HomeMy WebLinkAboutAddendum No. 1Tit f
KENNETH ROBERTSON TONY E. CRAPP, JR.
Director City Manager
ADDENDUM NO. 1
IFB No. 239226 January 14, 2011
Invitation For Bid (IFB) for Firefighter Boots and Helmets
TO: ALL PROSPECTIVE BIDDERS:
The following changes, additions, clarifications, and deletions amend the Bid Documents of the above captioned IFB,
and shall become an integral part of the Contract Documents. The remaining provisions are now in effect and remain
unchanged. Please note the contents herein and reflect same on the documents you have on hand.
IFB CLOSING DATE AND TIME HAS BEEN CHANGED TO:
FRIDAY, JANUARY 21, 2011 AT 2:00 PM
QI. In reviewing the bid, Prospective Bidder noticed there were no accessory parts/part numbers for the
helmet specified on the bid:
FIREFIGHTER HELMET, CAIRNS INVADER 664-C MOD DEFENDER, BLACK HELMET,
ASSEMBLE -TO -ORDER PART# C-MOD-E1D212210
The helmet accessories on the bid refer to the Fire -Rescue Department's current helmet configuration;
Cairns 660C. Is this the intent of the Department or perhaps an oversight? Some of the accessory
parts are the same, but not all. Prospective Bidder is prepared to supply part numbers for both
helmets.
Al. For lineitem numbers 2.2 through 2.16of the Invitation for Bid, Prospective Bidder(s) shall supply, in its bid
response, accessory part numbers for both the Cairns Metro 660-C and Invader 664-C Defender firefighter
helmets.
Q2. For reference purposes, can the City provide a history of past bids / responses for these Items?
A2. Attached to this amendment, please find a copy of the bid tabulation for the City's current Bid Contract #
38033 for Firefighter Boots and Helmets. To download a copy of the contract and amendments, please visit
ourwebsite: http://egov.ci.miami.fl.us/contracts/ (in the "Description Search" field type: "boots and helmets").
Q3. On line 2.3 Description: Accessory retaining buttons (10pcs) Number of Units: 100
Does this mean that the City needs 100 units of 10pcs each?
A3. That is correct. However, the "Number of Units" shown in each of the line items of the IFB, represents
"Estimated Quantities", as explained in General Terms and Conditions Section 1.33, which states:
Page 1
"Estimated quantities or estimated dollars are provided for your guidance only. No guarantee is
expressed or implied as to quantities that will be purchased during the contract period. The City is not
obligated to place an order for any given amount subsequent to the award of this contract. Said
estimates may be used by the City for purposes of determining the low bidder or most advantageous
proposer meeting specifications. The City reserves the right to acquire additional quantities at the
prices bid/proposed or at lower prices in this Formal Solicitation."
Q4. Section 2.6, Method of Award, states: If the bidder fails to bid on all items within .a group its bid MAY
be declared non -responsive for that group. Does this mean that the Firefighter Boots and Helmets will
be awarded together only? in other words, the City will not award the Boots to one supplier and the
Helmets to another supplier?
A4. Since the award of this contract "will -be -made -to -the -lowest -responsive and -responsible bidder -on -a -group by
group basis (._.], Prospective Bidder(s) may choose to bid on Group 1 and/or Group 2 of the IFB.
The portion of Section 2.6, Method of Award, cited in Question # 4 of this addendum, lets Prospective
Bidder(s) understand that if they fail to "[...] bid on all items within a group [whether that be Group 1 and/or
Group 2] its bid may be declared non -responsive for that group."
Example: Bidder "A" chooses to submit a bid for the items listed under Group 1 - Firefighter Boots of
this IFB. However; upon review of the bid submitted by Bidder "A", the City discovers that Bidder "A"
bid on line # 1.1, but failed to bid on line # 1.2. Then, in accordance with Section 2.6 of the IFB, the
City has the right to deem Bidder "A" as non -responsive for failure "to bid on all items"within Group 1 -
Firefighter Boots.
Q5: In Section 1.11, Bid Bond/Bid Security, it states: ...If so indicated under the Special Conditions a bid
bond is required. Is a bid bond required? What are the Special conditions for this bid and where can a
Prospective Bidder find that section on the package, for future reference?
A5: A bid bond is not required for IFB 239226. The Special Conditions begin on Page 30 of 38 of the IFB
solicitation document, under the section labeled "2. Special Conditions".
Q6: What are the minimum qualification requirements? Is there a checklist of all items required to be
submitted with the response? And can the City provide it?
A6:. Prospective Bidders must, meet the minimum requirements listed in Section .2:7, BIDDERS MINIMUM
QUALIFICATIONS, of the IFB.
The IFB solicitation document does not have a checklist of items to be submitted at time of bid response.
However, the IFB solicitation document does contain specific sections with instructions pertaining to bid
submittal, as indicated below:
• Section 1.12, RESPONSE FORM (HARDCOPY FORMAT) •
• Section 1.61, PREPARATION OF RESPONSES (HARDCOPY FORMAT)
• Section 1.79, SUBMISSION AND RECEIPT OF RESPONSES
Additionally, specific to this IFB, Prospective Bidders must provide at time of bid submittal the documentation
cited in the following sections of the IFB:
Section 2.7, BIDDERS MINIMUM QUALIFICATIONS, subsection (3):
(—d-Be-a-manufacturer-authorized-dealer/distributor-of-the-brand name -items -listed -in -this -Invitation for Bid.
Bidder shall provide, at time of bid submittal, manufacturer certification demonstrating that bidder is a
manufacturer authorized dealer/distributor. Failure to provide this documentation at time of bid submittal, may
deem bidder non -responsive."
Section 2.21, WARRANTY:
`Equipment specified in this Invitation for Bid (IFB) shall be fully guaranteed by the Successful Bidder(s) against
factory defects. Any defects that may occur as the result of either faulty material or workmanship within the period
Paget
of the manufacturer's standard warranty will be corrected by the Successful Bidder(s) without expense to the City
of Miami. SUCCESSFUL BIDDER(S) SHALL PROVIDE A COPY OF THE MANUFACTURER'S STANDARD
WARRANTY AT TIME OF BID SUBMITTAL. FAILURE TO COMPLY WITH THiS PROVISION MAY DEEM BIDDER
AS NON -RESPONSIVE"
Q7: Can the reference be for Uniform items?
A7: As stated in the "Certifications" section of the hardcopy IFB solicitation document, references must be of
companies or agencies (i.e. government agencies) for '[...J which bidder is currently providing the
services/goods as described in this solicitation, or has provided such services/goods in the past".
The Firefighter boots, helmet, and helmet accessories listed in Section 3, Specifications, of IFB 239226 are not
considered "Uniforms".
Q8: Is there a local preference as stated in Section 1.49 and how does it work?
A8: The "Local Preference" stated in Section 1.49 of the IFB and Section 18-85 of the City of Miami Procurement
Ordinance may be applied to this IFB, but only if `[...] if the amount of a bid submitted by a bidder who
maintains a local office is not more than ten percent in excess of the lowest other responsive and responsible
bidder, such local bidder may be offered the opportunity of accepting the contract at the low bid amount. [...J"
Should the above scenario present itself, upon tabulation of bids, the second lowest responsive and
responsible bidder (i.e. the "bidder who maintains a local office"), will be presented with the opportunity of
matching the low bid amount (bid amount of the lowest non -local bidder). Should the bidder with the local
office accept the low bid amount, then said bidder will be awarded the contract.
In accordance with Section 18-72, Definitions, of the City of Miami Procurement Ordinance, a "Local office
means a business which conducts all or a portion of its operations from a permanent structure that is located
within the corporate limits of the city, and has operated legally pursuant to all applicable zoning and licensing
laws for a minimum of six months prior to the date bids or proposals were received for the purchase or
contract at issue. A post office box shall not be sufficient to constitute a local office within the city. If the
business is located in the permanent structure pursuant to a lease, such lease must be in writing, for a term of
no less than one year, have been in effect for no less than six months prior to date bid or proposal was
received, and be available for review and approval by the chief procurement officer or its designee."
Q9: Does this bid have any insurance requirements?
A10: Yes. This IFB has insurance requirements. Please refer to Section 2.10, INSURANCE REQUIREMENTS, of
the IFB solicitation document.
Prospective Bidders are not required to submit evidence of insurance (i.e. Certificates of Insurance) at the
time of bid submittal. In accordance with Section 1.47, INSURANCE, Certificates of Insurance will be
requested from the successful Contractor:
"Within ten (10) days after receipt of Notice of Award, the successful Contractor, shall furnish Evidence
of Insurance to the Purchasing Department, if applicable. Submitted evidence of coverage shall
demonstrate strict compliance to all requirements listed on the Special Conditions entitled "Insurance
Requirements". The City shall be listed as an `Additional insured. [...J"
ALL OTHER TERMS AND CONDITIONS OF THE IFB REMAIN THE SAME.
KR/yg
Cc: Bid File
Sincerely,
/t(
Kenneth Robertson
Director/Chief Procurement Officer
Page 3
BID TABULATION
Invitation for Bid # 38033
Firefighters' Boots and Helmets
Three bids submitted:
• Law Enforcement Supply
• Municipal Equipment Company, Inc.
• Great Lakes Emergency Products, LLC
�Lierlc u vi Aio, I
Line
Description
Price
Total Cost
Qty
Notes
Delivery Time
Supplier: Law Enforcement Supply
Firefighter Boots, NFPA 1974
Certified, Model-No.31-240, --
NO SUBSTITUTION
- -----
110.1
-- -
44040
- - - _
—
# 1
400
60 Days
# 2
Firefighter Helmet, Cairns and Bro
Metro 660-C,
NO SUBSTITUTIONS
145.99
43797
300
Included with
Helmet: Shall be
complete with 4"
High Pivot
Tuffshield, Cairn's
Part# S905P
60 Days
# 3
Cairns and Bro Metro 660-C
Helmet Accessory: Cairns 4"
High PivotTuffshield Part#S905P,
NO SUBSTITUTION
35.6
35.6
1
60 Days
# 4
Cairns and Bro Metro 660-C
Helmet Accessory: Retaining
Buttons, 10 pcs., Part#M102,
NO SUBSTITUTION
5.85
5.85
1
60 Days
# 5
Caims and Bro Metro 660-C
Helmet Accessory: Sweat Liner,
Part#L21, NO SUBSTITUTION
19.7
19.7
1
6
60 Days . .
# 6
Caims and Bro Metro 660-C
Helmet Accessory: Jumbo
NOMEX Earlap, Part#L655,
NO SUBSTITUTION
17.39
17.39
1
60 Days
# 7
Cairns and Bro Metro 660-C
Helmet Accessory: Reflexite Bars,
16 per sheet, Part #RP16,
NO SUBSTITUTION
11.5
11.5
1
60 Days
# 8
Caims and Bro Metro 660-C
Helmet Accessory: Ratchet Band
with Buttons Cushion Liner, Part
#R9, NO SUBSTITUTION -
33
33
1
60 Days
# 9
Caims and Bro Metro 660=C
Helmet Accessory: Faceshield
Hardware KitPart #S910, NO
SUBSTITUTION
18.62
18.62
1
60 Days
Law Enforcement Supply
Total Aggregate Cost
$87,978.66
1
A-vi--e,tA 41 16
p d,41.1 vfr.,AfG-
Line
Description
Price
Total Cost
Qty
Notes
Delivery Tirne
Supplier: Municipal Equipment
Company Inc.
# 1
Firefighter Boots, NFPA 1974
Certified, Model No.31240, NO
SUBSTITUTION
124
49600
400
21 days
Firefighter Helmet, Cairns and Bro
# 2
Metro 660-C, NO
SUBSTITUTIONS per attached
specfications.
145
.43500
300
.
2-14 days
----
# 3
Cairns and Bro Metro 660-C
— ---
44
- —
44
-
1
- .- ---
2-14 days
Helmet -Accessory: Caims 4"-- ---
High. Pivot Tuffshield Part #S905P,
NO SUBSTITUTION
# 4
Cairns and Bro Metro 660-C
Helmet Accessory: Retaining
Buttons, 10 pcs., Part#M102, NO
SUBSTITUTION
7
7
1
2-14 days
# 5
Cairns and Bro Metro 660-C
Helmet Accessory: Sweat Liner,
Part #L21, NO SUBSTITUTION
21
21
1
s
2-14 days
# 6
Cairns and Bro Metro 660-C
Helmet Accessory: Jumbo
NOMEX'Eariap, Part #L655, NO
SUBSTITUTION
24
24
1
-: -
2-14 days
# 7
Cairns and Bro Metro 660-C
Helmet Accessory: Reflexite Bars,
16.per sheet, Part #RP16, NO
SUBSTITUTION
14
-14
1
2
2-14 days
# 8
Cairns and Bro Metro 660-C
Helmet Accessory: Ratchet Band
with Buttons Cushion Liner, Part
#R9, NO SUBSTITUTION
37
37
1
2-14 days
# 9
Cairns and Bro Metro 660-C
Helmet Accessory: Faceshield
Hardware Kit, includes screws,
retention tabs, washers, mounting
brackets, D-washers, handwheels,
C-clip, Part#S910, NO
SUBSTITUTION
21
21
1
2-14 days
Municipal Equipment Company Inc.
Total Aggregate Cost
$93,268 __
Supplier: Great Lakes Emergency
Products, LLC
# 1
Firefighter Boots, NFPA 1974
Certified, Model No.31240, NO
SUBSTITUTION
65.99
26396
400
*NON-
RESPONSIVE,
SUBSTITUTE
ITEM: Manufacturer
AIRBOSS 9510 ,
14 Days
1-0
A-4,1,zhc(oh, i 6
Line
Description
Price
Total Cost
Qty
Notes
Delivery Time
# 2
Firefighter Helmet, Cairns and Bro
Metro 660-C, NO
SUBSTITUTIONS per attached
specfications.
158.9.9 .
47697
.
300
included with
Helmet: Shall be
complete with 4"
High Pivot
Tuffshieid, Caim's
Part# S905P
30 Days
Cairns and Bro Metro 660-C
Helmet Accessory: Cairns 4" .
High Pivot Tuffshield Part #S905P,
NO SUBSTITUTION
# 3
35
35
1
10 Days
#4
Caims and Bro Metro 660-C
Helmet Accessory: Retaining
Buttons; 10 pcs_ Part-#M102—NO---
SUBSTITUTION
— -
6
-- —
6
1
10 Days
# 5
Cairns and Bro Metro 660-C
Helmet Accessory: Sweat Liner,
Part#L21, NO SUBSTITUTION
18.75
18.75
1
10 Days
# 6
Cairns and Bro Metro 660-C •
Helmet Accessory: Jumbo
NOMEX Earlap, Part #L655, NO
SUBSTITUTION
20:5
20.5.:
.1 .
10 Days
#7
Cairns and Bro Metro 660-C
Helmet Accessory: Reflexite Bars,
16 per sheet, Part #RP16, NO
SUBSTITUTION
12
12
1
10 Days
# 8
Cairns and Bro Metro 660-G
Helmet Accessory: Ratchet Band
with Buttons Cushion Liner, Part
#R9, NO SUBSTITUTION
35.5
35.5..1
10 Days
# 9 -
Cairns and Bro Metro 660-C
Helmet Accessory: Faceshield
Hardware Kit, includes screws,
retention tabs, washers, mounting
brackets, D-washers, handwheels,
C-clip, Part #S910, NO
SUBSTITUTION
18.5
18.5 .
1
10 Days
Great Lakes Emergency Products, LLC
Total Aggregate Cost
*
* Great Lakes Emergency Products, LLC Non -Responsive per item #1
Recommendation of Law Enforcement Supply for Items 1-9 as the lowest, overall aggregate bid.
Prepared by. Shannon Graham, CPPB
t
Approval:
De'partmentDirecto4i Designee
Date: September 12, 2007