Loading...
HomeMy WebLinkAboutConcurrency ReportProposal No 06-13 Date: 5/23/06 CONCURRENCY MANAGEMENT ANALYSIS CITY OF MIAMI PLANNING DEPARTMENT IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP WITHIN A TRANSPORTATION CORRIDOR AMENDMENT INFORMATION CONCURRENCY ANALYSIS Applicant: A. Vicky Garcia -Toledo on behalf of Jokur Acquisitions, Inc Address: 3663 SW 17th Street Boundary Streets: North: n/a East: n/a South: SW 17th Street West: n/a Proposed Change: From: Duplex Residential To: Restricted Commercial Existing Designation, Maximum Land Use Intensity Residential 0.42 acres @ 18 DU/acre 8 DU's Peak Hour Person -Trip Generation, Residential 8 Other sq.ft. @ FAR 0 sq.ft. Peak Hour Person -Trip Generation, Other Proposed Designation, Maximum Land Use Intensity Residential 0.63 acres @ 150 DU/acre 95 DU's Peak Hour Person -Trip Generation, Residential 47 Other sq.ft. @ FAR 0 sq.ft. Peak Hour Person -Trip Generation, Other 0 Net Increment With Proposed Change: Population 223 Dwelling Units 87 Peak Hour Person -Trips 39 Planning District Coral Way County Wastewater Collection Zone 310 Drainage Subcatchment Basin P1 Solid Waste Collection Route 35 Transportation Corridor Name Coral Way RECREATION AND OPEN SPACE Population Increment, Residents 223 Space Requirement, acres 0.29 Excess Capacity Before Change 182.80 Excess Capacity After Change 182.51 Concurrency Checkoff OK POTABLE WATER TRANSMISSION Population Increment, Residents 223 Transmission Requirement, gpd 50,050 Excess Capacity Before Change >2% above demand Excess Capacity After Change >2% above demand Concurrency Checkoff OK SANITARY SEWER TRANSMISSION Population Increment, Residents 223 Transmission Requirement, gpd 41,336 Excess Capacity Before Change See Note 1. Excess Capacity After Change See Note 1. Concurrency Checkoff WASA Permit Required STORM SEWER CAPACITY Exfiltration System Before Change On -site Exfiltration System After Change On -site Concurrency Checkoff OK SOLID WASTE COLLECTION Population Increment, Residents 223 Solid Waste Generation, tons/year 286 Excess Capacity Before Change 800 Excess Capacity After Change 514 Concurrency Checkoff OK RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES Land Use Policy 1.1.1 CIE Policy 1.2.3 TRAFFIC CIRCULATION Population Increment, Residents 223 Peak -Hour Person -Trip Generation 39 LOS Before Change A LOS After Change A Concurrency Checkoff OK NOTES 1. Permit for sanitary sewer connection must be issued by Metro -Dade Water and Sewer Authority Department (WASA). Excess capacity, if any, is currently not known CM 1 IN 03/11/90 ASSUMPTIONS AND COMMENTS Population increment is assumed to be all new residents. Peak -period trip generation is based on ITE Trip Generation, 5th Edition at 1.4 ppv average occupancy for private passenger vehicles. Transportation Corridor capacities and LOS are from Table PT-2(R1), Transportation Corridors report. Potable water and wastewater transmission capacities are in accordance with Metro -Dade County stated capacities and are assumed correct. Service connections to water and sewer mains are assumed to be of adequate size; if not, new connections are to be installed at owner's expense. Recreation/Open Space acreage requirements are assumed with proposed change made.