SCHOOL IMPACT REVIEW ANALYSIS
August 21, 2007
FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL
AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE
APPLICANT IS NOT REQUESTING ADDITIONAL RESIDENTIAL DENSITY OVER WHAT IS
CURRENTLY ALLOWED IN THE PROPERTY'S ZONING CLASSIFICATION.
APPLICATION: Cabi Development (Capital tinia SMA)
REQUEST: Large Scale Development
ACRES. 4- 2184 net acres
ZONING: SD-7 "Special District f Central Brickell Rapid Transit Commercial
Residential District" (500 DU/acre)
LOCATION:
MSA/
MULTIPLIER:
NUMBER OF
UNITS:
Site located between SW 1$° Avenue and South Miami Avenue and
between SW 14 Terrace and SW 14 Street, Miami
5.2/.18
724 units
(542 multifamily and 364/2 = 182 hotel units)
ESTIMATED STUDENT
POPULATION: 130
ELEMENTARY:
MIDDLE:
SENIOR HIGH:
62
29
39
SCHOOLS SERVING AREA OF APPLICATION
ELEMENTARY: Southside Elementary — 45 SW 13 Street
MIDDLE: Shenandoah Middle — 1950 SW 19 Street
SENIOR HIGH: Booker T. Washington Senior ® 1200 NW 6 Avenue
Ali schools are located in Regional Center V.
*Based on Census 2000 information provided by Miami -Dade County Department of Panning and
Zoning.
The following population and facility capacity data are as reported by the Office of
information Technology, as of October 2006:
Southside
Elementary
Shenandoah
Middle
Booker T,
Washington
Senior
UTIUZATION
% LITILAZATION NUMBEIR OF FISH DES/GIN
FISH DESIGN FJSK DESIGN PORTABLE CAPACITY
SP:JOE:NI CAPACITY CAPACITY STUDENT PERMANENT AND CUMULATIVE
POPULATION PERMANENT PERMANENT STATIONS RELCOATABLE STUDENTS"
429
491
1,125
1,152
1,535
1,574
234
1,204
2,270
183%
210%
93 %
96%
68%
69%
183%
210%
93%
96%
68%
69%
1,720
1,098
3,345
-Student population increase as a result of the proposed development
**Estimated number of students (cumulative) based on zoning/land use log (2001- present) and
assuming all approved developments are built; also assumes none of the prior cumulative
students are figured in current population.
Notes:
1) Figures above reflect the impact of the class size amendment.
2) Pursuant to the Interlace! Agreement, none of the schools meet the review threshold.
PLANNED RELIEF SCHOOLS IN THE AREA
(Information included in revised 5-Year Capital Plan, 2006-2010, dated November 2006)
Projects in Planning, Design or Construction
School Status
N/A
Proposed Relief Schools
School
N/A
Projected Occupancy Date
Funding year
OPERATING COSTS: Accounting 10 Financial Operations, the average cost for K-12 grade
students amounts to $6,549 per student. The total annual operating cost for additional students
residing in this development, if approved, would total $851,370.
CAPITAL COSTS: Based on the State's September 2007 student station cost factors*, capital
costs for the estimated additional students to be generated by the proposed development are:
ELEMENTARY 62 x $18,622 $1,154,564
MIDDLE Does not meet review threshold
SENIOR HIGH Does not meet review threshold
Total Potential Capital Cost $1,154,664
*Based on information provided by the Florida Department of Education, Office of Educational
Facilities Budgeting. Cost per student station does not include /and cost,