Loading...
HomeMy WebLinkAboutExhibit 1ATTACHMENT E-6 RESOLUTION FOR ASSISTANCE 2012 UNDER THE FLORIDA INLAND NAVIGATION DISTRICT WATERWAYS ASSISTANCE PROGRAM WHEREAS, THE City of Miami is interested in carrying out the (Name of Agency) following described project for the enjoyment of the citizenry of Miami and the State of Florida: Project Title Marine Stadium Marina Seawall Replacement — Phase II Total Estimated Cost $ 1.600.000 Brief Description of Project: This project will replace approximately 390 linear feet of seawall in along the Marine Stadium Marina. AND, Florida Inland Navigation District financial assistance is required for the program mentioned above, NOW THEREFORE, be it resolved by the that the project described above be authorized, AND, be it further resolved that said City of Miami (Name of Agency) City of Miami (Name of Agency) make application to the Florida Inland Navigation District in the amount of 50 % of the actual cost of the project in behalf of said City of Miami AND, be it further resolved by the that it certifies to the following: 1. That it will accept the teiius and conditions set forth in FIND Rule 66B-2 F.A.C. and which will be a part of the Project Agreement for any assistance awarded under the attached proposal. 2. That it -is in complete accord with the attached proposal and that it will carry out the Program in -the manner described in the proposal and any plans and specifications attached —thereto-unless prior approval for.any.change has_been.received from the District. (Name of Agency) City of Miami (Name of Agency) VA4 -#-- Q-3/ _3 Form No. 90-21 (Effective date 12-17-90, Rev. 10-14-92) 3. That it has the ability and intention to finance its share of the cost of the project and that the project will be operated and maintained at the expense of said City of Miami (Name of Agency) for public use. 4. That it will not discriminate against any person on the basis of race, color or national origin in the use of any property or facility acquired or developed pursuant to this proposal, and shall comply with the teens and intent of the Title VI of the Civil Rights Act of 1964, P. L. 88-352 (1964) and design and construct all facilities to comply fully with statutes relating to accessibility by handicapped persons as well as other federal, state and local laws, rules and requirements. 5. That it will maintain adequate financial records on the proposed project to substantiate claims for reimbursement. 6. That it will make available to FIND if requested, a post -audit of expenses incurred on the project prior to, or in conjunction with, request for the final 10% of the funding agreed to by FIND. This is to certify that the foregoing is a true and correct copy of a resolution duly and legally adopted by the Miami City Commission at a legal meeting held on this 8th day of March 2012 Attest Title Signature City Manager (2) Form No. 90-21 (Effective date 12-17-90, Rev. 10-14-92) Coastal Systems International, Inc. February 1, 2012 Marine Stadium Marina Seawall Replacement - Probable Opinion of Construction Costs 220240.07 escn tion uantt Unit Cost Estimated„i. —` Total' 1. Remove existing Asphalt and base 1,330 SY 6 7,980 2. Prepare Slab Base 900 SY 10 $ 9,000 3. Furnish and Install Floating Turbidity Curtain 450 LF 10 $ 4,500 4. Demolish and remove existing Bulkhead Cap 450 LF $ 100 $ 45,000 5. Furnish and Install Steel Sheet Piling' 11,400 SF 20 $ 228,000 6. Backfill between new and existing Sheet Piling 120 CY 40 $ 4,800 7. Construct 16" Dia. Augercast Foundation Piling 4,100 LF 30 $ 123,000 8. Construct Reinforced Concrete Slab 600 CY 410 $ 246,000 9. Construct Reinforced Concrete Bulkhead Cap 50 CY 1,200 $ 60,000 10. Adjacent Pavement Limerock Base Repairs 430 SY 15 $ 6,450 11. Adjacent Asphalt Pavement Repairs 130 140 $ 18,200 12. Furnish and Install Forklift Wheel Stops 32 EA. 9,000 $ 288,000 13. Utility Conduit 1 LS $ 15,000 $ 15,000 14. Riprap Mitigation Allowance2 700 90 $ 63,000 Subtotal Cost for Manne,Works`. $;1 118 930: Mobilization/Demobilization (15%) : General Conditions (10%) : Bond (5%) : Contingency (10%) : Total Estimated Construction' -:Cost $167, 840 $111,893 $55,947 $111,893 $ 1,567;goo''J NOTES: Coated Assume-1 cy/ft -of -limestone "boulder for bulkhead replacement per DERM guidelines. Final quantity and location subject to environmental agency requirements. The cost estimates herein are made on the basis of Coastal Systems' experience and qualifications, and represent Coastal Systems' best judgment as -an experienced and qualified professional generally familiar with the industry. However, Coastal Systems has no control over the cost of labor, materials, equipment, or services furnished by others, or over the Contractors' methods of determining prices, or -over competitive 'bidding or market conditions -Coastal. Systems cannot and does not guarantee that proposals, bids, or actual Construction Cost will not vary from the above estimates.