Loading...
HomeMy WebLinkAboutSummary FormAGENDA ITEM SUMMARY FORM FILE ID: 1- 0 0 Date: 3/8/2007 Commission Meeting Date: 4/12/2007 Requesting Department: Public Works District Impacted: 2 and 5 Type: ❑ Resolution ® Ordinance ❑ Emergency Ordinance ❑ Discussion Item ❑ Other Subject: Ordinance amending Chapter 54 of the City Code - Base Building Lines Purpose of Item: An Ordinance amending Chapter 54 of the Code of the City of Miami, Florida, entitled "Streets and Sidewalks" by amending Section 54-190 entitled "Nonstandard Street Widths" to increase the zoned street right of way width of NW/NE 79 Street between Biscayne Bay and the west city limits. Background Information: In response to residents' concerns and requests by the City, the Florida Department of Transportation is completing a study to make changes to NW/NE 79 Street and NW/NE 81/82 Street that will enhance livability along NE 82 Street in the Shorecrest neighborhood with the following resulting recommendation. SEE ATTACHED SUPPLEMENT Budget Impact Analysis NO Is this item related to revenue? NO Is this item an expenditure? If so, please identify funding source below. General Account No: 000 Special Revenue Account No: 000 CIP Project No: 000 Is this item funded by Homeland Defense/Neighborhood Improvement Bonds? Start Up Capital Cost: $0.00 Maintenance Cost: $0.00 Total Fiscal Impact: $0.00 CIP iU I Y If using or receiving C'tat lt'uds Grants I/ / Purchasing Ait/ i4 Chief r-7,1,1,,f Final Approvals (SIGJM AND DATE) Budget Risk Management Dept. Director ��n�y/ City Manager SUPPLEMENT TO AGENDA ITEM SUMMARY FORM ORDINANCE AMENDING CHAPTER 54 OF THE CITY CODE BASE BUILDING LINES - NW/NE 79 STREET The FDOT is currently finalizing the first phase of a two-phase Project Development and Environment (PD&E) Study to evaluate concept alternatives and preliminary design changes to NW/NE 79 Street and NW/NE 81/82 Street from approximately NW 13th Court on the west to Biscayne Bay on the east. The objective of the phased study is to promote livability enhancements along NE 82 Street within the Shorecrest community in the City of Miami while maintaining acceptable mobility standards along NW/NE 79 Street as the corridor currently functions as a one-way pair facility and a gateway to the City of Miami. Information garnered from the initial PD&E study has determined that the livability needs along NE 82 Street cannot be adequately addressed without significant capacity improvements to 79 Street by way of roadway widening and/or transit improvements. The initial PD&E study, however, was constrained from the standpoint of right-of-way acquisition. To accommodate the traffic capacity improvements along NW/NE 79th Street that will ultimately enhance livability along the NE 82 Street corridor, it is respectfully recommended that the zoned base building line width of NW/NE 79 Street between Biscayne Bay and the west city limits be increased from 80 feet to 110 feet for the segment from Biscayne Bay to NW 7th Avenue (this is a 30 foot increase, 15 feet from each side of the roadway) and from 100 feet to 110 for the segment from NW 7th Avenue to west city limits (this is a ten (10) foot increase, five (5) feet from each side of the roadway). The increase in zone base building line width is achieved through dedication as properties redevelop along the corridor. Dedication of the rights -of -way will be included in the building permit review process for new developments along NW/NE 79 Street.