Loading...
HomeMy WebLinkAboutCRA-R-10-0101 11-29-2010 BackupSOUTHEAST OVERTOWN/PARK WEST, OMNI AND MIDTOWN COMMUNITY REDEVELOPMENT AGENCIES INTER -OFFICE MEMORANDUM To: Pieter Bockweg Executive Director From: Mark Spanioli, P.E. Director of Engineering and Construction Date: September 15, 2010 File: Subject: Two Guys Restaurant Design Build RFP References: Enclosures: The CRA has received the responses to the RFP for Design Build Services that was advertised for the relocation of the Two Guys Restaurant in accordance with the grant that was provided for this project. Two responses were received which included qualification packages and price proposals in accordance with the requirements of State Statues for Design -Build services. The two proposers received were: • Design Build InterAmerican / The Architects Group • Landel Construction / R.E. Chisholm Architects Staff has reviewed the packages for compliance with the submission requirements and has deemed one of the proposers, Landel Construction / R.E. Chisholm Architects non -responsive due to the following reasons: • Under Section 4.1 Submission Requirements, sub -section B of the RFP, proposers were required to utilize the price proposal form that was provided in Exhibit B (the draft contract). This form was not used and was not submitted. In the same section under sub -section C. Response Submission Format, proposers were required to submit a list of sub -consultants and subcontractors along with the price proposal form. These lists were not provided. Based on this information, it is my recommendation not to include Landel Construction / R.E. Chisholm Architects as a responsive proposer. Staff has also reviewed the remaining proposers and has deemed Design Build InterAmerican / The Architects Group responsive and they have met all the requirements outlined in the RFP. If you concur with the findings, we can proceed with the evaluation of Design Build InterAmerican / The Architects Group. cc: Clarence Woods, Ass. Director Jamil Fraser, Staff Counsel MIAMI • • Commuuitv�l( Redevelopment Agency :H715iEV5TkrVERFL, rl .l.K;a::'>( RICHARD P. DUNN, II Board Chair Executive Director SUPPORTING DOCUMENTATION October 14, 2010 Mr. Manuel Leon-Petisco, President Design Build. InterAmerican 8000 NW 7th Street, Suite 101 Miami, FL 33126 PIETER BOCKWEG Re: Design -Build Services for the Design, Renovation and Interior Build -out of the Two Guys Restaurant (236 NW 14'i' Street, Miami, FL) RFP No. 10-002 Dear Mr. Leon-Petisco, The Community Redevelopment Agency of the City of Miami ("CRA") has received the responses to the above referenced RFP that was advertised for the relocation of the Two Guys .Restaurant. CRA staff has reviewed the packages for compliance with the submission requirements and has deemed your firm, Design Build Inter. -American, the only responsive bidder for the project. Based on this information, CRA staff will be submitting a recommendation to proceed with your firm for Board approval at the next scheduled CRA Board meeting. If the Board approves the recommendation, CRA staff will proceed with contract negotiations with your company followed by a notice to proceed if negotiations are successful. Thank you for submitting a response and we look forward to doing business together in the near future. Should you have any questions, please do not hesitate to contact me. Sincerely, Mark Soli, P.E. Director of Engineering and. Consttuction cc: Pieter A.Bockweg, Executive Director Clarence Woods, Assistant Director Jamil S. Fraser, Staff Counsel SOUTHEAST OVERTOWN/PARK WEST, OMNI REDEVELOPMENT DISTRICT, AND MIDTOWN COMMUNITY REDEVELOPMENT AGENCIES 49 N.W. 51" Street, Ste. 100 / Miami, FL 33128 / Telephone: (305) 679-6800 / Facsimile (305) 679-6835 Email: crae..ci,miami.0.us. / Website: www.mlami-cra.org • DOCUMENTATION PRICE FORM: (Page 3 of 9) Construction Costs Phase Item Amount Sub-Total/Total Fee Guaranteed Maximum Cost of the Work 1. Complete Restaurant Build -out 167,530 SUB -TOTAL XXXX $167,530 Guaranteed Maximum Staffing Costs $ 14,916 XXXX Guaranteed Maximum General Conditions $ 6,126 XXXX SUB -TOTAL XXXX $ 188,572 Overhead & Profit $ 3 7, 5 8 4 XXXX SUB -TOTAL XXXX $ 226,156 Bond & Insurance this is part of the General Conditions $ 5,400 XXXX Guaranteed Maximum Construction Price XXXX I $ 231, 556 Guaranteed Maximum Price (GMP) (Note: This is the combined GMP Prices for design & construction XXXX $ 231,556.00 Our GUARANTEED MAXIMUM PRICE includes the total cost for the Work specified in this solicitation, consisting of fumishing all materials, labor, equipment, supervision, mobilization, overhead & profit required, in accordance with the Bid Specifications. Lump Sum: $ 231,556.00 Two hundred thirty one thousand, five hundred fifty six dollars with .00 cent Written Amount 83 Two Guys Restaurant RFP No.: 10-002 AGENDA ITEM FINANCIALFORM SFU.PW CRA or OMNI CRA_(if applicable) CRA. Board .Meeting Date: October 26. 2009 CRA Section: Finance Brief description of CRA Agenda Item: Authorizing a grant, in an amount not to exceed $260,000, under the RenovationfTenant Improvement Grant Initiative authorized by Resolution No. CRA-F - 7-0034, to Two Guvs Restaurant, inc. for the design 'build renovation of the commercial space at the corner of N.W. 3rd Avenue and N.W.'141M Street, Miami, Florida, for use as a restaurant.. roject dumber (if appiicable): YES, there are sufficient funds in :Line ltetn Account Code: 1O0+0:9 O1O1,8$5000,OUOO.6tOOOO tSEOP1 Nt <Comp au r+ c`of funds r. Amount budgeted in the line Item: Balance in the >line Item: Amount needed in the :line .kern: So ice t finds tr, srer f frofolio i g litre it itx A ACcour r V"CIMl3� i k' T(?TAIL trade Minor'0010 t From To From To Comment .Approved. by: (. Dat xecutive DirectorlDesigiee APPROVAL