HomeMy WebLinkAboutCRA-R-04-0008 WARD-BACKUP DOCUMENTSARTHUR_ E. TEELE IJR.
CHAIRMAN
WORK ORDER NO. 04-27
RFSNO.#04-17
FRANK K.Rf3LLASO.N.
EXECUTIVE DIRECTOR
Consultant/Vendor: TY LIN/ H.J Ross
201 Alhambra Circle, Suite:900
Coral Gables, FL 33134
Request Date: August 12, 2004
Requestor: Frank K. Rollason
Purpose: Emergency A&E Services for Ward Rooming House
SCOPE OF SERVICES
TY LIN InternationallHJ Ross will provide design, inspections, permitting and lab testing, for the
improvement of the Ward Rooming House, located at 249-255 NW 9th Street as specified in the
feasibility study titled Restoration of the Ward Rooming House (TY LUHJR Project Number:
550023.29) dated March 10, 2004 under alternative #2 (Salvage Facade & Front Porch and Replace the
Main Building).
Estimated Fee: $80,541.50
Schedule: Work to be performed on an emergency basis
Approvals: 6e1/Zei.
FunditRe
Accounting
Frank K. Rollason, Executive Director
Community Redevelopment Agency
49 NW 5th Street, Suite 100
Miami, Florida 33128
Tel: (305) 679-6800 Fax: (305) 679-6835
E-mail: cra@ci.miami,fl.us
Website: www.miami-cra.org
/TYLININTERNATIONAL / H•J•ROSS
August 3, 2004
Frank K. Rollason, Executive Director
City of Miami Community Redevelopment Agency
49 NW 5th Street, Suite 100
Miami, FL 33128
RE: Ward Rooming House — Shell Structure Restoration
Architecture/Engineering Fee Proposal
Work Order No. 04-27; Request for Service No. 04-17
Dear Frank:
T.Y. Lin International / H.J. Ross (TYLI/HJR) proposes to provide professional architectural and
engineering services for the referenced project. The work scope involves designing the shell
structure and minor site improvements of the Ward Rooming House. The scope is further
described in the attached Exhibit "A", and in Gurri-Matute's architectural proposal.
TYLIIHJR proposes to accomplish this work as described in Exhibit "A" for a lump sum fee of
$106,552. This is broken down as 75% fee for design and permitting, and 25% fee for bidding
and construction management as follows:
$74,941.50 Design
$2,600.00 Survey
$3,000.00 Expenses
f $80,541.50 Design and Permitting I
$25,980.50 Bid and Construction Management
$106,522.00 Total Fee
A detailed breakdown of the fee is provided in Exhibit "B". If you concur with this proposal,
please issue a Work Order and we will begin work immediately.
Vice President
F:1Chuck's Files from G\Proposal\Ward Rooming House shell pro.doc
201 Alhambra Circle, Suite 900 • Coral Gables, FL 33134 • Telephone: (305) 567-1888 • Facsimile:(305) 567-1771
FEASIBILITY STUDY FOR
City of Miami
Community Redevelopment Agency
9 N.W. 9th Street, Miami
TYLIIHJR Project Numbert-550023.29
March 10, 2004
TYL NINTERNATIONAL/ 1-1J-ROSS
Engineers • Planners • Scientists
201 Alhambra Circle Suite 900 Coral Gables Florida 33134
1
1
r
1
z
1
1
i
STATEMENT OF PROBABLE CONSTRUCTION COST
Alternative #1- Restore the Existing Structure
Item
Ficus tree removal
Demolition of the west wall
Scaffold removal/relocation (as needed)
Restoration of the existing structure
Contmgcy
PWW
Des i • n, Ins • ections and Lab. Testin
Qty.
1
1
1
2,457
1
Unit
LS
LS
LS
SF
LS
Unit Price
Total
$4,500.00 $4,500.00
$1.,750.00. $1,750.00
$4,000.00 $4,000.00
$400.00 $982,800.00
20% $198,610.00
20%
Alternative #2 - Salvage Facade & Front Porch and Replace the Main Building
$238,332.00
Item
Qty.
Unit
Unit Price
Total
Ficus tree removal
Demolition of the main building
Scaffold removal/relocation (as needed)
Restoration of the front pooh & facade
Re -construct the main building
Contin •enc
LS
LS
LS
SF
SF
LS
1
1
1
400
2,057
1
1
Alternative #3 - Demolish Existing and Build a New Structure
$4,500.00
$4,000.00
$4,000.00
$325.00
$130.00
20%
20%
$4,500.00
$4,000.00
$4,000.00
$130,000.00
$267,410.00
$81,982.00
$98, 378.40
Item
Qty.
Unit
Unit Price
Total
Ficus tree removal
1
LS
$4,500.00
$4,500.00
Demolition of the entire building
1
LS
$5,000.00
$5,000.00
Scaffold removal
1
LS
$4,000.00
$4,000.00
Build new structure
2,457
SF
$130.00
$319,410.00
Contin enc
1
LS
20%
$66,582.00
�_'e�;
�' i `�a� :v"4..,F�t- z ;�
`a.
kA7x x
'i
g . r'K
i
Design Inspections and Lab. Testing
1 LS
20% $79,898.40
''R'>^¢4i.e5p., Y :A f'��," l V�`� -iN ;+Sq� ,,,4
TO`F NI6 , R TIVE .
�,
����§'�� �� Z
1 �. , _
{ . dt°�`'�
F._,
SEOPW AND OMNI/CRA
CITY CLERK'S REPORT
MEETING DATE: April 26, 2004
ITEM 14A
A RESOLUTION OF THE BOARD OF DIRECTORS
OF THE SOUTHEAST OVERTOWN/PARK WEST
COMMUNITY REDEVELOPMENT AGENCY
("CRA") DIRECTING THE EXECUTIVE DIRECTOR
TO SEEK FUNDING FOR THE PRESERVATION,
REHABILITATION, AND RESTORATION OF THE
WARD ROOMING HOUSE, AT 249 NORTHWEST
9TH STREET, MIAMI, FLORIDA, IN THE AMOUNT
OF $600,000.00, THROUGH THE CITY OF MIAMI
DEPARTMENT OF COMMUNITY DEVELOPMENT;
FURTHER DIRECTING THAT SHOULD SUCH
FUNDING BE UNAVAILABLE, THE EXECUTIVE
DIRECTOR SHALL ALLOCATE TAX INCREMENT
FUNDS IN THE AMOUNTS STATED ABOVE FOR
THIS PURPOSE IN THE CRA'S FISCAL YEAR 2005
BUDGET.
SEOPW/CRA RESOLUTION 04-33
(MODIFIED)
MOVED: REGALADO.
SECONDED: WINTON
UNANIMOUS
ITEM S-5
JUL
RESOLUTION NO. SEOPW/CRA R- on- 6 2
A RESOLUTION OF THE BOARD OF DIRECTORS
OF THE SOUTHEAST OVERTOWN/PARK WEST
COMMUNITY REDEVELOPMENT AGENCY
AUTHORIZING THE EXECUTIVE DIRECTOR TO
ISSUE A WORK ORDER, UNDER THE EXISTING
CONSTRUCTION MANAGER -AT -RISK CONTRACT
WITH MAGNUM CONSTRUCTION MANAGEMENT
CORP., D/B/A MCM CORP., FOR THE GRAND
PROMENADE INTERIM RENOVATION PROJECT IN
AN AMOUNT NOT TO EXCEED $500,000.00;
FUNDS TO BE ALLOCATED FROM ACCOUNT CODE
799126.452502.6.930.
WHEREAS, the Southeast Overtown/Park West Community
Redevelopment Agency ("CRA") is responsible for carrying
out community redevelopment activities and projects within
the Southeast Overtown/Park West redevelopment area in
accordance with the approved Redevelopment Plan; and
WHEREAS, by Resolution No. SEOPW/CRA 01-51, passed and
adopted on May 21, 2001, the CRA authorized the Executive
Director to execute a contract with Dover Kohl & Partners
for the design and planning of a Grand Promenade along the
old FEC right-of-way in the Park West entertainment
district; and
Page 1 of 3
SEOPW/CRA
03- 62
ITE s-5
JUL 15 2003
WHEREAS,' while the conceptual design is finalized,
interim renovations are necessary to upgrade service,
maintain access, and ensure the safety of the public and
businesses utilizing the area; and
WHEREAS, on October 1, 2002, the CRA entered into a
contract for Construction Manager -at -Risk services with
Magnum Construction Management Corp., D/B/A MCM Corp.; and
WHEREAS, the CRA desires to award construction of the
interim renovations under its existing contract for
Construction Manager -at -Risk services as Community
Development funding currently available for the interim
renovations will be withdrawn before the final design and
formal bid process can be completed.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF
DIRECTORS OF SOUTHEAST OVERTOWN/PARK WEST COMMUNITY
REDEVELOPMENT AGENCY OF THE CITY OF MIAMI, FLORIDA:
Section 1. The recitals and findings contained in
the Preamble to this Resolution are adopted by reference
and incorporated herein as if fully set forth in this
Section.
Section 2. The Executive Director is authorized to
issue a Work Order to Magnum Construction Management Corp.,
D/B/A MCM Corp. under its existing Construction Manager -at -
Page 2 of 3
SEOPW/CRA
03- 62
JUL 15 2003
Risk contract ° with the CRA for construction of the Grand
Promenade Interim Renovations in an amount not to exceed
$500,000.00.
Section 3. Funds are to be allocated from Account
Code No. 799126.452502.6.930.
Section 4. This Resolution shall become effective
immediately upon its adoption.
PASSED AND ADOPTED this 1✓ day of July, 2003.
ART ` E. TEELE, JR . , CHS;RMAN
ATTEST:
(y
PR SCILLA A. THOMPSON
CLERK OF THE BOARD
APPROVED AS T• ORM CORRECTNESS:
R VILARELLO
L COUNSEL
FKR/ JHV
Page 3 of 3
SEOPW/CR
0 3 - 62
JUL , 5 i3Oo,
Grant, Neko
From: Chuck Deeb [CDeeb@tylin-hjross.com]
Sent: Thursday, June 05, 2003 9:53 AM
To: Grant, Neko
Cc: Rollason, Frank; Villacoria, James H
Subject: Promenade Cost
Attached are detailed preliminary construction cost estimates for the three phases of the Grand
Promenade Interim Improvements. The cost summary is as follows:
Phase 1 $127,400
20% Cont. $25,500
Total $152,900
Phase 2 $130,500
20% Cont. $26,100
Total $156,600
Phase 3 $135,400
20% Cont. $27,100
Total $162,500
Grand Total = $472,000
Chuck Deeb, P. E.
Vice President
BLOCK ONE
BLOCK TWO
BLOCK THREE
T. Y. LIN International / H. J. ROSS
201 Alhambra Circle, Suite 900
Coral Gables, FL 33134
(305) 567-1888 Ext. 229 - Phone
(305) 567-1771 - Fax
SEOPW/CRA
19 3- 2.
6/l 2/2003
City of MiamiA
Grand Promenade interim Improvements - Phase 1
North Miami Ave. to NE lst Ave.
Date: 06/12/03
TYLII/HJR No. 550023.xx
Item
Description
Unit
Unit Price
Quantity
Amount
1
Maintenance of Traffic
DAY
$100.00
30
$3,000.00
2
Clearing and Grubbing
AC
$2,000.00
2
$4,000.00
3
$0.00
4
Tree Relocation
EA
$0.00
5
Tree Removal
EA
$200.00
5
$1,000.00
6
Earthwork
LS
$3,500.00
1
$3,500.00
7_-7yp-e
"B" Stabilization (LBR 40)(12"ThickL
SY
$0.00
8
Limerock Base (81`)(Primed)
SY
$0.00
9
Type S-III Asphaltic Concrete (1-1/2° Thick)
SY
$5.00
750
$3,750.00
. 10
Concrete Class I
CY
$0.00
11
Concrete Pavement (6" Thick)(dumpster pads)
SY
$35.00
65
$2,275.00
12
Catch Basin, Type D
EA
$2,000.00
4
$8,000.00
13
Pipe Culvert 94°)
LF
$35.00
60
$2,100.00
14
Exfiltration Trench (24")Includes Ballast Rock
LF
$85.00
100
$8,500.00
15
Concrete Curb & Gutter (Type "F)
LF
$14.00
975
$13,650.00
16
Concrete Sidewalk (6° Thicker
SY
$28.00
95
$2,660.00
17
Fencing
r-
LF
$18,00
80
$1,440.00
18
Sodding (Pensacola Bahia)(Inciudinp Watering
SY
$3.00
1,300
$3,900.00
19
Adjust and/or Relocate Existing Fire idrant
EA
$0.00
20
Dumpster Enclosure
EA
$3,000.00
6
$18,000.00
21
Roadside Sign
EA
$250.00
2
$500.00
22
Reflective Pavement Marker
EA
$4.00
20
$80.00
23
Pavement Markings
SF
$0.00
24
Solid Traffic Stripe 6° (Painted)
LF
' $1.00
, 980
$980.00
25
Solid Traffic Stripe 8" (Painted)
LF
$0.00
26
Solid Traffic Stripe 12" (Painted)
LF
$0.00
27
Solid Traffic Stripe 18" (Painted)
LF
$0.00
28
Solid Traffic Stripe 24" (Painted)
LF
$3.00
12
$36.00
29
$0.00
30
Conduit (2" P.V.C. Schedule 40)
LF
$5.00
500
$2,500.00
31
Service Load Center (Seconda y Voltage)
LS
$1,500.00
1
$1,500.00
32
Pull Box Sidewalk)
EA
$300.00
10
$3,000.00
33
Light Pole Complete
EA
$4,000.00
8
$32,000.00 .
34
Landscape
LS
$8,000.00
1
$8,000.00
35
irrigation
LS
$3 000.00
1
$3 000.00
Sub Total
Contingency 20%
Total
C:AOOCUME-UvrkeRILOCALS-11Tern Grand Promenade Iternuderromenede
$127,371.00
$25,474.20
$152,845.20
ITEM 5-5
JUL 15 20r
SEOPW/CRA
- 03- 62
City of Miami CRA •.
Grand Promenade Interim Improvements - Phase 2
ENE 1st Ave. to NE 2nd Ave.
Date: 06/12/03
TYLUHJ R No. 550023.xx
Item
Description
Unit
Unit Price
Quantity
Amount
1
Maintenance of Traffic
DAY
$100.00
30
$3,000.00
2
Clearing and Grubbing
AC
$2,000.00
1 2
. $4,000.00
3
T
$0.00
sin
lin
6
Tree Relocation
EA
$0.00
Tree Removal
EA
$200.00
5
$1,000.00
Earthwork
LS
$3,500.00
1
$3,500.00
7
Type "B" Stabilization (LBR 40)(12"Thick)
SY
"
$0.00
8
Limerock Base (8')(Primed)
SY
$0.00
9
TA•e S-III phalt$c Concrete (1-1/2" Thick)
SY
$5.00
750
$3,750.00
10
Concrete Class I
CY
$0.00
11
Concrete Pavement (6" Thick)(dumpster-pads)
SY
$35.00
65
$2,275.00
12
Catch Basin, Tyke D
EA
$21000.00
4
$8,000.00
13
Pipe Culvertg4')
LF
$35.00
60
$2,100.00
14
Exfiltration Trench (24') Includes Ballast Rock
LF
$85.00
100
$8,500.00
15
Concrete Curb & Gutter (Type "F")
LF
$14.00
980
$13,720.00
16
Concrete Sidewalk (6" Thick)
SY
$28.00
95
$2,660.00
17
Fencing
LF
$18.00
250
$4,500.00_,
$3,900.00
18
Sodding (Pensacola Bahia)(Including Watering)
SY
$3.00
1,300
19
Adjust and/or Relocate Existing Fire Hydrant
EA
$0.00_,
20
Dumpster Enclosure
EA
$3,000.00
6
$18,000.00
21
Roadside Sign
EA
$250.00
2
$500.00
• 22
Reflective Pavement Marker
EA
$4.00
20
$80.00
23
Pavement Markings
SF
$0.00
24
MI
26
Solid Traffic Stripe 6" (Painted
LF
' $1.00
980
,
$980.00
Solid Traffic Stripe 8" (Painted)
LF
$0.00
Solid Traffic Stripe 12" Painted)
LF
$0.00�
27
Solid Traffic Stripe 18" (Painted)
LF
$0.00
28
Solid Traffic Stripe 24" Painted)
LF
$3.00
12
$36.00
29
$0.00
30
Conduit.(2" P.V.C. Schedule 40)
LF
$5.00
500
$2,500.00 •
31
Service Load Center ( Secondary Voltage)
LS
$1,500.00
1
$1,500.00
32
Pull Box ( Sidewalk)
EA
$300.00
10
$3,000.00
33
Light Pole Complete
EA
$4,000.00
8
$32,000.00
34
Landscape
LS
$8,000.00
1
$8,000.00
35
Irri • ation
LS
$3,000.00
1
$3000.00
,
Sub Total
Contingency 20%
Total
C.IUOCUME-1IngranOLOCALS-11Templ(Grand Promenade Ilems.xs)Promenade
$130,501.00
$26,100.20
$15601.20
ITEM 3-5
JUL 15 2 O
SEOPW/CRA
3- G2
CityotatiamieRA
Grand Promenade interim Improvements - Phase 3
I NW ist Ave. to North Miami Ave.
Date: 06/12/03
TYLI/H"JR No. 550023.xx
Item .
Description
Unit
Unit Price
Quantity
Amount
1
Maintenance of Traffic
DAY
$100.00
30
$3,000.00
2
Clearing and Grubbing
AC
$2,000.00
2
$4,000.00
3
Railroad Track Demolition (Rail Cutting)
LF
$10.00 i
800
$8,000.00
4
Tree Relocation
EA
$0.00
5
Tree Removal
EA
$200.00
5
$1,000.00
6
Earthwork
LS
$3,500.00
1
$3,500.00
7
Type "B" Stabilization (LBR 40)(126-Mick)
SY
$0.00
8
Limerock Base (8")(Primed)
SY
$0.00
9
Type S-III Asphaltic Concrete (1-1/2' Thick)
SY
$5.00
550
$2,750.00
10
Concrete Class I
CY
$0.00
11
Concrete Pavement (6* Thick)(dumpster ads)
SY
$35.00
65
$2,275.001
$8 000.00
12
Catch Basin, Type D
EA
$2 000.00
4
13
Pipe Culvert (24")
LF
$35.00
60'
$2,100430
14
Exfiitration Trench (24") Includes Ballast Rock
LF
$85.00
100
$8,500.00
15
Concrete Curb & Gutter (Type"F')
LF
$14.00
980
$13,720.00.
16
Concrete Sidewalk (6" Thick)
SY
$28.00
95
$2,660.00
17
Fencing
.LF
$18.00
150
$2,700.00
18
Sodding(Pensacola Bahia)(Including Watering)
SY
$3.00
1,200
$3,600.00_;
19
Adjust and/or Relocate Existing Fire grant
EA
$0.00
20
Dumpster Enclosure
EA
$3,000.00
6
$18,000.00
21
Roadside Sign -
EA
$250.00
2
$500.00
22
Reflective Pavement Marker
EA
$4.00 .
20
$80.00
23
Pavement Markings
SF
$0.00
24
Solid Traffic Stripe 6" (Painted)
LF
' $1.00
` 980
$980.00
25
Solid Traffic Stripe 8' (Painted)
LF
$0.00
26
Solid Traffic Stripe 12" (Painted)
LF
$0.00
27
Solid Traffic Stripe 18" (Painted)
LF
$0.00
28
Solid Traffic Stripe 24' (Painted)
LF
$3.00
12
$36.00
29
$0.00
30
Conduit S2" P.V.C. Schedule 40)
LF
$5.00 '
500
$2,500.00 .
31
Service Load Center ( Secondary Voltage)
LS
$1,500.00
1
.___ $1,500.00
32
Pull Box ( Sidewalk)
EA
$300.00
10
, $3,000.00
33
Lgl t Pole Complete
EA
$4,000.00
8
$32,000.00
34
Landscape
LS
$8,000.00
1
$8,000.00
35
Irrigation
LS
$3,000.00
1
$3,000.00
Sub Total
Contingency 20%
Total
C:IDOCUME-1Mgra,i\LOCALS-11TempljGrand Promenade Hems.xls]P;omc,
$135,401.00
$27,080.20
$162,481.20
ITEM S-5
JUL -
sEOPWl CRA
03-- 62