Loading...
HomeMy WebLinkAboutCrosswalk ImprovementsPROJECT LOCATION LOCATION MAP DEPARTMENT OF CAPITAL IMPROVEMENTS PROGRAM NW 146 STREET & NW I2cd1 AVE CROSSWALK IMPROVEMENTS COMM / SS ION MAYOR: COMMISSIONERS: CITY MANAGER: CIP DIRECTOR: CITY OF MIAMI PROJECT NUMBE!' : R-30500 AUGUST 22.d, 2011 TOMAS P. REGALADO WIFREDO GORT MARC SARNOFF FRANK CAROLLO FRANCIS SUAREZ RICHARD P.DUNN JOHNNY MARTINEZ. ALBERTO SOSA, P.E. LENGTH OF PROJECT LINEAR FEET MILES ROA°1/AY 126 0.02 BRIDGES - NET LENGTH OF PROJECT 126 0.02 EXCEP/IONS - GROSS LENGTH OF PROJECT 126 0.02 CITY OF MIAMI PROJECT MANAGER: JOSE LAG° PLANS PREPARED 8Y: T•Y•LIN INTERNATIONAL EB00000407 201 Alhambra Circle Suite 900 Coral Gables, Florida. 33134 Phone: 305/567-1888 Fax: 305/567-1771 INDEX OF ROADWAY PLANS SHEET No. SHEET DESCRIPTION l KEY SHEET 2 GENERAL NOTES, LEGEND AND ABBREVIATIONS 3 NW l4th STREET AND NW 12th AVENUE 4 DETAILS 5-7 STORMWATER POLLUTION PREVENTION PLAN 8 TRAFFIC CONTROL NOTES SEAL LI FRAI215C0 J. RL0N50, P.E. \` 006 GABLE, Hatt• 33, % 8/22,04 /0 5150 Au 6 2 8 1 R.WroJeoS '55069J.25XN Ilse Street flood, I,Jvaenen/e/0JOXV Vro0O.V 0 lL MLL- GENERAL NOTES 1. ALL ELEVATIONS REFER TO THE CITY OF MIAMI VERTICAL DATUM. 2. ALL PUBLIC LAND CORNERS AND PRIMARY NETWORK CONTROL SURVEY MONUMENTS ARE 70 BE PROTECTED BY THE CONTRACTOR. CORNERS AND MONUMENTS WITHIN THE WORK ZONE AND IN DANGER OF BEING DAMAGED, DESTROYED DR COVERED SHALL BE PROPERLY REFERENCED VW A REGISTERED LAND SURVEYOR IN ACCORDANCE WITH THE MINIMUM TECHNICAL STANDARDS OF THE FLORIDA BOARD OF PROFESSIONAL LAND SURVEYOR PRIOR TO THE BEGINNING OF WORK. UPON PROJECT COMPLETION THE CONTRACTOR SHALL RESTORE ALL SUCH CORNERS ANO MONUMENTS AND SHALL FURNISH TO THE DISTRICT LOCATION SURVEYOR A SIGNED AND SEALED COPY OF THE LAND SURVEYOR'S REFERENCE DRAWING. INCLUDE ALL COST OF REFERENCING, RESTORING AND PRESERVING CORNERS AND MONUMENTS IN THE BID PRICE FOR ITEM 101-1 MOBILIZATION. 3. ALL EXCESS MATERIAL AS DES/NATED BY THE ENGINEER l5 TO BE DISPOSED BY THE CONTRACTOR IN AREAS PROVIDED BY HIM WITHIN 24 HOURS OF BEING DEPOSITED IN THE CONSTRUCTION AREA AND AT THE CONTRACTOR'S EXPENSE. 4. THE CONTRACTOR SHALL PAINT ALL STATIONS WITH STENCILED NUMBERS ON THE FACE OF THE CURB. A. FROM THE BEGINNING OF THE PROJECT WHERE THE CURB 15 TO REMAIN. B.AT NEW CURB NOT LATER THAN 72 HOURS AFTER BEING POURED. C. WHERE CURB DOES NOT EXIST AND SHALL NOT BE CONSTRUCTED THE CONTRACTOR SHALL MAINTAIN STATIONING WITH SURVEYING STAXES. THE CONTRACTOR SHALL MAINTAIN THE srnrtaW MARKS VISIBLE UNTIL FINAL INSPECTION. COST TO BE INCLUDED IN RELATED PAY ITEM 102-1 MAINTENANCE OF TRAFFIC. 5. COMMERCIAL MATERIAL INCLUDED FOR DRIVEWAY MAINTENANCE AND SAFE ACCESS TO RESIDENTIAL AND BUSINESS PROPERTIES AFFECTED BY CONSTRUCTION SHALL BE PAID ONLY ONCE PER ACCESS. IF THE MATERIAL l5 REMOVED WRING SUBSEQUENT CONSTRUCTION OPERATIONS, IT SHALL BE REPLACED AT THE CONTRACTORS EXPENSE. THIS WORK IS INCLUDED IN THE MAINTENANCE OF TRAFFIC PAY ITEM AND MAY BE INCREASED, DECREASED OR OMITTED A5 DIRECTED BY THE CITY. 6. LARGE CHUNKS OF EXCAVATED MATERIAL SHALL BE REPLACED WITH SUITABLE MATERIAL OR PROCESSED TO MAKE THEM SUITABLE FOR BACKFILLING 017 EMBANKMENT CONSTRUCTION. COST TO BE INCLUDED IN RELATED BID ITEMS. 7. CLEARING AND GRUBBING, GRADING AND OTHER INCIDENTAL WORK NECESSARY FOR HARMONIZATION OUTSIDE RYW SHALL BE INCLUDED IN RELATED BID ITEMS (STRUCTURAL ASPHALT, SOD, CONCRETE, BRICKS, ETC.) 8. THE CONTRACTOR SHALL PERFORM SELECTIVE CLEARING AND GRUBBING FOR THE WORK BEING DONE. THIS SHALL INCLUDE ALL LANDSCAPE AND SIDEWALK, COST TO BE INCLUDED IN 110-I-1, CLEARING AND GRUBBING. 9. SAW CUTTING OF THE EXISTING SIDEWALKS SHALL BE MADE ONLY AT THE NEAREST FLAG JOINTS. l0. INSTALLATIONS OF NEW PULL BOXES SHALL BE PERFORMED BY QUALIFIED ELECTRICAL CONTRACTOR. WHEN NEW PULL BOX l5 REPLACING EXISTING PULL BOX, THE CONTRACTOR SHALL ADJUST CONDUITS AND CABLES TO For THE NEW PALL BOX ELEVATION. COST OF ADJUSTMENTS AND NEW PULL BOXS IS INCIDENTAL TO TOTAL PROJECT COST. ll. ALL SIDEWALKS, DRIVEWAYS AND SWALES DAMAGED BY THE CONTRACTOR SHALL BE RESTORED IN KIND AT NO ADDITIONAL COST. SIGNING ANO PAVEMENT MARKING NOTES' 1. ALL SIGNING AND PAVEMENT MARKINGS INSTALLED AS PART OF THESE PLANS SHALL CONFORM TO THE CURRENT EDITION OF THE FEDERAL H(GhWAY ADMINISTRATION (FNMA, MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES FOR STREET AND HT,HNAYS, AND FLORIDA DEPARTMENT OF TRANSPORTATION DESIGN STANDARDS. ALL SIGN PANELS SHALL BE FABRICATED TO COMPLY WITH THE HOST RECENT EDITION OF THE FEDERAL HIGHWAY AND ADMINISTRATION STANDARD HIGHWAY SIGNS. 2. MATCH EXISTING PAVEMENT MARKINGS AT THE BEGINNING AND THE END OF THE PROJECT AND AT ALL SIDE STREETS WITHOUT JOGS AND OFFSETS. J. SIGN ASSEMBLY LOCATIONS SHOWN ON PLANS WHICH ARE IN CONFLICT WITH LIGHTING, UTILITIES, DRIVEWAYS, WHEELCHAIR RAMPS, ETC., MAY BE ADJUSTED SLIGHTLY AS DIRECTED PA THE ENGINEER. EXTREME LOCATION CHANCES MUST BE APPROVED BY MIAMI-DADE [MINTY TRAFFIC DN/S/ON. 4. INCORRECTLY PLACED (THERMOPLASTIC ORl PAINT MARKINGS OVER ASPHALT WILL BE REMOVED BY MILLING AND REPLACING THE ASPHALT A MINIMUM WIDTH OF 0.5 METERS 118 INT AT THE CONTRACTOR'S EXPENSE. THE ENGINEER MAY APPROVE AN ALTERNATIVE METHOD IF (T CAN BE DEMONSTRATED TO COMPLETELY REMOVE THE MARKINGS WITHOUT DAMAGING THE ASPHALT. 5. THE CONTRACTOR SHALL RELOCATE ALL EXISTING POST -MOUNTED STREET NAME AND STOP SIGNS TO A VISIBLE AREA UNDISTURBED BY THE CONSTRUCTION 50 AS TO .MINIMIZE DAMAGE TO THE SIGNS CURING CONSTRUCTION. THE STREET NAME SHALL BE REATTACHED TO THE TOP OF THE NEW STOP SIGNS ON MINOR SIDE STREETS AT THE ENO OF CONSTRUCTION. THE NEW STOP SIGN POST SHALL HAVE ADEQUATE LENGTH TO ACCOMMODATE THE EXISTING STREET NAMES AT THE TOP. COST OF RELOCATION AND REATTACHMENT OF STREET NAME SIGN SHALL BE PAID FOR UNDER PAY ITEM 102-1, MAINTENANCE OF TRAFFIC. 6. EXTRUDED ALUMINUM SIGN SUPPORT CLAMPS ARE NOT ACCEPTABLE. ALL RELOCATED SIGNS M05T COMPLY WITH THE STANDARD SPECIFICATIONS, SPECIAL PROVISIONS AND ROADWAY DESIGN AND TRAFFIC STANDARDS AS IF THEY WERE NEW SIGNS. IF EXISTING CLAMPS, BRACKETS, POLES, ETC. NEED TD OE REPLACED THE COST SHALL BE INCIDENTAL TO THE TOTAL PROJECT COST. 7. THE CONTRACTOR SHALL SUBMIT A LIST OF THE EXISTING SIGNS TO THE PROJECT ENGINEER AT THE PRE -CONSTRUCTION CONFERENCE. ANY SIGNS LOST OR DAMAGED WRING CONSTRUCTION SHALL BE REPLACED AT NO ADDITIONAL COST. COST OF MAINTAINING OF EXISTING SIGNS TO BE INCLUDED IN ITEM 102-1, MAINTENANCE OF TRAFFIC. 8. STOP BARS SHALL BE PLACED AT LEAST FIVE FEET FROM CROSSWALN5 IF TRAFFIC SIGNAL LOOPS ARE INSTALLED. 9. THE CONTRACTOR SHALL PROVIDE PERMANENT FIVE FOOT DEEP CASING FOR ALL DRILLED SHAFTS. COST OF CASINGS TO BE INCLUDED IN THE SIGNS PAY ITEMS. MIAMI-DADE COUNTY TRAFFIC SIGNALS & SIGNS DIVISION 7(00 N.W. J6TH STREET MIAMI, FLORIDA 33/66 RECEIPTS MUST BE OBTAINED FROM THE ABOVE AGENCY AND SUBMIT-IED 10 THE PROJECT ENGINEER TO RECEIVE PAYMENT FOR REMOVAL ITEMS. 10. EXIST. SIGNING AND PAVEMENT MARKING AFFECTED BY TIIE PROJECT CONSTRUCTION TO BE REPLACED IN KIND. COST SHALL BE INCIDENTAL TO THE TOTAL PROJECT COST. UTILITIES NOTES: I. FOR UTILITY ADJUSTMENT SYMBOLS, SEE FOOT STANDARD INDEX Na. 002. 2. ALL EXISTING UTILITIES ARE TO REMAIN UNLESS OTHERWISE NOTED. EXCERC15E EXTREME CAUTION WRING EXCAVATION AND INSTALLATION OF PROPOSED DRAINAGE. 3. PRE -TRENCHING IN THE ALIGNMENT AND GRADE OF PROPOSED IMPROVEMENTS SIIALL BE PERFORMED SEVEN DAYS IN ADVANCE OF ITS CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE UNDERGROUND UTILITY OWNERS AND THE DEPARTMENT WITH A SEVEN DAYS ADVANCE NOTICE OF ANY CONFLICT WITH PROPOSED CONSTRUCTION. THIS NOTIFICATION SHALL PROVIDE SURVEY INFORMATION ABOUT EXISTING UTILITY ALIGNMENT, -GRADE AND POSSIBLE CONFLICTS. PAYMENT FOR PRE -TRENCHING, SURVEY AND BACKFILLING SHALL BE INCLUDED IN THE COST OF THE RELATED B/0 ITEM FOR THE WORK BEING DONE. 4. ADJUSTMENT TO EXIST. VALVE BOXES, AND MANHOLES TOPS TO FINISHEDGRADE SHALL BE INCLUDED IN THE COST OF THE RELATED BID ITEM FOR THE WORK BEING DONE. 5. UTILITY ONNERST FOOT DISTRICT 6 COMCAST CABLE MIAMI-DADE COUNTY PUBLIC WORKS FLORIDA POWER AND LIGHT-DADE MIAMI-DADE WATER AND SEWER ATT/OISTR1BU7ION FLORIDA POWER AND LIGHT-FIBERNET LEVEL 3 COMMUNICATIONS MIAMI-DA0£ CTSD NCI QUEST COMMUNICATIONS TECO PEOPLES GAS 1/07WIRE COMMUNICATION MIAMI-DADE EXPRESSWAY AUTHORITY 1AIDX) SPRINT N£XTEL FlUERL1GHr LLC QUANTITIES' THO.MAS MILLER LEONARD .VAkWELL-NEWBOLD AURELIO DEL VALLE KAREN LUND PATRICK CHONG STEVE A/ASSIE DANNY MASKETT JUDY HENRY JUAII AGU/RRE INVESTIGATIONS MIKE FITZGERALD ALEX RACHE PHIL GALLUB JHORD4NO IRIZARRY THGMAS NAIL CHRIS PANCIONE 305-491-4391 954-447-8405 305-592-8925 EXT.258 305-942-5290 T86-268-5255 305-255-/030 J05-552-293i 720-888-2061 305-596-8409 972-729-6016 941-661-7557 959-953-0811 305-219-0286 959-J42-0690 I-800-521-0579 954-596-2559 0TR3I DESCRIPTION AZM..AoTTTS' UN, 0160 4 Type B Stabilization 470.0 Sr 0210 1 1 Reworking Llmereck Base (6') 172.a sY 208001 ter Ce^ Treated h neanle Base (Includes Cont. Pavement zuha,al0 z per Index 2Bal 7Sn 0 cx 0334 1 13 Snpeipave Asphaltic Concrete (C) 01.9 TIT 0337 7 33 Asphaltic Cnne,ete F,Iellnn 00118O 1T,410c C) 17C• 12.5,Rnbbei 11165111,zy17 111 0 TN 0350 1 5 Plain cement co crete pavement, 10' (class 11 399.5 51 0446 71 I Edyed,alr, Outlet Pipe 14'1 10.6 LF 0523 1 2 'nr,6Dextured Pavement (tor IntegralR9 rnio,l 3.5 0660 21xx LoopAsscntbly, F01 7.0 AS 0711 11123 12' Solid T,a(lic S1,ipe 1N11.(e) 134,0 tr ABBREVIATIONS Arc Length • Alr Conditioner Pod asv A5ph0/1 Benchmark ma Concrete Block Structure CDI mn Gutter. 14 CCan' L/na Concrete e kk Concrete Slab rc Driveway Depressed Curb. ox Electric Transtarmer Pod F/nlshed Floor Elevation Found Iron Plpe Found Nall R Disc Found Reber ldenllflcallon ,r hover/5 Lowest Floor Elevollon Monument Line IN Plot Book Permanent Control Paint Doge ▪ Planter PA Properly Line Permanent Reference Monument • Right -of -Way Llne 11. Sidewalk um rryy us Valley Temporary Benchmark ' 5,t th 8 0 AO a 0 O T A I FGENO Concrete Light Pole M0101 Light Pole Guy Wire T+i UMW Power Pole Fire Hydrant la Water Meter IDI Electric Ras Ca' Telephone Box Q Sever Manhole - - Overhead Umlly Lines -' Light Pole Gas VaNe Water Valve Water Manhole Telephone Manhole Monitoring Well ParkIng Meter Unknown Manhole Sewer VaNe Mall Box Spot Elevation Temporary Benchmark TRFE LEGFND SYMBOL COMMON NAME ® Tree !Species unknown) O Gumbo Limbo * Block Olive * Palm Tree e Black Olive 0 Oak Tree Pine Tree * Coconut Palm • Royal Polnclana Qy'� Ficus T Areag * Avocado Tree • Mango Tree * Trumpet Tree Dlalnel er-Helgnl -Spread Rlghl-of-Wan Lines Properly Corner Traffic Sign Exlsllrg Catch Basin New Catch Basin Exlsling Drainage Manhole New Drainage Manhole Wood Fence Iron Fence C.B.S. Wall Clean Out . Guard Pole Clain Llnk Fence Proposco Storm Pipe Proposed Exflllrallon Trench - 001311g French Drain -- Existing Sanitary Sewer - Existing Water Main • Existing Burled Telephone •• Existing Burled Communlc3Nons • - Exlslln. Burled Electricol 811 KNOW WHAT'S BELOW ALWAYS CALL 111 BEFORE YOU 010 22 ���!!!www.cagounshIne corn REVISIONS DATE DESCPIPT ION DATE DESCRIPTION T'Y'LIN INTERNATIONAL 201 ALHAMBRA CIRCLE SUITE 900 Coral Gables. Florida. 33134 Phone: 305 / 567-1888 Fax: 305 / 567-1771 CITY OF MInNil NW 14th STREET & NW 12th AVE CROSSWALK IMPROVEMENTS CITY OF L'IAMI PROJECT NUMBER: B-30500 GENERAL NOTES, LEGEND, ABBREVIATIONS & QUANTITIES SHEET N0. 2 +USER+ +PATE+ *11HE+ +FILE* R,W L/NE j I 900.5/ 36.9/' (LT) +95.05 38.49' /LT1 CURB & GUTTER! RECONSTRUCTION SHALL ,BE PAY UNDER PAY ITEM 288001 28.75' (LTI ��' +85.86 42.7/' /L INV. 3.39 12' WHITE 39.88' (RY2, +78.34 44.00' WI CURB & GUTTER RECONSTRUCTION SHALL BE PAY UNDER PAY ITEM 28800/ +89.02 53.60' (RT) +93.60 51.89' (RTI 14' D' �36 `.aii POW LINE NV. 3.37 12" JYHITE 12" WHITE PIPE 4' Olo (TYP.1 I I LIMITS OF DECONSTRUCTION LIMITS OF RECONSTRUCTION INV. 3.37 2' IYHITE 12' WHITE iIi 11 CORE HOLBj !AND CONNE TO E2J___P'RUCTURE (INV. 3.271 I I,I �`,.1'sj:,I . +92.28 47.93' (LT) *90.55 36.99' (LT) L'iMrrs--oF RECONSTRUCTION LIMITS OF RECONSTRUCTION INV. 3.27 +85.96 49.22' (RTI +87.38 47.65' MT, i1 CORE HOLE AND CONNECT TO Ely/ST. 5TRUCTURE (INV. 3.261 II I +9/.62 !I �11 59.35' (RTI CURB &1'GU TER RECONSTRUCTION SHALL BE PAY 'UNDER PAY ITEM 446-71-I IO' /4' —CURB & 0/) 72R RECONSTRUCT/ON SHALL BE PAY UNDER PAY ITEM 446-7/-1 +97.34 47.92' (L71 0 +96.50 42.59' (LT/ +92.33 35.46' (LT( CURB & GUTTER RECONSTRUCTION SHALL BE PAY UNDER PAY ITEM 288001 I +06.98 27.01' (LT/ I 905.13 /0 06 2/.08(L71 F: ,y N l' INV. 3.30 LIMITS OF RECONSTRUCTION J I V INV. 3.33 I • 12' WHITE INV. 3.30 Feel RAY LINE 37.17' (RTI CURB & GUTTER RECONSTRUCTION SHALL BE PAY UNDEP PAY ITEM 288001 -11\+95./0 57.,35L (ATI 996.2/ 59.36' MT) err_ KNOW INTAT'S MOO AVMS CALL I11 BYTOM TOO On www.ansunshine.com 811 RE ✓/5 /O N5 DATE DESCRIP/ION DATE DESCRIPTION T•Y•LIN INTERNATIONAL 201 ALHAMBRA CIRCLE SUITE 900 Coral Gables, Florida, 33134 Phone: 305 / 567-1888 Fax: 305 / 567-1771 CITY OF MIAMI NW 14th STREET 8 NW 12th AVE CROSSWALK IMPROVEMENTS CRY OF MIAMI PROJECT NUMBER: Ba0500 NW I4TH STREET AND NW I2TH AVENUE SHEET N0. 3 CPOIot SAWOR ron.eY R.P.o/r,550860asru yarn 5r.eer mea.q rmo.wemnnasrxovma+gw.r rf Are - v f2' RECONST. 1 7.5 FC.12 5' 1.5"5P CROSSWALK LONG. SLOPE R NST. BOTTOM OF NEW BASE SHOULD BE AT OR ABOVE STAB. MATCH EXIST. GRADE ELEV. (TYP.) f / XIS TA6+. TPB n 10" INTEGRAL4COLOR CL'ss LCoNC. SLAB - 4" TREATED PERMEABLE BASE 2" SEPARATION LAYER TYPE 5P r♦� .. •nA�n ,r / / .. ,�. / FABR 1IC1 -FILTER FABRIC TYPE 0-3 (SEE INDEX 1991 J 794I'--- PEREINDEIN2AS r_2' RECONST. r�;a5FC (25 �- 1.5-SP e BOTTOM OF NEW BASE SHOULD BE AT OR ABOVE STAB. SECTION AA CROSSWALK e - a 10" INTEGRAL COLOR CLASS /CONC. SLAB 4' TREATED PERMEABLE BASE I1\ SEPARATION LAYER TYPE SPA` SECTION BB .L1 T2' RECONST. //// / / ////J ��11L FILTER FA FILTER FABRIC TYPE 0-3 (SEE INDEX 1991 E-I1 `EOGEI DRAIN AS MATCH EXIST. GRADE ELEV.(TYP.( TYPE F CURB R GUTTER NOTES: I. Saw cyl existing asphalt pavement to a width capable of accommodating the IO wide concrete crosswalk as well as 2' an each side for form work. On the 2' reconstruction are/ remove asphalt abase to a depth of 9", grade P.compact remalnhg base material.. 2. For concre/e crosswalk nlocomenl Cemove existing osp(a// and base far o !opal e0Lavollan depth of a/0u/ 28 below exlstlrg grade. 3. Grading and compaction of existing subgrade (95% maximum density,. 4. Placement of /2" type B /obll/za/ion /LBR 401, 2" type SP structural course (21 (traffic C1, and 4 asphalt treated or cement treated permeable base. Construct 12• wide edge drain las per Index 2871 g pproprlate slate of the crosswalk. 5. Placement of a 10' thick Class I concrete slab and coloring of concrete (FOOT Standards Section 3461 with n Integral color mix; a. Expansion Joins will be placed on each lane Ilne (approx. every 10 -121 per FOOT Standard Index 305 b. Joints will be reinforced by (8" tong 1-1/4" bars on 12' spacing located 5' Irom the lop of the slab 6. After placem0n/ concrete will be finished 71rs1 with o Ngh/ burlap drag (per FOOT 5/andards Secl/on 350-10.N fo//mvcd 19 curing compound After concrete hos achieved a minimum 2500ps/ compressive strength, the form work will be rpmnv& 8. Prgvlde 0BG 9 I13-12.51 base, (.5" type SP structural course, and l.5 friction course PC-12 adjacent to newly placed corarele and compacted per FOOT standards. 9. 2" of SP-9.5 w111 be placed ono' compacted per 'DOT standards /0. All work and materials shall be as per FOOT Spoclflcations /l. Rep'aoe exist. lmpectrd vehlde loops per Index (778(. Per Mlam/-Dole County records (asset number 23771, there e 3 loops on the eastbound, 3 on the westbound and one on the northbound left turn lane. REV15/0N5 DATE DESCRIPTION OA/E DESCRIPTION T•Y•LIN INTERNATIONAL 201 ALHAMBRA CIRCLE SUITE 900 Coral Gables, Florida. 33134 Phone: 305 / 567-1888 Fax: 305 / 567-1771 CITY (DF MIAMI NW 14th STREET & NW 12th AVE CROSSWALK IMPROVEMENTS CITY OF MUM PROJECT NUMBER BJ0500 DETAILS SHEET N0. 4 3 er22,011 210,110 PI, Ir1Wnls515500W25S1 ran Wee? Roach, nrp.o.enn1s,930500, eadrea 50 12 Pre - sr POST 10171-IONS, 2' x 4' OR 2 I/2' MIN, DIA. WOOD, STEEL 1.33 LB5/FT. MIN.) 6' Ha,. ELEVATION OPTIONAL POST POSIrrox500. FILTER FABRIC LIN CONFORMANCE WITH SEC. 985 FOOT SPECS.) SILT FENCE DETAIL NI. TYPE 111 SILT FENCE PROTECTION AROUND DITCH BOTTOM INLETS. NOTE, 00 NOT DEPLOY IN A MANNER THAT SILT FENCES WILL ACT AS A DAM ACROSS PERMANENT FLOWING WATERCOURSES. SILT FENCES ARE TO BE USED AT UPLAND LOCATIONS AND TURBIDITY BARRIERS U5E0 AT PERMANENT BODIES OF WATER. PARTIAL INLET CURB & GUTTER PRINCIPLE POST POSITION !CANTED 20' TONARO FLOW) FILTER FABRIC SILT FLOW SECTION TYPE Ill SILT FENCE NOTE: SPACING FOR TYPE "'FENCE TO BE IN ACCORDANCE WITH CHART I,SHEET /OF 3 AND DITCH INSTALLATIONS AT DRAINAGE Srouor00ES SHEET 2 OF 3 PER INDEX 102 SILT FENCE APPLICATIONS DITCH -^— CURB & GUTTER COMPLETED INLET ANCHOR BALES WITH 2 - 2'72'54' STAKES PER BALE. PROTECTION AROUND INLETS OR SIMILAR STRUCTURES N.T.S. NOTE: TYPE A OR R FENCE ----DITCH DITCH BOTTOM INLET LOOSE SOIL PLACED BY SHOVEL AND LIGHTLY COMPACTED ALONG UPSTREAM FACE OF BALES. R E V /5 IDS HALES IO H6 SIAKED AI Ilk UlhtLIFUN OF IHt DATE DESCRIPTION BATE 0E5CR/PTIOV STORM WATER POLLUTION PREVENTION PRACTICES::FOR PROJECTS OF I ACRE OR MORE: I. TREE PROTECTION ANO PRUNING SHALL BE ACCOMPLISHED AS DETAILED IN SPECIAL PROVISIONS, THE CONSTRUCTION PLANS, AND OR PER TREE ORDINANCE /2636. 2. THE STORM WATER POLLUTION PREVENTION PLAN, SWPPP, SMUTTED TO PUBLIC WORKS, SHALL DESCRIBE IN DETAIL HON THE CONSTRUCTION EFFORT WILL BE PHASED WITH REGARDS TO MINIMIZING EROSION PROBLEMS BY THE USE OF TEMPORARY AND PERMANENT EROSION CONTROL MEASURES, FoR THE VARIOUS SERUENCES OF CONSTRUCTION OPERATIONS. ANY MOOIT!CATIONS MUST BE APPROVED BY THE CITY OF MIAMI - NPOES SECTION, DEPARTMENT OF PUBLIC WORKS. 3. ENVIRONMENTAL CONTROL FEATURES AS PROVIDED IN THE SWPPP, ARE TO DE INSTALLED AT ALL AREAS OF EXCAVATION OR FILL FOR DRAINAGE SYSTEM,OR STRUCTURE CONSTRUCTION PRIOR TO SUCH EXCAVATION OR FILL. INLET ENTRANCES ARE ALSO TO BE PROTECTED FROM SILTATION AS DETAILED ON SHEET 2 OF 4 OF M/SC.35-09-6. 4. ALL ENVIRONMENTAL CONTROL FEATURES ARE TO BE MAINTAINED THROUGHOUT THE LIFE OF THE PROJECT IN ACCORDANCE WITH N.P.O.E.S. REQUIREMENTS. THE CONTRACTOR MUST INSURE THAT ALL EROSION CONTROL FEATURES FUNCTION PROPERLY AT ALL TINES. 5. ALL EROSION AND MATERIAL DEPOSITS MUST BE CONTAINED WITHIN THE PROJECT UNITS. 6. ANY DAMAGED DR INEFFECTIVE ROCK BAGS ARE TO BE REPLACED WITH NEW ONES. THE LOCATION OF ROCK BAGS INSTALLATION IS A5 MENTIONED IN THE SWPPP PLANS. THE PROJECT ENGINEER MAY SPECIFY OTHER AREAS AS NECESSARY. T. DITCH BOTTOM INLETS SHALL DE PROTECTED FROM SEDIMENT INTAKE UNTIL PROJECT IS COMPLETE. ELEVATION OF GROUND ONSIDE INLET TOP SHALL NOT BE HIGHER THAN INLET TOP. ROCK BAGS SHALL BE INSTALLED AROUND INLET TOP. COMPLETE0 INLET$ IN PAVED AREAS SHALL ALSO RE PROTECTED WITH ROCK BAGS TO PREVENT SEDIMENT INTAKE. 8. CURD INLETS ALSO SHALT. BE PROTECTED FROM SEDIMENT INTAKE UNTIL THE PROJECT IS COMPLETE. ALL EXPOSED SLOPED MATERIAL ADJACENT TO INLET, SHALL BE COVERED WITH ER0510f0 CONTROL MATTING WITH OUTER LIMITS PROTECTED BY ROCK BAGS. 9. STOCKPILED MATERIAL SHALL NOT BF LFFT IN EROSION PRONE AREAS UNLESS PROTECTED BY CO/ER DR ROCK BAGS. TO. INSPECTION OF EROSION CONTROL MEASURES AND CONDITION OF ADJACENT PROPERTIES, SHALL BE PERFORMED DAILY BY THE CONTRACTOR'S REPRESENTATIVE AND THE PROJECT ENGINEER. DEFICIENCIES SHALL BE NOTED AND CORRECTED. II. ANY OFFSITE SEDIMENT DISCHARGE TO A MUNICIPAL SEPARATE STORM WATER SYSTEM ARISING FROM THE ONITRACTOR'S ACTNIr,ES IS NOT ALLOWED. REFER TO PUBLIC WORKS DEPARTMENT BULLETIN No. P.S. 12. THE USE OF SANITARY ST.WERS, FRENCH ORAINS,COVE9 DITCHES AND/OR ROCK DRAINS FOR THE DISPOSAL OF WASTEWATER 15 EXPRESSLY PROHIBITED. REFER TO PUBLIC WORKS DEPARTMENT BULLETIN No. 25.. NPDES - NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM STORAI WATER POLLUTION PREVENTION PLAN LSWPPPI EROSION & SEDIMENT CONTROL STABILIZATION PRACTICES: OTHER CONTROLS: OFFSITE VEHICLE TRACKING: _ TEMPORARY SODDING TEMPORARY GRASSING _ PERMANENT PLAN rING, SEEDING 0R SEED 8 MULCH TEMPORARY MULCHING - ARTIFICIAL COVERING ___ BUFFER ZONES _— PRESERVATION OF NATURAL RESOURCES _ OTHER STRUCTURAL PRACTICES[. — _ SAND BAGGING EN61„E2,.Y•LIN INTERNATIONAL 201 ALHAMBRA CIRCLE SUITE 900 Coral Gables, Florida. 33134 Phone: 305 / 587-1888 Fax: 305 / 587-1771 CITY OF M11\MI NW 14th STREET 8 NW 12th AVE CROSSWALK IMPROVEMENTS CRY OF MIAMI PROJECT NUMBER: 8-30500 - HAUL ROADS DAMPENED FOR OUST CONTROL LOADED HAUL TRUCKS TO BE COVERED WITH TARPAUL/N,OR APPROVED EQUAL. _— EXCESS DIRT ON ROAD REMOVED DAILY — STABILIZED CONSTRUCTION ENTRANCE ___ CONCRETE TRUCK WASH AREA __ OTHER TREATMENT OF STORM WATER TO MEET WATER QUALITY: ___ DEEP WELLS ___ CULVERTS FOR EMERGENCY OVERFLOW POLLUTION CONTROL STRUCTURES ___ OTHER GENERAL 1. APPROVED STATE, LOCAL PLANS OR STORM 11'ATER PERMITS. 2. ALL OF THE CONTROLS SHALL BE MAINTAINED AT ALL TIMES. 3. ALL CONTROLS SMALL BE INSPECTED DAILY. 4. APPLY FERTILIZERS AND PESTICIDES ACCORDING TO STANDARD SPECIFICATIONS, DESIGN AND SPECIAL PROVISIONS. 5. REPORT NON -STORM WATER DISCHARGE 'INCLUDING SPILU:30514/6-1200. 6. V151, xww.Ueo.oloIe.Tl.us/wafer/sl0rnweoler/n4Nes/ STORMWATER POLLUTION PREVENTION PLAN SHEET NO. 5 CROW 8/22/0311 1062.1 AM A.Wrofeclo,5INE025t0 H1n 511ee, Roo ., ImerorennH'9I/SCO1ra2.0WM /P Ave - 5 THE FOLLOWING NARRATIVE OF THE 5T0RLAVATER POLLUTION PREVENTION PLAN CONTAINS REFERENCES TO THE STANDARD SPECIFICATIONS FOR ROAD AND BRNxE CONSTRUCTION, THE DESIGN STANDAR:5,AR° OTHER SHEETS OF THESE CONSTRUCTION PLANS. THE FIRST SHEET OF THE CONSTRUCTION PLANS KEY SHEET CONTAINS AN INDEX TO THE OTHER SHEETS. THE COMPLETE STORMWATER POLLUTION PREVENTION PLAN INCLUDES SEVERAL ITEMS: THIS NARRATIVE DESCRIPTION. THE DOCUMENTS REFERENCED IN THIS NARRATIVE, THE CONTRACTOR'S APPROVED EROSION CONTROL PLAN REWIRED BY SPECIFICATION SECTION 104, AND REPORTS OF INSPECTIONS MADE DURING CONSTRUCTION. A. THE FOLLOWING NARRATIVE AND REFERENCED DOCUMENTS, B. THE CONTRACTOR'S APPROVED EROSION AND SEDIMENT CONTROL PLAN REQUIRED B/ SPECIFICATION SECTION 104,CITY OF MIAMI FW BULLETIN No. 25 AND CITY ORDINANCE No. 13081, C. REPORT OF INSPECTIONS MADE DURING CONSTRUCTION. l.0 SITE DESCRIPTION I.A. NATURE OF CONSTRUCTION AC TN, TY: THE PLAN DELINEATED IN THIS SWPPP IS FOR CONSTRUCTION ACTIVITIES WITHIN THE MIAMI-DADE AREA AT THE INTERSECTION OF MY l4TH Sr AND NW 12TH AVE. THE PROJECT INCLUDES THE INSTALLATION OF DECORATIVE CONC. CROSSWADC WITH TREATED PERMEABLE BASE SUBDRA/NAGS. 1.B. SEQUENCE OF MAJOR 50/L DISTURBING ACTIVITIES: IN THE SECTION 104 EROSION R SEDIMENT CONTROL PLAN, THE CONTRACTOR SHALL PROVIDE A DETAIL SEQUENCE OF CONSTRUCTION FOR ALL CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL FOLLOW THE SEQUENCE OF MAJOR ACTIVITIES DESCRIBED BELCW,UNLESS THE CONTRACTOR PROPOSES A DIFFERENT SEQUENCE THAI IS THE EQUAL OR BETTER AT CONTROLLING EROSION 4N0 TRAPPING SEDIMENT AND /5 APPROVED BY THE ENGINEER. INSTALL PERIMETER EROSION AND SEDIMENT CONTROLS AFTER CLEARING AND GRUBBING NECESSARY FOR INSTALLATION OF CONTROLS BUT BEFORE CLEARING AND GRUBBING OTHER AREAS OF THE SITE. I. CLEARING AND GRUBBING. 2. ` ASPHALT MILLING AND RESURFACING I.C. AREA ESTIMATES TOTAL PROJECT AREA: 2.0 ACRES TOTAL AREA TO BE DISTURBED:0.84 ACRES .D. RUNOFF DATA 80/oII Coefilclenls: Be0Rre Construction:0.90 During COnsiruclIon: 0.90 A/ler C0n0fncl0On: 0.90 I.E. SITE MAP THE SHEETS CONSTRUCTION PI.ANS ARE BEING USED AS THE SITE MAPS. THE LCC4T/ON OF THE REWIRED /NFORMA r,os 15 DESCRIBED BELOW. THE SHEET NUMBERS FOR THE PLANS REFERENCED IN THIS SECTION ARE IDENTIFIED OV THE KEY SHEET OF THE PLANS. • DRAINAGE PATTERNS: THE DRAINAGE BA5/N DIVIDES AND FLOW DIRECTIONS ARE SHOWN ON THE DRAINAGE MAP (INCLUDED IN THE DRAINAGE REPORT). THE FLOW ARROWS REPRESENT THE FLOW DIRECTION. • APPROXIMATE SLOPES: THE PLANS MAINTAINS A 2X TYPICAL CROSS SLOPE AS INDICATED ON THE TYPICAL SECTION. • AREAS OF 50/L DISTURBANCE: THE LIMITS OF SOIL DISTURBANCE ARE SHORN ON THE TYPICAL SECTION SHEETS AND PLANS SHEETS. • AREAS NOT TO BE D15TURBEO: ENTIRE PROJECT AREA TO BE DISTURBED. • LOCATIONS OF TEMPORARY CONTROLS: ROCK BAGS WILL BE LOCATED AROUND ALL EXISTING AND PROPOSED INLETS; TURBIDITY BARRIERS WILL BE 505475D AT ANY BODIES OF WATER AFFECTED B/ THIS PROJECT. • LOCATIONS OF PERMANENT CONTROLS: PERMANENT FEATURES ARE WORM ON THE CONSTRUCTION PLANS, WHICH GENERALLY CONSIST OF SOD, ASPHALT,CONCRETE, AND DRAINAGE STRUCTURES. • SURFACE WATERS: NONE • WETLAND AREAS: NONE • AREAS TO BE STABILIZED:NONE 2.0 CONTROLS 2.A. EROSION AND SEDIMENT CONTROLS: IN THE SECTION 104 EROSION AND SEDIMENT CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROPOSED STABILIZATION AND STRUCTURAL PRACTICES BASED ON THE CONTRACTOR'S 'TRAFFIC CONTROL PLAN. THE FOLLOWING RECOMMENDED GUIDELINES ARE BASED ON THE TRAFFIC CONTROL PLAN 1TCP1 OUTLINED IN THESE CONSTRUCTION PLANS. THE CONTRACTOR Mar CHOOSE TO ACCEPT THE FOLLOWING GUIDELINES OR MODIFY THEM IN THE SECTION 104 EROSION CONTROL PLAN, SUBJECT TO APPROVAL OF THE ENGINEER. AS WORK PROGRESSES, THE CONTRACTOR SHALL MODIFY THE PLAN 70 ADAPT TO SEASONAL VARIA7/ON,CHANGES IN CONSTRUCTION ACTIVITIES AND THE NEED FOR BETTER PRACTICES. TO (WIT THE TRANSPORT OF SEDIMENT FROM THE CONSTRUCTION AREA, THE CONTRACTOR,SHALL M/N/M/ZE THE SOIL AREAS EXPOSED AT ANY GIVEN TIME AND SHALL STABILIZE AREAS THAT WILL REMAIN IDLE FOR MORE THAN 7 DAYS. THE CONTRACTOR SHALL UTILIZE GRADING TECHNIQUES TO DIRECT RUNOFF TO AREAS WITH THE PROPER EROSION CONTROL FEATURES INSTALLED AND AWAY FPOM OPEN (WATER OR OTHER SENSITIVE AREAS ADJACENT TO THE WORK SITE. 2.A.1 STABILIZATION PRACTICES: IN THE SECTION 104 EROSION 8 SEDIMENT CONTROL PLANS, THE CONTRACTOR SHALL DESCRIBE THE STABILIZATION PRACTICES PROPOSED TO CONTROL .EROSION. THE CONTRACTOR SHALL INITIATE ALL STABILIZATION MEASURES AS SOON A5 PRACTICAL,BUT IN N0 CASE MORE THAN /4 DAYS. /N PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED THE STABILIZATION PRACTICES PROPOSED BY THE CONTRACTOR SHALL INCLUDE AT LEAST THE FOLLOWING: PERMANENT: • ASPHALT OR CONCRETE SURFACE. • 500 IN ACCORDANCE WITH ORDINANCE /2636. 2.A.2 STRUCTURAL PRACTICES: IN THE SECTION 104 EROSION b SEDIMENT CONTROL PLANS, THE CONTRACTOR SHALL DESCRIBE THE STRUCTURAL PRACTICES TO CONTROL OR TRAP SEDIMENT AND OTl/EfWISE PREVENT THE 0/5CHARGE OF PoILUT4NTS FROM EXPOSED AREAS OF THE SITE. ALL SEDIMENTS CONTROLS SHALL BE IN PLACE BEFORE ANY SOIL DISTURBING ACTIVITY UPSTREAM OF THE CONTROL. THE STRUCTURAL PRACTICES PROPOSED BY (I/O CONTRACTOR SHALL INCLUDE AT LEAST THE FOLLOWING: TEMPORARY: • ROCK BAGS /N ACCORDANCE WITH DESIGN STANDARD /02 AND SPECIFICATION SECTION 104. • TURBIDITY BARRIER IN ACCORDANCE WITH DESIGN STANDARD 103 AND SPECIFICATION SECTION 104 PERMANENT: • CURB AND GUTTER • DRAINAGE STRUCTURES • 500 2.8. STORM WATER MANAGEMENT: DRAINAGE PATTERNS AND DIVIDES ARE INCLUDED ON THE DRAINAGE MAP INCLUDED IN THE ORA/HALE REPORT. STORM WATER l5 CAPTURE BY PROPOSED INLETS AND RETAIN IN INFILTRATION TRENCHES 2.C. OTHER CONTROLS: THE CONTRACTOR SHALL PRACTICE GOOD HOUSEKEEPING BY INSTITUTING A CLEAN,ORDERLY CONSTRUCTION SITE; THE FOLLOWING CONTROLS SHALL BE IMPLEMENTED TO FURTHER REDUCE POLLUTION AT THE PROJECT SITE: 2.C.1. DISCHARGE OF MATERIAL TO SURFACE WATERS: NO CONSTRUCTION MATERIAL SHALL BE DISCHARGE TO WATERS OF THE STATE UNLESS AUTHORIZED BY SECTION 40. PERMIT AND/OR CONSTRUCTION DEBRIS SHALL BE DISPOSED OF IN AN APPROvE0 UPLAND LOCATION. BUILDING MATERIAL SHALL NOT BE DISPOSED OF IN WETLANDS OR BURIED ON -SITE. IN THE SECTION 104 EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROPOSED 0ET11005 TO PREVENT THE DISCHARGE OF SOLID MATERIALS. INCLUDING BUILDING MATERIAL. THE PROPOSED METHODS SHALL INCLUDE AT LEAST THE FOLLOWING, UNLESS OTHERVISE APPROVED BY THE ENGINEER. • PROVIDE LITTER CONTROL AND COLLECTION WITHIN THE PROJECT LIMITS DURING CONSTRUCTION ACTIVITIES. • DISPOSE OF ALL FERTILIZER OR OTHER CHEMICAL CONTAINERS ACCORDING TO EPA'S STANDARD PRACTICES AS DETAILED BY THE MANUFACTURER. • DISPOSE OF SOLID MATERIALS INCLUDING BUILDING AND CONSTRUCTION MATERIALS OFF THE PROJECT SITE BUT NOT IN SURFACE WATERS OR ;YET -LANDS. 2.C.2. OFF -SITE VEHICLE TRACKING AND OUST CONTROL: THE CONTRACTOR SHALL TAKE MEASURES TO INSURE THE CLEANUP OF THE SEDIMENTS THAT HAVE BEEN TRACKED BY VEHICLES OR HAVE BEEN TRANSPORTED BY WIND OR STORM WATER ABOUT THE SITE DR ONTO NEARBY R0400ArS. STABILIZED CONSTRUCTION ENTRANCES AND CONSTRUCTION ROADS, IF APPROPRIATE, SHALL BE IMPLEMENTED IN ORDER 10 REDUCE OFF-5/7E TRACKING. LOADED HAUL TRUCKS SHALL BE COVERED WITH TARPAULIN. EXCESS DIRT ON THE ROAD SHALL BE REMOVED DAILY. PROVIDE A STREET SWEEPING PLAN TO THE CITY INSPECTOR. IN THE SECTION 104 EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROPOSED METH00S FOR MINIMIZING OFFSITE VEHICLE TRACKING OF SEDIMENTS AND GENERATING DUST. THE PROPOSED METHODS SHALL INCLUDE AT LEAST THE FOLLOWING UNLESS OTHERWISE APPROVED BY THE. ENGINEER. • COVER LOADED HAUL TRUCKS WITH TARPAULINS. • REMOVE EXCESS DIRT FROM ROADS DAILY. • STABILIZE CONSTRUCTION ENTRANCES ACCORDING TO OCSIGN STANDARDS JOG. 1CONSTRICTION ENTRANCES ARE ALREADY STABILIZED FOR THIS PROJECT) 2.C.S. WASTE DISPOSAL, SANITART SEWER OR SEPTIC TANK REGULATIONS: THE CONTRACTOR SHALL DEMONSTRATE THE PROPER DISPOSAL OF ALL CONSTRUCTION WASTE GENERATED WITHIN THE PROJECT LIAR/T5.WA5TE MAY INCLUDE, BUT NOT LIMITED 70. VEGETATION FROM WEANING AND GRUBBING ACTIVITIES, PACKAGING MATERIAL, SCRAP BUILDING MATERIAL, LITTER FROM TRAVELING PUBLIC, SEWAGE FROII SANITARY FACILITIES, HERBICIDES AND PESTICIDES AND THEIR CONTAINERS, AND HYDROCARBON PRODUCTS SHALL BE DESIGNATE A WASTE COLLATION AREA ON SITE AND DELINEATE THE AREA ON THE SIVPFP SITE MAP. SANITARY SEPTIC 545/5/TIES SHALL BE PROVIDED AND MAINTAINED IN A NEAT AND SANITARY CONDITIDu. FOR THE USE OF THE CONTRACTOR'S EMPLOYEES A5 NECESSARY TO COMPLY WITH THE REQUIREMENTS AND REGULATIONS OF THE STATE AND LOCAL BOARDS OF HEALTH. A LICENSED SANITARY WASTE MANAGEMENT CONTRACTOR AS RED/IRED BY THE STATE REGULATIONS WILL COLLECT ALL 5AN/TARP WASTE FROM PORTABLE UNITS. THE CONTRACTOR WILL PROVIDE LITTER CONTROL AND COLLECTION I1,11/N THE PROJECT LIMITS DURING CONSTRUCTION ACT WIT '/ES.CONTRACTOR WILL PROVIDE AN ADEQUATE NUNBER OF LITTER CONTAINERS WITH L/05 AT THIS STAGING STOCKPILE AND FIELD OFFICE AREAS.W457E COLLECTION WILL BE SCHEDULED 50 THAT CONTAINERS ARE EMPTIED PRIOR TO OVERFLOW. SPILLED LITTER CONTAINERS WILL BE CLEANED UP IMMEDIATELY. REVISIONS DATE DESCRIPTION DATE DESCRIPTION T•Y•LIN INTERNATIONAL 201 ALHAMBRA CIRCLE SUITE 900. Coral Gables, Florida. 33134 Phone:305/567-1888 Fax: 305 / 567-1771 CITY OF MIAMI NW 14th STREET & NW 121h AVE CROSSWALK IMPROVEMENTS CM OF MIAMI PROJECT NUMBER B-00500 STORMWATER POLLUTION PREVENTION PLAN SHEET N0. 6 1062:Is Au e..vr01FIa155Q 50.052M /40 Sneer Wee.; llro 48S� 301585mf vYWN IP Me - 5 2.C.4. FERTILIZERS AND PESTICIDES: THE APPLICATION AND HANDLING OF HERBICIDES AND PESTICIDES SHALL BE IN COMPLIANCE WITH THE MANUFACTURES RECOMMENDED METHOD AND IN ACCORDANCE WITH FDOT STANDARD SPECIFICATION FOR ROADS AND BRIDGE CONSTRUCTION. HERBICIDES AND PESTICIDES SHALL BE ON SITE IN THEIR ORIGINAL CONTAINERS WITH PRODUCT LABEL INTACT. 2.C.5 TOXIC/HAZARDOUS MATERIAL HANDLING CONTRACTOR SHALL PROVIDE EQUIPMENT NECESSARY TO CONTAIN AND CLEAN UP SPILLS OF HAZARDOUS MATERIAL AFTER THEY OCCUR. SPILLED MATERIAL AND THE EQUIPMENT USED TO CLEAN UP THE SPILL SHALL NOT COME IN CONTACT WITH SURFACE WATERS OR BE INTRODUCED INTO STORM WATER. DISPOSAL OF SURPLUS PRODUCT WILL BE DONE ACCORDING TO MANUFACTURE RECOMMENDED ME TH00. CONTRACTOR SHALL PROVIDE A PROJECT SPECIFIC HAZARDOUS MATERIAL SPILL CONTROL PLAN TO ADDRESS THE HANDLING OF HYDROCARBON AND HAZARDOUS MATERIALS. PETROLEUM PRODUCTS SHALL BE STORED IN COVERED AREAS WITH SECONDARY CONTAINMENT SURROUNDING CONTAINER. TOXIC/HAZARDOUS MATERIAL EXPOSED DURING CONSTRUCTION ACTIVITIES SHALL BE HANDLE AS PER THE FOOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. 2.0 STATE AND LOCAL PERMITS TO BE APPLIED FOR: • NPOES FROM THE CITY OF WANT PUBLIC WORKS DEPARTMENT • FOOT CONSTRUCTION PERMIT 3.0 MAINTENANCE IN THE SECTION 104 EROSION CONTROL PLAN, THE CONTRACTOR SHALL PROVIDE A PLAN FOR MAINTAINING ALL EROSION AND SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN GOOD WORKING ORDER BY THE CONTRACTOR. IF A CONTROL NEEDS REPAIR OR REPLACEMENT, IT W/LL DE INITIATED WITHIN 24 HOURS OF REPORT AND RECORDED ON THE INSPECTION FORMS. MAINTENANCE SHALL CONTINUE UNTIL ALL ERODIBLE SOILS WITHIN THE CONTRIBUTING AREA HAVE BEEN STABILIZED. AT THIS POINT, THE CONTRACTOR SHALL REMOVE EXCESS SILT AT THE CONTROLS AND REMOVE THE TEMPORARY DEVICES. THE MAINTENANCE PLAN SHALL AT MINIMUM, COMPLY WITH THE FOLLOWING: • INLET PROTECTION (ROCK BAG51: THE CONTRACTOR SHALL INSPECT THE PROTECTED INLETS EVERY TWO WEEKS AND REPLACE THE ROCK BAGS IF NECESSARY OR WHEN EXCESSIVE POUNDING OCCURS: ELIMINATE BREACHES IN THE PROTECTION. • TURBIDITY BARRIER: MAINTAIN A5 PER SECTION 104 OF THE SPECIE 'CATIONS. • STREET SWEEPING: DAILY CONTROL AND DUST PREVENTION WITH WATER TRUCK. • GRASSED AREAS: NEWLY SODDED AREAS AND ADJACENT AREAS DISTURBED BY CONSTRUCTION OPERATIONS SHALL BE REPAIRED AND MAINTAINED,WATERING AND MOVING AS NEEDED OR REQUIRED /N THE FOOT STANDARD SPECIFICATIONS. 4.0 INSPECTIONS QUALIFIED PERSONNEL SHALL INSPECT ALL THE CONTROL FEATURES AT LEAST ONE EVERT 7 CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A STORM THAT IS 0.50 INCHES OR GREATER. TO LOWLY THE CONTRACTOR SHALL INSTALL AND MAINTAIN RAIN GAUGES AND RECORD THE DAILY RAINFALL./WHERE SITES HAVE BEEN PERMANENTLY STABILIZED, INSPECTIONS SHALL DE CONDUCTED AT LEAST ONCE EVERY WEEK. THE CONTRACTOR SHALL ALSO ENSURE THAT CONTROLS INS TALLEO IN THE FIELD AGREE WITH THE LATEST STOMA TER POLLUTION PREVENTION PLAN /SWOOP/. THE FOLLOW INC ITEMS WILL BE INSPECTED: • POINTS OF DISCHARGE TO SURFACE WATERS OR WETLANDS: INSPECT TO DETERMINE /F CONTROLS ARE EFFECTIVE IN PREVENTING OR MINIMIZING THE DISCHARGE OF POLLUTANTS. • POINTS OF DISCHARGE TO MUNICIPAL SEPARATE STORM SEWER SYSTEMS (INLETS. ETC./: INSPECT TO DETERMINE IF CONTROLS ARE EFFECTIVE IN PREVENTING OR MINIMIZING THE DISCHARGE OF POLLUTANTS. • DISTURBED AREAS OF THE SITE THAT HAVE NOT BEEN FINALLY STABILIZED: INSPECT FOR EVIDENCE OF POTENTIAL FOR DISCHARGING POLLUTANTS INTO SURFACE WATERS OR STORAM'A7ER 5Y5 TEM5. • AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION: INSPECT FOR EVIDENCE OF POTENTIAL FOR DISCHARGING POLLUTANTS INTO SURFACE WATERS OR STORAAVATER SY51 EATS. • STRUCTURAL CONTROLS: INSPECT FOR PROPER INSTALLATION AND OPERA) ION. • STORMWATER MANAGEMENT SYSTEMS: INSPECT FOR PROPER OPERATION, EVIDENCE OF FLOODING WE TO SEDIMENTATION OR CONTROLS REWIRING MAINTENANCE. • LOCATIONS WHERE VEHICLES ENTER AND EXIT THE SITE: INSPECT FOR EVIDENCE OF OFFSITE TRACKING. THE CONTRACTOR SHALL INITIATE WITHIN 24 HOURS OF INSPECTION THAT INDICATES ITEMS ARE NOT IN GOOD WORKING ORDER BASED ON THE RESULTS OF THE INSPECT ION, ALL MAINTENANCE OPERATIONS NEEDED TO ASSURE PROPER OPERATION OF ALL CONTROLS, IMPS OR MEASURES IDENI IFIED IN THIS SWPPP SHALL BE DONE IN A TIMELY MANNER, BUT NO LATER THAN 7 CALENDAR DAYS FOLLOWING THE INSPECT ION. IF NEEDED, POLLUTION PREVENTION CONTROLS SHALL BE REVISED AS APPROPRIATE IF FAILURES IN IHE PLAN ARE NOTED; THESE REVISIONS SHALL BE IMPLEMENTED NO LATER THAN 7 CALENDAR DAYS FOLLOWING THE INSPECTION. A REPORT !U5£ FOOT FORM 650-040-031 SUMMARIZING THE SCOPE OF THE INSPECT ION SHALL INCLUDE THE INSPECTOR'S NAME, QUALIFICATIONS, DATE, RAINFALL DATA, OBSERVATIONS RELATING TO THE SWPPP, AND ACTIONS TAKEN SINCE THE LAST REPORT. THE REPORT SHALL IDENTIFY ALL INCIDENTS OF NON-COMPLIANCE. IF THERE ARE NO INCIDENTS OF NON-COMPLIANCE, THE REPORT SHALL CONTAIN A CERTIFICATION THAT THE FACILITY l5 IN COMPLIANCE WITH THE SWPPP AND THE PERMIT. THE REPORT SHALL BE SIGNED AND FILED A5 REWIRED BY THE GENERIC PERMIT. THE CONTRACTOR SHALL MAINTAIN A FILE CONTAINING THE CURRENT SWPPP, NOT SUBMITrAL,CERTIFN'ATIONS AND ALL THE SIGNED INSPECTION REPORTS: THE NOTICE OF INTENT SUBMITTED AS REWIRED BY CHAPTER 62-621, FAC, MUST BE POSTED AT THE SITE. 5.0 NON -STORM WATER DISCHARGES: IN THE SECTION 104 EROSION CONTROL PLAN, THE CONTRACTOR SHALL IDENTIFY ALL ANTICIPATED NON -STORM WATER DISCHARGES (EXCEPT FLOWS FROM FIRE FIGHTING ACT ANT/ESISUCH AS THOSE LISTED DELON. THE CONTRACTOR SHALL DESCRIBE THE PROPOSED MEASURES TO PREVENT POLLUTION FROM THESE NON -STORM WATER DISCHARGES. IF CONTAMINATED 50/L OR GROUNDWATER IS ENCOUNTERED WRING CONSTRUCTION, THE CONTRACTOR l5 TO CEASE OPERATIONS /N THAT AREA. THE CONTRACTOR SHALL CONTACT THE CITY OF MIAMI PROJECT MANAGER. A DEIWATER/NG PERMIT l5 REQUIRED TO REMOVED GROUNDWATER FROM THE CONSTRUCTION SITE. • CULVERT INSTALLATION METHODS • SLURRY DISPOSAL • OUST CONTROL • EQUIPMENT WASHOUT • PIPE DESILTING ACTIVITIES • 'RAMATION 6.0 CONTRACTOR 5U041TTA4: IT l5 THE RESPONSIBILITY OF THE CONTRACTOR TO DEVELOP AN EROSION CONTROL PLAN THAT PROVIDES A DETAILED DESCRIPTION OF ALL EROSION ANB SEDIMENT CONTROLS. BMP'S AND MEASURES THAT WILL BE TAWEATFN TED AT THE CONSTRUCTION SITE FOR EACH ACTIVITY IDENTIFIED IN SECTION 1.8 SEQUENCE OF MAJOR SOIL DISTURB/NG ACTIVITIES. CONTRACTOR IS RESPONSIBLE FOR PROVIDING rime FRAMES IN WIT/CH THE CONTROLS WILL BE /AIPLEMEN7E0, MAINTAINED AND REMOVED. THIS INFORMATION SHALE BE CONSIDERED IN COMPLIANCE WITH THE FOEP GENERIC PERMIT FOR STORM WATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION SITES. rHE CONTRACTOR /5 RESPONSIBLE F0H ENSURING THE FOLLOWING ITEMS ARE ON SITE: COPY OF THE SWPPP WITH THE ORIGINAL CERTIFICATION SIGNATURES. 2. COPY OF THE CONTRACTOR'S EROSION CONTROL PLAN. 3. HAZARDOUS SPILL CONTROL PLAN WITH GUIDELINES ON CONTACTING THE 24-HOUR EMERGENCY RESPONSE PROGRAM FOR HAZARDOUS MATERIAL SPILLS. THIS SHALL INCLUDE COPIES OF DISCHARGE NOT IF /CATIONS THAT HAVE OCCURRED WITHIN THE PROJECT LIMITS. 4 COMPLETE INSPECTION FORAMS. 6 REVISIONS DATE DESCRIPTION DATE DESCRIPTION T•Y•LIN INTERNATIONAL 201 ALHAMBRA CIRCLE SUITE 900 Coral Gables, Florida. 33134 Phone: 305 / 567-1888 Fax: 305 / 567-1771 CITY OF MIAMI NW 14th STREET & NW 12th AVE CROSSWALK IMPROVEMENTS CRY OF MIAMI PROJECT NUMBER, B-MPOP 11,2,011 STORMWATER POLLUTION PREVENTION PLAN IVI SHEET NO. 7 8 0,,W,,U.5H1550950.25S1 HIA Street no., 1.Tanen/,49.105/7vea/.WWW 12 Ar - 5 MAINTENANCE OF TRAFFIC NOTES: GENERAL NOTES: I. THE TRAFFIC AND TRAVEL WAYS SHALL Nor BE ALTERED BY THE CONTRACTOR TO CREATE A WORK ZONE UNTIL ALL LABOR AND MATERIAL ARE AVAILABLE FOR THE CONSTRUCTION IN THAT AREA. 2. REGULATORY SPEED ESTABLISHED WITHIN WORK ZONE TRAVEL WAYS SHALL BE THE EXISTING POSTED SPEED. 3. AS DETERMINED BY THE ENGINEER, THE CONTRACTOR SHALL COVER WORK ZONE SIGNS WHEN CONDITIONS NO LONGER WARRANT THEIR USE. COST OF COVERING AND UNCOVERING THE SIGNS SHALL BE 'INCIDENTAL TO THE PROJECT AT NO ADDITIONAL COST TO TIE CONTRACT. 4. CONTRACTOR SHALL REMOVE, RELOCATE OR COVER ANY EXISTING OR PROPOSED SIGNS THAT CONFLICT WITH THE TRAFFIC CONTROL PLANS. WHEN THE CONFLICT NO LONGER EXISTS, THE CONTRACTOR SHALL RESTORE THE SIGNS TD THEIR ORIGINAL POSITION. COST OF TEMPORARILY COVERING OR REMOV/60590000ATING AND RESTORING THE SIGNS .SHALL BE INCIDENTAL TO THE PROJECT AT NO ADDITIONAL COST TD THE CONTRACT. 5. EACH EXISTING STREET NAME AND STOP SIGN AFFECTED BY CONSTRUCTION SHALL BE RELOCATED AND MAINTAINED IN AN APPROPRIATE LOCATION FOR rue DURATION OF THE PROJECT. WHEN NO LONGER AFFECTED BY CONSTRUCTION, THESE SIGNS SHALL BE RESTORED TO THEIR ORIGINAL POSITION. COST OF TEMPORARILY RELOCATING AND RESTORING THE SIGNS SHALL BE ,INCIDENTAL TO THE PROJECT AT NO ADDITIONAL COST TO THE CONTRACT. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR THE IMMEDIATE REMOVAL OF STDRAAYATER FROM ROADWAYS UTILIZED FOR MAINTAINING TRAFFIC THRU THE WORK ZONE IN A MANNER APPROVED BY THE ENGINEER. COST FOR REMOVING THE WATER SHALL BE DEEMED INCIDENTAL TO THE PROJECT COST. 7. THE TRAFFIC CONTROL PLAN SHALL COMPLY WITH 00/T INDEX 600 SERIES. 8. ALL WORK SHALL BE PERFORMED DURING DAYTIME ONLY 800AM TR 8:00PM; NO INTERRUPTION OF TRAFFIC IS PERMITTED. 9. NOTIFICATION OF LANE CLOSURES OR TEMPORARY DETOURS SHALL BE ACCOMPLISHED 14 WORKING DAYS PRIOR TO CLOSURE, DETOUR OR AIOT PHASE CHANGE BY SUBMITTING THE REQUIRED LANE CLOSURE FORM. SKE TC//ES, CALCULATIONS, AND OTHER DATA THROUGH THE ENGINEER TO THE CITY OF MIAMI. 10. CONTRACTOR SHALL NOTIFY LAW ENFORCEMENT AND FIRE PROTECTION SERVICES TWENTY-FOUR T2q/ HOURS IN ADVANCE OF ANY DETOURS, IN ACCORDANCE WITH SECTION 336.07 OF FLORIDA STATUTES. I1. AT THE DISCRETION OF THE ENGINEER. IF A LANE CLOSURE CAUSES EXTENDED CONGESTION OR DELAY, THE CONTRACTOR SHALL BE DIRECTED TO REOPEN DIE CLOSED LANEISI UNTIL SUCH TIME THAT THE TRAFFIC FLOW HIS RETURNED TO AN ACCEPTABLE LEVEL. I2. CONTRACTOR MUST PROVIDE FLASHER ARROW BOARD FOR ANY LANE THAT l5 CLOSED OR DIVERTED DROP OFFS: 9. DIE CONTRACTOR SHALL PROTECT THE WORK ZONE WITH DEVICES APPROVED TN' TH£ CITY OF MIAMI FIELD ENGINEER WHEN DROP OFFS EXCEED 3• ADJACENT TO TRAVEL t0AYS. MARKINGS: 10. THE CONTRACTOR SHALL REMOVE ANY EXISTING OR TEMPORARY PAVEMENT MARKINGS THAT CONFLICT WITH THE TRAFFIC CONTROL PLANS. GRINDING OR MILLING WITHOUT ASPHALT OVERLAY SHALL ONLY BE PERMITTED IN NON -TRAFFIC AREAS AS DESIGNATED BY THE ENGINEER. PAVEMENT MARKINGS SHALL BE REPLACED AT THE TINE TRAFFIC CONTROL PLANS ARE NO LONGER AFFECTED BY THEIR PLACEMENT. COST OF REMOVAL AND REPLACEMENT OF PAVEMENT MARKINGS SHALL BE INCIDENTAL TO THE PROJECT AT NO ADDITIONAL COST TO THE CONTRACT. USE OF BLACK PAINT TO COVER EXISTING AND/OR TEMPORARY PAVEMENT MARKINGS IS PROHIBITED. SIGNALS• II. CONTRACTOR SHALL NOTIFY MIAMI DADE COUNTY SIGNS AND SIGNALS DIVISION LOCATED AT 7100 N.W. 36TH STREET MIAMI, FLORIDA 33166 AND PHONE N0. 13051592-3470, 48 HOURS PRIOR TO ANY MODIFICATION OF AN EXISTING TRAFFIC SIGNAL SYSTEM. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR THE MAINTENANCE OF THE EXISTING OR TEMPORARY TRAFFIC SIGNAUSIWITHIN DIE PROJECT LIMITS. COST OF RELOCATING TRAFFIC SIGNAL HEADS, PROVIDING AND REMOVING TEMPORARY SIGNALS AND CONTROLLERS, AND MAINTAINING THE EXISTING OR TEMPORARY TRAFFIC SIGNALS AND CONTROLLERS SHALL BE INCIDENTAL TO THE PROJECT AT NO ADDITIONAL COST TO THE CONTRACT. 12. IHE CONTRACTOR SHALL AAINTAIN ONLINE COMMUNICATION OF EXISTING OR TEMPORARY SIGNALIZATION VIA INTERCONNECT OR PHONE LINE CURING CONSTRICTION. CONTRACTORS SHALL PROVIDE TEMPORARY LINES AND CONNECTIONS IF NECESSARY. COST OF MAINTAINING COMMUNICATION, INCLUDING TEMPORARY LINES AND CONNECTIONS SHALL BE INCIDENTAL TO THE PROJECT AT NO ADDITIONAL COST TO THE CONTRACT. WORK ZONE LIMITS: 13. THE LENGTH OF AN OPEN TRENCH SHALL NOT EXCEED 500 FEET. PROPERTY ACCESS SHALL BE MAINTAINED AT ALL TIMES. PFOESIR/ • N5. BIM/ ES. AND WHEELCHAIRS: 14. AT THE END OF EACH WORK DAY OR WHENEVER THE WORK ZONE BECOMES INACTIVE, AM' DROP OFF ADJACENT TO THE PEDESTRIAN, BICYCLE, AND WHEELCHAIR TRAVEL PATHS SHALL BE BACKEILIED FLUSH WITH THE SAID PATHS OR PROTECTED WITH BARRICADES, TEMPORARY CONCRETE BARRIER WALL, OR APPROVED HANDRAIL. COST OF BACKEILLING DROP OFF SHALL BE INCIDENTAL TO THE PROJECT AT NO ADDITIONAL COST TO THE CONTRACT. 15. PEDESTRIAN, BICYCLE, AND WHEELCHAIR TRAFFIC SHALL BE MAINTAINED ARO GUIDED USING APPROVED WARNING LIGHTS, SIGNING, AND CHANNELIZATION DEVICES ON AT LEAST ONE SIDE OF THE PROJECT AT ALL TIMES THROUGHOUT THE PROJECT LIMITS. THE TRAVEL PATH SHALL BE A MINIMUM OF 4 FEET WIDE WITH A SMOOTH SURFACE THAT l5 NOT SLICK AND IT SHOW) BE RAMPED AS NECESSARY FOR CONTINUITY. COST TO CONSTRUCT AND MAINTAIN I/OTTRAVEL PATH AS REWIRED SHALL BE INCIDENTAL TO THE PROJECT AT NO ADDITIONAL COST TO THE CONTRACT. REVISIONS DATE DESCRIPTION DATE DESCRIPTION T•Y•LIN INTERNATIONAL 201 ALHAMBRA CIRCLE SUITE 900 Coral Gables, Florida. 33134 Phone: 3051587-1888 Fax: 305/587-1771 CITY OF MIAMI NW 14th STREET & NW 12th AVE CROSSWALK IMPROVEMENTS 0778 OF MIAMI PROJECT NUMBER: 13J0500 - TRAFFIC CONTROL NOTES SHEET N0. 8 8 CPOIrm 11,2.011 U.52: 2 AN 702(,jc/e SSD8E0.5_. IMA Mr.... /nprwnwrH�BJOSMveel+gw' IE 48 - T