Loading...
HomeMy WebLinkAboutSubmittal E-mail PastorizaPage 1 of 1 Gilberto Pastoriza From: Smith, Anthony (MDT) [smitha@miamidade.gov] Sent: Wednesday, May 23, 2007 12:17 PM To: jlopez1052@aol.com Subject: RE: Update on Pedestrian Overpass The final report for the Pedestrian/Bicycle Crossing Study for the Metrorail Stations along US-1 Corridor was completed. As part of the study, a screening criterion was established to identify if the intersection warranted the investigation of a pedestrian overpass as a possible solution to pedestrian safety. The Coconut Grove Station site did not meet the warrant criterion for investigation of pedestrian overpasses; however, the results were close enough to include pedestrian overpass alternatives that will be evaluated in addition to geometric/operational safety improvements. MDT Leasing and Joint Development is currently working on a joint development project (19 story mixed -use transit center with retail, parking garage, and office space) at the Coconut Grove Station that is expected to be completed within 1 1/2 years: The Highway Division -of the Miami Dade Public Works Department is- currently working on a roadway beatification project on 27th Ave from US-1 a to Bayshore Dr. Once these projects are completed and the pedestrian volumes have increased, MDT will then reevaluate the feasibility of the pedestrian overpass in the Coconut Grove area to determine if a bridge is warranted. MDT is working diligently and currently coordinating with various departments and agencies for review and possible implementation of the alternatives for the pedestrian safety improvements near this station which includes fencing. These alternative improvements include the implementation of geometrical/operational safety improvements (i.e. pedestrian crosswalks, signals, and timing modifications) and/or the construction of a pedestrian overpass to better accommodate safer and pedestrian friendly crossing opportunities. The study of these alternatives for Coconut Grove Station will be presented and documented in a separate report to address the comments and concerns of The Florida Department of Transportation and Miami Dade County Public Works Department. MDT will have to perform and provide additional information and studies required by these agencies before their approval of these safety alternatives can be granted. From:j1opez1052@aok:ccun. [mailto:jlopez1052@aol.com] Sent: Wednesday, May 23, 2007 11:59 AM To: Smith, Anthony (MDT) Subject: Update on Pedestrian Overpass Hi Mr. Smith: SUBMITTED INTO TH. Please give a quick update on the status of the Pedestrian Overpass at Coconut Grove SW 27 Ave and US 1 (South Dixie). PUBLIC RECORD FOF You can email me at: jlopez1.052@aol.com Thanks, Mily Lopez ITEM /2" ON�'-7. AOL now offers free email to everyone. Find out more about what's free from AOL at AOL.com. 5/23/2007