Loading...
HomeMy WebLinkAboutCRA-R-16-0037 Cover Memo8EOPVVBoard nfCommissioners Meeting July 25'2O18 SOUTHEAST OVERTOVVN/PARKWEST COMMUNITY REDEVELOPMENT AGENCY INTER -OFFICE MEMORANDUM To: Board Chair KennHardemon and Members ofthe CRA Board '.'�� , ^ From: Clarence E.Woods, III References: Executive Director Date: July 16.3U10 Fl|e:1G'OUQ7G Subject: Resolution AuthohzingAdditioms|Gran Funds hoTown Park Plaza South, Inc. for the Renovation of Town Park Plaza South. Enclosures: Supporting Documentation; Legislation The attached Resolution of the Board of Commissioners of the Southeast Overtown/Park West Community Redevelopment Agency (^CRA) authorizes additional funding, in an amount not to exceed $3.500.000' Town Park Plaza South, Inc. (~7PPG^) to underwrite costs associated with the renovation and rehabilitation of Town Pork Plaza South located at 1798 N.W. 7m Avenua, Miemi, Florida 33136 (Folio #: 01-3136-068-0001) (]nJune 2Q.2O15.the Board ufCommissioners, byResolution No. CF6A-R'15'O025.authorized agrant, in an amount not toexceed $10.O0O.U0Ofor the Project. Further. the Board of Commissioners authorized atwn-otep process for the design build project. Step one, would involve the execution of o negotiated design build agreement bebweanTPPS and H.A. Contracting, Corp. (^HAC^) and payment ofpre-construction services. This step allows further development of the construction plans in order to ascertain the final construction costs. Step two would involve the amendment of the proposed agreement between TPPG and HAC to reflect the final construction costs. Since approval of the some. HAC has performed the following services to determine the anticipated final construction costs: ° Asbestos survey & lead based paint testing * Roof testing to include: moisture testing & pull test of light weight insulating concrete * Underground locating Vfutilities ° Camera inspection ofsewer & drainage systems ° Cleaned &]etteddrainage system m Met with the City of Miami Building Department & Miami -Dade County Water & Sewer Department * Obtained pricing from all subcontractors ° Completed 100Y6 Schematic Plans Boned on HAC's pre -construction work, the total anticipated Project cost is approximately $13'000.008. however, it is advised that the CRAset aside $13.50O.0O0for unforeseen ooabo that may arise during the Project. Additionally, the Board of Commissioners is also presented with o proposed relocation plan for the temporary relocation of residents at TPPS during the performance of the Project. The presentation of this temporary na|nnahon plan to the Board of Commissioners is required by the 2000 Southeast Overtuwn/Park VVomt Community Redevelopment Plan. Section 2, Goal 3, at page 11, of the 2009 Southeast Overhovvn/ParkVVemt Community Redevelopment Plan stated redevelopment goal. Section 2, Principle 3, at page 14, ofthe. Plan provides Uhat^[t]he neighborhood . . . retain access to affordable housing . . . ." This Project will eliminate slum and Night conditions by curing the visible deterioration as evidenced by structural cracks in some undo. broken windows, loose railings on upper floors, sewer backups, water leaks from decrepit p|umbing, existence of mo|d, wood rutting in doors and fascia of roofs, as well as outdated electrical wiring. In addition, the construction will provide, although temporary, needed jobs to the residents of the Redevelopment Area. FUNDING: $3,500,000 allocated from the tax revenue bond issuance provided for by Resolution No. CRA-R-12-0061. i