RE: Best and Final Offer — Bid No. 11-12-003 — Inlet Cleaning - North Zone
Dear Mr. Barba:
The City of Miami is in receipt of your bid response to Bid No. 11-12-003 for Inlet Cleaning — North
Zone. The bid closed on Wednesday. November 30, 2011, and Envirowaste Services Group, Inc. is the
apparent sole responsive and responsible bidder.
Pursuant to City of Miami Ordinance No. 12271, Section 18-85, the City has the authority to negotiate
with the sole bidder for better pricing or re -bid whichever is in the best interest of the City.
The City hereby requests that you carefully analyze your bid price for any cost savings you can in tum
extend to the City; and provide what is considered your firm's 'best and final offer' as it pertains to your
cost to provide North Zone Inlet Cleaning. This offer should be faxed or emailed to the attention of
Monica Rodriguez, Legislative & Contract Manager (305) 416-1278, or at
MURodriaueza.miamigov.com, by no later than 5:00 p.m. on Wednesday, February 15, 2012.
KR:mur
Enclosure: See attached_
Sincerely,
Kenneth Robertson
Director / Chief Procurement Officer
Page 1 of 3
Please indicate your firm's best and final offer in the spaces provided in last column of this table:
Item #
Description
Total Cost
Original Bid
Total Cost
Best and Final
Offer
1
Inlet and Manhole Cleaning (less than 6 ft cut): Furnishing all
labor, materials and equipment for the removal of sediment
debris, floatables, and any material inside the storm sewer
structures including all inlets and manholes. less than 6 feet cut-
approximately 3,500 structures. Price shall include the
contractor's water usage, the environmental testing fee of the
material and the dumping fee at the Miami -Dade Trash facility.
$35.00
2
3
2
Inlet and Manhole Cleaning (more than 6 ft cut): Furnishing
ail labor, materials and equipment for the removal of sediment
debris, floatabks, and any material inside the storm sewer
structures including all inlets and manholes, 6 to 8 feet cut.
approximately 2,000 structures. Price shall include the
contractor's water image. the environmental testing fee of the
material and the dumping fee at the Miami -Dade Trash facility.
$20.00
Z. O' oO
3
Pipe Cleaning (2" to 11" diameter): Furnishing all labor,
materials and equipment for the removal of sediment debris.
floatables, and any material inside the storm sewer pipes, 2" to
I I" interior diameter. approximately 5,000 linear feet. Price shalt
include the contractor's water usage, the environmental testing
fee of the material and the dumping fee at the Miami -Dade Trash
facility.
$2,500.00
7 ) Z S" -
J
4
Pipe Cleaning (12" to 23" diameter): Furnishing all labor.
materials and equipment for the removal of sediment debris,
floatables, and any material inside the storm sewer pipes, 12" to
24" interior diameter, approximately 10,000 linear feet. Price
shall include the contractors water usage, the environmental
testing fee of the material and the dumping fee at the Miami -
Dade Trash facility.
S50,000.00
/ /Z �Op
j r
5
Pipe Cleaning (24" to 36" diameter): Furnishing all labor,
materials and equipment for the removal of sediment debris.
floatables, and any material inside the storm sewer pipes, 24" to//�
36" interior dm iaeter. approximately 20,000 linear feet. Price
shall include the contractor's water nmape. the environmental
testing fee of the material and the dumping fee at the Miami -
Dade Trash Facility.
$88.000.00
rncao
W
6
Pipe Cleaning (more than 36" diameter): Furnishing all labor.
materials and equipment for the removal of sediment debris.
fioatables, and any material inside the storm sewer pipes. more
than 36` interior diameter, approximately 5,000 linear feet. Price
shall include the contractors water usage_ the environmental
testing fee of the material and the dumping fee at the Miami-
Dadc Trash facility..
$40,000.00
3 (, f cp
/i CJ —
7
Video Camera: Furnishing all labor. materials and equipment
for televising the storm sewer pipe system. any size interior
diameter. approximately 500 linear feet of pipe. any material. if
necessary.
�'�'�
GL
1/7�•
8
Cleaning Deep Drainage Wells: Furnishing all labor. materials
and equipment necessary for the cleaning of 50 deep drainage
wells at a minimum depth of 100 feet by compressed air jetting1
method or approved equal. at different locations citywide.
$10,000.00
l NN��
(�(�. �—
Page 2 of 3
9
GIS Data Collection: Furnishing all labor, materials and
equipment necessary to compile thc data for the each of thc inlet.
pipcs and storm sewer structure cleaned and inspected by the
contractor. The GIS data must be readable and compatible With
the City of Miami GIS darahacr.
$1,000.00
g SD m
10
SPECIAL PROVISION = Contingency Allowance
$5,000.00
S 000• se-
/
TOTAL (Oae Year)
$198,555.00
, 7 1 ? ) ‘ij-,
Please sign and date below to certify your response above:
Ar /3ath.4
Print Name
Title
Signature
Date