Loading...
HomeMy WebLinkAboutSchool Impact Review Analysis"PRELIMINARY" SCHOOL IMPACT REVIEW ANALYSIS August 21, 2007 FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE APPLICANT IS NOT REQUESTING ADDITIONAL RESIDENTIAL DENSITY OVER WHAT IS CURRENTLY ALLOWED IN THE PROPERTY'S ZONING CLASSIFICATION. APPLICATION: Cabi Development (Capital tinia SMA) REQUEST: Large Scale Development ACRES. 4- 2184 net acres ZONING: SD-7 "Special District f Central Brickell Rapid Transit Commercial Residential District" (500 DU/acre) LOCATION: MSA/ MULTIPLIER: NUMBER OF UNITS: Site located between SW 1$° Avenue and South Miami Avenue and between SW 14 Terrace and SW 14 Street, Miami 5.2/.18 724 units (542 multifamily and 364/2 = 182 hotel units) ESTIMATED STUDENT POPULATION: 130 ELEMENTARY: MIDDLE: SENIOR HIGH: 62 29 39 SCHOOLS SERVING AREA OF APPLICATION ELEMENTARY: Southside Elementary — 45 SW 13 Street MIDDLE: Shenandoah Middle — 1950 SW 19 Street SENIOR HIGH: Booker T. Washington Senior ® 1200 NW 6 Avenue Ali schools are located in Regional Center V. *Based on Census 2000 information provided by Miami -Dade County Department of Panning and Zoning. The following population and facility capacity data are as reported by the Office of information Technology, as of October 2006: Southside Elementary Shenandoah Middle Booker T, Washington Senior UTIUZATION % LITILAZATION NUMBEIR OF FISH DES/GIN FISH DESIGN FJSK DESIGN PORTABLE CAPACITY SP:JOE:NI CAPACITY CAPACITY STUDENT PERMANENT AND CUMULATIVE POPULATION PERMANENT PERMANENT STATIONS RELCOATABLE STUDENTS" 429 491 1,125 1,152 1,535 1,574 234 1,204 2,270 183% 210% 93 % 96% 68% 69% 183% 210% 93% 96% 68% 69% 1,720 1,098 3,345 -Student population increase as a result of the proposed development **Estimated number of students (cumulative) based on zoning/land use log (2001- present) and assuming all approved developments are built; also assumes none of the prior cumulative students are figured in current population. Notes: 1) Figures above reflect the impact of the class size amendment. 2) Pursuant to the Interlace! Agreement, none of the schools meet the review threshold. PLANNED RELIEF SCHOOLS IN THE AREA (Information included in revised 5-Year Capital Plan, 2006-2010, dated November 2006) Projects in Planning, Design or Construction School Status N/A Proposed Relief Schools School N/A Projected Occupancy Date Funding year OPERATING COSTS: Accounting 10 Financial Operations, the average cost for K-12 grade students amounts to $6,549 per student. The total annual operating cost for additional students residing in this development, if approved, would total $851,370. CAPITAL COSTS: Based on the State's September 2007 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY 62 x $18,622 $1,154,564 MIDDLE Does not meet review threshold SENIOR HIGH Does not meet review threshold Total Potential Capital Cost $1,154,664 *Based on information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include /and cost,