Loading...
HomeMy WebLinkAboutCRA-R-11-0030 06-27-2011 BackupSOUTHEAST OVERTOWN/PARK WEST, OMNI AND MIDTOWN COMMUNITY REDEVELOPMENT AGENCIES INTER -OFFICE MEMORANDUM To: Pieter Bockweg Date: May 18, 2011 File: Executive Director Subject: RFP 11-005, Overtown Enhancement Team From: Mark Spanioli, P.E. References: Director of Engineering and Construction Enclosures: The CRA has received the responses to the RFP for the Overtown Enhancement Team that was advertised for the for the one-year pilot program. Three responses were received which included qualification packages and price proposals in accordance with the requirements of the RFP. The three proposers received were: • Wis's lEngineering • Power Tree Service • Human Resources Staffing At your request, a selection committee comprised of Clarence Woods, Percilla Kelsey and Mark Spanioli met to review and qualify the respondents based on the qualification requirements. Based on our review, below please find the firm's placed In ranking order: 1. Human Resource Staffing — Overall Average 85.4 points 2. Wis's Engineering — Overall Average 48.3 points 3. Power Tree Service — Overall Average 20.4 points Based on the ranking order and the review of the proposals submitted, the selection committee has deemed the #1 ranked firm, Human Resources Staffing as the most qualified, responsible and responsive proposer. cc: Clarence Woods Percilla Kelsey RICHARD P. DUNN II PIETER A, BOCKWEG Board Chair Executive Director REQUEST FOR PROPOSALS OVERTOWN ENHANCEMENT TEAM SERVICES PILOT PROGRAM RFP NUMBER 11-005 ISSUE DATE April 8th, 2011 ADDITIONAL INFORMATION & CLARIFICATION DEAD NE APRIL 22, 2011 BY 5:00 PM RESPONSE SUBMISSION DATE AND TIME May 6, 2011 By 2:00 PM CONTACT CRA of Miami Community Redevelopment Agency 49 NW 5' Street, Suite 100 Miami, Florida 33128 Phone: 305-679-6800 Fax: 305-679-6835 Attention: Mark Spanioli, P.E. Email: mspan@miamigov.com , . I'l SECTION 2 2.0: RFP SCOPE [>FSERVICES .2.1. Purpose The CRA|oseeking ho procure aqualified and experienced firm to provide daily street level nnm|ntononoe men/|ceo and to employee personnel from the community within the Southeast [}vertovxn/PmrkWest {}HAarea for this program. 2,2 Summary The Overtown Enhancement Team Maintenance Crew (Clean Team) will serve to improve the physical environment of the Overtown/Parkwest area. The Clean Team will be implemented as a part time team of personnel employed from the area providing services 5 days a week (weekdays). Two shifts.shall be.provided, one in the morning and one in the afternoon, The morning shift will typically begin at 8:00am and end at noon; the afternoon shift will typically begin at 1:00pm and end at 5:00pm. Additional hours may be required for special events. 2.3. Employment Requirements _ The ocdeotedoomponywiUbm'required tV hire residents fnornxWthinthe Southeast OvortovvnPark West CR\boundary for all crew member positions. Vendor will be required to provide proof of residency for the employees. All employees must be work eligible and able toprovide mVV-9form. 2A. Contract Time This project Itkythe intent cf—Cduhngtbimone_yeorpehodtoevm|uote and determine ifadditional program time will bmfunded and implemented. 2.5. Uniform Use and Selection The selected vendor will be quinadtoprovdeunifornmnfPrall ofthe crew members. The uniform design will have to be approved by the ORA prior to implementation, In general, the uniform will consist ofmlogo embroidered b' hUyco|oradpo|omhirt.flot front work panto, belt and solid colored workbooto. 2.6. Program Boundary Request For Proposals SUPPORTING DOCUMENTATION 1:_rz5zl� mveriowis Enhancement Team Boundary Area In addition to the boundary ouUined, daily cleaning oonvioom yoick-upmnd disposal of all trash\mhaUbepo�onnednn(�RA-ovvnedparking lots. The y�orkconsists ofdaily v|o�s on 'ekdays(f|vweek) 'preventing the � accumulation of debris, faUan vagwtntion, trosh, plastic bags, caDa, 'papers, etc. CRA Parking Lot Locations: Parkirq Lot No.: ADD 'S8 ' ONO.: 1. P-2 247 NYV 12m8tneat 01'3136-O3T-0430 ,2. P-2 231 NW 12mG1neat 01-3130-037-0440 13./P-2 22SNVV12mStreet 01-3136'037-0450 4. P-5 345 NW 10mStrgat 01-0101-040-1160 M. -P'4 250NYV10m Street 01-0102-000-1030 m 8. P-4 2O2NVV1O Street 01-0102'080-1040 Request For Proposals 7 2.7. Project Scope nfWork The Scope ofWork for the program consists Vfthe following components: Provide street level maintenance services including all personnel, uniforms, equipment, storaBe, office facilities, nnonagennont, administration, payn)||, etc to implement the program' The selected firm will be required to hire all the necessary personnel, provide them with approved uniforms and all equipment tocarry out the|rduties. The crew members will be required to participate in the following work areas: � ° w � � ° Litter clean-up Trash pick-up Graffiti removal Landscape installation/maintenance services Sidewalk pressure washing Street sweeping and clean-up General paint maintenance including traffic enclosures, poles and street lights |naddition tothe daily duties o[the clean team, regular logs and reports will berequired to be prepared and submitted tothe CRA. At minimum, the fo|kowiing is a list of Thecrew lead �rowiU'ma��|nodm|�aen4lo g to track all activities � T�n�wh�dsrs will maintain ephoto log of before and after physical enhancement 'onUVUieo * Crew members will complete Daily.Activity Reports to summarize general activities throughout the day ' The program administrator will complete monthly progress reports. � Certified timesheets of all personnel assigned toAhis program will be required to be submitted along with invoices tothe CRA. CRA Oversight: The CRA will oversee the progress oftheteomand aCRA staff member will be assigned to this program. ° The selected vendor program administrator and crew leader will be required to check -in weekly with CRA project |Mnpantor. CRA project |nspeotorwiUbonmon|tohngthedaUyoctiv|tieoofthe clean team. The om|moted vendor pnoOnonn administrator will be naqu|nad to meet with the CRA on a monthly basis. � The ae|aotad firm will be naqu|nmdto give monthly report to the CRA board of directors. Request For Proposals RF9No.11-VDo 8 |ngeneral, the CR\is seeking to mimic the clean team that the Mlarn|Downtown Development Authority has implemented in the downtown area. The CRA intends on providing a grant to the ae|ochad finn for this undertaking. The selected firm should be able to provide a tunl-key program Including all management, ponaonne|, uniforms and equipment to provide the serv/oa^ described. ' ° Request For Proposals / 9 � t, negotiations with the next nonKmd Proposer(s) until m Contract is negotiated or all ' Responses are rejected, 12. |frequired, after reviewing the OFAExecutive Director recommendation, the CRA Board of Directors may: approve the CRA Executive []|nactorm recommendation and authorize award of the Agreement; reject the Agreement; or reject all Responses and direct the CRA Executive Director re -open negotiations or -to solicit new Responses. B. EVALUATION CRITERIA Responses shall be evaluated according to thefollowing criteria and respective weight: > Qualifications & Experience of Proposer > Local Vendor (located within CRAboundaries) > Implementation Strategy > Price Proposal Request For Proposals 13 Maximum @5points Maximum 15 points Maximum 15 points /Wezirnumn 35po|nto SUPPORTING DOCUMENTATION 6.1b. PRICE PROPOSAL FORM RFP No. 11-005: OVERTOWN ENHANCEMENT TEAM SERVICE PILOT PROGRAM Program Operations 10 Crew Members, part-time, 4 hours/day, 5 days/week, 52 weeks/year: 10,400 man hours 1 Crew Leader, full-time, 8 hours per day, 5 days/week, 52 weeks/year. 2,080 man hours Annual Cost for Crew Members: Annual Cost for Crew Leader: Annual Cost for Program Administration: Annual Cost for Overhead and Profit: Total Annual Cost Proposed: Special Events Coverage In the event that additional hours are needed to assist with a CRA related special event, please provide the hourly rates for this additional hours below. This rate shall be the "all in" rate that can be billed to the CRA including all fees, administration, etc. Crew Member Hourly Rate: Crew Leader Hourly Rate: Important Note: All proposers must submit and include with their price proposal a detailed itemized breakdown of all expenses related to the program operations as to how all the,costs were arrived at. This detailed breakdown should add up to the costs shown in the above arinual cost breakdown. The breakdown should include any and all costs associated with the program. Any proposer who does not submit a detailed itemized breakdown with their price proposal will not be considered, no exceptions. REQUEST FOR PROPOSALS 29 RFP No.11-005