OFF -SYSTEM CONSTRUCTION AND MAINTENANCE AGREEMENT
Between
STATE OF FLORIDA, DEPARTMENT OF TRANSPORTATION
("DEPARTMENT")
and
CITY OF MIAMI, a municipal corporation of the State of Florida
("the CITY")
THIS AGREEMENT is made and entered into as of June 19th, 2024, by and through the STATE OF
FLORIDA DEPARTMENT OF TRANSPORTATION, an agency of the State of Florida (the
"Department"), and the CITY OF MIAMI, a municipal corporation of the State of Florida (the "CITY"),
collectively referred to as the "Parties."
RECITALS
A. Upon approval of the Department's Work Program by the State of Florida Legislature,
and adoption by the Department Secretary, the Department shall complete the various projects included
in the Depaittnent Work Program; and
B. Included in the Department Work Program is Project Number FM# 431635-9-52-01, SR
9 / SW 27th Avenue at SW 23rd Street (the "Project"). A portion of the Project includes work on SW 23rd
Street, in Miami -Dade County, Florida, a road not on the State Highway System, as shown in Exhibit
"A" attached hereto and incorporated herein by reference; and
C. The CITY is the holder of ownership rights to SW 23rd Street, a road not on the State
Highway System; and
D. The Parties agree that it is in the best interest of each party for the Depaitinent to
undertake and to complete all aspects of the Project, including but not limited to, the design, construction,
construction inspection, maintenance during construction, utilities, easements, and other associated
tasks; and
E. The Parties further agree that it is in the best interest of each party to enter into this
Agreement in order to allow the Department to construct and complete the Project.
Rev. 6/22 1
FM#
Page 2 of 13
TERMS
NOW THEREFORE, in consideration of the premises, the mutual covenants and other valuable
considerations contained herein, the receipt and sufficiency of which are hereby acknowledged, the
Parties agree as follows:
1. The recitals in this Agreement are true and correct, and incorporated into and made a part hereof.
2. The Parties agree that the Department intends to undertake and complete Project Number FM#
431635-9-52-01, which Project generally includes the following:
• Milling and resurfacing of a section of SW 23rd Street to upgrade pavement markings.
• Installing a new signal controller/cabinet and service disconnect and connecting the new
traffic signals to FP&L service point located along SW 23rd Street — west of SW 27th Avenue.
The Project shall include improvements along SW 23rd Street, approximately 70' from the
DEPARTMENT right-of-way line, on both sides (east and west) of SW 27th Avenue (for
purposes of this agreement, the "Off -System Project Limits"). The work within the Off -System
Project Limits shall include, but may not be limited to the following (hereinafter referred to as
the "Local Roadway Improvements"):
a) Milling and resurfacing of the asphalt pavement.
b) Installation of sod & reconstruction of concrete sidewalk.
c) Installation of new signal controller cabinet and service disconnect concrete pole for new
traffic signals; and
d) Connecting new traffic signals to the FP&L service point at existing FP&L pole located
170' west of the intersection.
The Project shall further include all activities associated with or arising out of the construction
of the Local Roadway Improvements. In the event that the Project requires the acquisition of
additional right-of-way within the Off -System Project Limits, the Department shall acquire such
right-of-way in order to complete the Project. The CITY shall cooperate with and shall support
the Department's work efforts in these regards.
The Department will design and construct the Project in accordance with all applicable federal
and state laws and regulations and in accordance with Department design and construction
Rev. 6/22 2
FM#
Page 3 of 13
standards as set forth in the Department's guidelines, standards, and procedures. The Depailtuent
shall have final decision authority with respect to the design, the design review process, and
construction of the Local Roadway Improvements, and the relocation of any utilities that the
Department may determine to be required.
3. The Parties acknowledge and agree that the CITY will review the Project Design Plans ("Project
Design Plans") and shall submit its comments, if any, via Electronic Reviewer Comments
("ERC"). The Department shall provide the CITY access to the ERC, and the Department shall
use the ERC to submit the Project Design Plans for the CITY to review. When the Depaiinient
places the Project Design Plans in the ERC, the Department will designate a Comment Due Date
and a Response Due Date. The CITY shall submit its comments with regards to the Project
Design Plans on or before the Comment Due Date, and the Department shall respond to the
CITY's comments, if any, on or before the Response Due Date. If the CITY does not submit its
comments by the Comment Due Date, the CITY will be deemed to have approved the Project
Design Plans submitted by the Department. The review process for the Project Design Plans will
be deemed concluded when the Department has submitted the Final Project Design Plans to the
ERC, and the Comment Due Date and Response Due Date for the Final Project Design Plans
have passed, and the Department has addressed all of the CITY's comments that were submitted
through the ERC. Once the review process is concluded, the Department will construct the
Project in accordance with the Final Project Design Plans submitted through the ERC. The CITY
acknowledges and agrees that, during construction of the Local Roadway Improvements, the
Department will only utilize the services of law enforcement officers when required by the
Depailinent's Standard Specifications for Road and Bridge Construction, and no additional
requirements will be imposed. No further agreements or permits shall be required for production
or construction of this Project.
Major modifications of the approved Project Design Plans must be submitted to the CITY for
review. A "Major Modification" is any modification that materially alters the kind or nature of
the work depicted in the approved Project Design Plans, or that alters the integrity or
maintainability of the Local Roadway Improvements, or related components. The CITY's review
shall be within the reasonable time schedule proposed by the Department, in order to avoid delay
to the Department's construction contract. In the event that any Major Modifications are required
during construction, the Department shall be entitled to proceed with the modifications that are
Rev. 6/22 3
FM#
Page 4 of 13
necessary to complete the construction of the Project, and shall, upon identifying the need for a
Major Modification, immediately notify the CITY of the required changes prior to proceeding
with implementation of the same. It is specifically understood and agreed that any such changes
during construction shall not delay nor affect the timely construction schedule of the Project.
4. The CITY agrees to fully cooperate with the Depailinent in the construction, reconstruction and
relocation of utilities that are located within the CITY's right-of-way, within the Off -System
Project Limits. The utility relocations, if any, which may be required by the Department for
purposes of the Project, shall be done in accordance with the Department's guidelines, standards
and procedures. The Department shall submit the proposed utility relocation schedule to the
CITY. Utility relocations, if any, shall be done in accordance with the provisions of Chapter 337,
F. S.
Additionally, the CITY agrees to fully cooperate with the Department in the removal of any
encroachments or permitted improvements, and in the modification of any driveway connections,
located within the CITY's right-of-way, within the Off -System Project Limits, that are in conflict
with the Project, and the CITY hereby authorizes the Department to take any legal action
necessary to effectuate the removal of any such conflicting encroachments or permitted
improvements, and to effectuate the modification of any such driveway connections.
The Department shall coordinate with the CITY for said removals or modifications, at no cost to
the CITY.
5. The CITY agrees to perpetually maintain the Local Roadway Improvements. To maintain means
to perform normal maintenance operations for the preservation of the Local Roadway
Improvements, which shall include but is not limited to, roadway surfaces, shoulders, roadside
structures, drainage, signing and pavement markers, lighting, and such traffic control devices as
are necessary for the safe and efficient use of the Local Roadway Improvements.
Additionally, the Parties understand and agree that the Department shall transfer any permit(s)
required for the construction of the Local Roadway Improvements, if any, to the CITY as the
operational maintenance entity, and the CITY agrees to accept said transfer and to be fully
responsible to comply with all operational and maintenance conditions of the permit(s), at its sole
cost and expense.
Notwithstanding the requirements hereof, maintenance during construction shall be the
responsibility of the Depail.uient and its Contractor, as set forth in paragraph 9 of this Agreement.
Rev. 6/22 4
FM#
Page 5 of 13
6. The Parties acknowledge and agree that the CITY's right-of-way and the improvements and
structures located within the CITY's right-of-way, are and will remain under the ownership of
the CITY, and that the Department will not have any ownership interest in the right-of-way,
improvements, or structures located thereon or installed therein pursuant to this Project.
7. The Depaitinent shall require its construction Contractor to maintain, at all times during
construction, Commercial General Liability insurance providing continuous coverage for all
work or operations performed under the construction contract. Such insurance shall be no more
restrictive than that provided by the latest occurrence form edition of the standard Commercial
General Liability Coverage Form (ISO Form CG 00 01) as filed for use in the State of Florida.
The limits of coverage shall not be less than $1,000,000 for each occurrence and not less than a
$5,000,000 annual general aggregate, inclusive of amounts provided by an umbrella or excess
policy, or such other minimum insurance coverage that may be required by the Department for
the construction of the Project, in accordance with the Depailiuent's Standards and Specifications
for Road and Bridge Construction. The Department shall further cause its Contractor to name
the CITY and the Depaitinent as additional insured Parties on the afore -stated policies, and to
provide evidence of Workers' Compensation Insurance in accordance with the laws of the State
of Florida and in amounts sufficient to secure the benefit of the Florida Workers' Compensation
law for all employees.
8. The Department shall notify the CITY at least 48 hours before beginning construction within the
CITY's right-of-way. Such notification may be provided via email, to the
, and the notice requirements set forth in paragraph 20 shall not apply
to this paragraph.
The Department agrees that the CITY may, at reasonable times during the construction of the
Local Roadway Improvements, inspect the Contractor's construction site and perform such tests
as are reasonably necessary to determine whether the goods or services required to be provided
by the Contractor, pursuant to the Contractor's Construction Agreement with the Department,
conform to the terms of said Construction Agreement. Upon request by the CITY, the
Department shall coordinate with its Contractor to provide access to the CITY for performance
of said inspections.
During the construction work related to the Project, the CITY shall fully cooperate with any such
work being performed by the Department and the Department's contractors. The CITY shall not
Rev. 6/22 5
FM#
Page 6 of 13
commit nor permit any act which may delay or interfere with the performance of any such work
by the Department or the Department's contractors, unless the Department agrees in writing that
the CITY may commit or permit said act.
9. Maintenance during construction within the Off -System Project Limits, commencing as of the
first date of construction, shall be the responsibility of the Depaitinent's
Contractor. Notwithstanding, neither the Department nor its Contractor shall be responsible for
mowing or removing litter during construction of the Project. After completion of construction,
the CITY shall assume all maintenance responsibilities for the Local Roadway Improvements.
Upon completion of construction, the Department is required to invite the CITY on the Final
Inspection of the work within the Off -System Project Limits, and will incorporate legitimate
CITY concerns that are within the scope of the contract into the final Project punch list to be
corrected by the Contractor. Notice for Final Inspection shall be delivered via email to the CITY
and the notice provision of paragraph 20 shall not be applicable. However, if the CITY does not
attend the Final Inspection, the Depaitiuent shall proceed to conduct the Final Inspection, finalize
the Project punch list, and issue a Notice of Final Acceptance to its Contractor. The Final
Inspection shall be performed and the Notice of Final Acceptance shall be issued in accordance
with the Depaitruent's Standard Specifications for Road and Bridge Construction and the
Construction Proj ect Administration Manual (CPAM).
Upon issuance of the Notice of Final Acceptance to the Contractor, the Depaituient shall provide
a copy of said notice to the CITY. As of the date of the Notice of Final Acceptance, the CITY
shall be immediately responsible for the maintenance of the Local Roadway Improvements, and
shall further accept the Local Roadway Improvements. The Depailinent, however, shall have the
right to assure completion of any punch list by the Contractor. Notwithstanding the issuance of
the Notice of Final Acceptance, the CITY may notify the Department Project Manager of
deficiencies in the Local Roadway Improvements that may be covered by the warranty provisions
in the contract between the Department and its Contractor. The Department shall enforce the
warranty if remedial action is required by the warranty provisions, as determined by the
Department.
Upon completion of all work related to construction of the Project, the Department will be
required to submit to the CITY final as -built plans for the Local Roadway Improvements and an
engineering certification that construction was completed in accordance with the plans.
Rev. 6/22 6
FM#
Page 7 of 13
Additionally, the Department shall vacate those portions of the CITY's right-of-way used to
construct the Local Roadway Improvements, and shall remove the Department's property,
machinery, and equipment from said portions of the CITY's right-of-way. Furthermore, the
Department shall restore those portions of the CITY's right-of-way disturbed by Project
construction activities to the same or better condition than that which existed immediately prior
to commencement of the construction of the Project.
10. Upon submission by the Depailiuent of a deed, with accompanying sketch and legal description,
for the transfer to the CITY of any additional right-of-way acquired by the Department within
the Off -System Project Limits, the CITY shall forthwith submit the same to its governing board
or commission for approval and acceptance of such additional right-of-way.
11 This Agreement shall become effective as of the date both parties hereto have executed the
Agreement. Prior to commencement of construction, the Department may in its sole discretion
terminate this Agreement if it determines that it is in the best interest of the public to do so. If
the Department elects to terminate this Agreement, the Department shall deliver formal notice of
termination to the CITY, as set forth in paragraph 20 of this Agreement.
12. In the event that any election, referendum, approval, ratification, notice or other proceeding, or
authorization is required to carry out the Project, the CITY agrees to expeditiously initiate and
consummate, as provided by law, all actions necessary with respect to any such matters, with
time being of the essence.
13. The Department may utilize federal funds to design and construct the Project. In the event that
the Project shall be constructed using federal funds, all costs incurred must be in conformity with
applicable federal and state laws, regulations, and policies and procedures.
14. The Depailinent's performance and obligations under this Agreement are contingent upon an
annual appropriation by the Legislature. If the Department's funding for this Project is in multiple
fiscal years, funds approval from the Department's Comptroller must be received each fiscal year
prior to costs being incurred.
15. In the event that this Agreement is in excess of $25,000, and the Agreement has a term for a
period of more than one year, the provisions of Section §339.135(6)(a), Florida Statutes, are
hereby incorporated into this Agreement and are as follows:
"The department, during any fiscal year, shall not expend money, incur any liability, or enter
into any contract which, by its terms, involves the expenditure of money in excess of the amounts
Rev. 6/22 7
FM#
Page 8 of 13
budgeted as available for expenditure during any such fiscal year. Any contract, verbal or
written, made in violation of this subsection is null and void, and no money may be paid on such
contract. The department shall require a statement from the comptroller of the department that
funds are available prior to entering into any such contract or other binding commitment of
funds. Nothing herein contained shall prevent the making of contracts for periods exceeding 1
year, but any contract so made shall be executory only for the value of the services to be rendered
or agreed to be paid for in succeeding fiscal years; and this paragraph shall be incorporated
verbatim in all contracts of the department which are for an amount in excess of $25, 000 and
which have a term for a period of more than 1 year."
16. Nothing in this Agreement shall be deemed or otherwise interpreted as waiving the Department's
sovereign immunity protections, or as increasing the limits of liability as set forth in Section
768.28, Florida Statutes.
17. A modification or waiver of any of the provisions of this Agreement shall be effective only if
made in writing and executed with the same formality as this Agreement.
18. This Agreement shall be governed by the laws of the State of Florida. Any provision hereof
found to be unlawful or unenforceable shall be severable and shall not affect the validity of the
remaining portions hereof. Venue for any and all actions arising out of or in any way related to
the interpretation, validity, performance or breach of this Agreement shall lie exclusively in a
state court of appropriate jurisdiction in Leon County, Florida.
19. No term or provision of this Agreement shall be interpreted for or against any party because that
parry's legal counsel drafted the provision.
20. In accordance with Executive Order No. 11-02 the Depailiuent's Vendor/Contractor(s) shall
utilize the U.S. Department of Homeland Security's E-Verify system, in accordance with the
terms governing use of the system, to confirm the employment eligibility of;
i. all persons employed by the Vendor/Contractor during the term of the Contract to
perform employment duties within Florida; and
ii. all persons, including subcontractors, assigned by the Vendor/Contractor to perform
work pursuant to the contract with the Department.
21 All notices required pursuant to the terms hereof, shall be in writing and shall be sent by first
class United States Mail, facsimile transmission, hand delivery or express mail. Notices shall be
deemed to have been received by the end of five (5) business days from the proper sending thereof
Rev. 6/22 8
FM#
Page 9 of 13
unless proof of prior actual receipt is provided. Unless otherwise notified in writing, notices shall
be sent to the following:
To the
To the Department:
Director of Transportation Operations
State of Florida, Department of Transportation
1000 N.W. 111th Avenue
Miami, Florida 33172
22. The CITY, by and through Resolution No. , attached hereto as Exhibit "B",
has duly authorized the execution and delivery of this Agreement and agrees to be bound by the
terms hereunder, and has further authorized the Mayor or his designee to take all necessary steps
to effectuate the terms of this Agreement.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the dates
exhibited, by the signatures below.
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
By: By:
Name:
Title:
Name:
Title: Director of Transportation Operations
Date: Date:
Rev. 6/22 9
FM#
Page 10 of 13
Attest:
Name:
Title:
Approved as to form and legality:
By:
Name:
Department Legal Review:
Rev. 6/22 10
0 2 o 10
Feet
END TYPE F C,4G
INATCH EXIST.
r26,14
rOa
END COVC. SIDEWALK
I7ATCH EXIST.
+52.00 Reim LIINL
LINE
—BEGIN TYPE T CLG
rYATCII EXIST.
+26.1-1
SERIN CON'C. SIDE6Y4LK
ATCH EXIST
*34 00
SPECIAL DETAIL 1 - CR-L I00D.
BEGIN PROJECT
BEGIN CONSTRUCTION
STA. 40+83.95
MP 0.541
R/W LINE
MDWS 10" SAN—
Off-system work
(at SW 23rd Street)
BEGIN TYPE F C&G
WATCH E T.
+08.89 CO
BEGIN CONC. SILO 1//ALK—.
1'4ATCH EXIST.
+97.95, 63.67' RS�
EXIST. DRAINAGE
STRUCTURE
(TO REMAIN)
BEGIN TYPE F C&G
BEGIN CONIC. SIDEWALK
WATCH EXIST.
+88.90
MDWS 8" VIM E SURVEY
4
Noo
— NO2' 21' 32"W
+ 91.95 I'4DV/5 36" IVM
6.00 RT
+ 83.95 SR 9 / SW 27TH AVENUE
6.00 -R
AT&T FL 8T— s� MDWS 36" WM-
BEGIN MILLING & RESURFACING
MATCH EXISTING
STA 42+77.31
MP 0.578
NOTES:
1- ALL EXISTING TREES SHALL REINAIN IN PLACE UNLESS NOTED.
W
cC
+ 31.28
6.49' LT
+ 2212
2.65' RT
43
5AW CUT
R/VV LINE
LIMITS OF WILLING & RESURFACING
WATCH EXIST.
120.0' (LT)
INDIIVS 6" VV I'4
CROWN CASTLE
FIBER HDPE
INDWS 10" SAN
+ 36.73
86 00' LT
+ 50.00
82.75' LT
+ 50.00
76.75' LTBEGIN TYPE F C&G.
+42.24, 65.45' LT
+86
EXISTING TREE
SEE NOTE -2)
R/VV LINE BEGIN CONC. SIDEWALK
WATCH EXIST.
+54.11
EXIST. FIRE HYDRANT
EXIST. DRAINAGE STRUCTURE
(TO REMAIN)
Off -system work
(at SW 23rd Street)
2- OAK TREE L STA 43+83.29, 0.69 LT, DBH (IN.): 6. HEIGHT (FT.). 15,
CANOPY SPREAD (FT.): 10, CONDITION: GOOD, DISPOSITION. TO BE REMOVED.
BEGIN TYPE F C&G
MATCH EXIST.
+72.58
EI * PE F C&G
ND CDNC. SIDEWALK
MATCH EXIST,
+92.29 R/VV LINE.
AT&T FL BT`
FPL 120/240 V DISTRIBUTION LINE BE
8
—FLARED END
ROADWAY PLAN & SPECIAL DETAILS LEGEND
(1 EXISTING WATER VALVE TO BE ADJUSTED BY I0IAI71 DADE
COUNTY WATER & SEWER (WOWS).
02 EXISTING SANITARY 1'4ANHOLE TO BE ADJUSTED BY
MIAMI-DADE COUNTY WATER & SEWER (MOWS).
O3 EXISTING FEN- STORM DRAIN INANHOLE TO BE ADJUSTED.
OG EXISTING TELEPHONE INANHOLE TO BE .ADJUSTED 8'I AT&T.
BEGIN CDNC SIDEWALK
MATCH EXIST.
+62.00, 70. 75' LT
INDINS 10" SAN
EXIST. FIRE
HYDRANT
— TH-1
I I
INILLIING & RESURFACING
4" THICK CONCRETE SIDEWALK
6" THICK CONCRETE SIDEWALK
SOD
CURB RAMP
EXISTING TREES
—END TYPE F C&G
END CONC. SIDEWALK
MATCH EXIST.
+02.34
T
EXIST. DRAINAGE YPE F C&G STRUCTURE
(T0 REMAIN)
-01 EXIST.
TYPE F C&G
(TO REMAIN)
5 Tr G5G
A+8600 EI<WASH YIST
+94'I1b�
+-25 9
86.13
SW 23RD STREET
LI
I
I
WATCH EXf5T.
I 120.0' (�4T)
CROIVN CASTLE
FIBER HOPE 3 X 1 0"
END I4ILLING & RESURFACING
MATCH EXISTING
STA. 44+50.00
11IP 0.611
45,,„
k
—SEE SPECIA
DETAIL 1
J -51
(1'-'9-10DVVS 6' GV 67 W
D—RJV/ LINE jr�INDWS 12" II94
LIMITS OF MILLING & RESURFACING
0 10 40
Feet
RON LINE
+ 19E65
41. 00' LT
+ 27.61
41.00' LT
N
END PROJECT
, _END,.SONSTRLCTION„
I
\—R/VV LINE
STA. 46+27.61
1I N °0.644
EXHIBIT A - SHEET 1 OF 3
PABLO BIELECKI, P.E.
LICENSE NUMBER: 63061
TECHNIKA CONSULTING, INC.
1695 NW 110TH AVENUE, SUITE 321
IMAM!. FL 33172
.STATE OF FLORIDA
DEPARTNIE33T CIF T,R11147ORTOd TISOS
ROAD NO
5R 9
MI.AMI-DADE
FINANCIAL PROJECT ID
431635-9-52-01
ROADWAY PLAN
SHEET
NO.
5
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 51615-23.004, F.A.C.
,RAIN LINE
EXIST. SIGN
(TO 8E REM01ED)
I 700-1-60 I
1 PS
AN0 ¶1
I ` 1NII
r—�
(d01Sll
1 �f
IiFl-1
Iw NI AV LZMS
�N SVI27 AVE
A�-
AV LZMS
SW 27 AVE
+01
43.00' LT
01 x30'
( R3-5R )
30" 53G'
700-1-12
I 700-3-501
STA. 43+05
AINNO
1AS
4 EA
6" VHITE-
6" VVHITE 6-10 SKIP
BEGIN SIGNING &
PAVEMENT -MARKINGS
MATCH EXISTING
5/ ,4 40+83.95—
MP 0.541
( N11-2 )
I 700-1-11 I
STA. 41+00
LOCATION
6" WHITE 10'-30' SKIP
VV W/R RPIN'S 40 40' C.C. (TYP.)
YELLOW
DURABLE PAINT
442 EtYDI 7Y111/V_0PJ
et" C.C. ( g.
+21„-
SPEED LLOLIE CD SIGN
Vl ( SOLAR PANELS
rsEE DerAr1)
STA 40 Co
1700-142-1311
I 630-2-12 I
I 635-2- 11 I
SURVEY
6" WHITE 64'/ IN/R RPIN'S cp 20' C.C. (TVA
./—
1 E'
5 LT
EA
ASSET ID # 8244
SW 27 AVE AT SW 2323 BLK
R/W LINE /
n4-
ANV
1 sNIMIdlll
AS 1L0 N�
EXIST. SIGN
(TO REMAIN)
4)
6"YELLOW �`IR)R +7
8" Vi HITE ,,, 2" PREFORIIj�D
�, HITE (TYP
43.
Off -system work
(at SW 23rd Street)
SPEEDI
LIMIT
III 5 ll (TO REOIAIN)
RESIDENTIALII
EXIST. SIGN
o v II
0)s 1zII EXIST. SIGNS
z� (TO REINAIN)
�i
/ +/ 0000-402/
V/11-2, )
1 ).5
// (V( ID-7P )
,I2
I 700-1-11 I
STA- 44+00
' WHITE
OUBLE SELLOW
/Y RPI1I-5 @ 40' C.0
18" WHITE LD 20'
SPACING (TYP-)
cn
(RIO o 6
241)30"
I 700-1-11 I
STA. 43+21
I 700-1-11 I
ST4. 4.1+75
EXIST. SIGN
(T0 BE REINOV ED)
700-1-60 I
li NO-11
PARKING II
7 AS
11 ANY II
II
TIME II
ll_4-J
1 O5 'A
24" Pq REt
TTITYP.)
EI .OV
Pt --
w6 ,r„
AS
18" 1 E (TYP) -
12" PREFORMED
-N7 ;V KLTEyY P.)
700-1-11 I
STA 4s+75
AS
(13I4N36IS3Jl
P „ZII
ll w n ll01 I -I
I033dS I I
EXIST. SIGN
(T0 REMAIN)
6" DOUSLE YELLOW
VU/ V/Y RPI11-5 @ 40' CC
NHITE
00
ASSET ID # 8246
0 10 40 LOCATION: SW 27 AVE AT SW 2270 BLK
I 700-1-11 I
SIP. 444,
Feet SPEED FEEDBACK SICI1
WITH SOLAR PANELS
(SEE DETAIL)
1 A5
700-1- 1 I
EXIST. SIGN STA 44+50
(TO REINAIN)
SNI5 PO
(/0a0
iv
11N0
SSO6J
„ (u�tt�)
3" x36"
I 700-1-11
STA 45+91
;IN LINE R/I
ST4. 46+25
1700-142-1311
I 630-2-12 I
I 635-2-11 I
I 700-1-11 I
AS
E1VD PROJECT
EN-D SIGNIN-G- & PAV€-M-ENT MA-R-KINGS
MATCH EXISTING
45"
31 STA. 46127.61
6' WHITE IN/ W/R MP 0.644��
RPM'$,,-20'-GCm�T'-P-) ..r ---
TA 46-20
BNRM162E-PAINT Et.VW 6
IND/V REIMS ))a 8 CC. (TVA.)
6" NV HITP100 S4'/P °'
W Vi/R Rr1"L5 40' c C (TYP-) 5R 9 / SVV 27T,H AVE NpE
1E4
5 LT
T4
-�df0 11'HITE-61710- SKIP
2
43.00 RT
8'
e 3AV 22 MS
WHITE 0,4, 10' SPACING (TYP)
4—BSI 1 O m II
_11
II[)N�1912 EXIST. SIGN
1(,0N=if (TO REMAIN)
EXIST. SIGN
(TO REMAIN)
SW 27 AV
BLUE
\,I
6" WHITE
rI
ONLY
I 700-1-11
1 AS
T4 44+60
EXIST. SIGN
(TO REINAIIN)
Off -system work
(at SW 23rd Street)
I�
I�®�II
o �
Illo�`�II
EXIST. SIGN
(TO REMAIN)
—R/VV LINE
I 700-1-11 I
STA 46+05
1 A5
EXHIBIT A - SHEET 2 OF 3
REVISIONS
ENGINEER OF RECORD
- DATE
DESCRIPTION
DATE
DESCRIPTION
PABLO BIELECKI, P.E.
LICENSE NUMBER: 63061
TECHNIKA CONSULTING, INC.
1695 NW 110TH AVENUE, SUITE 321
INIAMI, FL 33172
ST1Tlt 0T INLOREi11
1)E Sri' ,T d)P T TSJNS'P(IRT2 T13
ROAD NO.
COUNTY
FINANCIAL PROJECT ID
5R 9
MIAMI-DADE
431635-9-52-01
SIGNING AND PEA U IEMENT
MARKING PLAN
SHEET
NO.
11
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RIILE 61G15-23.004, F.A.C.
SIGNAL HEAD DETAILS
1 0
3-SECT., I -HAY
WITH BACKPLATES
6, ADJUSTABLE BRACKETS
4 AS
654-3-10
SIGN DETAILS
PEDESTRIAN
CROSSWALK
LED IISNS
72" X 24"
2 EA
1 700-5-22 1
CONTROLLER OPERATIONS
CONDUITS
1 630-2-12 1
319 LF
P4 1 632-7-1 1 1 RI
PROP. PED. SIGNAL
COUNT -DOWN
1-SECT., 1-WAY
2 AS
1 653-1-11 1
CROSSWALK
STOP ON RED
PROCEED ON
FLASHING RED
WHEN CLEAR
R10-232
30" X 36"
2 EA
1700-3- 201 I
1. MAJOR STREET: SR-9 / SW 27TH AYE.
2. PEDESTRIAN SIGNAL P4 UPON ACTUATION ONLY.
3. FLASHING OPERATION. 2 & 6 YELLOW. P4 DARK.
4. PEDESTRIAN HYBRID BEACON INDICATIONS SHALL BE DARK (NOT
ILLUISINATED) DURING PERIODS BETV/EEN ACTUATIONS.
5. DISPLAY SEQUENCE TO FOLLOW UPON P4 ACTUATION.
SIGNAL OPERATING PLAN
PHASE 1
PG
H
1-
PHASE 2
L.ITF1ITF2H--1
Q P4
l.'
1e
010-36
9' X 15'
2 EA
CONTROLLER TIMING REFERENCE TABLE
VEHICLE MOVEMENT
1
2
3
4
5
6
7
a
l~i
z
2
APPROACH DIRECTION
58
NB
APPROACH POSTED SPEED (MPH)
40
40
ALL RED DISTANCE (FEET)
45
70
YELLOW CLEARANCE (SEC)
4.4
4.4
ALL RED (SEC)
2.0
2.0
PEDESTRIAN MOVEMENT
P4
z
0
,'
z
ti
PED. CROSSING DISTANCE
(FEET)
88
PEDESTRIAN WALK (SEC)
7
PED. CLEARANCE INTERVAL
(SEC)
2ti
PULL BOXES:
1 635-2-11 1
1 635-2-12 1
SERVICE POINT:
1639-1-122 1
I 639-2-1 I
I 641-2-12 I
CONTROLLER:
1670-5-140 I
I
17 EA
1 EA
1 AS
150 LF
1 EA
1 AS
PEDESTRIAN (TENS:
646-1-1] 1 2 EA
665-1-72 2 EA'
I I
" PEDESTRIAN DETECTOR
INCLUDES SIGN
PED
-SIGNAL
Off -system work
(at SW 23rd Street)
PED
PEDE_TSL
AUDIBLE -
PEDESTRIAN
DETECTOR
AUDIBLE
PEDESTRIAN
-DETECTOR
PED
PEDESTAL
SE CORNER
R/61' L/NE—\\
rR/W LINE
SURVEY —
N025 21' 32
HIGH -INTENSITY ACTIVATED CROSSWALK BEACON
(HAWK) SIGNALIZATION DISPLAY SEQUENCE
RA/ LINE
SEO. #
VEHICLE DISPLAY
PEDESTRIAN DISPLAY
INTERVAL (SEC)
1
DARK
STEADY UPRAISED HAND
DARK UNTIL
ACTIVATED
2
FLASHING Y ELLDW
STEADY UPRAISED HAND
6
3
YELL0IV
STEADY UPRAISED HAND
44
4
.RED
STEADY UPRAISED HAND
2
5
.RED
IVALK INC PERSON
7
6
FL45HING .RED
WV IC-VVA1771
FLASHING
UPRAISED HAND
26
a?
BORING .5 511A-1
I'44ST AR74
+63.18, 48.81' (RT)
ARM LENGTH= 78.0'
ARM BEARING
5 87° 38' 28" W
1649-21-21 I
1 EA
1 RUN @ 5 LF
1-SIGNAL
+7 .40,ED.E48 75'4(RT) 1 ; , Vl
R/W LINE
—R/11( LINE
FPDL SERVICE POINT
@ EXIST. POLE
N: 515016.45
6. 006697.15
�1 RUN @ 150 LF
1-ELECTRICAL
FP3L SERA/ICE DISCONNECT
CONCRETE POLE (TYPE P-111
+54.50, 81.00' (LT)
1 RUN (y0 15 LF
/ 1-ELECTRICAL
CONTROLLER 140DEL 2070LX
CABINET MODEL I7ID-6603
+54.50, 64.42' (LT)
— 2 RUNS @ 20 LF
2-SIGNAL
BORING # MA-1
1 RUN @ 27 LF
1-SIGNAL
PED PEDESTAL O
+87.58, 48.53' (LT)
—1 RUN @ 8 LE
1-SIGNAL
1 RUN /V9>LF
-1-51G/JI1L:'-
02
0 10 40
Feet
RAN LINE
R/VV LINE
EXHIBIT A - SHEET 3 OF 3
REVISIONS
ENGINEER OF RECORD
- DATE
DESCRIPTION
DATE
DESCRIPTION
PABLO BIELECKI, PE.
LICENSE NUMBER: 63061
TECHNIKA CONSULTING, INC.
1695 NW 110TH AVENUE, SUITE 321
MIAMI, FL 33172
ST1Tlt OT FLORIDA
TIED Sri025E ,T d)P TPSISJOS'PORT2 TIdIV
ROAD NO.
COUNTY
FINANCIAL PROJECT ID
5R 9
MIAMI-DADE
431635-9-52-01
�IIGNALIIZAT1ON
PLAN
SHEET
NO.
12
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RIILE 61G15-23.004, F.A.C.