HomeMy WebLinkAboutCrosswalk ImprovementsPROJECT LOCATION
LOCATION MAP
DEPARTMENT OF CAPITAL IMPROVEMENTS PROGRAM
NW 146 STREET & NW I2cd1 AVE
CROSSWALK IMPROVEMENTS
COMM / SS ION
MAYOR:
COMMISSIONERS:
CITY MANAGER:
CIP DIRECTOR:
CITY OF MIAMI PROJECT NUMBE!' : R-30500
AUGUST 22.d, 2011
TOMAS P. REGALADO
WIFREDO GORT
MARC SARNOFF
FRANK CAROLLO
FRANCIS SUAREZ
RICHARD P.DUNN
JOHNNY MARTINEZ.
ALBERTO SOSA, P.E.
LENGTH OF PROJECT
LINEAR FEET
MILES
ROA°1/AY
126
0.02
BRIDGES
-
NET LENGTH OF PROJECT
126
0.02
EXCEP/IONS
-
GROSS LENGTH OF PROJECT
126
0.02
CITY OF MIAMI PROJECT MANAGER: JOSE LAG°
PLANS PREPARED 8Y:
T•Y•LIN INTERNATIONAL
EB00000407
201 Alhambra Circle Suite 900
Coral Gables, Florida. 33134
Phone: 305/567-1888 Fax: 305/567-1771
INDEX OF ROADWAY PLANS
SHEET No. SHEET DESCRIPTION
l KEY SHEET
2 GENERAL NOTES, LEGEND AND ABBREVIATIONS
3 NW l4th STREET AND NW 12th AVENUE
4 DETAILS
5-7 STORMWATER POLLUTION PREVENTION PLAN
8 TRAFFIC CONTROL NOTES
SEAL
LI
FRAI215C0 J. RL0N50, P.E.
\` 006 GABLE, Hatt• 33, %
8/22,04
/0 5150 Au
6
2
8
1
R.WroJeoS '55069J.25XN Ilse Street flood, I,Jvaenen/e/0JOXV Vro0O.V 0 lL MLL-
GENERAL NOTES
1. ALL ELEVATIONS REFER TO THE CITY OF MIAMI VERTICAL DATUM.
2. ALL PUBLIC LAND CORNERS AND PRIMARY NETWORK CONTROL SURVEY MONUMENTS ARE 70 BE PROTECTED BY THE
CONTRACTOR. CORNERS AND MONUMENTS WITHIN THE WORK ZONE AND IN DANGER OF BEING DAMAGED, DESTROYED DR
COVERED SHALL BE PROPERLY REFERENCED VW A REGISTERED LAND SURVEYOR IN ACCORDANCE WITH THE MINIMUM
TECHNICAL STANDARDS OF THE FLORIDA BOARD OF PROFESSIONAL LAND SURVEYOR PRIOR TO THE BEGINNING OF WORK.
UPON PROJECT COMPLETION THE CONTRACTOR SHALL RESTORE ALL SUCH CORNERS ANO MONUMENTS AND SHALL FURNISH
TO THE DISTRICT LOCATION SURVEYOR A SIGNED AND SEALED COPY OF THE LAND SURVEYOR'S REFERENCE DRAWING.
INCLUDE ALL COST OF REFERENCING, RESTORING AND PRESERVING CORNERS AND MONUMENTS IN THE BID PRICE FOR
ITEM 101-1 MOBILIZATION.
3. ALL EXCESS MATERIAL AS DES/NATED BY THE ENGINEER l5 TO BE DISPOSED BY THE CONTRACTOR IN AREAS
PROVIDED BY HIM WITHIN 24 HOURS OF BEING DEPOSITED IN THE CONSTRUCTION AREA AND AT THE CONTRACTOR'S
EXPENSE.
4. THE CONTRACTOR SHALL PAINT ALL STATIONS WITH STENCILED NUMBERS ON THE FACE OF THE CURB.
A. FROM THE BEGINNING OF THE PROJECT WHERE THE CURB 15 TO REMAIN.
B.AT NEW CURB NOT LATER THAN 72 HOURS AFTER BEING POURED.
C. WHERE CURB DOES NOT EXIST AND SHALL NOT BE CONSTRUCTED THE CONTRACTOR SHALL MAINTAIN STATIONING
WITH SURVEYING STAXES.
THE CONTRACTOR SHALL MAINTAIN THE srnrtaW MARKS VISIBLE UNTIL FINAL INSPECTION. COST TO BE INCLUDED
IN RELATED PAY ITEM 102-1 MAINTENANCE OF TRAFFIC.
5. COMMERCIAL MATERIAL INCLUDED FOR DRIVEWAY MAINTENANCE AND SAFE ACCESS TO RESIDENTIAL AND BUSINESS
PROPERTIES AFFECTED BY CONSTRUCTION SHALL BE PAID ONLY ONCE PER ACCESS. IF THE MATERIAL l5 REMOVED
WRING SUBSEQUENT CONSTRUCTION OPERATIONS, IT SHALL BE REPLACED AT THE CONTRACTORS EXPENSE. THIS
WORK IS INCLUDED IN THE MAINTENANCE OF TRAFFIC PAY ITEM AND MAY BE INCREASED, DECREASED OR OMITTED
A5 DIRECTED BY THE CITY.
6. LARGE CHUNKS OF EXCAVATED MATERIAL SHALL BE REPLACED WITH SUITABLE MATERIAL OR PROCESSED TO MAKE
THEM SUITABLE FOR BACKFILLING 017 EMBANKMENT CONSTRUCTION. COST TO BE INCLUDED IN RELATED BID ITEMS.
7. CLEARING AND GRUBBING, GRADING AND OTHER INCIDENTAL WORK NECESSARY FOR HARMONIZATION OUTSIDE RYW
SHALL BE INCLUDED IN RELATED BID ITEMS (STRUCTURAL ASPHALT, SOD, CONCRETE, BRICKS, ETC.)
8. THE CONTRACTOR SHALL PERFORM SELECTIVE CLEARING AND GRUBBING FOR THE WORK BEING DONE. THIS SHALL
INCLUDE ALL LANDSCAPE AND SIDEWALK, COST TO BE INCLUDED IN 110-I-1, CLEARING AND GRUBBING.
9. SAW CUTTING OF THE EXISTING SIDEWALKS SHALL BE MADE ONLY AT THE NEAREST FLAG JOINTS.
l0. INSTALLATIONS OF NEW PULL BOXES SHALL BE PERFORMED BY QUALIFIED ELECTRICAL CONTRACTOR. WHEN NEW
PULL BOX l5 REPLACING EXISTING PULL BOX, THE CONTRACTOR SHALL ADJUST CONDUITS AND CABLES TO For THE
NEW PALL BOX ELEVATION. COST OF ADJUSTMENTS AND NEW PULL BOXS IS INCIDENTAL TO TOTAL PROJECT COST.
ll. ALL SIDEWALKS, DRIVEWAYS AND SWALES DAMAGED BY THE CONTRACTOR SHALL BE RESTORED IN KIND AT NO
ADDITIONAL COST.
SIGNING ANO PAVEMENT MARKING NOTES'
1. ALL SIGNING AND PAVEMENT MARKINGS INSTALLED AS PART OF THESE PLANS SHALL CONFORM TO THE CURRENT
EDITION OF THE FEDERAL H(GhWAY ADMINISTRATION (FNMA, MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES FOR
STREET AND HT,HNAYS, AND FLORIDA DEPARTMENT OF TRANSPORTATION DESIGN STANDARDS. ALL SIGN PANELS
SHALL BE FABRICATED TO COMPLY WITH THE HOST RECENT EDITION OF THE FEDERAL HIGHWAY AND
ADMINISTRATION STANDARD HIGHWAY SIGNS.
2. MATCH EXISTING PAVEMENT MARKINGS AT THE BEGINNING AND THE END OF THE PROJECT AND AT ALL SIDE
STREETS WITHOUT JOGS AND OFFSETS.
J. SIGN ASSEMBLY LOCATIONS SHOWN ON PLANS WHICH ARE IN CONFLICT WITH LIGHTING, UTILITIES, DRIVEWAYS,
WHEELCHAIR RAMPS, ETC., MAY BE ADJUSTED SLIGHTLY AS DIRECTED PA THE ENGINEER. EXTREME LOCATION
CHANCES MUST BE APPROVED BY MIAMI-DADE [MINTY TRAFFIC DN/S/ON.
4. INCORRECTLY PLACED (THERMOPLASTIC ORl PAINT MARKINGS OVER ASPHALT WILL BE REMOVED BY MILLING
AND REPLACING THE ASPHALT A MINIMUM WIDTH OF 0.5 METERS 118 INT AT THE CONTRACTOR'S EXPENSE. THE
ENGINEER MAY APPROVE AN ALTERNATIVE METHOD IF (T CAN BE DEMONSTRATED TO COMPLETELY REMOVE
THE MARKINGS WITHOUT DAMAGING THE ASPHALT.
5. THE CONTRACTOR SHALL RELOCATE ALL EXISTING POST -MOUNTED STREET NAME AND STOP SIGNS TO A VISIBLE
AREA UNDISTURBED BY THE CONSTRUCTION 50 AS TO .MINIMIZE DAMAGE TO THE SIGNS CURING CONSTRUCTION.
THE STREET NAME SHALL BE REATTACHED TO THE TOP OF THE NEW STOP SIGNS ON MINOR SIDE STREETS AT
THE ENO OF CONSTRUCTION. THE NEW STOP SIGN POST SHALL HAVE ADEQUATE LENGTH TO ACCOMMODATE
THE EXISTING STREET NAMES AT THE TOP. COST OF RELOCATION AND REATTACHMENT OF STREET NAME SIGN
SHALL BE PAID FOR UNDER PAY ITEM 102-1, MAINTENANCE OF TRAFFIC.
6. EXTRUDED ALUMINUM SIGN SUPPORT CLAMPS ARE NOT ACCEPTABLE. ALL RELOCATED SIGNS M05T COMPLY WITH
THE STANDARD SPECIFICATIONS, SPECIAL PROVISIONS AND ROADWAY DESIGN AND TRAFFIC STANDARDS AS
IF THEY WERE NEW SIGNS. IF EXISTING CLAMPS, BRACKETS, POLES, ETC. NEED TD OE REPLACED THE COST SHALL
BE INCIDENTAL TO THE TOTAL PROJECT COST.
7. THE CONTRACTOR SHALL SUBMIT A LIST OF THE EXISTING SIGNS TO THE PROJECT ENGINEER AT THE
PRE -CONSTRUCTION CONFERENCE. ANY SIGNS LOST OR DAMAGED WRING CONSTRUCTION SHALL BE REPLACED
AT NO ADDITIONAL COST. COST OF MAINTAINING OF EXISTING SIGNS TO BE INCLUDED IN ITEM 102-1, MAINTENANCE
OF TRAFFIC.
8. STOP BARS SHALL BE PLACED AT LEAST FIVE FEET FROM CROSSWALN5 IF TRAFFIC SIGNAL LOOPS ARE
INSTALLED.
9. THE CONTRACTOR SHALL PROVIDE PERMANENT FIVE FOOT DEEP CASING FOR ALL DRILLED SHAFTS. COST OF
CASINGS TO BE INCLUDED IN THE SIGNS PAY ITEMS.
MIAMI-DADE COUNTY TRAFFIC SIGNALS & SIGNS DIVISION
7(00 N.W. J6TH STREET
MIAMI, FLORIDA 33/66
RECEIPTS MUST BE OBTAINED FROM THE ABOVE AGENCY AND SUBMIT-IED 10 THE PROJECT ENGINEER TO RECEIVE
PAYMENT FOR REMOVAL ITEMS.
10. EXIST. SIGNING AND PAVEMENT MARKING AFFECTED BY TIIE PROJECT CONSTRUCTION TO BE REPLACED IN KIND.
COST SHALL BE INCIDENTAL TO THE TOTAL PROJECT COST.
UTILITIES NOTES:
I. FOR UTILITY ADJUSTMENT SYMBOLS, SEE FOOT STANDARD INDEX Na. 002.
2. ALL EXISTING UTILITIES ARE TO REMAIN UNLESS OTHERWISE NOTED. EXCERC15E EXTREME CAUTION WRING
EXCAVATION AND INSTALLATION OF PROPOSED DRAINAGE.
3. PRE -TRENCHING IN THE ALIGNMENT AND GRADE OF PROPOSED IMPROVEMENTS SIIALL BE PERFORMED
SEVEN DAYS IN ADVANCE OF ITS CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE UNDERGROUND UTILITY OWNERS
AND THE DEPARTMENT WITH A SEVEN DAYS ADVANCE NOTICE OF ANY CONFLICT WITH PROPOSED CONSTRUCTION.
THIS NOTIFICATION SHALL PROVIDE SURVEY INFORMATION ABOUT EXISTING UTILITY ALIGNMENT, -GRADE AND POSSIBLE
CONFLICTS. PAYMENT FOR PRE -TRENCHING, SURVEY AND BACKFILLING SHALL BE INCLUDED IN THE COST OF THE
RELATED B/0 ITEM FOR THE WORK BEING DONE.
4. ADJUSTMENT TO EXIST. VALVE BOXES, AND MANHOLES TOPS TO FINISHEDGRADE SHALL BE INCLUDED IN THE
COST OF THE RELATED BID ITEM FOR THE WORK BEING DONE.
5. UTILITY ONNERST
FOOT DISTRICT 6
COMCAST CABLE
MIAMI-DADE COUNTY PUBLIC WORKS
FLORIDA POWER AND LIGHT-DADE
MIAMI-DADE WATER AND SEWER
ATT/OISTR1BU7ION
FLORIDA POWER AND LIGHT-FIBERNET
LEVEL 3 COMMUNICATIONS
MIAMI-DA0£ CTSD
NCI
QUEST COMMUNICATIONS
TECO PEOPLES GAS
1/07WIRE COMMUNICATION
MIAMI-DADE EXPRESSWAY AUTHORITY 1AIDX)
SPRINT N£XTEL
FlUERL1GHr LLC
QUANTITIES'
THO.MAS MILLER
LEONARD .VAkWELL-NEWBOLD
AURELIO DEL VALLE
KAREN LUND
PATRICK CHONG
STEVE A/ASSIE
DANNY MASKETT
JUDY HENRY
JUAII AGU/RRE
INVESTIGATIONS
MIKE FITZGERALD
ALEX RACHE
PHIL GALLUB
JHORD4NO IRIZARRY
THGMAS NAIL
CHRIS PANCIONE
305-491-4391
954-447-8405
305-592-8925 EXT.258
305-942-5290
T86-268-5255
305-255-/030
J05-552-293i
720-888-2061
305-596-8409
972-729-6016
941-661-7557
959-953-0811
305-219-0286
959-J42-0690
I-800-521-0579
954-596-2559
0TR3I
DESCRIPTION
AZM..AoTTTS'
UN,
0160 4
Type B Stabilization
470.0
Sr
0210 1 1
Reworking Llmereck Base (6')
172.a
sY
208001
ter
Ce^ Treated h neanle Base (Includes Cont. Pavement zuha,al0
z per Index 2Bal
7Sn 0
cx
0334 1 13
Snpeipave Asphaltic Concrete (C)
01.9
TIT
0337 7 33
Asphaltic Cnne,ete F,Iellnn 00118O 1T,410c C)
17C• 12.5,Rnbbei 11165111,zy17
111 0
TN
0350 1 5
Plain cement co crete pavement, 10' (class 11
399.5
51
0446 71 I
Edyed,alr, Outlet Pipe 14'1
10.6
LF
0523 1 2
'nr,6Dextured Pavement (tor IntegralR9 rnio,l
3.5
0660 21xx
LoopAsscntbly, F01
7.0
AS
0711 11123
12' Solid T,a(lic S1,ipe 1N11.(e)
134,0
tr
ABBREVIATIONS
Arc Length
• Alr Conditioner Pod
asv A5ph0/1
Benchmark
ma Concrete Block Structure
CDI mn Gutter.
14 CCan'
L/na
Concrete e
kk Concrete Slab
rc Driveway
Depressed Curb.
ox Electric Transtarmer Pod
F/nlshed Floor Elevation
Found Iron Plpe
Found Nall R Disc
Found Reber
ldenllflcallon
,r hover/5
Lowest Floor Elevollon
Monument Line
IN Plot Book
Permanent Control Paint
Doge
▪ Planter
PA Properly Line
Permanent Reference Monument
• Right -of -Way Llne
11. Sidewalk
um rryy
us Valley Temporary Benchmark '
5,t
th
8
0
AO
a
0
O
T
A
I FGENO
Concrete Light Pole
M0101 Light Pole
Guy Wire T+i
UMW Power Pole
Fire Hydrant la
Water Meter IDI
Electric Ras Ca'
Telephone Box Q
Sever Manhole - -
Overhead Umlly Lines -'
Light Pole
Gas VaNe
Water Valve
Water Manhole
Telephone Manhole
Monitoring Well
ParkIng Meter
Unknown Manhole
Sewer VaNe
Mall Box
Spot Elevation
Temporary Benchmark
TRFE LEGFND
SYMBOL COMMON NAME
® Tree !Species unknown)
O Gumbo Limbo
* Block Olive
* Palm Tree
e Black Olive
0 Oak Tree
Pine Tree
* Coconut Palm
• Royal Polnclana
Qy'� Ficus
T Areag
* Avocado Tree
• Mango Tree
* Trumpet Tree
Dlalnel er-Helgnl -Spread
Rlghl-of-Wan Lines
Properly Corner
Traffic Sign
Exlsllrg Catch Basin
New Catch Basin
Exlsling Drainage Manhole
New Drainage Manhole
Wood Fence
Iron Fence
C.B.S. Wall
Clean Out .
Guard Pole
Clain Llnk Fence
Proposco Storm Pipe
Proposed Exflllrallon Trench
- 001311g French Drain
-- Existing Sanitary Sewer
- Existing Water Main
• Existing Burled Telephone
•• Existing Burled Communlc3Nons
• - Exlslln. Burled Electricol
811 KNOW WHAT'S BELOW
ALWAYS CALL 111
BEFORE YOU 010
22
���!!!www.cagounshIne corn
REVISIONS
DATE
DESCPIPT ION
DATE
DESCRIPTION
T'Y'LIN INTERNATIONAL
201 ALHAMBRA CIRCLE SUITE 900
Coral Gables. Florida. 33134
Phone: 305 / 567-1888 Fax: 305 / 567-1771
CITY OF MInNil
NW 14th STREET & NW 12th AVE
CROSSWALK IMPROVEMENTS
CITY OF L'IAMI PROJECT NUMBER: B-30500
GENERAL NOTES, LEGEND,
ABBREVIATIONS & QUANTITIES
SHEET
N0.
2
+USER+
+PATE+
*11HE+
+FILE*
R,W L/NE
j I
900.5/
36.9/' (LT)
+95.05
38.49' /LT1
CURB & GUTTER! RECONSTRUCTION SHALL
,BE PAY UNDER PAY ITEM 288001
28.75' (LTI
��' +85.86
42.7/' /L
INV. 3.39
12' WHITE
39.88' (RY2,
+78.34
44.00' WI
CURB & GUTTER RECONSTRUCTION SHALL
BE PAY UNDER PAY ITEM 28800/
+89.02
53.60' (RT)
+93.60
51.89' (RTI
14'
D' �36
`.aii
POW LINE
NV. 3.37
12" JYHITE
12" WHITE
PIPE 4' Olo (TYP.1
I I
LIMITS OF DECONSTRUCTION
LIMITS OF RECONSTRUCTION
INV. 3.37
2' IYHITE
12' WHITE
iIi
11
CORE HOLBj !AND CONNE TO
E2J___P'RUCTURE (INV. 3.271
I I,I �`,.1'sj:,I
. +92.28
47.93' (LT)
*90.55
36.99' (LT)
L'iMrrs--oF RECONSTRUCTION
LIMITS OF RECONSTRUCTION
INV. 3.27
+85.96
49.22' (RTI
+87.38
47.65' MT,
i1 CORE HOLE AND CONNECT TO
Ely/ST. 5TRUCTURE (INV. 3.261
II I +9/.62
!I �11 59.35' (RTI
CURB &1'GU TER RECONSTRUCTION SHALL
BE PAY 'UNDER PAY ITEM 446-71-I
IO'
/4'
—CURB & 0/) 72R RECONSTRUCT/ON SHALL
BE PAY UNDER PAY ITEM 446-7/-1
+97.34
47.92' (L71 0
+96.50
42.59' (LT/
+92.33
35.46' (LT(
CURB & GUTTER RECONSTRUCTION SHALL
BE PAY UNDER PAY ITEM 288001
I +06.98
27.01' (LT/
I 905.13
/0 06
2/.08(L71
F: ,y
N l'
INV. 3.30
LIMITS OF RECONSTRUCTION
J I
V INV. 3.33
I •
12' WHITE
INV. 3.30
Feel
RAY LINE
37.17' (RTI
CURB & GUTTER RECONSTRUCTION SHALL
BE PAY UNDEP PAY ITEM 288001
-11\+95./0
57.,35L (ATI
996.2/
59.36' MT)
err_
KNOW INTAT'S MOO
AVMS CALL I11
BYTOM TOO On
www.ansunshine.com
811
RE ✓/5 /O N5
DATE
DESCRIP/ION
DATE
DESCRIPTION
T•Y•LIN INTERNATIONAL
201 ALHAMBRA CIRCLE SUITE 900
Coral Gables, Florida, 33134
Phone: 305 / 567-1888 Fax: 305 / 567-1771
CITY OF MIAMI
NW 14th STREET 8 NW 12th AVE
CROSSWALK IMPROVEMENTS
CRY OF MIAMI PROJECT NUMBER: Ba0500
NW I4TH STREET AND
NW I2TH AVENUE
SHEET
N0.
3
CPOIot
SAWOR
ron.eY R.P.o/r,550860asru yarn 5r.eer mea.q rmo.wemnnasrxovma+gw.r rf Are - v
f2' RECONST. 1
7.5 FC.12 5'
1.5"5P
CROSSWALK
LONG. SLOPE
R NST.
BOTTOM OF NEW BASE SHOULD
BE AT OR ABOVE STAB.
MATCH EXIST. GRADE
ELEV. (TYP.)
f
/
XIS
TA6+. TPB
n 10" INTEGRAL4COLOR CL'ss LCoNC. SLAB
- 4" TREATED PERMEABLE BASE
2" SEPARATION LAYER TYPE 5P
r♦�
..
•nA�n
,r / / ..
,�. / FABR
1IC1
-FILTER FABRIC TYPE 0-3
(SEE INDEX 1991
J 794I'--- PEREINDEIN2AS
r_2' RECONST.
r�;a5FC (25
�- 1.5-SP e
BOTTOM OF NEW BASE SHOULD
BE AT OR ABOVE STAB.
SECTION AA
CROSSWALK
e - a 10" INTEGRAL COLOR CLASS /CONC. SLAB
4' TREATED PERMEABLE BASE
I1\ SEPARATION LAYER TYPE SPA`
SECTION BB
.L1
T2' RECONST.
//// / /
////J
��11L
FILTER
FA
FILTER FABRIC TYPE 0-3
(SEE INDEX 1991
E-I1 `EOGEI DRAIN AS
MATCH EXIST. GRADE
ELEV.(TYP.(
TYPE F CURB R GUTTER
NOTES:
I. Saw cyl existing asphalt pavement to a width capable of accommodating
the IO wide concrete crosswalk as well as 2' an each side for form
work. On the 2' reconstruction are/ remove asphalt abase to a
depth of 9", grade P.compact remalnhg base material..
2. For concre/e crosswalk nlocomenl Cemove existing osp(a// and base far o
!opal e0Lavollan depth of a/0u/ 28 below exlstlrg grade.
3. Grading and compaction of existing subgrade (95% maximum density,.
4. Placement of /2" type B /obll/za/ion /LBR 401, 2" type SP structural
course (21 (traffic C1, and 4 asphalt treated or cement treated
permeable base. Construct 12• wide edge drain las per Index 2871
g pproprlate slate of the crosswalk.
5. Placement of a 10' thick Class I concrete slab and coloring of
concrete (FOOT Standards Section 3461 with n Integral color mix;
a. Expansion Joins will be placed on each lane Ilne (approx. every
10 -121 per FOOT Standard Index 305
b. Joints will be reinforced by (8" tong 1-1/4" bars on 12' spacing
located 5' Irom the lop of the slab
6. After placem0n/ concrete will be finished 71rs1 with o Ngh/ burlap
drag (per FOOT 5/andards Secl/on 350-10.N fo//mvcd 19 curing compound
After concrete hos achieved a minimum 2500ps/ compressive strength,
the form work will be rpmnv&
8. Prgvlde 0BG 9 I13-12.51 base, (.5" type SP structural course, and
l.5 friction course PC-12 adjacent to newly placed corarele and
compacted per FOOT standards.
9. 2" of SP-9.5 w111 be placed ono' compacted per 'DOT standards
/0. All work and materials shall be as per FOOT Spoclflcations
/l. Rep'aoe exist. lmpectrd vehlde loops per Index (778(. Per Mlam/-Dole
County records (asset number 23771, there e 3 loops on the eastbound,
3 on the westbound and one on the northbound left turn lane.
REV15/0N5
DATE
DESCRIPTION
OA/E
DESCRIPTION
T•Y•LIN INTERNATIONAL
201 ALHAMBRA CIRCLE SUITE 900
Coral Gables, Florida. 33134
Phone: 305 / 567-1888 Fax: 305 / 567-1771
CITY (DF MIAMI
NW 14th STREET & NW 12th AVE
CROSSWALK IMPROVEMENTS
CITY OF MUM PROJECT NUMBER BJ0500
DETAILS
SHEET
N0.
4
3
er22,011
210,110 PI,
Ir1Wnls515500W25S1 ran Wee? Roach, nrp.o.enn1s,930500, eadrea 50 12 Pre - sr
POST 10171-IONS, 2' x 4' OR
2 I/2' MIN, DIA. WOOD, STEEL
1.33 LB5/FT. MIN.)
6' Ha,.
ELEVATION
OPTIONAL POST POSIrrox500.
FILTER FABRIC LIN
CONFORMANCE WITH
SEC. 985 FOOT SPECS.)
SILT FENCE DETAIL
NI.
TYPE 111 SILT FENCE PROTECTION AROUND DITCH BOTTOM INLETS.
NOTE,
00 NOT DEPLOY IN A MANNER THAT SILT FENCES WILL ACT AS A DAM ACROSS
PERMANENT FLOWING WATERCOURSES. SILT FENCES ARE TO BE USED AT UPLAND
LOCATIONS AND TURBIDITY BARRIERS U5E0 AT PERMANENT BODIES OF WATER.
PARTIAL INLET
CURB & GUTTER
PRINCIPLE POST POSITION
!CANTED 20' TONARO FLOW)
FILTER FABRIC
SILT FLOW
SECTION
TYPE Ill SILT FENCE
NOTE:
SPACING FOR TYPE "'FENCE TO BE IN ACCORDANCE
WITH CHART I,SHEET /OF 3 AND DITCH INSTALLATIONS
AT DRAINAGE Srouor00ES SHEET 2 OF 3 PER INDEX 102
SILT FENCE APPLICATIONS
DITCH -^—
CURB & GUTTER
COMPLETED INLET
ANCHOR BALES WITH 2 - 2'72'54' STAKES PER BALE.
PROTECTION AROUND INLETS OR SIMILAR STRUCTURES
N.T.S.
NOTE:
TYPE A OR R FENCE
----DITCH
DITCH BOTTOM INLET
LOOSE SOIL PLACED BY SHOVEL AND LIGHTLY COMPACTED
ALONG UPSTREAM FACE OF BALES.
R E V /5 IDS HALES IO H6 SIAKED AI Ilk UlhtLIFUN OF IHt
DATE
DESCRIPTION
BATE
0E5CR/PTIOV
STORM WATER POLLUTION PREVENTION PRACTICES::FOR PROJECTS OF I ACRE OR MORE:
I. TREE PROTECTION ANO PRUNING SHALL BE ACCOMPLISHED AS DETAILED IN SPECIAL PROVISIONS, THE CONSTRUCTION PLANS, AND OR PER TREE ORDINANCE
/2636.
2. THE STORM WATER POLLUTION PREVENTION PLAN, SWPPP, SMUTTED TO PUBLIC WORKS, SHALL DESCRIBE IN DETAIL HON THE CONSTRUCTION EFFORT WILL
BE PHASED WITH REGARDS TO MINIMIZING EROSION PROBLEMS BY THE USE OF TEMPORARY AND PERMANENT EROSION CONTROL MEASURES, FoR THE VARIOUS
SERUENCES OF CONSTRUCTION OPERATIONS. ANY MOOIT!CATIONS MUST BE APPROVED BY THE CITY OF MIAMI - NPOES SECTION, DEPARTMENT OF PUBLIC
WORKS.
3. ENVIRONMENTAL CONTROL FEATURES AS PROVIDED IN THE SWPPP, ARE TO DE INSTALLED AT ALL AREAS OF EXCAVATION OR FILL FOR DRAINAGE SYSTEM,OR
STRUCTURE CONSTRUCTION PRIOR TO SUCH EXCAVATION OR FILL. INLET ENTRANCES ARE ALSO TO BE PROTECTED FROM SILTATION AS DETAILED ON SHEET 2
OF 4 OF M/SC.35-09-6.
4. ALL ENVIRONMENTAL CONTROL FEATURES ARE TO BE MAINTAINED THROUGHOUT THE LIFE OF THE PROJECT IN ACCORDANCE WITH N.P.O.E.S. REQUIREMENTS.
THE CONTRACTOR MUST INSURE THAT ALL EROSION CONTROL FEATURES FUNCTION PROPERLY AT ALL TINES.
5. ALL EROSION AND MATERIAL DEPOSITS MUST BE CONTAINED WITHIN THE PROJECT UNITS.
6. ANY DAMAGED DR INEFFECTIVE ROCK BAGS ARE TO BE REPLACED WITH NEW ONES. THE LOCATION OF ROCK BAGS INSTALLATION IS A5 MENTIONED IN THE
SWPPP PLANS. THE PROJECT ENGINEER MAY SPECIFY OTHER AREAS AS NECESSARY.
T. DITCH BOTTOM INLETS SHALL DE PROTECTED FROM SEDIMENT INTAKE UNTIL PROJECT IS COMPLETE. ELEVATION OF GROUND ONSIDE INLET TOP SHALL
NOT BE HIGHER THAN INLET TOP. ROCK BAGS SHALL BE INSTALLED AROUND INLET TOP. COMPLETE0 INLET$ IN PAVED AREAS SHALL ALSO RE PROTECTED
WITH ROCK BAGS TO PREVENT SEDIMENT INTAKE.
8. CURD INLETS ALSO SHALT. BE PROTECTED FROM SEDIMENT INTAKE UNTIL THE PROJECT IS COMPLETE. ALL EXPOSED SLOPED MATERIAL ADJACENT TO INLET,
SHALL BE COVERED WITH ER0510f0 CONTROL MATTING WITH OUTER LIMITS PROTECTED BY ROCK BAGS.
9. STOCKPILED MATERIAL SHALL NOT BF LFFT IN EROSION PRONE AREAS UNLESS PROTECTED BY CO/ER DR ROCK BAGS.
TO. INSPECTION OF EROSION CONTROL MEASURES AND CONDITION OF ADJACENT PROPERTIES, SHALL BE PERFORMED DAILY BY THE CONTRACTOR'S
REPRESENTATIVE AND THE PROJECT ENGINEER. DEFICIENCIES SHALL BE NOTED AND CORRECTED.
II. ANY OFFSITE SEDIMENT DISCHARGE TO A MUNICIPAL SEPARATE STORM WATER SYSTEM ARISING FROM THE ONITRACTOR'S ACTNIr,ES IS NOT ALLOWED.
REFER TO PUBLIC WORKS DEPARTMENT BULLETIN No. P.S.
12. THE USE OF SANITARY ST.WERS, FRENCH ORAINS,COVE9 DITCHES AND/OR ROCK DRAINS FOR THE DISPOSAL OF WASTEWATER 15 EXPRESSLY PROHIBITED.
REFER TO PUBLIC WORKS DEPARTMENT BULLETIN No. 25.. NPDES - NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM
STORAI WATER POLLUTION PREVENTION PLAN LSWPPPI
EROSION & SEDIMENT CONTROL STABILIZATION PRACTICES: OTHER CONTROLS: OFFSITE VEHICLE TRACKING:
_ TEMPORARY SODDING
TEMPORARY GRASSING
_ PERMANENT PLAN rING, SEEDING 0R SEED 8 MULCH
TEMPORARY MULCHING
- ARTIFICIAL COVERING
___ BUFFER ZONES
_— PRESERVATION OF NATURAL RESOURCES
_ OTHER
STRUCTURAL PRACTICES[.
— _ SAND BAGGING
EN61„E2,.Y•LIN INTERNATIONAL
201 ALHAMBRA CIRCLE SUITE 900
Coral Gables, Florida. 33134
Phone: 305 / 587-1888 Fax: 305 / 587-1771
CITY OF M11\MI
NW 14th STREET 8 NW 12th AVE
CROSSWALK IMPROVEMENTS
CRY OF MIAMI PROJECT NUMBER: 8-30500
- HAUL ROADS DAMPENED FOR OUST CONTROL
LOADED HAUL TRUCKS TO BE COVERED WITH TARPAUL/N,OR APPROVED
EQUAL.
_— EXCESS DIRT ON ROAD REMOVED DAILY
— STABILIZED CONSTRUCTION ENTRANCE
___ CONCRETE TRUCK WASH AREA
__ OTHER TREATMENT OF STORM WATER TO MEET WATER QUALITY:
___ DEEP WELLS
___ CULVERTS FOR EMERGENCY OVERFLOW
POLLUTION CONTROL STRUCTURES
___ OTHER
GENERAL
1. APPROVED STATE, LOCAL PLANS OR STORM 11'ATER PERMITS.
2. ALL OF THE CONTROLS SHALL BE MAINTAINED AT ALL TIMES.
3. ALL CONTROLS SMALL BE INSPECTED DAILY.
4. APPLY FERTILIZERS AND PESTICIDES ACCORDING TO STANDARD
SPECIFICATIONS, DESIGN AND SPECIAL PROVISIONS.
5. REPORT NON -STORM WATER DISCHARGE 'INCLUDING SPILU:30514/6-1200.
6. V151, xww.Ueo.oloIe.Tl.us/wafer/sl0rnweoler/n4Nes/
STORMWATER
POLLUTION PREVENTION PLAN
SHEET
NO.
5
CROW
8/22/0311
1062.1 AM
A.Wrofeclo,5INE025t0 H1n 511ee, Roo ., ImerorennH'9I/SCO1ra2.0WM /P Ave - 5
THE FOLLOWING NARRATIVE OF THE 5T0RLAVATER POLLUTION PREVENTION PLAN
CONTAINS REFERENCES TO THE STANDARD SPECIFICATIONS FOR ROAD AND
BRNxE CONSTRUCTION, THE DESIGN STANDAR:5,AR° OTHER SHEETS OF THESE
CONSTRUCTION PLANS. THE FIRST SHEET OF THE CONSTRUCTION PLANS KEY
SHEET CONTAINS AN INDEX TO THE OTHER SHEETS. THE COMPLETE
STORMWATER POLLUTION PREVENTION PLAN INCLUDES SEVERAL ITEMS: THIS
NARRATIVE DESCRIPTION. THE DOCUMENTS REFERENCED IN THIS NARRATIVE,
THE CONTRACTOR'S APPROVED EROSION CONTROL PLAN REWIRED BY
SPECIFICATION SECTION 104, AND REPORTS OF INSPECTIONS MADE DURING
CONSTRUCTION.
A. THE FOLLOWING NARRATIVE AND REFERENCED DOCUMENTS,
B. THE CONTRACTOR'S APPROVED EROSION AND SEDIMENT CONTROL PLAN
REQUIRED B/ SPECIFICATION SECTION 104,CITY OF MIAMI FW BULLETIN No.
25 AND CITY ORDINANCE No. 13081,
C. REPORT OF INSPECTIONS MADE DURING CONSTRUCTION.
l.0 SITE DESCRIPTION
I.A. NATURE OF CONSTRUCTION AC TN, TY:
THE PLAN DELINEATED IN THIS SWPPP IS FOR CONSTRUCTION ACTIVITIES
WITHIN THE MIAMI-DADE AREA AT THE INTERSECTION OF MY l4TH Sr AND NW
12TH AVE. THE PROJECT INCLUDES THE INSTALLATION OF DECORATIVE CONC.
CROSSWADC WITH TREATED PERMEABLE BASE SUBDRA/NAGS.
1.B. SEQUENCE OF MAJOR 50/L DISTURBING ACTIVITIES:
IN THE SECTION 104 EROSION R SEDIMENT CONTROL PLAN, THE CONTRACTOR
SHALL PROVIDE A DETAIL SEQUENCE OF CONSTRUCTION FOR ALL CONSTRUCTION
ACTIVITIES. THE CONTRACTOR SHALL FOLLOW THE SEQUENCE OF MAJOR
ACTIVITIES DESCRIBED BELCW,UNLESS THE CONTRACTOR PROPOSES A
DIFFERENT SEQUENCE THAI IS THE EQUAL OR BETTER AT CONTROLLING
EROSION 4N0 TRAPPING SEDIMENT AND /5 APPROVED BY THE ENGINEER.
INSTALL PERIMETER EROSION AND SEDIMENT CONTROLS AFTER CLEARING AND
GRUBBING NECESSARY FOR INSTALLATION OF CONTROLS BUT BEFORE CLEARING
AND GRUBBING OTHER AREAS OF THE SITE.
I. CLEARING AND GRUBBING.
2. ` ASPHALT MILLING AND RESURFACING
I.C. AREA ESTIMATES
TOTAL PROJECT AREA: 2.0 ACRES
TOTAL AREA TO BE DISTURBED:0.84 ACRES
.D. RUNOFF DATA
80/oII Coefilclenls:
Be0Rre Construction:0.90
During COnsiruclIon: 0.90
A/ler C0n0fncl0On: 0.90
I.E. SITE MAP
THE SHEETS CONSTRUCTION PI.ANS ARE BEING USED AS THE SITE MAPS. THE
LCC4T/ON OF THE REWIRED /NFORMA r,os 15 DESCRIBED BELOW. THE SHEET
NUMBERS FOR THE PLANS REFERENCED IN THIS SECTION ARE IDENTIFIED OV
THE KEY SHEET OF THE PLANS.
• DRAINAGE PATTERNS: THE DRAINAGE BA5/N DIVIDES AND FLOW DIRECTIONS
ARE SHOWN ON THE DRAINAGE MAP (INCLUDED IN THE DRAINAGE REPORT).
THE FLOW ARROWS REPRESENT THE FLOW DIRECTION.
• APPROXIMATE SLOPES: THE PLANS MAINTAINS A 2X TYPICAL CROSS SLOPE
AS INDICATED ON THE TYPICAL SECTION.
• AREAS OF 50/L DISTURBANCE: THE LIMITS OF SOIL DISTURBANCE ARE
SHORN ON THE TYPICAL SECTION SHEETS AND PLANS SHEETS.
• AREAS NOT TO BE D15TURBEO: ENTIRE PROJECT AREA TO BE
DISTURBED.
• LOCATIONS OF TEMPORARY CONTROLS: ROCK BAGS WILL BE LOCATED AROUND
ALL EXISTING AND PROPOSED INLETS; TURBIDITY BARRIERS WILL BE
505475D AT ANY BODIES OF WATER AFFECTED B/ THIS PROJECT.
• LOCATIONS OF PERMANENT CONTROLS: PERMANENT FEATURES ARE WORM
ON THE CONSTRUCTION PLANS, WHICH GENERALLY CONSIST OF SOD,
ASPHALT,CONCRETE, AND DRAINAGE STRUCTURES.
• SURFACE WATERS: NONE
• WETLAND AREAS: NONE
• AREAS TO BE STABILIZED:NONE
2.0 CONTROLS
2.A. EROSION AND SEDIMENT CONTROLS:
IN THE SECTION 104 EROSION AND SEDIMENT CONTROL PLAN, THE CONTRACTOR
SHALL DESCRIBE THE PROPOSED STABILIZATION AND STRUCTURAL PRACTICES
BASED ON THE CONTRACTOR'S 'TRAFFIC CONTROL PLAN. THE FOLLOWING
RECOMMENDED GUIDELINES ARE BASED ON THE TRAFFIC CONTROL PLAN 1TCP1
OUTLINED IN THESE CONSTRUCTION PLANS. THE CONTRACTOR Mar CHOOSE TO
ACCEPT THE FOLLOWING GUIDELINES OR MODIFY THEM IN THE SECTION 104
EROSION CONTROL PLAN, SUBJECT TO APPROVAL OF THE ENGINEER. AS WORK
PROGRESSES, THE CONTRACTOR SHALL MODIFY THE PLAN 70 ADAPT TO
SEASONAL VARIA7/ON,CHANGES IN CONSTRUCTION ACTIVITIES AND THE NEED
FOR BETTER PRACTICES. TO (WIT THE TRANSPORT OF SEDIMENT FROM THE
CONSTRUCTION AREA, THE CONTRACTOR,SHALL M/N/M/ZE THE SOIL AREAS
EXPOSED AT ANY GIVEN TIME AND SHALL STABILIZE AREAS THAT WILL REMAIN
IDLE FOR MORE THAN 7 DAYS. THE CONTRACTOR SHALL UTILIZE GRADING
TECHNIQUES TO DIRECT RUNOFF TO AREAS WITH THE PROPER EROSION
CONTROL FEATURES INSTALLED AND AWAY FPOM OPEN (WATER OR OTHER
SENSITIVE AREAS ADJACENT TO THE WORK SITE.
2.A.1 STABILIZATION PRACTICES:
IN THE SECTION 104 EROSION 8 SEDIMENT CONTROL PLANS, THE CONTRACTOR
SHALL DESCRIBE THE STABILIZATION PRACTICES PROPOSED TO CONTROL
.EROSION. THE CONTRACTOR SHALL INITIATE ALL STABILIZATION MEASURES AS
SOON A5 PRACTICAL,BUT IN N0 CASE MORE THAN /4 DAYS. /N PORTIONS OF
THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR
PERMANENTLY CEASED THE STABILIZATION PRACTICES PROPOSED BY THE
CONTRACTOR SHALL INCLUDE AT LEAST THE FOLLOWING:
PERMANENT:
• ASPHALT OR CONCRETE SURFACE.
• 500 IN ACCORDANCE WITH ORDINANCE /2636.
2.A.2 STRUCTURAL PRACTICES:
IN THE SECTION 104 EROSION b SEDIMENT CONTROL PLANS, THE CONTRACTOR
SHALL DESCRIBE THE STRUCTURAL PRACTICES TO CONTROL OR TRAP SEDIMENT
AND OTl/EfWISE PREVENT THE 0/5CHARGE OF PoILUT4NTS FROM EXPOSED
AREAS OF THE SITE. ALL SEDIMENTS CONTROLS SHALL BE IN PLACE BEFORE
ANY SOIL DISTURBING ACTIVITY UPSTREAM OF THE CONTROL. THE STRUCTURAL
PRACTICES PROPOSED BY (I/O CONTRACTOR SHALL INCLUDE AT LEAST THE
FOLLOWING:
TEMPORARY:
• ROCK BAGS /N ACCORDANCE WITH DESIGN STANDARD /02 AND SPECIFICATION
SECTION 104.
• TURBIDITY BARRIER IN ACCORDANCE WITH DESIGN STANDARD 103 AND
SPECIFICATION SECTION 104
PERMANENT:
• CURB AND GUTTER
• DRAINAGE STRUCTURES
• 500
2.8. STORM WATER MANAGEMENT:
DRAINAGE PATTERNS AND DIVIDES ARE INCLUDED ON THE DRAINAGE MAP
INCLUDED IN THE ORA/HALE REPORT. STORM WATER l5 CAPTURE BY PROPOSED
INLETS AND RETAIN IN INFILTRATION TRENCHES
2.C. OTHER CONTROLS:
THE CONTRACTOR SHALL PRACTICE GOOD HOUSEKEEPING BY INSTITUTING A
CLEAN,ORDERLY CONSTRUCTION SITE; THE FOLLOWING CONTROLS SHALL BE
IMPLEMENTED TO FURTHER REDUCE POLLUTION AT THE PROJECT SITE:
2.C.1. DISCHARGE OF MATERIAL TO SURFACE WATERS:
NO CONSTRUCTION MATERIAL SHALL BE DISCHARGE TO WATERS OF THE STATE
UNLESS AUTHORIZED BY SECTION 40. PERMIT AND/OR CONSTRUCTION DEBRIS SHALL
BE DISPOSED OF IN AN APPROvE0 UPLAND LOCATION. BUILDING MATERIAL SHALL
NOT BE DISPOSED OF IN WETLANDS OR BURIED ON -SITE. IN THE SECTION 104
EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE THE PROPOSED
0ET11005 TO PREVENT THE DISCHARGE OF SOLID MATERIALS. INCLUDING BUILDING
MATERIAL. THE PROPOSED METHODS SHALL INCLUDE AT LEAST THE FOLLOWING,
UNLESS OTHERVISE APPROVED BY THE ENGINEER.
• PROVIDE LITTER CONTROL AND COLLECTION WITHIN THE PROJECT LIMITS
DURING CONSTRUCTION ACTIVITIES.
• DISPOSE OF ALL FERTILIZER OR OTHER CHEMICAL CONTAINERS ACCORDING TO
EPA'S STANDARD PRACTICES AS DETAILED BY THE MANUFACTURER.
• DISPOSE OF SOLID MATERIALS INCLUDING BUILDING AND CONSTRUCTION
MATERIALS OFF THE PROJECT SITE BUT NOT IN SURFACE WATERS
OR ;YET -LANDS.
2.C.2. OFF -SITE VEHICLE TRACKING AND OUST CONTROL:
THE CONTRACTOR SHALL TAKE MEASURES TO INSURE THE CLEANUP OF THE
SEDIMENTS THAT HAVE BEEN TRACKED BY VEHICLES OR HAVE BEEN
TRANSPORTED BY WIND OR STORM WATER ABOUT THE SITE DR ONTO NEARBY
R0400ArS.
STABILIZED CONSTRUCTION ENTRANCES AND CONSTRUCTION ROADS, IF
APPROPRIATE, SHALL BE IMPLEMENTED IN ORDER 10 REDUCE OFF-5/7E
TRACKING. LOADED HAUL TRUCKS SHALL BE COVERED WITH TARPAULIN. EXCESS
DIRT ON THE ROAD SHALL BE REMOVED DAILY. PROVIDE A STREET SWEEPING
PLAN TO THE CITY INSPECTOR.
IN THE SECTION 104 EROSION CONTROL PLAN, THE CONTRACTOR SHALL DESCRIBE
THE PROPOSED METH00S FOR MINIMIZING OFFSITE VEHICLE TRACKING OF
SEDIMENTS AND GENERATING DUST. THE PROPOSED METHODS SHALL INCLUDE AT
LEAST THE FOLLOWING UNLESS OTHERWISE APPROVED BY THE. ENGINEER.
• COVER LOADED HAUL TRUCKS WITH TARPAULINS.
• REMOVE EXCESS DIRT FROM ROADS DAILY.
• STABILIZE CONSTRUCTION ENTRANCES ACCORDING TO OCSIGN STANDARDS JOG.
1CONSTRICTION ENTRANCES ARE ALREADY STABILIZED FOR THIS
PROJECT)
2.C.S. WASTE DISPOSAL, SANITART SEWER OR SEPTIC TANK REGULATIONS:
THE CONTRACTOR SHALL DEMONSTRATE THE PROPER DISPOSAL OF ALL
CONSTRUCTION WASTE GENERATED WITHIN THE PROJECT LIAR/T5.WA5TE MAY
INCLUDE, BUT NOT LIMITED 70. VEGETATION FROM WEANING AND GRUBBING
ACTIVITIES, PACKAGING MATERIAL, SCRAP BUILDING MATERIAL, LITTER FROM
TRAVELING PUBLIC, SEWAGE FROII SANITARY FACILITIES, HERBICIDES AND
PESTICIDES AND THEIR CONTAINERS, AND HYDROCARBON PRODUCTS SHALL BE
DESIGNATE A WASTE COLLATION AREA ON SITE AND DELINEATE THE AREA ON
THE SIVPFP SITE MAP.
SANITARY SEPTIC 545/5/TIES SHALL BE PROVIDED AND MAINTAINED IN A NEAT
AND SANITARY CONDITIDu. FOR THE USE OF THE CONTRACTOR'S EMPLOYEES A5
NECESSARY TO COMPLY WITH THE REQUIREMENTS AND REGULATIONS OF THE
STATE AND LOCAL BOARDS OF HEALTH. A LICENSED SANITARY WASTE
MANAGEMENT CONTRACTOR AS RED/IRED BY THE STATE REGULATIONS WILL
COLLECT ALL 5AN/TARP WASTE FROM PORTABLE UNITS.
THE CONTRACTOR WILL PROVIDE LITTER CONTROL AND COLLECTION I1,11/N THE
PROJECT LIMITS DURING CONSTRUCTION ACT WIT '/ES.CONTRACTOR WILL PROVIDE
AN ADEQUATE NUNBER OF LITTER CONTAINERS WITH L/05 AT THIS STAGING
STOCKPILE AND FIELD OFFICE AREAS.W457E COLLECTION WILL BE SCHEDULED
50 THAT CONTAINERS ARE EMPTIED PRIOR TO OVERFLOW. SPILLED LITTER
CONTAINERS WILL BE CLEANED UP IMMEDIATELY.
REVISIONS
DATE
DESCRIPTION
DATE
DESCRIPTION
T•Y•LIN INTERNATIONAL
201 ALHAMBRA CIRCLE SUITE 900.
Coral Gables, Florida. 33134
Phone:305/567-1888 Fax: 305 / 567-1771
CITY OF MIAMI
NW 14th STREET & NW 121h AVE
CROSSWALK IMPROVEMENTS
CM OF MIAMI PROJECT NUMBER B-00500
STORMWATER
POLLUTION PREVENTION PLAN
SHEET
N0.
6
1062:Is Au
e..vr01FIa155Q 50.052M /40 Sneer Wee.; llro 48S� 301585mf vYWN IP Me - 5
2.C.4. FERTILIZERS AND PESTICIDES:
THE APPLICATION AND HANDLING OF HERBICIDES AND PESTICIDES SHALL BE IN
COMPLIANCE WITH THE MANUFACTURES RECOMMENDED METHOD AND IN
ACCORDANCE WITH FDOT STANDARD SPECIFICATION FOR ROADS AND BRIDGE
CONSTRUCTION. HERBICIDES AND PESTICIDES SHALL BE ON SITE IN THEIR
ORIGINAL CONTAINERS WITH PRODUCT LABEL INTACT.
2.C.5 TOXIC/HAZARDOUS MATERIAL HANDLING
CONTRACTOR SHALL PROVIDE EQUIPMENT NECESSARY TO CONTAIN AND CLEAN UP
SPILLS OF HAZARDOUS MATERIAL AFTER THEY OCCUR. SPILLED MATERIAL AND
THE EQUIPMENT USED TO CLEAN UP THE SPILL SHALL NOT COME IN CONTACT
WITH SURFACE WATERS OR BE INTRODUCED INTO STORM WATER. DISPOSAL OF
SURPLUS PRODUCT WILL BE DONE ACCORDING TO MANUFACTURE RECOMMENDED
ME TH00.
CONTRACTOR SHALL PROVIDE A PROJECT SPECIFIC HAZARDOUS MATERIAL SPILL
CONTROL PLAN TO ADDRESS THE HANDLING OF HYDROCARBON AND HAZARDOUS
MATERIALS.
PETROLEUM PRODUCTS SHALL BE STORED IN COVERED AREAS WITH SECONDARY
CONTAINMENT SURROUNDING CONTAINER.
TOXIC/HAZARDOUS MATERIAL EXPOSED DURING CONSTRUCTION ACTIVITIES SHALL
BE HANDLE AS PER THE FOOT STANDARD SPECIFICATIONS FOR ROAD AND
BRIDGE CONSTRUCTION.
2.0 STATE AND LOCAL PERMITS TO BE APPLIED FOR:
• NPOES FROM THE CITY OF WANT PUBLIC WORKS DEPARTMENT
• FOOT CONSTRUCTION PERMIT
3.0 MAINTENANCE
IN THE SECTION 104 EROSION CONTROL PLAN, THE CONTRACTOR SHALL PROVIDE
A PLAN FOR MAINTAINING ALL EROSION AND SEDIMENT CONTROLS THROUGHOUT
CONSTRUCTION. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN GOOD
WORKING ORDER BY THE CONTRACTOR. IF A CONTROL NEEDS REPAIR OR
REPLACEMENT, IT W/LL DE INITIATED WITHIN 24 HOURS OF REPORT AND
RECORDED ON THE INSPECTION FORMS. MAINTENANCE SHALL CONTINUE UNTIL
ALL ERODIBLE SOILS WITHIN THE CONTRIBUTING AREA HAVE BEEN STABILIZED.
AT THIS POINT, THE CONTRACTOR SHALL REMOVE EXCESS SILT AT THE
CONTROLS AND REMOVE THE TEMPORARY DEVICES. THE MAINTENANCE PLAN
SHALL AT MINIMUM, COMPLY WITH THE FOLLOWING:
• INLET PROTECTION (ROCK BAG51: THE CONTRACTOR SHALL INSPECT THE
PROTECTED INLETS EVERY TWO WEEKS AND REPLACE THE ROCK BAGS IF
NECESSARY OR WHEN EXCESSIVE POUNDING OCCURS: ELIMINATE BREACHES IN
THE PROTECTION.
• TURBIDITY BARRIER: MAINTAIN A5 PER SECTION 104 OF THE SPECIE 'CATIONS.
• STREET SWEEPING: DAILY CONTROL AND DUST PREVENTION WITH WATER
TRUCK.
• GRASSED AREAS: NEWLY SODDED AREAS AND ADJACENT AREAS DISTURBED BY
CONSTRUCTION OPERATIONS SHALL BE REPAIRED AND MAINTAINED,WATERING
AND MOVING AS NEEDED OR REQUIRED /N THE FOOT STANDARD
SPECIFICATIONS.
4.0 INSPECTIONS
QUALIFIED PERSONNEL SHALL INSPECT ALL THE CONTROL FEATURES AT LEAST
ONE EVERT 7 CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A STORM
THAT IS 0.50 INCHES OR GREATER. TO LOWLY THE CONTRACTOR SHALL INSTALL
AND MAINTAIN RAIN GAUGES AND RECORD THE DAILY RAINFALL./WHERE SITES
HAVE BEEN PERMANENTLY STABILIZED, INSPECTIONS SHALL DE CONDUCTED AT
LEAST ONCE EVERY WEEK. THE CONTRACTOR SHALL ALSO ENSURE THAT
CONTROLS INS TALLEO IN THE FIELD AGREE WITH THE LATEST STOMA TER
POLLUTION PREVENTION PLAN /SWOOP/. THE FOLLOW INC ITEMS WILL BE
INSPECTED:
• POINTS OF DISCHARGE TO SURFACE WATERS OR WETLANDS: INSPECT TO
DETERMINE /F CONTROLS ARE EFFECTIVE IN PREVENTING OR MINIMIZING THE
DISCHARGE OF POLLUTANTS.
• POINTS OF DISCHARGE TO MUNICIPAL SEPARATE STORM SEWER SYSTEMS
(INLETS. ETC./: INSPECT TO DETERMINE IF CONTROLS ARE EFFECTIVE IN
PREVENTING OR MINIMIZING THE DISCHARGE OF POLLUTANTS.
• DISTURBED AREAS OF THE SITE THAT HAVE NOT BEEN FINALLY
STABILIZED: INSPECT FOR EVIDENCE OF POTENTIAL FOR DISCHARGING
POLLUTANTS INTO SURFACE WATERS OR STORAM'A7ER 5Y5 TEM5.
• AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO
PRECIPITATION: INSPECT FOR EVIDENCE OF POTENTIAL FOR DISCHARGING
POLLUTANTS INTO SURFACE WATERS OR STORAAVATER SY51 EATS.
• STRUCTURAL CONTROLS: INSPECT FOR PROPER INSTALLATION AND OPERA) ION.
• STORMWATER MANAGEMENT SYSTEMS: INSPECT FOR PROPER OPERATION,
EVIDENCE OF FLOODING WE TO SEDIMENTATION OR CONTROLS REWIRING
MAINTENANCE.
• LOCATIONS WHERE VEHICLES ENTER AND EXIT THE SITE: INSPECT FOR
EVIDENCE OF OFFSITE TRACKING.
THE CONTRACTOR SHALL INITIATE WITHIN 24 HOURS OF INSPECTION THAT
INDICATES ITEMS ARE NOT IN GOOD WORKING ORDER BASED ON THE RESULTS
OF THE INSPECT ION, ALL MAINTENANCE OPERATIONS NEEDED TO ASSURE
PROPER OPERATION OF ALL CONTROLS, IMPS OR MEASURES IDENI IFIED IN THIS
SWPPP SHALL BE DONE IN A TIMELY MANNER, BUT NO LATER THAN 7 CALENDAR
DAYS FOLLOWING THE INSPECT ION. IF NEEDED, POLLUTION PREVENTION CONTROLS
SHALL BE REVISED AS APPROPRIATE IF FAILURES IN IHE PLAN ARE NOTED;
THESE REVISIONS SHALL BE IMPLEMENTED NO LATER THAN 7 CALENDAR DAYS
FOLLOWING THE INSPECTION.
A REPORT !U5£ FOOT FORM 650-040-031 SUMMARIZING THE SCOPE OF THE
INSPECT ION SHALL INCLUDE THE INSPECTOR'S NAME, QUALIFICATIONS, DATE,
RAINFALL DATA, OBSERVATIONS RELATING TO THE SWPPP, AND ACTIONS TAKEN
SINCE THE LAST REPORT. THE REPORT SHALL IDENTIFY ALL INCIDENTS OF
NON-COMPLIANCE.
IF THERE ARE NO INCIDENTS OF NON-COMPLIANCE, THE REPORT SHALL CONTAIN
A CERTIFICATION THAT THE FACILITY l5 IN COMPLIANCE WITH THE SWPPP AND
THE PERMIT. THE REPORT SHALL BE SIGNED AND FILED A5 REWIRED BY THE
GENERIC PERMIT.
THE CONTRACTOR SHALL MAINTAIN A FILE CONTAINING THE CURRENT SWPPP,
NOT SUBMITrAL,CERTIFN'ATIONS AND ALL THE SIGNED INSPECTION REPORTS:
THE NOTICE OF INTENT SUBMITTED AS REWIRED BY CHAPTER 62-621, FAC,
MUST BE POSTED AT THE SITE.
5.0 NON -STORM WATER DISCHARGES:
IN THE SECTION 104 EROSION CONTROL PLAN, THE CONTRACTOR SHALL IDENTIFY
ALL ANTICIPATED NON -STORM WATER DISCHARGES (EXCEPT FLOWS FROM FIRE
FIGHTING ACT ANT/ESISUCH AS THOSE LISTED DELON. THE CONTRACTOR SHALL
DESCRIBE THE PROPOSED MEASURES TO PREVENT POLLUTION FROM THESE
NON -STORM WATER DISCHARGES.
IF CONTAMINATED 50/L OR GROUNDWATER IS ENCOUNTERED WRING
CONSTRUCTION, THE CONTRACTOR l5 TO CEASE OPERATIONS /N THAT AREA. THE
CONTRACTOR SHALL CONTACT THE CITY OF MIAMI PROJECT MANAGER.
A DEIWATER/NG PERMIT l5 REQUIRED TO REMOVED GROUNDWATER FROM THE
CONSTRUCTION SITE.
• CULVERT INSTALLATION METHODS
• SLURRY DISPOSAL
• OUST CONTROL
• EQUIPMENT WASHOUT
• PIPE DESILTING ACTIVITIES
• 'RAMATION
6.0 CONTRACTOR 5U041TTA4:
IT l5 THE RESPONSIBILITY OF THE CONTRACTOR TO DEVELOP AN EROSION
CONTROL PLAN THAT PROVIDES A DETAILED DESCRIPTION OF ALL EROSION ANB
SEDIMENT CONTROLS. BMP'S AND MEASURES THAT WILL BE TAWEATFN TED AT
THE CONSTRUCTION SITE FOR EACH ACTIVITY IDENTIFIED IN SECTION 1.8
SEQUENCE OF MAJOR SOIL DISTURB/NG ACTIVITIES. CONTRACTOR IS
RESPONSIBLE FOR PROVIDING rime FRAMES IN WIT/CH THE CONTROLS WILL BE
/AIPLEMEN7E0, MAINTAINED AND REMOVED. THIS INFORMATION SHALE BE
CONSIDERED IN COMPLIANCE WITH THE FOEP GENERIC PERMIT FOR STORM
WATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION SITES.
rHE CONTRACTOR /5 RESPONSIBLE F0H ENSURING THE FOLLOWING ITEMS ARE
ON SITE:
COPY OF THE SWPPP WITH THE ORIGINAL CERTIFICATION SIGNATURES.
2. COPY OF THE CONTRACTOR'S EROSION CONTROL PLAN.
3. HAZARDOUS SPILL CONTROL PLAN WITH GUIDELINES ON CONTACTING
THE 24-HOUR EMERGENCY RESPONSE PROGRAM FOR HAZARDOUS MATERIAL
SPILLS. THIS SHALL INCLUDE COPIES OF DISCHARGE NOT IF /CATIONS THAT
HAVE OCCURRED WITHIN THE PROJECT LIMITS.
4 COMPLETE INSPECTION FORAMS.
6
REVISIONS
DATE
DESCRIPTION
DATE
DESCRIPTION
T•Y•LIN INTERNATIONAL
201 ALHAMBRA CIRCLE SUITE 900
Coral Gables, Florida. 33134
Phone: 305 / 567-1888 Fax: 305 / 567-1771
CITY OF MIAMI
NW 14th STREET & NW 12th AVE
CROSSWALK IMPROVEMENTS
CRY OF MIAMI PROJECT NUMBER, B-MPOP
11,2,011
STORMWATER
POLLUTION PREVENTION PLAN
IVI
SHEET
NO.
7
8
0,,W,,U.5H1550950.25S1 HIA Street no., 1.Tanen/,49.105/7vea/.WWW 12 Ar - 5
MAINTENANCE OF TRAFFIC NOTES:
GENERAL NOTES:
I. THE TRAFFIC AND TRAVEL WAYS SHALL Nor BE ALTERED BY THE CONTRACTOR TO CREATE
A WORK ZONE UNTIL ALL LABOR AND MATERIAL ARE AVAILABLE FOR THE CONSTRUCTION IN
THAT AREA.
2. REGULATORY SPEED ESTABLISHED WITHIN WORK ZONE TRAVEL WAYS SHALL BE THE EXISTING
POSTED SPEED.
3. AS DETERMINED BY THE ENGINEER, THE CONTRACTOR SHALL COVER WORK ZONE SIGNS WHEN
CONDITIONS NO LONGER WARRANT THEIR USE. COST OF COVERING AND UNCOVERING THE SIGNS
SHALL BE 'INCIDENTAL TO THE PROJECT AT NO ADDITIONAL COST TO TIE CONTRACT.
4. CONTRACTOR SHALL REMOVE, RELOCATE OR COVER ANY EXISTING OR PROPOSED SIGNS THAT
CONFLICT WITH THE TRAFFIC CONTROL PLANS. WHEN THE CONFLICT NO LONGER EXISTS, THE
CONTRACTOR SHALL RESTORE THE SIGNS TD THEIR ORIGINAL POSITION. COST OF TEMPORARILY
COVERING OR REMOV/60590000ATING AND RESTORING THE SIGNS .SHALL BE INCIDENTAL TO THE
PROJECT AT NO ADDITIONAL COST TD THE CONTRACT.
5. EACH EXISTING STREET NAME AND STOP SIGN AFFECTED BY CONSTRUCTION SHALL BE
RELOCATED AND MAINTAINED IN AN APPROPRIATE LOCATION FOR rue DURATION OF THE
PROJECT. WHEN NO LONGER AFFECTED BY CONSTRUCTION, THESE SIGNS SHALL BE RESTORED
TO THEIR ORIGINAL POSITION. COST OF TEMPORARILY RELOCATING AND RESTORING THE SIGNS
SHALL BE ,INCIDENTAL TO THE PROJECT AT NO ADDITIONAL COST TO THE CONTRACT.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR THE IMMEDIATE REMOVAL OF STDRAAYATER FROM
ROADWAYS UTILIZED FOR MAINTAINING TRAFFIC THRU THE WORK ZONE IN A MANNER APPROVED
BY THE ENGINEER. COST FOR REMOVING THE WATER SHALL BE DEEMED INCIDENTAL TO THE
PROJECT COST.
7. THE TRAFFIC CONTROL PLAN SHALL COMPLY WITH 00/T INDEX 600 SERIES.
8. ALL WORK SHALL BE PERFORMED DURING DAYTIME ONLY 800AM TR 8:00PM; NO INTERRUPTION
OF TRAFFIC IS PERMITTED.
9. NOTIFICATION OF LANE CLOSURES OR TEMPORARY DETOURS SHALL BE ACCOMPLISHED 14
WORKING DAYS PRIOR TO CLOSURE, DETOUR OR AIOT PHASE CHANGE BY SUBMITTING THE
REQUIRED LANE CLOSURE FORM. SKE TC//ES, CALCULATIONS, AND OTHER DATA THROUGH THE
ENGINEER TO THE CITY OF MIAMI.
10. CONTRACTOR SHALL NOTIFY LAW ENFORCEMENT AND FIRE PROTECTION SERVICES
TWENTY-FOUR T2q/ HOURS IN ADVANCE OF ANY DETOURS, IN ACCORDANCE WITH SECTION 336.07
OF FLORIDA STATUTES.
I1. AT THE DISCRETION OF THE ENGINEER. IF A LANE CLOSURE CAUSES EXTENDED CONGESTION
OR DELAY, THE CONTRACTOR SHALL BE DIRECTED TO REOPEN DIE CLOSED LANEISI UNTIL SUCH
TIME THAT THE TRAFFIC FLOW HIS RETURNED TO AN ACCEPTABLE LEVEL.
I2. CONTRACTOR MUST PROVIDE FLASHER ARROW BOARD FOR ANY LANE THAT l5 CLOSED OR
DIVERTED
DROP OFFS:
9. DIE CONTRACTOR SHALL PROTECT THE WORK ZONE WITH DEVICES APPROVED TN' TH£
CITY OF MIAMI FIELD ENGINEER WHEN DROP OFFS EXCEED 3• ADJACENT TO TRAVEL t0AYS.
MARKINGS:
10. THE CONTRACTOR SHALL REMOVE ANY EXISTING OR TEMPORARY PAVEMENT MARKINGS THAT
CONFLICT WITH THE TRAFFIC CONTROL PLANS. GRINDING OR MILLING WITHOUT ASPHALT
OVERLAY SHALL ONLY BE PERMITTED IN NON -TRAFFIC AREAS AS DESIGNATED BY THE
ENGINEER. PAVEMENT MARKINGS SHALL BE REPLACED AT THE TINE TRAFFIC CONTROL PLANS
ARE NO LONGER AFFECTED BY THEIR PLACEMENT. COST OF REMOVAL AND REPLACEMENT OF
PAVEMENT MARKINGS SHALL BE INCIDENTAL TO THE PROJECT AT NO ADDITIONAL COST TO
THE CONTRACT. USE OF BLACK PAINT TO COVER EXISTING AND/OR TEMPORARY PAVEMENT
MARKINGS IS PROHIBITED.
SIGNALS•
II. CONTRACTOR SHALL NOTIFY MIAMI DADE COUNTY SIGNS AND SIGNALS DIVISION LOCATED AT
7100 N.W. 36TH STREET MIAMI, FLORIDA 33166 AND PHONE N0. 13051592-3470, 48 HOURS PRIOR
TO ANY MODIFICATION OF AN EXISTING TRAFFIC SIGNAL SYSTEM. THE CONTRACTOR SHALL HAVE
FULL RESPONSIBILITY FOR THE MAINTENANCE OF THE EXISTING OR TEMPORARY TRAFFIC
SIGNAUSIWITHIN DIE PROJECT LIMITS. COST OF RELOCATING TRAFFIC SIGNAL HEADS, PROVIDING
AND REMOVING TEMPORARY SIGNALS AND CONTROLLERS, AND MAINTAINING THE EXISTING OR
TEMPORARY TRAFFIC SIGNALS AND CONTROLLERS SHALL BE INCIDENTAL TO THE PROJECT AT NO
ADDITIONAL COST TO THE CONTRACT.
12. IHE CONTRACTOR SHALL AAINTAIN ONLINE COMMUNICATION OF EXISTING OR TEMPORARY
SIGNALIZATION VIA INTERCONNECT OR PHONE LINE CURING CONSTRICTION. CONTRACTORS SHALL
PROVIDE TEMPORARY LINES AND CONNECTIONS IF NECESSARY. COST OF MAINTAINING
COMMUNICATION, INCLUDING TEMPORARY LINES AND CONNECTIONS SHALL BE INCIDENTAL TO THE
PROJECT AT NO ADDITIONAL COST TO THE CONTRACT.
WORK ZONE LIMITS:
13. THE LENGTH OF AN OPEN TRENCH SHALL NOT EXCEED 500 FEET. PROPERTY ACCESS
SHALL BE MAINTAINED AT ALL TIMES.
PFOESIR/ • N5. BIM/ ES. AND WHEELCHAIRS:
14. AT THE END OF EACH WORK DAY OR WHENEVER THE WORK ZONE BECOMES INACTIVE, AM'
DROP OFF ADJACENT TO THE PEDESTRIAN, BICYCLE, AND WHEELCHAIR TRAVEL PATHS
SHALL BE BACKEILIED FLUSH WITH THE SAID PATHS OR PROTECTED WITH BARRICADES,
TEMPORARY CONCRETE BARRIER WALL, OR APPROVED HANDRAIL. COST OF BACKEILLING DROP OFF
SHALL BE INCIDENTAL TO THE PROJECT AT NO ADDITIONAL COST TO THE CONTRACT.
15. PEDESTRIAN, BICYCLE, AND WHEELCHAIR TRAFFIC SHALL BE MAINTAINED ARO GUIDED USING
APPROVED WARNING LIGHTS, SIGNING, AND CHANNELIZATION DEVICES ON AT LEAST ONE SIDE OF
THE PROJECT AT ALL TIMES THROUGHOUT THE PROJECT LIMITS. THE TRAVEL PATH SHALL BE A
MINIMUM OF 4 FEET WIDE WITH A SMOOTH SURFACE THAT l5 NOT SLICK AND IT SHOW) BE
RAMPED AS NECESSARY FOR CONTINUITY. COST TO CONSTRUCT AND MAINTAIN I/OTTRAVEL PATH
AS REWIRED SHALL BE INCIDENTAL TO THE PROJECT AT NO ADDITIONAL COST TO THE
CONTRACT.
REVISIONS
DATE
DESCRIPTION
DATE
DESCRIPTION
T•Y•LIN INTERNATIONAL
201 ALHAMBRA CIRCLE SUITE 900
Coral Gables, Florida. 33134
Phone: 3051587-1888 Fax: 305/587-1771
CITY OF MIAMI
NW 14th STREET & NW 12th AVE
CROSSWALK IMPROVEMENTS
0778 OF MIAMI PROJECT NUMBER: 13J0500 -
TRAFFIC CONTROL NOTES
SHEET
N0.
8
8
CPOIrm
11,2.011