HomeMy WebLinkAboutCRA-R-14-0065 BackupCURRENT CONDITIONS
I �
ICO #I DATE
1.0
2.0 I 04/21/14
3.0 04/21/14
3.1 04/25/14
04/21/14
CHANGE ORDER LOG
Overtown Shopping Center
DESCRIPTION
Additional work to provide new hot water at Units #104, #108, #109, #110, and #111 due
to rusted existing units
.Additional work to remove existing panel at Unit #104 and replace with new panel.
!Additional work to provide new ceiling tiles at Spaces #109, #1.10, and #111 in lieu of re-
using existing.
Additional work to provide new ceiling tiles at Spaces #109, #110, and #111 in lieu of re-
using existing. Adjusted for incorrect quantities.
4.0 04/21/14 Additional work to provide new VCT floorings over existing at Space B-112 New offices.
5.0 04/21/14 Additional work to paint Net offices as requested.
6.0 04/21/14 ;Cost breakdown for custom color concrete at precast wall base to match pavers.
7.0 04/25/14 ;Additional work to provide new A/C unit at unit 108 to replace existing unit beyond life
;expectancy
8.0 04/25/14 Additional work to provide new VCT flooring and vinyl base at Unit 109.
9.0 'Additional work added insulation wrap of existing A/C ducts where missing and replace old
(grilles at Unit 104.
1
10.0 05/29/14 'Additional masonry patching as required where existing wall did not meet code (as
reviewed on 5/21/14).
05/21/14
11.0 05/30/14 ;Credit for removal of metal roof at modify monument sign as directed by Owner and to
,include EIFS cap similar to sign details.
Additional electric work related to modification of fighting in Unit 109, additional switch and
12.0 ! 05/30/14 outlets in Unit 104 where no outlets existed, and replace damaged grounding rod at
billboard sign.
1
REQUESTED I
ORIGINAL APPROVED
AMOUNT AMOUNT # STATUS
$6,474.00
$2, 329.00
$2, 541.00
$2,300.00
$8,108.00
$8,954.00
$678.00
$13,177.00
$2,493.00
$3,233.00
$545.00
($650.00)
$1,373.00
$6,474.00
$2,300.00
...__.__ _ $0.00
$0.00
$678.00
$13,177.00
$2,493.00
$3,233.00
$545.00
APPROVED
VOI D
REVISED
APPROVED
REJECTED
REJECTED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
($650.00) APPROVED
$1,373.00 '• APPROVED
DATE
06/04/14
14.0 06/09/14
CHANGE ORDER LOG
Overtown Shopping Center
DESCRIPTION
REQUESTED
Additional work at Store #108 including HVAC, Concrete demolition, concrete repair, and
tile base.
Additional work to provide new water service to building due to corroded existing pipe.
ORIGINAL
AMOUNT
$32,597.00
15.0 06/20/14 Additional work to provide canopy deck powder coat paint in the SW Terracotta color. $5,348.00
16.0 06/27/14
17.0 07/01/14
additional work to repair electric main at the unit #101 that was stolen.
Additional work to comply with RFI#4 related to structural damage to rear overhead door
at Unit 101 from attempted break-in.
f 1
18.0 ' 07/01/14 'Additoinai work to repair damaged roof drains at Unit 101.
19.0 07/01/14
:Additional work to modify rear of building per sketch and conversations at site on June 25,
2014 due to tree roots breaking sidewalks
20.0 07/01/14 Additional work to add bike rack to act as bollard at front of storefront
Additional work to provide new 900 gallon grease trap at front elevation of restaurant
21.0 07/08/14 `including additional piping due to condition of existing grease trap. *Cost of concrete
patch/flowable fill to be provided via separate RCO.
22.0 07/22/14 Additional work to repair damaged sanitary line at front building elevation.
2
APPROVED
AMOUNT
$5,469.00
$3,207.00
$2,118.00
$31,097.00
STATUS
APPROVED
$32,597.00 APPROVED
$5,348.00 APPROVED
$2,734.50
APPROVED
AMOUNT
$2,734.50
$3,207.00 APPROVED
$3,699.00
$1,002.00
$8,885.00
$2,091.00
$1,059.00
APPROVED
AMOUNT
$1,059.00
$3,699.00 APPROVED
$1,002.00 APPROVED
$0.00
VOIDED
$2,091.00 APPROVED
CHANGE ORDER LOG
Overtown Shopping Center
I REQUESTED
—j ORIGINAL APPROVED
CO # DATE DESCRIPTION _I AMOUNT AMOUNT STATUS
23.0 07/28/14
24.0 1 07/31/14
I �
Additional work to provide light fixtures at four (4) restrooms and replace three (3) non-
functioning roof top exterior lights on parapet walls.
Additional work required by fire department when processing fire alarm shop drawings and
submittals.
25.0 08/08/14 Additional work to provide new lay in type light fixture in Space 104 due to existing ballasts
being defective.
25.1 08/15/14 Additional work to provide new lay in type light fixture in Space 104 and 109 due to existing
ballasts being defective..
I 1
26.0 08/15/14 Additional work to replace all roof drains which were corroded in lieu of just providing new
domes.
26.1 08/20/14
Additional work to replace all roof drains which were corroded in lieu of just providing new
domes. Revised as negotiated and agreed at August 20, 2014 meeting.
27.0 08/15/14 Credit - for deleted work at rear sliding gate.
28.0 08/20/14
Credit - Cost breakdown to remove all carpet and provide Owner credit for future
replacement of same in damaged areas only.
29.0 09/08/14 Additional work to provide flowable fill at grease trap patch at front of building. (see change
order 21.0)
30.0 09/19/14 !Additional work for new condensing Unit originally intended to be provided by Owner which
;was stolen from rooftop
`
TOTAL APPROVED CHANGE ORDERS THROUGH INVOICE #11
3
$1,278.00
$4,743.00
$997.00
1
$1,336.00 I
j
S18,801.00
$15,101.00
($800.00)!
($1,755.00)
$1,278.00
$0.00
APPROVED
REJECTED
$0.00
$1,336.00
REVISED
APPROVED
$0.00
REVISED
$15,101.00 APPROVED
($800.00) APPROVED
($1,755.00)
$2,451.00 $2,451.00
$3,993.00
$3,993.00
$134,061.50
APPROVED
APPROVED
APPROVED
CO #
31.0
32.0
33.0
34.0
35.0
DATE L ... ._
10/02/14
10/02/14
Pending
Pending
Pending
CHANGE ORDER LOG
Overtown Shopping Center
DESCRIPTION
REQUESTED
ORIGINAL
AMOUNT
APPROVED
AMOUNT
STATUS
Additional work to comply with building department electrical requests at building final
inspection
Additional work to high pressure jet and camera existing storm line that was backup up
and to remove interior clean out from Unit #110 to prevent future flooding.
Additional work to provide sealer at brick pavers to prevent staining and protect from
bodily fluids
Outstanding additional fees to NE for increased contract amount due to changes
Additional work to provide securty cage at backflow preventers to prevent vandalism and
water theft
TOTAL PENDING CHANGE ORDERS (after invoice #11)
4
$339.00
$2,287.00
$19,000.00
$10, 000.00
$4,000.00
$339.00
$2,287.00
$19, 000.00
$10, 000.00
$4,000.00
$35,626.00
APPROVED
APPROVED
PENDING
ESTIMATED
PENDING
ESTIMATED
PENDING
ESTIMATED
TGSV ENTERPRISES INC.
RECONCILIATION
1 ORIGINAL CONTRACT SUM $1,301,694.33
2 PLUS NET CHANGE ORDERS $ 134,061.50
APPROVED THROUGH INVOICE # 11
3 CONTRACT SUM TO DATE
4 TOTAL COMPLETED & STORED TO
DATE
5 RETAINAGE
6 TOTAL EARNED LESS RETAINAGE
7 LESS TOTAL PAYMENTS RELEASED
8 AMOUNT OWED TO CONTRACTOR
FROM INVOICE # 11
10 BALANCE TO FINISH, INCLUDING
RETAINAGE (Contract sum to date less
Total payment previously released) Includes
previously approved change orders.
$1,435,755.83
$1,403, 454.74
$70,172.74
$1, 333, 282.00
$1, 282, 933.82
$50,348.18
$152,822.01
11 PLUS ADDITIONAL PENDING CHANGE ORDERS $35,626.00
12 TOTAL BALANCE TO FINISH, INCLUDING
RETAINAGE PLUS ADDITIONAL
PENDING CHANGE ORDERS
$188,448.01
13 AMOUNT REMAINING IN FUND BALANCE $9,949.85
(RESOLUTION CRA-R-13-0038)
14 FUNDING SHORTFALL $178,498.16
OVERTOWN SHOPPING CENTER PLAZA EXPENDITURES TO DATE
Date
CK #
Vendor
Description
Amount Paid
06/14/2012
CK # 1130297
ARC Florida
Copy services of the original
Overtown Shopping Center Plans
from City Asset Management
Dept. 01-...
$229.30
05/07/2013
Ck # 1147089
TGSV Enterprise
Provided facility evaluation
assessment report for the exterior
facade / building renovation and...
$25,000.00
06/10/2013
Ck # 1148732
Southern Waste Systems
Inc
2850143-Dumster /Waste
Container for debris removal at
1490 NW 3rd Ave WO # 36-2013
$1,159.40
06/24/2013
Ck # 1148967
Southern Waste Systems
Inc
2868944-Dumpster/waste
container for debris removal at
1490 NW 3rd Ave
$533.20
07/01/2013
Ck # 129743
Demolition Masters
2013-65-Asbestos abatement
report WO # 37-2013
$1,500.00
07/02/2013
CK # 1149630
TGSV Enterprise
Invoice-1
$74,780.49
07/10/2013
Ck # 1150104
Southern Waste Systems
Inc
Inv 2888087 - Dumpster / Waste
Container Rental for pick up of
debris at 1490 NW 3rd Ave
$533.20
08/08/2013
Ck # 1151683
TGSV Enterprise
Invoice 2 -
$27,097.48
08/22/2013
Journal Entry
City of Miami
Fire Flow Test -Fire Rescue
$250.00
08/23/2013
CK # 1152009
A.C.R. Environmental, Inc
ACR 2013-0621
$17,162.50
1
09/16/2013
CK # 1153341
TGSV Enterprise
Invoice 3
$18,065.00
09/29/2013
Ck # 1154239
Freezing Mechanical
Corp.
01279-The installation of
insulators on all metal duct work
done on Overtown Shopping
Center Sui...
$3,900.00
09/29/2013
Ck # 1154165
A C R Environmental, Inc.
ACR 2013-0621-Removal of
VFT/Black grocery store flooring
and from suites 104 105 108 109
110 111
$5,000.00
09/29/2013
Ck # 1155165
TGSV Enterprise
Invoice 4
$6,378.90
04/14/2014
CK # 1163355
TGSV Enterprise
Invoice 5
$24,775.39
05/06/2014
CK # 1164413
Miami Dade Water &
Meter box & Cover
$868.73
05/09/2014
CK # 1164699
TGSV Enterprise
Invoice # 6
$93,563.44
06/04/2014
CK # 1165968
TGSV Enterprise
Invoice 7
$202,002.43
07/16/2014
CK # 1167524
TGSV Enterprise
Invoice 8
$376,129.58
08/12/2014
CK # 1168793
TGSV Enterprise
Invoice 9
$120,010.97
09/02/2014
Pending CK #
V&F Electric, Inc
Installation of a new electrical
feeder
$980.00
09/10/2014
Pending CK #
TGSV Enterprise
Invoice 10
$200,130.14
10/08/2014
Pending CK #
TGSV Enterprise
Invoice No # 11 (partial payment)
$140,000.00
TO DATE PAYMENT AMOUNT
$1,340,050.15
TOTAL BALANCE TO FINISH, INCLUDING
RETAINAGE PLUS ADDITIONAL PENDING
CHANGE ORDERS
$188,448.01
TOTAL PROJECT COST
$1,528,498.16
RESOLUTION AMOUNT (CRA-R-13-0038)
-$1,350,000.00
FUNDING SHORTFALL
$178,498.16
2