Loading...
HomeMy WebLinkAboutCRA-R-13-0049 Backup25'-4 • . EXIST.•.P DESTRIAN••WALKWAY. • 1 i 5'-0" C.L.. O.F; .STREET N.11• b h STREET EISTING AA PAVING W TO• N DIAGCNAL ••••• #Air LOT 20� SCORES LINES*`♦. EN7•ANCEVi PIN. FL.EL 0'-0" /Fir LOT?1. LC)T 28 EXIST NG BUILDING FOOTPRINT //////// 9.829 SF /////// 3) STORY BUILC ION - OFFICE AI G. HT. 36'-4" T.O. Lyric Public Plaza 05-2.-3.3 Divisions Materials Used Quantity Unit Unit Cost Comments Cost Division # 2 Tree Trimming existing/removal Earthwork- 02300 Drainage - 02600 Bases- 02700 Planting -02900 Planters-02901 Structure + Pipe (15") Concrete Tree's Unknown 1 11,300 100 2 19 15 IS SF LF 3500 0.35 100 125 1350 250 Catch Basins Unspecified 18x18x24" / Pull Box ?? Royal Palms Not Specified 3,500 3,955 10,000 250 25,650 3,750 Division # 3 Concrete Forms- 03100 Concrete Reinforcement-03200 CIP Concrete- 03300 Cementitious Decks-03500 Tree Planters Pavers R&R (w/ 4-6"rock base) Unknown 0 0 0 11,300 0 0 0 0 SF 5.5 0 Remove/Stock/Reinstall Not Specified 0 0 0 62,150 0 Division 5 Ornamental Metal - 05700 6'-0" iron Railing Fence Division 6 Rough Carpentry - 06100 264 LF 60 Match 9th Street Mall 15,840 1 LS 1500 Forms If Required 1,500 Division 16 Basic Electrical -16050 Lighting -16500 Lighting - 16501 Lighting - 16500 Sub -Total Contractors OH&P Total Cost - Construction Permit Fee By Owner Design Fees (A/E) Owner PM Fees Total Cost- Project Bollards / Unspecified Decorative 0 1 13 4 0 LS 6600 EA 400 EA 2200 15 % 6 16 Receptacles/J Box / Wiring 36" HGT, 12.5 Watts Match 3rd Avenue 6,600 5,200 8,800 143,695 21,554 474 4165 249` 5,000 9,915 0