Loading...
HomeMy WebLinkAboutCRA-R-05-0023 Back UpTYLININTERNATIONAL I HJ ROSS engineers I planners I scientists April 19, 2005 Frank Rollason, Executive Director City of Miami Community Redevelopment Agency. 49 NW 5th Street, Suite 100 Miami, FL 33128 RE: Historic Mount Zion Missionary Baptist Church Underground Electrical Conversion Professional Engineering Services Fee Proposal Dear Frank: T.Y. Lin International I H.J. Ross (TYLI k HJR) proposes to provide professional engineering services for the underground electrical conversion on the referenced project. The work scope involves designing the electrical connection from the FPL transformer to the existing Mt. Zion church building. The scope is further described in the attached Exhibit "A". TYLI I HJR will accomplish this work as described in Exhibit "A" for a lump sum fee of $8,350. A breakdown of the fee is provided in Exhibit "B". If you agree with this proposal, please issue a Purchase Order and we will begin work immediately. Charles Deeb, P.E. Vice President GA55002365 Mt Zioa\Docs\Mt Zion Electrical pro.doc 201 Alhambra Circle, Suite 900 j Coral Gables, Florida 33134 I T 305.567.1888 I F 305.567.1771 1 www.tylin.com • Frank Rollason April 19, 2005 Page 2 of 3 EXHIBIT "A" "SCOPE OF WORK" 1. PROJECT DESCRIPTION The Community Redevelopment Agency is assisting the Historic Mount Zion Missionary Baptist Church with its underground electrical conversion. This is needed due to the placement of FPL's power lines underground along NW 3'd Avenue as part of the 9th Street Electrical Conversion Project. 2. SCOPE OF SERVICES TO BE PERFORMED BY TYLI HJR TYLI I HJR will provide professional engineering services to prepare design plans for the electrical conversion under its agreement with the CRA. The scope of work involves electrical plans and details to convert the existing overhead electrical power supply to and underground feed to the building. It is suspected that much of the building electrical system is not up to current code; therefore, this work will be limited to the main power supply to the electrical panel. The services are is limited to the following: 2.1 Field review - includes 2 site visits to assess the status of the existing facilities and to meet with FPL at the site. 2.2 Provide boundary and topographic survey. 2.3 Electrical Design — prepare plans and details sufficient for permitting and construction. Electrical design will only be from FPL power source to the main panel within the building. Design includes panel upgrades to meet current codes. 2.4 Process plans through the Building Department for permitting. Contractor obtains the permit. 2.5 Provide 4 site visits during construction to observe contractor's work. 3. ITEMS NOT INCLUDED 3.1 Materials testing. 3.2 Structural Assessment. 3.3 Civil or Site Engineering. 3.4 Electrical engineering downstream of the panel (within the building). G:155002365 Mt Zion\Docs\Mt Zion Electrical pro.doc Frank Rollason April 19, 2005 Page 3 of 3 4. INFORMATION TO BE PROVIDED TO TYLI I HJR 4.1 Access to the building and site. 4.2 Record drawings of existing building. 5. SCHEDULE OF SERVICES This work will commence upon receiving a Purchase Order and the necessary information requested. Plans will be ready for permit review within four weeks. G:155002365 Mt Zion\Docs\Mt Zion Electrical pro.doc } i N ERN lONAL City of Miami Community Redevelopment Agency Mt. Zion Historic Missionary Baptist Church Underground Electrical Conversion Date: 04/19/05 Project 550023.65 FEE PROPOSAL Principal Engineer Project Manager professional Engineer 1 Architect Engineer 1 Architect Technician Drafter No. Rate Rate Rate Rate Rate Rate Total. Total TASKS Shts Hours $120.00 Hours $100.00 Hours $90.00 Hours $85.00 Hours $65.00 Hours $56.00 Hours Cost Electrical Site Plan 1 $0 2 $180 4 $340 12 $780 $0 18 $1,300 Building Elevations 1 -.. $0 Y_...__...._....__- ._$0.._,...._.___ $0 ._.. ..._ 2 $180 _.___.. 6 $510 12 $780 $0 20 $1,470 Site Visits $0...:................................$0.........................2........ $180.............._..... 2 $170 $0 $0 4 $350 ......................... Coordination 2 $240 4 $400 4 $360 $0 $0 $0 10 $1,000 Permit Processing $0 $0 $0 6 $510 $0 $0 6 $510 Construction Admin. $0 4 $400 4 $360 8 $680 $0 $0 16 $1,440 Total 2 2 $240 8 $800 14 $1,260 26 $2,210 24 $1,560 0 $0 I 74 $6,070 G:155002365 Mt Zion1Docs1[Mt Zion electrical tee.xlsjA Direct Expenses: Subtotal: Consultants (survey): $300 $6,370 $1,980 TOTAL BASIC SERVICES: $8,350 1Iit tamt .W JOHNNY L.WINTON Chairman WORK ORDER NO. 05-34 RFS No. 05-12 FRANK K. ROtLASON Executive Director Consultant/Vendor: T.Y. Lin International j H.J. Ross 201 Alhambra, Circle, Suite 900 Coral Gables, Florida 33134 Request Date: April 25, 2005 Requestor: Frank K. Rollason, Executive Director Purpose: Electric Service Conversion at the Mt. Zion Historic Missionary Baptist Church — 301 N.W. 9th Street SCOPE OF SERVICES T.Y. Lin International I H.J. Ross (TYLI I HJR) will provide emergency professional engineering services:for the underground electrical conversion, to include signed and sealed plans, for The Historic Mount Zion Missionary Baptist Church located at 301 NW 9 Street in Overtown per the attached proposal from TYLI I HJR.. The work will be completed by TYLI 1 HJR per the terms of its agreement with the CRA. Estimated Fee: $8,350 Approximate Schedule: Emergency - April 25, 2005 through May 23, 2005 (4 weeks) Approvals: Funding Source h.,4Uu Accounting ? Frank K. Rollason, Executive Director �igq9l. sso/oF• . P-6 0 Account y/zsos Date L6/off I Date COMMUNITY REDEVELOPMENT AGENCY 49 Northwest 5` Street; Suite100 f Miami, Florida 33128 /005i 679-6800! Fax: (305) 679-6835 E-ma iL<r o.niami.t / ire: verew miam -C1a.mg