HomeMy WebLinkAboutCRA-R-13-0073 ExhibitOMNI REDEVELOPMENT DISTRICT COMMUNITY REDEVELOPMENT AGENCY INTER -OFFICE MEMORANDUM To: Pieter A. Bockweg Date: Nov. 12th, 2013 Executive Director Subject: Executive Summary from the MEC RFP Selection Committee, recommending the No.1 ranked bid proposal for the MEC's Design, Build, Manage & Operate RFP. From' H. Bert Gonzalez Asst. Director, OMNI CRA Chairperson, RFP Selection Committee BACKGROUND: The Board of the OMNI CRA Commissioners, by Resolution No.CRA-R-11-0043, passed and adopted on July 28th, 2011, authorized an expenditure of $1,087,268 for the planning, design, construction and development of the Miami Entertainment Complex ("MEC"), an Omni CRA owned property located at 50 NW 14th Street. On September 9th, 2013, the OMNI CRA issued RFP No. 13-001 for the Design, Build, Management and Operation of the Miami Entertainment Complex ("MEC"). SUMMARY: In preparation for the construction of the MEC loto a Film Studio Complex, the Omni CRA prepared and issued a Request for Proposal (RFP) No. 13-001 for Design, Build, Manage and Operation the Miami Entertainment Complex on September 9`h, 2013. As stipulated by Fbrida Statutes Chapter 287.055 "Consultants' Competitive Negotiation Act" (CCNA), the CRA is required to put out this public solicitation when a design -build method of construction is chosen for a project. . After a 3 8 day open advertisement period for the MEC RFP, proposals were received by the set deadline of October 161h, 2013. On October 28th, 2013, the Selection Committee held "oral" presentations and evaluated each proposal bid based on the evaluation criteria of the RFP. The selection committee was comprised of the following members: Committee Chairperson H . Bert Gonzalez (Assistant Director, Omni CRA), Mark Spanioli, P.E. (City of Miami, C I P Director), Hector Torres, Developer, Cymbal Development & Construction Project Manager, Patricia Arias, CAMACOL (Liaison for State Film and Entertainment Projects), Al West, CFO - GMCVB, Joe Peria, Special Projects — Miami Dade College. The evaluation criteria based on the development of a state of the art film studio complex included qualifications and experience of the proposer and their team (including comparable project experience for the past 5 years), experience of the project manager on similar projects, design philosophy and process as it relates to this project, technical capabilities and references. Emphasis on local business's to be included into the mix and part of the Design, Build and Construction Project. And finally, the "Teams" experience in the operations and management of similar Film, Media and Enter t a i n m e n t facilities. The selection committee ranked the presentations (Evaluation sheets are attached) . On October 28th, 2013, oral presentations were conducted by the selection committee and a final recommendation was made, the Selection Committee recommended to the OMNI CRA Executive Director to begin negotiations with the No. 1 ranked firm. The CRA staff is prepared to begin the negotiations with the top ranked firm and is recommending that a professional services agreement(s) be executed with the #1 ranked firm of EUE Screen Gems Studios. For reference, CCNA is very specific and outlines the procedures and criteria for architectural consultant selection. CRA staff and the selection committee followed these procedures as outlined in Florida Statutes Chapter 287.055. Selection Committee Scoring Sheet Project: Bid: MEC Design, Build, Manage & Operate Services Number: RFP 13-001 Score Criteria TANABI GROUP EUE/Screen Gems Team Qualifications and Experience. ( max. 35 paints) ) , Design Philosophy & Process ( max. 10 points) (6) Technical Capabilities ( max. 1 0 points) '-' Q�° t Team Execution & Delivery { max. 15 points ) ‘ .....?). Project Manager Experience. ( max. 10 points) Community Benefits ( max. 5 points) References (max 5 points) Location ( max. 10 points ) Total Score - Max. 100 points (0 .C\ - (4) t Scored by (print) Scored by (sign) Date: Selection Committee Scoring Sheet Project: Bid: MEC Design, Build, Manage & Operate Services Number: RFP 13-001 Score Criteria TANABI GROUP EUE/Screen Gems Team Qualifications and Experience. ( max. 35 points) a4 3, Design Philosophy & Process ( max. 10 points) 5 / 0 Technical Capabilities ( max. 1 0 points) 7 /0 Team Execution & Delivery ( max. 15 points) t /5 . Project Manager Experience. ( max. 10 points) 4 / " Community Benefits ( max. 5 points) r References (max 5 points) Location ( max. 10 points ) Total Score - Max. 100 pointsSci /co Scored by (print) Scored by(sign) Alva' Selection Committee Scoring Sheet Project: Bid: MEC Design, Build, Manage & Operate Services Number: RFP 13-001 Score Criteria TANABI GROUP EUE/Screen Gems Team Qualifications and Experience. ( max. 35 points) �-5- �-� Design Philosophy & Process ( max. 10 points) q Technical Capabilities ( max. 1 0 points) 7 Team Execution & Delivery ( max. 15 points) l 0 ../5 Project Manager Experience. ( max. 10 points) Community Benefits ( max. 5 points ) References (max 5 points)° 3 •1�•/�' Location ( max. 10 points) Total Score - Max. 100 points ? i Scored by (print) Scored by(sign) Date: r Selection Committee Scoring Sheet Project: Bid: K0ECDesign, Build, Manage & Operate Services Number: RFP13'0O1 Score Criteria TANAB| GROUP EUE��eon Gems Team Qualifications and Experience. —\ ^� '7� ( max, 35 points ) ~'� '} —/ Design Philosophy &Process max. 10 points) ~J / Technical Capabilities �f (mmx. 10 points) __�c� / Team Execution & Delivery (max, 15 points) —� / �/f Project Manager Experience. ( max. 10 pointu) ~l rr� / / �l `, Community Benefits ( max. 5points ) < / �� _5 References (max 5 points) � ` ^~ Location (max. 10points) - Total SoonnMax, 100 points Scored by (print) 1�e Date /0 r Selection Committee Scoring Sheet Project: Bid: MEC Design, Build, Manage & Operate Services Number: RFP 13-001 Score Criteria TANABI GROUP EUE/Screen Gems Team Qualifications and Experience. ( max. 35 points ) 2- • Design Philosophy & Process ( max. 10 points) 5- Technical Capabilities ( max. 1 0 points ) Team Execution & Delivery ( max. 15 points) Project Manager Experience. ( max. 10 points) /5 Community Benefits ( max. 5 points),% References (max5 points) Location (max. 10 paints) Total Score — Max. 100 points '`.*--5 r „6„. Scored by (print) / '/��'t6 " /21 C� Scored by(sign) Date: Selection Committee Scoring Sheet Project: Bid: MEC Design, Build, Manage & Operate Services Number: RFP 13-001 Score Criteria TANABI GROUP EUE/Screen Gems Team Qualifications and Experience. ( max. 35 points ) Design Philosophy & Process ( max, 10 points) Technical Capabilities ( max. 1 0 points) Team Execution & Delivery ( max. 15 points)7 /2-/ Project Manager Experience. ( max, 10 points ) Community BenefitsL{ ( max. 5 points ) References (max 5 points) Location ( max. 10 points) Total Score - Max. 100 points 2- Scored by (print) Scored by (sign) Date: