HomeMy WebLinkAboutHyatt Regency Miami - Table of ContentsCENTRAL CHILLED WATER PLANT AND COOLING TOWER DESIGN
HYATT REGENCY MIAMI
TABLE OF CONTENTS
PROJECT LOCATION
Hyatt Regency Miami
400 S.E. Second Avenue
Miami, FL 33131-2197
ENGINEERS OF RECORD
Mechanical and Electrical Engineer
Alexander S. Butkus, P.E.
820 Davis St., Suite 300
Evanston, IL 60201
License Number: 52206
Structural Engineer
Jerome P. O'Connor S.E, P.E.
Building Consultants,Ltd.
215 North Arlington Heights Rd.
Arlington Heights, IL 60004
License Number: 54261
APPLICABLE BUILDING CODES
2007 Florida Building Code (PBC), High Velocity Hurricane Zone (with 2009 Supplement)
2007 Florida Energy Code
2006 International Building Code
2006 International Plumbing Code
2006 International Mechanical Code
NEC 2005
EXHIBITS
EXHIBIT 1
EXHIBIT 2
EXHIBIT 3
PRE -PURCHASED CHILLERS SUBMITTALS (APPLICABLE TO BASE BID A ONLY)
PRE -PURCHASED COOLING TOWER SUBMITTAL (APPLICABLE TO BASE BID B
ONLY)
HYATT HOTELS CORPORATION WATER TREATMENT STANDARDS FOR HVAC
SYSTEMS (APPLICABLE TO BASE BID B ONLY)
SPECIFICATIONS
DIVISION 1- GENERAL REQUIREMENTS
SECTION 01010
SECTION 01049
SEC:1'ION 01300
SECTION 01400
SECTION 01600
SUMMARY OF WORK
MECHANICAL AND ELECTRICAL COORDINATION
SUBMITTALS _
QUALITY CONTROL SERVICES
MATERIAL AND EQUIPMENT
Hyatt Regency Miami
Central Chilled Water Plant and .Cooling Tower Design
G/BA //09096 •
Table of Contents
,1
November_, 2011
SECTION 01650
SECTION 01700
STARTING OF SYSTEMS
PROJECT CLOSEOUT
DIVISION 15 - MECHANICAL
SEC:IION 15010
SECTION 15060
SECTION 15140
SEC_ 1'ION.15170
SECTION 15172
SECTION 15190
SEC:1ION 15242
SECTION 15250
SECTION 15410
SECTION 15450
SECTION 15510
SEC11ON 15540
SECTION 15545
SEC UON 15620
SECTION 15684
SECTION 15712
SECTION 15755
SECTION 15790
SECTION 15860
SECTION 15890
SECTION 15910
SEC:110N 15936
SECTION 15980
SECTION 15981
SECTION 15990
BASIC MECHANICAL REQUIREMENTS
MINOR MECHANICAL DEMOLITION FOR REMODELING
SUPPORTS, ANCHORS AND SLEEVES
MOTOR REQUIREMENTS FOR HVAC AND PLUMBING EQUIPMENT
VARIABLE FREQUENCY DRIVES
MECHANICAL IDENTIFICATION
VIBRATION ISOLATION
THERMAL INSULATION
PLUMBING PIPING
PLUMBING EQUIPMENT
HYDRONIC PIPING AND SPECIALI'1hS
HVAC PUMPS
PIPE CLEANING, FLUSHING, AND CHEMICAL TREATMENT
WATER-COOLED POSITIVE DISPLACEMENT HEAT PUMP
CENTRIFUGAL WATER CHILLERS
INDUCED DRAFT COOLING TOWER
HEAT EXCHANGERS
AIR COILS
CENTRIFUGAL FANS
METAL AND FLEXIBLE DUCT
DUCTWORK ACCESSORIES
AIR INLETS AND OUTLETS
METERS AND GAUGES FOR HVAC AND PLUMBING
REFRIGERANT DETECTION SYSTEM
TESTING, ADJUSTING, AND BALANCING FOR HVAC
DIVISION 16 - ELECTRICAL
SEC. IION 16010
SECTION 16050
SECTION 16060
SECTION 16120
SECTION 16130
SECTION 16410
SECTION 16420
SECTION 16442
SECTION 16491
SECTION 16515
BASIC ELECTRICAL REQUIREMENTS
BASIC ELECTRICAL MATERIALS AND METHODS
GROUNDING AND BONDING
CONDUCTORS AND CABLES
RACEWAYS AND BOXES
SAFETY AND DISCONNECT SWITCHES 1 ENCLOSED CIRCUIT BREAKERS
MOTOR STARTERS
PANELBOARDS
FUSES
INTERIOR LIGHTING FIXTURES
DIVISION 17 - TEMPERATURE CONTROL (ALL PART OF BASE BID 13)
SECTION 17010 BASIC TEMPERATURE CONTROL REQUIREMENTS
SECTION 17100 TEMPERATURE CONTROL HARDWARE
Table of Contents IT
November , 2011
- - Hyatt Regency Miami
Central Chilled Wate Plant'and Cooling Tower Design
G/BA 4/09096
SECTION 17200
SECTION 17300
SECTION 17400
SEC.IION 17600
TEMPERATURE CONTROL SOFTWARE
TEMPERATURE CONTROL CONDUIT
TEMPERATURE CONTROL WIRING
= TEMPERATURE CONTROL DEMOLITION '
STRUCTURAL SPECIFICATIONS ON DRAWINGS
DRAWINGS (bound separately, if drawing not marked for specific Base Bid, see drawing)
CS
COVER SHEET
M0-1 MECHANICAL SYMBOLS AND ABBREVIATIONS
M1-1 BASE BID A -1sr FLOOR MECHANICAL PLAN - DEMOLITION
M1-2 BASE BID A - 1ST FLOOR MECHANICAL PLAN - NEW WORK
M1-3 CHILLER ROOM MECHANICAL PLAN - DEMOLITION
M1-4 CHILLER ROOM MECHANICAL PLAN - NEW WORK
M1-5 BASE BID B - ROOF MECHANICAL PLAN - DEMOLITION
M1-6 BASE BID B - ROOF MECHANICAL PLAN - NEW WORK
M2-1 MECHANICAL FLOW DIAGRAM - DEMOLITION
M2-2 MECHANICAL FLOW DIAGRAM - NEW WORK
M3-1 MECHANICAL DETAILS
M3-2 MECHANICAL DETAILS
M4-1 MECHANICAL SCHEDULES
M4-2 MECHANICAL SCHEDULES
M5-1 BASE BID B - TEMPERATURE CONTROLS
EO-1 ELECTRICAL SYMBOLS, NOTES, AND SCHEDULES
E1-1 BASE BID A - CHILLER ROOM ELECTRICAL PLAN - DEMOLITION
E1-2 BASE BID A - CHILLER ROOM ELECTRICAL PLAN - NEW WORK
E1-3 BASE BID A - CHILLER ROOM ELECTRICAL LIGHTING PLAN
EI-4 ROOF ELECTRICAL PLAN AND PARTIAL ELECTRICAL RISER DIAGRAM -
DEMOLI'1'lON
EI-5 ROOF ELECTRICAL PLAN AND ELECTRICAL RISER DIAGRAMS - NEW WORK
S-1 BASE BID B - STRUCTURAL KEY PLAN & DETAILS
S-2 BASE BID B - STRUCTURAL DEMOLITION PLAN AND NOTES
S-3 BASE BID B - STRUCTURAL PARTIAL PLANS AND ELEVATIONS
S-4 BASE BID B - STRUCTURAL DETAILS AND SEC:'1'1ONS
S-5 BASE BID B - STRUCTURAL SIGN SUPPORT, FRAMING PLAN, ELEVATIONS,
AND DETAILS
S-6 BASE BID B - STRUCTURAL PARTIAL ROOF PLAN AND DETAILS
P:\09PROJECrS\09096HYA-MIA\CAD\ISSUED\2011-11-07 FORBID REVISED \ PROJECT DOCUMENTS SINGLE CONTRACT \ TABLE OF
CONTENTS SINGLE CONTRACT.DOCX
Hyatt Regency Miami ,: , :... .
Central .Chilled Water Plant and Cooling Tower Design
GBA #09096
T_ able of Contents
November_., 2011
PROJECT MANUAL FOR PREPURCHASE OF EQUIPMENT
TABLE OF CONTENTS
BIDDING REOUIREMENTS
SECTION 00110 INVITATION TO BID FOR PREPURCHASE OF EQUIPMENT
SECTION 00200 • INSTRUCTIONS TO BIDDERS FOR PROCUREMENT CONTRACTS (EJCDC
No. P-200, 2000 Edition)
SECTION 00400 BID FORM FOR PREPURCHASE OF EQUIPMENT
CONTRACT FORM
SECTION 00520 • HYATT HOTELS CORPORATION REQUISITION/PURCHASE ORDER, WITH
AMENDMENTS (OBTAIN FROM DIRECTOR OF ENGINEERING)
CONDITIONS OF THE CONTRACT
SECTION 00700 • STANDARD GENERAL CONDITIONS FOR PROCUREMENT CONTRACTS
(EJCDC No. P-700, 2000 Edition)
SECTION 00800 SUPPLEMENTARY CONDITIONS FOR PREPURCHASE OF EQUIPMENT
TECHNICAL SPECIFICATIONS
SECTION 15170 MOTOR REQUIRMENTS FOR COOLING TOWERS
SECTION 15712 INDUCED DRAFT COOLING TOWERS
EXHIBITS
EXHIBIT 1 SK-1 COOLING TOWER LAYOUT AND PHOTO
P: \09PROJECFS \09096HYA-MIA \ WP\PREPURCHASE SPECS \ COOLING TOWER \TABLE OF CONTENTS.DOCX
Hyatt RegencyMiami
Prepurchase of -Cooling Towers
GJBA #09096
• Project Manual for Prepurchase of Equipment
TOC -1
June'12, 2009 '
CITY OF MIAMI OFFICE OF THE CITY CLERK
BID SECURITY LIST
BID ITEM: Hyatt Cooling Towers
BID NUMBER: ITB No.11-12-008
DATE BID OPENED: Friday, December 9, 2011
TIME:
2:OOPM
BIDDER
BASE BID
BID BOND (ER)
AMOUNT
CASHIER'S
CHECK
Kerney and Associates, Inc.
$3,680,500.00
5% Bid Bond
F.I-I. Paschen,
S.N. Nielsen & Associates, LLC
$4,350,500.00
. Bid Bond
aa5%
o rc
"Oilers 1`° 1''aa the 'Ge,a,:wo7.—.3 1`,93%1 67;,4.....
received timely as of 'ehs, cxn-,n.ro r--
v
'... are) these C'�":i'..7
-t=17.1 i dcz and time.
r.1_r ta',LWLLY
All
if any
other oilers k In Eyc .....,,..,
are hereby 9jected as late."
1 :JJu1.,..nL
„ .
,.
A
`_
eceiving Bid(s)
on )
Today's Date
d(s) on behalf Capital Improvements
City Department
PREPARED BY:
Deputy City Clerk