Loading...
HomeMy WebLinkAboutExhibit 2SERIES 2009 PROJECT The Series 2009 Project consists of acquisition, construction and improvements to certain roadways and streetscapes, including but not limited to: District 1 • In the area generally bounded by N.W. 27th Ave, N.W. 20th St., N.W. 17th Ave., and N.W. 38th St., including the area along N.W. 366h St. from N.W. 27th Ave. west to the City limits -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the areas generally bounded by N.W. 27th Ave, N.W. 20th St., N.W. 22nd Ave., and N.W. 7th St., and N.W. 22nd Ave., N.W. 20tb St., N.W. 17th Ave., and State Rd. 836 -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by N.W. 36th St., N.W. 7th Ave., State Rd. 836, and N.W. 17th Ave. - project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by Tamiami Canal to N.W. 3rd St., and N.W. 42nd Ave. to the City limits -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by N.W. 20th St, N.W. 42nd Ave., N.W. 7th St., and N.W. 27th Ave. - project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. District 2 • In the areas generally bounded by N.W. lst Ave., N.E. 14th St., Biscayne Bay, and Miami River, and N.W. 2nd Ave., N.E. 14th St., and N.E. 36th St., and Biscayne Bay -project components include: the design and construction of roadway improvements, including milling and resurfacing, curbs, gutters, striping, swale restoration, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and drainage improvements. • In the area of South Miami Ave. Rd. from S.W. 1st Ct. to S. Miami Ave. -project components include: the construction of roadway improvements including street reconstruction, resurfacing, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the area east of Biscayne Blvd. on N.E. 83rd Rd., 85th St., and 86th St. -project components include: the design and construction of roadway to include milling and resurfacing, swale restorations, new sidewalks, landscaping and roadway striping. • In an area generally bounded by N.E. 36th St., N.E. 87th St., N.E. 4th Ct., and Biscayne Bay - project components include: the design and construction of roadway improvements, including milling and resurfacing, curbs, gutters, striping, swale restoration, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage and drainage improvements. • In an area generally bounded by N.E. 86th St., N.E. 83rd Terr., Biscayne Blvd., and East Dixie Hwy. -project components include: the construction of roadway improvements, including milling and resurfacing, striping, swale restoration, sidewalk replacement, ADA compliant ramps, and drainage improvements. • In the area generally bounded by N.E. 58th St, N.E. 77th St., N.E. 4th Ct., and Biscayne Blvd. - project components include: the construction of roadway improvements, including, milling and resurfacing, sidewalk replacement, ADA compliant ramps, drainage improvements and landscaping. • In the areas generally bounded by the Miami River, S.W. lst Ave., Rickenbacker Cswy., and Biscayne Bay, and S.W. 27th Ave., S. Dixie Hwy., Rickenbacker Cswy., and Biscayne Bay - project components include: the design and construction of roadway improvements, including milling and resurfacing, curbs, gutters, striping, swale restoration, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage and drainage improvements. • Bird Ave. from U.S. 1 to Aviation Ave. and McDonald St. from U.S. 1 to Jackson Ave. -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, designated bicycle lanes, landscaping, signage, and striping. • In the area of Venetian Causeway from Herald Plaza to the City limits -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping. • In the area known as South Grove -project components include: the design and construction of speed humps and roadway improvements, including milling and resurfacing, swale restoration, drainage improvements, signage, and striping. • In the area along U.S. 1 from 19th Ave. to 17th Ave. -project components include: roadway improvements, including milling and resurfacing, curbs, gutters, replacement of the existing roadway wall, and landscaping. • In an area generally bounded by S.W. 24th St., S.W. 27th Ave., N. Prospect Dr., Biscayne Bay, and the City limits to the west -project components include: the design and construction of roadway improvements, including milling and resurfacing, curbs, gutters, striping, swale restoration, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage and drainage improvements. • In the area known as San Marco and Biscayne Islands -project components include: drainage improvements, roadway improvements, milling and resurfacing, curbs, gutters, sidewalk replacement, ADA compliant ramps, swale restoration, landscaping, signage, and striping. District 3 • In the area along N.W. S. River Dr. from N.W. 1st St. to N.W. 4th St. -project components include: the design and construction of roadway resurfacing, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping. • In the areas generally bounded by N.W. 9th St., N.W. 17th Ave., W. Flagler St., and N.W. 22nd Ave., and N.W. 7th St., N.W. 14th Ct., N.W. 9th St., and N.W. 17th Ave. -project components include: the design and construction of drainage system, resurfacing, curbs, gutters, sidewalk replacement, ADA compliant ramps, and striping. • In the areas generally bounded by N.W. 9th St., N.W. 12th Ave., W. Flagler St., and N.W. 22nd Ave., and N.W. 7th St., N.W. 22nd Ave., W. Flagler St., and N.W. 27th Ave. -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by S.W. 17th Ave., S.W. 8th St., S.W. 12th Ave., and S. Dixie Hwy. -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by S.W. 27th Ave., S.W. 9th St., S.W. 12th Ave., and W. Flagler St. - project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by S.W. 12th Ave., S.W. 7th St., and N.W. S. River Dr. -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by S.W. 7th St., S.W. 12th Ave., and S. Dixie Hwy. -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. District 4 • In the area generally bounded by S.W. 16th St., S.W. 27th Ave., S.W. 22nd St., and S.W. 32nd Ave. -project components include the design and construction of a positive storm sewer system, road improvements such as damaged sidewalk replacement, damaged curb and/or gutter replacement, ADA compliant ramp construction, swale restoration, landscaping, signage, milling and resurfacing, and striping. • In the area generally bounded by S.W. 27th Ave., S.W. 9`h St., S.W. 17th Ave., and S. Dixie Hwy. -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the areas generally bounded by S.W. 37th Ave., N.W. 7th St., S.W. 27th Ave. and S. W. 24th St., and N.W. 43rd Ave., N.W. 7th St., N.W. 37th Ave., S.W. 8th St. -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by Tamiami Canal Rd., N.W. 3rd St., S.W. 43`d Ave., and S.W. 8`h St. -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the area known as Shenandoah various intersections -project components include: the construction of traffic circles, including related drainage improvements, curbs, gutters, milling and resurfacing, landscaping, and pavement markings. • In the area known as Flagami various intersections -project components include: the construction of traffic circles, including related drainage improvements, curbs, gutters, milling and resurfacing, landscaping, and pavement markings. • In the area known as Silver Bluff various intersections -project components include: the construction of traffic circles, including related drainage improvements, curbs, gutters, milling and resurfacing, landscaping, and pavement markings. District 5 • In the area generally bounded by N.W. 19th Ave., N.W. 58th St., N.E. 4th Ct., and N.W. 36th St. - project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by N.W. 17th Ave., N.W. 715t St., N.E. 4th Ct., and N. W. 58th St. - project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the areas generally bounded by N.W. 7th Ave., N.W. 79th St., N.E. 4th Ct., N.W. 71' St., and N.W. Miami Ct., N.E. 84th St., N.E. 4th Pl., and N.E 79th St. -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the areas generally bounded by N.W. 7th Ave., N.W. 36th St., N.W. lst Ave., and the Miami River, and State Rd. 836, N.W. 7th Ave., and the Miami River -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by N.W. 715t St., N.W. 7th Ave., N.W. 62nd St., and N.W. 12th Ave - project components include: the construction of drainage improvements, milling and resurfacing, curbs, gutters, sidewalks replacement, ADA compliant ramps, and swale restoration. • In the area generally bounded by N. Miami Ave., N.W. 2nd Ave., N.W. 40th St., and N.W. 46th St. -project components include: the design and construction of roadway improvement, including widening and milling and resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, landscaping, and striping. Multi -District • Citywide -project components include: Miscellaneous sidewalk replacements and construction of ADA compliant improvements. • In the area generally bounded by Biscayne Blvd., Miami Ave., S.E. 2nd St., and N.E. 3rd St. - project components include: the construction of road improvements, such as damaged sidewalk replacement, damaged curb and/or gutter replacement, drainage system improvements, ADA compliant ramp construction, milling and resurfacing, lighting, landscaping, and pavement markings including crosswalks. • In an area generally bounded by N.W. 20th St., State Rd. 836, N.W. 7th Ave., and N.W. 17th Ave. - project components include: the design and construction of roadway improvements, such as damaged sidewalk replacement, damaged curb and/or gutter replacement, ADA compliant ramp construction, milling and resurfacing, and landscaping. • In the area generally bounded by N.W. 7tt, St., N.W. 3rd St., N.W. 17th Ave., and N.W. 14th Ave. - project components include: the design and construction of new roads, sanitary sewer and drainage systems, curbs, gutters, sidewalks, traffic signalization, lighting., milling and resurfacing, landscaping, and pavement markings. • In the area generally bounded by S. 9th St., S. lOt"1 St., S.W. lst Ave., and S.E. lst Ave. —project components include: the construction of a pump station and drainage system improvements, roadway improvements, including milling and resurfacing, curbs and/or gutter replacement, and sidewalk reconstruction. Or if such project components cannot be constructed as provided above, such other roadway and sidewalk improvements, as may be determined by the City, including but not limited to milling and resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant improvements, lighting improvements, landscaping, signage, and striping, in the areas described above or in any other areas as may be determined by the City.