Loading...
HomeMy WebLinkAbout1359 Submittal-FDOT-1395 ReconstructionSubmitted into the public record in connection with Item, on 12- 0-I (a Todd B. Hannon Clerk of the Board 1-395 Recon'4 ruction SR 836 Improvements k95PvemeJfl 135q-Subrni - FD01- 1-3615 &con5iyudio-ri Submitted into the public record in connection with Item 0Q on J 6t-14- iv Todd B. Hannon Clerk of the Board Project Location • FPID 251688-1-52-01: 1-395 Reconstruction ▪ FPID 429300-1-52-01: 1-95 Pavement Reconstruction • FPfD 423126-2-52-01: SR 836 WB Connector r'41.3 4 J I, 6-1-52-0 i. i`v'dV i kvt'riue Lo I',,+'i otown • Department Project • MDX Pro' SAFE LQYVENBE HT RELIABLE. Submitted into the public record in connection with item on f Q-1 q-/la Todd B. Hannan Clerk of the Board Expected Timeline and Schedule • Advertisement Date — February 8, 2016 • Shortlist Proposers —April 18, 2016 • Final Aesthetic Signature Bridge — June 20, 2016 • Public Meeting to Pass/Fail —August 19, 2016 • Technical Proposal Due — February 14, 2017 • Price Proposal Due —April 10, 2017 • Anticipated Award Date — May 11, 2017 • Anticipated Execution Date — July 27, 2017 • Anticipated Construction Start Date — Fall 2017 SA fC CGNVfN'CNI Iff116E41I Submitted into the public record in connection with , Item on 4-1!47 Todd B. Hannon Clerk of the Board Project Funding • FPID 251688-1-52-01: 1-395 Reconstruction: $555M • FPID 429300-1-52-01: 1-95 Pavement Reconstruction: $ 25M • FPID 423126-2-52-01. SR 836 WB Connector $ 35M • FPID 423126-1-52-01: NW 17Avenue to Midtown $186M • Department Project • MDX Projec Construction Timeline • Begin construction late 2017 • Construction Duration is estimated to be 5 years FDDT vim( SAFE CCNVENIrN1 • c611e Submitted into the public record in connection with Item a on i 1y/_j(p Todd B. Hannon Clerk of the Board Project Needs • Increase capacity to prevent future traffic congestion • Improve safety by alleviating existing operational and geometric deficiencies; eliminate left hand entrance/exit ramps • Improve local access to and from 1-395 • Reduce evacuation time from Miami Beach • Existing structures not designed to carry additional capacity S4{E [VW/EWE FU RL Lr AEILC FDOT =,41"P: CONVE N!! 41 RE ueui I Submitted into the public record in connection with Item6.on 14-f`-f(p Todd B. Hannon Clerk of the Board Submitted into the public record in connection with Item on J&-114--) , Todd B. Hannon Clerk of the Board Roadway Design - Alignment LEGEN-D 6FAIf.L1'vL! acuIP rKIL1uL 1111 s Fr,NA'I, 119k1oc1 - I4FIKII (IVER 3aincx IiAIY.LLvf ! AAMW EM9nNKMhT El Alt I tRIAL; LC1lAL A147 uh5u131FL11e4Ci ARIfR Iat i if]CA! HEe.:1.5.S]%I:If-1N5h SAi I. CI]NVE N,EN k6 Lltitil F. Looking SB Along Biscayne FDOT GLCC CflNVE NIF Ni. RL LIALiLC. Submitted into the public record in connection with Item on 12-1 Li--I(ca Todd B. Hannon Clerk of the Board 1-395 Aerial View FDOT SAIL Ci7NYENIEN1. RELIABLE. Submitted into the public record in connection with Item on 1—14-1!- 11 Todd B. Hannon Clerk of the Board Submitted into the public record in connection with Item o? on 0-1 4-14, Todd 8. Hannon Clerk of the Board 1-395 Streetscape SdfL LaNV[NILN1. q[LI4aLC 1-395 Streetscape - Zone 1 FDOT ►S.''1DX 5.FE. CON YENIENT. FEi4I AHL E. • Submitted into the public record in connection with Item,9 on 19-i - t Todd B. Hannon Clerk of the Board Submitted into the public record in connection with Item el on 12-) -1(, Todd B. Hannon Clerk of the Board Existing Condition — NWi4th Street EastView 3aP( COM4f MIENT Rt LIABLE. 1-395 Streetscape — Zone 1 (East View) FOOT 5.Aft LcNVENI[N1. Nf. LIpHLL. Submitted into the public record in connection with Item c/on 102414--U' Todd B. Hannon Clerk of the Board Submitted into the public record in connection with Item 02 on 1r -N`i ) Todd B. Hannon Clerk of the Board 1-395 Streetscape — Zone 1 (East View) r4 bx.. SAFE CONVENiEN RELIABLE. 1-395 Streetscape - Zone 2 FDDT • • • SAFE LW:YEMENI, RE/MU. • Submitted into the public record in connection with Item on I.^i'-j-j, Todd B. Hannon Clerk of the Board Submitted into the public record in connection with Item on )02- 4- (0 Todd B. Hannon Clerk of the Board Existing Condition — N Miami Avenue (North View) F Firato . sai E r,unr[N Oti auuUL e. 1-395 Streetscape —Zone 2 (EastView) FDOT WC CONw1Ni EN1 Rf L1ABLE. Submitted into the public record in connection with Item .P on ) - f'-j-ICI Todd B. Hannon Clerk of the Board 1-395 Streetscape — Zone 2 (WestView) FDOT AVES. CDNVENrOMT RELIABLE. Submitted into the public record in connection with Item on 1.2-I q-1 Ia Todd B. Hannon Clerk of the Board 1-395 Streetscape - Zone 3 FDOT r.4r413x, SAFE Con VErviCril. RELiI4LE. Submitted into the public record in connection with Item 2 on I Q—I q_-1 Todd B. Hannon Clerk of the Board Existing Condition — NE 2nd Avenue (North View) FDOT •,.AF[. CBNVEN,EHT RELIABLE. Submitted into the public record in connection with Item on I -I4-) 4 o Todd B. Hannon Clerk of the Board 1-395 Streetscape — Zone 3 (West View) FOOT $ATI. CBHY-MWEN NEL,RBLf. Submitted into the public record in connection with Item on J L_)& Todd B. Hannon Clerk of the Board 1-395 Streetscape — Zone 3 (EastView) FOOT SAFE CONKNIFN'T RELIABLE. Submitted into the public record in connection with Item 2 on Todd B. Hannon Clerk of the Board Submitted into the public record in connection with Item 2 on JP-)-1 Todd B. Hannon Clerk of the Board Ibx Submitted into the public record in connection with Item cR on 12--) c{ -Po Todd B. Hannon Clerk of the Board MDX 83611- Project Description • From the NW 17th Ave Interchange to the SR 836/ I-95/ 1-395 Interchange (Midtown Interchange) or approximately 1.4 miles FDOT rbx Safi C IINYE NIENI .tl i::,i I MDX 83611 - Scope ...........I. - FD OT ► DX SAFE CONVEN,ENr. R E L.AE&r Submitted into the public record in connection with Item on 04'44 ' Todd B. Hannon Clerk of the Board FDOT r, x '+All i.GNYIN'IIII INTERSTATE Submitted into the public record in connection with Item a on 10-1+-E I Todd B. Hannon Clerk of the Board 1-95 Pavement Reconstruction • NW 8th Street to NW 29th Street — 1.6 miles 440,0112. 1_ CI.k0P1 IM!•..MY MraY#er1..• '! ..OW •pa. 1. Y•R+ 4 py4[Y Lv.-.4,1 "M 1 MVr+ i FD&IN bx SAFE COM'VEN.LN% Err 1.1.49Lr. Submitted into the public record in connection with Item a2 on 10 -I i4 -! (a Todd B. Hannon Clerk of the Board Submitted into the public record in connection with Item .2 on la-1'-Ir/Go Todd B. Hannon Clerk of the Board Lane Closure Times — 1-395 During Construction • Mainline Single Lane: • 10:00 p.m. — 5:30 a.m. (Sunday — Friday) • 1:00 a.m. — 7:00 a.m. (Saturday and Sunday) • Mainline Multiple Lanes: • 12:00 a.m. 5:30 a.m. (Monday — Friday) • 2:00 a.m.— 7:00 a.m. (Saturday and Sunday) • Ramps: • 10:00 p.m. — 6:30 a.m. (Sunday — Friday) • 11:00 p.m. — 7:00 a.m. (Friday — Saturday) • 11:00 p.m. — 7:00 a.m. (Saturday — Sunday) FD©T riX SArr fDNYLtiq MT BEL14CiLL FDOT Lane Closure Times During Construction - SR 836 • Mainline Single Lane: • 8:00 p.m. — 5:30 a.m. (Sunday — Friday) • 8:30 p.m. — 9:00 a.m. (Friday — Saturday) • 8:30 p.m. — 11:00 a.m, (Saturday — Sunday) Mainline Multiple Lanes: • 8:00 p.m. — 5:30 a.m_ (Sunday — Friday) • 11:00 a.m. — 7:00 a.m. (Friday — Saturday) • 11:30 a.m.— 8:30 a.m. (Saturday and Sunday) • Ramps: • 10:00 p.m. — 6:30 a.m. (Sunday — Friday) • 11:00 p.m. — 7:00 a.m. (Friday — Saturday) • 11:30 p.m. — 7:00 a.m. (Saturday — Sunday) ►, 13x' 50.FF Cfr.'il N•::'EI qs,.;.=i; Submitted into the public record in connection with Item v2 on L Todd B. Hannon Clerk of the Board During Construction -1-95 • Mainline Single Lane: • 9:00 p.m. — 5:30 a.m. (Sunday — Friday) • 11:00 p.m. — 11:00 a.m. (Friday — Saturday) • 11:00 p.m. — 11:00 a.m. (Saturday — Sunday) • Mainline Multiple Lanes and Ramps: • 10:00 p.m. — 5:30 a.m. (Sunday — Friday) • 11:00 p.m.— 11:00 a.m. (Friday— Saturday) • 11:00 p.m.— 11:00 a.m. (Saturday — Sunday) Submitted into the public record in connection with Item vl on 12-14-49 Todd B. Hannon Clerk of the Board Community Outreach • Project Office Located at 1035 NW 3rd Avenue in Overtown • Community Outreach (Total of 19) • Home Owners Association • Neighborhood Associations/Alliance • School Outreach • Dunbar Elementary School • North Beach Elementary School • Jose de Diego Elementary School • Booker T Washington High School ■ Florida International University, Senior Design Class FDO ►, Tax SAFE CONFEME N N{LIApLE. Dunbar Elementary School ► X' SAFE CONVENIENT RELIABLE. Submitted into the public record in connection with Item ton )-I`i-1ty Todd B. Hannon Clerk of the Board North Beach Elementary School Booker T Washington High School Submitted into the public record in connection with Item c on 1 _-I;1-1(v Todd B. Hannan Clerk of the Board Questions Project Website: www.I-395Miami.com Project Manager: Maria I. Perdomo, P.E. Questions: maria. perdomo, dot.state.fl. us FDOT IprDX SLfl CO NYENIENi RLLiA13L1