HomeMy WebLinkAboutExhibit AEXHIBIT "A" FM# Page 1 of 13 OFF -SYSTEM CONSTRUCTION AND MAINTENANCE AGREEMENT Between STATE OF FLORIDA, DEPARTMENT OF TRANSPORTATION ("DEPARTMENT") and CITY OF MIAMI, a municipal corporation of the State of Florida ("the CITY") THIS AGREEMENT is made and entered into as of June 19th, 2024, by and through the STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION, an agency of the State of Florida (the "Department"), and the CITY OF MIAMI, a municipal corporation of the State of Florida (the "CITY"), collectively referred to as the "Parties." RECITALS A. Upon approval of the Department's Work Program by the State of Florida Legislature, and adoption by the Department Secretary, the Department shall complete the various projects included in the Depaittnent Work Program; and B. Included in the Department Work Program is Project Number FM# 431635-9-52-01, SR 9 / SW 27th Avenue at SW 23rd Street (the "Project"). A portion of the Project includes work on SW 23rd Street, in Miami -Dade County, Florida, a road not on the State Highway System, as shown in Exhibit "A" attached hereto and incorporated herein by reference; and C. The CITY is the holder of ownership rights to SW 23rd Street, a road not on the State Highway System; and D. The Parties agree that it is in the best interest of each party for the Depaitinent to undertake and to complete all aspects of the Project, including but not limited to, the design, construction, construction inspection, maintenance during construction, utilities, easements, and other associated tasks; and E. The Parties further agree that it is in the best interest of each party to enter into this Agreement in order to allow the Department to construct and complete the Project. Rev. 6/22 1 FM# Page 2 of 13 TERMS NOW THEREFORE, in consideration of the premises, the mutual covenants and other valuable considerations contained herein, the receipt and sufficiency of which are hereby acknowledged, the Parties agree as follows: 1. The recitals in this Agreement are true and correct, and incorporated into and made a part hereof. 2. The Parties agree that the Department intends to undertake and complete Project Number FM# 431635-9-52-01, which Project generally includes the following: • Milling and resurfacing of a section of SW 23rd Street to upgrade pavement markings. • Installing a new signal controller/cabinet and service disconnect and connecting the new traffic signals to FP&L service point located along SW 23rd Street — west of SW 27th Avenue. The Project shall include improvements along SW 23rd Street, approximately 70' from the DEPARTMENT right-of-way line, on both sides (east and west) of SW 27th Avenue (for purposes of this agreement, the "Off -System Project Limits"). The work within the Off -System Project Limits shall include, but may not be limited to the following (hereinafter referred to as the "Local Roadway Improvements"): a) Milling and resurfacing of the asphalt pavement. b) Installation of sod & reconstruction of concrete sidewalk. c) Installation of new signal controller cabinet and service disconnect concrete pole for new traffic signals; and d) Connecting new traffic signals to the FP&L service point at existing FP&L pole located 170' west of the intersection. The Project shall further include all activities associated with or arising out of the construction of the Local Roadway Improvements. In the event that the Project requires the acquisition of additional right-of-way within the Off -System Project Limits, the Department shall acquire such right-of-way in order to complete the Project. The CITY shall cooperate with and shall support the Department's work efforts in these regards. The Department will design and construct the Project in accordance with all applicable federal and state laws and regulations and in accordance with Department design and construction Rev. 6/22 2 FM# Page 3 of 13 standards as set forth in the Department's guidelines, standards, and procedures. The Depailtuent shall have final decision authority with respect to the design, the design review process, and construction of the Local Roadway Improvements, and the relocation of any utilities that the Department may determine to be required. 3. The Parties acknowledge and agree that the CITY will review the Project Design Plans ("Project Design Plans") and shall submit its comments, if any, via Electronic Reviewer Comments ("ERC"). The Department shall provide the CITY access to the ERC, and the Department shall use the ERC to submit the Project Design Plans for the CITY to review. When the Depaiinient places the Project Design Plans in the ERC, the Department will designate a Comment Due Date and a Response Due Date. The CITY shall submit its comments with regards to the Project Design Plans on or before the Comment Due Date, and the Department shall respond to the CITY's comments, if any, on or before the Response Due Date. If the CITY does not submit its comments by the Comment Due Date, the CITY will be deemed to have approved the Project Design Plans submitted by the Department. The review process for the Project Design Plans will be deemed concluded when the Department has submitted the Final Project Design Plans to the ERC, and the Comment Due Date and Response Due Date for the Final Project Design Plans have passed, and the Department has addressed all of the CITY's comments that were submitted through the ERC. Once the review process is concluded, the Department will construct the Project in accordance with the Final Project Design Plans submitted through the ERC. The CITY acknowledges and agrees that, during construction of the Local Roadway Improvements, the Department will only utilize the services of law enforcement officers when required by the Depailinent's Standard Specifications for Road and Bridge Construction, and no additional requirements will be imposed. No further agreements or permits shall be required for production or construction of this Project. Major modifications of the approved Project Design Plans must be submitted to the CITY for review. A "Major Modification" is any modification that materially alters the kind or nature of the work depicted in the approved Project Design Plans, or that alters the integrity or maintainability of the Local Roadway Improvements, or related components. The CITY's review shall be within the reasonable time schedule proposed by the Department, in order to avoid delay to the Department's construction contract. In the event that any Major Modifications are required during construction, the Department shall be entitled to proceed with the modifications that are Rev. 6/22 3 FM# Page 4 of 13 necessary to complete the construction of the Project, and shall, upon identifying the need for a Major Modification, immediately notify the CITY of the required changes prior to proceeding with implementation of the same. It is specifically understood and agreed that any such changes during construction shall not delay nor affect the timely construction schedule of the Project. 4. The CITY agrees to fully cooperate with the Depailinent in the construction, reconstruction and relocation of utilities that are located within the CITY's right-of-way, within the Off -System Project Limits. The utility relocations, if any, which may be required by the Department for purposes of the Project, shall be done in accordance with the Department's guidelines, standards and procedures. The Department shall submit the proposed utility relocation schedule to the CITY. Utility relocations, if any, shall be done in accordance with the provisions of Chapter 337, F. S. Additionally, the CITY agrees to fully cooperate with the Department in the removal of any encroachments or permitted improvements, and in the modification of any driveway connections, located within the CITY's right-of-way, within the Off -System Project Limits, that are in conflict with the Project, and the CITY hereby authorizes the Department to take any legal action necessary to effectuate the removal of any such conflicting encroachments or permitted improvements, and to effectuate the modification of any such driveway connections. The Department shall coordinate with the CITY for said removals or modifications, at no cost to the CITY. 5. The CITY agrees to perpetually maintain the Local Roadway Improvements. To maintain means to perform normal maintenance operations for the preservation of the Local Roadway Improvements, which shall include but is not limited to, roadway surfaces, shoulders, roadside structures, drainage, signing and pavement markers, lighting, and such traffic control devices as are necessary for the safe and efficient use of the Local Roadway Improvements. Additionally, the Parties understand and agree that the Department shall transfer any permit(s) required for the construction of the Local Roadway Improvements, if any, to the CITY as the operational maintenance entity, and the CITY agrees to accept said transfer and to be fully responsible to comply with all operational and maintenance conditions of the permit(s), at its sole cost and expense. Notwithstanding the requirements hereof, maintenance during construction shall be the responsibility of the Depail.uient and its Contractor, as set forth in paragraph 9 of this Agreement. Rev. 6/22 4 FM# Page 5 of 13 6. The Parties acknowledge and agree that the CITY's right-of-way and the improvements and structures located within the CITY's right-of-way, are and will remain under the ownership of the CITY, and that the Department will not have any ownership interest in the right-of-way, improvements, or structures located thereon or installed therein pursuant to this Project. 7. The Depaitinent shall require its construction Contractor to maintain, at all times during construction, Commercial General Liability insurance providing continuous coverage for all work or operations performed under the construction contract. Such insurance shall be no more restrictive than that provided by the latest occurrence form edition of the standard Commercial General Liability Coverage Form (ISO Form CG 00 01) as filed for use in the State of Florida. The limits of coverage shall not be less than $1,000,000 for each occurrence and not less than a $5,000,000 annual general aggregate, inclusive of amounts provided by an umbrella or excess policy, or such other minimum insurance coverage that may be required by the Department for the construction of the Project, in accordance with the Depailiuent's Standards and Specifications for Road and Bridge Construction. The Department shall further cause its Contractor to name the CITY and the Depaitinent as additional insured Parties on the afore -stated policies, and to provide evidence of Workers' Compensation Insurance in accordance with the laws of the State of Florida and in amounts sufficient to secure the benefit of the Florida Workers' Compensation law for all employees. 8. The Department shall notify the CITY at least 48 hours before beginning construction within the CITY's right-of-way. Such notification may be provided via email, to the , and the notice requirements set forth in paragraph 20 shall not apply to this paragraph. The Department agrees that the CITY may, at reasonable times during the construction of the Local Roadway Improvements, inspect the Contractor's construction site and perform such tests as are reasonably necessary to determine whether the goods or services required to be provided by the Contractor, pursuant to the Contractor's Construction Agreement with the Department, conform to the terms of said Construction Agreement. Upon request by the CITY, the Department shall coordinate with its Contractor to provide access to the CITY for performance of said inspections. During the construction work related to the Project, the CITY shall fully cooperate with any such work being performed by the Department and the Department's contractors. The CITY shall not Rev. 6/22 5 FM# Page 6 of 13 commit nor permit any act which may delay or interfere with the performance of any such work by the Department or the Department's contractors, unless the Department agrees in writing that the CITY may commit or permit said act. 9. Maintenance during construction within the Off -System Project Limits, commencing as of the first date of construction, shall be the responsibility of the Depaitinent's Contractor. Notwithstanding, neither the Department nor its Contractor shall be responsible for mowing or removing litter during construction of the Project. After completion of construction, the CITY shall assume all maintenance responsibilities for the Local Roadway Improvements. Upon completion of construction, the Department is required to invite the CITY on the Final Inspection of the work within the Off -System Project Limits, and will incorporate legitimate CITY concerns that are within the scope of the contract into the final Project punch list to be corrected by the Contractor. Notice for Final Inspection shall be delivered via email to the CITY and the notice provision of paragraph 20 shall not be applicable. However, if the CITY does not attend the Final Inspection, the Depaitiuent shall proceed to conduct the Final Inspection, finalize the Project punch list, and issue a Notice of Final Acceptance to its Contractor. The Final Inspection shall be performed and the Notice of Final Acceptance shall be issued in accordance with the Depaitruent's Standard Specifications for Road and Bridge Construction and the Construction Proj ect Administration Manual (CPAM). Upon issuance of the Notice of Final Acceptance to the Contractor, the Depaituient shall provide a copy of said notice to the CITY. As of the date of the Notice of Final Acceptance, the CITY shall be immediately responsible for the maintenance of the Local Roadway Improvements, and shall further accept the Local Roadway Improvements. The Depailinent, however, shall have the right to assure completion of any punch list by the Contractor. Notwithstanding the issuance of the Notice of Final Acceptance, the CITY may notify the Department Project Manager of deficiencies in the Local Roadway Improvements that may be covered by the warranty provisions in the contract between the Department and its Contractor. The Department shall enforce the warranty if remedial action is required by the warranty provisions, as determined by the Department. Upon completion of all work related to construction of the Project, the Department will be required to submit to the CITY final as -built plans for the Local Roadway Improvements and an engineering certification that construction was completed in accordance with the plans. Rev. 6/22 6 FM# Page 7 of 13 Additionally, the Department shall vacate those portions of the CITY's right-of-way used to construct the Local Roadway Improvements, and shall remove the Department's property, machinery, and equipment from said portions of the CITY's right-of-way. Furthermore, the Department shall restore those portions of the CITY's right-of-way disturbed by Project construction activities to the same or better condition than that which existed immediately prior to commencement of the construction of the Project. 10. Upon submission by the Depailiuent of a deed, with accompanying sketch and legal description, for the transfer to the CITY of any additional right-of-way acquired by the Department within the Off -System Project Limits, the CITY shall forthwith submit the same to its governing board or commission for approval and acceptance of such additional right-of-way. 11 This Agreement shall become effective as of the date both parties hereto have executed the Agreement. Prior to commencement of construction, the Department may in its sole discretion terminate this Agreement if it determines that it is in the best interest of the public to do so. If the Department elects to terminate this Agreement, the Department shall deliver formal notice of termination to the CITY, as set forth in paragraph 20 of this Agreement. 12. In the event that any election, referendum, approval, ratification, notice or other proceeding, or authorization is required to carry out the Project, the CITY agrees to expeditiously initiate and consummate, as provided by law, all actions necessary with respect to any such matters, with time being of the essence. 13. The Department may utilize federal funds to design and construct the Project. In the event that the Project shall be constructed using federal funds, all costs incurred must be in conformity with applicable federal and state laws, regulations, and policies and procedures. 14. The Depailinent's performance and obligations under this Agreement are contingent upon an annual appropriation by the Legislature. If the Department's funding for this Project is in multiple fiscal years, funds approval from the Department's Comptroller must be received each fiscal year prior to costs being incurred. 15. In the event that this Agreement is in excess of $25,000, and the Agreement has a term for a period of more than one year, the provisions of Section §339.135(6)(a), Florida Statutes, are hereby incorporated into this Agreement and are as follows: "The department, during any fiscal year, shall not expend money, incur any liability, or enter into any contract which, by its terms, involves the expenditure of money in excess of the amounts Rev. 6/22 7 FM# Page 8 of 13 budgeted as available for expenditure during any such fiscal year. Any contract, verbal or written, made in violation of this subsection is null and void, and no money may be paid on such contract. The department shall require a statement from the comptroller of the department that funds are available prior to entering into any such contract or other binding commitment of funds. Nothing herein contained shall prevent the making of contracts for periods exceeding 1 year, but any contract so made shall be executory only for the value of the services to be rendered or agreed to be paid for in succeeding fiscal years; and this paragraph shall be incorporated verbatim in all contracts of the department which are for an amount in excess of $25, 000 and which have a term for a period of more than 1 year." 16. Nothing in this Agreement shall be deemed or otherwise interpreted as waiving the Department's sovereign immunity protections, or as increasing the limits of liability as set forth in Section 768.28, Florida Statutes. 17. A modification or waiver of any of the provisions of this Agreement shall be effective only if made in writing and executed with the same formality as this Agreement. 18. This Agreement shall be governed by the laws of the State of Florida. Any provision hereof found to be unlawful or unenforceable shall be severable and shall not affect the validity of the remaining portions hereof. Venue for any and all actions arising out of or in any way related to the interpretation, validity, performance or breach of this Agreement shall lie exclusively in a state court of appropriate jurisdiction in Leon County, Florida. 19. No term or provision of this Agreement shall be interpreted for or against any party because that parry's legal counsel drafted the provision. 20. In accordance with Executive Order No. 11-02 the Depailiuent's Vendor/Contractor(s) shall utilize the U.S. Department of Homeland Security's E-Verify system, in accordance with the terms governing use of the system, to confirm the employment eligibility of; i. all persons employed by the Vendor/Contractor during the term of the Contract to perform employment duties within Florida; and ii. all persons, including subcontractors, assigned by the Vendor/Contractor to perform work pursuant to the contract with the Department. 21 All notices required pursuant to the terms hereof, shall be in writing and shall be sent by first class United States Mail, facsimile transmission, hand delivery or express mail. Notices shall be deemed to have been received by the end of five (5) business days from the proper sending thereof Rev. 6/22 8 FM# Page 9 of 13 unless proof of prior actual receipt is provided. Unless otherwise notified in writing, notices shall be sent to the following: To the To the Department: Director of Transportation Operations State of Florida, Department of Transportation 1000 N.W. 111th Avenue Miami, Florida 33172 22. The CITY, by and through Resolution No. , attached hereto as Exhibit "B", has duly authorized the execution and delivery of this Agreement and agrees to be bound by the terms hereunder, and has further authorized the Mayor or his designee to take all necessary steps to effectuate the terms of this Agreement. IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the dates exhibited, by the signatures below. STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION By: By: Name: Title: Name: Title: Director of Transportation Operations Date: Date: Rev. 6/22 9 FM# Page 10 of 13 Attest: Name: Title: Approved as to form and legality: By: Name: Department Legal Review: Rev. 6/22 10 0 2 o 10 Feet END TYPE F C,4G INATCH EXIST. r26,14 rOa END COVC. SIDEWALK I7ATCH EXIST. +52.00 Reim LIINL LINE —BEGIN TYPE T CLG rYATCII EXIST. +26.1-1 SERIN CON'C. SIDE6Y4LK ATCH EXIST *34 00 SPECIAL DETAIL 1 - CR-L I00D. BEGIN PROJECT BEGIN CONSTRUCTION STA. 40+83.95 MP 0.541 R/W LINE MDWS 10" SAN— Off-system work (at SW 23rd Street) BEGIN TYPE F C&G WATCH E T. +08.89 CO BEGIN CONC. SILO 1//ALK—. 1'4ATCH EXIST. +97.95, 63.67' RS� EXIST. DRAINAGE STRUCTURE (TO REMAIN) BEGIN TYPE F C&G BEGIN CONIC. SIDEWALK WATCH EXIST. +88.90 MDWS 8" VIM E SURVEY 4 Noo — NO2' 21' 32"W + 91.95 I'4DV/5 36" IVM 6.00 RT + 83.95 SR 9 / SW 27TH AVENUE 6.00 -R AT&T FL 8T— s� MDWS 36" WM- BEGIN MILLING & RESURFACING MATCH EXISTING STA 42+77.31 MP 0.578 NOTES: 1- ALL EXISTING TREES SHALL REINAIN IN PLACE UNLESS NOTED. W cC + 31.28 6.49' LT + 2212 2.65' RT 43 5AW CUT R/VV LINE LIMITS OF WILLING & RESURFACING WATCH EXIST. 120.0' (LT) INDIIVS 6" VV I'4 CROWN CASTLE FIBER HDPE INDWS 10" SAN + 36.73 86 00' LT + 50.00 82.75' LT + 50.00 76.75' LTBEGIN TYPE F C&G. +42.24, 65.45' LT +86 EXISTING TREE SEE NOTE -2) R/VV LINE BEGIN CONC. SIDEWALK WATCH EXIST. +54.11 EXIST. FIRE HYDRANT EXIST. DRAINAGE STRUCTURE (TO REMAIN) Off -system work (at SW 23rd Street) 2- OAK TREE L STA 43+83.29, 0.69 LT, DBH (IN.): 6. HEIGHT (FT.). 15, CANOPY SPREAD (FT.): 10, CONDITION: GOOD, DISPOSITION. TO BE REMOVED. BEGIN TYPE F C&G MATCH EXIST. +72.58 EI * PE F C&G ND CDNC. SIDEWALK MATCH EXIST, +92.29 R/VV LINE. AT&T FL BT` FPL 120/240 V DISTRIBUTION LINE BE 8 —FLARED END ROADWAY PLAN & SPECIAL DETAILS LEGEND (1 EXISTING WATER VALVE TO BE ADJUSTED BY I0IAI71 DADE COUNTY WATER & SEWER (WOWS). 02 EXISTING SANITARY 1'4ANHOLE TO BE ADJUSTED BY MIAMI-DADE COUNTY WATER & SEWER (MOWS). O3 EXISTING FEN- STORM DRAIN INANHOLE TO BE ADJUSTED. OG EXISTING TELEPHONE INANHOLE TO BE .ADJUSTED 8'I AT&T. BEGIN CDNC SIDEWALK MATCH EXIST. +62.00, 70. 75' LT INDINS 10" SAN EXIST. FIRE HYDRANT — TH-1 I I INILLIING & RESURFACING 4" THICK CONCRETE SIDEWALK 6" THICK CONCRETE SIDEWALK SOD CURB RAMP EXISTING TREES —END TYPE F C&G END CONC. SIDEWALK MATCH EXIST. +02.34 T EXIST. DRAINAGE YPE F C&G STRUCTURE (T0 REMAIN) -01 EXIST. TYPE F C&G (TO REMAIN) 5 Tr G5G A+8600 EI<WASH YIST +94'I1b� +-25 9 86.13 SW 23RD STREET LI I I WATCH EXf5T. I 120.0' (�4T) CROIVN CASTLE FIBER HOPE 3 X 1 0" END I4ILLING & RESURFACING MATCH EXISTING STA. 44+50.00 11IP 0.611 45,,„ k —SEE SPECIA DETAIL 1 J -51 (1'-'9-10DVVS 6' GV 67 W D—RJV/ LINE jr�INDWS 12" II94 LIMITS OF MILLING & RESURFACING 0 10 40 Feet RON LINE + 19E65 41. 00' LT + 27.61 41.00' LT N END PROJECT , _END,.SONSTRLCTION„ I \—R/VV LINE STA. 46+27.61 1I N °0.644 EXHIBIT A - SHEET 1 OF 3 PABLO BIELECKI, P.E. LICENSE NUMBER: 63061 TECHNIKA CONSULTING, INC. 1695 NW 110TH AVENUE, SUITE 321 IMAM!. FL 33172 .STATE OF FLORIDA DEPARTNIE33T CIF T,R11147ORTOd TISOS ROAD NO 5R 9 MI.AMI-DADE FINANCIAL PROJECT ID 431635-9-52-01 ROADWAY PLAN SHEET NO. 5 THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 51615-23.004, F.A.C. ,RAIN LINE EXIST. SIGN (TO 8E REM01ED) I 700-1-60 I 1 PS AN0 ¶1 I ` 1NII r—� (d01Sll 1 �f IiFl-1 Iw NI AV LZMS �N SVI27 AVE A�- AV LZMS SW 27 AVE +01 43.00' LT 01 x30' ( R3-5R ) 30" 53G' 700-1-12 I 700-3-501 STA. 43+05 AINNO 1AS 4 EA 6" VHITE- 6" VVHITE 6-10 SKIP BEGIN SIGNING & PAVEMENT -MARKINGS MATCH EXISTING 5/ ,4 40+83.95— MP 0.541 ( N11-2 ) I 700-1-11 I STA. 41+00 LOCATION 6" WHITE 10'-30' SKIP VV W/R RPIN'S 40 40' C.C. (TYP.) YELLOW DURABLE PAINT 442 EtYDI 7Y111/V_0PJ et" C.C. ( g. +21„- SPEED LLOLIE CD SIGN Vl ( SOLAR PANELS rsEE DerAr1) STA 40 Co 1700-142-1311 I 630-2-12 I I 635-2- 11 I SURVEY 6" WHITE 64'/ IN/R RPIN'S cp 20' C.C. (TVA ./— 1 E' 5 LT EA ASSET ID # 8244 SW 27 AVE AT SW 2323 BLK R/W LINE / n4- ANV 1 sNIMIdlll AS 1L0 N� EXIST. SIGN (TO REMAIN) 4) 6"YELLOW �`IR)R +7 8" Vi HITE ,,, 2" PREFORIIj�D �, HITE (TYP 43. Off -system work (at SW 23rd Street) SPEEDI LIMIT III 5 ll (TO REOIAIN) RESIDENTIALII EXIST. SIGN o v II 0)s 1zII EXIST. SIGNS z� (TO REINAIN) �i / +/ 0000-402/ V/11-2, ) 1 ).5 // (V( ID-7P ) ,I2 I 700-1-11 I STA- 44+00 ' WHITE OUBLE SELLOW /Y RPI1I-5 @ 40' C.0 18" WHITE LD 20' SPACING (TYP-) cn (RIO o 6 241)30" I 700-1-11 I STA. 43+21 I 700-1-11 I ST4. 4.1+75 EXIST. SIGN (T0 BE REINOV ED) 700-1-60 I li NO-11 PARKING II 7 AS 11 ANY II II TIME II ll_4-J 1 O5 'A 24" Pq REt TTITYP.) EI .OV Pt -- w6 ,r„ AS 18" 1 E (TYP) - 12" PREFORMED -N7 ;V KLTEyY P.) 700-1-11 I STA 4s+75 AS (13I4N36IS3Jl P „ZII ll w n ll01 I -I I033dS I I EXIST. SIGN (T0 REMAIN) 6" DOUSLE YELLOW VU/ V/Y RPI11-5 @ 40' CC NHITE 00 ASSET ID # 8246 0 10 40 LOCATION: SW 27 AVE AT SW 2270 BLK I 700-1-11 I SIP. 444, Feet SPEED FEEDBACK SICI1 WITH SOLAR PANELS (SEE DETAIL) 1 A5 700-1- 1 I EXIST. SIGN STA 44+50 (TO REINAIN) SNI5 PO (/0a0 iv 11N0 SSO6J „ (u�tt�) 3" x36" I 700-1-11 STA 45+91 ;IN LINE R/I ST4. 46+25 1700-142-1311 I 630-2-12 I I 635-2-11 I I 700-1-11 I AS E1VD PROJECT EN-D SIGNIN-G- & PAV€-M-ENT MA-R-KINGS MATCH EXISTING 45" 31 STA. 46127.61 6' WHITE IN/ W/R MP 0.644�� RPM'$,,-20'-GCm�T'-P-) ..r --- TA 46-20 BNRM162E-PAINT Et.VW 6 IND/V REIMS ))a 8 CC. (TVA.) 6" NV HITP100 S4'/P °' W Vi/R Rr1"L5 40' c C (TYP-) 5R 9 / SVV 27T,H AVE NpE 1E4 5 LT T4 -�df0 11'HITE-61710- SKIP 2 43.00 RT 8' e 3AV 22 MS WHITE 0,4, 10' SPACING (TYP) 4—BSI 1 O m II _11 II[)N�1912 EXIST. SIGN 1(,0N=if (TO REMAIN) EXIST. SIGN (TO REMAIN) SW 27 AV BLUE \,I 6" WHITE rI ONLY I 700-1-11 1 AS T4 44+60 EXIST. SIGN (TO REINAIIN) Off -system work (at SW 23rd Street) I� I�®�II o � Illo�`�II EXIST. SIGN (TO REMAIN) —R/VV LINE I 700-1-11 I STA 46+05 1 A5 EXHIBIT A - SHEET 2 OF 3 REVISIONS ENGINEER OF RECORD - DATE DESCRIPTION DATE DESCRIPTION PABLO BIELECKI, P.E. LICENSE NUMBER: 63061 TECHNIKA CONSULTING, INC. 1695 NW 110TH AVENUE, SUITE 321 INIAMI, FL 33172 ST1Tlt 0T INLOREi11 1)E Sri' ,T d)P T TSJNS'P(IRT2 T13 ROAD NO. COUNTY FINANCIAL PROJECT ID 5R 9 MIAMI-DADE 431635-9-52-01 SIGNING AND PEA U IEMENT MARKING PLAN SHEET NO. 11 THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RIILE 61G15-23.004, F.A.C. SIGNAL HEAD DETAILS 1 0 3-SECT., I -HAY WITH BACKPLATES 6, ADJUSTABLE BRACKETS 4 AS 654-3-10 SIGN DETAILS PEDESTRIAN CROSSWALK LED IISNS 72" X 24" 2 EA 1 700-5-22 1 CONTROLLER OPERATIONS CONDUITS 1 630-2-12 1 319 LF P4 1 632-7-1 1 1 RI PROP. PED. SIGNAL COUNT -DOWN 1-SECT., 1-WAY 2 AS 1 653-1-11 1 CROSSWALK STOP ON RED PROCEED ON FLASHING RED WHEN CLEAR R10-232 30" X 36" 2 EA 1700-3- 201 I 1. MAJOR STREET: SR-9 / SW 27TH AYE. 2. PEDESTRIAN SIGNAL P4 UPON ACTUATION ONLY. 3. FLASHING OPERATION. 2 & 6 YELLOW. P4 DARK. 4. PEDESTRIAN HYBRID BEACON INDICATIONS SHALL BE DARK (NOT ILLUISINATED) DURING PERIODS BETV/EEN ACTUATIONS. 5. DISPLAY SEQUENCE TO FOLLOW UPON P4 ACTUATION. SIGNAL OPERATING PLAN PHASE 1 PG H 1- PHASE 2 L.ITF1ITF2H--1 Q P4 l.' 1e 010-36 9' X 15' 2 EA CONTROLLER TIMING REFERENCE TABLE VEHICLE MOVEMENT 1 2 3 4 5 6 7 a l~i z 2 APPROACH DIRECTION 58 NB APPROACH POSTED SPEED (MPH) 40 40 ALL RED DISTANCE (FEET) 45 70 YELLOW CLEARANCE (SEC) 4.4 4.4 ALL RED (SEC) 2.0 2.0 PEDESTRIAN MOVEMENT P4 z 0 ,' z ti PED. CROSSING DISTANCE (FEET) 88 PEDESTRIAN WALK (SEC) 7 PED. CLEARANCE INTERVAL (SEC) 2ti PULL BOXES: 1 635-2-11 1 1 635-2-12 1 SERVICE POINT: 1639-1-122 1 I 639-2-1 I I 641-2-12 I CONTROLLER: 1670-5-140 I I 17 EA 1 EA 1 AS 150 LF 1 EA 1 AS PEDESTRIAN (TENS: 646-1-1] 1 2 EA 665-1-72 2 EA' I I " PEDESTRIAN DETECTOR INCLUDES SIGN PED -SIGNAL Off -system work (at SW 23rd Street) PED PEDE_TSL AUDIBLE - PEDESTRIAN DETECTOR AUDIBLE PEDESTRIAN -DETECTOR PED PEDESTAL SE CORNER R/61' L/NE—\\ rR/W LINE SURVEY — N025 21' 32 HIGH -INTENSITY ACTIVATED CROSSWALK BEACON (HAWK) SIGNALIZATION DISPLAY SEQUENCE RA/ LINE SEO. # VEHICLE DISPLAY PEDESTRIAN DISPLAY INTERVAL (SEC) 1 DARK STEADY UPRAISED HAND DARK UNTIL ACTIVATED 2 FLASHING Y ELLDW STEADY UPRAISED HAND 6 3 YELL0IV STEADY UPRAISED HAND 44 4 .RED STEADY UPRAISED HAND 2 5 .RED IVALK INC PERSON 7 6 FL45HING .RED WV IC-VVA1771 FLASHING UPRAISED HAND 26 a? BORING .5 511A-1 I'44ST AR74 +63.18, 48.81' (RT) ARM LENGTH= 78.0' ARM BEARING 5 87° 38' 28" W 1649-21-21 I 1 EA 1 RUN @ 5 LF 1-SIGNAL +7 .40,ED.E48 75'4(RT) 1 ; , Vl R/W LINE —R/11( LINE FPDL SERVICE POINT @ EXIST. POLE N: 515016.45 6. 006697.15 �1 RUN @ 150 LF 1-ELECTRICAL FP3L SERA/ICE DISCONNECT CONCRETE POLE (TYPE P-111 +54.50, 81.00' (LT) 1 RUN (y0 15 LF / 1-ELECTRICAL CONTROLLER 140DEL 2070LX CABINET MODEL I7ID-6603 +54.50, 64.42' (LT) — 2 RUNS @ 20 LF 2-SIGNAL BORING # MA-1 1 RUN @ 27 LF 1-SIGNAL PED PEDESTAL O +87.58, 48.53' (LT) —1 RUN @ 8 LE 1-SIGNAL 1 RUN /V9>LF -1-51G/JI1L:'- 02 0 10 40 Feet RAN LINE R/VV LINE EXHIBIT A - SHEET 3 OF 3 REVISIONS ENGINEER OF RECORD - DATE DESCRIPTION DATE DESCRIPTION PABLO BIELECKI, PE. LICENSE NUMBER: 63061 TECHNIKA CONSULTING, INC. 1695 NW 110TH AVENUE, SUITE 321 MIAMI, FL 33172 ST1Tlt OT FLORIDA TIED Sri025E ,T d)P TPSISJOS'PORT2 TIdIV ROAD NO. COUNTY FINANCIAL PROJECT ID 5R 9 MIAMI-DADE 431635-9-52-01 �IIGNALIIZAT1ON PLAN SHEET NO. 12 THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RIILE 61G15-23.004, F.A.C.