Loading...
HomeMy WebLinkAboutCC School Impact Review Analysis*REVISED" SCHOOL IMPACT REVIEW ANALYSIS February 8, 2007 APPLICATION: Coconut Grove Metrorail Station REQUEST: Site Plan Development Review ZONING: BU-1, BU-1A and BU-2 125 DU/acre - based on approved standards by the Rapid Transit Development Impact Committee ACRES: +5.18 acres LOCATION: Approximately 2780 SW 27 Avenue, Miami — Metrorail Station MSAI MULTIPLIER: NUMBER OF UNITS: 5.31.20 Multifamily 648 units (maximum potentiai) ESTIMATED STUDENT POPULATION: 130 students ELEMENTARY: 62 MIDDLE: 29 SENIOR HIGH: 39 SCHOOLS SERVING AREA OF APPLICATION ELEMENTARY: Silver Bluff Elementary — 2609 SW25 Avenue MIDDLE: Ponce de Leon Middle — 5801 Augusto St. SENIOR HIGH: Coral Gables Senior High — 450 Bird Road All schools are located in Regional Center IV. *Based on Census 2000 information provided by Miami -Dade County Department of Planning and Zoning. The following population and facility capacity data are as reported by the Office of Information Technology, as of October 2006: Silver Bluff Elementary Ponce De Leon Middle Coral Gables Senior High % UTILIZATION % UTILIZATION NUMBER OF FISH DESIGN FISH DESIGN FISH DESIGN PORTABLE CAPACITY STUDENT CAPACITY CAPACITY STUDENT PERMANENT AND CUMULATIVE POPULATION PERMANENT PERMANENT STATIONS RELCOATABLE STUDENTS" 624 686 1,219 1,248 * 3,528 3,567 * 522 1,184 2,799 120% 131% 103% 105% 126% 127% 44 139 0 11 a% 121% 92% 94% 126% 127% 776 1,463 3,866 `Student population increase as a result of the proposed development **Estimated number of students (cumulative) based on zoning/land use log (2001- present) and assuming all approved developments are built; also assumes none of the prior cumulative students are figured in current population. Notes: 1) Figures above reflect the impact of the class size amendment. 2) Pursuant to the Interlocal Agreement, Silver Bluff Elementary and Coral Gables Senior High schools meet the review threshold. PLANNED RELIEF SCHOOLS IN THE AREA (information included in revised 5-Year Capital Plan, 2006-2010, dated November 2006) Projects in Planning, Design or Construction School Status Projected Occupancy Remodeling / Renovation at Design School Opening 2007 Ponce de Leon Middle School (264 student stations) Proposed Relief Schools School N/A Funding Year Estimated Permanent Elementary Seats (Current and Proposed in 5-Year Plan) 522 Estimated Permanent Middle Seats (Current and Proposed in 5-Year Plan) 1,448 Estimated Permanent Senior High Seats (Current and Proposed in 5-year Plan) 2,799 OPERATING COSTS: Accounting to Financial Affairs, the average cost for K-12 grade students amounts to $6,549 per student. The total annual operating cost for additional students residing in this development, if approved, would total $851,370. CAPITAL COSTS: Based on the State's March 2007 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY 62 x $18,540 = $1,149,480 MIDDLE Does not meet review threshold SENIOR HIGH 39 x $26,006 = $1,014,234 Total Potential Capital Cost $2,163,714 *Based on Information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include land cost.