HomeMy WebLinkAboutLetter - Miami Marlins BallparkENGINE Z5 Ai{GHJI T5
July 29, 2011
Mr. Thomas F. Sheehan, Jr.
AELC, Inc.
2056 Westings Avenue, Suite 20
Naperville, IL 60563-2657
Re: Insured:
Policy No.:
Policy Period:
Claimant:
Project:
Dear Mr. Sheehan:
s.ccm
TIMOTHY i4AAHS FS ASSOCIATES, INC.
55o T 6wns':ip Line. Rd. #'100
i
=:3e' 22
T. 404 342. 200 F. 484.042.0222
Timothy Haahs & Associates, Inc.
09-00166-01
July 1, 2009 - July 1, 2012
City of Miami
Miami Marlins Ballpark Parking Garages
This is to confirm that Timothy Haahs & Associates, Inc., as the Purchasing Group Member for
the above captioned Policy, hereby consents to Architects & Engineers Insurance Company's
efforts through AELC, Inc. to negotiate a settlement in excess of the deductible but within the
policy limits to resolve the City of Miami's claim for damages arising from the structural design
of the Miami Marlins Ballpark Parking Garages.
Sincerely,
f" l�it
Timothy H. Haahs, PE, AIA
President
CC; Robert Fenton, City of Miami
Jerry Norris, Leo A. Daly
Abdel Martel, Leo A. Daly
N
Item / Vendor
Atkins
Atkins
Nova Enginnering
CECO
CECO
Suffolk Const.
National Preservation
Nova Enginnering
Bachiller Iron Works
KACO
PTE Strand
Paramount
ABC Concrete Cutting
National Preservation
CAP Engineering
Triangle & Associates
Target Engineering
City of Miami
City of Miami
Paramount
Fred McGilvray
Power Design
Sprinklermatic
Cost
$ 13,821.00
$ 67,763.00
$ 4,860.00
$ 5,344.36
$ 17,276.67
$ 891,292.87
inci above
inci above
inci above
inci above
inci above
inci above
inci above
inci above
inci above
inci above
inci above
STRUCTURAL REPAIRS
Notes
Initial review of repair details.
Comprehensive structural review
Crack Monitoring
ASI 16; five corbels. PCO 47
ASI 21; P3 parapet wall. PCO 50
ASI 22; P1 & P2 repairs. PCO 51
Concrete repairs
Material testing
Cross braces
Rebar location
New anchoring / fittings for barrier cables
Covering cross braces; $24,000 allowance
Core drilling for barrier cables
Clean up
Epoxy crack repairs; $6,250.75 allowance
Seal floor cracks; $1,293.75 allowance
Template for soffit beams
951,084.00 ASI 23; P3 & P4 repairs. PCO
30,095.40 Threshold inspections
Plan review
Cost estimating
164.00 ASI 22 permit fee.
184.00 ASI 23 permit fee.
Skim coat exterior facade all four garages
$ 16,229.00 Remove & reinstall duct work P1 & P2
Relocate electrical boxes
Relocate fire sprinkler lines
Fire proofing cross braces
RFI 272
RFI 306
RFI 364
RFI 464; modifications to SB conc. Extension
RFI 465
Change of tension lap splice table, ASI 16
Roof deck construction joints.
Leo Perez email dated 7/29/11 Rev. detail 1 & 5
$ 1,998,114.30*
*Estimated cost of repairs as of August 1, 2011