Loading...
HomeMy WebLinkAboutCRA-R-12-0052 07-30-2012 BackupSpanioli, Mark From: Spanioli, Mark Sent: Thursday, June 28, 2012 1:12 PM To: Greenspan, Ely Cc: Bockweg, Pieter; Gonzalez, H. Bert; Price, Michael; Woods, Clarence; Valentin, Miguel A Subject: Omni/SEOPW CRA Office Servers/Build-Out Ely, The Omni CRA will be utilizing the existing server equipment from our current office location. Can you provide us the quotes for the server equipment that will be needed for the Southeast Overtown CRA? I believe you had been working with Miguel from our office with this. Please continue to coordinate with him on the Overtown CRA IT needs. Thanks, Mark.S. Mark Spanioli, P.E. Director of Engineering and Construction City of Miami Community Redevelopment Agency 49 NW 5th Street, Suite 100, Miami, FL 33128 P: 305-679-6800 F: 305-679-6835 www.miamicra.com Spanioli, Mark From: Valentin, Miguel A Sent: Friday, June 29, 2012 2:22 PM To: Woods, Clarence Cc: Spanioli, Mark Subject: FW: Estimated cost for the CRA move to Old Homeless site Clarence, Please refer to below. We need a resolution at the next board meeting. Miguel A . Valentin CPA Financial Officer City of Miami Community Redevelopment Agency 49 NW 5th Street, Suite 100, Miami FL 33128 Tel 305-679-6810; Fax 305.679-6835 From: Greenspan, Ely Sent: Friday, June 29, 2012 2:01 PM To: Valentin, Miguel A Cc: Price, Michael; Fournier, Robert Subject: Estimated cost for the CRA move to Old Homeless site Hi Miguel, As per our conversation, below are the approximate network cost that your office will encounter do to the move to the Old Homeless site at 1490 NW 3rd Ave. Network Router with VOIP $5,000 Network Switch with PoE $2,000 Wiring $300 per drop (15) $4,500 Total $11,500 The router must have Voice over IP so that you can utilize your existing Cisco phones. The switch must have Power over Ethernet so that the Cisco phones can get their electrical power from the switch and not require a power brick. I will get you a valid quote for the by the early part of next week. The wiring will be done by Quality Wiring the City of Miami's wiring contractor. As Mike Price pointer out the Old Homeless site has existing wiring in it. If the wiring is not damaged by your remodeling project then you will be able to utilize a majority of the existing wiring if not all. The above estimate is a worst case scenario that will ensure that you will have the network that you will require to operate out of your new office. Sincerely Ely Greenspan System Software Manager Information Technology Department 1