HomeMy WebLinkAboutCRA-R-05-0022 backup point2Jan 31 2095 1:54P1i HP LASERJET FAX
p.1
e' ,;1
4 ;e
40417;
January 31, 2005
DOUGLAS WOOD
& ASSOCIATES, INC. r. STRUCTURAL ENGINEERS
!Mr. Armando Trujillo
4Gurri Mature, P.A.
;2701 Ponce de Leon Boulevard
;kSuiite 203
4Coral Gables, Florida 33134
deference:
L.
iN
;Dear Armando:
Ward Rooming House
Temporary Bracing and Sho
':ais�•�w�.:.ar�lG�vft�a�srni�bi>v;YL��,y
VIA FAX: 305.4.45.0656
;';We thank you for this opportunity to ass you, and we enthusiastelly submit : proposal for
-`y tructural engineering services for the temporary ro o
la #House p p bracing endbhoring for tfi.'' :rd Rooming
r
jDESCRIPTION OF PROJECT P
.';Our understanding of the extent of this prof is based on the HAGS j swings you rece , faxed to
'bus, the markings you placed on these draw' gs, the photos which you ecently e-mailed to and on
our preliminary site observations.
?At this time, it is intended to provide a ropriate temporary bracing nd shoring for the _ alning
portions of the existing structure. Tw ossible schemes are under nsideration. The fi is to
,provide appropriate temporary bracing and shoring for only the a isting front porch a ents,
;hollowed by immediate removal of the maining concrete block wails f the main part of the ' 'ginal
bullding. The second is to provide t porary bracing an oring for all of the presently re fining
'Iportions of the building.
lit should be noted that the a }
ppra ate bracing and sho'�,R �, ' ill need
reed not only to Support some amity loads, but it will also need t
;loads. This temporary cons ction will need to include substa
;foundations. We will need tg discuss the design wind speed with
;11require compliance with full.dasign wind speed (146 mph, using ASCE
'ildesign wind speed (say a minimal hurricane wind speed of 90 mph, usi
I SCOPE OF BASIC SERVICES
1 Douglas Wood & Associates, Inc. will provide the following structural
305 461-3450 a FAX 305 461-3650 • inbox@dou
299 Alhambra Circle a Suite 210 r Coral Gables,
be quite substantial.
t will
resist si nificant Iatera wind
ial fro g and sub = ntiet
Buiildi Official. may
-98) or may allow lesser
g ASCE -98).
sneerinq services:
aswood.
rida 331
ARinni,liue AutionlEqual Opportunity Emplay.r
CU 8353
Jan 31 2005 1:54P11 HP LffSERJET FAX
p.2
•
MS. ARMANDO TRUJILLO .IAHUARY 31. 2006
PROJECT: WARD ROOMING HOUSE PAGE 2 OF 6
1. review of available drawings for the existing construction for the purpose of coordinating it
with the proposed temporary bracing and shoring,
2. visual observation of the existing structure as it relates to the proposed temporary bracing and
shoring,
3. consultation and coordination with you and the Building Official,
4. research of the building code and other local ordinances effecting structural design for this
work,
5. coordination and review of foundation recommendations from the geotechnicai engineer,
6. participation in necessary design phase meetings, including one meeting with the Building
Official,
7. structural analysis and design,
8. preparation of structural engineering drawings (specifications will be in the form of notes on
the drawings),
9. preparation of a package of structural calculations for submission to the Building Department,
10. responses to any Building Department review comments,
11. review of required shop drawing and other structural submittals,
12. responses to reasonable questions from the contractor during construction, and
13. up to five construction site observation visits with written reports (for the purpose of general
monitoring of the structural construction).
ADDITIONAL SERVICES
All services not specifically indicated In the "Scope of Basic Services," any significant additions to the
project or to our scope of services, structural systems different from those described above,
construction phase site visits and meetings in excess of five and any changes to work already
accomplished will be considered additional services.
SERVICES BY OTHERS
It is also understood that it will be necessary for the owner to obtain the services of a geotechnical
engineer to perform soils exploration, testing and analysis and to prepare a written report of findings
and foundation recommendations. Douglas Wood & Associates, inc. will coordinate with this
consultant to provide suggested boring locations and provide projected structural requirements.
You and the owner will provide to us a copy of all drawings, reports and other documentation which
you and the owner have or which are available from the Building Department which are relevant to
this project. Unless otherwise informed by you or the owner, we will rely upon the accuracy of these
documents.
It is understood that all construction activities and the conformance of the construction to the
structural drawings and Building Coda will be the responsibility of the owner's contractor. It will be
the contractor's responsibility to assure that all required inspections have been completed prior to
continuing with subsequent construction work. It is recognized that any inspections performed by
Douglas Wood & Associates, Inc. in no way relieve the contractor from his responsibility to construct
In accordance with his contract documents and the Building Code. As an inspecting engineer,
Douglas Wood & Associates, inc. exercises no control over any of the contractor's activities.
Furthermore, it is recognized that an inspecting engineer can not directly observe every aspect of the
structural construction, nor can an inspecting engineer monitor actions by the contractor when the
) see cting engineer is not performing an inspection.
Jan 31 2005 1:54Pn HP LASERJET FAX
p.3
ipMS. ARMAfND0 1'fil J U.0 JANUARY 31, 2005
PROJECT: WARD ROOMING HOUSE PAGE 3 OF 5
•
If required, it will be the contractor's responsibility to prepare and submit shoring and reshoring
drawings.
LIMITATIONS
it must be understood that our review of the existing construction will be only for the purpose of
coordinating it with the proposed temporary bracing and stabilization. We will not be verifying its
adequacy and will not assume any responsibility for it.
Hidden Conditions and Hazardous Materials
A structural condition is hidden if concealed by existing finishes or if it cannot be investigated by
reasonable visual observation. If Douglas Wood & Associates, Inc. has reason to believe that such a
condition may exist, Douglas Wood & Associates, Inc. will notify you who shall obtain authorization
for payment for all costs associated with the investigation of such a condition and, if necessary, all
costs necessary to correct said condition. If (1) you fail to obtain such authorization for investigation
or correction after due notification, or (2) Douglas Wood & Associates, Inc. has no reason to believe
that such a condition exists, the owner will be responsible for all risks associated with this condition,
and Douglas Wood & Associates, Inc. shall not be responsible for the existing condition nor any
resulting damages to persons or property. Douglas Wood & Associates, Inc. shall have no
responsibility for the discovery, presence, handling, removal, disposal or exposure of persons to
hazardous materials of any form.
agg
Our fee for the performance of the "Scope of Basic Services" for the front porch only will be a lump
sum fee of 46,350.00. �.... ;-d �L---�_�-- - -•
down by phase as follows: This fee can be broken
These fee include reasonable out-of-pocket project expenses for coordination between our offices.
Reproduction expenses for permitting, owner review and construction will be billed at our cost plus
10%.
Additional services will be billed at our standard hourly rates at the time the services are performed.
Our current standard rates are as follows:
PRINCIPAL
SENIOR ENGINEER
FIELD ENGINEERIENGINEER INTERN
DRAFTSPERSON
CLERICAL
$ 135.00 PER HOUR
$ 110.00 PER HOUR
$ 75.00 PER HOUR
$ 60.00 PER HOUR
$ 40.00 PER HOUR
if desired,. we can negotiate a lump sum fee for any significant additional services for which e scope
of services can be well defined.
If it becomes necessary for portions of our Basic Services to be performed more than twenty-four
months after the date of this proposal, our lump sum fees for those remaining services will be
idjusted to reflect increases in our standard billing rates at that time.
Jan31 2005 1:54PH HP .LASERJET FOX
p. 4
IsMS. ARMANDO TRUJIL LO
PROJECT: WARD ROOMING HOUSE
•
•
TERMS AND CONDITIONS
JANUARY 31, 2005
PAGE 4 OF 5
Bllbngs And Payments
We will invoice approximately monthly. The amount of each invoice will be based on our estimated
percent complete of the "Basic Services" plus any appropriate charges foradditional services and out-
of-pocket project expenses and overdue invoice charges.
Payment of invoices will be due upon receipt. We reserve the right to withhold services and
documents, and/or file a lien on the real property pending receipt of appropriate payment. Any
invoices, which remain unpaid after sixty days from the date of the invoice, will accrue interest at the
rate of 1.50% per month.
In the event any portion of an account remains unpaid 90 days after billing, the costs of collection,
including reasonable attorneys' fees will be billed, and due upon receipt of the invoice.
Access to Site
Unless otherwise stated, Douglas Wood & Associates, Inc. will have access to the site for activities
necessary for the performance of the services. Douglas Wood & Associates, Inc. will take
precautions to minimize damage due to these activities, but the owner will be responsible for the cost
of restoration of any resulting damages.
;Termination of Services
This agreement may be terminated upon
to perform his obligations hereunder. In
Associates, Inc. for all services rendered
reasonable termination expenses.
Ownership of Documents
All documents produced by Douglas Wood & Associates, Inc. under this agreement shell remain the
property of Douglas Wood & Associates, Inc. and may not be used for any other endeavor without
the written consent of Douglas Wood & Associates, Inc.
Dispute Resolution
Any claim or dispute between you and Douglas Wood & Associates, Inc. shall be submitted to non-
binding mediation, subject to the parties agreeing to a mediatorlsl. This agreement shall be governed
by the laws of the principal place of business of Douglas Wood & Associates, Inc.
Any claim for professional negligence whether directly or by way of a cross complaint, against
Douglas Wood & Associates, Inc. shall be preceded by a written certification executed by an
independent registered engineer currently practicing structural engineering in Ronda. This certificate
shall contain: a) the name and license number of the certifier; b} specify the acts or omissions that
the certifier contends are not in conformance with the standard of care for a structural engineer under
similar circumstances; and ci state in detail the basis for the certifier's opinion that such acts or
omissions do not conform to the standard of care. This certificate shall be provided to Douglas Wood
& Associates, Inc., not less than thirty 130) calendar days prior to the presentation of any judicial
broceeding.
10 days written notice by either party should the other fail
the event of termination, you shall pay Douglas Wood &
to the date of termination, all reimbursable expenses, and
Building Owner's
?an 31 ,2005 1:55PM HP LASERJET FAX
MS. N tIA DQ TRWILLO JANUARY 31, x005
Building
Building
for Gurri Matute, P.A.
Date
PROJECT; WARD ROOMING HOUSE
PAGEE;QFg
CONCLUSION
It will be a pleasure to work with ycu on this project. We wiI! put our considerable experience,
expertise and resources to work to help make this a successful project for you and the owner.
Please indicate your acceptance of this proposal by signing a copy of this letter and completing the
requested information In the spaces provided below and returning it tO us. We will begin work upon
receipt of the retainer and completed letter, and we will work diligently to provide information to yaw
and to the other consultants and to provide cur services in a timely manner.
Sincerely,
DOUGLAS WOOD & ASSOCIATES, INC.
President
Is Wood,
Ow
Building Owner's Adc
SEOPW AND OMN I/CRA
CITY CLERK'S REPORT
MEETING DATE: April 26, 2004
Page No. 9
ITEM 14A
ITEM 14B
A RESOLUTION OF THE BOARD OF DIRECTORS
OF THE SOUTHEAST OVERTOWN/PARK WEST
COMMUNITY REDEVELOPMENT AGENCY
("CRA") DIRECTING THE EXECUTIVE DIRECTOR
TO SEEK FUNDING FOR THE PRESERVATION,
REHABILITATION, AND RESTORATION OF THE
WARD ROOMING HOUSE, AT 249 NORTHWEST
9TH STREET, MIAMI, FLORIDA, IN THE AMOUNT
OF $600,000.00, THROUGH THE CITY OF MIAMI
DEPARTMENT OF COMMUNITY DEVELOPMENT;
FURTHER DIRECTING THAT SHOULD SUCH
FUNDING BE UNAVAILABLE, THE EXECUTIVE
DIRECTOR SHALL ALLOCATE TAX INCREMENT
FUNDS IN THE AMOUNTS STATED ABOVE FOR
THIS PURPOSE 1N THE CRA'S FISCAL YEAR 2005
BUDGET.
A RESOLUTION OF THE BOARD OF DIRECTORS
OF THE SOUTHEAST OVERTOWN/PARK WEST
COMMUNITY REDEVELOPMENT AGENCY
("CRA") DIRECTING THE EXECUTIVE DIRECTOR
TO SEEK FUNDING FOR THE PRESERVATION,
REHABILITATION, AND RESTORATION OF THE
CHURCH OF THE DIVINE MISSION, AT 910
NORTHWEST 2ND COURT, MIAMI, FLORIDA, IN
THE AMOUNT OF $500,000.00, THROUGH THE
CITY OF MIAMI DEPARTMENT OF COMMUNITY
DEVELOPMENT; FURTHER DIRECTING THAT
SHOULD SUCH FUNDING BE UNAVAILABLE,
THE EXECUTIVE DIRECTOR SHALL ALLOCATE
TAX INCREMENT FUNDS IN THE AMOUNTS
STATED ABOVE FOR THIS PURPOSE IN THE
CRA'S FISCAL YEAR 2005 BUDGET.
SEOPW/CRA RESOLUTION04-33
(MODIFIED)
MOVED: REGALADO
SECONDED: WINTON
UNANIMOUS
SEOPW/CRA RESOLUTION 04-34
(MODIFIED)
MOVED: WINTON
' SECONDED: SANCHEZ
UNANIMOUS
ITEM 14
4/26/04
RESOLUTION NO. SEOPW/CRA R-3
A RESOLUTION OF THE BO
THE SOUTHEAST OVERTOWN/
REDEVELOPMENT AGENCY ("
EXECUTIVE DIRECTOR TO S
PRESERVATION, RE
RESTORATION OF THE WAR
D
WHEREAS, the Southeast Overtown/Park West Community
Redevelopment Agency ("CRA") has acquired the Ward Rooming House
at 249 Northwest 9th Street, Miami
Florida, and the Church of
the Divine Mission at 910 Northwest 2nd Court, Miami, Florida
with the intent of preserving,
these structures; -and
WHEREAS, the CRA has received
rehabilitate and restore these
rehabilitating and restoring
cost estimates to preserve,
structures from T.Y. Lin
International/H.J. Ross in the amounts of $600,000.00 for the
r
r
4110 Ward Rooming House and $500,000.00 for the Church of the Divine
Mission; and
WHEREAS, the Board of Directors wishes to direct the
Executive Director to seek funding for this purpose through the
City of Miami Department of Community Development; and
WHEREAS, the Board of Directors wishes to further direct
that should funding through the Department of Community
Development be unavailable, the Executive Director shall
allocate tax increment funds in amounts stated above for this
purpose in the CRA's Fiscal Year 2005 Budget;
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF
SOUTHEAST OVERTOWN/PARK WEST COMMUNITY REDEVELOPMENT AGENCY OF
THE CITY OF MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the
Preamble to this Resolution are adopted by reference and
incorporated as if fully set forth in this Section.
Section 2. The Executive Director is directed to pursue
funding for the preservation, rehabilitation and restoration of
the Ward Rooming House, at 249 Northwest 9th Street, Miami;
Florida, in the amount of $600,000, and the Church of the Divine
Mission, at 910 Northwest 2nd Court, Miami, Florida, in the
amount of $500,000, through the City of Miami Department of
Community Development.
Page 2 of 3
•
•
Section 3. The Executive Director is further directed
that should such funding be unavailable, the Executive Director
shall allocate tax increment funds in the amounts stated above
for this purpose in the CRA's Fiscal Year 2005 Budget;
Section 4. This Resolution -.shall become effective
immediately upon its adoption.
PASSED AND ADOPTED this 26th day of April, 2004.
ARTHUR E. TEELE, JR., CHAIRMAN
ATTEST:
PRISCILLA A. THOMPSON
CLERK OF THE BOARD
APPROV
0 FO' • 1 CORRECTNESS:
0 VILARELLO
ERAL COUNSEL
BSS:JHV
Page 3 of 3