HomeMy WebLinkAboutExhibit 1CITY OF MIAMI
AMENDMENT NO.1 TO CONSTRUCTION CONTRACT
WITH LINK CONSTRUCTION GROUP, INC.
FOR RENOVATION OF THE MIAMI GREEN LAB, B-30652
This Amendment No. 1 to the Contract dated October 8, 2010, (the "Contract")
between the City of Miami, a municipal corporation of the State of Florida ("City"), and
Link Construction Group, Inc., ("Contractor") a Florida corporation, for the project entitled
"Renovation of the Miami Green Lab, B-30652", ("Project") is entered into this day
of , 2011.
RECITALS
WHEREAS, the Contract was entered into pursuant to Invitations for Bids No. 08-
09-072, issued September 23, 2009, for the Scope of Work as stated in the original
Contract Documents for the Project; in the amount of $804,750, plus an additional
$80,475 owner contingency, for a total not to exceed award amount of $885,225; and
WHEREAS, additional work is now necessary due to the building's deteriorated
conditions, which includes structural reinforcement at the wall openings of the windows,
structural repairs to the roof, additional rehabilitation to the building's power service and
plumbing, and owner requested changes for the millwork and HVAC system to
accommodate a computer lab; and
WHEREAS, this Amendment No. 1 is now necessary, approved pursuant to R-
, to cover the additional work, in the amount of $100,000, for a total not to
exceed award amount of $985,225; and
NOW THEREFORE, for the considerations hereinafter set forth:
The Contract is hereby amended as follows:
1. Section 4, Scope of Work is hereby amended by the additional owner
requested changes to include the following additional work: structural
reinforcement at the wall openings of the windows, structural repairs to the
roof, additional rehabilitation to the building's power service and plumbing,
and owner requested changes for the millwork and HVAC system to
accommodate a computer lab.
2. The Contract Sum, as reflected in Bid Form, page 81, plus a 10% contingency
if authorized by the City, is hereby increased by $100,000, thereby increasing
the total award value from Eight Hundred Eighty Five Thousand, Two
Hundred Twenty Five ($885,225), to an amount not to exceed Nine Hundred
Eighty Five Thousand, Two Hundred Twenty Five Dollars ($985,225).
1
3. All other terms and conditions of the Contract are in effect and remain unchanged.
THE CITY OF MIAMI, FLORIDA
ATTEST: CITY OF MIAMI, FLORIDA, a municipal
Corporation of the State of Florida
By: By:
Priscilla A. Thompson, City Clerk Johnny Martinez, P.E., City Manager
(Affix City Seal)
APPROVED AS TO LEGAL FORM AND APPROVED AS TO INSURANCE
CORRECTNESS: REQUIREMENTS:
By: By:
Julie O. Bru, City Attorney Calvin Ellis, Director
Risk Management Department
CONTRACTOR
Link Construction Group, Inc., a Florida
corporation
ATTEST:
By: By:
Corporate Secretary Guillermo Fernandez, President
(Affix Corporate Seal)
rsr:Document 284620
2