum Park - Partially Funded by CRA Citywide Park Equipment & Site Improvements Caribbean Marketplace Renovation Marine Stadium Marina Improvements $60,000 $29,346 $491,852 $27,127 $90,000 $19,940 $42,111 $58,775 $(1 $29,346 $491,852 $27,127 $90,000 $19,940 $42,111 $58,775 $60,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $o $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $(1 $0 $0 $0 $0 $0 $0 $0 Active & Future CLP Projects Only FUNDING City Bonds (Cont.) 385200-1 2002 Homeland Defense Bonds (Series 1), ' B-35806 Curtis Park Ncw fool Facility $14,072•::.. $14,072 $0 $0 $0 $0 $0 $0 B-35838 Kennedy Park Restroom Building $100,000 ;S. $100,000 $0 $0 $0 $0 $0 $0 B-35853A Virrick l'ark New fool Facility $685,3441':': $685,344 $0 $0 $0 $0 $D $0 II-35865A Coral Gate Park Community Building $400,499: $400,499 $0 $0 $ll $0 $0 $0 B-35887 Moore Park New Construction $393,642 ' $391,642 $0 $0 $0 $0 $0 $0 B-35904 Neighborhood Parks Improv. Contingencies - $260',307 - .$260,307: $0 $0 $0 $0 $0 $0 B-40643A North Spring Garden Grcenway 1$79,800 $79,800 $0 $0 $0 $0 $0 $0 B-40665 Brentwood Village Project $123 618 $123,618 $0 $0 $0 $0 $0 $0 13-40695L Miami River GreenwaySegment G and $5,085 . ' $5,085 $0 $0 • $0 $0 $0 $j) B-50705 Kinloch Storm Sewer Improvements Project $714,000 $714,000 $0 $0 $0 $0 $0 $0 B-60453A Fire Station fi l 3 $52,992 $52,992 $0 $0 $0 $Il $0 $0 B-60454 Fire Station N14(New) $181,362 $181,362 $0 $0 $0 $0 $0 $0 B-72803 Fire Station Equipment and Furniture $3,798 $3,798 $0 $0 $0 $0 $0 $0 f3-72813 Defense and Security Equipment Acquisition $802,249 $802,249 .' $0 $0 $0 $0 $0 $0 ro B-78508 NE 2 Avenue Improvements $1,050,600 $1,050,600 $0 $0 $0 $0 $0 $0 m City Of Miami - Capital Improvement Program Fund Source Management System Funding Type by Job No. Total Funding Prior Approp. Approp. 201:1 - 2012 21)12-2013 2013-2014 2014-2015 2015-2016 2016-2017 385200-1 385200-2 2002 110meland Defense Bonds (Series 2) 13-30134A Bryan l'ark New Tennis/Community Center 13-30174 Virginia Key 13each l'ark l listoric Restoration 13-30305B Gibson l'ark New Construction (Partially B-30325 Miamarina Emergency 1'ier Repairs B-30538 Museum Park - Iartially Funded by CRA B-3054) Citywide Park Equipment & Site Improvements B-30671 Caribbean Marketplace Renovation B-30689 Marine Stadium 13ulkhead Replacement 13-30772 Bay of l'igs Park't.ighting - 1)4 B-30800 Fcrn isle / I'BA l'ark Improvements Project - B-35806 Curtis l'ark New Pool Facility B-35865A Coral Galc l'ark Community Building B-39910E District 2 Quality of Lifc lark Improvements 13-60453A Fire Station ff 13 B-60464 New Dinner Kcy Marina Dockmastcr Building 13-72813 Defense and Security Equipment Acquisition B-78502A Museum of Science - Development in $5,626,519 S5,626,519 $0 $0 $Il $0 SO $0 $6,992 $6,992 ' .$0 • $O $0 $0 $0 $0 51,046,765 51,046,765 $0 $0 $0 $0 $0 $0 $97,774 $97,774 $0 $0 $0 $0 $0 $0 $605,678 $605,678 • $0 $0 $0 $0 $0 $0 $288,153 $288,153' $0 $0 50 $0 $0 $0 $408,167 $408,167 $0.- $0 $0 $0 $0 $0 $207,889 $207,889 $0 $0 $0 $0 $0 $0 $839,408 $839,408 $0 $0 $0 $0 $0 $0 $53,000 $53,000 $0 $0 $0 $0 $0 $0 $116,782 $116,782 $0 $0 $0 $0 $0 $0 $108,439 $108,439 $0 $0 $() $0 $0 $0 $1,129,251 $1,129,251 $0 $0 $0 $0 $0 $0 $578,237 $578,237 $0 $0 $0 $0 $0 $0 $5,006,636 $5,006,636 $0 $0 $0 $0 $0 $0 $194,711 $194,711 $0 $0 $0 $0 $0 $0 $983,364 $983,364 $0 $0 $0 $0 $0 $0 $738,000 $738,000 $0 . $0 $0 $0 $0 $0 385200-2 $12,409,246 $12,409,246 $0 $1) 511 $0 $0 $0 385200-3 2002 Homeland Defense Buntls (Series 3) Active & Future CIP Projects Only City Of Miami - Capital Improvement Program Fund Source Management System Funding Type by Job No. Total FUNDING Funding City Bonds (Cont.) 385200-3 2002 Homeland Defense Bonds (Series 3) Prior Approp. A.pprop. 2011 - 2012 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016-2017 B-30I34A Bryan l'ark New Tennis/Community Center- $845,136>.:.. $845,136 $0 $0 $0 $0 $0 $0 B-30178 DesignDistrict/FEC $100,000 $100,000 $0 $0 $0 $0 $0 $0 B-30179 Downtown !Jaywalk Master flan &:Design $450,000 ''::: $450,000 $0 $0 $0 $0 $0 $0 B-30538B Museum Park Environmental Reinedialiun - $200,000 :;; $200,000 $0 $0 $0 $0 $0 $0 B-30541 Citywide Park Equipment & Site lmprovemcnls $457;51:5.= $4.57,515 $0 $0 $0 $0 $0 $0 i3-30541 B Kennedy Park Floating Dock 11-11 ..: $35;001 135,001 • $0 $0 $0 $0 $0 $0 B-30541 C Kennedy Park Shoreline Stabilization 1'h tse L;; $71,001 $71,001 $0 $0 $0 $0 $0 $0 B-30547E Parks ADA Modifications - District 2 $215,348.: ! . $215,348 $0 $0 $0 $0 $0 $0 B-30547E l'arks ADA Modifications - District 3-Jose $96,917:• ' 596,917 $0 $0 $0 $0 $0 $0 B-30547G ('arks ADA Modifications - District 4 - $49 Lt l 47 $491,147 $0 $0 $0 $0 $0 $0 B-3054711. Parks ADA Modifications - District 5 $21 1,137 $21 1,137 $0 $0 $0 $0 $0 $0 B-30685A 1 814 Brickell Avenue Park $42 (148 $42,048 $0 $0 $0 $0 $0 $0 B-30688 Marine Stadium Restoration $175,000 $175,000 $0 $0 $0 $0 $0 $0 B-30689 Marine Stadium Bulkhead Replacement $178,000 $178,000 $0 $0 $0 $0 $0 $0 o B-30690 West End Park New Community Building $435,471 .$435,471 $0 $0 $0 $0 $0 $0 B-30696 Miamarina I'icr A, B & C Fire Line Repairs $250,000 $250,000 $0 $0 $0 $0 $0 $0 B-30721 Spoil Island E Restoration and Floating Dock $0 $0 $0 $0 $0 $0 $0 $0 B-30773 Martin Luther King (MLK) Blvd / 1-95 Area $100,000 $ I00,000 • $0 $0 $0 $0 $0 $0 B-30801 Manatee Bendl'arkShorelinelmprovements- $50,027 $50,027 $0- $0 $0 $0 $0 $0 B-30802 1'allot Park Shoreline Improvements - D2 $50,000 $50,000 $0 $0 $0 $0 $0 $0 B-30820 Legion l'ark Boat Ramp Repairs - 172 $14,124 $14,124 $0 $0 $0 $0 $0 $0 B-30821 Coral Gate l'ark Furniture, Security System and $122,000 $ 122,000 $0 $t) $0 $0 $0 $0 B-30882 African Square l'ark - Splash I'ark - D5 $600 000 $600,000 $0 $0 $0 $0 $0 $0 B-30884 NW 62 Strcct West of 1-95 Roadway $75,000 $75,000 $0 $0 $0 $0 $0 $0 B-30885 Freedom Garden Statue Rehabilitation - D5 $75,000 $75,000 $0 $0 $0 $0 $0 $0 B-30886 Lumtnus Landing Square - 135 $925,061 $925,061 $0 $0 $0 $0 $0 $0 13-33514 Marine Stadium Marina Improvements $250,000 $250,000 $0 $0 $0 $0 $0 $0 13-35806 Curtis Park New l'ool Facility $1,297,161 $1,297,161 $0 $0 $0 $0 $0 $0 13-35812A Duarte Park Building Renovation, Splash I'ark $752,797 $752,797 $0 $0 $0 $0 $0 $0 13-35838 Kennedy Park Rcstroom Building $96,133 $96,133 $0 $0 $0 $0 $0 $0 .B-35853A Virrick l'ark Ncw fool Facility $797,175 $797, 175 $0 • $0 $0 $0 $0 $0 B-35865A Coral Gate Park Community Building $338,884 $338,884 $0 $0 $0 $0 $0 $0 B-35868A Robert King High Park Furniture- D4 $45,000 $45,000 $0 $0 $0 $0 $0 $0 B-35883A Hadley Park Ncw Youth Center $1,591,277 $1,591,277 $0 $0 $0 $0 $0 $0 B-35887 Moore Park Ncw Construction $5,168,221 $5,168,221 $0 $0 $0 $0 $0 $0 B-35904 Neighborhood l'arks lmprov. Contingencies - $510,916 $510,916 $0 $0 $0 $0 $0 $0 B-39910 Quality of Life District 2 - Various Projects $259,331 $259,331 $0 $0 $0 $0 $0 $0 Active & Future CIP Projects Only FUNDING City Bonds (Cont.) 385200-3 2002 Ilomcland Defense Bonds (Series 3) B-39910C .North Venetian Drive Lighting (District.2, $100,000,(• $100,000 $0 $0 $0 '3o $0 $0 B-3991013 District 2 Quality of Lire Park bnpnivcineuts $409,751 $409,751 $0 $0 $0 $0 $0 $0 B-399101 Brickell Avenue Decorative Pedestrian $33 132 $33,132 $0 $0 $0 $0 $0 $0 B-39910K 13ayside Historic Sign - D2 $25 000 $25,000 • $0 $0 $0 $0 $0 $0 B-40170 Irrigation Systetn at Kennedy Dog Park - D2 $55 945 ' e;h55;945 $0 $0 $0 $0 $0 $0 B-40180 Marine Stadiuin Marina at Virginia Kq . $94)) 007 $940,007 $0 $0 $0 $(1 $0 $0 B-40643A North Spring Garden Grecnway $100,200 $100,200 $0 $0 $0 $0 $0 $0 B-40686 Miami River Grcenways/ Streetscape Segment $478,217:; :•,..'' $478,217 $0 $0 $0 $0 $0 $0 13-50705 Kinloch Storm Sewer Improvements Project $1,805,867'' $1;805,867 $0 $0 $0 $0 $0 $0 B-50706A Roadway, Drainage and Traffic improvements $766,000 $7,6 ,,000 $0 $0 so $0 $0 $0 B-60453A Fire Station#13 $18,364 $18,364 $0 $0 $0 $0 $0 $0 B-60454 Fire Station #14(New) $1,050,105 $1,051),105 $0 $0 $0 $0 so $0 B-60464 New Dinner Key Marina Dockmaster Building S3,096,440 $3,096,440 . $0. $0 $0 $0 $0 $0 B-70100 Gusman Hall Improvements / Repairs $394,169 $394,169 $0 so $0 $0 $0 $0 w B-72813 Defense and Security Equipment Acquisition $1,981,636 $1: 981,636 $0 $0 $0 $0 $0 $0 B-75823 Biscayne Park Sitc improvements $150,000 $150 O00 $0 $0 $0 $0 $0 $0 B-75830A Blanche Park Master flan Improvements $250,000 $250,000 • $(1 $0 $0 $0 $0 $0 B-75883 l'eacock Park Site Improvements $800,000 $800,000 $0',$D $0 So $0 $0 B-75973 Oakland Grove l'ark Playground Equipment $15,000 $15,000 •$0 $0 $0 $0 So $0 B-78502A Museum of Scicncc - Development in $1,262,000 $1,262,000 $0 $0 $0 $0 $0 $0 13-78508 NE 2 Avenue Improvements $2,649420 $2,649,420 '$0 $0 $0 $0 $0 $0 City Of Miami - Capital Improvement Program Fund Source Management System Funding Type by Job No. Total Prior Funding Approp. Approp. 201.1 - 2012 2012 - 2013 2013 - 2014 2014-2015 2015 - 2016 2016 - 2017 3852(1(1-3 $33,753,081 S33,753,081 $tl 50 $t) $I) $1) $0 385200-8 2002 Homeland Defense Series 1 Interest Post 09-30-06 13-30305B Gibson Park New Construction (Partially $841,280 $841,280 $0 $0 $0 $0 $0 $0 B-30325 Miamarina Emergency I'icr Repairs $146,827 $146,827 $0 $0 $0 $0 $0 $0 B-30538 Museum Park - l'artially Funded by CIU $256,436 $256,436 $0 $0 $0 $0 $0 $0 B-3071 1 Triangle Park Swings - D3 $8,500 $8,500 $0 $0 .$0 $0 $O $0 B-35853A Virrick Park Ncw Pool Facility $306,378 $306,378 $0 $O - :$0 • $0 $0 $0 385200-8 $1,559,421 397001 1970 Pollution Control G.0.11. (30301)0) (399003) B-60351 Fire Station # 10 (New) $361,200 $1,559,421 $361,200 $I) $0 . $0. $0 $0 50 $0 $n $0 $0 $0 $0 397001 3361,200 $361,200 51) $0 $0 $0 $1) 50 399001 1976 & 78 Storm Sewer G 0 Bond B-30183 Garden Storm Sewer - Phase I $250,000 $250,000 $0 $0 $0 SO $0 $0 B-50643 Wagner Creek / Seybold Canal Dredging $617481 $617,481 $0 $0 $0 $0 $0 $0 399001 $867,481 5867,481 $0 $I) 50 50 5(1 50 Active & Future CIP Projects Only ' FUNDING City Of Miami - Capital Improvement Program Fund Source Management System Funding Type by Job No. Total Prior Approp. Footling Approp• 2011 - 2012 2012 - 2013 2013 - 2014 2014-2015 2015 - 2016 2016 - 2017 Cily Bonds :138 099,067 138,039,067 $60,1810 $0 $I1 SI) $0 $0 CIP Fees/Revenues 356001 Local Option Gas Tax 13-30035B Shorecrest Roadway Milling 4: Restirftcing $13,181 $13,181 $0 $0 $0 $0 $0 $0 B-30551 Public Works Maintenance Yard ' .: $2,000,00U;,:;. $0 $2,000,000 $0 $0 $0 $0 $0 B-30588 San Marco Island and Biscayne Island Drainage $747;173. ` '1747,173 $0 $0 $0 $0 $0 $0 B-30615 District 5 - Miscellaneous Roadway .:$193767 $193,767 ': $0 $0 $0 $0 $0 $0 B-30630 Palm Grove Road Improvements :',$13,180 $13,181) $0 $0 $0 $0 $0 910 B-30700 EDEP Drainage Wells Compliance $500,000, `.;;' $500,000 $0 $U $0 $0 $0 $0 13-3099I Citywide Roadway Improvements $2,416,500 $2,416,50(1 $0 $0 $0 $0 $0 $0 B-30992 Riverview Pump Station $500,000 $0 $500,000 $0 $(1 $0 $0 $0 B-40168 South Bayshore Drive from Aviation Avenue to $100,000 $100;00(1 .; . $0 $0 $0 $(1 $0 $0 B-40643A North Spring Garden Greenway $325,000 $325,000 $0 $0 $0 $0 $0 $0 B-43114A Citywide Sidewalk Replacement Phase 29 $3,671,025 $3,671,025 $0. $0 $0 $0 $0 . $0 B-50654 Overtown Stormwater Pump Station Upgrades $200,000 $200,000 , .:$0 $0 $0 $0 $0 $0 co N.) 356001 S10,679,826 $8,179,826 ;$2,50l),000 $0 $0 $0 $0 $0 356003 Parking Sarchargc 13-71210 Downtown Street Conversions $50,000 $50,000 • • .$0 $0 $0 $0 $0 $0 356003 S50,000 850,000 . .$0- • 8(1 80 80 80 80 356007 Parking Surcharge 2007 B-30606N DWNTWN Beautification -North $549,710 $549,710 $0 $0 $0 $0 $0 $0 B-306065 DWNTWN Beautification - South $549,716 $549,716 •$0 $0 $0 $0 $0 $0 B-30621 Center Grove Street and Lighting improvements $673,568 $673,568 $0, $0 $0 $0 $0 $0 13-30628 Bird Avenue Road Improvement $I 280,508 $1,280,508 $0 $0 $0 $0 $0 40 13-30637 Mary Brickell Village Drainage Improvements $1,000,001 $1,000,00I $0 $0 $(1 $0 $0 $0 B-31206 SE 3rd Street Widening . $280,205 $280,205 $0 $0 $0 $0 $0 $0 356007 $4,333,708 S4,333,708 80 80 120 SO $0 80 360(101 Stormwater Utility Trust Fund 13-30262 Citywide Storm Sewer Repair Project $1,372,476 $1,372,476 $0 $0 $0 $0 $0 $0 B-50643 Wagner Creek / Seybold Canal Dredging $2,534,160 $2,534,160 $0 $0 $0 $0 $0 $0 13-50654 Overtown Stormwater Pump Station Upgrades $360,152 $360,152 $0 $0 $0 $0 $0 $0 360001 $4,266,788 360003 Stormwater Utility Trust Fund (FY07 and Figure) 13-3001 1 Englewood Road and Storm Sewer $273,961 13-30014 Northwest Road and Storm Sewers $273,961 13-30262 Citywide Storm Sewer Repair Project $2,738,685 S4,266,788 $0 $0 80 $0 $0 S() $273,961 $0 $0 $11 $0 • $0 $0 $273,961 $0 $0 $U $0 $0 $0 $1,996,800 $741,885 $0 $0 80 $0 $0 Active & Future CIP Projects Only FUNDING C1l' Fees/Revenues (Cont.) City Of Miami - Capital Improvement Program Fund Source Management System Funding Type by Job No. Total Prior Approp. Funding Approp. 201 1 - 2012 360003 Stornnvater Utility Trust Fund (FY07 and F»lurc) B-30588 San Marco Island and Biscayne Island Drainage $489 938';'i $489,938 $0 B-30597 Citywide Drainage Improvement Project ' $9,854','. , $9,854 $0 B-30629 Durham Terrace Drainage Project • $220,000 $220,000 $0 B-30632 Drainage Master flan Update $715 38 I $715,384 $0 •B-30637 Mary Brickcll Village Drainage lrproVcmcnts $100 b00 $100,000 $0 B-30700 PDEP Drainage Wells Compliance $504,934 $504,934 •$0 B-50643 Wagner Creek / Scybold Canal Dredging 1430,297 $430,297 $0 B-50705 Kinloch Storm Sewer Improvements Project $370,233 $370,233 $0 B-50706A Roadway, Drainage and Trallic Improvements $154,919 . $1.54,917 $0 titttl'Y+,+Ptttidtit'f' dtiiri t6t 2012 - 2013 $0 $0 $0 $0 $0 $0 $0 $0 $0 2013 - 2014 SO $0 $0 $(1 $0 $0 $0 $0 $0 2014 - 2015 2015-2016 2016-2017 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 360003 $6,282;164 $5,540,279 $741,885 $0 $0 $0 $0 80 367001 Impact Fees B-30305D Gibson Park Furniture - D5 $22,020 $22,020 $0 $0 $0 $0 $0 $0 B-30997 Police Swat Vehicles $13,134 $13,134 $0 $0 $0 $0 $0 • $0 B-31206 SE 3rd Street Widening $177,892 $177,892 -$0 $0 $0 $0 $0 $0 B-35806 Curtis Park New fool Facility $9,295 $9,295 $0 $0 $0 $0 $0 $0 B-35838 Kennedy Park Restroom Building $4,900 $4,900 $0 $0 $0 $0 $0 $0 B-50654 OvertownStormwatcrPump Station UN] ades $12,088 $12,088 $0 $0 $0 10 $0' $0 B-60351 Fire Station # 10 (New) $195,737 $195,737 $0 - $0 $0 $0 $0 $0 8-72803 Fire Station Equipment and Furniture $82,022 $82,022 $0 $0 $0 $0 $0 $0 - 13-72915 Police headquarters 1lclipad and Roof $56,321 $56,321 $0 $0 $0 $0 $0 $0 367001 $573,409 $573,409 . $0 $0 $0 $0 $0 $ll 367011 Impact Fees - Ord 12750 13-30541 Citywide )'ark Equipment & Site improvements $345,785 $345,785 $0 $0 $0 $0 $0 $0 B-30541D Citywide Park Equipments 8c Site $397,101 $0 $397,101 • $0 $0 $0 $0 $0 B-30995 Virginia Key Bike Trail 13uilding -1J2 $377,000 $0 $377,000 $0 $0 $0 $0 $0 B-30996 MRC Emergency Repairs $520 $520 $0 $0 $0 $0 $0 $0 I3-30997 Police Swat Vehicles $258,318 $37,766 $220,552 $0 $0 $0 $0 $0 B-35806 Curtis Park Ncw fool Facility $193,123 $193,123 $0 • $0 $0 $0 $O $0 B-35883A Hadley Park New Youth Center $500,000 $500,000 $0 $0 $0 $0 $0 $0 B-35887 Moore Park New Construction $443,600 $443,600 $0 $0 $0 $0 $0 $0 B-60453A Fire Station # 13 $6,504 $6,504 $0 $0 $0 $0 $0 $0 B-729) 5 Police Headquarters 1-lelipad and Roof $65,000 $65,000 $0 $0 $0 $0 $0 $0 B-74205B GSA Fleet Maintenance Garage Expansion $48,535 $48,535 $0 $0 $0 . $0 $0 $0 B-75883 Peacock Park Site Improvements $124 $124 $0 $0 $0 $0 $0 $0 367011 $2,635,610 $1,640,957 $994,653 $O $0 $() $0 $0 Active & Future CIP Projects Only FUNDING CIP Fees/Revenues (Cunt.) 375001 Fire Assessment Fee B-70102A Fire Station No. 6 011icc Building - Slit.tcuual $74,619 $74,619 $0 $0 $0 $0 $0 $0 B-70104 Fire Station No. 10 Restroom Remodeling $60,301 , $60,301 $0 $0 $0 $0 $0 $0 B-70I05 Refurbishing of Existing Apparatus.. $230,000 '.t s. $230,000 $0 $0 $0 $0 $0 $O B-70106 Firefighting Equipment and Gear $158,124,. $158,124 $0 $0 $0 $0 $0 $ll B-72801 Computer Aided Dispatch (CAD) $120,866 $120,866 $0 $0 $0 $0 $0 $0 B-72802 Fire Stations & Other Fire Facilities $2;661:1;779 :: 2,661,779 $0 $0 $0 $0 $0 $0 B-72803 Fire Station Equipment and Furniture . $175,000 • $175,000 $0 $0 $0 $0 $0 $0 13-72804 Phone and Radio Equipment Upgrades $291 200. ,'. . $291,200 $0 $0 $0 $0 $0 $0 13-72805 Computer Equipment and Sollware Upgrades $93,461 $93,461 $0 $0 $0 $0 $0 $0 B-72808 Light Fleet Replacement $374,867 $374,867 $0 $0 $0 $0 $0 $0 B-72809 Large Firefighting Lquipment $110,316 $1 10,316 $0 $0 $0 $0 $0 $0 13-74204 Emergency Dispatch Furniture $1 1,876 $ 1 1,876 $0 $0 $0 $0 $0 . $0 B-74609 ERP Integration System 3305,015 $305,015 $0 $0 $0 $0 $0 $0 City Of Miami - Capital Improvement Program Fund Source Management System Funding Type by Job No. Total Prior Approp. Funding Approp. 2011 - 2012 iFitttti�l 2012 - 2013 2013 - 2014 2014 - 2015 2015-2016 2016-2017 375001 S4,667,424 $4,667,424 $0' $0 $0 $0 $O St) A 375002 Fire Assessment Fee (F1/07) B-70104 Fire Station No. 10 Restroom Remodeling $55,524 $55,524 $0 $0 $0 $0 $0 $0 13-72802 Fire Stations & Other Fire Facilities 3556,814 $556,814 .$0 $0 $0 $0 $0 $0 B-72803 Fire Station Equipment and Furniture $130,018 $130,018 $0 $0 $0 $0 $0 $0 B-72804 )'Done and Radio Equipment Upgrades $60,000 $60,000 :$0 $0 $0 $0 $0 $0 B-72808 Light Fleet Replacement 3292,791 $292,791 $0 . $0 $0 $0 $0 $0 13-72809 Large Firefighting Equipment 3216,500 $216,500 $0 $0 $0 $0 $0 $0 375002 $1,311,647 $1,311,647 10 10 10 $0 $0 $0 382001 Contribution From General Fund 13-30194A Manuel Artime ADA Improvements $152,205 $152,205 $0 $0 $0 $0 $0 $0 B-30538 Museum Park - l'ar(ially Funded by CRA $30,778 $30,778 $0 $0 $0 $0 $0 $0 B-30994 City of Miami Impact Fee Study - Citywide $65,490 $65,490 $0 $0 $0 $0 $0 $0 B-30997 Police Swat Vehicles $40,000 $40,000 $0 $0 - $0 $0 $0 $0 13-60351 Fire Station 1110 (New) $341,186 $341,186 $0 $0 $0 $0 $0 $0 ' B-70500 DevelopmenUUDI' Consultants - Watson Is, $451,566 $451,566 $0 $0 $0 $0 $0 $0 B-72915 1'olice Headquarters Ilelipad and Roof $1 17,229 $1 17,229 $0 $0 $0 $0 $0 $0 13-74200 Citywide General Fleet Replacement $ 1070,989 $1,070,989 $0 $0 $0 $0 $0 $0 B-74220 I'oliceVehicle Replacement $9,141,422 $9,141,422 $0 $0 $0 $0 $0 $0 B-74606 Upgrade I'C Software & hardware $2,003,786 $2 003,786 $0 $0 $0 $0 $0 $0 13-74609 ERP Integration System $5,486,772 $5,486,772 $0 $0 $0 $0 $0 $0 B-74610 Technology Infrastructure $2,648,299 $2,648,299 $0 $0 $0 $0 $0 $0 B-74614 Land Management System $1,176,209 $1 ,176,209 $0 $0 $0 $0 $0 $0 Active & Future CIP Projects Only FUNDING CIF Fees/Revenues (Cont.) •382001 Contribution From General Fund 13-75005 Watson Island Aviation & Visitor Center $50,016'"." $50,016 $0 $0 $0 $0 $0 $0 382001 $22,775,947 $22,775,947 $0 $0 50 50 51) 50 382007 Contribution From Gcncral Fluid 201)3 B-74609 ERP Integration System $7 000,00$7,000,000 $0 $0 $0 $0 $0 $0 . 38201)7 $7,000;000 S7,000,0110 $1) $0 $1) $0 $0 $Il 382008 Contribution From General Fund 2007 ai01.1Futti e B-30365E Coral Way NETOficcRemodeling - CI) $15,000:- $15,000 $0 $0 $0 $0 $0 $0 B-303651-1 Generator fix City I lall $25 000:?$25,000 ..- $0 so SO $0 $0 $0 B-30365J Beckham Hall Fire Damage Repair $6,770 . . $6,770 $0 $0 $0 $0 $0 $0 B-30384C Communication UPS I'ower $180,800 $380,800 $0 $0 $0 $0 $0 $0 B-30551 Public Works Maintenance Yard $1,268,254 $ 1268,254 $0 $0 $0 $0 $0 $0 B-30554 Police Radios Replacement $843,083 $84,3,083 $0 $0 $0 $0 $0 $0 B-30996 MRC Emergency Repairs $16,545 $16,545 $Or' • $0 $0 $0 $0 $0 oa w B-30997 Police Swat. Vehicles $1 1,394 $1 1,394 $0 $0 $0 $0 $0 $0 B-431 14A Citywide Sidewalk Replacement Phase 29 $399,990 $399,990 $0 $0 $0 R0 $0 $0 B-70104 Fire Station No. 10 Rcstroom Remodeling $63,579 ' $63,579 $0 . $0 $0 $0 $0 $0 B-7041 1 Fire Rescue Personal Protective Equipment • $164,1 14 • $164,1 14 - , $0':...... $0 $0 $0 $0 $0 B-70418 FEMA Assistance to Firelighters Program $68,722 $68,722 $0 . $0 $0 $0 $0 . $0 13-72802 Fire Stations & Other Fire Facilities $753,967 $753,967 $0 $0 $0 $0 $0 $0 13-72803 Fire Station Equipment and Furniture $150,000 $150 000 • $0 $0 $0 $0 $0 $0 B-73202C Solid Waste Collection Equipment $3,532,282 $1,418,538 $2,113,744 $O $0 $(1 $0 $0 B-74200 Citywide General Fleet Replacement $2,189,280 $2,189,280 $0 $0 $0. $0 $0 $0 B-74220 Police Vehicle Replacement $15,098,315 $15,098,315 $0 $0 $0 $0 $0 $0 B-74606 Upgrade PC Software & I•lardware $916,896 $916,896 $0 $0 $0 $0 $0 $0 B-74609 ERP Integration System $2,825,965 $2,825,965 $0 $0 $0 $0 $0 $0 13-74617 IT Modernization $2,800,000 $2,800,000 $0 $0 $0 $0 $0 $0 City Of Miami - Capital Improvement Program Fund Source Management System Funding Type by Job No. 'Pohl Prior Approp. Jf ending Approp. 2011 - 2012 2012 - 2013 2013 - 2014. 2014 - 2015 2015-2016 2016 - 21117 382(108 531,329,9.56 S29,216,212 52,1 13,744 $0 • 50 $0 50 $0 383001 C11' Misc. Revenue B-50654 Overtown Slormwaler Pump Station Upgrades $46,358 $46,358 $0 $0 $0 $0 $0 $0 38301)1 $46,358 $46,358 $0 $0- $Il $0 $0 $0 888923 Contribution From Special Revenue B-74609 ERP Integration System $1,500,000 $1,500,000 $0 $0 $0 $0 $0 $0 888923 $1,500,000 $1,500,000 $0 $0 $0 $I) $I) $0 888924 DRI Transportation Fee B-31220 Downtown DRI Transportation Component $1,417,532 $1, 117,532 $0 $0 $0 $0 $0 $0 Active & Future CUP Projects Only FUNDING City Of Miami - Capital Improvement Program Fund Source Management System Funding Type by Job No. Total Prior Funding Approp. Approp. 2011 -2012 1 Mp° i5 ',,rF; § ,,., ltlt�re .F1Y111f 11tgi slinhit e: 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016 - 2017 888924 'i51417;532 $1,417,532 50 888926 Prior Year Fund Balance B-50643 Wagner Creek /ScyboldCanal Diedging $91,565.:': $91,565 $0 $0 $0 $0 $0 $11 $0 $0 .50 $0 $0 888926 $91,565' ':,.; $91,565 $0 $0 $0 $0 $0 $0 888930 Transit llalf-Cent Surtax B-3003513 Shorecrest Roadway Milling &)tesurlacing $2 - . $2 $0 $0 $0 $0 $0 $0 B-30183 Garden Storm Sewer - Phase 1 $149,920 •:$149,920 $0 S0 $0 $0 $0 $0 B-30336 Miami River Greenway (5th Street bridge • $277,280 : $277,280 $0 $0 S0 $0 $0- $0 B-30606 DWNTWN Beautification Project Phase! $50,000 $50,000 $0 $0 $0 $0 $0 $0 B-30615 Districts - Miscellaneous Roadway $150 916 • . $150,916 $0 $0 $0 $0 $0 $0 11-30630 Palm Grove Road Improvements $256,693 $256,693 $0 $0 $0 $0 $0 S0 B-30645A Transportation Program Support Services - $81,788 $81,788 $0 $0 $0 $0 $0 $0 13-30716 Tigerlail Resurfacing - D2 $2,702 $2,702 $0 $0 $0 S0 $0 $0 B-30774 West Flagler Area Improvements - D4 $98,933 $98,933 $0 $0 $0 S0 $0 $0 B-30775 Shenandoah Arca Improvements - D4 $366,281 $366,281 $II $0 $0 $0 $0 $0 B-30780 NW 14 Avenue and 28 Street Area Roadway $145,372 $1 45,372 $0 $0 $0 $0 S0 $0 w cn B-406951, Miami River Greenway Segment G and $140,700 $140,700 $0 $0 $0 $0 $0 $0 13-50706A Roadway, Drainage and Traffic Improvements 5284,903 $284,903 $0 . $0 $0 $0 $0 $0 B-78508 NE 2 Avenue Improvements $55,001 $55,001 $0 • $0 $0 $0 $0 $0 888930 52,06(1,491 $2,060,491 5(1 $(I 50 5(1 $0 $0 888931 Transit IIaIf-Cent Surtax (FV07 and Future) B-30011 Englewood Road and Storni Sewer $618,102 $618,102 $0 $0 $0 $0 $0 $0 B-30014 Northwest Road and Storm Sewers $618,104 $618,104 $0 $0 $0 $0 $0 $0 ' B-300358 Shorecrest Roadway Milling & Resurfacing $458,525 $458,525 $) $0 $0 S0 $0 $0 B-30168A Silver BluffTraflic Calming Priority 3 - D4 $10,000 Si D,000 $0 - $0 $0 $0 $0 $0 B-30305C Gibson Park Area Street Improvements - Street $1 000,000 $1,000,000 $0 S0 $0 $0 $0 $0 13-30336 Miami River Greenway (5th Street bridge $979,360 $979,360 $0 $0 $0 $0 $0 $0 13-30518 Northwest 14th Street Streetscape Project - CI I' $439,001 $439,001 $0 $0 $0 $0 $0 $0 B-30588 San Marco Island and I3iscayne Island Drainage $1,076,873 $1 076,873 $0 $0 S0 $0 $0 $0 B-30606N DWNTWNBeautifeation - North $861,784 $861,784 $0 SU $0 $(f $0 $0 B-30606S DWNTWN Beautification - South $461,784 $461,784 $0 $0 $0 $0 $0 $0 B-30613 District 3-Miscellaneous Roadway $1,338,644 $1,338,644 $0 So $0 S0 $0 $0 B-30624 Overtown Greenway @ NW 11 Terrace - $461,905 $461,905 '$0 $0 $0 SO $0 $0 B-30628 Bird Avenue Road Improvement $680,000 $680,000 $(1 $0 $0 $0 $0 $0 B-30630 Palm Grove Road Improvements $1201,546 $1,201,546 $0 $0 $0 $0 $0 $0 B-30645A Transportation Program Support Services - $689,691 $184,291 $505,400 $0 $0 $0 $0 $0 B-3064513 Transportation Program Support Services - $1,026000 $1,026000 $0 $0 $0 $0 $0 $0 B-30645C Health District 13icycic and Pedestrian $12,000 $12,000 $0 $0 $0 $0 $0 $0 Active & Future CIP Projects Only FUNDING CII' Fees/Revenues (Cont.) 888931 Transit llalf-Cent Surtax (FY07 and Future B-30645D Baywalk Mobility flan B-30646 South Bayshore Drive Roadway and Drainage B-30651 Miami River Greenway liom NW 1(Ith to NW 13-30662D US-1 Median Closures at Bridgeport and SW B-30694A Citywide Bicycle Rack & SignagOtogram B-30716 Tigertail Resurfacing - D2 B-30770 SW 22nd Avenue Medians - US 1 to Coral Way B-30774 West Nagler Area Improvements - D4 B-30780 NW 14 Avenue and 28 Street Area Roadway B-30822 13rickell Area Shared Use Path and Roadway B-30823 Fair Isle Area Roadway and Drainage B-30883 NW 12 Avenue / NW 12 Place Roadway B-30990 Roadway Improvements B-30993 SW/NW 171h Avenue Traffic Corridor Study - B-31206 SF, 3rd Street Widening B-40268 ITC Quiet Zone Study 13-40704A SW 32 Avenue Improvements Additional B-431 I4A Citywide Sidewalk Replacement Phase 29 B-50706A Roadway, Drainage and Traffic Improvements B-70715 City of -Miami Trolley Program - Capital 13-78508 NE 2 Avenue Improvements City Of Miami - Capital Improvement Program Fund Source Management System Funding Type by Job No. Total (finding $12,000-'.. $100,000 ,: $820,640c"''. r $ 115;0O(1- $3(11i156 $240,000 $209,239.;.,1 $83 467'. $600,000 $180,000 $999,976 $1,361,000 $200,000 $183,398 $50,667 $785,000 $100,000 $2,426 $991,972 $1,230,810 Prior Approp. Approp. 2011.- 2012 $12,000 $100,000 $820,640 $100,000 $1.15,000 ..:$308,156 $240,000 $209,239 $83,467 $6011,000 $180,000 $999,976 $1,361,000 $200,000 $183,398 $50,667 $185,000 $100,000 $2,426 $964,972 $1,230,810 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 50 $0 $0 $0 $0' $0 $27,000 $0 2012 - 2013 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $(l $0 $0 $0 $0 $(1 $0 $0 $0 $0 $(1 2013 - 2014 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 2014 - 2015 $ 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 2015-2016 2016-2017 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $o $0 $0 $0 $0 $0 $0 $0 $0 888931 888956 Contribution from Special Revenue - SRE 2(107 B-30194A Manuel Ai time ADA Improvements B-30596 Dinner Key Marina - Miscellaneous Repair B-30602 Seminole Dinghy Dock Expansion B-30604 Miamarina Intracoastal Bulkhead Assessment B-30689 Marine Stadium Bulkhead Replacement B-30706 Miscellaneous Repairs 10% Set Aside B-33514 Marine Stadium Marina Improvements B-50722 Little River Waterfront l'ark B-60464 New Dinner Key Marina Docknmster Building $20,6(17,070 $21 1,626 $401,356 $30,000 $50,000 $71,695 $1,667,998 $76,870 $600,000 $155,290 $20,074,670 5532;401) $21 1,626 $401,356 $30,000 $50,000 $71,695 $1,113,510 $76,870 $600,000 $155,290 $0 $0 $0 $0 $0 $554,488 $0 $0 $0 $0 $0 $0 $0 $(1 $0 $0 $0 $0 $0 $11 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $() $0 $0 $0 $11 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1) $0 $0 $0 $0 $0 $0 $0 888956 888969 Subrogation Auto Claim Revenues B-30666 Damaged Vehicle Replacement / Repairs $3,264,835 $2,710,347 $554,488 $II $447,124 $334,924 $112,200 $0 $(1 $0 $(I $(1 $Il $0 $0 $0 888969 $447,124 $334,924 5112,2(1(1 $0 $11 $o $11 SO Active & Future CIP Projects Only City Of Miami - Capital Improvement Program Fund Source Management System Funding Type by Job Nu. Total Prior Approp. FUNDING Footling Approp. 2011 - 2012 CH' Fees/Revenues (Cont.) 888972 Rickenbachcr Marina Rental Revenue B-30706 Miscellaneous Repairs 10% Set Aside $146,700:'n..• $146,700 $0 $0 $0 $0 $0 $0 $146,700 '.. $146,700 $0 $0 $0 $(1 $11 $0 2012 - 2013 2013 - 2014 2014 - 2015 2015 - 2016 2016.- 2017 888972 888973 TVM Production Basic Use Fee 13-30182A Coconut Grove Waterfront Master Plan B-30541 B Kennedy Park Floating Dock I'1-II B-30541C Kennedy l'ark Shoreline Stabilization Phase $403,500,'• $253,500 $150,000 $0 $0 $0 $0 $0 $60,000 $60,000 $0 $0 $0 $0 $0 $0 $75,000 ' $75,000 $0 $0 $0 $0 $0 $0 13-30721 Spoil Island C Restoration and Floating Dock • $75,000 $75,000 $0 $0 $0 $0 $0 $0 B-40171 Coconut Grove Viewing Platform Spoil Island $750$750 $0 $0 $0 $0 $0 $0 B-40172 Coconut Grove Viewing Platform Spoil Island $750 $750 $0 $0 $0 $0 $0 $0 B-75883 Peacock Park Silc Improvements $30,000 $30,000 . $0 $0 $0 $0 $0 $0 888973 1.645,00(1 $495,000 $150,000 50 $1) 5(1 $0 $11 Cll' Fees/Revenues 126,133,154 118,433,784 57,699,37() $(I $O $(1 $() $1) w Private Donations / Other co 000001 General Fund Operating Budget 13-50654 Overtown Stormwater Pump Station Upgrades $60,000 $60,000 . $0 $0 $0 $0 $0 $0 000001 1.60,00(1 $60,0110 $11'. 50 $0 $0 1.0 $11 1100002 Special Revenue Operating Budget 13-30262 Citywide Storm Sewer Repair Project $290,400 $290,400 • $0 $0 $0 $0 $0 $0 B-30346 Traffic Study Reviews - Oracle Project $41 1,622 $41 1,622 $0 $0 $0 $0 $0 $0 B-30384C Communication Ul'S l'owcr $825,000 $825,000 $0 $0 $0 so $0 $0 01)0002 $1,527,1122 $1,527,022 St) $1) $O $1) $O $O 888951 Other Public & Private Contributions B-30374 Virginia Key Rowing Center Improvements $616,513 $616,513 $0 $0 $0 $0 $O $0 B-40171 Coconut Grove Viewing Platform Spoil Island $1,650 $1,650 $0 $0 $0 $0 $O $0 B-40172 Coconut Grove Viewing Platform Spoil Island $1,650 $ I,650 $0 • $0 $0 $0 $0 $0 888951 888963 Proceeds from Conveyance of Easement B-30182A Coconut Grove Waterfront Master flan $1,502,044 $1,502,044 $0. $0 $0 so $0 $0 $619,813 $619,81.3 $(1 $0 $O $0 $() $() 888963 51,502,044 $1,502,044 $0 $0 $0 $11 $0 $II Private Donations / Other $3,71(8,879 $3,708,879 $() $O $0 $11 $O $0 Total 410,951,861 378,155,982 $22,005,879 1.10,790,000 $0 SEGTION REPORTS - FUNDING BY COST COMPONENT & FUNDING SOURCE Active & Future CIP Projects Only FUND: 301-CRA projects Phase Total Ftililing 201.1-2012 Capital Improvement Plan Funding by Cost Component & Sources Prior Years Current 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 Management $0,00 ,.. $0.00 Land Acquisition $0 O(i":;<'' . $0.00 Planning $0.00 $0.00 Design $1,381,982.00 'a51,381,982.00 Construction Equipment Administration Other Construction Engineering $6,219,375.00 $6,219,375A0 $0.00'.T. $9.1)0 $299,075;00.'' 1299;075.00 12;889;868:00 $2.889;868.00 $502,700.00 • :Y ,1502,700.00 $0.00 $0.00 $0.00 $0.00 . $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.011 $0.00 $0.00 $0.00 $0.00 Total$11,293,000.00,j;'7$11,293,000.00 $0.00 $0.011 $0.00 $0.00 $0.110 $0.00 Fund Fund No. Name Total Prior Funding Yc;us Current 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 000004 CRA Operating Budget ca 385200-3 2002 Homeland Defense Bonds (Series 3) co 888920 FIND Waterways Assistance l'rogram FY07 $1 1 046,500,00 $200,000.00 $46,500.00 $1 1,046,500.00 $200,000.00 $46,500.00 $0.00 50.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total 5) 1,293,000.00 $I I,293,000.00 $0,00 $0.00 50.00 50.011 511.00 $0.00 Active & Future CIP Projects Only FUND: 311-General Government Phase 2011-2012 Capital Improvement flan Funding by Cost Component & Sources Total Prior Current: Funding Years 2011.-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 Management Land Acquisition Planning Design Construction Equipment Administration Other Construction Engineering ..$7 564,636.25 , $7,564,636.28 80.00 81,268,254.37;,:. 1,268,254.37 $0.00 80 00 $0.00 $0.00 $20,326,252.79 ;320,326,252.79 $0.00 $3,440,824.60 .! : $1,328,624.60 82,1 12,200.00 $47,745,689.49. •,,847,745,689:49.. $0.00 $140,000:00 ` 8140,000,00 $0.00 8200 888,22 $200,888.22 $0.00 650,150.00 8 0,150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total $80,736,695.75 $78,624,495.75 82,112,200.00 $0.0)) $0.110 $0.1)1) $0.110 $0.00 Fund Fund No. Name Total Prior Current Funding Years 2011-2012 2012-2013 • 2(113-2014 2014-2015 2015-2016 2016-2017 356001 Local Option Gas Tax $2,000,000.00 367011 Impact Fees - Ord 12750 $49,055.26 375001 Fire Assessment Fcc $316,891.16 382001 Contribution From General Fund $21,592,967.98 382007 Contribution Frain General Fund 2003 $7,000,000.00 382008 Contribution From General Fund 2007 and $25,162,026.00 385200-3 2002 Homeland Defense Bonds (Series 3) $259,331.35 888896 Miami -Dade County DERM Virginia Key $650,000.00 888902 Community Development Block Grant $1,000,000.00 888920 FIND Waterways Assistance Program FY07 $15,000.00 888923 Contribution From Special Revenue $1,500,000.00 888951 Other Public & Private Contributions $3,300.00 888961 Sunshine Slate Financing Commission $775,000.00 888966 Sunshine State Financing Commission $19,964,500.00 888969' Subrogation Auto Claim Revenues $447,124.00 888973 TVM Production 13asic Use Fee $1,500.00 • $0.00 $49,055.26 $316,891.16 $21,592,967.98 .. $7,000,000.00 $25,162,026.00 $259,331.35 $650,000.00 $1,000,000.00 $15,000.00 $1 ,500,000.00 $3,300.00 $775,000.00 $19,964,500.00 $334,924.00 $1,500.00 $2,000 000.00 ".$0.00 $0.00 $0.0(1...' .. $0.00 $0.00.... $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 $1 12,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.011 $0.00 $0.00 $0.00 $0,00. •$0.1.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.0(1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total 88(1,736,695.75 $78,624,495.75 82,112,200.110 80.011 $(1.1)0 $0.11(1 $0.011 $(1.11O Active & Future CIP Projects Only FUND: 312-Public Safety 2011.-201.2 Capital Improvement Plan Funding by Cost Component & Sources Total Prior Current Phase Riding Ycars 2(11.1-2012 2012-2013 2013-2014 2014-2015 2015-2016 2(116-2017 Management Land Acquisition Planning Design Construction Equipment Administration Other Construction Engineering $4,392t9', $4,392.19 $ I ,767,043,06'.:.i.. ; • $1,767,043.06 $20,000.00 ` $20,000.00 $2,050,383.62 ;$2,050,383.62 $10,810,843.43 . 1.0,810,843.43 $9,757,071.38 .,."; i' $9,536,519.62 $412,912:68 5412,91268:" $0.00 $0.00 $471,362.49 • `:$471.362.49 $0.00 $0.00 $0.00 $0.00 $0.00 $220,551.76' $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 50.00 $0.00 $0.00 $0.00 Total 1)25,294,008.85':. `:1)25,((73,457.09 $220,551.76 $0.00 $0.110 $0.00 $0.0(1 $0.00 Fund Fund No. Name Total Funding Current Ycars 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 Prior 000002 Special Revenue Operating Budget 363001 1984 I'olice Bonds 367001 Impact Fees 367011 Impact Fees - Ord 12750 369100 1991 Fire Bonds 375001 Fire Assessment Fee 375002 Fire Assessment Fee (FY07) 382001 Contribution From General Fund 382008 Contribution From General Fund 2007 and 385200-1 2002 Homeland Defense Bonds (Series 1) 385200-2 2002 Homeland Defense Bonds (Serics 2) 385200-3 2002 Homeland Defense Bonds (Series 3) 397001 1970 Pollution Control G.O.B. (303000) 888939 FEMA Federal Assistance to Firelighters 888961 Sunshine Stale Financing Commission $825,000.00 $1,771.00 $347,214.03 $329,821.85 $50,400.00 $4,350,532.87 $1,31 1,646.80 $498,414.98 $2,235,658.80 $1,040,100.59 $5,990,000.00 $3,050,104.93 $361,200.00 $656,466.00 $4 245,377.00 $825,000.00 $1,771.00 $347,214.03 $109,270.09 $50,400.00 $4,350,532.87 $1,31 1,64 6.80 $498,414.98 $2,235,658.80 $1,040,400.59 $5,990,000.00 $3,050,104.93 $361,200.00 $656,466.00 $4,245,377.00 $0.00' -i• $0.00 $0.00 $220;551.76 $0.00 $0.00 $0.00 $0.00 50:00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $(1.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $(1.00 $0.00 $0.00 $0.00 Total $25,294,008.85 $25,073,457.09 S220,551.76 $0.00 $0.00 $11.00 S0.00 $0.00 Active & Future C1P Projects Only FUND: 325-Public Facilities Phase 2011-2012 Capital Improvement Plan Funding by Cost Component & Sources Total Prior Current It,intling Years 2011-201.2 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 Management Land Acquisition Planning Design Construction Equipment Administration Other Construction Engineering ;:'s546,349:35 C. i $26,349.35 $20,000.00 $0.00 $0.00 $0.00 $752,044.46 5752,044.46 $0.00 $6,159,089.92 ' ,$5,209,089.92 $950,000.00 $16,384,006.22 `; :5,13,925,241.22 $2,458,765.00 $156,787.00FGr' - 556,787A0 $100,000.00 $224,595i87.:�' $224,595'.87; 50.00 5)50000':00 $150000.00 $0.00 i5 12,937.29 , 5542,937 29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 50.00 $0.00 $0.(10 $0.00 $0.00 $0.00 $(1 00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 30.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total $24,415,810.11 >i.':'F20,887,045.11 S3,528,765.00 $0.00 $0.00 5(1.00 $0.00 $0.00 Fund Fund No. Name Total Funding Prior Years Current 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 000007 American Recovery Reinvestment Act 382001 Contribution From General Fund N 385200-1 2002 homeland Defense Bonds (Series 1) 385200-2 2002 Homeland Defense Bonds (Series 2) 385200-3 2002 Homeland Defense Bonds (Series 3) 385200-8 2002 Homeland Defense Series 1 Interest 888917 PDOT Other 888920 FIND Waterways Assistance Program FY07 888927 Federal Aviation Admin. Grant 888932 Greater Miami CVB 888947 MDC Building Better Communities G013 888956 Contribution from Special Revenue - SRP 888960 Sunshine State Financing Commission 888961 Sunshine Slate Financing Commission 888963 Proceeds from Conveyance of Easement 888972 Rickcnbacker Marina Rental Revenue 888973 TVivt Production Basic Use Fee 888975 Hyatt - Chiller/Cooling Tower $2,497,123.00 $653,786.69 $550,627.00 $1,639,797.16 $5,283,616.45 $146,826.72 $4,460,746.00 $1,071,250.00 $150,000.00 $284,569.00 $250,000.00 $2,664,834.87 $ 8,063.09 $678,048.67 $1, 502,044.46 $146,700.00 $403,500.00 $2,024,277.00 $2,497,123.00 $653,786.69 $550,627.00 $1,639,797.16 $5,283,616.45 $146,826.72 $4,460,746.00 $271,250.00 $150,000.00 $284,569.00 $250,000.00 $2,1 10,346.87 $8,063.09 $678,048.67 $1,502,044.46 $146,700.00 $253,500.00 $0.00 $0.00 $0:00 $0.00 . $0.00 $0.00 $0.00 $0.00 $800,000;00 $0.00 $0.00 $0.00 $554,488.00 $0.00 $0.00 $0.00 $0.00 $150,000.00 $2,024,277.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0 (0) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 .$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total S24,415,810.11 S20,887,045.11 53,528,765.0(1 $0.00 $0.0(1 $0.0(1 $0.00 $0.00 Active & Future CIP Projects Only FUND: 331-Parks and Recreation Phase Management Land Acquisition Planning Design Construction Equipment Administration Other Construction Engineering Total I�UniGng 2011-2012 Capital Improvement Plan Funding by Cost Component & Sources Prior Current Years 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 51 357,625::41 $1,351,905 41 8500,000.00 8500,000.00 $0.00 $0.00 $14,756,195.41 $14,655,092.41 $61,899,729.13 ..7856,209,1 15.13 $3,611,660.70 $3,414,559.90 51,176,82597 $1,112,525.97 0289 653.00 5289;653.00 $ 1772,502.85 $1;702,625.85 $5,720.00 $0.00 $0.00 $101,103.00 $5,690,614.00 $197,100.80 $64,300.00 $0.00 $69,877.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Woo Woo $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total 585,36,1,192.47 $79,235,477.67 86,12(1,714.80 $0.00 $0.00 $0.00 $0.00 $0.1)0 Fund Fund No. Name Total Prior Current Funding Years 2011-2012 2012-2013 2013-2014 2014-2015 2015-2(116 2016-2(117 000004 CRA Operating Budget $6,000,000.00 $1,000,000.00 $5,000,000.0O A 367001 Impact Fees $36,215.00 $36;215.00 •'$0100 co 367011 impact Pees - Ord 12750 $2,256,733.04 $1,482,632.24 $774;100.80 373001 Safe Neighborhood l'arks Bond $1 19,622.00 $1 19,622.00 $0,00 373002 Safe Neighborhood Parks Bond 2008 & $83,320.00 $83,320.00 $0.00. 382001 Contribution From General Fund $30,777.90 $30,777.90 $0.00 385200-1 2002 Homeland Defense Bonds (Series 1) $2,062,388.82 $2,062,388.82 $0.00 385200-2 2002 Homeland Defense Bonds (Series 2) $4,779,448.66 $4,779,448.66 $0.00 385200-3 2002 Homeland Defense Bonds (Series 3) $18,277,191 .99 $18,277,191.99 $0.00 385200-8 2002•1-lomelandDefense Series 1Interest $1,412,594.40 $1,412,594.40 $0.00 888907 Florida Recreation Assistance Program $200,000.00 $200,000.00 $0.00 888920 FIND Waterways Assistance Program FY07 $90,000.00 $90,000.00 $0.00 888947 MDC Building Better Communities GOB $15,500,000.00 $15,500,000.00 $0.00 888951 Other Public & Private Contributions $616,513.00 $616,513.00 $0.00 888955 MSEA Contribution to Capital $2,505,560.00 $2,505,560.00 $0.00 888956 Contribution from Special Revenue - SRI . $600,000.00 $600,000.00 $0.00 888960 Sunshine State Financing Commission $2,671,069.00 $2,671,069.00 $0.00 888961 Sunshine State Financing Commission $21,959,144.66 $21,959,144.66 $0.00 888962 The Children's Trust $260,000.00 $260,000.00 $0.00 888964 County CDT $5,000,000.00 $5,000,000.00 $0.00 888965 Bayfront Park Management Trust $309,000.00 $309,000.00 $0.00 888973 TVM Production Basic Use Fee $240,000.00 $240,000,00 $0.00 888976 Miami -Dade County Dept Cultural Affairs $354,614.00 . $0.00 $354,614.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $000 $(1.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 • $0.00 _$0.00 $0.00 $0.00 $0.00 • $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 -$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $QOO $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Active & Future CIP Projects Only FUND: 331-Parks and Recreation 2011.-2012 Capital Improvement Plan Funding by Cost Component & Sources Total S85,364,192.47 $79,235,477.67 $6,128,714.811 $O.00 $11.110 $0.00 $11.110 S0.00 Active & Future C1P Projects Only FUND: 341-Streets & Sidewalks Phase 2011.-2012 Capital Improvement Plan Funding by Cost Component & Sources Total Prior Current Minding Years 201.1-201.2 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 Management Land Acquisition Planning $0.00 $0.00 Design $18,069,335.14 ]$13,021,335.14 Construction Equipment Administration Other Construction Engineering . $37'2,447i(2):_., $372,447.62 $0.00,,%;,"r::; $0.00 897,396,685.78 . $91,439,047.78 $0.00'"I'i $0.00 54,183,25907:''.:: $4,183,259.07 534.8'70<:47 5348,702.47 $6 657,585.05 1,6,234,605.05 $0.00 $0.00 $0.00 $48,000.00 $4,996,63 8.00 $0.00 •$0.00 $0.00 $422,980.00 $0.00 $0.00 $0.00 $0.00 $96I ,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total 127,1)28,015.13 120,599,397.13 55,461,6 18.00 $961,000.00 $0.))11 $0.00 $0.00 $0.0)) Fund Fund No. Name Total Funding Prior Years Current 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 000002 Special Revenue Operating )3udgel $41 1,622.47 - $41 1:622.47 000004 CRA Operating Budget $1,120,080.00 $1,120,080.00 356001 Local Option Gas Tax $6,732,652.76 $6,732,6 52.76 356003 Parking Surcharge $50,000.00 $50,000.00 356005-1 Streets Bond Program - Series I $24,256,655.26 $24,256,655.26 356005-2 Streets Bond Program - Series 2 $47,676,813.82 $47,676,813.82 356007 Parking Surcharge 2007 $3,333,707.00 $3,333,707.00 367001 Impact fees $177,891.86 $177,891.86 382008 Contribution From General Fund 2007 and $399,989.90 $399,989.90 385200-1 2002 homeland Defense Bonds (Series I) $1,259,103.3(1 $1,259,103.30 385200-3 2002 Homeland Defense Bonds (Serics3) $4,110,968.95 $4,110,968.95 888902 Cominunity Development Block Grant $400,000.00 $400,000.00 888913 FDOT Transportation Enhancement Program $9,419,618.00 $4000 000.00 888917 FDOT Other $83,537.00 $83,537.00 888924 DIU Transportation Fee $1,417,532.00 $1,417,532.00 888930 Transit Half -Cent Surtax $1,543,88(1.83 $1,543,880.83 888931 Transit Ralf -Cent Surtax (FY07 and Future) $16,559,235.52 $16,559,235.52 888938 Miami -Dade County GranUContribution $450,000.00 $450,000.00 888947 MDC Building Better Communities GOB $961,000.00 $0.(10 888953 Miami -Dade Metropolitan Planning Org $96,000.00 $48,000.00 888967 Economic Stimulus Package 2009 - FDOT $6,175,596.46 $6,175,596.46 888974 Economic Stimulus 2009 - FD Of Health $392,130.(10 $392,130.00 $0.00 $0.00 $0.0(1 $0.00 $0.00 $0.00 $0.00 $0.00 .. $0.00 $0.00 $5, 119,6 1 8.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $48,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 $11.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $961,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $(1.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00. $0.00 $0.00 $0,00, ' $0.00 $0.00 $11,00 $0.00 $0.00 .$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 • $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 . $0.00 $0.00 $0.00 Active & Future CIP Projects Only FUND: 341-Streets & Sidewalks 201.1-2012 Capital Improvement Plan Funding by Cost Component & Sources Total 127,028,015.13 120,599,397.13 85,467,618.00 $961,000.00 8I1.00 $0.00 $0.00 $0.01) Active & Future CIP Projects Only FUND: 343-Mass Transit 2011-2012 Capital Improvement Plan Funding by Cost Component & Sources Total Prior Current Phase blinding Years 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 Management Land Acquisition Planning Design Construction Equipment Administration Other Construction Engineering $0.00 $1,075,996.20 $0.00 $6,811,281.63 `.:` $34,69.14O;:;; l000 $0.00 $0.00 $0.00 $ 0.00 $590,996.20 $0.00 $6,784,281 .63 $14,29.1.:00 $0.00 $0.00 $0.00 $0.00 $0.00 $485,000.00 $0.00 $27,000.00 $20,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $Q00 $0.00 Woo $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total $7,921,968.83::;. $7,389,568.83 $532;400.00 $0.00 $0.00 $11.00 $0.011 $0.011 Fund Fund No. Name Total Prior Current Funding Years 2011-2012 2012-2013 2013-2014 2014-2015 2015-21116 2016-2017 888917 FDOT Other 888930 Transit Half -Cent Surtax 888931 Transit Half -Cent Surtax (FY07 and Future) 888938 Miami -Dade County Grant/Contribution 888957 Downtown Development Agency 888968 Economic Stimulus Package 2009 - Miami $1,899,150.63 $81,788.00 $1, 732,33 0.00 $99,418.20 $25,000.00 $4,084,282.00 $ 1 ,899,150.63 $81 ;788.00 $1,199,930.00 $99,418.20 $25000.00 $4,084,282.00 $0,00 "$0.00 $532,400.00 $0.00 $0.1)0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0A0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.01) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total $7,921,968.83 $7,389,568.83 $532,400.00 $0.0)) $0.00 $0.00 $0.110 $0.00 Active & Future CIP Projects Only FUND: 351-Sanitary Sewers Phase Management Land Acquisition Planning Design Construction Equipment Administration Other Construction Engineering Total F,i ding $58900;::. $0.00 > `•j: $0.00 $0.00 $55,000.00 $550__00 $3,861.00 2011-2012 Capital improvement Plan Funding by Cost Component & Sources Prior Years $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00, $0.00 $0.00 Current 2011-2012 $589.00 $0.00 $0.00 $0.00 $55,000.00 $0.00 $550.00 $0.00 .;$3,861.00 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 $0.00 $0.00 $0.0D $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.0(1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total $60,000.00' $0.00 $60,000.00 $0.00 $0.00 $0.00 $11.00 $0.00 Fund Fund No. Nance Total Prior Funding Years Current 2011-2012 2012-2013 2013-2(114 2014-2015 2015-2016 2016-2017 371 100 Series 1995 Sanitary Sewer Bonds $60,000.00 $0.00 $60,000.0O $0.00 $0.00 $0.00 $0.00 moo Total $60,000.00 $0.00 • .:$60000.00 $0.00 $0.00 $0.00 $0.00 $0.00 Active & Future OP Projects Only FUND: 352-Storm Sewers Phase 2011-2012 Capital improvement flan Funding by Cost Component & Sources Total Prior Current Funding Years 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 Management Land Acquisition Planning Design Construction Equipment Administration Other Construction Engineering 564 087.45 $64,087.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 . $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0 00 5000 $0.00 $0.00 $8,460,608.71 :;$8,460,608.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $31,456,918.03 .!'5'19,786,033.04 51,841,884.99 $9,829,000.00 $0.00 $0.00 $0.00 $0.00 50.00 $0.00, $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 51,840,795,71 51 840195.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $572;065:00 $572,065.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 52,911,416.80 4,$2,911,416.80 50.00 80.00 50.00 $0.00 50.00 50.00 Total $45,305,891.70 533,635,006.71 $1,841,884.99 $9,829,000.00 $0.00 $0.00 50.00 $0.00 Fund Fund Total Prior Current No. Name Funding Years 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 000001 General Fund Operating Budget $60,000.00 000002 Special Revenue Operating Budget $290,400.00 356001 Low] Option Gas Tax $1,947,173.00 356005-1 Streets Bond Program - Series 1 $2,786,035.00 356005-2 . Streets Bond Program - Scrics 2 $8,690,444.00 356007 Parking Surcharge 2007 $1,000,001 .00 360001 Stormwa(er Utility Trust Fund $4,266,788.00 360003 Stormwater Utility Trust Fund (FY07 and $6,282,164.00 367001 Impact Fees $12,087.88 383001 C1P Misc. Revenue $46,357.55 385200-1 2002 Homeland Defense Bonds (Series 1) $714,000.00 385200-3 2002 Homeland Defense Bonds (Series 3) $2,571,867.00 399001 1976 & 78 Storm Sewer G 0 Bond $867,481.00 888909 FL Dept of Environmental Protection (FDL'1') $500,000.00 888925 FEMA Recovery Assistance $173,200.00 888926 Prior Year Fund Balance $91,565.00 888930 'Transit Half -Cent Surtax $434,823.04 888931 Transit 1-lalf-Cent Surtax (FY07 and Future) $2,315,505.24 888947 MDC Building Better Communities GOB $11,181,000.00 888959 FEMA 2007 & Future Pre -Disaster $599,999.99 888961 Sunshine Slate Financing Commission $475,000.00. $60,000.00 $290,400.00 $ 1 ,447; 173.00 $2,786,035.00 $8,690,444.00 $1,000,001.00 $4,266,788.00 $5,540,279.00 $12,087.88 $46,357.55 $714,000.00 $2,571,867.00 $867,481.00 $500,000.00 $173,200.00 $91,565.00 $434,823.04 $2,315,505.24 $1,352,000.00 $0.00 $475,000.00 $0.00 $0.00 $ 500;0.00.00 $000 $0.00 $0.00 $0.00, $741,885'.00`> $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $599;999.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9,829,000.00 $0.00 $0.00 $000 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Woo $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.0(1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00' $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.0(1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Active & Future CD' Projects Only FUND: 352-Storm Sewers 2011-2012 Capital Improvement Plan Funding by Cost Component & Sources Total $45,30$,891.70 $33,635,006.71 $1,841,884.99 $9,829,000.00 $0.01) $0.00 $0.00 511.01) Active & Future CIP Projects Only FUND: 353-Solid Waste Phase "Total 1+iiiling 2011-20.12 Capital Improvement Plan Funding by Cost Component & Sources Prior Years Current 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 Management Land Acquisition Planning Design Construction Equipment Administration Other Construction Engineering $0:00 $0.00' $0.00 $0.00 $0.00 $3,532,282.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,418,538,00. . '$0.00.:. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 50.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 50.00 $2, 1 13,744.00 $0.00 $0.00 $0.00 $0.(I(1 $0.00 $0.00 $0.00 $0.00 $0.00 50.0(1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $(1.00 $0.(10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total 53,532,282.00:;:'<:''$1,418,538.00 52,1,13,744.00 $0.1111 $0.00 $0.00 $0.00 $0.011 Fund Fund No. Naive Total Prior Funding Years Current 2011-2012 2012-2013 2(113-2014 2014-2015 2015-2016 2016-2017 382008 u1 Contribution From Geueial Fund 2007 and $3,532,282.00 51,418,5.38.00 $2,113,744.00: $0.0(l $0.00 $0.00 $0.00 $0.00 Total $3,532,282.00 $1,418,538.00 $2,113;744.00 $0.00 $0.00 $0.0(1 $0.01) $0.00 Active & Future CEP Projects Only FUND: Totals Phase Total Funding 2011-2012 Capital Improvement Plan Funding by Cost Component & Sources Prior Current Years 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 Management Land Acquisition Planning Design Construction Equipment Administration Other Construction Engineering $9 410 127 3(1 $9,383,818.30 $3,535,297.43 $3,535,297.43 $772,044.46 ,: $772,044.46 $72,279,843.79 ;`',$70,695,740.79 227, 663 ,3 82.19 .. l.99,7 18,2 80.20 971,614,772.20 ;168,956,375:64 1,8,312,705r30$8,227,455.30 $9 45) 176:69 $4,451 176.69 1,12;912515.48 $12,415,797.48 $26,309.00 $0.00 $0.00 $1,584,103.00 $17,155,101.99 $2,658,396.56 $85,250.00 $0.00 $496,718.00 $0.00 $0.00 $0.00 $0.00 $10,790,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0,0(1 $0.00 $0.00 $(1.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.(10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 . $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0A0 Total 410,951,864.84 `',>'`378,155,986.29 $22,005;878.55 $10,790,000.00 971.0)) $0.00 $0.0(1 $0.00 Fund Fund No. Name Total Funding Prior Years Current 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 000001 General Fund Operating Budget $60,000.00 $60,000.00 000002 Special Revenue Operating Budget $1,527,022.47 $1,527,022.47 000004 CRA Operating Budget $18,166,580.00 $13,166,580.00 000007 American Recovery Reinvestment Act $2,497,123.00 $2,497,123.00 356001 Local Option Gas "fax $10,679,825.76 $8,179,825.76 356003 Parking Surcharge $50,000.00 $50,000.00 356005-1 Streets Bond Program - Series 1 $27,042,690.26 $27,042,690.26 356005-2 Streets Bond Program - Series 2 $56,367,257.82 $56,367,257.82 356007 Parking Surcharge 2007 $4,333,708.00 $4,333,708.00 360001 Slormwaler Utility Trust Fund $4,266,788.00 $4,266,788.00 360003 Slormwaler Utility Trust Fund (FY07 and $6,282,164.00 $5,540,279.00 363001 1984 Police Bonds $1,771.00 $1,771.00 367001 Impact Fees $573,408.77 $573,408.77 367011 Impact Fees - Ord 12750 $2,635,610.15 $1,640,957.59 369100 1991 Fire Bonds $50,400.00 $50,400.00 371 100 Series 1995 Sanitary Sewer Bonds $60,000.00 $0.00 373001 Safe Neighborhood ('arks Bond $1 19,622.00 $1 19,622.00 373002 Safe Neighborhood Parks Bond 2008 R. $83,320.00 $83,320.00 37500) Fire Assessment Fee $4,667,424.03 $4,667,424.03 375002 Fire Assessment Fee(FY07) $1,311,646.80 $1,311,646.80 382001 Contribution From General Fund S22,775,947.55 $22,775,947.55 382007 Contribution From General Fund 2003 $7,000,000.00 S7,000,000.00 382008 Contribution From General Fund 2007 and $31,329,956.70 $29,21 6,212.70 $0.00. $5,000,000.00 $0.00 $2,500,000:00. $0.00 $0.00 $0.00` $0.00 $0.00 $741,885.00 $0.00 $0.00 $994,652.56 $0.00 $60,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,1 13,744.00 $0.00 $0.00 $0.00 $0.0(1 $0.00 $0.00 $0.00 $0.(10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $(LO0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.0(1 $0.00 r $0.00 $0.00 $0.00 $0.00 Active & Future COP Projects Only FUND: Totals Fund Fund No. Name Total Fiiu ling 201.1.-2012 Capital Improvement Plan Funding by Cost Component & Sources Prior Years Current. 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 383001 CIP Misc. Revenue $4G357`55 $46,357.55 385200-1 2002 Homeland Defense 13onds (Series 1) • $5,626,519.71`' .$5,626,5197I 385200-2 2002 Homeland Defense 13onds (Series ?Al" . $12,409,245.82 :'1,)2,409,245.82 385200-3 2002 homeland Defense Bonds (Series 3) $33,753,080.67 $33,753,080,67 385200-8 2002 Homeland Defense Series 1 Interest $1,559,421.12 .'' ;11,559,421.12 397001 1970 Pollution Control G.O.B..(303000) $361,200.00 $361,20(1(10 399001 1976 & 78 Storm Sewer G 0 Bond $867,481.00: $867151:00' 888896 Miami -Dade County DERM Virginia Kcy • $651);00040 $650 000.00 888902 Community Development Block Grant $1 400 000.00 $1, 4C10,000.00 888907 Florida Recreation Assistance Program $200,000.00 $200,000.00 888909 FL Dept of Environmental Protection (FDLI') $500,000;O0 $500,000.00 888913 PDOT Transportation Enhancement Program $9,419,618.00 $4,000,000.00 888917 FDOT Other $6,443,433.63 $6,443,433,63 888920 FIND Waterways Assistance I'rogram FY07 $1,222,750.00 $422,750.00 888923 Contribution From Special Revenue $1,500,000.00 $1,500,000.00 888924 DRI Transportation Fce • $1,417,532.00 $1,417,532.00 888925 FEMA Recovery Assistance $173,200.00 $173,200.00 888926 Prior Year Fund 13a1ancc $91 ,565.00 $91,565.00 888927 Federal Aviation Admin. Grant $150,000.00 $150,000.00 888930 Transit Half -Cent Surtax $2,060,491 .87 $2,060,491 .87 888931 Transit Half -Cent Surtax (FY07 and Future) $20,607,070.76 $20,074,670 76 888932 Greater Miami CVB $284,569.00 $284,569.00 888938 Miami -Dade County Grant/Contribution $549,418.20 $549,4 18 21) 888939 FEMA Federal Assistance to Firelighters $656,466.00 $656,466.00 888947 MDC Building Better Communities G0(3 $27,892,000.00 $17,102,000.00 888951 Other Public & Private Contributions $619,813.00 $619,813.00 888953 Miami -Dade Metropolitan Planning Org $96,000.00 $48,000.00 888955 MSEA Contribution to Capital $2,505,560.00 $2,505,560.00 888956 Contribution from Special Revenue- SRF $3,264,834.87 $2,710,346.87 888957 Downtown Development Agency $25,000.00 $25,000.00 888959 FEMA 2007 & Future Pre -Disaster $599,999.99 $0.00 888960 Sunshine Stale Financing Commission $2,679,132.09 $2,679,132.09 888961 Sunshine State Financing Commission . $28,132,570.33 $28,132,570.33 888962 The Children's Trust $260,000.00 $260,000.00 888963 Proceeds from Conveyance of Easement $1,502,044.46 $1,502,044.46 888964 County CDT $5,000,000.00 $5,000,000.00 888965 Bayfronl Park Management Trust $309,000.00 $309,000.00 888966 Sunshine State Financing Commission $19,964,500.00 $19,964,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5;4119,618.00 $0.00 $800,000.00 $0.0(1 '$0:00 $0.00 $0.00 $0.00. $0.00 $532,400.00 $0.00 $010 $0.00 $0.00 $0.00 $48,000.00 $0.00 $554,488.00 $0.00 $599,999.99 $0.00 $0.00 $0.00 $0 00 $0.00 $(1.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.1)1) $0.00 ' $10,790 000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.0(1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 50.00 50.00 50.00 50,00 $0.00 $0.00 $0.00 $0.00 $o.00 $o.00 Sumo $o.00 50.00 $0.00 Sumo $0.00 $0.0(1 $0.00 Sumo $0.00 50.00 50,00 50.00 50.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 50.00 50.00 50.00 50.00 $o.o1 Sumo $0.00 $o.mo Sumo $0.00 50.01 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 50.011 $0.00 $(1.11) $0.0(1 $0.00 $0.00-'$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.0(1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Active & Future CIP Projects Ouly FUND: Totals Fund Fund No. Name 2011.-2012 Capital Improvement flan Funding by Cost Component & Sources Total Prior Current Funding Years 2011-2012 2012-2013 2013-2014 2014-2015 ' 2015-2016 2016-2017 888967 Economic Stimulus Package 2009 - FDOT 888968 Economic Stimulus Package 2009 - Miami 888969 Subrogation Auto Claim Revenues 888972 Rickenbacker Marina Rental Rcvenuc 888973 TVM Production Basic Use Fee 888974 Economic Stimulus 2009 - I'D OFl.leal(Ii 888975 Myatt- Chiller/Cooling Tower 888976 Miami -Dade County Dept Cultural AlTairs $6.175,596 4O'-. _ $6,175,596.46 50.00 .: 54,084,282.00 $4,084,282.00 $0.00 $447,124.00 ;`i 5334,924.00 51 12,200.00 $146,700.00 ;.5146,700.00 $0.00 $645,000.00 $495,000.00 5150,000.0(1 $392,130.00 ;:: ` 5392,130:00 50.00 52,024,277 00 : $0 00 $2,024,277.00 5354 614.00 $0 00 ' $354,614.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.0(1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.uo $0.00 $0.00 $0.00 _ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total 410,951,864.84 ,37') 155,986.29 $22,005,878.55 310,790,000.0(1 $0.00 $11.00 30.11(1 $0.00 SECTION ' EPORTS 3 - COST ESTIMATES VERSUS AVAILABLE FUNDING Active & Future CIP Projects Only 1l-No. Client Project City Of Miami - Capital improvement Program Cost Estimates versus Available Funding Dist. Total Cost Estimate ($) Total Funds (5) Status Phase Fund Stains 301-CRA projects B-30394 Community Redevelopment Agency 13-30579 B-3073 I B-30538B 13-40169 Community Redevelopment Agency Community Redevelopment Agency Community Redevelopment Agency Community Redevelopment Agency North 14 St, Media Ent ertainment tertainment D islrict Slrectsca pc 92-686001`?';, ' 01d Firc Station No. 2 Rcstoralioii CRA 92-686001 Miunini Woman's Club Baywillk'Project -GItA.. 92-686001 Museum PaitilltriVifoninental Remcdialiou - 92-686001 300 NW 1 I Street Camniu iity'Center-CIRA 92-68900 1 2 6,000,000 2 3,500,000 2 93,000 1,2,3,4,5 2,000,000 5 1,987,714 6,000000 Active 3,500,000 Aclivc 93,000 Active 200,000 Active 1,500,000 Active 5-Construction Funded 5-Construction 3-Design 3-Design 3-l)csign Funded Funded Partially Funded -1,800,000 Partially Funded -487,714 Total Fund minus Total Cost Estimate (5) 0 0 0 311-General Government 13-30365E Community Development tr D-30365.1 B-30551 B-30666 I3uilding Department Public Works 301-CRA projects Coral Way NET Office Remodeling - CD 91-02994 Beckham lull Fire Damage Repair Public Works Maintenance Yard General Services Damaged Veliicle Replacement / Repairs Administration B-30996 General Services MRC: Emergency Repairs Administration Capital Improvement Program Virginia Key Landfill Assessment Admin Capital Improvement Program Quality of Li le District 2 - Various Projects Admin 13-35002 13-39910 B-70416 B-74204 B-7420513 B-74220 13-74609 General Services Emergency Radio Equipment replacement Administration General Services Emergency Dispatch Furniture Administration General Services GSA Fleet Maintenance Garage Expansion Administration General Services Police Vehicle Replacement Administration Information Technology EILI' Integration System 3 13,580,714 • 1 015,000 1 (i,770 1,2,3,4,5 '3,268,254 1,2,3,4,5 :447,124 1,2,3,4,5 17,065 2 1,400000 2 259,331 1,2,3,4',5 25,000 1,2,3,4,5 11,876 48,535 1,2,3,4,5 24,239,737 1,2,3,4,5 25,474,457 11,293,000 1,015,000 Active 6,770 Future 3,268,25,1 Active 447,124'Active 17,065 Future 1,400,000 Active 259,331 Future 25,000 • Future • 11,876 Active 48,535 Active 2,1,239,737 Active 25,474,457 Active 3-Design Funded 8-Future Funded 3-Design Funded 5-Construction Funded 8-Future 5-Construction 8-Future 8-Future 5-Construction 5-Construction 5-Construction 5-Construction Funded • Funded Funded Funded Funded Funded Funded Funded -2,287,714 Active & Future CIP Projects Only Il-No. Client 311-General Government B-74610 B-3036511 B-30994 B-40171 B-40172 13-74200 B-74606 B-746 14 B-74617 13-30365C B-70415 I3-74219 Information Technology General Services Administration Public Facilities City Manager City Manager Gcncral Services Administration Information Technology Information Technology Information Technology Community Development General Services Administration General Services Administration City Of Miami - Capital Improvement Program Cost Estimates versus Available Funding Project 'Technology infrastructure Generator lilt City Hall City of Miami Impact Fee Study,- Citywide • Coconut Grove Viewing Pisllorm Spoil Island Dist. 1,2,3,4,5 1,2,3,4,5 1,2,3,4,5 C-132 Coconut Grove Viewing Plailorm Spoil Island 2 E-D2 Citywide General Fleet Replacement 1,2,34,5.' Upgrade PC Sollware& Hardware 1,2,3,4,5 Land Management System 1,2,3,4,5 1'1' Modernization 1,2,3,4,5 City Property Building Maintenance 1,2,3,4;5 MRC Security System Harding - UASI Funded 2 1 8-1 8001 1 Property Maintenance Building Improvements 1,2,3,4,5 Total Cost Estimate ($) 9,116,151 186,819 65,490 12,200 12,200 3,619,887 7,174,921 7,913,01 8 4,100,000 700,000 54.977 300,000 'Poled Funds ($) Slalus Phase 9,116,151 Active 25,000 Active 65,490 Future 9,900 Fuluic 9,900 Future 3,260,268 Active 2,920,682 Active 6,316,151 Active 2,800,000 Active 0 Future 0 Active 5-Construction 4-I3it1 (JOC) 8-Future 8-Future 8-Future 5-Construction 5-Construction 3-I)csign 5-Construction 8-Future 3-Design 0 Future 8-Future Fund Slalus Tulal Fund minus "Total Cost Estimate ($) Funded 0 Partially Funded -161,819 Partially Funded -0 Partially Funded -2,30O Partially Funded -2,300 Partially Funded-359,618 Partially Funded -4,254,238 Partially Funded -1,596,866 Iartially Funded -1,300,000 UnFunded -700,000 UnFundcd -54,977 1JnFundcd -300,000 312-Public Safety 13-30384C B-30997 B-60454 B-70102A Police Police Fire Rescue Fire Rescue B-70104 Fire Rescue B-70105 Fire Rescue B-70106 Fire Rescue B-7041 1 Fire Rescue B-7280I Fire Rescue B-72802 Fire Rescue B-72813 Fire Rescue 311-General Government Communication UPS Power Police Swat Vehicles Fire Station 1114 (New) Inc Station No. 6 Office Building - Structural Analysis Fire Station No. 10 Restroom Remodeling Refurbishing of Existing Appal Mils Firefighting Equipment and Gear Fire Rescue Personal Protective Equipment . Computer Aidcd Dispatch (CAD) Fire Stations & Other Fire Facilities Defense and Security Equipment Acquisition 89,468,815 1,2,3,4,5 1,005,8(1(1 1,2,3,4,5 322,845 4 5,076,843 5 74,619 1 179,403 1,2,3,4,5 230,000 1,2,3,4,5 158,123 1,2,3,4,5 820,580 1,2,3,4,5 120,865 1,2,3,4,5 4,022,960 1,2,3,4,5 3,767,249 80,736,695 1,005,800 322,845 5,076,843 7,1,619 179,403 230,000 158,123 820,580 120,865 4,022,960 3,767,2,19 Active . Future Future Active. Active Future Future Active Active . Active Active 5-Consl. (.IOC) Funded 8-Fulurc Funded 2-Pre-Design Funded 7-0n-hold Funded 3-Design Funded 8-Future Funded 8-Future •Pundcd 3-Design Funded 3-Design Funded 5-Construction Funded 5-Construction Funded -8,732,120 0 0 0 0 0 0 0 0 (1 (1 Active & Future CH' Projects Only 13-No. Client Project City Of Miami - Capital Improvement Program Cost Estimates versus Available Funding Dist. Total Cost Estimalc (1) Tula) Funds ($) Status Fond Phase Status 312-Public Safety 13-72915 Police B-30554 Police 13-60351 Fire Rescue B-60453A Fire Rescue B-704 (8 Fire Rescue B-72803 Fire Rescue 13-72804 Fire Rescue B-72805 Fire Rescue B-72808 Fire Rescue cn B-72809 Fire Rescue B-72915A I'olice B-30709 B-70103 B-72811 Fire Rescue Fire Rescue Fire Rescue Police Headquarters flclipaclzind.Roof Replacement Police Radios Replacement Fire Station /110 (New) Fire Station 1113 FEMA Assistance t( irclighlers Progrim FY201 1 Fire Station Equipment and Purnilure • Replacement Phone and Radio Equipment Upgrades Computer Equipment and Software Upgrades Light Fleet Replacement Large Firefighting Equipment Police I-leadquarlers llclipad and Roof Replacement Fire Station Hardening / Facility Apparatus Room Doors Fire Department Training l3urn'I'ower / Search Facility & Props Total Fund minus Total Cost Estimate (5) 1,2,3,4,5 240,321 240,321 Active 4-13id (.IOC) Funded 0 1,2,3,4,5 1,2 3;4,5 1,2,3,4;5 1,2;3,4,5 1,2,3,4,5 1,2,3,4,5 12,3,4,5.`.. 1,2,3,4,5 1,2,3,4,5 1,2,3,4,5 Replace Existing Fire Engines I ,2,3,4,5 6,150,000 6,275,200 5,168,420 343,610 713,417 1,209,200 950,00(1 1,649,658 660,316 1,600,000 622,48 I 0 3,035,000 843,082 898,123 5,084,496 68,722 Active Futurc 'Aclivc Future 5,10,837 Active 351,200 93,461 667,658 326,816 400,000 Active Active Active Active Future 0 Future 0 Active 0 Future 3-Design Partially Funded-5,306,917 8-Future Partially Funded -5,377,076 5-Construction Partially Funded -83,924 8-Future Partially Funded -274,888 5-Construction Partially Funded-172,579 5-Construction I'aitially Funded-858,000 5-Construction Partially Funded -856,539 5-Construction Partially Funded -982,000 5-Construction Partially Funded -333,500 8-Future Partially Funded -1,200,000 8-Futnrc 7-0n-IIo1(1 8-Future UnFuudecl LInFunded UnFundcd -622,481 -3,035,000 325-Public Facilities B-30194A B-30325 B-3053 I B-30546A B-30596 B-30604 B-30696 B-40181 Public Facilities Public Facilities Capital Improvement Program Admin Capital Improvement Program Admin I'ublic Facilities Public Facilities Public Facilities Public Facilities 312-Public Safely Manuel Artime ADA Improvements Miamarina Emergency l'icr Repairs Dorsey Memorial Library Restoration 3 2 2 Gilman 1)all Improvements - FY2012 1,2,3,4,5 Dinner Key Marina - Miscellaneous Repair Miamarina Intracoastal Bulkhead Assessment Miamarina l'ier A, 13 & C Fire Line Repairs James L. Knight Center Chiller & Cooling 2 2 2 2 44,396,914 363,831 1,31 1,253 250,000 105,000 401,356 90,000 250,000 4,521,400 25,294,0(18 363,831 1,31 1,253 250,000 Active Active • ,Active 5-Coust. (IOC) 5-Cansl. (IOC) 7-0n-l-lold 105,000 Future 8-Fultne 401,356 90,000 250,000 4,521,400 Active Active Active Active 5-Consl. (IOC:) 1-Study 5-ConsL (.IOC) 5-Construction Irundecl Funded Funded Funded Funded Funded Funded - Funded -19,102,906 0 0 0 (1 0 0 0 0 Active & Future C1P Projects Only B-No. Client Project City Of Miami - Capital Improvement Program Cost Estimates versus Available Funding Dist. Total Cost Estimate ($) Total Funds (1;) Status Phase. Fund Stales rolnl Fund Total Cost Fslintalc (9i) 325-Public Facilities 13-70414 B-70500 B-30182A B-30602 B-30688 B-30689 B-30706 13-33514 B-40180 B-60464 B-70100 B-75001 B-75005 13-35000 13-35003 13-39903 Public Facilities I'ublic Facilities Public Facilities Public Facilities l'ublic Facilities Public Facilities Public Facilities Public Facilities Public Facilities I'ublic Facilities Public Facilities Public Facilities Economic Development Public Facilities Public Facilities Capilal lmprovemcnt Program Admin Tower Ot IL'll] Project 41-410004 James I Knight Center / llyall='Itii e Alarm 2 System Replacement DevclopmenUUDI' Consultants =.Watson Is, . olhcis. Coconut Grove.W!alci0ont'Masler Implementation'-'1'liase 1 Seminole Dinghy Dock Expansion Marine Stadium Restoration." Marine Stadium Bulkhead Replacement Miscellaneous Repairs 10% Set Aside • Marine Stadium Marina Improvements Marine Stadium Marina at Virginia Kcy. . New Dinner Kcy Marina Dockmaster Building Gusman Ball Improvements / Repairs Watson Island Inliastructurc Watson Island Aviation & Visitor Center Watson Island 1'ublic 1'ark Improvements Allapallah Community Elderly Center Waterfront Improvements Citywide 2,5 2 2 2 2 2 2 2 2 2 2 2 1,2,3,4,5 484,978 484,978 Future 8-Future Funded 451,566 451,566 Active 7-On-Hold Funded 47,179,389 1,9(15,5,14 Active 3-Design Partially Funded 60,000 511,716 2,094,393 1,853,459 1,315,550 33,180,900 4,725,960 .10,000,000 647,190 .:8;326,357 .2,600,000 287,000 30,000 Future 8-Future Partially Funded 350,000 Active 7-On-l-lold Partially Funded 1,106,603 Active 3-Design Partially funded 1,853,447 Future 8-Future Partially Funded 385,645 Active 3-Dcsign I'ar(ially Funded 1,74(1,007 Active 2-Pre-Design Partially Funded 3446,441 Aclivc 3-Dcsign Partially Funded 423,405 Future 8-Future Partially Funded 150,000 Future 8-Future Partially Funded 4,795,330 Aclivc 5-Construction Partially Funded 0 Future 8-Future UnFundcd 0 Future 8-Future 1Jn1unded 0 0 Future 8-Future tinFundcd 0 0 -45,273,844 -30,000 -161,716 -987,789 -12 -929,905 .-31,440,893 -1,279,519 -9,576,594 -497,190 -3,53 1 ,026 -2,600,000 -287,000 0 325-Public Facilities 33 l-Parks and Recreation 8-30078 Capital Improvement Program Homeland Defense l..cgal Services Support Admin 13-30134A l'arks and Recreation 13-30174 Virginia Key Park Trust B-3030513 Parks and Recreation B-30305D Parks and Recreation B-30374 Parks and Recreation Bryan Park New'1'cnnis/Community Center Virginia Key Beach Park I listoric Restoration 121,011,301 24,415,811) 1,2,3,4,5 29,346 29,346 Fuiure 8-Future Funded 4 2 Phase 2 Gibson l'ark New Construction (Partially 5 Funded by CRA 92-689001) Gibson I'ark Furniture - D5 5 Virginia Kcy Rowing Center Improvements 2 852,128 852,128 Active 3-Design Funded 1,306,765 1,306,765 Active 5-Construction Funded 9,939,521 9,939,521 Aclivc 5-Construction Funded 22,020 22,020 Active 5-Construction Funded 616,513 616,513 Active 2-l'rc-Dcsign Funded -96,595,491 0 0 0 (1 0 0 Active & Future CIY Projects Only 13-No. Client Projccl City Of Miami - Capital Improvement Program Cost Estimates versus Available Funding Total Fund 111i1ins Total Cost Total Fund Total Cost Dist. Estimate ($) Funds ($) Status Phase . Status Estimate (5) 33I-Parks and Recreation 13-30508 Virginia Key Park 'Frits) Virgmi 1 Key 13each Park Mnsctitn 2 20,527,127 .20,527,127 Active 2-Pre-Design Funded 0 13-30541 D Parks and Recreation Citywide Park Equipments 1( Site: 1,2,3,4,5 397,100 397,100 Active 3-Design Funded 0 lniprovemcnts FYI2 B-30566A Parks and Recreation . , Mclrcese GolfTraining Center:.:' 1 2,385,560 2,385,561) Active 5-Construction Moulted 0 13-30685A Parks and Recreation 18l'<1 13rickell Avenue Palk . 2 42,048 42,048 Active 4-I1id Funded 0 1'IaygrutintlEquip nuri B-3071 1 Parks and Recreation Triangle Park Swings - D3 3 8,500 8,500 Active 7-On-I told Funded 0 13-30772 Parks and Recreation Bay of Pigs Park Lighting D 1 4 53,000 53,000 Active 2-Pre-Design Funded 0 B-30800 Parks and Recreation Fern lslc / I'BA Park liiiproventenls Project - . I 1 16,781 116,781 Future 8-Future Funded 0 DI 13-30801 1'arks and Recreation Manatee Bend Park Shoreline Improvements - 2 50,026 50,026 Future 8-Fulurc Funded 0 D2 8-30802 Parks and Recrcalion 1'allot Park Shoreline Improvements - D2' 2 50,000 50,000 Future 8-Future Funded 0 ro B-30820 Parks and Recreation Legion Park Boat Ramp Repairs - D2 2 . 14,123 14,123 Future 8-1Iuture Funded 0 B-30821 I'arks and Recreation Coral Gate Park Furniture, Security System 4 122,000 122,000 Active 5-Construction Funded 0 and Miscellaneous Improvements - D4 B-30882 l'arks and Recreation Aliican Square Park -Splash l'ark - D5 5 600,000 600,000 Active 2-the-Design Funded I) B-30885 Parks and Recreation Freedom Garden Statue Rehabilitation - D5 5 • 75,000 75,000 Aclivc 5-Construction Funded 0 B-30886 Parks and Recreation Lumnuls Landing Square - D5 5 925,061 9.25.061 Active 3-Design Funded 0 B-30995 Parks and Recreation Virginia Kcy Bike Trail Building - D2 2 377,000 377,000 Active . 2-Pre-Design Funded 0 13-35806 Parks and Recreation Curtis Park New Pool Facility I 2,127,159 2,127,159 Aclivc I-Sludv Funded 0 B-35868A Parks and Recreation Robert King High Park Furniture - D4 4 45,000 45,000 Active 5-Construction Funded 0 13-39910E Parks and Recreation District 2 Quality of Life Park Improvements 2 987,988 987,988 Active 5-Construction Funded 0 B-40170 ('arks and Recreation Irrigation System st Kennedy Dog l'ark - D2 2 55,945 55,945 Aclivc 2-Pre-Design Funded 0 B-40I73 Bayfrunt Park Management 13ayli'ont Park Electrical Repairs 2 309,000 309,000 'Aclivc 3-Design Funded 0 Trust B-75823 ('arks and Recreation Biscayne l'ark Site Improvements 2 150,000 150,000 Future • 8-Future Funded 0 13-75830A 1'arks and Recreation Blanche l'ark Master flan Improvements 2 250,000 250,000 Active 5-Consl. (.IOC) Funded 0 13-75883 1'arks and Recreation Peacock Park Site Improvements 2 830,124 830,124 Active 3-Design Pundcd 0 13-75973 Parks and Recreation Oakland Grove Park Playground Equipment 5 15,000 15,000 Future 8-Future Funded 0 I3-78502A Capital Improvement Program Museum of Science - Development in 1,2,3,4,5 2,000,000 2,000,000 Active 3-Design • Funded 0 Admin Bicentennial Park - Phase 2 Active & Future OP Projects Only B-No. Client Project City Of Miami - Capital Improvement Program Cost Estimates versus Availableiunding Dist. Total Cost Estimate (5) Total Funds (5) Status Phase Fund Slams 331-Parks and Recreation B-30538 Parks and Recreation 13-30541 Parks and Recreation B-30541 B B-30541C B-30547E B-30547E Parks and Recreation Parks and Recreation ('arks and Recreation Parks and Recreation B-30547G l'arks and Recreation B-305471-1 B-30585 B-30671 B-30690 B-30721 B-35812A B-35838 B-35853A B-35865A B-35883A B-35887 B-35904 B-50722 B-30587 B-35844 B-35858 B-35872 Parks and Recreation ('arks and Recreation ('arks and Recreation Parks and Recreation ('arks and Recreation l'arks and Recreation Parks and Recreation Parks and Recreation Parks and Recreation Parks and Recreation l'arks and Recreation larks and Recreation ('arks and Recreation Parks and Recreation Parks and Recreation l'arks and Recreation . Parks and Recreation Museumi'ark - Partially Puudcd:by CRA 92-686001 Citywide Park Equipment Sc 1 rriprovemenls Keanecly Park Floating I)ock'1111 Kennedy l'tnk Shorellion Phrase 1 Parks ADA Modifications - Distri0t.2 • • Parks ADA Modifications -:District 3 _ Jose Marti Park Parks ADA Modifications - District 4 - Shcnadoah l'ark l'arks ADA Modifications - District 5 Morningside Park Ncw Pool Facility Caribbean Marketplace Renovation West End Park New Community Building Spoil Island E Restoration and Floating Dock 1,2,3,4,5 16,339,250 1,2,3,4,5 5,293,595 2 3 4 5 2 5 4 2 Duarte l'ark Building Renovation, Splash l'ark 1 and Sign Kennedy l'ark Restroom Building 2 Improvements Virrick Park New fool Facility Coral Gale Park Community Building Hadley l'ark New Youth Center Moore l'ark New Construction Neighborhood Parks l)nprov. Contingencies - ADA Modifications Little River Waterfionl Park 2 Virginia Kcy Beach Swimming Arca 2 Lummus Park Historic Building Restoration 5 Kinloch l'ark - Senior Community Center 1 African Square Park Rec. Bldg. Improvements ,5 2 4 5 5 1,2,3,4,5 252,830 997,424 1,278,018 434,719 607,351 5;17,816 '3,519,500 1,104,614 2,252,675 '416,400 ,' 1„ 550,187 235,750 3,457,462 1,963,181 7,838,562 7,606,074 1,272,223 675,000 346,250 225,770 0 432,000 11,756,367 Aclivc 4,896,494 Aclivc 130,001 Active 186,001 Active 215,348 Active 96,917 Active 491,147 Active 211,137 Active 200,000 Future 954,614 Active 435,471 Active 90,000 Active 1,312,797 Aclivc 222,033 Active 2,088,897 Active 1,943,634 Active 5,876,805 Active 7,605,466 Active 771,223 Future 600,000 Future t) Future 0 Future 0 Aclivc 0 Future 3-Design 5-Construction 4-Bid 3-Dcsign 4-130 (.IOC) 4-Bid (.IOC) 3-Dcsign 4-13id (.IOC) 8-Future 4-Bid 3-Design 3-Design 5-Construction 3-Design 7-0n-11o1d 5-Construction 3-Dcsign 3-Dcsign 8-Future 8-Fatale 8-Foturc 8-Future 7-011-I told 8-Future Total Fund minus Total Cosl Estimate (5) Partially Funded -4,582,882 Partially Funded -397,100 Partially Funded Partially Funded Partially Funded Partially Funded -122,829 -811,423 -1,062,670 -337,802 Partially Funded -1 16,204 Partially Funded -306,679 Partially Funded -3,319,500 Partially Funded -150,000 Partially Funded -1,817,204 Partially Funded -326,400 Partially Funded -237,390 Partially Funded -13,717 Partially Funded-1,368,564 Partially Funded -19,546 Partially Funded -1,961,757 Partially Funded -608 Partially Funded -501,000 Partially Funded -75,000 UnFunded -346,250 Unfunded -225,770 IJnFundcd 0 (JnFnndcd-432,000 33I-Parks and Recreation 103,896,491 85,364,192 -18,532,299 City Of Miami - Capital improvement Program CIP Projects Only Cost Estimates versus Available Funding Fatal Fund Active & Future "Pohl Cost Total Fund 'Total Cost 11-No. Client Project Dist. Estimate ($) Funds ($) Status Phase Status Estimate ($) 341-Streets & Sidewalks B-30130 Capital Improvement Program Miami River Grcenway SW •Is! Court to South 2 • 1,557,530 1,557,530 Active 5-Construction Funded 0 Admin Miami'Avenuc - D2 I3-30168A Capital Improvement Program Silver 131ufT'I'rallic Calming Priority 3 - D4 4 620,841 620,841 Active 5-Const. (JOC) Funded 0 Admin B-30178 Capital Improvement Program Design Districl/PI3C 5 100,000 100,000 Future 8-Futurc Funded 0 Admin B-30305C Capital Improvement Program Gibson Park'Arca street lmproveineists - Street 5 1,000,000 1,000,000 Active 5-Construction Funded 0 Admin Component of 13-3030513 B-30336 Capital Improvement Program Miami River Greenway (5th Street bridge 3 2,256,640 2,256,640 Active 4-Bid Funded 0 Admin extcn.) B-30346 Transportation & Transit Traffic Study Reviews - Oracle Project 1,2,3,4,5 411,622 4 11,622 Active 1-Study Funded 0 35-110007 B-30377A Capital Improvement Program District 1 -Sidewalk Repairs and ADA 1 • :250,692 250,692 Active 5-Construction Funded 0 co Admin B-30377B Capital Improvement Program District 2 - Sidewalk Repairs & ADA 2 250,691 250,691 Active 5-Construction Funded 0 Admin B-30377C l'ublic Works District 3 -Sidewalk Repairs and ADA 3 2.50,691 250,691 Active 7-On-I told Funded 0 B-30377D Capital Improvement Program District 4 - Sidewalk Repairs & ADA 4 ' 250,691 250,691 Active 5-Construction Funded 0 Admin B-30377E Capital Improvement Program District 5 - Sidewalk Repairs & ADA 5 250,691 250,691 Active 5-Construction Funded 0 Admin B-30500 Capital Improvement Program Civic Center NW 141h Street 1,2,3,4,5 2,500,000 2,500,000 Active 3-Design Funded 0 Admin B-30504 Capital Improvement Program Linear 1'arks, Cirecnways and Baywalk 1,2,3,4,5 961,000 961,000 Future 8-Future Funded 0 . Admin Improvements B-30542A Capital Improvement Program US 1 Roadway Improvements and Wall 2 2,671,422 2,671,422 Active 5-Const. (.IOC) Funded 0 Admin Replacement Phase It B-30606 Capital Improvement Program DWNTWN I3eautilieation Project Phase! 1,2,3,4,5 3,150,565 3,150,565 Active 5-ConsL (IOC) Funded 0 Admin B-30606D Capital Improvement Program DWNTWN Beautification - Design Phase 1,2,3,4,5 498,780 498,780 Active 3-Design Funded 0 Admin - B-30606L Capital Improvement I'rogram DWNTWN Beautification (Lighting) 1,2,3,4,5 4,475,915 4,475,915 Active 5-ConsL (JOC) Funded 0 Admin • D-30606N .Capital Improvement Program DWNTWN Beautification - North 1,2,3,4,5 7,817,426 7,817,426 Active 5-Const. (.IOC:) Funded 0 Active & Future CIP Projects Only It -No. Client 341-Streets & Sidewalks Admin B-30606S Capital Improvement Program DWNTWN Beautification - Stittth: 1,2,3,4,5 5,090,853 5,09(1,853 Active 5-Construction Funded 0 Admin Project City Of Miami - Capital Improvement Program Cost Estimates versus Available Funding Dist. Total Cost Estimate (5) Total Funds CO Status 1'Irasr, Fund Status Total Fund minus Total Cost Estimate ($i) 13-30611 Capital improvement Program, District 1 -Miscellaneous Roadway 1 11 1,418 1 1 1,418 Future 8-Future Funded 0 Admin Improvements 13-30613 Capital Improvement Program District3-Mistellaio.outiRoitdway -' "1 10,158,973 1(1,158,973 Future 8-Future Funded 0 Admin Improvements,:' "' - B-30614 Capital Improvement Program District 4-MisecllaneousRoadvay 4 36,381 36,381 Future 8-Future Funded 0 Adm in Improvements 13-30615 Capital Improvement Program 1)isoict5- Miscellaneous Roadway 5. '' . 1,809,194 1,809,194 Future 8-Future Funded 0 Admin Improvements B-30628 Capital Improvement Program Bird Avenue Road Improvement 2 1,960,508 1,960,508 Active 3-Design Funded 0 Admin ns) 13-30630 Capital Improvement Program Palm Grove Road Improvements 2 3,851,337 3,851,337 Active 5-Construction Funded 0 Admin B-30643 l'arks and Recreation Luinmus Park Landing Project - Street Project 5-..,1,368,535 1,368,535 Active 3-Design Funded 0 B-30645B Transportation & Transit Transportation Program Support Services - 1,2,3,4,5 .1,026000 1026,000 • Active 3-Design Funded 0 Transportation Professional Services B-30645C 'Transportation & Transit Ilcallh District Bicycle and Pedestrian Mobility 1,2,3,4,5 60,000 60,000 Active 1-Study Funded 0 Study 13-30645D Capital Improvement Program !Jaywalk Mobility Plan 2 '60,000 60,(1(10 Active 1-Study Funded 0 Admin B-30651 Capital Improvement Program Miami River Grecnway from NW 10th to NW 3 3,160,379 3,16(1,379 Active 3-Design Funded 0 Admin 12th Ave. B-30662D Capital Improvement Program US-1 Median Closures at Bridgeport and SW 2 330,000 330,000 Active, 7-0n-I told Funded 0 Admin 30 Ct - D2 B-30687 Capital Improvement Program Coconut Grove Business Improvement District 2 3,099,637 3,099,637 :Active 4-Bid (IOC) Funded 0 Admin - Street Improvements B-30693 Capital lmprovement Program Neighborhood Traffic Calming 4 35,892 35,892 Active 1-Study Funded 0 Admin Improvements-1)4-Study B-30694 Capital Improvement Program ARRA Cilywidc Bicycle Rack & Signagc 1,2,3,4,5 392,130 392,130 Active 5-Cunst. (.IOC) Funded 0 Admin Program B-30694A Transportation &'Transit Cilywidc Bicycle Rack & Signagc Program 1,2,3,4,5 115,000 115,000 Future 8-Future Funded 0 B-30699 Capital Improvement Program Beacom Project Area Improvements 3 721,100 721,1(1(1 Active 7-011-Ilrid Funded 0 City Of Miami - Capital Improvement Program CIP Projects Only Cost Estimates versus Available Fundillg roial Fund rnimrs Total Cost TotalFund 'Total Cost B-No. Client Project Dist Estimate ($) Funds ($) Status Phase Status Estimate (S) 341-Streets & Sidewalks Admin B-30703 Capital Improvement Program Bob.1:1ope Dr. Between NW 2010-Street to NW I 190,000 190,000 Active 5-Cunst. (.IOC) Funded 0 Admin 1•711iStreet- DI B-30704 Capital Improvement Program NW 141h Avenue Between NW,24th Strccl to 1 240,000 240,000 Active 5-Cunst. (JOC) Funded 0 Admin NW 27thStreet-DI B-30705 Capital Improvement Program NW 24(0 Slrcet J3elwceti.NW 14(11 Avenue I' 360,000 360,000 Active 5-Cunst. (JOC) Funded 0 Admin and NW (7tliAvenue-Dl 13-30717 Capital Improvement Program Coral Gate Community Improvements _ 1)4 4 200,000 200,000 Active 5-Cunst. (1OC) Funded 0 Admin B-30718 Capital Improvement Program 1-95 South Miami Terminal Street 2 859,000 859,000 Active 3-Design Funded 0 Admin Improvements - D2 - B-30719 Capital Improvement Program SW 16th Avenue liom Coral Way to 20 Street 3 .135,000 135,000 Active 5-Censt. (JOC) Funded 0 Admin - D3 w B-30722 Capital Improvement Program NW 31st Street Roadway Improvement Project I 311,000 311,000 Active 3-Design Funded 0 Admin - 1)1 13-30725 Capital Improvement Program NW I 1 th Street Roadway Improvement Project 1 749,999 749,999 Active 5-Construction Funded 0 Admits - D 1 13-30726 Capital Improvement Program NW 60th Avenue Roadway Improvement I . 888,000 888,000 Active 4-llid Funded (1 Admin Project - 1)1 B-30727 Capital Improvement Program NW (80h Avenue Roadway Improvement I . 1,810.000 • 1,810,000 Active 3-Design Funded (1 Admin Project -1)1 B-30728 Capital Improvement Program NW 17th Court Roadway Improvement Project 1 1 10,000 110,000 Active 5-Cunsl. (.IOC) Funded 0 Admin - D 1 B-30729 • Capital Improvement Program NW 171h Terrace Roadway Improvement 1 250,000 250,000 Active - 3-Design Funded 0 Admin Project - D I B-30730 Capital Improvement Program NW 4th Terrace Roadway Improvement 1 75,000 75,000 Active 3-Design Funded 0 Admin Project - DI B-30732 Capital Improvement Program NW 9th Street Roadway Improvement Project I 756,247 756,247 Active 5-Construction Funded 0 Admin - D I 13-3074I Transportation & Transit SW 16 Avenue Roadway & Drainage 3 198,000 198,000 Active 3-Design - Funded 0 Improvements - D3. . 13-30743 Transportation & Transit SW 28th Road Roadway &Drainage 3 250,000 250,000 Active 3-Design Funded 0 Improvements - D3 B-30745 Transportation & 3'ransit NW 8t1 Street Roadway and Drainage • 3 402,000 402,000 Active 4-13id (JOC) Funded 0 Active & Future Active & Future CIP Projects Only B-No. Client 341-Streets & Sidewalks 13-30746 Transportation & Transit 13-30747 Capital Improvement Program Admin B-30760 'Transportation &'Transit 13-30770 Capital Improvement Program Admin B-3077I Capital Improvement Program Admin B-30773 Capital Improvement Program Admin A 13-30775 B-30781 B-30822 B-30823 B-30883 B-30884 B-30990 13-30991 13-30993 13-31220 B-39910C Capital Improvement Program Admin Capilal Improvement l'rogram Admin Capital Improvement l'rogratn Admin Capital Improvement Program Admin Capital Improvement Program Admin Capital Improvement Program Admin Capital Improvement Program Admin Capital Improvement Program Admin Capital Improvement Program Admin Capital Improvement Program Admin Capital Improvement Program City Of Miami - Capital Improvement Program Cost Estimates versus Available Funding Project Improvcments NW.14tli Court Roadway & Dnrinage liii{n'ovements - D3 SW 131h Street Roadway &Drainage Improvements - D3 SW 1 7111AvenueRoa way & Drainage; Improvements 133 & D4 SW 2211d Avenue Medians - 1JS I to Coral Way-1)4 Traffic Calming SW 611i Street Project - D4 Martin Luther King (MLK) Blvd / 1-95 Arca Improvements - D5 Shenandoah Arca Improvements - D4 NW 11 Street from 27 to 37 Avenue Area Roadway Improvements - DI 13riekell Area Shared Use l'ath and Roadway Improvements Fair Isle Arca Roadway and Drainage lmprovements - D2 NW 12 Avenue /NW 12 Place Roadway Improvements NW 62 Street West orl-95 Roadway Improvements - D5 Roadway Improvements Citywide Roadway Improvements SW/NW 17th Avenue Traffic Corridor Study - Citywidc Downtown DRI Transportation Component North Venetian Drive Lighting (District 2 Dist. 3 3 Total Cost Estimate ($) 180,000 400,000 34:, 600,000 4 400,000 4 324,670 5 100,000 414,388 1 739,493 2 600,000 2 180,1)00 5 999,975 5 75,000 1,2,3,4,5 I ,361,000 1,2,3,4,5 2,416,500 1,2,3,4,5 200,000 2 1,417,532 2 100,000 Total Funds (3) Stains Phase 180,000. Active 400,000 Active 600,000 Future 400,000 Active 324,670 Active 100,000 Active 414,388 Active 739,493 Future 600,000 Future 180,000 Active 999,975 Active 75,000 Future 1,361,000 F irtu re 2,416,50(1 Future 200,000 Active 1,417,532 Active 100,000 Active 4-13id (.IOC) 3-Design 8-Future 1-Study 3-Design 3-1)csign 3-l)csign 8-Future 8-Fulurc 4-13id (.IOC:) 3-Design 8-Future 8-Future 8-Fulurc 1-Study • 1-Study 3-Design Mond Stains Funded Funded Funded Funded Funded Funded Fundcd Fundcd Fundcd Fundcd Fundcd Fundcd ' Fundcd Funded Fundcd Fundcd Fundcd Total Fund minus Total Cost Estimate ($) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 City Of Miami - Capital Improvement Program CH' Projects Only Cost Estimates versus Available Funding I'olstl Fund minus I'olul Cos( 'I'ola1 17111111 Total Cost 8-No. Client Project Dist. Estimate ($) Funds ($) Slalns Phase Status 17,stima(c ($) Active & Future 341-Streets & Sidewalks Admin QOI.,) 8-39910I Public Works 13rickll Avenue Decorative Pedestrian 2 33,132 33,132 Active 2-Pre-Design Funded 0 Crosswalk 13-39910K Capilal Improvement Program 31ayside historic Sign-D2 2 25,000 25,000 Active 5-Consl (JOC) Funded 0 Admin 13-39911 Capilal Improvement Program Venetian Causeway frapinVemcnts 2 3,196,465 3,19G 465 Active 4-13id Funded 0 Admin 13-40168 Public Works South I3ayshore Drive from Aviation Avenue 2 100,000 100,000 Active 2-Pie-Design Funded 0 to Kirk Avenuc - D2 PW -r• 8-40174 Capital Improvement Program Royal Road - Milling and Resurfacing - D2 2 60,000 60,000 Active 5-Construction Funded 0 Admin B-40183 Capilal Improvement Program Belle Meade Gateway Enclosure 2 85,996 85,996 Active 3-Design Funded 0 Admin • to 8-40643A Capital Improvement Program North Spring Garden Grccnway 5 2,762,175 2,762,175 Active 5-Construction Funded 0 Admin B-4066613 Capital Improvement Program Brickell Lighting Phase 11 - 1.32 2 850;000 850,000 Active 5-Consl (JOC) Funded 0 Admin • B-40672G Capilal Improvement Program FlagamiTraffic Calming -D4(Including 1Ith 4 590,000 590,000 Active 5-Consl.(JOC) Funded 0 Admin Street Milling and Resurfacing) B-40686 Capital Improvement Program Miami River Grecnways/ Strectscapc Segment 3 3,1 13,501 3,1 13,501 Active'5-Construction Funded 0 Admin D (ELN) B-40695L Capital Improvement Program Miami River Grecnway Segment G and 3 145,785 145,785 Active 7-On-1 told Funded O Admin Segment 132 Decorative Lighting B-40704A Capital Improvement Program SW 32 Avenue Improvements Additional 2,4 1,752,327 1,752,327 Active i 3-Design Funded 0 Admin Services B-431 14A I'ublic Works Citywide Sidewalk Replacement Phase 29 1,2,3,4,5 5,017,214 5,017,214 Active 5-Construction Funded 0 13-71210 Capilal Improvement Program Downtown Street Conversions 2,5 50,000 50,000 . Active I -Study Funded 0 Admin B-7850813 Capital Improvement Program ARRA -NE 2nd Avenue Improvements (57111 5 3,955,018 3,955,018 Active 5-Construction Funded (1 Admin Street to 69th Street) Segment C f3-78508C Capital Improvement Program ARRA - Nis 2 Avenuc Improvements Segment 5 2,220,578 2,22(1,578 Active 5-Construction Funded 0 Adrnin 132 B-30035A Capital Improvement Program North Shorecrest Roads Improvements Project 2 1,207,178 1,147,178 Active 5-Conslruclion Partially Funded -60,000 Admin -Partial CDBG 91-02910 - D2 Active & Future CIP Projects Only 13-No. Client Project City Of Miami - Capital Improvement Program Cost Estimates versus Available Funding Dist. Total Cost Estimate (S) Total Funds (S) Status Phase Fund Stains 341-Streets & Sidewalks B-30035 B B-30167B 13-30167D B-30 179 B-30518 B-30621 B-30624 cn m B-30631 Capital Improvement Program Admin Capital Improvement Program Admin Capital improvement Program Admin Capital Improvement Program Admin Capital Improvement Program Admin Capital Improvement Program Admin Capital Improvement Program Admin Capital Improvement Program Admin B-30646 Capital Improvement l'rogram Admin 8-30716 Capital Improvement Program Admin B-30724 Capital Improvement Program Admin B-30774 Capital Improvement Program Admin B-30780 Capital Improvement Program Admin B-30880 Capital Improvement Program Admin B-31206 Capital Improvement Program Admin B-40665 Capital Improvement Program Admin B-40672D Capital Improvement Program Admin ShoreereslRoadway 2 Project`. Shenandoah TrafTic Calming -Phase 2 - D4 Shenandoah Roadway Improvements • Downtown Baywalk'Mastcr Plan C Design Northwest I4th Street Slrcoleeape Project- CB' Funded Center Grove Street and Lighting Improvements Overlown Greenway @ N W I I Terrace. - Partially Funded by CRA 92-689001 Miami River Grecnway from Miann Circle Grecnway to South Miami Avenue South Bayshore Drive Roadway and Drainage 2 Improvements 4 2 5 2 5 Tigcrtail Resurfacing - D2 2 NW 33rd Street Roadway Improvement Project - 1)1 West Nagler Area Improvements - D4 1 NW 14 Avenue and 28 Street Area Roadway 1 Improvements - DI Nl3 2nd Court Roadway and Drainage 5 Improvements Project - D 5 SE 3rd Street Widening 2 Brentwood Village Project 5 Flaganni Traflic Calming Phase 1V - 1)4 4 1,138,397 1,212,500 1,6(13,890 11,248,770 2,617,649 2,702,729 2,998,700 1,221,625 9,260,130 716,694 5,664,273 3,061,314 1,052,354 488,405 2,705,098 800,000 2,414,686 1,138,099 Aclivc 5-Construction 182,100 Active 3-Design 1,550,000 Active 5-Const. (JOC) 450,00(1 Active 1-Study 439,001 Activc 4-13id 673,568 Active 3-Dcsign 2,66 1,864 Activc 3-Design 1,000,000 Activc 3-Dcsign 550,000 . Active 3-Design 711,257 Aclive. 5-Construction 3,700,001 Active 3-Dcsign 308,172 Active 3-Dcsign 355,276 Active 2-Pre-Design 300,001 Active 3-Dcsign 641,494 Aclive 7-On-I-fold 123,618 Fuluie 8-Future 1,198,012 Active, 3-Design Partially Funded Partially Funded Partially Funded Partially Funded Partially Funded Partially Funded Partial!), Funded Partially Funded Partially Funded Partially Funded Partially Funded Partially Funded Partially Funded Partially Funded Partially Funded Partially Funded Partially Funded Total Fund minas Total Cost Estimate (S) -297 -I ,030,400 -53,890 -10,798,770 -2,178,648 -2,029,161 -336,836 -221,625 -8,710,130 -5,436 -1,964,272 -2,753,142 -697,078 -188,404 -2,063,603 -676,382 -1,216,673 Active & Future CIP Projects Only B-No. Client Project City Of Miami - Capital Improvement 1'rogram Cost Estimates versus Available Funding Dist. Total Cost Estimate ($) Total Funds ($) Status Phase Fund Status 341-Streets & Sidewalks B-78508 B-30520 B-30612 B-30723 8-31212 B-31213 13-31214 en B-31215 Capital Improvement 1'rogram Admin Capital Improvement Program Admin Capital improvement Program Admin Capital Improvement I'rogram Admin Capital Improvement Program Admin Capital improvement Program Admin Capital Improvement Program Admin Capital Improvement Program Admin NC 2 Avcniiclmprovemcnls l lainsworth Village Street lmprovenicul Di8triel2 - Miscellaneous Roadway ImpsOVetnents NW 24th Avenue. Roadway lrnpreivciiicut Project - DI NE 1st Avenue Rcconslrticliun -NE 41 St. to NE43St. N. Miami Court Reconstruction NE I Court Reconstruction NE Miami Place Reconstruction B-312I7 Capital lmprovemcnt Program NE 43 Street Reconstruction Admin B-40176 Capital Improvement Program West Nagler Street Landscape - 1)4 Admin B-40672E Capital Improvement Program Flagami Traffic Calming, Phase V -1)4 Admin B-40672F Capital Improvement Program Flagami Traffic Calming, Phase VI - D4 Admin B-40700 Capital Improvement Program Little River Road Improvements Project - Admin Phase 1 2,5 2 1 5 5 5 5 4 4 4 5 36,938,862 1062,500 0 1,140,000 660,816 441,636 666,995 500,000 868,100 287,000 2,652,720 3,233,408 0 4,985,831 Active 0 Future 0 Future 0 Active 0 Future 0 Future 0 Future 0 Fri tut 0 Futurc 0 Futurc. 0 Future 0 Future 0 Futurc 3-Design 8-Future 8-Fulmc 3-Design 8-Future 8-Future 8-pulurc 8-Future 8-pulurc 8-Future 8-Future 8-Future • 8-Fu(ure Partially Funded tlnFundcd IJntuntled UnFunded UnFunded UnFunded Unfunded UnFunded UnPuuded Unfunded Unfunded Unfunded Unfunded Total Fund minus Total Cost Estimate ($) -31,953,031 -1062,500 -1,140,000 -660,816 -441,636 -666,995 -500,000 -868,100 -287,000 -2,652,720 -3,233,408 (1 343-Mass Transit B-30645A Transportation & Transit B-30668 B-40268 B-70715 Transportation &'Transit Transportation & "Transit Transportation &'Transit 341-Sheets & Sidewalks Transportation Program Support Services - 'I'ransit Professional Services ARRA - Purchase of -Trolley Vehicles FEC Quiet Zone Study City of Mianti Trolley Program - Capital Acquisition 1,2,3,4,5 1,2,3,4,5 2,5 1,2,3,4,5 2(15,478,973 796,479 4,08,1,282 150,085 2,891,122 127,028,015 796,479 Active 4,084,282 Active 150,085 Active 2,891,122 Active 3-Design 5-Construction 1-Slily 3-Design Funded Funded Funded Funded -78,450,957 0 0 0 0 Active & Future CI.P Projects Only I3-No. Client Project -City Of Miami - Capital improvement Program Cost Estiinatcs versus Available Funding Dist. 'I'olal Cost Eslitnale ($) Total Rands ($) • Stales Phase Stains 351-SanitaryScwcrs B-70600 Police 343-Mass Transit 1'olice.Department Sanitary Sewyci' System Repairs 1,2,3,4,5 7,921,968 60,000 7,921,968 60,000 Active 3-Design Funded Total front minus "Total Cost Estimate ($) 0 0 352-Storm Sewers 13-30014 B-30262 B-30588 B-30597 co B-30629 B-30700 B-30776 B-30992 Capital Improvement I'rogram Admin Public Works, Capital Improvement Program Admin Capital Improvement Program Admin Capital improvement Program Admin Capital improvement Program Admin Capital Improvement Program Admin l'ublic Works B-50654 l'ublic Works B-50705 Capital improvement Program Adm in B-3001 I Capital Improvement Program Admin B-30183 Capital improvement Program Admin B-30632 Capital Improvement Program Admin 13-30637 Capital Improvement Program Admin B-50643 Capital improvement Program Admin B-50706A Capital Improvement I'rogratn ,351-Sanilmy Sewers NorthwcstRoad`aiidStorm Sewers . Improvements - D5 Citywide Storm Sewer Relian Project San Marco Island and Biscayne island Drainage Improvements - D2 Citywide Drainage Improvement Project Durham 'Terrace Drainage Project MEP Drainage Wells Compliance Silver BMW Drainage Improvements - D4 Riverview Pump Station Ovcrlown Stornnvater Pump Station Upgrades Kinloch Storm Sewer Improvements Project Englewood Road and Storm Sewer Improvements - Phase 111 - D4 Garden Storm Scwcr - Phase' Drainage Master Plan Update Mary 13rickell Village Drainage Improvements Wagner Creek / Seybold Canal Dredging Roadway, Drainage and Traffic Improvements 60,000 60,000 9,230,466 9,230,466 Aclivc 1,2,3,45'' 4,401,561 4,401,561 Active 2 4,488,983 4,488,983 Active 5-Construction Funded 5-Construction 5-Construction 1,2,3,4,5 ...9,853 ' 9,853 Active 1-Study 1 3,445,33(1 3,445,330 Active 5-Construction 1,2,3,4,5 I,004,934 1,004,934 Active 3-Dcsign 4 600,000 600,000 future 8-Future 3 500,00(1 500,000 Active 3-Design 5 8.51,797 851,797 Active 7-On-hold 1,4 2,890,100 2,890,100 Active 5-Construction 4 9,518,900 8,785,811 Active 4-Bid I 1,398,000 399,920 Aclivc 3-Design 1,2,3,4,5 716,819 715,384 Active 1-Study 1,2,3,4,5 3,278,827 3,100,001 Active 3-Design 1,5 23,087,275 3,673,503 Active 7-On-IIold 1,4 1,483,601 1,208,246 Active 4-Bid (.I)C) Funded Funded Funded Funded Funded Funded Funded Funded Funded Partially Funded Partially Funded Partially Funded Partially Funded Partially Funded Partially Funded (1 0 0 0 0 0 0 0 0 0 -733,089 -998,079 -1,435 -178,826 -19,413,771 -275,355 Active & Future C1P Projects Only B-No. Client 352-Storm Sewers Admin -DI &1)4:':..; 13-30007 Capital Improvement Program Auburn Storm Sewer Phase 111' Admin B-30012 Capital Improvement Program=Auburn Storm Sewer Ph. I &,li:>i. Admin Project City Of Miami - Capital Improvement Program Cost Estimates versus Available Funding B-30013 Capital Improvement Program Reid Acres Storm Sewers Admin Dist. Total Cost Estimate ($) Total Fund minas Total Fund 'Total Cost Funds (5) Slalns Phase Slates Estimate (5) 4 7,049,000 0 Future 8-Future UuFundcd -7,049,000 4 5,320,000 0 Untrue 8-Future llnFundcd -5,320,000 5,719,000 0 Future 8-Future Unpundcd-5,719,000 B-30015 Capital Improvement Program Little River Storm Sewers 1'.h11 5 3,990,000 0 I7ulurc 8-Future thtlontled -3,990,000 Admin 13-30016 Capital Improvement l'ntgrant Liberty Storm Sewers 5 5,586,000 0 Future 8-Futtuc UnFundcd -5,586,000 Admin 13-30017 Capital Improvement Program Fairway Storm Scwcrs 5 5,586,000 0 Future 8-Fulurc (hiFundcd-5,586,000 Admin cn m B-30018 Capital Improvement Program NW 71 St. Main Trunk Sturm Scwcr 5 9,975,000 0 Future 8-Future LlnFunded -9,975,000 Admin B-30216 Capital Improvement Program Avalon Storm Sewer - Phase III 2,4 : 4,500,000 0 Future 8-Future IJnFunded -4,500,000 Admin B-30637A Capital Improvement Program South Miami Avenue Drainage Improvements 2 . 204,444 0 Future 8-Future UnFunded -204,444 Adinin - MDC B-30647 Capital Improvement Program famiami Roadway &Storm Sewer Project 1,4 9,600,000 0 Future 8-Future tittFunded-9,600,000 Admin 353-Solid Waste 13-73202C Solid Waste 352-Storm Sewers Solid Waste Collection Equipment 124,435,893 45,3(15,891-79,130,0(11 1,2,3,4,5 4,950,820 3,532,282 Active 5-Construction Partially Funded -1,418,538 353-Solid Waste 4,950,820 3,532,282 -1,418,538 Grand Total 715,201,892 410,951, 864 -304,250,027 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL, PLAN ALPHABETICAL PROJECT INDEX 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN ALPHABELITAL PROJECT INDEX Project name • Project Number Fund Allocation Project Status Project Phase 1814 Brickell Avenue Park PlaygroundEquipment B-30685A $ 42,048 Active 4-Bid 300 NW 11 Street Community Center - CRA 92-689001 B-40169 $ 1,500,000 Active 3-Design African Square Park - Splash Park - D5 B-30882 $ 600,000 Active 2-Pre-Design African Square Park Rec. Bldg. Improvements ' B-35872 $ - Future 8-Future Allapattah Community Elderly Center B-35003 $ - Future 8-Future ARRA - NE 2 Avenue Improvements Segment B2 B-78508C $ 2,220,578 Active 5-Construction ARRA- NE 2nd Avenue Improvements (57th Street to 69th Street) Segment C B-78508B $ 3,955,018 Active 5-Construction ARRA-Purchase of TrolleyVehicies:-``" ``• B-30668 `_ $ 4,084,282 Active 5-Construction ARRA Citywide Bicycle Rack &Signage Program B-30694 $ 392,130 Active 5-Const. (JOC) Auburn Storm Sewer Ph. I & II B-30012 $ - Future 8-Future Auburn Storm Sewer Phase III`;:_", B-30007 $ - Future 8-Future Avalon Storm`.' Sewer - Phase III ' B-30216 $ - Future 8-Future Bay of Pigs Park Lighting - D4 B-30772 $ 53,000 Active 2-Pre-Design Bayfront Park Electrical Repairs B-40173 $ 309,000 Active 3-Design Bayside Historic Sign - D2 B-39910K $ 25,000 Active 5-Const. (JOC) Baywalk Mobility Plan B-30645D $ 60,000 Active • 1-Study 70 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project name Project Number Fund Allocation Project Status Project Phase Beacom Project Area Improvements B-30699 $ 721,100 Active 7-On-Hold Beckham Hall Fire Damage Repair B-30365J $ 6,770 Future 8-Future Belle Meade Gateway Enclosure B-40183 $ 85,997 Active 3-Design Bird Avenue Road Improvement B-30628 $ 1,960,508 Active 3-Design Biscayne Park Site Improvements B-75823 $ 150,000 Future 8-Future Blanche Park Master Plan Improvements B-75830A $ 250,000 Active 5-Const. (JOC) Bob Hope Dr. Between NW 20th Street to NW 17th Street - D1 B-30703 $ 190,000 Active 5-Const. (JOC) Brentwood Village Project B-40665 $. .. 123,618'. Future 8-Future Brickell Area Shared Use Path and Roadway Improvements B-30822 . $ 600,000 Future 8-Future Brickell Avenue Decorative Pedestrian Crosswalk B-399101 $ 32,440 Active 2-Pre-Design Brickell Lighting Phase II - D2 B-406666 • $ 850,000 Active 5-Const. (JOC) Bryan Park New Tennis/Community Censer B-30134A $ 852,128 Active 3-Design Caribbean lvlarketplace Renovation B-30671 $ 954,614 Active 4-Bid Center Grove Street and Lighting Improvements .. 6-30621 $ 673,568 Active 3-Design City of Miami Impact Fee Study - Citywide B-30994 $ 65,490 Future 8-Future City of Miami Trolley Prdgrard - Capital Acquisition B-70715 $ 2,891,123 Active 3-Design City Property Building. Maintenance B-30365C $ - Future 8-Future 71 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project name Project Number Fund Allocation Project Status 'Project Phase Citywide Bicycle Rack & Signage Program B-30694A $ 115,000 Future 8-Future Citywide Drainage Improvement Project B-30597 $ 9,854 Active 1-Study Citywide General Fleet Replacement B-74200 $ 3,260,269 Active 5-Construction Citywide Park Equipment & Site Improvements B-30541 $ 5,293,595 Active 5-Construction Citywide Park Equipments & Site Improvements FY12 B-30541D $ 397,101 Active 3-Design Citywide Roadway Improvements B-30991 $ 2,416,500 Future 8-Future Citywide Sidewalk Replacement Phase 29 B-43114A $ 5,017,215 Active 5-Construction Citywide Storm Sewer Repair Project B-30262 $ 4,401,551;_ Active 5-Construction Civic Center NW 14th Street B-30500 $ 2,500,000 Active 3-Design Coconut Grove Business Improvement District - Street Improvements B-30687 $ 3,099,638 Active 4-Bid (JOC) Coconut Grove Viewing Platform Spoil 1B-40171 Island C - D2 $ 9,900 Future 8-Future Coconut Grove Viewing Pletrorm Spoil:. Island E DZ B-40172 $ 9,900 Future 8-Future Coconut Grove Waterfront Master Plan . Implementation - Phase I B-30182A $ 1,905,544 Active 3-Design Communication UPS Power B-30384C $ 1,005,800 Active 5-Const. (JOC) Computer Aided Dispatch'(CAD) B-72801 $ 120,866 Active 3-Design Computer Equipment and Software Upgrades B-72805 $ 93,461 Active 5-Construction Coral Gate Community Improvements - D4 B-30717 $ 200,000 Active 5-Const. (JOC) 72 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project name Project Number Fund Allocation Project Status Project Phase Coral Gate Park Community Building B-35855A $ 1,943,634 Active 5-Construction Coral Gate Park Furniture, Security System and Miscellaneous Improvements - D4 B-30821 $ 122,000 Active 5-Construction Coral Way NET Office Remodeling - CD 91- 02994 B-30365E $ 1,015,000 Active 3-Design Curtis Park New Pool Facility B-35805 $ 2,127,160 Active 1-Study Damaged Vehicle Replacement / Repairs B-30666 $ 447,124 Active 5-Construction Defense and Security Equipment Acquisition B-72813 $ 3,767,249 Active 5-Construction Design District/FEC B-30178 $ 100,000 Future 8-Future Development/UDP Consultants Watson Is, others B 70500 $ 451,566; Active 7-On-Hold Dinner Key Marina - Miscellaneous Repair B-30596.;:.. $ 401,356 Active 5-Const. (JOC) District 1 - Miscellaneous Roadway Improvements B-30611 $ 111,419 Future 8-Future District 1 - Sidewalk Repairs and ADA B-30377A $ 250,692 Active 5-Construction District 2 - Miscellaneous Roadway Improvements B-30612 $ - Future 8-Future District 2 Sidewalk Repairs & ADA B-30377E $ 250,691 Active 5-Construction District 2 Quality or Life Park Improvements B-39910E $ 987,988 Active 5-Construction District 3 - Miscellaneous Roadway Improvements B-30613 $ 10,158,973 Future 8-Future District 3 - Sidewalk Repairs and ADA B-30377C $ 250,691 Active 7-On-Hold District 4 - Miscellaneous Roadway Improvements B-30614 $ 36,381 Future 8-Future 73 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project name Project Number Fund Allocation Project Status Project Phase District 4 - Sidewalk Repairs & ADA B-30377D $ 250,691 Active 5-Construction District 5 - Miscellaneous Roadway Improvements B-30615 $ 1,809,195 Future 8-Future District 5 - Sidewalk Repairs & ADA B-30377E $ 250,691 Active 5-Construction Dorsey Memorial Library Restoration B-30531 $ 250,000 Active 7-On-Hold Downtown Baywalk Master Plan & Design B-30179 $ 450,000 Active 1-Study Downtown DRI Transportation Component B-31220 $ 1,417,532 Active 1-Study Downtown Street Conversions B-71210 $ 50,000 Active 1-Study Drainage Master Plan Update B-30632 $ : 715,384- Active 1-Study Duarte Park Building Renovation, Splash Park and Sign B-35812A $ 1,312,797 Active 5-Construction Durham Terrace Drainage Project B-30629 $ 3,445,330 Active 5-Construction DWNTWN Beautification - Design Phase B=30606D $ 498,780 (Active 3-Design DWNTWN Beautifrcation:.;;North B-30606N $ 7,817,426 Active 5-Const. (JOC) DWNTWN Beautification - South`' B-30606$ $ 5,090,853 Active 5-Construction DWNTWN Beautification (Lighting) B-30606L $ 4,475,915 Active 5-Const. (JOC) DWNTWN Beautification Project Phase I , B-30606 $ 3,150,565 Active 5-Const. (JOC) Emergency Dispatch Furniture B-74204 $ 11,876 Active 5-Construction Emergency Radio Equipment replacement B-70416 $ 25,000 Future 8-Future 74 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project name Project Number Fund Allocation Project Status Project Phase Englewood Road and Storm Sewer Improvements - Phase III - D4 B-30011 I $ 8,785,811 Active 4-Bid ERP Integration System B-74609 $ 25,474,458 Active 5-Construction Fair Isle Area Roadway and Drainage Improvements - D2 B-30823 $ 180,000 Active 4-Bid (JOC) Fairway Storm Sewers B-30017 $ - Future 8-Future FDEP Drainage Wells Compliance B-30700 $ 1,004,934 Active 3-Design FEC Quiet Zone Study B-40268 $ 150,085 Active 1-Study FEMA Assistance to Firefighters Program FY2011 B-70418 $ . 68,722 Future 8-Future Fern Isle / PBA Park Improvements Project - D1 B-30800 $ 116,782 ;Future 8-Future Fire Department Training Burn Tower / Search Facility & Props B-70103' . $ . - Active 7-On-Hold Fire Rescue Personal Protective' Equipment . B-70411 $ 820,580 Active 3-Design Fire Station#10 (New) B-60351 $ 898,123 Future 8-Future Fire Station #13 B-60453A $ 5,084,496 Active 5-Construction Fire Station:#14 (New) B-60454 $ 5,076,844 Future 2-Pre-Design Fire Station Equipment and Furniture Replacement B-72803 $ 540,838 Active 5-Construction Fire Station Hardening /Facility Apparatus Room Doors B-30709 $ - Future 8-Future Fire Station No. 10 Restroom Remodeling B-70104 $ 179,403 Active 3-Design Fire Station No. 6 Office Building - Structural Analysis B-70102A $ 74,619 Active 7-On-Hold 75 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project name Project Nurnber Fund Allocation Project Status Project Phase Fire Stations & Other Fire Facilities B-72802 $ 4,022,960 Active 5-Construction Firefighting Equipment and Gear B-70106 $ . 158,124 Future 8-Future Flagami Traffic Calming - D4 (Including 11th Street Milling and Resurfacing) B-40672G $ 590,000 Active 5-Const. (JOC) Flagami Traffic Calming Phase IV - D4 B-40672D $ 1,198,012 Active 3-Design Flagami Traffic Calming, Phase V - D4 B-40672E $ - Future 8-Future Flagami Traffic Calming, Phase VI - D4 B-40672F $ - Future 8-Future Freedom Garden Statue Rehabilitation - D5 B-30885 $ 75,000 Active 5-Construction Garden Storm Sewer- Phase I B-30183 $.. 399,92O.,;,Active 3-Design Generator for City Hall B-30365H . $ 25,001 Active 4-Bid (JOC) Gibson Park Area Street Improvements - Street Component of B-30305B B-30305C $ 1,000,000 Active 5-Construction Gibson Park Furniture - D5 B-30305D $ 22,020 Active . 5-Construction Gibson Park New Construetjon (Partially;. Funded byCRA 92-689001) B-303058 $ 9,939,521 Active 5-Construction GSA FleetWIaintenance Garage Expansion ' B-74205E $ 48,535 Active 5-Construction Gusman Hall Improvements - FY2012 B-30546A $ 105,000 Future 8-Future Gusman Hall Improvements / Repairs B-70100 $ 423,405 Future. 8-Future Hadley Park New Youth Center B-35883A $ 5,876,805 Active 3-Design Hainsworth Village Street Improvement B-30520 $ - Future 8-Future 76 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project name Project Number Fund Allocation Project Status Project Phase Health District Bicycle and Pedestrian Mobility Study B-30645C $ 60,000 Active 1-Study Homeland Defense Legal Services Support B-30078 $ 29,346 Future 8-Future 1-95 South Miami Terminal Street Improvements - D2. B-30718 $ 859,000 Active 3-Design Irrigation System at Kennedy Dog Park - D2 B-40170 $ 55,945 Active 2-Pre-Design IT Modernization B-74617 $ 2,800,000 Active 5-Construction James L. Knight Center / Hyatt- Fire Alarm System Replacement B-70414 $ 484,979 ' Future 8-Future James L. Knight Center Chiller & Cooling Tower Oracle Project 41-410004 B-40181 $ 4,521,400 Active 5-Construction Kennedy Park Floating Dock PHI B-305416 $ , 130,001'<.: Active 4-Bid Kennedy Park Restroom Building Improvements B-35838':,I:. $ 222,033 Active 3-Design Kennedy Park Shoreline Stabilization Phase 1 'B-30541C $ 186,001 Active 3-Design Kinloch Park - Senior Community Center B-35858 $ - Active 7-On-Hold Kinloch Storm: Sewerimprovements Project B-50705 $ 2,890,100 Active 5-Construction Land Management System B-74614 $ 6,316,151 Active 3-Design Large Firefighting Equipment B-72809 $ 326,816 Active 5-Construction Legion Park Boat Ramp Repairs - D2 B-30820 $ 14,124 Future 8-Future Liberty Storm Sewers B-30016 $ - Future 8-Future Light Fleet Replacement B-72808 $ 667,658 Active 5-Construction 77 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project name Project Number Fund Allocation Project Status Project Phase Linear Parks, Greenways and Baywalk Improvements B-30504 $ 961,000 Future 8-Future Little River Road Improvements Project - Phase I B-40700 $ - Future 8-Future Little River Storm Sev✓e-s Ph. 11 B-30015 $ - Future 8-Future Little River Waterfront Park B-50722 $ 600,000 Future I8-Future Lummus Landing Square - D5 B-30886 $ 925,061 Active 3-Design Lummus Park Historic Building Restoration B-35844 $ - Future 8-Future Lummus Park Landing Project - Street Project B-30643 $ 1,36>,535 Active 3-Design Manatee Bend Park Shoreline Improvements - D2 B-30801 1$ 50,027:`:._Future 8-Future Manuel Artime ADA Improvements B-30194A $ , 363,831 Active 5-Const. (JOC) Marine Stadium Bulkhead Replacement B-30689 $ 1,106,603 Active 3-Design Marine Stadium Marina at Virginia Key B-40180 $ 1,740,007 Active 2-Pre-Design Marine Stadium Manna Improvemenr. . B 33514 $ 385,645 (Active 3-Design Marine Stadium Restoration B-30688 $ 350,000 Active 7-On-Hold Martin Luther King (MLK) Blvd / I.95•Area Improvements - D'S B-30773 $ 100,000 Active 3-Design Mary Brickell Village Drainage Improvements B-30637 $ 3,100,001 Active 3-Design Melreese Golf Training Center B-30566A $ 2,385,560 Active 5-Construction Miamarina Emergency Pier Repairs B-30325 $ 1,311,254 Active 5-Const. (JOC) 78 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project name Project Number Fund Allocation Project Status Project Phase Miamarina Intracoastal Bulkhead Assessment B-30604 $ 90,000 Active 1-Study Miamarina Pier A, B & C Fire Line Repairs B-30696 $ 250,000 Active 5-Const. (ADC) Miami River Greenway (5th Street bridge exten.) B-30336 $ 2,256,640 Active 4-Bid Miami River Greenway from Miami Circle Greenway to South Miami Avenue B-30631 $ 1,000,000 Active 3-Design Miami River Greenway from NW 10th to NW 12th Ave. B-30651 $ 3,160,379 Active 3-Design Miami River Greenway Segment G and Segment E2 Decorative Lighting B-40695L ' $ 145,785 Active 7-On-Hold Miami River Greenway SW 1st Court to South Miami Avenue - D2 B-30130 $ 1,557,530 . Active 5-Construction Miami River Greenways/ Streetscape Segment D (ELH) B-40686 $ 3,113,501. Active 5-Construction Miami Women's Club Baywalk Project.- CRA 92-686001 B-30731 . 1 $ 93,000 Active 3-Design Miscellaneous Repairs 10%SetASide B-30706 $ 1,853,460 Future 8-Future Moore Park New Construction' 8-35887 $ 7,605,466 Active 3-Design Morningside Pa, k New Pool Facility B-30585 $ 200,000 Future 8-Future MRC Emergency Repairs B-30996 $ 17,065 Future 8-Future MRC Security System Harding - UASI Funded 18-180011` B-70415 $ - Active 3-Design Museum of Science - Development in Bicentennial Park - Phase 2 B-78502A $ 2,000,000 Active 3-Design Museum Park - Partially Funded by CRA 92- 686001. B-30538 $ 11,756,367 Active 3-Design Museum Park Environmental Remediation - 92-686001 B-30538B $ 200,000 Active 3-Design 79 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project name Project Number Fund Allocation Project Status Project Phase N. Miami Court Reconstruction B-31213 $ - Future 8-Future NE 1 Court Reconstruction B-31214 $ - Future 8-Future NE 1st Avenue Reconstruction - NE 41 St. B-31212 to NE 43 St. $ - Future 8-Future NE 2 Avenue Improvements B-78508 $ 4,985,831 Active 3-Design NE 2nd Court Roadway and Drainage B-30880 Improvements Project - D5 $ 300,001 Active 3-Design NE 43 Street Reconstruction B-31217 $ - Future 8-Future NE Miami Place Reconstruction B-31215 $ - Future 8-Future Neighborhood Parks lmprov. Contingencies - ADA Modifications B-35904 $ 771,223 : Future 8-Future Neighborhood Traffic Calming Improvements-D4-Study B-30693- $ 35,892 Active 1-Study New Dinner Key Marina Dock;rnaster Building : B-60464 $ 3,446,441 Active 3-Design North 14 St. Multi Media Entertainment District Streetscape 92-686001 '; B-30394 $ 6,000,000 Active 5-Construction North Shorecrest Roads lmp rovements ..., Project Partial CDBG 91-02910.- D2 B 30035A $ 1,147,178 Active 5-Construction North Spring„Garden Greenwey B-40643A $ 2,762,175 Active 5-Construction North Venetian Drive Lighting (District 2 OCL) B-39910C $ 100,000 Active 3-Design Northwest 14th Street Streetscape Project - OP Funded B-30518 $ 439,001 Active 4-Bid Northwest Road and Storm Sewers Improvements - D5 B-30014 $ 9,230,466 Active 5-Construction NW 11 Street from 27 to 37 Avenue Area Roadway Improvements - D1 B-30781 $ 739,493 Future 8-Future 80 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project name ;Project Number Fund Allocation Project Status 'Project Phase NW llth Street Roadway Improvement Project - D1 B-30725 $ 750,000 Active 5-Construction NW 12 Avenue / NW 12 Place Roadway Improvements B-30883 $ 999,976 Active 3-Design NW 14 Avenue and 28 Street Area Roadway Improvements - D1 B-30780 $ 355,276 Active 2-Pre-Design NW 14th Avenue Between NW 24th Street to NW 27th Street - D1 B-30704 $ 240,000 Active 5-Const. (JOC) NW 14th Court Roadway & Drainage Improvements - D3 B-30746 $ 180,000 Active 4-Bid (JOC) NW 17th Court Roadway Improvement Project - D1 B-30728 $ 110,000. Active 5-Const. (JOC) NW 17th Terrace Roadway Improvement Project - D1 B-30729 $ 250,000 Active 3-Design NW 18th Avenue Roadway Improvement Project - D1 B-3072.7 $ . 1,810,000 Active 3-Design NW 24th Avenue Roadway Improvement Project - D1 B-30723 $,: - Active 3-Design NW 24th Street Between NW 14th Avenue .B-30705 and NW 17th Avenue - D1 $ 360,000 Active 5-Const. (JOC) NW 31st Street Roadway Improvement Project - D1 B-30722 $ 311,000 Active 3-Design NW 33rd Street Roadway lmprovement:. Project D1:;;,'` B-30724 $ 3,700,001 Active 3-Design NW 4th Terrace Roadway Improvement Project - D1 '`' B-30730 $ 75,000 Active 3-Design NW 60th Avenue;Rbadway Improvement Project - D1 B-30726 $ 888,000 Active 4-Bid NW 62 Street West of.I-95 Roadway Improvements - D5 B-30884 i $ 75,000 Future 8-Future NW 71 St. Main Trunk Storm Sewer B-30018 $ - Future 8-Future. NW 8th Street Roadway and Drainage B-30745 Improvements $ 402,000 Active 4-Bid (JOC) 81 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project name Project Number Fund Allocation Project Status Project Phase NW 9th Street Roadway Improvement Project - D1 B-30732 $ 756,248 Active 5-Construction Oakland Grove Park Playground Equipment B-75973 $ 15,000 Future 8-Future Old Fire Station No. 2 Restoration - CRA 92- 686001 B-30579 $ 3,500,000 Active 5-Construction Overtown Greenway @ NW 11 Terrace - Partially Funded by CRA 92-689001 B-30624 $ 2,661,864 Active 3-Design Overtown Stormwater Pump Station Upgrades B-50654 $ 851,797 Active 7-On-Hold Pallot Park Shoreline Improvements - D2 B-30802 $ 50,000 iFuture 8-Future Palm Grove Road Improvements IB-30630 $ 3,851,337 Active 5-Construction Parks ADA Modifications - District 2 B-30547E $ ' 215,348; Active 4-Bid (JOC) Parks ADA Modifications - District 3 - Jose Marti Park B-30547F. $ 96,917 Active 4-Bid (JOC) Parks ADA Modifications - District 4 - Shenadoah Park B-30547G $ 491,147 Active 3-Design Parks ADA Modifications - DiS rict 5 B-30547H $ 211,137 Active 4-Bid (JOC) Peacock Park Site<Irnprovernents B-75883 $ 830,124 Active 3-Design Phone and Radio Equipment Upgrades �B-72804 $ 351,200 Active 5-Construction Police Department Sanitary Sewer System Repairs B-70600 $ 60,000 Active I3-Design Police Headquarters Helipad and Roof Replacement • B-72915 $ 240,321 Active 4-Bid (JOC) Police Headquarters Helipad and Roof Replacement B-72915A $ 400,000 Future 8-Future Police Radios Replacement B-30554 $ 843,083 Active 3-Design 82 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project name Project Number Fund Allocation Project Status Project Phase Police Swat Vehicles B-30997 $ 322,846 Future 8-Future Police Vehicle Replacement B-74220 $ 24,239,738 Active 5-Construction Property Maintenance Building Improvements B-74219 $ - Future 8-Future Public Works Maintenance Yard B-30551 $ 3,268,254 Active 3-Design Quality of Life District 2 - Various Projects B-39910 $ 259,331 Future B-Future Refurbishing of Existing Apparatus IB-70105 $ 230,000 Future 8-Future • Reid Acres Storm Sewers B-30013 $ - Future 8-Future Replace Existing Fire Engines B-72811 $ - : Future 8-Future Riverview Pump Station B-30992 $ 500,000 Active 3-Design Roadway Improvements B-30990 $ 1,361,000 Future 8-Future Roadway, Drainage and Traffic:. Improvements - D1 & D4 B-50706A $ 1,208,246 Active 4-Bid (JOC) Robert King High.Pa'r`k Furniture - D4 `: B-35868A $ 45,000 Active 5-Construction Royal Road -;.Milling and Resurfacing - D2 B-40174 $ 60,000 Active 5-Construction San Marco Island and Biscayne. Island Drainage Improvements - D2'' B-30588 $ 4,488,984 Active 5-Construction SE 3rd Street Widening B-31206 $ 641,495 Active 7-On-Hold Seminole Dinghy Dock Expansion B-30602 $ 30,000 Future 8-Future Shenandoah Area Improvements - D4 B-30775 $ 414,389 Active 3-Design 83 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project name Project Number Fund Allocation Project Status Project Phase Shenandoah Roadway Improvements B-30167D $ 1,550,000 Active 5-Const. (JOC) Shenandoah Traffic Calming - Phase 2 - D4 B-30167B $ 182,100 Active 3-Design Shorecrest Roadway Milling & Resurfacing Project B-30035B $ 1,138,100 Active 5-Construction Silver Bluff Drainage Improvements - D4 B-30776 $ 600,00Q Future 8-Future Silver Bluff Traffic Calming Priority 3 - D4 B-30168A $ 620,841 Active 5-Const. (JOC) Solid Waste Collection Equipment B-73202C $ 4,950,820 Active 5-Construction South Bayshore Drive from Aviation Avenue to Kirk Avenue - D2 P.W B-40168 $ 100,000 Active, 2-Pre-Design South Bayshore Drive Roadway and Drainage Improvements B-30646 $ 550,000... Active 3-Design South Miami Avenue Drainage Improvements - MDC B-30637A: $ . - Future 8-Future Spoil Island E Restoration and Floating Dock B-30721 $ 90,000 Active 3-Design SW 13th Street Roadway & Drainage Improvements - D3 B-30747 $ 400,000 Active 3-Design SW 16 Avenue Roadway & Drainage Improvements'' D3 B-30741 $ 198,000 Active 3-Design SW 16th Avenue from Coral Way to 20 Street - D3 B-30719 $ 135,000 Active 5-Const. (JOC) SW 17th Avenue :Roadway & Drainage Improvements D3 &'D,4 B-30760 $ 600,000 Future 8-Future SW 22nd Avenue Medians - US 1 to Coral Way-D4 B-30770 $ 400,000 Active 1-Study SW 28th Road Roadway & Drainage Improvements - D3 B-30743 $ 250,000 Active 3-Design SW 32 Avenue Improvements Additional Services B-40704A $ 1,752,327 Active 3-Design 84 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project name Project Number Fund Allocation Project Status Project Phase r- SW/NW 17th Avenue Traffic Corridor Study - Citywide B-30993 $ 200,000 Active 1-Study Tamiami Roadway & Storm Sewer Project B-30647 $ - Future 8-Future Technology Infrastructure B-74610 $ 9,116,151 Active 5-Construction Tigertail Resurfacing - D2 B-30716 $ 711,258 Active 5-Construction Traffic Calming SW 6th Street Project - D4 B-30771 $ 324,670 Active 3-Design Traffic Study Reviews - Oracle Project 35- 110007 B-30346 $ 411,622 Active 1-Study Transportation Program Support Services - Transit Professional Services B-30645A $ 796,479 Active 3-Design Transportation Program Support Services - Transportation Professional Services B-30645B $ 1,026,000: Active 3-Design Triangle Park Swings - D3 B-30711 $ 8,500 Active 7-On-Hold Upgrade PC Software & Hardware `B-74606 $ 2,920,683 Active 5-Construction US-1 Median Closures at Bridgeport and SW30Ct-D2 B-30662D $ 330,000 Active 7-On-Hold US1 Roadway impro'ements.,and We'll.;.... Replacement :Phase II 8-30542A $ 2,671,423 Active 5-Const. (JOC) Venetian Causeway Improvements B-39911 $ 3,196,465 Active 4-Bid Virginia Key Beach Park Historic Restoration Phase 2- : B-30174 $ 1,306,765 Active 5-Construction Virginia Key Beach Park Museum B-30508 $ 20,527,127 Active 2-Pre-Design Virginia Key Beach Swimming Area B-30587 $ - Future 8-Future Virginia Key Bike Trail Building - D2 B-30995 $ 377,000 Active 2-Pre-Design 85 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project name Project Number ; Fund Allocation Project Status Project Phase Virginia Key Landfill Assessment B-35002 $ 1,400,000 Active 5-Construction Virginia Key Rowing Center Improvements B-30374 $ 616,513 Active 2-Pre-Design Virrick Park New Pool Facility B-35853A $ 2,088,897 Active 7-On-Hold Wagner Creek / Seybold Canal Dredging B-50643 $ 3,573,503 Active 7-On-Hold Waterfront Improvements Citywide B-39903 $ - Future 8-Future Watson Island Aviation & Visitor Center B-75005 $ 4,795,331 Active 5-Construction Watson Island Infrastructure B-75001 $ 150,000 Future 8-Future Watson Island Public Park Improvements B-35000 $ `.. Future 8-Future West End Park New Community Building B-30690 $ 435,471 Active 3-Design West Flagler Area Improvements - D4 B-30774 $ 308,173 Active 3-Design West Flagler Street Landscape = D4 B-40176 $ - Future 8-Future 86 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN LIST OF COMPLETED PROJECTS [N FY2010201 `I 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN LIST CIFCOMPL D PROJECTSFY2010.2b1 I Project NW 2nd Avenue Roadway Improvements - CRA 92-689001 NW 3rd Avenue Overtown Business Corridor Streetscape Project - CRA 92- 689001 City Hall.j'Staff Room Improvements:, Citywide Telephone Equipment Upgrade Compound fence modification for Public Works Operations Yard Fleet Truck Wash Upgrade Project Project Description Number B-30135 This project includes the design, and construction of the needed improvements including but not limited to roadway reconstruction, pavement::rnilling and resufacing,: repair:of. broken driveway approches and sidewalk, riew:ADA compliant pedestrian ramps, and repair of curb and gutters needed, NW 2nd Avenue is under the jurisdiction Miami Dade :County Public Works. B-30390 Reconstruction of.the roadway, sidewalk reconstruction, decorative lights, landscaping and hards.cape of the corridor B-30365 D ENERAL GOVERNMENT Renovate the Staff room at City Hall to improve the utilization of the space and the HVAC system, install some electrical outlets and provide 3 new cubicles by eliminating a storage room behind the Staff Room. B-74616 Replacement of aging voice communications equipment B-30365G Modify existing 6' high fence on east property line to 10' high. B-74205A Construction of an automated truck wash facility included a water reclamation system, new 2000 SF building and all related components of the demolition of the existing metal structure.:;_, Fund Allocation ($) 1,800,000 5,200,000 16,384 192,432 9,995 1,447,677 87 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project MRC - Elevator Modernization SAR for Property Maintenance Facility Strategic IT and Project Management Services Fire Station #11 - Trailer Rental / Land Lease Fire Station #11 (New) Fire Station Alerting and Records Management Fire Station Emergency Generator Upgrades Project Project Description Number B-74214 Replace building's original passenger elevators B-30001 The project involves the preparation & submittal of a site assessment report (SAR) to MD-DERM for the city maintenance facility.: B-74608 Acquisition of Strategic IT and Project Management Services. 312 PUBLIC SAFE' B-60452B To cover cost of lease agreement for use of vacant lot and the monthly lease payments for trailers. B-60452 Design and construction of approx: 11;;749 s.f. two stones and two bay apparatus fire rescue facility. The facility includes, all typical .fire station amenities for fire rescue personnel plus two lieutenants and a captain. The project indluaes,idemolition of an existing fire station and site development including parking spaces for 'i 5-.'i 8 vehicles and landscaping. Also, the project includes a water main improvement and new signalization. The project included design and construction of a..temporary site for firefighter relocation in two trailers with temporary sigrialization, electrical, water, sewer, fire truck parking area, some landscape, chainlink and wood fences for security. The temporary site. is at close location of the new fire station construction, and it shall operate until the conclusion of the construction. B-72806 Replacing the Fire Stations alerting system with new updated system B-30364 Emergency Generator Replacement at Fire Stations #2, #5, #7 and Headquarter Complex Building. Fire Station B-72802N Modification and/or replacement of existing stove hood Enhancements - Range equipment at the following Fire Stations: 1, 2, 3, 4, 5, 6, Hoods 7, 8, 9, 10 and 12. Fund Allocation ($) 1,060, 900 122,429 599,290 200,000 4,633,273 2,645144 364,407 45,000 88 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project New Rescue Trucks - Impact Fees North District New Rescue Trucks - Impact Fees South District - Fire Station 4 South Police Substation Hurricane Protection Project Project Description Number B-72810N To fund purchase of 2 new rescue trucks with enhanced capabilities and technology, to be housed at fire station #6 and fire station #5. Rescue Trucks #25 & #26. B-72810S To fund the purchase of a new rescue truck with enhanced capabilities and technology, to be housed at fire station #4. B-30592 The project consists of providing hurricane protection for the windows and the circular main front entrance at the 2-story police substation.. Phase I included the preparation of a design analysis report to retrofit the building with protective screening and:irripact resistant window/glass system. Phase II will include the purchase and Installation of a selected system based on the phase I report. The College of Policing . B-72910A Upgraded IT SWitchgear equipment for the Emergency EOC Facility Operations Center City Hall Roof Dinner Key Dredging Dinner Key::. Harbormaster Office Trailer James L Knight Center Garage Improvements (Garage #4) James L. Knight Center Miscellaneous Improvements B-30121 B Temporary water proofing repairs to existing roof. B-30247_-::Engineering and implementation of dredging approximately 10,000 cy for the main approach channel :at the north end of the Marina. -. B-33511A 1. Purchase and install an office trailer, restroom/shower trailer and an ADA compliant restroom/shower trailer. 2. Provide utility hook-up to the trailers.:- 3. Stripe parking spaces on the existing asphalt surface... 4. Provide parking lot illumination: 5. Stripe crosswalk on the access road for pedestrian crossing to the boat ramp B-30365B Contribution to MPA to automate the parking operation at the Miami Tower to a new on foot system_ B-33506 Various improvements to James L. Knight Center Fund Allocation ($) 494,508 243,375 548,521 1,231,406 7,201 1,261,370 228,547 480,000 86,438 89 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project Manuel Artime Building #970 Re -Roof Manuel Artime Miscellaneous Project Marine Stadium Marina - Miscellaneous Repair & Equipment Miamarina - Miscellaneous Repairs Project Project Description Number B-30672 Replace existing roof with new roof. B-30501A Miscellaneous Improvements B-30595 Miscellaneous Repair & Equipment B-30594 Miscellaneous Repairs Piling and Pier Repairs - B-60474A Piling and Pier Repairs_. Dinner Key Alice Wainwright Park Site Improvements Armbrister Park Site Improvements Bay of Pigs Park Shade Structure Bayfront Park Baywalk Improvements` Belle Meade Playground 331 - PARKS & RECREATION B-35906 Site Improvements including irrigation, landscaping, playground and f irrishing upgrades or installation._ B-758'i;6 Site Improvements including Court, Irrigation, Landscaping, Playground and Furnishing Upgrades or Installation. B-75920A . Park Shade Structure Fund Allocation ($) 175,000 273,664 281,146 186,720 166,000 283,803 110,000 29,000 B.-30656 The project scope is limited to the area immediately 1,600,000 surrounding the existing Baywalk, from Chopin Plaza to N.E.`'2nd Avenue. The scope includes but is not limited to: demolition of portions of existing concrete walks including hauling and proper disposal of all debris; removal of existing plant material including small trees, shrubs and existing ground cover; excavation and preparation of new planters with suitable planting material and topsoil; new plant material to include, large feature trees, large palms, medium trees, ground cover; all necessary topsoil and mulch; irrigation including reworking existing systems and potentially new pumps and controls; site furnishings including park benches and litter receptacles. B-75821 Playground 18,505 90 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project Bicentennial / Museum Park Mooring Bollards Blanche Park Site Improvements Brickell Avenue Park Land Acquisition Buena Vista Park Court Upgrades Buena Vista Park Playground Equipment Buena Vista Park Site Furnishings Charles Hadley Park Field House and Concession Building Project Project Description Number B-30538A Design and install ship bollards for Bicentennial Park on the north side of FEC slip B-75830 Site Improvements including: Irrigation, Landscaping, Playground and Furnishing Upgrades or Installation._i B-30685 Acquisition of property located at 1814 Brickell Avenue for park land purposes B-75947 Court Upgrades B-75945 Playground Equipment Fund Allocation ($) 1484,754 45.000 2,553,277 10,000 15,000 B-75946 Site Furnishing 5,000 B-35883 • Project consists, of the rurPishing`of all labor, materials 1,271,000 and equipment for the design and construction of a one story concession builaing or approximately 3,000 square. feet as well as water main and sewer line improvements. The building includes a field house, restrooms, park office and ancillary space to support the..buiidinig's operation. Also, the project includes a Site Plan Study to identify future site improvements in :'the park. Curtis Park. Playground B-35808A Playground Equipment and Site Furnishings' Equipmentand Site Furnish(( 56,123 91 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project Duarte Park ADA Modification - Construction Only Henderson Park New Office / Restroom Facility Jose Marti+'Park New Swings / Shade:and Additional Vitacourse Kirk Munroe Tennis Court Improvements Legion Park Site Furnishings Marjorie Stoneman Douglas Park Site Improvements Project Project Description Number B-35812B At the parking lot, provide accessible parking spaces and access aisle. At the Recreational Building: Replace the entrance door knob hardware with accessible lever operated hardware at the Computer room. At women's and men's bathrooms: Provide permanent ADA signage, grab bars at handicap stalls, paper towel dispensers and at the women'sonly replace the toilet flush control on the open side of the toilet's clear space. At the recreation -area replace the drinking fountain with hi -low accessible drinking fountain. At the Pavilion area provide an accessible picnic table. At the Field house restrooms provide ADA permanent signage, accessible stalls, replace all 'bathroom accessories, replace all plumbing fixtures and adjust plumbing rough accordingly replace entry door with accessible door and hardware: At the Field relocate and replace:drinking fountain with :i-ii Lo accessible drinking fountain`aand provide an accessible route from the Field House to the Basketball and Baseball bleachers. B-35856A Design and construction of a 1,290 SF building with restrooms, office with storage, food serving area, and storage rooms for la><vn equipment and Park furniture. The_ scope.also includes the design and construction of a.2;560SF-covered recreation area, entry plaza, :landscaping, security and sports lighting and miscellaneous site improvements such as site furniture <•and accessibility from Park to Clinic facility next door. 13-30640 Install new swings and shade structure and expand vita • course. B-75854 Tennis Court Improvements B-75856 To provide and install light structure at basketball court.-1 B-75862 Site Improvements including: Court, Irrigation, Landscaping, Playground and Furnishing Upgrades or Installation. J Fund Allocation ($) 147,781 1,234, 069 73,897 143,057 60; 000 49,768 92 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project Project Project Description Fund Number Allocation ($) Merrie Christmas Park B-75864 Site Improvements including: Court, Irrigation, Site Improvements Landscaping, Playground and Furnishing Upgrades or Installation._ Moore Park Athletic Field OBC B-30625 To commemorate its 75th anniversary the Orange Bowl Committee proposed to build with the City of Miami a youth sports/high school football stadium at Moore Par, the place where the tradition of the Orange BoWI game was born. The new facility includes:.. " E.00tball field of synthetic turf L "Running track with facilities .for track & field events_, "Electronic score board_ "Eield sports lighting, "1,500-seat aluminum bleachers'_ "6000 sf building with restrooms, clubrooms, concession area for home and visitor teams, in addition to ticket booth; storage spaces and:press box with PA system. J Roberto Clemente Park B-30172A_The:.project consists of the furnishing of all labor, Recreation Building materials and equipment for a new Recreation Building of approximately 9000 sq. ft. (Gross Area)at Roberto Clerente Park. The new building has spaces for Neighborlood;Enharicement Team (NET) that includes 'two staff offices,- one large open office, reception area. Also, the new building has the Parks Department spaces such as art and craft room/homework , computer room for 8 to 12 stations, multipurpose rooms; children room and warming kitchen and staff office. The shared areas are the conference room for 8 to 10 people, the staff room and the public rooms for approximatly 300 kids during summer programs, electrical room, pump room, maintenance storage, covered terrace, playground area and water playground area. 60,000 2,500,000 3,081,158 93 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project Project Project Description Fund Number Allocation ($) Shenandoah Park Improvements Town Park • Improvements B-30304 PHASE I: Install bollards along SW 22 Ave, improve SVV 17 Alley, construct a drainage system and replace fence and wind screen. PHASE II: New pool heater system and modify related piping and electrical systems. PHASE III: New irrigation and drainage systems, grade and sod the field. PHASE IV: Remodel the Recreation Building, install a new HVACsystem, Install New Insulation and ceiling Drywall, Insfal1 new Movable Partition, construct a new addition for Arts and Craft, and Remodeling of Restroom facility. B-75985A Miscellaneous Improvements: Virginia Key Master B-30363 Master Plan: Plan Virginia Key Wild Life & B-30347 Virginia Key Wild Life & Nature Center'- General Nature Center Improvements 'o Park Site: Williams Park Community Building B 75991A Demolish the existing 2,500 SF community center and construct a new approximately 5,000 SF community center with three multipurpose rooms, an art and crafts room a computer room, a manager's office, public restrooms and Various support spaces. Remodel portions of the walkways and bleachers to satisfy accessibility requirements. Remodel the pool building restrooms/shower rooms to satisfy accessibility requirements and provide a year-round changing facility. Remodel a portion of the site surrounding the new community center and parking area to remediate drainage problems. The project is LEED Silver. 341 - STREETS & SIDEWALKS 2,513,184 45,000 725,000 435,996 1,638, 569 ARRA - ADA Sidewalk B-30683A Sidewalk Improvements within District 1 Boundaries 180,805 Improvements District 1 ARRA - ADA`Sidewalk B-30683B Sidewalk Improvements within District 2 Boundaries 129,780 Improvements District 2 94 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project Project Project Description Fund Number Allocation ($) ARRA - ADA Sidewalk B-30683C Sidewalk Improvements within District 3 Boundaries 132,035 Improvements District 3 . ARRA - ADA Sidewalk B-30683D Sidewalk Improvements within District 4 Boundaries 174,362 Improvements District 4 ARRA - ADA Sidewalk B-30683E Sidewalk Improvements within District 5 Boundaries 179,935 Improvements District 5 ARRA - Brickell Key B-30634A The purpose of this service IS to provide structural Bridge Rehabilitation bridge repairs, inspection, survey, desien'of repairs, Project detailed construction plans, technical special provisions, prepare permit packages, cost estimates, utility coordination, FRI's and RAFs, shop drawing reviews and reviewing proposed repair products. ARRA - NE 2 Avenue Improvements (36th Street to 42nd Street) - Segment B1 BrickeilKdq Bridge Rehabilitation Project B-78508A Provide all project management and. engineering analysis and design services necessary for preparing construction ddc4)rnents for the reconstruction of NE end Avenue fror N;E 36th Street to NE 42nd Street. The slope of work.includes roadway reconstruction, stormwater system, curb and gutter, concrete sidewalk, sighing and pavement markings, decorative lighting, signalization and landscape, Reference B-78508 for Non-ARRA Funded Segment and B-78058B for ARRA Funded Segment from 59th to 69th Streets. The purpose of this service is to provide structural bridge repairs, inspection, survey, design of repairs, detailed construction plans, technical special provisions, prepare permit packages, cost estimates, utility coordination, FRI's and RAFs, shop drawing reviews and reviewing proposed repair products. Buena Vista East B-78500B Removal of existing street lighting; installation of new Lighting street lighting; installation of decorative light poles conduit and wiring; permitting fees; field construction inspection of underground conduits & handholes installation and related surface restoration. Coconut Grove Park Area Milling & Resurfacing 1,713,201 510,979 735,000 2,368,482 B-30035 The project consist of milling and resurfacing.: 609,397 95 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project Coral Gate Roadway & Wall Improvements District 3 NW Quadrant - Phase 1 District 3 NW Quadrant - Phase II Flagami Traffic Calming (including East Little, Havana devices) Flagami Traffic Calming Improvement (Phase 2) Flagami Traffic Calming Phase ill-. Little River: f dustrial Park Mary St -Grand Ave and Tiger Tail Traffic Calming - Civil Engineering Services NW 13th Terrace Project Project Description Number B-30627 The project scope includes but is not limited to milling and resurfacing, sidewalk upgrades to meet ADA criteria, swale regrading, signing and pavement markings, and removal of the existing wall and its corresponding foundation to construct a 10-ft high precast concrete v✓all, and landscape improvements. B-30020C Milling, resurfacing, fixing swales,, sidewalk, curb and gutter where existing and ADA ramps, striping. B-30020D Milling, resurfacing, fixing swales, sidewalk, curb and gutter where existing and ADA ramps, striping. B-40672A Construction of traffic circles and other traffic devices subject to site conditions. B-40672B 'Construction of traffic circles. B-40672CI This is a traffic calming project. Various roadway intersections and adjacent areas were improved. 2.: B 30540 Fund Allocation ($) 1,552,874 2,072.521 450,258 131,950 555,469 513,940 Study„ develop alternative recommendations, and 2,000,000 implementation of a variety of streetscape related items such as gateway signs, lighting, landscaping, and way finding signage for the Little River Industrial Park. B-30037 Study and design of a traffic circle for the intersection of Mary St and Grand Avenue; Design of traffic circle or alternative for Tiger Tail and SW 22nd Avenue. 29,503 B-30019H Milling, resurfacing, sidewalks, turfblock, landscapng, 362,738 striping. 96 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project NW 17 Avenue between NW 3rd and NW 1st Street - Install • Guardrail - D3 NW 24 Ave between NW 3 Street to NW 6 Street - D3 NW 34th Avenue @ SR 836 Roadway Improvements - D1 NW 35th Street - D1 Pedro Pan Monument Project Project Description Number B-30714 Install Guardrail B-30715 Project includes the abandoment of existing auger holes and the addition of new inlets and french drain along various streets along NW 24 Avenue and SW 24 Road B-30702 Project consists of removing the. existing paver blocks within the swale area between:NW 13th Street to NW 14th Street along 13th Avenue under SR 836. The paver blocks were replaced with gravel and a new curb and gutter will be constructed to prevent vehicles from parking along the street. As part of this contract drainage inlets and pipe were craned/desilted. B-30500D Streetscape„project including milling and resurfacing, sidewalks, turrblock insallation, an soaping, ramps, and striping. B-30535 The.scope consists of furnishing design, labor, materials equipment and supervision of monument 14 ft. Ht. The project also includes the stand support for the. Bronze plaque and sidewalk repair._: Renaming of Coconut . B 399.10L Replacing Street Name signs in Coconut Grove. Grove Streets Silver Bluff -Traffic B-30168B Calming1Phase 2 - D4 SW 11th Street (14-17 B-30034E Avenue) SW 17 Terrace between SW 18 and 19 Avenues - D4 SW 5th Street (55-57 Avenue) Construction of traffic circles which include drainage improvements, curbs, gutters, milling & resurfacing, landscaping, and pavement markings. Streetscape project including milling & resurfacing, sidewalks, curb and gutters, landscaping, handicap ramps, and striping. B-30710 Drainage Improvement of SW 17th Terrace between SW 18th Avenue and SW 19th Avenue, milling and resurfacing and final striping of the resurfaced pavement. B-30025A Streetscape project including milling & resurfacing, sidewalks, curbs and gutters, landscaping, handicap ramps, and striping Fund Allocation ($) 58,000 290,542 21,165 356,751 49,024 2,700 1,204,936 753,983 65,001 513,828 97 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project Project Project Description Fund Allocation ($) SW 5th Street Improvements Number B-30026A Milling & resurfacing, curbs and gutter & sidewalk 580,137 West Grove and Center B-30041A Traffic data collection and analysis. Feasibility study to Grove traffic circles determine whether or not the locations warrant traffic feasibility circle installation. Belle Meade Storm Sewer Project, Ph 2 Flagami/West End Storm Sewer Improvements PH II Flag ami/West-End Storm Water Pump: Stations Nos. 1, 2, 3 and 4 352 - STORM SEWERS`";;' B-50672 Storm sewer improvements includes. solid storm water pipes, storm water pump station, water quality structure, roadway milling/resurfacing, selected road construction and a new outfall & surface restoration. Other improvements include darnaged sidewalk replacement; ne,y curb & gutter, new ADA compliant ramps, & resod of svales:C B-50695 Construction of a.:storm sewer system that will consist of new outfalls retrofit of existing outfalls with manatee barriers, new exfiltration trench, storm sewer pipe for gravity conveyance;;: cross drains, catch basins, manholes; and surface restoration. Road improvementsauch as roadway milling & resurfacing, damaged sidewalk replacement, damaged curb and/or gutter replacement, ADA Compliant Ramp construction :...and resod of swale at the affected road blocks by the drainage construction.= B-50696 Construction of 4 new storm sewer pump stations to alleviate flooding problems in the Flagami/West End areas. North Bayshore Drive B-50658 Develop drainage alternatives to address the existing Drainage flooding & roadway conditions. Improvements under Improvements - study include designlconst new storm sewer pump sta Partially Funded CRA & Rebuilding of the intersection @ N Bayshore Dr & NE 92-686001 18 St & new pavement @ N Bayshore Dr, between NE 17 & 18 St.= 18,259 12,301,058 8,731,704 5,832,228 4,586,253 98 2011-2012 CAPITAL BUDGET AND MULTI -YEAR CAPITAL PLAN Project Project Project Description Fund Number Allocation ($) Tamiami Storm Sewer Improvements Project ARRA / Solid Waste Biodiesel Refuse Haulers B-50706 Drainage Improvements consisting of French drains, new storm sever outfalls, catch basins, cross drains and surface restoration. Road improvements such as roadway milling & resurfacing, damaged sidewalk replacement, curb and/or gutter replacement, resod of swales, and ADA compliant ramp construction as needed within project limits._ Design and construction of traffic circle at r.i.74th Ave. and Flagami Blvd._ 353 - SOLID WASTE B-73202B Pucharse biodiesel refuse haulers Solid Waste Collection B-73202A Purchase bibditesel refusa;ihaulers Equipment ARRA Grant Match 1,792,084 731,850 2,195,550 99