Loading...
HomeMy WebLinkAboutSchedule of ValuesGIBSON PARK : PHASE II SCHEDULE OF VALUES RECREATIONAL DESIGN & CONSTRUCTION, INC. EgCER'S C(YAPwvY EWAE Date 03/02/12 Gymnasium Building with Kitchen Concession DESCRIPTION QUANT. UNIT UNIT COST AMOUNT Design Fees ( Including Kitchen Consutlatnts) 1 Ls $ - $ 215,000 Builders Risk Insurance 1 Ls $ - $ 9,500 Permit Fees ( Allowance) 1 Ls $ - $ 10,000 Pre Construction Administration 1 Ls $ - $ 15,650 Project management and Supervision 1 Ls $ - $ 108,000 General Conditions 1 Ls $ - $ 102,315 Demolish Remainder of Concession Building 1 Ls $ - $ 12,350 Earthwork and Grading 1 Ls $ - $ 34,700 Drainage Adjustments & Swales 1 Ls $ - $ 10,500 Water and Fire Line Extensions (Connected to existing 12" mains) 1 Ls $ - $ 9,000 Sanitary Sewer & Greas Trap ( Connected to existing mains) 1 Ls $ - $ 8,500 Asphalt Paving, curbs and Marking 1 Ls $ - $ 53,000 Concrete Sidewalks, and Concrete Walkways 1 Ls $ - $ 1,000 Irrigation Extensions 1 Ls $ - $ 7,200 Landscaping , Shrubs, Ground Cover & Sod 1 Ls $ - $ 27,850 Gymnasium Building Structure 1 Ls $ - $ 468,000 Doors and Hardware 1 Ls $ - $ 18,600 Glazing 1 Ls $ - $ 22,995 Covered Canopy Extension (To cover South Entry Door) 1 Ls $ - $ 26,500 Cabinetry and Shelving 1 Ls $ - $ 13,500 Stucco Finishes 1 Ls $ - $ 75,400 Drywall Finishes 1 Ls $ - $ 27,300 Ceramic Tiles & Epoxy Flooring 1 Ls $ - S 27,390 Sports Flooring & Marking 1 Ls $ - $ 80,500 Painting 1 Ls $ - $ 36,900 Signage and Specialties 1 Ls $ - $ 10,300 Basket Ball Equipment 1 Ls $ - $ 47,000 Retractable Bleachers (260 Total Seating Capacity) 1 Ls $ - $ 39,780 Basket Ball Scoreboard 1 Ls $ - $ 12,600 JILILU I Wall Padding Curtain Divider Ceiling Acoustical Panels Kitchen Equipment,Hood, Counters and Shelving. Fire Protection Mechanical and Plumbing Kitchen Plumbing, Gas and Ventilaition Electrical, Lighting ,Fire Alarm and Lighting Protection 1 1 1 , 1 1 1 1 1 Ls Ls Ls Ls Ls Ls Ls Ls $ - $ - $ - $ - $ - $ - $ - $ - $ 10,500 $ 9,875 $ 9,800 $ 75,000 $ 38,000 $ 192,500 $ 40,855 $ 273,600 Sub Total _ $ 2,181,460 Overhead and Fees $ 261,775 12% Bond & Insurances $ 54,973 2.250% ESTIMATE TOTAL $2,498,208 Gibson Park Gym with Concession 03_02_12.xis 3/212012 RECREATIONAL DESIGN & CONSTRUCTION, INC. 3990 North Powerline Road, Fort Lauderdale, Florida 33309 (954) 566-3885 • Fax (954) 566-3335 • Email: joe@recreationaldesign.com GIBSON PARK PHASE II Kitchen/Concession Equipment ITEM PART NUMBER/ NAME Shelving Wire - 3 ea Work Table w/ Sink Wall Mounted Shelf - 2 ea Mop Sink Utility Faucet Wall Mount Hand Sink French Fry Warmer Gas Fryer Counter Unit Low Profile Gas Charbroiler Reach In Refrigerator Griddle Gas Counter Unit Microwave Oven Undercounter Refrigerator 3 Compartment Sink Stainless Steel Cooks Counter Nacho Chips Dispenser Warmer, Nacho Cheese Coffee Maker Dispenser, Ice Tea/ Ice Coffee Ice Maker for Beverage Dispenser Paper Cup Dispenser Beverage Dispenser, Electric Popcorn Machine Ice Cream Merchandiser Hot Dog Steamer Spike Toaster S/S Condiment and Napkin Shelf 8 ft Kitchen Hood Advance Tabco Advance Tabco Advance Tabco Advance Tabco Fisher Industries Advance Tabco By Hatco By Imperial Industries By Vulcan Industries 49 cu ft Unit By True Food Equipment By Imperial Industries Amana Products 23 cu ft Unit By True Food Equipment With Dryboards by Advance Tabco Custom Model w/ Hand Sink - Emjac By Star Mfg. Industries By Star Mfg. Industries Bunn-O-Matic by Bunn Industries By Bloomfield Industries Manitowac A.J Antunes & Co. Grindmaster By Star Mfg. Industries 4.3 cu ft Unit by Master Bilt By Equipex By Equipex Custom Model - Emjac Fabrications Standard w/ Ansul System Gibson Park Phase II Kitchen/Concession Equipment 1/11/2012