Loading...
HomeMy WebLinkAboutCC 11-20-14 Analysis & Color MapsCity of Miami Planning and Zoning Department Land.:Development Section File ID#:07-01499ac1 ANALYSIS FOR ALLEY CLOSURE Request: Pursuant to Section 55-15 (c) of the Miami City Code, the Planning Department has reviewed the proposed public right-of-way vacation and closure to determine whether it is in the public interest, or whether the general public would benefit from the vacation of the right-of-way. Project: Closing, vacating, abandoning and discontinuing for public use alleys Location: NORTH/SOUTH AND EAST/WEST ALLEYS LOCATED BETWEEN NORTH MIAMI AVENUE AND NW MIAMI COURT FROM NW 20TH STREET TO APPROXIMATELY 215 FEET NORTH OF NW 20TH STREET, MIAMI, FLORIDA Net District: Wynwood / Edgewater Folio #: N/A Square footage: N/A Current Zoning Designation: N/A FINDINGS AND COMMENTS: 1. The current alleys are very narrow and vehicular access is not available. A replacement alley is being dedicated by this plat that is wider than the existing alleys and will provide improved access. The alleys are currently not being used for its intended purpose and presents security and illicit activity problems. The closure of the current alleys, creation of a wider alley between North Miami Avenue and NW Miami Court and unification of the site will enable a modern, clean recycling/processing plant to be constructed and reduce the amount of material otherwise deposited in landfills. 2. The existing alleys are too narrow for vehicular access by police, fire, emergency vehicles or the general public. 3. There are three street frontages to this property and emergency vehicle access will not be negatively affected by the alley closures. 4. A wider alley will be provided between North Miami Avenue and NW Miami Court that better accommodates vehicular and pedestrians and maintains the continuity of the grid . 5. The Plat and Street Committee members voted to recommend 6 in favor and 0 in denial of these alley closure requests. K. Cooper Page 1 of 2 -City of Miami Planning and Zoning Department LandDevelopment Section Based on the above findings, the Planning and Zoning Department recommends Approval of the request. 02/21/2014 K. Cooper Page 2 of 2 M IAM 121 MAP I•N.1I.m.U•i 1M.U.M1p MI MUM 11=1.1I NW,22ND, ST!.II :::■ NE,22ND ST 0 150 300 600 Feet I i I I T6-8-O 1 NE ,22ND;ST Ft"NE.-19TH:TER= ADDRESS:07-01499ac1 . o o hgo o M99 z(l 206 mit/ 0 150 300 600 Feet ADDRESS:07-01499ac1 TTtg 41$liami JOHNNY MARTINEZ, P.E. City Manager February 7, 2014 Southern Waste Systems, LID 790 Hillbrath Drive Lantana, FL 33462 Ladies and Gentlemen: MIAMI SUN (SIXTH RESUBMITTAL) TENTATIVE PLAT # 1734-F Located along NW 20 Street between NW Miami Court and North'Miami Avenue The City of Miami Plat and Street Committee, at its meeting of February 6, 2014 approved the above tentative plat subject to the following revisions being made to the tentative plat, additional information being provided and/or variances being granted. Please be advised that the processing of your tentative plat cannot proceed until these conditions have been satisfied: 1. Be more specific about the proposed development intent, new equipment and new buildings. 2. Existing utilities in the alleys to be closed and vacated must be relocated or easement must be created. 3. All encroachments across proposed lot lines and across alley must be removed prior to final plat submittal. 4. An Opinion of Title, in the City of Miami Opinion of Title form, must be provided at the time of final plat submittal. 5. Backup documentation will be required for all who execute the final plat. A resolution for authority to execute documents and a Certificate of Good Standing from the Secretary of State are required, if applicable. 6. Tentative plat application must be made with the Miami -Dade County Public Works/Waste Management Department after receiving approval from the City of Miami Plat and Street Committee. 7. Be advised that an incomplete final plat package will not be accepted by the City of Miami. It is the owner's responsibility to work with the surveyor and his attorney to assure that everything is in order before submitting the final plat package. 8. Be advised that if all requirements for scheduling the final plat for the City Commission action are not in order, the final plat will not be scheduled for a City Commission meeting. 9. A letter from Comcast is required to determine if any adjustments to their facilities or easements are required. 10. Provide all exhibits for the Opinion of Title. 11. An opinion of title as to the reversionary rights for the right-of-way to be closed and vacated will be required by the Planning, Zoning and Appeals Board. The opinion of title must also address whether or not there are individuals, in addition to the abutting DEPARTMENT OF PUBLIC WORKS 444 S.W. 2nd Avenue / Miami, Florida 33130 / (305) 416-1200/ Fax: (305) 416-1278 Mailing Address: P.O. Box 330708 Miami, FL 33233-0708 Southern Waste Systems, LTD February 7, 2014 Page 2 of 3 property owners, having an interest in the right-of-way to be closed and vacated. A copy of the opinion of title must be provided to the Public Works Department. 12. The Planning, Zoning and Appeals Board will require a sketch and legal description with a square footage, on an 8 1/z" x 11" paper, for the proposed closure. Contact the Office of Hearing Boards, at 305-416-2030. Provide a copy to the Public Works Depaitlaient. 13. The Plat and Street Committee has reviewed the tentative plat of MIAMI SUN subdivision and determined that all technical requirements contained in the Miami City Code Subdivision Regulations have been met and has approved the tentative plat. The members of the Plat and Street Committee have further considered the request for vacation and closure of the east/west and north/south portion of the alley with respect to the Miami City Code requirements and have voted to recommend 6 in favor and 0 in denial of this vacation and closure request. In addition to the above requirements, you should be aware of the following: 1. State and local laws require the installation of various physical improvements in the public rights -of -way when property is platted. These subdivision improvements include paving, drainage, landscaping, sidewalks, etc. In some cases this could represent a substantial investment on your part. REQUIRED: The submission of an electronic copy of the tentative plat, in an AutoCAD version, to the City of Miami Public Works Department, Roadway Plans Section will EXPEDITE the preparation and enhance the ACCURACY of the subdivision improvement letter required for the final plat approval. 2. The alteration, relocation or installation of utilities such as storm and sanitary sewers, electric, telephone, water, etc., caused by this plat will be at the property owner's expense. Also, utility easements may be required on the property being platted. 3. A building peiinit will not be issued on the property being platted until the final plat is recorded or as authorized by the City of Miami Code Section 55-10(i). Also, the Certificate of Occupancy for any building construction will be issued only after all. the required subdivision improvements have been completed. 4. Approval for fire flow requirements must be obtained from the Fire -Rescue Department prior to the issuance of a building permit. 5. In order to mitigate problems associated with access and construction activities throughout the neighborhood, the contractor/developer is encouraged to notify the affected neighborhood residents, in writing, of the project starting and completion dates at the time of issuance of permits. The contractor/developer may coordinate the notification of residents with the local City of Miami NET Service Center. 6. Additional items must be provided to the City of Miami Department of Public Works before the final plat is submitted to the City Commission for approval. You will be notified in writing as to what these items are after the amount of the bond has been determined for the necessary subdivision improvements. 7. Tentative plat approval is only valid for one (1) year and six (6) months from the date of the Plat and Street Committee meeting at which time it was approved. Southern Waste Systems, LTD February 7, 2014 Page 2 of 3 If you have any questions concerning these requirements, please refer to the attached sheet for the appropriate person to contact. Sincerely, zeribe lhekwaba, Ph.D., P.E. Director of Public Works N / jd zITl+G4' Enclosure: Contact Sheet c: Angel Lopez E.R. Brownell & Associates, Inc 2434 SW 28 Lane Miami, FL 33133 Miguel Diaz de la Portilla & Elinette Ruiz Arnstein & Lehr LLP 200 South Biscayne Boulevard, Suite 3600 Miami, FL 33131-2395 Plat and Street Committee Members Nzeribe Ihekwaba, Ph.D., P.E., Director of Public Works Survey Development and Roadway Plans Central