To Chairman Johnny L. Winton Date: 05-13-05 Ile 05-00455
and Members of the CRA Board
?nl
Subject: Ratification of Emergency Action by
Executive Director for Mt. Zion Underground
Electric Service Engineering
From: Frank K. Rollason References
Executive Director
Enclosures: Supporting Documentation;
Legislation
RECOMMENDATION:
It is recommended that the Board of Directors for the Southeast Overtown/Park West Community
Redevelopment Agency (CRA) approve and adopt the attached Resolution ratifying the Emergency Action of
the Executive Director to issue Work Order No. 05-34 to TY Linn/HJ Ross for professional engineering services
for the Underground Electrical Service Conversion for The Historic Mount Zion Missionary Baptist Church
located at 301 NW 9th Street in Overtown in the amount of $8,350.00.
JUSTIFICATION:
As part of the completion for the 9'h Street Pedestrian Mall Extension Project (the section between NW 2nd and
3rd Avenues), Florida Power and Light (FPL) has been given a work order to remove the power poles along this
portion of the mall and has completed all the work they can until the Mt. Zion work is completed. To keep this
project moving forward, the Executive Director has issued Work Order No. 05-34 on an emergency basis. As
part of the FPL work it is necessary to convert all the properties fronting the mall to underground service (The
Dorsey House and the adjacent apartment building were converted in late 2003 and funded by the CRA). The
conversion for Mt.Zion is more complicated in nature and thus requires the formulation of engineering plans that
can be utilized for bids from various electrical contractors to perform the construction. It is estimated that the
actual cost of the conversion will be in the $20,000 range and thus, we will want to bid this particular project
rather than just select a vendor at will. The CRA's Engineering Consultant, TY Linn/HJ Ross has submitted a
proposal and associated Scope of Services to perform the engineering element of this job (copy attached) for
the amount of $8,350 which includes the preparation of the required engineering drawing and processing of
same through the permitting process as well as required boundary and topographic survey. TY Linn/HJ Ross
will also oversee the contractor's work during the construction phase as part of their Scope of Services.
FUNDING SOURCE: $8,350.00 from SEOPW Account # 689001.550108.6.270 entitled Professional Services -
Other.