HomeMy WebLinkAboutCity Commission slidesProject Update Briefing
for the
Miami City Commissio
--, STREETCAR CORRIDOR
FEASIBILITY STUDY
■
July 8, 2004
Charles Hales
HDR Engineering
1
Connecting People and Shaping Places
STREETCAR CORRIDOR ■
FEASIBILITY STUDY
Miami Streetcar Feasibility Study
Connecting People and Shaping Places
STREETCAR CORRIDOR
FEASIBILITY STUDY
Why consider streetcars in Miami?
Pilaff a STATE unI.
Connecting People and Shaping Places
a.
STREETCAR CORRIDOR
FEASIBILITY STUDY
Miami Streetcar Feasibility
Study Goals
Provide connectivity between redeveloping
areas and Downtown
Improve connectivity between neighborhoods
Promote additional economic development
stimulus
Support a more transit -oriented form of
development
Attract urban residents to make local trips via
transit
Connecting People and Shaping Places
STREETCAR CORRIDOR
FEASIBILITY STUDY
Connecting People and Shaping Places
STREETCAR CORRIDOR
FEASIBILITY STUDY
Connecting People and Shaping Places
a.
STREETCAR CORRIDOR
FEASIBILITY STUDY
Light Rail vs. Streetcars
Connecting People and Shaping Places
STREETCAR CORRIDOR
FEASIBILITY STUDY
Construction
Connecting People and Shaping Places
STREETCAR CORRIDOR ■
FEASIBILITY STUDY
Connecting People and Shaping Places
STREETCAR CORRIDOR ■
FEASIBILITY STUDY
Connecting People and Shaping Places
STREETCAR CORRIDOR ■
FEASIBILITY STUDY
Miami Streetcar Feasibility Study
Key Tasks
Examine possible routes/alignments
Evaluate physical feasibility
Estimate ridership
Estimate costs and benefits
Detail route, station Iocations=,
IMP
Develop financing proposal
Develop implementation plan
VFW
Connecting People and Shaping Places
tlf STREETCAR CORRIDOR
FEASIBILITY STUDY
Miami Streetcar Feasibility Study
Major Drivers in Alignment and Phasing
Bay Link downtown loop creates the "hub"
Connection to Metromover and Metrorail
Multiple corridors to neighborhoods
North Alignment to serve Redevelopment and
Major Projects
Bridging the river —costs and complexities -
drives initial phase North rather than South or
West
Connecting People and Shaping Places
STREETCAR CORRIDOR
FEASIBILITY STUDY
NW loth St. l
}
NW 1 441)1,
F...t
00�
�395�
'_� I r'•t
''`` 0 ;; NW 1 1 t17 :�C.O r
95
N1st �O _,_ _,� 0
w
Flagler 4
SW 15t QY! 0_
Connection to
Wi Bay Link
■
Llipt
0
0
vVV5thSt.
c5
.1
Port Blvd.
Potential to
Advance Bay Link
with Streetcar
Serve both local
and Miami -Miami
Beach circulation
needs
�o
7' Use same/similar
technology
STREETCAR CORRIDOR I to
FEASIBILITY STUDY
NW 4oth St.
NW 36th St.
CITY 6F
MIAMI
NOT TO SCALE
NW asth St.
nd pas MX
NW Both St.
NW i'ith b,
0
0
NW ittli
q o
d o
NW 5th St. I
b
d
I
NW 1st0 O
FlaglerS .
SW Istep 0
0
0
0
O
Ji
00
Recommended
Phase I Alignment
Buena Vista/Design
District
N E 2nd Avenue
N E 9th Street
Miami Avenue
Government Center
SW 1st Avenue
N E 1st Avenue
N E 14th Street
N E 29th Street
a.
STREETCAR CORRIDOR
FEASIBILITY STUDY
NW +oth St.
NW Stith St.
CITY OF
MIAMI
NOT TO SCALE
NW 2sth St.
MMMil
P.
1 1N
a 1
9, NVynwood/g
ashior.Eddgewater�
Pistri F I
NW ,loth St.
NW 14thlh.
NW 5th St,
z
NW 1st
Flagler
SW tst
r
owntow
Public Faciltities
and Attractions
Miami Design District
Midtown Miami
Omni Center _
Performing Arts Center
Museum Park
Miami Arena
American Airlines Arena
Miami -Dade College
Bayside Marketplace
Government Center
Bayfront Park
STREETCAR CORRIDOR
FEASIBILITY STUDY
NW 4oth St.
NW 36th St.
CITY OF
MIAMI
NOT TO SCALE
NW 29th St.
NW Koth St.�
►I
NW 14thb.
►
NW tttd
►
NW 5th S
`
NW 1st
Flagler
SW Ist
•
Port Blvd.
•
ir
Bay Link (proposed)
Metromover
Metrorail
Connection to
Other Modes of
Transportation
Enhances
Downtown
Circulation
Connects to
Regional
Transportation —
Bus Network,
Baylink & Metrorail
♦xii r
STREETCAR CORRIDOR
FEASIBILITY STUDY
Key costs and specifications
Track and Traction Power:
■ Single Track: $9.5 million per mile
• Double Track: $16.5 million per mile
Vehicles: $2.3 million per vehicle
Maintenance facility: 2.5 - 3 acres / $5 - 7.5M
(if joint Bay Link Use) 5 - 10 acres /$10 - 17M
Vehicle life: 30 years +
Vehicle reliability: 99.5%
Connecting People and Shaping Places
STREETCAR CORRIDOR
FEASIBILITY STUDY
Potential Funding Sources
Local
• Parking meter and garage revenues
• People's Transportation Plan funds
• Local gas tax
• Advertising and sponsorship revenues
• Fares
• DDA funds (dedicated millage rate)
• Tax increment financing (through CRA mechanism)
• Already -programmed street improvement/reconstruction projects
• MDTA funding (in lieu)
• Local improvement district(s)
Connecting People and Shaping Places
STREETCAR CORRIDOR
FEASIBILITY STUDY
Potential Funding Sources
State
• Transit or Rail Service Development Programs
• Strategic Intermodal System funding
• Park and Ride Program
• Commuter Assistance Program
• Intermodal Development Program
• Public Transit Block Grant Program
• State Infrastructure Bank loans
Connecting People and Shaping Places
STREETCAR CORRIDOR I to
FEASIBILITY STUDY
Potential Funding Sources
Federal
• FTA"Small Starts" program
• Flexible funds, CMAQ, Enhancements
• Congressional earmarks
• EDA Public Works or Economic Adjustment programs
- AI" alprAilliir sow Or
Connecting People and Shaping Places
•
G� 4ti
VINE
STREETCAR CORRIDOR I to
FEASIBILITY STUDY
Stakeholder Coordination
Miami -Dade MPO and Subcommittees
Downtown Development Authority
Community Redevelopment Authority
Chamber of Commerce TEXCOM Committee
Miami -Dade County
Parking Authority
"Entities of Common Interest"
FEC Railroad
Federal Transit Administration
FDOT
Connecting People and Shaping Places
4;k cJt
°xl
VFW
1?!OE1
STREETCAR CORRIDOR ■
FEASIBILITY STUDY
Connecting People and Shaping Places
."Y.Gd P{1��i4h
STREETCAR CORRIDOR
FEASIBILITY STUDY I~x�
Project Contacts
Lilia Medina, Assistant Transportation Coordinator
City of Miami
(305) 416-1429
inticUma tuLi.miami.fl.us
Charles Hales, Vice President
HDR Engineering, Inc.
(305) 557-4770
.,41arles.hales74drinc.com
Jason McGlashan, PE/PTOE
HDR Engineering, Inc.
(407) 420-4200
jason.mcglashan ar,hdrinc.com
Connecting People and Shaping Places
STREETCAR CORRIDOR
FEASIBILITY STUDY
Project Update Briefing
for the
Miami City Commissio
--, STREETCAR CORRIDOR
FEASIBILITY STUDY
■
July 8, 2004
Charles Hales
HDR Engineering
Serves Little Haiti
Accesses Additional
Redevelopment
Connecting People and Shaping Places
�'�P{1y�i4k
STREETCAR CORRIDOR ■
FEASIBILITY STUDY