HomeMy WebLinkAboutTAB D.3 Utility ReportD.3 UTILITY REPORT
May, 2011
Site Utility Study
Brickell Citicentre
Miami, Florida
Prepared for
Arquitectonica
2900 Oak Avenue
Miami, FL 33133
Prepared by:
Kimley-Horn and Associates, Inc.
1221 Brickell Avenue
Suite 400
Miami, Florida 33131
1
Brickell Citicentre
Site Utility Study
TABLE OF CONTENTS
SECTION PAGE
I. INTRODUCTION
1
II. SITE LOCATION MAP 2
III. SITE DRAINAGE AND STORMWATER MANAGEMENT 3
IV. WATER DISTRIBUTION AND FIRE PROTECTION SYSTEMS 4
V. SANITARY SEWER COLLECTION SYTEM 5
VI. ELECTRICAL DISTRIBUTION SYSTEM (FPL) AND TELEPHONE (AT&T) 7
VII. GAS (TECO) 7
VIII. SOLID WASTE GENERATION 7
Kimley=Horn-and Associates,Inc. Page i
Brickell Citicentre
Site Utility Study
APPENDICES
APPENDIX "A" MAPS
APPENDIX "B" PRELIMINARY DRAINAGE CALCULATIONS
APPENDIX "C" EXISTING UTILITY RECORDS
APPENDIX "D" PUMP STATION INFORMATION
Kimley=horn- and Associates, —Inc. Page ii
Brickell Citicentre
Site Utility Study
I. INTRODUCTION
The Brickell Citicentre is a proposed major mixed -use development that will encompass approximately
four (4) blocks. The development will cover approximately 9.16 +/- acres in the Brickell / City of Miami
area. The subject site is the northeast, southeast, and southwest blocks at the intersections of 7th Street and
South Miami Avenue (see Site Location Map -Figure 1). The Brickell Citicentre project shall include a
mix of retail/shopping, office, hotel, entertainment and residential space. See Table 1. below for a project
summary.
Table 1
Project Summary
i ~' t}
Occupancy
,} a u (,
Units
i.
1 t 1 } 1.
1 Floor Ai ea
Retail/Shopping Center
461,595
Entertainment
93,429
Medical Office
187,030
Hotel
269
270,284
Serviced Apartments
75
Residential
755
Office
805,850
The project will require permits and appiovals from the City of Miami Public Works Department, City
of Miami Fire Department, City of Miami Building Department, Miami -Dade County Public Works,
Miami -Dade County Department of Environmental Resources Management (DERM), Miami -Dade
County Water and Sewer Department (MDWASD), Florida Department of Environmental Protection
(FEDP), Florida Department of Transportation (FDOT) and the Florida Department of Health (FDOH).
Kimley-Horn and Associates, Inc. Page 1
Brickell Citicentre
Site Utility Study
II. SITE LOCATION MAP
Figure 1: Site Location Map
• -q --. *il :t . IT;',...,\ - ---,'
71 1,
ali,, 31E5E7— ' 77,Park
1 P41I j4'
Mort! '
WI
-[ --: -
zsw. 461 1.— - .--7'; : ''' ''&1.. fiz,1115.6,ni
I I II:
Ji JBRICKELL CITICENTRE
PROJECT AREA
I i 1 1 1:'
4y,.'
J ,),.. 51
4,• ; ,
. 611'St:—.- SW 6111 S 1 ':):
r I
1.1 \twit (ant Prk
W2ndSi: ...
A I
=sw
41IS' 111E7-
I
r
11 ,
I ---) I / ,1:51'-
iN -7-fhT-7Sli 7-- PY7.1 9thISC- -- -, 1 'II al -
i 1 is I: i.i
1 !Miami I i : ;1 1;
w
i 4
.:113th_t r-'7' ._ 7.--i sWilliNTSI i•-S1.74-67,,f4,1 ji.
' • I il "
.S rriftli:SrsW_Sitn•st tifili-:"SG -g ••
Suit nada Peak i Ilt.1
I
.0.' l'''' 400 '' '' " D J.w.i2iff- tW-12tr-.4t,-.1,/ ,•
ir :
I a '4•S v i /
-•„51.13111. t -- ,•, jp.i./ g ' iii,..s,• ,
7ir
I.
L.____J._ L
,,ss,tyo
, , A
.46 Simpstait Pik '
- • h
c • \. ‘40.
AAA
N
Kindey-Hom and Associates, Inc.
Page 2
Brickell Citicentre
C9 Site Utility Study
III. SITE DRAINAGE AND STORMWATER MANAGEMENT
A. Existing Private Drainage Systems
Based on site observations and available historical information, there is no existing onsite stormwater
management system within the subject parcels of BCC East and West. A new stormwater management
system will be constructed for each parcel to retain the runoff' generated by the proposed improvements,
as required by code (see below). BCC North and ENB are currently developed areas with a stormwater
management system in place. There are three (3) existing drainage wells currently serving BCC North
(Brickell Tennis Center) with an approximate capacity of 800 GPM/ft of head. The existing stormwater
management system will likely have to be modified land or abandoned based on the proposed
configuration of new buildings.
B. Proposed Private Drainage System Design Criteria
The drainage system for the proposed development will consist of drainage wells and detention structures
for both water quantity and water quality purposes, to facilitate on -site disposal of stormwater runoff. The
twenty five-year design storm event will be used to design the stormwater management system, in
accordance with SFWMD criteria which states that the 25 year-72 hour storm must be contained onsite.
Based on preliminary calculations, it is anticipated that twenty-seven (27) drainage wells will be required
to serve BCC East, West and the ENB Site. These calculations are based on well capacity rates obtained
by Jaffer Construction during the construction of Brickell Tennis Center. Jaffer Construction provided
Kimley-Horn these rates on May 10, 2011. The proposed twenty-seven wells should provide sufficient
capacity to dispose of the design 25—year 72-hour stormwater runoff generate by the proposed
development. Preliminary drainage computations for the project areas are provided in Appendix `B"
Preliminary Drainage Calculations, which includes the basis for design.
The final drainage design for the project shall be in conformance with the requirements of the Miami -
Dade County Department of Environmental Resources Management (DERM) Water Control Section,
Florida Department of Environmental Protection (FDEP), South Florida Water Management District
(SFWMD) and other local, state and federal regulatory agencies having jurisdiction over the project.
C. Floodplain Management
The proposed project site grade elevations will be design to meet floodplain management criteria
according to Federal, State, Miami -Dade County and City of Miami standards as follows:
1. The subject property is located in PANEL 314 of 1031 of COMMUNITY -PANEL
NUMBER 12086C0314L of Flood Insurance Rate Map (FIRM). According to the
National Flood Insurance program, the property is located within the following Flood
Zones:
Ki,nley-Horn and Associates, Inc. Page 3
Brickell Citice.utre
Site Utility Study
a) Flood Zone AE, Elevation 10.0 (See Appendix "A")
2 Miami -Dade County Flood Criteria elevation is estimated to be 6.0 ft. NGVD. This will
be used to determine proposed minimum site grade elevations.
3. The average October ground water table elevation is estimated to be 2 ft. NGVD. This
will be used as the control water elevation for stormwater management calculations
(Source: Miami -Dade County Public Works manual, Volume II- Design Standard Detail
WC 2-2).
IV. WATER DISTRIBUTION AND FIRE PROTECTION SYSTEMS
A summary of the water mains owned and operated by the Miami -Dade Water and Sewer Department
(MDWASD) in the vicinity of the project are shown in Table 2 below. The MDWASD Water Atlas is
also provided in Appendix "C" for reference.
Table 2:
Existing Water Mains
(Per MDWASD Water Atlas Sheets)
SE 6th Street
South Miami Avenue and SE lst Avenue
12"
SW 71h Street
SW Avenue and South Miami Avenue
6"
SE 7th Street
South Miami Avenue and Brickell Avenue
8"
8th Street
SW 1'1 Avenue and Brickell Avenue
20"
South Miami Avenue
6th Street and 8th Street
12"
SW ist Avenue
SW 7th Street and 8'h Street
12"
Miami -Dade Water and Sewer Department (MDWASD) will likely request watermain upgrades along 7th
Street. Currently, a 6-inch and an 8-inch watermain run along 7th Street; per MDWASD criteria, a 12-
inch water main is required along the frontage of all commercial developments. KHA anticipates that
MDWASD will require the installation of approximately 1,400 LF of 12-inch water main along 7th Street.
In addition, MDWASD and City of Miami Fire Department may request additional fire hydrants be
Kiinley-Horn and Associates, Inc.
Page 4
Brickell Citicentre
Site Utility Study
placed in the vicinities of the subject project. A final determination of the points of connection and
requirements will not be provided by MDWASD until a Water and Sewer Agreement is requested by the
Owner. Water service meters would need to purchased by the owner and installed by MDWASD
representatives at the Owner's expense. See Appendix "C" for a copy of the MDWASD water atlas sheet
for the project area.
The Fire Code (NFPA) requires fire hydrants be located no more than 300 feet (drivable distance) from
proposed buildings or structures, and that there be no more than 300 feet between hydrants along the
frontage of a property, as measured along the water main. As such, the City of Miami Fire Department
may request additional fire hydrants be placed in the vicinity of the subject project. Additionally, fire
hydrants must be located within 150 feet of each proposed building's fire department (Siamese)
connection. The fire department connections to serve any proposed structures must also be located at the
front of the building.
V. SANITARY SEWER COLLECTION SYSTEM
A summary of the sewer mains owned and operated by the Miami -Dade Water and Sewer Department
(MDWASD) in the vicinity of the project are shown in Table 3 below. The MDWASD Sewer Atlas is
also provided in Appendix "C" for reference.
Table 3
Existing Sewer Mains
(Per MDWASD Sewer Atlas Sheets)
SE 6`h Street
South Miami Avenue and SE 1s' Avenue
8"
SW 7111 Street
SW 1s1 Avenue and South Miami Avenue
8"
SE 7`h Street
South Miami Avenue and Brickell Avenue
8"
8`h Street
SW Is` Avenue and Brickell Avenue
8"
South Miami Avenue
6`' Street and 8`h Street
8"
SW 1s` Avenue
SW 7`h Street and 8'11 Street
8"
The existing gravity sanitary sewer mains along the frontage of the property may not have sufficient
capacity to accommodate the proposed development. ILIA anticipates that MDWASD will require
upsizing approximately 1, 800 LF of gravity sewer main, from the existing 8 and 10-inch piping to new
Kimley-Hon and Associates, Inc.
Page 5
Brickell Citicentre
Site Utility Study
12-inch piping. We anticipate this will occur along 7`h Street between SW lg Avenue and the Metro -
Mover, and on South Miami Ave between SW 8th Street and SW 61h Avenue. However, this cannot be
verified until a downstream analysis of the existing gravity lines is completed. A letter of availability and
further coordination with MDWASD is recommended to verify the proposed sanitary sewer service
connection points and requirements of this project. MDWASD may require upgrades to the existing
sanitary sewer system, but this cannot be determined without a request for a Water and Sewer Agreement.
MDWASD Pump Station #30-001 at 390 NW North River Drive receives the flows from these mains. As
of 04/22/2011, this pump station is projected to have an average operating run time (NAPOT) of 5.51
hours per day, which is 59.60% of its design capacity. Therefore, a new sanitary sewer pump station or
upgrades to said pump station will not be required for the proposed development. A final determination
regarding the status of the existing transmission system and the need to make improvements will not be
known until construction plans are submitted to the Miami -Dade County DERM Wastewater Section and
a Sanitary Sewage System Capacity Certification Letter is issued. Please refer to Appendix "D" for Pump
Station Information.
A request for a letter of Sanitary Sewage Capacity Certification must be submitted to the Miami -Dade
County DERM Water & Wastewater Section during the building permitting phase of the project in order
to reserve the necessary allocation for the proposed development. Below, in Table 4 are the estimated
water and sewer flow generation rates per Miami -Dade Water and Sewer Department's schedule of daily
rates. Further coordination with MDWASD is recommended.
Table 4:
Estimated Water and Sewer Flow Generation
(Per MDWASD Schedule of Daily Rates)
Type `of Occupancy
Quantity
(Units, or SF)
Usage rate
Total Aver age at
Prow (GFF)
Retail/Shopping
Center`
461,595 SF
10 GPD/100 SF
46,159.5
Entertainment**
93,429 SF
20 GPD/100 SF
18,685.8
Medical Office
187,030 SF
20 GPD/100 SF
37,406
Hotel
269 Units
100 GPD/Unit
26,900
Serviced Apartments
75 Units
150 GPD/Unit
11,250
Residential
755 Units
150 GPD/Unit
113,250
Office
805,850 SF
5 GPD/100 SF
40,292.5
Kimley-Horn and Associates, Inc.
Page 6
Brickell Citicentre
Site Utility Study
Total Anticipated Flow
293,943.8
"Retail/Shopping Center" usage rates assume a retail or store use; any full service restaurant use
will have a usage rate of 100GPD/100SF.
** "Entertainment" usage rates assume a Bar and/or Cocktail Lounge Use.
VI. ELECTRICAL DISTRIBUTION SYSTEM (FPL) AND TELEPHONE (AT&T)
Currently, the existing electrical service is provided by Florida Power and Light (FPL). A
request for a utility load letter will have to be submitted to FPL to determine if the existing
system has the capacity for the additional loads. Any overhead to underground conversions will
need to be designed and coordinated through an FPL representative. Further coordination will
be necessary to determine the required upgrades to the existing system. Based on a preliminary
assessment it can be anticipated that at a minimum, existing overhead power lines will have to be
relocated underground, electrical easements will need to be dedicated to FPL, and pad mounted
transformers and/or an electrical room will be required.
AT&T currently serves area via underground conduit. The proposed facilities may require
upgrades to the existing AT&T communication lines. An easement may be required for
additional conduits to serve the proposed build out. It is highly recommended that further
coordination with AT&T occur.
VII. GAS (TECO)
The need for gas service has not yet been determined for this project.
VIII. SOLID WASTE GENERATION
Solid waste generated by this project will be collected in standard on -site containers for refuse
and recyclables. Regular pick-up services will be provided either by private hauling companies
and/or by the City of Miami Solid Waste Department, who will transport the waste to Miami -
Dade County's or private disposal and recycling facilities. The volumes of solid waste projected
to be generated by the project are shown in Table 5.
Kimley-horn and Associates, Inc.
Page 7
Brickell Citicentre
Site utility Study
Table 5
Solid Waste Generation
Type of Occupancy
Qnantity
" , ,
Usage rate
Total Solid Waste
4 � Generated
(Tonsil ay
Retail/Shopping
Center
461,595 SF
5 lb / 1000 SF / day
1.15
Entertainment
93,429 SF
5 lb / 1000 SF / day
0.23
Medical Office
187,030 SF
4 lb / 1000 SF / day
0.37
Hotel
269 Units
1.5 lb / unit / day
0.20
Serviced Apartments
75 Units
5 lb / unit / day
0.19
Residential
755 Units
5 lb / unit / day
1.89
Office
805,850 SF
21b / 1000 SF / day
0.81
Total Anticipated Solid Waste Generation
4.84
Kinley-Horn and Associates, Inc. Page 8
Brickell Citicentre
Site Utility Study
Appendix "A"
Maps
Kimley-Horn and Associates, Inc. Page 9
Briclzell Citicentre
Site Utility Study
Map 1: FIRM Map
Are
PANEL 0314L
FIRM
FLOOD INSURANCE RATE MAP
DIIAMI-DADE COUNTY,
FLORIDA
AND ISCORPORATED AREAS
PANEL 314 OF 1031
(SEEMAP INDEX FOR DM l PANEL LAYOUT(
MISES
WARM, Mill L
Ndo b TM: TM W► NwTimid to r Yew poll. Tim
imd Moo id
Opal Pare t. pod m1 at e1p(Qsi n laat toile
MAP NUMBER
12086C03141.
MAP REVISED
SEPTEMBER 11, 2009
Federal E.ner`elaty MauatencatAgency
Ti. to n dad& eaty «• paattt Cl Ina ab,M, ILMIMew good mop II
watt extracted won FMrTO,0Une. Thls map does not regal champs
or an.Mnea. WWII may na a tam made auto pawn( to tM d.taan tM
NM Meek. For toe latest product Inteimsdan poach Noise( Rood Mamma
Ptomain good maps check me FEMAFIoad Map Stare at wootatraetema0er
Kinlley-Horn and Associates, Inc.
Page 10
�1?
Brickell Citicentre
Site Utility Study
�\1
Map 2: October Water Table Map
BRICKELL CITICENTRE
PROJECT AREA
4
4
Kilnley-Horn and Associates, Inc. Page 11
Brickell Citicentre
Site Utility Study
Map 3: Flood Criteria Map
BRICKELL CITICENTRE
PROJECT AREA
•
Kimley-Item and Associnies, Inc.
Page 12
Brickell Citicentre
Site Utility Study
Appendix "B"
Preliminary Drainage Calculations
Kirnley-Horn and Associates, Inc. Page 13
Brickell Citicentre
Site Utility Study
Brickell Citicentre - West
Miami, FL
1. Site Data:
A. Average October Water Table Elevation =
B. County Flood Criteria Elevation =
C. F,I.R.M Base Flood Elevation =
D. Average Crown Elevation =
E. Average Existing Onsite Grade Elevation =
F. Proposed drainage inlet grade elevation =
❑-0wodszel.Irc.
2.00 NGVD
6.00 NGVD (County Flood Criteria Mop, see Appendix A)
10.00 Zone AE (Map No. I20225C00841, see Appendix A)
6.50 NGVD
5.50 NGVD
5.50 NGVD
2. Total Site Area (A) (See Draisege Area Map in Appendix B): 3.41 Acres
A. Impervious Areas:
Total Impervious Area (A1)= 3.07 Acres (90%)
B. Pervious areas:
Green Areas = 0.34 Acres (10%)
(Assumed Code Min.)
3. Weighted Runoff Coefficient (C):
Runoff Coefficient Impervious (C1) _
Runoff Coefficient Pervious (C2) =
C=[(AIxCI) +(A2xC2)]/A; C=
Cx A=Total Contributing Area; Cx A=
0.90
0.30
0.84
2.86 Acres
4. Time required to generate one inch of runoff (per DERM Water Control Section D-4)
Rainfall Intensity (I) = 308.5 / [(48.6 x F4'11) +l (0.5895 +Fm)]
Frequency (F) = 2iS years - Frequency Curve
Q = CIA, V = Qy Vt; ;RJ = Qtt; ;n,l, to m.) = Time to generate 1 inch of runoff
Ito 1,.1= ClAttt Ana
1"x A = CIAtt; I) ; Solving for to 1„.1, to in,; = 1" / (IC)
Time to Generate one inch of run-off t(in)
Time to reach the inlet (te.)
Total Time required to generate 1 in of runoff
= 9.44 Min.
= 10.00 Min.
= 19.44 IVEn.
C:\Documents and Settings\katie.vila\Desktop\Copy of Drainage Weil Calculations BCC West.xis
Knnley-Horn and Associates, Inc. Page 14
Brickell Citicentre
Site Utility Study
knit.
i CcA
I, k`
Q 1
=AenuWed
I 1Ra iss'
Osten.)
,. (a.e)
(scree)
(inchtio)' •
(aka)
1C0) .
8
480
2861
7.739
22.22
10,668
10
600
2861
7.491
2146
12.877
13
900
2861
6.901
19.77
17.790
19.44
1167
2.861
4.148
11.47
21,545
30
1800
2861
3.378
15.98
28,762
40
2400
2861
4.947
14.17
34003
30
3000
2.864
4.443
12.73
38.182
60
3600
2866
4.033
11.55
41.366
90
3400
2.86t
3.138
9.03
48.846
120
7200
2.864
2393
7.43
33j18
180
10800
2864
1.913
3.48
59.177
6. Drainage Well Design Disdtuge Rath:
Dined an well di..h.e,trots of:
844 DPmm. ne.e
W11
.n0
toi-i Ygit
I,Ek6,
k(00000).
Elmtb
,,Kia6Crie
064v7(NOVO
Oit Warer
T,hk do
:(NCJVD) .
t lligirr
ofWi9 i4
--.:1(R) ` s
hp
lkiJ'Arne g
W'illlfti
W.8D..h.g`i,Wdl0tud.n
. asp.$
t d
i s
I3 06.
di
eYo6`im�
1C0=
=6008h(0:).
$L4GEt U1.T11
080-1
600
600
2.00
240
1.60
285
. - 6.0
ILO
115.2
1360.2
6.00
400
200
2.10
1.60
2.83
GO
120
115.2
090.3
6.00
600
200
2A0
1.60
.2.85
60 -
120
113.2
DV/4
6.00
600
2.00
2.40
1.60
2.83
60
12.0
113.2
090-5
600
600
200
240
1.60
285
60
12D
113.2
060.6
6.00
600
2.00
2.10
1.60
2.82
60
12.0.
115.2
060-7
600
600
2.00
2,10
1.60
2.83
CO
12.0
115.2
08041
600
6.00
2.00
2A0
I.60
2.85
60
12.0
115.2
DW-9
6.00
600
2.00
210
1.60
2.83
60
120
115.2
DW-10
6,00
G00
2.00
240
1.60
2.85
6.0
120
115.2
090.11
6.00
600
200
240
1.60
2.83
6A
120
113.2
049.12
6.00
600
200
2.10
1.60
1.83
60
120
1172
090.13
6.00
6.00
LOU
2d0
1.60
283
6.0
120
115.2
Wdl Discklug. R.t. (MI 37.88
Taal t.r.V.(Cr)
7. Detention li te:
DW
The es -gorge well ctmemn must be designed to detail nmoftfa. minimum 0190 . eood. picric discharge.
Q4-Deeigd Runoff Ride (CFS)-
Ve . 0etenl166 Volume (CE)-Q,,x 901ee--
VA-Damao. Volum.Per Well (C17-
W - W iW I of Well 800don (IL) -
L • Length of Well Structure (1L) •
18.47 CM
166230 CP
1662.30 CF.
6.0 0.
12a6.
1437.60
iIm is the mi0inum depth required from to lop oftnll cluing to the Door of the well box to achieve 90 «eond detention tine:
(ye(IL)-ve,f(WoL)- 23.I04
Top of W<II C2414E100.. 2.84
Elc1166. el Floarof Well Dux (NOVD) -Top of Well Casing Elm 4.- -2026
CODocuminl. and SNI6gis`ke0wv0.W.sklop`Oopy of Dniupe Wel C064.0ons_BCC W.11 .1.
Kin)ley-Horn and Associates, Inc. Page 15
Brickell Citicentre
Site Utility Study
8. Excess storm woltr runoff excluding well structure 1for2ge
Th4•BM
XI
itgluab
d• ,
,
Anumulild
Wa1106duro6
�, b,
w A
8acnwu, rted
01 IcualR
1
Toiilgrrrllar,
•,°,,,t 8,
NW
(5ioi '.
(am atln41
�
...K (CFI,
'.'y'rtcijp".
r>+ti coi +
8
480
37.08
17,797
10.668
0
10
600
37,08
22,246
12,877
0
13
900
37.08
33,169
17,790
0
13.44
1.16190
37.08
43.250
21,543
0
70
1800
37,06
66,738
28,762
0
40
2400
37.01
88,984
34,003
0
50
3000.
37.08
.111.130
38,182
0
60
3600
37.08
133;176
41,586
0
90
3400
37.08
200,214
48.816
0
120
7200
37.08
266,952
33,518
0
180
10800
37.08
400,428
59.177
0
9. Excess Mom' water tonal -Mauling wen structure dornge:
c e. T6a
'A mulrt.d
8romIoon 4r
¢0.4ii,9WH1
§uumua
lfir--:ulli
e+D.kflinq
c'xtiV0lune
Toiat�,w!! t..
ff�e4f1
Wne
tal i3
.. (0..) �T.
„'>«CFI "a'
. s(CV)
a� ICEI
cf .w3(
8
480
10.668
1.498
17,797
0.00
10
600
12,877
1,498
22,246
0.00
15
900
17,790
1,498
33.369
0.00
19.44
1,16650
21,615
1,498
43,258
0.00
30
11100
28,762
1,498
66.738
0.00
40
2400
34,003
1.498
88,984
0.00
70
3000
38,182
1,498
111,235
0.00
60
3600
41,586
1,498
133,176
0.00
90
3400
48.846
1,198
200,214
0.00
120
7200
33,318
1498
266,932
0.00
180
10800
39.177
1.498
.100,428
0.00
Safety Factor
Safety Factor
C:9Jocumenis a1M Sallhgswdl4.v0 1BaskIop5Copyat 0rslnage W.I Carulatktn-BCC Wa>f xis
MEM
WIENI
Kirnley-Florn and Associates, Inc. Page 16
Brieliell Citicentre
Site Utility Study
Brickell Citicentre - East
Miami, FL
1. Site Data:
A. Average October Water Table Elevation =
B. County Flood Criteria Elevation =
C. P.LR.M. Base Flood Elevation =
D. Average Crown Elevation =
E. Average Existing Onsite Grade Elevation =
F. Proposed drainage inlet grade elevation =
WW1l<mmHm
to srillosoriates.u�.
2.00 NGVD
6.00 NGVD (County Flood Criteria Map, see Appendix A)
10.00 Zone AE (Map No. 120225C00841, see Appendix A)
6.50 NGVD
5.50 NGVD
5.50 NGVD
2. Total Site Area (A) (See DmirngeArea Map inAppendix 13): 2.32 Acres
A. Impervious Areas:
Total Impervious Area (Al) = 2.09 Acres (90%)
B. Pervious areas:
Green Areas = 0.23 Acres (10%)
(Assumed Code Min.)
3. Weighted Runoff Coefficient (C):
Runoff Coefficient Impervious (CD_
Runoff Coefficient Pervious (C2) =
C=[(AlxCI) +(A2xC2)]/A; C=
C x A = Total Contributing Area; Cx A=
0.90
0.30
0.84
1.95 Acres
4. Time required to generate one inch of runoff (per DERM Water Control Section D-4)
Rainfall Intensity (I) = 308.5 / [(48.6 x I" ") + t (0.5895 + Fur)]
Frequency (F) = 25 years - Frequency Curve
Q = CIA, V = Qt; Vlt ia) = Qttt iy), to t) = Time to generate 1 inch of runoff
Vo in.) = CIAtI1 ia)
I" x A = CIAtp rnt ; Solving for to B,;p tp tad = 1" / (IC)
Time to Generate one inch of run-off t(in)
'fine to reach the inlet (tc,)
Total Time required to generate 1 in of runoff:
9.44 Min.
_' 10.00 ,Iv1in.
= 19.44 Min.
C:10ocuments and Settings\katie.vilalDesktop\Drainage Well Calculations BCC East .xls
Kintley-Horn and Associates, Inc. Page 17
Brickell Citicentre
Site Utility Study
Tin. -
an::_t
,lt
•
Q
lGmmuhf.d
4'S)a.ta 'r
djl0 .00' §t.6
IMin.)
NO
Dcr..)
(OI.Mv) t
(CFR)
ri. (CF)
e
480
1.949
7.759
13.12
7.236
10
600
1.9.19
7.493
14.60
8.761
13
900
1.949
6.901
13.43
11103
19.44
1167
1.949
4.448
1157
11,658
30
1800
1.949
3.578
10.87
19,568
40
2400
1.949
4.947
9.61
23,136
50
3000
1.949
4.443
8.66
23,977
60
3600
1.919
4.033
7.86
28.293
90
3100
1.949
3 138
6.15
33,233
120
7200
1.949
2.595
3.06
36,111
180
10800
1.919
1.913
3.73
40,261
6. Drainage Weil Design Discharge Rale:
Domed on ewes dtxh. g. rote or.
nee'OP6rm.lIe.6
iy R'l
�u0wv:
l• m tt
I IatNeea
.." r„a''
�T(W0VD)p
) sat,<t.n
11.0.0md.
EIw,INCVD)
_5t,w.60'
T.bM.I i,
."(NCVD) _0
Ne1ah4.67
s!lDgbaso
ri(Salr Water
'!' (6).a.a
irA, i.10 jm
.x.W ili0.': a
,.
W.DD.eeh.ree
a1.R.c.(C38)
w.R9m
ur.Dm.nr en,
W.nsl
1#
SWfdh(1L)1
:1-4-0161fEre
'I'-„es(CM
DWI
6,00
6.00
2,00
2A0
1.60
2.83
. 6.0
12.0
115.2
D19.2
6.00
6.00
100
2.40
1.60
2.83
. 6.0
82.0
113.2.
DW.3
6.00
6110
2.00
2A0
1.60
2.85
6.0
110
113.2
8)004
6.00
6.00
100
2.10
1.60
183
6.0
12.0
113.2
DW.3
6.00
600
0.00
140
1.60
2.83
6.0
12.0
115.2
009-6
6.00
600
1.00
2.40
1.60
2.83
6.0
12.0
113.2.
DW.7
6.00
600
100
2.10
1.60
2.85
6.0
11.0
113.2
8)00-8
6..00
6.00
2.00
2A0
1.60
IBS
6.0
12.0
115.2
DW9
6.00
G.00
100
240
1.60
2.63
6.0
110
115.2
Wall Ditch. 8. Rac. (CFS) 25.67
Total Sanaa(CV)
7. Delenlidlt Time:
OW
The dalaape well awetme must be designed to delei, runoff for aminimuot ot90.eeond. prier to di.ehrge.
Qr-Design Runoff Rate (C90)
Vu - Detention Valente (CF) -Qes 90 are. •
V,t - Detention Volume Per Well (CF) -
99- Width of Well Structure DIP.
I.mLenglh of Well Structure lR)s
12-37 CFs
113093 CF
1130.93 CF
6.0 0.
12.0 IL
1036.10
Itmu it the min/Wan depth required front the top Orwell cueing to the Oaoeof the well bon to.ohiive 90 second delenlion line.
(ty • Vet f (W s L). 13.80.ft
Tel of Well C.dnl Elev. • 284
Elevation e1 Floor of Well Das (NOVD)'.Top of Well Cuing Elev. • 11... -1I56
C7Docurntuts and Sallttgi\t.B..W.1D.thtop'D0Nna5. Wall Carcunihnt OCC Earl41e
Kimley-Horn and Associates, Inc. Page 18
Brickell Citicentre
Site Utility Study
8. Excess gown wrier runoff excluding well structure storage:
•, D�'I
"
:7t[Iif
•� Well
' 0u.0ar6. 1
:Rrtr
} „1 d
We� Do.b...
{ '.'V au4
Aeawnpialeedd
SeM RL i
M4L,'�
Toli10m11000
u����'V,�Olvu`gc•i"
natal
tercel.I
at:1.aa11r i)
i" '.
'S (cei "�
(C'
8
480
23.67
12,321
7,238
10
600
23.67
13,401
8.761
13
900
23.67
23.102
12.103
13.44
1,16630
23.67
29,942
14,638
30
1800
23.67
46,203
19.368
30
2400
23.67
61,601
23.136
30
3000
25.67
77.003
23,977
60
3600
23.67
92.406
28,293
90
3400
25.67
138,610
33,233
120
7200
23.67
184,813
36,411
190
10800
25.67
277,219
40.261
9. Excess stair wat r runoff Inducting well0Ndu a st0roge:
F; r
^r
m
h
Aeeuta Mad
81` Rwoff
maps We
"➢mr
jDixnwar
V016.ime
TetdOo..
'„� alma
(Ulm)(s.e)
3
�lC 'i..:
,CF)
(CO
nSC9)
8
480
7,238
1,037
12,321
0.00
10
600
8,761
1,037
13,401
0.00
13
900
12,103
1,037
23,102
0.00
13.44
1,16630
14,438
1,057
29,942
0.00
30
1800
19,568
1,037
46.203
0.00
40
2400
23,136
1,037
61,604
0.00
30
3000
23,977
1,037
77,003
0.00
60
3600
28,293
1,037
92,406
0.00
90
3400
. 33.233
1,037
138,610
0.00
120
7100
36,411
1,037
18.1.813
0.00
180
10800
40,261
1.031
277,219
0.00
C10ommonia and SatIllsiAtallomlattnaloplOraiumo WW1 Caeulelbru BCC East ads
Safety Factor
Safety Factor
MEMO
MEM
thm
\:aZ� v�M.aontlG
Kinney -Korn and Associates, Inc. Page 19
Brickell Citicentre
Site Utilzty Study
Brickell Citicentre -.ENB
Miami, FL
DRAINAGE CALCULATIONS
;. is 17IM NAGCIVLLIL the '3<
.(lv issiDIAGI AM—DLILb1 GItITLItI.1)
1. Site Data:
A. Average October Water Table Elevation =
B. County Flood Criteria Elevation =
C. F.LR.M Base Flood Elevation=
D. Average Crown Elevation =
E. Average Existing Onsitc Grade Elevation =
F. Proposed drainage inlet grade elevation =
ten
❑-� aniAseko9lot,tn:.
2.00 NGVD
6.00 NGVD (County Flood Criteria Map, see Appendix A)
10.00 Zone AE (Map No. I20225C0084J, sea Appendix A)
6.50 NGVD
5.50 NGVD
5.50 NGVD
2. Total Site Area (A) (See Drainage Area Map in Appendix B):
A. Impervious Areas:
Total Impervious Area (Al)
B. Pervious areas:
Green Areas =
3. Weighted Runoff Coefficient (C):
1.28 Acres
1.15 Acres (90%)
0.13 Acres (1036)
(Assumed Code Min.)
Runoff Coefficient Impervious (Cl) = 0.90
RunotTCoefficient Pervious (C2) = 0.30
C=[(A1xCI) +(A2xC2)]/A; C= 0.84
C x A = Total Contributing Area; Cx A = 1.08 Acres
4. Time required to generate one inch of runoff (per DERM Water Control Section D-4)
Rainfall Intensity (I) = 308.5 / [(48.6 x F-011) + t (0.5895 •r Vm)]
Frequency (F) = 25 years - Frequency Curve
Q= CIA, V = Qt; Vp j,F = Qi(I 10, ltl ial = Time to generate 1 inch of runoff
V(11,0 = C1At(11,0
1"x A = CIAt((,,) ; Solving for to (n.);1(( i„.) = 1" / (IC)
Time to Generate one inch of run -of t(in)
Time to reach the. inlet (tc.)
Total Tint required in generate 1 in of runoff:
= 9.44 Min.
10.00 Min.
= 19.44 Min.
C:\Documents and Settings katle.vila\DesktoplDrainage Well Calculations_ENB .xis
Kimley-Horn and Associates. Inc. Page 20
Brickell Citicentre
Site Utility Study
It. .-�Thnt
etA
,. .(ocrti):,.
11
'.. (mehOr)=a
Q t
..� (CF9)
. 151E y.
..+!SR7 (6)'i�il.
,(Mind
:,.: vim)
8
480
1.07S
7.759
8.34
4,004
10
600
1.075
7.493
8.06
4,834
IS
900
1.073
6.901
7.42
6,678
17.44
1107
1.073
6.448
6.73
8,087
30
1800
1.073
3.378
6.00
10,796
40
2400
L075
4.947
5.32
11761
30
3000
1.075
4.443
4.78
14.332
60
3600
1.075
4.033
4.34
15,610
90
5400
1.075
3.158
3.40
18.335
120
7200
1.073
2.595
2.79
20,089
180
10800
1.075
1.913
2,06
22,217
6. Drainage Well Design Disohorge Rine:
tl6 C196lm. Ptah
A$
7ariii'i
IahUVst)
,Lity -
rPIND)_r
r, {ie i^
96ve
ub.mG,l3hed
Elev(0501
"i• '
d Lw.
vE'
MGVD)
Iir.dtoe4 du
0l0hr86
)of0e11Wrer
N(8.).[
IAii
W I`()
WMPmh.ryt
aitRCLS
eaM
We7ISlmd00.0m
out
t
, eWI4
(f�)4900
aWdb(R)i
ti46tli(P6
001-1
6.00
6.00
100
2.40
1.60
2.03
6.0
12.0
115.2
1219.2
6.00
6.00
2.00
2.40
1.60
2.85
6,0
110
113.2
DW-I
6.00
6.00
200
2.40
1.60
2.85
CO
720
115.2
13W-4
6.00
6.00
2.00
2.40
1.60
2.83
0.0
12.0
115.2
001-5
6.00
6.00
200
2.40
1.60
2.83
6.0
12.0
115.2
Well DIseherge Rale (MS)
t4.16
TelelSlorsge(CT)
7. Detention TUC
BW
The dretueye well et,Vemm mutt be deiyted to detain runoff for a minim um of90 teeonde prior to dieehorge.
Qe Detiy,Runoff/Isle (CFS)-
Ve-Detentioo Volume (CF) ' Qer 90 tee. -
Vee - Dundee Volume pee Weil (CF)-
W - W idh of Well Souebae (0.)
L-Lenyth of Well S0Hure (fL)
6.93 CF8
623.97 CF
623.97 CF
6.0 0.
12.00.
.00
8a,e ie the minimum depth required from the tap arm!' codas to the Door of the wit box to achievt 90 second detailing time:
1L (6)-Vd1I(W;L)^ 8.7081.
Top ofWell Credo: Elan- 2.04
Elevation at Floor of Well Box (Nf4VD)-Top of Well Casing Eley. • II.., - -5.86
C.7Daamlenll and Sehll0P olle.w9DN81op9Jrame6e Wee C.RWellon, BMO 1h
Kimlev-Horn and Associeties, Inc.
Page 21
Brickell Citicentre
Site Utility Study
8. Excess stone water nulon'exduding wcil structure slutage:
-.:Tuna
➢ac6:11(8
''{,Oslo ,,,
Slleii PkO6arse
I':Vo6uer
1 .' ry, .0'gOl
Arcalautitd
8ram,ru9of(
T6aiOrtitl
Y?,, oboe
(Mkt
(5ao.1 :
1C18A. N[al)
. (Co)
I . (CF)..i8l
wd:C (CF)l�.E
8
480
14.26
6.845
4,004
0
10
600
14.26
8.356
4.834
0
13
900
1.1.26
12,834
6,678
0
19.44
1.14630
14.26
16.635
0,087
0
30
1800
14.26
23,668
10,796
0
40
2400
14.26
34,225
12,764
0
10
3000.
14.26
42,781
14,332
0
60
3600
1.1.26
31,337
13,610
0
90
5400
14.26
77,005
18,335
0
120
7200
14.26
102,671
20,089
0
180
10600
0626
151.011
22.213
0
9. Excess Mom water runoff including well structure storage:
3' Ya0 Y
Stn+mul6ed
&am800 *
Brag (n W I(
° 0 080
119,74
,
D
,7.VoLmr
Ta 0ra(Imr
^'+F*Volua
Odm:)
(Sac.) .
; (CF), °
{ r (CO
.i. t(l:837
8
430
4.004
376
6,843
0.00
10
600
4,834
576
8.336
000
13
900
6,678
376
12.831
0.00
11.44
1.146.50
8,087
576
16,635
0,00
30
1800.
10,796
576
23,668
0.00
40
2.100
12.764
376
34,223
100
30
3000
14,332
376
42,781
0.00
60
3600
13,610
376
51,337
0,00
90
3400
18.333
376
77,003
0.00
120
7200
20,009
376
103,674
0,00
880
10800
22,213
376
154.011
0.00
C782000 rants and Sa8khgekella.N800u81ep10te0ugs WA Cakulslbns ENB x6
Safety Factor
Safety ('actor
MOM
MEIN
fri7 ..1`
Kimley-I•Iorn and Associates, Inc. Page 22
Brickell Citicentre
Site Utility Study
Appendix "C"
Existing Utility Records
Kinzley-I-Torn and Associates, Inc. Page 23
Brickell Citicentre
Site Utility Study
N
i
� a a
I
If
II
,
d l
Y r�
_G .§w cT^`t r ..
I
lt
d—) (._ 10 j —
a
•D
SS /
.7
n N
i` n Jq� /koj
0
n 1
if
n
.r 11-tiRLzclaso/
90 ouoritu
-r
0 I'
I� terms am
ka .r
w°nu�e ro�`�•L�
Ki nley-Florn and Associates, Inc.
Page 24
Brickell Citicentre
Site Utility Study
Ih
Oa
wt In Oa
CO Oa m
r r r ..
.91
AYtMYco
N f.,
Ab ]liJi'0`l�l�'•—�
10
w
°r
114I0,3 — ——1NI.bZ
m °° MS
tt
Imo CO
,
.9—
777170/1,r-
PI P
a
�tfHrlitittil�i t••Ht!!Oi>:'It111l4t:II
I3;tiEiltiifi-t..i-H'1'Fi'�'"•'i-1"f-I:ti-^1lltll�
.O4
1clro�
tn
to
Kimleh-Horn and Associates, Inc.
Page 25
Brickell Citicentre
Site Utility Study
Appendix "D"
Pump Station Information
Kimley-Horn and Associates, Inc.
Page 26
Brickell Citicentre
Site Utility Study
Sanitary Sewer Pump Stations Database
Pump Station Monthly Information
Pump Station: 30.0001
UNINCORPORATED DADE COUNTY
390 NW NORTH RIVER DR
Station Category: ET
NOTE: All Flows are in GPDs.
Moratorium: OK
OK
Section • Township - Range: _El • 41
TYPED Class:E Speod:❑2 H.P.:
Peak Factor (last 7 entries): 2.40
Peak Modified Date:
Factor: By:
2.40 TRANSFER 01272007
Number of Pumps: 8
Moratorium In effect since: 1272007
Generator: ❑U Telemetry: El ET Clock: a
Yearly NAPOT (hrs):. 5.51
Reserved Flow (gpd): 2,477,272
Projected Napot (hrs): 5.96
Used Capacity ('h): 59.60
Stn Gross Capacity (gpd): 221,760,000
Station Reduction Factor: 0.60
Stn Net Cap Certified (gpd): 0
Station Net. Capacity (gpd): 133,056,000
Indicated Flow (gpd): 30,547,440
Date: NAPOT: Avg. Daily: Reading:
# of Comments:
Pumps:
Modified
By:
Date:
2/26/2011
1282011
12292010
11292010
10272010
9282010
8272010
7292010
5282010
4292010
4.95
4.97
5.10
5.69
6.94
6.83
5.71
4.18
5.26
5.44
Generated: 4/22/2011 - 10:01 AM
34.65
34.79
35.70
39.80
48.61
47.83
39.99
29.27
36.81
38.10
Y
Y
Y
Y
Y
Y
Y
Y
8
8
8
8
8
8
8
8
8
8
AREASR
AREASR
AREASR
AREASR
GATTOB
AREASR
AREASR
AREASR
AREASR
AREASR
03282011
03/112011
01272011
12/28/2010
11242010
10252010
09/24/2010
08/20/2010
06/25/2010
05/20/2010
Page 1 of
Kimley-INor•n and Associates, Inc. Page 27
Brickell Citicentre
Site Utility Study
Kimley-Horn and Associates, Inc.
Page 28
.Brickell Citicentre
Site Utility Study
Kimley-Horn was retained to perform a site utility study and performed only those tasks
specifically stated in our scope of services. The Client may use this report as part of its site
feasibility assessment, but this report should not be used as the sole basis for the Client's
decision making. We endeavored to research site development issues and constraints to the
extent practical given the limited scope, budget, and schedule agreed to with the Client. Our
assessment is based in large part on information provided to us by others (city staff, DOT staff,
Utility Company Representatives, etc.) and therefore is only as accurate and complete as the
information provided to us.
This report is based on our knowledge as of January 2009. New issues may arise during
development because of changes in governmental rules and policy, changed circumstances, or
unforeseen conditions. Our assessment is based on the desires of the Client that have been
specifically disclosed to us. The Client should do its own due diligence to become comfortable
with our findings and to be sure no other significant development issues exist.
Kimley-Horn and Associates, Inc. Page 29