Loading...
HomeMy WebLinkAboutCRA-R-05-0032 Back-upa m Poinciana Village Condominium Association, Inc 269NW 71h Street, Mani, Regis 33136 January 10, 2005 City of Miami Community Redevelopment Agency 49 NW 5th Street Suite 100 Miami, Florida 33128 Attention: Frank K. Rollason, Executive Director Re: Request for Funding Dear Mr. Rollason: The homeowners of Poinciana Village have continued to be good citizens of the City of Miami, under very difficult and challenging circumstances. At this time we find ourselves in need of assistance to address a number of issues as listed below (see attached schedule): 1. Replacement of 32 Pyramid Canopies for a total of $42, 267 — Canopies that cover the carports were either worn or torn and the Association was forced to remove all of the canopies that cover the carports. The steel framing is now exposed and gives the appearance of neglect and abandonment. 2. Refurbish the pool for a cost of $4,000 — The pool walls appear to be discolored and pool floor is plagued with holes (concrete exposed), creating a health hazard. 3. Seal Coat the Parking Lot fora total of $3,000 — The parking lot is in dire need of patch and seal coat. The parking lot markings are faded and asphalt is cracked in many areas. 4. Concrete repairs and painting of buildings for an estimated cost of $60,000 — A number of units are experiencing water leaks as a result of cracks to the exterior walls. This needs to be addressed immediately. Both buildings need to be repainted to achieve uniformity and maintain proper value. We remain confident that the promises and commitment of the City of Miami to redevelop this area will eventually come to fruition. However, realistically the development of Poinciana will probably extend over a period of two to three years. This is the estimated timeline before construction begins on the original Poinciana Village site. We therefore ask that you diligently examine resources within the Community Redevelopment Agency that may be available to assist us in meeting these urgent needs at the present time. Sincerely, Del Bryan, President Poinciana Village Condominium Association, Inc. CC: BOD Innovative Property Mgt. GRANT REQUEST ITEMS Poinciana Village Condominium Association, Inc. 2005 Facade/ Improvement Projects Description of Projects Costs 32 Pyramid Canopies $ 42,267.00 Refurbish Pool Walls and Floor 4,000.00 Seal Coat Parking Lot 3,000.00 Budding Painting/Concrete Repairs Total Cost of Projects: 60,000.00 $ 109,267.00 TOTAL ITEMS REQUIRING ATTENTION Poinciana Village Condominium Association, Inc. 2005 Capital Improvements - Critical Maintenance Projects Description of Projects Costs 32 Pyramid Canopies $ 42,267.00 Refurbish Pool Walls and Floor 4,000.00 Seal Coat Parking Lot 3,000.00 Building Painting/Concrete Repairs 80,000.00 Replacement of Floors 5,600.00 Tele-Entry 1,800.00 Engineering Services 3,500.00 Construction Administration - 2% of Project 4,000.00 Repair of Units - Water Intrusion 10,000.00 Lighting - Electrical 3,004.61 Gating - NW 8th - Installation 875.00 Elevator Cab - Floors 1,500.00 Landscaping Upgrades - Bldg. 201 and 269 5,000.00 Entrance - Signage 800.00 Entrance - Landscaping Upgrades 1,500.00 Sub -meter 17,250.00 Contingency - Concrete & Painting - 25% 20,000.00 Total Cost of Projects: $ 204,096.61