HomeMy WebLinkAboutCRA-R-11-0039 07-25-2011 BackupTo: Pieter Bockweg
Executive Director
SOUTHEAST OVERTOWN/PARK WEST, OMNI
AND MIDTOWN
COMMUNITY REDEVELOPMENT AGENCIE
INTER -OFFICE MEMORANDUM
Date: July 18, 2011 File:
Subject: RFQ 11-003-Engineering and
Architecture Services for
Overtown/Parkwest Greenway
Connections
From,. Mark Spanioli, P.E. References:
Director of Engineering and Construction
Enclosures: Final Scoring Sheet, Shortlist Memo
On July 15th and on the 18th, 2011, the selection committee (myself, Clarence Woods and Chelsa
Arscott) as you requested observed the oral presentations from the shortlisted responsive firms. After
careful review and consideration, please review the final scoring sheet that provides the rank order
determined by the selection committee. The final ranking order is as follows:
1. Kimley-Horn and Associates
2. Curtis and Rogers Design Group, Inc.
3. Bermello Ajamil and Partners, Inc.
4. Corzo, Castella, Carballo, Thompson and Salman, PA
5. AECOM, Inc.
If you concur with the results, State Statutes requires that we select a minimum of the 3 top ranked
firms to begin negotiations with once you have approved the selection process and our board of
directors has approved of the same.
Please advise if you concur with the process and findings thus far so that we can proceed to the
board for review and approval.
cc: Clarence Woods, Assistant Director
Chelsa Arscott, Program Administrator
Selection Committee Final Scores
Project:
Bid Number:
Engineering and Architecture Services for Overtown/Parkwest Greenway Connections
RFQ 11-003
Selection Committee
Member
Kimley Horn
Bermello
Ajamil
Curtis and
Rogers
AECOM
C3TS
Mark Spanioli, P.E.
95
82
90
85
84
Clarence Woods
86
79
77
70
82
Chelsa Arscott
99
86
89
68
71
Total Score
280
247
256
223
237
Average
93.3
82.3
85.3
74.3
79.0
Rank Order
1
3
2
5
4
SOUTHEAST OVERTOWN/PARK WEST, OMNI
AND MIDTOWN
COMMUNITY REDEVELOPMENT AGENCIES
INTER -OFFICE MEMORANDUM
To: Pieter Bockweg Date: June 27, 2011 File:
Executive Director
Fomr
ark Spanioli, P.E.
Director of Engineering and Construction
Subject: RFQ 11-003-Engineering and
Architecture Services for
Overtown/Parkwest Greenway
Connections
References:
Enclosures: Shortlist Scoring Sheet, List of
Proposers
The CRA has received the responses to the RFQ for the Engineering and Architectural Services that
was advertised for development of the Overtown Greenway Connections Project. Thirteen responses
were received which included qualification packages in accordance with the requirements of State
Statutes for Architecture and Engineering Services. The list of proposers is included as an
attachment with this memo.
Staff has reviewed the packages for compliance with the submission requirements and has deemed
one of the proposers, Wolfberg, Alvarez and Partners non -responsive due to the following reasons:
• Question #7 of Addendum #1 issued on April 18th, 2011 required that references be submitted
in the form of a letter from the owner of the project that will be used as a reference. Wolfberg,
Alvarez and Partners did not include any reference letters in the proposal.
On June 23`d, 2011, the selection committee (myself, Clarence Woods and Chelsa Arscott) as you
requested met to review, and shortlist the responsive firms. After careful review and consideration,
please review the attached shortlist scoring sheet that provides the rank order determined by the
selection committee. If you concur with the results, we will request that the top five ranked firms
provide oral presentations to the selection committee at which time, final ranking will be determined.
Once final ranking is determined, State Statutes requires that we select a minimum of the 3 top
ranked firms to begin negotiations with once you have approved the selection process and our board
of directors has approved of the same.
Please advise if you concur with the process and findings thus far so that we can proceed with the
oral presentations. 01c
cc: Clarence Woods, Assistant Director
Chelsa Arscott, Program Administrator t �1"
fElly 6
(C\
h aSt
Rains 2
Village rare
;a
NW 20th Sr
Wrtiliams
Park
Dolphin Expy
t,1V571Ath St ,ri
t• utz-.
5291b4.i.14114.
2
ra
4
He
nry
Rees. Park
Wit# 8ttt St
Overt;. i`Pr
Gih5o't Park
tti st
3pri-tg G artier NW.Sill St
N iit {gar s
5ttt 5
Nth' 20tti
ra
3
' Ntt'"
NE 191r-Tditzz
ai`
,Otis tit
Biscayrt y
$kate P Ma r,
C ep Pa 'f , .E i th
NW 141ii St
NWAt 9t
' ith r=-rrri
tsl t 5[t St
i 4th St
{{
N 121 ie
N'
Eicerterria
Park
RC Tin St ,_1.1.;1;.,,..,,,rafiA41:17,0f,
5th St cz .,1: r
0 vtn...-rouJrJ 0-A t.A} uA.t-1
C tf Sc`c.
etKsr
snitCOr• "eta
Sar
CITY OF MIAMI OFFICE:OF THE CITY CLERK
BID SECURITY LIST'
SUPPORTING
DOCUMENTATION
BID ITEM-. 'Engineering & Architecture Serviees for:Overrtown/Farkwest Greenway
Connections
BID NUMBER; RFQ No. l I-003
DATE BID 'OPEN EO Friday, April 29, 2011 TIME: t 1 00AM
BIDDER
SR ; I ngineer ng Inc.
BASE BID BID BOND (Eft).
AM J► NT CASHIER'S:
CHECK
CIS
fee Attached See Attached
Wolfberg Alvarez & Partners
Seca Attached See Attached
Malley -Horn & Associes, Inc,
See Attached
'Saying Miller. Design 'Studxt :
e Attmch
See Altackmd
Ber e=llo Ajamil & Partners ,Tna;
See Attached
See Attached
See, Attached
Grote .. lnc.
See Attached
See Attached
`alvin,,Giordano .&.Associates, Inc.
See Attached See:Attached
Chen -Moore 4'4. Associates
s
R.E..Chishoi)n Architects,
Coro .Castella Carballo Thompson Saimaa, PA
See Attached See Attached
See Attached See Attached
Sce.. Attadhed.
T.Y. Lin International / HT Ross
See Attached "See. Attacl1ed'.
Curtis & Rogers
See Attached
"Offers from the vendors listed herein are the only offers
received timely ;as of the clove o exii n dote and time. All
other offers submitted in response to this sol citation, 'W any.
are hereby rejected as late
Attached
Receiv
r rd s)
z-ct (
Today's Date
id(s) on behalf
c
PREPARED BY:
Community Redevelopment Agency
Citpa anent
Deputy City Clerk
SUPPORTING
DOCUMENTATION
REQUEST FOR IQUALIF1CATIO.NS
ENGINEERING AND ARCHITECTURE SERVICES FOR
OVERTOWN/PARWEST GREENWAY CONNECTIONS
RFQ NUMBER
11-003
ISSUE DATE
MARCH 30T", 2011
NON -MANDATORY PRE -SUBMITTAL MEETING
APRIL 11",1011-- 10:00 AM.AT THE ORA OFF10E3
ADDITIONAL INFORMATION &CLARIFICATION DEADLINE
APRIL 1.5TH, 2011
RESPONSE SUBMISSION DATE
•APRIL 291.", 2011
11:00 AM
CONTACT
Mark Spanioli, P.E.
•Director • of Engineering and 'Construction
City of Miami
Community Redevelopment Agency
49 NW 5Th Street Suite 100
Miami, Florida '33128
Fax: 305-679-6835
Email: msoana.mtamioov:com
DOCUMTAT ON
SECTION 2
2.0. RFQ SCOPE OF SERVICES
21. Purpose
The CRA is seeking the services of an Engineering, Architecture or Landscape
Architecture firm(s) to provide professional services for ;planning, design, cost
estimating, bid assistance and construction engineering/inspection services for
the development: of portions of the Overtown/Park. West Greenway within the City
of Miami. The Proposer and its .Sub -consultants must be able to perform every
element of the scope ofservices as outlined below and in Attachment A of the
proposed Agreement.
2.2. Background
In 1994, the 9th Street Pedestrian "Mall was constructed within the Metrorail right-
of-way and along portions of City of Miami right-of-way in the Overtown Folk Life
Village area. In August of 2002, the CRA completed the Overtown Greenway
Plan which outlined the layout and design elements to be used in the
development of the entire Overtown Greenway. In 2010, the 9th street pedestrian
mall aesthetics improvement project was completed. Currently, the City of Miami`
and the CRA are working on completing multiple elements of the Greenway. As
part of a separate project partially funding by FOOT, the CRA is developing plans
for the portion of the greenway along NW 111h Terrace from NW 3ftl Avenue, to
NW 7th Avenue: In conjunction with these efforts, the CRA is spearheading this
RFQ to create the eastern connections of the greenway that will link the
Overtown NW 3rd Avenue .commercial district with Biscayne Bay. For reference,
the Overtown Greenway Plan can be found on the CRA's webpage at:
www.miamicra.com,
2.2 Project Area
The project is broken up in to two sections. Section 1 will require 100%
engineering drawings and the limits are generally within the Motorail right-of-way
starting at the northern limit of the existing 9th Street Pedestrian Mall at NW 10th
Street just west of NW 1st Avenue and traveling northwesterly along the Metrorail
right-of-way and terminating at NW 3`d Avenue and NW 1 Terrace. Section.2
will start as a planning .exercise to <determine the best route for the on -road
greenway that will run easterly towards Biscayne Bay at Bicentennial Park and.
may include a pedestrian/bicycle railroad crossing. Once a determination is
made as to the favorable route, 100% engineering drawings will be required for
the second section asweli. A map of the area can; be found on the next page.
'6
S
DOCUMENTATION
24. Scope of Services
Consultant shall provide the following:
` Planning
• Greenway Design (100% engineering drawings)
• Permitting
® Cost Estimating
® Bid Assistance
6 Construction Engineering: & inspection
These services shall include all trades such as surveying, geotechnical, civil,.
landscape, electrical and any other trades deemed necessary to complete the
project. Consultant will be responsible with coordinating the proposed plans with
existing and on -going greenway efforts and will be responsible for obtaining the
necessary permits along right-of-ways that may have multiple jurisdictions.
Proposed Proiect
The proposed greenway Connections will include a walking/bike path, play areas,
landscape improvements, linear park elements, lighting, benches, trash
receptacles, signage a railroad crossing and on -road greenway elements (wider
sidewalks, bike lanes, additional lighting, etc). The new greenway connections
should tie into the character of the existing and proposed greenway sections and
should enhance the Overtown and Park West districts:
Existing 9`h Street Pedestrian Mall
Proposed Greenway Section 1
7