Loading...
HomeMy WebLinkAboutCRA-R-10-0075 Backup 09-20-2010aim IMO THE BG GROUP C September.3, 2010 Mark Spanioli, PE. Director of Engineering and Construction City of Miami Commimity Redevelopment Agency 49 NW 5th Street, Suite 100 Miami, FL .33128 • I': 305-679-6800 F: 305-679.-6835, mspan@miamigov.corn Re: Cafe Bldg Demo at Bicentennial Park, Miami, FL To Attn: Mark E Under the terms and conditions of this Proposal by and between The BG Group, LLC (TheBG Group) and City of Miami (Customer), The BG Group will provide all labor, material and supervisioryneceSsary to complete the demolition and removal work described herein: SCOPE OF WORK: Site grading and tree removal, including permits, as per discussion with Steve Greenberg Proposal Amount: TEN THOUSAND AND FOUR HUNDRED ONE DOLLARS AND TVVENTY FOUR CENTS ($10/101.24) Work by The BG Group: 2.1 The BG Group will verify all utilities that serviced the structures or equipment to be removed have been disconnected prior to the start of any work. The BG Group will remove, load, haul and legally dispose of all combustible, solid and metallic, • debris resulting from the above captioned removal'work. Provide water supply in sufficient quantity and pressure and In close proximity to the removal site to support all dust control and fire control measures necessary for the completion of the work. 3. ,Licenses, Permits,.Regulatians and Insurance • 3.1 Prepare and submit any notifications required to complete the work described in this Agreement, • 3.2 The BG.Group will maintain Workers Compensation, General Liability Insurance with a 'combined 1140 Holland Drive Ste19 Roca Raton, a 33487 561-998-7997 Fax.:581-998-8815,emall:Sieperman@thebogroup.net • • . ...:... THE BO. 01100P,...11C single limit of $1,000,000.00 with a $ 5,000,000.00 umbrella 4. Work by Customer: Customer agrees to perform the.following.in a timely manner so as not to impede the progress of The BG Group's work described herein 4,5 Authorize The BG Group to utilize any or all of the following equipment and/or devices to complete the work described in this Agreement:. Crawler excavator with shear / grapple attachments Rubber tire skid steer loader 5. Contract Conditions: The Customer and The BG Group agree that The BG Group shall occupy the entire work area exclusively upon the.commencement of The BG Group's work. The BG Group shall not be responsible forthe safety of any person who enters the work area .unless such person has been specifically authorized by The BG Group to enter the work area. The BG Group will schedule work between the hours of 8:00 a.m. and 6:00 p.m. on a single shift basis, 5 days each week. Customer will convey to The BG Group all rights to, title to and interest in all building contents and/or salvage materials not listed above that are currently located within the dismantling area. Payment: Payment for all work completed shall be made to The BG Group upon the completion of work and owners acceptance without exception or retention whether or not Customer has received payment from any other party. Acceptance: • This Propo may be 'n shall remain an offer for acceptance by Customer for a period of thirty days and such offer tea thereafter, Steven -rep rman The BG Gro C 'Accepted By: Date: :1140 Holland Drive Ste ig Bocallanni,IL-33487 561-99S-7997 Fax:561-990-881 110 maw PROPOSAL General Engineering Contractors 13831 S.W. 59 ST., Suite 204 V NG Miami, FL 33183 Tel: (305) 752-7742 Fax: (305) 752-7728 Submitted To: Miami Dade Phone: ATTN: Mark Spanioli Proposal No: 4629 Date : 09/0912010 Revised by: Robert Delgado Fax: Page Number 1 of 6 Job Name: Biccentenial Park Job Location: Biscayne Boulevard 8'11 ST Description of Job The following is the quote for spreading and leveling of existing soils where trees were removed Grand Total $ 11,950.00 SOLUTION Construction, Inc. LIC, 11 CQC1505866 F oj CONTRACT PROPOSAL Mark Spanioli City of Mlaml 49 NW 5th Street, Suite 100, Miami , FL 33128, OFFICE: (305) 679-6800 FAX: (306) 679-6835 Project: Museum Park SCOPE OF WORK Tree Demolition Tree Disposal Spreading & Grading of Apprx. 2962cuyd. september 10, 2010 'LABOR, MATERIALS, EQUIPMENT, AND INSTALLATION AS REQUIRED TO COMPLETE THIS SCOPE OF WORK TOTAL PROPOSAL AMOUNT: .$16,538.00 (Owner Acceptance) (Date) 7955 NW 12 Street • Suite 425 • .Doral, Florida 33126 • Tel.: 786-621-8550 • Fax: 786-524-0775