ISLAND GARDENS MARINA CONSTRUCTION OUTLINE:
• OUTLINE OF MARINA PERMITS
• TIMELINE OF MARINA CONSTRUCTION
• STAGES OF MARINA CONSTRUCTION
MITIGATION, BULKHEAD, DREDGING, PIERWORK
Submitted into the public
record in connection with
item PA.1 on 07/10/14
Citv Clerk
Submitted into the public
record in connection with
item PA.1 on 07/10/14
City Clerk
OUTLINE OF MARINA PERMITS
Prior to submitting for application of the Marina permits, Flagstone had to conduct and complete phase I and
phase II environmental reports. Flagstone had to then complete further environmental assessments pursuant
to the results of phase I and phase II of the environmental reports before obtaining approval of the permits
identified below:
Marina and Dredging Permit, U.S. Army Corps of Engineers
Issued November 2, 2005, and renewed through October 18, 2015.
(In addition to the permit general conditions, the permit has 107 special conditions)
Environmental Resource Permit, South Florida Water Management District
Issued August 11, 2004, and renewed through April 29, 2015.
Class I Permit, Miami -Dade Department of Regulatory and Economic Resources
Issued November 24, 2008 and valid through July 23, 2016.
(Previously DERM, now "RER"- Department of Regulatory and Economic Resources)
Marine Facilities Annual Operating Permit
Issued October 1, 2013 and valid through September 30, 2014.
Submitted into the public
record in connection with
item PA.1 on 07/10/14
City Clerk
TIMELINE OF MARINA CONSTRUCTION
I I l I I I 1 1 1
2014
1 1 I 1 1 1 1 I
2015
MAY JUKE
JULY
AUG
SEPT
OCT 1 NOV I DEC
JAN
FEBRUARY
MARCH
APRIL
MAY
JUNE
JULY
AUG
MARINAWORK
MITIGATION: Coral,
Seagrass and Sponge
Relocation
BULKHEAD / SEAWALL
DREDGING
PIERWORK
Submitted into the public
record in connection with
item PA.1 on 07/10/14
City Clerk
STAGES OF MARINA CONSTRUCTION
MITIGATION STAGE
May 22, 2014 to Feb, 2015
BULKHEAD STAGE
July 22, 2014 to November 30, 2014
DREDGING STAGE
August 4, 2014 to February 5, 2015
PIERWORK STAGE
January, 2015 to August, 2015
Submitted into the public
record in connection with
item PA.1 on 07/10/14
City Clerk
MARINA CONSTRUCTION MITIGATION STAGE ONE
MITIGATION STAGE
May 22, 2014 to Feb, 2015
Contractor: Ocean Consulting LLC
Engineer: Coastal Systems International, Inc.
Reconnaissance Mitigation Work entails three stages:
1. CORAL RELOCATION
2. SPONGE RELOCATION
3. SEAGRASS RELOCATION
Submitted into the public
record in connection with
item PA.1 on 07/10/14
City Clerk
MARINA CONSTRUCTION: MITIGATION STAGE
Conditions to commencement of mitigation work:
May 13, 2014: State Waiver Secured
May 14 2014: Ocean Consulting Kick-off Meeting with U.S. Army Corps of Engineers
May 15, 2014: Ocean Consulting Kick-off Meeting with DERM (PERA)
May 21, 2014: Ocean Consulting Kick-off Meeting with SFWMD
Submitted into the public
record in connection with
item PA.1 on 07/10/14
City Clerk
MARINA CONSTRUCTION: MITIGATION STAGE
May 22, 2014: Commencement of Mitigation Work
Survey of the bulkhead was conducted: 1,200 feet from point zero.
The locations of all corals were marked along the bulkhead. Measurements of each coral head and general
observations were recorded.
Submitted into the public
record in connection with
item PA.1 on 07/10/14
City Clerk
MARINA CONSTRUCTION: MITIGATION STAGE
Over 60 specimens of the hard coral species Oculina diffusa were identified.
The corals were attached to concrete blocks with marine grade epoxy.
The blocks served as a weighted base for the corals during transport to their new locations.
Submitted into the public
record in connection with
item PA.1 on 07/10/14
City Clerk
MARINA CONSTRUCTION: MITIGATION STAGE
27 coral colonies of Oculina diffusa were relocated. Note that permit conditions stipulated the removal
and relocation of 14 specimens.
18 blocks with epoxied corals were relocated to the opposing shoreline (adjacent to the new art museum).
9 coral heads were too large to epoxy to blocks so they were attached directly to the riprap boulders along
the shoreline.
Submitted into the public
record in connection with
item PA.1 on 07/10/14
City Clerk
MARINA CONSTRUCTION: MITIGATION STAGE
The map below shows all habitats within the project site. The map was created using data collected during
the seagrass survey and AutoCAD software.
1.I it111, tkr I \'
1'k1r11KIM
ki vPI RI t •I It%l1
- J MNIX t AMI* *
44.4114 l W PAMI s►
1 MOM alltoaL MRAU
01001 I! 4101N711. •4'•^.
‘r u,r ut..0 (AU{
▪ 18I M •011 t I w.utttill • •a'1,
t*% ! 1pd• auras
u 1 as
*VV1tii •a11Y1 AIA
WARM 4,01.111 mutt
▪ MLIi1 CN t1OI6191W11Vtt1
Mt till t7-,0••
__- WNW . "l1 RYN cams
1 IlWitttOY MN iWbilIt MTV
.N;•.t1k t'13.1N111c
:14
• $. $111 $ .111t11 1• TAM • t t 11 I I I 1• t /�
•he 1.ttt.1r..4tt• O. N:•••
cc•‘i wi i t -z, •.t ••/Y
MARINA CONSTRUCTION: MITIGATION STAGE
42 sponges were removed and placed in the staging location. Note that permit conditions stipulated the
removal and relocation of 30 specimens.
Sponges were attached to concrete blocks with marine grade epoxy. Once the epoxy had cured, the
sponge/blocks were transported to the relocation site on the north side of the McArthur Causeway.
Submitted into the public
record in connection with
item PA.1 on 07/10/14
City Clerk
MARINA CONSTRUCTION: MITIGATION STAGE
June 30, 2014: Seagrass mitigation, the last stage of the reconnaissance mitigation work began.
• 2000 plugs are being removed and transported to a temporary
holding site, north of the Julia Tuttle Causeway. --"`
When the dredging phase of the marina construction is
completed and the dredge holes are filled, these plugs will be
replanted in the filled dredge hole. We have identified additional
donor locations whereupon 8,000 plugs will be removed and
replanted within the filled dredge hole (i.e. mitigation site).
Submitted into the public
record in connection with
item PA.1 on 07/10/14
uiy Lier?
MARINA CONSTRUCTION: MITIGATION STAGE
July 11, 2014: Anticipated completion date of Mitigation Work required prior to bulkhead stage
and dredging stage
• Mitigation will continue throughout the marina project with the Brickell artificial reef mitigation
anticipated to begin October, 2014 through February, 2015.
• The Brickell Mitigation Site is for the creation of an artificial reef. The artificial reef will most likely be
constructed of limestone boulders or concrete reef balls. It is to off -set impacts to hard -bottom habitat at
the project site. This Brickell Artificial Reef will result in a net -increase of hard bottom habitat — as we are
required to create more suitable habitat than impacted.
Submitted into the public
record in connection with
item PA.1 on 07/10/14
City Clerk
MARINA CONSTRUCTION BULKHEAD STAGE TWO
BULKHEAD STAGE
July 22, 2014 to November 30, 2014
Contractor: Ebsary Foundation Company
Engineer: Coastal Systems International, Inc.
July 22, 2014: Demolition of existing bulkhead caps begins.
It is important to note that the bulkhead must be strengthened prior to any upland construction
commencing.
The new bulkhead is to be built behind the existing bulkhead to protect the existing seawall and
strengthen the upland side.
Piles are estimated to be delivered to the site by July 22, 2014. The bulkhead phase is estimated to be
completed by the end of November, 2014.
Submitted into the public
record in connection with
item PA.1 on 07/10/14
City Clark
MARINA CONSTRUCTION DREDGING STAGE THREE
DREDGING STAGE
August 4, 2014 to February 5, 2015
Contractor: Cashman Dredging and Marine Contracting Co.
Engineer: Coastal Systems International, Inc.
• The dredged material will be barged and shipped to 3 identified locations north of 1-195.
• New qualified sand will be purchased to be placed as top soil where the seagrass will be re -located.
Submitted into the public
record in connection with
item PA.1 on 07/10/14
City Clerk
MARINA CONSTRUCTION PIERWORK STAGE FOUR
PIERWORK STAGE
January, 2015 to August, 2015
Contractor: Negotiations in process with pierwork contractor
Engineer: Coastal Systems International, Inc.
• Dock will be begin to be delivered to the site around November, 2014.
• Piling will commence around the same time.
• Installation of the docks will commence January, 2015.
October, 2015: Completion of Marina Work