00402 SCHEDULE OF BID PRICES — PAY ITEMS
M-0020 Page 1 of 2
Pay Item Description
Cost
Item
Quantity
Unit of
Measure
Total Cost=Item
Item cost x
Item
quantity
1
TRAFFIC CIRCLES MAINTENANCE:
Furnish all equipment, labor and material necessary for mowing, weeding, trimming (ground
cover and grass areas inside the traffic circle location), mulching, fertilizing, herbicide spraying
(including all landscaping and brick area), insect spraying the entire area, cutting/trimming the
dead frond of the palm trees, and litter pick up, for one traffic circle locations, 26 times per
year (on a "bi-weekly" basis). Contractor shall remove all debris and trash bags from the
area, the same day of the work being performed.
Note: Price is for one (1) traffic circle maintained 26 times per year (bi-weekly).
$ 7
66
Each
Traffic
circle on a
bi-weekly
basis.
$ SJl
2
STREET BARRICADE MAINTENANCE:
Furnish all equipment, labor and material necessary for mowing, weeding, trimming (ground
cover and grass areas inside the barriers), mulching, fertilizing, herbicide spraying (including
all landscaping areas), insect spraying the entire area, cutting/trimming the dead frond of the
palm trees or tree limbs, and litter pick up, for street barrier locations, twelve(12) times per
year (on a "monthly" basis). Contractor shall remove all debris and trash bags from the area,
the same day of the work being performed.
Price is for one (1) street barrier maintained 12 times per year (monthly).
$ 7J.QCI)
28
Each street
barrier on
a monthly
basis.
$.i/00
.
3
SPECIAL PROVISIONS = Contingency Allowance
$ 50,000
Note: Approval of this contract for use by the City of Miami means a C-Opta c�of the contract unit prices not necessarily the quantities shown
Approved: Check one L
YES OR ❑ NO
By: _
Orlando Otero, President
Superior Landscaping & Lawn Service
Date: 9- /--09
Line
No.
00402 SCHEDULE OF BID PRICES — PAY ITEMS
M-0020 Page 2 of 2
IMPORTANT: PLEASE SUBMIT THIS PAGE COMPLETED WITH PROPOSAL OR BID
WILL BE DEEMED INCOMPLETE.
Item Cost
Quantity
Total Cost=
Item cost*
Item
quantity *
frequency
per year
A
Installation of one (1) reflective pavement marking (rpm), mono directional yellow at any traffic circle
location.
$ r51 j
/ C J
.
$ / 0
B
Installation of one (1) reflective pavement marking (rpm), double yellow at any traffic circle location.
$ /rpm
Each
$ / 0
C
Installation of one (1) reflective pavement marking (rpm), bi-directional white/red at any traffic circle
location.
$ ��
1 rpm
Each
$ �
`
r
D
Installation of one (1) traffic signs at any traffic circle, including furnishing all appurtenances for a new
pole (<12'), new stand, all hardware, concrete for the base, etc. This price does not contain the price for
the actual traffic signage.
$ . ^
1 sign pole
and stand
Each
$
.S(3
E
Furnish one (1) Yield sign, R1-2, 36"x36"
$ f0 j
1 sign
Each
$ /OS
F
Furnish one (1) traffic circle ahead sign, W2-6, 30"x30"
$ % (
1 sign
Each
$ / .S
G
Furnish one (1) 15'm.p.h. sign, W13-1, 18"x18"
$ 7r)
1 sign
Each
$ -20
H
Furnish one (1) Keep Right sign, R4-7a, 24"x30"
$ 7S
1 sign
Each
$ -7S
I
Furnish one (1) pedestrian crossing sign, W11-2, 24"x24"
$ 7E
1 sign
Each
$ - S
Furnish one (1) W16-7P, 24"x12", regulatory sign
$ -70
1 sign
Each
$ 70
K
Reset one (1) traffic marking/ signage at any traffic circle of any kind, including assembly, concrete for
base, all hardware, and existing sign.
$ c9fs
1 sign
Each
$ C.
L
Installation of one (1) Bishmarck Palm, Bismarchia nobilis, 45 gal., including watering and wood stand.
$ 27/6S
1 Palm
Each
$ 1, 1(`
M
Install 100 cubic yards of red mulch, at any traffic circle location, including removal of the existing
mulching, if necessary.
$
100 cu. Yd.
Cubic yard
$ ,/
N
Install 100 cubic yards of solid sod "Floratam" - Refer to DIVISION 2B- SODDING
$ z/ i-�
100 cu. Yd.
Cubic yard
,
$ 17/0S
O
Replacement of one (1) shrub- 3 gal. by removal deceased shrubs/plants and planting new shrubs -
same as existing (24" ht. - 3 gal), watering, fertilize and mulch around affected area, at any traffic circle.
New planting to occur at 36" off the back of walk way.
$
-7
CC::q
1 plant
Each
$
ie . U-7
p
Installation of 100 cubic yards of top soil, 50/50 mix to be place at any of the traffic circle locations.
$ C
100 cu. Yd.
Cubic yard
$ �I?)
Q
Replanting/ resetting of one (1) existing tree (25 gal.), including wood stand, as required by the
Engineer.
$ / 745
1 tree
Each
$ ) 7(
/
R
Installation of one (1) Christmas Palm, Veitchia merrillii, 45 gal., including watering and wood stand.
$ 1S
1 palm
Each
$
$ 4/65
S
Installation of 100 square feet of EASYGRASS, or approved equal product - refer to Division 2A for
specifications.
$
100 sq. ft.
Square Feet
$ s�J