Loading...
HomeMy WebLinkAboutCRA-R-14-0027 BackupENTERPRISES, INC. General Contractor / Construction Manager Budget Proposal October 16, 2013 Community Redevelopment Agency 1490 NW 3rd Avenue, Suite #105 Miami, FL 33136 Attn: Brian Zeltsman Project Two Guys Burgers Dear Mr. Zeltsman, We are pleased to submit this proposal for the interior renovations to the Overtown Shopping Center at tenant space #108 for the re -location of Two Guys Burgers. This proposal is based on the following qualifications: DIVISION 1: GENERAL REQUIREMENTS The following itemsare included in proposal: • Master permit cost • Full time project supervision • Trash removal and durnpster cost • All work being performed during regular working hours • Engineering and Architecture fees • Dumpster fees The following items are excluded from proposal: • Upgrades due to existing building code violations • Impact fees • All testing and special inspections 1301 West 68th Street, Hialeah: Honda 33014 4579 • Telephone: (305) 823-5755 • Facsimile: (305) 558-9020 • Website: www.tgsv.corn" DIVISION 2: DEMOLITION The following items are included in proposal: Demolition • Removal of casework to be re -used at new location • Removal of doors to be re -used at new location • Removal of existing kitchen equipment, to be moved to new location • Removal of acoustical ceilings at new location • Concrete cutting at new location The following items are excluded frorn proposal: • Asbestos and mold abatement • Asbestos and mold testing DIVISION 3: CONCRETE The following items are included in proposal: Concrete • Patching of concrete slab due to installation of new kitchen equipment The following items are excluded from proposal: • Concrete work other than patching of slab DIVISION 4: MASONRY • No work included in proposal DIVISION 5: METALS The following items are included in proposal: • Equipment supports for kitchen hood system DIVISION 6: CARPENTRY The following items are included in proposal: Casework/Millwork • Provide and install plastic laminate countertop for small area dine -in • Installation of existing casework to be re -used in new location • Provide and install wood base at customer pick-up area The following items are excluded from proposal: Casework/Millwork • Seating at new countertop (To be provided and installed by Others) 2 ENTERPRISES, INC. [;rtnz,m cnmrne:ar r ca�,oln+ciocr, Unnagi rs DIVISION 7: THERMAL AND MOISTURE PROTECTION The following items are included in proposal: Roofing • Roof patching due to kitchen hood exhaust and A/C unit Insulation • Wall insulation .at new drywall partitions The following items are excluded from proposal: • Any insulation not included above • Insulation at acoustical ceilings • Any roofing other than patching DIVISION 8: WINDOWS AND DOORS The following items are included in proposal: Doors & Hardware • Install Owner provided Aluminum dual action door and frame • Install Owner provided door and frame for new Utility Room • Install Owner provided door hardware • Provide &. install solid core swing door at front counter lihe following items are excluded from proposal : Doors & Hardware • Providing doors or hardware not listed above • Stain grade wood doors DIVISION 9: FINISHES The following items are included in proposal: Drywall • 3-5/8" 20 Gauge metal framing at new drywall partitions • 3-5/8" 20 Gauge metal framing for new soffit at customer pick-up area • 1 1--IR Fire Rated wall between kitchen and customer pick-up area • 5/8" Drywall at new partitions Flooring • Provide and install VCT flooring at customer pick up area • Provide and install epoxy floor paint finish at kitchen area Paint • Painting of hollow metal doors and frames • Painting of new and existing drywall partitions • Painting of new drywall soffit • Paint wood base Acoustical Ceilings • Provide and install new acoustical ceiling in tenant space 3 ENTERPRISES, INC. :.de�rraf Cnoir,rtar; Cow:4761 0m, hMnnayern The following items are excluded from proposal : Drywall • Moisture resistant drywall • Drywall ceilings or soffits not mentioned above Acoustical Ceilings • Acoustical ceiling in Restroom (To be provided in separate project) Flooring • Floor finish in Restroom (To be provided in separate project) Paint • Epoxy paint • Painting of any exterior walls • Staining of wood doors or wood base DIVISION 10: SPECIALTIES The 'Following items are included in proposal: Fire Extinguishers • Install multi -purpose fire extinguishers with standard mounting brackets provided from previous location Fire Extinguishers • Fire extinguisher cabinets DIVISION 11: EQUIPMENT Kitchen Equipment • Installation of Kitchen Equipment from previous location as shown on provided Equipment Schedule The following items are excluded from proposal: Kitchen Equipment • Providing any new Kitchen Equipment, all Kitchen equipment to be provided by Owner DIVISION 12: FURNISHINGS • No work included in proposal DIVISION 13: SPECIAL CONSTRUCTION • No work included in proposal DIVISION 14: CONVEYING SYSTEMS • No work included in proposal 4 ENTERPRISES. INC. vuna .i Comb -nays l f:arto��>ld:on M»no�cre DIVISION 15: MECHANICAL The following items are included in proposal HVAC • Remove existing Exhaust Hood system including fans, ductwork, fire suppression system • Remove existing split AIC unit including ductwork, drops, grilles • Remove existing RTU package unit hanging from exterior wall • Transport and install Exhaust Hood system including fans, ductwork, fire suppression system from previous location • Transport and install existing split AIC unit including ductwork, drops, grilles from previous location Plumbing • Sanitary PVC piping • All water piping to be copper • Pump and clean out existing grease trap • Grease line to be connected to existing grease trap • Installation of plumbing required kitchen equipment • Gas line to existing gas service on property to be galvanized pipe & fittings The following items are excluded.from proposal HVAC • Test and balance for hood or AIC system Plumbing • Providing new plumbing fixtures • New grease trap (If needed add $6,000 for new 750 gallon grease trap) DIVISION 16: ELECTRICAL The following items are included in proposal • Re -use lighting fixtures from previous location • Provide and install new lighting fixtures at soffit • Install Owner provided Kitchen Equipment The following items are excluded from proposal • Fire Alarm • Security system devices conduit and wiring • FPL fees 5 ENTERPRISES, INC. Cere�nk C3nllaelw I GnI krntio. la51innws BID BASE BID 01000 GENERAL CONDITIONS $ 17,778.35 02002 DEMOLITION $ 1,400,00 02005 MOVE EXISTING EQUIPMENT $ 490.00 03000 CONCRETE $ 600.00 06501 CASEWORK & MILLWORK $ 3,470,00 07100 ROOFING $ 1,000,00 07206 INSULATION $ 310.00 08111 H.M. DOORS & FRAMES Existing 08120 WOOD DOORS $ ' 200.00 08710 FINISH HARDWARE in wood doors 08750 INSTALL DOORS $ 360.00 09130 ACOUSTICAL CEILINGS $ 2,767.50 09930 DRYWALL $ 8,830.00 09860 RESILIENT FLOORING $ 3,690.00 09870 WOOD BASE $ 276.00 09880 SS BASE $ 1,800.00 09950 PAINTING $ 1,900.00 10430 SIGN By Others 10525 INSTALL FIRE EXTINGUISHERS $ 70.00 11452 RES. KITCHEN EQUIP, BY OWNER 15001 PLUMBING $ 17,050.00 15010 HVAC $ 14,800.00 16001 ELECTRICAL $ 16,800.00 SUBTOTAL $ 92,591.85 APE DESIGN FEE $ 10,000.00 2% PERMIT $ 1,851.84 0.33% BUILDERS RISK $ 311.66 PROFESSIONAL LIABILTY $ 4,012.50 ADDITIONAL UMBRELLA Not Included OWNER ALLOWANCES Not Included SUBTOTAL $ 108,767.85 10% PROFIT $ 10,876,79 BONDS $ 5,661.09 1.5% INSURANCE $ 1,879,69 TOTAL $ 127,000.00 t �w aa. rposay Efr