Loading...
HomeMy WebLinkAboutLetter - Miami Marlins BallparkENGINE Z5 Ai{GHJI T5 July 29, 2011 Mr. Thomas F. Sheehan, Jr. AELC, Inc. 2056 Westings Avenue, Suite 20 Naperville, IL 60563-2657 Re: Insured: Policy No.: Policy Period: Claimant: Project: Dear Mr. Sheehan: s.ccm TIMOTHY i4AAHS FS ASSOCIATES, INC. 55o T 6wns':ip Line. Rd. #'100 i =:3e' 22 T. 404 342. 200 F. 484.042.0222 Timothy Haahs & Associates, Inc. 09-00166-01 July 1, 2009 - July 1, 2012 City of Miami Miami Marlins Ballpark Parking Garages This is to confirm that Timothy Haahs & Associates, Inc., as the Purchasing Group Member for the above captioned Policy, hereby consents to Architects & Engineers Insurance Company's efforts through AELC, Inc. to negotiate a settlement in excess of the deductible but within the policy limits to resolve the City of Miami's claim for damages arising from the structural design of the Miami Marlins Ballpark Parking Garages. Sincerely, f" l�it Timothy H. Haahs, PE, AIA President CC; Robert Fenton, City of Miami Jerry Norris, Leo A. Daly Abdel Martel, Leo A. Daly N Item / Vendor Atkins Atkins Nova Enginnering CECO CECO Suffolk Const. National Preservation Nova Enginnering Bachiller Iron Works KACO PTE Strand Paramount ABC Concrete Cutting National Preservation CAP Engineering Triangle & Associates Target Engineering City of Miami City of Miami Paramount Fred McGilvray Power Design Sprinklermatic Cost $ 13,821.00 $ 67,763.00 $ 4,860.00 $ 5,344.36 $ 17,276.67 $ 891,292.87 inci above inci above inci above inci above inci above inci above inci above inci above inci above inci above inci above STRUCTURAL REPAIRS Notes Initial review of repair details. Comprehensive structural review Crack Monitoring ASI 16; five corbels. PCO 47 ASI 21; P3 parapet wall. PCO 50 ASI 22; P1 & P2 repairs. PCO 51 Concrete repairs Material testing Cross braces Rebar location New anchoring / fittings for barrier cables Covering cross braces; $24,000 allowance Core drilling for barrier cables Clean up Epoxy crack repairs; $6,250.75 allowance Seal floor cracks; $1,293.75 allowance Template for soffit beams 951,084.00 ASI 23; P3 & P4 repairs. PCO 30,095.40 Threshold inspections Plan review Cost estimating 164.00 ASI 22 permit fee. 184.00 ASI 23 permit fee. Skim coat exterior facade all four garages $ 16,229.00 Remove & reinstall duct work P1 & P2 Relocate electrical boxes Relocate fire sprinkler lines Fire proofing cross braces RFI 272 RFI 306 RFI 364 RFI 464; modifications to SB conc. Extension RFI 465 Change of tension lap splice table, ASI 16 Roof deck construction joints. Leo Perez email dated 7/29/11 Rev. detail 1 & 5 $ 1,998,114.30* *Estimated cost of repairs as of August 1, 2011 Approvals LAD TH