Loading...
HomeMy WebLinkAboutI.C. Approved Major Use Special Permit Resolution No. 05-0484i City of Miami Certified Copy City Hall 3500 Pan American Drive Miami, FL 33133 www.ci.miaml.fl.us File Number: 05-00624 Enactment Number: R-05-0484 A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENTS, APPROVING WITH CONDITIONS, A MAJOR USE SPECIAL PERMIT PURSUANT TO ARTICLES 5, 13 AND 17 OF ZONING ORDINANCE NO. 11000, AS AMENDED, FOR THE CAPITAL AT BRICKELL (FKA SMA) PROJECT, TO BE LOCATED AT APPROXIMATELY 1420, 1430, 1434, 1438 SOUTH MIAMI AVENUE AND 1401, 1429 SOUTHWEST 1ST AVENUE AND 21, 37, 45, 65 SOUTHWEST 14TH TERRACE AND 26, 44, 54 SOUTHWEST 14TH STREET, MIAMI, FLORIDA, TO CONSTRUCT A MIXED -USE TWO -TOWER DEVELOPMENT RANGING IN HEIGHT FROM APPROXIMATELY 607 FEET TO APPROXIMATELY 649 FEET TO BE COMPRISED OF APPROXIMATELY 832 TOTAL MULTIFAMILY RESIDENTIAL UNITS WITH RECREATIONAL AMENITIES, APPROXIMATELY 108,543 SQUARE FEET OF OFFICE SPACE; APPROXIMATELY 47,853 SQUARE FEET OF RETAIL SPACE; AND APPROXIMATELY 1,274 TOTAL PARKING SPACES; PROVIDING FOR CERTAIN FLOOR AREA RATIO ("FAR") BONUSES; DIRECTING TRANSMITTAL; MAKING FINDINGS OF FACT AND STATING CONCLUSIONS OF LAW; PROVIDING FOR BINDING EFFECT; CONTAINING A SEVERABILITY CLAUSE AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on. May 6, 2005, Lucia A. Dougherty, on behalf of Cabi SMA, LLC owner and contract purchaser and Chestnut Capital, LLC (referred to as "APPLICANT"), submitted a complete Application for Major Use Special Permit for Capital at Brickell (fka SMA)(referred to as "PROJECT") pursuant to Articles 5, 13 and 17 of Zoning Ordinance No. 11000, for the property located at approximately 1420, 1430, 1434 and 1438 South Miami Avenue; 1401 and 1429 SW 1 Avenue; 21, 37, 45 and 65 SW 14 Terrace; and 26, 44 and 54 SW 14 Street, Miami, Florida, as legally described in "Exhibit A", attached and incorporated; and WHEREAS, development of the Project requires the issuance of a Major Use Special Permit pursuant to Article 17 of Zoning Ordinance No. 11000, the Zoning Ordinance of the City of Miami, Florida, as amended; and WHEREAS, the Large Scale Development Committee met on March 2, 2005 to consider the proposed project and offer its input; and WHEREAS, the Urban Development Review Board met on April 20, 2005, to consider the proposed project and recommended APPROVAL; and WHEREAS, the Historic and Environmental Preservation Board met on June 7, 2005, to consider the proposed project and recommended APPROVAL; and WHEREAS, the Miami Planning Advisory Board, at its meeting held on July 6, 2005 Item No. 2, following an advertised public hearing, adopted Resolution No. PAB 79-05 by a vote of five to zero (5- 0), recommending APPROVAL WITH CONDITIONS of the Major Use Special Permit as presented in the Development Order as incorporated; and WHEREAS, the City Commission deems it advisable and in the best interest of the gener of the City of Miami to issue a Major Use Special Permit Development Order as hereinafter City of Miami Page 1 of 8 • File Number: 05-00624 Enactment Number: R-05-0484 NOW, THEREFORE, BE IT•RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by reference and incorporated as if fully set forth in this Section. Section 2. A Major Use Special Permit Development Order, ashereinafter set forth, is approved subject to the conditions specified in the Development Order, per Article 17 of Zoning Ordinance No. 11000, for the PROJECT to be developed by the APPLICANT, at approximately 1420, 1430, 1434 and 1438 South Miami Avenue; 1401 and 1429 SW 1 Avenue; 21, 37, 45 and 65 SW 14 Terrace; and 26, 44 and 54 SW 14 Street, Miami, Florida, more particularly described on "Exhibit A," attached and ,incorporated. Section 3. The PROJECT is approved for the construction of a mixed use two tower development ranging in height from approximately 607 feet to 649 feet to be comprised of approximately 832 total multifamily residential units with recreational amenities, approximately 108,543 square feet of office space; approximately 47,853 square feet of retail space; approximately 1,274 total parking spaces; providing for certain floor area ratio ("FAR") bonuses. Section 4. The Major Use Special Permit Application for the Project also encompasses the lower ranking Special Permits as set forth in the Development Order. Section 5. The findings of fact set forth below are made with respect to the subject PROJECT: a. The PROJECT is in conformity with the adopted Miami Comprehensive Neighborhood Plan, as amended. b. The PROJECT is in accord with the SD-7 (Central Brickell Rapid Transit Commercial Residential District) Zoning classification of Zoning Ordinance No. 11000, the Zoning Ordinance of the City of Miami, Florida, as amended. c. Pursuant to Section 1305 of the Zoning Ordinance of the City of Miami, Florida, the specific site plan aspects of the PROJECT, i.e., ingress and egress, parking, signs and lighting, utilities, drainage, preservation of natural features and control of potentially adverse effects generally, have been considered and will be further considered administratively during the process of issuing a building permit and a certificate of occupancy. d. The PROJECT is expected to cost approximately $584,359,903, and to employ approximately 312 workers during construction.(FTE-Full Time Employees); the PROJECT will also result in the creation of approximately 10 permanent new jobs (FTE). The PROJECT will generate approximately $2,978,341annually in tax revenues to the City (2005 dollars). ' e. The City Commission further finds that: (1) the PROJECT will have a favorable impact on the economy of the City; (2) the PROJECT will efficiently use public transportation facilities; (3) any potentially adverse effects of the PROJECT will be mitigated through compliance with the conditions of this Major Use Special Permit; (4) the PROJECT will favorably affect the need for people to find adequate housing reasonably accessible to their places of employment; (5) the PROJECT will efficiently use necessary public facilities; (6) the PROJECT will not negatively impact the environment and natural resources of the City; (7) the PROJECT will not adversely affect living conditions in the neighborhood; (8) the PROJECT will not adversely affect public safety; (9) based on the record presented and evidence presented, the public welfare will be served by the PROJECT; and (10) any potentially adverse effects of the PROJECT arising from safety and security, fire Ciry of Miami Page 2 of 8 R-05-0484 • File Number: 05-00624 Enactment Number: R-05-0484 protection and life safety, solid waste, heritage conservation, trees, shoreline development, minority participation and employment, and minority contractor/subcontractor participation will be mitigated through compliance with the conditions of this Major Use Special Permit. Section 6. The Major Use Special Permit, as approved and amended, shall be binding upon the APPLICANT and any successors in interest. Section 7. The application for Major Use Special Permit, which was submitted on May 6, 2005, and on file with the Planning Department of the City of Miami, Florida, shall be relied upon generally for administrative interpretations and is incorporated by reference. Section 8. The City Manager is directed to instruct the Planning Director to transmit a copy of this Resolution and attachment to the APPLICANT. Section 9. The Findings of Fact and Conclusions of Law are made with respect to the Project as described in the Development Order for the PROJECT, incorporated within. Section 10. The Major Use Special Permit Development Order for the PROJECT is granted and issued. Section 11. In the event that any portion or section of this Resolution or the Development Order is determined to be invalid, illegal, or unconstitutional by a court or agency of competent jurisdiction, such decision shall in no manner affect the remaining portions of this Resolution or Development Order which shall remain in full force and effect. Section 12. The provisions approved for this Major Use Special Permit, as approved, shall commence and become operative thirty (30) days after the adoption of the Resolution. Section 13. This Major Use Special Permit, as approved, shall expire two (2) years from its commencement and operative date. Section 14. This Resolution shall become effective immediately upon its adoption and signature of the Mayor. {1} DEVELOPMENT ORDER Let it be known that pursuant to Articles 5, 13 and 17 of Ordinance No. 11000, the Zoning Ordinance of the City of Miami, Florida, as amended (the "Zoning Ordinance"), the Commission of the City of Miami, Florida, has considered in a public hearing, the issuance of a Major Use Special Permit for Capital at Brickell (MU-2005-019), (hereinafter referred to as the "PROJECT") to be located at approximately 1420, 1430, 1434 and 1438 South Miami Avenue; 1401 and 1429 SW 1 Avenue; 21, 37, 45 and 65 SW 14 Terrace; and 26, 44 and 54 SW 14 Street, Miami, Florida (see legal description on "Exhibit A", attached and incorporated), is subject to anydedications, limitations, restrictions, reservations or easements of record: After due consideration of the recommendations of the Planning Advisory Board and after due consideration of the consistency of this proposed development with the Miami Comprehensive Neighborhood Plan, the City Commission has approved the PROJECT, and subject to the following conditions approves the Major Use Special Permit and issues this Permit: FINDINGS OF FACT City of Miami Page 3 of 8 R-05-0484 File Number: 05-00624 Enactment Number: R-05-0484 PROJECT DESCRIPTION: The proposed PROJECT is a mixed use development to be located at approximately 1420, 1430, 1434 and 1438 South Miami Avenue; 1401 and 1429 SW 1 Avenue; 21, 37, 45 and 65 SW 14 Terrace; and 26, 44 and 54 SW 14 Street, Miami, Florida. The PROJECT is located on a gross lot area of approximately 3.78± acres and a net lot area of approximately 2.784± acres of land (more specifically described on "Exhibit A", incorporated herein by reference). The remainder of the PROJECT's Data Sheet is attached and incorporated as "Exhibit B". The proposed PROJECT will be a mixed use two tower development ranging in height from approximately 607 feet to approximately 649 feet to be comprised of approximately 832 total multifamily residential units with recreational amenities, approximately 108,543 square feet of office space; approximately 47,853 square feet of retail space; and approximately 1,274 total parking spaces; providing for certain floor area ratio ("FAR") bonuses. The Major Use Special Permit Application for the PROJECT also encompasses the following lower ranking Special Permits: MAJOR USE SPECIAL PERMITS MUSP, as per Article 17 for development of 832 residential units; MUSP, as per Article 17 for parking of approximately 1,274 parking spaces; MUSP, as per Article 5, Section 502, PUD Districts; to increase the floor area by twenty percent, for a total 197,572 square feet in bonus. Per City Code, Chapter 36, Construction Equipment Request for waiver of noise ordinance while under construction for continuous pours. CLASS II SPECIAL PERMITS CLASS II SPECIAL PERMIT, as per Article 7, Section 607.8.3 to allow open space or private recreational open space; CLASS II SPECIAL PERMIT, as per Article 7, Section 607, for development of new construction within the SD-7 Districts; CLASS II SPECIAL PERMIT, .as per Article 4, covered walkway; CLASS II SPECIAL PERMIT, as per Article 4, CLASS II SPECIAL PERMIT, as per Article 4, and outdoor cafes; CLASS II SPECIAL PERMIT, as per Article 9, Section 908.2, for access from a public street roadway with driveway greater than twenty five feet in width; CLASS II SPECIAL PERMIT, as per Article 15, Section 1512, to request a waiver of City of Miami Parking Guides and Standards for reduction of required backup space for parking. Required 23 feet. Proposed 22 feet. Request to waive 1 foot. Section 401, to allow construction fence and Section 401, for signage approval; Section 401, to allow for outdoor eating areas CLASS I SPECIAL PERMITS CLASS I SPECIAL PERMIT, as per Article 9, Section 906.9, to allow for a special event namely a ground breaking ceremony; CLASS I SPECIAL PERMIT, as per Article 9, Section 917.1.2, to permit valet parking; CLASS I SPECIAL PERMIT, as per Article 9, Section 920.1, to allow a trailer(s) for construction and other temporary offices such as leasing and sales; • City of Miami Page 4 of 8 R-O5-0484 • • File Number: 05-00624 Enactment Number: R-05-0484 CLASS I SPECIAL PERMIT, as per Article 9, Section 904, for parking and staging of construction during construction; CLASS I SPECIAL PERMIT, as per Article 9, Section 925.3.8, to allow development/construction/rental signage; CLASS I SPECIAL PERMIT, as per Article 9, Section 920.1, to allow a construction trailer and watchman's quarters. REQUEST for applicable MUSP conditions to be satisfied at the time of shell permit instead of at issuance of foundation permit: a) The requirement to record in the Public Records a Declaration of Covenants and Restrictions providing that the ownership, operation and maintenance of all common areas and facilities will be by the property owner or a mandatory property owner association; and b) The requirement to record in the Public Records a unity of title or covenant in lieu of unity of title. Pursuant to Articles 5, 13 and 17 of Zoning Ordinance 11000, approval of the requested Major Use Special Permit shall be considered sufficient for the subordinate permits requested and referenced above as well as any other special approvals required by the City which may be required to carry out the requested plans. The PROJECT shall be constructed substantially in accordance with plans and design schematics on file prepared by Fullerton Diaz Architects, dated May 4, 2005; the landscape plan shall be implemented substantially in accordance with plans and design schematics on file prepared by Urban Resource Group, dated May 4, 2005; said design and landscape plans may be permitted to be modified only to the extent necessary to comply with the conditions for approval imposed herein; all modifications shall be subject to the review and approval of the Planning Director prior to the issuance of any building permits; and • The PROJECT conforms to the requirements of the SD-7 "Central Brickell Rapid Transit Commercial Residential District "Zoning classification, as contained in the Zoning Ordinance, the Zoning Ordinance of the City of Miami, Florida, as amended. The existing comprehensive plan future land use designation on the subject property allows the proposed uses. CONDITIONS THE APPLICANT, ITS SUCCESSORS, AND/OR ASSIGNS, JOINTLY OR SEVERALLY, PRIOR TO THE ISSUANCE OF ANY BUILDING PERMITS, SHALL COMPLY WITH THE FOLLOWING: 1) Meet all applicable building codes, land development regulations, ordinances and other laws and pay all applicable fees due prior to the issuance of a building permit. 2) Allow the Miami Police Department to conduct a security survey, at the option of the Department, and to make recommendations concerning security measures and systems; further submit a report to the Planning Department, prior to commencement of construction, demonstrating how the Police Department recommendations, if any, have been incorporated into the PROJECT security and construction plans, or demonstrate to the Planning Director why such recommendations are impractical. 3) Obtain approval from, or provide a letter from the Department of Fire -Rescue indicating APPLICANT'S coordination with members of the Fire Plan Review Section at the Department of City of Miami Page 5 of 8 R-05-0484 • File Number: 05-00624 Enactment Number: R-05-0484 Fire -Rescue in the review of the scope of the PROJECT, owner responsibility, building development process and review procedures, as well as specific requirements for fire protection and life safety systems, exiting, vehicular access and water supply. 4) Obtain approval from, or provide a letter of assurance from the Department of Solid Waste that the PROJECT has addressed all concerns of the said Department prior to the obtainment of a shell permit. 5) Comply with the Minority Participation and Employment Plan (including a Contractor/Subcontractor Participation Plan) submitted to the City as part of the Application for Development Approval, with the understanding that the APPLICANT must use its best efforts to follow the provisions of the City's Minority/Women Business Affairs and Procurement Program as a guide. 6) Record the following in the Public Records of Dade County, Florida, prior to the issuance of a Temporary Certificate of Occupancy or Certificate of Occupancy, a Declaration of Covenants and Restrictions providing that the ownership, operation and maintenance of all common areas and facilities will be by the property owner or a mandatory property owner association in perpetuity. 7) Prior to the issuance of a shell permit, provide the City with a recorded copy of the MUSP permit resolution and development order, and further, an executed, record able unity of title or covenant in lieu of unity of title agreement for the subject property; said agreement shall be subject to the review and approval of the City Attorney's Office. 8) Provide the Planning Department with a temporary construction plan that includes the' following: a temporary construction parking plan, with an enforcement policy; a construction noise management plan with an enforcement policy; and a maintenance plan for the temporary construction site; said plan shall be subject to the review and approval by the Planning Department prior to the issuance of any building permits and shall be enforced during construction activity. All construction activity shall remain in full compliance with the provisions of the submitted construction plan; failure to comply may lead to a suspension or revocation of this Major Use Special Permit. 9) In so far as this Major Use Special Permit includes the subordinate approval of a series of Class I Special Permits for which specific details have not yet been developed or provided, the applicant shall provide the Planning Department with all subordinate Class 1 Special Permit plans and detailed requirements for final review and approval of each one prior to the issuance of any of the subordinate approvals required in order to carry out any of the requested activities and/or improvements listed in this development order or captioned in the plans approved by it. 10) If the project is to be developed in phases, the Applicant shall submit an interim plan, including a landscape plan, which addresses design details for the land occupying future phases of this Project in the event that the future phases are not developed, said plan shall include a proposed timetable and shall be subject to review and approval by the Planning Director. 11) Pursuant to HEPB Resolution 2005-040, the applicant shall meet the following conditions: (a) Submit monthly reports to the City of Miami during any archeological testing and monitoring activities to document the results of any finds; (b) Submit two final reports to the City of Miami within 90 days of completion of the archeological investigations and monitoring; (c) Submit a detailed archeological management or mitigation plan to the City of Miami prior to the commencement of any further archeological investigations or construction activities if significant archeological material is identified. 41, 12) Within 90 days of the effective date of this Development Order, record a certified copy of CO, of Mafia Page 6 of 8 R-05-0484 File Number: 05-00624 Enactment Number: R-05-0484 the Development Order specifying that the Development Order runs with the land and is binding on the Applicant, its successors, and assigns, jointly or severally. THE CITY SHALL: Establish the operative date of this Permit as being thirty (30) days from the date of itsissuance; the issuance date shall constitute the commencement of the thirty (30) day period to appeal from the provisions of the Permit. CONCLUSIONS OF LAW The PROJECT, proposed by the APPLICANT, complies with the Miami Comprehensive Neighborhood Plan, as amended, is consistent with the orderly development and goals of the City of Miami, and complies with local land development regulations and further, pursuant to Section 1703 of the Zoning Ordinance: the PROJECT will have a favorable impact on the economy of the City; and the PROJECT will efficiently use public transportation facilities; and the PROJECT will favorably affect the need for people to find adequate housing reasonably accessible to their places of employment; and the PROJECT will efficiently use necessary public facilities; and the PROJECT will not negatively impact the environment and natural resources of the City; and the PROJECT will not adversely affect public safety; and the public welfare will be served by the PROJECT; and any potentially adverse effects of the PROJECT will be mitigated through conditions of this Major Use Special Permit. The proposed development does not unreasonably interfere with the achievement of the objectives of the adopted State Land Development Plan applicable to the City of Miami. Pursuant to Section 1305 of the Zoning Ordinance, the specific site plan aspects of the PROJECT i.e., ingress and egress, offstreet parking and loading, refuse and service areas, signs and lighting, utilities, drainage and control of potentially adverse effects generally have been considered and will be further considered administratively during the process of issuing individual building permits and certificates of occupancy. Date: • JULY 28, 2005 Mover: COMMISSIONER WINTON Seconder: COMMISSIONER ALLEN Vote: AYES: 5 - COMMISSIONER GONZALEZ, WINTON, SANCHEZ, REGALADO AND ALLEN Action: ADOPTED Date: Action: AUGUST 2, 2005 SIGNED BY THE MAYOR • City of Miami Page 7 of 8 R-05-0484 • hereby -c qrtify.. attachm -0 • •‘ .., 41° "?94 piccn, City Clerk) Date Certified • 0 Ck \* Irifie Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. File Number: 05-00624 Enactment Number: R-05-0484 Priscilla A. Thornpson, City Clerk of the City of Miami, Florida, and keeper of the records thereof, do his:constitutes a true and correct copy of Resolution No. R-05-0484, with the City Commission on 7/28/2005. October 13, 2005 Ciry of Miami Page 8 of 8 R-05-0484 EXHIBIT "A" All of Stock 96 South, City of Miami, according to the Plot thereof as recoeded in Plat Soak a Page 41 of the public records of Mlornl-Dade County, Florida A. ZONING DISTRICT B. AREA C. MAXIMUM DENSITY D. BUILDING SETBACKS (SD-7) FRONT (EAST) FRONT (WEST) SIDES (NORTH & SOUTH) E. MAXIMUM atioiIT PROJECT FACT SHEET EXHIBIT "B" SD-7 (HIGH INTENSITY) CENTRAL BRICKELL RAPID TRANSIT COMMERCIAL -RESIDENTIAL DISTRICT GROSS AREA NET AREA 164,643 Sq.Ft (3.78 Acres) 121,259 SgYi. (2.784 Acres) ALLOWED NEC AREA 121,259 Sq.Ft. (2.784 Acres) 500 UNITS PER NEC ACRE - 500 x 2.784 Acres - 1,392 UNITS REQUIRED -MAX REQUIRED -MIN. Other than Pedestrian Street -First 18' Height -Ma setback 20' Other than Pedestrian Street -First 18' Height-Mrnr. setback 20' Odic than Pedestrian Sores -First 18' Height -Max. ,aback 20' ALLOWED UNUMITED(BY CODE) COUNTY FEDERAL Id 10' 10' F. FLOOR RESIDENTIAL USES FAR - 6.0 x GROSS LOT AREA - 6.0 x 164,643 Sq.FL - AREA LIMITATIONS ArtieteV-PUD Boons - 2096 of Cross Lot At - 0.2 x 987,858 Sq.Ft - '- By Major Use Special Permit (MUSP) Sec.502 • TOTAL RESIDENTIAL F.A.R. W/ BONUSES - NON-RESIDENTIAL USES FA.R. - 2.00 x GROSS LOT AREA - 10 x 164,643 Sq.Ft. - TOTAL NON-R.ESBDENTLU.FA.R. - TOTAL RESIDENTIAL + NON-RESIDENTIAL F.A.R. W/ BONUSES - O. OPEN SPACE/ RESIDENTIAL RECREATION SPACE REQUIRED RESIDENTIAL - Min. 1 SqFt for every 10 SqFt 1,163,548/10 SqFt - 116,355 Sq Ft NON-RESIDENTIAL -Min 1 SqFt for every 50 SqFt Non -Residential over 50,000 Sq Ft 156,396.50,000 SgFP-106,396 SqFt/50 SqFt - 2,128 Sq Ft Amenities to be included in Recreaction Space as per Class 11 Art 607.83 TOTAL RESIDENTIAL + NON-RESIDENTIAL OPEN SPACE REQ.- 118,483 Sq Ft H. OFF-STREET PARKING REQUIREMTS: Residential - FHA (Handicapped Parking) Retail - PHA (Handicapped Pig) Office - FHA (Handicapped Parking) r 1. OFF-STREET LOADING BERTH REQUIREMENTS: Space per 800 SF (Office - 108,543 SF)... 136 spaces (including 5 H.C.) Florida Building Code - From 101-150 - 5 N.C. Space Requited minimum number of accessible spaces - Office Total office parking spaces provided TOTAL SPACES REQUIRED TOTAL SPACES PROVIDED (Not including Tandem spaces) REQUIRED Fourth berth for 250,000 to 500,000 (12'x35') In additional 1 berth for every 500,000 (12'x55') PROPOSED 832 UNTS PROVIDED 10' Ft. 10' Ft. 10' Ft. PROPOSED ELEV. 710' MSL ELEV. 649'MSL 987,858 Sq.Fl 197,572 Sq.Ft 1,185,430 Sq. Pt . 329,286 Sq.Ft. 329.286 Sq. Pt. 1,514,716 Sq. Ft. PROPOSED 1,163,348Sq. Ft • PROPOSED 136,396 Sq. Ft PROPOSED 1,319,944 Sq. Ft. PROPOSED Ground Floor Plaza 27,940 SqFt Pool Deck 59,408 SgF1 Pedestal Tcrtaces 5,089 SqFt P.H. Deck Terraces 7.878 SqFt Loft Terraces 3,212 SqFt First 131dg stepTenacea 592 SqFt P.H. Mesa Tenses 1,684 SqPt Amenities 21,237 SqFt TOTAL OPEN SPACE PROV. 127,040 Sq Pt REQUIRED PROPOSED 1 Span per Unit - 832 Units x 1 - 832 spas (including 17 H.C.) 81$ Regular Spaces Florida Building Code - From 501 to 1000 2% Total in parking lot -17 Spam Requited minimum numbs of accessible spates - Residential 17 H.C. Spaces Total residential parking spew provided 832 Spaces I Space per 1000 SF (Retail - 47,853 SF) -48 spates (including 2 H.C.) 46 Regular Spaces Florida Bw'Iding Code - From 26 to 50 - 2 H.C. Space Required minimum number of accessible spacer - Retail 2 H.C. Space Total retail parting apnoea provided 48 Specks 131 Regular Spaces 5 H.C. Spaces 136 Spaces 1,016 Spaces 1,214 Spaces PROVIDED 4 Stalls (12'x35') 2 Stall s(12'x55') City of Miami Master Report Enactment Number: R-05-0484 City Hall 3500 Pan American Drive Miami, FL 33133 www.ci.miami.tl.us File Number: 05-00624 Version: 1 File Type: Resolution Status: Reference: Controlling Body: File Name: Major Use Special Permit - Capital at Brickell Requester: Cost: Mayor's Office for Signature Office of the City Clerk Introduced: 6/20/2005 Final Action: 7/28/2005 Title: A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENTS, APPROVING WITH CONDITIONS, A MAJOR USE SPECIAL PERMIT PURSUANT TO ARTICLES 5, 13 AND 17 OF ZONING ORDINANCE NO. 11000, AS AMENDED, FOR THE CAPITAL AT BRICKELL (FKA SMA) PROJECT, TO BE LOCATED AT APPROXIMATELY 1420, 1430, 1434, 1438 SOUTH MIAMI AVENUE AND 1401, 1429 SOUTHWEST 1ST AVENUE AND 21, 37, 45, 65 SOUTHWEST 14TH TERRACE AND 26, 44, 54 SOUTHWEST 14TH STREET, MIAMI, FLORIDA, TO CONSTRUCT A MIXED -USE TWO -TOWER DEVELOPMENT RANGING IN HEIGHT FROM APPROXIMATELY 607 FEET TO APPROXIMATELY 649 FEET TO BE COMPRISED OF APPROXIMATELY 832 TOTAL MULTIFAMILY RESIDENTIAL UNITS WITH RECREATIONAL AMENITIES, APPROXIMATELY 108,543 SQUARE FEET OF OFFICE SPACE; APPROXIMATELY 47,853 SQUARE FEET OF RETAIL SPACE; AND APPROXIMATELY 1,274 TOTAL PARKING SPACES; PROVIDING FOR CERTAIN FLOOR AREA RATIO ("FAR") BONUSES; DIRECTING TRANSMITTAL; MAKING FINDINGS OF FACT AND STATING CONCLUSIONS OF LAW; PROVIDING FOR BINDING EFFECT; CONTAINING A SEVERABILITY CLAUSE AND PROVIDING FOR AN EFFECTIVE DATE. Sponsors: Notes: Indexes: Attachments: 05-00624 Inside Cover.PDF,05-00624 Table of Contents.PDF,05-00624 Article 1 - Project Information.PDF,05-00624 Letter of lntent.PDF,05-00624 Major Use Special Permit Application.PDF,05-00624 Zoning Write-Up.PDF,05-00624 Zoning Atlas.PDF,05-00624 Project Data Sheet.PDF,05-00624 Deed - Computer.PDF,05-00624 Ownership List.PDF,05-00624 State of Florida Documents.PDF,05-00624 Owner's Authorization Letter.PDF,05-00624 Directory of Project Principals.PDF,05-00624 Article II - Project Description.PDF,05-00624 Article III - Supporting Documents.PDF,05-00624 Minority Construction Employment Plan.PDF,05-00624 Traffic Impact Analysis - Part I.PDF,05-00624 Traffic Impact Analysis - Part II.PDF,05-00624 Site Utility Study.PDF,05-00624 Economic Impact Study.PDF,05-00624 Survey of Property.PDF,05-00624 Drawings Submitted.PDF,05-00624 Legislation.pdf,05-00624 Exhibit A.pdf,05-00624 Exhibit B.pdf,05-00624 Analysis.pdf,05-00624 Zoning Map.pdf,05-00624 Aerial Map.pdf,05-00624 Design Review Comments.pdf,05-00624 Miami -Dade Aviation Dept Review.pdf,05-00624 HEPB Reso.pdf,05-00624 School Board Review.pdf,05-00624 PAB Reso.pdf,05-00624 Fact Sheet.pdf,05-00624 Outside Cover.PDF, History of Legislative File Version: Acting Body: . Date: Action: Sent To: Due Date: Return Date: Result: City of Miami Page 1 Printed on 10/13/2005 BOOK 23882.PAGE 2893 LAST PAGE City of Miami Master Report Enactment Number: R-05-0484 City Hall 3500 Pan American Drive Miami, FL 33133 www.ci.miami.fl.us Office of the City Attorney City Commission Office of the Mayor 7/11/2005 Reviewed and Approved 7/28/2005 ADOPTED 8/2/2005 Signed by the Mayor Office of the City Clerk Office of the City Clerk 8/4/2005 Signed and Attested by City Clerk Pass City of Miami (ATE OF FLORIDA, COUNTY OF DADE r HEREBY CERTIFY that this is a t py of the - ongrna filed thr office on , A D 2.0 dl / ial Seal. RK, of Circuit and County Courts D.C. NITNE HARV By Page 2 Printed on /0/0/2005